WO2020010326A1 - Technologies for optimizing power grids through decentralized forecasting - Google Patents
Technologies for optimizing power grids through decentralized forecasting Download PDFInfo
- Publication number
- WO2020010326A1 WO2020010326A1 PCT/US2019/040719 US2019040719W WO2020010326A1 WO 2020010326 A1 WO2020010326 A1 WO 2020010326A1 US 2019040719 W US2019040719 W US 2019040719W WO 2020010326 A1 WO2020010326 A1 WO 2020010326A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power grid
- conditions
- power
- components
- component
- Prior art date
Links
- 238000005516 engineering process Methods 0.000 title abstract description 4
- 238000005259 measurement Methods 0.000 claims abstract description 48
- 238000000034 method Methods 0.000 claims description 103
- 238000013528 artificial neural network Methods 0.000 claims description 76
- 238000005457 optimization Methods 0.000 claims description 51
- 238000009826 distribution Methods 0.000 claims description 40
- 230000006399 behavior Effects 0.000 claims description 28
- 239000003795 chemical substances by application Substances 0.000 claims description 28
- 238000004519 manufacturing process Methods 0.000 claims description 17
- 230000006870 function Effects 0.000 claims description 16
- 238000010801 machine learning Methods 0.000 claims description 15
- 238000010248 power generation Methods 0.000 claims description 12
- 239000002028 Biomass Substances 0.000 claims description 7
- 230000000306 recurrent effect Effects 0.000 claims description 7
- 238000000714 time series forecasting Methods 0.000 claims description 6
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 claims description 5
- 239000000446 fuel Substances 0.000 claims description 5
- 239000001257 hydrogen Substances 0.000 claims description 5
- 229910052739 hydrogen Inorganic materials 0.000 claims description 5
- 230000004044 response Effects 0.000 claims description 3
- 238000004891 communication Methods 0.000 description 26
- 238000012986 modification Methods 0.000 description 13
- 230000004048 modification Effects 0.000 description 13
- 230000005856 abnormality Effects 0.000 description 10
- 230000008569 process Effects 0.000 description 10
- 238000012549 training Methods 0.000 description 9
- 238000013500 data storage Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000003860 storage Methods 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 240000007651 Rubus glaucus Species 0.000 description 1
- 235000011034 Rubus glaucus Nutrition 0.000 description 1
- 235000009122 Rubus idaeus Nutrition 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00002—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/0265—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion
- G05B13/027—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion using neural networks only
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/048—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00022—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/20—Climate change mitigation technologies for sector-wide applications using renewable energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/30—State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
Definitions
- each of the plurality of compute devices may be further configured to receive measurements of one or more conditions of other power grid components from other compute devices of the plurality of compute devices.
- the plurality of autonomous agents may negotiate with one another in a virtual market place according to a trading algorithm.
- the distributed energy resources may supply power to the power grid from one or more renewable energy sources.
- the central control is not configured to set the behaviors of the plurality of power grid components.
- obtaining measurements of the one or more conditions of the associated power grid component may comprise obtaining measurements of power consumption of the associated power grid component.
- obtaining measurements of the one or more conditions of the associated power grid component may comprise obtaining measurements of power generation of the associated power grid component.
- the method may further comprise receiving, by the compute device, measurements of one or more conditions of the other power grid components from the other compute devices.
- the future state of the one or more conditions of the power grid component forecast by the compute device may be between 1 and 60 minutes into the future. [0053] In some embodiments, the future state of the one or more conditions of the power grid component forecast by the compute device may be less than one minute into the future.
- forecasting the future state of the one or more conditions may comprise employing time series forecasting.
- the forecast of the future state of the one or more conditions may be based on the obtained measurements of the one or more conditions for the associated power grid component.
- to locally optimize the subsection of the power grid may comprise to maximize availability of the associated power grid component and the other power grid components.
- to negotiate the behavior of the associated power grid component using the forecast may comprise executing a neural network by the compute device.
- the neural network may comprise one of a feedforward neural network, a radial basis function neural network, a kohonen self-organizing neural network, a recurrent neural network, a modular neural networks, and a physical neural network.
- the associated power grid component may be a distributed energy resource.
- the distribution substation may comprise one or more voltage transformers.
- the disclosed embodiments may be implemented, in some cases, in hardware, firmware, software, or any combination thereof.
- the disclosed embodiments may also be implemented as instructions carried by or stored on a transitory or non-transitory computer- readable storage medium, which may be read and executed by one or more processors.
- a computer-readable storage medium may be embodied as any storage device, mechanism, or other physical structure for storing or transmitting information in a form readable by a compute device (e.g., a volatile or non-volatile memory, a media disc, or other media device).
- the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process, or any other command necessary in order to maintain the decentralized power grid 100.
- the central control 102 may exchange data with at least one of the other power grid components in FIG. 1. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the power grid 100.
- the central control may be a power station, such as a coal power station, a nuclear power station, a wind farm, or any other station capable of producing electrical power.
- the industrial load 108 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112.
- the industrial load 108 is communicatively coupled with the central control and each of the power grid components in the subsection 112.
- the industrial load 108 may negotiate with at least one of the power grid components in the subsection 112.
- the distribution substation may negotiate using a machine learning technique, such as a neural network or an autonomous agent.
- the industrial load 108 may negotiate with the other power grid components in order to optimize the subsection 112.
- the industrial load 108 may negotiate with power grid components outside the subsection 112.
- the industrial load 108 may negotiate with power grid components based on constraints received from the central control 102.
- the residential load 110 may be embodied as any power grid component capable of fulfilling the functions described herein.
- the residential load 110 consumes electricity and is electrically connected to each of the power grid components in the subsection 112.
- the residential load 110 may be embodied a single-family home, a condominium, a town house, or any other type of residential building.
- the industrial load may include a DER such as solar panels, wind turbines, or other generators.
- the residential load 110 comprises a compute device 200.
- the residential load 110 may gather data related to its power consumption and its power production.
- the residential load 110 may gather local weather data.
- the residential load 110 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112.
- the residential load 110 may receive override commands from the central control 102.
- the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the decentralized power grid 100.
- the subsection 112 may be embodied as any subsection of a power grid.
- the subsection of the power grid 100 contains the distribution substation 104, the DER 106, the industrial load 108, and the residential load 110.
- the subsection 112 may contain any combination of power stations, power transformers, transmission substations, distribution substations, DERs, distribution automation devices, commercial/ industrial consumers, residential consumers, and any other power grid component.
- Each power grid component in subsection 112 may comprise a compute device 200.
- Each power grid component in subsection 112 may be electrically and communicatively coupled to each other.
- the power grid components within the subsection 112 may negotiate with each other.
- the distribution substation may negotiate using a machine learning technique, such as a neural network or autonomous agents.
- the power grid components may negotiate in order to optimize the subsection 112.
- the forecast determiner 302 which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to forecast the power production and consumption of the power grid component connected to the compute device 200.
- the forecast determiner 302 may determine the current power output and the current power consumption of the attached power grid component.
- the forecast determiner 302 may then retrieve data from the sensors 212.
- the forecast determiner 302 may retrieve data related to the voltage levels, the current levels, and weather data, such as the temperature, the wind speed, and the humidity levels.
- the forecast determiner 302 may receive weather data from the central control 102.
- the forecast determiner 302 may download the weather prediction from another source.
- the communication controller 304 which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to establish a communication link with the other power grid components in the subsection 112. In some embodiments, the communication controller 304 may establish a communication link with power grid components outside of the subsection 112. In some embodiments, the communication channel will be established using the 5G communication protocol.
- the compute device 200 monitors the current power output and/or the current power consumption of the power grid component associated with the compute device 200.
- the power output may be generated by the DER 214.
- the DER 214 may be embodied as solar panels, hydro systems, wind turbines, geothermal power systems, biomass power systems, diesel generators, and/or any other systems capable of producing and/or storing electrical power.
- the compute device 200 may monitor the current power output and/or the current power consumption of other power grid components.
- the distribution substation 104 may monitor the current power output and the current power consumption of the DER 106, industrial load 108, and residential load 110.
- the compute device 200 may determine if an abnormality is detected.
- the compute device 200 may detect the abnormality using machine learning techniques. If the compute device 200 detects an abnormality, then the method advances to block 408.
- the compute device 200 addresses the abnormality. In some embodiments the compute device address the abnormality by adjusting the amount of power consumed or produced by the power grid component. If the compute device 200 does not detect an abnormality, then the method advances to block 410.
- the compute device 200 may retrieve historical data from the historical database 310.
- the compute device 200 may retrieve the historical data based in part on the current power production, the current power consumption, the retrieved sensor data, the weather, the present day, and the current time.
- the historical data may describe typical power output/consumption levels of the power grid component under similar constraints. In some embodiments, the historical data may represent human behavior.
- the optimization strategy may state that the power grid components in subsection should be optimized in order to produce maximum power. In some embodiments, the optimization strategy may state that the power grid components in subsection should be optimized in order to lower cost and energy loss. In some embodiments, the optimization strategy may state that the power grid components in subsection should be optimized in order to maximize reliability, availability or resilience. In some embodiments, the optimization strategy may be adjusted based on pre-defined key performance indicators.
- the compute device 200 configures the optimization strategy based on the constraints received from central control. The compute device 200 may configure the optimization strategy based on the power production of the DER 106. In some embodiments, the compute device 200 may modify the optimization strategy based on the optimization strategy of other compute devices 200 in the subsection 112.
- the compute device 200 determines if it should begin the optimization process with power grid components further away.
- the determination in block 428 may involve the compute device 200 evaluating whether it was able to successfully implement its optimization strategy by negotiating with the first subset of power grid components. If not, the compute device 200 may decide to negotiate with power grid components further away to attempt to implement its optimization strategy. In this case, the method 400 advances to block 430. If the compute device 200 decides to not negotiate with power grid components further away, then the method 400 advances to block 438.
- the compute device 200 established a communication link with a second subset of power grid components.
- the second subset of power grid components is defined by all power grid components within a second subset of the electrical grid.
- the communication channel will be established using the 5G communication protocol.
- the compute device 200 begins negotiation with the second subset of power grid components.
- the compute device 200 negotiates with the second subset of power grid components in order to implement the optimization strategy.
- the negotiations may be implemented with a neural network, an autonomous agent or any other negotiation method.
- the neural network may be embodied as a feedforward neural network, radial basis function neural network, kohonen self-organizing neural network, recurrent neural network, modular neural networks, physical neural network, or any other type of neural network.
- the negotiations will result in potential power modification that the compute device 200 may implement to the power grid component
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Power Engineering (AREA)
- Artificial Intelligence (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Evolutionary Computation (AREA)
- Strategic Management (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Automation & Control Theory (AREA)
- Software Systems (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Technologies for optimizing a power grid through decentralized forecasting are disclosed. In at least one illustrative embodiment, a power grid may comprise a plurality of power grid components and a plurality of compute devices each associated with one of the plurality of power grid components. Each of the plurality of compute devices may be configured to obtain measurements of one or more conditions of the associated power grid component, to forecast a future state of the one or more conditions of the associated power grid component, and to wirelessly communicate with other compute devices of the plurality of compute devices to negotiate a behavior of the associated power grid component using the forecast.
Description
TECHNOLOGIES FOR OPTIMIZING POWER GRIDS THROUGH DECENTRALIZED FORECASTING
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of and priority to U.S. Provisional Patent
Application No. 62/694,431, filed July 5, 2018, the entire disclosure of which is incorporated herein by reference.
TECHNICAL FIELD
[0002] The present disclosure relates to systems and methods for decentralized forecasting to optimize power grid operation.
BACKGROUND
[0003] Traditional transmission grid operation takes a centralized approach.
Measurements from the power grid are gathered and transmitted to a central control. The central control processes the data and formulates a plan on how optimize power production. The central control will then transmit instructions to all the power grid components in order to implement the plan.
[0004] However, the increasing complexity and scale of power grids have made the traditional approach no longer feasible. The rise of Distributed Energy Resources (DERs), such as solar panels and wind turbines, has increased the erratic nature of power grids due to the unreliability of these energy sources. Today’s power grids need sub-minute control and optimizations, and the latencies associated with a centralized approach do not allow for such precision. The traditional techniques are impossible to implement with the scale of today’s transmission grid systems.
SUMMARY
[0005] According to one aspect of the present disclosure, a power grid may comprise a plurality of power grid components and a plurality of compute devices each associated with one of the plurality of power grid components. Each of the plurality of compute devices may be configured to (i) obtain measurements of one or more conditions of the associated power grid component, (ii) forecast a future state of the one or more conditions of the associated power grid component, and (iii) wirelessly communicate with other compute devices of the plurality of compute devices to negotiate a behavior of the associated power grid component using the forecast.
[0006] In some embodiments, each of the plurality of compute devices may be communicatively coupled to one of the plurality of power grid components.
[0007] In some embodiments, each of the plurality of compute devices may be integrated with one of the plurality of power grid components.
[0008] In some embodiments, the power grid may further comprise a plurality of sensors coupled to the plurality of power grid components. To obtain measurements of the one or more conditions of the associated power grid component may comprise to receive measurements of the one or more conditions from one or more of the plurality of sensors.
[0009] In some embodiments, the plurality of sensors may comprise one or more of voltage sensors, current sensors, temperature sensors, wind speed sensors, and humidity sensors.
[0010] In some embodiments, to obtain measurements of the one or more conditions of the associated power grid component may comprise to measure power consumption of the associated power grid component.
[0011] In some embodiments, to obtain measurements of the one or more conditions of the associated power grid component may comprise to measure power generation of the associated power grid component.
[0012] In some embodiments, to obtain measurements of the one or more conditions of the associated power grid component may comprise to measure one or more local weather conditions.
[0013] In some embodiments, each of the plurality of compute devices may be further configured to receive measurements of one or more conditions of other power grid components from other compute devices of the plurality of compute devices.
[0014] In some embodiments, the received measurements may comprise at least one of power consumption data, power generation data, and local weather data for the other power grid components.
[0015] In some embodiments, the future state of the one or more conditions of the power grid component forecast by each compute device may be between 1 and 60 minutes into the future.
[0016] In some embodiments, the future state of the one or more conditions of the power grid component forecast by each compute device may be less than one minute into the future.
[0017] In some embodiments, to forecast the future state of the one or more conditions may comprise employing a time series forecasting technique.
[0018] In some embodiments, each forecast of the future state of the one or more conditions may be based on the measurements of the one or more conditions for the associated power grid component.
[0019] In some embodiments, each forecast of the future state of the one or more conditions may be further based on the received measurements of the one or more conditions of the other power grid components.
[0020] In some embodiments, each forecast of the future state of the one or more conditions may be further based on historical data relating to the one or more conditions.
[0021] In some embodiments, to negotiate the behavior of the associated power grid component using the forecast may comprise to locally optimize a subsection of the power grid comprising the plurality of power grid components.
[0022] In some embodiments, to locally optimize the subsection of the power grid may comprise to maximize total power production from the plurality of power grid components.
[0023] In some embodiments, to locally optimize the subsection of the power grid may comprise to minimize total energy cost associated with the plurality of power grid components.
[0024] In some embodiments, to locally optimize the subsection of the power grid may comprise to minimize total energy loss associated with the plurality of power grid components.
[0025] In some embodiments, to locally optimize the subsection of the power grid may comprise to maximize availability of the plurality of power grid components.
[0026] In some embodiments, the plurality of compute devices may be configured to negotiate with one another using one or more machine learning techniques.
[0027] In some embodiments, the one or more machine learning techniques may comprise a plurality of autonomous agents, each of the plurality of autonomous agents being executed by one of the plurality of compute devices.
[0028] In some embodiments, the plurality of autonomous agents may negotiate with one another in a virtual market place according to a trading algorithm.
[0029] In some embodiments, the one or more machine learning techniques may comprise a plurality of neural networks, each of the plurality of neural networks being executed by one of the plurality of compute devices.
[0030] In some embodiments, each of the plurality of neural networks may comprise one of a feedforward neural network, a radial basis function neural network, a kohonen self-
organizing neural network, a recurrent neural network, a modular neural networks, and a physical neural network.
[0031] In some embodiments, at least some of the plurality of power grid components may be distributed energy resources.
[0032] In some embodiments, the distributed energy resources may supply power to the power grid from one or more renewable energy sources.
[0033] In some embodiments, the distributed energy resources may comprise at least one of a solar panel array, a wind turbine, a hydroelectric power plant, a biomass power plant, a geothermal power plant, and a hydrogen fuel cell power plant.
[0034] In some embodiments, one of the plurality of power grid components may be a distribution substation that electrically connects the remaining power grid components of the plurality of power grid components.
[0035] In some embodiments, the distribution substation may comprise one or more voltage transformers.
[0036] In some embodiments, the power grid may further comprise a central control configured to provide one or more constraints to the plurality of compute devices.
[0037] In some embodiments, the one or more constraints may include at least one of a power constraint, an economic constraint, a weather constraint, and a time constraint.
[0038] In some embodiments, to negotiate the behavior of the associated power grid component may comprise to negotiate the behavior based upon the one or more constraints received from the central control.
[0039] In some embodiments, the central control is not configured to set the behaviors of the plurality of power grid components.
[0040] In some embodiments, the central control may be further configured to provide one or more override commands to one or more of the plurality of compute devices.
[0041] In some embodiments, the one or more override commands may include at least one of a command to reduce power consumption of the associated power grid component, a command to disconnect the associated power grid component from the power grid, and a command to halt the negotiation of the behavior of the associated power grid component.
[0042] According to another aspect of the present disclosure, a method may comprise obtaining, by a compute device, measurements of one or more conditions of a power grid component associated with the compute device; forecasting, by the compute device, a future state of the one or more conditions of the power grid component associated with the compute
device; and wirelessly communicating, by the compute device, with other compute devices associated with other power grid components to negotiate a behavior of the power grid component associated with the compute device using the forecast.
[0043] In some embodiments, each compute devices may be communicatively coupled to its associated power grid component.
[0044] In some embodiments, each compute devices may be integrated with its associated power grid component.
[0045] In some embodiments, obtaining measurements of the one or more conditions of the associated power grid component may comprise receiving the measurements from one or more sensors affixed to the associated power grid component.
[0046] In some embodiments, the one or more sensors may comprise at least one of a voltage sensor, a current sensor, a temperature sensor, a wind speed sensor, and a humidity sensor.
[0047] In some embodiments, obtaining measurements of the one or more conditions of the associated power grid component may comprise obtaining measurements of power consumption of the associated power grid component.
[0048] In some embodiments, obtaining measurements of the one or more conditions of the associated power grid component may comprise obtaining measurements of power generation of the associated power grid component.
[0049] In some embodiments, obtaining measurements of the one or more conditions of the associated power grid component may comprise obtaining measurements of one or more local weather conditions.
[0050] In some embodiments, the method may further comprise receiving, by the compute device, measurements of one or more conditions of the other power grid components from the other compute devices.
[0051] In some embodiments, the received measurements may comprise at least one of power consumption data, power generation data, and local weather data for the other power grid components.
[0052] In some embodiments, the future state of the one or more conditions of the power grid component forecast by the compute device may be between 1 and 60 minutes into the future.
[0053] In some embodiments, the future state of the one or more conditions of the power grid component forecast by the compute device may be less than one minute into the future.
[0054] In some embodiments, forecasting the future state of the one or more conditions may comprise employing time series forecasting.
[0055] In some embodiments, the forecast of the future state of the one or more conditions may be based on the obtained measurements of the one or more conditions for the associated power grid component.
[0056] In some embodiments, the forecast of the future state of the one or more conditions may be further based on received measurements of one or more conditions of the other power grid components.
[0057] In some embodiments, the forecast of the future state of the one or more conditions may be further based on historical data relating to the one or more conditions.
[0058] In some embodiments, the method may further comprise retrieving the historical data from a database maintained by the compute device.
[0059] In some embodiments, to negotiate the behavior of the associated power grid component using the forecast may comprise to locally optimize a subsection of a power grid comprising the associated power grid component and the other power grid components.
[0060] In some embodiments, to locally optimize the subsection of the power grid may comprise to maximize total power production from the associated power grid component and the other power grid components.
[0061] In some embodiments, to locally optimize the subsection of the power grid may comprise to minimize total energy cost associated with the associated power grid component and the other power grid components.
[0062] In some embodiments, to locally optimize the subsection of the power grid may comprise to minimize total energy loss associated with the associated power grid component and the other power grid components.
[0063] In some embodiments, to locally optimize the subsection of the power grid may comprise to maximize availability of the associated power grid component and the other power grid components.
[0064] In some embodiments, to negotiate the behavior of the associated power grid component may comprise executing an autonomous agent, by the compute device, to cause the
autonomous agent to negotiate with other autonomous agents, executed by the other compute devices, in a virtual market place according to a trading algorithm.
[0065] In some embodiments, to negotiate the behavior of the associated power grid component using the forecast may comprise executing a neural network by the compute device.
[0066] In some embodiments, the neural network may comprise one of a feedforward neural network, a radial basis function neural network, a kohonen self-organizing neural network, a recurrent neural network, a modular neural networks, and a physical neural network.
[0067] In some embodiments, the associated power grid component may be a distributed energy resource.
[0068] In some embodiments, the distributed energy resource may supply power to a power grid from a renewable energy source.
[0069] In some embodiments, the distributed energy resource may comprise at least one of a solar panel array, a wind turbine, a hydroelectric power plant, a biomass power plant, a geothermal power plant, and a hydrogen fuel cell power plant.
[0070] In some embodiments, the associated power grid component may be a distribution substation that is electrically connected to the other power grid components.
[0071] In some embodiments, the distribution substation may comprise one or more voltage transformers.
[0072] In some embodiments, the method may further comprise receiving, by the compute device, one or more constraints from a central control.
[0073] In some embodiments, the one or more constraints may include at least one of a power constraint, an economic constraint, a weather constraint, and a time constraint.
[0074] In some embodiments, to negotiate the behavior of the associated power grid component may comprise to negotiate the behavior based upon the one or more constraints received from the central control.
[0075] In some embodiments, the method may further comprise receiving, by the compute device, an override command from the central control and executing, by the compute device, the override command.
[0076] In some embodiments, the override command may be one of a command to reduce power consumption of the associated power grid component, a command to disconnect the associated power grid component from the power grid, and a command to halt the negotiation of the behavior of the associated power grid component.
[0077] In some embodiments, wirelessly communicating with the other compute devices associated with the other power grid components may comprise wirelessly communicating with a first subset of the other compute devices to negotiate with the first subset of the other compute devices.
[0078] In some embodiments, wirelessly communicating with the other compute devices associated with the other power grid components may further comprise wirelessly communicating with a second subset of the other compute devices, subsequent to wireless communicating with the first subset of the other compute devices, to negotiate with the second subset of the other compute devices.
[0079] In some embodiments, the compute devices may wirelessly communicate with the second subset of the other compute devices in response to negotiations with the first subset of the other compute devices not satisfying an optimization strategy of the compute device.
[0080] In some embodiments, the second subset of the other compute devices may be geographically farther away from the compute device than the first subset of the other compute devices.
[0081] According to yet another aspect of the present disclosure, one or more machine- readable media may store a plurality of instructions that, when executed by a compute device, cause the compute device to perform any of the methods described above (or elsewhere in the present disclosure).
BRIEF DESCRIPTION OF THE DRAWINGS
[0082] The concepts described in the present disclosure are illustrated by way of example and not by way of limitation in the accompanying figures. For simplicity and clarity of illustration, elements illustrated in the figures are not necessarily drawn to scale. For example, the dimensions of some elements may be exaggerated relative to other elements for clarity. Further, where considered appropriate, reference labels have been repeated among the figures to indicate corresponding or analogous elements. The detailed description particularly refers to the accompanying figures in which:
[0083] FIG. 1 is a simplified diagram of a decentralized power grid;
[0084] FIG. 2 is a simplified block diagram of at least one embodiment of a compute device attached to each power grid component of FIG. 1 ;
[0085] FIG. 3 is a block diagram of at least one embodiment of an environment that may be established by the compute device of FIG. 2; and
[0086] FIGS. 4-6 are a simplified flow diagram of at least one embodiment of a method for optimizing the operation of the power grid of FIG. 1 using the compute device of FIG. 2 that may be executed by the compute device of FIG. 2.
DETAILED DESCRIPTION OF THE DRAWINGS
[0087] While the concepts of the present disclosure are susceptible to various modifications and alternative forms, specific embodiments thereof have been shown by way of example in the figures and will be described herein in detail. It should be understood, however, that there is no intent to limit the concepts of the present disclosure to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives consistent with the present disclosure and the appended claims.
[0088] References in the specification to“one embodiment,”“an embodiment,”“an illustrative embodiment,” etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may or may not necessarily include that particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is submitted that it is within the knowledge of one skilled in the art to effect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.
[0089] The disclosed embodiments may be implemented, in some cases, in hardware, firmware, software, or any combination thereof. The disclosed embodiments may also be implemented as instructions carried by or stored on a transitory or non-transitory computer- readable storage medium, which may be read and executed by one or more processors. A computer-readable storage medium may be embodied as any storage device, mechanism, or other physical structure for storing or transmitting information in a form readable by a compute device (e.g., a volatile or non-volatile memory, a media disc, or other media device).
[0090] In the drawings, some structural or method features may be shown in specific arrangements and/or orderings. However, it should be appreciated that such specific arrangements and/or orderings may not be required. Rather, in some embodiments, such features may be arranged in a different manner and/or order than shown in the illustrative figures. Additionally, the inclusion of a structural or method feature in a particular figure is not meant to imply that such feature is required in all embodiments and, in some embodiments, may not be included or may be combined with other features.
[0091] The presently disclosed systems and methods allow for the optimization of an electrical grid without relying on a central control to perform calculations. In particular, the present disclosed systems and methods allow for decentralized forecasting and localized optimization. Each component in the electrical grid may be equipped with a compute device. The compute device allows each component to determine its own forecast and communicate with other components having such capabilities. The components may“negotiate” with one another using various machine learning techniques in order to locally optimize that section of the power grid. Decentralizing the forecasting and optimization processes decreases latencies and cost of the power grid system. As used in the present disclosure, “optimize,” “optimization,” and similar terms are not intended to require that a truly optimal state be achieved or even sought; rather, such terms are intended to convey any level of relative improvement of (or even an attempt to improve) the condition or state being“optimized.”
[0092] Referring now to FIG. 1, one illustrative embodiment of a decentralized power grid 100 is shown as a simplified diagram. The power grid 100 includes a central control 102, a distribution substation 104, a distributed energy resource (“DER”) 106, an industrial load 108, a residential load 110. The distribution substation 104, DER 106, industrial load 108, and residential load 110 are located together in a subsection 112 of the power grid 100. Each of the central control 102, distribution substation 104, DER 106, industrial load 108, and residential load 110 are electrically connected to one another. Additionally, each of the power grid components in FIG.1 comprises a compute device 200 that is communicatively coupled to other compute devices 200 of the power grid 100. The compute devices 200 associated with the power grid components 104, 106, 108, 110 of the subsection 112 may negotiate with the one another in order to optimize the subsection 112. In some embodiments, the power grid components negotiate using machine learning techniques in order to increase the efficiency of the subsection 112 and the optimization process.
[0093] The central control 102 may be embodied as any power grid component capable of fulfilling the functions described herein. In this illustrative embodiment, the central control 102 is responsible for the maintenance of the decentralized power grid 100. The central control 102 provides constraints to the distribution substation 104, the DER 106, the industrial load 108, and the residential load 110. In some embodiments, the constraints may be power related, economics related, weather related, time related, or related to any other factor that may affect the power delivered over decentralized power grid 100. The central control 102 may also issue override commands to any of the distribution substation 104, DER 106, industrial load 108, or
residential load 110. In some embodiments, the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process, or any other command necessary in order to maintain the decentralized power grid 100. In some embodiments, the central control 102 may exchange data with at least one of the other power grid components in FIG. 1. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the power grid 100. In some embodiments, the central control may be a power station, such as a coal power station, a nuclear power station, a wind farm, or any other station capable of producing electrical power.
[0094] The distribution substation 104 may be embodied as any power grid component capable of fulfilling the functions described herein. The distribution substation 104 electrically connects each of the power grid components in subsection 112 to the central control 102 and the rest of the decentralized power grid 100. In some embodiments, the distribution substation 104 includes one or more transformers. The distribution substation 104 comprises a compute device 200. The distribution substation 104 may gather data related to its power consumption. In some embodiments, the distribution substation 104 may gather local weather data. In some embodiments, the distribution substation 104 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112. The distribution substation 104 is communicatively coupled with the central control and each of the power grid components in the subsection 112. The distribution substation 104 may negotiate with at least one of the power grid components in the subsection 112. In some embodiments, the distribution substation may negotiate using a machine learning technique, such as a neural network or an autonomous agent. The distribution substation 104 may negotiate with the other power grid components in order to optimize the subsection 112. In some embodiments, the distribution substation 104 may negotiate with power grid components outside the subsection 112. In some embodiments, the distribution substation 104 may negotiate with power grid components based on constraints received from the central control 102. In some embodiments, the distribution substation may exchange data with the central control 102. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the distribution substation 104. In some embodiments, the distribution substation 104 may receive override commands from the central control 102. In some embodiments, the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the decentralized power grid 100.
[0095] The DER 106 may be embodied as any power grid component capable of fulfilling the functions described herein. The DER 106 produces electricity and is electrically connected to each of the power grid components in a subsection 112. The DER 106 may be embodied as a solar panel array, a wind turbine, a hydroelectric power plant, a biomass power plant, a geothermal power plant, a hydrogen fuel cell power plant, or any other station that produces power from a renewable energy source. In some embodiments, the DER 106 produces power using a non-renewable energy source, such as oil, coal or natural gas. The DER 106 comprises a compute device 200. The DER 106 may gather data related to its power consumption and its power production. In some embodiments, the DER 106 may gather local weather data. In some embodiments, the DER 106 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112. The DER 106 is communicatively coupled with the central control and each of the power grid components in the subsection 112. The DER 106 may negotiate with at least one of the power grid components in the subsection 112. In some embodiments, the distribution substation may negotiate using a machine learning technique, such as a neural network or an autonomous agent. The DER 106 may negotiate with the other power grid components in order to optimize the subsection 112. In some embodiments, the DER 106 may negotiate with power grid components outside the subsection 112. In some embodiments, the DER 106 may negotiate with power grid components based on constraints received from the central control 102. In some embodiments, the distribution substation may exchange data with the central control 102. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the DER 106. In some embodiments, the DER 106 may receive override commands from the central control 102. In some embodiments, the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the decentralized power grid 100.
[0096] The industrial load 108 may be embodied as any power grid component capable of fulfilling the functions described herein. The industrial load 108 consumes electricity and is electrically connected to each of the power grid components in the subsection 112. The industrial load 108 may be embodied a factory, an office building, a retail store, a warehouse or any other type of commercial building. In some embodiments, the industrial load may include DERs, such as solar panels, wind turbines, or generators. The industrial load 108 comprises a compute device 200. The industrial load 108 may gather data related to its power consumption
and/or its power production. In some embodiments, the industrial load 108 may gather local weather data. In some embodiments, the industrial load 108 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112. The industrial load 108 is communicatively coupled with the central control and each of the power grid components in the subsection 112. The industrial load 108 may negotiate with at least one of the power grid components in the subsection 112. In some embodiments, the distribution substation may negotiate using a machine learning technique, such as a neural network or an autonomous agent. The industrial load 108 may negotiate with the other power grid components in order to optimize the subsection 112. In some embodiments, the industrial load 108 may negotiate with power grid components outside the subsection 112. In some embodiments, the industrial load 108 may negotiate with power grid components based on constraints received from the central control 102. In some embodiments, the distribution substation may exchange data with the central control 102. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the industrial load 108. In some embodiments, the industrial load 108 may receive override commands from the central control 102. In some embodiments, the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the decentralized power grid 100.
[0097] The residential load 110 may be embodied as any power grid component capable of fulfilling the functions described herein. The residential load 110 consumes electricity and is electrically connected to each of the power grid components in the subsection 112. The residential load 110 may be embodied a single-family home, a condominium, a town house, or any other type of residential building. In some embodiments, the industrial load may include a DER such as solar panels, wind turbines, or other generators. The residential load 110 comprises a compute device 200. The residential load 110 may gather data related to its power consumption and its power production. In some embodiments, the residential load 110 may gather local weather data. In some embodiments, the residential load 110 may gather data related to the power consumption and power generation of each of the power grid components located in the subsection 112. The residential load 110 is communicatively coupled with the central control and each of the power grid components in the subsection 112. The residential load 110 may negotiate with at least one of the power grid components in the subsection 112. In some embodiments, the distribution substation may negotiate using a machine learning
technique, such as a neural network or an autonomous agent. The residential load 110 may negotiate with the other power grid components in order to optimize the subsection 112. In some embodiments, the residential load 110 may negotiate with power grid components outside the subsection 112. In some embodiments, the residential load 110 may negotiate with power grid components based on constraints received from the central control 102. In some embodiments, the distribution substation may exchange data with the central control 102. The data may include weather readings, power consumption records, historical data, negotiation results, or any other data related to the residential load 110. In some embodiments, the residential load 110 may receive override commands from the central control 102. In some embodiments, the override commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the decentralized power grid 100.
[0098] The subsection 112 may be embodied as any subsection of a power grid. In the illustrative embodiment, the subsection of the power grid 100 contains the distribution substation 104, the DER 106, the industrial load 108, and the residential load 110. In some embodiments, the subsection 112 may contain any combination of power stations, power transformers, transmission substations, distribution substations, DERs, distribution automation devices, commercial/ industrial consumers, residential consumers, and any other power grid component. Each power grid component in subsection 112 may comprise a compute device 200. Each power grid component in subsection 112 may be electrically and communicatively coupled to each other. The power grid components within the subsection 112 may negotiate with each other. In some embodiments, the distribution substation may negotiate using a machine learning technique, such as a neural network or autonomous agents. The power grid components may negotiate in order to optimize the subsection 112.
[0099] Referring now to FIG. 2, the compute device 200 may be embodied as any type of compute device capable of negotiating with other compute devices and performing the functions described herein. For example, the compute device 200 may be embodied as or otherwise be included in, without limitation, a raspberry pi, a tablet computer, a notebook computer, a laptop computer, an embedded computing system, a server computer, a System-on- a-Chip (SoC), a multiprocessor system, a processor-based system, a consumer electronic device, a smartphone, a cellular phone, a desktop computer, a network device, a networked computer, a wearable computer, a handset, a messaging device, a camera device, and/or any other compute device. The illustrative compute device 200 includes the processor 202, a
memory 204, an input/output (I/O) subsystem 206, a data storage 208, and a communication system 210. The illustrative compute device 200 is connect to a sensor(s) 212 and a DER(s) 214. In some embodiments, one or more of the illustrative components of the compute device 200 may be incorporated in, or otherwise form a portion of, another component. For example, the memory 204, or portions thereof, may be incorporated in the processor 202 in some embodiments. In some embodiments, the sensor(s) 212 and DERs 214 may be included within the compute device 200.
[0100] The processor 202 may be embodied as any type of processor capable of performing the functions described herein. For example, the processor 202 may be embodied as a single or multi-core processor(s), a single or multi-socket processor, a digital signal processor, a graphics processor, a microcontroller, or other processor or processing/controlling circuit. Similarly, the memory 204 may be embodied as any type of volatile or non-volatile memory or data storage capable of performing the functions described herein. In operation, the memory 204 may store various data and software used during operation of the compute device 200 such as operating systems, applications, programs, libraries, and drivers. The memory 204 is communicatively coupled to the processor 202 via the I/O subsystem 206, which may be embodied as circuitry and/or components to facilitate input/output operations with the processor 202, the memory 204, and other components of the compute device 200. For example, the I/O subsystem 206 may be embodied as, or otherwise include, memory controller hubs, input/output control hubs, firmware devices, communication links (i.e., point-to-point links, bus links, wires, cables, light guides, printed circuit board traces, etc.) and/or other components and subsystems to facilitate the input/output operations. In some embodiments, the I/O subsystem 206 may form a portion of a system-on-a-chip (SoC) and be incorporated, along with the processor 202, the memory 204, and other components of the compute device 200 on a single integrated circuit chip.
[0101] The data storage 208 may be embodied as any type of device or devices configured for the short-term or long-term storage of data. For example, the data storage 208 may include any one or more memory devices and circuits, memory cards, hard disk drives, solid-state drives, or other data storage devices.
[0102] The compute device 200 also includes the communication subsystem 210, which may be embodied as any communication circuit, device, or collection thereof, capable of enabling communications between the compute device 200 and other remote devices over a network. For example, the communication subsystem 210 may be embodied as or otherwise
include a network interface controller (NIC) for sending and/or receiving network data with remote devices. The communication subsystem 210 may be configured to use any one or more communication technology (e.g., wired or wireless communications) and associated protocols (e.g., Ethernet, InfiniBand®, Bluetooth®, Wi-Fi®, WiMAX, 3G, 4G LTE, 5G, etc.) to effect such communication.
[0103] The sensors 212 may be embodied as any one or more sensors capable of generating one or more input signals that are indicative of power production of a power grid component, power consumption of a power grid component, and/or weather and temperature surrounding a power grid component, among other input signals. In the illustrative embodiment, the sensors 212 may include voltage sensors, current sensors, temperature sensors, wind speed sensors, humidity sensors. Additional sensors 212 may be included in order to perform the functions of the compute device below.
[0104] The DERs 106 may be embodied as any decentralized power supply which is electrically connected to the compute device 200. By way of illustrative example, DERs 106 may include solar panels, hydro systems, wind turbines, geothermal power systems, biomass power systems, diesel generators, and/or any other systems capable of producing and/or storing electrical power.
[0105] Referring now to FIG. 3, in one illustrative embodiment, the compute device 200 establishes an environment 300 during operation. The illustrative environment 300 includes a forecast determiner 302, a communication controller 304, a negotiation controller 306, a power output/consumption controller 308, and a historical database 310. The various components of the environment 300 may be embodied as hardware, software, firmware, or a combination thereof. For example, the various components of the environment 300 may form a portion of, or otherwise be established by, the processor 202 or other hardware components of the compute device 200. As such, in some embodiments, one or more of the components of the environment 300 may be embodied as circuitry or collection of electrical devices (e.g., forecast determiner circuitry 302, communication controller circuitry 304, etc.). It should be appreciated that, in such embodiments, one or more of the circuits (e.g., forecast determiner circuitry 302, communication controller circuitry 304, etc.) may form a portion of one or more of the processor 202, the memory 204, the I/O subsystem 206, the communication system 210, the data storage 208, an application specific integrated circuit (ASIC), a programmable circuit such as a field-programmable gate array (FPGA), and/or other components of the compute device 200. For example, the negotiation controller 306 may be embodied as the processor 202 and
associated instructions stored on the data storage 208 and/or the memory 204, which may be executed by the processor 202. Additionally, in some embodiments, one or more of the illustrative components may form a portion of another component and/or one or more of the illustrative components may be independent of one another. Further, in some embodiments, one or more of the components of the environment 300 may be embodied as virtualized hardware components or emulated architecture, which may be established and maintained by the processor 202 or other components of the compute device 200. It should be appreciated that some of the functionality of one or more of the components of the environment 300 may require a hardware implementation, in which case embodiments of components which implement such functionality will be embodied at least partially as hardware.
[0106] The forecast determiner 302, which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to forecast the power production and consumption of the power grid component connected to the compute device 200. The forecast determiner 302 may determine the current power output and the current power consumption of the attached power grid component. The forecast determiner 302 may then retrieve data from the sensors 212. In some embodiments, the forecast determiner 302 may retrieve data related to the voltage levels, the current levels, and weather data, such as the temperature, the wind speed, and the humidity levels. In some embodiments, the forecast determiner 302 may receive weather data from the central control 102. In some embodiments, the forecast determiner 302 may download the weather prediction from another source. The forecast determine 302 may then determine the present day and time. In some embodiments, the forecast determined 302 may determine the present day and time by reading the internal calendar and clock of the compute device 200. The forecast determine 302 may then retrieve historical data from the historical database 310. The forecast determiner 302 may retrieve the historical data based in part on the current power production, the current power consumption, the retrieved sensor data, the weather, the present day, and the current time. The historical data may describe typical power output/consumption levels under similar constraints. In some embodiments, the historical data may define human behavior. The forecast determiner 302 may then determine a forecast based at least the historical data, the current power output, the current power consumption, the retrieved sensor data, the weather, the present day, and/or the current time. The forecast determiner 302 may determine the forecast for any period of time, including sub-minute, and using any appropriate forecasting technique. In some embodiments, the compute device 200 may determine the
forecast for a period of time that is between 1 and 60 minutes into the future. In some embodiments, the forecast determiner 302 may employ a time series forecasting technique. The forecast determiner 302 may detect an abnormality. In some embodiments, the forecast determiner 302 may detect the abnormality using machine learning techniques. The forecast determiner 302 may address the abnormality. In some embodiments the forecast determiner 302 may address the abnormality by adjusting the amount of power consumed or produced by the power grid component.
[0107] The communication controller 304, which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to establish a communication link with the other power grid components in the subsection 112. In some embodiments, the communication controller 304 may establish a communication link with power grid components outside of the subsection 112. In some embodiments, the communication channel will be established using the 5G communication protocol.
[0108] The negotiation controller 306 which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to negotiate with the other power grid components in the subsection 112. In some embodiments, the negotiation controller 306 negotiates with power grid components outside the subsection 112. The negotiation controller 306 will negotiate with the other power grid components in order to optimize the subsection 112. The negotiation controller 306 may include an optimization controller 312, a neural network controller 314, and/or an autonomous agent controller 316.
[0109] The optimization controller 312 is configured to control an optimization strategy.
The optimization strategy defines how the subsection 112 should be optimized. In some embodiments, the optimization strategy may state that the power grid components in subsection 112 should be optimized in order to produce maximum power. In some embodiments, the optimization strategy may state that the power grid components in subsection 112 should be optimized in order to lower cost and energy loss. In some embodiments, the optimization strategy may state that the power grid components in subsection 112 should be optimized in order to maximize reliability, availability or resilience. In some embodiments, the optimization strategy may be adjusted based on pre-defined key performance indicators. The optimization controller 312 configures the optimization strategy based on the constraints received from central control. The optimization controller 312 may configure the optimization strategy based
on the power production of the DER 214. In some embodiments, the optimization controller 312 may modify the optimization strategy based on the optimization strategy of other compute devices 200 in the subsection 112. Once the optimization controller 312 has defined the optimization strategy, the neural network controller 314 and the autonomous agent controller 316 will implement the optimization strategy when negotiating with other compute devices 200.
[0110] The neural network controller 314 is configured to negotiate with other compute devices 200 using a neural network. The neural network controller 314 may negotiate with the other compute devices using the optimization strategy in order to optimize the subsection 112. The neural network may be embodied as a feedforward neural network, radial basis function neural network, kohonen self-organizing neural network, recurrent neural network, modular neural networks, physical neural network, or any other type of neural network. The neural network controller 314 may contain a network trainer. The network trainer is configured to train the neural network with a training algorithm. The training algorithm is configured with one or more configuration parameters. In some embodiments, the configuration parameters are based on the historical data. In some embodiments, the configuration parameters are based on the constraints received from central control 102. The network trainer is further configured to capture a time series of partial accuracy values in response to training the neural network. Each partial accuracy value is indicative of neural network accuracy at an associated training iteration. The network trainer may be further configured to train the neural network with multiple, parallel instances of the training algorithm. Each parallel instance of the training algorithm is configured with a different set of one or more configuration parameters. The network trainer may be further configured to capture a time series of partial accuracy values for each parallel instance of the training algorithm. In some embodiments, the network trainer may be further configured to train the neural network with the training algorithm in parallel by a plurality of distributed computing nodes. The training algorithm of each computing node is configured with a different set of one or more configuration parameters.
[0111] The autonomous agent controller 316 is configured to negotiate with other compute devices using an autonomous agent. The autonomous agent may negotiate with the other compute devices using the optimization strategy in order to optimize the subsection 112. The autonomous agent will represent the compute device 200, along with its power grid component, on a virtual market place. The autonomous agent will“trade” its surplus or missing energy with the agents of other compute devices 200 in the subsection 112. The autonomous agent will“trade” according to a trading algorithm. In some embodiments, the trading
algorithm will be based on the need(s) of the power grid component connected to compute device 200. In some embodiments, the trading algorithm will be based on the optimization strategy.
[0112] The power output/consumption controller 308, which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to adjust the power consumption and/or power production of the power grid component based on the negotiation results. For example the power output/consumption controller 308 may remove the DER 214 from the subsection 112 or the power output/consumption controller 308 may reduce the energy consumption of the power grid component. In some embodiments, the power output/consumption controller 308 may receive an override command from central control 102 and act upon the command. For example, the power output/consumption controller 308 may receive a command to disconnect the DER 214 from the power grid when the subsection 112 has been damaged.
[0113] The historical database 310, which may be embodied as hardware, firmware, software, virtualized hardware, emulated architecture, and/or a combination thereof as discussed above, is configured to store historical data. The historical data may include power production and power consumption records under various conditions, such as weather and time of day. In some embodiments, the historical data may include previous optimization strategies. The historical database 310 may include the historical data received from central control 102 or from other compute devices 200.
[0114] Referring now to FIGS. 4-6, in use, the compute device 200 may execute a method 400 for optimizing the subsection 112. The method 400 begins in block 402, in which the compute device 200 receives constraints and data from central control. The received constraints may dictate how the subsection 112 should be optimized. For example, the received constraints may dictate that the subsection 112 should keep operational costs at low as possible. Or the received constraints may dictate that the subsection 112 should maximize power production. In some embodiments, the received data contains weather data for the subsection 112. In some embodiments, the received data contains historical data to be stored in the historical database 310.
[0115] In block 404, the compute device 200 monitors the current power output and/or the current power consumption of the power grid component associated with the compute device 200. The power output may be generated by the DER 214. The DER 214 may be embodied as solar panels, hydro systems, wind turbines, geothermal power systems, biomass
power systems, diesel generators, and/or any other systems capable of producing and/or storing electrical power. In some embodiments, the compute device 200 may monitor the current power output and/or the current power consumption of other power grid components. For example, the distribution substation 104 may monitor the current power output and the current power consumption of the DER 106, industrial load 108, and residential load 110.
[0116] In block 406, the compute device 200 may determine if an abnormality is detected. The compute device 200 may detect the abnormality using machine learning techniques. If the compute device 200 detects an abnormality, then the method advances to block 408. In block 408, the compute device 200 addresses the abnormality. In some embodiments the compute device address the abnormality by adjusting the amount of power consumed or produced by the power grid component. If the compute device 200 does not detect an abnormality, then the method advances to block 410.
[0117] In block 410, the compute device 200 may retrieve data from the sensors 212.
The data may be indicative of voltage, current, temperature, wind speed, humidity level or any other constraint related to an electric grid.
[0118] In block 412, the compute device 200 may determine the present day and time.
In some embodiments, the compute device 200 may determine the present day and time by reading its internal calendar and clock.
[0119] In block 414, the compute device 200 may retrieve historical data from the historical database 310. The compute device 200 may retrieve the historical data based in part on the current power production, the current power consumption, the retrieved sensor data, the weather, the present day, and the current time. The historical data may describe typical power output/consumption levels of the power grid component under similar constraints. In some embodiments, the historical data may represent human behavior.
[0120] In block 416, the compute device 200 may determine a forecast for the power grid component. The compute device 200 may then determine a forecast based at least the historical data, the current power output, the current power consumption, the retrieved sensor data, the weather, the present day, and/or the current time. The compute device 200 may determine the forecast for any period of time, including sub-minute, and using any appropriate forecasting technique. In some embodiments, the compute device 200 may determine the forecast for a period of time that is between 1 and 60 minutes into the future. In some embodiments, the compute device 200 may employ a time series forecasting technique.
[0121] Referring now to FIG. 5, in block 418, the compute device 200 may determine an optimization strategy. The optimization strategy defines how the subsection should be optimized. In some embodiments, the optimization strategy may state that the power grid components in subsection should be optimized in order to produce maximum power. In some embodiments, the optimization strategy may state that the power grid components in subsection should be optimized in order to lower cost and energy loss. In some embodiments, the optimization strategy may state that the power grid components in subsection should be optimized in order to maximize reliability, availability or resilience. In some embodiments, the optimization strategy may be adjusted based on pre-defined key performance indicators. The compute device 200 configures the optimization strategy based on the constraints received from central control. The compute device 200 may configure the optimization strategy based on the power production of the DER 106. In some embodiments, the compute device 200 may modify the optimization strategy based on the optimization strategy of other compute devices 200 in the subsection 112.
[0122] In block 420, the compute device 200 may establish a communication link with a first subset of power grid components. The first subset of power grid components is defined as all power grid components within a first subset of the electrical grid. In some embodiments, the communication channel will be established using the 5G communication protocol.
[0123] In block 422, the compute device 200 begins negotiation with the first subset of power grid components. The compute device 200 negotiates with the first subset of power grid components in order to implement the optimization strategy. The negotiations may be implemented with a neural network, an autonomous agent, or any other negotiation method. The neural network may be embodied as a feedforward neural network, radial basis function neural network, kohonen self-organizing neural network, recurrent neural network, modular neural networks, physical neural network, or any other type of neural network. The negotiations will result in potential power modification that the compute device 200 may implement to the power grid component.
[0124] In block 424, the compute device 200 determines if the potential power modifications conflict with any constraints received from central control 102. If the potential power modifications do conflict with the central control 102 constraints, then the method 400 advances to block 428 of FIG. 6. If the potential power modifications do not conflict with central control constraints, then the method 400 advances to block 426.
[0125] In block 426, the compute device 200 implements the potential power modifications on the attached power grid component. In some embodiments, the compute device may remove the DER 214 from the first subsection electric grid. In some embodiments, the compute device 200 may reduce the energy consumption of the attached power grid component.
[0126] Referring now to FIG. 6, in block 428 the compute device 200 determines if it should begin the optimization process with power grid components further away. In some embodiments, the determination in block 428 may involve the compute device 200 evaluating whether it was able to successfully implement its optimization strategy by negotiating with the first subset of power grid components. If not, the compute device 200 may decide to negotiate with power grid components further away to attempt to implement its optimization strategy. In this case, the method 400 advances to block 430. If the compute device 200 decides to not negotiate with power grid components further away, then the method 400 advances to block 438.
[0127] In block 430, the compute device 200 established a communication link with a second subset of power grid components. The second subset of power grid components is defined by all power grid components within a second subset of the electrical grid. In some embodiments, the communication channel will be established using the 5G communication protocol.
[0128] In block 432, the compute device 200 begins negotiation with the second subset of power grid components. The compute device 200 negotiates with the second subset of power grid components in order to implement the optimization strategy. The negotiations may be implemented with a neural network, an autonomous agent or any other negotiation method. The neural network may be embodied as a feedforward neural network, radial basis function neural network, kohonen self-organizing neural network, recurrent neural network, modular neural networks, physical neural network, or any other type of neural network. The negotiations will result in potential power modification that the compute device 200 may implement to the power grid component
[0129] In block 434, the compute device 200 determines if the potential power modification conflicts with any constraints received from central control 102. If the potential power modifications do conflict with the central control constraints then the method 400 advances to block 428. If the potential power modifications do not conflict with central control constraints, then the method 400 advances to block 436.
[0130] In block 436, the compute device 200 implements the potential power modifications on the attached power grid component. In some embodiments, the compute device may remove the DER 214 from the second subsection electric grid. In some embodiments, the compute device 200 may reduce the energy consumption of the attached power grid component. Then the method 400 advances back to block 428.
[0131] In block 438, the compute device 200 determines if it has received a command
(e.g., an override command) from central control 102. If the compute device 200 has received a command from central control 102, then the method 400 advances to block 440. In block 440, the compute device 200 modifies the current power consumption and/or power output based on the received command. In some embodiments, the commands may be to reduce power consumption, to remove itself from the power grid, to halt the optimization process or any other command necessary in order to maintain the subsection of the grid. Referring back to block 438, if the compute device 200 has not received a command from central control 102, then the method 400 advances to block 442. In block 442, the compute device 200 continues the previously established power consumption and/or power output. Then the method 400 advances back to block 402.
[0132] While the disclosure has been illustrated and described in detail in the drawings and foregoing description, such an illustration and description is to be considered as exemplary and not restrictive in character, it being understood that only illustrative embodiments have been shown and described and that all changes and modifications that come within the spirit of the disclosure are desired to be protected.
[0133] There exist a plurality of advantages of the present disclosure arising from the various features of the method, apparatus, and system described herein. It will be noted that alternative embodiments of the method, apparatus, and system of the present disclosure may not include all of the features described yet still benefit from at least some of the advantages of such features. Those of ordinary skill in the art may readily devise their own implementations of the method, apparatus, and system that incorporate one or more of the features of the present invention and fall within the spirit and scope of the present disclosure as defined by the appended claims.
Claims
1. A power grid comprising :
a plurality of power grid components; and
a plurality of compute devices each associated with one of the plurality of power grid components, each of the plurality of compute devices being configured to (i) obtain measurements of one or more conditions of the associated power grid component, (ii) forecast a future state of the one or more conditions of the associated power grid component, and (iii) wirelessly communicate with other compute devices of the plurality of compute devices to negotiate a behavior of the associated power grid component using the forecast.
2. The power grid of claim 1, wherein each of the plurality of compute devices is communicatively coupled to one of the plurality of power grid components.
3. The power grid of claim 1, wherein each of the plurality of compute devices is integrated with one of the plurality of power grid components.
4. The power grid of any preceding claim, further comprising a plurality of sensors coupled to the plurality of power grid components, wherein to obtain measurements of the one or more conditions of the associated power grid component comprises to receive measurements of the one or more conditions from one or more of the plurality of sensors.
5. The power grid of claim 4, wherein the plurality of sensors comprise one or more of voltage sensors, current sensors, temperature sensors, wind speed sensors, and humidity sensors.
6. The power grid of any preceding claim, wherein to obtain measurements of the one or more conditions of the associated power grid component comprises to measure power consumption of the associated power grid component.
7. The power grid of any preceding claim, wherein to obtain measurements of the one or more conditions of the associated power grid component comprises to measure power generation of the associated power grid component.
8. The power grid of any preceding claim, wherein to obtain measurements of the one or more conditions of the associated power grid component comprises to measure one or more local weather conditions.
9. The power grid of any preceding claim, wherein each of the plurality of compute devices is further configured to receive measurements of one or more conditions of other power grid components from other compute devices of the plurality of compute devices.
10. The power grid of claim 9, wherein the received measurements comprise at least one of power consumption data, power generation data, and local weather data for the other power grid components.
11. The power grid of any preceding claim, wherein the future state of the one or more conditions of the power grid component forecast by each compute device is between 1 and 60 minutes into the future.
12. The power grid of any one of claims 1-10, wherein the future state of the one or more conditions of the power grid component forecast by each compute device is less than one minute into the future.
13. The power grid of any preceding claim, wherein to forecast the future state of the one or more conditions comprises employing a time series forecasting technique.
14. The power grid of any preceding claim, wherein each forecast of the future state of the one or more conditions is based on the measurements of the one or more conditions for the associated power grid component.
15. The power grid of claim 14, wherein each forecast of the future state of the one or more conditions is further based on the received measurements of the one or more conditions of the other power grid components.
16. The power grid of claim 14 or claim 15, wherein each forecast of the future state of the one or more conditions is further based on historical data relating to the one or more conditions.
17. The power grid of any preceding claim, wherein to negotiate the behavior of the associated power grid component using the forecast comprises to locally optimize a subsection of the power grid comprising the plurality of power grid components.
18. The power grid of claim 17, wherein to locally optimize the subsection of the power grid comprises to maximize total power production from the plurality of power grid components.
19. The power grid of claim 17, wherein to locally optimize the subsection of the power grid comprises to minimize total energy cost associated with the plurality of power grid components.
20. The power grid of claim 17, wherein to locally optimize the subsection of the power grid comprises to minimize total energy loss associated with the plurality of power grid components.
21. The power grid of claim 17, wherein to locally optimize the subsection of the power grid comprises to maximize availability of the plurality of power grid components.
22. The power grid of any preceding claim, wherein the plurality of compute devices are configured to negotiate with one another using one or more machine learning techniques.
23. The power grid of claim 22, wherein the one or more machine learning techniques comprises a plurality of autonomous agents, each of the plurality of autonomous agents being executed by one of the plurality of compute devices.
24. The power grid of claim 23, wherein the plurality of autonomous agents negotiate with one another in a virtual market place according to a trading algorithm.
25. The power grid of any one of claims 22-24, wherein the one or more machine learning techniques comprises a plurality of neural networks, each of the plurality of neural networks being executed by one of the plurality of compute devices.
26. The power grid of claim 25, wherein each of the plurality of neural networks comprises one of a feedforward neural network, a radial basis function neural network, a kohonen self-organizing neural network, a recurrent neural network, a modular neural networks, and a physical neural network.
27. The power grid of any preceding claim, wherein at least some of the plurality of power grid components are distributed energy resources.
28. The power grid of claim 27, wherein the distributed energy resources supply power to the power grid from one or more renewable energy sources.
29. The power grid of claim 27, wherein the distributed energy resources comprise at least one of a solar panel array, a wind turbine, a hydroelectric power plant, a biomass power plant, a geothermal power plant, and a hydrogen fuel cell power plant.
30. The power grid of any preceding claim, wherein one of the plurality of power grid components is a distribution substation that electrically connects the remaining power grid components of the plurality of power grid components.
31. The power grid of claim 30, wherein the distribution substation comprises one or more voltage transformers.
32. The power grid of any preceding claim, further comprising a central control configured to provide one or more constraints to the plurality of compute devices.
33. The power grid of claim 32, wherein the one or more constraints include at least one of a power constraint, an economic constraint, a weather constraint, and a time constraint.
34. The power grid of claim 32 or claim 33, wherein to negotiate the behavior of the associated power grid component comprises to negotiate the behavior based upon the one or more constraints received from the central control.
35. The power grid of any one of claims 32-34, wherein the central control is not configured to set the behaviors of the plurality of power grid components.
36. The power grid of any one of claims 32-35, wherein the central control is further configured to provide one or more override commands to one or more of the plurality of compute devices.
37. The power grid of claim 36, wherein the one or more override commands include at least one of a command to reduce power consumption of the associated power grid component, a command to disconnect the associated power grid component from the power grid, and a command to halt the negotiation of the behavior of the associated power grid component.
38. A method comprising:
obtaining, by a compute device, measurements of one or more conditions of a power grid component associated with the compute device;
forecasting, by the compute device, a future state of the one or more conditions of the power grid component associated with the compute device; and
wirelessly communicating, by the compute device, with other compute devices associated with other power grid components to negotiate a behavior of the power grid component associated with the compute device using the forecast.
39. The method of claim 38, wherein each compute devices is communicatively coupled to its associated power grid component.
40. The method of claim 38, wherein each compute devices is integrated with its associated power grid component.
41. The method of any one of claims 38-40, wherein obtaining measurements of the one or more conditions of the associated power grid component comprises receiving the measurements from one or more sensors affixed to the associated power grid component.
42. The method of claim 41, wherein the one or more sensors comprise at least one of a voltage sensor, a current sensor, a temperature sensor, a wind speed sensor, and a humidity sensor.
43. The method of any one of claims 38-42, wherein obtaining measurements of the one or more conditions of the associated power grid component comprises obtaining measurements of power consumption of the associated power grid component.
44. The method of any one of claims 38-43, wherein obtaining measurements of the one or more conditions of the associated power grid component comprises obtaining measurements of power generation of the associated power grid component.
45. The method of any one of claims 38-44, wherein obtaining measurements of the one or more conditions of the associated power grid component comprises obtaining measurements of one or more local weather conditions.
46. The method of any one of claims 38-45, further comprising receiving, by the compute device, measurements of one or more conditions of the other power grid components from the other compute devices.
47. The method of claim 46, wherein the received measurements comprise at least one of power consumption data, power generation data, and local weather data for the other power grid components.
48. The method of any one of claims 38-47, wherein the future state of the one or more conditions of the power grid component forecast by the compute device is between 1 and 60 minutes into the future.
49. The method of any one of claims 38-47, wherein the future state of the one or more conditions of the power grid component forecast by the compute device is less than one minute into the future.
50. The method of any one of claims 38-49, wherein forecasting the future state of the one or more conditions comprises employing time series forecasting.
51. The method of any one of claims 38-50, wherein the forecast of the future state of the one or more conditions is based on the obtained measurements of the one or more conditions for the associated power grid component.
52. The method of claim 51, wherein the forecast of the future state of the one or more conditions is further based on received measurements of one or more conditions of the other power grid components.
53. The method of claim 51 or claim 52, wherein the forecast of the future state of the one or more conditions is further based on historical data relating to the one or more conditions.
54. The method of claim 53, further comprising retrieving the historical data from a database maintained by the compute device.
55. The method of any one of claims 38-54, wherein to negotiate the behavior of the associated power grid component using the forecast comprises to locally optimize a subsection of a power grid comprising the associated power grid component and the other power grid components.
56. The method of claim 55, wherein to locally optimize the subsection of the power grid comprises to maximize total power production from the associated power grid component and the other power grid components.
57. The method of claim 55, wherein to locally optimize the subsection of the power grid comprises to minimize total energy cost associated with the associated power grid component and the other power grid components.
58. The method of claim 55, wherein to locally optimize the subsection of the power grid comprises to minimize total energy loss associated with the associated power grid component and the other power grid components.
59. The method of claim 55, wherein to locally optimize the subsection of the power grid comprises to maximize availability of the associated power grid component and the other power grid components.
60. The method of any one of claims 38-59, wherein to negotiate the behavior of the associated power grid component comprises executing an autonomous agent, by the compute device, to cause the autonomous agent to negotiate with other autonomous agents, executed by the other compute devices, in a virtual market place according to a trading algorithm.
61. The method of any one of claims 38-60, wherein to negotiate the behavior of the associated power grid component using the forecast comprises executing a neural network by the compute device.
62. The method of claim 61, wherein the neural network comprises one of a feedforward neural network, a radial basis function neural network, a kohonen self-organizing neural network, a recurrent neural network, a modular neural networks, and a physical neural network.
63. The method of any one of claims 38-62, wherein the associated power grid component is a distributed energy resource.
64. The method of claim 63, wherein the distributed energy resource supplies power to a power grid from a renewable energy source.
65. The method of claim 63, wherein the distributed energy resource comprises at least one of a solar panel array, a wind turbine, a hydroelectric power plant, a biomass power plant, a geothermal power plant, and a hydrogen fuel cell power plant.
66. The method of any one of claims 38-65, wherein the associated power grid component is a distribution substation that is electrically connected to the other power grid components.
67. The method of claim 66, wherein the distribution substation comprises one or more voltage transformers.
68. The method of any one of claims 38-67, further comprising receiving, by the compute device, one or more constraints from a central control.
69. The method of claim 68, wherein the one or more constraints include at least one of a power constraint, an economic constraint, a weather constraint, and a time constraint.
70. The method of claim 68 or claim 69, wherein to negotiate the behavior of the associated power grid component comprises to negotiate the behavior based upon the one or more constraints received from the central control.
71. The method of any one of claims 68-70, further comprising:
receiving, by the compute device, an override command from the central control; and executing, by the compute device, the override command.
72. The method of claim 71, wherein the override command is one of a command to reduce power consumption of the associated power grid component, a command to disconnect the associated power grid component from the power grid, and a command to halt the negotiation of the behavior of the associated power grid component.
73. The method of any one of claims 38-72, wherein wirelessly communicating with the other compute devices associated with the other power grid components comprises wirelessly communicating with a first subset of the other compute devices to negotiate with the first subset of the other compute devices.
74. The method of claim 73, wherein wirelessly communicating with the other compute devices associated with the other power grid components further comprises wirelessly communicating with a second subset of the other compute devices, subsequent to wireless communicating with the first subset of the other compute devices, to negotiate with the second subset of the other compute devices.
75. The method of claim 74, wherein the compute devices wirelessly communicates with the second subset of the other compute devices in response to negotiations with the first subset of the other compute devices not satisfying an optimization strategy of the compute device.
76. The method of claim 74 or claim 75, wherein the second subset of the other compute devices are geographically farther away from the compute device than the first subset of the other compute devices.
77. One or more machine-readable media storing a plurality of instructions that, when executed by a compute device, cause the compute device to perform the method of any one of claims 38-76.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201980045159.6A CN112368652A (en) | 2018-07-05 | 2019-07-05 | Technique for optimizing an electrical grid by decentralized prediction |
JP2021500035A JP7178478B2 (en) | 2018-07-05 | 2019-07-05 | Techniques for optimizing power grids with distributed prediction |
EP19831552.5A EP3818418A4 (en) | 2018-07-05 | 2019-07-05 | Technologies for optimizing power grids through decentralized forecasting |
US17/257,436 US11909215B2 (en) | 2018-07-05 | 2019-07-05 | Technologies for optimizing power grids through decentralized forecasting |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201862694431P | 2018-07-05 | 2018-07-05 | |
US62/694,431 | 2018-07-05 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020010326A1 true WO2020010326A1 (en) | 2020-01-09 |
Family
ID=69059298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2019/040719 WO2020010326A1 (en) | 2018-07-05 | 2019-07-05 | Technologies for optimizing power grids through decentralized forecasting |
Country Status (5)
Country | Link |
---|---|
US (1) | US11909215B2 (en) |
EP (1) | EP3818418A4 (en) |
JP (1) | JP7178478B2 (en) |
CN (1) | CN112368652A (en) |
WO (1) | WO2020010326A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7552370B2 (en) | 2021-01-14 | 2024-09-18 | トヨタ自動車株式会社 | Information processing device, information processing system, and program |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11875371B1 (en) | 2017-04-24 | 2024-01-16 | Skyline Products, Inc. | Price optimization system |
CN112368652A (en) * | 2018-07-05 | 2021-02-12 | Abb电网瑞士股份公司 | Technique for optimizing an electrical grid by decentralized prediction |
US20220335546A1 (en) * | 2021-04-20 | 2022-10-20 | Volta Charging, Llc | System and method for estimating electric vehicle charging station demand at specific points of interest |
EP4456365A1 (en) * | 2023-04-28 | 2024-10-30 | Robert Bosch GmbH | Predicting supply and/or demand of physical commodities in a distribution network |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8103389B2 (en) * | 2006-05-18 | 2012-01-24 | Gridpoint, Inc. | Modular energy control system |
US20140379156A1 (en) * | 2011-06-15 | 2014-12-25 | Expanergy, Llc | System and methods to wirelessly control distributed renewable energy on the grid or microgrid |
US9557723B2 (en) * | 2006-07-19 | 2017-01-31 | Power Analytics Corporation | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5215822B2 (en) * | 2008-11-21 | 2013-06-19 | 日本電信電話株式会社 | Energy system control device and control method |
US8401709B2 (en) | 2009-11-03 | 2013-03-19 | Spirae, Inc. | Dynamic distributed power grid control system |
JP5645244B2 (en) * | 2010-02-05 | 2014-12-24 | パナソニックIpマネジメント株式会社 | Energy supply and demand control system |
EP2599183B1 (en) | 2010-07-29 | 2016-11-30 | Spirae Inc. | Dynamic distributed power grid control system |
US20120083930A1 (en) * | 2010-09-30 | 2012-04-05 | Robert Bosch Gmbh | Adaptive load management: a system for incorporating customer electrical demand information for demand and supply side energy management |
WO2012145715A2 (en) * | 2011-04-22 | 2012-10-26 | Expanergy,Llc. | Systems and methods for analyzing energy usage |
JP5802463B2 (en) * | 2011-07-22 | 2015-10-28 | 株式会社東芝 | Electric quantity adjusting device, electric quantity adjusting method, electric quantity adjusting program, and power supply system |
US9207698B2 (en) * | 2012-06-20 | 2015-12-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US20150372488A1 (en) | 2013-02-07 | 2015-12-24 | Nec Corporation | Electric power control system |
US9286646B1 (en) * | 2013-07-05 | 2016-03-15 | Clean Power Research, L.L.C. | Method for managing centralized power generation with the aid of a digital computer |
US9564757B2 (en) * | 2013-07-08 | 2017-02-07 | Eaton Corporation | Method and apparatus for optimizing a hybrid power system with respect to long-term characteristics by online optimization, and real-time forecasts, prediction or processing |
US10209291B2 (en) * | 2016-02-04 | 2019-02-19 | The University Of Akron | System and method for condition monitoring of electricity transmission structures |
EP3449413A1 (en) * | 2016-04-25 | 2019-03-06 | Intertrust Technologies Corporation | Data management systems and methods |
US10650621B1 (en) * | 2016-09-13 | 2020-05-12 | Iocurrents, Inc. | Interfacing with a vehicular controller area network |
US10906545B2 (en) * | 2016-12-22 | 2021-02-02 | Blackberry Limited | Adjusting mechanical elements of cargo transportation units |
CN112368652A (en) * | 2018-07-05 | 2021-02-12 | Abb电网瑞士股份公司 | Technique for optimizing an electrical grid by decentralized prediction |
-
2019
- 2019-07-05 CN CN201980045159.6A patent/CN112368652A/en active Pending
- 2019-07-05 JP JP2021500035A patent/JP7178478B2/en active Active
- 2019-07-05 US US17/257,436 patent/US11909215B2/en active Active
- 2019-07-05 WO PCT/US2019/040719 patent/WO2020010326A1/en active Application Filing
- 2019-07-05 EP EP19831552.5A patent/EP3818418A4/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8103389B2 (en) * | 2006-05-18 | 2012-01-24 | Gridpoint, Inc. | Modular energy control system |
US9557723B2 (en) * | 2006-07-19 | 2017-01-31 | Power Analytics Corporation | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks |
US20140379156A1 (en) * | 2011-06-15 | 2014-12-25 | Expanergy, Llc | System and methods to wirelessly control distributed renewable energy on the grid or microgrid |
Non-Patent Citations (1)
Title |
---|
See also references of EP3818418A4 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7552370B2 (en) | 2021-01-14 | 2024-09-18 | トヨタ自動車株式会社 | Information processing device, information processing system, and program |
Also Published As
Publication number | Publication date |
---|---|
US11909215B2 (en) | 2024-02-20 |
EP3818418A4 (en) | 2022-03-30 |
CN112368652A (en) | 2021-02-12 |
JP2021529502A (en) | 2021-10-28 |
JP7178478B2 (en) | 2022-11-25 |
US20210184471A1 (en) | 2021-06-17 |
EP3818418A1 (en) | 2021-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11909215B2 (en) | Technologies for optimizing power grids through decentralized forecasting | |
CN103201702B (en) | To the method and system that evaluation work load manages | |
RU2601957C2 (en) | Method and apparatus for controlling energy services based on market data | |
Yang et al. | Research on heat and electricity coordinated dispatch model for better integration of wind power based on electric boiler with thermal storage | |
CN104620458A (en) | A method of determining individual set points in a power plant controller, and a power plant controller | |
EP3039767A1 (en) | Dispatch controller for an energy system | |
US11942782B2 (en) | Grid asset manager | |
US11791631B2 (en) | Dynamic computation and control of distributed assets at the edge of a power grid | |
JP5524428B1 (en) | Power control apparatus, control method and program for power control apparatus | |
CN114755985A (en) | Comprehensive energy management system and method | |
Zhu et al. | Multi‐time‐scale robust economic dispatching method for the power system with clean energy | |
Yao et al. | Active power dispatch strategy of the wind farm based on improved multi‐agent consistency algorithm | |
CN116488149A (en) | Method and device for determining micro-grid power generation strategy and micro-grid | |
WO2023107495A1 (en) | Systems and techniques for renewable energy generation | |
EP3966907B1 (en) | Apparatus and method for dynamic forecasting, aggregation, and validation | |
EP4145660A1 (en) | Dynamic computation and control of distributed assets at the edge of a power grid | |
Maulana et al. | Wireless Smart Grid Monitoring System Based on Internet of Things (IoT) via Telegram and Website | |
CN118350613B (en) | Optimized scheduling method and system based on partitioned virtual power plant | |
US11831162B1 (en) | Systems source asset between renewable energy power plants | |
CN117408840B (en) | Multi-energy scheduling management and control system based on intelligent energy management platform | |
Zhong | Pioneering next-generation smart grids | |
CN118485131A (en) | Deep reinforcement learning training method and device for micro-grid dispatching | |
CN118822308A (en) | Energy management method and device, electronic equipment and storage medium | |
JP2024515413A (en) | Demand Response Management for Battery Charging Systems | |
Zhou et al. | Hierarchical control strategy based on bidding mechanism in active distribution network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19831552 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2021500035 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2019831552 Country of ref document: EP |