WO2019084530A1 - Supplemental power unit for drilling rig - Google Patents

Supplemental power unit for drilling rig

Info

Publication number
WO2019084530A1
WO2019084530A1 PCT/US2018/057917 US2018057917W WO2019084530A1 WO 2019084530 A1 WO2019084530 A1 WO 2019084530A1 US 2018057917 W US2018057917 W US 2018057917W WO 2019084530 A1 WO2019084530 A1 WO 2019084530A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
unit
bus
electrical
electrical grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2018/057917
Other languages
French (fr)
Inventor
Seetharam KOTHURU
Brian Mckinney
Ramakrishna MADHIREDDY
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Original Assignee
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd, Services Petroliers Schlumberger SA, Schlumberger Technology BV, Schlumberger Technology Corp filed Critical Schlumberger Canada Ltd
Priority to US16/759,442 priority Critical patent/US11735950B2/en
Publication of WO2019084530A1 publication Critical patent/WO2019084530A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other DC sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other DC sources, e.g. providing buffering using capacitors as storage or buffering devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J15/00Systems for storing electric energy specially adapted for power networks
    • H02J15/30Systems for storing electric energy specially adapted for power networks using storage of inertial or mechanical energy, e.g. using flywheels
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in networks by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J4/00Circuit arrangements for mains or distribution networks not specified as AC or DC; Circuit arrangements for mains or distribution networks combining AC and DC sections or sub-networks
    • H02J4/20Networks integrating separated AC and DC power sections
    • H02J4/25Networks integrating separated AC and DC power sections for transfer of electric power between AC and DC networks, e.g. for supplying the DC section within a load from an AC mains system
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
    • H02J7/80Circuit arrangements for charging or discharging batteries or for supplying loads from batteries including monitoring or indicating arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
    • H02J7/50Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially

Definitions

  • Drilling rigs are large and complex and involve many pieces of equipment and require large quantities of power and coordination to operate.
  • a top drive that is used to provide torque to the drill string that can reach deep into a wellbore.
  • the power requirements of the top drive and of other components of the drilling operation can be immense and sometimes vary substantially, needing much power one moment and
  • Embodiments of the present disclosure are directed to system for providing power, including one or more generators configured to provide a predetermined quantity of energy, and one or more motors configured to draw power from the generators to perform one or more operations.
  • the system also includes an electrical grid system configured to convey electrical power from the generators to the motors, and a power unit electrically coupled to the electrical grid.
  • the power unit can selectively draw power from the electrical grid system, store power drawn from the electrical grid system, and selectively provide power to the motor to enable the motors to perform one or more of the operations.
  • the power provided by the power unit is greater than the predetermined quantity of energy.
  • the system includes a computation component operably coupled to the power unit and configured to store a well plan describing power needs of the motor.
  • the power unit is configured to provide power to the motor according to the well plan.
  • FIG. 1 Other embodiments of the present disclosure are directed to a method including coupling a power unit to an electrical grid system, the electrical grid system being operatively coupled between a generator system and a motor system.
  • the generator system is configured to power the motor system.
  • the method also includes determining a first time period during which available power from the generator system is greater than the power required by the motor system, and a second time period during which power required by the motor system is greater than a quantity available from the generator system.
  • the method also includes sapping power from the electrical grid system during the first time period and providing power to the electrical grid system during the second time period.
  • the present disclosure is directed to a power system including a generator, a prime mover, and an electrical bus operatively coupled between the generator and prime mover. Power from the generator is delivered to the prime mover via the electrical bus.
  • the power system also includes a power storage unit, a power receiving unit operatively coupled to the electrical bus and configured to sap power from the electrical bus and to store the power in the power storage unit, and a power delivery unit operatively coupled to the electrical bus and configured to deliver the power from at least one of the power storage unit and the electrical bus to the prime mover.
  • the power system also includes a control unit operatively coupled to the power receiving unit and to the power delivery unit and configured to instruct the power receiving unit to sap power and to instruct the power delivery unit to deliver the power.
  • the control unit may also store a well plan dictating amounts of power and demand times of the power.
  • the control unit is configured to instruct the power receiving unit and power delivery unit according to the well plan.
  • Figure 1 is a schematic diagram of a power system for a drilling operation according to embodiments of the present disclosure.
  • Figure 2 is a graph of power delivery, consumption, and storage for a generator, motor, and power unit according to embodiments of the present disclosure.
  • Figure 3 is a flowchart block diagram showing a method according to embodiments of the present disclosure.
  • FIG. 1 is a schematic diagram of a power system 8 for a drilling operation according to embodiments of the present disclosure.
  • the power system 8 includes generators 12, an AC Bus 14, rectifiers 16, a DC Bus 18, several variable frequency drives (VFDs) 20 and several motors 22.
  • the generators 12 typically run on diesel gasoline or another fuel source and provide power to the AC Bus 14 which is converted to DC power by the rectifiers 16 and transmitted to the DC Bus 18.
  • the VFDs 20 operate with the motors 22 to operate equipment on the drill site.
  • a power unit 10 is operatively coupled to the AC Bus 12 with a rectification system 16 and is configured to store power and to provide occasional power to the AC Bus 14 as needed by the system 8.
  • the power unit 10 is coupled to the DC Bus 18, or in some embodiments is coupled to both the AC Bus 14 and the DC Bus 18.
  • the power unit 10 can include any suitable electronic equipment including rectifiers, capacitors, batteries, etc.
  • one or more capacitors store electrical power and, when needed by the motors, supply a fast, powerful burst of energy to the AC Bus 14 or the DC Bus 18 which is used by the motors.
  • the power unit 10 can sap power from the AC/DC Bus to recharge the capacitors. 12.
  • the motors 22 can be a top drive, a drawworks, a mud pump or series of mud pumps or any other component that consumes power to do work at the rig site.
  • Other, lesser power- consuming components such as HVAC, lighting, communications, and other components at the rig can also be included here.
  • Any power-consuming component can be a motor for purposes of the present disclosure. For brevity these components are referred to herein as "motors" without loss of generality.
  • the system 8 can include a computational component 24 that is configured to electrically communicate with components of the system 8.
  • the computational component 24 can store or receive a well plan or drill plan that includes parameters such as timings of certain power needs of the motors 22.
  • the well plan can also include information about the formation including regions of the formation that require more or less power, a speed profile for the formation that details a rate of penetration (ROP) for a given region of the formation, power consumption for a given region of the formation, and a planned drill pattern including any deviations or lateral drilling plans.
  • the well plan can include many other factors that relevant to the drilling operation.
  • the well plan can be created using data captured at other drilling operations that share a characteristic with the present drilling site.
  • the well plan can be derived from the first drilling operation and can be used in the second. In other embodiments the well plan is derived from wells that share any other characteristic even though they may be geographically remote.
  • the power unit 10 can be operated in accordance with the well plan.
  • the well plan can provide information to the power unit 10 instructing the power unit 10 when additional power is needed, how much power is needed, and also when power consumption is less, during which time the power unit can safely sap power to charge the capacitors (or other suitable storage means).
  • the power unit 10 can be connected to the system 8 at different locations, including at multiple locations.
  • the power unit 10 can comprise a power receiving unit 26 and a power delivery unit 28 which are coupled to the system at different locations.
  • the power receiving unit 26 can be coupled to the generators 12 or to the AC Bus 14 and/or DC Bus 18 and the power delivery unit 28 can be coupled to the AC/DC Bus.
  • the multiple power units and the components thereof can be operated together in harmony.
  • the power receiving unit 26 for example can be coupled to the power delivery unit 28 such that the power received at the power receiving unit 26 is the same power delivered by the power delivery unit 28 even though these two units are individually coupled to the system at different locations.
  • FIG. 2 is a graph 30 of power delivery, consumption, and storage for a generator, motor, and power unit according to embodiments of the present disclosure.
  • generator refers to one or more generators working together or individually to provide power to a drilling rig
  • motor refers to one or more motors working together or individually to perform work for a drilling operation
  • the power unit refers to one or more power units providing needed power and storing power according to embodiments of the present disclosure.
  • the vertical axis is power in watts (or any other suitable units) and the horizontal axis is time. Time points A-G will be discussed.
  • A is an initial time for reference and can be any arbitrary time in the operation of a drilling operation.
  • the power unit is sapping power from the generator and storing the power for later use. Once the power unit reaches full capacity it can cease sapping power.
  • the needs of the motor begin to ramp up until exceeding the capacity of the generators by time C. Starting at time B, the power unit changes from sapping power to providing power to the motor.
  • the power unit is providing the needed power to the motor that the generator cannot provide.
  • the needs of the motor begin to decline until reaching below the available power from the generator. The power unit can observe this is taking place and can (if needed) begin to sap power from the generator again.
  • the power unit reaches capacity and begins to stop sapping power. The system is ready for another spike in power demand.
  • the shape of these curves can be known in advance according to a well plan.
  • the system can update the well plan for use on the next drilling operation. Over time, the accuracy of the well plan will improve with a larger data set from which to pull.
  • FIG 3 is a flowchart block diagram showing a method 40 according to embodiments of the present disclosure.
  • the method 40 begins. The beginning of the method 40 can be any arbitrary point during a drilling operation and is not necessarily the absolute initial stage of the operation.
  • the method 40 can be executed by a combination of the computation component 24 shown in Figure 1, or it can be executed by logic stored in the power unit 10 or in a remote component configured to execute portions of the method 40.
  • the connection of the power unit is verified.
  • the available power and demand for power is monitored. The available power is the power provided by the generator(s) of a given system, and the power demand is the power required by the motors of the system.
  • the method continues by comparing the available power to the power demands of the motors.
  • This comparison can factor in upcoming power demands according to a well plan or other data that describes not just the current power consumption but an expected power consumption for as long into the future as there is data in the well plan. If there available power is sufficient, at 50 another check is performed to determine whether or not the power unit needs charging. If the power unit does need to charge, at 52 the power unit draws power from the generators. At 54, with sufficient power for the operation, the operation is executed. Periodically at 60 a check can be performed for whether or not a given operation is complete. If yes, the method 40 terminates at 62. If not, control can return to 46 where monitoring continues.
  • the method 40 includes a check for the power unit to determine whether or not there is sufficient power in the power unit. If so, the system will draw power from the power unit at 58 and execute the operation. If there is insufficient power, at 64 the method can include some sort of preventive measures to limit the power to the system.. The method 40 accordingly can allow a power unit to periodically and safely store power for later delivery without interfering with operations and thereby enabling a system to execute operations requiring more power than otherwise would be available. The rate at which power is delivered is another aspect.
  • the power unit can be configured to deliver power at a higher rate than available from a generator.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Mechanical Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

La présente invention concerne des systèmes et des procédés pour supplémenter l'alimentation électrique d'un générateur d'une opération de forage et de systèmes de moteur. Une unité d'alimentation électrique est connectée à un réseau d'alimentation électrique entre des générateurs et des moteurs pour une opération de forage. L'unité d'alimentation électrique extrait et stocke l'énergie qui provient du réseau d'alimentation électrique lorsque le générateur a un excès de capacité et fournit de l'énergie électrique aux moteurs lorsque la demande des moteurs dépasse la capacité disponible des générateurs.The present invention relates to systems and methods for supplementing the power supply of a generator of a drilling operation and engine systems. A power supply unit is connected to a power supply network between generators and motors for a drilling operation. The power supply unit extracts and stores power from the power grid when the generator has excess capacity and provides power to the motors when the demand for the motors exceeds the available capacity of the generators.

Description

SUPPLEMENTAL POWER UNIT FOR DRILLING RIG
Cross-Reference to Related Applications
[0001] This application claims priority to U.S. Provisional Patent Application No. 62/577,778, which was filed on October 27, 2017, the entirety of which is incorporated by reference herein.
BACKGROUND
[0002] Drilling rigs are large and complex and involve many pieces of equipment and require large quantities of power and coordination to operate. Among the equipment is a top drive that is used to provide torque to the drill string that can reach deep into a wellbore. The power requirements of the top drive and of other components of the drilling operation can be immense and sometimes vary substantially, needing much power one moment and
comparatively little the next.
SUMMARY
[0003] Embodiments of the present disclosure are directed to system for providing power, including one or more generators configured to provide a predetermined quantity of energy, and one or more motors configured to draw power from the generators to perform one or more operations. The system also includes an electrical grid system configured to convey electrical power from the generators to the motors, and a power unit electrically coupled to the electrical grid. The power unit can selectively draw power from the electrical grid system, store power drawn from the electrical grid system, and selectively provide power to the motor to enable the motors to perform one or more of the operations. The power provided by the power unit is greater than the predetermined quantity of energy.
[0004] In further embodiments the system includes a computation component operably coupled to the power unit and configured to store a well plan describing power needs of the motor. The power unit is configured to provide power to the motor according to the well plan.
[0005] Other embodiments of the present disclosure are directed to a method including coupling a power unit to an electrical grid system, the electrical grid system being operatively coupled between a generator system and a motor system. The generator system is configured to power the motor system. The method also includes determining a first time period during which available power from the generator system is greater than the power required by the motor system, and a second time period during which power required by the motor system is greater than a quantity available from the generator system. The method also includes sapping power from the electrical grid system during the first time period and providing power to the electrical grid system during the second time period.
[0006] In yet further embodiments the present disclosure is directed to a power system including a generator, a prime mover, and an electrical bus operatively coupled between the generator and prime mover. Power from the generator is delivered to the prime mover via the electrical bus. The power system also includes a power storage unit, a power receiving unit operatively coupled to the electrical bus and configured to sap power from the electrical bus and to store the power in the power storage unit, and a power delivery unit operatively coupled to the electrical bus and configured to deliver the power from at least one of the power storage unit and the electrical bus to the prime mover. The power system also includes a control unit operatively coupled to the power receiving unit and to the power delivery unit and configured to instruct the power receiving unit to sap power and to instruct the power delivery unit to deliver the power. The control unit may also store a well plan dictating amounts of power and demand times of the power. The control unit is configured to instruct the power receiving unit and power delivery unit according to the well plan.
BRIEF DESCRIPTION OF THE FIGURES
[0007] Figure 1 is a schematic diagram of a power system for a drilling operation according to embodiments of the present disclosure.
[0008] Figure 2 is a graph of power delivery, consumption, and storage for a generator, motor, and power unit according to embodiments of the present disclosure.
[0009] Figure 3 is a flowchart block diagram showing a method according to embodiments of the present disclosure. DETAILED DESCRIPTION
[0010] Figure 1 is a schematic diagram of a power system 8 for a drilling operation according to embodiments of the present disclosure. The power system 8 includes generators 12, an AC Bus 14, rectifiers 16, a DC Bus 18, several variable frequency drives (VFDs) 20 and several motors 22. The generators 12 typically run on diesel gasoline or another fuel source and provide power to the AC Bus 14 which is converted to DC power by the rectifiers 16 and transmitted to the DC Bus 18. The VFDs 20 operate with the motors 22 to operate equipment on the drill site. There can be any number of generators 12, rectifiers 16, VFDs 20, and motors 22 as needed in a given drilling operation.
[0011] The power needs of the motors 22 vary during the drilling operation. Occasionally, the needs of the motors 22 can even exceed the capabilities of the generators 12, but there are also times where the motors 22 require less power than what is available. According to embodiments of the present disclosure, a power unit 10 is operatively coupled to the AC Bus 12 with a rectification system 16 and is configured to store power and to provide occasional power to the AC Bus 14 as needed by the system 8. In other embodiments the power unit 10 is coupled to the DC Bus 18, or in some embodiments is coupled to both the AC Bus 14 and the DC Bus 18. The power unit 10 can include any suitable electronic equipment including rectifiers, capacitors, batteries, etc. In some embodiments, one or more capacitors store electrical power and, when needed by the motors, supply a fast, powerful burst of energy to the AC Bus 14 or the DC Bus 18 which is used by the motors. When not called upon, the power unit 10 can sap power from the AC/DC Bus to recharge the capacitors. 12.
[0012] The motors 22 can be a top drive, a drawworks, a mud pump or series of mud pumps or any other component that consumes power to do work at the rig site. Other, lesser power- consuming components such as HVAC, lighting, communications, and other components at the rig can also be included here. Any power-consuming component can be a motor for purposes of the present disclosure. For brevity these components are referred to herein as "motors" without loss of generality.
[0013] In some embodiments, the system 8 can include a computational component 24 that is configured to electrically communicate with components of the system 8. The computational component 24 can store or receive a well plan or drill plan that includes parameters such as timings of certain power needs of the motors 22. The well plan can also include information about the formation including regions of the formation that require more or less power, a speed profile for the formation that details a rate of penetration (ROP) for a given region of the formation, power consumption for a given region of the formation, and a planned drill pattern including any deviations or lateral drilling plans. The well plan can include many other factors that relevant to the drilling operation. The well plan can be created using data captured at other drilling operations that share a characteristic with the present drilling site. For example, if two or more wells are dug in the same general geographic area, it is likely that the drilling operation will encounter similar structures in the formation. The well plan can be derived from the first drilling operation and can be used in the second. In other embodiments the well plan is derived from wells that share any other characteristic even though they may be geographically remote.
[0014] The power unit 10 can be operated in accordance with the well plan. The well plan can provide information to the power unit 10 instructing the power unit 10 when additional power is needed, how much power is needed, and also when power consumption is less, during which time the power unit can safely sap power to charge the capacitors (or other suitable storage means). The power unit 10 can be connected to the system 8 at different locations, including at multiple locations. The power unit 10 can comprise a power receiving unit 26 and a power delivery unit 28 which are coupled to the system at different locations. For example, the power receiving unit 26 can be coupled to the generators 12 or to the AC Bus 14 and/or DC Bus 18 and the power delivery unit 28 can be coupled to the AC/DC Bus. There may be multiple power units 10 coupled to the system 8 at different locations. The multiple power units and the components thereof can be operated together in harmony. The power receiving unit 26 for example can be coupled to the power delivery unit 28 such that the power received at the power receiving unit 26 is the same power delivered by the power delivery unit 28 even though these two units are individually coupled to the system at different locations.
[0015] Figure 2 is a graph 30 of power delivery, consumption, and storage for a generator, motor, and power unit according to embodiments of the present disclosure. It is to be understood that generator refers to one or more generators working together or individually to provide power to a drilling rig, motor refers to one or more motors working together or individually to perform work for a drilling operation, and the power unit refers to one or more power units providing needed power and storing power according to embodiments of the present disclosure. The vertical axis is power in watts (or any other suitable units) and the horizontal axis is time. Time points A-G will be discussed. A is an initial time for reference and can be any arbitrary time in the operation of a drilling operation. For purposes of discussion there is a constant available power level 32 from the generator. In systems using multiple generators, one or more of the generators can be brought online of taken offline which will of course change the available power level. A single generator can be operated at varying levels which will also change the available power level. For ease of explanation the power level from the generator is constant, without limiting the scope of the present disclosure. The power needs of the motor is shown by line 34. Power into the power unit is shown at 36 with positive being power into the power unit and negative being power out of the power unit.
[0016] At time A the power needs of the motor are less than the available power from the generator. Accordingly, the power unit is sapping power from the generator and storing the power for later use. Once the power unit reaches full capacity it can cease sapping power. At time B the needs of the motor begin to ramp up until exceeding the capacity of the generators by time C. Starting at time B, the power unit changes from sapping power to providing power to the motor. At time C the power unit is providing the needed power to the motor that the generator cannot provide. At time D the needs of the motor begin to decline until reaching below the available power from the generator. The power unit can observe this is taking place and can (if needed) begin to sap power from the generator again. At time F the power unit reaches capacity and begins to stop sapping power. The system is ready for another spike in power demand.
[0017] The shape of these curves can be known in advance according to a well plan. In some embodiments, there is some level of uncertainty between the well plan and the actual needs for a given well. No two wells are exactly alike, so the well plan can provide guidance to the power unit, the motor, and the generator concerning the current and future needs of the system, but actual conditions can vary. The system can update the well plan for use on the next drilling operation. Over time, the accuracy of the well plan will improve with a larger data set from which to pull.
[0018] Figure 3 is a flowchart block diagram showing a method 40 according to embodiments of the present disclosure. At 42 the method 40 begins. The beginning of the method 40 can be any arbitrary point during a drilling operation and is not necessarily the absolute initial stage of the operation. The method 40 can be executed by a combination of the computation component 24 shown in Figure 1, or it can be executed by logic stored in the power unit 10 or in a remote component configured to execute portions of the method 40. At 44 the connection of the power unit is verified. At 46, the available power and demand for power is monitored. The available power is the power provided by the generator(s) of a given system, and the power demand is the power required by the motors of the system. At 48 the method continues by comparing the available power to the power demands of the motors. This comparison can factor in upcoming power demands according to a well plan or other data that describes not just the current power consumption but an expected power consumption for as long into the future as there is data in the well plan. If there available power is sufficient, at 50 another check is performed to determine whether or not the power unit needs charging. If the power unit does need to charge, at 52 the power unit draws power from the generators. At 54, with sufficient power for the operation, the operation is executed. Periodically at 60 a check can be performed for whether or not a given operation is complete. If yes, the method 40 terminates at 62. If not, control can return to 46 where monitoring continues.
[0019] Returning to 48, if there is insufficient power for a given operation or for an upcoming operation according to a well plan, the method 40 includes a check for the power unit to determine whether or not there is sufficient power in the power unit. If so, the system will draw power from the power unit at 58 and execute the operation. If there is insufficient power, at 64 the method can include some sort of preventive measures to limit the power to the system.. The method 40 accordingly can allow a power unit to periodically and safely store power for later delivery without interfering with operations and thereby enabling a system to execute operations requiring more power than otherwise would be available. The rate at which power is delivered is another aspect. The power unit can be configured to deliver power at a higher rate than available from a generator.
[0020] Embodiments of the present disclosure have been described herein with reference to the Figures. Features have been described to enable a person of ordinary skill in the art to make and use aspects of the present disclosure and are not given in a limiting manner.

Claims

1. A system for providing power, the system comprising:
one or more generators configured to provide a predetermined quantity of energy;
one or more motors configured to draw power from the generators to perform one or more operations;
an electrical grid system configured to convey electrical power from the generators to the
motors; and
a power unit electrically coupled to the electrical grid and being configured to:
selectively draw power from the electrical grid system;
store power drawn from the electrical grid system; and
selectively provide power to the motor to enable the motors to perform one or more of the operations, wherein the power provided by the power unit is greater than the predetermined quantity of energy.
2. The system of claim 1 wherein the motors comprise one or more of a drawworks, a top drive, or a mud pump.
3. The system of claim 1 wherein the electrical grid comprises at least one of an AC Bus and a DC Bus.
4. The system of claim 1 wherein the electrical grid comprises an AC Bus and a DC Bus and the power unit is coupled to at least one of the AC Bus and the DC Bus.
5. The system of claim 4, the system further comprising a plurality of rectifiers coupled between the AC Bus and the DC Bus.
6. The system of claim 1, further comprising a computation component operably coupled to the power unit and configured to store a well plan describing power needs of the motor, and wherein the power unit is configured to provide power to the motor according to the well plan.
7. The system of claim 6 wherein the well plan describes a future time in which a power need of the motor is greater than available energy from the generators, wherein the computation component is configured to instruct the power unit to store sufficient energy for the future time.
8. The system of claim 1 wherein the power unit is configured to store the power drawn from the electrical grid in a battery.
9. A method, comprising:
coupling a power unit to an electrical grid system, the electrical grid system being operatively coupled between a generator system and a motor system, wherein the generator system is configured to power the motor system;
determining a first time period during which available power from the generator system is greater than the power required by the motor system, and a second time period during which power required by the motor system is greater than a quantity available from the generator system;
sapping power from the electrical grid system during the first time period; and
providing power to the electrical grid system during the second time period.
10. The method of claim 9 wherein coupling the power unit to the electrical grid comprises coupling the power unit to an AC Bus.
11. The method of claim 9 wherein coupling the power unit to the electrical grid comprises coupling the power unit to a DC Bus.
12. The method of claim 9 wherein coupling the power unit to the electrical grid comprises coupling the power unit to an AC Bus or a DC Bus with a rectifier coupled between the AC Bus and the DC Bus.
13. The method of claim 9, further comprising receiving a well plan describing power needs of the motor system.
14. The method of claim 13, further comprising instructing the power unit to deliver power to the motor system according to the well plan.
15. The method of claim 9, further comprising receiving a well plan that describes a time in which a power need of the motor system is greater than power currently available from the generator system.
16. The method of claim 15, further comprising instructing the power unit to store energy sufficient to meet the power need.
17. The method of claim 15, further comprising determining that the power need cannot be met and delivering an alarm.
18. A power system, comprising:
a generator;
a prime mover;
an electrical bus operatively coupled between the generator and prime mover, wherein power from the generator is delivered to the prime mover via the electrical bus;
a power storage unit;
a power receiving unit operatively coupled to the electrical bus and configured to sap power from the electrical bus and to store the power in the power storage unit;
a power delivery unit operatively coupled to the electrical bus and configured to deliver the power from at least one of the power storage unit and the electrical bus to the prime mover; and
a control unit operatively coupled to the power receiving unit and to the power delivery unit and configured to instruct the power receiving unit to sap power and to instruct the power delivery unit to deliver the power.
19. The power system of claim 18 wherein the control unit is configured to store a well plan dictating amounts of power and demand times of the power, wherein the control unit is configured to instruct the power receiving unit and power delivery unit according to the well plan.
20. The power system of claim 18 wherein the power receiving unit is further configured to sap power from the motors when they are operating in regeneration or from the electrical bus when there is enough power available than the demand.
21. The power system of claim 18 wherein the power storage unit comprises at least one of a battery, a capacitor, or a flywheel.
PCT/US2018/057917 2017-10-27 2018-10-29 Supplemental power unit for drilling rig Ceased WO2019084530A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/759,442 US11735950B2 (en) 2017-10-27 2018-10-29 Supplemental power unit for drilling rig

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201762577778P 2017-10-27 2017-10-27
US62/577,778 2017-10-27

Publications (1)

Publication Number Publication Date
WO2019084530A1 true WO2019084530A1 (en) 2019-05-02

Family

ID=66247052

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2018/057917 Ceased WO2019084530A1 (en) 2017-10-27 2018-10-29 Supplemental power unit for drilling rig

Country Status (2)

Country Link
US (1) US11735950B2 (en)
WO (1) WO2019084530A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210301630A1 (en) * 2020-03-31 2021-09-30 Schlumberger Technology Corporation Power Management at a Wellsite
US11264801B2 (en) 2018-02-23 2022-03-01 Schlumberger Technology Corporation Load management algorithm for optimizing engine efficiency
US11268350B2 (en) 2020-04-03 2022-03-08 Schlumberger Technology Corporation Intelligent energy management system of a drilling rig
US11514383B2 (en) 2019-09-13 2022-11-29 Schlumberger Technology Corporation Method and system for integrated well construction
US11697986B2 (en) 2020-09-04 2023-07-11 Schlumberger Technology Corporation Power management at a wellsite
US11942781B2 (en) 2021-12-20 2024-03-26 Schlumberger Technology Corporation Power management at a wellsite
US12051897B2 (en) 2021-12-20 2024-07-30 Schlumberger Technology Corporation Power management at a wellsite
US12573845B2 (en) 2022-08-17 2026-03-10 Nabors Drilling Technologies Usa, Inc. Power management with an energy storage system

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020236423A1 (en) 2019-05-23 2020-11-26 Schlumberger Technology Corporation Dynamic settings for genset automatic load-dependent start-stop control
US12326074B2 (en) 2019-06-13 2025-06-10 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Fracturing apparatus and control method thereof, fracturing system
US11746636B2 (en) 2019-10-30 2023-09-05 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Fracturing apparatus and control method thereof, fracturing system
US12173594B2 (en) 2019-06-13 2024-12-24 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Fracturing system
CN215870792U (en) * 2021-10-12 2022-02-18 烟台杰瑞石油装备技术有限公司 Power supply system for wellsite electric drive equipment
WO2023155065A1 (en) 2022-02-16 2023-08-24 烟台杰瑞石油装备技术有限公司 Electrically-driven fracturing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090195074A1 (en) * 2008-01-31 2009-08-06 Buiel Edward R Power supply and storage device for improving drilling rig operating efficiency
US20140354081A1 (en) * 2013-05-31 2014-12-04 Schlumberger Technology Corporation Electrical Power Grid for A Downhole BHA
US20160215769A1 (en) * 2015-01-27 2016-07-28 Baker Hughes Incorporated Systems and Methods for Providing Power to Well Equipment
EP2569844B1 (en) * 2010-04-09 2017-05-31 Siemens Aktiengesellschaft Power supply system for marine drilling vessel
US20170229869A1 (en) * 2016-02-05 2017-08-10 Canrig Drilling Technology Ltd. Micro grid power optimization

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6639331B2 (en) 2001-11-30 2003-10-28 Onan Corporation Parallel generator power system
US20090312885A1 (en) * 2008-06-11 2009-12-17 Buiel Edward R Management system for drilling rig power supply and storage system
US8519565B2 (en) 2008-10-24 2013-08-27 Caterpillar Inc. Generator set control system
US9197071B2 (en) * 2009-12-04 2015-11-24 Kevin R. Williams Energy storage system for supplying power to loads of a drilling rig
WO2011149478A1 (en) 2010-05-28 2011-12-01 Canrig Drilling Technology Ltd. Rig fuel management systems and methods
US8604639B2 (en) 2010-08-25 2013-12-10 Omron Oilfield and Marine, Inc. Power limiting control for multiple drilling rig tools
US9240687B2 (en) 2010-10-04 2016-01-19 The Boeing Company Smart microgrid
WO2013152073A2 (en) * 2012-04-03 2013-10-10 National Oilwell Varco, L.P. Drilling control and information system
ES2586954T3 (en) 2012-06-07 2016-10-19 Grupo Guascor S.L. Load sharing system
US9385557B2 (en) * 2012-08-23 2016-07-05 At&T Mobility Ii Llc Methods, systems, and products for charging of devices
WO2015057197A1 (en) 2013-10-15 2015-04-23 Halliburton Energy Services, Inc. Optimization of fuel consumption in equipment used in well site operations
CN105337397B (en) 2014-06-18 2019-03-29 通用电气公司 Drilling system and power supply method therefor
KR20160039901A (en) * 2014-10-02 2016-04-12 대우조선해양 주식회사 Apparatus and method for controlling power in offshore plant
US9644431B2 (en) 2014-11-26 2017-05-09 Integrated Drive Systems LLC Drilling rig system having improved electrical subsystem
WO2017044482A1 (en) 2015-09-08 2017-03-16 Weatherford Technology Holdings, Llc Genset for top drive unit
US10390466B2 (en) 2016-07-29 2019-08-20 Schlumberger Technology Corporation External structure heat sink
US10491004B2 (en) 2016-10-19 2019-11-26 Caterpillar Inc. Systems and methods for controlling power output to a load by multiple gensets based on load operation modes
US10243371B2 (en) 2016-12-15 2019-03-26 Caterpillar Inc. System, apparatus, and method for controlling load sharing of generator sets
WO2018201118A1 (en) 2017-04-28 2018-11-01 Schlumberger Technology Corporation Integrated power and electronics unit for drilling machine
CA2967921A1 (en) 2017-05-23 2018-11-23 Rouse Industries Inc. Drilling rig power supply management
US10760348B2 (en) 2017-08-14 2020-09-01 Schlumberger Technology Corporation Electrical power transmission for well construction apparatus
US10745975B2 (en) 2017-08-14 2020-08-18 Schlumberger Technology Corporation Electrical power transmission for well construction apparatus
AU2018322656B2 (en) * 2017-09-01 2022-10-13 Noble Drilling A/S Fire-resistant energy storage devices and associated systems and methods
US10472953B2 (en) 2017-09-06 2019-11-12 Schlumberger Technology Corporation Local electrical room module for well construction apparatus
US11322942B2 (en) 2017-10-12 2022-05-03 Schlumberger Technology Corporation Electrical power generation and distribution system with power recovery and regeneration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090195074A1 (en) * 2008-01-31 2009-08-06 Buiel Edward R Power supply and storage device for improving drilling rig operating efficiency
EP2569844B1 (en) * 2010-04-09 2017-05-31 Siemens Aktiengesellschaft Power supply system for marine drilling vessel
US20140354081A1 (en) * 2013-05-31 2014-12-04 Schlumberger Technology Corporation Electrical Power Grid for A Downhole BHA
US20160215769A1 (en) * 2015-01-27 2016-07-28 Baker Hughes Incorporated Systems and Methods for Providing Power to Well Equipment
US20170229869A1 (en) * 2016-02-05 2017-08-10 Canrig Drilling Technology Ltd. Micro grid power optimization

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11264801B2 (en) 2018-02-23 2022-03-01 Schlumberger Technology Corporation Load management algorithm for optimizing engine efficiency
US11514383B2 (en) 2019-09-13 2022-11-29 Schlumberger Technology Corporation Method and system for integrated well construction
US20210301630A1 (en) * 2020-03-31 2021-09-30 Schlumberger Technology Corporation Power Management at a Wellsite
WO2021202715A1 (en) * 2020-03-31 2021-10-07 Schlumberger Technology Corporation Power management at a wellsite
US12392225B2 (en) * 2020-03-31 2025-08-19 Schlumberger Technology Corporation Power management at a wellsite
US11268350B2 (en) 2020-04-03 2022-03-08 Schlumberger Technology Corporation Intelligent energy management system of a drilling rig
US11697986B2 (en) 2020-09-04 2023-07-11 Schlumberger Technology Corporation Power management at a wellsite
US11942781B2 (en) 2021-12-20 2024-03-26 Schlumberger Technology Corporation Power management at a wellsite
US12051897B2 (en) 2021-12-20 2024-07-30 Schlumberger Technology Corporation Power management at a wellsite
US12494669B2 (en) 2021-12-20 2025-12-09 Schlumberger Technology Corporation Power management at a wellsite
US12573845B2 (en) 2022-08-17 2026-03-10 Nabors Drilling Technologies Usa, Inc. Power management with an energy storage system

Also Published As

Publication number Publication date
US11735950B2 (en) 2023-08-22
US20200270948A1 (en) 2020-08-27

Similar Documents

Publication Publication Date Title
US11735950B2 (en) Supplemental power unit for drilling rig
CA3099596C (en) Powertrain for wellsite operations and method
USRE50263E1 (en) Modular hybrid low emissions power for hydrocarbon extraction
US20190337392A1 (en) Storing and Providing Electric Energy to Equipment
US10597996B2 (en) Rig fuel management systems and methods
CN102712265B (en) Mining vehicle and method for its energy supply
US20090312885A1 (en) Management system for drilling rig power supply and storage system
US11697986B2 (en) Power management at a wellsite
US12237674B2 (en) Power management at a wellsite
US20090195074A1 (en) Power supply and storage device for improving drilling rig operating efficiency
US20190128107A1 (en) Remote control and monitoring of engine control system
RU2644971C2 (en) Charging circuit of high-value capacitor for mud-pulse telemetry device
CN105720664A (en) Mining vehicle and method for energy supply thereof
US10018044B2 (en) Power integrated system and method for drilling rig and oil/gas production equipment
US20230205146A1 (en) Energy storage system control
US20180163514A1 (en) Active alternator control in a downhole tool string
CN109843631A (en) Drive the d.c. motor power supply system and method for hydraulic pump
FR3016933A1 (en) HYDROCARBON PUMPING INSTALLATION, MODULE AND METHOD.
CN118044091A (en) Energy-saving power distribution in a primary electric connection battery machine
US11603739B2 (en) Electric, battery-powered wireline systems
US12573845B2 (en) Power management with an energy storage system
US20240162708A1 (en) Hybrid power systems for equipment used in subterranean field operations
WO2026015734A1 (en) Hybrid gas turbine generator package for hydrocarbon extraction operations
WO2025153543A1 (en) Method and system for increasing capacity of a battery of an electric vehicle prior to kinetic energy capture
US12345144B2 (en) Automatically controlling a power ramp rate of a motor of a pump system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18870134

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18870134

Country of ref document: EP

Kind code of ref document: A1