WO2020133725A1 - 岩样保真取芯系统 - Google Patents
岩样保真取芯系统 Download PDFInfo
- Publication number
- WO2020133725A1 WO2020133725A1 PCT/CN2019/078288 CN2019078288W WO2020133725A1 WO 2020133725 A1 WO2020133725 A1 WO 2020133725A1 CN 2019078288 W CN2019078288 W CN 2019078288W WO 2020133725 A1 WO2020133725 A1 WO 2020133725A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- core
- section
- shear pin
- valve
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/02—Core bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels or core extractors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels or core extractors
- E21B25/10—Formed core retaining or severing means
Definitions
- the core is an important material for discovering oil and gas layers and studying strata, oil-generating layers, oil reservoirs, caprocks, structures, etc.
- the core Through the observation and study of the core, you can directly understand the lithology and physical properties of underground rock layers And the characteristics of oil, gas and aquatic conditions.
- the core taking tool includes a core drilling tool and a core catcher. After the core drilling tool is cut into the formation, the core catcher is used to keep the core in the inner cylinder.
- the existing core catcher can only take soft rock and hard rock. In addition, the cooling speed of the blade of the existing core drilling tool is slow, the wear of the cutter is fast, and the service life of the blade is short.
- Downhole temperature is high, electrical equipment can not be used, hydraulic equipment is often used. Before the hydraulic equipment is started, the liquid flow path needs to be blocked. After the start, the liquid flow path should be unblocked, provide hydraulic pressure to the working parts, drive the hydraulic motor, and cold remove the drill bit .
- the rock sample fidelity coring system disclosed in the present invention includes a drive module, a fidelity module and a coring module connected in sequence, the core coring module, a core drilling tool, a core sample storage barrel, and the fidelity module includes
- the driving module includes a core drilling rig, and the core drilling rig includes a liquid channel;
- the core barrel is sleeved on the inner core barrel, the upper end of the inner core barrel communicates with a liquid nitrogen storage tank, the liquid nitrogen storage tank is located in the outer core barrel, and the accumulator communicates with the outer core core barrel.
- the outer core barrel is equipped with a flap valve;
- the liquid channel includes a liquid channel starting mechanism.
- the liquid channel starting mechanism includes a lock body, a locking rod, a shear pin, and a center rod.
- the lock body penetrates back and forth, and the lock body is followed by a locking section, a sealing section, and a sealing section.
- the side wall of the locking section has a shear pin hole, and the shear pin hole is a through hole.
- the locking rod penetrates forward and backward, the locking rod is in the lock body, and the locking rod is the connecting section, the outflow section, the closing section and the
- the inflow section has a groove on the outer wall of the connecting section, the length of the shear pin is greater than the depth of the shear pin hole on the side wall of the lock body, the shear pin is in the shear pin hole and the groove, the sidewall of the outflow section has an outflow hole, inflow
- the side wall of the segment has an inflow hole
- the central rod is in the locking rod
- the inner diameter of the sealing segment is equal to the outer diameter of the closed segment
- the inner diameter of the fluid channel segment is greater than the outer diameter of the locking rod
- the inner diameter of is greater than the outer diameter of the center rod
- the inner diameter of the closed section is equal to the outer diameter of the center rod
- the axial distance from the front end of the seal section to the rear end of the lock body is less than the axial
- the outer core tube and the outer wall of the drill bit are provided with spiral grooves, and the spiral groove on the drill bit is continuous with the spiral groove on the outer core tube.
- the sealing flap includes an elastic sealing ring, an elastic connecting strip, a sealing member and a plurality of locking strips arranged in parallel in sequence, the elastic connecting strip connects all the locking strips in series and the elastic sealing ring hoops all the locking strips together
- the integral structure is formed, and the locking strip has a clamping groove adapted to the elastic sealing ring, the elastic sealing ring is installed in the clamping groove, a sealing member is provided between two adjacent locking strips, and one end of the valve flap is movably connected to the valve through a limiting hinge
- the upper end of the seat; the valve flap is arc-shaped when it is not turned down, and the valve flap fits with the outer wall of the inner core barrel; when the valve flap is turned down, it is flat and covers the upper end of the valve seat.
- the electric heater is a resistance wire
- the resistance wire is embedded in the inner wall of the outer core barrel, and the resistance wire is coated with an insulating layer; the inner wall of the inner core barrel is attached with a graphene layer; the inner core core The upper part of the cylinder is filled with dripping film-forming agent.
- the shear pin head includes a big head and a small head, the big head faces outward, and the outer diameter of the big head is larger than the outer diameter of the small head.
- the shear pin hole includes an outer section and an inner section.
- the section hole diameter is not less than the shear pin head big head diameter
- the inner section hole diameter is not less than the shear pin head small head outer diameter
- the inner section hole diameter is smaller than the big head outer diameter
- the outer section depth is not less than the big head length
- the sum of the small head and the shear pin tail length is greater than Inner depth.
- the invention can automatically pressurize the fidelity cabin, which is helpful for the core to maintain its state in the in-situ environment.
- the flip mechanism of the present invention can automatically close the fidelity cabin when the core is taken, the structure is simple, safe and reliable.
- the mechanical jaw of the present invention is designed to face upwards and gather inwards. When the jaws are descending, the jaws are easily spread by the core, so that the core enters the inner core barrel; when the jaws are ascending, the jaws are difficult Be stretched by the core, because the core can not resist the large pulling force and the clamping effect of the jaws, the core is broken at the jaws, the broken core will continue to go up with the jaws to keep it in the inner cylinder;
- the shear pin fixes the locking rod, the outflow hole is in the sealing section, the outer wall opening of the outflow hole is blocked, and the liquid cannot flow out.
- the hydraulic pressure provided by the rear mud pump reaches the starting value, the shear pin is broken, and the locking rod moves forward , The liquid flows through the outer wall of the central rod and the inner wall of the connecting section, and the inner wall of the outlet section enters the inner wall of the liquid passage section and the outer wall of the inflow section through the outflow hole, and flows into the outer wall of the central rod and flows in through the inflow hole
- the liquid flow channel formed by the inner wall of the segment communicates with the hydraulic motor in front and the drill bit, starts the hydraulic motor, and cools the drill bit;
- the outer diameter of the protrusion is larger than the inner diameter of the sealing section, limiting the distance that the locking rod moves forward, so that the locking rod does not move forward after reaching the working position;
- the locking hole A and the locking hole B cooperate with the fixing screw to limit the circumferential rotation
- the shear pin head includes a large head and a small head, and the shear pin hole includes an outer section and an inner section, which can restrict the shear pin from moving radially inward.
- Figure 1 is a schematic diagram of the structure of the present invention
- FIG. 10 is a schematic structural view of the outer drill body
- FIG. 11 is a schematic structural view of the inner drill body
- FIG. 13 is a schematic structural view when the flap valve has been turned down
- Figure 18 is a schematic diagram before the start of the liquid channel
- Figure 19 is a schematic diagram after the liquid channel is started.
- the core catcher 11 includes an annular base 111 and a plurality of jaws 112.
- the jaws 112 are evenly arranged on the annular base 111, the lower end of the jaw 112 is connected to the annular base 111, and the upper end of the jaw 112 is inward Collapse.
- the number of the claws 112 can be set as needed, and is not limited to the above number.
- the claw 112 includes an integrally made vertical arm 1121 and a tilting arm 1122.
- the lower end of the vertical arm 1121 is connected to the ring-shaped base 11, the upper end of the vertical arm 1121 is connected to the lower end of the tilting arm 1122, and the upper end of the tilting arm 1122 is a free end.
- the arm 1122 tilts inward from bottom to top, and the tilt of the tilt arm 1122 can be adjusted as needed.
- the tilt angle of the tilt arm 1122 is 60°, and the width of the claw 112 gradually decreases from bottom to top.
- the drill bit 14 is a PCD tool. As shown in FIGS. 8 and 9, the drill bit 14 includes an inner drill bit 141 and an outer drill bit 142, and the inner drill bit 141 includes a first-stage blade 1411 and a hollow inner drill blade body 1121412. As shown in FIG. 11, the lower end of the inner drill blade body 1121412 has a first-stage blade mounting groove 1413 for installing the first-stage blade 1411. The first-stage blade mounting groove 1413 is opened at the lower end surface of the inner drill blade body 1121412. The inner drill blade The body 1121412 has a coolant circuit hole 15 at the first-stage blade mounting groove 1413.
- the coolant circuit hole 15 is an arc-shaped hole that opens to the front end surface of the drill bit 4 and communicates with the first-stage blade mounting groove 1413.
- the inner drill body 1121412 is provided with three first-level blade mounting grooves 1413 at equal intervals in the circumferential direction. Each first-level blade mounting groove 1413 is provided with a coolant circuit hole 15 and each first-level blade mounting groove 1413 The first-stage blade 1411 is installed in both.
- the outer drill bit 142 includes a second-stage blade 1421 and a hollow outer drill body 1422.
- the outer wall of the second-level blade 1421 has a second-level blade mounting groove 1423 for installing the second-level blade 1421, and the coolant return hole 15 is located at the second-level blade mounting groove 1423 on the outer drill body 1422.
- the coolant circuit hole 15 is a bar-shaped hole, and the bar-shaped hole communicates with the second-stage blade mounting groove 1423.
- the outer drill blade body 1422 is provided with three second-level blade mounting grooves 1423 at equal intervals in the circumferential direction. Each second-level blade mounting groove 1423 is provided with a coolant circuit hole 15 and each second-level blade mounting groove 1423 Both are equipped with a second-stage blade 1421.
- the inner drill bit 141 is installed in the outer drill bit 142.
- the outer drill body 1422 has a first-level blade avoidance gap 1424 corresponding to the first-level blade 1411.
- the first-level blade escape gap 1424 opens at the front end surface of the outer drill bit 142.
- the cutting edge of the first-level blade 1411 is exposed to the outer drill body 1422 from the first-level blade escape gap 1424.
- the core In operation, as the drill bit 14 is drilled, the core enters the inner core tube 12 and passes through the middle of the core catcher 1. When the core passes through the hard jaw 112, the jaw 112 will be spread; Later, when pulling up, the claw 112 moves upward with the inner core tube 12, because the free end of the claw 112 is retracted, the claw 112 is difficult to be opened by the core at this time, because the core cannot resist the large pulling force and the card With the retracted clamping of the free end of the claw 112, the core is pulled off at the claw 112, and the broken core will continue to ascend with the claw 112 to remain in the inner core tube 12.
- the flap valve 23 includes a valve seat 236 and a valve flap 237.
- the valve flap 237 includes an elastic sealing ring 234, an elastic connecting strip 232, a sealing member, and a plurality of locking strips arranged in parallel in sequence 235, the elastic connecting strip 232 connects all the locking strips 235 in series and the elastic sealing ring 234 hoops all the locking strips 235 together to form an integral structure.
- the locking strip 235 has a clamping groove 231 adapted to the elastic sealing ring, the elastic sealing ring 234 is installed in the clamping slot 231, a seal is provided between two adjacent locking bars 235, one end of the valve flap 23 is movably connected to the upper end of the valve seat 236 through a limiting hinge 233; the valve flap 237 is arc-shaped when not turned down, The valve flap 237 is attached to the outer wall of the inner core barrel 28; when flapped, the valve flap 237 is flat and covers the upper end of the valve seat 236.
- the inner wall of the outer core barrel 26 is provided with a sealing cavity 239, which is in communication with the inner core barrel 28.
- the inner core barrel 28 is made of PVC, the inner wall of the inner core barrel 28 is attached with a graphene layer 281, and the upper part of the inner core barrel 28 is filled with a dripping film-forming agent 282.
- the control part also includes a pressure sensor 27, a three-way shut-off valve A2210, two ports of the three-way shut-off valve A2210 are connected to the accumulator 229 and the outer core 26 respectively, and a third port of the three-way shut-off valve A2210 is connected to a pressure relief valve In 2211, the three-way cut-off valve A2210 is an electrically controlled valve.
- the pressure sensor 27 and the three-way cut-off valve A2210 are connected to the processing unit 224.
- the pressure sensor 27 is used to detect the pressure in the fidelity cabin.
- the invention also includes a pressure gauge 2212, which communicates with the outer core barrel through the three-way shut-off valve B213.
- the starting mechanism includes a lock body 33 that penetrates back and forth.
- the lock body 33 includes a locking section 331, a sealing section 332, and a liquid passage section 333 in order from the rear to the front.
- the pin hole and the shear pin hole are through holes, and further include a locking rod 32 that penetrates back and forth.
- the locking rod 32 is in the lock body 33.
- the locking rod 32 is a connecting section 321, an outflow section 322 in order from back to front.
- the closing section 323 and the inflow section 324, the connecting section 321 and the outflow section 322 are screwed, the closing section 323 and the inflow section 323 are welded, the outer wall of the connecting section 321 has a groove 3212, the groove 3212 is an annular groove, and the starting mechanism further includes a shear pin 35 , The length of the shear pin 35 is greater than the depth of the shear pin hole, the shear pin 35 is in the shear pin hole and groove 3212, the outflow section 322 has an outflow hole 3221 on the side wall, the outflow hole 3221 is inclined forward from inside to outside, and there are multiple outflow holes 3221 , A plurality of outflow holes 3221 are evenly distributed along the radial circumference, an inflow hole 3241 is formed on the side wall of the inflow section 324, and there are a plurality of inflow holes 3241, the inflow holes 3241 are distributed on different sides of the inflow section 324, and the starting mechanism further includes a central rod 31 , The central
- the lock nut 34 includes a fixed section and a threaded section.
- the outer diameter of the protrusion 3211 behind the connecting section 321 is smaller than the inner diameter of the fixed section 3211.
- the inner diameter of the threaded section is equal to the outer diameter of the locked section 331,
- the lock nut 34 has an axial locking hole A, the locking hole A is a shear pin hole, the locking body 33 has a locking hole B at the rear end surface, and the locking hole B is a blind hole , Locking hole A and
- the locking holes B are paired, and further include a fixing screw 36 whose length is greater than the depth of the locking hole A.
- the fixing screw 36 is in the locking hole A.
- the front end of the fixing screw 36 is inserted into the locking hole B through the locking hole A.
- the shear pin 35 Before starting, the shear pin 35 is inserted into the groove 3212 through the shear pin hole, the axial distance from the outer wall opening of the outflow hole 3221 to the rear end of the lock body 33 is smaller than the axial distance from the rear end of the liquid passage section 333 to the rear end of the lock body 3, the outflow hole 221 The opening of the outer wall is closed by the sealing section 332, and the liquid cannot flow forward.
- the rear end of the lock lever 32 is impacted, the shear pin 35 is cut off, and the shear pin 35 is broken into the shear pin head 351 and the shear pin
- the tail 352 the shear pin head 351 is in the shear pin hole, the shear pin tail 352 is in the groove 3212, the locking rod 32 moves forward, the axial distance from the outer wall opening of the outflow hole 3221 to the rear end of the lock body 33 is greater than the rear end of the liquid passage section 333
- the outflow section inner cavity 371 and the liquid passage section inner cavity 372 communicate with each other through the outflow hole 3221, the liquid passage communicates, and the liquid enters the liquid flow passage and flows forward to drive the front hydraulic motor and cooling drill bit.
- the shear pin head 351 includes a big head and a small head, with the big head facing outward, the outside diameter of the big head is larger than the outside diameter of the small head, the shear pin hole includes the outer section and the inner section, the outer diameter of the outer section is not smaller than the outer diameter of the big head, and the inner diameter of the inner section is not smaller than the outer diameter of the small head.
- the diameter of the inner section is smaller than the outer diameter of the large head, the depth of the outer section is not less than the length of the large head, and the sum of the length of the small head and the tail of the shear pin 352 is greater than the depth of the inner section.
- the rear end of the segment 321 is 15mm
- the front end of the groove 212 is 27.8mm from the rear end of the connecting segment
- the width of the groove 3212 is 5.5mm
- the front end of the groove 3212 is 73mm from the front end of the connecting segment 321
- the side wall of the connecting segment 321 also has a through hole with an aperture of 8mm
- the center of the through hole is 65mm away from the front end of the connecting section 321
- the outer diameter of the thread at the front end of the connecting section 321 is 43mm
- the thread is M45 ⁇ 1.5mm
- the length of the screw connection between the connecting section 321 and the outflow section 322 is 39mm.
- the outer diameter of the outflow section 322 and the closed section 323 are 50mm, the inner diameter of the outflow section 322 is 36mm, the diameter of the outflow hole 3221 is 8mm, the angle between the outflow hole 3221 and the axial direction is 45°, and the front end of the outer wall opening of the outflow hole 3221 is behind the outflow section 322 152mm at the end, there are 6 outflow holes 3221, the total length of the outflow section 322 and the closed section 323 is 196mm, the inner diameter of the closed section 323 is 25mm, the diameter of the inflow hole 3241 is 16mm, and there are 4 inflow holes 3241, respectively on 4 sides and 4 inflows
- the distance between the center of the hole 3241 and the rear end of the inflow section 24 is 39 mm, 55 mm, 71 mm, and 87 mm, the inner diameter of the inflow section 24 is 40.5 mm, the outer diameter of the inflow section 24 is 44.5 mm, and the outer diameter of the center rod 31 is 25
- the outer diameter of the locking section 331 is 82mm, the inner diameter is 56mm, the center of the shear pin hole is 8mm from the rear end of the locking section 331, the locking section 331 is 56mm long, the outer diameter of the shear pin hole is 8mm, 5mm deep, the inner diameter of the hole is 5mm, depth It is 8 mm, the outer diameter of the sealing section 332 is 99.6 mm, the inner diameter is 50 mm, the length of the sealing section 32 is 176 mm, and the inner diameter of the liquid passage section 333 is 70 mm.
- the total length of the shear pin 35 is 16.5mm, the shear pin head 351 is 3.5mm long, the outer diameter is 7mm, the shear pin head 351 is small and the outer diameter is 4.8mm, the sum of the length of the shear pin head 351 and the shear pin tail 352 is 13mm
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Sampling And Sample Adjustment (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Earth Drilling (AREA)
Abstract
一种岩样保真取芯系统,包括依次连接的驱动模块(300)、保真模块(200)和取芯模块(100),取芯模块(100)包括岩芯钻取工具、岩芯样品存储筒,保真模块(200)包括岩芯样品保真舱,驱动模块包括取芯钻机,取芯钻机包括液道;岩芯样品保真舱包括内取芯筒(28)、外取芯筒(26)和蓄能器(229),外取芯筒(26)套在内取芯筒(28)上,内取芯筒(28)上端连通液氮存储罐(225),液氮存储罐(225)位于外取芯筒(26)内,蓄能器(229)连通外取芯筒(26),外取芯筒(26)设有翻板阀(23)。该系统有利于岩芯保持其在原位环境下的状态,提高钻进速度,提高取芯效率。
Description
本发明涉及油气田勘探领域,尤其涉及岩样保真取芯系统。
在油田勘探过程中,岩芯是发现油气层和研究地层、生油层、储油层、盖层、构造等的重要资料,通过对岩芯的观察研究,可以直接地了解地下岩层的岩性、物性和含油、气、水产状特征。油田投入开发后,要通过岩芯进一步研究和认识油层沉积特征,储层的物性、孔隙结构、润湿性、相对渗透率、岩相特征,油层物理模拟和油层水淹规律;认识和掌握不同开发阶段、不同含水阶段油层水淹特征,搞清剩余油分布,为油田开发方案设计,层系、井网调整和加密井提供科学依据。
取岩芯是在钻井过程中使用特殊的取芯工具把地下岩石成块地取到地面上来,这种成块的岩石叫做岩芯,通过它可以测定岩石的各种性质,直观地研究地下构造和岩石沉积环境,了解其中的流体性质等。在矿产勘探和开发过程中,需要按地质设计的地层层位和深度,开展钻进工作,向井内下入取芯工具,钻取出的岩芯样品,并存储在岩芯存储舱中,在设备上升过程中,岩芯存储舱的温度、压力等环境参数会降低,使得岩芯不能保持其在原位环境下的状态。
取芯工具包括取芯钻具和捕芯器,取芯钻具切割进入地层后,用捕芯器将岩芯保持在内筒中,现有的捕芯器只能取软岩,难以取硬岩。此外,现有的取芯钻具的刀片冷却速度慢,刀具的磨损快,刀片的使用寿命短。
井下温度高,电气设备无法使用,常使用液压设备,液压设备启动前,需阻断液体流道,启动后,应使液体流道畅通,向工作部件提供液压,驱动液压马达,冷去钻机钻头。
发明内容
本发明旨在提供一种岩样保真取芯系统,有利于岩芯保持其在原位环境下的状态,并且可以提高钻进速度,提高取芯效率,液道启动机构启动前,阻断液体流道,启动后,向工作部件提供液压。
为达到上述目的,本发明是采用以下技术方案实现的:
本发明公开的岩样保真取芯系统,包括依次连接的驱动模块、保真模块和取芯模块,所述取芯模块岩芯钻取工具、岩芯样品存储筒,所述保真模块包括岩芯样品保真舱,所述驱动模块包括取芯钻机,所述取芯钻机包括液道;
所述岩芯钻取工具包括取芯钻具、捕芯器和内芯管,取芯钻具包括外芯管和空心的钻头,钻头与外芯管的下端连接;所述捕芯器包括环形基体和多个卡爪, 环形基体同轴安装在内芯管下端的内壁上,卡爪均匀设置在环形基体上,卡爪下端与环形基体连接,卡爪上端向内收拢;所述内芯管下端伸向外芯管底部,内芯管与外芯管间隙配合;
所述岩芯样品存储筒包括岩芯筒、钻机外筒、翻板阀和触发机构,翻板阀包括阀座和密封阀瓣,阀座同轴安装在钻机外筒内壁上,密封阀瓣一端与阀座上端外侧壁活动连接,阀座顶部有与密封阀瓣匹配的阀口密封面;所述岩芯样品保真舱包括内取芯筒、外取芯筒和蓄能器,所述外取芯筒套在内取芯筒上,所述内取芯筒上端连通液氮存储罐,所述液氮存储罐位于外取芯筒内,所述蓄能器连通外取芯筒,所述外取芯筒设有翻板阀;
所述液道包括液道启动机构,所述液道启动机构包括锁体、锁定杆、剪销、中心杆,所述锁体前后贯通,锁体从后至前依次为锁定段、密封段和液道段,锁定段侧壁有剪销孔,剪销孔为通孔,所述锁定杆前后贯通,锁定杆在锁体内,锁定杆从后至前依次为连接段、流出段、封闭段和流入段,连接段外壁有凹槽,所述剪销长度大于锁体侧壁上的剪销孔深度,所述剪销在剪销孔和凹槽内,流出段侧壁开有流出孔,流入段侧壁开有流入孔,所述中心杆在锁定杆内,所述密封段内径等于封闭段外径,所述液道段内径大于锁定杆外径,所述连接段、流出段和流入段的内径大于中心杆外径,所述封闭段内径等于中心杆外径,所述密封段前端到锁体后端的轴向距离小于封闭段前端到锁体后端的轴向距离,液道段内腔与流入段内腔通过流入孔连通,剪销穿过剪销孔嵌入凹槽,流出孔外壁开口到锁体后端的轴向距离小于液道段后端到锁体后端的轴向距离。
进一步的,所述岩芯样品保真舱还包括电加热器、温度传感器、设于内取芯筒与液氮存储罐之间的电控阀、压力传感器、设于蓄能器与外取芯筒之间的三通截止阀A,所述三通截止阀A的两个端口分别连接蓄能器和外取芯筒,三通截止阀A的第三端口连接泄压阀,三通截止阀A为电控阀,所述温度传感器、压力传感器连接处理单元,所述电加热器、电控阀、三通截止阀A均受控于处理单元,所述电加热器用于对外取芯筒内部加热,所述温度传感器用于检测保真舱内的温度,所述压力传感器用于检测保真舱内的压力。
优选的,所述钻头包括用于钻孔的第一级刀片和用于扩孔的第二级刀片,钻头包括内钻头和外钻头,所述内钻头安装在外钻头内,第一级刀片位于内钻头下端,第二级刀片位于外钻头外侧壁上,所述第一级刀片在圆周方向等间隔设有三个,第二级刀片在圆周方向等间隔设有三个,钻头上第一级刀片和第二级刀片处均设有冷却液回路孔。
优选的,所述外芯管和钻头外壁均设有螺旋槽,钻头上的螺旋槽与外芯管上的螺旋槽连续。
优选的,所述卡爪包括一体制造的竖直臂和倾斜臂,所述竖直臂下端与环形基体连接,竖直臂上端与倾斜臂的下端连接,倾斜臂的上端为自由端,倾斜臂从下往上向内倾斜,倾斜臂的倾斜角为60°。
优选的,所述密封阀瓣包括弹性密封圈、弹性连接条、密封件和多个依次平 行排列的锁条,弹性连接条将所有锁条串连并由弹性密封圈将所有锁条箍在一起形成整体结构,锁条上有与弹性密封圈适配的卡槽,弹性密封圈装在卡槽中,相邻两个锁条间设有密封件,阀瓣一端通过限位铰链活动连接在阀座上端;所述阀瓣在未翻下时为弧形,阀瓣与内取芯筒的外壁贴合;阀瓣在翻下时为平面并盖住阀座上端。
进一步的,所述外取芯筒内壁设有密封腔,所述翻板位于密封腔,所述密封腔与内取芯筒连通;所述外取芯筒内壁设有密封圈,所述密封圈位于翻板阀的下方。
优选的,所述电加热器为电阻丝,所述电阻丝嵌装在外取芯筒的内壁,电阻丝涂覆绝缘层;所述内取芯筒的内壁附着石墨烯层;所述内取芯筒上部填充滴水成膜剂。
优选的,所述锁定段内径大于密封段内径,所述连接段外壁有凸起部,凸起部外径大于密封段内径,连接段凸起部前方外径等于密封段内径,所述凹槽在凸起部;所述流出孔由内向外向前倾斜;所述连接段与流出段螺纹连接,所述封闭段和流入段焊接;启动后,锁定杆前移,剪销剪断,剪销头在剪销孔内,剪销尾在凹槽内,所述剪销头包括大头和小头,大头朝外,大头外径大于小头外径,所述剪销孔包括外段和内段,外段孔径不小于剪销头大头外径,内段孔径不小于剪销头小头外径,内段孔径小于大头外径,外段深度不小于大头长度,小头与剪销尾长度的和大于内段深度。
进一步的,所述启动机构还包括锁紧螺母,锁紧螺母在锁体后方,锁紧螺母前后贯通,中心杆穿过锁紧螺母内腔,锁紧螺母前端与锁体后端螺纹连接,剪销孔开在锁体后端螺纹处,锁紧螺母内壁到凹槽底的径向距离不小于剪销长度;所述锁紧螺母包括固定段和螺纹段,连接段凸起部后方外径小于固定段内径小于凸起部外径,螺纹段内径等于锁定段外径;所述锁紧螺母轴向开有锁紧孔A,所述锁紧孔A为剪销孔,锁体后端面有锁紧孔B,锁紧孔B为盲孔,锁紧孔A和锁紧孔B配对,还包括固定螺钉,固定螺钉长度大于锁紧孔A深度,固定螺钉在锁紧孔A内,固定螺钉前端穿过锁紧孔A嵌入锁紧孔B内;所述流出孔有多个,多个流出孔沿径向圆周均匀分布;所述流入孔有多个,流入孔在不同侧面前后分布
本发明的有益效果如下:
1、本发明可自动加热和冷却保真舱,有利于岩芯保持其在原位环境下的状态。
2、本发明可自动增压保真舱,有利于岩芯保持其在原位环境下的状态。
3、本发明的翻板机构能够在取芯完成时自动封闭保真舱,结构简单,安全可靠。
4、本发明的石墨烯层能够降低岩芯在PVC管内侧的滑动阻力,同时提高内侧的强度和表面精度,增强热导系数等。
5、本发明的密封腔可以隔绝通过保真腔内的钻井液。
6、本发明设计朝上并向内收拢的机械卡爪,当卡爪下行时,卡爪易被岩芯 撑开,从而使岩芯进入内芯筒内;当卡爪上行时,卡爪难以被岩芯撑开,由于岩芯不能抵抗较大的拉力以及卡爪的夹紧作用,岩芯在卡爪处被拉断,断裂的岩芯将随卡爪继续上行从而保持在内筒中;
7、本发明中钻头分为二级刀片,由最下端的刀片首先钻小孔,再由上方的刀片扩孔,可以提高钻进速度,提高取芯效率;
8、本发明在刀片部位均设置通孔作为冷却液回路孔,冷却液可以通过该通孔喷出来冷却刀片,加快刀片的冷却速度,减少刀具的磨损,延长刀片的寿命;
9、在外芯管的外壁设置有与钻头连续的螺旋槽,随着外芯管旋入岩层,外芯管给取芯工具创造一个密闭空间,可防止保真舱被污染;
10、启动前,剪销固定锁定杆,流出孔在密封段,流出孔外壁开口被封死,液体为无法流出,当后方泥浆泵提供的液压达到启动值,冲断剪销,锁定杆前移,液体流经中心杆外壁与连接段内壁、出液段内壁形成的液体流道通过流出孔进入液道段内壁与流入段外壁形成的液体流道,在经流入孔流进中心杆外壁与流入段内壁形成的液体流道与前方液压马达和钻机钻头连通,启动液压马达,冷却钻机钻头;
11、凸起部外径大于密封段内径,限定锁定杆向前移动的距离,使锁定杆到达工作位置后不再向前移动;
12、设置锁紧螺母,锁紧螺母与锁体螺纹连接,连接段与流出段螺纹连接,便于安装、更换剪销;
13、锁紧孔A、锁紧孔B和固定螺钉配合,限制周向转动;
14、剪销头包括大头和小头,剪销孔包括外段和内段,可限制剪销径向向内移动。
图1是本发明结构示意图;
图2为岩芯样品保真舱的结构示意图;
图3是岩芯钻取工具的结构示意图;
图4是内芯管的结构示意图;
图5是图3中A处的放大图;
图6是捕芯器的三维立体图;
图7是捕芯器的截面图;
图8是取芯钻具的结构示意图;
图9是钻头的结构示意图;
图10是外钻刀体的结构示意图;
图11是内钻刀体的结构示意图;
图12为翻板阀未翻下时的结构示意图;
图13为翻板阀已翻下时的结构示意图;
图14为阀瓣的结构示意图;
图15为密封腔的结构示意图;
图16为内取芯筒的局部剖视图;
图17为本发明的电气原理图;
图18为液道启动前的示意图;
图19为液道启动后的示意图。
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图,对本发明进行进一步详细说明。
如图1所示,本发明公开的岩样保真取芯系统,包括依次连接的驱动模块300、保真模块200和取芯模块100,取芯模块岩芯钻取工具、岩芯样品存储筒,所述保真模块包括岩芯样品保真舱,所述驱动模块包括取芯钻机,所述取芯钻机包括液道;
如图2所示,岩芯保真舱包括机械部分和控制部分,机械部分包括内取芯筒28、外取芯筒26和蓄能器229,蓄能器229连通外取芯筒,内取芯筒28用于放置岩芯21,外取芯筒26套在内取芯筒26上,内取芯筒28上端连通液氮存储罐225,内取芯筒28与液氮存储罐225之间的连通管道上设有电控阀226,液氮存储罐225位于外取芯筒26内,外取芯筒26设有翻板阀23。
如图3、8所示,岩芯钻取工具包括取芯钻具、捕芯器11和内芯管12,取芯钻具包括外芯管13和空心的钻头14,钻头14与外芯管13的下端连接,捕芯器11设于内芯管12下端的内壁上,内芯管12下端伸向外芯管13底部并与外芯管13间隙配合。
如图6、7所示,捕芯器11包括环形基体111和多个卡爪112,卡爪112均匀设置在环形基体111上,卡爪112下端与环形基体111连接,卡爪112上端向内收拢。卡爪112有8-15个,优选地,卡爪112有12个。卡爪112的个数可根据需要设置,不限于上述个数。
卡爪112包括一体制造的竖直臂1121和倾斜臂1122,竖直臂1121下端与环形基体11连接,竖直臂1121上端与倾斜臂1122的下端连接,倾斜臂1122的上端为自由端,倾斜臂1122从下往上向内倾斜,倾斜臂1122的倾斜度可以根据需要调整。本实施方式中倾斜臂1122的倾斜角为60°,卡爪112从下往上宽度逐渐变小。
其中,卡爪112的厚度与环形基体111的厚度相等,卡爪112与环形基体111一体制造。环形基体111外套装有环形套17,环形基体111与环形套17固接。内芯管12内壁有石墨烯涂层。如图4、5所示,内芯管12包括岩芯筒121和芯套管122,芯套管122上端套装固定在岩芯筒121的下端,芯套管122内壁有与环形套17适配的环形槽123,环形套17装在环形槽123中,卡爪112的自由端朝向上方。卡爪112自由端朝上并向内收拢,当岩芯从下往上穿过硬质的捕芯器11时卡爪112容易被撑开,反之则难。
钻头14为PCD刀具。如图8、9所示,钻头14包括内钻头141和外钻头142,内钻头141包括第一级刀片1411和空心的内钻刀体1121412。如图11所示,内 钻刀体1121412下端有用于安装第一级刀片1411的第一级刀片安装槽1413,第一级刀片安装槽1413开口于内钻刀体1121412的下端面,内钻刀体1121412上第一级刀片安装槽1413处有冷却液回路孔15,该冷却液回路孔15为弧形孔,弧形孔开口于钻头4的前端面并且与第一级刀片安装槽1413连通。内钻刀体1121412上在圆周方向等间隔设有三个第一级刀片安装槽1413,每个第一级刀片安装槽1413处均设有冷却液回路孔15,每个第一级刀片安装槽1413中均安装有第一级刀片1411。
外钻头142包括第二级刀片1421和空心的外钻刀体1422。如图10所示,第二级刀片1421外壁有用于安装第二级刀片1421的第二级刀片安装槽1423,外钻刀体1422上第二级刀片安装槽1423处有冷却液回路孔15,该冷却液回路孔15为条形孔,条形孔与第二级刀片安装槽1423连通。外钻刀体1422上在圆周方向等间隔设有三个第二级刀片安装槽1423,每个第二级刀片安装槽1423处均设有冷却液回路孔15,每个第二级刀片安装槽1423中均安装有第二级刀片1421。
内钻头141安装在外钻头142内,外钻刀体1422上对应第一级刀片1411的位置有第一级刀片避让缺口1424,第一级刀片避让缺口1424开口于外钻头142的前端面,第一级刀片1411的切削刃从第一级刀片避让缺口1424处外露于外钻刀体1422。
内钻刀体1121412内壁设有密封圈18,密封圈18位于第一级刀片1411上方,利用高弹性的环向密封圈,实现取芯过程中对岩芯的包裹,达到隔离保质效果,达到保湿、保质目标。
本发明中钻头分为二级刀片,由最下端的第一级刀片1411首先钻小孔,再由上方的第二级刀片1421扩孔,可以提高钻进速度。在刀片部位均设置通孔作为冷却液回路孔15,冷却液可以通过该通孔喷出,来冷却刀片。本发明利用硬质合金锐口薄唇钻头切割岩层,减少取芯过程对地层的扰动,保证取芯完整度和质量。
如图3、8、10所示,外芯管13和外钻刀体1422外壁均设有螺旋槽6,外钻刀体1422上的螺旋槽16与外芯管13上的螺旋槽16连续。外壁设置螺旋槽16的外芯管13相当于螺旋外钻,随着外芯管13旋入岩层,外芯管13给取芯工具创造一个密闭空间,密封圈18在取芯过程中对岩芯的包裹,防止保真舱被污染。
工作时,随着钻头14的钻进,岩芯进入内芯管12中并从捕芯器1中间穿过,在岩心穿过硬质的卡爪112时会将卡爪112撑开;停钻后,向上提拉时,卡爪112随内芯管12向上移动,因为卡爪112自由端内收,此时卡爪112难以被岩芯撑开,由于岩芯不能抵抗较大的拉力以及卡爪112自由端的内收夹紧,岩芯在卡爪112处被拉断,断裂的岩芯将随卡爪112继续上行从而保持在内芯管12中。
如图12、图13、图14所示,翻板阀23包括阀座236和阀瓣237,阀瓣237包括弹性密封圈234、弹性连接条232、密封件和多个依次平行排列的锁条235,弹性连接条232将所有锁条235串连并由弹性密封圈234将所有锁条235箍在一起形成整体结构,锁条235上有与弹性密封圈适配的卡槽231,弹性密封圈234 装在卡槽231中,相邻两个锁条235间设有密封件,阀瓣23一端通过限位铰链233活动连接在阀座236上端;阀瓣237在未翻下时为弧形,阀瓣237与内取芯筒28的外壁贴合;阀瓣237在翻下时为平面并盖住阀座236上端。
如图15所示,外取芯筒26内壁设有密封腔239,密封腔239与内取芯筒28连通。
如图16所示,内取芯筒28采用PVC材质,内取芯筒28的内壁附着石墨烯层281,内取芯筒28上部填充滴水成膜剂282。
如图17所示,控制部分包括电加热器2214、温度传感器25和设于管道的电控阀226,温度传感器25连接处理单元224,电加热器2214通过开关227连接电源228,开关227、电控阀226均受控于处理单元224,电加热器用于对外取芯筒内部加热,温度传感器25用于检测保真舱内的温度;电加热器2214采用电阻丝,电阻丝嵌装在外取芯筒的内壁,电阻丝涂覆绝缘层,控制部分的电源228位于外取芯筒上。控制部分还包括压力传感器27、三通截止阀A2210,三通截止阀A2210的其中两个端口分别连接蓄能器229和外取芯筒26,三通截止阀A2210的第三端口连接泄压阀2211,三通截止阀A2210为电控阀,压力传感器27、三通截止阀A2210均连接处理单元224,压力传感器27用于检测保真舱内的压力。
本发明还包括压力表2212,压力表2212通过三通截止阀B213连通外取芯筒。
通过温度传感器实时检测保真舱内的温度,并与在先测试的岩芯原位温度比较,根据两个温度的差异,控制电加热器加热或者控制电控阀打开向保真舱内注入液氮冷却保真舱,从而恒定保真舱内的温度与岩芯原位温度相同。2、通过压力传感器实时检测保真舱内的压力,并与在先测试的岩芯原位压力比较,根据两个压力的差异,控制三通截止阀A的通断,使保真舱内的压力增加从而保持与岩芯原位压力相同,由于保真舱在提升过程中的环境压力是逐步减小的,岩芯原位压力大于保真舱在提升过程中的环境压力,故采用增压措施即可。
如图18、19所示,启动机构包括锁体33,锁体33前后贯通,锁体33从后至前依次为锁定段331、密封段332和液道段333,锁定段331侧壁有剪销孔,剪销孔为通孔,还包括锁定杆32,所述锁定杆32前后贯通,锁定杆32在锁体33内,锁定杆32从后至前依次为连接段321、流出段322、封闭段323和流入段324,连接段321与流出段322螺纹连接,封闭段323和流入段323焊接,连接段321外壁有凹槽3212,凹槽3212为环形槽,启动机构还包括剪销35,剪销35长度大于剪销孔深度,剪销35在剪销孔和凹槽3212内,流出段322侧壁开有流出孔3221,流出孔3221由内向外向前倾斜,流出孔3221有多个,多个流出孔3221沿径向圆周均匀分布,流入段324侧壁开有流入孔3241,流入孔3241有多个,流入孔3241在流入段324不同侧面前后分布,启动机构还包括中心杆31,中心杆31在锁定杆32内,密封段332内径等于封闭段323外径等于流出段322外径,液道段333内径大于锁定杆32外径,连接段321、流出段322和流入 段324的内径大于中心杆31外径,封闭段323内径等于中心杆31外径,密封段332前端到锁体33后端的轴向距离小于封闭段323前端到锁体3后端的轴向距离,液道段333内壁和流入段324外壁围成液道段内腔372,流入段324内壁与中心杆31外壁围成流入段内腔373,中心杆31外壁与流出段322内壁、连接段321内壁围成流出段内腔371,液道段内腔372与流入段内腔373通过流入孔3241连通,锁定段331内径大于密封段332内径,连接段321外壁有凸起部3211,凸起部3211外径大于密封段332内径,连接段321凸起部3211前方外径等于密封段332内径,凹槽3212在凸起部3211,启动机构还包括锁紧螺母34,锁紧螺母34在锁体33后方,锁紧螺母34前后贯通,中心杆31穿过锁紧螺母34内腔,锁紧螺母34前端与锁体33后端螺纹连接,剪销孔开在锁体33后端螺纹处,锁紧螺母34内壁到凹槽3212底的径向距离不小于剪销35长度,锁紧螺母34包括固定段和螺纹段,连接段321凸起部3211后方外径小于固定段内径小于凸起部3211外径,螺纹段内径等于锁定段331外径,锁紧螺母34轴向开有锁紧孔A,锁紧孔A为剪销孔,锁体33后端面有锁紧孔B,锁紧孔B为盲孔,锁紧孔A和锁紧孔B配对,还包括固定螺钉36,固定螺钉36长度大于锁紧孔A深度,固定螺钉36在锁紧孔A内,固定螺钉36前端穿过锁紧孔A嵌入锁紧孔B内。
启动前,剪销35穿过剪销孔嵌入凹槽3212,流出孔3221外壁开口到锁体33后端的轴向距离小于液道段333后端到锁体3后端的轴向距离,流出孔221外壁开口被密封段332封闭,液体不能向前流动,后方泥浆泵提供的液压达到启动值后,冲击锁定杆32后端,减断剪销35,剪销35断为剪销头351和剪销尾352,剪销头351在剪销孔内,剪销尾352在凹槽3212内,锁定杆32前移,流出孔3221外壁开口到锁体33后端的轴向距离大于液道段333后端到锁体33后端的轴向距离,流出段内腔371与液道段内腔372通过流出孔3221连通,液体通道连通,液体进入液体流道流向前方驱动前方的液压马达和冷却钻机钻头。
剪销头351包括大头和小头,大头朝外,大头外径大于小头外径,剪销孔包括外段和内段,外段孔径不小于大头外径,内段孔径不小于小头外径,内段孔径小于大头外径,外段深度不小于大头长度,小头与剪销尾352长度的和大于内段深度。
连接段321凸起部3211外径为56mm,内径为36mm,总长为106mm,连接段321凸起部3211前方、后方外径均为50mm,凹槽212深6mm,凸起部3211后端距离连接段321后端15mm,凹槽212前端距离连接段后端27.8mm,凹槽3212宽5.5mm,凹槽3212前端距离连接段321前端73mm,连接段321侧壁还开有一孔径为8mm的通孔,通孔孔心距离连接段321前端65mm,连接段321前端螺纹处外径为43mm,螺纹为M45×1.5mm,连接段321与流出段322螺纹连接的长度 为39mm。
流出段322和封闭段323外径均为50mm,流出段322内径为36mm,流出孔3221孔径为8mm,流出孔3221与轴向夹角为45°,流出孔3221外壁开口前端距离流出段322后端152mm,流出孔3221有6个,流出段322和封闭段323总长196mm,封闭段323内径为25mm,流入孔3241孔径为16mm,流入孔3241有4个,分别在4个侧面,4个流入孔3241孔心距离流入段24后端距离分别为39mm、55mm、71mm和87mm,流入段24内径为40.5mm、流入段24外径为44.5mm,中心杆31外径为25mm。
锁定段331外径为82mm,内径为56mm,剪销孔孔心距离锁定段331后端8mm,锁定段331长56mm,剪销孔外段孔径为8mm,深5mm,内段孔径为5mm,深度为8mm,密封段332外径为99.6mm,内径为50mm,密封段32长176mm,液道段333内径为70mm。
剪销35总长16.5mm,剪销头351大头长3.5mm,外径为7mm,剪销头351小头外径为4.8mm,剪销头351小头与剪销尾352长度的和为13mm
当然,本发明还可有其它多种实施例,在不背离本发明精神及其实质的情况下,熟悉本领域的技术人员可根据本发明作出各种相应的改变和变形,但这些相应的改变和变形都应属于本发明所附的权利要求的保护范围。
Claims (10)
- 岩样保真取芯系统,其特征在于:包括依次连接的驱动模块、保真模块和取芯模块,所述取芯模块岩芯钻取工具、岩芯样品存储筒,所述保真模块包括岩芯样品保真舱,所述驱动模块包括取芯钻机,所述取芯钻机包括液道;所述岩芯钻取工具包括取芯钻具、捕芯器和内芯管,取芯钻具包括外芯管和空心的钻头,钻头与外芯管的下端连接;所述捕芯器包括环形基体和多个卡爪,环形基体同轴安装在内芯管下端的内壁上,卡爪均匀设置在环形基体上,卡爪下端与环形基体连接,卡爪上端向内收拢;所述内芯管下端伸向外芯管底部,内芯管与外芯管间隙配合;所述岩芯样品存储筒包括岩芯筒、钻机外筒、翻板阀和触发机构,翻板阀包括阀座和密封阀瓣,阀座同轴安装在钻机外筒内壁上,密封阀瓣一端与阀座上端外侧壁活动连接,阀座顶部有与密封阀瓣匹配的阀口密封面;所述岩芯样品保真舱包括内取芯筒、外取芯筒和蓄能器,所述外取芯筒套在内取芯筒上,所述内取芯筒上端连通液氮存储罐,所述液氮存储罐位于外取芯筒内,所述蓄能器连通外取芯筒,所述外取芯筒设有翻板阀;所述液道包括液道启动机构,所述液道启动机构包括锁体、锁定杆、剪销、中心杆,所述锁体前后贯通,锁体从后至前依次为锁定段、密封段和液道段,锁定段侧壁有剪销孔,剪销孔为通孔,所述锁定杆前后贯通,锁定杆在锁体内,锁定杆从后至前依次为连接段、流出段、封闭段和流入段,连接段外壁有凹槽,所述剪销长度大于锁体侧壁上的剪销孔深度,所述剪销在剪销孔和凹槽内,流出段侧壁开有流出孔,流入段侧壁开有流入孔,所述中心杆在锁定杆内,所述密封段内径等于封闭段外径,所述液道段内径大于锁定杆外径,所述连接段、流出段和流入段的内径大于中心杆外径,所述封闭段内径等于中心杆外径,所述密封段前端到锁体后端的轴向距离小于封闭段前端到锁体后端的轴向距离,液道段内腔与流入段内腔通过流入孔连通,剪销穿过剪销孔嵌入凹槽,流出孔外壁开口到锁体后端的轴向距离小于液道段后端到锁体后端的轴向距离。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述岩芯样品保真舱还包括电加热器、温度传感器、设于内取芯筒与液氮存储罐之间的电控阀、压力传感器、设于蓄能器与外取芯筒之间的三通截止阀A,所述三通截止阀A的两个端口分别连接蓄能器和外取芯筒,三通截止阀A的第三端口连接泄压阀,三通截止阀A为电控阀,所述温度传感器、压力传感器连接处理单元,所述电加热器、电控阀、三通截止阀A均受控于处理单元,所述电加热器用于对外取芯筒内部加热,所述温度传感器用于检测保真舱内的温度,所述压力传感器用于检测保真舱内的压力。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述钻头包括用于钻孔的第一级刀片和用于扩孔的第二级刀片,钻头包括内钻头和外钻头,所述内钻头安装在外钻头内,第一级刀片位于内钻头下端,第二级刀片位于外钻头外侧壁上,所述第一级刀片在圆周方向等间隔设有三个,第二级刀片在圆周方向 等间隔设有三个,钻头上第一级刀片和第二级刀片处均设有冷却液回路孔。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述外芯管和钻头外壁均设有螺旋槽,钻头上的螺旋槽与外芯管上的螺旋槽连续。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述卡爪包括一体制造的竖直臂和倾斜臂,所述竖直臂下端与环形基体连接,竖直臂上端与倾斜臂的下端连接,倾斜臂的上端为自由端,倾斜臂从下往上向内倾斜,倾斜臂的倾斜角为60°。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述密封阀瓣包括弹性密封圈、弹性连接条、密封件和多个依次平行排列的锁条,弹性连接条将所有锁条串连并由弹性密封圈将所有锁条箍在一起形成整体结构,锁条上有与弹性密封圈适配的卡槽,弹性密封圈装在卡槽中,相邻两个锁条间设有密封件,阀瓣一端通过限位铰链活动连接在阀座上端;所述阀瓣在未翻下时为弧形,阀瓣与内取芯筒的外壁贴合;阀瓣在翻下时为平面并盖住阀座上端。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述外取芯筒内壁设有密封腔,所述翻板位于密封腔,所述密封腔与内取芯筒连通;所述外取芯筒内壁设有密封圈,所述密封圈位于翻板阀的下方。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述电加热器为电阻丝,所述电阻丝嵌装在外取芯筒的内壁,电阻丝涂覆绝缘层;所述内取芯筒的内壁附着石墨烯层;所述内取芯筒上部填充滴水成膜剂。
- 根据权利要求1所述的岩样保真取芯系统,其特征在于:所述锁定段内径大于密封段内径,所述连接段外壁有凸起部,凸起部外径大于密封段内径,连接段凸起部前方外径等于密封段内径,所述凹槽在凸起部;所述流出孔由内向外向前倾斜;所述连接段与流出段螺纹连接,所述封闭段和流入段焊接;启动后,锁定杆前移,剪销剪断,剪销头在剪销孔内,剪销尾在凹槽内,所述剪销头包括大头和小头,大头朝外,大头外径大于小头外径,所述剪销孔包括外段和内段,外段孔径不小于剪销头大头外径,内段孔径不小于剪销头小头外径,内段孔径小于大头外径,外段深度不小于大头长度,小头与剪销尾长度的和大于内段深度。
- 根据权利要求9所述的岩样保真取芯系统,其特征在于:还包括锁紧螺母,锁紧螺母在锁体后方,锁紧螺母前后贯通,中心杆穿过锁紧螺母内腔,锁紧螺母前端与锁体后端螺纹连接,剪销孔开在锁体后端螺纹处,锁紧螺母内壁到凹槽底的径向距离不小于剪销长度;所述锁紧螺母包括固定段和螺纹段,连接段凸起部后方外径小于固定段内径小于凸起部外径,螺纹段内径等于锁定段外径;所述锁紧螺母轴向开有锁紧孔A,所述锁紧孔A为剪销孔,锁体后端面有锁紧孔B,锁紧孔B为盲孔,锁紧孔A和锁紧孔B配对,还包括固定螺钉,固定螺钉长度大于锁紧孔A深度,固定螺钉在锁紧孔A内,固定螺钉前端穿过锁紧孔A嵌入锁紧孔B内;所述流出孔有多个,多个流出孔沿径向圆周均匀分布;所述流入孔有多个,流入孔在不同侧面前后分布。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/419,059 US11846149B2 (en) | 2018-12-26 | 2019-03-15 | Core sampling and preservation system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811596435.1 | 2018-12-26 | ||
| CN201811596435.1A CN109973035B (zh) | 2018-12-26 | 2018-12-26 | 岩样保真取芯系统 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2020133725A1 true WO2020133725A1 (zh) | 2020-07-02 |
Family
ID=67076367
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2019/078288 Ceased WO2020133725A1 (zh) | 2018-12-26 | 2019-03-15 | 岩样保真取芯系统 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US11846149B2 (zh) |
| CN (1) | CN109973035B (zh) |
| WO (1) | WO2020133725A1 (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116291420A (zh) * | 2023-03-13 | 2023-06-23 | 临沂市自然资源和规划局 | 一种地质勘测用反馈预警装置及其使用方法 |
| CN117662046A (zh) * | 2022-09-08 | 2024-03-08 | 中石化石油工程技术服务有限公司 | 岩心出心接心装置 |
| CN118933582A (zh) * | 2024-07-29 | 2024-11-12 | 中煤科工西安研究院(集团)有限公司 | 一种具有参数测量功能的钻头 |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109441383B (zh) * | 2018-11-08 | 2023-11-10 | 深圳大学 | 取芯钻机钻取控制机构 |
| CN111894502B (zh) * | 2020-07-28 | 2023-03-10 | 四川大学 | 气体作为流体介质的坑道取芯方法 |
| CN113123748B (zh) * | 2021-01-04 | 2022-06-03 | 成都理工大学 | 一种保应力取心的岩心管压力智能调节系统及方法 |
| CN115876516B (zh) * | 2022-07-12 | 2023-07-04 | 平顶山天安煤业股份有限公司 | 一种可自清洁的保压取芯设备及其使用方法 |
| CN115059425B (zh) * | 2022-07-14 | 2023-08-04 | 平顶山天安煤业股份有限公司 | 一种气囊阻隔式密闭取心器及其使用方法 |
| CN115126433B (zh) * | 2022-07-22 | 2023-06-20 | 平顶山天安煤业股份有限公司 | 适用于松软地层的插入式保压取芯器及其使用方法 |
| CN115307959B (zh) * | 2022-08-17 | 2024-11-05 | 北京卫星制造厂有限公司 | 钻头、螺旋取样部、地外天体取样钻具 |
| CN115597912A (zh) * | 2022-11-01 | 2023-01-13 | 安徽理工大学(Cn) | 新型井下煤层密闭取芯装置 |
| CN115680650B (zh) * | 2022-11-28 | 2024-12-10 | 中冶成都勘察研究总院有限公司 | 一种岩芯信息快速获取的钻进方法 |
| CN115749653B (zh) * | 2022-12-21 | 2023-09-12 | 青岛地质工程勘察院(青岛地质勘查开发局) | 一种矿山勘探用具有岩芯保护功能的钻探取样装置 |
| CN116399638B (zh) * | 2023-04-04 | 2024-02-06 | 深圳大学 | 一种原状土取样保存装置及方法 |
| CN117868812B (zh) * | 2024-03-11 | 2024-05-07 | 山东省地矿工程勘察院(山东省地质矿产勘查开发局八〇一水文地质工程地质大队) | 一种用于地质矿产的勘查方法 |
| CN118518414B (zh) * | 2024-07-23 | 2024-09-13 | 中国有色金属工业昆明勘察设计研究院有限公司 | 一种岩土分层取样装置及方法 |
| CN120007127B (zh) * | 2025-04-18 | 2025-07-29 | 河南发恩德矿业有限公司 | 一种矿井涌水探测装置及其方法 |
| CN120333902B (zh) * | 2025-06-20 | 2025-09-05 | 中地华北(北京)工程技术研究院有限公司 | 一种用于地质矿产勘查的防扬尘取样装置及方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2200225C2 (ru) * | 2001-04-12 | 2003-03-10 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Двойной керноизолирующий снаряд |
| RU2209912C1 (ru) * | 2002-04-10 | 2003-08-10 | Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) | Колонковый электромеханический буровой снаряд |
| CN1948940A (zh) * | 2006-09-30 | 2007-04-18 | 长沙矿山研究院 | 深海硬岩保真取芯器 |
| CN106124242A (zh) * | 2016-06-01 | 2016-11-16 | 四川大学 | 原位保真取芯系统及取芯方法 |
| CN109025874A (zh) * | 2018-08-13 | 2018-12-18 | 四川大学 | 取芯钻机自动启动机构 |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4071099A (en) * | 1976-07-19 | 1978-01-31 | Sun Oil Company | Method and apparatus for stabilizing borehole cores |
| US4716974A (en) * | 1986-07-21 | 1988-01-05 | Eastman Christensen Co | Method and apparatus for coring with an in situ core barrel sponge |
| US6283228B2 (en) * | 1997-01-08 | 2001-09-04 | Baker Hughes Incorporated | Method for preserving core sample integrity |
| CN101215959B (zh) * | 2008-01-11 | 2010-06-02 | 中国地质大学(武汉) | 双管强制取芯钻具 |
| CN101532922B (zh) * | 2008-03-14 | 2011-08-31 | 吉林大学 | 天然气水合物孔底冷冻取样器及其取样方法 |
| US8307704B2 (en) * | 2008-12-22 | 2012-11-13 | Baker Hughes Incorporated | Apparatus and methods for gas volume retained coring |
| CN201778708U (zh) * | 2010-04-16 | 2011-03-30 | 北京骄阳山水石油工程技术有限公司 | 一种取芯工具内藏式岩芯爪 |
| US9828820B2 (en) * | 2015-09-30 | 2017-11-28 | Aramco Services Company | Methods and apparatus for collecting and preserving core samples from a reservoir |
| CN106932223A (zh) * | 2017-05-11 | 2017-07-07 | 四川大学 | 保压筒下部密封装置及保压取芯密封设备 |
| CN109025879B (zh) * | 2018-08-13 | 2023-06-09 | 四川大学 | 保压筒密封结构 |
| CN108930517B (zh) * | 2018-08-13 | 2024-03-22 | 四川大学 | 硬岩取芯钻具 |
| CN109000012B (zh) * | 2018-08-13 | 2023-10-24 | 四川大学 | 一种取芯钻机液道启动机构 |
| CN210013681U (zh) * | 2018-12-26 | 2020-02-04 | 深圳大学 | 岩样保真取芯系统 |
-
2018
- 2018-12-26 CN CN201811596435.1A patent/CN109973035B/zh active Active
-
2019
- 2019-03-15 US US17/419,059 patent/US11846149B2/en active Active
- 2019-03-15 WO PCT/CN2019/078288 patent/WO2020133725A1/zh not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2200225C2 (ru) * | 2001-04-12 | 2003-03-10 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Двойной керноизолирующий снаряд |
| RU2209912C1 (ru) * | 2002-04-10 | 2003-08-10 | Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) | Колонковый электромеханический буровой снаряд |
| CN1948940A (zh) * | 2006-09-30 | 2007-04-18 | 长沙矿山研究院 | 深海硬岩保真取芯器 |
| CN106124242A (zh) * | 2016-06-01 | 2016-11-16 | 四川大学 | 原位保真取芯系统及取芯方法 |
| CN109025874A (zh) * | 2018-08-13 | 2018-12-18 | 四川大学 | 取芯钻机自动启动机构 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117662046A (zh) * | 2022-09-08 | 2024-03-08 | 中石化石油工程技术服务有限公司 | 岩心出心接心装置 |
| CN116291420A (zh) * | 2023-03-13 | 2023-06-23 | 临沂市自然资源和规划局 | 一种地质勘测用反馈预警装置及其使用方法 |
| CN116291420B (zh) * | 2023-03-13 | 2023-09-19 | 临沂市自然资源和规划局 | 一种地质勘测用反馈预警装置及其使用方法 |
| CN118933582A (zh) * | 2024-07-29 | 2024-11-12 | 中煤科工西安研究院(集团)有限公司 | 一种具有参数测量功能的钻头 |
Also Published As
| Publication number | Publication date |
|---|---|
| US11846149B2 (en) | 2023-12-19 |
| CN109973035B (zh) | 2024-04-12 |
| CN109973035A (zh) | 2019-07-05 |
| US20220170335A1 (en) | 2022-06-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109681140B (zh) | 岩样保真取芯装置 | |
| WO2020133726A1 (zh) | 岩样原位保真取芯系统 | |
| US11846149B2 (en) | Core sampling and preservation system | |
| CN210013681U (zh) | 岩样保真取芯系统 | |
| CN109458147B (zh) | 取芯装置 | |
| US10161192B2 (en) | Downhole self-isolating wellbore drilling systems | |
| BRPI1003098B1 (pt) | ferramenta amostradora de fluido de formação para obtenção de um fluido em uma posição dentro de um poço, e método para obtenção de uma amostra de fluido em uma posição num poço | |
| GB2495839A (en) | A well tool with a sliding sleeve which opens or closes a bypass passage | |
| CN209855732U (zh) | 岩样原位保真取芯系统 | |
| US11859450B2 (en) | Drilling fluid channel structure of core drilling rig | |
| CN109025874B (zh) | 取芯钻机自动启动机构 | |
| CN109138881B (zh) | 岩芯钻取工具 | |
| WO2020034364A1 (zh) | 一种取芯钻机液道启动机构 | |
| CN210013680U (zh) | 岩样保真取芯装置 | |
| CN109779552B (zh) | 取芯钻机自动启停机构 | |
| CN209228328U (zh) | 取芯钻机钻井液通道结构 | |
| CN208967146U (zh) | 取芯钻机液道启动机构 | |
| CN209339886U (zh) | 一种取芯钻机自动启动机构 | |
| CN209228327U (zh) | 取岩芯装置 | |
| CN209339884U (zh) | 一种岩芯保真舱 | |
| WO2020034365A1 (zh) | 取芯钻机自动启停机构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19905416 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 06/10/2021) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 19905416 Country of ref document: EP Kind code of ref document: A1 |