WO2020052291A1 - 附着于钢平台模架的施工电梯附墙架安装平台及方法 - Google Patents
附着于钢平台模架的施工电梯附墙架安装平台及方法 Download PDFInfo
- Publication number
- WO2020052291A1 WO2020052291A1 PCT/CN2019/090296 CN2019090296W WO2020052291A1 WO 2020052291 A1 WO2020052291 A1 WO 2020052291A1 CN 2019090296 W CN2019090296 W CN 2019090296W WO 2020052291 A1 WO2020052291 A1 WO 2020052291A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- steel
- platform
- construction elevator
- guide rails
- attached
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Definitions
- the invention relates to the technical field of building construction, in particular to a construction elevator wall attachment platform and method for a construction elevator attached to a steel platform formwork.
- This type of construction platform has a simple structure, but its safety is poor, and the construction platform needs to be dismantled after each construction and reinstalled in the next construction, which is time-consuming and labor-intensive.
- the purpose of the present invention is to provide a construction elevator attached wall frame mounting platform and method attached to a steel platform formwork, which can be synchronously lifted with the steel platform, avoiding repeated installation and disassembly, and can be partially adjusted in height to suit the construction elevator attachment.
- the installation height of the wall frame reduces the influence of wind load on the installation of the wall frame of the construction elevator and improves the safety and reliability of the construction.
- the present invention provides the following technical solutions:
- a construction elevator wall-attachment mounting platform attached to a steel platform formwork includes an electric hoist, a hanging basket, four guide rails, and a bolt, and the four guide rails are hung from a steel platform steel beam by bolts, two of which are A plurality of connecting rods are provided at equal intervals between the guide rails to form a climbing ladder.
- the lower ends of the four guide rails are connected by section steel and a closed steel plate is laid.
- the gondola is suspended by an electric hoist in a space surrounded by the four guide rails.
- the guide rail is provided with a row of bolt holes along its longitudinal direction, and a bolt hole is respectively provided on the surrounding pillars of the basket.
- the bolt holes of the basket and the bolt holes on the guide rail are connected by the bolts.
- a card slot block is respectively provided on the card slot block, and the card slot block is provided with a card slot matching the outer contour of the corresponding guide rail.
- the guide rail is H-shaped steel.
- the card slot is C-shaped and is sleeved on the outside of one end of the H-shaped steel.
- an oblique guide rail support is provided between each guide rail and the steel platform steel beam.
- the climbing ladder is located on the side of the four guide rails away from the construction elevator attachment wall bracket to be installed.
- the connecting rod is a 40x40mm angle steel with an interval of 300mm.
- the invention also discloses a construction method of a wall mounting platform for a construction elevator attached to a steel platform formwork as described above, including the following steps:
- the first step is to fix the four guide rails under the steel platform steel beam on the side where the wall bracket of the construction elevator is to be installed, among which there are several connecting rods at equal intervals between the two guide rails to form the ladder;
- the second step is to lift the gondola with an electric hoist, so that the card slot of the gondola catches the guide rail, and inserts the bolt;
- the lower ends of the four guide rails are connected to form a single body and closed steel plates are laid to complete the installation of the construction elevator attachment wall mounting platform attached to the steel platform formwork on the side where the attachment wall bracket of the construction elevator is to be installed;
- the fourth step is to install the construction elevator attachment wall mounting platform attached to the steel platform formwork on the other side of the construction elevator attachment wall bracket to be installed in the same way;
- the sixth step is to remove the bolt and adjust the height of the hanging basket by the electric hoist to a position suitable for installing the wall bracket of the construction elevator;
- the eighth step the installer begins to install the construction elevator wall bracket
- the installer leaves the gondola along the climbing ladder.
- the construction elevator attachment wall rack installation platform attached to the steel platform formwork provided by the present invention hangs four guide rails on the steel platform steel beam by bolts, and the four guide rails can withstand when the installer installs the construction elevator attachment wall rack.
- the weight of the gondola and installers can be synchronized with the steel platform, which reduces the continuous assembly and disassembly process, saving time and labor.
- the gondola is suspended in a space surrounded by the four guide rails by an electric hoist, the guide rail is provided with a row of pin holes along its longitudinal direction, and a column is provided on each of the surrounding columns of the gondola.
- a bolt hole, the bolt hole of the hanging basket and the bolt hole on the guide rail are connected through the bolt, and the height of the hanging basket can be adjusted by means of an electric hoist And using the basket is fixed to the latch position suitable for installation of the wall frame attached to the elevator construction.
- the surrounding pillars of the gondola are respectively provided with card groove blocks.
- the card groove blocks are provided with card grooves matching the outer contour of the corresponding guide rails.
- the card grooves of the gondola catch the guide rails to improve the lateral rigidity of the mounting platform. Prevent the gondola from swinging sideways under the effect of wind load, reduce the fear of installation workers, and improve construction safety.
- the construction elevator attached to the steel platform formwork attached to the wall mounting platform of this embodiment integrates three layers of safety lines, which are bolts, electric hoists, and closed steel plates at the lower end of the guide rails, making the construction safer and more reliable.
- the construction method of the construction elevator attachment wall mounting platform attached to the steel platform formwork provided by the present invention, four guide rails are bolted below the steel platform steel beam on one side of the construction elevator attachment construction wall to be installed, of which two Several connecting rods are equidistantly formed between the guide rails to form a ladder, so that the installation platform can climb synchronously with the steel platform, reducing the process of continuous assembly and disassembly, saving time and labor; lifting the gondola with an electric hoist, making the gondola
- the clamping grooves of the guide rails can improve the lateral rigidity of the installation platform, prevent the basket from swinging sideways under the effect of wind loads, reduce the fear of installation workers, and improve construction safety; the lower ends of the four guide rails are connected by profile steel Integrate and lay a closed steel plate, thereby completing the installation of the construction elevator attachment wall mounting platform attached to the steel platform formwork at the side where the attachment wall bracket of the construction elevator is to be installed, which can not only improve the overall rigid
- FIG. 1 is a use state diagram of a construction elevator wall attachment platform attached to a steel platform formwork according to an embodiment of the present invention
- FIG. 2 is a schematic plan view of a mounting platform for a wall attachment of a construction elevator attached to a steel platform formwork according to an embodiment of the present invention
- FIG. 3 is a schematic view from A to A in FIG. 2; FIG.
- Fig. 4 is a schematic diagram taken along the line B-B in Fig. 2.
- this embodiment discloses a construction elevator wall mounting platform attached to a steel platform formwork, which is used to install the wall attachment 13 of the construction elevator 12 on the core wall 11.
- the construction elevator wall-attachment mounting platform attached to a steel platform formwork includes: an electric hoist 1, a hanging basket 2, four guide rails 3, and a limit bolt 4, the four guide rails 3 are hung on the steel platform steel by bolts.
- On the beam 5 two connecting rails 3 are equidistantly provided with a plurality of connecting rods 6 to form a climbing ladder.
- the lower ends of the four rails 3 are connected by profile steel 8 and a closed steel plate (not labeled) is laid.
- the hanging basket 2 is electrically connected by electricity.
- the hoist 1 is suspended in a space surrounded by the four guide rails 3, the four guide rails 3 surround a square frame, the cross section of the hanging basket 2 is square, and the guide rail 3 is provided with a row of pins along its longitudinal direction.
- the hole is the first pin hole, and the surrounding columns of the gondola 2 are respectively provided with a pin hole, that is, the second pin hole.
- the pin hole of the gondola 2 and the pin hole on the guide rail 3 are connected through the pin 4.
- the surrounding columns of the hanging basket 2 are respectively provided with clamping groove blocks, and the clamping groove blocks are provided with clamping grooves 9 matching the outer contour of the corresponding guide rail 3.
- the construction elevator attachment wall rack installation platform attached to the steel platform formwork provided in this embodiment hangs four guide rails 3 on the steel platform steel beam 5 by bolts, and the four guide rails 3 are installed by the installer to install the construction elevator attachment wall rack. At 13, it can bear the weight of the hanging basket 2 and the installation workers, and can climb synchronously with the steel platform, which reduces the continuous assembly and disassembly process, saving time and labor. Among them, there are several connecting rods 6 at equal intervals between the two guide rails 3.
- Forming a climbing ladder can not only enhance the rigidity of the guide rail 3, but also can be used as an up-and-down climbing ladder; the lower ends of the four guide rails 3 are connected by section steel 8 and a closed steel plate is laid, which can not only strengthen the lateral rigidity of the guide rails 3 but also increase the four guide rails 3
- the guide rail 3 is provided with a row of bolt holes along its longitudinal direction, and a bolt hole is respectively formed on each of the surrounding columns of the hanging basket 2.
- the bolt hole of the hanging basket 2 and the bolt hole on the guide rail 3 pass through the plug. 4 is connected, by means of the electric hoist 1 can adjust the height of the basket 2 and 4 using a pin fixed to the basket 2 a suitable position attached to the wall mounting construction elevator cage.
- the surrounding columns of the gondola 2 are respectively provided with card slot blocks, the card slot blocks are provided with card slot 9 matching the outer contour of the corresponding guide rail 3, and the card slot 9 of the gondola 2 catches the rail 3 to improve
- the lateral rigidity of the installation platform prevents the sideways swing of the gondola 2 under the action of the wind load, reduces the fear of installation workers, and improves construction safety.
- the construction elevator attached to the steel platform formwork attached to the wall mounting platform of this embodiment integrates three layers of safety lines, which are bolts 4, electric hoists 1, and closed steel plates at the lower end of the guide rail 3, making the construction safer and more reliable. .
- the four square pipe columns of the gondola 2 that is, the surrounding columns of the gondola 2 are provided with a pin hole corresponding to a row of pin holes on each guide rail 3.
- the pin holes on the basket 2 correspond to the pin holes of different heights on the guide rail 3.
- the weight of the gondola 2 and the installer is borne by the electric hoist 1.
- the two guide rails 3 are equidistantly provided with a plurality of connecting rods 6 to form a climbing ladder
- the connecting rods 6 are 40x40mm angle steel, spaced It is 300mm, which can not only enhance the rigidity of the guide rail 3, but also can be used as an up and down ladder.
- the guide rail 3 is H-shaped steel
- the above-mentioned construction elevator wall mounting installation platform attached to the steel platform formwork the guide rail 3 is H-shaped steel
- the card slot 9 is C-shaped, and is sleeved on the outer side of the wing plate at one end of the H-shaped steel, so that the lateral rigidity of the installation platform can be increased, and the swinging of the gondola 2 under the wind load can be prevented, thereby reducing the fear of installation workers. Psychology to improve construction safety.
- an oblique guide support 10 is provided between each guide rail 3 and the steel platform steel beam 5 to further improve the side of the guide rail 3.
- Directional stiffness thereby increasing the overall stiffness of the mounting platform.
- the climbing ladder is located on the side of the four guide rails 3 away from the construction elevator attachment wall bracket to be installed.
- this embodiment also discloses a construction method of a construction elevator attachment wall mounting platform attached to a steel platform formwork as described above, including the following steps:
- the second step is to lift the gondola 2 with the electric hoist 1 so that the slot 9 of the gondola 2 catches the guide rail 3 and inserts the latch 4;
- the lower ends of the four guide rails 3 are connected into a single body by using section steel 8 and a closed steel plate is laid to complete the installation of the construction elevator attachment wall mounting platform attached to the steel platform formwork on the side where the attachment wall bracket of the construction elevator is to be installed. ;
- the fourth step is to install the construction elevator attachment wall mounting platform attached to the steel platform formwork on the other side of the construction elevator attachment wall bracket to be installed in the same way;
- the sixth step is to remove the bolt 4 and adjust the height of the hanging basket 2 by the electric hoist 1 to a position suitable for installing the wall bracket of the construction elevator;
- the seventh step insert the bolt 4 and adjust the electric hoist 1 so that the gondola 2 sinks, so as to transfer the gravity of the gondola 2 and thus the electric hoist 1 to the guide rail 3;
- the eighth step the installer begins to install the construction elevator wall bracket
- the installer leaves the hanging basket 2 along the ladder.
- the wall-mounted installation platform can not only strengthen the lateral direction of the guide rails 3
- the rigidity improves the overall rigidity of the four guide rails 3, and also plays a role of supporting the hanging basket 2 when the bolt 4 and the electric hoist 1 fail, improving the construction safety;
- the installation platform is raised with the steel platform steel beam 5 ,
- the installer descends into the hanging basket 2 along the ladder, removes the bolt 4, and adjusts the height of the hanging basket 2 by the electric hoist 1 to a position suitable for installing the wall bracket of the construction elevator, inserts the plug 4, and adjusts the electric hoist 1 to make the hanging basket 2 sinks, so that the gravity of the hanging basket 2 and the electric hoist 1 are transferred to the guide rail 3, and the installer starts to install the construction elevator wall bracket, thereby realizing the safe construction of the elevator wall bracket.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
Description
Claims (7)
- 一种附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,包括:电葫芦、吊篮、四根导轨以及插销,所述四根导轨通过螺栓下挂于钢平台钢梁上,其中两根导轨之间等间距设有若干连接杆形成爬梯,所述四根导轨的下端通过型钢连接并铺设封闭钢板,所述吊篮通过电葫芦悬挂于所述四根导轨围成的空间内,所述导轨沿自身纵向设有一排插销孔,所述吊篮的四周立柱上分别开设一插销孔,所述吊篮的插销孔与导轨上的插销孔通过所述插销连接,所述吊篮的四周立柱上分别设置卡槽块,所述卡槽块设有与对应导轨的外轮廓相匹配的卡槽。
- 如权利要求1所述的附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,所述导轨为H型钢。
- 如权利要求2所述的附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,所述卡槽呈C字形,套设于H型钢的一端翼板外侧。
- 如权利要求1所述的附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,每根导轨与钢平台钢梁之间设有一斜向的导轨支撑。
- 如权利要求1所述的附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,所述爬梯位于四根导轨中远离拟安装施工电梯附墙架的那一侧。
- 如权利要求1所述的附着于钢平台模架的施工电梯附墙架安装平台,其特征在于,所述连接杆为40x40mm角钢,间隔为300mm。
- 一种如权利要求1-6中任意一项所述的附着于钢平台模架的施工电梯附墙架安装平台的施工方法,其特征在于,包括如下步骤:第一步,在拟安装施工电梯附墙架的一侧,将四根导轨采用螺栓固定于钢平台钢梁下方,其中两根导轨之间等间距设有若干连接杆形成爬梯;第二步,用电葫芦将吊篮吊起,使得吊篮的卡槽卡住导轨,并插上插销;第三步,四根导轨的下端采用型钢连接成一体并铺设封闭钢板,从而在拟安装施工电梯附墙架的一侧完成附着于钢平台模架的施工电梯附墙架安装平台的安装;第四步,以相同的方法在拟安装施工电梯附墙架的另一侧安装附着于钢平 台模架的施工电梯附墙架安装平台;第五步,安装平台随钢平台钢梁提升后,安装工人沿着爬梯下至吊篮内;第六步,取下插销,通过电葫芦调节吊篮高度至适宜安装施工电梯附墙架的位置;第七步,插上插销,调节电葫芦使得吊篮下沉,以使吊篮的重力从电葫芦转移至导轨上;第八步,安装工人开始安装施工电梯附墙架;第九步,施工电梯附墙架安装完成后,安装工人沿爬梯离开吊篮。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811066294.2A CN108708546B (zh) | 2018-09-13 | 2018-09-13 | 附着于钢平台模架的施工电梯附墙架安装平台及方法 |
CN201811066294.2 | 2018-09-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020052291A1 true WO2020052291A1 (zh) | 2020-03-19 |
Family
ID=63873587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2019/090296 WO2020052291A1 (zh) | 2018-09-13 | 2019-06-06 | 附着于钢平台模架的施工电梯附墙架安装平台及方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN108708546B (zh) |
WO (1) | WO2020052291A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111485499A (zh) * | 2020-05-15 | 2020-08-04 | 中铁建大桥工程局集团第四工程有限公司 | 一种用于高位小空间作业电动爬升吊篮及安装方法 |
CN111827651A (zh) * | 2020-07-28 | 2020-10-27 | 郭智斌 | 一种装配式建筑外挂平台 |
CN112962916A (zh) * | 2021-02-08 | 2021-06-15 | 斯迈普电梯(中国)有限公司 | 一种新型冷弯薄壁型钢电梯井道 |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708546B (zh) * | 2018-09-13 | 2018-12-07 | 上海建工集团股份有限公司 | 附着于钢平台模架的施工电梯附墙架安装平台及方法 |
CN109775511A (zh) * | 2019-01-30 | 2019-05-21 | 中建四局第六建筑工程有限公司 | 一种顶升平台的施工电梯附着结构及附着方法 |
CN110195411A (zh) * | 2019-04-04 | 2019-09-03 | 中铁大桥局集团第六工程有限公司 | 一种自行式桥梁模板作业台车 |
CN113482311B (zh) * | 2021-06-29 | 2023-01-03 | 中交二公局第七工程有限公司 | 一种绿色工程建设用施工辅助安装架 |
CN113942966A (zh) * | 2021-10-19 | 2022-01-18 | 西安热工研究院有限公司 | 一种爬高升降器 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199800A (ja) * | 1995-01-19 | 1996-08-06 | Nihon Bisoh Co Ltd | ゴンドラ装置 |
CN103723600A (zh) * | 2014-01-17 | 2014-04-16 | 上海建工集团股份有限公司 | 施工电梯上钢平台的附墙装置及其操作方法 |
CN103866985A (zh) * | 2012-12-18 | 2014-06-18 | 中建四局第一建筑工程有限公司 | 一种施工电梯与爬模架体对接方法及装置 |
CN207296386U (zh) * | 2017-07-28 | 2018-05-01 | 中建四局第一建筑工程有限公司 | 一种施工电梯与爬模架体的组合结构 |
CN108708546A (zh) * | 2018-09-13 | 2018-10-26 | 上海建工集团股份有限公司 | 附着于钢平台模架的施工电梯附墙架安装平台及方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8302735B2 (en) * | 2005-06-29 | 2012-11-06 | Sky Climber, Llc | Self-erecting suspension platform system |
CN2832761Y (zh) * | 2005-10-02 | 2006-11-01 | 吴仁山 | 电梯安装吊篮 |
JP5105146B2 (ja) * | 2007-03-12 | 2012-12-19 | 清水建設株式会社 | ゴンドラ装置及びゴンドラ装置を用いた建物の外装の施工方法 |
CN105735140B (zh) * | 2016-04-15 | 2017-10-24 | 中国五冶集团有限公司 | 一种桥梁侧方高空作业平台装置 |
CN206607835U (zh) * | 2017-01-22 | 2017-11-03 | 中国航天建设集团有限公司 | 建筑吊篮以及带软梯的吊篮 |
CN106672743A (zh) * | 2017-03-07 | 2017-05-17 | 中国五冶集团有限公司 | 用于大空间结构施工电梯附墙架的临时支撑装置 |
-
2018
- 2018-09-13 CN CN201811066294.2A patent/CN108708546B/zh active Active
-
2019
- 2019-06-06 WO PCT/CN2019/090296 patent/WO2020052291A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199800A (ja) * | 1995-01-19 | 1996-08-06 | Nihon Bisoh Co Ltd | ゴンドラ装置 |
CN103866985A (zh) * | 2012-12-18 | 2014-06-18 | 中建四局第一建筑工程有限公司 | 一种施工电梯与爬模架体对接方法及装置 |
CN103723600A (zh) * | 2014-01-17 | 2014-04-16 | 上海建工集团股份有限公司 | 施工电梯上钢平台的附墙装置及其操作方法 |
CN207296386U (zh) * | 2017-07-28 | 2018-05-01 | 中建四局第一建筑工程有限公司 | 一种施工电梯与爬模架体的组合结构 |
CN108708546A (zh) * | 2018-09-13 | 2018-10-26 | 上海建工集团股份有限公司 | 附着于钢平台模架的施工电梯附墙架安装平台及方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111485499A (zh) * | 2020-05-15 | 2020-08-04 | 中铁建大桥工程局集团第四工程有限公司 | 一种用于高位小空间作业电动爬升吊篮及安装方法 |
CN111827651A (zh) * | 2020-07-28 | 2020-10-27 | 郭智斌 | 一种装配式建筑外挂平台 |
CN112962916A (zh) * | 2021-02-08 | 2021-06-15 | 斯迈普电梯(中国)有限公司 | 一种新型冷弯薄壁型钢电梯井道 |
CN112962916B (zh) * | 2021-02-08 | 2021-12-07 | 斯迈普电梯(中国)有限公司 | 一种冷弯薄壁型钢电梯井道 |
Also Published As
Publication number | Publication date |
---|---|
CN108708546A (zh) | 2018-10-26 |
CN108708546B (zh) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020052291A1 (zh) | 附着于钢平台模架的施工电梯附墙架安装平台及方法 | |
CN106958346B (zh) | 曲面超高层建筑智能化附着升降脚手架设备及施工方法 | |
CN105401714A (zh) | 一种附着式升降脚手架及升降方法 | |
CN205077845U (zh) | 建筑物核心筒井道液压智能爬升操作脚手架 | |
KR101553966B1 (ko) | 외벽설치 타워크레인 등반장치 | |
CN108033367B (zh) | 一种钢柱筒架交替支撑式钢平台与塔吊同步提升装置及其提升方法 | |
CN205077885U (zh) | 建筑物核心筒液压智能爬升防护平台 | |
CN102587645A (zh) | 具有伸缩及自动咬合功能的可爬升支撑机构及其施工方法 | |
CN205100531U (zh) | 一种升降脚手架架体总成 | |
CN104989111B (zh) | 钢结构高层吊装施工方法 | |
WO2023240812A1 (zh) | 一种用于空中增加核心筒墙体的整体施工平台结构及方法 | |
CN113323368A (zh) | 用于拼装式建筑的外防护挂架升降施工方法 | |
CN105152052B (zh) | 一种玻璃幕墙构件安装方法 | |
CN206053282U (zh) | 一种转角附着升降脚手架主框架 | |
CN205575534U (zh) | 格构式井字形架体提升设备 | |
CN210857952U (zh) | 一种新型附着式升降脚手架 | |
CN105625732B (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
CN110359696A (zh) | 一种可调节附着式升降脚手架及其斜爬方法 | |
CN214995818U (zh) | 一种建筑物外部的爬升式施工操作平台 | |
CN103225390B (zh) | 中空立面滑轮导座式附着升降脚手架 | |
CN107642241A (zh) | 一种预制阳台的受力支撑结构及施工方法 | |
CN211473336U (zh) | 受力稳定的附着式升降脚手架 | |
CN114412192A (zh) | 层间复杂异型铝单板幕墙及其施工方法 | |
CN210973660U (zh) | 一种适用于整体提升架的可翻转塔吊临时通道 | |
CN107269014B (zh) | 液压爬模变角度防护网系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19858744 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19858744 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 11.08.2021) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19858744 Country of ref document: EP Kind code of ref document: A1 |