WO2019090374A1 - Method for producing a bridge support of a prestressed concrete bridge - Google Patents
Method for producing a bridge support of a prestressed concrete bridge Download PDFInfo
- Publication number
- WO2019090374A1 WO2019090374A1 PCT/AT2018/060266 AT2018060266W WO2019090374A1 WO 2019090374 A1 WO2019090374 A1 WO 2019090374A1 AT 2018060266 W AT2018060266 W AT 2018060266W WO 2019090374 A1 WO2019090374 A1 WO 2019090374A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wall
- segments
- plates
- bridge girder
- plate
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Definitions
- the invention relates to a method for producing a bridge girder of a prestressed concrete bridge and to bridge girders produced by this method.
- Prestressed concrete bridges were typically made with the final concrete sections.
- CN 205152771 U The erection of a bridge of prefabricated segments made of ultra high strength concrete slabs is described in CN 205152771 U.
- To make a segment two wall panels, the bottom panel, and the top panel in the corners of the segment are bonded together with in-situ concrete. After joining the segments frame structures are formed in the segment joints lying within the hollow box.
- the bridge girder has a low dead weight, because the wall plates are made of ultra-high strength concrete and therefore can be made very thin.
- a disadvantage of the construction described in CN 205152771 U is that the bridge girder is manufactured with the final cross-sectional dimensions. In the case of CN 205152771 U, transverse frames are formed in the segment joints. This requires making the cross frame after joining the segments to a bridge girder. This procedure is more complicated than a production of the frame in the production of the segments and thus represents a further disadvantage of the CN 205152771 U dar.
- a disadvantage of the construction of a bridge with the final cross-sectional dimensions is that in the construction conditions already affects the entire weight of the bridge girder. This can lead to the fact that the cross-sectional dimensions of the final bridge structure must be chosen due to the stresses in the construction conditions. It can also be disadvantageous that the supports of the bridge girder in the condition of construction must be designed for the entire dead weight of the bridge girder. In order to reduce the dead weight of the bridge girder in the construction state, also construction methods for bridges have been developed in which after the preparation of the bridge girder a cross-sectional complement is performed with in-situ concrete.
- the construction of a bridge of thin-walled prefabricated beams with a trough-shaped cross-section is described in the publication "Building bridges using the balanced lift method" by Johann Kollegger et al., In the journal “Structural Concrete", Vol. 15, 2014, pages 281-291.
- the trough-shaped cross-section consists of two wall plates and a bottom plate. In the vicinity of the upper edges of the wall panels reinforcing bars are welded to the lattice girders arranged in the wall panels. The connection of the wall panels by the reinforcing bars contributes to a stiffening of the trough-shaped cross-section.
- a bandage which also consists of reinforcing bars, is welded onto these reinforcing bars.
- the thin-walled precast beams are mounted in a vertical position according to the method described in DE 10 2006 039551 and brought by a folding operation in a horizontal position. Subsequently, a filled concrete is introduced into the precast beams with trogförmigem cross-section and the deck plate is made with a composite formwork car.
- a support with a trough-shaped cross section is also shown in FIG. 13 of WO 2016 037 864.
- the wall plates of the carrier are formed by the two plates of a double wall.
- a connecting element which consists of a steel profile with an angular cross-section, arranged.
- This connecting element serves to receive the concreting pressure during the introduction of the filling concrete into the carrier consisting of thin-walled plates.
- this connecting element serves to stiffen the trough-shaped cross section during the transport and assembly operations.
- FIG. 14 of WO 2016 037 864 a box-shaped cross-section is also shown which has two webs of double walls, a bottom plate and a cover plate. A bending load due to its own weight can be absorbed much better by this box-shaped cross-section than by a trough-shaped cross-section.
- a disadvantage of the cross section shown in FIG. 14 of WO 2016 037 864, however, is that the two wall panels of a double wall are connected to one another only by lattice girders arranged parallel to the lower and upper edges of the double wall.
- the lattice girders serve as connecting elements between the two wall panels and are dimensioned so that they can accommodate the concreting pressure arising during the filling of the concrete in the cavity between the two wall panels.
- the fasteners are usually also sized for stresses that occur when lifting and moving a double wall.
- the cross section shown in FIG. 14 of WO 2016 037 864 is not in capable of absorbing shear stresses in the lands formed by, for example, applying a layer of reinforced concrete to the floor slab or to the cover slab. It is also disadvantageous in the cross section shown in FIG.
- FIG. 14 of WO 2016 037 864 A cross section corresponding to FIG. 14 of WO 2016 037 864 is also shown in FIG. 1 of the publication "Bridge girders out of hollow wall elements and ultra-thin precast elements", 10th International PhD Symposium in Civil Engineering, Quebec, Canada, 2014 of Sara Foremniak is formed between the lower edges of the double walls, a rib which is connected to the bottom plate, formed between the upper edges of the top plate a rib which is connected to the cover plate, the wall plates of the double walls are only on the In the figures of this publication it can be seen that the wall panels of a double wall are interconnected by connecting means formed in one segment as a lattice girder and in a segment other than steel shafts, lattice girders and steel shafts are common connection means in a double wall, whose function is the inclusion of concreting pressure s is during the filling of the concrete in the arranged between the inner and the outer wall plate cavity.
- the cross-section shown in this publication is incapable
- a disadvantage of the segments shown in this publication is also that the lower edges of the inner wall panels are arranged in the bottom plate. This results in a considerable effort for performing an upper reinforcement of a layer of reinforced concrete on the bottom plate through the inner wall panels in the cavities between the inner and outer wall panels.
- KR 10140525 Bl shows a method in which is formed by the connection of prefabricated wall elements, a segment with trough-shaped cross section on a mounting station.
- the individual segments become one with two end blocks containing the tendon anchors and cross frames in the segment joints One-field carrier joined together.
- the cross-sectional supplement is made by producing a cover plate from a precast slab with a concrete layer.
- JP 20061159730 A shows a method in which two wall panels are set up to make a segment, a reinforced concrete floor panel is formed between the lower edges of the wall panel, and the upper edges of the wall panels are connected by a cross member. After joining the segments to form a bridge girder, a concrete slab is formed in the final layer.
- JP 2005023684 shows a method for producing a bridge with the clock shift method.
- the bottom plate, then the wall panels, then transverse frames are produced with oblique pressure struts and finally arranged between the wall panels part of the cover plate in each construction section first.
- After hardening of the concrete in the last produced segment of the entire bridge body is moved in the longitudinal direction so far that the assembly space for the production of the next segment is free.
- the cantilevered parts of the cover plates are produced on the projecting parts of the transverse frames.
- the present invention solves this problem by providing a method for producing a bridge carrier according to claim 1 and by bridge carrier produced according to this method according to claim 22.
- Advantageous developments of the invention are defined in the subclaims.
- An inventive method for producing a prestressed bridge girder with a hollow box-shaped cross section of prefabricated segments is characterized in that for the production of a segment, at least two wall panels having a preferably rectangular shape in a section through the median plane are made of reinforced concrete,
- the at least two wall panels are placed on a mounting station so as to be spaced from one another in a sectional plane normal to the longitudinal axis of the segment, and that the ribs are arranged in sectional planes which are at an angle ⁇ between 45 ° and 135 ° with the longitudinal axis of the segment; preferably 90 °.
- a reinforced concrete floor slab having at least one rib frictionally connected to the floor slab is formed between the lower edges of the wall slabs, the at least one rib being disposed in the floor slab such that the at least one rib of the floor slab and the ribs the wall panels are in one plane,
- the wall panels are connected to the bottom plate by connecting the arranged in the wall plates ribs with the at least one arranged in the bottom plate rib non-positively and rigidly;
- the wall panels are connected to the cover plate by a connector of the arranged in the wall panels ribs with the at least one arranged in the cover plate rib non-positively and rigidly and at least one transverse frame is formed by this connection;
- the at least two segments are assembled at the installation site to a bridge girder
- bridge girders can be produced which have a much lower weight in the construction state than in the final state.
- the construction method according to the invention is particularly advantageous if the course of the bending moments in the bridge girder in the construction state during the manufacture of the bridge girder differs from the course of the bending moments in the final state, as is the case for example with the clock sliding method or the bridge folding method.
- One with the According to the method of the invention produced bridge girder may, for example, in the construction state have a weight that is only one fifth of the weight of the bridge girder in the final state. This allows significant savings in the number of tendons and supports in the construction state.
- segments are joined together at the installation site to pieces of a bridge girder. Subsequently, the sections of the bridge girder are brought into the final position and connected to each other.
- the low weight of the segments made by the method according to the invention is particularly advantageous in the transport, lifting and assembly operations at the installation site and in the building operations required to bring the bridge girder to its final position.
- the joining of the segments to a bridge girder or to a section of a bridge girder can advantageously take place by the tensioning of tendons arranged in the longitudinal direction of the segments. It will be particularly advantageous if more than two segments are joined together by the tensioning of tendons.
- the weight of the bridge girder in the construction state is much lower than in the final state.
- layers of reinforced concrete can be applied to the bottom plates and / or the wall plates and / or the cover plates of the segments to increase the area, the moment of inertia and the resistance moment of the girder.
- This cross-sectional complement enhances the static properties of the bridge girder in the final position, and thereby becomes able to remove loads from traffic.
- the layers of reinforced concrete are applied to the top of the bottom plates and the tops of the cover plates of the segments.
- the layers of reinforced concrete can be beneficial on the inside or the Outside of the wall panels of the segments are applied.
- the wall panels are prefabricated in a match-cast method and / or the bottom panel and the cover panel are concreted in the manufacture of a segment in a match-cast method.
- the joints between the segments in the assembly of the segments as Vergussfugen with a width of 1mm to 100mm, preferably 10 to 30mm produced.
- the faces of the segments are milled and the joints between the segments in the assembly of the segments made as dry joints.
- At least two plates of a segment preferably all plates of a segment having a thickness of between 25 mm and 250 mm, preferably 50 mm to 150 mm, are produced.
- the segments are made so that the height and / or width within the segments is variable.
- the production of segments with variable height requires the production of wall panels, which have a trapezoidal shape in the view.
- the ribs are made of T-shaped steel girders and the webs of the T-shaped steel girders are partially embedded in the concrete when concreting the slabs.
- the T-shaped steel beams are produced with webs of trapezoidal sheet or corrugated metal.
- the ribs are made of truss girders made of steel and the lower chords of the truss girders when concreting the slabs embedded in the concrete.
- the outer wall panels of the double walls are formed to the underside of the segments in order not to arrange the joints extending at the bottom of the bridge in the longitudinal direction between the outer wall panels and the bottom plate on the outer sides of the webs.
- the lower edges of the inner wall panels have a distance, which is between 0mm and 50mm smaller than the thickness of a layer of reinforced concrete, which is applied to the bottom plate, to the top of the thin-walled base plate in the construction state.
- the outer sides of the outer wall panels are affected by environmental factors such as changing moisture conditions claimed higher than the arranged in the hollow box outer sides of the inner wall panels. Therefore, the concrete cover can be made smaller in the outer sides of the inner wall panels than in the outer wall panels.
- the thickness of the inner wall panels can be made smaller than the thickness of the outer wall panels, which is advantageous in terms of the production of light segments as possible.
- the ribs in the double walls can be advantageously formed from steel sheets, trapezoidal sheets, corrugated sheets, steel profiles, T-shaped steel beams, truss structures or lattice girders. Also, the production of ribs of concrete between the inner and the outer wall plate of a double wall is possible.
- the frame corners can be advantageously made of sheets and profiles made of steel, which is favorable for the production of a quick connection of the ribs of the double walls with the ribs of the bottom plate and the cover plate.
- the frame corners can also be made of a pourable building material such as concrete or a grout, if the manufacturing cost of a segment to be reduced and the assembly speed of minor importance.
- the reinforcement arranged in the layers of reinforced concrete at the installation site and / or the installation site it may be advantageous to at least partially, ideally completely, place the reinforcement arranged in the layers of reinforced concrete at the installation site and / or the installation site.
- the majority of this reinforcement is laid at the assembly site and at the installation this reinforcement is supplemented by an additional reinforcement at the segment joints.
- the transverse frames have a distance from each other which is at least 0.5 m and at most 10 m and preferably between 1.0 m and 3.0 m.
- An inventive, longitudinally prestressed bridge girder with hollow-box-shaped cross section of prefabricated segments is characterized in that the bridge girder comprises transverse frames, wherein the transverse frames have a distance from one another which is at least 0.5 m and at most 10.0 m and preferably between 1.0 m and 3 , 0m is located.
- Figure 2 is a section through a bridge girder, the webs are formed by double walls, the tensions due to dead weight and the stresses due to a combination of dead weight and bias.
- FIG. 3 shows a section through a bridge carrier produced by the method according to the invention, the stresses due to its own weight and the stresses due to a combination of dead weight and preload;
- FIG. 4 is a view of two wall panels according to a first embodiment of the invention.
- Fig. 5 is a view of four wall panels according to a first embodiment of the invention.
- Fig. 6 is a view of four wall plates and a bottom plate of an embodiment according to the invention.
- FIG. 7 is a view of a segment according to a first embodiment of the invention.
- FIG. 8 is a view during the insertion of a bridge carrier of a first embodiment of the invention.
- FIG. 9 shows a view after the insertion of the bridge carrier of a first embodiment according to the invention.
- Fig. 10 is a section along the line XX of Fig. 8 and Fig. 9;
- Figure 11 is a section corresponding to Figure 10 after applying a layer of reinforced concrete on the bottom plate.
- Figure 12 is a section corresponding to Figure 11 after the application of a layer of reinforced concrete on the cover plate.
- Figure 13 is a section corresponding to Figure 12 after the application of layers of reinforced concrete on the wall panels.
- FIG. 14 shows a section corresponding to FIG. 13 after assembly of the pressure struts and the production of the cantilever plates
- Fig. 16 is a section along the line XVI-XVI of Fig. 15;
- FIG. 17 shows detail A of FIG. 16
- FIG. 18 shows the detail B of FIG. 16
- FIG. 19 is a detail corresponding to FIG. 17 after the application of a layer of reinforced concrete on the floor slab and after the assembly of precast slabs;
- Fig. 20 is a section along the line XX-XX of Fig. 19;
- 21 is a view during production of a segment according to a third embodiment of the invention.
- Fig. 22 is a view during assembly of a portion of a bridge girder according to the third embodiment of the present invention.
- FIG. 23 shows a section through a bridge girder after the application of layers of reinforced concrete
- FIG. 24 shows a section according to the line XXIV-XXIV of FIG. 22;
- Fig. 25 is a section along the line XXV-XXV of Fig. 23;
- Fig. 26 is a view during manufacture of a segment according to a fourth embodiment of the invention.
- FIG. 27 shows a section during the production of a bridge carrier according to the fourth embodiment of the invention.
- FIG. 28 is a view of two double walls according to a fifth embodiment of the invention
- FIG. FIG. 29 is a view of four double walls according to the fifth embodiment of the present invention
- FIG. 28 is a view of two double walls according to a fifth embodiment of the invention
- FIG. 29 is a view of four double walls according to the fifth embodiment of the present invention.
- Fig. 30 is a view of four double walls and a bottom plate according to the fifth embodiment of the invention.
- FIG. 31 is a view of a segment according to the fifth embodiment of the present invention.
- FIG. 32 is a view during insertion of a bridge carrier according to the fifth embodiment of the present invention.
- Fig. 34 is a section along the line XXXIV- XXXIV of Fig. 32 and Fig. 33;
- Figure 35 is a section corresponding to Figure 34 after the application of a layer of reinforced concrete on the bottom plate.
- FIG. 36 shows a section corresponding to FIG. 35 after the application of a layer of reinforced concrete on the cover plate
- FIG. 37 shows a section corresponding to FIG. 36 after the filling of concrete into the double walls
- FIG. 38 shows a section corresponding to FIG. 37 after assembly of the pressure struts and the production of the cantilever plates
- 39 is a view during the production of parts of a bridge girder according to a sixth embodiment of the invention.
- Fig. 40 is a section along the line XL-XL of Fig. 39;
- FIG. 41 shows detail C of FIG. 40
- Fig. 42 shows the detail D of Fig. 40
- Fig. 43 is a detail corresponding to Fig. 41 after the application of a layer of reinforced concrete on the floor slab;
- Fig. 44 is a section taken along the line XLIV-XLIV of Fig. 43;
- FIG. 45 is a view during manufacture of a bridge carrier according to a seventh embodiment of the present invention.
- FIG. 46 shows a view corresponding to FIG. 45 after the positioning of a section at the installation location;
- FIG. 47 shows a view corresponding to FIG. 46 during the displacement of a further section of the bridge girder from the assembly site to the installation location;
- Fig. 48 is a section along the line XLVI I l-XLVI 11 of Fig. 45 and
- Fig. 49 shows the detail E of Fig. 47, wherein the section between the wall panels of the double walls has been performed.
- FIGS. 1 to 3 in which the static load-bearing behavior of different cross-sections for a bridge girder 1 is examined.
- the three cross sections illustrated in FIGS. 1 to 3 have a height of 2.0 m and a width of 1.0 m.
- Fig. 1 shows a trough-shaped cross section of a bridge girder 1, as shown in Fig. 13 in WO 2016 037 864.
- the thickness of the wall panels 4 is 50mm.
- the thickness of the bottom plate 5 is equal to 200mm.
- the area of this cross-section is 0.380m 2 , the moment of inertia 0.144m 4 , the moment of resistance at the top of the wall plates 4 -0.101m 3 , the moment of resistance at the bottom of the bottom plate 0.251m 3 and the radius of gyration 0.616m.
- the center of gravity is 0.574m from the bottom of the bottom plate 5.
- two tendons 15 are arranged in the vicinity of the wall plates 4 at a distance of 0.15 m from the bottom of the bottom plate.
- a positioning of the tendons 15 in the vicinity of the wall panels 4 is favorable because in this way deflection forces and anchoring forces of the tendons 15 can be introduced into the wall panels 4 with only slight bending stresses of the bottom plate 5.
- the weight of the trough-shaped cross section is 9.5 kN / m when the weight is assumed to be 25 kN / m 3 .
- a length of 40 m and the trough-shaped cross section according to FIG. 1 a bending moment of 1900 kNm results due to dead weight in the middle of the field.
- the tensions due to dead weight in mid-field of the bridge girder 1 are -18.8MPa at the top and +7.6MPa at the bottom.
- a prestressing force of 1750 kN applied with the two tendons 15 is required in order to ensure that the cross-section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
- Fig. 1 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top of a compressive stress of 15.8 MPa is present.
- Fig. 2 shows a cross section with four wall panels 4, a bottom plate 5 and a cover plate 6 as shown in FIG. 14 of WO 2016 037 864. Die Dicke des.
- the thickness of Wall panels 4 is 50mm.
- the thicknesses of the bottom plate 5 and the cover plate 6 are equal to 100mm.
- the area of this cross-section is 0.56m 2 , the moment of inertia 0.278m 4 , the moment of resistance at the top of the top plate 6 -0.278m 3 , the moment of resistance at the bottom of the bottom plate 5 0.278m 3 and the radius of gyration 0.704m.
- the focus is in half the height of the cross section.
- two tendons 15 are arranged between the wall panels 4.
- a positioning of the tendons 15 between the wall panels 4 is beneficial because in this way deflection forces and anchoring forces of the tendons 15 can be introduced directly into the wall panels 4 via not shown in FIG. 2 anchor blocks.
- the coupling of the ducts to the joints 16 between the segments 3 is connected in the example shown in FIG. 2, however, with considerable expenses, because the ducts are between the wall panels 4 and are not accessible.
- a coupling of the cladding could be done for example by arranged in the wall panels 4 recesses.
- the weight of the cross section shown in Fig. 2 is 14.0 kN / m when the weight of the building material is assumed to be 25 kN / m 3 .
- a length of 40 m and a cross section according to FIG. 2 a bending moment of 2800 kNm results due to its own weight in the middle of the field.
- the tensions due to deadweight in the middle of the bridge girder 1 are -10, lMPa at the top and 10, lMPa at the bottom.
- a prestressing force of 2080 kN applied with the two tendons 15 is required in order to ensure that the cross section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
- Fig. 2 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top a compressive stress of -7.4 MPa is present.
- Fig. 3 shows a cross section produced by the method according to the invention with two wall plates 4, a bottom plate 5 and a cover plate 6.
- the thickness of the wall plates 4 is 50mm.
- the thicknesses of the bottom plate 5 and the cover plate 6 are equal to 100mm.
- the area of the cross-section is 0.38 m 2
- the moment of inertia is 0.229 m 4
- the moment of resistance at the top of the cover plate 6 is -0.229 m 3
- the moment of resistance at the bottom of the bottom plate 5 is 0.229 m 3
- the inertia radius is 0.777 m.
- the focus is in half the height of the cross section. At a distance of 0.15 m from the bottom of the bottom plate 5, two tendons 15 are arranged.
- the weight of the cross section shown in Fig. 3 is 9.5 kN / m when the weight of the building material is assumed to be 25 kN / m 3 .
- a length of 40 m and the cross section according to FIG. 3 a bending moment of 1900 kNm results due to dead weight in the middle of the field.
- the tensions due to dead weight in the middle of the bridge girder 1 amount to -8.3 MPa at the Top and 8.3MPa at the bottom.
- a pretensioning force of 1310 kN applied with the two tendons 15 is required in order to ensure that the cross-section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
- Fig. 3 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top of a compressive stress of -6.9 MPa is present.
- a comparison of the cross section according to the invention produced in accordance with the invention with the trough-shaped cross section of FIG. 1 shows that both cross sections have the same area and thus for the selected example of the 40m long bridge girder the same bending moment due to dead weight in the middle of the field.
- a prestressing force of 1310 kN is required in order to ensure that in the middle of the field at the underside of the cross section no tensile stresses occur under load due to its own weight.
- the required biasing force is 1750kN (+ 34%).
- FIG. 2 shows that the cross-section according to FIG. 2, because of the minimum thickness of 50 mm required for the production of wall panels 4, has a higher dead weight and thus a higher one Moment due to dead weight in the middle of the field. Therefore, a much higher biasing force of 2080kN (+ 59%) is required for biasing the bridge beam 1 with the cross section of FIG.
- the stresses at the top of the cross sections due to the effects of dead weight and biases are only -6.9 MPa for the cross section produced by the method according to the invention and 2 -7.4 MPa (+ 7%) for the cross section according to FIG.
- the higher prestressing steel consumption and the somewhat higher compressive stresses are disadvantageous in the cross section according to FIG. 2.
- a bridge support 1 with a cross section according to FIG. 2 is advantageous for the production of a layer 9 of reinforced concrete between the inner wall panels 53 and the outer wall panels 54th
- the bottom plates 5, the cover plates 6 and the wall plates 4 are also referred to as plates 7 when common characteristics of these thin-walled concrete components are described.
- the plates 7 are connected to ribs 8, which are more accurately referred to in the embodiments in which it serves a clarification, for example as a rib 40 which is connected to a bottom plate, or as a rib 41 which is connected to a cover plate is, or as a rib 50 which is connected to a wall plate, or as a rib 52 in a double wall.
- the reinforcement arranged in the plates 7 and the layers 9 of reinforced concrete is not shown for the sake of clarity. Reinforcing steel, textile reinforcements and steel or stainless steel components can be used as the reinforcement.
- the reinforcement can be prestressed. Also fibers made of steel or plastic can be used as reinforcement.
- the tendons 15 and the anchors and deflections of the tendons 15 are not shown in most cases for clarity. Tendons 15 with subsequent or immediate bond, tendons 15 without composite or external tendons 15 can be arranged.
- FIGS. 4 to 14 in which the production of an exemplary bridge girder 1 with a method according to the invention according to a first embodiment is described.
- two wall panels 4 are placed in a vertical position as shown in FIG. 4 on a mounting place 10.
- a rib 50 which is non-positively connected to the wall plate 4 is arranged.
- the ribs 50 are made of T-shaped steel beams 18, the webs 24 are arranged normal to the center planes of the wall panels 4.
- two further wall panels 4, each with a rib 50 are set up on the assembly station 10 such that the median plane of these wall panels 4 is parallel to the median plane of the wall panels 4 erected in the first step and that the outsides of the wall panels 4 are at a distance have to each other, which corresponds to the width of the segment 3.
- the joints 17 between the wall panels 4 are then filled with a grout.
- a bottom plate 5 is formed between the lower edges 13 of the wall panels 4.
- the surface of the assembly station 10 is equipped in this example with a formwork 21, so that the bottom plate 5 can be made in situ concrete on the assembly station 10.
- the wall panels 4 have at the lower edges 13 connection reinforcements, which are connected by in-situ concrete with the reinforcement of the bottom plate 5.
- the connection of the wall panels 4 with the bottom plate 5 is statically advantageous because it shear forces between the lower edges 13 of the wall panels 4 and the bottom plate 5 can be transmitted.
- ribs 40 are connected to the arranged in the wall panels 4 ribs 50 in frame corners 26 frictionally and rigidly.
- two prefabricated cover plates 6 each having a rib 41 are mounted.
- the ribs 41 with the arranged at the ends frame corners 26 each have a length which is greater than the width of the cover plates 6.
- the ribs 41 of the cover plates 6 are placed in the assembly process on the arranged in the wall panels 4 ribs 50 and with these positively and rigidly connected. Due to the rigid connection of the arranged in the wall panels 4 ribs 50 with the arranged in the bottom plates 5 and in the cover plates 6 ribs 8 in the frame corners 26 in the segment 3 two transverse frames 20 are formed. These transverse frames 20 are so stiff that they give the segment 3 sufficient rigidity for later lifting, transporting and assembly operations. The transmission of shear forces between the cover plate 6 and the wall plates 4 takes place in this example on the transverse frame 20.
- the transverse frame 20 are in this example in planes that include an angle of 90 ° with the longitudinal axis of the segment 3.
- FIGS. 4 to 7 For reasons of clarity, the production of a segment 3 from four wall panels 4, one floor panel 5 and two cover panels 6 is shown in FIGS. 4 to 7. However, it would also be possible with the inventive method because of the use of prefabricated panels 7 to produce a much longer segment 3, for example, twenty wall panels 4, one floor panel 5 and ten cover panels 6 within a week. In compliance with the customary in the application of the clock shift method weekly clock construction time could be significantly shortened and the number of couplings for the tendons 15 can be reduced in this way.
- Fig. 8 shows the preparation of a bridge girder 1 with segments 3 of thin-walled plates 7 and transverse frame 20 with the clock shift method.
- the sectioned segments 3 shown in FIGS. 4 to 7 are positioned at the right end of the bridge girder 1 and connected with tendons 15 to the already existing part of the bridge girder 1.
- the bridge girder 1 is shifted to the left by the length of the last mounted segment 3.
- the mounting of the segments 3 and displacement of the bridge girder 1 is repeated until the left end of the bridge girder 1 reaches the abutment 33 arranged in FIG. 8 and FIG. 9 on the left side.
- the weight of the bridge girder 1 during construction, during the displacement of the bridge girder 1, is small, because the segments 3 consist of thin-walled plates 7, which are stiffened by transverse frame 20.
- a layer 9 of reinforced concrete in the statically required thickness is first applied to the base plate 5.
- the weight of the layer 9 of reinforced concrete is removed from the bottom plate 5 of the segment 3 via bending in the longitudinal direction of the bridge girder 1 and introduced into the transverse frame 20.
- the thickness of the bottom plate 5 can be 80mm, for example are performed when the transverse frames 20 have a distance of 2m and the sum of the thicknesses of the bottom plate 5 and the layer 9 of reinforced concrete is 250mm.
- a layer 9 of reinforced concrete is applied to the cover plate 6.
- the removal of the weight of the layer 9 of reinforced concrete is advantageously carried out over the cover plate 6 in the longitudinal direction of the bridge girder 1 and then on the transverse frame 20.
- the cover plate 6 and the layer 9 are made reinforced concrete monolithically connected to each other and form a piece of the deck slab 22nd
- layers 9 of reinforced concrete are applied to the insides of the wall panels 4.
- the application of the concrete can be done for example with shotcrete.
- a formwork can be constructed in the interior of the bridge girder 1 and the concrete can be filled by means of a concrete pump from the top of the carriageway slab 22.
- the pressure of the fresh concrete must be absorbed by the formwork mounted inside the bridge girder 1 and by the wall plates 4.
- the wall panels 4 direct the concreting pressure over bending to the transverse frame 20.
- FIGS. 15 to 20 The production of an exemplary bridge girder 1 with the method according to the invention in accordance with a second embodiment is shown in FIGS. 15 to 20.
- FIG. 15 shows the vertical assembly of segments 3 for producing two sections 2 of a bridge girder 1 according to the method described in US Pat. No. 7,996,944 B2.
- the joints 16 between the segments 3 can be formed as dry joints 16, when the end face of the segments 3 are machined by a milling process so that they have a precisely fitting surface.
- FIG. 16 shows that the sections 2 of the bridge girder 1 consist of segments 3, which are formed from thin-walled plates 7.
- the bottom plate 5, the cover plate 6 and the two wall plates 4 are connected to ribs 8. Due to the rigid connection of the ribs 8 creates a transverse frame 20, which serves to stiffen a segment 3.
- the ribs 8 have recesses 19, which reduce the weight of the ribs 8 and are favorable for the laying of a longitudinally arranged in the segments 3 and laid on the plates 7 reinforcement.
- the connection of the rib 50 of the wall plate 4 with the rib 40 of the bottom plate 5 in the left lower frame corner 26 of Fig. 16 is shown in Fig. 17 in an enlarged scale.
- the ribs 8 consist of T-shaped steel beams 18 which have recesses 19 in the webs 24.
- FIG. 17 shows that the webs 24 of the T-shaped steel girders 18 are partially embedded in the concrete of the wall plate 4 and the bottom plate 5.
- the ribs 8 are connected to the wall plate 4 and the bottom plate 5 in a shear-resistant manner, which is favorable for absorbing bending moments in the transverse frame 20, because the ribs 8 and part of the plates 7 act as a common component.
- reinforcing rods can be welded to the embedded in the concrete part of the webs.
- the ribs 8 are welded to additional steel plates 28. With screw 27 and embedded in the bottom plate 5 connection reinforcement of the wall plate 4, it is possible to produce a rigid frame corner 26, which can accommodate both positive and negative bending moments.
- connection of the rib 50 of the wall plate 4 with the rib 41 of the cover plate 6 in the left upper frame corner 26 of Fig. 16 is shown in Fig. 18 in an enlarged scale.
- the ribs 8 are provided to form the frame corner 26 with additional steel plates 28 which are welded to the ribs 8.
- screw 27 a rigid connection of the arranged in the wall plate 4 rib 50 can be made with the arranged in the cover plate 6 rib 41.
- FIG. 19 shows a detail corresponding to FIG. 17 in a later construction state after unfolding the sections 2 of the bridge girder 1 and applying a layer 9 of reinforced concrete to the floor slab 5.
- a layer 9 of reinforced concrete for producing the layer 9 of reinforced concrete on the wall slabs
- thin-walled prefabricated panels 30 made of ultra high-strength concrete with a textile reinforcement are inserted from the upper side of the bridge girder 1 in such a way that each precast slab 30 rests on the flanges 25 of two T-shaped steel girders 18.
- FIG. 1 A section through two prefabricated panels 30 and a wall panel 4 is shown in FIG. It may be advantageous to place sealing strips 29 between the prefabricated panels 30 and the flanges 25 of the T-shaped steel girders 18 to ensure that no concrete can escape into the interior of the bridge girder 1 when the layer 9 of reinforced concrete is formed on the wall panels 4.
- the introduction of the concrete into the cavity 31 formed by the wall panels 4 and the prefabricated panels 30 can take place by means of a concrete pump from the top of the carriageway panel 22.
- the pressure of the fresh concrete can be absorbed by the wall panels 4 and the precast panels 30 and directed to the transverse frames 20.
- the webs 24 of the T-shaped steel beams 18 have anchoring elements 32 in order to safely accommodate the concreting pressure in the To allow transverse frame 20. As anchoring elements 32 reinforcing bars can be used, which are welded to the web 24 of a T-shaped steel beam 18 and embedded in the wall plate 4
- FIGS. 21 to 25 The production of an exemplary bridge girder 1 with the method according to the invention according to a third embodiment is described in FIGS. 21 to 25.
- the wall panels 4 are made in this example in a match-cast process.
- the end face of the last produced component serves as a part of the formwork 21 for the next component.
- FIG. 21 shows a construction state in which two wall panels 4 produced by the match casting method are set up and connected with a dry joint 16 to an already finished segment 3.
- the bottom plate 5 of a segment 3 to be produced was concreted against the bottom plate 5 of the already completed segment 3 in a match-casting process.
- the ribs 8 are made of reinforced concrete in this example. After the base plate 5 has been produced, the rib 40 connected to the base plate 5 via a connecting reinforcement is concreted and joined to the ribs 50, which are connected to the wall plates 4, in a force-fitting and rigid manner.
- the cover plate 6 is produced in a match-cast process.
- rib 41 is produced.
- the rib 41 connected to the cover plate 6 is arranged below the cover plate 6 in this example.
- connection reinforcement the rib 41 of the cover plate 6 is non-positively and rigidly connected to the ribs 50 of the wall plate 4.
- Fig. 22 shows a construction state in which a portion 2 of the bridge girder 1 is superimposed on an abutment 33 and the pillar 34 and the second portion 2 of the bridge girder 1 with two cranes, which are not shown in FIG. 22 for clarity, lifted becomes.
- the transverse frames 20 formed by the ribs 8 are in this example arranged in planes which enclose an angle ⁇ of 90 ° with the longitudinal axes 36 of the segments 3.
- Fig. 23 shows a construction state after applying layers 9 of reinforced concrete on the floor panels 5 and the cover plates 6.
- no layer 9 of reinforced concrete is applied in this example.
- a layer 9 of reinforced concrete is applied to the cover plates 6 of all segments 3.
- On the bottom plate 5 is in this example only in the area of the centered pillar 34 applied a layer 9 of reinforced concrete to increase the height of the pressure zone in the range of negative moments.
- Fig. 24 shows a cross section through a portion 2 of the bridge girder 1, during the lifting.
- the segments 3 of the section 2 consist of wall panels 4, bottom plates 5 and cover plates 6 and are stiffened by transverse frame 20.
- FIG. 25 shows a cross section through the bridge girder 1 in the final layer 12 after the application of layers 9 of reinforced concrete on the cover plates 6 in all segments 3 and the bottom plates 5 of two segments 3.
- FIG. 26 and FIG. 27 The production of an exemplary bridge girder 1 with the method according to the invention according to a fourth embodiment is shown in FIG. 26 and FIG. 27.
- FIG. 26 shows the production of a segment 3.
- the wall panels 4 have a trapezoidal shape in the view.
- the height of the wall panels 4 changes in the longitudinal direction of the segment 3.
- the ribs 50 of the wall panels 4 are connected to the ribs 40 of the bottom panel 5.
- the ribs 8 lie in a plane which is not normal to the longitudinal axis of the segment 3.
- FIG. 27 shows that the ribs 8 are inclined at an angle ⁇ to the longitudinal axis 36 of the segments 3.
- the angle ⁇ in FIG. 27 is approximately 120 °.
- FIG. 27 shows the production of a prestressed concrete bridge 35 according to the cantilever method.
- Four segments 3 are already mounted and form part of the bridge girder 1. In this example, the operation in which the girder 1 is brought into the final layer 12 is eliminated because the segments 3 are mounted in the final layer 12.
- the segments 3 could be raised, for example, with cranes positioned on the ground, positioned at the end of the cantilevers and connected with tendons 15 to the already manufactured part of the bridge girder 1.
- the low weight of the segments 3 produced by the method according to the invention is particularly favorable for the rapid implementation of the lifting operations and for a reduction in the number of required tendons 15 for fixing the segments 3 in comparison to the conventional segment construction method.
- a possible manufacturing variant would be the joining of several segments 3 to a section 2 of a bridge girder 1 and the lifting and mounting of this section 2. As a result, the number of lifting and clamping operations could be reduced and the construction process can be accelerated.
- FIGS. 28 to 38 The production of an exemplary bridge girder 1 with a method according to the invention in accordance with a fifth embodiment is shown in FIGS. 28 to 38.
- two double walls 51 are set up in a vertical position according to FIG. 28 on an assembly site 10.
- a rib 52 which is frictionally connected to the inner wall plate 53 and the outer wall plate 54, respectively.
- the ribs 52 are made of T-shaped steel beams 18, the webs 24 are arranged normal to the center planes of the double walls 51.
- the flange 25 of the T-shaped steel beam 18 can be welded to the reinforcement of the first prepared wall plate 4. After filling and hardening of the concrete for producing the first wall plate 4 of a double wall 51, in a horizontal position, the double wall is turned and the web 24 of the T-shaped steel beam 18 is pressed into the fresh concrete of the second wall plate 4. After hardening of the concrete of the second wall plate 4, the two wall panels 4 are connected to each other by the T-shaped steel beam 18.
- the flange 25 of the T-shaped steel beam 18 opposite side of the web 24 may be formed as a dowel strip with a profiling to improve the thrust connection between the T-shaped steel beam 18 and the second wall plate 4. If it is required to accommodate the concreting pressure that results when filling the concrete in the cavity 31 between the inner wall plate 53 and the outer wall plate 54, additional connecting elements can be installed in the production of the double wall 51.
- two further double walls 51 are set up on the assembly station 10 such that the center planes of these double walls 51 are parallel to the center planes of the double walls 51 erected in the first step and that the outer sides of the outer wall plates 54 have a distance from one another which corresponds to the width of the segment 3.
- the joints 17 between the wall panels 4 of the double walls 51 are then filled with a grout.
- a bottom plate 5 is formed between the lower edges 13 of the double walls 51.
- the surface of the assembly station 10 is equipped in this example with a formwork 21, so that the bottom plate 5 can be made in situ concrete on the assembly station 10.
- the outer wall panels 54 of the double walls 51 have at the lower edges 13 connection reinforcements, which are connected by in-situ concrete with the reinforcement of the bottom plate 5.
- the connection of the double walls 51 with the bottom plate 5 is statically advantageous because it shear forces between the lower edges 13 of the double walls 51 and the bottom plate 5 can be transmitted.
- ribs 40 are connected to the arranged in the double walls 51 ribs 52 in frame corners 26 frictionally and rigidly.
- two prefabricated cover plates 6, each with a rib 41 are placed on the inner wall plates 53 and mounted.
- the ribs 41 with the arranged at the ends frame corners 26 each have a length which is greater than the width of the cover plates 6.
- the ribs 41 of the cover plates 6 are placed in the assembly process on the arranged in the double walls 51 ribs 52 and with these in the frame corners 26 positively and rigidly connected.
- transverse frames 20 are so stiff that they give the segment 3 sufficient rigidity for later lifting, transporting and assembly operations.
- the transmission of shear forces between the cover plate 6 and the double walls 51 takes place in this example on the transverse frame 20.
- a connection between the cover plates 6 and the inner wall panels 53 of the double walls 51 could be made to shear forces between the cover plates 6 and the double walls 51 to transfer. This connection could be done, for example, by welding in the cover plates 6 and in the inner wall panels 53 of the double walls 51 inserted fixtures.
- the transverse frames 20 lie in this example in planes which form an angle of 90 ° with the longitudinal axis 36 of the segment 3.
- the support structures 37 may be made of steel tubes and welded to the top of the upper frame corners 26.
- On the support structures 37 Verschublager 38 are attached, which allow the movement of a carriage 39 used in subsequent steps in the longitudinal direction of the bridge girder 1.
- FIGS. 28 to 31 For the sake of clarity, the production of a segment 3 from four double walls 51, a bottom plate 5 and two cover plates 6 is shown in FIGS. 28 to 31. However, it would also be possible with the method according to the invention to produce a much longer segment 3, for example, of twenty double walls 51, one base plate 5 and ten cover plates 6 within one week. In compliance with the usual in the application of the clock shift method weekly clock construction time could be significantly shortened and the number of couplings for the tendons can be reduced in this way.
- Fig. 32 shows the preparation of a bridge girder 1 with segments 3 of double walls 51, thin-walled plates 7 and transverse frame 20 with the clock shift method.
- the sectioned segments 3 shown in FIGS. 28 to 31 are positioned at the right end of the bridge girder 1 and connected with tendons 15 to the already existing part of the bridge girder 1.
- the bridge girder 1 is shifted to the left by the length of the last mounted segment 3.
- the mounting of the segments 3 and displacement of the bridge girder 1 is repeated until the left end of the bridge girder 1 reaches the abutment 33 arranged in FIG. 32 and FIG. 33 on the left side.
- FIGS. 32 and 33 show that support structures 37 and Verschublager 38 are mounted on the bridge girder 1. On the Verschublagern 38, as shown in FIG. 33, a carriage 39 are moved in the longitudinal direction of the bridge girder 1.
- the weight of the bridge girder 1 in the construction state, during the displacement of the bridge girder 1, is small, because the segments 3 consist of thin-walled plates 7, which are stiffened by transverse frame 20.
- the cross section illustrated in FIG. 34 despite its low weight, is sufficiently rigid to absorb the stresses occurring during the insertion of the bridge girder 1.
- the bridge girder 1 Once the bridge girder 1 has reached its final position 12, it is possible to start applying layers 9 of reinforced concrete to the plates 7.
- a layer 9 of reinforced concrete in the statically required thickness is first applied to the base plate 5.
- a carriage 39 can be used for the transport of the concrete and the workers. The carriage 39 is thereby moved on the Verschublagern 38 in the longitudinal direction of the bridge girder 1 and positioned at the installation site 11 for carrying out the concreting work.
- the weight of the layer 9 of reinforced concrete is removed from the bottom plate 5 of the segment 3 via bending in the longitudinal direction of the bridge girder 1 and introduced into the transverse frame 20.
- the weight of the layer 9 of reinforced concrete is introduced into the bridge girder 1 and removed via the arranged on the pillars 34 and abutments 33 bearing 44.
- the thickness of the bottom plate 5 may be made 80mm, for example, when the transverse frames 20 are spaced 2m apart and the sum of the thicknesses of the bottom plate 5 and the reinforced concrete layer 9 is 250mm.
- a layer 9 of reinforced concrete is applied to the cover plate 6.
- the removal of the weight of the layer 9 of reinforced concrete is advantageously carried out over the cover plate 6 in the longitudinal direction of the bridge girder 1 and then on the transverse frame 20.
- the cover plate 6 and the layer 9 are made reinforced concrete monolithically connected to each other and form a piece of the deck slab 22nd
- the pressure struts 23 and the projecting parts of the roadway slab 22 are produced. Also, for the mounting of the struts 23 and the production of the projecting parts of the deck plate 22, the use of the carriage 39 may be advantageous. Finally, a seal is applied to the top of the deck slab 22 and a pavement is produced.
- FIG. 39 shows the vertical assembly of segments 3 for producing two sections 2 of a bridge girder 1 according to the method described in US Pat. No. 7,996,944 B2.
- the joints 16 between the segments 3 can be formed as dry joints 16, when the end face of the segments 3 are machined by a milling process so that they have a precisely fitting surface.
- FIG. 40 shows that the sections 2 of the bridge girder 1 consist of segments 3 which are formed from thin-walled plates 7 and double walls 51.
- the double walls 51 and the thin-walled plates 7 are prefabricated to increase the mounting speed.
- FIG. 40 shows that the rib 40 connected to the bottom plate 5 and the rib 41 connected to the top plate 6 are connected to the ribs 52 of the double walls 51 in the frame corners 26. Due to the rigid connection of the rib 40, the rib 41 and the ribs 52 in the frame corners 26 creates a transverse frame 20, which serves to stiffen a segment 3.
- the ribs 40 which are connected to the bottom plates 5, and the ribs 41, which are connected to the cover plates 6, have recesses 19 which reduce the weight of the ribs 40 and the ribs 41 and favorable for laying a longitudinal direction Segments 3 are arranged and laid on the bottom plates 5 and the cover plates 6 reinforcement.
- the ribs 52 in the double walls 51 are formed by lattice girders 56.
- the diameter of the lattice girder 56 must be chosen so large that no buckling can occur under pressure stresses in the diagonal bars.
- the inner wall plate 53 which has lower demands on the concrete cover due to the more favorable Eurocode exposure class, is made smaller in thickness than the outer wall plate 54 to reduce the weight of the segment 3.
- Fig. 41 The connection of the rib 52 of the double wall 51 with the rib 40 of the bottom plate 5 in the left lower frame corner 26 of Fig. 40 is shown in Fig. 41 in an enlarged scale.
- the rib 40 which is connected to the bottom plate 5, consists of a T-shaped steel beam 18, which has recesses 19 in the webs 24.
- Fig. 41 shows that the web 24 of the T-shaped steel beam 18 is partially embedded in the concrete of the bottom plate 5.
- the rib 40 is connected to the bottom plate 5 in a shear-resistant manner, which is favorable for absorbing bending moments in the lower part of the transverse frame 20, because the rib 40 and part of the bottom plate 5 act as a common component.
- reinforcing rods can be welded to the embedded part of the web in the concrete.
- the rib 40 of the bottom plate 5 is welded to an additional steel plate 28.
- rib 52 is a steel plate 28 in the concrete of the inner wall plate 53 and the outer Wall plate 54 embedded and anchored.
- connection of the rib 52 of the double wall 51 with the rib 41 of the cover plate 6 in the left upper frame corner 26 of Fig. 40 is shown in Fig. 42 in an enlarged scale.
- the ribs 41 are equipped to form the frame corner 26 with additional steel plates 28.
- screw 27 a rigid connection of the arranged in the double wall 51 rib 52 can be made with the arranged in the cover plate 6 rib 41.
- FIG. 43 shows a detail corresponding to FIG. 41 in a later construction state after unfolding of the sections 2 of the bridge girder 1 and the application of a layer 9 of reinforced concrete on the floor slab 5.
- the application of the layer 9 of reinforced concrete becomes Base plate 5 rigidly connected to the double wall 51.
- the distance from the bottom of the inner wall plate 53 to the top of the bottom plate 5 is smaller by 20 mm than the thickness of the layer 9 of reinforced concrete applied to the bottom plate 5.
- the inner wall plate 53 is therefore embedded on its underside in the layer 9 of reinforced concrete.
- FIG. 44 A section through the double wall 51 is shown in FIG. 44.
- the introduction of the concrete into the cavity 31 formed by the inner wall plate 53 and the outer wall plate 54 can take place by means of a concrete pump from the upper side of the roadway plate 22.
- the pressure of the fresh concrete is absorbed by the inner wall plate 53 and the outer wall plate 54 and introduced into the lattice girder 56, which forms part of the transverse frame 20.
- FIGS. 45 to 49 The production of an exemplary bridge girder 1 with the method according to the invention according to a seventh embodiment is described in FIGS. 45 to 49.
- a bridge girder 1 with a displacement machine 42 In this example, the manufacture of a bridge girder 1 with a displacement machine 42 will be explained.
- a translation engine 42 is referred to as a launching gantry or erection gantry.
- Fig. 45 shows how a portion 2 of the bridge girder 1, which is fastened with tension members 43 on the displacement machine 42, is lowered.
- the section 2 is lowered so that a horizontal distance a remains between the suspended on the transfer unit 42 section 2 and the last mounted section 2. By this horizontal distance a between the end faces of the sections 2, a working space is created, which allows coupling of the tendons 15.
- the tendons 15, which consist of tension wire strands 46, transition pieces 48, sheaths and anchors are already installed in the suspended on the Versetzmaschine 42 section 2.
- the tension wire strands 46 protrude from the right end of the section 2.
- the attached to the Versetzmaschine 42 segment 3 is moved to the right and the joint 16 between the sections 2 closed.
- additional tension members 43 are mounted in the next work step.
- the tension members 43 may be attached to the support structures 37.
- layers 9 of concrete are applied to the bottom plate 5 and the cover plate 6 and concrete is introduced into the cavities 31 in the double walls 51.
- the additional tension members 43 serve to support the section 2 during the concreting process. After the partial hardening of the introduced at the installation site concrete, after a period of, for example, 6 to 48 hours, the tension members 43 are removed and the weight is absorbed by the bridge girder 1.
- FIG. 47 shows that a further section 2 is delivered.
- the section 2 is mounted during the horizontal displacement along the bridge girder 1 on the Verschublagern 38 mounted on the upper side of the Auflagerkonstrutationen 37.
- Fig. 47 shows a state in which tension members 43 are mounted on the left end of the section 2 just supplied. The tension members 43 are tensioned after assembly to a predetermined force in order to minimize the load on the last filled with concrete section 2 of the bridge carrier during the following feed.
- the section 2 is moved so far to the left until the tension members 43 can be mounted at the right end of the section 2.
- the section 2 is raised and transported to the left until one of Fig. 45 corresponding position is reached.
- FIG. 48 shows a section through a section 2 which is fastened with tension members 43 to the displacement machine 42.
- the cross section through the section 2 shows a transverse frame 20 through which the double walls 51 are connected to the bottom plate 5 and the cover plate 6.
- Auflagerkonstrutationen 37 are secured with Verschublagern 38.
- the support structures 37 may be used to secure the tension members 43.
- the supports of the displacement machine 42 are arranged on brackets 45.
- the brackets 45 may consist of steel profiles which are fastened laterally to the pillar 34 with tension rods.
- the brackets 45 and the tie rods are reusable elements that can be disassembled after passing over the Versetzwagen 39.
- FIG. 49 shows a section through two sections 2 of the bridge girder.
- the right section 2 is almost completely provided with layers 9 of reinforced concrete on the bottom plate 5 and the cover plate 6. Only in a region with the length b at the left end of the already concreted section 2 has no concrete been applied to the bottom plate 5 and the cover plate 6, because in this area the connection reinforcement between the two sections 2 is housed.
- an anchoring block 49 made of concrete with a steel plate 28 and a transition piece 48 is arranged between the wall plates 4 of the double walls 51.
- the biasing force of the clamping member 15 is transferred to the steel plate 28 and from there to the anchoring block 49.
- the coupling of the tendons 15 is carried out by the usual method in the working space, which is formed by the distance a shown in Fig. 45.
- the left portion 2 is moved to the right. In this movement, a relative displacement between the tension wire strands 46 and the cladding tube in the left part 2 takes place.
- the tight connection of the transition piece 48 to the prestressed in the right portion 2 clamping member 15 is achieved in that a steel ring 47 which is fixed in the left portion 2, to the steel plate 28 which is fixed in the right part 2, is pressed. It would also be possible to insert an annular seal of sponge rubber between the steel ring 47 and the steel plate 28 to assure a tight connection between the tendons 15.
- Establishing a tight connection between the tendons 15, which are arranged in the left and right section 2, is important because when introducing the concrete into the cavity 31 between the wall panels 4 no concrete must penetrate into the tendon 15.
- the production of prestressed bridge girders 1 having a box-shaped cross-section has been described with the tact shift method, the bridge folding method, the cantilever method, with a crane mounting and with a displacement machine 42.
- the inventive method can also be used for the production of bridge girders with other construction methods.
- the preparation of the bottom plate 5 has been described before the manufacture of the cover plate 6. It is also possible with the method according to the invention to produce the cover plate 6 in front of the base plate 5 or the base plate 5 and the cover plate 6 at the same time.
- bridge girders 1 which correspond in their static behavior to a continuous carrier.
- segments 3 of constant width and variable height have been described, which have a rectangular shape in a section normal to the longitudinal axis 36 of the segment 3.
- segments 3 which, in a section normal to the longitudinal axis 36 of the segment 3, have a trapezoidal shape.
- Such a trapezoidal cross-section need not be symmetrical.
- Rib connected to a bottom plate Rib connected to a top plate Offset machine
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The method for producing a prestressed bridge support (1) of hollow-box-shaped cross section from prefabricated segments (3) comprises the following work steps: - producing a first segment (3) from slabs (7) of reinforced concrete, wherein the slabs (7) have ribs (8) which are designed to be normal to the centre plane of the slabs (7); - producing at least one transverse frame (20) in the first segment (3) by the force-fitting and flexurally rigid connection of the ribs (8) in frame corners (26); - producing further segments (3) in the same way; - moving the segments (3) to an installation site (11); - assembling the segments (3) to form a bridge support (1); - bringing the bridge support (1) into the final position (12) and - applying layers (9) of reinforced concrete to the slabs (7) of the segments (3).
Description
Verfahren zur Herstellung eines Brückenträgers einer Spannbetonbrücke Method for producing a bridge girder of a prestressed concrete bridge
Die Erfindung betrifft ein Verfahren zur Herstellung eines Brückenträgers einer Spannbetonbrücke sowie nach diesem Verfahren hergestellte Brückenträger. The invention relates to a method for producing a bridge girder of a prestressed concrete bridge and to bridge girders produced by this method.
Brücken aus Spannbeton wurden in der Regel mit den endgültigen Betonquerschnitten hergestellt. Prestressed concrete bridges were typically made with the final concrete sections.
Die Errichtung von Brücken aus Ortbeton nach dem Freivorbauverfahren ist in der US 2,963,764 beschrieben. Der Brückenträger wird ausgehend von einem Pfeiler nach beiden Seiten in Abschnitten hergestellt. Üblicherweise werden in einer Woche zwei Abschnitte mit den endgültigen Querschnittsabmessungen betoniert. The construction of in situ concrete bridges according to the cantilever method is described in US 2,963,764. The bridge girder is made starting from a pier on both sides in sections. Usually, two sections with the final cross-sectional dimensions are concreted in one week.
Die Errichtung einer Brücke mit vorgefertigten Segmenten aus Stahlbeton ist in der US 5,577,284 beschrieben. Die trogförmigen Segmente weisen die endgültigen Querschnittsabmessungen auf und werden mit einem Kran auf Verlegeträgern platziert. Wenn alle trogförmigen Segmente montiert sind, werden Spannglieder innerhalb des Betonquerschnitts der Segmente eingebaut und angespannt. Das Anspannen der Spannglieder bewirkt, dass aus den einzelnen Segmenten ein tragfähiger Brückenträger gebildet wird. The construction of a bridge with prefabricated reinforced concrete segments is described in US 5,577,284. The trough-shaped segments have the final cross-sectional dimensions and are placed on trusses with a crane. When all trough-shaped segments are mounted, tendons are installed and tense within the concrete section of the segments. The tensioning of the tendons causes a load-bearing bridge carrier to be formed from the individual segments.
Die Errichtung einer Brücke aus vorgefertigten Segmenten, die aus Platten aus ultrahochfestem Beton hergestellt werden, ist in der CN 205152771 U beschrieben. Zur Herstellung eines Segments werden zwei Wandplatten, die Bodenplatte und die Deckplatte in den Ecken des Segments mit Ortbeton miteinander verbunden. Nach dem Zusammenfügen der Segmente werden in den Segmentfugen innerhalb des Hohlkastens liegende Rahmenkonstruktionen ausgebildet. Der Brückenträger weist ein niedriges Eigengewicht auf, weil die Wandplatten aus ultrahochfestem Beton bestehen und deshalb sehr dünn ausgeführt werden können. Nachteilig bei der in der CN 205152771 U beschriebenen Bauweise ist, dass der Brückenträger mit den endgültigen Querschnittsabmessungen hergestellt wird. Bei der CN 205152771 U werden Querrahmen in den Segmentfugen ausgebildet. Das bedingt ein Herstellen der Querrahmen nach dem Zusammenfügen der Segmente zu einem Brückenträger. Diese Vorgangsweise ist aufwändiger als eine Herstellung der Rahmen bei der Herstellung der Segmente und stellt somit einen weiteren Nachteil der CN 205152771 U dar. The erection of a bridge of prefabricated segments made of ultra high strength concrete slabs is described in CN 205152771 U. To make a segment, two wall panels, the bottom panel, and the top panel in the corners of the segment are bonded together with in-situ concrete. After joining the segments frame structures are formed in the segment joints lying within the hollow box. The bridge girder has a low dead weight, because the wall plates are made of ultra-high strength concrete and therefore can be made very thin. A disadvantage of the construction described in CN 205152771 U is that the bridge girder is manufactured with the final cross-sectional dimensions. In the case of CN 205152771 U, transverse frames are formed in the segment joints. This requires making the cross frame after joining the segments to a bridge girder. This procedure is more complicated than a production of the frame in the production of the segments and thus represents a further disadvantage of the CN 205152771 U dar.
Nachteilig bei der Errichtung einer Brücke mit den endgültigen Querschnittsabmessungen ist, dass in den Bauzuständen bereits das gesamte Eigengewicht des Brückenträgers wirkt. Dies kann dazu führen, dass die Querschnittsabmessungen des endgültigen Brückenbauwerks auf Grund der Beanspruchungen in den Bauzuständen gewählt werden müssen. Nachteilig kann auch sein, dass die Unterstützungen des Brückenträgers im Bauzustand für das gesamte Eigengewicht des Brückenträgers ausgelegt werden müssen.
Um das Eigengewicht des Brückenträgers im Bauzustand zu reduzieren, sind auch Baumethoden für Brücken entwickelt worden, bei denen nach der Herstellung des Brückenträgers eine Querschnittsergänzung mit Ortbeton ausgeführt wird. A disadvantage of the construction of a bridge with the final cross-sectional dimensions is that in the construction conditions already affects the entire weight of the bridge girder. This can lead to the fact that the cross-sectional dimensions of the final bridge structure must be chosen due to the stresses in the construction conditions. It can also be disadvantageous that the supports of the bridge girder in the condition of construction must be designed for the entire dead weight of the bridge girder. In order to reduce the dead weight of the bridge girder in the construction state, also construction methods for bridges have been developed in which after the preparation of the bridge girder a cross-sectional complement is performed with in-situ concrete.
Die Errichtung einer Brücke aus dünnwandigen Fertigteilträgern mit trogförmigem Querschnitt ist in der Veröffentlichung„Building bridges using the balanced lift method" von Johann Kollegger et al. in der Zeitschrift„Structural Concrete", Vol. 15, 2014, Seiten 281-291 beschrieben. Der trogförmige Querschnitt besteht aus zwei Wandplatten und einer Bodenplatte. In der Nähe der oberen Ränder der Wandplatten sind an den in den Wandplatten angeordneten Gitterträgern Bewehrungsstäbe angeschweißt. Die Verbindung der Wandplatten durch die Bewehrungsstäbe trägt zu einer Aussteifung des trogförmigen Querschnitts bei. Zusätzlich ist auf diesen Bewehrungsstäben ein Verband, der ebenfalls aus Bewehrungsstäben besteht, angeschweißt. Die dünnwandigen Fertigteilträger werden gemäß dem in der DE 10 2006 039551 beschriebenen Bauverfahren in vertikaler Lage montiert und durch einen Klappvorgang in eine horizontale Lage gebracht. Anschließend wird ein Füllbeton in die Fertigteilträger mit trogförmigem Querschnitt eingebracht und die Fahrbahnplatte wird mit einem Verbundschalwagen hergestellt. The construction of a bridge of thin-walled prefabricated beams with a trough-shaped cross-section is described in the publication "Building bridges using the balanced lift method" by Johann Kollegger et al., In the journal "Structural Concrete", Vol. 15, 2014, pages 281-291. The trough-shaped cross-section consists of two wall plates and a bottom plate. In the vicinity of the upper edges of the wall panels reinforcing bars are welded to the lattice girders arranged in the wall panels. The connection of the wall panels by the reinforcing bars contributes to a stiffening of the trough-shaped cross-section. In addition, a bandage, which also consists of reinforcing bars, is welded onto these reinforcing bars. The thin-walled precast beams are mounted in a vertical position according to the method described in DE 10 2006 039551 and brought by a folding operation in a horizontal position. Subsequently, a filled concrete is introduced into the precast beams with trogförmigem cross-section and the deck plate is made with a composite formwork car.
Ein Träger mit trogförmigem Querschnitt wird auch in der Fig. 13 der WO 2016 037 864 gezeigt. Die Wandplatten des Trägers werden durch die beiden Platten einer Doppelwand gebildet. In der Nähe der oberen Ränder der Wandplatte ist ein Verbindungselement, das aus einem Stahlprofil mit winkelförmigen Querschnitt besteht, angeordnet. Dieses Verbindungselement dient zur Aufnahme des Betonierdrucks beim Einbringen des Füllbetons in den aus dünnwandigen Platten bestehenden Träger. Darüber hinaus dient dieses Verbindungselement zur Aussteifung des trogförmigen Querschnitts während der Transport- und Montagevorgänge. A support with a trough-shaped cross section is also shown in FIG. 13 of WO 2016 037 864. The wall plates of the carrier are formed by the two plates of a double wall. In the vicinity of the upper edges of the wall plate, a connecting element, which consists of a steel profile with an angular cross-section, arranged. This connecting element serves to receive the concreting pressure during the introduction of the filling concrete into the carrier consisting of thin-walled plates. In addition, this connecting element serves to stiffen the trough-shaped cross section during the transport and assembly operations.
Kastenförmige Querschnitte sind viel besser zur Aufnahme von Biege- und Torsionsbeanspruchungen geeignet als trogförmige Querschnitte. Deshalb wird in der Fig. 14 der WO 2016 037 864 auch ein kastenförmiger Querschnitt gezeigt, der zwei Stege aus Doppelwänden, eine Bodenplatte und eine Deckplatte aufweist. Eine Biegebeanspruchung infolge Eigengewicht kann von diesem kastenförmigen Querschnitt viel besser aufgenommen werden, als von einem trogförmigen Querschnitt. Nachteilig bei dem in Fig. 14 der WO 2016 037 864 gezeigten Querschnitt ist aber, dass die beiden Wandplatten einer Doppelwand nur durch parallel zu den unteren und oberen Rändern der Doppelwand angeordnete Gitterträger miteinander verbunden sind. Die Gitterträger dienen als Verbindungselemente zwischen den beiden Wandplatten und sind so dimensioniert, dass sie den beim Einfüllen des Betons, in den zwischen den beiden Wandplatten vorhandenen Hohlraum, entstehenden Betonierdruck aufnehmen können. Die Verbindungselemente werden üblicherweise auch für Beanspruchungen, die beim Anheben und Versetzen einer Doppelwand auftreten, dimensioniert. Der in der Fig. 14 der WO 2016 037 864 gezeigte Querschnitt ist aber nicht in
der Lage Schubbeanspruchungen in den Stegen, die beispielsweise durch das Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte oder auf der Deckplatte entstehen, aufzunehmen. Nachteilig bei dem in der Fig. 14 der WO 2016 037 864 gezeigten Querschnitt ist auch, dass die obere Bewehrung für eine Schicht aus bewehrten Beton, die auf der Bodenplatte aufgebracht wird, durch die inneren Wandplatten der Doppelwände hindurchgeführt werden muss, was mit einem erheblichen Aufwand für das Herstellen von Löchern oder Schlitzen in den inneren Wandplatten der Doppelwände verbunden ist. Box-shaped cross-sections are much better suited for absorbing bending and torsional loads than trough-shaped cross sections. Therefore, in FIG. 14 of WO 2016 037 864 a box-shaped cross-section is also shown which has two webs of double walls, a bottom plate and a cover plate. A bending load due to its own weight can be absorbed much better by this box-shaped cross-section than by a trough-shaped cross-section. A disadvantage of the cross section shown in FIG. 14 of WO 2016 037 864, however, is that the two wall panels of a double wall are connected to one another only by lattice girders arranged parallel to the lower and upper edges of the double wall. The lattice girders serve as connecting elements between the two wall panels and are dimensioned so that they can accommodate the concreting pressure arising during the filling of the concrete in the cavity between the two wall panels. The fasteners are usually also sized for stresses that occur when lifting and moving a double wall. However, the cross section shown in FIG. 14 of WO 2016 037 864 is not in capable of absorbing shear stresses in the lands formed by, for example, applying a layer of reinforced concrete to the floor slab or to the cover slab. It is also disadvantageous in the cross section shown in FIG. 14 of WO 2016/037864 that the upper reinforcement for a layer of reinforced concrete applied to the floor slab must be passed through the inner wall slabs of the double walls, which results in a considerable increase Expenses for making holes or slots in the inner wall panels of the double walls is connected.
Ein der Fig. 14 der WO 2016 037 864 entsprechender Querschnitt ist auch in der Figur 1 der Veröffentlichung„Bridge girders out of hollow wall elements and ultra-thin precast elements", 10th International PhD Symposium in Civil Engineering, Quebec, Kanada, 2014 von Sara Foremniak dargestellt. Zwischen den unteren Rändern der Doppelwände ist eine Rippe, die mit der Bodenplatte verbunden ist, ausgebildet. Zwischen den oberen Rändern der Deckplatte ist eine Rippe, die mit der Deckplatte verbunden ist, ausgebildet. Die Wandplatten der Doppelwände sind nur an den unteren und oberen Rändern miteinander verbunden. In den Figuren dieser Veröffentlichung ist zu erkennen, dass die Wandplatten einer Doppelwand durch Verbindungsmittel, die in einem Segment als Gitterträger und in einem anderen Segment als Stahlwellen ausgebildet sind, miteinander verbunden sind. Gitterträger und Stahlwellen sind übliche Verbindungsmittel in einer Doppelwand, deren Funktion die Aufnahme des Betonierdrucks beim Einfüllen des Betons in den zwischen der inneren und der äußeren Wandplatte angeordneten Hohlraum ist. Der in dieser Veröffentlichung gezeigte Querschnitt ist nicht in der Lage Schubbeanspruchungen in den Stegen, die beispielsweise durch das Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte oder der Deckplatte entstehen, aufzunehmen. A cross section corresponding to FIG. 14 of WO 2016 037 864 is also shown in FIG. 1 of the publication "Bridge girders out of hollow wall elements and ultra-thin precast elements", 10th International PhD Symposium in Civil Engineering, Quebec, Canada, 2014 of Sara Foremniak is formed between the lower edges of the double walls, a rib which is connected to the bottom plate, formed between the upper edges of the top plate a rib which is connected to the cover plate, the wall plates of the double walls are only on the In the figures of this publication it can be seen that the wall panels of a double wall are interconnected by connecting means formed in one segment as a lattice girder and in a segment other than steel shafts, lattice girders and steel shafts are common connection means in a double wall, whose function is the inclusion of concreting pressure s is during the filling of the concrete in the arranged between the inner and the outer wall plate cavity. The cross-section shown in this publication is incapable of absorbing shear stresses in the lands caused, for example, by the application of a layer of reinforced concrete to the floor slab or deck slab.
Nachteilig bei den in dieser Veröffentlichung gezeigten Segmenten ist auch, dass die unteren Ränder der inneren Wandplatten in der Bodenplatte angeordnet sind. Dadurch entsteht ein erheblicher Aufwand für das Durchführen einer oberen Bewehrung einer Schicht aus bewehrtem Beton auf der Bodenplatte durch die inneren Wandplatten in die Hohlräume zwischen den inneren und den äußeren Wandplatten. A disadvantage of the segments shown in this publication is also that the lower edges of the inner wall panels are arranged in the bottom plate. This results in a considerable effort for performing an upper reinforcement of a layer of reinforced concrete on the bottom plate through the inner wall panels in the cavities between the inner and outer wall panels.
Weitere Beispiele von Segmentbrücken bei denen eine Querschnittsergänzung in der endgültigen Lage erfolgt sind in der KR 10140525 Bl, in der JP 20061159730 A und in der JP 2005023684 A beschrieben. Die KR 10140525 Bl zeigt ein Verfahren, bei dem durch die Verbindung von vorgefertigten Wandelementen ein Segment mit trogförmigem Querschnitt auf einem Montageplatz gebildet wird. Die einzelnen Segmente werden mit zwei Endblöcken, die die Spanngliedverankerungen enthalten, und Querrahmen in den Segmentfugen zu einem
Einfeldträger zusammengefügt. In der endgültigen Lage erfolgt die Querschnittsergänzung durch das Herstellen einer Deckplatte aus einer Fertigteilplatte mit einer Aufbetonschicht. Further examples of segment bridges in which a cross-sectional completion takes place in the final position are described in KR 10140525 Bl, in JP 20061159730 A and in JP 2005023684 A. The KR 10140525 Bl shows a method in which is formed by the connection of prefabricated wall elements, a segment with trough-shaped cross section on a mounting station. The individual segments become one with two end blocks containing the tendon anchors and cross frames in the segment joints One-field carrier joined together. In the final position, the cross-sectional supplement is made by producing a cover plate from a precast slab with a concrete layer.
Die JP 20061159730 A zeigt ein Verfahren bei dem zur Herstellung eines Segments zwei Wandplatten aufgestellt werden, eine Bodenplatte aus bewehrtem Beton zwischen den unteren Rändern der Wandplatte ausgebildet wird und die oberen Ränder der Wandplatten durch einen Querträger verbunden werden. Nach dem Zusammenfügen der Segmente zu einem Brückenträger wird in der endgültigen Lage eine Deckplatte aus bewehrtem Beton ausgebildet. JP 20061159730 A shows a method in which two wall panels are set up to make a segment, a reinforced concrete floor panel is formed between the lower edges of the wall panel, and the upper edges of the wall panels are connected by a cross member. After joining the segments to form a bridge girder, a concrete slab is formed in the final layer.
Die JP 2005023684 zeigt ein Verfahren zur Herstellung einer Brücke mit dem Taktschiebeverfahren. Auf einem Montageplatz werden in jedem Bauabschnitt zuerst die Bodenplatte, anschließend die Wandplatten, dann Querrahmen mit schrägen Druckstreben und abschließend der zwischen den Wandplatten angeordnete Teil der Deckplatte hergestellt. Nach der Erhärtung des Betons in dem zuletzt hergestellten Segment wird der ganze Brückenkörper in Längsrichtung so weit verschoben, dass der Montageplatz zur Herstellung des nächsten Segments frei wird. Nach dem Verschieben des gesamten Brückenträgers in die endgültige Lage werden die auskragenden Teile der Deckplatten auf den auskragenden Teilen der Querrahmen hergestellt. JP 2005023684 shows a method for producing a bridge with the clock shift method. On an assembly site, the bottom plate, then the wall panels, then transverse frames are produced with oblique pressure struts and finally arranged between the wall panels part of the cover plate in each construction section first. After hardening of the concrete in the last produced segment of the entire bridge body is moved in the longitudinal direction so far that the assembly space for the production of the next segment is free. After the entire bridge girder has been moved to the final position, the cantilevered parts of the cover plates are produced on the projecting parts of the transverse frames.
Nachteilig bei dem in der KR 10140525 Bl, in der JP 2006169730 und in der JP 2005023684 beschriebenen Verfahren ist, dass nur ein geringer Teil des gesamten Querschnitts durch die Ortbetonergänzung in der endgültigen Lage des Brückenträgers hergestellt wird. A disadvantage of the method described in KR 10140525 Bl, in JP 2006169730 and in JP 2005023684 is that only a small part of the entire cross section is produced by the Ortbetonergänzung in the final position of the bridge girder.
Es ist deshalb die Aufgabe der vorliegenden Erfindung einen Brückenträger mit hohlkastenförmigem Querschnitt zu schaffen, bei dem das Verhältnis von dem Gewicht des Brückenträgers im Bauzustand zu dem Gewicht des Brückenträgers im Endzustand kleiner ist als bei den bekannten Ausführungsformen, der günstigere Querschnittswerte aufweist als die bekannten Brückenträger mit trogförmigen Querschnitten und der in der Lage ist, Beanspruchungen aus dem Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte oder auf der Deckplatte aufzunehmen. It is therefore an object of the present invention to provide a bridge girder with hollow box-shaped cross-section, in which the ratio of the weight of the bridge girder in the construction state to the weight of the bridge girder in the final state is smaller than in the known embodiments, which has more favorable cross-sectional values than the known bridge girder with trough-shaped cross-sections and capable of absorbing stresses from the application of a layer of reinforced concrete on the floor slab or on the cover slab.
Die vorliegende Erfindung löst diese Aufgabe durch das Bereitstellen eines Verfahrens zur Herstellung eines Brückenträgers gemäß Anspruch 1 sowie durch nach diesem Verfahren hergestellter Brückenträger gemäß Anspruch 22. Vorteilhafte Weiterbildungen der Erfindung sind in den Unteransprüchen definiert. The present invention solves this problem by providing a method for producing a bridge carrier according to claim 1 and by bridge carrier produced according to this method according to claim 22. Advantageous developments of the invention are defined in the subclaims.
Ein erfindungsgemäßes Verfahren zur Herstellung eines vorgespannten Brückenträgers mit hohlkastenförmigem Querschnitt aus vorgefertigten Segmenten ist dadurch gekennzeichnet, dass
- zur Herstellung eines Segments mindestens zwei Wandplatten, die in einem Schnitt durch die Mittelebene eine vorzugsweise rechteckige Form aufweisen, aus bewehrtem Beton hergestellt werden, An inventive method for producing a prestressed bridge girder with a hollow box-shaped cross section of prefabricated segments is characterized in that for the production of a segment, at least two wall panels having a preferably rectangular shape in a section through the median plane are made of reinforced concrete,
- jede Wandplatte mit mindestens einer Rippe, die im Wesentlichen normal zu der Mittelebene der Wandplatte ausgebildet wird, kraftschlüssig verbunden wird, each wall panel having at least one rib, which is formed substantially normal to the median plane of the wall panel, is non-positively connected,
- die mindestens zwei Wandplatten auf einem Montageplatz so aufgestellt werden, dass sie in einer Schnittebene normal zur Längsachse des Segments zueinander beabstandet sind und dass die Rippen in Schnittebenen angeordnet sind, die mit der Längsachse des Segments einen Winkel α zwischen 45° und 135°, vorzugsweise 90°, einschließen. the at least two wall panels are placed on a mounting station so as to be spaced from one another in a sectional plane normal to the longitudinal axis of the segment, and that the ribs are arranged in sectional planes which are at an angle α between 45 ° and 135 ° with the longitudinal axis of the segment; preferably 90 °.
- eine Bodenplatte aus bewehrtem Beton mit mindestens einer Rippe, die mit der Bodenplatte kraftschlüssig verbunden wird, zwischen den unteren Rändern der Wandplatten ausgebildet wird, wobei die mindestens eine Rippe in der Bodenplatte so angeordnet wird, dass die mindestens eine Rippe der Bodenplatte und die Rippen der Wandplatten in einer Ebene liegen, a reinforced concrete floor slab having at least one rib frictionally connected to the floor slab is formed between the lower edges of the wall slabs, the at least one rib being disposed in the floor slab such that the at least one rib of the floor slab and the ribs the wall panels are in one plane,
- die Wandplatten mit der Bodenplatte durch ein Verbinden der in den Wandplatten angeordneten Rippen mit der mindestens einen in der Bodenplatte angeordneten Rippe kraftschlüssig und biegesteif verbunden werden; - The wall panels are connected to the bottom plate by connecting the arranged in the wall plates ribs with the at least one arranged in the bottom plate rib non-positively and rigidly;
- eine Deckplatte aus bewehrtem Beton mit mindestens einer Rippe, die mit der Deckplatte kraftschlüssig verbunden wird, zwischen den oberen Rändern der Wandplatten ausgebildet wird, wobei die mindestens eine Rippe in der Deckplatte so angeordnet wird, dass die mindestens eine Rippe der Deckplatte und die Rippen der Wandplatten in einer Ebene liegen; - A reinforced concrete cover plate having at least one rib, which is frictionally connected to the cover plate, is formed between the upper edges of the wall plates, wherein the at least one rib in the cover plate is arranged so that the at least one rib of the cover plate and the ribs the wall panels lie in one plane;
- die Wandplatten mit der Deckplatte durch einen Verbinder der in den Wandplatten angeordneten Rippen mit der mindestens einen in der Deckplatte angeordneten Rippe kraftschlüssig und biegesteif verbunden werden und durch diese Verbindung mindestens ein Querrahmen gebildet wird; - The wall panels are connected to the cover plate by a connector of the arranged in the wall panels ribs with the at least one arranged in the cover plate rib non-positively and rigidly and at least one transverse frame is formed by this connection;
- mindestens ein weiteres Segment in der gleichen Weise hergestellt wird; - at least one further segment is produced in the same way;
- die mindestens zwei Segmente zu einem Einbauort bewegt werden; - The at least two segments are moved to an installation location;
- die mindestens zwei Segmente an dem Einbauort zu einem Brückenträger zusammengefügt werden; - The at least two segments are assembled at the installation site to a bridge girder;
- der Brückenträger in die endgültige Lage gebracht wird und - The bridge girder is brought into the final position and
- in der endgültigen Lage des Brückenträgers in mindestens einem Segment auf mindestens zwei Platten, vorzugsweise auf allen Platten, vorzugsweise in allen Segmenten, eine Schicht aus bewehrtem Beton aufgebracht wird. - In the final position of the bridge girder in at least one segment on at least two plates, preferably on all plates, preferably in all segments, a layer of reinforced concrete is applied.
Mit dem erfindungsgemäßen Verfahren können Brückenträger hergestellt werden, die im Bauzustand ein viel geringeres Gewicht als im Endzustand aufweisen. Das erfindungsgemäße Bauverfahren ist besonders vorteilhaft, wenn der Verlauf der Biegemomente im Brückenträger im Bauzustand während der Herstellung des Brückenträgers sich von dem Verlauf der Biegemomente im Endzustand unterscheidet, wie dies zum Beispiel beim Taktschiebeverfahren oder beim Brückenklappverfahren der Fall ist. Ein mit dem
erfindungsgemäßen Verfahren hergestellter Brückenträger kann zum Beispiel im Bauzustand ein Gewicht aufweisen, das nur ein Fünftel des Gewichtes des Brückenträgers im Endzustand beträgt. Dadurch werden wesentliche Einsparungen bei der Anzahl der Spannglieder und bei Unterstützungen im Bauzustand ermöglicht. Using the method according to the invention, bridge girders can be produced which have a much lower weight in the construction state than in the final state. The construction method according to the invention is particularly advantageous if the course of the bending moments in the bridge girder in the construction state during the manufacture of the bridge girder differs from the course of the bending moments in the final state, as is the case for example with the clock sliding method or the bridge folding method. One with the According to the method of the invention produced bridge girder may, for example, in the construction state have a weight that is only one fifth of the weight of the bridge girder in the final state. This allows significant savings in the number of tendons and supports in the construction state.
In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens werden Segmente an dem Einbauort zu Teilstücken eines Brückenträgers zusammengefügt. Anschließend werden die Teilstücke des Brückenträgers in die endgültige Lage gebracht und miteinander verbunden. Das geringe Gewicht der mit dem erfindungsgemäßen Verfahren hergestellten Segmente ist besonders vorteilhaft bei den Transport,- Hebe- und Montagevorgängen am Einbauort und bei den Bauvorgängen, die erforderlich sind, um den Brückenträger in die endgültige Lage zu bringen. In an advantageous embodiment of the method according to the invention segments are joined together at the installation site to pieces of a bridge girder. Subsequently, the sections of the bridge girder are brought into the final position and connected to each other. The low weight of the segments made by the method according to the invention is particularly advantageous in the transport, lifting and assembly operations at the installation site and in the building operations required to bring the bridge girder to its final position.
Bei der Herstellung der Segmente kann es vorteilhaft sein, die unteren Ränder der Wandplatten mit der Bodenplatte kraftschlüssig zu verbinden. In einer Ausführungsvariante mit Doppelwänden kann es vorteilhaft sein, die unteren Ränder der äußeren Wandplatten der Doppelwände mit der Bodenplatte kraftschlüssig zu verbinden. Dadurch wird eine Übertragung von Schubkräften zwischen den Platten entlang der kraftschlüssig verbundenen Kanten ermöglicht. In the production of the segments, it may be advantageous to frictionally connect the lower edges of the wall panels with the bottom plate. In a variant with double walls, it may be advantageous to frictionally connect the lower edges of the outer wall panels of the double walls with the bottom plate. This allows a transmission of shear forces between the plates along the frictionally connected edges.
Bei der Herstellung der Segmente kann es vorteilhaft sein, die oberen Ränder der Wandplatten mit der Deckplatte kraftschlüssig zu verbinden. In einer Ausführungsvariante mit Doppelwänden kann es vorteilhaft sein, die oberen Ränder der inneren Wandplatten der Doppelwände mit der Deckplatte kraftschlüssig zu verbinden. Dadurch wird eine Übertragung von Schubkräften zwischen den Platten entlang der kraftschlüssig verbundenen Kanten ermöglicht. In the manufacture of the segments, it may be advantageous to frictionally connect the upper edges of the wall panels with the cover plate. In a variant with double walls, it may be advantageous to non-positively connect the upper edges of the inner wall panels of the double walls with the cover plate. This allows a transmission of shear forces between the plates along the frictionally connected edges.
Das Zusammenfügen der Segmente zu einem Brückenträger oder zu einem Teilstück eines Brückenträgers kann vorteilhaft durch das Anspannen von in Längsrichtung der Segmente angeordneten Spanngliedern erfolgen. Es wird besonders vorteilhaft sein, wenn mehr als zwei Segmente durch das Anspannen von Spanngliedern zusammengefügt werden. The joining of the segments to a bridge girder or to a section of a bridge girder can advantageously take place by the tensioning of tendons arranged in the longitudinal direction of the segments. It will be particularly advantageous if more than two segments are joined together by the tensioning of tendons.
Es wurde bereits erläutert, dass bei dem erfindungsgemäßen Verfahren das Gewicht des Brückenträgers im Bauzustand viel geringer ist als im Endzustand. In der endgültigen Lage des Brückenträgers können Schichten aus bewehrtem Beton auf die Bodenplatten und/oder die Wandplatten und/oder die Deckplatten der Segmente aufgebracht werden, um die Fläche, das Trägheitsmoment und das Widerstandmoment des Brückenträgers zu vergrößern. Durch diese Querschnittsergänzung werden die statischen Eigenschaften des Brückenträgers in der endgültigen Lage verbessert und er wird dadurch in die Lage versetzt Lasten aus Verkehr abzutragen. It has already been explained that in the method according to the invention, the weight of the bridge girder in the construction state is much lower than in the final state. In the final position of the bridge girder, layers of reinforced concrete can be applied to the bottom plates and / or the wall plates and / or the cover plates of the segments to increase the area, the moment of inertia and the resistance moment of the girder. This cross-sectional complement enhances the static properties of the bridge girder in the final position, and thereby becomes able to remove loads from traffic.
Besonders vorteilhaft wird es sein, wenn die Schichten aus bewehrtem Beton auf die Oberseite der Bodenplatten und den Oberseiten der Deckplatten der Segmente aufgebracht werden. Die Schichten aus bewehrtem Beton können vorteilhaft auf der Innenseite oder der
Außenseite der Wandplatten der Segmente aufgebracht werden. Vorteilhaft werden die Wandplatten im Match-Cast-Verfahren vorgefertigt und/oder die Bodenplatte und die Deckplatte bei der Herstellung eines Segments im Match-Cast-Verfahren betoniert. It will be particularly advantageous if the layers of reinforced concrete are applied to the top of the bottom plates and the tops of the cover plates of the segments. The layers of reinforced concrete can be beneficial on the inside or the Outside of the wall panels of the segments are applied. Advantageously, the wall panels are prefabricated in a match-cast method and / or the bottom panel and the cover panel are concreted in the manufacture of a segment in a match-cast method.
Vorteilhaft werden die Fugen zwischen den Segmenten bei dem Zusammenfügen der Segmente als Vergussfugen mit einer Breite von 1mm bis 100mm, vorzugsweise 10 bis 30mm, hergestellt. Advantageously, the joints between the segments in the assembly of the segments as Vergussfugen with a width of 1mm to 100mm, preferably 10 to 30mm produced.
Vorteilhaft werden die Stirnseiten der Segmente gefräst und die Fugen zwischen den Segmenten bei dem Zusammenfügen der Segmente als trockene Fugen hergestellt. Advantageously, the faces of the segments are milled and the joints between the segments in the assembly of the segments made as dry joints.
Vorteilhaft werden mindestens zwei Platten eines Segments, vorzugsweise alle Platten eines Segments mit einer Dicke zwischen 25mm und 250mm, vorzugsweise 50mm bis 150mm, hergestellt. Advantageously, at least two plates of a segment, preferably all plates of a segment having a thickness of between 25 mm and 250 mm, preferably 50 mm to 150 mm, are produced.
Um Brückenträger mit veränderlicher Höhe oder veränderlicher Breite zu schaffen werden die Segmente so hergestellt, dass die Höhe und/oder die Breite innerhalb der Segmente veränderlich ist. Die Herstellung von Segmenten mit veränderlicher Höhe erfordert die Herstellung von Wandplatten, die in der Ansicht eine trapezförmige Form aufweisen. To provide bridge girders with variable height or varying width, the segments are made so that the height and / or width within the segments is variable. The production of segments with variable height requires the production of wall panels, which have a trapezoidal shape in the view.
Vorteilhaft werden die Rippen aus T-förmigen Stahlträgern hergestellt und die Stege der T- förmigen Stahlträger beim Betonieren der Platten teilweise in den Beton eingebettet. Advantageously, the ribs are made of T-shaped steel girders and the webs of the T-shaped steel girders are partially embedded in the concrete when concreting the slabs.
In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens werden die T- förmigen Stahlträger mit Stegen aus Trapezblech oder Wellblech hergestellt. In an advantageous embodiment of the method according to the invention, the T-shaped steel beams are produced with webs of trapezoidal sheet or corrugated metal.
Vorteilhaft werden in den Stegen der T-förmigen Stahlträger Aussparungen, die sich bis zu den Stegkanten, die nicht mit dem Flansch verbunden sind, erstrecken, angeordnet. Advantageously, in the webs of the T-shaped steel carrier recesses, which extend up to the web edges which are not connected to the flange, arranged.
In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens werden die Rippen aus Fachwerksträgern aus Stahl hergestellt und die Untergurte der Fachwerkträger beim Betonieren der Platten in den Beton eingebettet. In an advantageous embodiment of the method according to the invention, the ribs are made of truss girders made of steel and the lower chords of the truss girders when concreting the slabs embedded in the concrete.
Um die Kosten für die Herstellung der Rippen aus Stahl einzusparen kann es vorteilhaft sein, die Rippen aus bewehrtem Beton herzustellen. To save the cost of manufacturing the steel fins, it may be advantageous to make the reinforced concrete fins.
In einer Ausführungsvariante des erfindungsgemäßen Verfahrens mit Doppelwänden werden die äußeren Wandplatten der Doppelwände bis zur Unterseite der Segmente ausgebildet, um die an der Unterseite der Brücke in Längsrichtung zwischen den äußeren Wandplatten und der Bodenplatte verlaufenden Fugen nicht auf den Außenseiten der Stege anzuordnen. Die unteren Ränder der inneren Wandplatten weisen einen Abstand, der zwischen 0mm und 50mm kleiner ist als die Dicke einer Schicht aus bewehrtem Beton, die auf der Bodenplatte aufgebracht wird, zu der Oberseite der dünnwandigen Bodenplatte im Bauzustand auf. Die Außenseiten der äußeren Wandplatten werden durch Umwelteinwirkungen wie zum Beispiel
wechselnde Feuchtigkeitsbedingungen höher beansprucht als die im Hohlkasten angeordneten Außenseiten der inneren Wandplatten. Deswegen kann die Betondeckung bei den Außenseiten der inneren Wandplatten kleiner gewählt werden als bei den äußeren Wandplatten. Das führt dazu, dass die Dicke der inneren Wandplatten kleiner als die Dicke der äußeren Wandplatten ausgeführt werden kann, was vorteilhaft im Hinblick auf die Herstellung möglichst leichter Segmente ist. Die Rippen in den Doppelwänden können vorteilhaft aus Stahlblechen, Trapezblechen, Wellblechen, Stahlprofilen, T-förmigen Stahlträgern, Fachwerkkonstruktionen oder Gitterträgern ausgebildet werden. Auch die Herstellung von Rippen aus Beton zwischen der inneren und der äußeren Wandplatte einer Doppelwand ist möglich. In an embodiment of the method according to the invention with double walls, the outer wall panels of the double walls are formed to the underside of the segments in order not to arrange the joints extending at the bottom of the bridge in the longitudinal direction between the outer wall panels and the bottom plate on the outer sides of the webs. The lower edges of the inner wall panels have a distance, which is between 0mm and 50mm smaller than the thickness of a layer of reinforced concrete, which is applied to the bottom plate, to the top of the thin-walled base plate in the construction state. The outer sides of the outer wall panels are affected by environmental factors such as changing moisture conditions claimed higher than the arranged in the hollow box outer sides of the inner wall panels. Therefore, the concrete cover can be made smaller in the outer sides of the inner wall panels than in the outer wall panels. This results in that the thickness of the inner wall panels can be made smaller than the thickness of the outer wall panels, which is advantageous in terms of the production of light segments as possible. The ribs in the double walls can be advantageously formed from steel sheets, trapezoidal sheets, corrugated sheets, steel profiles, T-shaped steel beams, truss structures or lattice girders. Also, the production of ribs of concrete between the inner and the outer wall plate of a double wall is possible.
In der endgültigen Lage des Brückenträgers müssen noch Betonierarbeiten für das Einbringen des Betons in die Doppelwände und für das Aufbringen von Schichten aus bewehrtem Beton auf den Bodenplatten und/oder den Deckplatten und/oder den Wandplatten ausgeführt werden. Zur Unterstützung dieser Arbeiten ist es günstig, wenn ein Wagen für den Transport von Material und Arbeitskräften in Längsrichtung des Brückenträgers auf dem Brückenträger bewegt werden kann. Auf den oberen Rahmenecken können Auflagerkonstruktionen ausgebildet werden. Auf den Auflagerkonstruktionen, die beispielsweise so ähnlich wie die in der WO 2016 187 634 beschriebenen Auflagerkonstruktionen ausgeführt werden können, werden Verschublager montiert. Auf den Verschublagern kann ein ähnlich wie in der WO 2016 187 634 gestalteter Wagen in Längsrichtung der Brücke bewegt werden. In the final position of the bridge girder still concreting work for the introduction of the concrete in the double walls and for the application of layers of reinforced concrete on the floor panels and / or the cover plates and / or the wall panels must be performed. In support of this work, it is advantageous if a carriage for the transport of material and labor in the longitudinal direction of the bridge girder can be moved on the bridge girder. On the upper frame corners support structures can be formed. On the support structures, which can be carried out, for example, similar to the support structures described in WO 2016 187 634, Verschublager be mounted. On the Verschublagern a similar as in WO 2016 187 634 designed carriage can be moved in the longitudinal direction of the bridge.
Die Rahmenecken können vorteilhaft aus Blechen und Profilen aus Stahl hergestellt werden, was günstig für die Herstellung einer schnellen Verbindung der Rippen der Doppelwände mit den Rippen der Bodenplatte und der Deckplatte ist. Die Rahmenecken können auch aus einem gießfähigen Baustoff wie zum Beispiel Beton oder einem Vergussmörtel hergestellt werden, wenn die Herstellungskosten eines Segments reduziert werden sollen und die Montagegeschwindigkeit von untergeordneter Bedeutung ist. The frame corners can be advantageously made of sheets and profiles made of steel, which is favorable for the production of a quick connection of the ribs of the double walls with the ribs of the bottom plate and the cover plate. The frame corners can also be made of a pourable building material such as concrete or a grout, if the manufacturing cost of a segment to be reduced and the assembly speed of minor importance.
Um den Bauprozess zu beschleunigen, kann es vorteilhaft sein, die in den Schichten aus bewehrtem Beton angeordnete Bewehrung zumindest teilweise, im Idealfall vollständig, am Montageplatz und/oder dem Einbauort zu verlegen. Vorteilhaft wird der Großteil dieser Bewehrung am Montageplatz verlegt und am Einbauort wird diese Bewehrung durch eine Zulagebewehrung an den Segmentfugen ergänzt. In order to accelerate the building process, it may be advantageous to at least partially, ideally completely, place the reinforcement arranged in the layers of reinforced concrete at the installation site and / or the installation site. Advantageously, the majority of this reinforcement is laid at the assembly site and at the installation this reinforcement is supplemented by an additional reinforcement at the segment joints.
In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens weisen die Querrahmen einen Abstand zueinander auf, der mindestens 0,5m und höchstens 10m beträgt und vorzugsweise zwischen 1,0m und 3,0m liegt.
Ein erfindungsgemäßer, in Längsrichtung vorgespannter Brückenträger mit hohlkastenförmigem Querschnitt aus vorgefertigten Segmenten ist dadurch gekennzeichnet, dass der Brückenträger Querrahmen aufweist, wobei die Querrahmen einen Abstand voneinander aufweisen, der mindestens 0,5m und höchstens 10,0m beträgt und vorzugsweise zwischen 1,0m und 3,0m liegt. In an advantageous embodiment of the method according to the invention, the transverse frames have a distance from each other which is at least 0.5 m and at most 10 m and preferably between 1.0 m and 3.0 m. An inventive, longitudinally prestressed bridge girder with hollow-box-shaped cross section of prefabricated segments is characterized in that the bridge girder comprises transverse frames, wherein the transverse frames have a distance from one another which is at least 0.5 m and at most 10.0 m and preferably between 1.0 m and 3 , 0m is located.
Im Folgenden wird die Erfindung anhand von in den Zeichnungen dargestellten, nicht einschränkenden Ausführungsbeispielen beschrieben. Es zeigen jeweils in schematischen Darstellungen: In the following the invention will be described with reference to non-limiting exemplary embodiments illustrated in the drawings. In each case show in schematic representations:
Fig. 1 einen Schnitt durch einen Brückenträger mit trogförmigem Querschnitt, die Spannungen infolge Eigengewicht und die Spannungen infolge einer Kombination von Eigengewicht und Vorspannung; 1 shows a section through a bridge carrier with trogförmigem cross section, the tensions due to dead weight and the stresses due to a combination of dead weight and bias voltage.
Fig. 2 einen Schnitt durch einen Brückenträger, dessen Stege durch Doppelwände gebildet werden, die Spannungen infolge Eigengewicht und die Spannungen infolge einer Kombination von Eigengewicht und Vorspannung; Figure 2 is a section through a bridge girder, the webs are formed by double walls, the tensions due to dead weight and the stresses due to a combination of dead weight and bias.
Fig. 3 einen Schnitt durch einen mit dem erfindungsgemäßen Verfahren hergestellten Brückenträger, die Spannungen infolge Eigengewicht und die Spannungen infolge einer Kombination von Eigengewicht und Vorspannung; 3 shows a section through a bridge carrier produced by the method according to the invention, the stresses due to its own weight and the stresses due to a combination of dead weight and preload;
Fig. 4 eine Ansicht von zwei Wandplatten gemäß einer ersten erfindungsgemäßen Ausführungsform; 4 is a view of two wall panels according to a first embodiment of the invention;
Fig. 5 eine Ansicht von vier Wandplatten gemäß einer ersten erfindungsgemäßen Ausführungsform; Fig. 5 is a view of four wall panels according to a first embodiment of the invention;
Fig. 6 eine Ansicht von vier Wandplatten und einer Bodenplatte einer erfindungsgemäßen Ausführungsform; Fig. 6 is a view of four wall plates and a bottom plate of an embodiment according to the invention;
Fig. 7 eine Ansicht eines Segments gemäß einer ersten erfindungsgemäßen Ausführungsform; 7 is a view of a segment according to a first embodiment of the invention;
Fig. 8 eine Ansicht während des Einschiebens eines Brückenträgers einer ersten erfindungsgemäßen Ausführungsform; 8 is a view during the insertion of a bridge carrier of a first embodiment of the invention;
Fig. 9 eine Ansicht nach dem Einschieben des Brückenträgers einer ersten erfindungsgemäßen Ausführungsform; 9 shows a view after the insertion of the bridge carrier of a first embodiment according to the invention;
Fig. 10 einen Schnitt längs der Linie X-X der Fig. 8 und der Fig. 9;
Fig. 11 einen Schnitt entsprechend der Fig. 10 nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte; Fig. 10 is a section along the line XX of Fig. 8 and Fig. 9; Figure 11 is a section corresponding to Figure 10 after applying a layer of reinforced concrete on the bottom plate.
Fig. 12 einen Schnitt entsprechend der Fig. 11 nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Deckplatte; Figure 12 is a section corresponding to Figure 11 after the application of a layer of reinforced concrete on the cover plate.
Fig. 13 einen Schnitt entsprechend der Fig. 12 nach dem Aufbringen von Schichten aus bewehrtem Beton auf den Wandplatten; Figure 13 is a section corresponding to Figure 12 after the application of layers of reinforced concrete on the wall panels.
Fig. 14 einen Schnitt entsprechend der Fig. 13 nach der Montage der Druckstreben und der Herstellung der Kragplatten; FIG. 14 shows a section corresponding to FIG. 13 after assembly of the pressure struts and the production of the cantilever plates; FIG.
Fig. 15 eine Ansicht während der Herstellung von Teilstücken eines Brückenträgers gemäß einer zweiten erfindungsgemäßen Ausführungsform; 15 shows a view during the production of portions of a bridge girder according to a second embodiment of the invention;
Fig. 16 einen Schnitt längs der Linie XVI-XVI der Fig. 15; Fig. 16 is a section along the line XVI-XVI of Fig. 15;
Fig. 17 das Detail A der Fig. 16; FIG. 17 shows detail A of FIG. 16; FIG.
Fig. 18 das Detail B der Fig. 16; FIG. 18 shows the detail B of FIG. 16; FIG.
Fig. 19 ein der Fig. 17 entsprechendes Detail nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte und nach der Montage von Fertigteilplatten; 19 is a detail corresponding to FIG. 17 after the application of a layer of reinforced concrete on the floor slab and after the assembly of precast slabs;
Fig. 20 einen Schnitt längs der Linie XX-XX der Fig. 19; Fig. 20 is a section along the line XX-XX of Fig. 19;
Fig. 21 eine Ansicht während der Herstellung eines Segments gemäß einer dritten erfindungsgemäßen Ausführungsform; 21 is a view during production of a segment according to a third embodiment of the invention;
Fig. 22 eine Ansicht während der Montage eines Teilstücks eines Brückenträgers gemäß der dritten erfindungsgemäßen Ausführungsform; Fig. 22 is a view during assembly of a portion of a bridge girder according to the third embodiment of the present invention;
Fig. 23 einen Schnitt durch einen Brückenträger nach dem Aufbringen von Schichten aus bewehrtem Beton; FIG. 23 shows a section through a bridge girder after the application of layers of reinforced concrete; FIG.
Fig. 24 einen Schnitt gemäß der Linie XXIV-XXIV der Fig. 22; FIG. 24 shows a section according to the line XXIV-XXIV of FIG. 22; FIG.
Fig. 25 einen Schnitt gemäß der Linie XXV-XXV der Fig. 23; Fig. 25 is a section along the line XXV-XXV of Fig. 23;
Fig. 26 Fig. l eine Ansicht während der Herstellung eines Segments gemäß einer vierten erfindungsgemäßen Ausführungsform; Fig. 26 is a view during manufacture of a segment according to a fourth embodiment of the invention;
Fig. 27 einen Schnitt während der Herstellung eines Brückenträgers gemäß der vierten erfindungsgemäßen Ausführungsform; FIG. 27 shows a section during the production of a bridge carrier according to the fourth embodiment of the invention; FIG.
Fig. 28 eine Ansicht von zwei Doppelwänden gemäß einer fünften erfindungsgemäßen Ausführungsform;
Fig. 29 eine Ansicht von vier Doppelwänden gemäß der fünften erfindungsgemäßen Ausführungsform; FIG. 28 is a view of two double walls according to a fifth embodiment of the invention; FIG. FIG. 29 is a view of four double walls according to the fifth embodiment of the present invention; FIG.
Fig. 30 eine Ansicht von vier Doppelwänden und einer Bodenplatte gemäß der fünften erfindungsgemäßen Ausführungsform; Fig. 30 is a view of four double walls and a bottom plate according to the fifth embodiment of the invention;
Fig. 31 eine Ansicht eines Segments gemäß der fünften erfindungsgemäßen Ausführungsform; FIG. 31 is a view of a segment according to the fifth embodiment of the present invention; FIG.
Fig. 32 eine Ansicht während des Einschiebens eines Brückenträgers gemäß der fünften erfindungsgemäßen Ausführungsform; FIG. 32 is a view during insertion of a bridge carrier according to the fifth embodiment of the present invention; FIG.
Fig. 33 eine Ansicht nach dem Einschieben des Brückenträgers gemäß der fünften erfindungsgemäßen Ausführungsform; 33 is a view after the insertion of the bridge carrier according to the fifth embodiment of the invention;
Fig. 34 einen Schnitt längs der Linie XXXIV- XXXIV der Fig. 32 und Fig. 33; Fig. 34 is a section along the line XXXIV- XXXIV of Fig. 32 and Fig. 33;
Fig. 35 einen Schnitt entsprechend der Fig. 34 nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte; Figure 35 is a section corresponding to Figure 34 after the application of a layer of reinforced concrete on the bottom plate.
Fig. 36 einen Schnitt entsprechend der Fig. 35 nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Deckplatte; FIG. 36 shows a section corresponding to FIG. 35 after the application of a layer of reinforced concrete on the cover plate; FIG.
Fig. 37 einen Schnitt entsprechend der Fig. 36 nach dem Einfüllen von Beton in die Doppelwände; FIG. 37 shows a section corresponding to FIG. 36 after the filling of concrete into the double walls; FIG.
Fig. 38 einen Schnitt entsprechend der Fig. 37 nach der Montage der Druckstreben und der Herstellung der Kragplatten; FIG. 38 shows a section corresponding to FIG. 37 after assembly of the pressure struts and the production of the cantilever plates; FIG.
Fig. 39 eine Ansicht während der Herstellung von Teilstücken eines Brückenträgers gemäß einer sechsten erfindungsgemäßen Ausführungsform; 39 is a view during the production of parts of a bridge girder according to a sixth embodiment of the invention;
Fig. 40 einen Schnitt längs der Linie XL-XL der Fig. 39; Fig. 40 is a section along the line XL-XL of Fig. 39;
Fig. 41 das Detail C der Fig. 40; FIG. 41 shows detail C of FIG. 40; FIG.
Fig. 42 das Detail D der Fig. 40; Fig. 42 shows the detail D of Fig. 40;
Fig. 43 ein der Fig. 41 entsprechendes Detail nach dem Aufbringen einer Schicht aus bewehrtem Beton auf der Bodenplatte; Fig. 43 is a detail corresponding to Fig. 41 after the application of a layer of reinforced concrete on the floor slab;
Fig. 44 einen Schnitt längs der Linie XLIV-XLIV der Fig. 43; Fig. 44 is a section taken along the line XLIV-XLIV of Fig. 43;
Fig. 45 eine Ansicht während der Herstellung eines Brückenträgers gemäß einer siebenten erfindungsgemäßen Ausführungsform;
Fig. 46 eine der Fig. 45 entsprechende Ansicht nach der Positionierung eines Teilstücks am Einbauort; FIG. 45 is a view during manufacture of a bridge carrier according to a seventh embodiment of the present invention; FIG. FIG. 46 shows a view corresponding to FIG. 45 after the positioning of a section at the installation location; FIG.
Fig. 47 eine der Fig. 46 entsprechende Ansicht während des Verschiebens eines weiteren Teilstücks des Brückenträgers vom Montageplatz zum Einbauort; FIG. 47 shows a view corresponding to FIG. 46 during the displacement of a further section of the bridge girder from the assembly site to the installation location; FIG.
Fig. 48 einen Schnitt längs der Linie XLVI I l-XLVI 11 der Fig. 45 und Fig. 48 is a section along the line XLVI I l-XLVI 11 of Fig. 45 and
Fig. 49 das Detail E der Fig. 47, wobei der Schnitt zwischen den Wandplatten der Doppelwände geführt wurde. Fig. 49 shows the detail E of Fig. 47, wherein the section between the wall panels of the double walls has been performed.
Im Folgenden wird zunächst auf die Fig. 1 bis Fig. 3 Bezug genommen, in denen das statische Tragverhalten von unterschiedlichen Querschnitten für einen Brückenträger 1 untersucht wird. Die drei in den Fig. 1 bis Fig. 3 dargestellten Querschnitte weisen eine Höhe von 2,0m und eine Breite von 1,0m auf. Reference will first be made below to FIGS. 1 to 3, in which the static load-bearing behavior of different cross-sections for a bridge girder 1 is examined. The three cross sections illustrated in FIGS. 1 to 3 have a height of 2.0 m and a width of 1.0 m.
Fig. 1 zeigt einen trogförmigen Querschnitt eines Brückenträgers 1, entsprechend der Darstellung in der Fig. 13 in der WO 2016 037 864. Die Dicke der Wandplatten 4 beträgt 50mm. Die Dicke der Bodenplatte 5 ist gleich 200mm. Die Fläche dieses Querschnitts beträgt 0,380m2, das Trägheitsmoment 0,144m4, das Widerstandsmoment an der Oberseite der Wandplatten 4 -0,101m3, das Widerstandsmoment an der Unterseite der Bodenplatte 0,251m3 und der Trägheitsradius 0,616m. Der Schwerpunkt ist 0,574m von der Unterseite der Bodenplatte 5 entfernt. In der Bodenplatte 5 sind in einem Abstand von 0,15m von der Unterseite der Bodenplatte 5 zwei Spannglieder 15 in der Nähe der Wandplatten 4 angeordnet. Eine Positionierung der Spannglieder 15 in der Nähe der Wandplatten 4 ist günstig, weil auf diese Art Umlenkkräfte und Verankerungskräfte der Spannglieder 15 mit nur geringen Biegebeanspruchungen der Bodenplatte 5 in die Wandplatten 4 eingeleitet werden können. Fig. 1 shows a trough-shaped cross section of a bridge girder 1, as shown in Fig. 13 in WO 2016 037 864. The thickness of the wall panels 4 is 50mm. The thickness of the bottom plate 5 is equal to 200mm. The area of this cross-section is 0.380m 2 , the moment of inertia 0.144m 4 , the moment of resistance at the top of the wall plates 4 -0.101m 3 , the moment of resistance at the bottom of the bottom plate 0.251m 3 and the radius of gyration 0.616m. The center of gravity is 0.574m from the bottom of the bottom plate 5. In the bottom plate 5, 5, two tendons 15 are arranged in the vicinity of the wall plates 4 at a distance of 0.15 m from the bottom of the bottom plate. A positioning of the tendons 15 in the vicinity of the wall panels 4 is favorable because in this way deflection forces and anchoring forces of the tendons 15 can be introduced into the wall panels 4 with only slight bending stresses of the bottom plate 5.
Das Gewicht des trogförmigen Querschnitts beträgt 9,5kN/m, wenn die Wichte mit 25kN/m3 angenommen wird. Für einen einfeldrigen Brückenträger 1 mit gelenkiger Lagerung an den Endpunkten, einer Länge von 40m und dem trogförmigen Querschnitt gemäß Fig. 1 ergibt sich infolge Eigengewicht in Feldmitte ein Biegemoment von 1900kNm. Die Spannungen infolge Eigengewicht in Feldmitte des Brückenträgers 1 betragen -18,8MPa an der Oberseite und +7,6MPa an der Unterseite. Eine mit den beiden Spanngliedern 15 aufgebrachte Vorspannkraft von 1750kN ist erforderlich, um zu erreichen, dass der Querschnitt in Feldmitte des Brückenträgers 1 infolge Eigengewicht keine Zugspannungen aufweist. The weight of the trough-shaped cross section is 9.5 kN / m when the weight is assumed to be 25 kN / m 3 . For a single-span bridge girder 1 with articulated mounting at the end points, a length of 40 m and the trough-shaped cross section according to FIG. 1, a bending moment of 1900 kNm results due to dead weight in the middle of the field. The tensions due to dead weight in mid-field of the bridge girder 1 are -18.8MPa at the top and +7.6MPa at the bottom. A prestressing force of 1750 kN applied with the two tendons 15 is required in order to ensure that the cross-section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
Fig. 1 zeigt, dass die Spannung infolge der Einwirkungen von Eigengewicht und Vorspannung an der Unterseite gleich Null ist und an der Oberseite eine Druckspannung von 15,8MPa vorhanden ist. Fig. 1 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top of a compressive stress of 15.8 MPa is present.
Fig. 2 zeigt, einen Querschnitt mit vier Wandplatten 4, einer Bodenplatte 5 und einer Deckplatte 6 entsprechend der Darstellung in der Fig. 14 der WO 2016 037 864. Die Dicke der
Wandplatten 4 beträgt 50mm. Die Dicken der Bodenplatte 5 und der Deckplatte 6 sind gleich 100mm. Die Fläche dieses Querschnitts beträgt 0,56m2, das Trägheitsmoment 0,278m4, das Widerstandsmoment an der Oberseite der Deckplatte 6 -0,278m3, das Widerstandsmoment an der Unterseite der Bodenplatte 5 0,278m3 und der Trägheitsradius 0,704m. Der Schwerpunkt liegt in der halben Höhe des Querschnitts. In einem Abstand von 0,15m von der Unterseite der Bodenplatte 5 sind zwischen den Wandplatten 4 zwei Spannglieder 15 angeordnet. Eine Positionierung der Spannglieder 15 zwischen den Wandplatten 4 ist günstig, weil auf diese Art Umlenkkräfte und Verankerungskräfte der Spannglieder 15 über in der Fig. 2 nicht dargestellte Verankerungsblöcke direkt in die Wandplatten 4 eingeleitet werden können. Die Kopplung der Hüllrohre an den Fugen 16 zwischen den Segmenten 3 ist bei dem in der Fig. 2 dargestellten Beispiel allerdings mit erheblichen Aufwendungen verbunden, weil die Hüllrohre zwischen den Wandplatten 4 liegen und nicht zugänglich sind. Eine Kopplung der Hüllrohre könnte zum Beispiel durch in den Wandplatten 4 angeordnete Aussparungen erfolgen. Fig. 2 shows a cross section with four wall panels 4, a bottom plate 5 and a cover plate 6 as shown in FIG. 14 of WO 2016 037 864. Die Dicke des. The thickness of Wall panels 4 is 50mm. The thicknesses of the bottom plate 5 and the cover plate 6 are equal to 100mm. The area of this cross-section is 0.56m 2 , the moment of inertia 0.278m 4 , the moment of resistance at the top of the top plate 6 -0.278m 3 , the moment of resistance at the bottom of the bottom plate 5 0.278m 3 and the radius of gyration 0.704m. The focus is in half the height of the cross section. At a distance of 0.15 m from the bottom of the bottom plate 5, two tendons 15 are arranged between the wall panels 4. A positioning of the tendons 15 between the wall panels 4 is beneficial because in this way deflection forces and anchoring forces of the tendons 15 can be introduced directly into the wall panels 4 via not shown in FIG. 2 anchor blocks. The coupling of the ducts to the joints 16 between the segments 3 is connected in the example shown in FIG. 2, however, with considerable expenses, because the ducts are between the wall panels 4 and are not accessible. A coupling of the cladding could be done for example by arranged in the wall panels 4 recesses.
Das Gewicht des in Fig. 2 gezeigten Querschnitts beträgt 14,0kN/m, wenn die Wichte des Baustoffs mit 25kN/m3 angenommen wird. Für einen einfeldrigen Brückenträger 1 mit gelenkiger Lagerung an den Endpunkten, einer Länge von 40m und einem Querschnitt gemäß Fig. 2 ergibt sich infolge Eigengewicht in Feldmitte ein Biegemoment von 2800kNm. Die Spannungen infolge Eigengewicht in Feldmitte des Brückenträgers 1 betragen -10,lMPa an der Oberseite und 10,lMPa an der Unterseite. Eine mit den beiden Spanngliedern 15 aufgebrachte Vorspannkraft von 2080kN ist erforderlich, um zu erreichen, dass der Querschnitt in Feldmitte des Brückenträgers 1 infolge Eigengewicht keine Zugspannungen aufweist. The weight of the cross section shown in Fig. 2 is 14.0 kN / m when the weight of the building material is assumed to be 25 kN / m 3 . For a single-span bridge girder 1 with articulated mounting at the end points, a length of 40 m and a cross section according to FIG. 2, a bending moment of 2800 kNm results due to its own weight in the middle of the field. The tensions due to deadweight in the middle of the bridge girder 1 are -10, lMPa at the top and 10, lMPa at the bottom. A prestressing force of 2080 kN applied with the two tendons 15 is required in order to ensure that the cross section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
Fig. 2 zeigt, dass die Spannung infolge der Einwirkungen von Eigengewicht und Vorspannung an der Unterseite gleich null ist und an der Oberseite eine Druckspannung von -7,4MPa vorhanden ist. Fig. 2 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top a compressive stress of -7.4 MPa is present.
Fig. 3 zeigt einen mit dem erfindungsgemäßen Verfahren hergestellten Querschnitt mit zwei Wandplatten 4, einer Bodenplatte 5 und einer Deckplatte 6. Die Dicke der Wandplatten 4 beträgt 50mm. Die Dicken der Bodenplatte 5 und der Deckplatte 6 sind gleich 100mm. Die Fläche des Querschnitts beträgt 0,38m2, das Trägheitsmoment 0,229m4, das Widerstandsmoment an der Oberseite der Deckplatte 6 -0,229m3, das Widerstandsmoment an der Unterseite der Bodenplatte 5 0,229m3 und der Trägheitsradius 0,777m. Der Schwerpunkt liegt in der halben Höhe des Querschnitts. In einem Abstand von 0,15m von der Unterseite der Bodenplatte 5 sind zwei Spannglieder 15 angeordnet. Fig. 3 shows a cross section produced by the method according to the invention with two wall plates 4, a bottom plate 5 and a cover plate 6. The thickness of the wall plates 4 is 50mm. The thicknesses of the bottom plate 5 and the cover plate 6 are equal to 100mm. The area of the cross-section is 0.38 m 2 , the moment of inertia is 0.229 m 4 , the moment of resistance at the top of the cover plate 6 is -0.229 m 3 , the moment of resistance at the bottom of the bottom plate 5 is 0.229 m 3 and the inertia radius is 0.777 m. The focus is in half the height of the cross section. At a distance of 0.15 m from the bottom of the bottom plate 5, two tendons 15 are arranged.
Das Gewicht des in Fig. 3 gezeigten Querschnitts beträgt 9,5kN/m, wenn die Wichte des Baustoffs mit 25kN/m3 angenommen wird. Für einen einfeldrigen Brückenträger 1 mit gelenkiger Lagerung an den Endpunkten, einer Länge von 40m und dem Querschnitt gemäß Fig. 3 ergibt sich infolge Eigengewicht in Feldmitte ein Biegemoment von 1900kNm. Die Spannungen infolge Eigengewicht in Feldmitte des Brückenträgers 1 betragen -8,3MPa an der
Oberseite und 8,3MPa an der Unterseite. Eine mit den beiden Spanngliedern 15 aufgebrachte Vorspannkraft von 1310kN ist erforderlich, um zu erreichen, dass der Querschnitt in Feldmitte des Brückenträgers 1 infolge Eigengewicht keine Zugspannungen aufweist. The weight of the cross section shown in Fig. 3 is 9.5 kN / m when the weight of the building material is assumed to be 25 kN / m 3 . For a single-span bridge girder 1 with articulated mounting at the end points, a length of 40 m and the cross section according to FIG. 3, a bending moment of 1900 kNm results due to dead weight in the middle of the field. The tensions due to dead weight in the middle of the bridge girder 1 amount to -8.3 MPa at the Top and 8.3MPa at the bottom. A pretensioning force of 1310 kN applied with the two tendons 15 is required in order to ensure that the cross-section in the middle of the field of the bridge girder 1 has no tensile stresses due to its own weight.
Fig. 3 zeigt, dass die Spannung infolge der Einwirkungen von Eigengewicht und Vorspannung an der Unterseite gleich Null ist und an der Oberseite eine Druckspannung von -6,9MPa vorhanden ist. Fig. 3 shows that the stress due to the effects of dead weight and bias at the bottom is zero and at the top of a compressive stress of -6.9 MPa is present.
Ein Vergleich des mit dem erfindungsgemäßen Verfahren hergestellten Querschnitts gemäß Fig. 3 mit dem trogförmigen Querschnitt gemäß Fig. 1 zeigt, dass beide Querschnitte die gleiche Fläche und damit für das gewählte Beispiel des 40m langen Brückenträgers das gleiche Biegemoment infolge Eigengewicht in Feldmitte aufweisen. Zur Vorspannung des mit dem erfindungsgemäßen Verfahren hergestellten Querschnitts ist aber nur eine Vorspannkraft von 1310kN erforderlich, um zu erreichen, dass in Feldmitte an der Unterseite des Querschnitts keine Zugspannungen bei einer Belastung durch Eigengewicht auftreten. Beim trogförmigen Querschnitt gemäß Fig. 1 beträgt die erforderliche Vorspannkraft 1750kN (+34%). Die Spannungen an den Oberseiten der Querschnitte infolge der Einwirkungen von Eigengewicht und Vorspannung betragen bei dem mit dem erfindungsgemäßen Verfahren hergestellten Querschnitt nur -6,9MPa und bei dem trogförmigen Querschnitt -15,8MPa (+129%). Der höhere Spannstahlverbrauch und die höheren Druckspannungen sind nachteilig beim trogförmigen Querschnitt. A comparison of the cross section according to the invention produced in accordance with the invention with the trough-shaped cross section of FIG. 1 shows that both cross sections have the same area and thus for the selected example of the 40m long bridge girder the same bending moment due to dead weight in the middle of the field. For prestressing of the cross section produced by the method according to the invention, however, only a prestressing force of 1310 kN is required in order to ensure that in the middle of the field at the underside of the cross section no tensile stresses occur under load due to its own weight. When trough-shaped cross-section of FIG. 1, the required biasing force is 1750kN (+ 34%). The stresses on the tops of the cross sections due to the effects of dead weight and preload are only -6.9 MPa for the cross section produced by the method according to the invention and -15.8 MPa (+ 129%) for the trough-shaped cross section. The higher prestressing steel consumption and the higher compressive stresses are disadvantageous in the case of a trough-shaped cross section.
Ein Vergleich des mit dem erfindungsgemäßen Verfahren hergestellten Querschnitts gemäß Fig. 3, mit dem Querschnitt gemäß Fig. 2 zeigt, dass der Querschnitt gemäß Fig. 2, wegen der zur Herstellung von Wandplatten 4 erforderlichen Mindestdicke von 50mm, ein höheres Eigengewicht und damit ein höheres Moment infolge Eigengewicht in Feldmitte aufweist. Deshalb ist zur Vorspannung des Brückenträgers 1 mit dem Querschnitt gemäß Fig. 2 eine viel höhere Vorspannkraft von 2080kN (+59%) erforderlich. Die Spannungen an der Oberseite der Querschnitte infolge der Einwirkungen von Eigengewicht und Vorspannungen betragen bei dem mit dem erfindungsgemäßen Verfahren hergestellten Querschnitt nur -6,9MPa und bei dem Querschnitt gemäß Fig. 2 -7,4MPa (+7%). Der höhere Spannstahlverbrauch und die etwas höheren Druckspannungen sind nachteilig bei dem Querschnitt gemäß Fig. 2. Ein Brückenträger 1 mit einem Querschnitt gemäß der Fig. 2 ist jedoch vorteilhaft für die Herstellung einer Schicht 9 aus bewehrtem Beton zwischen den inneren Wandplatten 53 und den äußeren Wandplatten 54. 2 shows that the cross-section according to FIG. 2, because of the minimum thickness of 50 mm required for the production of wall panels 4, has a higher dead weight and thus a higher one Moment due to dead weight in the middle of the field. Therefore, a much higher biasing force of 2080kN (+ 59%) is required for biasing the bridge beam 1 with the cross section of FIG. The stresses at the top of the cross sections due to the effects of dead weight and biases are only -6.9 MPa for the cross section produced by the method according to the invention and 2 -7.4 MPa (+ 7%) for the cross section according to FIG. The higher prestressing steel consumption and the somewhat higher compressive stresses are disadvantageous in the cross section according to FIG. 2. However, a bridge support 1 with a cross section according to FIG. 2 is advantageous for the production of a layer 9 of reinforced concrete between the inner wall panels 53 and the outer wall panels 54th
In den folgenden Ausführungsbeispielen werden die Bodenplatten 5, die Deckplatten 6 und die Wandplatten 4 auch als Platten 7 bezeichnet, wenn gemeinsame Eigenschaften dieser dünnwandigen Betonbauteile beschrieben werden. Die Platten 7 sind mit Rippen 8 verbunden, die in den Ausführungsbeispielen an den Stellen, an denen es einer Präzisierung dient, genauer bezeichnet werden, beispielsweise als Rippe 40, die mit einer Bodenplatte verbunden ist, oder als Rippe 41, die mit einer Deckplatte verbunden ist, oder als Rippe 50, die mit einer Wandplatte verbunden ist, oder als Rippe 52 in einer Doppelwand.
In den folgenden Ausführungsbeispielen ist die in den Platten 7 und den Schichten 9 aus bewehrtem Beton angeordnete Bewehrung der Übersichtlichkeit halber nicht dargestellt. Als Bewehrung können Betonstahl, textile Bewehrungen und Bauteile aus Stahl oder Edelstahl verwendet werden. Die Bewehrung kann vorgespannt sein. Auch Fasern aus Stahl oder Kunststoff können als Bewehrung eingesetzt werden. In the following embodiments, the bottom plates 5, the cover plates 6 and the wall plates 4 are also referred to as plates 7 when common characteristics of these thin-walled concrete components are described. The plates 7 are connected to ribs 8, which are more accurately referred to in the embodiments in which it serves a clarification, for example as a rib 40 which is connected to a bottom plate, or as a rib 41 which is connected to a cover plate is, or as a rib 50 which is connected to a wall plate, or as a rib 52 in a double wall. In the following exemplary embodiments, the reinforcement arranged in the plates 7 and the layers 9 of reinforced concrete is not shown for the sake of clarity. Reinforcing steel, textile reinforcements and steel or stainless steel components can be used as the reinforcement. The reinforcement can be prestressed. Also fibers made of steel or plastic can be used as reinforcement.
In den folgenden Ausführungsbeispielen sind die Spannglieder 15 sowie die Verankerungen und Umlenkungen der Spannglieder 15 in den meisten Fällen der Übersichtlichkeit halber nicht dargestellt. Spannglieder 15 mit nachträglichem oder sofortigem Verbund, Spannglieder 15 ohne Verbund oder externe Spannglieder 15 können angeordnet werden. In the following embodiments, the tendons 15 and the anchors and deflections of the tendons 15 are not shown in most cases for clarity. Tendons 15 with subsequent or immediate bond, tendons 15 without composite or external tendons 15 can be arranged.
Im Folgenden wird zunächst auf die Fig. 4 bis Fig. 14 Bezug genommen, in denen die Herstellung eines beispielhaften Brückenträgers 1 mit einem erfindungsgemäßen Verfahren gemäß einer ersten Ausführungsform beschrieben ist. Reference will first be made below to FIGS. 4 to 14, in which the production of an exemplary bridge girder 1 with a method according to the invention according to a first embodiment is described.
Zur Herstellung eines ersten Segments 3 werden gemäß Fig. 4 auf einem Montageplatz 10 zwei Wandplatten 4 in senkrechter Lage aufgestellt. In jeder Wandplatte 4 ist eine Rippe 50, die kraftschlüssig mit der Wandplatte 4 verbunden ist, angeordnet. Die Rippen 50 bestehen aus T-förmigen Stahlträgern 18, deren Stege 24 normal zu den Mittelebenen der Wandplatten 4 angeordnet werden. Im nächsten Schritt werden gemäß Fig. 5 zwei weitere Wandplatten 4 mit jeweils einer Rippe 50 auf dem Montageplatz 10 so aufgestellt, dass die Mittelebene dieser Wandplatten 4 parallel zur Mittelebene der im ersten Schritt aufgestellten Wandplatten 4 ist und dass die Außenseiten der Wandplatten 4 einen Abstand zueinander aufweisen, der der Breite des Segments 3 entspricht. Die Fugen 17 zwischen den Wandplatten 4 werden anschließend mit einem Vergussmörtel verfüllt. For the production of a first segment 3, two wall panels 4 are placed in a vertical position as shown in FIG. 4 on a mounting place 10. In each wall plate 4, a rib 50, which is non-positively connected to the wall plate 4, is arranged. The ribs 50 are made of T-shaped steel beams 18, the webs 24 are arranged normal to the center planes of the wall panels 4. In the next step, according to FIG. 5, two further wall panels 4, each with a rib 50, are set up on the assembly station 10 such that the median plane of these wall panels 4 is parallel to the median plane of the wall panels 4 erected in the first step and that the outsides of the wall panels 4 are at a distance have to each other, which corresponds to the width of the segment 3. The joints 17 between the wall panels 4 are then filled with a grout.
Im nächsten Schritt wird gemäß Fig. 6 zwischen den unteren Rändern 13 der Wandplatten 4 eine Bodenplatte 5 ausgebildet. Die Oberfläche des Montageplatzes 10 ist bei diesem Beispiel mit einer Schalung 21 ausgestattet, so dass die Bodenplatte 5 in Ortbeton auf dem Montageplatz 10 hergestellt werden kann. Die Wandplatten 4 weisen an den unteren Rändern 13 Anschlussbewehrungen auf, die durch Ortbeton mit der Bewehrung der Bodenplatte 5 verbunden werden. Die Verbindung der Wandplatten 4 mit der Bodenplatte 5 ist statisch vorteilhaft, weil dadurch Schubkräfte zwischen den unteren Rändern 13 der Wandplatten 4 und der Bodenplatte 5 übertragen werden können. In der Bodenplatte 5 angeordnete Rippen 40 werden mit den in den Wandplatten 4 angeordneten Rippen 50 in Rahmenecken 26 kraftschlüssig und biegesteif verbunden. In the next step, as shown in FIG. 6, a bottom plate 5 is formed between the lower edges 13 of the wall panels 4. The surface of the assembly station 10 is equipped in this example with a formwork 21, so that the bottom plate 5 can be made in situ concrete on the assembly station 10. The wall panels 4 have at the lower edges 13 connection reinforcements, which are connected by in-situ concrete with the reinforcement of the bottom plate 5. The connection of the wall panels 4 with the bottom plate 5 is statically advantageous because it shear forces between the lower edges 13 of the wall panels 4 and the bottom plate 5 can be transmitted. Arranged in the bottom plate 5 ribs 40 are connected to the arranged in the wall panels 4 ribs 50 in frame corners 26 frictionally and rigidly.
Im nächsten Schritt werden gemäß Fig. 7 zwei vorgefertigte Deckplatten 6 mit jeweils einer Rippe 41 montiert. Die Rippen 41 mit den an den Enden angeordneten Rahmenecken 26 weisen jeweils eine Länge auf, die größer ist als die Breite der Deckplatten 6. Die Rippen 41 der Deckplatten 6 werden bei dem Montagevorgang auf den in den Wandplatten 4 angeordneten Rippen 50 aufgesetzt und mit diesen kraftschlüssig und biegesteif verbunden. Durch die biegesteife Verbindung der in den Wandplatten 4 angeordneten Rippen 50 mit den
in den Bodenplatten 5 und in den Deckplatten 6 angeordneten Rippen 8 in den Rahmenecken 26 werden in dem Segment 3 zwei Querrahmen 20 gebildet. Diese Querrahmen 20 sind so steif, dass sie dem Segment 3 für spätere Hebe,- Transport- und Montagevorgänge eine ausreichende Steifigkeit verleihen. Die Übertragung von Schubkräften zwischen der Deckplatte 6 und den Wandplatten 4 erfolgt bei diesem Beispiel über die Querrahmen 20. Die Querrahmen 20 liegen bei diesem Beispiel in Ebenen, die mit der Längsachse des Segments 3 einen Winkel von 90° einschließen. In the next step, as shown in FIG. 7, two prefabricated cover plates 6 each having a rib 41 are mounted. The ribs 41 with the arranged at the ends frame corners 26 each have a length which is greater than the width of the cover plates 6. The ribs 41 of the cover plates 6 are placed in the assembly process on the arranged in the wall panels 4 ribs 50 and with these positively and rigidly connected. Due to the rigid connection of the arranged in the wall panels 4 ribs 50 with the arranged in the bottom plates 5 and in the cover plates 6 ribs 8 in the frame corners 26 in the segment 3 two transverse frames 20 are formed. These transverse frames 20 are so stiff that they give the segment 3 sufficient rigidity for later lifting, transporting and assembly operations. The transmission of shear forces between the cover plate 6 and the wall plates 4 takes place in this example on the transverse frame 20. The transverse frame 20 are in this example in planes that include an angle of 90 ° with the longitudinal axis of the segment 3.
Der Übersichtlichkeit halber ist in der Fig. 4 bis Fig. 7 die Herstellung eines Segments 3 aus vier Wandplatten 4, einer Bodenplatte« 5 und zwei Deckplatten 6 dargestellt. Es wäre mit dem erfindungsgemäßen Verfahren wegen der Verwendung vorgefertigter Platten 7 jedoch auch möglich ein viel längeres Segment 3 beispielsweise aus zwanzig Wandplatten 4, einer Bodenplatte« 5 und zehn Deckplatten 6 innerhalb einer Woche herzustellen. Unter Einhaltung des bei der Anwendung des Taktschiebeverfahrens üblichen Wochentakts könnte auf diese Weise die Bauzeit wesentlich verkürzt und die Anzahl der Kopplungen für die Spannglieder 15 reduziert werden. For reasons of clarity, the production of a segment 3 from four wall panels 4, one floor panel 5 and two cover panels 6 is shown in FIGS. 4 to 7. However, it would also be possible with the inventive method because of the use of prefabricated panels 7 to produce a much longer segment 3, for example, twenty wall panels 4, one floor panel 5 and ten cover panels 6 within a week. In compliance with the customary in the application of the clock shift method weekly clock construction time could be significantly shortened and the number of couplings for the tendons 15 can be reduced in this way.
Fig. 8 zeigt die Herstellung eines Brückenträgers 1 mit Segmenten 3 aus dünnwandigen Platten 7 und Querrahmen 20 mit dem Taktschiebeverfahren. Die gemäß den in den Fig. 4 bis Fig. 7 dargestellten in Abschnitten hergestellten Segmente 3 werden am rechten Ende des Brückenträgers 1 positioniert und mit Spanngliedern 15 an den bereits bestehenden Teil des Brückenträgers 1 angeschlossen. Anschließend wird der Brückenträger 1 um die Länge des zuletzt montierten Segments 3 nach links verschoben. Das Montieren der Segmente 3 und Verschieben des Brückenträgers 1 wird so oft wiederholt, bis das linke Ende des Brückenträgers 1 das in der Fig. 8 und der Fig. 9 auf der linken Seite angeordnete Widerlager 33 erreicht. Fig. 8 shows the preparation of a bridge girder 1 with segments 3 of thin-walled plates 7 and transverse frame 20 with the clock shift method. The sectioned segments 3 shown in FIGS. 4 to 7 are positioned at the right end of the bridge girder 1 and connected with tendons 15 to the already existing part of the bridge girder 1. Subsequently, the bridge girder 1 is shifted to the left by the length of the last mounted segment 3. The mounting of the segments 3 and displacement of the bridge girder 1 is repeated until the left end of the bridge girder 1 reaches the abutment 33 arranged in FIG. 8 and FIG. 9 on the left side.
Besonders vorteilhaft bei der Anwendung des erfindungsgemäßen Verfahrens bei diesem Beispiel ist, dass das Gewicht des Brückenträgers 1 im Bauzustand, während des Verschiebens des Brückenträgers 1, klein ist, weil die Segmente 3 aus dünnwandigen Platten 7 bestehen, die durch Querrahmen 20 ausgesteift sind. Particularly advantageous in the application of the method according to the invention in this example is that the weight of the bridge girder 1 during construction, during the displacement of the bridge girder 1, is small, because the segments 3 consist of thin-walled plates 7, which are stiffened by transverse frame 20.
Der in der Fig. 10 dargestellte Querschnitt, ist trotz seines geringen Gewichts ausreichend steif ausgebildet, um die während des Einschiebens des Brückenträgers 1 auftretenden Beanspruchungen aufzunehmen. Sobald der Brückenträger 1 seine endgültige Lage 12 erreicht hat, kann mit dem Aufbringen von Schichten 9 aus bewehrtem Beton auf die Platten 7 begonnen werden. Gemäß Fig. 11 wird zunächst auf der Bodenplatte 5 eine Schicht 9 aus bewehrtem Beton in der statisch erforderlichen Dicke aufgebracht. Das Gewicht der Schicht 9 aus bewehrtem Beton wird von der Bodenplatte 5 des Segments 3 über Biegung in Längsrichtung des Brückenträgers 1 abgetragen und in die Querrahmen 20 eingeleitet. Über die Querrahmen 20 wird das Gewicht der Schicht 9 aus bewehrtem Beton in den Brückenträger 1 eingeleitet und über die auf den Pfeilern 34 und Widerlagern 33 angeordneten Lager abgetragen. Die Dicke der Bodenplatte 5 kann zum Beispiel mit 80mm
ausgeführt werden, wenn die Querrahmen 20 einen Abstand von 2m aufweisen und die Summe der Dicken der Bodenplatte 5 und der Schicht 9 aus bewehrtem Beton 250mm beträgt. The cross-section shown in FIG. 10, despite its low weight, is sufficiently rigid to absorb the stresses occurring during the insertion of the bridge girder 1. Once the bridge girder 1 has reached its final position 12, it is possible to start applying layers 9 of reinforced concrete to the plates 7. According to FIG. 11, a layer 9 of reinforced concrete in the statically required thickness is first applied to the base plate 5. The weight of the layer 9 of reinforced concrete is removed from the bottom plate 5 of the segment 3 via bending in the longitudinal direction of the bridge girder 1 and introduced into the transverse frame 20. About the transverse frame 20, the weight of the layer 9 of reinforced concrete is introduced into the bridge girder 1 and removed via the arranged on the pillars 34 and abutments 33 warehouse. The thickness of the bottom plate 5 can be 80mm, for example are performed when the transverse frames 20 have a distance of 2m and the sum of the thicknesses of the bottom plate 5 and the layer 9 of reinforced concrete is 250mm.
Im nächsten Schritt wird gemäß Fig. 12 eine Schicht 9 aus bewehrtem Beton auf die Deckplatte 6 aufgebracht. Die Abtragung des Gewichts der Schicht 9 aus bewehrtem Beton erfolgt vorteilhaft über die Deckplatte 6 in Längsrichtung des Brückenträgers 1 und anschließend über die Querrahmen 20. Nach dem Erhärten der Schicht 9 aus bewehrtem Beton auf der Deckplatte 6 sind die Deckplatte 6 und die Schicht 9 aus bewehrtem Beton monolithisch miteinander verbunden und bilden ein Stück der Fahrbahnplatte 22. In the next step, according to FIG. 12, a layer 9 of reinforced concrete is applied to the cover plate 6. The removal of the weight of the layer 9 of reinforced concrete is advantageously carried out over the cover plate 6 in the longitudinal direction of the bridge girder 1 and then on the transverse frame 20. After hardening of the layer 9 of reinforced concrete on the cover plate 6, the cover plate 6 and the layer 9 are made reinforced concrete monolithically connected to each other and form a piece of the deck slab 22nd
Im nächsten Schritt werden gemäß Fig. 13 auf den Innenseiten der Wandplatten 4 Schichten 9 aus bewehrtem Beton aufgebracht. Das Aufbringen des Betons kann beispielsweise mit Spritzbeton erfolgen. Alternativ kann im Inneren des Brückenträgers 1 eine Schalung aufgebaut werden und der Beton mittels einer Betonpumpe von der Oberseite der Fahrbahnplatte 22 eingefüllt werden. Der Druck des Frischbetons muss von der im Inneren des Brückenträgers 1 montierten Schalung und von den Wandplatten 4 aufgenommen werden. Die Wandplatten 4 leiten den Betonierdruck über Biegung zu den Querrahmen 20. In the next step, as shown in FIG. 13, layers 9 of reinforced concrete are applied to the insides of the wall panels 4. The application of the concrete can be done for example with shotcrete. Alternatively, a formwork can be constructed in the interior of the bridge girder 1 and the concrete can be filled by means of a concrete pump from the top of the carriageway slab 22. The pressure of the fresh concrete must be absorbed by the formwork mounted inside the bridge girder 1 and by the wall plates 4. The wall panels 4 direct the concreting pressure over bending to the transverse frame 20.
Im nächsten Schritt werden gemäß Fig. 14 die Druckstreben 23 und die auskragenden Teile der Fahrbahnplatte 22 hergestellt. Abschließend wird auf der Oberseite der Fahrbahnplatte 22 eine Abdichtung aufgebracht und ein Fahrbahnbelag hergestellt. In the next step, according to FIG. 14, the pressure struts 23 and the projecting parts of the roadway slab 22 are produced. Finally, a seal is applied to the top of the deck slab 22 and a pavement is produced.
Die Herstellung eines beispielhaften Brückenträgers 1 mit dem erfindungsgemäßen Verfahren gemäß einer zweiten Ausführungsform ist in den Fig. 15 bis Fig. 20 dargestellt. The production of an exemplary bridge girder 1 with the method according to the invention in accordance with a second embodiment is shown in FIGS. 15 to 20.
Die Fig. 15 zeigt die vertikale Montage von Segmenten 3 zur Herstellung von zwei Teilstücken 2 eines Brückenträgers 1 gemäß dem in der US 7,996,944 B2 beschriebenen Verfahren. Bei diesem Verfahren ist es von großer Bedeutung, dass das Gewicht der Teilstücke 2 des Brückenträgers 1 während des Klappvorganges möglichst klein ist, um die Gelenke und die Hubvorrichtungen wirtschaftlich herstellen zu können. Auch während der Hubvorgänge und vertikalen Montage der Segmente 3 ist ein geringeres Gewicht der Segmente 3 von Vorteil. Die Fugen 16 zwischen den Segmenten 3 können als trockene Fugen 16 ausgebildet werden, wenn die Stirnfläche der Segmente 3 durch einen Fräsvorgang so bearbeitet werden, dass sie eine passgenaue Oberfläche aufweisen. FIG. 15 shows the vertical assembly of segments 3 for producing two sections 2 of a bridge girder 1 according to the method described in US Pat. No. 7,996,944 B2. In this method, it is of great importance that the weight of the sections 2 of the bridge girder 1 during the folding process is as small as possible in order to produce the joints and the lifting devices economically. Even during the lifting operations and vertical mounting of the segments 3, a lower weight of the segments 3 is advantageous. The joints 16 between the segments 3 can be formed as dry joints 16, when the end face of the segments 3 are machined by a milling process so that they have a precisely fitting surface.
Die Fig. 16 zeigt, dass die Teilstücke 2 des Brückenträgers 1 aus Segmenten 3 bestehen, die aus dünnwandigen Platten 7 gebildet werden. Die Bodenplatte 5, die Deckplatte 6 und die zwei Wandplatten 4 sind mit Rippen 8 verbunden. Durch die biegesteife Verbindung der Rippen 8 entsteht ein Querrahmen 20, der zur Aussteifung eines Segments 3 dient. Die Rippen 8 weisen Aussparungen 19 auf, die das Gewicht der Rippen 8 reduzieren und günstig für das Verlegen einer in Längsrichtung der Segmente 3 angeordneten und auf den Platten 7 verlegten Bewehrung sind.
Die Verbindung der Rippe 50 der Wandplatte 4 mit der Rippe 40 der Bodenplatte 5 in der linken unteren Rahmenecke 26 der Fig. 16 ist in der Fig. 17 in vergrößertem Maßstab dargestellt. Die Rippen 8 bestehen aus T-förmigen Stahlträgern 18, die in den Stegen 24 Aussparungen 19 aufweisen. Die Fig. 17 zeigt, dass die Stege 24 der T-förmigen Stahlträger 18 teilweise in den Beton der Wandplatte 4 und der Bodenplatte 5 eingebettet sind. Dadurch sind die Rippen 8 schubfest mit der Wandplatte 4 und der Bodenplatte 5 verbunden, was günstig für die Aufnahme von Biegemomenten in den Querrahmen 20 ist, weil die Rippen 8 und ein Teil der Platten 7 wie ein gemeinsamer Bauteil wirken. Zur besseren Verbindung der Stege 24 der T-förmigen Stahlträger 18 mit den Platten 7 können an dem im Beton eingebetteten Teil der Stege 24 Bewehrungsstäbe angeschweißt werden. In der Rahmenecke 26 des Querrahmens 20 werden die Rippen 8 mit zusätzlichen Stahlplatten 28 verschweißt. Mit Schraubverbindungen 27 und der in der Bodenplatte 5 eingebetteten Anschlussbewehrung aus der Wandplatte 4 ist es möglich, eine biegesteife Rahmenecke 26 herzustellen, die sowohl positive als auch negative Biegemomente aufnehmen kann. FIG. 16 shows that the sections 2 of the bridge girder 1 consist of segments 3, which are formed from thin-walled plates 7. The bottom plate 5, the cover plate 6 and the two wall plates 4 are connected to ribs 8. Due to the rigid connection of the ribs 8 creates a transverse frame 20, which serves to stiffen a segment 3. The ribs 8 have recesses 19, which reduce the weight of the ribs 8 and are favorable for the laying of a longitudinally arranged in the segments 3 and laid on the plates 7 reinforcement. The connection of the rib 50 of the wall plate 4 with the rib 40 of the bottom plate 5 in the left lower frame corner 26 of Fig. 16 is shown in Fig. 17 in an enlarged scale. The ribs 8 consist of T-shaped steel beams 18 which have recesses 19 in the webs 24. FIG. 17 shows that the webs 24 of the T-shaped steel girders 18 are partially embedded in the concrete of the wall plate 4 and the bottom plate 5. As a result, the ribs 8 are connected to the wall plate 4 and the bottom plate 5 in a shear-resistant manner, which is favorable for absorbing bending moments in the transverse frame 20, because the ribs 8 and part of the plates 7 act as a common component. For better connection of the webs 24 of the T-shaped steel beams 18 with the plates 7 24 reinforcing rods can be welded to the embedded in the concrete part of the webs. In the frame corner 26 of the transverse frame 20, the ribs 8 are welded to additional steel plates 28. With screw 27 and embedded in the bottom plate 5 connection reinforcement of the wall plate 4, it is possible to produce a rigid frame corner 26, which can accommodate both positive and negative bending moments.
Die Verbindung der Rippe 50 der Wandplatte 4 mit der Rippe 41 der Deckplatte 6 in der linken oberen Rahmenecke 26 der Fig. 16 ist in der Fig. 18 in vergrößertem Maßstab dargestellt. Die Rippen 8 sind zur Ausbildung der Rahmenecke 26 mit zusätzlichen Stahlplatten 28 ausgestattet, die an den Rippen 8 angeschweißt werden. Mit Schraubverbindungen 27 kann eine biegesteife Verbindung der in der Wandplatte 4 angeordneten Rippe 50 mit der in der Deckplatte 6 angeordneten Rippe 41 hergestellt werden. Zur Ausbildung einer biegesteifen Rahmenecke 26, die zur Übertragung von positiven und negativen Momenten geeignet ist, wird es erforderlich sein, einen Teil der in der Wandplatte 4 und in der Deckplatte 6 angeordneten Bewehrung aus Betonstahl mit der Stahlplatte 28 zu verschweißen. The connection of the rib 50 of the wall plate 4 with the rib 41 of the cover plate 6 in the left upper frame corner 26 of Fig. 16 is shown in Fig. 18 in an enlarged scale. The ribs 8 are provided to form the frame corner 26 with additional steel plates 28 which are welded to the ribs 8. With screw 27, a rigid connection of the arranged in the wall plate 4 rib 50 can be made with the arranged in the cover plate 6 rib 41. To form a rigid frame corner 26, which is suitable for the transmission of positive and negative moments, it will be necessary to weld part of the reinforcing steel reinforcement arranged in the wall plate 4 and in the cover plate 6 to the steel plate 28.
Die Fig. 19 zeigt ein der Fig. 17 entsprechendes Detail in einem späteren Bauzustand nach dem Ausklappen der Teilstücke 2 des Brückenträgers 1 und dem Aufbringen einer Schicht 9 aus bewehrtem Beton auf der Bodenplatte 5. Zur Herstellung der Schicht 9 aus bewehrtem Beton auf den Wandplatten 4 werden bei diesem Beispiel dünnwandige Fertigteilplatten 30 aus ultrahochfestem Beton mit einer textilen Bewehrung von der Oberseite des Brückenträgers 1 so eingeschoben, dass jede Fertigteilplatte 30 auf den Flanschen 25 von zwei T-förmigen Stahlträgern 18 aufliegt. FIG. 19 shows a detail corresponding to FIG. 17 in a later construction state after unfolding the sections 2 of the bridge girder 1 and applying a layer 9 of reinforced concrete to the floor slab 5. For producing the layer 9 of reinforced concrete on the wall slabs In this example, thin-walled prefabricated panels 30 made of ultra high-strength concrete with a textile reinforcement are inserted from the upper side of the bridge girder 1 in such a way that each precast slab 30 rests on the flanges 25 of two T-shaped steel girders 18.
Ein Schnitt durch zwei Fertigteilplatten 30 und eine Wandplatte 4 ist in der Fig. 20 dargestellt. Es kann vorteilhaft sein, zwischen den Fertigteilplatten 30 und den Flanschen 25 der T- förmigen Stahlträger 18 Dichtungsbänder 29 anzuordnen, um zu gewährleisten das beim Herstellen der Schicht 9 aus bewehrtem Beton auf den Wandplatten 4 kein Beton in das Innere des Brückenträgers 1 austreten kann. Das Einbringen des Betons in den durch die Wandplatten 4 und die Fertigteilplatten 30 gebildeten Hohlraum 31 kann mittels einer Betonpumpe von der Oberseite der Fahrbahnplatte 22 erfolgen. Der Druck des Frischbetons kann von den Wandplatten 4 und den Fertigteilplatten 30 aufgenommen und zu den Querrahmen 20 geleitet werden. Die Stege 24 der T-förmigen Stahlträger 18 weisen Verankerungselemente 32 auf, um eine sichere Aufnahme des Betonierdrucks in die
Querrahmen 20 zu ermöglichen. Als Verankerungselemente 32 können Bewehrungsstäbe verwendet werden, die an den Steg 24 eines T-förmigen Stahlträgers 18 angeschweißt werden und in der Wandplatte 4 eingebettet sind A section through two prefabricated panels 30 and a wall panel 4 is shown in FIG. It may be advantageous to place sealing strips 29 between the prefabricated panels 30 and the flanges 25 of the T-shaped steel girders 18 to ensure that no concrete can escape into the interior of the bridge girder 1 when the layer 9 of reinforced concrete is formed on the wall panels 4. The introduction of the concrete into the cavity 31 formed by the wall panels 4 and the prefabricated panels 30 can take place by means of a concrete pump from the top of the carriageway panel 22. The pressure of the fresh concrete can be absorbed by the wall panels 4 and the precast panels 30 and directed to the transverse frames 20. The webs 24 of the T-shaped steel beams 18 have anchoring elements 32 in order to safely accommodate the concreting pressure in the To allow transverse frame 20. As anchoring elements 32 reinforcing bars can be used, which are welded to the web 24 of a T-shaped steel beam 18 and embedded in the wall plate 4
Die Herstellung eines beispielhaften Brückenträgers 1 mit dem erfindungsgemäßen Verfahren gemäß einer dritten Ausführungsform ist in den Fig. 21 bis Fig. 25 beschrieben. The production of an exemplary bridge girder 1 with the method according to the invention according to a third embodiment is described in FIGS. 21 to 25.
Die Wandplatten 4 werden bei diesem Beispiel im Match-Cast-Verfahren hergestellt. Bei diesem Verfahren dient die Stirnfläche des zuletzt hergestellten Bauteils als ein Teil der Schalung 21 für den nächsten Bauteil. Durch diese Herstellungsmethode ist es möglich die Segmente 3 vorzufertigen und am Einbauort 11 mit einer trockenen Fuge 16 oder einer Fuge 16 mit einer dünnen Epoxidharzschicht aneinander zu fügen. The wall panels 4 are made in this example in a match-cast process. In this method, the end face of the last produced component serves as a part of the formwork 21 for the next component. By this manufacturing method, it is possible to prefabricate the segments 3 and add to the installation site 11 with a dry joint 16 or a joint 16 with a thin Epoxidharzschicht together.
Die Fig. 21 zeigt einen Bauzustand bei dem zwei im Match-Cast-Verfahren hergestellte Wandplatten 4 aufgestellt und mit einer trockenen Fuge 16 an ein bereits fertiggestelltes Segment 3 angeschlossen werden. Die Bodenplatte 5 eines herzustellenden Segments 3 wurde gegen die Bodenplatte 5 des bereits fertiggestellten Segments 3 im Match-Cast- Verfahren betoniert. Die Rippen 8 werden bei diesem Beispiel aus bewehrtem Beton hergestellt. Nach der Herstellung der Bodenplatte 5 wird die mit der Bodenplatte 5 über eine Anschlussbewehrung verbundene Rippe 40 betoniert und mit den Rippen 50, die mit den Wandplatten 4 verbunden sind, kraftschlüssig und biegesteif verbunden. FIG. 21 shows a construction state in which two wall panels 4 produced by the match casting method are set up and connected with a dry joint 16 to an already finished segment 3. The bottom plate 5 of a segment 3 to be produced was concreted against the bottom plate 5 of the already completed segment 3 in a match-casting process. The ribs 8 are made of reinforced concrete in this example. After the base plate 5 has been produced, the rib 40 connected to the base plate 5 via a connecting reinforcement is concreted and joined to the ribs 50, which are connected to the wall plates 4, in a force-fitting and rigid manner.
Im nächsten Schritt wird die Deckplatte 6 im Match-Cast-Verfahren hergestellt. Gleichzeitig wird die mit der Deckplatte 6 verbundene Rippe 41 hergestellt. Die mit der Deckplatte 6 verbundene Rippe 41 ist bei diesem Beispiel unter der Deckplatte 6 angeordnet. Über eine in den Rippen 50 der Wandplatte 4 angeordnete Anschlussbewehrung wird die Rippe 41 der Deckplatte 6 kraftschlüssig und biegesteif mit den Rippen 50 der Wandplatte 4 verbunden. In the next step, the cover plate 6 is produced in a match-cast process. At the same time connected to the cover plate 6 rib 41 is produced. The rib 41 connected to the cover plate 6 is arranged below the cover plate 6 in this example. About a arranged in the ribs 50 of the wall plate 4 connection reinforcement the rib 41 of the cover plate 6 is non-positively and rigidly connected to the ribs 50 of the wall plate 4.
Am Montageplatz 10 werden jeweils sechs Segmente 3 zu einem Teilstück 2 eines Brückenträgers 1 mit in Längsrichtung des Brückenträgers 1 angeordneten Spanngliedern 15 zusammengefügt. Die Fig. 22 zeigt einen Bauzustand bei dem ein Teilstück 2 des Brückenträgers 1 auf einem Widerlager 33 und dem Pfeiler 34 aufgelagert ist und das zweite Teilstück 2 des Brückenträgers 1 mit zwei Kränen, die der Übersichtlichkeit halber in Fig. 22 nicht dargestellt sind, eingehoben wird. At the assembly location 10, six segments 3 are joined together to form a section 2 of a bridge girder 1 with tendons 15 arranged in the longitudinal direction of the bridge girder 1. Fig. 22 shows a construction state in which a portion 2 of the bridge girder 1 is superimposed on an abutment 33 and the pillar 34 and the second portion 2 of the bridge girder 1 with two cranes, which are not shown in FIG. 22 for clarity, lifted becomes.
Die durch die Rippen 8 gebildeten Querrahmen 20 sind bei diesem Beispiel in Ebenen angeordnet, die einen Winkel α von 90° mit den Längsachsen 36 der Segmente 3 einschließen. The transverse frames 20 formed by the ribs 8 are in this example arranged in planes which enclose an angle α of 90 ° with the longitudinal axes 36 of the segments 3.
Die Fig. 23 zeigt einen Bauzustand, nach dem Aufbringen von Schichten 9 aus bewehrtem Beton auf den Bodenplatten 5 und den Deckplatten 6. Auf den Wandplatten 4 der Segmente 3 wird bei diesem Beispiel keine Schicht 9 aus bewehrtem Beton aufgebracht. Zur Herstellung einer Fahrbahnplatte 22 wird eine Schicht 9 aus bewehrtem Beton auf den Deckplatten 6 von allen Segmenten 3 aufgebracht. Auf die Bodenplatte 5 wird bei diesem Beispiel nur im Bereich
des in der Mitte angeordneten Pfeilers 34 eine Schicht 9 aus bewehrtem Beton aufgebracht, um die Höhe der Druckzone im Bereich der negativen Momente zu vergrößern. Fig. 23 shows a construction state after applying layers 9 of reinforced concrete on the floor panels 5 and the cover plates 6. On the wall panels 4 of the segments 3, no layer 9 of reinforced concrete is applied in this example. To produce a roadway slab 22, a layer 9 of reinforced concrete is applied to the cover plates 6 of all segments 3. On the bottom plate 5 is in this example only in the area of the centered pillar 34 applied a layer 9 of reinforced concrete to increase the height of the pressure zone in the range of negative moments.
Die Fig. 24 zeigt einen Querschnitt durch ein Teilstück 2 des Brückenträgers 1, während des Einhebens. Die Segmente 3 des Teilstücks 2 bestehen aus Wandplatten 4, Bodenplatten 5 und Deckplatten 6 und sind durch Querrahmen 20 ausgesteift. Fig. 24 shows a cross section through a portion 2 of the bridge girder 1, during the lifting. The segments 3 of the section 2 consist of wall panels 4, bottom plates 5 and cover plates 6 and are stiffened by transverse frame 20.
Die Fig. 25 zeigt einen Querschnitt durch den Brückenträger 1 in der endgültigen Lage 12 nach dem Aufbringen von Schichten 9 aus bewehrtem Beton auf die Deckplatten 6 in allen Segmenten 3 und den Bodenplatten 5 von zwei Segmenten 3. FIG. 25 shows a cross section through the bridge girder 1 in the final layer 12 after the application of layers 9 of reinforced concrete on the cover plates 6 in all segments 3 and the bottom plates 5 of two segments 3.
Die Herstellung eines beispielhaften Brückenträgers 1 mit dem erfindungsgemäßen Verfahren gemäß einer vierten Ausführungsform ist in der Fig. 26 und der Fig. 27 dargestellt. The production of an exemplary bridge girder 1 with the method according to the invention according to a fourth embodiment is shown in FIG. 26 and FIG. 27.
Die Fig. 26 zeigt die Herstellung eines Segments 3. Die Wandplatten 4 weisen in der Ansicht eine trapezförmige Form auf. Die Höhe der Wandplatten 4 ändert sich in Längsrichtung des Segments 3. Die Rippen 50 der Wandplatten 4 sind mit den Rippen 40 der Bodenplatte 5 verbunden. Die Rippen 8 liegen in einer Ebene, die nicht normal zu der Längsachse des Segments 3 ist. FIG. 26 shows the production of a segment 3. The wall panels 4 have a trapezoidal shape in the view. The height of the wall panels 4 changes in the longitudinal direction of the segment 3. The ribs 50 of the wall panels 4 are connected to the ribs 40 of the bottom panel 5. The ribs 8 lie in a plane which is not normal to the longitudinal axis of the segment 3.
Der Schnitt in Fig. 27 zeigt, dass die Rippen 8 unter einem Winkel α zu der Längsachse 36 der Segmente 3 geneigt sind. Der Winkel α in der Fig. 27 beträgt ca. 120°. Die Fig. 27 zeigt die Herstellung einer Spannbetonbrücke 35 nach dem Freivorbauverfahren. Vier Segmente 3 sind bereits montiert und bilden einen Teil des Brückenträgers 1. Bei diesem Beispiel entfällt der Arbeitsschritt in dem der Brückenträger 1 in die endgültige Lage 12 gebracht wird, weil die Segmente 3 in der endgültigen Lage 12 montiert werden. Die Segmente 3 könnten zum Beispiel mit am Boden positionierten Kränen angehoben werden, am Ende der Kragarme positioniert werden und mit Spanngliedern 15 an den bereits hergestellten Teil des Brückenträgers 1 angeschlossen werden. Das geringe Gewicht der mit dem erfindungsgemäßen Verfahren hergestellten Segmente 3 ist besonders günstig für die schnelle Durchführung der Hebearbeiten und für eine Verringerung der Anzahl der erforderlichen Spannglieder 15 zur Fixierung der Segmente 3 im Vergleich zu dem herkömmlichen Segmentbauverfahren. The section in FIG. 27 shows that the ribs 8 are inclined at an angle α to the longitudinal axis 36 of the segments 3. The angle α in FIG. 27 is approximately 120 °. FIG. 27 shows the production of a prestressed concrete bridge 35 according to the cantilever method. Four segments 3 are already mounted and form part of the bridge girder 1. In this example, the operation in which the girder 1 is brought into the final layer 12 is eliminated because the segments 3 are mounted in the final layer 12. The segments 3 could be raised, for example, with cranes positioned on the ground, positioned at the end of the cantilevers and connected with tendons 15 to the already manufactured part of the bridge girder 1. The low weight of the segments 3 produced by the method according to the invention is particularly favorable for the rapid implementation of the lifting operations and for a reduction in the number of required tendons 15 for fixing the segments 3 in comparison to the conventional segment construction method.
Eine mögliche Herstellungsvariante wäre das Zusammenfügen von mehreren Segmenten 3 zu einem Teilstück 2 eines Brückenträgers 1 und das Einheben und Montieren dieses Teilstücks 2. Dadurch könnte die Anzahl der Hebe- und Spannvorgänge verringert und der Bauablauf beschleunigt werden. A possible manufacturing variant would be the joining of several segments 3 to a section 2 of a bridge girder 1 and the lifting and mounting of this section 2. As a result, the number of lifting and clamping operations could be reduced and the construction process can be accelerated.
Die Herstellung eines beispielhaften Brückenträgers 1 mit einem erfindungsgemäßen Verfahren gemäß einer fünften Ausführungsform ist in den Fig. 28 bis Fig. 38 dargestellt. The production of an exemplary bridge girder 1 with a method according to the invention in accordance with a fifth embodiment is shown in FIGS. 28 to 38.
Zur Herstellung eines ersten Segments 3 gemäß Fig. 31 werden gemäß Fig. 28 auf einem Montageplatz 10 zwei Doppelwände 51 in senkrechter Lage aufgestellt. In jeder Doppelwand
51 ist eine Rippe 52, die kraftschlüssig mit der inneren Wandplatte 53 und der äußeren Wandplatte 54 verbunden ist, angeordnet. Die Rippen 52 bestehen aus T-förmigen Stahlträgern 18, deren Stege 24 normal zu den Mittelebenen der Doppelwände 51 angeordnet werden. For the production of a first segment 3 according to FIG. 31, two double walls 51 are set up in a vertical position according to FIG. 28 on an assembly site 10. In every double wall 51 is a rib 52 which is frictionally connected to the inner wall plate 53 and the outer wall plate 54, respectively. The ribs 52 are made of T-shaped steel beams 18, the webs 24 are arranged normal to the center planes of the double walls 51.
Bei der Herstellung einer Doppelwand 51 kann der Flansch 25 des T-förmigen Stahlträgers 18 an die Bewehrung der zuerst hergestellten Wandplatte 4 angeschweißt werden. Nach dem Einfüllen und Erhärten des Betons zur Herstellung der ersten Wandplatte 4 einer Doppelwand 51, in horizontaler Lage, wird die Doppelwand gewendet und der Steg 24 des T-förmigen Stahlträgers 18 wird in den Frischbeton der zweiten Wandplatte 4 eingedrückt. Nach dem Erhärten des Betons der zweiten Wandplatte 4 sind die beiden Wandplatten 4 durch den T- förmigen Stahlträger 18 miteinander verbunden. Die dem Flansch 25 des T-förmigen Stahlträgers 18 gegenüberliegende Seite des Steges 24 kann als Dübelleiste mit einer Profilierung ausgebildet werden, um die Schubverbindung zwischen dem T-förmigen Stahlträger 18 und der zweiten Wandplatte 4 zu verbessern. Falls es zur Aufnahme des Betonierdrucks, der beim Einfüllen des Betons in den Hohlraum 31 zwischen der inneren Wandplatte 53 und der äußeren Wandplatte 54 entsteht, erforderlich ist, können bei der Herstellung der Doppelwand 51 noch zusätzliche Verbindungselemente eingebaut werden. In the production of a double wall 51, the flange 25 of the T-shaped steel beam 18 can be welded to the reinforcement of the first prepared wall plate 4. After filling and hardening of the concrete for producing the first wall plate 4 of a double wall 51, in a horizontal position, the double wall is turned and the web 24 of the T-shaped steel beam 18 is pressed into the fresh concrete of the second wall plate 4. After hardening of the concrete of the second wall plate 4, the two wall panels 4 are connected to each other by the T-shaped steel beam 18. The flange 25 of the T-shaped steel beam 18 opposite side of the web 24 may be formed as a dowel strip with a profiling to improve the thrust connection between the T-shaped steel beam 18 and the second wall plate 4. If it is required to accommodate the concreting pressure that results when filling the concrete in the cavity 31 between the inner wall plate 53 and the outer wall plate 54, additional connecting elements can be installed in the production of the double wall 51.
Im nächsten Schritt werden gemäß Fig. 29 zwei weitere Doppelwände 51 mit jeweils einer Rippe 52 auf dem Montageplatz 10 so aufgestellt, dass die Mittelebenen dieser Doppelwände 51 parallel zu den Mittelebenen der im ersten Schritt aufgestellten Doppelwände 51 sind und dass die Außenseiten der äußeren Wandplatten 54 einen Abstand zueinander aufweisen, der der Breite des Segments 3 entspricht. Die Fugen 17 zwischen den Wandplatten 4 der Doppelwände 51 werden anschließend mit einem Vergussmörtel verfüllt. In the next step, according to FIG. 29, two further double walls 51, each with a rib 52, are set up on the assembly station 10 such that the center planes of these double walls 51 are parallel to the center planes of the double walls 51 erected in the first step and that the outer sides of the outer wall plates 54 have a distance from one another which corresponds to the width of the segment 3. The joints 17 between the wall panels 4 of the double walls 51 are then filled with a grout.
Im nächsten Schritt wird gemäß Fig. 30 zwischen den unteren Rändern 13 der Doppelwände 51 eine Bodenplatte 5 ausgebildet. Die Oberfläche des Montageplatzes 10 ist bei diesem Beispiel mit einer Schalung 21 ausgestattet, so dass die Bodenplatte 5 in Ortbeton auf dem Montageplatz 10 hergestellt werden kann. Die äußeren Wandplatten 54 der Doppelwände 51 weisen an den unteren Rändern 13 Anschlussbewehrungen auf, die durch Ortbeton mit der Bewehrung der Bodenplatte 5 verbunden werden. Die Verbindung der Doppelwände 51 mit der Bodenplatte 5 ist statisch vorteilhaft, weil dadurch Schubkräfte zwischen den unteren Rändern 13 der Doppelwände 51 und der Bodenplatte 5 übertragen werden können. In der Bodenplatte 5 angeordnete Rippen 40 werden mit den in den Doppelwänden 51 angeordneten Rippen 52 in Rahmenecken 26 kraftschlüssig und biegesteif verbunden. In the next step, as shown in FIG. 30, a bottom plate 5 is formed between the lower edges 13 of the double walls 51. The surface of the assembly station 10 is equipped in this example with a formwork 21, so that the bottom plate 5 can be made in situ concrete on the assembly station 10. The outer wall panels 54 of the double walls 51 have at the lower edges 13 connection reinforcements, which are connected by in-situ concrete with the reinforcement of the bottom plate 5. The connection of the double walls 51 with the bottom plate 5 is statically advantageous because it shear forces between the lower edges 13 of the double walls 51 and the bottom plate 5 can be transmitted. Arranged in the bottom plate 5 ribs 40 are connected to the arranged in the double walls 51 ribs 52 in frame corners 26 frictionally and rigidly.
Im nächsten Schritt werden gemäß Fig. 31 zwei vorgefertigte Deckplatten 6 mit jeweils einer Rippe 41 auf den inneren Wandplatten 53 aufgelegt und montiert. Die Rippen 41 mit den an den Enden angeordneten Rahmenecken 26 weisen jeweils eine Länge auf, die größer ist als die Breite der Deckplatten 6. Die Rippen 41 der Deckplatten 6 werden bei dem Montagevorgang auf den in den Doppelwänden 51 angeordneten Rippen 52 aufgesetzt und mit diesen in den Rahmenecken 26 kraftschlüssig und biegesteif verbunden. Durch die
biegesteife Verbindung der in den Doppelwänden 51 angeordneten Rippen 52 mit den in den Bodenplatten 5 angeordneten Rippen 40 und den in den Deckplatten 6 angeordneten Rippen 41 in den Rahmenecken 26 werden in dem Segment 3 zwei Querrahmen 20 gebildet. Diese Querrahmen 20 sind so steif, dass sie dem Segment 3 für spätere Hebe,- Transport- und Montagevorgänge eine ausreichende Steifigkeit verleihen. Die Übertragung von Schubkräften zwischen der Deckplatte 6 und den Doppelwänden 51 erfolgt bei diesem Beispiel über die Querrahmen 20. Alternativ könnte auch eine Verbindung zwischen den Deckplatten 6 und den inneren Wandplatten 53 der Doppelwände 51 hergestellt werden, um Schubkräfte zwischen den Deckplatten 6 und den Doppelwänden 51 zu übertragen. Diese Verbindung könnte zum Beispiel durch das Verschweißen von in den Deckplatten 6 und in den inneren Wandplatten 53 der Doppelwände 51 eingelegten Einbauteilen erfolgen. Die Querrahmen 20 liegen bei diesem Beispiel in Ebenen, die mit der Längsachse 36 des Segments 3 einen Winkel von 90° einschließen. Auf den oberen Rahmenecken 26, die bei diesem Ausführungsbeispiel aus Stahl bestehen, werden Auflagerkonstruktionen 37 befestigt. Die Auflagerkonstruktionen 37 können aus Stahlrohren bestehen und werden auf der Oberseite der oberen Rahmenecken 26 angeschweißt. Auf den Auflagerkonstruktionen 37 werden Verschublager 38 befestigt, die das in späteren Verfahrensschritten eingesetzte Bewegen eines Wagens 39 in Längsrichtung des Brückenträgers 1 ermöglichen. In the next step, according to FIG. 31, two prefabricated cover plates 6, each with a rib 41, are placed on the inner wall plates 53 and mounted. The ribs 41 with the arranged at the ends frame corners 26 each have a length which is greater than the width of the cover plates 6. The ribs 41 of the cover plates 6 are placed in the assembly process on the arranged in the double walls 51 ribs 52 and with these in the frame corners 26 positively and rigidly connected. By the rigid connection of the ribs 52 arranged in the double walls 51 with the ribs 40 arranged in the bottom plates 5 and the ribs 41 arranged in the cover plates 6 in the frame corners 26, two transverse frames 20 are formed in the segment 3. These transverse frames 20 are so stiff that they give the segment 3 sufficient rigidity for later lifting, transporting and assembly operations. The transmission of shear forces between the cover plate 6 and the double walls 51 takes place in this example on the transverse frame 20. Alternatively, a connection between the cover plates 6 and the inner wall panels 53 of the double walls 51 could be made to shear forces between the cover plates 6 and the double walls 51 to transfer. This connection could be done, for example, by welding in the cover plates 6 and in the inner wall panels 53 of the double walls 51 inserted fixtures. The transverse frames 20 lie in this example in planes which form an angle of 90 ° with the longitudinal axis 36 of the segment 3. On the upper frame corners 26, which are made of steel in this embodiment, support structures 37 are attached. The support structures 37 may be made of steel tubes and welded to the top of the upper frame corners 26. On the support structures 37 Verschublager 38 are attached, which allow the movement of a carriage 39 used in subsequent steps in the longitudinal direction of the bridge girder 1.
Der Übersichtlichkeit halber ist in der Fig. 28 bis Fig. 31 die Herstellung eines Segments 3 aus vier Doppelwänden 51, einer Bodenplatte 5 und zwei Deckplatten 6 dargestellt. Es wäre mit dem erfindungsgemäßen Verfahren jedoch auch möglich ein viel längeres Segment 3 beispielsweise aus zwanzig Doppelwänden 51, einer Bodenplatte 5 und zehn Deckplatten 6 innerhalb einer Woche herzustellen. Unter Einhaltung des bei der Anwendung des Taktschiebeverfahrens üblichen Wochentakts könnte auf diese Weise die Bauzeit wesentlich verkürzt und die Anzahl der Kopplungen für die Spannglieder reduziert werden. For the sake of clarity, the production of a segment 3 from four double walls 51, a bottom plate 5 and two cover plates 6 is shown in FIGS. 28 to 31. However, it would also be possible with the method according to the invention to produce a much longer segment 3, for example, of twenty double walls 51, one base plate 5 and ten cover plates 6 within one week. In compliance with the usual in the application of the clock shift method weekly clock construction time could be significantly shortened and the number of couplings for the tendons can be reduced in this way.
Fig. 32 zeigt die Herstellung eines Brückenträgers 1 mit Segmenten 3 aus Doppelwänden 51, dünnwandigen Platten 7 und Querrahmen 20 mit dem Taktschiebeverfahren. Die gemäß den in den Fig. 28 bis Fig. 31 dargestellten, in Abschnitten hergestellten Segmente 3 werden am rechten Ende des Brückenträgers 1 positioniert und mit Spanngliedern 15 an den bereits bestehenden Teil des Brückenträgers 1 angeschlossen. Anschließend wird der Brückenträger 1 um die Länge des zuletzt montierten Segments 3 nach links verschoben. Das Montieren der Segmente 3 und Verschieben des Brückenträgers 1 wird so oft wiederholt, bis das linke Ende des Brückenträgers 1 das in der Fig. 32 und der Fig. 33 auf der linken Seite angeordnete Widerlager 33 erreicht. Fig. 32 shows the preparation of a bridge girder 1 with segments 3 of double walls 51, thin-walled plates 7 and transverse frame 20 with the clock shift method. The sectioned segments 3 shown in FIGS. 28 to 31 are positioned at the right end of the bridge girder 1 and connected with tendons 15 to the already existing part of the bridge girder 1. Subsequently, the bridge girder 1 is shifted to the left by the length of the last mounted segment 3. The mounting of the segments 3 and displacement of the bridge girder 1 is repeated until the left end of the bridge girder 1 reaches the abutment 33 arranged in FIG. 32 and FIG. 33 on the left side.
Die Fig. 32 und Fig. 33 zeigen, dass auf dem Brückenträger 1 Auflagerkonstruktionen 37 und Verschublager 38 montiert sind. Auf den Verschublagern 38 kann gemäß Fig. 33 ein Wagen 39 in Längsrichtung des Brückenträgers 1 bewegt werden. FIGS. 32 and 33 show that support structures 37 and Verschublager 38 are mounted on the bridge girder 1. On the Verschublagern 38, as shown in FIG. 33, a carriage 39 are moved in the longitudinal direction of the bridge girder 1.
Besonders vorteilhaft bei der Anwendung des erfindungsgemäßen Verfahrens bei diesem Beispiel ist, dass das Gewicht des Brückenträgers 1 im Bauzustand, während des Verschiebens
des Brückenträgers 1, klein ist, weil die Segmente 3 aus dünnwandigen Platten 7 bestehen, die durch Querrahmen 20 ausgesteift sind. Particularly advantageous in the application of the method according to the invention in this example is that the weight of the bridge girder 1 in the construction state, during the displacement of the bridge girder 1, is small, because the segments 3 consist of thin-walled plates 7, which are stiffened by transverse frame 20.
Der in der Fig. 34 dargestellte Querschnitt ist trotz seines geringen Gewichts ausreichend steif ausgebildet, um die während des Einschiebens des Brückenträgers 1 auftretenden Beanspruchungen aufzunehmen. Sobald der Brückenträger 1 seine endgültige Lage 12 erreicht hat, kann mit dem Aufbringen von Schichten 9 aus bewehrtem Beton auf die Platten 7 begonnen werden. Gemäß Fig. 35 wird zunächst auf der Bodenplatte 5 eine Schicht 9 aus bewehrtem Beton in der statisch erforderlichen Dicke aufgebracht. Zum Einbringen der Schicht 9 kann ein Wagen 39 für den Transport des Betons und der Arbeitskräfte verwendet werden. Der Wagen 39 wird dabei auf den Verschublagern 38 in der Längsrichtung des Brückenträgers 1 bewegt und am Einbauort 11 zur Durchführung der Betonierarbeiten positioniert. Das Gewicht der Schicht 9 aus bewehrtem Beton wird von der Bodenplatte 5 des Segments 3 über Biegung in Längsrichtung des Brückenträgers 1 abgetragen und in die Querrahmen 20 eingeleitet. Über die Querrahmen 20 wird das Gewicht der Schicht 9 aus bewehrtem Beton in den Brückenträger 1 eingeleitet und über die auf den Pfeilern 34 und Widerlagern 33 angeordneten Lager 44 abgetragen. Die Dicke der Bodenplatte 5 kann zum Beispiel mit 80mm ausgeführt werden, wenn die Querrahmen 20 einen Abstand von 2m aufweisen und die Summe der Dicken der Bodenplatte 5 und der Schicht 9 aus bewehrtem Beton 250mm beträgt. The cross section illustrated in FIG. 34, despite its low weight, is sufficiently rigid to absorb the stresses occurring during the insertion of the bridge girder 1. Once the bridge girder 1 has reached its final position 12, it is possible to start applying layers 9 of reinforced concrete to the plates 7. According to FIG. 35, a layer 9 of reinforced concrete in the statically required thickness is first applied to the base plate 5. For introducing the layer 9, a carriage 39 can be used for the transport of the concrete and the workers. The carriage 39 is thereby moved on the Verschublagern 38 in the longitudinal direction of the bridge girder 1 and positioned at the installation site 11 for carrying out the concreting work. The weight of the layer 9 of reinforced concrete is removed from the bottom plate 5 of the segment 3 via bending in the longitudinal direction of the bridge girder 1 and introduced into the transverse frame 20. About the transverse frame 20, the weight of the layer 9 of reinforced concrete is introduced into the bridge girder 1 and removed via the arranged on the pillars 34 and abutments 33 bearing 44. The thickness of the bottom plate 5 may be made 80mm, for example, when the transverse frames 20 are spaced 2m apart and the sum of the thicknesses of the bottom plate 5 and the reinforced concrete layer 9 is 250mm.
Im nächsten Schritt wird gemäß Fig. 36 eine Schicht 9 aus bewehrtem Beton auf die Deckplatte 6 aufgebracht. Die Abtragung des Gewichts der Schicht 9 aus bewehrtem Beton erfolgt vorteilhaft über die Deckplatte 6 in Längsrichtung des Brückenträgers 1 und anschließend über die Querrahmen 20. Nach dem Erhärten der Schicht 9 aus bewehrtem Beton auf der Deckplatte 6 sind die Deckplatte 6 und die Schicht 9 aus bewehrtem Beton monolithisch miteinander verbunden und bilden ein Stück der Fahrbahnplatte 22. In the next step, according to FIG. 36, a layer 9 of reinforced concrete is applied to the cover plate 6. The removal of the weight of the layer 9 of reinforced concrete is advantageously carried out over the cover plate 6 in the longitudinal direction of the bridge girder 1 and then on the transverse frame 20. After hardening of the layer 9 of reinforced concrete on the cover plate 6, the cover plate 6 and the layer 9 are made reinforced concrete monolithically connected to each other and form a piece of the deck slab 22nd
Im nächsten Schritt wird gemäß Fig. 37 Beton in die Hohlräume 31 der Doppelwände 51 eingefüllt. Der Betonierdruck wird von den inneren Wandplatten 53 und den äußeren Wandplatten 54 aufgenommen und zu den Rippen 52 weitergeleitet. Falls es statisch erforderlich ist, können zusätzlich Verbindungselemente zwischen den inneren Wandplatten 53 und den äußeren Wandplatten 54 zur Aufnahme des Betonierdrucks vorgesehen werden. In the next step, as shown in FIG. 37, concrete is filled into the cavities 31 of the double walls 51. The concreting pressure is absorbed by the inner wall panels 53 and the outer wall panels 54 and forwarded to the ribs 52. In addition, if it is required statically, connecting members may be provided between the inner wall panels 53 and the outer wall panels 54 for receiving the concreting pressure.
Im nächsten Schritt werden gemäß Fig. 38 die Druckstreben 23 und die auskragenden Teile der Fahrbahnplatte 22 hergestellt. Auch für das Montieren der Druckstreben 23 und das Herstellen der auskragenden Teile der Fahrbahnplatte 22 kann der Einsatz des Wagens 39 vorteilhaft sein. Abschließend wird auf der Oberseite der Fahrbahnplatte 22 eine Abdichtung aufgebracht und ein Fahrbahnbelag hergestellt. In the next step, according to FIG. 38, the pressure struts 23 and the projecting parts of the roadway slab 22 are produced. Also, for the mounting of the struts 23 and the production of the projecting parts of the deck plate 22, the use of the carriage 39 may be advantageous. Finally, a seal is applied to the top of the deck slab 22 and a pavement is produced.
Die Herstellung eines beispielhaften Brückenträgers 1 mit dem erfindungsgemäßen Verfahren gemäß einer sechsten Ausführungsform ist in den Fig. 39 bis Fig. 45 dargestellt.
Die Fig. 39 zeigt die vertikale Montage von Segmenten 3 zur Herstellung von zwei Teilstücken 2 eines Brückenträgers 1 gemäß dem in der US 7,996,944 B2 beschriebenen Verfahren. Bei diesem Verfahren ist es von großer Bedeutung, dass das Gewicht der Teilstücke 2 des Brückenträgers 1 während des Klappvorganges möglichst klein ist, um die Gelenke und die Hubvorrichtungen wirtschaftlich herstellen zu können. Auch während der Hubvorgänge und vertikalen Montage der Segmente 3 ist ein geringes Gewicht der Segmente 3 von Vorteil. Die Fugen 16 zwischen den Segmenten 3 können als trockene Fugen 16 ausgebildet werden, wenn die Stirnfläche der Segmente 3 durch einen Fräsvorgang so bearbeitet werden, dass sie eine passgenaue Oberfläche aufweisen. The production of an exemplary bridge girder 1 with the method according to the invention in accordance with a sixth embodiment is shown in FIGS. 39 to 45. FIG. 39 shows the vertical assembly of segments 3 for producing two sections 2 of a bridge girder 1 according to the method described in US Pat. No. 7,996,944 B2. In this method, it is of great importance that the weight of the sections 2 of the bridge girder 1 during the folding process is as small as possible in order to produce the joints and the lifting devices economically. Even during the lifting operations and vertical assembly of the segments 3, a low weight of the segments 3 is advantageous. The joints 16 between the segments 3 can be formed as dry joints 16, when the end face of the segments 3 are machined by a milling process so that they have a precisely fitting surface.
Die Fig. 40 zeigt, dass die Teilstücke 2 des Brückenträgers 1 aus Segmenten 3 bestehen, die aus dünnwandigen Platten 7 und Doppelwänden 51 gebildet werden. Bei diesem Ausführungsbeispiel werden die Doppelwände 51 und die dünnwandigen Platten 7 vorgefertigt, um die Montagegeschwindigkeit zu erhöhen. Die Fig. 40 zeigt, dass die mit der Bodenplatte 5 verbundene Rippe 40 und die mit der Deckplatte 6 verbundene Rippe 41 mit den Rippen 52 der Doppelwände 51 in den Rahmenecken 26 verbunden werden. Durch die biegesteife Verbindung der Rippe 40, der Rippe 41 und der Rippen 52 in den Rahmenecken 26 entsteht ein Querrahmen 20, der zur Aussteifung eines Segments 3 dient. Die Rippen 40, die mit den Bodenplatten 5 verbunden sind, und die Rippen 41, die mit den Deckplatten 6 verbunden sind, weisen Aussparungen 19 auf, die das Gewicht der Rippen 40 und der Rippen 41 reduzieren und günstig für das Verlegen einer in Längsrichtung der Segmente 3 angeordneten und auf den Bodenplatten 5 und den Deckplatten 6 verlegten Bewehrung sind. Die Rippen 52 in den Doppelwänden 51 werden durch Gitterträger 56 gebildet. Der Durchmesser der Gitterträger 56 muss so groß gewählt werden, dass bei Druckbeanspruchungen in den Diagonalstäben kein Knicken auftreten kann. Bei diesem Ausführungsbeispiel wird die innere Wandplatte 53, bei der wegen der günstigeren Expositionsklasse gemäß Eurocode geringere Anforderungen an die Betonüberdeckung gestellt werden, mit einer geringeren Dicke als die äußere Wandplatte 54 hergestellt, um das Eigengewicht des Segments 3 zu verringern. FIG. 40 shows that the sections 2 of the bridge girder 1 consist of segments 3 which are formed from thin-walled plates 7 and double walls 51. In this embodiment, the double walls 51 and the thin-walled plates 7 are prefabricated to increase the mounting speed. FIG. 40 shows that the rib 40 connected to the bottom plate 5 and the rib 41 connected to the top plate 6 are connected to the ribs 52 of the double walls 51 in the frame corners 26. Due to the rigid connection of the rib 40, the rib 41 and the ribs 52 in the frame corners 26 creates a transverse frame 20, which serves to stiffen a segment 3. The ribs 40, which are connected to the bottom plates 5, and the ribs 41, which are connected to the cover plates 6, have recesses 19 which reduce the weight of the ribs 40 and the ribs 41 and favorable for laying a longitudinal direction Segments 3 are arranged and laid on the bottom plates 5 and the cover plates 6 reinforcement. The ribs 52 in the double walls 51 are formed by lattice girders 56. The diameter of the lattice girder 56 must be chosen so large that no buckling can occur under pressure stresses in the diagonal bars. In this embodiment, the inner wall plate 53, which has lower demands on the concrete cover due to the more favorable Eurocode exposure class, is made smaller in thickness than the outer wall plate 54 to reduce the weight of the segment 3.
Die Verbindung der Rippe 52 der Doppelwand 51 mit der Rippe 40 der Bodenplatte 5 in der linken unteren Rahmenecke 26 der Fig. 40 ist in der Fig. 41 in vergrößertem Maßstab dargestellt. Die Rippe 40, die mit der Bodenplatte 5 verbunden ist, besteht aus einem T- förmigen Stahlträger 18, der in den Stegen 24 Aussparungen 19 aufweist. Die Fig. 41 zeigt, dass der Steg 24 des T-förmigen Stahlträgers 18 teilweise in den Beton der Bodenplatte 5 eingebettet ist. Dadurch ist die Rippe 40 schubfest mit der Bodenplatte 5 verbunden, was günstig für die Aufnahme von Biegemomenten im unteren Teil des Querrahmens 20 ist, weil die Rippe 40 und ein Teil der Bodenplatte 5 wie ein gemeinsamer Bauteil wirken. Zur besseren Verbindung des Steges 24 des T-förmigen Stahlträgers 18 mit der Bodenplatte 5 können an dem im Beton eingebetteten Teil des Steges 24 Bewehrungsstäbe angeschweißt werden. In der Rahmenecke 26 des Querrahmens 20 wird die Rippe 40 der Bodenplatte 5 mit einer zusätzlichen Stahlplatte 28 verschweißt. Am Ende der in der Doppelwand 51 angeordneten Rippe 52 wird eine Stahlplatte 28 im Beton der inneren Wandplatte 53 und der äußeren
Wandplatte 54 eingebettet und verankert. Beim Anschluss der Bodenplatte 5 an die äußere Wandplatte 54 der Doppelwand 51 ist eine Längsfuge 55 ausgebildet, weil die beiden dünnwandigen Platten 7 vorgefertigt werden. Nach dem Zusammenfügen der Bodenplatte 5 und der äußeren Wandplatte 54 wird die Längsfuge 55 mit einem Vergussmörtel verfüllt. Mit Schraubverbindungen 27 ist es möglich, eine biegesteife Rahmenecke 26 herzustellen, die sowohl positive als auch negative Biegemomente aufnehmen kann. The connection of the rib 52 of the double wall 51 with the rib 40 of the bottom plate 5 in the left lower frame corner 26 of Fig. 40 is shown in Fig. 41 in an enlarged scale. The rib 40, which is connected to the bottom plate 5, consists of a T-shaped steel beam 18, which has recesses 19 in the webs 24. Fig. 41 shows that the web 24 of the T-shaped steel beam 18 is partially embedded in the concrete of the bottom plate 5. As a result, the rib 40 is connected to the bottom plate 5 in a shear-resistant manner, which is favorable for absorbing bending moments in the lower part of the transverse frame 20, because the rib 40 and part of the bottom plate 5 act as a common component. For better connection of the web 24 of the T-shaped steel beam 18 with the bottom plate 5 24 reinforcing rods can be welded to the embedded part of the web in the concrete. In the frame corner 26 of the transverse frame 20, the rib 40 of the bottom plate 5 is welded to an additional steel plate 28. At the end of the arranged in the double wall 51 rib 52 is a steel plate 28 in the concrete of the inner wall plate 53 and the outer Wall plate 54 embedded and anchored. When connecting the bottom plate 5 to the outer wall plate 54 of the double wall 51, a longitudinal joint 55 is formed because the two thin-walled plates 7 are prefabricated. After joining the bottom plate 5 and the outer wall plate 54, the longitudinal joint 55 is filled with a grout. With screw 27, it is possible to produce a rigid framework corner 26, which can accommodate both positive and negative bending moments.
Die Verbindung der Rippe 52 der Doppelwand 51 mit der Rippe 41 der Deckplatte 6 in der linken oberen Rahmenecke 26 der Fig. 40 ist in der Fig. 42 in vergrößertem Maßstab dargestellt. Die Rippen 41 sind zur Ausbildung der Rahmenecke 26 mit zusätzlichen Stahlplatten 28 ausgestattet. Mit Schraubverbindungen 27 kann eine biegesteife Verbindung der in der Doppelwand 51 angeordneten Rippe 52 mit der in der Deckplatte 6 angeordneten Rippe 41 hergestellt werden. Zur Ausbildung einer biegesteifen Rahmenecke 26, die zur Übertragung von positiven und negativen Momenten geeignet ist, wird es erforderlich sein, einen Teil der in der Doppelwand 51 und in der Deckplatte 6 angeordneten Bewehrung aus Betonstahl mit den Stahlplatten 28 zu verschweißen. The connection of the rib 52 of the double wall 51 with the rib 41 of the cover plate 6 in the left upper frame corner 26 of Fig. 40 is shown in Fig. 42 in an enlarged scale. The ribs 41 are equipped to form the frame corner 26 with additional steel plates 28. With screw 27, a rigid connection of the arranged in the double wall 51 rib 52 can be made with the arranged in the cover plate 6 rib 41. To form a rigid frame corner 26, which is suitable for the transmission of positive and negative moments, it will be necessary to weld part of the reinforcing steel reinforcing steel arranged in the double wall 51 and in the cover plate 6 to the steel plates 28.
Die Fig. 43 zeigt ein der Fig. 41 entsprechendes Detail in einem späteren Bauzustand nach dem Ausklappen der Teilstücke 2 des Brückenträgers 1 und dem Aufbringen einer Schicht 9 aus bewehrtem Beton auf der Bodenplatte 5. Durch das Aufbringen der Schicht 9 aus bewehrtem Beton wird die Bodenplatte 5 mit der Doppelwand 51 biegesteif verbunden. Bei diesem Ausführungsbeispiel ist der Abstand von der Unterseite der inneren Wandplatte 53 zu der Oberseite der Bodenplatte 5 um 20 mm kleiner als die Dicke der Schicht 9 aus bewehrtem Beton, die auf der Bodenplatte 5 aufgebracht wird. Die innere Wandplatte 53 ist deshalb an ihrer Unterseite in die Schicht 9 aus bewehrtem Beton eingebettet. FIG. 43 shows a detail corresponding to FIG. 41 in a later construction state after unfolding of the sections 2 of the bridge girder 1 and the application of a layer 9 of reinforced concrete on the floor slab 5. The application of the layer 9 of reinforced concrete becomes Base plate 5 rigidly connected to the double wall 51. In this embodiment, the distance from the bottom of the inner wall plate 53 to the top of the bottom plate 5 is smaller by 20 mm than the thickness of the layer 9 of reinforced concrete applied to the bottom plate 5. The inner wall plate 53 is therefore embedded on its underside in the layer 9 of reinforced concrete.
Ein Schnitt durch die Doppelwand 51 ist in der Fig. 44 dargestellt. Das Einbringen des Betons in den durch die innere Wandplatte 53 und die äußere Wandplatte 54 gebildeten Hohlraum 31 kann mittels einer Betonpumpe von der Oberseite der Fahrbahnplatte 22 erfolgen. Der Druck des Frischbetons wird von der inneren Wandplatte 53 und der äußeren Wandplatte 54 aufgenommen und in den Gitterträger 56, der einen Teil des Querrahmens 20 bildet, eingeleitet. A section through the double wall 51 is shown in FIG. 44. The introduction of the concrete into the cavity 31 formed by the inner wall plate 53 and the outer wall plate 54 can take place by means of a concrete pump from the upper side of the roadway plate 22. The pressure of the fresh concrete is absorbed by the inner wall plate 53 and the outer wall plate 54 and introduced into the lattice girder 56, which forms part of the transverse frame 20.
Die Herstellung eines beispielhaften Brückenträgers 1 mit dem erfindungsgemäßen Verfahren gemäß einer siebenten Ausführungsform ist in den Fig. 45 bis Fig. 49 beschrieben. The production of an exemplary bridge girder 1 with the method according to the invention according to a seventh embodiment is described in FIGS. 45 to 49.
In diesem Beispiel wird die Herstellung eines Brückenträgers 1 mit einer Versetzmaschine 42 erläutert. In der englischen Sprache wird eine derartige Versetzmaschine 42 als launching gantry oder erection gantry bezeichnet. Die Fig. 45 zeigt wie ein Teilstück 2 des Brückenträgers 1, das mit Zuggliedern 43 an der Versetzmaschine 42 befestigt ist, abgesenkt wird. Der Übersichtlichkeit halber sind die Segmente 3 und die Fugen 16 zwischen den Segmenten 3 in den Fig. 45 bis Fig. 47 nicht dargestellt. Das Teilstück 2 wird so abgesenkt, dass
ein horizontaler Abstand a zwischen dem an der Versetzmaschine 42 abgehängten Teilstück 2 und dem zuletzt montierten Teilstück 2 verbleibt. Durch diesen horizontalen Abstand a zwischen den Stirnflächen der Teilstücke 2 wird ein Arbeitsraum geschaffen, der ein Koppeln der Spannglieder 15 ermöglicht. Die Spannglieder 15, die aus Spanndrahtlitzen 46, Übergangsstücken 48, Hüllrohren und Verankerungen bestehen sind in dem an der Versetzmaschine 42 abgehängten Teilstück 2 bereits eingebaut. Die Spanndrahtlitzen 46 ragen aus dem rechten Ende des Teilstücks 2 heraus. Nach dem Koppeln der Spannglieder 15 wird das an der Versetzmaschine 42 befestigte Segment 3 nach rechts bewegt und die Fuge 16 zwischen den Teilstücken 2 geschlossen. In this example, the manufacture of a bridge girder 1 with a displacement machine 42 will be explained. In the English language, such a translation engine 42 is referred to as a launching gantry or erection gantry. Fig. 45 shows how a portion 2 of the bridge girder 1, which is fastened with tension members 43 on the displacement machine 42, is lowered. For the sake of clarity, the segments 3 and the joints 16 between the segments 3 in FIGS. 45 to 47 are not shown. The section 2 is lowered so that a horizontal distance a remains between the suspended on the transfer unit 42 section 2 and the last mounted section 2. By this horizontal distance a between the end faces of the sections 2, a working space is created, which allows coupling of the tendons 15. The tendons 15, which consist of tension wire strands 46, transition pieces 48, sheaths and anchors are already installed in the suspended on the Versetzmaschine 42 section 2. The tension wire strands 46 protrude from the right end of the section 2. After coupling the tendons 15, the attached to the Versetzmaschine 42 segment 3 is moved to the right and the joint 16 between the sections 2 closed.
Gemäß Fig. 46 werden im nächsten Arbeitsschritt zusätzliche Zugglieder 43 montiert. Die Zugglieder 43 können an den Auflagerkonstruktionen 37 befestigt werden. Im nächsten Arbeitsschritt werden Schichten 9 aus Beton auf die Bodenplatte 5 und die Deckplatte 6 aufgebracht und Beton in die Hohlräume 31 in den Doppelwänden 51 eingebracht. Die zusätzlichen Zugglieder 43 dienen zur Unterstützung des Teilstücks 2 während des Betoniervorgangs. Nach dem teilweisen Erhärten des am Einbauort eingebrachten Betons, nach einem Zeitraum von beispielsweise 6 bis 48 Stunden, werden die Zugglieder 43 entfernt und das Eigengewicht wird vom Brückenträger 1 aufgenommen. According to FIG. 46, additional tension members 43 are mounted in the next work step. The tension members 43 may be attached to the support structures 37. In the next step, layers 9 of concrete are applied to the bottom plate 5 and the cover plate 6 and concrete is introduced into the cavities 31 in the double walls 51. The additional tension members 43 serve to support the section 2 during the concreting process. After the partial hardening of the introduced at the installation site concrete, after a period of, for example, 6 to 48 hours, the tension members 43 are removed and the weight is absorbed by the bridge girder 1.
Im nächsten Arbeitsschritt wird die Versetzmaschine 42 gemäß Fig. 47 um ein Feld nach links bewegt. Das Gewicht der Versetzmaschine 42 wird über Konsolen 45, die seitlich an den Pfeilern 34 montiert sind, in die Pfeiler 34 eingeleitet. Die Fig. 47 zeigt, dass ein weiteres Teilstück 2 angeliefert wird. Das Teilstück 2 wird während des horizontalen Verschubs entlang des Brückenträgers 1 auf den an der Oberseite der Auflagerkonstruktionen 37 montierten Verschublagern 38 gelagert. Die Fig. 47 zeigt einen Zustand, bei dem an dem linken Ende des gerade angelieferten Teilstücks 2 Zugglieder 43 montiert werden. Die Zugglieder 43 werden nach der Montage auf eine vorgegebene Kraft angespannt, um während des folgenden Vorschubs das zuletzt mit Beton verfüllte Teilstück 2 des Brückenträgers möglichst wenig zu belasten. Anschließend wird das Teilstück 2 so weit nach links verschoben bis die Zugglieder 43 am rechten Ende des Teilstücks 2 montiert werden können. Nach der Montage der Zugglieder 43 am rechten Ende des Teilstücks 2 wird das Teilstück 2 angehoben und nach links transportiert bis eine der Fig. 45 entsprechende Lage erreicht wird. In the next step, the displacement machine 42 is moved to the left as shown in FIG. 47 by one field. The weight of the displacement machine 42 is introduced into the pillars 34 via brackets 45, which are mounted laterally on the pillars 34. FIG. 47 shows that a further section 2 is delivered. The section 2 is mounted during the horizontal displacement along the bridge girder 1 on the Verschublagern 38 mounted on the upper side of the Auflagerkonstruktionen 37. Fig. 47 shows a state in which tension members 43 are mounted on the left end of the section 2 just supplied. The tension members 43 are tensioned after assembly to a predetermined force in order to minimize the load on the last filled with concrete section 2 of the bridge carrier during the following feed. Subsequently, the section 2 is moved so far to the left until the tension members 43 can be mounted at the right end of the section 2. After assembly of the tension members 43 at the right end of the section 2, the section 2 is raised and transported to the left until one of Fig. 45 corresponding position is reached.
Die Fig. 48 zeigt einen Schnitt durch ein Teilstück 2, das mit Zuggliedern 43 an der Versetzmaschine 42 befestigt ist. Der Querschnitt durch das Teilstück 2 zeigt einen Querrahmen 20 durch den die Doppelwände 51 mit der Bodenplatte 5 und der Deckplatte 6 verbunden sind. Auf der oberen Rahmenecke 26 sind Auflagerkonstruktionen 37 mit Verschublagern 38 befestigt. Die Auflagerkonstruktionen 37 können zur Befestigung der Zugglieder 43 verwendet werden. In der Fig. 48 ist auch zu sehen, dass die Stützen der Versetzmaschine 42 auf Konsolen 45 angeordnet sind. Die Konsolen 45 können aus Stahlprofilen bestehen, die mit Spannstangen seitlich am Pfeiler 34 befestigt sind. Die Konsolen 45 und die Spannstangen sind wiederverwendbare Elemente, die nach dem Überfahren mit dem Versetzwagen 39 demontiert werden können.
Die Fig. 49 zeigt einen Schnitt durch zwei Teilstücke 2 des Brückenträgers. Zwischen den Wandplatten 4 der Doppelwände 51 des rechten Teilstücks 2 wurde Beton eingebracht. Das rechte Teilstück 2 ist fast vollständig mit Schichten 9 aus bewehrtem Beton auf der Bodenplatte 5 und der Deckplatte 6 ausgestattet. Lediglich in einem Bereich mit der Länge b am linken Ende des bereits ausbetonierten Teilstücks 2 wurde noch kein Beton auf die Bodenplatte 5 und die Deckplatte 6 aufgebracht, weil in diesem Bereich die Anschlussbewehrung zwischen den beiden Teilstücken 2 untergebracht ist. FIG. 48 shows a section through a section 2 which is fastened with tension members 43 to the displacement machine 42. The cross section through the section 2 shows a transverse frame 20 through which the double walls 51 are connected to the bottom plate 5 and the cover plate 6. On the upper frame corner 26 Auflagerkonstruktionen 37 are secured with Verschublagern 38. The support structures 37 may be used to secure the tension members 43. It can also be seen in FIG. 48 that the supports of the displacement machine 42 are arranged on brackets 45. The brackets 45 may consist of steel profiles which are fastened laterally to the pillar 34 with tension rods. The brackets 45 and the tie rods are reusable elements that can be disassembled after passing over the Versetzwagen 39. FIG. 49 shows a section through two sections 2 of the bridge girder. Between the wall panels 4 of the double walls 51 of the right section 2 concrete was introduced. The right section 2 is almost completely provided with layers 9 of reinforced concrete on the bottom plate 5 and the cover plate 6. Only in a region with the length b at the left end of the already concreted section 2 has no concrete been applied to the bottom plate 5 and the cover plate 6, because in this area the connection reinforcement between the two sections 2 is housed.
Im rechten Teilstück 2 der Fig. 49 ist zwischen den Wandplatten 4 der Doppelwände 51 ein Verankerungsblock 49 aus Beton mit einer Stahlplatte 28 und einem Übergangsstück 48 angeordnet. Bei dem Anspannen des im rechten Teilstück 2 angeordneten Spannglieds 15 wird die Vorspannkraft des Spannglieds 15 auf die Stahlplatte 28 und von dieser auf den Verankerungsblock 49 übertragen. Das Koppeln der Spannglieder 15 erfolgt mit der üblichen Methode in dem Arbeitsraum, der durch den in Fig. 45 dargestellten Abstand a gebildet wird. Nach dem Koppeln der Spanndrahtlitzen 46 wird, wie bereits bei der Erläuterung der Fig. 45 beschrieben, das linke Teilstück 2 nach rechts bewegt. Bei dieser Bewegung findet eine Relativverschiebung zwischen den Spanndrahtlitzen 46 und dem Hüllrohr im linken Teilstück 2 statt. Der dichte Anschluss des Übergangsstücks 48 an das im rechten Teilstück 2 bereits einbetonierte Spannglied 15 wird dadurch erreicht, dass ein Stahlring 47, der im linken Teilstück 2 befestigt ist, an die Stahlplatte 28, die im rechten Teilstück 2 befestigt ist, angepresst wird. Es wäre auch möglich zwischen dem Stahlring 47 und der Stahlplatte 28 eine ringförmige Dichtung aus Moosgummi einzulegen, um das Herstellen einer dichten Verbindung zwischen den Spanngliedern 15 zu gewährleisten. Das Herstellen einer dichten Verbindung zwischen den Spanngliedern 15, die in dem linken und dem rechten Teilstück 2 angeordnet sind, ist wichtig, weil beim Einbringen des Betons in den Hohlraum 31 zwischen den Wandplatten 4 kein Beton in das Spannglied 15 eindringen darf. In the right-hand portion 2 of FIG. 49, an anchoring block 49 made of concrete with a steel plate 28 and a transition piece 48 is arranged between the wall plates 4 of the double walls 51. In the tensioning of the arranged in the right portion 2 clamping member 15, the biasing force of the clamping member 15 is transferred to the steel plate 28 and from there to the anchoring block 49. The coupling of the tendons 15 is carried out by the usual method in the working space, which is formed by the distance a shown in Fig. 45. After coupling the tension wire strands 46, as already described in the explanation of Fig. 45, the left portion 2 is moved to the right. In this movement, a relative displacement between the tension wire strands 46 and the cladding tube in the left part 2 takes place. The tight connection of the transition piece 48 to the prestressed in the right portion 2 clamping member 15 is achieved in that a steel ring 47 which is fixed in the left portion 2, to the steel plate 28 which is fixed in the right part 2, is pressed. It would also be possible to insert an annular seal of sponge rubber between the steel ring 47 and the steel plate 28 to assure a tight connection between the tendons 15. Establishing a tight connection between the tendons 15, which are arranged in the left and right section 2, is important because when introducing the concrete into the cavity 31 between the wall panels 4 no concrete must penetrate into the tendon 15.
In den Beispielen wurde die Herstellung von vorgespannten Brückenträgern 1, die einen hohlkastenförmigen Querschnitt aufweisen, mit dem Taktschiebeverfahren, dem Brückenklappverfahren, dem Freivorbau, mit einer Kranmontage und mit einer Versetzmaschine 42 beschrieben. Sinngemäß kann das erfindungsgemäße Verfahren auch zur Herstellung von Brückenträgern mit anderen Bauverfahren eingesetzt werden. In the examples, the production of prestressed bridge girders 1 having a box-shaped cross-section has been described with the tact shift method, the bridge folding method, the cantilever method, with a crane mounting and with a displacement machine 42. Analogously, the inventive method can also be used for the production of bridge girders with other construction methods.
In den Beispielen wurde die Herstellung der Bodenplatte 5 vor der Herstellung der Deckplatte 6 beschrieben. Es ist mit dem erfindungsgemäßen Verfahren auch möglich, die Deckplatte 6 vor der Bodenplatte 5 oder die Bodenplatte 5 und die Deckplatte 6 gleichzeitig herzustellen. In the examples, the preparation of the bottom plate 5 has been described before the manufacture of the cover plate 6. It is also possible with the method according to the invention to produce the cover plate 6 in front of the base plate 5 or the base plate 5 and the cover plate 6 at the same time.
In den Beispielen wurde die Herstellung von Platten 7 mit angeschlossenen Rippen 8 beschrieben. Es ist mit dem erfindungsgemäßen Verfahren auch möglich die Rippen 8 innerhalb der Dicke der Platten 7 auszubilden.
In den Beispielen wurde das Herstellen der Schichten 9 aus bewehrtem Beton in einem Arbeitsgang beschrieben. Es ist mit dem erfindungsgemäßen Verfahren jedoch auch möglich eine Schicht 9 durch das zeitlich versetzte Herstellen von mehreren dünnen Betonschichten herzustellen. In the examples, the production of plates 7 with attached ribs 8 has been described. It is also possible with the method according to the invention to form the ribs 8 within the thickness of the plates 7. In the examples, the production of the layers 9 of reinforced concrete was described in one operation. However, it is also possible with the method according to the invention to produce a layer 9 by the staggered production of several thin concrete layers.
In den Beispielen wurde die Herstellung von Brückenträgern 1 beschrieben, die in ihrem statischen Tragverhalten einem Durchlaufträger entsprechen. Es ist mit dem erfindungsgemäßen Verfahren jedoch auch möglich Brückenträger 1 zu bauen, die in ihrem statischen Tragverhalten einem Einfeldträger oder einem Rahmenbauwerk entsprechen. In the examples, the preparation of bridge girders 1 has been described, which correspond in their static behavior to a continuous carrier. However, it is also possible with the method according to the invention to build bridge girders 1, which correspond in their static load behavior to a single-span girder or a frame structure.
In den Beispielen wurde die Herstellung von Segmenten 3 mit konstanter Breite und veränderlicher Höhe beschrieben, die in einem Schnitt normal zur Längsachse 36 des Segments 3 eine rechteckige Form aufweisen. Es ist mit dem erfindungsgemäßen Verfahren jedoch auch möglich Segmente 3 zu bauen, die in einem Schnitt normal zur Längsachse 36 des Segments 3 eine trapezförmige Form aufweisen. Ein derartiger trapezförmiger Querschnitt muss nicht symmetrisch sein. In the examples, the production of segments 3 of constant width and variable height has been described, which have a rectangular shape in a section normal to the longitudinal axis 36 of the segment 3. However, it is also possible with the method according to the invention to build segments 3 which, in a section normal to the longitudinal axis 36 of the segment 3, have a trapezoidal shape. Such a trapezoidal cross-section need not be symmetrical.
Liste der Bezugszeichen: List of reference numbers:
1 Brückenträger 1 bridge girder
2 Teilstück eines Brückenträgers 2 section of a bridge girder
3 Segment 3 segment
4 Wandplatte 4 wall plate
5 Bodenplatte 5 base plate
6 Deckplatte 6 cover plate
7 Platte 7 plate
8 Rippe 8 rib
9 Schicht aus bewehrtem Beton 9 layer of reinforced concrete
10 Montageplatz 10 mounting place
11 Einbauort 11 installation location
12 Endgültige Lage 12 Final location
13 Unterer Rand einer Wandplatte 13 Lower edge of a wall plate
14 Oberer Rand einer Wandplatte 14 Upper edge of a wall plate
15 Spannglied 15 tendon
16 Fuge zwischen zwei Segmenten bzw. zwischen zwei Teilstücken 16 joint between two segments or between two segments
17 Fuge zwischen zwei Platten innerhalb eines Segments 17 Fugue between two plates within a segment
18 T-förmiger Stahlträger 18 T-shaped steel girder
19 Aussparung in einer Rippe 19 recess in a rib
20 Querrahmen
Schalung 20 transverse frames formwork
Fahrbahnplatte carriageway
Druckstrebe strut
Steg eines T-förmigen Stahlträgers Bridge of a T-shaped steel girder
Flansch eines T-förmigen Stahlträgers Flange of a T-shaped steel girder
Rahmenecke frame corner
Schraubverbindung screw
Stahlplatte steel plate
Dichtungsband sealing tape
Fertigteilplatte Precast concrete slab
Hohlraum cavity
Verankerungselement anchoring element
Widerlager abutment
Pfeiler pier
Spannbetonbrücke prestressed concrete bridge
Längsachse longitudinal axis
Auflagerkonstruktion support construction
Verschublager Verschublager
Wagen dare
Rippe, die mit einer Bodenplatte verbunden ist Rippe, die mit einer Deckplatte verbunden ist Versetzmaschine Rib connected to a bottom plate Rib connected to a top plate Offset machine
Zugglied tension member
Lager warehouse
Konsole console
Spanndrahtlitze Spanndrahtlitze
Stahlring steel ring
Übergangsstück Transition piece
Verankerungsblock anchoring block
Rippe, die mit einer Wandplatte verbunden ist Doppelwand Rib connected to a wall plate. Double wall
Rippe in einer Doppelwand Rib in a double wall
Innere Wandplatte Inner wall plate
Äußere Wandplatte Outer wall plate
Längsfuge longitudinal joint
Gitterträger
girder
Claims
1. Verfahren zur Herstellung eines vorgespannten Brückenträgers mit hohlkastenförmigem Querschnitt aus vorgefertigten Segmenten, dadurch gekennzeichnet, dass 1. A method for producing a prestressed bridge girder with hollow box-shaped cross-section of prefabricated segments, characterized in that
- zur Herstellung eines ersten Segments (3) mindestens zwei Wandplatten (4), die in einem Schnitt durch die Mittelebene vorzugsweise eine rechteckige Form aufweisen, aus bewehrtem Beton hergestellt werden; - For the production of a first segment (3) at least two wall plates (4), which in a section through the median plane preferably have a rectangular shape, are made of reinforced concrete;
- jede Wandplatte (4) mit mindestens einer Rippe (50), die im Wesentlichen normal zu der Mittelebene der Wandplatte (4) ausgebildet wird, kraftschlüssig verbunden wird; - each wall plate (4) having at least one rib (50) which is formed substantially normal to the median plane of the wall plate (4), is positively connected;
- die mindestens zwei Wandplatten (4) auf einem Montageplatz (10) so aufgestellt werden, dass sie in einer Schnittebene normal zur Längsachse des Segments (3) zueinander beabstandet sind und dass die Rippen (50) in Schnittebenen angeordnet sind, die mit der Längsachse des Segments (3) einen Winkel α zwischen 45° und 135°, vorzugsweise 90°, einschließen; - The at least two wall panels (4) are placed on a mounting station (10) so that they are in a sectional plane normal to the longitudinal axis of the segment (3) spaced from each other and that the ribs (50) are arranged in sectional planes, with the longitudinal axis of the segment (3) enclose an angle α between 45 ° and 135 °, preferably 90 °;
- eine Bodenplatte (5) aus bewehrtem Beton mit mindestens einer Rippe (40), die mit der Bodenplatte (5) kraftschlüssig verbunden wird, zwischen den unteren Rändern (13) der Wandplatten (4) ausgebildet wird, wobei die mindestens eine Rippe (40) in der Bodenplatte (5) so angeordnet wird, dass die mindestens eine Rippe (40) der Bodenplatte (5) und die Rippen (8) der Wandplatten (4) in einer Ebene liegen; a bottom plate (5) made of reinforced concrete having at least one rib (40) which is frictionally connected to the bottom plate (5) is formed between the lower edges (13) of the wall plates (4), the at least one rib (40 ) is arranged in the bottom plate (5) so that the at least one rib (40) of the bottom plate (5) and the ribs (8) of the wall plates (4) lie in one plane;
- die Wandplatten (4) mit der Bodenplatte (5) durch ein Verbinden der in den Wandplatten (4) angeordneten Rippen (50) mit der mindestens einen in der Bodenplatte (5) angeordneten Rippe (40) in Rahmenecken (26) kraftschlüssig und biegesteif verbunden werden; - The wall panels (4) with the bottom plate (5) by connecting the in the wall plates (4) arranged ribs (50) with the at least one in the bottom plate (5) arranged rib (40) in frame corners (26) non-positively and rigidly get connected;
- eine Deckplatte (6) aus bewehrtem Beton mit mindestens einer Rippe (41), die mit der Deckplatte (6) kraftschlüssig verbunden wird, zwischen den oberen Rändern (14) der Wandplatten (4) ausgebildet wird, wobei die mindestens eine Rippe (41) der Deckplatte (6) so angeordnet wird, dass die mindestens eine Rippe (41) der Deckplatte (6) und die Rippen (50) der Wandplatten (4) in einer Ebene liegen; - A cover plate (6) made of reinforced concrete with at least one rib (41) which is frictionally connected to the cover plate (6), between the upper edges (14) of the wall plates (4) is formed, wherein the at least one rib (41 ) the cover plate (6) is arranged so that the at least one rib (41) of the cover plate (6) and the ribs (50) of the wall plates (4) lie in a plane;
- die Wandplatten (4) mit der Deckplatte (6) durch ein Verbinden der in den Wandplatten (4) angeordneten Rippen (50) mit der mindestens einen in der Deckplatte (6) angeordneten Rippe (41) in Rahmenecken (26) kraftschlüssig und biegesteif verbunden werden und durch diese Verbindungen mindestens ein Querrahmen (20) gebildet wird; - The wall panels (4) with the cover plate (6) by connecting the in the wall plates (4) arranged ribs (50) with the at least one in the cover plate (6) arranged rib (41) in frame corners (26) non-positively and rigid be connected and at least one transverse frame (20) is formed by these compounds;
- mindestens ein weiteres Segment (3) in der gleichen Weise hergestellt wird;
- die mindestens zwei Segmente (3) zu einem Einbauort (11) bewegt werden;- at least one further segment (3) is produced in the same way; - The at least two segments (3) are moved to a mounting location (11);
- die mindestens zwei Segmente (3) an dem Einbauort (11) zu einem Brückenträger (1) zusammengefügt werden; - The at least two segments (3) are joined together at the installation site (11) to form a bridge girder (1);
- der Brückenträger (1) in die endgültige Lage (12) gebracht wird und - The bridge girder (1) is brought into the final position (12) and
- in der endgültigen Lage (12) des Brückenträgers (1) in mindestens einem Segment (3), vorzugsweise in allen Segmenten (3), auf mindestens zwei Platten (7) vorzugsweise auf allen Platten (7), eine Schicht (9) aus bewehrtem Beton aufgebracht wird. - In the final position (12) of the bridge girder (1) in at least one segment (3), preferably in all segments (3), on at least two plates (7) preferably on all plates (7), a layer (9) reinforced concrete is applied.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass jeweils mindestens zwei Segmente (3) an dem Einbauort zu Teilstücken (2) eines Brückenträgers (1) zusammengefügt werden, die Teilstücke (2) des Brückenträgers (1) in die endgültige Lage (12) gebracht und miteinander verbunden werden. 2. The method according to claim 1, characterized in that in each case at least two segments (3) at the installation site to pieces (2) of a bridge girder (1) are joined together, the sections (2) of the bridge girder (1) in the final position (12 ) and connected with each other.
3. Verfahren nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, dass die Wandplatten (4) an den unteren Rändern (13) mit der Bodenplatte (5) und/ oder an den oberen Rändern (14) mit der Deckplatte (6) kraftschlüssig verbunden werden. 3. The method according to any one of claims 1 or 2, characterized in that the wall plates (4) at the lower edges (13) with the bottom plate (5) and / or at the upper edges (14) with the cover plate (6) non-positively get connected.
4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das Zusammenfügen der mindestens zwei Segmente (3) zu einem Brückenträger (1) oder einem Teilstück (2) eines Brückenträgers (1) durch das Anspannen von vorzugsweise in Längsrichtung der Segmente (3) angeordneten Spanngliedern (15) erfolgt. 4. The method according to any one of claims 1 to 3, characterized in that the joining of the at least two segments (3) to a bridge girder (1) or a portion (2) of a bridge girder (1) by the clamping of preferably in the longitudinal direction of the segments (3) arranged tendons (15).
5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass eine Schicht (9) aus bewehrtem Beton auf der Deckplatte (6) und/oder auf der Bodenplatte (5) und/oder auf den Innenseiten der Wandplatten (4) und/oder auf den Außenseiten der Wandplatten (4) aufgebracht wird. 5. The method according to any one of claims 1 to 4, characterized in that a layer (9) made of reinforced concrete on the cover plate (6) and / or on the bottom plate (5) and / or on the inner sides of the wall plates (4) and / or on the outer sides of the wall panels (4) is applied.
6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Wandplatten (4) im Match-Cast-Verfahren vorgefertigt werden und/oder die Bodenplatte (5) und/oder die Deckplatte (6) bei der Herstellung eines Segments (3) im Match-Cast-Verfahren betoniert werden. 6. The method according to any one of claims 1 to 5, characterized in that the wall panels (4) are prefabricated in a match-cast process and / or the bottom plate (5) and / or the cover plate (6) in the manufacture of a segment ( 3) in the match-casting process.
7. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Fugen (16) zwischen den Segmenten (3) bei dem Zusammenfügen der Segmente (3) als Vergussfugen mit einer Breite von 1 mm bis 100 mm, vorzugsweise 10 bis 30 mm, hergestellt werden. 7. The method according to any one of claims 1 to 5, characterized in that the joints (16) between the segments (3) in the assembly of the segments (3) as Vergussfugen with a width of 1 mm to 100 mm, preferably 10 to 30 mm, are produced.
8. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Stirnseiten der Segmente (3) gefräst werden und die Fugen (16) zwischen den
Segmenten (3) bei dem Zusammenfügen der Segmente (3) als trockene Fugen hergestellt werden. 8. The method according to any one of claims 1 to 5, characterized in that the end faces of the segments (3) are milled and the joints (16) between the Segments (3) are produced in the joining of the segments (3) as dry joints.
9. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass mindestens zwei Platten (7) eines Segments (3), vorzugsweise alle Platten (7) eines Segments (3), mit einer Dicke zwischen 25 mm und 250 mm, vorzugsweise 50 mm bis 150 mm, hergestellt werden. 9. The method according to any one of claims 1 to 8, characterized in that at least two plates (7) of a segment (3), preferably all plates (7) of a segment (3), with a thickness between 25 mm and 250 mm, preferably 50 mm to 150 mm.
10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass ein Segment (3) mit Wandplatten (4) mit einer nicht einheitlichen Höhe und/oder mit Bodenplatten (5) und/oder Deckplatten (6) mit einer nicht einheitlichen Breite hergestellt wird. 10. The method according to any one of claims 1 to 9, characterized in that a segment (3) with wall plates (4) having a non-uniform height and / or bottom plates (5) and / or cover plates (6) with a non-uniform width will be produced.
11. Verfahren nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Rippen (8) aus T-förmigen Stahlträgern (18) hergestellt werden und die Stege (24) der T- förmigen Stahlträger (18) beim Betonieren der Platten (7) teilweise in den Beton eingebettet werden, wobei die Stege (24) aus Trapezblech oder Wellblech hergestellt werden. 11. The method according to any one of claims 1 to 10, characterized in that the ribs (8) are made of T-shaped steel beams (18) and the webs (24) of the T-shaped steel beams (18) during concreting of the plates (7 ) are partially embedded in the concrete, wherein the webs (24) are made of trapezoidal sheet or corrugated metal.
12. Verfahren nach Anspruch 11, dadurch gekennzeichnet, dass in den Stegen (24) der T- förmigen Stahlträger (18) Aussparungen (19), die sich bis zu den Stegkanten, die nicht mit dem Flansch (25) verbunden sind, erstrecken, angeordnet werden. 12. The method according to claim 11, characterized in that in the webs (24) of the T-shaped steel beam (18) recesses (19) which extend up to the web edges, which are not connected to the flange (25) extend, to be ordered.
13. Verfahren nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Rippen (8) aus Fachwerkträgern oder aus Gitterträgern (56) aus Stahl hergestellt werden und die Untergurte der Fachwerkträger oder der Gitterträger (56) beim Betonieren der Platten (7) in den Beton eingebettet werden. 13. The method according to any one of claims 1 to 10, characterized in that the ribs (8) of truss girders or lattice girders (56) are made of steel and the lower chords of the truss girder or the girder (56) when concreting the plates (7). be embedded in the concrete.
14. Verfahren nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Rippen (8) aus bewehrtem Beton hergestellt werden. 14. The method according to any one of claims 1 to 10, characterized in that the ribs (8) are made of reinforced concrete.
15. Verfahren nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass die in den Schichten (9) aus bewehrtem Beton angeordnete Bewehrung auf dem Montageplatz (10) zumindest teilweise, vorzugsweise vollständig verlegt wird. 15. The method according to any one of claims 1 to 14, characterized in that in the layers (9) of reinforced concrete arranged reinforcement on the mounting station (10) at least partially, preferably completely laid.
16. Verfahren nach einem der Ansprüche 1 bis 15, dadurch gekennzeichnet, dass die Querrahmen (20) einen Abstand voneinander aufweisen, der mindestens 0,5 m und höchstens 10 m beträgt und vorzugsweise zwischen 1,0 m und 3,0 m liegt. 16. The method according to any one of claims 1 to 15, characterized in that the transverse frame (20) have a distance from each other which is at least 0.5 m and at most 10 m and preferably between 1.0 m and 3.0 m.
17. Verfahren nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass mindestens eine Wandplatte (4) als Doppelwand (51) mit mindestens einer Rippe (52), die im Wesentlichen normal zu der Mittelebene der Doppelwand (51) angeordnet wird und sowohl mit der inneren Wandplatte (53) der Doppelwand (51) als auch mit der äußeren Wandplatte (54) der Doppelwand (51) kraftschlüssig verbunden wird,
ausgebildet wird und dass der untere Rand (13) der inneren Wandplatte (53) einen Abstand, der zwischen Omm und 50mm kleiner ist als die Dicke einer Schicht (9) aus bewehrtem Beton, die auf die Bodenplatte (5) aufgebracht wird, zur Oberseite der Bodenplatte (5) aufweist. 17. The method according to any one of claims 1 to 16, characterized in that at least one wall plate (4) as a double wall (51) with at least one rib (52), which is arranged substantially normal to the median plane of the double wall (51) and both with the inner wall plate (53) of the double wall (51) and with the outer wall plate (54) of the double wall (51) is non-positively connected, and that the lower edge (13) of the inner wall plate (53) has a distance between Omm and 50mm smaller than the thickness of a layer (9) of reinforced concrete applied to the bottom plate (5) to the upper side the bottom plate (5).
18. Verfahren nach Anspruch 17, dadurch gekennzeichnet, dass in mindestens einer Doppelwand (51) die innere Wandplatte (53) mit einer kleineren Dicke als die äußere Wandplatte (54) hergestellt wird. 18. The method according to claim 17, characterized in that in at least one double wall (51), the inner wall plate (53) is made with a smaller thickness than the outer wall plate (54).
19. Verfahren nach einem der Ansprüche 17 oder 18, dadurch gekennzeichnet, dass eine Rippe (52) in einer Doppelwand (51) als Stahlblech, Trapezblech, Wellblech, Stahlprofil, T-förmiger Stahlträger (18), Fachwerkkonstruktion, Gitterträger (56) oder aus Beton ausgebildet wird. 19. The method according to any one of claims 17 or 18, characterized in that a rib (52) in a double wall (51) as a steel sheet, trapezoidal sheet, corrugated iron, steel profile, T-shaped steel beams (18), truss structure, lattice girder (56) or made of concrete.
20. Verfahren nach einem der Ansprüche 17 bis 19, dadurch gekennzeichnet, dass eine äußere Wandplatte (54) einer Doppelwand (51) am unteren Rand (13) mit der Bodenplatte (5) und/ oder dass eine innere Wandplatte (53) einer Doppelwand (51) am oberen Rand (14) mit der Deckplatte (6) kraftschlüssig verbunden wird. 20. The method according to any one of claims 17 to 19, characterized in that an outer wall plate (54) of a double wall (51) at the lower edge (13) with the bottom plate (5) and / or that an inner wall plate (53) of a double wall (51) at the upper edge (14) with the cover plate (6) is non-positively connected.
21. Verfahren nach einem der Ansprüche 1 bis 20, dadurch gekennzeichnet, dass auf Rahmenecken (26) Auflagerkonstruktionen (37) mit an der Oberseite angeordneten Verschublagern (38) ausgebildet werden und auf den Verschublagern (38) ein Wagen (39) und/oder Teilstücke (2) des Brückenträgers (1) in Längsrichtung der Spannbetonbrücke (35) bewegt werden. 21. The method according to any one of claims 1 to 20, characterized in that on frame corners (26) support structures (37) are arranged with arranged on the top Verschublagern (38) and on the Verschublagern (38) a carriage (39) and / or Pieces (2) of the bridge girder (1) are moved in the longitudinal direction of the prestressed concrete bridge (35).
22. Vorgespannter Brückenträger (1) mit hohlkastenförmigem Querschnitt aus vorgefertigten Segmenten (3), wobei der Brückenträger (1) mit einem Verfahren gemäß einem der Ansprüche 1 bis 21 hergestellt wurde, dadurch gekennzeichnet, dass der Brückenträger (1) Querrahmen (20) aufweist, wobei die Querrahmen (20) einen Abstand voneinander aufweisen, der mindestens 0,5m und höchstens 10m beträgt und vorzugsweise zwischen 1,0m und 3,0m liegt.
22. prestressed bridge girder (1) with a hollow box-shaped cross-section of prefabricated segments (3), wherein the bridge girder (1) was produced by a method according to one of claims 1 to 21, characterized in that the bridge girder (1) transverse frame (20) , wherein the transverse frames (20) have a distance from each other which is at least 0.5m and at most 10m, and preferably between 1.0m and 3.0m.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA431/2017A AT520193B1 (en) | 2017-11-07 | 2017-11-07 | Method for producing a bridge girder of a prestressed concrete bridge |
ATA431/2017 | 2017-11-07 | ||
ATA50759/2018A AT521261B1 (en) | 2018-09-06 | 2018-09-06 | Method for producing a bridge girder of a prestressed concrete bridge |
ATA50759/2018 | 2018-09-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019090374A1 true WO2019090374A1 (en) | 2019-05-16 |
Family
ID=64277459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AT2018/060266 WO2019090374A1 (en) | 2017-11-07 | 2018-11-06 | Method for producing a bridge support of a prestressed concrete bridge |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2019090374A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112878211A (en) * | 2021-03-19 | 2021-06-01 | 河南郑大工程检测咨询有限公司 | Reinforcement construction method based on wet-joint-free segment precast concrete box girder |
CN113123221A (en) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | Prefabricated assembled hollow pier based on UHPC joint and construction method |
AT524664A4 (en) * | 2021-06-09 | 2022-08-15 | Kollegger Gmbh | Process for manufacturing a bridge from prefabricated girders and roadway slab elements |
WO2024112990A1 (en) | 2022-12-02 | 2024-06-06 | Kollegger Gmbh | Method for producing a bridge from pier segments, longitudinal beams, and deck slab elements |
WO2024112989A1 (en) | 2022-12-02 | 2024-06-06 | Kollegger Gmbh | Method for producing a bridge from longitudinal beams and deck slab elements |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2963764A (en) | 1950-07-06 | 1960-12-13 | Dyckerhoff & Widmann Ag | Constructing a prestressed concrete bridge |
DE3104595A1 (en) * | 1981-02-10 | 1982-08-19 | Ed. Züblin AG, 7000 Stuttgart | Method for the production of a bridge superstructure from reinforced or prestressed concrete by the daily-rate method |
US5577284A (en) | 1994-02-22 | 1996-11-26 | Muller; Jean | Channel bridge |
KR0140525B1 (en) | 1989-02-03 | 1998-06-01 | 미다 가쓰시게 | Method for producing high viscosity materials |
JPH11140824A (en) * | 1997-11-13 | 1999-05-25 | Sakurada Co Ltd | Assembly method for box girder |
JP2005023684A (en) | 2003-07-04 | 2005-01-27 | Sumitomo Mitsui Construction Co Ltd | Erection method for bridge |
JP2006169730A (en) | 2004-12-13 | 2006-06-29 | Oriental Construction Co Ltd | Concrete bridge girder and method of forming the same |
DE102006039551B3 (en) | 2006-08-23 | 2007-09-20 | Kollegger, Johann, Prof. Dr.-Ing. | Bridge manufacturing method involves articulating end point of support rod with bridge carrier, and column, a bridge carrier with end points and support rod with end points is manufactured in perpendicular position |
KR101482523B1 (en) * | 2014-03-05 | 2015-01-30 | 주식회사 장헌산업 | Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof |
WO2016037864A1 (en) | 2014-09-08 | 2016-03-17 | Technische Universität Wien | Double wall made of high-strength or ultra-high-strength reinforced concrete |
CN205152771U (en) | 2015-11-03 | 2016-04-13 | 中铁第一勘察设计院集团有限公司 | Empty core plate case roof beam of active powder concrete of railway |
WO2016187634A1 (en) | 2015-05-27 | 2016-12-01 | Johann Kollegger | Method for producing a roadway plate for a bridge |
-
2018
- 2018-11-06 WO PCT/AT2018/060266 patent/WO2019090374A1/en active Application Filing
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2963764A (en) | 1950-07-06 | 1960-12-13 | Dyckerhoff & Widmann Ag | Constructing a prestressed concrete bridge |
DE3104595A1 (en) * | 1981-02-10 | 1982-08-19 | Ed. Züblin AG, 7000 Stuttgart | Method for the production of a bridge superstructure from reinforced or prestressed concrete by the daily-rate method |
KR0140525B1 (en) | 1989-02-03 | 1998-06-01 | 미다 가쓰시게 | Method for producing high viscosity materials |
US5577284A (en) | 1994-02-22 | 1996-11-26 | Muller; Jean | Channel bridge |
JPH11140824A (en) * | 1997-11-13 | 1999-05-25 | Sakurada Co Ltd | Assembly method for box girder |
JP2005023684A (en) | 2003-07-04 | 2005-01-27 | Sumitomo Mitsui Construction Co Ltd | Erection method for bridge |
JP2006169730A (en) | 2004-12-13 | 2006-06-29 | Oriental Construction Co Ltd | Concrete bridge girder and method of forming the same |
DE102006039551B3 (en) | 2006-08-23 | 2007-09-20 | Kollegger, Johann, Prof. Dr.-Ing. | Bridge manufacturing method involves articulating end point of support rod with bridge carrier, and column, a bridge carrier with end points and support rod with end points is manufactured in perpendicular position |
US7996944B2 (en) | 2006-08-23 | 2011-08-16 | Kollegger Gmbh | Tilt-lift method for erecting a bridge |
KR101482523B1 (en) * | 2014-03-05 | 2015-01-30 | 주식회사 장헌산업 | Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof |
WO2016037864A1 (en) | 2014-09-08 | 2016-03-17 | Technische Universität Wien | Double wall made of high-strength or ultra-high-strength reinforced concrete |
WO2016187634A1 (en) | 2015-05-27 | 2016-12-01 | Johann Kollegger | Method for producing a roadway plate for a bridge |
CN205152771U (en) | 2015-11-03 | 2016-04-13 | 中铁第一勘察设计院集团有限公司 | Empty core plate case roof beam of active powder concrete of railway |
Non-Patent Citations (1)
Title |
---|
JOHANN KOLLEGGER ET AL.: "Building bridges using the balanced lift method", STRUCTURAL CONCRETE, vol. 15, 2014, pages 281 - 291 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113123221A (en) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | Prefabricated assembled hollow pier based on UHPC joint and construction method |
CN112878211A (en) * | 2021-03-19 | 2021-06-01 | 河南郑大工程检测咨询有限公司 | Reinforcement construction method based on wet-joint-free segment precast concrete box girder |
AT524664A4 (en) * | 2021-06-09 | 2022-08-15 | Kollegger Gmbh | Process for manufacturing a bridge from prefabricated girders and roadway slab elements |
AT524664B1 (en) * | 2021-06-09 | 2022-08-15 | Kollegger Gmbh | Process for the construction of a bridge from prefabricated girders and roadway slab elements |
WO2022256851A1 (en) | 2021-06-09 | 2022-12-15 | Kollegger Gmbh | Method for producing a bridge from finished-part beams and roadway plate elements |
WO2024112990A1 (en) | 2022-12-02 | 2024-06-06 | Kollegger Gmbh | Method for producing a bridge from pier segments, longitudinal beams, and deck slab elements |
WO2024112989A1 (en) | 2022-12-02 | 2024-06-06 | Kollegger Gmbh | Method for producing a bridge from longitudinal beams and deck slab elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019090374A1 (en) | Method for producing a bridge support of a prestressed concrete bridge | |
EP2914790B1 (en) | Method for producing a tower construction from reinforced concrete | |
EP2088244B1 (en) | Reinforced concrete or composite bridge and method for their production | |
EP3303707B1 (en) | Method for producing a roadway plate for a bridge | |
AT524664B1 (en) | Process for the construction of a bridge from prefabricated girders and roadway slab elements | |
DE102008032209B4 (en) | Steel-concrete composite trough as a bridge superstructure and method for its production | |
AT521261B1 (en) | Method for producing a bridge girder of a prestressed concrete bridge | |
DE2247609B1 (en) | PROCESS FOR CREATING A BRIDGE STRUCTURE FROM PRE-STRENGTHENED CONCRETE IN SECTIONAL FREE FRONT-FRAME | |
AT520614B1 (en) | Process for the production of a carriageway slab with precast slabs underneath | |
AT520193B1 (en) | Method for producing a bridge girder of a prestressed concrete bridge | |
WO2021203150A1 (en) | Method for producing a roadway deck for a bridge | |
AT230931B (en) | Process for the production of a long-span bridge from prestressed concrete | |
DE956685C (en) | Precast concrete or reinforced concrete part for composite structures | |
AT526142B1 (en) | Method for producing a bridge from longitudinal girders and deck slab elements | |
DE19903310A1 (en) | Compound support as steel support for bridge structure | |
AT526252B1 (en) | METHOD FOR PRODUCING A ROAD Slab FOR A BRIDGE | |
WO2024112990A1 (en) | Method for producing a bridge from pier segments, longitudinal beams, and deck slab elements | |
DE1124075B (en) | Method for prestressing statically indeterminate composite beams, in particular bridge beams | |
DE102008022180B3 (en) | Frame corner forming arrangement for roller support in concrete construction, has reinforced concrete wall that is reinforced concrete support, and ends of roller support are provided as double-T-profile that is recessed over frame corner | |
DE2451574C3 (en) | Prestressed concrete deck slab for bridge structures as well as laying equipment and process for their manufacture | |
DE934773C (en) | Process for the production of steel trough bridges with steel composite deck | |
DE2400939A1 (en) | Multi-field concrete structure - continuous bearing effectiveness promotion with site-concrete slabs concreted onto reinforced-concrete structural component joints | |
DE2422396A1 (en) | Precast reinforced concrete permanent beams - are tee sections with slender flanges or hollow webs for longer spans | |
CH278218A (en) | Process for the production of girder bridges from reinforced concrete and girder bridge produced by the process. | |
EP0878581A1 (en) | Supporting element and method of making a supporting element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18800839 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18800839 Country of ref document: EP Kind code of ref document: A1 |