WO2020010291A1 - Systems and methods for identifying anomalous events for electrical systems - Google Patents

Systems and methods for identifying anomalous events for electrical systems Download PDF

Info

Publication number
WO2020010291A1
WO2020010291A1 PCT/US2019/040664 US2019040664W WO2020010291A1 WO 2020010291 A1 WO2020010291 A1 WO 2020010291A1 US 2019040664 W US2019040664 W US 2019040664W WO 2020010291 A1 WO2020010291 A1 WO 2020010291A1
Authority
WO
WIPO (PCT)
Prior art keywords
electrical system
time
data
time series
series data
Prior art date
Application number
PCT/US2019/040664
Other languages
French (fr)
Inventor
David N. Cox
Karen J. Smiley
Mithun P. ACHARYA
Original Assignee
Abb Schweiz Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb Schweiz Ag filed Critical Abb Schweiz Ag
Publication of WO2020010291A1 publication Critical patent/WO2020010291A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/80Arrangements in the sub-station, i.e. sensing device
    • H04Q2209/86Performing a diagnostic of the sensing device
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Definitions

  • the present disclosure relates to systems and methods for identifying and reporting potential upcoming anomalous events for an electrical system.
  • PV solar plants are susceptible to interruptions caused by, for example, overheating, broken equipment, or a decrease in the amount of sunlight available. These events must be rectified or compensated for so that the plant can meet its obligations to consumers and/or government regulators. Other electrical systems suffer from similar anomalous events that can cause disruptions in service.
  • a method may comprise segmenting first time series data representing one or more characteristics of an electrical system into a first plurality of data segments, assigning a time-to-event parameter to each of the first plurality of data segments, each time-to-event parameter representing an amount of time between the data in the corresponding data segment and an anomalous event associated with the electrical system, and training a neural network using the first plurality of data segments together with the assigned time-to-event parameters.
  • the first time series data may be generated by one or more sensors measuring the one or more characteristics of the electrical system.
  • the first time series data may be collected from at least one of a solar panel array and a direct current to alternating current inverter.
  • the method may further comprise segmenting second time series data representing the one or more characteristics of the electrical system into a second plurality of data segments, and inputting one or more of the second plurality of data segments to the trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system.
  • the second time series data may represent the one or more characteristics of the electrical system during a later time period than the first time series data.
  • each of the second plurality of data segments may be input to the trained neural network in real time as the second time series data is collected and segmented.
  • the first time series data and the second time series data may each be collected from at least one of a solar panel array and a direct current to alternating current inverter.
  • the electrical system may be a solar power plant or a subsystem thereof.
  • the anomalous event may correspond with overheating of the electrical system.
  • the anomalous event may correspond with a decrease in available sunlight.
  • the anomalous event may correspond to a reduction in power generation by the solar power plant.
  • the anomalous event may correspond to a disruption in service of the electrical system.
  • the electrical system may consist of a single electrical device.
  • the electrical system may comprise a collection of multiple electrical devices.
  • a method may comprise segmenting live time series data representing one or more characteristics of an electrical system into a plurality of live data segments, and inputting one or more of the plurality of live data segments to a trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system, where the trained neural network was previously trained using a plurality of historical data segments each having an assigned time-to-event parameter, the plurality of historical data segments being generated from historical time series data representing the one or more characteristics of the electrical system, each assigned time-to- event parameter representing an amount of time between the data in the corresponding data segment and a historical anomalous event associated with the electrical system.
  • the time series data may be generated by one or more sensors measuring the one or more characteristics of the electrical system.
  • first time series data may be collected from at least one of a solar panel array and a direct current to alternating current inverter.
  • the electrical system may be a solar power plant or a subsystem thereof.
  • the anomalous event may correspond with overheating of the electrical system.
  • the anomalous event may correspond with a decrease in available sunlight.
  • the anomalous event may correspond to a reduction in power generation by the solar power plant.
  • the anomalous event corresponds to a disruption in service of the electrical system.
  • the electrical system may consist of a single electrical device.
  • the electrical system may comprise a collection of multiple electrical devices.
  • one or more computer-readable media may store a plurality of instructions that, when executed by a power controller operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array, cause the power controller to perform any of the methods described above and throughout this disclosure.
  • a power controller may be configured to perform any of the methods described above and throughout this disclosure.
  • the power controller may be operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array.
  • the power controller, the at least one solar panel array, and the inverter may be incorporated in a power plant.
  • FIG. 1 is a simplified block diagram illustrating an exemplary layout for a solar plant utilizing event prediction to detect potential losses in power generation
  • FIG. 2 is a simplified diagram illustrating one possible embodiment of the architecture of the presently disclosed neural network.
  • FIG. 3 is a simplified graph illustrating one example of data to be input into the presently disclosed neural network.
  • references in the specification to“one embodiment,”“an embodiment,”“an illustrative embodiment,” etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may or may not necessarily include that particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is submitted that it is within the knowledge of one skilled in the art to effect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.
  • the disclosed embodiments may be implemented, in some cases, in hardware, firmware, software, or any combination thereof.
  • the disclosed embodiments may also be implemented as instructions carried by or stored on a transitory or non-transitory computer- readable storage medium, which may be read and executed by one or more processors.
  • a computer-readable storage medium may be embodied as any storage device, mechanism, or other physical structure for storing or transmitting information in a form readable by a computing device (e.g., a volatile or non-volatile memory, a media disc, or other media device).
  • the presently disclosed systems and methods operate using segmented time series data, collected from an electrical system (which may be a single electrical device or a collection of multiple electrical devices), with a neural network 200 designed to predict a future anomalous event affecting the electrical system and the amount of time before said event.
  • the neural network 200 receives segmented time series data representing any number of characteristics of the electrical system, which may be naturally occurring and/or controlled by the operator, and predicts anomalous events which could result in a reduction or cessation of power generation or transmission if not addressed.
  • Each segment of time series data input to the neural network is assigned a time-to-event parameter, which represents the amount of time between the data and a known anomalous event (for data used in training the neural network 200) or the amount of time until a predicted anomalous event is likely to occur (for live data input to the neural network 200 for analysis).
  • FIG. 1 illustrates, in a simplified block diagram, a simplified layout 100 of a power plant 102 that uses the event prediction methods described herein.
  • the power plant 102 includes a power controller 120 that is operatively connected to one or more solar panel arrays 130 via a direct current (DC) to alternating current (AC) (DAC) inverter 140.
  • the power controller 120 is further communicatively coupled to a system operator 104 and is configured to dynamically control performance of the DAC inverter 140.
  • the DAC inverter 140 is used in solar power generation and may be programmed to provide ancillary services, such as, for example, voltage and frequency regulation, power factor correction, and reactive power control. Such a DAC inverter 140 may stabilize the power system 100 and compensate rapid fluctuations in supply and demand that result from intermittent renewable resources.
  • the power controller 120 may be embodied as part of DAC inverter 140.
  • the neural network 200 may be a component of the power controller 120, a component of the DAC inverter 140, or external to the power plant 102 and accessible through a network 106.
  • Time series data may be collected from the solar panel array 130, the DAC inverter 140, the power controller 120, the system operator 104, and/or other components of the system 100 and sent to the neural network 200 for processing. It is contemplated that time series data representing any number of characteristics associated with the electrical system being characterized may be used as inputs to the neural network 200.
  • FIG. 2 illustrates a simplified diagram of one embodiment of the neural network
  • a different number of inputs 220 and/or a different number of outputs 250 may be present depending on the exact specifications of the system and the need of the user.
  • the inputs 220 to the neural network 200 are segments of time series data collected from or by the components in FIG. 1. This data can represent natural phenomenon and/or inputs controlled by the user.
  • the outputs of the neural network 200 are time-to-event parameters.
  • an output field 251 is labelled“1 day”
  • output field 252 is labeled“2 days”
  • output field 253 is labeled“3 days”
  • output field 254 is labeled“4 days”
  • output field 255 is labeled“longer.”
  • the outputs 250 may represent time periods of seconds, minutes, hours, months, years, etc. The time values associated with output field and the number of output fields may change depending on the application and/or the needs of the user.
  • FIG. 3 a simplified graph is shown with time series data representing a characteristic of the DAC inverter 140 before an anomalous event.
  • the y-axis of the graph is the value of the characteristic under measurement (in this case, output current of the DAC inverter 140).
  • the data in this graph shows the value of the characteristic as it gets closer to the anomalous event. As one moves from right to left on the x-axis, the data begins to fluctuate and deviate from its regular pattern.
  • the neural network 200 is trained by feeding it data from signals similar to that shown in FIG. 3.
  • the brackets 300 represent one exemplary data segment in the time series data of FIG. 3.
  • the time series data is segmented into a plurality of data segments.
  • the data segments are each assigned a time-to-event parameter representing the amount of time between the collection of the data in that segment and a known anomalous event that occurred after that data was collected.
  • Each of the plurality of data segments, along with their assigned time-to-event parameters are input to the neural network 200 to train the network regarding the relationship(s) between the data and the time-to-event parameters.
  • live (or recently collected) time series data can be segmented into similar data segments and input to the neural network 200.
  • the trained neural network will then output a predicted time-to-event parameter for each inputted data segment. In this way, future anomalous events, as well as the amount of time until those events occur, can be predicted from the live data.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Inverter Devices (AREA)

Abstract

The present disclosure relates to systems and methods for identifying anomalous events. In at least one illustrative embodiment, a method may comprise segmenting live time series data representing one or more characteristics of an electrical system into a plurality of live data segments, and inputting one or more of the plurality of live data segments to a trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system. The neural network may be trained using a plurality of historical data segments each having an assigned time-to-event parameter, each assigned time-to-event parameter representing an amount of time between the data in the corresponding data segment and a histroical anomalous event associated with the electrical system.

Description

SYSTEMS AND METHODS FOR IDENTIFYING
ANOMALOUS EVENTS FOR ELECTRICAL SYSTEMS
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of and priority to U.S. Provisional Patent
Application No. 62/694,432, filed July 5, 2018, the entire disclosure of which is incorporated herein by reference.
TECHNICAL FIELD
[0002] The present disclosure relates to systems and methods for identifying and reporting potential upcoming anomalous events for an electrical system.
BACKGROUND
[0003] Photovoltaic (PV) solar plants are susceptible to interruptions caused by, for example, overheating, broken equipment, or a decrease in the amount of sunlight available. These events must be rectified or compensated for so that the plant can meet its obligations to consumers and/or government regulators. Other electrical systems suffer from similar anomalous events that can cause disruptions in service.
[0004] Most events do not spontaneously appear but, instead, are the result of degradation over time or are part of some pattern. These patterns are usually difficult to notice. As a result, most problems only become apparent to the operator after a device fails to perform as expected.
SUMMARY
[0005] According to one aspect of the present disclosure, a method may comprise segmenting first time series data representing one or more characteristics of an electrical system into a first plurality of data segments, assigning a time-to-event parameter to each of the first plurality of data segments, each time-to-event parameter representing an amount of time between the data in the corresponding data segment and an anomalous event associated with the electrical system, and training a neural network using the first plurality of data segments together with the assigned time-to-event parameters.
[0006] In some embodiments, the first time series data may be generated by one or more sensors measuring the one or more characteristics of the electrical system.
[0007] In some embodiments, the first time series data may be collected from at least one of a solar panel array and a direct current to alternating current inverter. [0008] In some embodiments, the method may further comprise segmenting second time series data representing the one or more characteristics of the electrical system into a second plurality of data segments, and inputting one or more of the second plurality of data segments to the trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system.
[0009] In some embodiments, the second time series data may represent the one or more characteristics of the electrical system during a later time period than the first time series data.
[0010] In some embodiments, each of the second plurality of data segments may be input to the trained neural network in real time as the second time series data is collected and segmented.
[0011] In some embodiments, the first time series data and the second time series data may each be collected from at least one of a solar panel array and a direct current to alternating current inverter.
[0012] In some embodiments, the electrical system may be a solar power plant or a subsystem thereof.
[0013] In some embodiments, the anomalous event may correspond with overheating of the electrical system.
[0014] In some embodiments, the anomalous event may correspond with a decrease in available sunlight.
[0015] In some embodiments, the anomalous event may correspond to a reduction in power generation by the solar power plant.
[0016] In some embodiments, the anomalous event may correspond to a disruption in service of the electrical system.
[0017] In some embodiments, the electrical system may consist of a single electrical device.
[0018] In some embodiments, the electrical system may comprise a collection of multiple electrical devices.
[0019] According to another aspect of the present disclosure, a method may comprise segmenting live time series data representing one or more characteristics of an electrical system into a plurality of live data segments, and inputting one or more of the plurality of live data segments to a trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system, where the trained neural network was previously trained using a plurality of historical data segments each having an assigned time-to-event parameter, the plurality of historical data segments being generated from historical time series data representing the one or more characteristics of the electrical system, each assigned time-to- event parameter representing an amount of time between the data in the corresponding data segment and a historical anomalous event associated with the electrical system.
[0020] In some embodiments, the time series data may be generated by one or more sensors measuring the one or more characteristics of the electrical system.
[0021] In some embodiments, first time series data may be collected from at least one of a solar panel array and a direct current to alternating current inverter.
[0022] In some embodiments, the electrical system may be a solar power plant or a subsystem thereof.
[0023] In some embodiments, the anomalous event may correspond with overheating of the electrical system.
[0024] In some embodiments, the anomalous event may correspond with a decrease in available sunlight.
[0025] In some embodiments, the anomalous event may correspond to a reduction in power generation by the solar power plant.
[0026] In some embodiments, the anomalous event corresponds to a disruption in service of the electrical system.
[0027] In some embodiments, the electrical system may consist of a single electrical device.
[0028] In some embodiments, the electrical system may comprise a collection of multiple electrical devices.
[0029] According to still another aspect of the present disclosure, one or more computer-readable media may store a plurality of instructions that, when executed by a power controller operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array, cause the power controller to perform any of the methods described above and throughout this disclosure.
[0030] According to yet another aspect of the present disclosure, a power controller may be configured to perform any of the methods described above and throughout this disclosure. In some embodiments, the power controller may be operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array. In some embodiments, the power controller, the at least one solar panel array, and the inverter may be incorporated in a power plant.
BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The concepts described in the present disclosure are illustrated by way of example and not by way of limitation in the accompanying figures. For simplicity and clarity of illustration, elements illustrated in the figures are not necessarily drawn to scale. For example, the dimensions of some elements may be exaggerated relative to other elements for clarity. Further, where considered appropriate, reference labels have been repeated among the figures to indicate corresponding or analogous elements. The detailed description particularly refers to the accompanying figures in which:
[0032] FIG. 1 is a simplified block diagram illustrating an exemplary layout for a solar plant utilizing event prediction to detect potential losses in power generation;
[0033] FIG. 2 is a simplified diagram illustrating one possible embodiment of the architecture of the presently disclosed neural network; and
[0034] FIG. 3 is a simplified graph illustrating one example of data to be input into the presently disclosed neural network.
DETAILED DESCRIPTION OF THE DRAWINGS
[0035] While the concepts of the present disclosure are susceptible to various modifications and alternative forms, specific embodiments thereof have been shown by way of example in the figures and will be described herein in detail. It should be understood, however, that there is no intent to limit the concepts of the present disclosure to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives consistent with the present disclosure and the appended claims.
[0036] References in the specification to“one embodiment,”“an embodiment,”“an illustrative embodiment,” etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may or may not necessarily include that particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is submitted that it is within the knowledge of one skilled in the art to effect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.
[0037] The disclosed embodiments may be implemented, in some cases, in hardware, firmware, software, or any combination thereof. The disclosed embodiments may also be implemented as instructions carried by or stored on a transitory or non-transitory computer- readable storage medium, which may be read and executed by one or more processors. A computer-readable storage medium may be embodied as any storage device, mechanism, or other physical structure for storing or transmitting information in a form readable by a computing device (e.g., a volatile or non-volatile memory, a media disc, or other media device).
[0038] In the drawings, some structural or method features may be shown in specific arrangements and/or orderings. However, it should be appreciated that such specific arrangements and/or orderings may not be required. Rather, in some embodiments, such features may be arranged in a different manner and/or order than shown in the illustrative figures. Additionally, the inclusion of a structural or method feature in a particular figure is not meant to imply that such feature is required in all embodiments and, in some embodiments, may not be included or may be combined with other features.
[0039] The presently disclosed systems and methods operate using segmented time series data, collected from an electrical system (which may be a single electrical device or a collection of multiple electrical devices), with a neural network 200 designed to predict a future anomalous event affecting the electrical system and the amount of time before said event. In particular, the neural network 200 receives segmented time series data representing any number of characteristics of the electrical system, which may be naturally occurring and/or controlled by the operator, and predicts anomalous events which could result in a reduction or cessation of power generation or transmission if not addressed. Each segment of time series data input to the neural network is assigned a time-to-event parameter, which represents the amount of time between the data and a known anomalous event (for data used in training the neural network 200) or the amount of time until a predicted anomalous event is likely to occur (for live data input to the neural network 200 for analysis).
[0040] FIG. 1 illustrates, in a simplified block diagram, a simplified layout 100 of a power plant 102 that uses the event prediction methods described herein. The power plant 102 includes a power controller 120 that is operatively connected to one or more solar panel arrays 130 via a direct current (DC) to alternating current (AC) (DAC) inverter 140. The power controller 120 is further communicatively coupled to a system operator 104 and is configured to dynamically control performance of the DAC inverter 140. The DAC inverter 140 is used in solar power generation and may be programmed to provide ancillary services, such as, for example, voltage and frequency regulation, power factor correction, and reactive power control. Such a DAC inverter 140 may stabilize the power system 100 and compensate rapid fluctuations in supply and demand that result from intermittent renewable resources. It should be appreciated that, in some embodiments, the power controller 120 may be embodied as part of DAC inverter 140.
[0041] The neural network 200 may be a component of the power controller 120, a component of the DAC inverter 140, or external to the power plant 102 and accessible through a network 106. Time series data may be collected from the solar panel array 130, the DAC inverter 140, the power controller 120, the system operator 104, and/or other components of the system 100 and sent to the neural network 200 for processing. It is contemplated that time series data representing any number of characteristics associated with the electrical system being characterized may be used as inputs to the neural network 200.
[0042] FIG. 2 illustrates a simplified diagram of one embodiment of the neural network
200 for predicting if and when an anomalous event is likely to occur. It should be appreciated that, in some embodiments, a different number of inputs 220 and/or a different number of outputs 250 may be present depending on the exact specifications of the system and the need of the user.
[0043] In the illustrative embodiment, the inputs 220 to the neural network 200 are segments of time series data collected from or by the components in FIG. 1. This data can represent natural phenomenon and/or inputs controlled by the user. The outputs of the neural network 200 are time-to-event parameters. In this example, an output field 251 is labelled“1 day”, output field 252 is labeled“2 days,” output field 253 is labeled“3 days,” output field 254 is labeled“4 days,” and output field 255 is labeled“longer.” It is contemplated that other embodiments of the neural network 200 may use different numbers of outputs and/or different time scales. For instance, in other embodiments, the outputs 250 may represent time periods of seconds, minutes, hours, months, years, etc. The time values associated with output field and the number of output fields may change depending on the application and/or the needs of the user.
[0044] Referring now to FIG. 3, a simplified graph is shown with time series data representing a characteristic of the DAC inverter 140 before an anomalous event. The x-axis of the graph represents the amount of time before the event, and the event occurs on the left side of the graph where x=0. This means that time flows from right to left on the x-axis, as the rightmost part of the graph represents the greatest amount of time before the event. The y-axis of the graph is the value of the characteristic under measurement (in this case, output current of the DAC inverter 140). The data in this graph shows the value of the characteristic as it gets closer to the anomalous event. As one moves from right to left on the x-axis, the data begins to fluctuate and deviate from its regular pattern.
[0045] The neural network 200 is trained by feeding it data from signals similar to that shown in FIG. 3. The brackets 300 represent one exemplary data segment in the time series data of FIG. 3. Before being input to the neural network 200, the time series data is segmented into a plurality of data segments. For historical data used in training the neural network 200, the data segments are each assigned a time-to-event parameter representing the amount of time between the collection of the data in that segment and a known anomalous event that occurred after that data was collected. Each of the plurality of data segments, along with their assigned time-to-event parameters are input to the neural network 200 to train the network regarding the relationship(s) between the data and the time-to-event parameters.
[0046] After training, live (or recently collected) time series data can be segmented into similar data segments and input to the neural network 200. The trained neural network will then output a predicted time-to-event parameter for each inputted data segment. In this way, future anomalous events, as well as the amount of time until those events occur, can be predicted from the live data.
[0047] While certain illustrative embodiments have been described in detail in the figures and the foregoing description, such an illustration and description is to be considered as exemplary and not restrictive in character, it being understood that only illustrative embodiments have been shown and described and that all changes and modifications that come within the spirit of the disclosure are desired to be protected. There exist a plurality of advantages of the present disclosure arising from the various features of the apparatus, systems, and methods described herein. It will be noted that alternative embodiments of the apparatus, systems, and methods of the present disclosure may not include all of the features described, yet still benefit from at least some of the advantages of such features. Those of ordinary skill in the art may readily devise their own implementations of the apparatus, systems, and methods that incorporate one or more of the features of the present disclosure.

Claims

WHAT IS CLAIMED IS:
1. A method comprising:
segmenting first time series data representing one or more characteristics of an electrical system into a first plurality of data segments;
assigning a time-to-event parameter to each of the first plurality of data segments, each time-to-event parameter representing an amount of time between the data in the corresponding data segment and an anomalous event associated with the electrical system; and
training a neural network using the first plurality of data segments together with the assigned time-to-event parameters.
2. The method of claim 1 , wherein the first time series data are generated by one or more sensors measuring the one or more characteristics of the electrical system.
3. The method of claim 2, wherein the first time series data are collected from at least one of a solar panel array and a direct current to alternating current inverter.
4. The method of any preceding claim, further comprising:
segmenting second time series data representing the one or more characteristics of the electrical system into a second plurality of data segments; and
inputting one or more of the second plurality of data segments to the trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system.
5. The method of claim 4, wherein the second time series data represents the one or more characteristics of the electrical system during a later time period than the first time series data.
6. The method of claim 5, wherein each of the second plurality of data segments is input to the trained neural network in real time as the second time series data is collected and segmented.
7. The method of any one of claims 4-6, wherein the first time series data and the second time series data are each collected from at least one of a solar panel array and a direct current to alternating current inverter.
8. The method of any preceding claim, wherein the electrical system is a solar power plant or a subsystem thereof.
9. The method of claim 8, wherein the anomalous event corresponds with overheating of the electrical system.
10. The method of claim 8, wherein the anomalous event corresponds with a decrease in available sunlight.
11. The method of any one of claims 8-10, wherein the anomalous event corresponds to a reduction in power generation by the solar power plant.
12. The method of any preceding claim, wherein the anomalous event corresponds to a disruption in service of the electrical system.
13. The method of any preceding claim, wherein the electrical system consists of a single electrical device.
14. The method of any one of claims 1-12, wherein the electrical system comprises a collection of multiple electrical devices.
15. A method comprising:
segmenting live time series data representing one or more characteristics of an electrical system into a plurality of live data segments; and
inputting one or more of the plurality of live data segments to a trained neural network to output a predicted time-to-event parameter for each inputted data segment, the predicted time-to-event parameter representing a predicted amount of time between the data in the inputted data segment and a predicted anomalous event associated with the electrical system; wherein the trained neural network was previously trained using a plurality of historical data segments each having an assigned time-to-event parameter, the plurality of historical data segments being generated from historical time series data representing the one or more characteristics of the electrical system, each assigned time-to-event parameter representing an amount of time between the data in the corresponding data segment and a historical anomalous event associated with the electrical system.
16. The method of claim 15, wherein the time series data are generated by one or more sensors measuring the one or more characteristics of the electrical system.
17. The method of claim 16, wherein first time series data are collected from at least one of a solar panel array and a direct current to alternating current inverter.
18. The method of any one of claims 15-17, wherein the electrical system is a solar power plant or a subsystem thereof.
19. The method of claim 18, wherein the anomalous event corresponds with overheating of the electrical system.
20. The method of claim 18, wherein the anomalous event corresponds with a decrease in available sunlight.
21. The method of any one of claims 18-20, wherein the anomalous event corresponds to a reduction in power generation by the solar power plant.
22. The method of any one of claims 15-21, wherein the anomalous event corresponds to a disruption in service of the electrical system.
23. The method of any one of claims 15-22, wherein the electrical system consists of a single electrical device.
24. The method of any one of claims 15-22, wherein the electrical system comprises a collection of multiple electrical devices.
25. One or more computer-readable media storing a plurality of instructions that, when executed by a power controller operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array, cause the power controller to perform the method of any one of the preceding claims.
26. A power controller to be operatively connected to (i) at least one solar panel array and (ii) an inverter electrically coupled to the at least one solar panel array, the power controller being configured to perform the method of any one of claims 1-24.
27. A power plant comprising:
at least one solar panel array;
an inverter electrically coupled to the at least one solar panel array; and
a power controller operatively connected to the at least one solar panel array and to the inverter, the power controller being configured to perform the method of any one of claims 1- 24.
PCT/US2019/040664 2018-07-05 2019-07-05 Systems and methods for identifying anomalous events for electrical systems WO2020010291A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201862694432P 2018-07-05 2018-07-05
US62/694,432 2018-07-05

Publications (1)

Publication Number Publication Date
WO2020010291A1 true WO2020010291A1 (en) 2020-01-09

Family

ID=69059289

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2019/040664 WO2020010291A1 (en) 2018-07-05 2019-07-05 Systems and methods for identifying anomalous events for electrical systems

Country Status (1)

Country Link
WO (1) WO2020010291A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112622676A (en) * 2020-11-09 2021-04-09 特瓦特能源科技有限公司 Monitoring method and system for power battery safe charging

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010042533A2 (en) * 2008-10-06 2010-04-15 Atonometrics, Inc. Photovoltaic module performance monitoring system and devices
US20100201374A1 (en) * 2009-02-07 2010-08-12 Vasilyev Leonid A High speed detection of shunt defects in photovoltaic and optoelectronic devices
US20120166085A1 (en) * 2010-12-14 2012-06-28 Peter Gevorkian Solar power monitoring and predicting of solar power output
WO2016069810A1 (en) * 2014-10-28 2016-05-06 Sinewatts, Inc. Systems and methods for dispatching maximum available capacity for photovoltaic power plants
US20160190981A1 (en) * 2014-12-31 2016-06-30 Industry-Academic Cooperation Foundation, Yonsei University Method for hybrid solar tracking, and apparatus for hybrid solar tracking and photovoltaic blind system using same
US20180046924A1 (en) * 2015-08-31 2018-02-15 Guangzhou Institute Of Energy Conversion, Chinese Academy Of Sciences Whole-life-cycle power output classification prediction system for photovoltaic systems

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010042533A2 (en) * 2008-10-06 2010-04-15 Atonometrics, Inc. Photovoltaic module performance monitoring system and devices
US20100201374A1 (en) * 2009-02-07 2010-08-12 Vasilyev Leonid A High speed detection of shunt defects in photovoltaic and optoelectronic devices
US20120166085A1 (en) * 2010-12-14 2012-06-28 Peter Gevorkian Solar power monitoring and predicting of solar power output
WO2016069810A1 (en) * 2014-10-28 2016-05-06 Sinewatts, Inc. Systems and methods for dispatching maximum available capacity for photovoltaic power plants
US20160190981A1 (en) * 2014-12-31 2016-06-30 Industry-Academic Cooperation Foundation, Yonsei University Method for hybrid solar tracking, and apparatus for hybrid solar tracking and photovoltaic blind system using same
US20180046924A1 (en) * 2015-08-31 2018-02-15 Guangzhou Institute Of Energy Conversion, Chinese Academy Of Sciences Whole-life-cycle power output classification prediction system for photovoltaic systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GREEN ET AL.: "Improving Efficiency of PV Systems Using Statistical Performance Monitoring", IEA PVPS TASK 13, SUBTASK 2, REPORT IEA-PVPS T13-07, June 2017 (2017-06-01), pages 1 - 55, XP055673545, ISBN: 978-3-906042-48-0, Retrieved from the Internet <URL:http://iea-pvps.org/fileadmin/dam/public/report/technical/Report_IEA-PVPS_T13-07_2017_lmproving_Efficiency_of_PV_Systems_Using_StatisticalPerformance_Monitoring.pdf> [retrieved on 20190907] *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112622676A (en) * 2020-11-09 2021-04-09 特瓦特能源科技有限公司 Monitoring method and system for power battery safe charging

Similar Documents

Publication Publication Date Title
Das et al. Optimal placement of distributed energy storage systems in distribution networks using artificial bee colony algorithm
Metwaly et al. Optimum network ageing and battery sizing for improved wind penetration and reliability
EP3629439B1 (en) Method for controlling photovoltaic power generation, and photovoltaic power generation system
US10289765B2 (en) Fast model generating and solving method for security-constrained power system operation simulation
Sachs et al. A two-stage model predictive control strategy for economic diesel-PV-battery island microgrid operation in rural areas
EP3046200A1 (en) Control device, electricity storage device, battery control system, battery control device, control method, battery control method, and recording medium
JP6063632B2 (en) System and method for operating a capacitor bank
Mahmoud et al. Optimal voltage control in distribution systems with intermittent PV using multiobjective Grey-Wolf-Lévy optimizer
Iliadis et al. Energy management and techno‐economic assessment of a predictive battery storage system applying a load levelling operational strategy in island systems
EP3648279B1 (en) Method, electrical grid and computer program product for predicting overloads in an electrical grid
WO2021129955A1 (en) System and method for load and source forecasting for increasing electrical grid component longevity
DE112018000245T5 (en) Machine for balancing uncertainty and flexibility for intertemporal electrical energy products
JPWO2017090519A1 (en) Information processing apparatus, information processing method, and recording medium
CN104978479A (en) Apparatus for forecasting water demand
US9965016B2 (en) Power asset command and control architecture
WO2022136186A1 (en) Power grid resource allocation
Ravindran et al. Feeder level power loss reduction through reactive power control with presence of distributed generation
WO2020010291A1 (en) Systems and methods for identifying anomalous events for electrical systems
Armendariz et al. Comparative study of optimal controller placement considering uncertainty in PV growth and distribution grid expansion
KR102458380B1 (en) Method and server for controlling energy storage system
Lakshmi et al. Centralized and distributed battery energy storage system for peak load demand support of radial distribution networks
Van Horn A network-inclusive, optimization-based approach to power system flexibility evaluation
Diaz et al. Scenario-selection for hosting capacity analysis of distribution feeders with voltage regulation equipment
US20220021217A1 (en) Photovoltaic power plant energy harvest optimization - capacity factor, delta-p loss and ramp rate compensation
EP4064494A1 (en) Power supply and demand planning device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19831211

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19831211

Country of ref document: EP

Kind code of ref document: A1