WO2020062323A1 - 一种导线预绞式防振锤 - Google Patents
一种导线预绞式防振锤 Download PDFInfo
- Publication number
- WO2020062323A1 WO2020062323A1 PCT/CN2018/109601 CN2018109601W WO2020062323A1 WO 2020062323 A1 WO2020062323 A1 WO 2020062323A1 CN 2018109601 W CN2018109601 W CN 2018109601W WO 2020062323 A1 WO2020062323 A1 WO 2020062323A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- plate
- sleeved
- sleeve
- wire
- fixed
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/14—Arrangements or devices for damping mechanical oscillations of lines, e.g. for reducing production of sound
Definitions
- the invention relates to the technical field of anti-vibration hammers, in particular to a wire pre-twisted anti-vibration hammer.
- the anti-vibration hammer is designed to reduce the vibration of the wire due to the wind; the pole position of the high-voltage overhead line is high and the gear distance is large. When the wire is subjected to wind, vibration will occur. Generally, the anti-vibration hammer is used to prevent vibration.
- Traditional anti-vibration hammer uses a single fixing method. There is no pre-twisted wire to fix the wire. It is easy to cause the position of the anti-vibration hammer to shift.
- the traditional method of fixing the anti-vibration hammer is complicated and troublesome to install and remove. Periodic bending and fatigue damage are not conducive to protecting the wire and greatly shortening the service life of the wire; the traditional anti-vibration hammer head is an integrated structure that cannot be removed, which is not conducive to the maintenance and replacement of the hammer head. At the same time, the angle of the hammer head cannot be adjusted, which is not applicable. For various installation conditions, it is not conducive to the vibration prevention of the wire. In view of these defects, it is necessary to design a wire pre-twisted anti-vibration hammer.
- the object of the present invention is to provide a wire pre-twisted anti-vibration hammer to solve the problems raised in the background art described above.
- a wire pre-twisted anti-vibration hammer including a wire clamp body, a galvanized steel strand, a hammer head, a wire clamping plate, a blocking pin, a closed pin, a hinge pin, A rubber pad, a pre-twisted wire, a connecting plate, and a rotating fixing component; the top of the wire clamp body is fixed with a wire clamping plate by screws; the top of the wire clamping plate is sleeved with a hinge pin; and the bottom of the wire clamping plate is sleeved with a closed pin A blocking pin is sleeved at one end of the closed pin, and a galvanized steel strand is sleeved at both ends of the bottom of the clamp body.
- a hammer head is provided at one end of the galvanized steel strand, and a center of one end of the hammer head is provided.
- a connection plate is fixed by screws, and a rotation fixing component is installed at one end of the connection plate.
- the rotation fixing component comprises a first threaded post, a first nut sleeve, a sliding hole, a clamping plate, a bottom plate, a second threaded post, and a second nut.
- Connecting plate bottom and bottom The top is fitted, and one end of the bottom plate is fixed with a first threaded post by a screw.
- the top of the first threaded post is sleeved with a clamping plate.
- One end of the clamping plate is provided with a sliding hole, and the sliding hole is sleeved with the first threaded column.
- a first nut sleeve is sleeved on the top of the first threaded column, and the first nut sleeve is located on the top of the card plate.
- a reinforcing plate is fixed at the center of the other end of the first threaded column by screws, and one end of the reinforcing plate passes
- a rotating housing is fixed with screws, and both ends of the rotating housing are provided with threaded holes, a second threaded post is sleeved inside the threaded hole, a second nut sleeve is sleeved on the top of the second threaded post, and the second nut is A sleeve is located on one side of the outer wall of the rotating housing, and a lock nut is sleeved on the bottom of the second threaded column, and the lock nut is located on one side of the inner wall of the rotating housing.
- An outer clamping plate is fixed on the bottom of the second threaded column by screws.
- a plurality of first spring plates are fixed on the inner wall of the splint by screws, a first sleeve is fixed on the bottom of the first spring plate by screws, a second sleeve is sleeved on the bottom of the first sleeve, and the second sleeve is Bottom through screw
- a second spring plate is fixed, the return spring is sleeved on the outside of the first sleeve and the second sleeve, the bottom of the second spring plate is fixed with an inner clamping plate by screws, and the inner clamping plate is sleeved on a galvanized steel strand Outside.
- a rubber pad is sleeved on the top of the wire clamping plate, and a pre-twisted wire is sleeved inside the rubber pad.
- both sides of the bottom of the wire clamping plate are provided with side grooves, and the side grooves are sleeved outside the closed pin.
- opening grooves are provided on both sides of the clamp body, and the opening grooves are sleeved on the outside of the galvanized steel wire.
- an anti-slip sleeve is sleeved inside the inner plywood, and the non-slip sleeve is attached to the outside of the galvanized steel strand.
- the wire pre-twisted anti-vibration hammer has a simple structure and is easy to operate.
- the pre-twisted wire is used to fix the wire inside the wire clamping plate to avoid the position of the wire pre-twisted anti-vibration hammer being shifted.
- the closed pin and the blocking pin will clamp the wire to the clamp plate. It is fixed on the top of the clamp body, which is convenient for installation and removal.
- the hammer head and the conductor are in the opposite phase of the vibration, so that the vibration of the conductor is eliminated, the vibration of the conductor is greatly reduced, and the periodic bending and fatigue damage of the conductor due to multiple vibrations are avoided. Extend the life of the wire;
- This wire pre-twisted anti-vibration hammer's rotary fixing assembly has a simple structure and easy operation.
- the hammer head is clamped and fixed by the clamping plate and the bottom plate, which is more firmly fixed and easy to install and remove, which is conducive to the maintenance and replacement of the hammer head.
- the inner clamping plate is used for clamping and fixing.
- the angle of the hammer head can be adjusted by rotating the inner clamping plate, which is conducive to adjusting the angle of the hammer head. It is suitable for various installation conditions.
- the return spring provides elastic force to avoid loosening due to inadequate fixing, and can weaken it. A part of the wire is vibrated, which is good for the wire to prevent vibration.
- FIG. 1 is a schematic diagram of the overall structure of the present invention
- Figure 2 is a side view of the entirety of the present invention.
- Figure 3 is a side view of the hammer head of the present invention.
- FIG. 4 is a schematic structural diagram of a rotation fixing component of the present invention.
- Figure 5 is a side view of the rotating housing of the present invention.
- a wire pre-twisted anti-vibration hammer which includes a wire clamp body 1, a galvanized steel stranded wire 2, a hammer head 3, a wire clamping plate 4, a stopper pin 5 , Closed pin 6, hinge pin 7, rubber pad 8, pre-twisted wire 9, connecting plate 10 and rotary fixing component 11, the top of the clamp body 1 is fixed with a wire clamp plate 4 by screws, and the top of the clamp plate 4 is sleeved with a hinge pin 7.
- the rubber clamp 8 is sleeved on the top of the clamp plate 4, and the pre-twisted wire 9 is sleeved inside the rubber pad 8, which is beneficial to the pre-stranded wire 9.
- the closed pin 6 is sleeved on the bottom of the clamp plate 4, and the clamp plate 4 Both sides of the bottom are provided with side grooves, and the side grooves are sleeved on the outside of the closed pin 6, which is conducive to the fixed connection of the closed pin 6.
- One end of the closed pin 6 is sleeved with a stop pin 5.
- the two ends of the bottom of the clamp body 1 are sleeved
- There are galvanized steel strands 2 and both sides of the clamp body 1 are provided with open grooves, and the open grooves are sleeved on the outside of the galvanized steel strands 2 to facilitate the fixed connection of the galvanized steel strands 2 and the galvanized steel strands 2 is provided with a hammer head 3 at one end, and a connecting plate 10 is fixed at the center of one end of the hammer head 3 by screws; a rotating fixing component 11 is installed at one end of the connecting plate 10;
- the part 11 is composed of a first threaded post 12, a first nut sleeve 13, a sliding hole 14, a clamp plate 15, a bottom plate 16, a second threaded column 17, a second nut sleeve 18, a rotating housing 19, a threaded hole 20, and a lock nut 21 ,
- One end of the bottom plate 16 is fixed with a first threaded post 12 by screws.
- the top of the first threaded post 12 is sleeved with a card 15.
- One end of the card 15 is provided with a sliding hole 14, and the sliding hole 14 is sleeved.
- a first nut sleeve 13 is sleeved on the top of the first threaded column 12 outside the first threaded column 12, and the first nut sleeve 13 is located on the top of the clamping plate 15.
- a reinforcing plate is fixed at the center of the other end of the first threaded column 12 by screws. 30.
- One end of the reinforcing plate 30 is fixed with a rotating housing 19 by screws. Both ends of the rotating housing 19 are provided with screw holes 20.
- a second threaded column 17 is sleeved inside the threaded hole 20, and a second threaded column 17 is sleeved on the top.
- a nut sleeve 18, and the second nut sleeve 18 is located on the outer wall side of the rotating housing 19, and the bottom of the second threaded column 17
- a lock nut 21 is sleeved, and the lock nut 21 is located on the inner wall side of the rotating housing 19.
- An outer clamping plate 22 is fixed at the bottom of the second threaded column 17 by screws, and a plurality of first spring plates 23 are fixed at the inner wall of the external clamping plate 22 by screws.
- a first sleeve 24 is fixed at the bottom of the first spring plate 23 by screws
- a second sleeve 26 is sleeved at the bottom of the first sleeve 24
- a second spring plate 27 is fixed at the bottom of the second sleeve 26 by screws.
- 25 is sleeved on the outside of the first sleeve 24 and the second sleeve 26.
- the bottom of the second spring plate 27 is fixed with an inner clamping plate 28 by screws, and the inner clamping plate 28 is sleeved on the outside of the galvanized steel strand 2 and inside the inner clamping plate 28.
- a non-slip sleeve 29 is sleeved, and the non-slip sleeve 29 is attached to the outer side of the galvanized steel strand 2 to facilitate the fixed connection of the inner splint 28.
- the pre-twisted wire 9 and the wire are manually threaded. Inside the rubber pad 8, insert the clamp plate 4 into the top of the clamp body 1, insert the closing pin 6 and the stop pin 5, and then tilt the hammer head 3 to complete the fixation.
- the wire When the wind blows the wire, the wire vibrates and drives The clamp plate 4 vibrates, the clamp plate 4 drives the clamp body 1 to vibrate, and the clamp body 1 drives a hammer 3 vibration, the hammer head 3 is opposite to the phase of the wire vibration, weaken the wire vibration, use the pre-twisted wire 9 to fix the wire inside the clamp plate 4, to avoid the position of the wire pre-twisted anti-vibration hammer, the closed pin 6 and the stop pin 5
- the clamp plate 4 is fixed on the top of the clamp body 1 for convenient installation and removal.
- the hammer head 3 is opposite to the vibration phase of the wire, thereby eliminating the vibration of the wire.
- the wire pre-twisted anti-vibration hammer is used, one end of the hammer head 3 is manually connected.
- the plate 10 is sleeved inside the card plate 15 and the bottom plate 16, and the first nut sleeve 13 is screwed clockwise.
- the first nut sleeve 13 rotates to squeeze the card plate 15, and the card plate 15 presses the connection plate 10 until the card plate 15 and the bottom plate 16 Clamp the connecting plate 10 to complete the fixing, and then set the galvanized steel strand 2 inside the inner clamping plate 28, rotate the hammer head 3 to adjust to the proper position, and tighten the lock nut 21 clockwise.
- the lock nut 21 rotates to drive
- the threaded hole 20 rotates, the threaded hole 20 presses the outer clamping plate 22, the outer clamping plate 22 presses the return spring 25, and the return spring 25 provides elastic force to press the inner clamping plate 28 until the inner clamping plate 28 clamps the galvanized steel strand 2 to complete the fixing.
- the clamping head 15 and the bottom plate 16 are used to clamp and fix the hammer head 3, and the fixing is more convenient. It is firm and at the same time clamped and fixed with the inner clamp plate 28.
- the purpose of adjusting the angle of the hammer head 3 can be achieved by rotating the inner clamp plate 28, which is beneficial to adjust the angle of the hammer head 3, and the return spring 25 provides elastic force to avoid loosening due to improper fixing.
Landscapes
- Catching Or Destruction (AREA)
- Harvester Elements (AREA)
- Vibration Prevention Devices (AREA)
- Clamps And Clips (AREA)
Abstract
Description
Claims (5)
- 一种导线预绞式防振锤,包括线夹本体(1)、镀锌钢绞线(2)、锤头(3)、线夹压板(4)、挡销(5)、闭口销(6)、铰链销(7)、橡胶垫(8)、预绞丝(9)、连接板(10)和旋转固定组件(11),其特征在于:所述线夹本体(1)顶部通过螺丝固定有线夹压板(4),所述线夹压板(4)顶部套接有铰链销(7),所述线夹压板(4)底部套接有闭口销(6),所述闭口销(6)一端套接有挡销(5),所述线夹本体(1)底部两端均套接有镀锌钢绞线(2),所述镀锌钢绞线(2)一端设置有锤头(3),所述锤头(3)一端中心处通过螺丝固定有连接板(10),所述连接板(10)一端安装有旋转固定组件(11),所述旋转固定组件(11)由第一螺纹柱(12)、第一螺母套(13)、滑动孔(14)、卡板(15)、底板(16)、第二螺纹柱(17)、第二螺母套(18)、旋转外壳(19)、螺纹孔(20)、锁紧螺母(21)、外夹板(22)、第一弹簧板(23)、第一套管(24)、复位弹簧(25)、第二套管(26)、第二弹簧板(27)、内夹板(28)、防滑套(29)和加强板(30)组成,所述连接板(10)一端底部与底板(16)顶部贴合,所述底板(16)一端通过螺丝固定有第一螺纹柱(12),所述第一螺纹柱(12)顶部套接有卡板(15),所述卡板(15)一端开设有滑动孔(14),且滑动孔(14)套接在第一螺纹柱(12)外侧,所述第一螺纹柱(12)顶部套接有第一螺母套(13),且第一螺母套(13)位于卡板(15)顶部,所述第一螺纹柱(12)另一端中心处通过螺丝固定有加强板(30),所述加强板(30)一端通过螺丝固定有旋转外壳(19),所述旋转外壳(19)两端均开设有螺纹孔(20),所述螺纹孔(20)内部套接有第二螺纹柱(17),所述第二螺纹柱(17)顶部套接有第二螺母套(18),且第二螺母套(18)位于旋转外壳(19)外壁一侧,所述第二螺纹柱(17)底部套接有锁紧螺母(21),且锁紧螺母(21)位于旋转外壳(19)内壁一侧,所述第二螺纹柱(17)底部通过螺丝固定有外夹板(22),所述外夹板(22)内壁通过螺丝固定有若干个第一弹簧板(23),所述第一弹簧板(23)底部通过螺丝固定有第一套管(24),所述第一套管(24)底部套接有第二套管(26),所述第二套管(26)底部通过螺丝固定有第二弹簧板(27),所述复位弹簧(25)套接在第一套管(24)与第二套管(26)外侧,所述第二弹簧板(27)底部通过螺丝固定有内夹板(28),且内夹板(28)套接在镀锌钢绞线(2)外侧。
- 根据权利要求1所述的一种导线预绞式防振锤,其特征在于:所述线夹压板(4)顶部套接有橡胶垫(8),且橡胶垫(8)内部套接有预绞丝(9)。
- 根据权利要求1所述的一种导线预绞式防振锤,其特征在于:所述线夹压板(4)底部两侧均开设有边槽,且边槽套接在闭口销(6)外侧。
- 根据权利要求1所述的一种导线预绞式防振锤,其特征在于:所述线夹本体(1)两侧均开设有开口槽,且开口槽套接在镀锌钢绞线(2)外侧。
- 根据权利要求1所述的一种导线预绞式防振锤,其特征在于:所述内夹板(28)内部套接有防滑套(29),且防滑套(29)与镀锌钢绞线(2)外侧贴合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR112020010744-1A BR112020010744A2 (pt) | 2018-09-28 | 2018-10-10 | amortecedor de vibração pré-torcido de fio |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811137042.4 | 2018-09-28 | ||
CN201811137042.4A CN108963934B (zh) | 2018-09-28 | 2018-09-28 | 一种导线预绞式防振锤 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020062323A1 true WO2020062323A1 (zh) | 2020-04-02 |
Family
ID=64472679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2018/109601 WO2020062323A1 (zh) | 2018-09-28 | 2018-10-10 | 一种导线预绞式防振锤 |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN108963934B (zh) |
BR (1) | BR112020010744A2 (zh) |
WO (1) | WO2020062323A1 (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112098698A (zh) * | 2020-09-16 | 2020-12-18 | 国网山东省电力公司招远市供电公司 | 一种装表接线放线装置 |
CN112838548A (zh) * | 2021-02-26 | 2021-05-25 | 浙江泰昌实业有限公司 | 一种防磨防滑型防振锤 |
CN113315070A (zh) * | 2021-06-19 | 2021-08-27 | 国家电网有限公司 | 一种锤头-钢绞线可拆卸的防振锤及其安装方法 |
CN113839363A (zh) * | 2021-10-27 | 2021-12-24 | 国网山东省电力公司建设公司 | 一种输电线路预绞式防振锤 |
CN114024255A (zh) * | 2021-10-30 | 2022-02-08 | 国网辽宁省电力有限公司丹东供电公司 | 一种电力工程用预绞丝护线条自动安装设备 |
CN114299475A (zh) * | 2021-12-23 | 2022-04-08 | 北京中电普华信息技术有限公司 | 一种防振锤锈蚀检测方法及相关设备 |
CN114977057A (zh) * | 2022-07-01 | 2022-08-30 | 国网河北省电力有限公司超高压分公司 | 一种便于智能巡检的输电线路防振锤 |
CN115207833A (zh) * | 2022-07-22 | 2022-10-18 | 安徽博晟亿电力科技有限公司 | 一种具备跑位矫正功能的防振锤复位作业机构及其方法 |
CN115411683A (zh) * | 2022-08-31 | 2022-11-29 | 安徽威龙电力器材有限公司 | 一种便于检查挂轴磨损的悬垂线夹及其实施方法 |
CN115632364A (zh) * | 2022-10-24 | 2023-01-20 | 安徽博晟亿电力科技有限公司 | 一种防绞线周期性疲劳损坏的防振锤及其实施方法 |
CN116388099A (zh) * | 2023-02-27 | 2023-07-04 | 江东金具设备有限公司 | 一种预绞式防舞绝缘间隔棒 |
CN116598985A (zh) * | 2023-07-18 | 2023-08-15 | 山东佰斯德电力科技有限公司 | 一种电力工程用线缆防护金具 |
CN116706617A (zh) * | 2023-08-08 | 2023-09-05 | 深圳富明精密工业有限公司 | 一种具有连接锁定结构的电连接器 |
CN117039775A (zh) * | 2023-08-11 | 2023-11-10 | 浙江泰昌实业有限公司 | 一种线夹自锁式防振锤及其智能生产工艺 |
CN117080981A (zh) * | 2023-09-19 | 2023-11-17 | 上海神勇机械技术有限公司 | 铠装接地悬垂线夹 |
CN117620854A (zh) * | 2024-01-25 | 2024-03-01 | 长春市伟伦电力科技有限公司 | 预绞式悬垂线夹加工用的磨削机床 |
WO2025092187A1 (zh) * | 2023-10-31 | 2025-05-08 | 中国电力科学研究院有限公司 | 一种预加应力的防振锤及预加应力的确定方法及系统 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109678022A (zh) * | 2019-02-19 | 2019-04-26 | 王国荣 | 一种高效智能化电梯ucmp检测系统及测试盒 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201289991Y (zh) * | 2008-10-24 | 2009-08-12 | 北京帕尔普线路器材有限公司 | 一种防振锤 |
JP2010142008A (ja) * | 2008-12-11 | 2010-06-24 | Chugoku Electric Power Co Inc:The | 振動防止装置 |
CN205212387U (zh) * | 2015-12-15 | 2016-05-04 | 四平线路器材厂 | 一种特高压防振锤 |
CN105633894A (zh) * | 2014-08-25 | 2016-06-01 | 天津市华电电力器材厂 | 一种防震锤 |
CN207234358U (zh) * | 2017-09-15 | 2018-04-13 | 国网四川省电力公司凉山供电公司 | 一种防震锤 |
CN207504526U (zh) * | 2017-12-07 | 2018-06-15 | 北京帕尔普线路器材有限公司 | 一种预绞式防电晕型防振锤 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208690901U (zh) * | 2018-09-28 | 2019-04-02 | 江苏天南电力器材有限公司 | 一种导线预绞式防振锤 |
-
2018
- 2018-09-28 CN CN201811137042.4A patent/CN108963934B/zh active Active
- 2018-10-10 WO PCT/CN2018/109601 patent/WO2020062323A1/zh active Application Filing
- 2018-10-10 BR BR112020010744-1A patent/BR112020010744A2/pt not_active IP Right Cessation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201289991Y (zh) * | 2008-10-24 | 2009-08-12 | 北京帕尔普线路器材有限公司 | 一种防振锤 |
JP2010142008A (ja) * | 2008-12-11 | 2010-06-24 | Chugoku Electric Power Co Inc:The | 振動防止装置 |
CN105633894A (zh) * | 2014-08-25 | 2016-06-01 | 天津市华电电力器材厂 | 一种防震锤 |
CN205212387U (zh) * | 2015-12-15 | 2016-05-04 | 四平线路器材厂 | 一种特高压防振锤 |
CN207234358U (zh) * | 2017-09-15 | 2018-04-13 | 国网四川省电力公司凉山供电公司 | 一种防震锤 |
CN207504526U (zh) * | 2017-12-07 | 2018-06-15 | 北京帕尔普线路器材有限公司 | 一种预绞式防电晕型防振锤 |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112098698B (zh) * | 2020-09-16 | 2023-07-18 | 国网山东省电力公司招远市供电公司 | 一种装表接线放线装置 |
CN112098698A (zh) * | 2020-09-16 | 2020-12-18 | 国网山东省电力公司招远市供电公司 | 一种装表接线放线装置 |
CN112838548A (zh) * | 2021-02-26 | 2021-05-25 | 浙江泰昌实业有限公司 | 一种防磨防滑型防振锤 |
CN113315070A (zh) * | 2021-06-19 | 2021-08-27 | 国家电网有限公司 | 一种锤头-钢绞线可拆卸的防振锤及其安装方法 |
CN113315070B (zh) * | 2021-06-19 | 2024-04-30 | 国家电网有限公司 | 一种锤头-钢绞线可拆卸的防振锤及其安装方法 |
CN113839363A (zh) * | 2021-10-27 | 2021-12-24 | 国网山东省电力公司建设公司 | 一种输电线路预绞式防振锤 |
CN114024255A (zh) * | 2021-10-30 | 2022-02-08 | 国网辽宁省电力有限公司丹东供电公司 | 一种电力工程用预绞丝护线条自动安装设备 |
CN114024255B (zh) * | 2021-10-30 | 2023-08-08 | 国网辽宁省电力有限公司丹东供电公司 | 一种电力工程用预绞丝护线条自动安装设备 |
CN114299475A (zh) * | 2021-12-23 | 2022-04-08 | 北京中电普华信息技术有限公司 | 一种防振锤锈蚀检测方法及相关设备 |
CN114977057A (zh) * | 2022-07-01 | 2022-08-30 | 国网河北省电力有限公司超高压分公司 | 一种便于智能巡检的输电线路防振锤 |
CN115207833A (zh) * | 2022-07-22 | 2022-10-18 | 安徽博晟亿电力科技有限公司 | 一种具备跑位矫正功能的防振锤复位作业机构及其方法 |
CN115207833B (zh) * | 2022-07-22 | 2023-10-13 | 安徽博晟亿电力科技有限公司 | 一种具备跑位矫正功能的防振锤复位作业机构及其方法 |
CN115411683A (zh) * | 2022-08-31 | 2022-11-29 | 安徽威龙电力器材有限公司 | 一种便于检查挂轴磨损的悬垂线夹及其实施方法 |
CN115632364A (zh) * | 2022-10-24 | 2023-01-20 | 安徽博晟亿电力科技有限公司 | 一种防绞线周期性疲劳损坏的防振锤及其实施方法 |
CN115632364B (zh) * | 2022-10-24 | 2025-04-11 | 安徽博晟亿电力科技有限公司 | 一种防绞线周期性疲劳损坏的防振锤及其实施方法 |
CN116388099B (zh) * | 2023-02-27 | 2023-10-13 | 江东金具设备有限公司 | 一种预绞式防舞绝缘间隔棒 |
CN116388099A (zh) * | 2023-02-27 | 2023-07-04 | 江东金具设备有限公司 | 一种预绞式防舞绝缘间隔棒 |
CN116598985A (zh) * | 2023-07-18 | 2023-08-15 | 山东佰斯德电力科技有限公司 | 一种电力工程用线缆防护金具 |
CN116598985B (zh) * | 2023-07-18 | 2023-09-19 | 山东佰斯德电力科技有限公司 | 一种电力工程用线缆防护金具 |
CN116706617A (zh) * | 2023-08-08 | 2023-09-05 | 深圳富明精密工业有限公司 | 一种具有连接锁定结构的电连接器 |
CN116706617B (zh) * | 2023-08-08 | 2024-01-19 | 深圳富明精密工业有限公司 | 一种具有连接锁定结构的电连接器 |
CN117039775A (zh) * | 2023-08-11 | 2023-11-10 | 浙江泰昌实业有限公司 | 一种线夹自锁式防振锤及其智能生产工艺 |
CN117039775B (zh) * | 2023-08-11 | 2024-02-02 | 浙江泰昌实业有限公司 | 一种线夹自锁式防振锤及其智能生产工艺 |
CN117080981A (zh) * | 2023-09-19 | 2023-11-17 | 上海神勇机械技术有限公司 | 铠装接地悬垂线夹 |
WO2025092187A1 (zh) * | 2023-10-31 | 2025-05-08 | 中国电力科学研究院有限公司 | 一种预加应力的防振锤及预加应力的确定方法及系统 |
CN117620854A (zh) * | 2024-01-25 | 2024-03-01 | 长春市伟伦电力科技有限公司 | 预绞式悬垂线夹加工用的磨削机床 |
CN117620854B (zh) * | 2024-01-25 | 2024-03-26 | 长春市伟伦电力科技有限公司 | 预绞式悬垂线夹加工用的磨削机床 |
Also Published As
Publication number | Publication date |
---|---|
BR112020010744A2 (pt) | 2020-11-24 |
CN108963934A (zh) | 2018-12-07 |
CN108963934B (zh) | 2019-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020062323A1 (zh) | 一种导线预绞式防振锤 | |
US20090014208A1 (en) | Hinged bushing suspension clamp and method for using said clamp | |
JP2019513204A5 (zh) | ||
EP2824786B1 (en) | Vibration damper for an aerial cable or conductor | |
CN206272732U (zh) | 一种公共安全用的防破坏的微型摄像机 | |
CN204290226U (zh) | 节能型防振锤 | |
CN106911112B (zh) | 一种输电线路防振锤的固定装置 | |
CN118508345A (zh) | 一种回转式悬垂线夹 | |
CN111376039A (zh) | 防震锤螺栓紧固装置 | |
CN207835259U (zh) | 一种带安装支架的电机 | |
CN217784784U (zh) | 可调节支撑臂结构 | |
CN208690901U (zh) | 一种导线预绞式防振锤 | |
CN201766333U (zh) | 一种防松装置和防振锤 | |
CN201241878Y (zh) | 减震紧固装置以及风扇装置 | |
CN211163786U (zh) | 一种镜头拆解治具 | |
CN216981484U (zh) | 一种输电线路防振锤防滑套 | |
CN109555768B (zh) | 一种医用连接轴的辅助紧固装置 | |
CN209855445U (zh) | 锁紧装置及电气柜 | |
CN217640915U (zh) | 一种变压器铁芯夹件结构 | |
KR200457967Y1 (ko) | 송전선로용 스페이서 댐퍼의 클램퍼 및 이에 채용되는 조절 볼트가 결합된 클립 | |
CN222301946U (zh) | 一种音响过载保护装置 | |
CN221743018U (zh) | 一种阻尼转轴结构以及摄影设备固定支架 | |
CN223004293U (zh) | 一种防脱落卡式螺母 | |
CN111564806A (zh) | 防滑防损伤导线新型防振锤 | |
CN216130724U (zh) | 一种电控柜门板固定工装 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18935944 Country of ref document: EP Kind code of ref document: A1 |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112020010744 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112020010744 Country of ref document: BR Kind code of ref document: A2 Effective date: 20200528 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18935944 Country of ref document: EP Kind code of ref document: A1 |