WO2018062977A1 - 4g와 5g 공존 시스템에서 통신 방법 및 그 장치 - Google Patents

4g와 5g 공존 시스템에서 통신 방법 및 그 장치 Download PDF

Info

Publication number
WO2018062977A1
WO2018062977A1 PCT/KR2017/011088 KR2017011088W WO2018062977A1 WO 2018062977 A1 WO2018062977 A1 WO 2018062977A1 KR 2017011088 W KR2017011088 W KR 2017011088W WO 2018062977 A1 WO2018062977 A1 WO 2018062977A1
Authority
WO
WIPO (PCT)
Prior art keywords
terminal
base station
paging
information
signal
Prior art date
Application number
PCT/KR2017/011088
Other languages
English (en)
French (fr)
Inventor
백상규
강현정
권상욱
김대균
목영중
아닐에기월
장영빈
황준
Original Assignee
삼성전자 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성전자 주식회사 filed Critical 삼성전자 주식회사
Priority to US16/338,391 priority Critical patent/US10856254B2/en
Publication of WO2018062977A1 publication Critical patent/WO2018062977A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W68/00User notification, e.g. alerting and paging, for incoming communication, change of service or the like
    • H04W68/005Transmission of information for alerting of incoming communication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W68/00User notification, e.g. alerting and paging, for incoming communication, change of service or the like
    • H04W68/02Arrangements for increasing efficiency of notification or paging channel
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/06Selective distribution of broadcast services, e.g. multimedia broadcast multicast service [MBMS]; Services to user groups; One-way selective calling services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/11Allocation or use of connection identifiers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/15Setup of multiple wireless link connections
    • H04W76/16Involving different core network technologies, e.g. a packet-switched [PS] bearer in combination with a circuit-switched [CS] bearer
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/70Services for machine-to-machine communication [M2M] or machine type communication [MTC]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W68/00User notification, e.g. alerting and paging, for incoming communication, change of service or the like
    • H04W68/12Inter-network notification
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/02Terminal devices
    • H04W88/06Terminal devices adapted for operation in multiple networks or having at least two operational modes, e.g. multi-mode terminals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • One embodiment of the present invention relates to an apparatus and method for supporting paging signal processing using multiple connections in a wireless communication system. Another embodiment of the present invention relates to an apparatus and method for supporting multiple connections of a terminal in a wireless communication system. Another embodiment of the present invention relates to a beamforming method and apparatus when a base station function is distributed and implemented in a wireless communication system.
  • a 5G communication system or a pre-5G communication system is called a system after a 4G network (Beyond 4G Network) or a system after an LTE system (Post LTE).
  • 5G communication systems are being considered for implementation in the ultra-high frequency (mmWave) band (eg, such as the 60 Gigabit (60 GHz) band).
  • mmWave ultra-high frequency
  • FD-MIMO massive array multiple input / output
  • FD-MIMO massive array multiple input / output
  • Array antenna, analog beam-forming, and large scale antenna techniques are discussed.
  • 5G communication system has evolved small cells, advanced small cells, cloud radio access network (cloud RAN), ultra-dense network , Device to Device communication (D2D), wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), and interference cancellation
  • cloud RAN cloud radio access network
  • D2D Device to Device communication
  • CoMP Coordinated Multi-Points
  • FQAM Hybrid FSK and QAM Modulation
  • SWSC Sliding Window Superposition Coding
  • ACM Advanced Coding Modulation
  • FBMC Fanter Bank Multi Carrier
  • NOMA advanced access technologies. (non orthogonal multiple access), and sparse code multiple access (SCMA), and the like are being developed.
  • IoT Internet of Things
  • IoE Internet of Everything
  • M2M machine to machine
  • MTC Machine Type Communication
  • IT intelligent Internet technology services can be provided that collect and analyze data generated from connected objects to create new value in human life.
  • IoT is a field of smart home, smart building, smart city, smart car or connected car, smart grid, health care, smart home appliances, advanced medical services, etc. through convergence and complex of existing information technology (IT) technology and various industries. It can be applied to.
  • An object of the present invention is to provide an apparatus and method for supporting paging signal processing of a terminal in a system in which 4G and 5G coexist.
  • an object of the present invention is to provide an apparatus and method for supporting multiple connections of a terminal in a system in which 4G and 5G coexist.
  • Another object of the present invention is to provide an apparatus and method for supporting a connection between a terminal and a base station in a system in which 4G and 5G coexist.
  • an object of the present invention is to provide an apparatus and method for supporting the RRC connection of the terminal in a system in which 4G and 5G coexist.
  • another object of the present invention is to provide a beamforming method and apparatus when a base station function is distributed and implemented in a wireless communication system.
  • an object of the present invention is to provide a method and apparatus for ensuring mobility of a terminal.
  • an object of the present invention is to provide an apparatus and method for reducing the overall delay time caused by the delay of the network according to the change of the serving node when the base station function is implemented distributed.
  • a communication method of a terminal including: receiving a first broadcast signal including transmission information of a second broadcast signal from a base station; Receiving, from the base station, a second broadcast signal including transmission information of a paging signal according to the transmission information of the second broadcast signal; And receiving a paging signal from the base station according to the transmission information of the paging signal.
  • the receiving of the paging signal may include transmitting a message including at least one of identification information or paging identification information of the terminal to the base station; And receiving the paging signal transmitted from the base station according to at least one of the terminal identification information or the paging identification information.
  • the second broadcast signal may include information on whether a paging signal for the paging area to which the terminal belongs is transmitted.
  • the second broadcast signal receives a paging signal from the base station. The paging signal may be received.
  • the method may further include identifying radio access technology (RAT) that the terminal desires to receive the paging signal; And receiving the paging signal from the base station included in the RAT in which the terminal desires to receive the paging signal.
  • RAT radio access technology
  • the transmitting of the paging signal may include: receiving a message including at least one of identification information or paging identification information of the terminal from the terminal; And determining whether to transmit the paging signal to the terminal according to at least one of the identification information or the paging identification information of the terminal, and transmitting the paging signal to the terminal.
  • the transmitting of the paging signal may include information for determining a radio access technology (RAT) that the terminal wants to receive the paging signal, and at least one of an entity for controlling a paging signal of the terminal and the terminal.
  • RAT radio access technology
  • the terminal for solving the above problems, the transceiver for transmitting and receiving a signal; And receiving a first broadcast signal including transmission information of a second broadcast signal from a base station, and receiving a second broadcast signal including transmission information of a paging signal from the base station according to the transmission information of the second broadcast signal. And a controller configured to receive a paging signal from the base station according to the transmission information of the paging signal.
  • the base station for solving the above problems, the transmission and reception unit for transmitting and receiving a signal; And transmitting a first broadcast signal including transmission information of a second broadcast signal to the terminal, and transmitting a second broadcast signal including transmission information of a paging signal to the terminal according to the transmission information of the second broadcast signal. And a controller for transmitting a paging signal to the terminal according to the transmission information of the paging signal.
  • paging transmission and reception through 4G to 5G is supported to provide a reduction in power consumption of the terminal.
  • Supporting paging transmission and reception over 4G to 5G provides a base station or network load reduction. It is possible to provide connection latency / collision reduction of the UE by separating the connection reconnection radio access technology (RAT) through 4G to 5G.
  • RAT connection reconnection radio access technology
  • the data unit (DU) processes the fast DU change using beam feedback information. can do.
  • FIG. 1 is an illustration of a paging channel operating in a 5G system according to an embodiment of the present invention.
  • FIG. 2 is an example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • FIG 3 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • FIG. 4 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • 5 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • FIG. 6 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • FIG. 7 illustrates an example of cell-based paging area operation according to an embodiment of the present invention.
  • TRP-based paging area operation is an example of TRP-based paging area operation according to an embodiment of the present invention.
  • FIG 9 illustrates an example of an LTE base station based paging area operation according to an embodiment of the present invention.
  • FIG. 10 is an illustration of 5G base station based paging area operation according to an embodiment of the present invention.
  • FIG. 11 illustrates an embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 12 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 13 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 14 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 15 illustrates an embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 16 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 17 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 18 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 19 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 20 is an embodiment of a 5G RRC connection operating procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 21 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 22 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 23 is another embodiment of a 5G RRC connection operating procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 25 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 26 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 27 is a diagram illustrating an operation procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • TAI format used for triggering 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 29 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • FIG. 30 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 31 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 32 is a view illustrating another operation procedure of triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 33 is another embodiment of an operation procedure of triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • 35 is a specific example of a distributed structure of a base station based on an LTE protocol stack according to an embodiment of the present invention.
  • 36 is a schematic illustration of a beamforming and node change related procedure in a communication system according to an embodiment of the present invention.
  • FIG. 37 is a detailed illustration of a beamforming and node change related procedure in a communication system according to an embodiment of the present invention.
  • 39 is a diagram illustrating a beam feedback and node feedback preparation process in a communication system according to an embodiment of the present invention.
  • FIG. 40 illustrates an example of transmitting and receiving downlink beam training signals in a communication system according to an embodiment of the present invention.
  • 41 illustrates an example of uplink beam training signal transmission and reception in a communication system according to an embodiment of the present invention.
  • 43 is an example of beam feedback and node feedback in a communication system according to an embodiment of the present invention.
  • 44 is a diagram illustrating a data transmission / reception path switching process in a communication system according to an embodiment of the present invention.
  • 45 to 48 illustrate examples of a timer operation related to beam feedback in a communication system according to an embodiment of the present invention.
  • 49 is a block diagram illustrating a base station according to an embodiment of the present invention.
  • 50 is a block diagram illustrating a terminal according to an embodiment of the present invention.
  • each component shown in the embodiments of the present invention are independently shown to represent different characteristic functions, and do not mean that each component is made of separate hardware or one software component unit.
  • each component is listed as a component for convenience of description, and at least two of the components may form one component, or one component may be divided into a plurality of components to perform a function.
  • the integrated and separated embodiments of each component are also included in the scope of the present invention without departing from the spirit of the invention.
  • the components may not be essential components for performing essential functions in the present invention, but may be optional components for improving performance.
  • the present invention can be implemented including only the components essential for implementing the essentials of the present invention except for the components used for improving performance, and the structure including only the essential components except for the optional components used for improving performance. Also included in the scope of the present invention.
  • each block of the flowchart illustrations and combinations of flowchart illustrations may be performed by computer program instructions. Since these computer program instructions may be mounted on a processor of a general purpose computer, special purpose computer, or other programmable data processing equipment, those instructions executed through the processor of the computer or other programmable data processing equipment may be described in flow chart block (s). It creates a means to perform the functions. These computer program instructions may be stored in a computer usable or computer readable memory that can be directed to a computer or other programmable data processing equipment to implement functionality in a particular manner, and thus the computer usable or computer readable memory. It is also possible for the instructions stored in to produce an article of manufacture containing instruction means for performing the functions described in the flowchart block (s).
  • Computer program instructions may also be mounted on a computer or other programmable data processing equipment, such that a series of operating steps may be performed on the computer or other programmable data processing equipment to create a computer-implemented process to create a computer or other programmable data. Instructions for performing the processing equipment may also provide steps for performing the functions described in the flowchart block (s).
  • ' ⁇ part' used in the present embodiment refers to software or a hardware component such as an FPGA or an ASIC, and ' ⁇ part' performs certain roles.
  • ' ⁇ ' is not meant to be limited to software or hardware.
  • ' ⁇ Portion' may be configured to be in an addressable storage medium or may be configured to play one or more processors.
  • ' ⁇ ' means components such as software components, object-oriented software components, class components, and task components, and processes, functions, properties, procedures, and the like. Subroutines, segments of program code, drivers, firmware, microcode, circuits, data, databases, data structures, tables, arrays, and variables.
  • the functionality provided within the components and the 'parts' may be combined into a smaller number of components and the 'parts' or further separated into additional components and the 'parts'.
  • the components and ' ⁇ ' may be implemented to play one or more CPUs in the device or secure multimedia card.
  • FIG. 1 is an illustration of a paging channel operating in a 5G system according to an embodiment of the present invention.
  • a first broadcast channel (BCH) 110 a second BCH 120 and a paging signal (signal) or an additional BCH (or third BCH) 130
  • the scenario that is transmitted is shown.
  • the first BCH 110 may be referred to as, for example, primary BCH (xBCH) or xBCH
  • the second BCH 120 may be referred to as a secondary BCH (SBCH) or an enhanced BCH (evolved BCH), for example. , extended BCH), and the like.
  • an information block (eg, a master information block (MIB)) may be transmitted at a predetermined position periodically through the xBCH 110.
  • MIB master information block
  • the MIB includes a system frame number (SFN), beam reference signal configuration (beam reference signal configuration), whether the eBCH 120 is transmitted, a transmission period of the eBCH 120, a transmission position of the eBCH 120, and an eBCH ( It may include at least one information of the version information of the 120, paging area information of the base station transmitting the eBCH (120).
  • the MIB may include information on whether the terminal supports a connection for multiple connections.
  • the terminal receiving the broadcast channel for example, xBCH (110), eBCH (120), etc.
  • the signal transmitted through the BCH (110, 120) for example, a signal including a MIB, etc.
  • the reception and transmission of the BCH (110, 120) and the broadcast signal transmitted through the BCH (110, 120) can be used interchangeably.
  • the terminal receives the eBCH 120 may mean that the terminal receives a signal transmitted through the eBCH 120.
  • the term base station and cell may be used interchangeably.
  • Table 1 below shows an example of MIB 110 information of a 5G system according to an embodiment of the present invention.
  • Table 1 SFN System frame number Beam reference signal configuration Beam measurement reference signal transmission information (e.g. period, location, etc.) eBCH transmission Whether eBCH is sent in this MIB period eBCH transmission cycle eBCH transmission cycle eBCH Version Information For example, when changing eBCH, version information can be increased by 1 (for example, using wrap around).
  • Paging area information Paging area code of base station transmitting eBCH Multi-connection access information Announce support for multi-cell connection
  • the eBCH 120 may be transmitted according to a period defined by the MIB 110 or the system, and the transmission location of the eBCH 120 may be defined in the MIB or the system.
  • the eBCH 120 configures system parameters (eg, base station ID, etc.) and radio configuration information (eg, random access channel (RACH) configuration required for the UE to access a cell).
  • Information eg, base station ID, etc.
  • RACH random access channel
  • Information paging signal transmission period
  • paging signal transmission location transmission information of the remaining system information (for example, system information (SI), additional BCH, etc.), paging area information of the base station transmitting the eBCH 120, It may include at least one of paging area information to which the terminal to receive the paging signal belongs.
  • the eBCH 120 may include information on whether the terminal supports a connection for multiple connectivity.
  • [Table 2] is an example of eBCH information of the 5G system according to an embodiment of the present invention.
  • Base station ID For example, the globally unique ID of the base station Radio configuration
  • parameters required for system access Paging Signal Transmission Instruction Can inform whether paging signal is transmitted in eBCH period Paging signal transmission position Resource location information for which paging signals are sent Paging Signal Transmission Cycle Transmission period of paging signal Paging area information
  • Paging area code of base station transmitting eBCH Paging signal transmission information for each paging area Can inform whether paging signal of each paging area of system is transmitted in eBCH period Transfer information of the remaining system information Can tell if it transmits system information other than eBCH Multi-connection access information Announce support for multi-cell connection
  • the terminal receives the configuration information (for example, MIB transmitted through the xBCH 110, etc.) whether the eBCH 120 is transmitted, the transmission period of the eBCH 120 and the transmission location of the eBCH 120, eBCH 120 At least one of the version information of the) and the paging area information of the base station for transmitting the MIB.
  • the configuration information for example, MIB transmitted through the xBCH 110, etc.
  • the terminal may receive the eBCH 120 according to the transmission period of the eBCH 120 and the transmission position of the eBCH 120.
  • the transmission period of the eBCH 120 and the transmission position of the eBCH 120 may be a value transmitted through the MIB 110 or a value predefined in the system and known to the terminal.
  • the terminal may omit receiving the eBCH 120.
  • the terminal may receive system parameters or radio configuration information required for cell access through the eBCH 120.
  • the terminal may receive the remaining system information 130 at the transmission position of the remaining system information.
  • the transmission position of the remaining system information 130 may be a value obtained through transmission information of the remaining system information transmitted from the eBCH 120 or may be a value predefined in the system.
  • the base station when the terminal receives the MIB 110 and / or the eBCH 120, the base station is multiplexed through a signal transmitted through the MIB 110 and / or the eBCH 120. Information about whether to support the connection can be obtained.
  • the terminal supporting the multiple connectivity may perform a multiple connectivity connection procedure through the base station.
  • a terminal that does not support multiple access may perform a radio access technology (RAT) connection access supported by the base station through the base station.
  • RAT radio access technology
  • the terminal when the terminal supports the multiple connectivity connection through the LTE cell and 5G cell, and the base station supports the multiple connectivity connection through the LTE cell and 5G cell, the terminal through the base station to the LTE cell and 5G cell Multiple connection access procedure can be performed.
  • the terminal when the terminal supports only access through a 5G cell and the base station supports multiple connectivity through an LTE cell and a 5G cell, the terminal may perform a connection access procedure to a 5G cell through the base station.
  • the terminal when the terminal supports only access through an LTE cell and the base station supports multiple connectivity through an LTE cell and a 5G cell, the terminal cannot perform a connection access procedure to the 5G cell through the base station. Can be.
  • the terminal may perform only a connection access procedure to the LTE cell through the base station.
  • the terminal in the idle mode may check the paging area information of the base station when receiving the MIB 110 and / or the eBCH 120.
  • the terminal may perform a location registration procedure based on the paging area information.
  • the UE may check whether a paging signal is transmitted through the eBCH 120.
  • whether the paging signal is transmitted may be indicated by a 1-bit paging signal indicator and transmitted through the eBCH 120.
  • whether or not to transmit a paging signal may be indicated by resource location information on which the paging signal is transmitted.
  • whether to transmit a paging signal may be indicated as information indicating whether a paging signal is transmitted for each paging area supported by the system.
  • the eBCH 120 may include at least one of information on a paging signal transmission period, information on a paging signal transmission position, and information on the number of paging signal transmission symbols.
  • the UE in the idle mode may receive a paging signal based on the paging signal transmission information obtained from the eBCH 120.
  • the terminal in the idle mode may receive a paging signal based on paging signal transmission information for each paging area obtained from the eBCH 120.
  • the transmission period of the paging signal or the transmission position of the paging signal is dedicated to the terminal. It may be delivered in advance through a dedicated signal.
  • the paging signal may be transmitted in the same transmission format as the eBCH 120 or the additional BCH 130.
  • the paging signal may be transmitted in the same transmission format as the PDSCH.
  • the paging signal may be transmitted to one terminal as a target. Alternatively, the paging signal may be transmitted to one or more terminals.
  • the transmission format of the paging signal may correspond to at least one of an MCS level, a modulation order, channel coding, a number of repetitions, and a physical channel.
  • the terminal may receive the eBCH 120 by performing a downlink beam search suitable for receiving a paging signal and monitoring the appropriate downlink beam at the time of monitoring the paging signal. And, if the paging area has not been changed, the terminal may receive whether to transmit the paging signal according to the instruction of the eBCH (120).
  • the paging signal may be received at a transmission resource position indicated by the eBCH 120 or at a transmission resource position known to the terminal in advance. After confirming that the downlink data is pending through the paging signal, the terminal may continue the access procedure for data transmission and reception through the base station.
  • the terminal confirming that the downlink data is not pending through the paging signal may maintain the idle mode. Meanwhile, the terminal may perform a location registration procedure when it confirms the paging area change. The terminal may perform a location registration procedure and receive a paging signal.
  • the UE when the UE performs downlink beam search suitable for receiving a paging signal at the time of monitoring the paging signal, it is determined that the UE is located in the serving cell to which the UE is connected before transitioning to the idle mode. May receive the eBCH 120 by monitoring the used downlink beam with the serving cell.
  • the terminal may receive whether to transmit a paging signal according to the instruction of the eBCH (120).
  • the paging signal may be received at a transmission resource position indicated by the eBCH 120 or at a transmission resource position known to the terminal in advance.
  • the terminal confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station.
  • the terminal confirming that the downlink data is not pending through the paging signal may maintain the idle mode. Meanwhile, the terminal may perform a location registration procedure when it confirms the paging area change. The terminal may perform a location registration procedure and receive a paging signal.
  • the terminal may receive the eBCH 120 by performing a downlink beam search suitable for receiving a paging signal and monitoring the appropriate downlink beam at the time of monitoring the paging signal.
  • the terminal may receive information indicating whether to transmit a paging signal for each paging area.
  • the embodiment of the information indicating whether the paging signal is transmitted to the paging area may include a form of information indicating whether to transmit a paging signal corresponding to identification information ID of each paging area.
  • Information indicating whether to transmit a paging signal for each paging area may be transmitted through the eBCH (120).
  • the terminal can determine whether there is a paging signal to be transmitted for the paging area to which it belongs. If the paging area is not changed, the terminal may receive whether to transmit the paging signal according to the instruction of the eBCH 120 (information indicating whether a paging signal for the paging area is transmitted). The paging signal may be received at a transmission resource position indicated by the eBCH 120 or at a transmission resource position known to the terminal in advance. The terminal confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station.
  • the terminal confirming that the downlink data is not pending through the paging signal may maintain the idle mode. Meanwhile, the terminal may perform a location registration procedure when it confirms the paging area change. The terminal may perform a location registration procedure and receive a paging signal.
  • FIG. 2 is an example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • the terminal 210 may determine the start of a paging signal monitoring time point in step 230. In addition, at the time of monitoring the paging signal, the terminal 210 may perform downlink beam searching suitable for receiving the paging signal, and receive the eBCH 120 by monitoring the suitable downlink beam (steps 235 and 240).
  • the eBCH 120 may be system broadcast information, and the eBCH 120 may include paging area information.
  • the eBCH 120 may be transmitted by the base station 220.
  • the base station 220 may be an evolved node B (eNB) or a 5G base station 5GNB. When the base station 220 is a 5G base station 5GNB, the base station 220 may be a next generation base station (NRB, gNB). This may be equally applied in the case of embodiments to be described later.
  • the terminal 210 and the base station 220 perform random access according to the instruction of the eBCH 120 in steps 250 and 255. random access) procedure may be performed.
  • the base station 220 performs the terminal 210 based on paging access information such as a terminal identifier (for example, an ID of the terminal 210, a random access preamble for the terminal, etc.). It can be recognized.
  • the base station 220 may transmit a paging signal to the terminal 210 through the random access procedure.
  • the paging signal transmitted by the base station 220 to the terminal 210 may be a unicast signal or a broadcast signal.
  • the paging signal may further include information for confirming whether the terminal 210 receiving the paging signal is a paging signal directed to the paging signal.
  • the base station 220 that has received paging access information (eg, a terminal ID, etc.) through the msg1 of the random access procedure in step 250, transmits to the terminal 210 through msg2 of the random access procedure in step 255.
  • the msg2 format including the paging signal may include a 1-bit usage format of a random access response (RAR) message or a 1-bit usage format of a RAR message grant or concatenation with the RAR message.
  • RAR message grant may be a UL grant of sufficient size to transmit the RAR message + paging signal) or a format separate from the RAR message or a format transmitted instead of the RAR message.
  • the msg2 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 2, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the base station 220 that receives the terminal ID and the like through msg3 of the random access procedure in step 250 may transmit a paging signal to the terminal 210 through msg4 of the random access procedure in step 255.
  • the msg4 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like).
  • the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • step 260 the terminal 210 confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station 220 in step 270.
  • the terminal 210 confirming that the downlink data is not pending through the paging signal may maintain the idle mode.
  • the terminal 210 may perform a location registration procedure.
  • the terminal 210 may perform a location registration procedure and receive a paging signal.
  • FIG 3 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • the terminal 210 may determine the start of a paging signal monitoring time point in step 310. In addition, at the time of monitoring the paging signal, the terminal 210 may perform downlink beam searching suitable for receiving the paging signal, and receive the eBCH 120 by monitoring the suitable downlink beam (steps 320 and 330).
  • the terminal 210 and the base station 220 perform a random access procedure according to the instructions of the eBCH 210 in steps 350 and 360. Can be performed.
  • the base station 220 performs a paging identifier (eg, paging random access preamble, paging random access resource, paging random access symbol, etc.). It may be recognized that at least one terminal 210 monitors paging based on the paging access identification information of the terminal.
  • the base station 220 may transmit a paging signal to one or more terminals 210 through the random access procedure.
  • the base station 220 that receives paging access identification information (for example, paging ID, etc.) of the terminal through msg1 of the random access procedure in step 350 is one through msg2 of the random access procedure in step 360.
  • the paging signal may be transmitted to the terminal 210.
  • an embodiment of the msg2 format including the paging signal may include a 1 bit usage format of a RAR message or a 1 bit usage format of a RAR message grant or a format concatenation with the RAR message (for example, It may include a UL grant having a size sufficient to transmit a RAR message + paging signal) or a format separate from the RAR message or a format transmitted instead of the RAR message.
  • the msg2 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 2, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the base station 220 that receives paging access identification information (for example, paging ID, etc.) of the terminal through msg3 of the random access procedure in step 350 is one through msg4 of the random access procedure in step 360.
  • the paging signal may be transmitted to the terminal 210.
  • the msg4 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 4, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the above procedure may also be applied when a random access procedure including a paging identifier is performed in each beam.
  • the terminal 210 confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station 220 in step 380.
  • the terminal 210 confirming that the downlink data is not pending through the paging signal may maintain the idle mode.
  • the terminal 210 may perform a location registration procedure. Although not shown, the terminal 210 may perform a location registration procedure and receive a paging signal.
  • FIG. 4 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • the terminal 210 may determine start of paging signal monitoring at step 410. In addition, at the time of monitoring the paging signal, the terminal 210 may perform downlink beam searching suitable for receiving the paging signal, and receive the eBCH 120 by monitoring the suitable downlink beam (steps 420 and 430).
  • the terminal 210 may receive information indicating whether a paging signal for each paging area is transmitted through the eBHC 120 transmitted in step 420.
  • the terminal 210 may check whether there is a paging signal to be transmitted for the paging area to which the terminal 210 belongs.
  • the terminal 210 may determine whether the paging area is changed and determine whether there is a paging signal to be transmitted in the paging area.
  • the terminal 210 and the base station 220 perform a random access procedure according to the instructions of the eBCH 120 in steps 450 and 460. Can be performed.
  • the base station 220 performs paging based on paging access identification information of the terminal, such as a paging identifier (for example, paging random access preamble, paging random access resource, paging random access symbol, etc.). It can be recognized that there is at least one terminal 210 for monitoring.
  • the base station 220 may transmit a paging signal to one or more terminals 210 through the random access procedure.
  • the base station 220 that receives paging access identification information (for example, paging ID, etc.) of the terminal through msg1 of the random access procedure in step 450 is one through msg2 of the random access procedure in step 460.
  • the paging signal may be transmitted to the terminal 210.
  • the msg2 format including the paging signal including the paging signal, a 1-bit usage format of a RAR message or a 1-bit usage format of a RAR message grant or a format concatenation with the RAR message (for example, the RAR message grant is the RAR message + It may include a UL grant of sufficient size to transmit the paging signal) or at least one of a format separate from the RAR message or a format transmitted in place of the RAR message.
  • the msg2 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 2, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the base station 220 that receives the paging access identification information (for example, paging ID, etc.) of the terminal through msg3 of the random access procedure in step 450, one base station msg4 of the random access procedure in step 460
  • the paging signal may be transmitted to the terminal 210.
  • the msg4 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 4, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the above procedure may also be applied when a random access procedure including a paging identifier is performed in each beam.
  • the terminal 210 confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station 220 in step 480.
  • the terminal 210 confirming that the downlink data is not pending through the paging signal may maintain the idle mode.
  • the terminal 220 may perform a location registration procedure.
  • the terminal 210 may perform a location registration procedure and receive a paging signal.
  • 5 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • the terminal 210 may determine the start of a paging signal monitoring time point in step 510. In addition, at the time of monitoring the paging signal, the terminal 210 may perform downlink beam searching suitable for receiving the paging signal and monitor the suitable downlink beam to receive the eBCH 120 (steps 520 and 530).
  • the terminal 210 may receive information indicating whether a paging signal for each paging area is transmitted through the eBHC 120 transmitted in step 520. In operation 540, the terminal 210 may check whether there is a paging signal to be transmitted for the paging area to which the terminal 210 belongs. In operation 540, the terminal 210 may check whether the paging area has been changed or not, and whether there is a paging signal to be transmitted in the paging area.
  • the terminal 210 and the base station 220 perform a random access procedure according to the instructions of the eBCH 120 in steps 550 and 560. Can be performed.
  • the base station 220 may recognize the terminal 210 based on paging access information such as a terminal identifier (eg, the terminal ID, the random access preamble for the terminal, etc.).
  • the base station 220 may transmit a paging signal to the terminal through the random access procedure.
  • the base station 220 that has received paging access information (eg, a terminal ID, etc.) through msg1 of the random access procedure in step 550, transmits to the terminal 210 through msg2 of the random access procedure in step 560. You can send a paging signal.
  • paging access information eg, a terminal ID, etc.
  • the msg2 format including the paging signal including the paging signal, a 1-bit usage format of a RAR message or a 1-bit usage format of a RAR message grant or a format concatenation with the RAR message (for example, the RAR message grant is the RAR message + It may include a UL grant of sufficient size to transmit the paging signal) or at least one of a format separate from the RAR message or a format transmitted in place of the RAR message.
  • the msg2 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like). After the transmission of msg 2, the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • the msg4 may include information that a paging signal is to be transmitted (for example, information indicating whether a paging signal is transmitted or the like).
  • the base station 220 may transmit a paging signal to the terminal 210 using a separate message.
  • step 570 the terminal 210 confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the base station 220 in step 580.
  • the terminal 210 confirming that the downlink data is not pending through the paging signal may maintain the idle mode.
  • the terminal 210 may perform a location registration procedure. Although not shown, the terminal 210 may perform a location registration procedure and receive a paging signal.
  • FIG. 6 is another example of a paging monitoring procedure in a 5G system according to an embodiment of the present invention.
  • the terminal 610 may determine the start of the paging signal monitoring time in step 630. In operation 635, the terminal 610 may search for an LTE cell 620 suitable for receiving a paging signal. In addition, the eBCH 120 (or BCH) may be received from the selected LTE cell 620 (step 640).
  • the terminal 610 may receive a paging signal according to the instruction of the eBCH 120 in step 650.
  • the paging signal may be a signal related to whether data to be transmitted from the 5G base station is pending.
  • the eBCH 120 or the paging signal transmitted from the LTE cell 620 may be a UE-specific or 5G UE-specific transmission format or decoding identifier (eg, existing for supporting a system to which beamforming is applied). It can be transmitted and received using the paging RNTI and other separate paging RNTI used in the LTE system.
  • the terminal 610 confirming that the downlink data is pending through the paging signal may continue to perform an access procedure for data transmission and reception through the LTE base station 620 in step 660.
  • the terminal 610 and the 5G base station establish a 5G connection for transmitting and receiving 5G data through the LTE base station 620.
  • an RRC setup procedure may be performed between the terminal 610 and the 5G base station, and a bearer (eg, a signaling radio bearer (SRB) 3) for 5G RRC may be configured. The procedure can be performed.
  • the terminal 610 confirming that the downlink data is not pending through the paging signal may maintain the idle mode.
  • the terminal 610 may perform a location registration procedure.
  • the terminal 610 may receive a paging signal while performing a location registration procedure.
  • FIG. 7 is an illustration of cell-based paging area operation according to an embodiment of the present invention
  • FIG. 8 is an illustration of TRP-based paging area operation according to an embodiment of the present invention
  • FIG. 9 is an embodiment of the present invention.
  • Figure 10 is an illustration of 5G base station based paging area operation according to an embodiment of the present invention.
  • the MIB or eBCH may include paging area code information.
  • the paging area may be cell based or transmission / reception point (TRP) based or LTE base station based or 5G base station based or radio unit (RU) based or data unit (DU) based or control unit (CU) control unit)
  • TRP transmission / reception point
  • RU radio unit
  • DU data unit
  • CU control unit
  • one or more cells may configure one paging area.
  • TRP-based paging area one or more TRPs may constitute one paging area.
  • the LTE base station based paging area one or more LTE base stations may configure one paging area.
  • one LTE base station may be connected to one or more 5G base stations.
  • one or more 5G base stations may configure one paging area.
  • one 5G base station may be connected to one or more LTE base stations.
  • one or more CUs may configure one paging area.
  • one or more cells may configure one paging area. And, one cell may belong to one or more paging areas.
  • one or more TRPs belonging to one or more cells may configure one paging area.
  • one TRP may belong to one or more paging areas.
  • one or more LTE base stations may configure one paging area. And, one LTE base station may belong to more than one paging area.
  • one or more 5G base stations may configure one paging area. And, one 5G base station may belong to one or more paging areas.
  • the terminal receiving the paging area code information transmitted from the MIB or the BCH / eBCH does not include the paging area code information known to the terminal and whether the terminal contains the paging area code information unknown to the terminal. It can be determined (checked). If the paging area code information known to the terminal is not included in the MIB or BCH / eBCH, the terminal may perform a location registration procedure through the cell in which the MIB or BCH / eBCH is received. As another embodiment, a terminal receiving paging area code information transmitted from the MIB or BCH / eBCH and information indicating whether a paging signal for each paging area is transmitted may determine whether there is a paging signal transmission for its paging area. Can be.
  • the terminal If the terminal has a paging signal transmission for its paging area and does not include paging area code information that the terminal knows in the MIB or BCH / eBCH, the terminal includes the paging area code information that the terminal does not know. Alternatively, the location registration procedure may be performed through the cell in which the BCH / eBCH is received. In addition, the terminal may receive a paging signal. If the terminal does not transmit a paging signal to its paging area and does not include paging area code information known to the terminal in the MIB or BCH / eBCH, the terminal may register the paging area code information that the terminal does not know. It may be postponed.
  • FIG. 11 is an embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention
  • Figure 12 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention
  • 13 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention
  • FIG. 14 is another embodiment of a paging RAT selection procedure in a 4G and 5G coexistence system according to an embodiment of the present invention Yes.
  • a paging signal may be generated in an idle mode.
  • a RAT or paging preference RAT to receive may be selected.
  • the terminal 1110 may be connected to the LTE base station 1120 system.
  • the UE 1110 determines whether to receive a paging signal in the LTE cell 1120 or a paging signal in the 5G cell 1130, and provides information about a cell to receive the determined paging signal in LTE. May transmit to the base station 1120.
  • the information may be paging preference RAT information.
  • the terminal 1110 may deliver paging preference RAT information to the base station 1120 through a UE capability transmission procedure, an idle mode transition procedure, an RRC configuration (re) configuration procedure, or a location registration procedure.
  • the LTE base station 1120 may transmit the received paging preference RAT information to the paging control (management) entity 1140 in step 1170.
  • the paging control entity 1140 may be a mobility management entity (MME).
  • the paging control entity 1140 may be an access and mobility management function (AMF), a user plane function (UPF), a session management function (SMF), etc., and may be an entity managing an idle mode of the terminal. have.
  • the paging control entity 1140 may manage the paging RAT of the terminal according to the received paging preference RAT information.
  • the base station 1120 or 1130 determines that the terminal 1110 supports multi-RAT or multi-connectivity (including LTE + 5G) capability
  • the corresponding terminal 1110 It may be determined whether the LTE cell 1120 receives the paging signal or the 5G cell 1130.
  • the terminal 1110 may be connected to the LTE base station 1120 system.
  • the terminal 1110 may transmit information on whether the terminal supports multi-RAT or multi-connectivity to the LTE base station 1120.
  • the LTE base station 1120 determines that the UE 1110 supports multi-RAT or multi-connectivity (including LTE + 5G) capability
  • the UE 1110 receives a paging signal from the LTE cell 1120.
  • the UE 1110 may determine the RAT (or paging preference RAT) to receive the paging signal in the idle mode.
  • the LTE base station 1120 may exchange the paging preference RAT information with the paging control entity 1140 to determine the RAT to receive the paging signal in the UE 1110 in the idle mode.
  • the LTE base station 1120 may transmit information (ie, paging preference RAT information) about the RAT to receive the paging signal in the terminal 1110 in the idle mode to the paging control entity 1140.
  • the paging control entity 1140 may manage the paging RAT of the terminal according to the received paging preference RAT information.
  • the LTE base station 1120 may transmit information (ie, paging preference RAT information) on which cell the terminal 1110 receives a paging signal to the terminal 1110.
  • the LTE base station 1120 may deliver the paging preference RAT information to the UE 1110 through a UE capability transmission procedure, an idle mode transition procedure, an RRC configuration (re) configuration procedure, or a location registration procedure.
  • the paging preference RAT determination procedure of the terminal 1110 transmits a measurement result of the RAT or cell to the base station 1120 and the base station 1120 is described above.
  • the paging preference RAT may be determined by determining usable RAT or cell information of the UE 1110.
  • the terminal 1110 may be connected to the LTE base station 1120 and the system.
  • the terminal 1110 may report the measurement result of the terminal to the LTE base station 1120 (measurement report).
  • the measurement result may be a measurement result for a RAT or a cell (eg, LTE, 5G) supported by the terminal 1110.
  • the LTE base station 1120 determines a RAT (or paging preference RAT) for receiving a paging signal in the idle mode.
  • the LTE base station 1120 may exchange the paging preference RAT information with the paging control entity 1140 to determine the RAT to receive the paging signal in the UE 1110 in the idle mode.
  • the LTE base station 1120 may transmit information (ie, paging preference RAT information) about the RAT to receive the paging signal in the terminal 1110 in the idle mode to the paging control entity 1140.
  • the paging control entity 1140 may manage the paging RAT of the terminal according to the received paging preference RAT information.
  • the LTE base station 1120 may transmit information (ie, paging preference RAT information) on which cell the terminal 1110 receives a paging signal to the terminal 1110.
  • the LTE base station 1120 may deliver the paging preference RAT information to the UE 1110 through a UE capability transmission procedure, an idle mode transition procedure, an RRC configuration (re) configuration procedure, or a location registration procedure.
  • the terminal 1110 is connected to the LTE base station 1120 and the 5G base station through a multi-connection connection.
  • the RAT information eg, measurement for LTE cell and measurement for 5G cell
  • the respective base stations 1120 and 1130 may be transmitted and received through the respective base stations 1120 and 1130.
  • a paging preference RAT indication transmitted to a terminal 1110 supporting multi-RAT or multi-connectivity (including LTE + 5G) capability is signaled from a base station corresponding to a selected RAT. Can be delivered via.
  • the terminal 1110 may be connected to the LTE base station 1120 and the system.
  • the terminal 1110 may transmit information on whether the terminal supports multi-RAT or multi-connectivity to the LTE base station 1120.
  • the terminal 1110 may be connected to the LTE base station 1120 and the 5G base station 1130 in a multi-connectivity manner.
  • the idle mode configuration of the terminal 1110 is set in a message that the terminal 1110 exchanges with the LTE base station 1120 in step 1430.
  • the idle mode configuration information may include at least one of a paging cycle, a paging offset, and a paging identify of the terminal 1110.
  • the idle mode configuration information may be interpreted as a paging preference RAT indicator.
  • the base station that receives the idle mode configuration information in this example, the LTR base station 1120
  • paging preference RAT information may be included in the idle mode configuration information.
  • the idle mode configuration information of the terminal 1110 is applied to a message exchanged with the 5G base station 1130 by the terminal 1110 in step 1430. Can be transmitted.
  • the idle mode configuration information may include at least one of a paging cycle, a paging offset, and a paging identity of the terminal 1110.
  • the idle mode configuration information may be interpreted as a paging preference RAT indicator.
  • the LTE base station 1120 and / or the 5G base station 1130 may inform the paging control entity 1140 of the RAT to receive the paging signal in the idle mode of the UE 1110 (that is, paging preference RAT). Information).
  • the paging control entity 1140 sends the paging preference RAT information back to the LTE base station 1120.
  • the paging control entity 1140 may manage the paging RAT of the terminal according to the received paging preference RAT information.
  • the terminal 1110 may receive paging preference RAT information from the base stations 1120 and 1130.
  • the terminal 1110 may receive the paging preference RAT from a base station (eg, 5G base station 1130) corresponding to the RAT selected as the paging preference RAT.
  • the base stations 1120 and 1130 may deliver paging preference RAT information to the UE 1110 through a UE capability transmission procedure, an idle mode transition procedure, an RRC configuration (re) configuration procedure, or a location registration procedure.
  • the paging preference RAT information transmitted to the terminal 1110 may be determined based on a cell connected to the system by the terminal 1110. For example, when the terminal 1110 performs system access to the LTE cell 1120, the LTE cell 1120 may be determined as a paging preference RAT of the terminal. In addition, when the terminal 1110 performs system access to the 5G cell 1130, the 5G cell 1130 may be determined as a paging preference RAT of the terminal 1110.
  • the paging control entity 1140 may determine that the terminal 1110 may receive a paging signal from the LTE cell 1120.
  • the paging control entity 1140 may determine that the terminal 1110 may receive a paging signal in the 5G cell 1130. If the terminal 1110 uses more than one service, the paging control entity 1140 (or base station 1120, 1130) is a multi-terminal of the terminal 1110 before the terminal 1110 transitions to the idle mode.
  • the RAT or multi-connectivity (including LTE + 5G) capability and the UE 1110 may explicitly inform the UE 1110 of the type of service to receive the paging signal.
  • the paging control entity 1140 (or the base stations 1120 and 1130) may use service information (eg, a radio bearer (eg, a radio bearer) before the terminal 1110 transitions to the idle mode. based on a quality of service (QoS), a service profile, or a separate service type that can be distinguished at a RAN level) of a radio bearer), to determine which RAT or cell to receive a paging signal. Information may be instructed to the terminal 1110.
  • service information eg, a radio bearer (eg, a radio bearer) before the terminal 1110 transitions to the idle mode. based on a quality of service (QoS), a service profile, or a separate service type that can be distinguished at a RAN level) of a radio bearer
  • a core network entity or anchor base station that controls paging of the terminal 1110 may manage paging preference RAT information of the terminal.
  • the paging preference RAT information of the terminal 1110 stored in the core network entity or anchor base station is performed during the procedure of exchanging paging preference RAT information between the terminal 1110 and the base station, or the terminal 1110 is in idle mode. It can be obtained while the base station performs a procedure for notifying the core network entity or anchor base station that the transition to.
  • the anchor base station may be a serving base station to which the terminal 1110 is connected or a base station managing a terminal context transitioned to an idle mode.
  • the entity for determining the paging preference RAT information of the terminal 1110 and the entity for managing the paging preference RAT information may be the same or different.
  • the paging preference RAT information is used when the terminal 1110 accesses a new base station by performing a handover, during communication with a serving base station, or while the terminal 1110 monitors paging in an idle mode, or when the terminal 1110
  • the multi-connectivity cell can be changed while being added / changed / deleted.
  • the core network entity or anchor base station decides to change the paging preference RAT of the terminal 1110, the core network entity or anchor base station indicates paging preference RAT change indication information of the terminal 1110 in a paging indication message of the terminal 1110. It can be transmitted to the terminal 1110 including the.
  • the LTE base station 1120 or 5G base station 1130 that has received the paging preference RAT change indication information of the terminal 1110 from a core network entity or anchor base station, has a paging signal including the paging preference RAT change indication information. May be transmitted to the terminal 1110.
  • the UE 1110 may monitor the indicated paging preference RAT from a later time point.
  • the UE 1110 in the idle mode may perform an operation of monitoring the paging signal in the LTE cell 1120.
  • the terminal 1110 may not monitor the 5G cell 1130.
  • the terminal 1110 may power off the 5G modem.
  • the terminal 1110 may perform an operation of monitoring the paging signal in the 5G cell 1130. In addition, the terminal 1110 may not monitor the LTE cell 1120. According to an embodiment, the terminal 1110 may power off the LTE modem.
  • the core network entity or anchor base station When it is necessary to transmit a paging signal to the terminal 1110, the core network entity or anchor base station, based on the paging preference RAT information of the terminal 1110, a paging instruction message to the base station corresponding to the RAT indicated by the paging preference RAT information Can be transmitted.
  • the core network entity or anchor base station instructs the paging area for the terminal 1110 to the LTE base station 1120 managing the paging area in which the terminal 1110 is registered. You can send a message.
  • the LTE base station 1120 may transmit a paging message including the terminal identifier to the terminal 1110.
  • the core network entity or anchor base station may paging the terminal 1110 to the 5G base station 1130 managing the paging area in which the terminal 1110 is registered.
  • Instruction message can be sent.
  • the 5G base station 1130 may transmit a paging message including the terminal identifier to the terminal 1110.
  • the carrier frequency of each cell may be different.
  • the paging preference RAT may be a heterogeneous RAT or a cell in a base station of the same RAT.
  • the indication information about the paging preference RAT may include at least one of a RAT ID, a cell ID, and a frequency ID.
  • a paging preference RAT exchange procedure between the terminal 1110 and the base stations 1120 and 1130, a procedure for exchanging paging preference RAT information of the terminal 1110 between the core network entity / anchor base station and the serving base station, and the terminal 1110 A paging monitoring procedure based on paging preference RAT information and a paging indication message receiving procedure including paging preference RAT information of the terminal 1110 will be described.
  • FIG. 15 illustrates an embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 1110 may access the system through the LTE base station 1120 in step 1510.
  • the terminal 1110 may transmit paging preference RAT information through the LTE base station 1120.
  • the LTE base station 1120 may inform the paging control entity 1140 of the paging preference RAT information of the terminal 1110.
  • the paging control entity 1140 may manage a paging RAT of the terminal 1110.
  • the terminal 1110 While the terminal 1110 is performing data transmission / reception through the LTE base station 1120 and / or the 5G base station 1130, the terminal 1110 may transition to the idle mode in step 1550. In idle mode, the UE 1110 may receive a paging signal by monitoring a paging preference RAT in step 1560.
  • the paging preference RAT of the terminal 1110 may be the 5G cell 1130. In this case, the terminal 1110 may receive a paging signal by monitoring the 5G cell 1130.
  • the paging preference RAT of the terminal 1110 may be the LTE cell 1130.
  • the paging control entity 1140 may transmit the terminal paging indication information to the cell 1130 corresponding to the paging RAT of the terminal 1110. For example, when the paging preference RAT of the terminal 1110 is a 5G cell, the paging control entity 1140 may transmit the terminal paging indication information to the 5G base station 1130 managing the 5G cell.
  • the 5G cell 1130 that has received the terminal paging indication information may transmit a paging signal to the terminal 1110 in step 1580.
  • the terminal 1110 may receive the paging signal by monitoring the 5G cell 1130.
  • the LTE base station 1120 to 5G base station 1130 may transmit multi-connectivity support information.
  • the terminal 1110 may monitor a base station supporting multiple connection access among base stations corresponding to the paging RAT.
  • 16 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 1110 may access the system through the LTE cell 1120 in step 1610.
  • the terminal 1110 may transmit multi-connectivity support information through the LTE base station 1120.
  • the LTE base station 1120 may exchange paging preference RAT information of the paging control entity 1140 and the terminal 1110 based on the multi-connectivity support information of the terminal 1110.
  • the LTE base station 1120 may determine paging preference RAT information of the terminal 1110 based on the multi-connectivity support information of the terminal 1110 and transmit the paging preference RAT information to the paging control entity 1140.
  • the LTE base station 1120 transmits the multi-connectivity support information of the terminal 1110 to the paging control entity 1140, and the paging control entity 1140 determines the paging preference RAT information of the terminal 1110 and this is LTE. It can be transmitted to the base station 1120.
  • the LTE base station 1120 and the paging control entity 1140 may negotiate to determine and exchange paging preference RAT information of the terminal 1110.
  • the LTE base station 1120 may transmit paging preference RAT information to the terminal 1110.
  • the paging control entity 1140 may manage a paging RAT for the terminal 1110.
  • the terminal 1110 While the terminal 1110 is performing data transmission and reception through the LTE base station 1120 and / or the 5G base station 1130, the terminal 1110 may transition to the idle mode in step 1660.
  • the UE 1110 may receive a paging signal by monitoring a paging preference RAT.
  • the paging preference RAT of the terminal 1110 may be the 5G cell 1130.
  • the terminal 1110 may receive a paging signal by monitoring the 5G cell 1130.
  • the paging preference RAT of the terminal 1110 may be the LTE cell 1130.
  • the paging control entity 1140 may transmit terminal paging indication information to the 5G cell 1130 corresponding to the paging RAT of the terminal 1110.
  • the paging control entity 1140 may transmit the terminal paging indication information to the 5G base station 1130 managing the 5G cell.
  • the 5G cell 1130 that has received the terminal paging indication information may transmit a paging signal to the terminal 1110 in step 1690.
  • the terminal 1110 may receive the paging signal by monitoring the 5G cell 1130.
  • the LTE base station 1120 to 5G base station 1130 may transmit multi-connectivity support information.
  • the terminal 1110 may monitor a base station supporting multiple connection access among base stations corresponding to the paging RAT.
  • 17 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 1110 may access the system through the LTE cell 1120 in step 1710.
  • the terminal 1110 may transmit multi-connectivity support information through the LTE base station 1120.
  • the LTE base station 1120 may exchange paging preference RAT information of the paging control entity 1140 and the terminal 1110 based on the multi-connectivity support information of the terminal 1110. Since the description thereof has been described above, the detailed description thereof will be omitted.
  • the LTE base station 1120 may transmit the paging preference RAT information to the terminal 1110.
  • the paging preference RAT of the terminal 1110 may be the LTE cell 1120.
  • the paging control entity 1140 may manage a paging RAT for the terminal 1110.
  • the paging control entity 1140 may determine to change the paging preference RAT of the terminal 1110.
  • the paging control entity 1140 may transmit paging preference RAT change information of the terminal 1110 to the LTE base station 1120.
  • the LTE base station 1120 may transmit the changed paging preference RAT information to the terminal 1110.
  • the changed paging preference RAT of the terminal 1110 may be the 5G cell 1130.
  • the terminal 1110 While the terminal 1110 is performing data transmission / reception through the LTE base station 1120 and / or the 5G base station 1130, the terminal 1110 may transition to the idle mode in step 1780. During idle mode, in operation 1785, the UE 1110 may receive a paging signal by monitoring a paging preference RAT. As described above, the changed paging preference RAT of the terminal may be the 5G cell 1130.
  • the paging control entity 1140 may transmit terminal paging indication information to the 5G cell 1130 corresponding to the paging RAT of the terminal 1110.
  • the 5G cell receiving the terminal paging indication information may transmit a paging signal to the terminal.
  • the paging control entity 1140 may transmit the terminal paging indication information to the 5G base station 1130 managing the 5G cell.
  • the 5G cell 1130 that has received the terminal paging indication information may transmit a paging signal to the terminal 1110 in step 1795.
  • the terminal 1110 may receive the paging signal by monitoring the 5G cell 1130.
  • the LTE base station 1120 to 5G base station 1130 may transmit multi-connectivity support information.
  • the terminal 1110 may monitor a base station supporting multiple connection access among base stations corresponding to the paging RAT.
  • 18 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 1110 may access the system through the LTE cell 1120 in step 1810.
  • the terminal 1110 may transmit multi-connectivity support information through the LTE base station 1120.
  • the LTE base station 1120 may exchange paging preference RAT information of the paging control entity 1140 and the terminal 1110 based on the multi-connectivity support information of the terminal 1110. Since the description thereof has been described above, the detailed description thereof will be omitted.
  • the LTE base station 1120 may transmit paging preference RAT information to the terminal 1110.
  • the paging preference RAT of the terminal 1110 may be the 5G cell 1130.
  • the paging control entity 1140 may manage a paging RAT for the terminal 1110.
  • the terminal 1110 While the terminal 1110 is performing data transmission and reception through the LTE base station 1120 and the 5G base station 1130, the terminal 1110 may transition to the idle mode in step 1860. During idle mode, in step 1865, the UE 1110 may receive a paging signal by monitoring a paging preference RAT.
  • the paging control entity 1140 may determine to change the paging preference RAT of the terminal 1110 transitioned to the idle mode.
  • the paging control entity 1140 may transmit terminal paging indication information including the paging preference RAT change information of the terminal 1110 to the cell 1130 corresponding to the current paging preference RAT of the terminal 1110.
  • the 5G cell 1130 may receive the terminal paging indication information from the paging control entity 1140.
  • the 5G base station 1130 may transmit a paging signal including the terminal paging preference RAT change information to the terminal 1110.
  • the paging signal may include the changed paging preference RAT information.
  • the terminal 1110 that receives the paging signal including the paging preference RAT change information may perform the new paging preference RAT monitoring in step 1880.
  • the new paging preference RAT may be the LTE cell 1120.
  • the paging control entity 1140 may transmit the terminal paging indication information to the cell 1120 corresponding to the paging RAT of the terminal 1110.
  • the LTE cell 1120 may correspond to a paging RAT.
  • the LTE cell 1120 receiving the terminal paging indication information may transmit a paging signal to the terminal 1110 in step 1895.
  • the terminal 1110 may receive a paging signal by monitoring the LTE cell 1120.
  • the LTE base station 1120 to 5G base station 1130 may transmit multi-connectivity support information.
  • the terminal 1110 may monitor a base station supporting multiple connection access among base stations corresponding to the paging RAT.
  • 19 is another embodiment of a paging RAT operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 1110 may access the system through the LTE cell 1120 in step 1910.
  • the terminal 1110 may transmit multi-connectivity support information through the LTE base station 1120.
  • the terminal 1110 may be connected to the LTE cell 1120 and the 5G cell 1130 to perform multi-connectivity data transmission and reception.
  • the LTE base station 1120, the 5G base station 1130, and the paging control entity 1140 may exchange paging preference RAT information for the terminal 1110.
  • the detailed operation thereof is similar to the exemplary embodiment illustrated in FIG. 14, and a detailed description thereof will be omitted.
  • the paging control entity 1140 may manage a paging RAT for the terminal 1110.
  • the 5G cell 1130 may transmit paging preference RAT information to the terminal 1110 in step 1960.
  • the paging preference RAT of the terminal 1110 may be a 5G cell 1130.
  • the terminal 1110 While the terminal 1110 is performing data transmission / reception through the LTE base station 1120 and / or the 5G base station 1130, the terminal 1110 may transition to the idle mode in step 1970. In idle mode, in operation 1980, the UE 1110 may receive a paging signal by monitoring a paging preference RAT.
  • the paging control entity 1140 may transmit the terminal paging indication information to the cell 1130 corresponding to the paging RAT of the terminal 1110.
  • the 5G cell 1130 may correspond to a paging RAT.
  • the 5G cell 1130 that has received the terminal paging indication information may transmit a paging signal to the terminal 1110 in step 1995.
  • the terminal 1110 may receive the paging signal by monitoring the 5G cell 1130.
  • the LTE base station 1120 to 5G base station 1130 may transmit multi-connectivity support information.
  • the terminal 1110 may monitor a base station supporting multiple connection access among base stations corresponding to the paging RAT.
  • the terminal 1110 when the terminal 1110 fails to detect (detect) a cell corresponding to a paging preference RAT in order to monitor a paging signal, the terminal 1110 transmits the terminal through a cell of an accessible RAT. You can start the procedure for establishing a UE-initiated connection.
  • the UE 1110 may receive or transmit a pending downlink packet or an uplink packet through the UE-initiated connection configuration procedure.
  • the terminal performs a system access procedure through an LTE base station, but the same may be applied to a case where the terminal performs a system access procedure through a 5G base station. That is, the terminal and the 5G base station may perform a procedure of exchanging multi-connectivity capability information of the terminal and exchanging paging preference RAT information, and exchanging terminal paging preference RAT information between the LTE base station / 5G base station and the paging control entity. Can be performed.
  • the 5G may of course include other RAT than LTE.
  • the LTE base station described as an example in the present invention may be replaced with a 5G base station operating in a low frequency band, for example, 6 GHz or less or 3.5 GHz or 2 GHz or 700 MHz band.
  • a 5G base station operating in a low frequency band for example, 6 GHz or less or 3.5 GHz or 2 GHz or 700 MHz band.
  • each step described in the various embodiments does not mean a sequential step, the steps described later may be performed first, or each step may be performed at the same time.
  • 20 is an embodiment of a 5G RRC connection operating procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the above procedure may be applied in the case of initial connection of the terminal 2010 or reconnection to transition from the idle mode of the terminal 2010 to the connected mode.
  • An embodiment in which the above procedure is applied in the case of a reconnection in which the UE 2010 transitions from an idle mode to a connected mode may include a case in which an LTE base station (eNB) 2020 receives a paging and performs a system access procedure. .
  • eNB LTE base station
  • the LTE base station (eNB) 2020 is an indicator (identification information) of the 5G base station 2030 when there are 5G base stations (5GNB, gNB, NR NB) 2030 around, for example, the corresponding 5G base station ( 2030 may broadcast the 5G public land mobile network (PLMN).
  • the 5G base station indicator is delivered in a system information (for example, a master information block (MIB), a system information block (SIB), etc.), or is UE-specific only for the corresponding terminal 2010. It may be delivered in one way.
  • a system information for example, a master information block (MIB), a system information block (SIB), etc.
  • the 5G base station (5GNB) 2030 When the terminal 2010 receives the information of the 5G base station in step 2065, the 5G base station (5GNB) 2030 is considered to exist in the vicinity, and the control signal for establishing a connection with the 5G base station (5GNB) 2030 (for example, a procedure of generating a packet data network (PDN) connection (PDN Connection) for transmitting / receiving 5G RRC signaling may be performed.
  • a procedure of generating a packet data network (PDN) connection (PDN Connection) for transmitting / receiving 5G RRC signaling may be performed.
  • RRC signaling for example, 5G RRC signaling for 5G connection establishment
  • a new PDN connection between the terminal 2010 and the LTE base station 2020 Can be generated.
  • the terminal 2010 transmits a 5G RRC message to be transmitted to the 5G base station 2030 through a new PDN connection different from the PDN connection for transmitting and receiving the LTE message between the terminal 2010 and the LTE base station 2020.
  • the LTE base station 2020 may transmit (forward) the 5G RRC message to the 5G base station 2030 through a connection between the LTE base station 2020 and the 5G base station 2030. That is, the terminal 2010 may transmit and receive an RRC message with the 5G base station 2030 through the new PDN connection.
  • Another embodiment of the condition for triggering the performance of the procedure for creating a PDN connection for sending / receiving 5G RRC signaling as described above will be described in detail in the embodiment of (2-3). Meanwhile, for convenience of description, the PDN connection for transmitting the 5G RRC signaling may be referred to as a 5G PDN connection.
  • a tunnel (channel) for transmitting a 5G RRC message may be created (set) between the terminal 2010 and the 5G base station (5GNB) 2030 in step 2070.
  • the terminal 2010 may exchange a 5G RRC message with the 5G base station 2030 through the tunnel (channel).
  • an indicator indicating that the PDN connection and the tunnel (channel) for transmitting / receiving the 5G RRC signaling may be a 5G RRC signaling dedicated PDN or a tunnel (channel) may be used.
  • the terminal 2010 may perform a cell selection procedure of selecting an appropriate 5G base station (5GNB) 2030 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2030. .
  • the terminal 2010 selects an appropriate 5G base station (5GNB) 2030
  • the terminal 2010 performs a 5G RRC connection setup procedure with the 5G base station 5GNB 2030 in step 2085. can do.
  • the LTE base station (eNB) 2020 between the terminal 2010 and the 5G base station (5GNB) 2030. May not require 5G RRC signaling.
  • the terminal 2010, 5G base station (5GNB) 2030, and LTE base station (eNB) 2020 may perform a 5G PDN connection release procedure configured for 5G RRC signaling.
  • the terminal 2010 receives a 5G RRC Connection Setup message from the 5G base station 2030, the terminal 2010 and the 5G base station 2030 are configured for 5G RRC signaling.
  • the terminal 2010 may transmit a 5G RRC connection setup complete message through a direct connection with the 5G base station 2030.
  • the terminal 2010 and the 5G base station 2030 may receive the 5G RRC.
  • the terminal 2010 may transmit a 5G RRC Connection Reconfiguration Complete message through a direct connection with the 5G base station 2030 in response thereto.
  • the 5G RRC Connection Setup or 5G RRC Connection Setup Complete or 5G RRC Connection Reconfiguration or 5G RRC Connection Reconfiguration Complete message may be changed to another message having the same purpose (for example, 5G RRC configuration).
  • a tunnel (channel) for transmitting a 5G RRC message between the terminal 2010 and the 5G base station (5GNB) 2030 may be released.
  • an indicator indicating that the PDN connection and the tunnel (channel) for transmitting / receiving the released 5G RRC signaling may be released for a 5G RRC signaling dedicated PDN or a tunnel (channel).
  • 21 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • mobility for example, handover
  • 5G PDN connection release procedure configured for 5G RRC signaling according to another embodiment of the present invention
  • mobility for example, handover
  • the 5G base station 2030 may deliver 5G RRC signaling including information that the terminal 2010 can handover to the terminal 2010 through the 5G PDN connection.
  • the terminal 2010 may transmit 5G RRC signaling transmitted to the 5G base station 2020 when the 5G RLF event occurs or 5G RRC connection reestablishment through the 5G PDN connection.
  • the LTE base station (eNB) 2020 is an indicator (identification information) of the 5G base station 2030 when there is a 5G base station (5GNB) 2030 around, for example, the corresponding 5G base station ( 5G PLMN of 2030 may be broadcast.
  • the indicator of the 5G base station may be delivered by being included in system information (eg, MIB, SIB, etc.) or may be delivered in a UE-specific manner for the corresponding terminal 2010 only.
  • the terminal 2010 receives the information of the 5G base station in step 2115, it is assumed that the 5G base station 5GNB 2030 exists in the vicinity, and a control signal for establishing a connection with the 5G base station 5GNB 2030 (for example, a procedure of generating a PDN connection for sending / receiving 5G RRC signaling) may be performed. Since a detailed description thereof has been made in the part related to FIG. 20, the detailed description thereof will be omitted. Another embodiment of the condition for triggering the performance of the procedure for creating a PDN connection for sending / receiving 5G RRC signaling as described above will be described in detail in the embodiment of (2-3).
  • a tunnel (channel) for transmitting a 5G RRC message may be generated (set) between the terminal 2010 and the 5G base station (5GNB) 2030 in step 2120.
  • the terminal 2010 may exchange a 5G RRC message with the 5G base station 2030 through the tunnel (channel).
  • an indicator indicating that the PDN connection and the tunnel (channel) for transmitting / receiving the 5G RRC signaling may be a 5G RRC signaling dedicated PDN or a tunnel (channel) may be used.
  • the terminal 2010 may perform a cell selection procedure for selecting an appropriate 5G base station (5GNB) 2030 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2030.
  • the terminal 2010 may perform a 5G RRC connection setup procedure with the 5G base station 5GNB 2030 in step 2135.
  • the terminal 2010, the 5G base station (5GNB) 2030, and the LTE base station 2020 may suspend (or deactivate) the use of the PDN connection or tunnel (channel) generated for the 5G RRC signaling. Can be.
  • the terminal 2010 and the 5G base station 2030 may establish a PDN connection configured for the 5G RRC signaling.
  • the terminal 2010 may transmit a 5G RRC Connection Setup Complete message through a direct connection with the 5G base station 2030.
  • the 5G RRC Connection Setup or 5G RRC Connection Setup Complete message may be changed to another message of the same purpose.
  • the terminal 2010 and the 5G base station 2030 have a PDN configured for the 5G RRC signaling.
  • Deactivation of the connection in response to the terminal 2010 may transmit a 5G RRC Connection Reconfiguration Complete message through a direct connection with the 5G base station 2030.
  • the 5G base station 2030 and the LTE base station 2020 may exchange the PDN connection or tunnel (channel) usage stop information.
  • an indicator indicating that the PDN connection and the tunnel (channel) are dedicated 5G RRC signaling PDNs or tunnels (channels) may be deactivated.
  • the tunnel (channel) for transmitting the 5G RRC message is deactivated between the terminal 2010 and the 5G base station (5GNB) 2030 in step 2145, the terminal 2010 and the 5G base station (5GNB). ) 2030 may directly transmit and receive a 5G RRC message.
  • the UE 2010 may check a handover event for changing the 5G cell.
  • the terminal 2010 may transmit signaling for activating the use of the PDN connection or tunnel (channel) for the deactivated 5G RRC signaling for the 5G RRC signaling for handover to the LTE base station 2020.
  • the signaling transmitted to the LTE base station 2020 may include the PDN connection or tunnel (channel) indicator information.
  • the terminal 2010, the LTE base station 2020, and the 5G base station 2030 may activate a 5G PDN connection or tunnel (channel).
  • the 5G base station 2030 when the 5G base station 2030 confirms a handover event that changes the 5G cell of the terminal 2010, the 5G base station 2030 is the deactivated 5G RRC for the 5G RRC signaling for the handover Signaling for activating a PDN connection or tunnel (channel) for signaling may be transmitted to the terminal 2010 and the LTE base station 2020.
  • the signaling transmitted by the 5G base station 2030 to the terminal 2010 or the LTE base station 2020 may include the PDN connection or tunnel (channel) indicator information.
  • the terminal 2010 when the terminal 2010 confirms a handover event for changing a 5G cell, the terminal 2010 uses a PDN connection or tunnel (channel) for the deactivated 5G RRC signaling for the handover 5G RRC signaling.
  • Terminal-to-network entity signaling eg, NAS signaling
  • the terminal-network entity signaling may include the PDN connection or tunnel (channel) indicator information.
  • the network entity receiving the PDN connection or tunnel (channel) indicator information may transmit the PDN connection or tunnel (channel) activation indication information to the LTE base station 2020 or the 5G base station 2030.
  • the terminal 2010, the LTE base station 2020, and the 5G base station 2030 may transmit and receive 5G RRC signaling of the terminal 2010 through the activated PDN connection or tunnel (channel).
  • the terminal 2010 that attempts to reconnect 5G cells after a radio link failure (RLF) occurs, the PDN connection is inactive for transmitting and receiving the 5G RRC signaling for 5G cell reconnection
  • the tunnel (channel) activation indication information may be transmitted to the 5G base station 2030 or the LTE base station 2020.
  • the terminal 2010 may include the PDN connection or tunnel (channel) information to be activated in a message transmitted to the LTE base station 2020 or the 5G base station 2030.
  • the terminal 2010 may include PDN connection or tunnel (channel) information to be activated in a message (for example, NAS signaling) transmitted to a network entity.
  • the interface between the LTE base station 2020 and the 5G base station 2030 for establishing the PDN connection may assume a direct connection or a connection through another network entity.
  • the terminal 2010 performs an access procedure with the 5G base station 2030 after establishing a PDN connection through the LTE base station 2020, but the PDN connection is performed through the 5G base station 2030.
  • the terminal 2010 can be extended to the case of performing a multi-connection access procedure with the LTE base station 2020.
  • FIG. 22 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • a PDN connection / tunnel (channel) for 5G RRC signaling is not separately set. Instead, the 5G RRC signaling may be transmitted and received between the LTE base station 2020 and the terminal 2010 through a preset PDN connection / tunnel (channel).
  • the LTE base station (eNB) 2020 is an indicator (identification information) of the 5G base station 2030 when there is a 5G base station (5GNB) 2030 around, for example, the corresponding 5G base station ( 5G PLMN of 2030 may be broadcast.
  • the indicator of the 5G base station 2030 may be delivered by being included in system information (eg, MIB, SIB, etc.) or may be delivered in a UE-specific manner for the corresponding terminal 2010 only.
  • the terminal 2010 When the terminal 2010 receives the information of the 5G base station in step 2220, the 5G base station (5GNB) 2030 is considered to exist in the vicinity, and 5G RRC signaling for establishing a connection with the 5G base station (5GNB) 2030. A procedure of creating a PDN connection for sending / receiving a message may be performed.
  • the terminal 2010 may request the LTE base station 2020 to create a PDN connection for transmitting / receiving 5G RRC signaling by transmitting a multi-connection connection capability of the terminal 2010.
  • the LTE base station 2020 may transmit the LTE PDN connection information for transmitting / receiving the 5G RRC signaling to the terminal 2010.
  • the LTE base station 2020 may allocate an indicator for distinguishing 5G RRC signaling transmitted and received through the LTE PDN connection.
  • the terminal 2010 and the LTE base station 2020 may use a separate radio network temporary identifier (RNTI) to distinguish the LTE RRC message and the 5G RRC message.
  • RNTI radio network temporary identifier
  • a 5G RRC Connection Reconfiguration message transmitted by the 5G base station 2030 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be encoded and transmitted as the RNTI for 5G-RRC.
  • a 5G RRC Connection Setup Complete message transmitted by the terminal 2010 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be encoded and transmitted as the RNTI for 5G RRC.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling is generated between the terminal 2010 / LTE base station 2020 and 5G base station 2030 by using the LTE PDN connection.
  • 2010 may exchange a 5G RRC message of the terminal 2010 with the 5G base station 2030 through the tunnel (channel).
  • the terminal 2010 and the 5G base station 2030 transmit and receive the 5G RRC signaling with the LTE base station 2020 through a preset PDN connection / tunnel (channel)
  • the PDN connection / tunnel (channel) The message transmitted to may include identification information or a header indicating 5G RRC signaling.
  • the terminal 2010 includes a packet data convergence protocol (PDCP) header or a radio link control (RLC) header or a medium access control (MAC) header that attaches indication information indicating that the 5G RRC signaling is attached to the 5G RRC signaling. Or it may be included in at least one of the MAC CE (control element).
  • the 5G base station 2030 may include indication information indicating that the 5G RRC signaling is included in at least one of a PDCP header, an RLC header, a MAC header, or a MAC CE attached to the 5G RRC signaling.
  • the LTE base station 2020 may include indication information indicating that the 5G RRC signaling is included in at least one of a PDCP header, an RLC header, a MAC header, or a MAC CE attached to the 5G RRC signaling.
  • the terminal 2010 may perform a cell selection procedure for selecting an appropriate 5G base station (5GNB) 2030 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2030.
  • the terminal 2010 may perform a 5G RRC connection setup procedure with the 5G base station 5GNB 2030 in step 2270.
  • 5G RRC signaling transmission and reception using the preset LTE PDN connection may be used until the terminal 2010 completes RRC connection establishment with the 5G base station 2030 according to an embodiment of the present invention.
  • 5G RRC signaling transmission / reception using the preset LTE PDN connection is performed when the terminal 2010 establishes RRC connection with the 5G base station 2030 according to an embodiment of the present invention.
  • the terminal 2010 may be used when determining the RLF event.
  • 5G RRC signaling transmission and reception using the preset LTE PDN connection may be used during the period in which the terminal 2010 maintains connection with the LTE cell according to an embodiment of the present invention.
  • 23 is another embodiment of a 5G RRC connection operating procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • an LTE signaling bearer eg, a signaling radio bearer (SRB)
  • SRB signaling radio bearer
  • the LTE base station (eNB) 2020 is an indicator (identification information) of the 5G base station 2030 when there is a 5G base station (5GNB) 2030 around, for example, the corresponding 5G base station ( 5G PLMN of 2030 may be broadcast.
  • the indicator of the 5G base station 2030 may be delivered by being included in system information (eg, MIB, SIB, etc.) or may be delivered in a UE-specific manner for the corresponding terminal 2010 only.
  • the terminal 2010 When the terminal 2010 receives the information of the 5G base station in step 2320, the 5G base station (5GNB) 2030 is considered to exist in the vicinity, and 5G RRC signaling for establishing a connection with the 5G base station (5GNB) 2030. You can perform the procedure to create a connection for sending / receiving messages.
  • the terminal 2010 may request the LTE base station 2020 to create a connection for sending / receiving 5G RRC signaling by transmitting a multi-connection connection capability of the terminal 2010.
  • the LTE base station 2020 may transmit LTE signaling bearer information for transmitting / receiving the 5G RRC signaling to the terminal 2010.
  • the LTE base station 2020 may allocate an indicator for distinguishing the LTE RRC SRB (signaling bearer) and 5G RRC SRB to the terminal 2010.
  • the terminal 2010 and the LTE base station 2020 may use a separate RNTI to distinguish the LTE RRC and the 5G RRC.
  • a 5G RRC Connection Reconfiguration message transmitted by the 5G base station 2030 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be encoded and transmitted as the RNTI for 5G-RRC.
  • a 5G RRC Connection Setup Complete message transmitted by the terminal 2010 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be encoded and transmitted as the RNTI for 5G RRC.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling is generated between the terminal 2010 / LTE base station 2020 / 5G base station 2030 by using the LTE signaling bearer, and in step 2350, the terminal ( 2010 may exchange a 5G RRC message of the terminal 2010 with the 5G base station 2030 through the tunnel (channel).
  • the terminal 2010 and / or the LTE base station 2020 determines whether the RRC signaling transmitted from a signaling bearer for transmitting and receiving the RRC signaling between the terminal 2010 and the LTE base station 2020 is for LTE RRC or 5G RRC.
  • the identifier information may be included in at least one of a PDCP header, an RLC header, a MAC header, or a MAC CE attached to the RRC signaling. Since a specific example thereof has been described above with reference to FIG. 22, a detailed description thereof will be omitted.
  • the terminal 2010 may perform a cell selection procedure for selecting an appropriate 5G base station (5GNB) 2030 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2030.
  • the terminal 2010 may perform a 5G RRC connection setup procedure with the 5G base station 5GNB 2030 in step 2370.
  • 5G RRC signaling transmission and reception using the LTE signaling bearer may be used until the terminal 2010 completes RRC connection establishment with the 5G base station 2030 according to an embodiment of the present invention.
  • 5G RRC signaling transmission and reception using the LTE signaling bearer when the terminal 2010 establishes the RRC connection with the 5G base station 2030, the terminal 2010 determines the 5G cell handover event In this case, the terminal 2010 may be used when determining the RLF event.
  • 5G RRC signaling transmission and reception using the LTE signaling bearer may be used during the period in which the terminal 2010 maintains connection with the LTE cell according to an embodiment of the present invention.
  • the terminal 2010 and the LTE base station 2020 may configure a signaling bearer for 5G RRC.
  • a 5G RRC Connection Reconfiguration message transmitted by the 5G base station 2030 to perform an RRC connection procedure with the 5G base station 2030 may be transmitted through the signaling bearer for 5G RRC.
  • a 5G RRC Connection Setup Complete message transmitted by the terminal 2010 to perform an RRC connection procedure with the 5G base station 2030 may be transmitted through the signaling bearer for 5G RRC.
  • the 5G RRC signaling bearer may be operated in an LTE air interface.
  • step 2410 when the LTE base station (eNB) 2020 has a 5G base station (5GNB) 2030 around the indicator (identification information) of the 5G base station 2030, for example, the corresponding 5G base station ( 5G PLMN of 2030 may be broadcast.
  • the indicator of the 5G base station 2030 may be delivered by being included in system information (eg, MIB, SIB, etc.) or may be delivered in a UE-specific manner for the corresponding terminal 2010 only.
  • the terminal 2010 When the terminal 2010 receives the information of the 5G base station in step 2420, the 5G base station (5GNB) 2030 is considered to exist in the vicinity, and 5G RRC signaling for establishing a connection with the 5G base station (5GNB) 2030. You can perform the procedure to create a connection for sending / receiving messages.
  • the terminal 2010 may request the LTE base station 2020 to create a connection for transmitting / receiving 5G RRC signaling by transmitting a multi-connection connection capability of the terminal 2010.
  • the LTE base station 2020 may transmit 5G signaling bearer information for transmitting / receiving the 5G RRC signaling to the terminal 2010.
  • 5G RRC Connection Reconfiguration message transmitted by the 5G base station 2030 to the terminal 2010 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be transmitted by the 5G signaling bearer.
  • a 5G RRC Connection Setup Complete message transmitted by the terminal 2010 to the 5G base station 2030 to perform an RRC connection procedure between the terminal 2010 and the 5G base station 2030 may be transmitted by the 5G signaling bearer. have.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling is generated between the terminal 2010 / LTE base station 2020 and 5G base station 2030 by using the 5G signaling bearer.
  • 2010 may exchange a 5G RRC message of the terminal 2010 with the 5G base station 2030 through the tunnel (channel).
  • the terminal 2010 may perform a cell selection procedure for selecting an appropriate 5G base station (5GNB) 2030 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2030.
  • the terminal 2010 may perform a 5G RRC connection setup procedure with the 5G base station 5GNB 2030 in step 2470.
  • 5G RRC signaling transmission and reception using the 5G RRC signaling bearer configured in the LTE base station 2020 may be used until the terminal 2010 completes RRC connection establishment with the 5G base station 2030 according to an embodiment of the present invention.
  • 5G RRC signaling transmission / reception using the 5G RRC signaling bearer configured in the LTE base station 2020 is performed when the terminal 2010 establishes an RRC connection with the 5G base station 2030 according to an embodiment of the present invention.
  • 5G RRC signaling transmission and reception using the 5G RRC signaling bearer configured in the LTE base station 2020 may be used during the period in which the terminal 2010 maintains connection with the LTE cell according to an embodiment of the present invention.
  • 25 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 2510 and the network entity 2540 may configure a signaling bearer for 5G RRC in the LTE base station 2520.
  • the signaling bearer for 5G RRC may be a signaling bearer for transmitting and receiving signaling (for example, non-access stratum (NAS) signaling) between the terminal 2510 and the network entity 2540.
  • the network entity 2540 may include at least one of an MME, an AMF, an UPF, an SMF, a P-GW, and an S-GW.
  • the LTE base station (eNB) 2520 is an indicator (identification information) of the 5G base station 2530 when there is a 5G base station (5GNB) 2530 around, for example, the corresponding 5G base station ( 2530 may broadcast the 5G PLMN.
  • the indicator of the 5G base station 2530 may be delivered by being included in system information (eg, MIB, SIB, etc.) or in a UE-specific manner for the corresponding terminal 2510 only.
  • the terminal 2510 When the terminal 2510 receives the information of the 5G base station in step 2555, the 5G base station (5GNB) 2530 is considered to exist in the vicinity, and 5G RRC signaling for establishing a connection with the 5G base station (5GNB) 2530. You can perform the procedure to create a connection for sending / receiving messages.
  • the terminal 2510 may establish a connection for 5G RRC signaling through a network entity 2540 that processes NAS signaling.
  • the terminal 2510 may deliver a multi-connection access capability of the terminal 2510 through NAS signaling to the network entity 2540.
  • the network entity 2540 may transmit 5G NAS signaling bearer information for transmitting / receiving the 5G RRC signaling to the terminal 2510.
  • the terminal 2510 and the network entity 2540 may include indication information for distinguishing between NAS signaling for LTE or NAS signaling for 5G.
  • a 5G RRC Connection Reconfiguration message transmitted by the 5G base station 2530 to the terminal 2510 to perform an RRC connection procedure between the terminal 2510 and the 5G base station 2530 is transmitted through the 5G NAS signaling bearer.
  • a 5G RRC Connection Setup Complete message transmitted by the terminal 2510 to the 5G base station 2530 to perform an RRC connection procedure between the terminal 2510 and the 5G base station 2530 is transmitted through the 5G NAS signaling bearer. Can be sent.
  • the terminal 2510 may exchange a 5G RRC message of the terminal 2510 with the 5G base station 2530 through the tunnel (channel).
  • the terminal 2510 may perform a cell selection procedure for selecting an appropriate 5G base station (5GNB) 2530 by measuring signal strength while synchronizing with the 5G base station (5GNB) 2530.
  • the terminal 2510 may perform a 5G RRC connection setup procedure with the 5G base station 5GNB 2530 in step 2575.
  • 5G RRC signaling transmission and reception using the 5G NAS signaling bearer may be used until the terminal 2510 completes RRC connection establishment with the 5G base station 2530 according to an embodiment of the present invention.
  • 5G RRC signaling transmission / reception using the 5G NAS signaling bearer is performed when the terminal 2510 establishes an RRC connection with the 5G base station 2530 according to an embodiment of the present invention.
  • the terminal 2510 may be used when determining the RLF event.
  • 5G RRC signaling transmission and reception using the 5G NAS signaling bearer may be used during a period in which the terminal 2510 maintains connection with the LTE cell according to an embodiment of the present invention.
  • 26 is another embodiment of a 5G RRC connection operation procedure in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the above procedure may be applied to an initial connection of the terminal 2610 or a reconnection to transition from the idle mode of the terminal 2610 to the connected mode.
  • the procedure is applied to a case of reconnection in which the procedure transitions from an idle mode to a connected mode of a terminal 2610.
  • the terminal 2610 receives paging at an LTE base station (eNB) 2620 according to an embodiment of the present invention. This may include a case of performing a system connection procedure.
  • eNB LTE base station
  • the terminal 2610 may perform a connection establishment procedure with the LTE base station (eNB) 2620.
  • the terminal 2610 and the LTE base station 2620 may perform a procedure for generating a connection for sending / receiving LTE RRC signaling, and the channel for sending / receiving the LTE RRC signaling is an LTE RRC signaling radio. bearer).
  • the LTE base station (eNB) 2620 is an indicator (identification information) of the 5G base station 2630 when there is a 5G base station (5GNB) 2630 around, for example, a 5G PLMN of the corresponding 5G base station 2630. Can be broadcast.
  • the indicator of the 5G base station 2630 may be delivered by being included in system information (for example, MIB, SIB, etc.) or in a UE-specific manner for the corresponding terminal 2610 only.
  • step 2645 when the terminal 2610 receives the information of the 5G base station, the 5G base station (5GNB) 2630 is considered to exist in the vicinity, and the appropriate 5G base station (5GNB) 2630 is selected to select the 5G base station (5GNB).
  • a procedure for generating a connection for sending / receiving 5G RRC signaling for establishing a connection with 2630 may be performed.
  • Another embodiment of the condition for triggering the performance of the procedure for creating a connection for sending / receiving 5G RRC signaling as described above will be described in detail in the embodiment of (2-3).
  • a channel for transmitting a 5G RRC message may be generated (set) between the terminal 2610 and the 5G base station (5GNB) 2630 in step 2650.
  • the terminal 2610 may exchange a 5G RRC message with the 5G base station 2630 through the channel.
  • the channel for sending / receiving the 5G RRC signaling may correspond to, for example, a 5G signaling radio bearer. If a connection for 5G RRC signaling is established between the terminal 2610 and the 5G base station (5GNB) 2630, the RRC of the terminal 2610 is between the LTE base station 2620 and the 5G base station 2630 in step 2650.
  • a tunnel (channel) for transmitting signaling (LTE RRC message to 5G RRC message, etc.) may be configured.
  • the tunnel for the RRC signaling of the terminal 2610 between the LTE base station 2620 and the 5G base station 2630 the terminal 2610 can transmit and receive LTE RRC signaling with the LTE base station 2620 When an unknown event occurs, it may be used as a path for transmitting LTE RRC signaling between the LTE base station 2620 and the terminal 2610.
  • the tunnel for RRC signaling of the terminal 2610 between the LTE base station 2620 and the 5G base station 2630 may transmit and receive 5G RRC signaling between the terminal 2610 and the 5G base station 2630.
  • the terminal 2610 may be used as a path for transmitting 5G RRC signaling between the 5G base station 2630.
  • the event may be, for example, a radio link failure (RLF) determination with an LTE base station 2620 or a radio link failure (RLF) determination with a 5G base station 2630 or an LTE base station 2620 handover decision or a 5G base station 2630. ) Handover determination and the like.
  • RLF radio link failure
  • the terminal 2610 and the LTE base station 2620 can directly perform LTE RRC signaling transmission
  • the terminal 2610 and 5G base station 2630 is 5G RRC signaling transmission can be performed directly.
  • the terminal 2610 and the LTE base station 2620 perform LTE RRC signaling and 5G RRC signaling, and between the terminal 2620 and the 5G base station 2630.
  • the 5G RRC signaling transport channel may be deactivated.
  • the terminal 2610 and the 5G base station 2630 perform 5G RRC signaling and LTE RRC signaling and the terminal 2610 and the LTE base station 2620.
  • the inter-LTE RRC signaling transport channel may be deactivated.
  • a channel for transmitting and receiving 5G RRC signaling between the terminal 2610 and the 5G base station 2620 may be deactivated.
  • the UE 2610 and the LTE base station 2620 may perform LTE RRC signaling transmission and reception through the configured LTE RRC signaling transmission and reception channel.
  • the terminal 2610 and the 5G base station 2630 may transmit and receive 5G RRC signaling through a tunnel established between the LTE base station 2620 and the 5G base station 2630.
  • transmission and reception of 5G RRC signaling between the UE 2610 and the LTE base station 2620 may be performed using the LTE RRC signaling transmission / reception channel, or using a PDN connection channel separately configured for the 5G purpose, or LTE signaling separately configured for the 5G purpose. It may be assumed to use a bearer channel, to use a signaling bearer for 5G RRC configured in the LTE base station 2620, or to use a NAS signaling bearer channel. Since specific examples thereof have been described above, detailed descriptions thereof will be omitted.
  • an event in which the terminal 2610 cannot transmit / receive LTE RRC signaling may be generated through a direct connection with the LTE base station 2620 (eg, LTE RLF generation).
  • the terminal 2610 may activate a 5G RRC signaling transmission / reception channel with the 5G base station 2630.
  • the UE 2610 transmits a random access code for requesting activation of the 5G RRC signaling transmission / reception channel to the 5G base station 2630, or MAC CE.
  • the terminal 2610 and the 5G base station 2630 may transmit and receive 5G RRC signaling through the activated 5G RRC signaling transmission and reception channel.
  • the terminal 2610 and the LTE base station 2620 may transmit and receive LTE RRC signaling through a tunnel established between the LTE base station 2620 and the 5G base station 2630.
  • the transmission and reception of LTE RRC signaling between the terminal 2610 and the 5G base station 2630 may be performed by using the 5G RRC signaling transmission / reception channel, or by using a PDN connection channel configured separately for the LTE purpose, or 5G signaling separately configured for the LTE purpose. It may be assumed to use a bearer channel, or to use a signaling bearer for LTE RRC configured in the 5G base station 2630 or to use a NAS signaling bearer channel.
  • the 5G RRC signaling transmission / reception channel between the activated terminal 2610 and the 5G base station 2630 may be used until the LTE RRC signaling transmission / reception channel between the terminal 2610 and the LTE base station 2620 is normally operated.
  • the interface between the LTE base station and the 5G base station using a preset PDN connection, or using an LTE signaling bearer, or using a 5G RRC signaling bearer configured in the LTE base station, or using a NAS signaling bearer directly Assume a connection or a connection through another network entity.
  • a 5G base station is used by using a PDN connection of an LTE base station, an LTE signaling bearer, a 5G RRC signaling bearer configured in an LTE base station, or a 5G NAS signaling bearer configured in an LTE base station.
  • the terminal may determine the presence of the 5G cell to trigger the access procedure to the 5G cell, the information necessary to determine the 5G cell presence can be obtained by the following embodiment.
  • information for triggering a connection procedure to a 5G cell includes a PDN connection configuration for using a PDN connection, 5G RRC indication information configuration for using an LTE signaling bearer, or a 5G RRC signaling bearer configured for an LTE base station. It may be applied to perform signaling bearer configuration for 5G RRC for use or NAS signaling bearer configuration for using NAS signaling bearer for 5G.
  • FIG. 27 is a view illustrating an operation procedure of triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention
  • FIG. 28 is a 5G RRC connection triggering in a 4G and 5G coexistence system according to an embodiment of the present invention
  • TAI format used.
  • the LTE base station 2720 may transmit identification information of the 5G base station 2730 to the terminal 2710.
  • the information may be transmitted to the terminal in a broadcasting manner through the system information.
  • the information used for 5G cell access triggering of the terminal 2710 may include a 5G cell identifier or a tracking area identifier previously stored in the terminal 2710.
  • the LTE cell identifier information of the system broadcast information acquired from the LTE cell 2720 in step 2760 may coexist with the LTE cell 2720.
  • Information may include
  • the LTE cell identifier information may include tracking area code (TAC) information of a 5G cell 2730 that coexists with the LTE cell 2720.
  • TAC tracking area code
  • the terminal 2710 that has received the TAC information of the 5G cell 2730 has a 5G cell 2730 coexisting with the LTE cell 2720 in comparison with the TA identifier of the 5G cell 2730 previously stored. You can predict it.
  • the UE 2710 predicting the existence of the 5G cell 2730 that coexists with the LTE cell 2720 is connected to the 5G cell 2730 in step 2770 (for example, PDN connection procedure for 5G RRC signaling). Can be started.
  • the terminal 2710 may transmit a PDN connection request message to the MME 2750.
  • the PDN connection request message may be transmitted by designating an access point name (APN) as a 5G network. This is for configuring 5G PDN connection for 5G RRC signaling. Since the detailed description thereof has been described above, the detailed description thereof will be omitted.
  • APN access point name
  • the MME 2750 transmits a create session request message to the S-GW / P-GW 2740, and in step 2773, a session creation response message to the S-GW / P-GW 2740. Receive from the GW / P-GW 2740. Thereafter, in step 2774, the MME 2750 may transmit a bearer setup request message to the LTE base station 2720.
  • the bearer setup request message may include a PDN connectivity accept message.
  • a QoS class identifier (QCI) may be designated as 5G-RRC.
  • the LTE base station 2720 may transmit an RRC connection reconfiguration message to the terminal 2710.
  • the terminal 2710 may transmit an RRC connection reset complete message to the LTE base station 2720.
  • the LTE base station 2720 transmits a bearer setup response message to the MME 2750, and the terminal 2710 sends a PDN connectivity complete message to the MME 2750 in step 2778.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the terminal 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • 29 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the LTE base station 2720 may transmit identification information of the 5G base station 2730 to the terminal 2710.
  • the information may be transmitted to the terminal in a broadcasting manner through the system information.
  • the identifier of the 5G cell 2720 that coexists with the LTE cell 2720 through system broadcast information transmitted by the LTE cell 2720 5G cell ID) can be obtained.
  • the system broadcast information transmitted by the LTE cell 2720 may include a 5G cell identifier.
  • the terminal 2710 may predict the existence of a 5G cell 2730 that coexists with the LTE cell 2720 through the 5G cell identifier information.
  • the 5G cell identifier may be transmitted to the terminal 2710 in the form of a 5G cell ID list.
  • the UE 2710 predicting the existence of the 5G cell 2730 that coexists with the LTE cell 2720 is connected to the 5G cell 2730 in step 2920 (for example, PDN connection procedure for 5G RRC signaling). Can be started.
  • steps 2921 to 2928 are similar to steps 2771 to 2778 of the embodiment described in connection with FIG. 28, and a detailed description thereof will be omitted.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the UE 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • FIG. 30 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 2710 may previously store location information (eg, latitude, longitude, radius, etc.) of the 5G cell 2730.
  • location information eg, latitude, longitude, radius, etc.
  • the terminal 2710 may determine its own location information through GPS and determine whether the terminal 2710 is located at a location corresponding to an area of the 5G cell 2730.
  • steps 3021 to 3028 are similar to steps 2771 to 2778 of the embodiment described in FIG. 28 and the detailed description thereof will be omitted.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the terminal 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • an embodiment of determining whether a 5G cell 2730 is used by using the GPS is 5G cell in the embodiments of (2-3-1) to (2-3-2). After predicting the presence of 2730, it may be further performed to begin the connection procedure with the 5G cell 2730.
  • 31 is another embodiment of an operating procedure for triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 2710 may detect that a 5G application is executed. In addition, when the 5G application is executed, the terminal 2710 may start an access procedure (eg, PDN connection procedure for 5G RRC signaling) to the 5G cell 2730 in step 3120.
  • steps 3121 to 3128 are similar to steps 2771 to 2778 of the embodiment described in FIG. 28 and the detailed description thereof will be omitted.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the UE 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • the terminal 2710 determines whether the 5G cell 2730 coexists based on the information provided by the LTE cell 2720 or the presence of the 5G cell 2730 based on the GPS. That is, although the presence of the 5G cell 2730 that coexists with the LTE cell 2720 is confirmed, if there is no need to transmit and receive 5G application data through the 5G cell 2730, access procedure to the 5G cell 2730 May not be performed. When it is determined that it is necessary to transmit and receive 5G application data through the 5G cell 2730, the terminal 2710 may perform an access procedure to the 5G cell 2730.
  • 32 is a view illustrating another operation procedure of triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 2710 may transmit to the LTE cell 2720 that there is 5G capability when accessing the LTE cell 2720.
  • the terminal 2710 when the terminal 2710 is requested to transmit the terminal capability information from the LTE base station 2720 in step 3210 (for example, through a UE capability enquiry message), the terminal 2710 in step 3220 The terminal capability information may be transmitted to the LTE base station 2720.
  • the 5G capability information of the terminal 2710 may be delivered to an entity (eg, MME 2750, NG-Core, etc.) that manages capability information of the terminal 2710 in step 3225.
  • entity eg, MME 2750, NG-Core, etc.
  • step 3230 to step 3240 when the terminal 2710 accesses the LTE cell 2720 that coexists with the 5G cell 2730 (connection by handover, connection by RLF, or transition from idle mode to connected mode).
  • An entity that manages capability information of the terminal 2710 eg, the MME 2750
  • NAS signaling may be transmitted to the terminal 2710 to instruct an access procedure (eg, PDN connection procedure for 5G RRC signaling) with the 5G cell 2730.
  • the UE 2710 determines that a tracking area update (TAU) is required in step 3230, the UE 2710 may transmit a TAU request message to the MME 2750 in step 3235.
  • the MME 2750 may transmit a TAU complete message to the terminal 2710.
  • the TAU completion message may include information triggering a 5G PDN connection and may be transmitted to the terminal 2710.
  • the terminal 2710 may start an access procedure (eg, PDN connection procedure for 5G RRC signaling) with the 5G cell 2730 in step 3250.
  • steps 3251 to 3258 are similar to steps 2771 to 2778 of the embodiment described in connection with FIG. 28, and a detailed description thereof will be omitted.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the terminal 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • 33 is another embodiment of an operation procedure of triggering a 5G RRC connection in a 4G and 5G coexistence system according to an embodiment of the present invention.
  • the terminal 2710 may deliver 5G capability to the LTE cell 2730 when accessing the LTE cell 2720.
  • the terminal 2710 when the terminal 2710 is requested to transmit the terminal capability information from the LTE base station 2720 in step 3310 (for example, through a UE capability enquiry message), the terminal 2710 in step 3320 The terminal capability information may be transmitted to the LTE base station 2720.
  • an access procedure with the 5G cell 2730 is performed to the terminal 2710 (for example, PDN connection procedure for 5G RRC signaling) may be performed.
  • a 5G RRC message may be transmitted between the terminal 2710 and the LTE cell 2720.
  • the RRC message may be defined to trigger 5G PDN connection.
  • the terminal 2710 may start an access procedure (eg, PDN connection procedure for 5G RRC signaling) with the 5G cell 2730 in step 3340.
  • steps 3341 to 3348 are similar to steps 2771 to 2778 of the embodiment described in connection with FIG. 28, and a detailed description thereof will be omitted.
  • a tunnel (channel) for transmitting / receiving 5G RRC signaling may be generated between the UE 2710 / LTE base station 2720 / 5G base station 2730.
  • the terminal 2710 may exchange a 5G RRC message of the terminal 2710 with the 5G base station 2730 through the tunnel (channel).
  • the information for triggering the access procedure with the 5G cell 2730 of the embodiment of the (2-3) is the 5G cell 2730 without transmitting and receiving 5G RRC signaling through the LTE cell 2720 It can be used as a condition for transmitting and receiving 5G RRC signaling through a direct connection with the network.
  • the terminal 2710 may coexist with the LTE cell 2720.
  • the connection procedure to cell 2730 may begin.
  • the access procedure to the 5G cell 2730 may be processed by transmitting and receiving 5G RRC signaling directly to the 5G cell 2730.
  • the terminal 2710 receives UE capability information (eg, supports multi-connectivity with the LTE cell 2720) while performing the access procedure to the 5G cell 2730. You can inform. Recognizing that the terminal 2710 supports multi-connectivity with the LTE cell 2720, the 5G cell 2730 has a multi-connection with the 5G cell 2730 and the LTE cell 2720 by the terminal 2710. A procedure for performing a connectivity operation may be performed. A procedure for performing a multi-connectivity operation of the terminal 2710 may include, for example, transmitting UE capability information of the terminal 2710 to the LTE cell 2720.
  • the terminal 2710 may obtain configuration information of the 5G cell 2730 that coexists with the LTE cell 2720 from the LTE cell 2720.
  • Configuration information of the 5G cell 2730 is an example of whether the 5G cell 2730 can operate as a standalone cell, or whether the 5G cell 2730 can operate as a cell parasitic in another cell May contain information.
  • the terminal 2710 performs an access procedure to a 5G cell 2730 that can operate as a standalone cell when at least one of the conditions for triggering the access procedure with the 5G cell 2730 according to the embodiment of (2-3) is satisfied.
  • the terminal 2710 may operate as a parasitic cell in another cell when at least one of the conditions for triggering an access procedure with the 5G cell 2730 according to the embodiment of the present invention (2-3) is satisfied.
  • Measurement result for example, measurement report
  • Measurement result for the LTE cell 2720 may be transmitted, and the data through the 5G cell 2730 and the LTE cell 2720 according to the instruction of the LTE cell 2720 You can start sending and receiving.
  • the LTE base station described as an example in the present invention may be replaced by a 5G base station operating in a low frequency band, for example, 6 GHz or less or 3.5 GHz or 2 GHz or 700 MHz band.
  • a role corresponding to an existing base station managing a radio link is divided into a central node 3410 and a node (or a general node, a distributed node, etc.) 3420.
  • the central node 3410 is connected to a plurality of nodes 3420 (3421, 3422, 3423, 3424, 3425, 3426, 3427) and manages each node 3420.
  • the central node 3410 may be connected to a network 3430 at the nose.
  • the central node 3410 and the node 3420 are connected by wire or wirelessly and may be called a fronthaul.
  • the central node 3410 may be referred to as a central unit (CU), a wireless controller (wireless controller), a data center (data center), an anchor node (anchor node), or the like.
  • Central Node 3410 has all or part of the protocol stack, and at least part of the L2 higher protocol stack.
  • the node 3420 may be a distributed unit (DU), an access unit (AU), a transmission and reception point (TRP), an access point (AP), or an evolved node (evolved). Node B) and the like. Node 3420 may have a portion of an L1 / L2 protocol stack.
  • the node 3420 may be a wireless communication base station operating in a high frequency band using a millimeter wave or the like, and may support beamforming according to an embodiment.
  • 35 is a specific example of a distributed structure of a base station based on an LTE protocol stack according to an embodiment of the present invention.
  • splitting option 1-8 may be applied based on the LTE protocol stack, which may be determined by standardization, system deployment, fronthaul delay time, and service requirement.
  • the present invention can be applied to these various partitioning options, and some functions may be omitted depending on the options implemented.
  • 36 is a schematic illustration of a beamforming and node change related procedure in a communication system according to an embodiment of the present invention.
  • a process for beamforming is performed between a UE (user equipment, terminal, etc.) 3610, Nodes 3620, 3630, and Central Node 3640 in step 3650.
  • the Central Node 3640 and the Nodes 3620 and 3630 may determine a beam training method so that the UE 3610 may perform beam training.
  • the central node 3640 and the nodes 3620 and 3630 need to prepare a beam feedback for determining a method of feeding back a beam training result after performing beam training with the terminal 3610.
  • the conditions of the beam feedback, the apparatus that should receive the beam feedback, the information included in the beam feedback, and the like must be determined.
  • the preparation process of the beam training of step 3650 and the preparation process of the beam feedback of step 3655 may occur at the same time.
  • the terminal 3610 After the beam training and the beam feedback method are determined, the terminal 3610 performs beam training in step 3660.
  • the terminal 3610, the central node 3640, and the nodes 3620 and 3630 may transmit / receive data according to the beam used in the beam training.
  • the terminal 3610, the nodes 3620 and 3630, and the central node 3640 need to share resources and terminal context.
  • beam feedback may be performed in step 3670.
  • the beam feedback may determine the nodes 3620 and 3630 to communicate with, the beam feedback may be delivered to the Node or Central Node 3640 that determines the Nodes 3620 and 3630 to communicate with.
  • the nodes 3620 and 3630 and the central node 3610 may switch data transmission / reception paths.
  • some of the processes may be omitted in advance, or the order of the processes having no relation between information may be changed.
  • FIG. 37 is a detailed illustration of a beamforming and node change related procedure in a communication system according to an embodiment of the present invention.
  • FIG. 37 is one embodiment contemplated by the present invention.
  • 36 is a schematic flowchart of FIG. 36 and various specific methods shown in FIGS. 38 to 48 are actual examples. An example of a specific operation process or modification will be described in a part related to FIGS. 38 to 48.
  • the terminal 3610 initially communicates with the Node1 3620 and assumes that the beam of the Node2 3630 is excellent in Beam Feedback to perform an operation for communicating with the Node2 3630. do.
  • the central node 3640 may transmit a message including beam measurement configuration information to the terminal 3610 (for example, a beam measurement configuration message) to inform a method of beam training.
  • the terminal 3610 may accurately perform beam training by receiving the beam measurement configuration information at least once.
  • Information that may be included in this message includes 1) whether the configuration information corresponds to one or more specific terminals / all terminals, 2) whether a reference signal for beam training is up / down link, 3 ) Number of beams to be used by Nodes 3620 and 3630, 4) Operating frequency, 5) Frequency / time resources to use for reference signals, 6) Number of reference signals transmitted simultaneously by Nodes 3620 and 3630, 7) Reference signals It may include at least one or more information of the type of code (Code) used for, 8) terminal ID, 9) Node ID for a node other than the serving node.
  • Code type of code
  • the central node 3640 may transmit a message including beam feedback configuration information to the terminal 3610 (for example, a beam feedback configuration message).
  • the message including the Beam Feedback Configuration information may include information on how the UE 3610 performs Beam Feedback.
  • Information that may be included in the Beam Feedback Configuration information includes 1) uplink beam feedback resources (eg, time / frequency information, physical uplink control channel (PUCCH) resources, etc.) of the corresponding nodes 3620 and 3630, and 2) random access.
  • uplink beam feedback resources eg, time / frequency information, physical uplink control channel (PUCCH) resources, etc.
  • Uplink synchronization information (e.g., Timing Alignment, etc.) between Nodes 3620 and 3630 and UE 3610, and 5) UE 3610) UE ID information (e.g., cell radio network temporary identifier (C-RNTI), S-temporary mobile subscriber identity (S-TMSI), etc.) to be used by the 3610;
  • C-RNTI cell radio network temporary identifier
  • S-TMSI S-temporary mobile subscriber identity
  • RSRP reference signal received power
  • RSSI received signal strength indicator
  • L1 Information about whether to apply L3 filtering, etc.
  • RSRP reference signal received power
  • RSRQ reference signal received quality
  • RSSI received signal strength indicator
  • RI rank indication
  • the Beam Feedback Configuration message may be transmitted as a message, such as a Beam Measurement Configuration message.
  • transmission of the Beam Feedback Configuration message or the Beam Measurement Configuration message may be omitted, and the base station 3620, 3630, 3640 and the terminal 3610 may be previously described in detail. You can recognize all of this.
  • the Central Node 3640 requests the Nodes 3620 and 3630 to transmit beam feedback information of the UE 3610 in steps 3715 and 3717. It may be. Such beam feedback information may be necessary for various reasons, such as when the serving node of the UE 3610 is changed.
  • the message including information for requesting the central node 3640 to transmit the beam feedback information of the terminal 3610 to the nodes 3620 and 3630 may be referred to as a node feedback configuration message.
  • the Node Feedback Configuration message includes: 1) information on whether to apply to a specific UE ID or a specific UE; 2) a condition under which Nodes 3620 and 3630 should send feedback to Central Node 3640 (eg, Whether to send all the time or only when certain conditions are satisfied, etc.) 3) A value that should be included when the Nodes 3620 and 3630 send feedback to the Central Node 3640 (for example, optimal beam identification information of the UE 3610).
  • Best Beam ID the number of beams above the threshold of the terminal 3610 and the threshold value, the signal strength received by the Best Beam (for example, RSRP, RSSI, RSRQ, etc.), signal quality (for example, CQI, PMI, RI, etc.), the signal strength received by the nth (n is a natural number) beam strength, the signal strength of all beams, the signal strength of the beam that can be measured, etc.), and Whether it should be processed and sent, or the raw data of the Nodes 3620 and 3630. At least one of information on whether to send a part, 5) information on whether a condition should be satisfied for a specific time, and information on the specific time may be included.
  • the nodes 3620 and 3630 may inform the central node 3640 of the beam feedback situation of the terminal 3610.
  • the Nodes 3620 and 3630 may inform the Central Node 3640 of the Beam Feedback status of the UE 3610 and may be referred to as Node Feedback.
  • some information of the message included in the Beam Feedback Configuration message may be included in the Node Feedback Configuration message.
  • the terminal 3610 may receive a downlink beam training signal in steps 3720 and 3723. If the condition specified in the Beam Feedback Configuration information is satisfied, the UE 3610 may transmit a Beam Feedback to the Node1 3620 in step 3735. In this case, in order to receive data from the terminal 3610, the central node 3640 may transmit a downlink (DL) monitoring configuration (DL) message to the terminal 3610 in step 3640.
  • DL downlink
  • DL monitoring configuration
  • the Central Node 3640 exchanges User Context information (or UE context information) with Node 1 3620, Node2 3630, and UE 3610.
  • Information can be stored.
  • User Context information includes 1) Security information (e.g. AS Security Key), 2) Terminal Capability (e.g. Beam information, Tx / Rx information, etc.), 3) QoS Information, 4) Terminal History Information (UE) History Info) (eg, tracking area information), and 5) user information.
  • the message including the user context information may include information regarding the data flow such as bearer information of the terminal 3610.
  • Radio Bearer information for example, DRB ID / SRB ID transmitted to Node1 3620 or Node2 3630
  • Layer information for example, PDCP / RLC / RRC / Configuration information such as MAC / PHY, etc.
  • Bearer-related information used in the node communicating with the terminal 3610
  • Node ID sharing information about the corresponding terminal 3610 10) At least one of information on the length of time corresponding to when the information is valid and 11) information corresponding to 1) to 10) shared to other nodes may be included.
  • the message including the user context information may be generated by the central node 3640 and then shared with the nodes 3620 and 3630.
  • the nodes 3620 and 3630 may generate this message and transmit the message to the terminal 3610 and the central node 3640 to share the message. If the UE context is delivered, when a node performs beam feedback, data transmission, transmission resumption request, link recovery request, etc. from one node to another node, the corresponding node may play a role without additional request for the UE context. If there is no need to receive some or all of the UE context in advance, the terminal 3610 or the nodes 3620 and 3630 may request and receive this information from the central node 3640 when needed.
  • the UE 3610 may receive a Beam Feedback Confirm message, for example, in step 3745 to indicate that the beam feedback has been successfully transmitted.
  • the terminal 3610 may transmit a Beam Feedback message and then operate the timer 3735 until the Beam Feedback Confirm is received.
  • the terminal 3610 may consider that the beam feedback has not been successfully delivered and may retransmit the beam feedback.
  • the Node1 3620 may transmit a Node Feedback message to the Central Node 3640 in step 3740.
  • the information included in the Node Feedback message may be information specified in the Node Feedback Configuration information. If the node changes after the node feedback, in step 3743, the central node 3640 may transmit a message including Node Change Indication information to the node 3620 before the change. After the Node Change Indication is transmitted to the Node1 3620, the Node1 3620 may transmit a Beam Feedback Confirm to the UE 3610.
  • the central node 3640 may request the UE 3610 to transmit a downlink status report message in step 3760 (for example, through a DL-RX status report request message).
  • the DL-RX status report request message may be included in another message and transmitted to the terminal 3610.
  • the central node 3640 may transmit a UE context to the terminal 3610 in step 3755. Based on this, the terminal 3610 may transmit a downlink status report to the central node 3640 (for example, through a DL-RX status report message) in step 3765 and deliver messages required for ARQ.
  • step 3770 and 3775 data forwarding may be performed from Node1 3620 to which the current terminal 3610 communicates with Node2 3630. After the signaling is completed, the terminal 3610 may normally perform communication with the Node2 3630 in step 3780.
  • FIG. 38 a detailed example of a preparation process for beam training performed by the nodes 3620, 3630, the central node 3640, and the terminal 3610 may be described with reference to the “Beam Training preparation process” in step 3660 of FIG. 36. Is illustrated.
  • information about the beamforming-related capability of the terminal 3610 is transmitted to at least one of the nodes 3620, 3630 and / or the central node 3640.
  • Information on the beamforming related capability of the terminal 3610 may be transmitted through, for example, a UE Beam Capability message.
  • the UE Beam Capability message includes 1) the number of terminal beams, 2) the beam gain of the terminal, 3) the number of beams that the terminal can measure simultaneously, 4) the number of RF chains, 5) the transmit power of the terminal, and 6) the terminal.
  • One or more pieces of information may be included, whether there is a Beam Feedback resource allocated to another node already.
  • a UE ID such as C-RNTI, international mobile subscriber identity (IMSI), globally unique temporary identity (GUTI), S-TMSI, etc. may be included in the UE Beam Capability message and transmitted.
  • the UE 3610 transmits the UE beam capability information to at least one node 3620 and 3630, and modifies the information received by the nodes 3620 and 3630 or inserts the received information into another message to the central node 3640. Can transmit
  • each node 3620 and 3630 may transmit a message including beam training information of the nodes 3620 and 3630 to the central node 3640.
  • the central node 3640 may know the beam training capability of the nodes 3620 and 3630.
  • the beam training information includes 1) the number of beams of the node, 2) the number of sectors, 3) the period it takes to transmit all of the beam training, 4) beam training frequency / time resource information, 5) the number of RF chains of the node, 6 1) Node transmit power, 7) Beam Gain of Node, 8) Number of Beam Training Signals that can be transmitted simultaneously, 9) Range of Beam ID to be used, 10) Frequency, 11) Bandwidth, or more.
  • the beam training information may be divided into IDs of nodes 3620 and 3630.
  • the nodes 3620 and 3630 may transmit information to the central node 3640 in uplink / downlink beam training signals that can be assigned to a specific terminal 3610. This may be applied when the beam training signal is assigned to a specific terminal 3610 or a specific plurality of terminals 3610.
  • 1) Unused Beam Training Code (Sequence) ID 2) Unused Beam Training Code (Sequence) ID, 3) Frequency / Time Resource Location to Send Beam Training Sequence, 4) Frequency / Time Resource to Send Beam Training Sequence Index for location, 5)
  • the number of terminals currently allocated to the Beam Training Signal, etc. may be included in the message and transmitted to the Central Node 3640.
  • the central node 3640 or the nodes 3620 and 3630 may actually perform beam training based on at least one of UE beam capability information of the terminal 3610 and beam training information of the node.
  • the central node 3640 determines that the beam training is determined and instructs the nodes 3620 and 3630, but according to an embodiment, the nodes 3620 and 3630 may determine the beam training. .
  • the central node 3640 needs to transmit a beam training method to the nodes 3620 and 3630 and the terminal 3610 that perform actual beam training.
  • FIG. 38 the central node 3640 needs to transmit a beam training method to the nodes 3620 and 3630 and the terminal 3610 that perform actual beam training.
  • a message for transmitting the beam training method to the nodes 3620 and 3630 by the central node 3640 in step 3830 and 3835 is called a beam training command message, and in step 3840 and 3843.
  • the central node 3640 or the nodes 3620 and 3630 transmit a method of beam training to the terminal 3610 is called a beam measurement configuration message.
  • the Beam Training may be performed according to the contents included in the message.
  • the information that may be included in the Beam Training Command message includes: 1) whether the node corresponds to one or more terminals (transmission of a reference signal transmitted by a node to a specific terminal in a downlink or transmitted by a specific terminal to a node in an uplink, etc.) / To all terminals.
  • a message transmitted from the Central Node 3640 to the Nodes 3620 and 3630 may be forwarded from one Node 3620 and 3630 to another Node 3620 and 3630 and transmitted.
  • the nodes 3620 and 3630 may transmit a downlink beam training signal or receive an uplink beam training signal specified in the beam training command.
  • the central node 3640 or the nodes 3620 and 3630 may transmit information on a beam training method to the terminal 3610 (Beam Measurement Configuration).
  • the terminal 3610 may accurately perform beam training by receiving this information at least once.
  • Information that may be included in this message includes 1) information on whether one or more UEs correspond to all UEs, 2) information on whether a reference signal to be used for beam training is up / down link, 3) Node ( 3620, 3630, the number of beams to use, 4) operating frequency, 5) frequency / time resources used for reference signals, 6) number of reference signals transmitted simultaneously by nodes 3620 and 3630, 7) used for reference signals Code type, 8) UE ID, 9) Node ID for a node other than the serving node, and one or more information may be included. According to an exemplary embodiment, it may take a certain time for the actual beam training to be applied based on this message. You can insert it and notice that the Beam Measurement Configuration is newly applied exactly after that time.
  • the wireless signal transmitted between Node1 3620, Node2 3630 and UE 3610 of FIG. 38 may be transmitted / received in a frequency band other than the frequency band for beam training and feedback. For example, it may be transmitted as an LTE message in the LTE frequency band.
  • 39 is a diagram illustrating a beam feedback and node feedback preparation process in a communication system according to an embodiment of the present invention.
  • the central node 3640 may proceed to step 3910 and In operation 3915, the beam feedback resource request message may be transmitted to the nodes 3620 and 3630 to request information on the beam feedback resources of the nodes 3620 and 3630.
  • the Beam Feedback Resource Request message may include at least one of 1) terminal identification information (ID) and 2) content to be included in the Beam Feedback Resource Report. In some embodiments, transmission of the Beam Feedback Resource Request message may be omitted.
  • the nodes 3620 and 3630 need to inform the central node 3640 of beam feedback resource information for the specific terminal 3610, the nodes 3620 and 3630 transmit a Beam Feedback Resource Report message in steps 3920 and 3925. May transmit to the Central Node 3640.
  • the Beam Feedback Resource Report message includes 1) terminal identification information (ID) for beam feedback, 2) resource information for beam feedback (eg, PUCCH resource information), 3) random access preamble ID to be used for beam feedback, 4) At least one of a Node or a Beam ID of a terminal to be used for beam feedback may be included.
  • the Beam Feedback Resource Report message may include Beam Feedback Resource information available in the corresponding Nodes 3620 and 3630 instead of resource information for a specific UE.
  • 1) available beam feedback resource information 2) resource information available as beam feedback (for example, PUCCH resource information, frequency, time, PUCCH Index, etc.), 3) random access preamble ID to be used for beam feedback, 4 ) At least one of beam feedback resource information currently used, 5) PUCCH resource information currently used, and 6) Random Access Preamble ID currently used may be included in the Beam Feedback Resource Report message.
  • Nodes 3620 and 3630 that have received Beam Feedback from the terminal 3610 or have received Beam Feedback of the terminal 3610 from other nodes 3620 and 3630 are required to receive beam feedback received from the Central Node 3640 as needed. It may be necessary to transmit all or part of the information. In the present invention, this may be referred to as Node Feedback.
  • the central node 3640 may transmit a Node Feedback Configuration message to the nodes 3620 and 3630.
  • the Node Feedback Configuration message is a message including information on conditions for the Nodes 3620 and 3630 to deliver all or part of the beam feedback result of the UE 3610 to the Central Node 3640.
  • the Node Feedback Configuration message includes: 1) information on whether to apply to a specific UE ID or a specific UE; 2) a condition under which Nodes 3620 and 3630 should send feedback to Central Node 3640 (eg, Whether to send all the time, or only when certain conditions are satisfied, etc.) 3) Values that should be included when the Nodes 3620 and 3630 send feedback to the Central Node 3640 (eg, Best Beam ID of the UE 3610, UE) The number of beams equal to or greater than the threshold of 3610 and the threshold, the signal strength received by Best Beam (e.g., RSRP, RSSI, RSRQ, etc.), signal quality (e.g., CQI, PMI, RI, etc.), signal strength received by the nth (n is a natural number) beam, the signal strength of all beams, the signal strength of the beam that can be measured, etc.) 4) Whether the beam feedback data should be processed by L1, L3 filtering, etc.
  • Best Beam e
  • the nodes 3620 and 3630 may inform the central node 3640 of the beam feedback situation of the terminal 3610.
  • some information of the message included in the Beam Feedback Configuration message may be included in the Node Feedback Configuration message.
  • a condition under which Nodes 3620 and 3630 should send Node Feedback to Central Node 3640 may include at least one of the following examples.
  • the highest quality among the beams of the node e.g., the beam with the highest beam RSRP, the beam with the highest multi-input multi-output (MIMO) rank, the beam with the highest predicted transmission rate, and the available MCS (modulation). and coding scheme
  • MIMO multi-input multi-output
  • the highest quality among the beams of the node for example, the highest beam RSRP beam, the highest MIMO rank beam
  • the number of beams for which a specific terminal 3610 has a feedback value equal to or greater than a threshold value is another threshold value (eg, the number of beams is 3, etc.) It may be when the above.
  • the threshold values of the above embodiment may be included in a Node Feedback Configuration message.
  • the nodes 3620 and 3630 may send node feedback to the central node 3640.
  • the predetermined time may be included in the Node Feedback Configuration message.
  • At least one of the nodes 3620, 3630, and the central node 3640 may provide configuration information on how the terminal 3610 makes a beam feedback to the terminal 3610.
  • a Beam Feedback Configuration message which is a message including a may be transmitted.
  • the Central Node 3640 may generate a Beam Feedback Configuration message and transmit it to Node1 3620 and / or Node2 3630 in steps 3940 and / or 3945.
  • the Node1 3620 and / or Node2 3630 may transmit a Beam Feedback Configuration message received from the Central Node 3640 to the UE 3610 in steps 3953 and / or 3955.
  • the Beam Feedback Configuration message transmitted by the Nodes 3620 and 3630 to the UE 3610 includes information for allowing the UE 3610 to reserve an uplink resource for beam feedback after beam measurement using a downlink reference signal. May be included.
  • Beam Feedback Configuration message includes 1) information on uplink beam feedback resources (eg, time / frequency information, information on PUCCH resources, etc.) of the corresponding nodes 3620 and 3630, and 2) random access. 3) Code information to be used for beam feedback, 4) Uplink synchronization information (e.g., Timing Alignment, etc.) between Nodes 3620 and 3630 and UE 3610, and 5) UE 3610) UE ID information (e.g., C-RNTI, S-TMSI, etc.) to be used, 6) UE 3610, the number of times that the terminal 3610 should retry when a specific method of beam feedback fails (e.g., If a beam feedback is attempted using PUCCH resources but fails, it may be necessary to perform random access to the same node or another node.How many times should this process be applied?), 7) Use (eg RSRP, RSRQ, RSSI, etc.), 8) beam-by-beam F when measuring information on whether to
  • Such information may be information about a specific node or may be information that is equally applied to several nodes. If the information about a specific node, different information for each node may be included in one Beam Feedback Configuration message.
  • Node 1 3620 sends a Beam Feedback Configuration message, but this message includes information that the UE 3610 beams to Node 1 3620 and the UE 3610 beams feedback to Node 2 3630. Information may be included separately.
  • the Beam Feedback Configuration message may be generated by the Central Node 3640, or transmitted to the Nodes 3620 and 3630, and then modified by the Nodes 3620 and 3630 to the UE 3610, or transmitted without modification. It may be.
  • the Beam Feedback Configuration message may be included in any message other than a separate message and transmitted.
  • the nodes 3620 and 3630 may share an index of a beam recognized by the terminal 3610.
  • Node 1 3620 may be shared in a manner such as Beam Index 1-10 and Node 2 3630 as Beam Index 11-20.
  • the terminal 3610 may be recognized as one node operating with the Beam Index 1-20.
  • Node 1 3620 and Node 2 3630 may exist physically in different locations, it takes time to move from the beam of Node 1 3620 to the beam of Node 2 3630. For that reason, the terminal 3610 may need to know the Beam Index.
  • the beam index may be grouped and operated without node classification. For example, Beam Index Group 1 is 1-10 and Beam Index Group 2 is 11-20.
  • Beam Feedback Beam Feedback conditions may be set for each group or beam feedback may be received for each group.
  • FIG. 40 illustrates an example of transmitting and receiving downlink beam training signals in a communication system according to an embodiment of the present invention.
  • the terminal 3610 may perform beam training illustrated in FIG. 40.
  • the UE 3610 may perform beam training by receiving a downlink beam training signal from the Node1 3620 and the Node2 3630.
  • 41 illustrates an example of uplink beam training signal transmission and reception in a communication system according to an embodiment of the present invention.
  • FIG. 41 it is illustrated that an uplink beam training signal is transmitted.
  • the terminal 3610 of FIG. 38 transmits the Node 13620 and the Node2 3630 to the beam training signals in steps 4110 and 4120 as illustrated in FIG. 41. Can be sent to.
  • the nodes 3620 and 3630 may perform beam training.
  • FIG. 42 a process of performing data transmission / reception between the node 3620 and the terminal 3610 is illustrated. This process should typically occur after the beamforming-related setting is completed, but according to an embodiment, the embodiment may not be affected by the beamforming process illustrated in FIGS. 38 to 41.
  • a message (for example, a DL monitoring configuration message) including downlink (DL) monitoring configuration information is transmitted from the central node 3640 to the terminal 3610 in step 4210.
  • the downlink monitoring configuration information includes: 1) location to be monitored (eg, frequency, bandwidth, resource location, etc.), 2) monitoring period, and 3) UE specific information (eg, C for decoding downlink control information).
  • C-RNTI such as -RNTI
  • it may be another C-RNTI between the nodes 3620 and 3630, and it may be a Common C-RNTI assigned by the Central Node 3640 or created through cooperation between the nodes 3620 and 3630. Can be included.
  • resource allocation for uplink / downlink communication may be monitored.
  • the DL monitoring configuration information may be generated in the Central Node 3640 and then transmitted to at least one Node 3620 and 3630 in steps 4213 and 4215.
  • the nodes 3620 and 3630 may generate DL monitoring configuration information and transmit the generated DL monitoring configuration information to the terminal 3610 and the central node 3640 to be shared.
  • the central node 3640 may provide user context information (or UE context information) to at least one of the node 13620, the node2 3630, and the terminal 3610 in at least one of steps 4220, 4223, and 4225. After transmitting the received entity, the entity may store the received information.
  • user context information or UE context information
  • User context information includes 1) Security information (e.g. AS Security Key), 2) Terminal Capability (e.g. Beam information, Tx / Rx information, etc.), 3) QoS information, 4) UE History Info (eg, Tracking Area information, etc.) and 5) User Information.
  • the message including the user context information may include information regarding the data flow such as bearer information of the terminal 3610.
  • Radio Bearer information for example, DRB ID / SRB ID transmitted to Node1 3620 or Node2 3630
  • Layer information for example, PDCP / RLC / RRC / Configuration information such as MAC / PHY, etc.
  • Bearer-related information used in the node communicating with the terminal 3610
  • Node ID sharing information about the corresponding terminal 3610 10) At least one of information on the length of time corresponding to when the information is valid and 11) information corresponding to 1) to 10) shared to other nodes may be included.
  • the UE context information may be generated in the Central Node 3640 and then transmitted to at least one Node 3620 and 3630 in at least one of steps 4223 and 4225.
  • the nodes 3620 and 3630 may generate UE context information and may transmit the generated user context information to the terminal 3610 and the central node 3640 to be shared.
  • the node may perform the role without additional request for the UE context when performing a beam feedback, data transmission, transmission resumption request, link recovery request, etc. from one node to another node. If there is no need to receive some or all of the UE context in advance, the terminal 3610 or the nodes 3620 and 3630 may request and receive this information from the central node 3640 when needed.
  • the terminal 3610 may transmit and receive data with the Node1 3620.
  • 43 is an example of beam feedback and node feedback in a communication system according to an embodiment of the present invention.
  • FIG. 43 there is illustrated a process in which a terminal 3610 performs beam feedback and a node feedback process in which nodes 3620 and 3630 feed back a beam training result of a terminal to a central node 3640.
  • the UE 3610 determines the Beam Feedback in step 4310. In this case, the terminal 3610 may transmit a beam feedback to at least one of the various nodes 3620 and 3630 in step 4320 and / or 4325. If it is assumed that the terminal 3610 is transmitting / receiving data with the Node1 3620, the terminal 3610 may transmit beam feedback to the Node1 3620 according to an embodiment. However, if necessary, the terminal 3610 may also transmit beam feedback to the Node2 3630. According to an embodiment, in operation 4330 and / or 4335, the nodes 3620 and 3630 that have received the Beam Feedback may transmit (deliver) the Beam Feedback received to other nodes.
  • the Nodes 3620 and 3630 that have received the Beam Feedback may transmit a Beam Feedback Confirm message indicating that the Beam Feedback has been successfully received to the UE 3610 in steps 4340 and / or 4335.
  • the time from Beam Feedback to Beam Feedback Confirm may be set in advance.
  • the time required to wait for the Beam Feedback Confirm may be set in advance. If the Beam Feedback Confirm message is not received within the preset time, the terminal 3610 may determine that the beam feedback has failed.
  • the terminal 3610 may retransmit the Beam Feedback to the nodes 3620 and 3630.
  • the UE 3610 may enter an initial access procedure or a link recovery procedure. In this case, a specific number of times that the Beam Feedback fails may be set in advance. Alternatively, when the beam feedback fails for a specific number of times, the terminal 3610 may change the beam feedback method.
  • the terminal 3610 may perform a beam report through random access or beam feedback in the LTE network. There may be a way.
  • the Beam Feedback message includes 1) terminal ID, 2) conditions for determining beam feedback transmission, 3) Best Beam ID of the terminal 3610, the number of beams above the threshold of the terminal 3610, and the threshold value, Best Beam.
  • Received signal strength e.g., RSRP, RSSI, RSRQ, etc.
  • signal quality e.g., CQI, PMI, RI, etc.
  • n-th n is a natural number
  • At least one of signal strength of all beams, signal strength of beams that can be measured, and 4) information on whether beam feedback data is processed by L1, L3 filtering, or raw data may be included.
  • the UE 3610 will follow it.
  • the beam feedback configuration may be changed as a result of the beam measurement by the nodes 3620 and 3630.
  • the method of performing beam measurement at the nodes 3620 and 3630 may be content included in a Beam Feedback Configuration message sent from the central node 3640 illustrated in FIG. 39 to the nodes 3620 and 3630.
  • Nodes 3620 and 3630 that have received Beam Feedback from the UE 3610 or have received Beam Feedback of the UE 3610 from other Nodes 3620 and 3630 may transmit all or all of the information of the Beam Feedback to the Central Node 3640 as needed. You may need to send some. In the present invention, this may be referred to as Node Feedback.
  • at least one of the nodes 3620 and 3630 may determine whether to perform node feedback in steps 4350 and / or 4355.
  • the Nodes 3620 and 3630 apply the Node Feedback condition according to the Node Feedback Configuration information of FIG. 39, or when there is no Node Feedback Configuration information or in exceptional situations, the Nodes 3620 and 3630 determine the Node Feedback by itself. Can be.
  • the Nodes 3620 and 3630 may need to send all or part of the Beam Feedback information to the Central Node 3640. Determination of node feedback and node feedback may be performed when there is a beam feedback or beam measurement result regardless of whether beam training is based on uplink or downlink.
  • the nodes 3620 and 3630 may transmit to the central node 3640 in step 4360 and / or 4365.
  • the Node Feedback message includes 1) terminal ID, 2) conditions under which Nodes 3620 and 3630 determine Node Feedback, or conditions under which UE 3610 determines Beam Feedback, and 3) Best Beam ID of terminal 3610. , The number of beams having a threshold value greater than or equal to the terminal 3610, the threshold value, the signal strength received by Best Beam (for example, RSRP, RSSI, RSRQ, etc.), signal quality (for example, CQI, PMI, RI, etc.).
  • Best Beam for example, RSRP, RSSI, RSRQ, etc.
  • signal quality for example, CQI, PMI, RI, etc.
  • nth (n is the natural number) signal strength received by the beam with the higher signal strength, the signal strength of all beams, the signal strength of the beam that can be measured, and 4) the value of the node feedback data processed by L1, L3 filtering, etc. At least one of information on whether raw data is recognized or 5) a time point of generating beam feedback or node feedback.
  • the Beam Feedback Confirm may be sent to the terminal 3610 by the Central Node 3640.
  • a time required for the UE 3610 to wait for the Beam Feedback Confirm may be set from transmission of the Beam Feedback to the Beam Feedback Confirm. This time may be set to a different time (e.g., typically a little longer) than the time it takes to send a Beam Feedback Confirm in the Node.
  • 44 is a diagram illustrating a data transmission / reception path switching process in a communication system according to an embodiment of the present invention.
  • FIG. 44 a Node Change procedure for changing a Node performing data transmission and beam training in the Central Node 3640 and accompanying procedures are illustrated.
  • the terminal 3610 is performing data transmission / reception with the Node1 3620 (step 4410).
  • Node2 3630 is changed to perform data transmission / reception with the terminal 3610.
  • the terminal 3610 does not necessarily need to perform data transmission / reception of one node and data, and the procedure may be the same even when several nodes and the terminal 3610 simultaneously perform data transmission / reception.
  • the central node 3640 may newly determine a data path based on beam feedback information or node feedback information. If the central node 3640 determines to change the data path, in step 4420 and 4425, the central node 3640 needs to newly perform data transmission / reception with Node1 3620, which has previously performed data transmission / reception.
  • a message including Node Change Indication may be transmitted to Node2 3630.
  • the message may include at least one or more of 1) terminal ID, 2) node ID to be changed, 3) status report request information of TX or RX, and 4) data forwarding request information. If the terminal 3610 needs to confirm the beam to be used in the Node 2 3630, the Central Node 3640 may transmit a Beam Feedback Confirm message to the terminal 3610.
  • the Beam Feedback Confirm message may be delivered through one of the nodes accessible by the UE 3610.
  • the Node1 3620 may transmit the TX buffer and the DL-TX status of the downlink data transmitted by the downlink to the Central Node 3640. Can be sent to.
  • it may be a variable value of an RLC sublayer or a value of an SN receiving an ACK or an SN receiving an NACK.
  • the Node1 3620 may transmit a UL-RX status of the data received on the uplink to the Central Node 3640.
  • the RLC Status PDU may be a UL-RX Status Report.
  • the node 13620 may transmit the data uplink packet successfully received by the node 13620 to the central node 3640 in step 4445 (UL data). Forwarding).
  • the DL Monitoring Configuration information and the UE Context information to be used when the Node to participate in data transmission / reception are changed are similar to those of the example of FIG. 42, in steps 4450, 4453, 4455, 4460, 4463, and 4465.
  • the central node 3640 may transmit to the terminal 3610 and the nodes 3620 and 3630.
  • the terminal 3610 and the nodes 3620 and 3630 may be configured according to the received DL Monitoring Configuration information and the UE Context information.
  • the central node 3640 sends a status report to the terminal 3610 in step 4470.
  • Request eg, a DL-RX Status Report Request message. If the terminal 3610 receives the DL-RX Status Report Request message or is previously promised, the terminal 3610 transmits the DL-RX Status Report to the Central Node 3640 in step 4475 and receives the DL-RX Status Report Request message in advance. Information about the link data and unreceived downlink data can be informed. If necessary, in step 4485, Node1 3620 may forward downlink data that has not been ACK so far to Node2 3630.
  • the DL data forwarding may be transmitted to the Node2 3630 via the Central Node 3640 in steps 4480 and 4483. If there is an interface between Node1 3620 and Node2 3630, it may be directly transmitted. Thereafter, in step 4490, the Node2 3630 may normally perform data transmission / reception with the UE 3610.
  • 45 to 48 illustrate examples of a timer operation related to beam feedback in a communication system according to an embodiment of the present invention.
  • the beam feedback, the node feedback, and the beam feedback confirm are shown as separate embodiments of operation, and the descriptions of FIG. 43 illustrate modifications that may appear according to the embodiment.
  • the process of the UE 3610 receiving a Beam Feedback Confirm message and a Node for transmitting Beam Feedback are different.
  • the UE 3610 may display a time for the UE 3610 to wait for the Beam Feedback Confirm message as a Timer for Confirm. If the terminal 3610 does not receive the Beam Feedback Confirm message until the timer expires, the terminal 3610 may try Beam Feedback again.
  • the beam feedback method is different or a link recovery (for example, RLF) procedure is entered. You can also enter the initial connection procedure.
  • the terminal 3610 may determine beam feedback in step 4510, and transmit beam feedback to Node1 3620, which is a node to which the terminal 3610 is currently connected in step 4520.
  • the beam feedback may include information that beam A of Node2 3630 is an optimal beam.
  • the terminal 3610 may drive the timer 4525 after transmitting the beam feedback.
  • the timer 4525 may be referred to as a timer for confirmation.
  • Node1 3620 may transmit Node Feedback to Central Node 3640.
  • the node feedback may include information that the terminal 3610 determines that the beam of the Node2 3620 is a better beam and requests the terminal 3610 to communicate with the Node2 3620.
  • the central node 3640 may transmit a node change indication message to the node1 3620.
  • the message may include information for approving the terminal 3610 to communicate with the Node2 3640.
  • the central node 3640 may also transmit a node change indication message to the node 23630 that the terminal 3610 wishes to communicate with.
  • Node1 3620 may transmit a Beam Feedback Confirm message to the UE 3610 in step 4550.
  • the Beam Feedback Confirm message may include information indicating that the terminal 3610 has been approved to communicate with the Node2 3640.
  • the terminal 3610 may determine that the beam feedback is successful.
  • the terminal 3610 may determine that the beam feedback has failed and perform an operation accordingly.
  • the terminal 3610 may determine beam feedback in step 4610, and may transmit beam feedback to Node1 3620, which is a node currently connected to the terminal 3610 in step 4620.
  • the beam feedback may include information that beam A of Node2 3630 is an optimal beam.
  • the terminal 3610 may drive the timer 4625 after transmitting the beam feedback. At this time, the timer 4625 may be referred to as a Timer for Confirm.
  • Node1 3620 may transmit Node Feedback to Central Node 3640.
  • the node feedback may include information that the terminal 3610 determines that the beam of the Node2 3620 is a better beam and requests the terminal 3610 to communicate with the Node2 3620.
  • the central node 3640 may transmit a node change indication message to the node 13620.
  • the message may include information for approving the terminal 3610 to communicate with the Node2 3640.
  • the central node 3640 may also transmit a node change indication message to the node 23630 that the terminal 3610 wishes to communicate with.
  • Node2 3630 may transmit a Beam Feedback Confirm message to the UE 3610 in step 4650.
  • the Beam Feedback Confirm message may include information indicating that the terminal 3610 has been approved to communicate with the Node2 3640.
  • the terminal 3610 may determine that the beam feedback is successful.
  • the terminal 3610 may determine that the beam feedback has failed and perform an operation accordingly.
  • the terminal 3610 may determine beam feedback in step 4710. For example, the terminal 3610 may determine that the beam A of the Node2 3630 is an optimal beam, and determine to feed back information about the beam A.
  • the UE 3610 may transmit beam feedback to the Node2 3630 determined to include the optimal beam, not the currently connected Node1 3620.
  • the beam feedback may include information that beam A of Node2 3630 is an optimal beam.
  • the terminal 3610 may drive the timer 4725 after transmitting the beam feedback. In this case, the timer 4725 may be referred to as a timer for confirmation.
  • the Node2 3630 may transmit a Node Feedback to the Central Node 3640.
  • the node feedback may include information that the terminal 3610 determines that the beam of the Node2 3620 is a better beam and requests the terminal 3610 to communicate with the Node2 3620.
  • the Central Node 3640 may transmit a Node change indication message to Node1 3620.
  • the message may include information for approving the terminal 3610 to communicate with the Node2 3640.
  • the central node 3640 may also transmit a node change indication message to the node 23630 that the terminal 3610 wishes to communicate with.
  • the node23630 may transmit a Beam Feedback Confirm message to the UE 3610 in step 4750.
  • the Beam Feedback Confirm message may include information indicating that the terminal 3610 has been approved to communicate with the Node2 3640.
  • the terminal 3610 may determine that the beam feedback is successful.
  • the terminal 3610 may determine that the beam feedback has failed and perform an operation accordingly.
  • the terminal 3610 may determine beam feedback in step 4810. For example, the terminal 3610 may determine that the beam A of the Node2 3630 is an optimal beam, and determine to feed back information about the beam A.
  • FIG. in operation 4820 the terminal 3610 may transmit beam feedback to Node1 3620, which is a node to which the terminal 3610 is currently connected.
  • the beam feedback may include information that beam A of Node2 3630 is an optimal beam.
  • the terminal 3610 may drive the first timer 4825 after transmitting the beam feedback. In this case, the first timer 4825 may be referred to as a timer for confirmation.
  • the UE 3610 may receive a Beam Feedback Confirm message from the Node1 3620.
  • the Beam Feedback Confirm message may include information indicating that the UE 3610 has been approved to communicate with the Node2 3640.
  • the UE 3610 receives the Beam Feedback Confirm message from the Node1 3620, not from the Node2 3630, which is the node to be moved. In this case, the time required for the beam to be prepared in Node2 3630 to be actually moved may be necessary. Therefore, when the terminal 3610 receives the Beam Feedback Confirm message from the Node1 3620, the terminal 3610 may drive the second timer 4835.
  • the second timer 4835 used at this time may be referred to as a timer for indication.
  • the terminal 3610 may perform a beam related operation process with the Node2 3630.
  • the Node2 3630 may transmit a message including an indication to the terminal 3610 to inform the start of the beam related operation, and the message may be omitted.
  • Node1 3620 may transmit Node Feedback to Central Node 3640.
  • the Node Feedback may include information that the terminal 3610 determines that the beam of the Node2 3620 is a better beam and requests the terminal to communicate with the Node2 3620.
  • the Central Node 3640 may transmit a Node change indication message to Node1 3620.
  • the message may include information for approving the terminal 3610 to communicate with the Node2 3640.
  • the central node 3640 may also transmit a node change indication message to Node2 3630, which the terminal 3610 wishes to communicate with. After the Node2 3630 receives the Node Change Instruction message, the Node2 3630 may be in a state capable of performing a beam related operation process.
  • the terminal 3610 may determine that the beam feedback is successful. On the other hand, if the Beam Feedback Confirm message is not received by the terminal 3610 until the expiration of the first timer 4825, the terminal 3610 may determine that the beam feedback has failed and perform an operation accordingly.
  • the terminal 3610 may perform a beam related operation process with the Node2 3630 after the second timer 4835 expires.
  • the terminal 3610 determines that the beam feedback has failed. The operation accordingly can be performed.
  • 49 is a block diagram illustrating a base station according to an embodiment of the present invention.
  • a base station may include a transceiver 4910 and a controller 4920 for controlling overall operations of the base station.
  • the transceiver 4910 may include a transmitter 4913 and a receiver 4915.
  • the base station may further include a storage unit 4930.
  • the controller 4920 of the base station controls the base station to perform any one of the above-described embodiments.
  • the controller 4920 of the base station transmits the first broadcast signal including the transmission information of the second broadcast signal to the terminal, and includes transmission information of the paging signal according to the transmission information of the second broadcast signal.
  • the second broadcast signal may be transmitted to the terminal, and the paging signal may be transmitted to the terminal according to the transmission information of the paging signal.
  • the controller 4920 of the base station receives a message including at least one of identification information or paging identification information of the terminal from the terminal, the paging according to at least one of the identification information or the paging identification information of the terminal; It may be determined whether to transmit a signal to the terminal, and transmit the paging signal to the terminal.
  • the control unit 4920 of the base station the information for determining the radio access technology (RAT) that the terminal wants to receive the paging signal from at least one of the terminal and the entity controlling the paging signal of the terminal; If the base station is included in the RAT that the terminal wants to receive the paging signal, the base station may transmit the paging signal to the terminal.
  • RAT radio access technology
  • the transceiver 4910 of the base station may transmit and receive signals according to any one of the above-described embodiments.
  • the controller 4920 and the transceiver 4910 are not necessarily implemented as separate modules, but may be implemented as a single component in the form of a single chip.
  • the controller 4920 and the transceiver 4910 may be electrically connected to each other.
  • the controller 4920 may be a circuit, an application-specific circuit, or at least one processor. Further, the operations of the base station can be realized by providing a memory device (storage unit 4930) storing the corresponding program code to any component in the base station. That is, the controller 4920 may execute the above-described operations by reading and executing the program code stored in the memory device by a processor or a central processing unit (CPU).
  • a memory device storage unit 4930
  • CPU central processing unit
  • 50 is a block diagram illustrating a terminal according to an embodiment of the present invention.
  • the terminal may include a transceiver 5010 and a controller 5020 for controlling the overall operation of the terminal.
  • the transceiver 5010 may include a transmitter 5013 and a receiver 5015.
  • the controller 5020 of the terminal controls the terminal to perform any one of the above-described embodiments.
  • the controller 5020 of the terminal receives the first broadcast signal including the transmission information of the second broadcast signal from the base station, and includes transmission information of the paging signal according to the transmission information of the second broadcast signal.
  • the second broadcast signal may be received from the base station, and the paging signal may be received from the base station according to the transmission information of the paging signal.
  • the controller 5020 of the terminal transmits a message including at least one of identification information or paging identification information of the terminal to the base station, and is transmitted according to at least one of identification information or paging identification information of the terminal.
  • a paging signal may be received from the base station.
  • the controller 5020 of the terminal checks the radio access technology (RAT) that the terminal wants to receive the paging signal, and the paging signal from the base station included in the RAT that the terminal wants to receive the paging signal Can be received.
  • RAT radio access technology
  • the transceiver 5010 of the terminal may transmit and receive a signal according to any one of the above-described embodiments.
  • controller 5020 and the transceiver 5010 are not necessarily implemented as separate modules, but may be implemented as a single component in the form of a single chip.
  • the controller 5020 and the transceiver 5010 may be electrically connected to each other.
  • the controller 5020 may be a circuit, an application-specific circuit, or at least one processor.
  • the operations of the terminal can be realized by providing a memory device (storage unit) 5030 storing the corresponding program code to any component in the terminal. That is, the controller 5020 may execute the above-described operations by reading and executing the program code stored in the memory device by a processor or a central processing unit (CPU).

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

본 개시는 4G 시스템 이후 보다 높은 데이터 전송률을 지원하기 위한 5G 통신 시스템을 IoT 기술과 융합하는 통신 기법 및 그 시스템에 관한 것이다. 본 개시는 5G 통신 기술 및 IoT 관련 기술을 기반으로 지능형 서비스 (예를 들어, 스마트 홈, 스마트 빌딩, 스마트 시티, 스마트 카 혹은 커넥티드 카, 헬스 케어, 디지털 교육, 소매업, 보안 및 안전 관련 서비스 등)에 적용될 수 있다. 본 발명은 무선 통신 시스템에서 다중 연결을 이용한 페이징 시그널 처리를 지원하는 장치 및 방법을 개시한다.

Description

4G와 5G 공존 시스템에서 통신 방법 및 그 장치
본 발명의 일 실시 예는 무선 통신 시스템에서 다중 연결을 이용한 페이징 시그널 처리를 지원하는 장치 및 방법에 관한 것이다. 본 발명의 다른 일 실시 예는 무선 통신 시스템에서 단말의 다중 연결을 지원하는 장치 및 방법에 관한 것이다. 본 발명의 또 다른 일 실시 예는 무선 통신 시스템에서 기지국 기능이 분산되어 구현된 경우 빔포밍 방법 및 장치에 관한 것이다.
4G 통신 시스템 상용화 이후 증가 추세에 있는 무선 데이터 트래픽 수요를 충족시키기 위해, 개선된 5G 통신 시스템 또는 pre-5G 통신 시스템을 개발하기 위한 노력이 이루어지고 있다. 이러한 이유로, 5G 통신 시스템 또는 pre-5G 통신 시스템은 4G 네트워크 이후(Beyond 4G Network) 통신 시스템 또는 LTE 시스템 이후 (Post LTE) 이후의 시스템이라 불리어지고 있다.
높은 데이터 전송률을 달성하기 위해, 5G 통신 시스템은 초고주파(mmWave) 대역(예를 들어, 60기가(60GHz) 대역과 같은)에서의 구현이 고려되고 있다. 초고주파 대역에서의 전파의 경로손실 완화 및 전파의 전달 거리를 증가시키기 위해, 5G 통신 시스템에서는 빔포밍(beamforming), 거대 배열 다중 입출력(massive MIMO), 전차원 다중입출력(Full Dimensional MIMO: FD-MIMO), 어레이 안테나(array antenna), 아날로그 빔형성(analog beam-forming), 및 대규모 안테나(large scale antenna) 기술들이 논의되고 있다.
또한 시스템의 네트워크 개선을 위해, 5G 통신 시스템에서는 진화된 소형 셀, 개선된 소형 셀(advanced small cell), 클라우드 무선 액세스 네트워크(cloud radio access network: cloud RAN), 초고밀도 네트워크(ultra-dense network), 기기 간 통신(Device to Device communication: D2D), 무선 백홀(wireless backhaul), 이동 네트워크(moving network), 협력 통신(cooperative communication), CoMP(Coordinated Multi-Points), 및 수신 간섭 제거(interference cancellation) 등의 기술 개발이 이루어지고 있다. 이 밖에도, 5G 시스템에서는 진보된 코딩 변조(Advanced Coding Modulation: ACM) 방식인 FQAM(Hybrid FSK and QAM Modulation) 및 SWSC(Sliding Window Superposition Coding)과, 진보된 접속 기술인 FBMC(Filter Bank Multi Carrier), NOMA(non orthogonal multiple access), 및 SCMA(sparse code multiple access) 등이 개발되고 있다.
한편, 인터넷은 인간이 정보를 생성하고 소비하는 인간 중심의 연결 망에서, 사물 등 분산된 구성 요소들 간에 정보를 주고 받아 처리하는 IoT(Internet of Things, 사물인터넷) 망으로 진화하고 있다. 클라우드 서버 등과의 연결을 통한 빅데이터(Big data) 처리 기술 등이 IoT 기술에 결합된 IoE(Internet of Everything) 기술도 대두되고 있다. IoT를 구현하기 위해서, 센싱 기술, 유무선 통신 및 네트워크 인프라, 서비스 인터페이스 기술, 및 보안 기술과 같은 기술 요소 들이 요구되어, 최근에는 사물간의 연결을 위한 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 연구되고 있다. IoT 환경에서는 연결된 사물들에서 생성된 데이터를 수집, 분석하여 인간의 삶에 새로운 가치를 창출하는 지능형 IT(Internet Technology) 서비스가 제공될 수 있다. IoT는 기존의 IT(information technology)기술과 다양한 산업 간의 융합 및 복합을 통하여 스마트홈, 스마트 빌딩, 스마트 시티, 스마트 카 혹은 커넥티드 카, 스마트 그리드, 헬스 케어, 스마트 가전, 첨단의료서비스 등의 분야에 응용될 수 있다.
이에, 5G 통신 시스템을 IoT 망에 적용하기 위한 다양한 시도들이 이루어지고 있다. 예를 들어, 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 5G 통신 기술이 빔 포밍, MIMO, 및 어레이 안테나 등의 기법에 의해 구현되고 있는 것이다. 앞서 설명한 빅데이터 처리 기술로써 클라우드 무선 액세스 네트워크(cloud RAN)가 적용되는 것도 5G 기술과 IoT 기술 융합의 일 예라고 할 수 있을 것이다.
본 발명의 목적은 4G와 5G 가 공존하는 시스템에서 단말의 페이징 시그널 처리를 지원하는 장치 및 방법을 제공하는 것이다.
또한, 본 발명은 4G와 5G 가 공존하는 시스템에서 단말의 다중 연결을 지원하는 장치 및 방법을 제공하는 것을 목적으로 한다.
또한, 본 발명은 4G와 5G 가 공존하는 시스템에서 단말과 기지국 사이의 연결을 지원하는 장치 및 방법을 제공하는 것을 목적으로 한다. 또한, 본 발명은 4G와 5G 가 공존하는 시스템에서 단말의 RRC 연결을 지원하는 장치 및 방법을 제공하는 것을 목적으로 한다.
또한, 본 발명은 무선 통신 시스템에서 기지국 기능이 분산되어 구현된 경우 빔포밍 방법 및 장치를 제공하는 것을 목적으로 한다. 그리고, 단말의 이동성 보장을 위한 방법 및 장치를 제공하는 것을 목적으로 한다. 또한, 본 발명은 기지국 기능이 분산되어 구현된 경우 서빙 노드의 변경에 따른 망의 지연으로 발생하는 전체 지연 시간을 줄이는 장치 및 방법을 제공하는 것을 목적으로 한다.
본 발명에서 이루고자 하는 기술적 과제들은 이상에서 언급한 기술적 과제들로 제한되지 않으며, 언급하지 않은 또 다른 기술적 과제들은 아래의 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
상기와 같은 문제점을 해결하기 위한 본 발명의 일 실시 예에 따른 단말의 통신 방법은, 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 기지국으로부터 수신하는 단계; 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 기지국으로부터 수신하는 단계; 및 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 기지국으로부터 수신하는 단계를 포함할 수 있다.
또한, 상기 페이징 신호를 수신하는 단계는, 상기 기지국에게 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 전송하는 단계; 및 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 전송된 상기 페이징 신호를 상기 기지국으로부터 수신하는 단계를 포함할 수 있다.
또한, 상기 제2 방송 신호는, 상기 단말이 속한 페이징 영역에 대한 페이징 신호가 전송되는지 여부에 대한 정보를 포함하고, 상기 단말이 속한 페이징 영역에서 페이징 신호가 전송되는 경우, 상기 기지국으로부터 페이징 신호를 페이징 신호를 수신할 수 있다.
또한, 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 확인하는 단계; 및 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 기지국으로부터 상기 페이징 신호를 수신하는 단계를 더 포함할 수 있다.
또한, 상기와 같은 문제점을 해결하기 위한 본 발명의 일 실시 예에 따른 기지국의 통신 방법은, 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 단말에게 전송하는 단계; 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 단말에게 전송하는 단계; 및 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 단말에게 전송하는 단계를 포함할 수 있다.
또한, 상기 페이징 신호를 전송하는 단계는, 상기 단말로부터 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 수신하는 단계; 및 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 상기 페이징 신호를 상기 단말에게 전송할지 여부를 결정하고, 상기 단말에게 상기 페이징 신호를 전송하는 단계를 포함할 수 있다.
또한, 상기 페이징 신호를 전송하는 단계는, 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 결정하기 위한 정보를, 상기 단말 및 상기 단말의 페이징 신호를 제어하는 엔터티 중 적어도 하나로부터 수신하는 단계; 및 상기 기지국이 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 경우, 상기 단말에게 상기 페이징 신호를 전송하는 단계를 포함할 수 있다.
또한, 상기와 같은 문제점을 해결하기 위한 본 발명의 일 실시 예에 따른 단말은, 신호를 송수신하는 송수신부; 및 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 기지국으로부터 수신하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 기지국으로부터 수신하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 기지국으로부터 수신하는 제어부를 포함할 수 있다.
또한, 상기와 같은 문제점을 해결하기 위한 본 발명의 일 실시 예에 따른 기지국은, 신호를 송수신하는 송수신부; 및 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 단말에게 전송하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 단말에게 전송하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 단말에게 전송하는 제어부를 포함할 수 있다.
본 발명의 일 실시 예에 따르면, 4G 내지 5G 를 통한 페이징 송수신을 지원함으로써 단말의 전력 소모 감소를 제공한다. 4G 내지 5G를 통한 페이징 송수신을 지원함으로써 기지국 또는 네트워크 부하(load) 감소를 제공한다. 4G 내지 5G를 통한 연결 재접속 RAT(radio access technology)을 분리함으로써 단말의 접속 지연(latency)/충돌(collision) 감소를 제공할 수 있다.
본 발명의 일 실시 예에 따르면, 4G와 5G 를 통한 RRC 연결을 지원함으로써 신뢰성(reliability)을 제공할 수 있다. 그리고, 4G와 5G를 통한 RRC 연결을 지원함으로써 latency 감소를 제공할 수 있다. 또한, 4G와 5G를 통한 다중 연결을 지원함으로써 고속 데이터 전송을 제공할 수 있다.
본 발명의 일 실시 예에 따르면, 단말의 서빙 노드 변경 시 망의 지연 시간으로 인한 전체 지연시간 감소가 가능하고, 또한 데이터 유닛(DU: data unit)이 빔 피드백 정보를 사용하여 빠른 DU 변경을 처리할 수 있다.
본 발명에서 얻을 수 있는 효과는 이상에서 언급한 효과들로 제한되지 않으며, 언급하지 않은 또 다른 효과들은 아래의 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
도 1은 본 발명의 일 실시 예에 따른 5G 시스템에서 운영하는 페이징 채널의 예시이다.
도 2는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 일 예시이다.
도 3은 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 4는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 5는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 6은 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 7은 본 발명의 일 실시 예에 따른 셀 기반 페이징 영역(area) 운용의 예시이다.
도 8은 본 발명의 일 실시 예에 따른 TRP 기반 페이징 area 운용의 예시이다.
도 9는 본 발명의 일 실시 예에 따른 LTE 기지국 기반 페이징 area 운용의 예시이다.
도 10은 본 발명의 일 실시 예에 따른 5G 기지국 기반 페이징 area 운용의 예시이다.
도 11은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 실시 예이다.
도 12는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이다.
도 13은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이다.
도 14는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이다.
도 15는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 실시 예이다.
도 16은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
도 17은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
도 18은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
도 19는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
도 20은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 실시 예이다.
도 21은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 22는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 23은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 24는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 25는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 26은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 27은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 실시 예이다.
도 28은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 트리거링에 사용하는 TAI 포맷 예이다.
도 29는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 30은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 31은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 32는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 33은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 34는 본 발명의 일 실시 예에 따른 기지국 분산 구조의 예시이다.
도 35는 본 발명의 일 실시 예에 따른 LTE 프로토콜 스택 기반 기지국 분산 구조의구체적 예시이다.
도 36은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔포밍 및 노드 변경 관련 절차의 개괄적 예시이다.
도 37은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔포밍 및 노드 변경 관련 절차의 구체적 예시이다.
도 38은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 트레이닝 준비과정의 예시이다.
도 39는 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백 및 노드 피드백 준비과정의 예시이다.
도 40은 본 발명의 일 실시 예에 따른 통신 시스템에서 하향링크 빔 트레이닝 신호 송수신 예시이다.
도 41은 본 발명의 일 실시 예에 따른 통신 시스템에서 상향링크 빔 트레이닝 신호 송수신 예시이다.
도 42는 본 발명의 일 실시 예에 따른 통신 시스템에서 데이터 송/수신을 위한 준비과정의 예시이다.
도 43은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백 및 노드 피드백 예시이다.
도 44는 본 발명의 일 실시 예에 따른 통신 시스템에서 데이터 송/수신 경로 전환 과정의 예시이다.
도 45 내지 도 48은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백과 관련한 타이머 동작 과정 예시이다.
도 49는 본 발명의 일 실시 예에 따른 기지국의 블록 구성도를 도시한 도면이다.
도 50은 본 발명의 일 실시 예에 따른 단말의 블록 구성도를 도시한 도면이다.
이하, 본 발명의 실시 예를 첨부한 도면과 함께 상세히 설명한다. 또한 본 발명을 설명함에 있어서 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단된 경우 그 상세한 설명은 생략한다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.
본 명세서에서 어떤 구성 요소가 다른 구성 요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성 요소에 직접적으로 연결되어 있거나 또는 접속되어 있는 것을 의미할 수도 있고, 중간에 다른 구성 요소가 존재하여 전기적으로 연결되어 있는 것을 의미할 수도 있다. 아울러, 본 명세서에서 특정 구성을 "포함" 한다고 기술하는 내용은 해당 구성 이외의 구성을 배제하는 것이 아니며, 추가적인 구성이 본 발명의 실시 또는 본 발명의 기술적 사상의 범위에 포함될 수 있음을 의미한다.
그리고, 본 발명의 실시 예에 나타나는 구성부들은 서로 다른 특징적인 기능을 나타내기 위해 독립적으로 도시되는 것으로, 각 구성부들이 분리된 하드웨어나 하나의 소프트웨어 구성 단위로 이루어짐을 의미하지 않는다. 즉, 각 구성부는 설명의 편의상 각각의 구성부로 나열하여 포함한 것으로 각 구성부 중 적어도 두 개의 구성부가 하나의 구성부를 이루거나, 하나의 구성부가 복수 개의 구성부로 나뉘어져 기능을 수행할 수 있다. 각 구성부의 통합된 실시 예 및 분리된 실시 예도 본 발명의 본질에서 벗어나지 않는 한 본 발명의 권리 범위에 포함된다.
또한, 일부의 구성 요소는 본 발명에서 본질적인 기능을 수행하는 필수적인 구성 요소는 아니고 단지 성능을 향상시키기 위한 선택적 구성 요소일 수 있다. 본 발명은 단지 성능 향상을 위해 사용되는 구성 요소를 제외한 본 발명의 본질을 구현하는데 필수적인 구성부만을 포함하여 구현될 수 있고, 단지 성능 향상을 위해 사용되는 선택적 구성 요소를 제외한 필수 구성 요소만을 포함한 구조도 본 발명의 권리범위에 포함된다.
본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시 예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭한다.
이 때, 처리 흐름도 도면들의 각 블록과 흐름도 도면들의 조합들은 컴퓨터 프로그램 인스트럭션들에 의해 수행될 수 있음을 이해할 수 있을 것이다. 이들 컴퓨터 프로그램 인스트럭션들은 범용 컴퓨터, 특수용 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비의 프로세서에 탑재될 수 있으므로, 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비의 프로세서를 통해 수행되는 그 인스트럭션들이 흐름도 블록(들)에서 설명된 기능들을 수행하는 수단을 생성하게 된다. 이들 컴퓨터 프로그램 인스트럭션들은 특정 방식으로 기능을 구현하기 위해 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비를 지향할 수 있는 컴퓨터 이용 가능 또는 컴퓨터 판독 가능 메모리에 저장되는 것도 가능하므로, 그 컴퓨터 이용가능 또는 컴퓨터 판독 가능 메모리에 저장된 인스트럭션들은 흐름도 블록(들)에서 설명된 기능을 수행하는 인스트럭션 수단을 내포하는 제조 품목을 생산하는 것도 가능하다. 컴퓨터 프로그램 인스트럭션들은 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비 상에 탑재되는 것도 가능하므로, 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비 상에서 일련의 동작 단계들이 수행되어 컴퓨터로 실행되는 프로세스를 생성해서 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비를 수행하는 인스트럭션들은 흐름도 블록(들)에서 설명된 기능들을 실행하기 위한 단계들을 제공하는 것도 가능하다.
이 때, 본 실시 예에서 사용되는 '~부'라는 용어는 소프트웨어 또는 FPGA또는 ASIC과 같은 하드웨어 구성요소를 의미하며, '~부'는 어떤 역할들을 수행한다. 그렇지만 '~부'는 소프트웨어 또는 하드웨어에 한정되는 의미는 아니다. '~부'는 어드레싱할 수 있는 저장 매체에 있도록 구성될 수도 있고 하나 또는 그 이상의 프로세서들을 재생시키도록 구성될 수도 있다. 따라서, 일 예로서 '~부'는 소프트웨어 구성요소들, 객체지향 소프트웨어 구성요소들, 클래스 구성요소들 및 태스크 구성요소들과 같은 구성요소들과, 프로세스들, 함수들, 속성들, 프로시저들, 서브루틴들, 프로그램 코드의 세그먼트들, 드라이버들, 펌웨어, 마이크로코드, 회로, 데이터, 데이터베이스, 데이터 구조들, 테이블들, 어레이들, 및 변수들을 포함한다. 구성요소들과 '~부'들 안에서 제공되는 기능은 더 작은 수의 구성요소들 및 '~부'들로 결합되거나 추가적인 구성요소들과 '~부'들로 더 분리될 수 있다. 뿐만 아니라, 구성요소들 및 '~부'들은 디바이스 또는 보안 멀티미디어카드 내의 하나 또는 그 이상의 CPU들을 재생시키도록 구현될 수도 있다.
<실시 예 1>
(1-1) 페이징 채널, 페이징 전송 방법 및 페이징 정보
도 1은 본 발명의 일 실시 예에 따른 5G 시스템에서 운영하는 페이징 채널의 예시이다.
도 1을 참고하면, 제1 방송 채널(BCH: broadcast channel)(110), 제2 BCH(120) 및 페이징(paging) 신호(시그널, signal) 또는 추가 BCH(또는 제3 BCH)(130)가 전송되는 시나리오가 도시되어 있다. 한편, 상기 제1 BCH(110)은 예를 들면 PBCH(primary BCH) 또는 xBCH 등으로 지칭될 수 있으며, 제2 BCH(120)은 예를 들면 SBCH(secondary BCH) 또는 eBCH(enhanced BCH, evolved BCH, extended BCH) 등으로 지칭될 수 있다.
이때, 정보 블록(예를 들면, 마스터 정보 블록(MIB: master information block))은 xBCH(110)를 통해 주기적으로 정해진 위치에서 전송될 수 있다. 한편, 설명의 편의를 위해서 상기 xBCH(110)를 통해 전송되는 정보가 MIB인 경우를 예를 들어 설명하도록 한다. MIB는 시스템 프레임 번호(SFN: system frame number), 빔 참조 신호 설정(beam reference signal configuration), eBCH(120)의 전송 여부, eBCH(120)의 전송 주기, eBCH(120)의 전송 위치, eBCH(120)의 버전 정보, eBCH(120)를 전송하는 기지국의 페이징 영역(paging area) 정보 중 적어도 하나의 정보를 포함할 수 있다. 본 발명의 일 실시 예에 따라 상기 MIB는 단말의 다중 연결을 위한 접속을 지원하는지 여부에 대한 정보를 포함할 수 있다. 한편, 단말이 상기 방송 채널(예를 들면, xBCH(110), eBCH(120) 등)을 수신한다는 것은, BCH(110, 120)를 통해 전송되는 신호(예를 들면, MIB 등을 포함하는 신호)를 수신한다는 것을 의미하는 것으로, 설명의 편의를 BCH(110, 120)를 수신(전송)한다는 것과 상기 BCH(110, 120)를 통해 전송되는 방송 신호를 수신(전송)한다는 것을 혼용하여 사용할 수 있다. 예를 들면, 단말이 eBCH(120)를 수신한다는 것은, 단말이 eBCH(120)를 통해 전송되는 신호를 수신한다는 것을 의미할 수 있다. 그리고, 기지국이라는 용어와 셀이라는 용어는 혼용되어 사용될 수 있다.
다음 [표 1]은 본 발명의 일 실시 예에 따른 5G 시스템의 MIB(110) 정보의 일 예시이다.
표 1
SFN System frame number
Beam reference signal configuration Beam 측정 기준 신호 전송 정보 (예를 들면, 주기, 위치 등)
eBCH 전송 여부 eBCH가 이번 MIB 주기에서 전송되는지 여부
eBCH 전송 주기 eBCH 전송 주기
eBCH 버전 정보 예를 들면, eBCH 변경 시 버전 정보를 1씩 증가할 수 있다(예를 들면, wrap around 사용 등)
Paging area 정보 eBCH를 전송하는 기지국의 paging area 코드
다중 연결 접속 정보 다중 셀 연결 접속 지원을 알림
eBCH(120)는 MIB(110) 또는 시스템에서 정의한 주기에 따라 전송될 수 있고, 상기 eBCH(120)의 전송 위치는 MIB 또는 시스템에서 정의될 수 있다. eBCH(120)는 단말이 셀에 접속하는 데 필요한 시스템 파라미터(예를 들면, 기지국 ID 등), 라디오 설정(radio configuration) 정보(예를 들면, 랜덤 엑세스 채널(RACH: random access channel) 설정(configuration) 정보 등), paging 시그널 전송 주기, paging 시그널 전송 위치, 나머지 시스템 정보(예를 들면, SI(system information), additional BCH 등)의 전송 정보, eBCH(120)를 전송하는 기지국의 paging area 정보, paging 시그널을 수신할 단말이 속한 paging area 정보 중 적어도 하나의 정보를 포함할 수 있다. 본 발명의 일 실시 예에 따라 상기 eBCH(120)는 단말의 다중 연결을 위한 접속을 지원하는지 여부에 대한 정보를 포함할 수 있다.
다음 [표 2]는 본 발명의 일 실시 예에 따른 5G 시스템의 eBCH 정보의 일 예시이다.
표 2
기지국 ID 예를 들면, 기지국의 Globally unique ID 등
Radio configuration 예를 들면, 시스템 액세스에 필요한 파라미터 등
Paging 시그널 전송 지시 eBCH 주기에 paging 시그널이 전송되는지 여부를 알릴 수 있음
Paging 시그널 전송 위치 Paging 시그널이 전송되는 자원 위치 정보
Paging 시그널 전송 주기 Paging 시그널의 전송 주기
Paging area 정보 eBCH를 전송하는 기지국의 paging area 코드
Paging area 별 paging 시그널 전송 정보 eBCH 주기에서 시스템의 각 paging area별 paging 시그널이 전송되는지 알려줄 수 있음
나머지 시스템 정보의 전송 정보 eBCH 외의 시스템 정보를 전송하는지 알려줄 수 있음
다중 연결 접속 정보 다중 셀 연결 접속 지원을 알림
(1-2) 페이징 모니터링 동작 실시 예
단말은 설정 정보(예를 들면, xBCH(110)을 통하여 전송되는 MIB 등)를 수신하여 eBCH(120)의 전송 여부, eBCH(120)의 전송 주기 및 eBCH(120)의 전송 위치, eBCH(120)의 버전 정보, MIB를 전송하는 기지국의 paging area 정보 중 적어도 하나를 획득할 수 있다.
상기 MIB(110)에서 eBCH(120)의 전송을 지시하는 경우, 단말은 eBCH(120)의 전송 주기 및 eBCH(120)의 전송 위치에 따라 상기 eBCH(120)를 수신할 수 있다. 상기 eBCH(120)의 전송 주기 및 eBCH(120)의 전송 위치는 상기 MIB(110)를 통해 전송되는 값이거나 시스템에서 미리 정의되어 단말이 알고 있는 값일 수 있다. 실시 예에 따라, eBCH(120)의 버전 정보를 사용하는 경우, 상기 eBCH(120)의 버전 정보 값이 변경되지 않으면, 상기 단말은 eBCH(120)의 수신을 생략할 수 있다.
단말은 eBCH(120)를 통해 셀 접속에 필요한 시스템 파라미터 또는 radio configuration 정보를 수신할 수 있다. 단말은 eBCH(120)에서 나머지 시스템 정보(예를 들면, additional BCH(130))의 전송 여부에 대한 정보를 수신하면, 나머지 시스템 정보의 전송 위치에서 나머지 시스템 정보(130)를 수신할 수 있다. 상기 나머지 시스템 정보(130)의 전송 위치는 eBCH(120)에서 전송되는 나머지 시스템 정보의 전송 정보를 통해 획득하는 값이거나 시스템에서 미리 정의되어 있는 값일 수 있다.
본 발명의 일 실시 예에 따라 단말은 상기 MIB(110) 및/또는 eBCH(120)를 수신하면, 상기 MIB(110) 및/또는 eBCH(120)을 통해 전송되는 신호를 통해서 상기 기지국이 다중 연결 접속을 지원하는지 여부에 대한 정보를 획득할 수 있다. 상기 MIB(110) 및/또는 eBCH(120)의 정보에 따라 상기 기지국이 단말의 다중 연결 접속을 지원하는 경우, 다중 연결 접속을 지원하는 단말은 상기 기지국을 통해 다중 연결 접속 절차를 수행할 수 있다. 그리고, 다중 연결 접속을 지원하지 않는 단말은 상기 기지국을 통해 상기 기지국이 지원하는 RAT(radio access technology) 연결 접속을 수행할 수 있다. 일 실시 예로서, 단말이 LTE 셀과 5G 셀을 통한 다중 연결 접속을 지원하고 기지국이 LTE 셀과 5G 셀을 통한 다중 연결 접속을 지원하는 경우, 상기 단말은 상기 기지국을 통해 LTE 셀 및 5G 셀로의 다중 연결 접속 절차를 수행할 수 있다. 다른 실시 예로서 단말이 5G셀을 통한 접속만 지원하고 기지국이 LTE 셀과 5G 셀을 통한 다중 연결 접속을 지원하는 경우, 상기 단말은 상기 기지국을 통해 5G 셀로의 연결 접속 절차를 수행할 수 있다. 또 다른 실시 예로서 단말이 LTE 셀을 통한 접속만 지원하고 기지국이 LTE 셀과 5G 셀을 통한 다중 연결 접속을 지원하는 경우, 상기 단말은 상기 기지국을 통해 5G 셀로의 연결 접속 절차를 수행할 수 없을 수 있다. 그리고, 단말은 상기 기지국을 통해 LTE 셀로의 연결 접속 절차만 수행할 수 있다.
실시 예에 따라, 아이들 모드(idle mode) 상태에 있는 단말은, MIB(110) 및/또는 eBCH(120)를 수신하면 기지국의 paging area 정보를 확인할 수 있다. 그리고, 상기 paging area 정보에 기반하여 단말은 위치 등록 절차를 수행할 수 있다.
실시 예에 따라, idle mode 상태에 있는 단말은 MIB(110) 및/또는 eBCH(120)를 수신하면 상기 eBCH(120)를 통해서 paging 시그널 전송 여부를 확인할 수 있다. 실시 예에 따라, paging 시그널 전송 여부는 1-bit paging signal indicator로 표기되어 eBCH(120)를 통해 전송될 수 있다. 또는, 실시 예에 따라 paging 시그널 전송 여부는 paging 시그널이 전송되는 자원 위치 정보로 표기될 수 있다. 또한, 실시 예에 따라 paging 시그널 전송 여부는 시스템에서 지원하는 각 paging area에 대해 paging 시그널이 전송되는지 여부를 알려주는 정보로 표기될 수 있다. 상기 eBCH(120)는 paging 시그널 전송 주기에 대한 정보, paging 시그널 전송 위치에 대한 정보, paging 시그널 전송 심볼 개수에 대한 정보 중 적어도 하나를 포함할 수 있다. 실시 예에 따라 idle mode 상태에 있는 단말은 eBCH(120)로부터 획득한 paging 시그널 전송 정보를 기반으로 paging 시그널을 수신할 수 있다. 그리고, 실시 예에 따라 idle mode 상태에 있는 단말은 eBCH(120)로부터 획득한 각 paging area에 대한 paging 시그널 전송 정보를 기반으로 paging 시그널을 수신할 수 있다. 실시 예에 따라, 상기 eBCH(120)에 paging 시그널의 전송 주기에 대한 정보 또는 paging 시그널 전송 위치에 대한 정보가 포함되지 않는 경우, 상기 paging 시그널의 전송 주기 또는 paging 시그널의 전송 위치는 상기 단말에게 전용 신호(dedicated signal)를 통해 미리 전달될 수 있다. 실시 예에 따라, paging 시그널은 eBCH(120) 또는 additional BCH(130)와 동일한 전송 포맷으로 전송될 수 있다. 실시 예에 따라, paging 시그널은 PDSCH와 동일한 전송 포맷으로 전송될 수 있다. 실시 예에 따라, paging 시그널은 1개 단말을 타겟으로 전송될 수 있다. 또는 paging 시그널은 1개 이상의 단말들을 타겟으로 전송될 수 있다. paging 시그널의 전송 포맷은 MCS level, modulation order, channel coding, repetition 개수, physical channel 중 적어도 하나에 해당할 수 있다.
(1-3) 빔 포밍 시스템에서의 페이징 모니터링 동작 실시 예
(1-3-1)
빔포밍이 적용되는 시스템의 경우, paging 시그널 모니터링 시점에서 단말은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다. 그리고, paging area 변경이 되지 않았다면, 단말은 상기 eBCH(120)의 지시에 따라 paging 시그널 전송 여부를 수신할 수 있다. paging 시그널은 eBCH(120)에서 지시하는 전송 자원 위치 또는 단말이 미리 알고 있는 전송 자원 위치에서 수신될 수 있다. paging 시그널을 통해 하향링크 데이터가 팬딩(pending)되어 있음을 확인한 단말은, 상기 기지국을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말은 idle mode를 유지할 수 있다. 한편, 상기 단말은 paging area 변경을 확인하면 위치 등록 절차를 수행할 수 있다. 그리고 상기 단말은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-2)
빔포밍이 적용되는 시스템의 경우, paging 시그널 모니터링 시점에서 단말이 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행할 때, 단말이 idle mode로 천이하기 전에 접속하였던 서빙 셀에 위치해 있음을 판단하면, 단말은 상기 서빙 셀과 사용한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다. 그리고, 단말은 상기 eBCH(120)의 지시에 따라 paging 시그널 전송 여부를 수신할 수 있다. paging 시그널은 eBCH(120)에서 지시하는 전송 자원 위치 또는 단말이 미리 알고 있는 전송 자원 위치에서 수신될 수 있다. paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말은 상기 기지국을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending되어 있지 않음을 확인한 단말은 idle mode를 유지할 수 있다. 한편, 상기 단말은 paging area 변경을 확인하면 위치 등록 절차를 수행할 수 있다. 그리고, 상기 단말은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-3)
빔포밍이 적용되는 시스템의 경우, paging 시그널 모니터링 시점에서 단말은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다. 실시 예에 따라, 단말은 각 paging area에 대한 paging 시그널의 전송 여부를 지시하는 정보를 수신할 수 있다. 상기 paging area에 대한 paging 시그널 전송 여부를 지시하는 정보의 실시 예는, 각각의 paging area의 식별 정보(ID)에 대응되는 paging 시그널의 전송 여부를 나타내는 정보의 형태를 포함할 수 있다. 상기 각 paging area에 대한 paging 시그널의 전송 여부를 지시하는 정보는 eBCH(120)를 통해 전송될 수 있다. 그리고, 상기 각 paging area에 대한 paging 시그널의 전송 여부를 지시하는 정보에 따라서 단말은 자신이 속한 paging area에 대해 전송될 paging 시그널이 있는지 여부를 확인할 수 있다. 상기 단말은 paging area 변경이 되지 않았다면 상기 eBCH(120)의 지시(상기 paging area에 대한 paging 시그널이 전송되는지 여부를 나타내는 정보)에 따라 paging 시그널 전송 여부를 수신할 수 있다. paging 시그널은 eBCH(120)에서 지시하는 전송 자원 위치 또는 단말이 미리 알고 있는 전송 자원 위치에서 수신될 수 있다. paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말은, 상기 기지국을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말은 idle mode를 유지할 수 있다. 한편, 상기 단말은 paging area 변경을 확인하면 위치 등록 절차를 수행할 수 있다. 그리고 상기 단말은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-4)
도 2는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 일 예시이다.
도 2를 참고하면, 빔포밍이 적용되는 시스템의 경우, 단말(210)은 230 단계에서 paging 시그널 모니터링 시점 시작을 판단할 수 있다. 그리고, paging 시그널 모니터링 시점에서 단말(210)은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고, 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다(235 단계 및 240 단계). 상기 eBCH(120)는 시스템 방송 정보일 수 있고, 상기 eBCH(120)에는 paging area 정보가 포함될 수 있다. 상기 eBCH(120)는 기지국(220)이 전송할 수 있다. 그리고, 기지국(220)은 LET 기지국(eNB: evolved node B)일 수도 있고, 5G 기지국(5GNB)일 수 있다. 상기 기지국(220)이 5G 기지국(5GNB)인 경우 상기 기지국(220)은 차세대 기지국(NR NB(new radio node B), gNB)일 수 있다. 이는 후술할 실시 예들의 경우에도 동일하게 적용될 수 있다.
245 단계에서 단말(210)이 paging area 변경이 되지 않은 것으로 확인(판단)한 경우, 단말(210) 및 기지국(220)은 250 단계 및 255 단계에서 상기 eBCH(120)의 지시에 따라 랜덤 엑세스(random access) 절차를 수행할 수 있다. random access 절차를 수행하는 중 기지국(220)은 단말 식별자(예를 들면, 단말(210)의 ID, 단말용 랜덤 엑세스 프리앰블(random access preamble) 등)와 같은 paging 엑세스 정보를 기반으로 단말(210)을 인지할 수 있다. 그리고, 상기 기지국(220)은 상기 random access 절차를 통해 단말(210)에게 paging 시그널을 전송할 수 있다. 또한, 상기 기지국(220)이 단말(210)에게 전송하는 paging 신호는 unicast 신호일 수 있고 또는 broadcast 신호일 수도 있다. paging 신호가 broadcast 신호인 경우, 상기 paging 신호는 이를 수신한 단말(210)이 자신에게 지시된 paging 신호인지 여부를 확인하기 위한 정보가 더 포함될 수 있다.
예를 들어, 250 단계에서 random access 절차의 msg1를 통해 paging 엑세스 정보(예를 들면, 단말 ID 등)를 수신한 기지국(220)은, 255 단계에서 random access 절차의 msg2를 통해 단말(210)에게 paging 시그널을 전송할 수 있다. 예를 들어 상기 paging 시그널을 포함하는 상기 msg2 포맷의 실시 예는, 랜덤 엑세스 응답 메시지(RAR(random access response) message)의 1 비트 사용 포맷 또는 RAR message grant의 1 비트 사용 포맷 또는 상기 RAR message에 concatenation되는 포맷(예를 들면, RAR message grant는 상기 RAR message + paging signal 전송에 충분한 크기의 UL grant가 될 수 있다) 또는 RAR message와 별도의 포맷 또는 RAR message 대신 전송되는 포맷 등 중 적어도 하나를 포함할 수 있다. 실시 예에 따라, 상기 msg2에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg2의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
다른 예로서, 250 단계에서 random access 절차의 msg3를 통해 단말 ID 등을 수신한 기지국(220)은, 255 단계에서 random access 절차의 msg4를 통해 단말(210)에게 paging 시그널을 전송할 수 있다. 실시 예에 따라, 상기 msg4에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg4의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
260 단계에서 paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말(210)은, 270 단계에서 상기 기지국(220)을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말(210)은 idle mode를 유지할 수 있다. 또한, 단말(210)은 245 단계에서 paging area 변경을 확인한 경우, 위치 등록 절차를 수행할 수 있다. 그리고, 도시되지 않았지만 단말(210)은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-5)
도 3은 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 3을 참고하면, 빔포밍이 적용되는 시스템의 경우, 단말(210)은 310 단계에서 paging 시그널 모니터링 시점 시작을 판단할 수 있다. 그리고, paging 시그널 모니터링 시점에서 단말(210)은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고, 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다(320 단계 및 330 단계).
340 단계에서 단말(210)이 paging area 변경이 되지 않은 것으로 확인(판단)한 경우, 단말(210) 및 기지국(220)은 350 단계 및 360 단계에서 상기 eBCH(210)의 지시에 따라 random access 절차를 수행할 수 있다. random access 절차를 수행하는 중 기지국(220)은 페이징 식별자(예를 들면, paging용 random access preamble, paging용 랜덤 엑세스 자원(random access resource), paging용 랜덤 엑세스 심볼(random access symbol) 등)와 같은 단말의 페이징 엑세스 식별 정보를 기반으로 페이징을 모니터링하는 단말(210)이 적어도 1개 이상 있음을 인지할 수 있다. 그리고, 상기 기지국(220)은 상기 random access 절차를 통해 1개 이상의 단말(210)에게 paging 시그널을 전송할 수 있다.
예를 들어, 350 단계에서 random access 절차의 msg1를 통해 단말의 페이징 엑세스 식별 정보(예를 들면, paging ID 등)를 수신한 기지국(220)은, 360 단계에서 random access 절차의 msg2를 통해 1개 이상의 단말(210)을 대상으로 paging 시그널을 전송할 수 있다. 예를 들어 상기 paging 시그널을 포함하는 상기 msg2 포맷의 실시 예는 RAR message의 1 비트 사용 포맷 또는 RAR message grant의 1 비트 사용 포맷 또는 상기 RAR message에 concatenation되는 포맷(예를 들면, RAR message grant는 상기 RAR message + paging signal 전송에 충분한 크기의 UL grant가 될 수 있다) 또는 RAR message와 별도의 포맷 또는 RAR message 대신 전송되는 포맷 등 중 적어도 하나를 포함할 수 있다. 실시 예에 따라, 상기 msg2에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg2의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
다른 예로서, 350 단계에서 random access 절차의 msg3를 통해 단말의 페이징 엑세스 식별 정보(예를 들면, paging ID 등)를 수신한 기지국(220)은, 360 단계에서 random access 절차의 msg4를 통해 1개 이상의 단말(210)에게 paging 시그널을 전송할 수 있다. 실시 예에 따라, 상기 msg4에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg4의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
상기 절차는 각 빔에서 페이징 식별자를 포함하는 random access 절차가 수행되는 경우에도 적용될 수 있다.
370 단계에서 paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말(210)은, 380 단계에서 상기 기지국(220)을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말(210)은 idle mode를 유지할 수 있다. 또한, 단말(210)은 340 단계에서 paging area 변경을 확인한 경우, 위치 등록 절차를 수행할 수 있다. 그리고, 도시되지 않았지만 단말(210)은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-6)
도 4는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 4를 참고하면, 빔포밍이 적용되는 시스템의 경우, 단말(210)은 410 단계에서 paging 시그널 모니터링 시점 시작을 판단할 수 있다. 그리고, paging 시그널 모니터링 시점에서 단말(210)은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고, 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다(420 단계 및 430 단계).
한편, 단말(210)은 420 단계에서 전송되는 eBHC(120)를 통해 각 paging area에 대한 paging 시그널이 전송되는지 여부를 나타내는 정보를 수신할 수 있다. 그리고, 440 단계에서 단말(210)은 자신이 속한 paging area에 대해 전송될 paging 시그널이 있는지 여부를 확인할 수 있다. 또한, 440 단계에서 단말(210)은 paging area가 변경되었는지 여부를 확인하고, 상기 paging area에서 전송될 paging 시그널이 있는지 여부를 확인할 수 있다.
440 단계에서 단말(210)이 paging area 변경이 되지 않은 것으로 확인(판단)한 경우, 단말(210) 및 기지국(220)은 450 단계 및 460 단계에서 상기 eBCH(120)의 지시에 따라 random access 절차를 수행할 수 있다. random access 절차를 수행하는 중 기지국(220)은 페이징 식별자(예를 들면, paging용 random access preamble, paging용 random access resource, paging용 random access symbol 등)와 같은 단말의 페이징 엑세스 식별 정보를 기반으로 페이징을 모니터링하는 단말(210)이 적어도 1개 이상 있음을 인지할 수 있다. 그리고, 상기 기지국(220)은 상기 random access 절차를 통해 1개 이상의 단말(210)에게 paging 시그널을 전송할 수 있다.
예를 들어, 450 단계에서 random access 절차의 msg1를 통해 단말의 페이징 엑세스 식별 정보(예를 들면, paging ID 등)를 수신한 기지국(220)은, 460 단계에서 random access 절차의 msg2를 통해 1개 이상의 단말(210)을 대상으로 paging 시그널을 전송할 수 있다. 상기 paging 시그널을 포함하는 상기 msg2 포맷의 실시 예는 RAR message의 1 비트 사용 포맷 또는 RAR message grant의 1 비트 사용 포맷 또는 상기 RAR message에 concatenation 되는 포맷(예를 들면, RAR message grant는 상기 RAR message + paging signal 전송에 충분한 크기의 UL grant가 될 수 있다) 또는 RAR message와 별도의 포맷 또는 RAR message 대신 전송되는 포맷 등 중 적어도 하나를 포함할 수 있다. 실시 예에 따라, 상기 msg2에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg2의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
다른 예로서, 450 단계에서 random access 절차의 msg3를 통해 단말의 페이징 엑세스 식별 정보(예를 들면, paging ID 등)를 수신한 기지국(220)은, 460 단계에서 random access 절차의 msg4를 통해 1개 이상의 단말(210)에게 paging 시그널을 전송할 수 있다. 실시 예에 따라, 상기 msg4에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg4의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
상기 절차는 각 빔에서 페이징 식별자를 포함하는 random access 절차가 수행되는 경우에도 적용될 수 있다.
470 단계에서 paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말(210)은, 480 단계에서 상기 기지국(220)을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말(210)은 idle mode를 유지할 수 있다. 또한, 단말(220)은 440 단계에서 paging area 변경을 확인한 경우, 위치 등록 절차를 수행할 수 있다. 그리고, 도시되지 않았지만 단말(210)은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-3-7)
도 5는 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 5를 참고하면, 빔포밍이 적용되는 시스템의 경우, 단말(210)은 510 단계에서 paging 시그널 모니터링 시점 시작을 판단할 수 있다. 그리고, paging 시그널 모니터링 시점에서 단말(210)은 paging 시그널 수신에 적합한 하향링크 빔 탐색을 수행하고 상기 적합한 하향링크 빔을 모니터링하여 eBCH(120)를 수신할 수 있다(520 단계 및 530 단계).
한편, 단말(210)은 520 단계에서 전송되는 eBHC(120)를 통해 각 paging area에 대한 paging 시그널이 전송되는지 여부를 나타내는 정보를 수신할 수 있다. 그리고, 540 단계에서 단말(210)은 자신이 속한 paging area에 대해 전송될 paging 시그널이 있는지 여부를 확인할 수 있다. 또한, 540 단계에서 단말(210)은 paging area가 변경되었는지 여부를 확인하고, 상기 paging area에서 전송될 paging 시그널이 있는지 여부를 확인할 수 있다.
440 단계에서 단말(210)이 paging area 변경이 되지 않은 것으로 확인(판단)한 경우, 단말(210) 및 기지국(220)은 550 단계 및 560 단계에서 상기 eBCH(120)의 지시에 따라 random access 절차를 수행할 수 있다. random access 절차를 수행하는 중 기지국(220)은 단말 식별자 (예를 들면, 상기 단말 ID, 상기 단말용 random access preamble 등)와 같은 paging 엑세스 정보를 기반으로 단말(210)을 인지할 수 있다. 그리고, 상기 기지국(220)은 상기 random access 절차를 통해 단말에게 paging 시그널을 전송할 수 있다.
예를 들어, 550 단계에서 random access 절차의 msg1를 통해 paging 엑세스 정보(예를 들면, 단말 ID 등)를 수신한 기지국(220)은, 560 단계에서 random access 절차의 msg2를 통해 단말(210)에게 paging 시그널을 전송할 수 있다. 상기 paging 시그널을 포함하는 상기 msg2 포맷의 실시 예는 RAR message의 1비트 사용 포맷 또는 RAR message grant의 1 비트 사용 포맷 또는 상기 RAR message에 concatenation 되는 포맷(예를 들면, RAR message grant는 상기 RAR message + paging signal 전송에 충분한 크기의 UL grant가 될 수 있다) 또는 RAR message와 별도의 포맷 또는 RAR message 대신 전송되는 포맷 등 중 적어도 하나를 포함할 수 있다. 실시 예에 따라, 상기 msg2에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg2의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
다른 예로서, 550 단계에서 random access 절차의 msg3를 통해 단말 ID 등을 수신한 기지국(220)은, 560 단계에서 random access 절차의 msg4를 통해 단말(210)에게 paging 시그널을 전송할 수 있다. 실시 예에 따라, 상기 msg4에는, paging 시그널이 전송될 것이라는 정보(예를 들면, paging 시그널 전송 여부를 지시하는 정보 등)가 포함될 수 있다. 그리고 기지국(220)은 msg4의 전송 이후에, 별도의 메시지를 이용하여 paging 시그널을 단말(210)에게 전송할 수 있다.
570 단계에서 paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말(210)은, 580 단계에서 상기 기지국(220)을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말(210)은 idle mode를 유지할 수 있다. 또한, 단말(210)은 540 단계에서 paging area 변경을 확인하면 위치 등록 절차를 수행할 수 있다. 그리고, 도시되지 않았지만 단말(210)은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-4) 빔 포밍 시스템에서의 페이징 모니터링 동작 다른 실시 예
도 6은 본 발명의 일 실시 예에 따른 5G 시스템에서 페이징 모니터링 절차의 다른 예시이다.
도 6을 참고하면, 빔포밍이 적용되는 시스템의 경우, 단말(610)은 630 단계에서 paging 시그널 모니터링 시점 시작을 판단할 수 있다. 그리고, paging 시그널 모니터링 시점에서 단말(610)은 paging 시그널 수신에 적합한 LTE 셀(620)을 탐색할 수 있다(635 단계). 그리고, 상기 선택된 LTE 셀(620)로부터 eBCH(120)(또는 BCH)를 수신할 수 있다(640 단계).
645 단계에서 단말(610)이 paging area가 변경되지 않은 것으로 확인(판단)한 경우, 단말(610)은 650 단계에서 상기 eBCH(120)의 지시에 따라 paging 시그널을 수신할 수 있다. 이때, paging 시그널은 5G 기지국에서 전송될 데이터가 pending되어 있는지 여부와 관련된 신호일 수 있다.
한편, 상기 LTE 셀(620)에서 전송하는 eBCH(120) 또는 paging 시그널은 빔포밍이 적용되는 시스템을 지원하는 단말-특정(specific) 또는 5G 단말-specific 전송 포맷 또는 디코딩 식별자(예를 들면, 기존 LTE시스템에서 사용하는 paging RNTI와 다른 별도의 paging RNTI 사용 등)를 사용하여 송수신될 수 있다.
655 단계에서 paging 시그널을 통해 하향링크 데이터가 pending되어 있음을 확인한 단말(610)은, 660 단계에서 상기 LTE 기지국(620)을 통해 데이터 송수신을 위한 접속 절차를 계속 수행할 수 있다. 예를 들면, 단말(610)과 5G 기지국이 LTE 기지국(620)을 통해 5G 데이터를 송수신하기 위한 5G 연결(connection)을 수립하는 절차를 660 단계에서 수행할 수 있다. 예를 들면, 단말(610)과 5G 기지국 사이의 RRC 셋업(setup) 절차를 수행할 수 있고, 5G RRC를 위한 베어러(예를 들면, 시그널링 라디오 베어러(SRB: signalling radio bearer)3)를 설정하는 절차가 수행될 수 있다.
그리고, paging 시그널을 통해 하향링크 데이터가 pending 되어 있지 않음을 확인한 단말(610)은 idle mode를 유지할 수 있다. 또한, 단말(610)은 645 단계에서 paging area 변경을 확인한 경우, 위치 등록 절차를 수행할 수 있다. 그리고, 도시되지 않았지만 단말(610)은 위치 등록 절차를 수행하며 paging 시그널을 수신할 수 있다.
(1-5) LTE와 5G 공존 시스템 또는 5G 시스템에서의 페이징 area 실시 예
도 7은 본 발명의 일 실시 예에 따른 셀 기반 페이징 영역(area) 운용의 예시이고, 도 8은 본 발명의 일 실시 예에 따른 TRP 기반 페이징 area 운용의 예시이고, 도 9는 본 발명의 일 실시 예에 따른 LTE 기지국 기반 페이징 area 운용의 예시이고, 도 10은 본 발명의 일 실시 예에 따른 5G 기지국 기반 페이징 area 운용의 예시이다.
MIB 또는 eBCH는 paging area 코드 정보를 포함할 수 있다. paging area는 cell 기반 또는 송수신점(TRP: transmission/ reception point) 기반 또는 LTE 기지국 기반 또는 5G 기지국 기반 또는 라디오 유닛(RU: radio unit) 기반 또는 데이터 유닛(DU: data unit)기반 또는 제어 유닛(CU: control unit) 기반 등으로 구성될 수 있다. 예를 들어, cell 기반 paging area는 1개 이상의 cell이 1개의 paging area을 구성할 수 있다. 예를 들어, TRP 기반 paging area는 1개 이상의 TRP가 1개의 paging area를 구성할 수 있다. 예를 들어, LTE 기지국 기반 paging area는 1개 이상의 LTE 기지국이 1개의 paging area를 구성할 수 있다. 여기서 1개의 LTE 기지국은 1개 이상의 5G 기지국과 연결될 수 있다. 예를 들어, 5G 기지국 기반 paging area는 1개 이상의 5G 기지국이 1개의 paging area를 구성할 수 있다. 여기서 1개의 5G 기지국은 1개 이상의 LTE 기지국과 연결될 수 있다. 예를 들어, CU 기반 paging area는 1개 이상의 CU가 1개의 paging area를 구성할 수 있다.
도 7을 참고하면, 한 개 이상의 셀이 하나의 paging area 를 구성할 수 있다. 그리고, 하나의 셀이 1개 이상 paging area에 속할 수 있다. 도 8을 참고하면, 한 개 이상의 셀에 속한 한 개 이상의 TRP가 하나의 paging area를 구성할 수 있다. 그리고, 하나의 TRP가 1개 이상 paging area에 속할 수 있다.도 9를 참고하면, 한 개 이상의 LTE 기지국이 하나의 paging area를 구성할 수 있다. 그리고, 하나의 LTE 기지국이 1개 이상 paging area에 속할 수 있다. 도 10을 참고하면, 한 개 이상의 5G 기지국이 하나의 paging area를 구성할 수 있다. 그리고, 하나의 5G 기지국이 1개 이상 paging area에 속할 수 있다.
MIB 또는 BCH/eBCH에서 전송되는 paging area 코드 정보를 수신한 단말은, MIB 또는 BCH/eBCH가 상기 단말이 알고 있는 paging area 코드 정보를 포함하지 않고, 상기 단말이 모르는 paging area 코드 정보를 포함하고 있는지 여부를 판단(확인)할 수 있다. MIB 또는 BCH/eBCH에 상기 단말이 알고 있는 paging area 코드 정보가 포함되어 있지 않으면, 단말은 상기 MIB 또는 BCH/eBCH가 수신된 셀을 통해 위치 등록 절차를 수행할 수 있다. 다른 실시 예로서 상기 MIB 또는 BCH/eBCH에서 전송되는 paging area 코드 정보와 각 paging area별 paging 시그널의 전송 여부를 나타내는 정보를 수신한 단말은 자신의 paging area에 대해 paging 시그널 전송이 있는지 여부를 판단할 수 있다. 단말은 자신의 paging area에 대해 paging 시그널 전송이 있고, 상기 MIB 또는 BCH/eBCH에 상기 단말이 알고 있는 paging area 코드 정보를 포함하지 않고 자신이 모르는 paging area 코드 정보를 포함하고 있다면, 단말은 상기 MIB 또는 BCH/eBCH가 수신된 셀을 통해 위치 등록 절차를 수행할 수 있다. 또한 상기 단말은 paging 시그널을 수신할 수 있다. 단말은 자신의 paging area에 대해 paging 시그널 전송이 없고, 상기 MIB 또는 BCH/eBCH에 상기 단말이 알고 있는 paging area 코드 정보를 포함하지 않고 자신이 모르는 paging area 코드 정보를 포함하고 있다면 단말은 위치 등록 절차 수행을 연기할 수도 있다.
(1-6) LTE와 5G 공존 시스템에서의 페이징 RAT 운용 절차 실시 예
도 11은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 실시 예이고, 도 12는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이고, 도 13은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이고, 도 14는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 선택 절차 다른 실시 예이다.
도 11을 참고하면, LTE 셀(LTE 기지국)(1120)과 5G 셀(5G 기지국)(1130)에 동시에 연결되어 데이터 송수신을 수행할 수 있는 단말(1110)의 경우, idle mode 상태에서 paging 시그널을 수신할 RAT(또는 페이징 선호(preference) RAT)를 선택할 수 있다.
좀 더 구체적으로 살펴보면, 1150 단계에서 단말(1110)은 LTE 기지국(1120)과 시스템 접속을 하고 있을 수 있다. 1160 단계에서 단말(1110)은 LTE 셀(1120)에서 paging 시그널을 수신할 것인지, 5G 셀(1130)에서 paging 시그널을 수신할 것인지를 결정하고, 상기 결정한 페이징 시그널을 수신할 셀에 대한 정보를 LTE 기지국(1120)에게 전송할 수 있다. 이때, 상기 정보는 페이징 preference RAT 정보일 수 있다. 실시 예에 따라, 단말(1110)은 UE capability 전송 절차 또는 idle mode 천이 절차 또는 RRC configuration (재)설정 절차 또는 위치 등록 절차를 통해 기지국(1120)에게 페이징 preference RAT 정보를 전달할 수 있다.
그리고, LTE 기지국(1120)은 상기 수신한 페이징 preference RAT 정보를 1170 단계에서 페이징 제어(관리) 엔티티(1140)에게 전송할 수 있다. 이때, 상기 페이징 제어 엔티티(1140)는 이동성 관리 엔티티(MME: mobility management entity)일 수 있다. 또한, 실시 예에 따라 상기 페이징 제어 엔티티(1140)는 AMF(access and mobility management function), UPF(user plane function), SMF(session management function) 등일 수 있으며, 단말의 idle mode를 관리하는 엔티티일 수 있다. 1180 단계에서 페이징 제어 엔티티(1140)는 수신한 페이징 preference RAT 정보에 따라 단말의 페이징 RAT를 관리할 수 있다.
다른 실시 예로서, 도 12를 참고하면, 기지국(1120, 1130)은 단말(1110)이 multi-RAT 또는 multi-connectivity(LTE+5G를 포함) capability를 지원하는 것으로 판단하면, 해당 단말(1110)이 LTE 셀(1120)에서 페이징 시그널을 수신할 것인지 5G 셀(1130)에서 페이징 시그널을 수신할 것인지를 결정할 수 있다.
좀 더 구체적으로 살펴보면, 1210 단계에서 단말(1110)은 LTE 기지국(1120)과 시스템 접속을 하고 있을 수 있다. 1220 단계에서 단말(1110)은 LTE 기지국(1120)에게 상기 단말이 multi-RAT 또는 multi-connectivity를 지원하는지 여부에 대한 정보를 전송할 수 있다. 그리고, LTE 기지국(1120)은 단말(1110)이 multi-RAT 또는 multi-connectivity(LTE+5G를 포함) capability를 지원하는 것으로 판단한 경우, 단말(1110)이 LTE 셀(1120)에서 페이징 시그널을 수신할 것인지 5G 셀(1130)에서 페이징 시그널을 수신할 것인지, 즉 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT(또는 페이징 선호(preference) RAT)를 결정할 수 있다. 이때, 1230 단계에서 LTE 기지국(1120)은 페이징 제어 엔티티(1140)과 페이징 preference RAT 정보를 교환하여 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT를 결정할 수도 있다. 또는, 1230 단계에서 LTE 기지국(1120)은 페이징 제어 엔티티(1140)에게 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT에 대한 정보(즉, 페이징 preference RAT 정보)를 전송할 수 있다. 그리고, 1250 단계에서 페이징 제어 엔티티(1140)는 수신한 페이징 preference RAT 정보에 따라 단말의 페이징 RAT를 관리할 수 있다.
1240 단계에서 LTE 기지국(1120)은 단말(1110)이 어느 셀에서 페이징 시그널을 수신할 것인지에 대한 정보(즉, 페이징 preference RAT 정보)를 단말(1110)에게 전송할 수 있다. 실시 예에 따라, LTE 기지국(1120)은 UE capability 전송 절차 또는 idle mode 천이 절차 또는 RRC configuration (재)설정 절차 또는 위치 등록 절차를 통해 단말(1110)에게 페이징 preference RAT 정보를 전달할 수 있다.
다른 실시 예로서, 도 13을 참고하면, 단말(1110)의 페이징 preference RAT 결정 절차는 단말(1110)이 RAT 또는 cell의 측정(measurement) 결과를 기지국(1120)에게 전달하고 기지국(1120)은 상기 단말(1110)의 사용 가능한 RAT 또는 cell 정보를 결정하여, 페이징 preference RAT가 결정될 수 있다.
좀 더 구체적으로 살펴보면, 1310 단계에서 단말(1110)은 LTE 기지국(1120)과 시스템 접속을 하고 있을 수 있다. 1320 단계에서 단말(1110)은 LTE 기지국(1120)에게 상기 단말의 측정 결과를 보고(measurement report)할 수 있다. 상기 측정 결과는 단말(1110)이 지원하는 RAT 또는 셀(예를 들면, LTE, 5G)에 대한 측정 결과일 수 있다. 그리고, LTE 기지국(1120)은 단말(1110)로부터 수신한 측정 결과에 따라, 단말(1110)이 LTE 셀(1120)에서 페이징 시그널을 수신할 것인지 5G 셀(1130)에서 페이징 시그널을 수신할 것인지, 즉 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT(또는 페이징 선호(preference) RAT)를 결정할 수 있다. 이때, 1330 단계에서 LTE 기지국(1120)은 페이징 제어 엔티티(1140)과 페이징 preference RAT 정보를 교환하여 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT를 결정할 수도 있다. 또는, 1330 단계에서 LTE 기지국(1120)은 페이징 제어 엔티티(1140)에게 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT에 대한 정보(즉, 페이징 preference RAT 정보)를 전송할 수 있다. 그리고, 1350 단계에서 페이징 제어 엔티티(1140)는 수신한 페이징 preference RAT 정보에 따라 단말의 페이징 RAT를 관리할 수 있다.
1340 단계에서 LTE 기지국(1120)은 단말(1110)이 어느 셀에서 페이징 시그널을 수신할 것인지에 대한 정보(즉, 페이징 preference RAT 정보)를 단말(1110)에게 전송할 수 있다. 실시 예에 따라, LTE 기지국(1120)은 UE capability 전송 절차 또는 idle mode 천이 절차 또는 RRC configuration (재)설정 절차 또는 위치 등록 절차를 통해 단말(1110)에게 페이징 preference RAT 정보를 전달할 수 있다.
상기에서는 단말(1110)의 페이징 preference RAT 선택을 위한 시그널링을 LTE 기지국(1120)과 수행하는 경우를 예를 들어 설명하였으나, 상기 단말(1110)이 다중 연결 접속을 통해 LTE 기지국(1120) 및 5G 기지국(1130)과 연결되어 있는 경우에는, 상기 각각의 기지국(1120, 1130)을 통해 각각의 RAT 정보(예, LTE 셀에 대한 measurement, 5G 셀에 대한 measurement)를 송수신할 수 있음은 물론이다.
다른 실시 예로, 도 14를 참고하면, multi-RAT 또는 multi-connectivity (LTE+5G를 포함) capability를 지원하는 단말(1110)에게 전송되는 페이징 preference RAT 지시는 선택된 RAT에 해당하는 기지국으로부터 전송되는 시그널링을 통해 전달될 수 있다.
좀 더 구체적으로 살펴보면, 1410 단계에서 단말(1110)은 LTE 기지국(1120)과 시스템 접속을 하고 있을 수 있다. 1420 단계에서 단말(1110)은 LTE 기지국(1120)에게 상기 단말이 multi-RAT 또는 multi-connectivity를 지원하는지 여부에 대한 정보를 전송할 수 있다. 그리고, 단말(1110)은 1430 단계와 같이 LTE 기지국(1120) 및 5G 기지국(1130)과 multi-connectivity 연결될 수 있다.
이때, 단말(1110)의 페이징 preference RAT이 LTE 셀(1120)인 경우, 단말(1110)이 1430 단계에서 LTE 기지국(1120)과 교환하는 메시지에 상기 단말(1110)의 유휴 모드 설정(idle mode configuration) 정보를 포함하여 전송할 수 있다. 상기 idle mode configuration 정보는 상기 단말(1110)의 paging cycle, paging offset, paging identify 중 적어도 하나를 포함할 수 있다. 그리고, 상기 idle mode configuration 정보는 페이징 preference RAT 지시자로 해석될 수 있다. 예를 들면, 상기 idle mode configuration 정보를 수신한 기지국(본 예에서는 LTR 기지국(1120))은 자신이 단말(1110)의 페이징 preference RAT인 것으로 해석될 수 있다. 실시 예에 따라, 상기 idle mode configuration 정보에 페이징 preference RAT 정보가 포함될 수 있다.
또 다른 예로, 단말(1110)의 페이징 preference RAT이 5G 셀(1130)인 경우, 단말(1110)이 1430 단계에서 5G 기지국(1130)과 교환하는 메시지에 상기 단말(1110)의 idle mode configuration 정보를 포함하여 전송할 수 있다. 상기 idle mode configuration 정보는 상기 단말(1110)의 paging cycle, paging offset, paging identity 중 적어도 하나를 포함할 수 있다. 그리고, 상기 idle mode configuration 정보는 페이징 preference RAT 지시자로 해석될 수 있다.
그리고, LTE 기지국(1120) 및/또는 5G 기지국(1130)은 1440 단계에서 페이징 제어 엔티티(1140)에게 단말(1110)이 idle mode 상태에서 paging 시그널을 수신할 RAT에 대한 정보(즉, 페이징 preference RAT 정보)를 전송할 수 있다. 또는, LTE 기지국(1120) 및/또는 5G 기지국(1130)이 페이징 제어 엔티티(1140)에게 페이징 preference RAT 정보를 전송하면, 페이징 제어 엔티티(1140)는 상기 페이징 preference RAT 정보를 다시 LTE 기지국(1120) 및/또는 5G 기지국(1130)에게 전송하거나, 페이징 preference RAT 정보를 전송하지 않은 기지국(1120, 1130)에게 전송할 수도 있다. 그리고, 1450 단계에서 페이징 제어 엔티티(1140)는 수신한 페이징 preference RAT 정보에 따라 단말의 페이징 RAT를 관리할 수 있다.
1460 단계에서 단말(1110)은 기지국(1120, 1130)으로부터 페이징 preference RAT 정보를 수신할 수 있다. 실시 예에 따라, 단말(1110)은 페이징 preference RAT로 선택된 RAT에 해당하는 기지국(예를 들면, 5G 기지국(1130))으로부터 상기 페이징 preference RAT를 수신할 수 있다. 실시 예에 따라, 기지국(1120, 1130)은 UE capability 전송 절차 또는 idle mode 천이 절차 또는 RRC configuration (재)설정 절차 또는 위치 등록 절차를 통해 단말(1110)에게 페이징 preference RAT 정보를 전달할 수 있다.
도시되지 않았지만, 다른 실시 예로 단말(1110)에게 전송되는 페이징 preference RAT 정보는 상기 단말(1110)이 시스템에 접속한 셀을 기반으로 결정될 수 있다. 예를 들면, 단말(1110)이 LTE 셀(1120)로 시스템 접속을 수행한 경우에는 상기 LTE 셀(1120)이 상기 단말의 페이징 preference RAT으로 결정될 수 있다. 그리고, 단말(1110)이 5G 셀(1130)로 시스템 접속을 수행한 경우에는 상기 5G 셀(1130)이 상기 단말(1110)의 페이징 preference RAT으로 결정될 수 있다.
도시되지 않았지만, 다른 실시 예로 단말(1110)이 multi-RAT 또는 multi-connectivity (LTE+5G를 포함) capability를 지원하면서 LTE 셀(1120)에서 페이징 시그널을 수신할 수 있는 서비스를 사용하는 것으로 판단하면, 페이징 제어 엔터티(1140)(또는 기지국(1120, 1130) 또는 단말(1110))는 해당 단말(1110)이 LTE 셀(1120)에서 페이징 시그널을 수신할 수 있도록 결정할 수 있다. 다른 실시 예로 단말(1110)이 multi-RAT 또는 multi-connectivity (LTE+5G를 포함) capability를 지원하면서 5G 셀(1130)에서 페이징 시그널을 수신할 수 있는 서비스를 사용하는 것으로 판단하면, 페이징 제어 엔터티(1140)(또는 기지국(1120, 1130) 또는 단말(1110))는 해당 단말(1110)이 5G 셀(1130)에서 페이징 시그널을 수신할 수 있도록 결정할 수 있다. 상기 단말(1110)이 한 개 이상의 서비스를 사용하는 경우, 페이징 제어 엔터티(1140)(또는 기지국(1120, 1130))는 단말(1110)이 idle mode로 천이하기 전에, 단말(1110)의 multi-RAT 또는 multi-connectivity (LTE+5G를 포함) capability 및 단말(1110)이 페이징 시그널을 수신할 서비스 타입을 단말(1110)에게 명시적으로 알릴 수 있다. 다른 실시 예로 페이징 제어 엔터티(1140)(또는 기지국(1120, 1130))는 단말(1110)이 idle mode로 천이하기 전에, 단말(1110)의 데이터 송수신에 사용한 서비스 정보(예를 들어, 무선 베어러(radio bearer)의 QoS(quality of service), 서비스 프로파일(service profile) 또는 RAN level에서 구분할 수 있는 별도의 서비스 타입 등)에 기반하여 어느 RAT 또는 cell에서 paging 시그널을 수신할 것인지를 결정하고, 상기 결정된 정보를 상기 단말(1110)에게 지시할 수 있다.
단말(1110)의 페이징을 제어하는 코어 네트워크 엔터티 또는 앵커(anchor) 기지국은 단말의 페이징 preference RAT 정보를 관리할 수 있다. 상기 코어 네트워크 엔터티 또는 anchor 기지국에 저장된 단말(1110)의 페이징 preference RAT 정보는, 상기 단말(1110)과 기지국 간 페이징 preference RAT 정보를 교환하는 절차를 수행하는 중에, 또는 상기 단말(1110)이 idle mode로 천이하였음을 기지국이 상기 코어 네트워크 엔터티 또는 anchor 기지국에게 알리는 절차를 수행하는 중에 획득될 수 있다. 상기 anchor 기지국은 상기 단말(1110)이 접속 중인 서빙 기지국이거나 idle mode로 천이한 단말 컨텍스트(context)를 관리하는 기지국이 될 수 있다. 실시 예에 따라, 단말(1110)의 페이징 preference RAT 정보를 결정하는 엔터티와 페이징 preference RAT 정보를 관리하는 엔터티는 동일하거나 다를 수 있다.
페이징 preference RAT 정보는 단말(1110)이 핸드오버를 수행하여 새로운 기지국으로 접속하는 경우, 또는 서빙 기지국과의 통신 중에 또는 단말(1110)이 idle mode 에서 페이징을 모니터링 하는 중에, 또는 단말(1110)의 multi-connectivity 셀이 추가/변경/삭제되는 중에 변경될 수 있다. 코어 네트워크 엔터티 또는 anchor 기지국이 단말(1110)의 페이징 preference RAT을 변경하기로 결정하면, 코어 네트워크 엔터티 또는 anchor 기지국은 단말(1110)의 페이징 지시 메시지에 상기 단말(1110)의 페이징 preference RAT 변경 지시 정보를 포함해서 단말(1110)에게 전송할 수 있다. 실시 예에 따라, 코어 네트워크 엔터티 또는 anchor 기지국으로부터 상기 단말(1110)의 페이징 preference RAT 변경 지시 정보를 수신한 LTE 기지국(1120) 또는 5G 기지국(1130)은 상기 페이징 preference RAT 변경 지시 정보를 포함한 페이징 시그널을 단말(1110)에게 전송할 수 있다. 상기 페이징 시그널로부터 페이징 preference RAT 변경 지시 정보를 수신한 단말(1110)은 이후 시점부터 상기 지시된 페이징 preference RAT에 대한 모니터링을 수행할 수 있다.
페이징 preference RAT 정보에서 LTE 셀(1120)에서 페이징을 수신할 것을 지시하였으면, idle mode 상태의 단말(1110)은 LTE 셀(1120)에서 페이징 시그널을 모니터링하는 동작을 수행할 수 있다. 그리고, 단말(1110)은 5G 셀(1130)을 모니터링 하지 않을 수 있다. 실시 예에 따라, 단말(1110)은 5G 모뎀을 파워 오프(power off)할 수 있다.
다른 실시 예로서, 페이징 preference RAT 정보에서 5G 셀(1130)에서 페이징을 수신할 것을 지시하였으면, 단말(1110)은 5G 셀(1130)에서 페이징 시그널을 모니터링하는 동작을 수행할 수 있다. 그리고, 단말(1110)은 LTE 셀(1120)을 모니터링 하지 않을 수 있다. 실시 예에 따라, 단말(1110)은 LTE 모뎀을 power off 할 수 있다.
단말(1110)에게 페이징 시그널을 전송해야 하는 경우, 코어 네트워크 엔터티 또는 anchor 기지국은 단말(1110)의 페이징 preference RAT 정보를 기반으로, 상기 페이징 preference RAT 정보에서 지시하는 RAT에 해당하는 기지국에게 페이징 지시 메시지를 전송할 수 있다.
일 예로, 단말(1110)의 페이징 preference RAT이 LTE인 경우, 코어 네트워크 엔터티 또는 anchor 기지국은 단말(1110)이 등록된 paging area를 관리하는 LTE 기지국(1120)에게 상기 단말(1110)에 대한 페이징 지시 메시지를 전송할 수 있다. 상기 페이징 지시 메시지를 수신한 LTE 기지국(1120)은 상기 단말 식별자를 포함하는 페이징 메시지를 단말(1110)에게 전송할 수 있다.
다른 실시 예로, 단말(1110)의 페이징 preference RAT 이 5G인 경우, 코어 네트워크 엔터티 또는 anchor 기지국은 단말이(1110) 등록된 paging area를 관리하는 5G 기지국(1130)에게 상기 단말(1110)에 대한 페이징 지시 메시지를 전송할 수 있다. 상기 페이징 지시 메시지를 수신한 5G 기지국(1130)은 상기 단말 식별자를 포함하는 페이징 메시지를 단말(1110)에게 전송할 수 있다.
본 발명의 실시 예에 따라, 하나의 기지국이 한 개 이상의 셀로 구성되는 경우(예를 들면, 다중 캐리어(multi-carrier) 등), 각 셀의 캐리어 주파수(carrier frequency)는 상이할 수 있으며, 상기 페이징 preference RAT은 이종 RAT 또는 동일 RAT의 기지국 내 셀이 될 수 있다. 페이징 preference RAT에 대해 지시 정보는 RAT ID, cell ID, frequency ID 중 적어도 하나를 포함할 수 있다.
다음으로, 단말(1110)과 기지국(1120, 1130) 간 페이징 preference RAT 교환 절차, 코어 네트워크 엔터티/anchor 기지국과 서빙 기지국 간 단말(1110)의 페이징 preference RAT 정보를 교환하는 절차, 단말(1110)의 페이징 preference RAT 정보에 기반한 페이징 모니터링 절차, 단말(1110)의 페이징 preference RAT 정보를 포함하는 페이징 지시 메시지 수신 절차에 대해서 살펴보도록 한다.
(1-6-1)
도 15는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 실시 예이다.
단말(1110)은 1510 단계에서 LTE 기지국(1120)을 통해 시스템에 접속할 수 있다. 그리고, 1520 단계에서 단말(1110)은 LTE 기지국(1120)을 통해 페이징 preference RAT 정보를 전송할 수 있다. 1530 단계에서 LTE 기지국(1120)은 페이징 제어 엔터티(1140)에게 단말(1110)의 페이징 preference RAT 정보를 알려줄 수 있다. 그리고, 1540 단계에서 페이징 제어 엔터티(1140)는 단말(1110)의 페이징 RAT을 관리할 수 있다.
단말(1110)이 LTE 기지국(1120) 및/또는 5G 기지국(1130)을 통한 데이터 송수신을 수행하는 중에, 1550 단계에서 단말(1110)은 idle mode로 천이할 수 있다. idle mode 중에, 1560 단계에서 단말(1110)은 페이징 preference RAT을 모니터링하여 페이징 시그널을 수신할 수 있다. 일 실시 예에 따라 단말(1110)의 페이징 preference RAT은 5G 셀(1130)이 될 수 있다. 이 경우, 단말(1110)은 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다. 또는 실시 예에 따라 단말(1110)의 페이징 preference RAT은 LTE 셀(1130)이 될 수 있다.
페이징 제어 엔터티(1140)는 단말(1110)에게 페이징 시그널을 전송해야 하면, 1570 단계에서 상기 단말(1110)의 페이징 (preference) RAT에 해당하는 셀(1130)에게 단말 페이징 지시 정보를 전송할 수 있다. 예를 들면, 단말(1110)의 페이징 preference RAT가 5G 셀인 경우, 페이징 제어 엔터티(1140)는 5G 셀을를 관리하는 5G 기지국(1130)에게 단말 페이징 지시 정보를 전송할 수 있다.
상기 단말 페이징 지시 정보를 수신한 5G 셀(1130)은 1580 단계에서 단말(1110)에게 페이징 시그널을 전송할 수 있다. 단말(1110)은 상기 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다.
한편, 실시 예에 따라 상기 LTE 기지국(1120) 내지 5G 기지국(1130)은 다중 연결 접속(multi-connectivity) 지원 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)은 상기 페이징 RAT에 해당하는 기지국 중 다중 연결 접속 지원하는 기지국을 모니터링 할 수 있다.
(1-6-2)
도 16은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
단말(1110)은 1610 단계에서 LTE 셀(1120)을 통해 시스템에 접속할 수 있다. 그리고, 1620 단계에서 단말(1110)은 LTE 기지국(1120)을 통해 multi-connectivity 지원 정보를 전송할 수 있다. 1630 단계에서 LTE 기지국(1120)은 단말(1110)의 multi-connectivity 지원 정보를 기반으로 페이징 제어 엔터티(1140)와 단말(1110)의 페이징 preference RAT 정보를 교환할 수 있다. 예를 들면, LTE 기지국(1120)은 단말(1110)의 multi-connectivity 지원 정보를 기반으로 단말(1110)의 페이징 preference RAT 정보를 결정해 페이징 제어 엔터티(1140)에게 전송할 수 있다. 또는, LTE 기지국(1120)은 단말(1110)의 multi-connectivity 지원 정보를 페이징 제어 엔터티(1140)에게 전송하고, 페이징 제어 엔터티(1140)가 단말(1110)의 페이징 preference RAT 정보를 결정하고 이를 LTE 기지국(1120)에게 전송하여 줄 수 있다. 또는, 단말(1110)의 multi-connectivity 지원 정보를 기반으로 LTE 기지국(1120) 및 페이징 제어 엔터티(1140)가 협의하여 단말(1110)의 페이징 preference RAT 정보를 결정하고 이를 교환할 수 있다.
1640 단계에서 LTE 기지국(1120)은 단말(1110)에게 페이징 preference RAT 정보를 전송할 수 있다. 1650 단계에서 페이징 제어 엔터티(1140)는 상기 단말(1110)에 대한 페이징 RAT을 관리할 수 있다.
단말(1110)이 LTE 기지국(1120) 및/또는 5G 기지국(1130)을 통한 데이터 송수신을 수행하는 중에, 1660 단계에서 단말(1110)은 idle mode로 천이할 수 있다. idle mode 중에, 1670 단계에서 단말(1110)은 페이징 preference RAT을 모니터링하여 페이징 시그널을 수신할 수 있다. 일 실시 예에 따라 단말(1110)의 페이징 preference RAT은 5G 셀(1130)이 될 수 있다. 이 경우, 단말(1110)은 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다. 또는 실시 예에 따라 단말(1110)의 페이징 preference RAT은 LTE 셀(1130)이 될 수 있다.
페이징 제어 엔터티(1140)는 단말(1110)에게 페이징 시그널을 전송해야 하면, 1680 단계에서 상기 단말(1110)의 페이징 RAT에 해당하는 5G 셀(1130)에게 단말 페이징 지시 정보를 전송할 수 있다. 예를 들면, 단말(1110)의 페이징 preference RAT가 5G 셀인 경우, 페이징 제어 엔터티(1140)는 5G 셀을를 관리하는 5G 기지국(1130)에게 단말 페이징 지시 정보를 전송할 수 있다.
상기 단말 페이징 지시 정보를 수신한 5G 셀(1130)은 1690 단계에서 단말(1110)에게 페이징 시그널을 전송할 수 있다. 단말(1110)은 상기 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다.
한편, 실시 예에 따라 상기 LTE 기지국(1120) 내지 5G 기지국(1130)은 다중 연결 접속(multi-connectivity) 지원 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)은 상기 페이징 RAT에 해당하는 기지국 중 다중 연결 접속 지원하는 기지국을 모니터링 할 수 있다.
(1-6-3)
도 17은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
단말(1110)은 1710 단계에서 LTE 셀(1120)을 통해 시스템에 접속할 수 있다. 그리고, 1720 단계에서 단말(1110)은 LTE 기지국(1120)을 통해 multi-connectivity 지원 정보를 전송할 수 있다. 1730 단계에서 LTE 기지국(1120)은 단말(1110)의 multi-connectivity 지원 정보를 기반으로 페이징 제어 엔터티(1140)와 단말(1110)의 페이징 preference RAT 정보를 교환할 수 있다. 이에 대한 설명은 상술하였으므로, 그 구체적인 설명은 생략하기로 한다.
1740 단계에서 LTE 기지국(1120)은 단말(1110)에게 페이징 preference RAT 정보를 전송할 수 있다. 실시 예에 따라 단말(1110)의 페이징 preference RAT은 LTE 셀(1120)이 될 수 있다. 그리고, 1750 단계에서 페이징 제어 엔터티(1140)는 상기 단말(1110)에 대한 페이징 RAT을 관리할 수 있다.
한편, 1760 단계에서 페이징 제어 엔터티(1140)는 상기 단말(1110)의 페이징 preference RAT을 변경하기로 결정할 수 있다. 페이징 제어 엔터티(1140)는 LTE 기지국(1120)에게 단말(1110)의 페이징 preference RAT 변경 정보를 전송할 수 있다. 그리고, 1770 단계에서 LTE 기지국(1120)은 단말(1110)에게 변경된 페이징 preference RAT 정보를 전송할 수 있다. 실시 예에 따라 단말(1110)의 변경된 페이징 preference RAT은 5G 셀(1130)이 될 수 있다.
단말(1110)이 LTE 기지국(1120) 및/또는 5G 기지국(1130)을 통한 데이터 송수신을 수행하는 중에, 1780 단계에서 단말(1110)은 idle mode로 천이할 수 있다. idle mode 중에, 1785 단계에서 단말(1110)은 페이징 preference RAT을 모니터링하여 페이징 시그널을 수신할 수 있다. 상술한 것과 같이 단말의 변경된 페이징 preference RAT는 5G 셀(1130)일 수 있다.
페이징 제어 엔터티(1140)는 단말(1110)에게 페이징 시그널을 전송해야 하면, 1790 단계에서 상기 단말(1110)의 페이징 RAT에 해당하는 5G 셀(1130)에게 단말 페이징 지시 정보를 전송할 수 있다. 상기 단말 페이징 지시 정보를 수신한 5G셀은 단말에게 페이징 시그널을 전송할 수 있다. 예를 들면, 단말(1110)의 페이징 preference RAT가 5G 셀인 경우, 페이징 제어 엔터티(1140)는 5G 셀을를 관리하는 5G 기지국(1130)에게 단말 페이징 지시 정보를 전송할 수 있다.
상기 단말 페이징 지시 정보를 수신한 5G 셀(1130)은 1795 단계에서 단말(1110)에게 페이징 시그널을 전송할 수 있다. 단말(1110)은 상기 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다.
한편, 실시 예에 따라 상기 LTE 기지국(1120) 내지 5G 기지국(1130)은 다중 연결 접속(multi-connectivity) 지원 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)은 상기 페이징 RAT에 해당하는 기지국 중 다중 연결 접속 지원하는 기지국을 모니터링 할 수 있다.
(1-6-4)
도 18은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
단말(1110)은 1810 단계에서 LTE 셀(1120)을 통해 시스템에 접속할 수 있다. 그리고, 1820 단계에서 단말(1110)은 LTE 기지국(1120)을 통해 multi-connectivity 지원 정보를 전송할 수 있다. 1830 단계에서 LTE 기지국(1120)은 단말(1110)의 multi-connectivity 지원 정보를 기반으로 페이징 제어 엔터티(1140)와 단말(1110)의 페이징 preference RAT 정보를 교환할 수 있다. 이에 대한 설명은 상술하였으므로, 그 구체적인 설명은 생략하기로 한다.
1840 단계에서 LTE 기지국(1120)은 단말(1110)에게 페이징 preference RAT 정보를 전송할 수 있다. 실시 예에 따라 단말(1110)의 페이징 preference RAT은 5G 셀(1130)이 될 수 있다. 그리고, 1850 단계에서 페이징 제어 엔터티(1140)는 상기 단말(1110)에 대한 페이징 RAT을 관리할 수 있다.
단말(1110)이 LTE 기지국(1120) 및 5G 기지국(1130)을 통한 데이터 송수신을 수행하는 중에, 1860 단계에서 단말(1110)은 idle mode로 천이할 수 있다. idle mode 중에, 1865 단계에서 단말(1110)은 페이징 preference RAT을 모니터링하여 페이징 시그널을 수신할 수 있다.
이때, 본 발명의 실시 예에 따라 1870 단계에서 페이징 제어 엔터티(1140)는 idle mode로 천이한 단말(1110)의 페이징 preference RAT을 변경하기로 결정할 수 있다. 그리고 페이징 제어 엔터티(1140)는 단말(1110)의 페이징 preference RAT 변경 정보를 포함하는 단말 페이징 지시 정보를 상기 단말(1110)의 현재 페이징 preference RAT에 해당하는 셀(1130)에게 전송할 수 있다. 상기 실시 예에서는 5G 셀(1130)이 페이징 제어 엔터티(1140)로부터 상기 단말 페이징 지시 정보를 수신할 수 있다.
상기 단말 페이징 지시 정보에 따라, 1875 단계에서 5G 기지국(1130)은 단말 페이징 preference RAT 변경 정보를 포함하는 페이징 시그널을 단말(1110)에게 전송할 수 있다. 이때, 상기 페이징 시그널은 변경된 페이징 preference RAT 정보를 포함할 수 있다.
상기 페이징 preference RAT 변경 정보를 포함하는 페이징 시그널을 수신한 단말(1110)은 1880 단계에서 상기 새로운 페이징 preference RAT 모니터링을 수행할 수 있다. 상기 실시 예에 따라 새로운 페이징 preference RAT은 LTE 셀(1120)이 될 수 있다.
페이징 제어 엔터티(1140)는 단말(1110)에게 페이징 시그널을 전송해야 하면, 1890 단계에서 상기 단말(1110)의 페이징 RAT에 해당하는 셀(1120)에게 단말 페이징 지시 정보를 전송할 수 있다. 상기 실시 예에서는 LTE 셀(1120)이 페이징 RAT에 해당될 수 있다.
상기 단말 페이징 지시 정보를 수신한 LTE 셀(1120)은 1895 단계에서 단말(1110)에게 페이징 시그널을 전송할 수 있다. 단말(1110)은 상기 LTE 셀(1120)을 모니터링하여 페이징 시그널을 수신할 수 있다.
한편, 실시 예에 따라 상기 LTE 기지국(1120) 내지 5G 기지국(1130)은 다중 연결 접속(multi-connectivity) 지원 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)은 상기 페이징 RAT에 해당하는 기지국 중 다중 연결 접속 지원하는 기지국을 모니터링 할 수 있다.
(1-6-5)
도 19는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 페이징 RAT 운용 절차 다른 실시 예이다.
단말(1110)은 1910 단계에서 LTE 셀(1120)을 통해 시스템에 접속할 수 있다. 그리고, 1920 단계에서 단말(1110)은 LTE 기지국(1120)을 통해 multi-connectivity 지원 정보를 전송할 수 있다. 1930 단계에서 단말(1110)은 LTE 셀(1120) 및 5G 셀(1130)에 연결되어 multi-connectivity 데이터 송수신을 수행할 수 있다.
1940 단계에서 상기 LTE 기지국(1120), 5G 기지국(1130) 및 페이징 제어 엔터티(1140)는 상기 단말(1110)에 대한 페이징 preference RAT 정보를 교환할 수 있다. 이에 대한 구체적인 동작은 도 14에서 예시한 실시 예와 유사한바, 그 구체적인 설명은 생략하기로 한다.
그리고, 1950 단계에서 상기 페이징 제어 엔터티(1140)는 상기 단말(1110)에 대한 페이징 RAT을 관리할 수 있다. 예를 들면, 5G 셀(1130)이 페이징 preference RAT인 경우, 5G 셀(1130)은 1960 단계에서 단말(1110)에게 페이징 preference RAT 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)의 페이징 preference RAT은 5G 셀(1130)이 될 수 있다.
단말(1110)이 LTE 기지국(1120) 및/또는 5G 기지국(1130)을 통한 데이터 송수신을 수행하는 중에, 1970 단계에서 단말(1110)은 idle mode로 천이할 수 있다. idle mode 중에, 1980 단계에서 단말(1110)은 페이징 preference RAT을 모니터링하여 페이징 시그널을 수신할 수 있다.
페이징 제어 엔터티(1140)는 단말(1110)에게 페이징 시그널을 전송해야 하면, 1990 단계에서 상기 단말(1110)의 페이징 RAT에 해당하는 셀(1130)로 단말 페이징 지시 정보를 전송할 수 있다. 실시 예에서는 5G 셀(1130)이 페이징 RAT에 해당될 수 있다.
상기 단말 페이징 지시 정보를 수신한 5G 셀(1130)은 1995 단계에서 단말(1110)에게 페이징 시그널을 전송할 수 있다. 단말(1110)은 상기 5G 셀(1130)을 모니터링하여 페이징 시그널을 수신할 수 있다.
한편, 실시 예에 따라 상기 LTE 기지국(1120) 내지 5G 기지국(1130)은 다중 연결 접속(multi-connectivity) 지원 정보를 전송할 수 있다. 본 발명의 실시 예에 따라 단말(1110)은 상기 페이징 RAT에 해당하는 기지국 중 다중 연결 접속 지원하는 기지국을 모니터링 할 수 있다.
한편, 실시 예에 따라, 단말(1110)이 페이징 시그널을 모니터링하기 위해 페이징 preference RAT에 해당하는 셀을 검출(detection)(감지)하지 못하는 경우, 단말(1110)은 접속 가능한 RAT의 셀을 통해서 단말-개시 연결(UE-initiated connection) 설정 절차를 시작할 수 있다. 상기 UE-initiated connection 설정 절차를 통해서 단말(1110)은 pending 되어 있는 하향링크 패킷 또는 상향링크 패킷을 수신 또는 송신할 수 있다.
한편, 상기 다양한 실시 예에서는 단말이 LTE 기지국을 통해 시스템 접속 절차를 수행하는 예를 도시하였으나, 단말이 5G 기지국을 통해 시스템 접속 절차를 수행하는 경우에도 동일하게 적용될 수 있다. 즉, 단말과 5G 기지국은 단말의 multi-connectivity capability 정보를 교환, 페이징 preference RAT 정보를 교환하는 절차를 수행할 수 있고, LTE 기지국/5G 기지국과 페이징 제어 엔터티 간 단말 페이징 preference RAT 정보를 교환하는 절차를 수행할 수 있다.
또한, 상기 5G는 LTE가 아닌 다른 RAT을 포함할 수 있음은 물론이다.
한편, 본 발명에서 예를 들어 설명한 LTE 기지국은 저주파수 대역, 예를 들어 6 GHz 이하 또는 3.5 GHz 또는 2 GHz 또는 700 MHz 대역 등에서 운용되는 5G 기지국으로 대체될 수 있음은 물론이다. 또한, 상기 다양한 실시 예들에서 설명된 각 단계는 순차적인 단계를 의미하는 것이 아니며, 나중에 설명된 단계가 먼저 이루어질 수도 있고, 각 단계가 동시에 이루어질 수도 있다.
<실시 예 2>
(2-1) LTE와 5G 공존 시스템에서 단말 접속 절차의 실시 예
(2-1-1)
도 20은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 실시 예이다.
도 20을 참고하면, 본 발명의 실시 예에 따라 LTE 기지국(2020)과 5G 기지국(2030)이 공존하는 시스템에서 단말(2010)의 접속 절차를 나타낸다. 상기 절차는 단말(2010)의 초기 접속 또는 단말(2010)의 idle mode에서 connected mode로 천이하는 재접속의 경우에 적용될 수 있다. 상기 절차가 단말(2010)의 idle mode에서 connected mode로 천이하는 재접속의 경우에 적용되는 실시 예는 LTE 기지국(eNB)(2020)에서 페이징을 수신하고 시스템 접속 절차를 수행하는 경우를 포함할 수 있다.
2060 단계에서 LTE 기지국(eNB)(2020)은 주변에 5G 기지국(5GNB, gNB, NR NB)(2030)이 있는 경우에 5G 기지국(2030)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2030)의 5G PLMN(public land mobile network)을 브로드캐스트 할 수 있다. 상기 5G 기지국 지시자는 시스템 정보(예를 들면, MIB(master information block), 시스템 정보 블록(SIB: system information block) 등) 속에 포함되어서 전달되거나, 해당 단말(2010)만을 위한 단말 특정(UE-specific)한 방법으로 전달될 수도 있다.
2065 단계에서 단말(2010)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2030)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2030)과의 연결 설정을 위한 제어 신호(예를 들면, 5G RRC 시그널링)을 보내기/받기 위한 패킷 데이터 네트워크(PDN: packet data network) 연결(PDN Connection)을 생성하는 절차를 수행할 수 있다. 단말(2010)이 5G 기지국(2030)에게 RRC 시그널링(예를 들면, 5G 연결 설정을 위한 5G RRC 시그널링일 수 있다)을 송수신하기 위하여, 단말(2010)과 LTE 기지국(2020) 사이에 새로운 PDN connection을 생성할 수 있다. 예를 들면, 단말(2010)과 LTE 기지국(2020) 사이의 LTE 메시지 송수신을 위한 PDN connection과 다른, 새로운 PDN connection을 통해 단말(2010)이 5G 기지국(2030)에게 전송될 5G RRC 메시지를 전송하면, LTE 기지국(2020)은 LTE 기지국(2020)과 5G 기지국(2030) 사이의 연결을 통해 상기 5G RRC 메시지를 5G 기지국(2030)에게 전송(포워딩)할 수 있다. 즉, 단말(2010)은 상기 새로운 PDN connection을 통해 5G 기지국(2030)과 RRC 메시지를 송수신할 수 있다. 상기와 같이 5G RRC 시그널링을 보내기/받기 위한 PDN Connection을 생성하는 절차 수행을 트리거링하는 조건의 다른 실시 예는 (2-3)의 실시 예에서 상세히 설명하기로 한다. 한편, 설명의 편의를 위해, 상기 5G RRC 시그널링을 전송하기 위한 PDN connection을 5G PDN connection이라고 할 수 있.
상기 2065 단계가 완료가 되면, 2070 단계에서 단말(2010)과 5G 기지국(5GNB)(2030) 사이에는 5G RRC message를 전송하기 위한 터널(채널)이 생성(설정)될 수 있다. 그리고, 2075 단계에서 단말(2010)은 상기 터널(채널)을 통해 5G RRC message를 5G 기지국(2030)과 주고 받을 수 있다. 실시 예에 따라, 상기 5G RRC 시그널링을 보내기/받기 위한 PDN Connection 및 터널(채널)에 대해서 5G RRC 시그널링 전용 PDN 또는 터널(채널)임을 지시하는 지시자가 사용될 수 있다.
2080 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2030)을 선택하는 셀 선택(cell selection) 절차를 수행할 수 있다. 단말(2010)이 적절한 5G 기지국(5GNB)(2030)을 선택하게 되면, 2085 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과의 5G RRC 연결 셋업(5G RRC Connection Setup) 절차를 수행할 수 있다.
5G RRC Connection Setup 절차를 수행하여 5G 기지국(5GNB)(2030)과 단말(2010)이 직접 통신이 가능하게 되면, 단말(2010)과 5G 기지국(5GNB)(2030) 간에 LTE 기지국(eNB)(2020)을 통한 5G RRC signaling이 필요하지 않을 수 있다. 2090 단계에서 상기 단말(2010), 5G 기지국(5GNB)(2030), LTE 기지국(eNB)(2020)은 5G RRC signaling를 위해 설정해놓은 5G PDN connection 해제 절차를 수행할 수 있다. 예를 들어, 상기 단말(2010)이 상기 5G 기지국(2030)으로부터 5G RRC Connection Setup 메시지를 수신하면, 상기 단말(2010)과 상기 5G 기지국(2030)은 상기 5G RRC signaling을 위해 설정해 놓은 5G PDN connection의 해제를 하고, 이에 대한 응답으로 단말(2010)은 5G RRC 연결 셋업 완료(5G RRC Connection Setup Complete) 메시지를 상기 5G 기지국(2030)과의 직접 연결을 통해 전송할 수 있다. 또 다른 예를 들면, 상기 단말(2010)이 상기 5G 기지국(2030)으로부터 5G RRC 연결 재설정(5G RRC Connection Reconfiguration) 메시지를 수신하면, 상기 단말(2010)과 상기 5G 기지국(2030)은 상기 5G RRC signaling을 위해 설정해 놓은 PDN connection 해제를 하고, 이에 대한 응답으로 단말(2010)은 5G RRC 연결 재설정 완료(5G RRC Connection Reconfiguration Complete) 메시지를 상기 5G 기지국(2030)과의 직접 연결을 통해 전송할 수 있다. 상기 5G RRC Connection Setup 또는 5G RRC Connection Setup Complete 또는 5G RRC Connection Reconfiguration 또는 5G RRC Connection Reconfiguration Complete 메시지는 동일한 목적(예를 들면, 5G RRC 설정)의 다른 메시지로 변경될 수 있음은 물론이다.
상기 2090 단계가 완료 되면, 2095 단계에서 단말(2010)과 5G 기지국(5GNB)(2030) 사이에 5G RRC message를 전송하기 위한 터널(채널)이 해제될 수 있다. 실시 예에 따라, 상기 해제된 5G RRC 시그널링을 보내기/받기 위한 PDN Connection 및 터널(채널)에 대해서 5G RRC 시그널링 전용 PDN 또는 터널 (채널)임을 지시하는 지시자가 해제될 수 있다.
(2-1-2)
도 21은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 21을 참고하면, 본 발명의 다른 실시 예에 따라 상기 5G RRC signaling을 위해 설정해 놓은 5G PDN connection 해제 절차를 수행하지 않고, 상기 5G PDN connection을 이동성(mobility)(예를 들면, 핸드오버 등) 용도의 5G RRC signaling을 송수신하는 데 사용할 수 있다. 즉, 단말(2010)이 핸드오버 이벤트 발생을 판단하면, 5G 기지국(2030)으로 전송하는 5G RRC signaling을 상기 5G PDN connection을 통해 전달할 수 있다. 상기 5G 기지국(2030)은 상기 단말(2010)이 핸드오버할 수 있는 정보를 포함하는 5G RRC signaling을 상기 5G PDN connection을 통해 단말(2010)에게 전달할 수 있다. 상기 단말(2010)이 타겟 5G 기지국(2030)으로 핸드오버 한 이후의 일반적인 패킷 송수신은 상기 PDN connection 을 거치지 않고 단말(2010)과 타겟 5G 기지국(2030) 간의 직접 통신을 통해 수행할 수 있다. 또한, 단말(2010)은 5G RLF 이벤트 발생시 또는 5G RRC 연결 재수립(5G RRC connection re-establishment) 시 5G 기지국(2020)에게 전송하는 5G RRC signaling을 상기 5G PDN connection을 통해 전달할 수 있다.
구체적으로 살펴보면, 2110 단계에서 LTE 기지국(eNB)(2020)은 주변에 5G 기지국(5GNB)(2030)이 있는 경우에 상기 5G 기지국(2030)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2030)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2010)만을 위한 UE-specific한 방법으로 전달될 수도 있다.
2115 단계에서 단말(2010)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2030)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2030)과의 연결 설정을 위한 제어 신호(예를 들면, 5G RRC 시그널링)을 보내기/받기 위한 PDN Connection을 생성하는 절차를 수행할 수 있다. 이에 대한 구체적인 설명은 상기 도 20과 관련된 부분에서 하였으므로, 그 구체적인 설명은 생략하기로 한다. 상기와 같이 5G RRC 시그널링을 보내기/받기 위한 PDN Connection을 생성하는 절차 수행을 트리거링하는 조건의 다른 실시 예는 (2-3)의 실시 예에서 상세히 설명하기로 한다.
2115 단계가 완료가 되면, 2120 단계에서 단말(2010)과 5G 기지국(5GNB)(2030) 사이에는 5G RRC message를 전송하기 위한 터널(채널)이 생성(설정)될 수 있다. 그리고, 2125 단계에서 단말(2010)은 상기 터널(채널)을 통해 5G RRC message를 5G 기지국(2030)과 주고 받을 수 있다. 실시 예에 따라, 상기 5G RRC 시그널링을 보내기/받기 위한 PDN Connection 및 터널(채널)에 대해서 5G RRC 시그널링 전용 PDN 또는 터널(채널)임을 지시하는 지시자가 사용될 수 있다.
2130 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2030)을 선택하는 cell selection 절차를 수행할 수 있다. 단말(2010)이 적절한 5G 기지국(5GNB)(2030)을 선택하게 되면, 2135 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과의 5G RRC Connection Setup 절차를 수행할 수 있다.
5G RRC Connection Setup 절차를 수행하여 5G 기지국(5GNB)(2030)과 단말(2010)이 직접 통신이 가능하게 되면, 단말(2010)과 5G 기지국(5GNB)(2030) 간에 LTE 기지국(eNB)(2020)을 통한 5G RRC signaling이 필요하지 않을 수 있다. 2140 단계에서 상기 단말(2010)과 5G 기지국(5GNB)(2030), LTE 기지국(2020)은 상기 5G RRC signaling을 위해 생성한 PDN Connection 또는 터널(채널) 사용을 중단(또는 비활성화(deactive))할 수 있다. 예를 들어, 상기 단말(2010)이 상기 5G 기지국(2030)으로부터 5G RRC Connection Setup 메시지를 수신하면, 상기 단말(2010)과 상기 5G 기지국(2030)은 상기 5G RRC signaling을 위해 설정해 놓은 PDN connection의 사용을 중지 하고, 이에 대한 응답으로 단말(2010)은 5G RRC Connection Setup Complete 메시지를 상기 5G 기지국(2030)과의 직접 연결을 통해 전송할 수 있다. 상기 5G RRC Connection Setup 또는 5G RRC Connection Setup Complete 메시지는 동일한 목적의 다른 메시지로 변경될 수 있음은 물론이다. 또 다른 예를 들면, 상기 단말(2010)이 상기 5G 기지국(2030)으로부터 5G RRC Connection Reconfiguration 메시지를 수신하면, 상기 단말(2010)과 상기 5G 기지국(2030)은 상기 5G RRC signaling을 위해 설정해 놓은 PDN connection을 비활성화를 하고, 이에 대한 응답으로 단말(2010)은 5G RRC Connection Reconfiguration Complete 메시지를 상기 5G 기지국(2030)과의 직접 연결을 통해 전송할 수 있다. 실시 예에 따라 상기 5G 기지국(2030)과 LTE 기지국(2020)은 상기 PDN connection 또는 터널(채널) 사용 중단 정보를 교환할 수 있다. 실시 예에 따라, 상기 PDN Connection및 터널(채널)에 대해서 5G RRC 시그널링 전용 PDN 또는 터널 (채널)임을 지시하는 지시자가 비활성화될 수 있다.
상기 2140 단계가 완료 되면, 2145 단계에서 단말(2010)과 5G 기지국(5GNB)(2030) 사이에 5G RRC message를 전송하기 위한 터널(채널)이 비활성화 되고, 상기 단말(2010)과 5G 기지국(5GNB)(2030)은 직접 5G RRC message를 송수신할 수 있다.
이후, 2150 단계에서 단말(2010)은 5G 셀을 변경하는 핸드오버 이벤트를 확인할 수 있다. 이때, 2155 단계에서 단말(2010)은 핸드오버용 5G RRC signaling을 위해 상기 비활성화된 5G RRC signaling을 위한 PDN Connection 또는 터널(채널) 사용을 활성화하기 위한 시그널링을 LTE 기지국(2020)에게 전송할 수 있다. 상기 LTE 기지국(2020)에게 전송되는 시그널링에는 상기 PDN Connection 또는 터널(채널) 지시자 정보가 포함될 수 있다. 이를 위해 단말(2010), LTE 기지국(2020), 5G 기지국(2030)은 5G PDN connection 또는 터널(채널)을 활성화(activate)할 수 있다.
다른 실시 예에 따라, 상기 5G 기지국(2030)이 단말(2010)의 5G 셀을 변경하는 핸드오버 이벤트를 확인하면, 5G 기지국(2030)은 상기 핸드오버용 5G RRC signaling을 위해 상기 비활성화된 5G RRC signaling을 위한 PDN Connection 또는 터널(채널) 사용을 활성화하기 위한 시그널링을 단말(2010) 및 상기 LTE 기지국(2020)에게 전송할 수 있다. 상기 5G 기지국(2030)이 단말(2010) 또는 LTE 기지국(2020)에게 전송하는 시그널링에는 상기 PDN Connection 또는 터널(채널) 지시자 정보가 포함될 수 있다.
또 다른 실시 예에 따라, 상기 단말(2010)은 5G 셀을 변경하는 핸드오버 이벤트를 확인하면, 상기 핸드오버용 5G RRC signaling을 위해 상기 비활성화된 5G RRC signaling을 위한 PDN Connection 또는 터널(채널) 사용을 활성화하기 위한 단말-네트워크 엔터티간 시그널링(예, NAS signaling)을 상기 LTE 기지국(2020) 또는 상기 5G 기지국(2030)을 통해 전송할 수 있다. 상기 단말-네트워크 엔터티간 시그널링에는 상기 PDN Connection 또는 터널(채널) 지시자 정보가 포함될 수 있다. 상기 PDN Connection 또는 터널(채널) 지시자 정보를 수신한 네트워크 엔터티는 상기 LTE 기지국(2020) 또는 상기 5G 기지국(2030)에게 상기 PDN Connection 또는 터널(채널) 활성화 지시 정보를 전송할 수 있다. 상기 단말(2010), LTE 기지국(2020) 및 5G 기지국(2030)은 상기 활성화된 PDN Connection 또는 터널(채널)을 통해 단말(2010)의 5G RRC signaling을 송수신할 수 있다.
본 발명의 다른 실시 예로서, 무선 연결 실패(RLF: radio link failure)가 발생 후 5G 셀 재접속을 시도하는 단말(2010)이, 상기 5G 셀 재접속용 5G RRC signaling을 송수신하기 위해 상기 비활성화된 PDN Connection 또는 터널(채널) 활성화 지시 정보를 5G 기지국(2030) 또는 LTE 기지국(2020)에게 전송할 수 있다. 상기 단말(2010)은 LTE 기지국(2020) 또는 상기 5G 기지국(2030)에게 전송하는 메시지에 상기 활성화될 PDN Connection 또는 터널(채널) 정보를 포함할 수 있다. 또는 상기 단말(2010)은 네트워크 엔터티에게 전송하는 메시지(예를 들면, NAS signaling)에 상기 활성화될 PDN Connection 또는 터널(채널) 정보를 포함할 수 있다.
여기서 상기 PDN connection을 설정하기 위한 LTE 기지국(2020)과 5G 기지국(2030) 간 인터페이스는 직접 연결 또는 다른 네트워크 엔터티를 통한 연결을 가정할 수 있다.
상기의 실시 예에서는 LTE 기지국(2020)을 통해 PDN connection을 설정한 후 단말(2010)이 5G 기지국(2030)과의 접속 절차를 수행하는 예시를 기술하였으나, 5G 기지국(2030)을 통해 PDN connection을 설정한 후 단말(2010)이 LTE 기지국(2020)과의 다중 연결 접속 절차를 수행하는 경우로 확장할 수 있음은 물론이다.
(2-2) LTE와 5G 공존 시스템에서 5G RRC Signaling 처리의 다른 실시예
(2-2-1)
도 22는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 22를 참고하면, 단말(2010)이 LTE 기지국(2020)과의 PDN Connection 또는 터널(채널)을 통해 5G RRC signaling을 송수신하는 경우, 5G RRC signaling용 PDN connection/터널(채널)을 별도로 설정하지 않고, 상기 LTE 기지국(2020)과 단말(2010) 사이에 기 설정된 PDN connection /터널(채널)을 통해 상기 5G RRC signaling을 송수신할 수 있다.
구체적으로 살펴보면, 2210 단계에서 LTE 기지국(eNB)(2020)은 주변에 5G 기지국(5GNB)(2030)이 있는 경우에 상기 5G 기지국(2030)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2030)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국(2030)의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2010)만을 위한 UE-specific 한 방법으로 전달될 수도 있다.
2220 단계에서 단말(2010)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2030)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2030)과의 연결 설정을 위한 5G RRC 시그널링을 보내기/받기 위한 PDN Connection을 생성하는 절차를 수행할 수 있다. 상기 2220 단계에서 단말(2010)은 LTE 기지국(2020)에게 단말(2010)의 다중 연결 접속 capability를 전달함으로써 5G RRC 시그널링을 보내기/받기 위한 PDN connection 생성을 요청할 수 있다.
2230 단계에서 LTE 기지국(2020)은 상기 5G RRC 시그널링을 보내기/받기 위한 LTE PDN connection 정보를 상기 단말(2010)에게 전송할 수 있다. 상기 2230 단계에서 LTE 기지국(2020)은 LTE PDN connection으로 송수신되는 5G RRC 시그널링을 구분하기 위한 지시자를 할당할 수 있다. 본 발명의 실시 예에 따라 상기 단말(2010)과 LTE 기지국(2020)은 상기 LTE RRC 메시지와 5G RRC 메시지를 구분하기 위해 별도의 RNTI(radio network temporary identifier)를 사용할 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 5G 기지국(2030)이 전송하는 5G RRC Connection Reconfiguration 메시지는 상기 5G-RRC용 RNTI로 인코딩되어 전송될 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 단말(2010)이 전송하는 5G RRC Connection Setup Complete 메시지는 상기 5G RRC 용 RNTI로 인코딩되어 전송될 수 있다.
2240 단계에서, 상기 단말(2010)/LTE 기지국(2020)/5G 기지국(2030) 사이에는 상기 LTE PDN connection을 이용하여 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생기고, 2250 단계에서 단말(2010)은 상기 터널(채널)을 통해 단말(2010)의 5G RRC message를 5G 기지국(2030)과 주고 받을 수 있다. 실시 예에 따라, 단말(2010) 및 5G 기지국(2030)이 LTE 기지국(2020)과 기 설정된 PDN connection/터널(채널)을 통해 상기 5G RRC signaling을 송수신하는 경우, 상기 PDN connection/터널(채널)로 전송되는 메시지는 5G RRC signaling 임을 지시하는 식별 정보(indicator) 또는 헤더(header)를 포함할 수 있다. 상향 링크의 경우, 단말(2010)은 상기 5G RRC signaling임을 지시하는 지시 정보를 상기 5G RRC signaling 에 붙는 PDCP(packet data convergence protocol) header 또는 RLC(radio link control) header 또는 MAC(medium access control) header 또는 MAC CE(control element) 중 적어도 하나에 포함시킬 수 있다. 하향 링크의 경우, 5G 기지국(2030)은 상기 5G RRC signaling임을 지시하는 지시 정보를 상기 5G RRC signaling에 붙는 PDCP header 또는 RLC header 또는 MAC header 또는 MAC CE 중 적어도 하나에 포함시킬 수 있다. 또는 하향 링크의 경우 LTE 기지국(2020)은 상기 5G RRC signaling임을 지시하는 지시 정보를 상기 5G RRC signaling에 붙는 PDCP header 또는 RLC header 또는 MAC header 또는 MAC CE 중 적어도 하나에 포함시킬 수 있다.
2260 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2030)을 선택하는 cell selection 절차를 수행할 수 있다. 단말(2010)이 적절한 5G 기지국(5GNB)(2030)을 선택하게 되면, 2270 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과의 5G RRC Connection Setup 절차를 수행할 수 있다.
상기 기 설정된 LTE PDN Connection 을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 완료할 때까지 사용될 수 있다. 상기 기 설정된 LTE PDN Connection을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 하는 경우, 상기 단말(2010)이 5G 셀 핸드오버 이벤트를 판단하는 경우, 상기 단말(2010)이 RLF 이벤트를 판단하는 경우에 사용될 수 있다. 상기 기 설정된 LTE PDN Connection을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 상기 LTE 셀과의 접속을 유지하는 기간에 사용될 수 있다.
(2-2-2)
도 23은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 23을 참고하면, 본 발명의 다른 실시 예에 따라 5G RRC signaling을 전송하는 채널로서 LTE 시그널링 베어러(signaling bearer)(예를 들면, SRB(signaling radio bearer)를 사용할 수 있다. 상기 LTE signaling bearer는 상기 LTE와의 RRC signaling을 송수신하기 위한 signaling bearer를 포함할 수 있다.
구체적으로 살펴보면, 2310 단계에서 LTE 기지국(eNB)(2020)은 주변에 5G 기지국(5GNB)(2030)이 있는 경우에 상기 5G 기지국(2030)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2030)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국(2030)의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2010)만을 위한 UE-specific한 방법으로 전달될 수도 있다.
2320 단계에서 단말(2010)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2030)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2030)과의 연결 설정을 위한 5G RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차를 수행할 수 있다. 상기 2320 단계에서 단말(2010)은 LTE 기지국(2020)에게 단말(2010)의 다중 연결 접속 capability를 전달함으로써 5G RRC 시그널링을 보내기/받기 위한 connection 생성을 요청할 수 있다.
2330 단계에서 LTE 기지국(2020)은 상기 5G RRC 시그널링을 보내기/받기 위한 LTE signaling bearer 정보를 상기 단말(2010)에게 전송할 수 있다. 상기 2330 단계에서 LTE 기지국(2020)은 상기 단말(2010)에게 LTE RRC SRB(signaling bearer)와 5G RRC SRB를 구분할 수 있는 지시자를 할당할 수 있다. 본 발명의 실시 예에 따라 상기 단말(2010)과 LTE 기지국(2020)은 상기 LTE RRC와 5G RRC를 구분하기 위해 별도의 RNTI를 사용할 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 5G 기지국(2030)이 전송하는 5G RRC Connection Reconfiguration 메시지는 상기 5G-RRC용 RNTI로 인코딩되어 전송될 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 단말(2010)이 전송하는 5G RRC Connection Setup Complete 메시지는 상기 5G RRC 용 RNTI로 인코딩되어 전송될 수 있다.
2340 단계에서, 상기 단말(2010)/LTE 기지국(2020)/5G 기지국(2030) 사이에는 상기 LTE signaling bearer을 이용하여 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생기고, 2350 단계에서 단말(2010)은 상기 터널(채널)을 통해 단말(2010)의 5G RRC message를 5G 기지국(2030)과 주고 받을 수 있다. 상기 단말(2010) 및/또는 LTE 기지국(2020)은, 단말(2010)과 LTE 기지국(2020)의 RRC signaling을 송수신하기 위한 signaling bearer에서 전송되는 RRC signaling이 LTE RRC 용도인지 5G RRC 용도인지를 구분하기 위한 식별자 정보를 상기 RRC signaling에 붙는 PDCP header 또는 RLC header 또는 MAC header 또는 MAC CE 중 적어도 하나에 포함시킬 수 있다. 이에 대한 구체적인 예시는 상기 도 22와 관련된 부분에서 설명하였으므로, 그 구체적인 설명은 생략하기로 한다.
2360 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2030)을 선택하는 cell selection 절차를 수행할 수 있다. 단말(2010)이 적절한 5G 기지국(5GNB)(2030)을 선택하게 되면, 2370 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과의 5G RRC Connection Setup 절차를 수행할 수 있다.
상기 LTE signaling bearer를 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 완료할 때까지 사용될 수 있다. 상기 LTE signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 하는 경우, 상기 단말(2010)이 5G 셀 핸드오버 이벤트를 판단하는 경우, 상기 단말(2010)이 RLF 이벤트를 판단하는 경우에 사용될 수 있다. 상기 LTE signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 상기 LTE 셀과의 접속을 유지하는 기간에 사용될 수 있다.
(2-2-3)
도 24는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 24를 참고하면, 본 발명의 다른 실시 예에 따라 단말(2010)과 LTE 기지국(2020)은 5G RRC용 signaling bearer를 설정할 수 있다. 예를 들어, 5G 기지국(2030)과의 RRC 접속 절차를 수행하기 위해 5G 기지국(2030)이 전송하는 5G RRC Connection Reconfiguration 메시지는 상기 5G RRC 용 signaling bearer를 통해 전송될 수 있다. 예를 들어, 5G 기지국(2030)과의 RRC 접속 절차를 수행하기 위해 단말(2010)이 전송하는 5G RRC Connection Setup Complete 메시지는 상기 5G RRC 용 signaling bearer를 통해 전송될 수 있다. 상기 5G RRC signaling bearer는 LTE 에어 인터페이스(air interface)에서 운용될 수 있다.
구체적으로 살펴보면, 2410 단계에서 LTE 기지국(eNB)(2020)은 주변에 5G 기지국(5GNB)(2030)이 있는 경우에 상기 5G 기지국(2030)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2030)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국(2030)의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2010)만을 위한 UE-specific 한 방법으로 전달될 수도 있다.
2420 단계에서 단말(2010)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2030)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2030)과의 연결 설정을 위한 5G RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차를 수행할 수 있다. 상기 2420 단계에서 단말(2010)은 LTE 기지국(2020)에게 단말(2010)의 다중 연결 접속 capability를 전달함으로써 5G RRC 시그널링을 보내기/받기 위한 connection 생성을 요청할 수 있다.
2430 단계에서 LTE 기지국(2020)은 상기 5G RRC 시그널링을 보내기/받기 위한 5G signaling bearer 정보를 상기 단말(2010)에게 전송할 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 5G 기지국(2030)이 단말(2010)에게 전송하는 5G RRC Connection Reconfiguration 메시지는 상기 5G signaling bearer에서 전송될 수 있다. 예를 들어, 단말(2010)과 5G 기지국(2030)의 RRC 접속 절차를 수행하기 위해 단말(2010)이 5G 기지국(2030)에게 전송하는 5G RRC Connection Setup Complete 메시지는 상기 5G signaling bearer에서 전송될 수 있다.
2440 단계에서, 상기 단말(2010)/LTE 기지국(2020)/5G 기지국(2030) 사이에는 상기 5G signaling bearer을 이용하여 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생기고, 2450 단계에서 단말(2010)은 상기 터널(채널)을 통해 단말(2010)의 5G RRC message를 5G 기지국(2030)과 주고 받을 수 있다.
2460 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2030)을 선택하는 cell selection 절차를 수행할 수 있다. 단말(2010)이 적절한 5G 기지국(5GNB)(2030)을 선택하게 되면, 2470 단계에서 단말(2010)은 5G 기지국(5GNB)(2030)과의 5G RRC Connection Setup 절차를 수행할 수 있다.
상기 LTE 기지국(2020)에 설정된 5G RRC용 signaling bearer를 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 완료할 때까지 사용될 수 있다. 상기 LTE 기지국(2020)에 설정된 5G RRC 용 signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 5G 기지국(2030)과 RRC 연결 설정을 하는 경우, 상기 단말(2010)이 5G 셀 핸드오버 이벤트를 판단하는 경우, 상기 단말(2010)이 RLF 이벤트를 판단하는 경우에 사용될 수 있다. 상기 LTE 기지국(2020)에 설정된 5G RRC용 signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2010)이 상기 LTE 셀과의 접속을 유지하는 기간에 사용될 수 있다.
(2-2-4)
도 25는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 25를 참고하면, 본 발명의 다른 실시 예에 따라 단말(2510)과 네트워크 엔터티(2540)는 LTE 기지국(2520)에 5G RRC용 signaling bearer을 설정할 수 있다. 상기 5G RRC용 signaling bearer는 상기 단말(2510)과 네트워크 엔터티(2540) 간 시그널링(예를 들면, NAS(non-access stratum) signaling)을 송수신하는 signaling bearer가 될 수 있다. 실시 예에 따라 상기 네트워크 엔터티(2540)은 MME, AMF, UPF, SMF, P-GW, S-GW 중 적어도 하나를 포함할 수 있다.
구체적으로 살펴보면, 2550 단계에서 LTE 기지국(eNB)(2520)은 주변에 5G 기지국(5GNB)(2530)이 있는 경우에 상기 5G 기지국(2530)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2530)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국(2530)의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2510)만을 위한 UE-specific 한 방법으로 전달될 수도 있다.
2555 단계에서 단말(2510)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2530)이 존재하는 것으로 간주하고, 5G 기지국(5GNB)(2530)과의 연결 설정을 위한 5G RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차를 수행할 수 있다. 상기 2555 단계에서 단말(2510)은 NAS signaling을 처리하는 네트워크 엔터티(2540)를 통해 5G RRC signaling용 connection을 설정할 수 있다. 상기 2555 단계에서 상기 단말(2510)은 상기 네트워크 엔터티(2540)로의 NAS signaling을 통해 단말(2510)의 다중 연결 접속 capability를 전달할 수 있다. 상기 2555 단계에서 상기 네트워크 엔터티(2540)는 상기 5G RRC 시그널링을 보내기/받기 위한 5G 용 NAS signaling bearer 정보를 상기 단말(2510)에게 전송할 수 있다. 이때 상기 단말(2510)과 네트워크 엔터티(2540)는 상기 주고 받는 시그널링에 LTE용 NAS signaling 인지 또는 5G 용 NAS signaling 인지를 구분하는 지시 정보를 포함할 수 있다. 예를 들어, 단말(2510)과 5G 기지국(2530)의 RRC 접속 절차를 수행하기 위해 5G 기지국(2530)이 단말(2510)에게 전송하는 5G RRC Connection Reconfiguration 메시지는 상기 5G 용 NAS signaling bearer를 통해 전송될 수 있다. 예를 들어, 단말(2510)과 5G 기지국(2530)의 RRC 접속 절차를 수행하기 위해 단말(2510)이 5G 기지국(2530)에게 전송하는 5G RRC Connection Setup Complete 메시지는 상기 5G 용 NAS signaling bearer를 통해 전송될 수 있다.
2560 단계에서, 상기 단말(2510)/네트워크 엔터티(2540)/LTE 기지국(2520)/5G 기지국(2530) 사이에는 상기 5G용 NAS signaling bearer을 이용하여 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생기고, 2565 단계에서 단말(2510)은 상기 터널(채널)을 통해 단말(2510)의 5G RRC message를 5G 기지국(2530)과 주고 받을 수 있다.
2570 단계에서 단말(2510)은 5G 기지국(5GNB)(2530)과 동기를 맞추면서, 신호 세기를 측정하여 적절한 5G 기지국(5GNB)(2530)을 선택하는 cell selection 절차를 수행할 수 있다. 단말(2510)이 적절한 5G 기지국(5GNB)(2530)을 선택하게 되면, 2575 단계에서 단말(2510)은 5G 기지국(5GNB)(2530)과의 5G RRC Connection Setup 절차를 수행할 수 있다.
상기 5G 용 NAS signaling bearer를 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2510)이 5G 기지국(2530)과 RRC 연결 설정을 완료할 때까지 사용될 수 있다. 상기 5G 용 NAS signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2510)이 5G 기지국(2530)과 RRC 연결 설정을 하는 경우, 상기 단말(2510)이 5G 셀 핸드오버 이벤트를 판단하는 경우, 상기 단말(2510)이 RLF 이벤트를 판단하는 경우에 사용될 수 있다. 상기 5G 용 NAS signaling bearer을 이용한 5G RRC signaling 송수신은 본 발명의 실시 예에 따라 상기 단말(2510)이 상기 LTE 셀과의 접속을 유지하는 기간에 사용될 수 있다.
(2-2-5)
도 26은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 운용 절차 다른 실시 예이다.
도 26을 참고하면, 본 발명의 실시 예에 따라 LTE 기지국(2620)과 5G 기지국(2630)이 공존하는 시스템에서 단말(2610)의 RRC 연결 설정 절차를 나타낸다. 상기 절차는 단말(2610)의 초기 접속 또는 단말(2610)의 idle mode에서 connected mode로 천이하는 재접속의 경우에 적용될 수 있다. 상기 절차가 단말(2610)의 idle mode에서 connected mode로 천이하는 재접속의 경우에 적용되는 실시 예는 본 발명의 실시 예에 따라 단말(2610)이 LTE 기지국(eNB)(2620)에서 페이징을 수신하고, 시스템 접속 절차를 수행하는 경우를 포함할 수 있다.
2640 단계에서 단말(2610)은 LTE 기지국(eNB)(2620)과의 연결 설정 절차를 수행할 수 있다. 이때, 상기 단말(2610)과 LTE 기지국(2620)은 LTE RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차를 수행할 수 있고, 상기 LTE RRC 시그널링을 보내기/받기 위한 채널은 LTE RRC SRB(signaling radio bearer)에 해당될 수 있다.
한편, LTE 기지국(eNB)(2620)은 주변에 5G 기지국(5GNB)(2630)이 있는 경우에 상기 5G 기지국(2630)의 지시자(식별 정보), 예를 들어 해당 5G 기지국(2630)의 5G PLMN을 브로드캐스트 할 수 있다. 상기 5G 기지국(2630)의 지시자는 시스템 정보(예를 들면, MIB, SIB 등) 속에 포함되어서 전달되거나, 해당 단말(2610)만을 위한 UE-specific 한 방법으로 전달될 수도 있다.
2645 단계에서 단말(2610)은 5G 기지국의 정보를 수신하게 되면 주변에 5G 기지국(5GNB)(2630)이 존재하는 것으로 간주하고, 적절한 5G 기지국(5GNB)(2630)을 선택하여 5G 기지국(5GNB)(2630)과의 연결 설정을 위한 5G RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차를 수행할 수 있다. 상기와 같이 5G RRC 시그널링을 보내기/받기 위한 Connection을 생성하는 절차 수행을 트리거링하는 조건의 다른 실시 예는 (2-3)의 실시 예에서 상세히 설명하기로 한다.
상기 2645 단계가 완료가 되면, 2650 단계에서 단말(2610)과 5G 기지국(5GNB)(2630) 사이에는 5G RRC message를 전송하기 위한 채널이 생성(설정)될 수 있다. 그리고, 상기 채널을 통해 단말(2610)은 5G RRC message를 5G 기지국(2630)과 주고 받을 수 있다. 상기 5G RRC 시그널링을 보내기/받기 위한 채널은 예를 들어 5G signaling radio bearer에 해당될 수 있다. 상기 단말(2610)과 5G 기지국(5GNB)(2630) 사이에 5G RRC 시그널링을 위한 Connection이 설정되면, 2650 단계에서 상기 LTE 기지국(2620)과 상기 5G 기지국(2630) 사이에는 단말(2610)의 RRC 시그널링(LTE RRC 메시지 내지 5G RRC 메시지 등) 전송을 위한 터널(채널)을 설정할 수 있다.
실시 예에 따라, 상기 LTE 기지국(2620)과 상기 5G 기지국(2630) 간 단말(2610)의 RRC 시그널링을 위한 터널은, 상기 단말(2610)이 LTE 기지국(2620)과의 LTE RRC 시그널링을 송수신할 수 없는 이벤트가 발생할 때, 상기 LTE 기지국(2620)과 단말(2610) 간의 LTE RRC 시그널링을 전달하는 통로로 사용될 수 있다. 혹은 실시 예에 따라, 상기 LTE 기지국(2620)과 상기 5G 기지국(2630) 간 단말(2610)의 RRC 시그널링을 위한 터널은, 단말(2610)과 5G 기지국(2630)과의 5G RRC 시그널링을 송수신할 수 없는 이벤트가 발생할 때, 상기 단말(2610)과 상기 5G 기지국(2630)과의 5G RRC 시그널링을 전달하는 통로로 사용될 수 있다. 상기 이벤트는 예를 들어, LTE 기지국(2620)과의 RLF(radio link failure) 판정 혹은 5G 기지국(2630)과의 RLF(radio link failure) 판정 혹은 LTE 기지국(2620) 핸드오버 판정 또는 5G 기지국(2630) 핸드오버 판정 등을 포함할 수 있다. 본 발명의 실시 예에 따라 상기 이벤트가 발생하지 않으면, 상기 단말(2610)과 LTE 기지국(2620)은 LTE RRC 시그널링 전송을 직접 수행할 수 있고, 상기 단말(2610)과 5G 기지국(2630)은 5G RRC 시그널링 전송을 직접 수행할 수 있다. 본 발명의 다른 실시 예에 따라 상기 이벤트가 발생하지 않으면 상기 단말(2610)과 LTE 기지국(2620)은 LTE RRC 시그널링 전송과 5G RRC 시그널링 전송을 수행하고 상기 단말(2620)과 5G 기지국(2630) 간 5G RRC 시그널링 전송 채널은 비활성화될 수 있다. 본 발명의 또 다른 실시 예에 따라 상기 이벤트가 발생하지 않으면 상기 단말(2610)과 5G 기지국(2630)은 5G RRC 시그널링 전송과 LTE RRC 시그널링 전송을 수행하고 상기 단말(2610)과 LTE 기지국(2620) 간 LTE RRC 시그널링 전송 채널은 비활성화될 수 있다.
2655 단계에서 단말(2610)과 5G 기지국(2620) 간 5G RRC signaling을 송수신하는 채널이 비활성화될 수 있다. 이 경우, 2660 단계에서 상기 단말(2610)과 LTE 기지국(2620)은 설정된 LTE RRC signaling 송수신 채널을 통해 LTE RRC signaling 송수신을 수행할 수 있다. 그리고, 2665 단계에서 상기 단말(2610)과 5G 기지국(2630)은 상기 LTE 기지국(2620)과 상기 5G 기지국(2630) 간 설정된 터널을 통해 5G RRC signaling을 송수신할 수 있다.
여기서 상기 단말(2610)과 LTE 기지국(2620) 간 5G RRC signaling의 송수신은 상기 LTE RRC signaling 송수신 채널의 이용, 또는 상기 5G 용도로 별도로 설정된 PDN connection 채널의 이용, 또는 상기 5G 용도로 별도로 설정된 LTE signaling bearer 채널의 이용, 또는 상기 LTE 기지국(2620)에 설정된 5G RRC용 signaling bearer의 이용, 또는 NAS signaling bearer 채널의 이용을 가정할 수 있다. 이에 대한 구체적인 예는 상술하였으므로, 그 구체적인 설명은 생략하기로 한다.
2670 단계에서 단말(2610)이 LTE 기지국(2620)과의 직접 연결을 통해 LTE RRC signaling을 송수신할 수 없는 이벤트가 발생될 수 있다(예를 들면, LTE RLF 발생). 2675 단계에서 단말(2610)은 상기 5G 기지국(2630)과의 5G RRC signaling 송수신 채널을 활성화할 수 있다. 상기 5G 기지국(2630)과의 5G RRC signaling 송수신 채널 활성화 요청을 위해, 상기 단말(2610)은 상기 5G 기지국(2630)에게 상기 5G RRC signaling 송수신 채널 활성화를 요청하는 랜덤 액세스 코드를 전송하거나, MAC CE 형식의 시그널링을 전송하거나, 5G RRC 시그널링(예를 들면, RRC Connection reestablishment with 5G RRC activation, RRC connection reconfiguration with 5G RRC activation 등)을 전송할 수 있다. 2680 단계에서 단말(2610)과 5G 기지국(2630)은 상기 활성화된 5G RRC signaling 송수신 채널을 통해 5G RRC 시그널링을 송수신할 수 있다. 그리고, 2685 단계에서 상기 단말(2610)과 LTE 기지국(2620)은 상기 LTE 기지국(2620)과 상기 5G 기지국(2630) 간 설정된 터널을 통해 LTE RRC signaling 을 송수신할 수 있다.
여기서 상기 단말(2610)과 5G 기지국(2630) 간 LTE RRC signaling을 송수신은 상기 5G RRC signaling 송수신 채널의 이용, 또는 상기 LTE 용도로 별도로 설정된 PDN connection 채널의 이용, 또는 상기 LTE 용도로 별도로 설정된 5G signaling bearer 채널의 이용, 또는 상기 5G 기지국(2630)에 설정된 LTE RRC용 signaling bearer의 이용 또는 NAS signaling bearer 채널의 이용을 가정할 수 있다. 상기 활성화된 단말(2610)과 5G 기지국(2630) 간 5G RRC signaling 송수신 채널은 단말(2610)과 LTE 기지국(2620) 간 LTE RRC signaling 송수신 채널이 정상적으로 운용될 때까지 사용될 수 있다.
상술한 실시 예들에서, 기 설정된 PDN Connection을 이용, 또는 LTE signaling bearer를 이용, 또는 LTE 기지국에 설정된 5G RRC용 signaling bearer를 이용, 또는 NAS signaling bearer를 이용하기 위한 LTE 기지국과 5G 기지국 간 인터페이스는 직접 연결 또는 다른 네트워크 엔터티를 통한 연결을 가정할 수 있다. 또한 상기의 실시 예에서는 LTE 기지국의 PDN connection을 이용, 또는 LTE signaling bearer를 이용, 또는 LTE 기지국에 설정된 5G RRC용 signaling bearer를 이용, 또는 LTE 기지국에 설정된 5G 용 NAS signaling bearer를 이용하여 5G 기지국과의 RRC signaling 송수신을 수행하는 예시를 기술하였으나, 5G 기지국에 설정된 PDN connection을 이용, 또는 5G signaling bearer를 이용, 또는 5G 기지국에 설정된 LTE RRC 용 signaling bearer를 이용, 또는 5G 기지국에 설정된 LTE용 NAS signaling bearer를 통해 LTE 기지국과의 RRC signaling 송수신을 수행하는 경우로 확장할 수 있음은 물론이다.
(2-3) 단말이 5G 접속 절차를 트리거링 하는 동작의 실시 예
단말은 5G 셀 존재를 판단하여 5G 셀로의 접속 절차를 트리거링할 수 있는데, 상기 5G 셀 존재를 판단하는 데 필요한 정보는 다음의 실시 예에 의해 획득될 수 있다. 본 발명의 실시 예에 따라 5G 셀로의 접속 절차를 트리거링하는 정보는 PDN Connection을 이용하기 위한 PDN Connection 설정 또는 LTE signaling bearer를 이용하기 위한 5G RRC 지시 정보 설정 또는 LTE 기지국에 설정된 5G RRC용 signaling bearer를 이용하기 위한 5G RRC용 signaling bearer 설정 또는 5G용 NAS signaling bearer를 이용하기 위한 NAS signaling bearer 설정 동작을 수행하는 데 적용될 수 있다.
(2-3-1)
도 27은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 실시 예이고, 도 28은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결 트리거링에 사용하는 TAI 포맷 예이다.
도 27을 참고하면, 2760 단계에서 LTE 기지국(2720)은 주변에 5G 기지국(5GNB)(2730)이 있는 경우에 상기 5G 기지국(2730)의 식별 정보를 단말(2710)에게 전송할 수 있다. 이때, 상기 정보는 시스템 정보를 통해 브로드캐스팅 방식으로 단말에게 전송될 수 있다.
좀 더 구체적으로 살펴보면, 단말(2710)의 5G 셀 접속 트리거링에 사용되는 정보는 단말(2710)에 미리 저장된 5G 셀 식별자 또는 트래킹 영역(tracking area) 식별자를 포함할 수 있다. 단말(2710)이 LTE 셀(2720)에 접속할 때, 상기 2760 단계에서 상기 LTE 셀(2720)로부터 획득하는 시스템 방송 정보 중 LTE 셀 식별자 정보는 상기 LTE 셀(2720)과 공존하는 5G 셀(2720)의 정보를 포함할 수 있다.
예를 들어, LTE 셀 식별자 정보는 도 28에 예시된 것과 같이 상기 LTE 셀(2720)과 공존하는 5G 셀(2730)의 트래킹 영역 코드(TAC: tracking area code) 정보를 포함할 수 있다. 그리고, 상기 5G 셀(2730)의 TAC 정보를 수신한 단말(2710)은 미리 저장된 5G 셀(2730)의 TA 식별자와 비교하여 상기 LTE 셀(2720)과 공존하는 5G 셀(2730)이 존재함을 예측할 수 있다.
상기 LTE 셀(2720)과 공존하는 5G 셀(2730)의 존재를 예측한 단말(2710)은 2770 단계에서 상기 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 구체적으로, 2771 단계에서 단말(2710)은 MME(2750)에게 PDN 연결 요청(PDN connection request) 메시지를 전송할 수 있다. 이때, APN(access point name)을 5G 네트워크로 지정하여 상기 PDN 연결 요청 메시지가 전송될 수 있다. 이는 5G RRC 시그널링을 위한 5G PDN connection 설정을 위한 것으로 이에 대한 구체적인 설명은 상술하였으므로, 그 구체적인 설명은 생략하기로 한다. 그리고, MME(2750)는 2772 단계에서 S-GW/P-GW(2740)에게 세션 생성 요청(create session request) 메시지를 전송하고, 2773 단계에서 그에 대한 세션 생성 응답(create session response) 메시지를 S-GW/P-GW(2740)로부터 수신할 수 있다. 이후, 2774 단계에서 MME(2750)는 LTE 기지국(2720)에게 베어러 셋업 요청(bearer setup request) 메시지를 전송할 수 있다. 그리고, 상기 베어러 셋업 요청 메시지는 PDN 연결 승인(PDN connectivity accept) 메시지를 포함할 수 있다. 그리고, QCI(QoS class identifier)는 5G-RRC로 지정될 수 있다. 2775 단계에서 LTE 기지국(2720)은 단말(2710)에게 RRC 연결 재설정 메시지를 전송할 수 있다. 그리고 2776 단계에서 단말(2710)은 RRC 연결 재설정 완료 메시지를 LTE 기지국(2720)에게 전송할 수 있다. 2777 단계에서 LTE 기지국(2720)은 MME(2750)에게 베어러 셋업 응답(bearer setup response) 메시지를 전송하고, 단말(2710)은 2778 단계에서 MME(2750)에게 PDN 연결 완료(PDN connectivity complete) 메시지를 전송할 수 있다. 이에 따라, 5G RRC 시그널링을 위한 PDN 연결이 설정될 수 있다.
이후, 2780 단계 및 2785 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 2790 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
(2-3-2)
도 29는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 29를 참고하면, 2910 단계에서 LTE 기지국(2720)은 주변에 5G 기지국(5GNB)(2730)이 있는 경우에 상기 5G 기지국(2730)의 식별 정보를 단말(2710)에게 전송할 수 있다. 이때, 상기 정보는 시스템 정보를 통해 브로드캐스팅 방식으로 단말에게 전송될 수 있다.
좀 더 구체적으로 살펴보면, 단말(2710)은 LTE 셀(2720)에 접속할 때 상기 LTE 셀(2720)이 전송하는 시스템 방송 정보를 통해 상기 LTE 셀(2720)과 공존하는 5G 셀(2720)의 식별자(5G cell ID)를 획득할 수 있다. 상기 LTE 셀(2720)이 전송하는 시스템 방송 정보는 5G 셀 식별자를 포함할 수 있다. 상기 5G 셀 식별자 정보를 통해 상기 단말(2710)은 상기 LTE 셀(2720)과 공존하는 5G 셀(2730)의 존재를 예측할 수 있다. 또한, 상기 5G 셀 식별자는 5G 셀 식별자 리스트(5G cell ID list)의 형태로 단말(2710)에게 전송될 수 있다.
상기 LTE 셀(2720)과 공존하는 5G 셀(2730)의 존재를 예측한 단말(2710)은 2920 단계에서 상기 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 이때, 2921 단계 내지 2928 단계는 상기 도 28과 관련된 부분에서 설명한 실시 예의 2771 단계 내지 2778 단계와 유사한바, 그 구체적인 설명은 생략하기로 한다.
이후, 2930 단계 및 2935 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 2940 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
(2-3-3)
도 30은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 30을 참고하면, 단말(2710)은 5G 셀(2730)의 위치 정보(예를 들면, 위도, 경도, 반경 등)를 미리 저장하고 있을 수 있다. 그리고, 3010 단계에서 단말(2710)은 GPS 등을 통해 자신의 위치 정보를 파악하고, 상기 5G 셀(2730)의 영역에 해당하는 위치에 상기 단말(2710)이 위치해 있는지를 판단할 수 있다.
상기 단말(2710)은 자신이 상기 5G 셀(2730)의 위치에 존재함을 판단하면, 3020 단계에서 상기 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 이때, 3021 단계 내지 3028 단계는 상기 도 28과 관련된 부분에서 설명한 실시 예의 2771 단계 내지 2778 단계와 유사한바, 그 구체적인 설명은 생략하기로 한다.
이후, 3030 단계 및 3035 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 3040 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
실시 예에 따라, 상기 GPS를 활용한 5G 셀(2730)의 존재 여부를 파악하는 실시 예는, 상기 (2-3-1)의 실시 예 내지 (2-3-2)의 실시 예에서 5G 셀(2730)의 존재를 예측한 후에 추가로 수행되어 5G 셀(2730)과의 접속 절차를 시작하는 데 활용할 수 있다.
(2-3-4)
도 31은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 31을 참고하면, 3110 단계에서 단말(2710)은 5G 어플리케이션(application)이 실행되는 것을 감지할 수 있다. 그리고, 5G 어플리키에션이 실행되면, 단말(2710)은 3120 단계에서 5G 셀(2730)로의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 이때, 3121 단계 내지 3128 단계는 상기 도 28과 관련된 부분에서 설명한 실시 예의 2771 단계 내지 2778 단계와 유사한바, 그 구체적인 설명은 생략하기로 한다.
이후, 3130 단계 및 3135 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 3140 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
이 실시 예는 상기 단말(2710)이 LTE 셀(2720)이 제공하는 정보를 기반으로 공존하는 5G 셀(2730)의 존재 여부를 파악하거나, GPS 기반으로 5G 셀(2730)의 존재 여부를 파악한 이후에 적용될 수 있음은 물론이다. 즉, 상기 LTE 셀(2720)과 공존하는 5G 셀(2730)의 존재 여부는 확인하였으나, 상기 5G 셀(2730)을 통해 5G application 데이터를 송수신할 필요가 없으면, 상기 5G 셀(2730)로의 접속 절차를 수행하지 않을 수 있다. 상기 5G 셀(2730)을 통해 5G application 데이터를 송수신할 필요가 있다고 판단될 때, 상기 단말(2710)은 상기 5G 셀(2730)로의 접속 절차를 수행할 수 있다.
(2-3-5)
도 32는 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 32를 참고하면, 3220 단계에서 단말(2710)은 LTE 셀(2720)로 접속할 때 5G capability가 있음을 상기 LTE 셀(2720)에게 전달할 수 있다. 실시 예에 따라, 3210 단계에서 단말(2710)이 LTE 기지국(2720)으로부터 단말 capability 정보의 전송을 요청받는 경우에(예를 들면, UE capability enquiry 메시지를 통해), 3220 단계에서 단말(2710)이 LTE 기지국(2720)에게 상기 단말 capability 정보를 전송할 수 있다.
그리고, 상기 단말(2710)의 5G capability 정보는, 3225 단계에서 상기 단말(2710)의 capability 정보를 관리하는 엔터티(예를 들면, MME(2750), NG-Core 등)에게 전달될 수 있다.
3230 단계 내지 3240 단계에서 상기 단말(2710)이 5G 셀(2730)과 공존하는 LTE 셀(2720)에 접속하는 경우(핸드오버에 의한 접속 또는 RLF에 의한 접속 또는 idle 모드에서 connected 모드로의 전환에 의한 접속 또는 위치 등록 절차에 의한 접속 등을 포함), 상기 단말(2710)의 capability 정보를 관리하는 엔터티(예를 들면, MME(2750))는 상기 엔터티(2750)와 단말(2710) 간 시그널링(예를 들면, NAS signaling)를 상기 단말(2710)에게 전송하여, 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 수행하도록 지시할 수 있다. 예를 들면, 3230 단계에서 단말(2710)이 트래킹 영역 업데이트(TAU: tracking area update)가 필요한 것을 판단한 경우, 3235 단계에서 단말(2710)은 MME(2750)에게 TAU 요청 메시지를 전송할 수 있다. 그리고, 3240 단계에서 MME(2750)는 단말(2710)에게 TAU 완료(complete) 메시지를 전송할 수 있다. 이때, 상기 TAU 완료 메시지에 5G PDN 연결을 트리거하는 정보가 포함되어 단말(2710)에게 전송될 수 있다.
단말(2710)은 3250 단계에서 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 이때, 3251 단계 내지 3258 단계는 상기 도 28과 관련된 부분에서 설명한 실시 예의 2771 단계 내지 2778 단계와 유사한바, 그 구체적인 설명은 생략하기로 한다.
이후, 3260 단계 및 3265 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 3270 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
(2-3-6)
도 33은 본 발명의 일 실시 예에 따른 4G와 5G 공존 시스템에서 5G RRC 연결을 트리거링하는 운용 절차 다른 실시 예이다.
도 33을 참고하면, 단말(2710)은 3320 단계에서 LTE 셀(2720)에 접속할 때 5G capability를 LTE 셀(2730)에게 전달할 수 있다. 실시 예에 따라, 3310 단계에서 단말(2710)이 LTE 기지국(2720)으로부터 단말 capability 정보의 전송을 요청받는 경우에(예를 들면, UE capability enquiry 메시지를 통해), 3320 단계에서 단말(2710)이 LTE 기지국(2720)에게 상기 단말 capability 정보를 전송할 수 있다.
5G 셀(2730)과 공존한 LTE 셀(2720)은 단말(2710)이 5G capability를 지원한다고 판단하면, 3330 단계에서 상기 단말(2710)에게 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 수행하도록 지시할 수 있다. 상기 5G 셀(2730)과의 접속 절차 수행을 지시하기 위해, 상기 단말(2710)과 상기 LTE 셀(2720)간 5G RRC 메시지가 전송될 수 있다. 그리고, 상기 RRC 메시지는 5G PDN 연결을 트리거하기 위한 것으로 정의될 수 있다.
단말(2710)은 3340 단계에서 5G 셀(2730)과의 접속 절차(예를 들면, 5G RRC 시그널링을 위한 PDN 연결 절차)를 시작할 수 있다. 이때, 3341 단계 내지 3348 단계는 상기 도 28과 관련된 부분에서 설명한 실시 예의 2771 단계 내지 2778 단계와 유사한바, 그 구체적인 설명은 생략하기로 한다.
이후, 3350 단계 및 3355 단계에서 단말(2710)/LTE 기지국(2720)/5G 기지국(2730) 사이에 5G RRC 시그널링을 보내기/받기 위한 터널(채널)이 생길 수 있다. 그리고, 3360 단계에서 단말(2710)은 상기 터널(채널)을 통해 단말(2710)의 5G RRC message를 5G 기지국(2730)과 주고 받을 수 있다.
(2-4) LTE와 5G 공존 시스템에서 5G RRC Signaling 처리의 또 다른 실시 예
실시 예에 따라, 상기 (2-3)의 실시 예의 5G 셀(2730)과의 접속 절차를 트리거링하기 위한 정보는 상기 LTE 셀(2720)을 통해 5G RRC signaling을 송수신하지 않고 상기 5G 셀(2730)과의 직접 연결을 통해 5G RRC signaling을 송수신하기 위한 조건으로 활용될 수 있다.
실시 예에 따라, 상기 (2-3)의 실시 예에 따른 5G 셀(2730)과의 접속 절차 트리거링 조건 중 적어도 하나를 만족하는 경우 단말(2710)은 상기 LTE 셀(2720)과 공존하고 있는 5G 셀(2730)로의 접속 절차를 시작할 수 있다. 실시 예에 따라, 상기 5G 셀(2730)로의 접속 절차는 상기 5G 셀(2730)로 직접 5G RRC signaling을 송수신하여 처리될 수 있다.
실시 예에 따라, 단말(2710)은 상기 5G 셀(2730)로의 접속 절차를 수행하는 중에 UE capability 정보(예를 들면, LTE 셀(2720)과의 multi-connectivity 지원함)을 상기 5G 셀(2730)에게 알릴 수 있다. 상기 단말(2710)이 LTE 셀(2720)과의 multi-connectivity를 지원함을 인지한 5G 셀(2730)은 상기 단말(2710)이 상기 5G 셀(2730) 및 상기 LTE 셀(2720)과의 multi-connectivity 동작을 수행할 수 있는 절차를 수행할 수 있다. 상기 단말(2710)의 multi-connectivity 동작을 수행할 수 있는 절차는 일 예로 상기 LTE 셀(2720)로 상기 단말(2710)의 UE capability 정보를 전송하는 동작을 포함할 수 있다.
상기 단말(2710)은 상기 LTE 셀(2720)로부터 상기 LTE 셀(2720)과 공존하고 있는 5G 셀(2730)의 설정(configuration) 정보를 획득할 수 있다. 상기 5G 셀(2730)의 configuration 정보는 일 예로 상기 5G 셀(2730)이 독립(standalone) 셀로 동작할 수 있는지, 또는 상기 5G 셀(2730)이 다른 셀에 기생된 셀로 동작할 수 있는지 여부에 대한 정보를 포함할 수 있다. 상기 단말(2710)은 상기 (2-3)의 실시 예에 따른 5G 셀(2730)과의 접속 절차 트리거링 조건 중 적어도 하나를 만족하는 경우 standalone 셀로 동작할 수 있는 5G 셀(2730)로의 접속 절차 수행을 시작할 수 있다. 상기 단말(2710)은 상기 (2-3)의 실시 예에 따른 5G 셀(2730)과의 접속 절차 트리거링 조건 중 적어도 하나를 만족하는 경우 다른 셀에 기생된 셀로 동작할 수 있는 5G 셀(2730)에 대한 측정 결과(예를 들면, measurement report)를 상기 LTE 셀(2720)에게 전송할 수 있고, 상기 LTE 셀(2720)의 지시에 따라 상기 5G 셀(2730) 및 상기 LTE 셀(2720)을 통한 데이터 송수신을 시작할 수 있다.
한편 본 발명에서 예를 들어 설명한 LTE 기지국은 저주파수 대역 예를 들어 6 GHz 이하 또는 3.5 GHz 또는 2 GHz 또는 700 MHz 대역 등에서 운용되는 5G 기지국으로 대체될 수 있음은 물론이다.
<실시 예 3>
도 34는 본 발명의 일 실시 예에 따른 기지국 분산 구조의 예시이다.
도 34를 참고하면, 무선 링크를 관리하는 기존 기지국에 해당하는 역할은 중심 노드(central node)(3410)와 노드(node)(또는 일반 노드, 분산 노드 등)(3420)에 나누어 구현되어 있다. Central Node(3410)는 다수의 Node들(3420; 3421, 3422, 3423, 3424, 3425, 3426, 3427)에 연결되어 있고 각 Node(3420)를 관리할 수 있다. 그리고, Central node(3410)는 코에 네트워크(3430)과 연결될 수 있다. Central Node(3410)와 Node(3420)는 유선 혹은 무선으로 연결되어 있고 이를 프론트홀(fronthaul)이라고 부를 수 있다.
Central Node(3410)는 실시 예에 따라 중심 유닛(CU: Central Unit), Wireless Controller(무선 컨트롤러), Data Center(데이터 센터), Anchor Node(앵커 노드) 등으로 불릴 수 있다. Central Node(3410)는 프로토콜 스택의 전체 또는 일부를 가지고 있고, 최소한 L2 상위 프로토콜 스택의 일부는 가지고 있다.
Node(3420)는 실시 예에 따라 분산 유닛(DU: Distributed Unit), 엑세스 유닛(AU: Access Unit), 송수신점(TRP: Transmission and Reception Point), 엑세스 포인트(AP: Access Point), eNB(evolved Node B) 등으로 불릴 수 있다. Node(3420)는 L1/L2 프로토콜 스택의 일부를 가지고 있을 수 있다. Node(3420)는 밀리미터파(millimeter wave) 등을 사용하는 고주파 대역에서 동작하는 무선 통신 기지국일 수 있으며, 실시 예에 따라 빔포밍(beamforming)을 지원할 수도 있다.
도 35는 본 발명의 일 실시 예에 따른 LTE 프로토콜 스택 기반 기지국 분산 구조의구체적 예시이다.
도 35를 참고하면, LTE의 프로토콜 스택을 기준으로 Central Node(3410)와 Node(3420)의 기능을 나눌 수 있는 분할 옵션(Splitting Option)에 대한 가능한 경우들을 나타낸다. LTE 프로토콜 스택에 기반하여 Option 1-8 중 하나의 Splitting Option이 적용될 수 있으며 이는 표준화, 시스템 배치(System Deployment), Fronthaul 지연 시간, Service Requirement 등에 의해 결정될 수 있다. 본 발명은 이러한 다양한 분할 옵션에 대해 적용할 수 있으며 실시되는 옵션에 따라 일부 기능은 생략될 수 있다.
도 36은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔포밍 및 노드 변경 관련 절차의 개괄적 예시이다.
도 36을 참고하면, 3650 단계에서 단말(UE(user equipment), terminal 등)(3610), Node(3620, 3630), Central Node(3640) 간에 빔포밍을 위한 준비 과정부터 시행된다. 이 과정 동안 Central Node(3640)와 Node(3620, 3630)는 단말(3610)이 빔 트레이닝(beam training)을 할 수 있도록 빔 트레이닝 방법을 결정할 수 있다.
그리고, 3655 단계에서 Central Node(3640)와 Node(3620, 3630)는 단말(3610)과 빔 트레이닝을 수행한 후 빔 트레이닝의 결과를 피드백하는 방법을 결정하는 빔 피드백의 준비 과정이 필요하다. 예를 들면, 빔 피드백의 조건, 빔 피드백을 수신해야 하는 장치, 빔 피드백에 포함되는 정보 등이 결정되어야 한다. 실시 예에 따라, 상기 3650 단계의 빔 트레이닝의 준비 과정과 상기 3655 단계의 빔 피드백의 준비 과정은 동시에 일어날 수 있다.
빔 트레이닝과 빔 피드백 방법이 결정된 후, 3660 단계에서 단말(3610)은 빔 트레이닝을 수행한다. 그리고, 3665 단계에서 빔 트레이닝에서 결정된 사용하는 빔에 따라 단말(3610), Central Node(3640), Node(3620, 3630)는 데이터 송/수신을 할 수 있다. 이 때 단말(3610)과 Node(3620, 3630), Central Node(3640)가 사용할 자원 및 단말 context 등의 공유가 필요하다. 데이터 송/수신과 동시에 빔 트레이닝의 결과가 빔 피드백을 야기하는 경우, 3670 단계에서 빔 피드백이 이루어질 수 있다. 이 때 빔 피드백은 통신을 할 Node(3620, 3630)를 결정할 수 있기 때문에 통신을 할 Node(3620, 3630)를 결정하는 Node 또는 Central Node(3640)에게 전달될 수 있다. 이후에 3675 단계에서 Node(3620, 3630)와 Central Node(3610)는 데이터 송/수신 경로를 전환할 수 있다.
실시 예에 따라 각각의 과정 중 일부는 사전에 약속되어 생략되거나, 정보의 선후 관계가 없는 과정은 그 순서가 바뀔 수도 있다.
도 37은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔포밍 및 노드 변경 관련 절차의 구체적 예시이다.
도 37는 본 발명에서 생각할 수 있는 하나의 실시 예이다. 도 36의 개괄적인 순서도와 도 38 내지 도 48에서 나타난 다양한 구체적 방법들이 실제로 동작하는 예시이다. 구체적인 동작과정이나 변형의 예시는 도 38 내지 도 48과 관련된 부분에서 살펴보도록 한다.
도 37의 실시 예에서는 초기에는 단말(3610)이 Node1(3620)과 통신을 수행하다가 Beam Feedback에서 Node2(3630)의 빔이 우수하여 Node2(3630)와 통신을 하기 위한 동작을 수행하는 것을 가정하도록 한다.
3710 단계에서 Central Node(3640)는 단말(3610)에게 빔 측정 설정(Beam Measurement Configuration) 정보가 포함된 메시지를 전송하여(예를 들면, Beam Measurement Configuration 메시지), 빔 트레이닝을 하는 방법을 알려줄 수 있다. 단말(3610)은 상기 빔 측정 설정 정보를 적어도 한 번 수신함으로써 빔 트레이닝을 정확히 수행할 수 있다. 이 메시지에 포함될 수 있는 정보로는 1) 상기 설정 정보가 특정한 하나 이상의 단말에 해당하는지/모든 단말에게 해당되는 것인지, 2) 빔 트레이닝에 사용할 참조 신호(reference signal)가 상향/하향 링크인지, 3) Node(3620, 3630)가 사용할 Beam의 수, 4) 동작 주파수, 5) 참조 신호에 사용하는 주파수/시간 자원, 6) Node(3620, 3630)가 동시에 전송하는 참조 신호 수, 7) 참조 신호에 사용하는 코드(Code)의 종류, 8) 단말 ID, 9) 서빙 Node가 아닌 다른 Node에 대한 Node ID, 중 적어도 하나 이상의 정보가 포함될 수 있다.
그리고, 3713 단계에서 Central Node(3640)는 단말(3610)에게 빔 피드백 설정(Beam Feedback Configuration) 정보가 포함된 메시지를 전송할 수 있다(예를 들면, Beam Feedback Configuration 메시지). 상기 Beam Feedback Configuration 정보가 포함된 메시지에는 단말(3610)이 Beam Feedback을 어떻게 할지에 대한 정보가 포함될 수 있다. Beam Feedback Configuration 정보에 포함될 수 있는 정보는 1) 해당 Node(3620, 3630)의 상향링크 빔 피드백 자원(예를 들면, 시간/주파수 정보, PUCCH(physical uplink control channel) 자원 등), 2) Random Access가 필요할 경우 사용할 Random Access Preamble ID, 3) 빔 피드백 시 사용할 Code 정보, 4) Node(3620, 3630)와 단말(3610)의 상향 링크 동기화 정보(예를 들면, Timing Alignment 등), 5) 단말(3610)이 사용할 단말 ID 정보(예를 들면, C-RNTI(cell radio network temporary identifier), S-TMSI(S-temporary mobile subscriber identity) 등), 6) 단말(3610)이 특정 방법의 빔 피드백 방법이 실패할 때 재시도를 해야 할 횟수(예를 들면, PUCCH 자원을 사용하여 빔 피드백을 시도했으나 실패할 경우 동일 Node 또는 타 Node에 Random Access를 수행해야 할 수 있는데 몇 번 재시도 할 시에 이런 과정을 적용할지 등), 7) 빔 피드백 시 측정 양으로 사용하는 것(예를 들면, RSRP(reference signal received power), RSRQ(reference signal received quality), RSSI(received signal strength indicator) 등), 8) 측정할 때 빔 별 필터링(filtering(예를 들면, L1, L3 필터링 등))을 적용할 지 여부에 대한 정보, 9) 빔 피드백이 발생하는 조건(예를 들면, 동일 기지국 내 사용하고 있지 않은 다른 빔이 사용 중인 빔보다 일정 크기 이상 우수함으로 판단될 때 등), 10) 빔 피드백에 포함시켜야 하는 정보(예를 들면, RSRP, RSRQ, RSSI, CQI(channel quality indicator), PMI(precoding matrix indicator), RI(rank indication) 등), 중 적어도 하나 이상의 정보가 포함될 수 있다. Beam Feedback Configuration 메시지는 실시 예에 따라 Beam Measurement Configuration 메시지와 같이 메시지로 전송될 수도 있다. 또는, 실시 예에 따라 상기 Beam Feedback Configuration 메시지 또는 Beam Measurement Configuration 메시지의 전송은 생략되고, 상기 Beam Feedback Configuration 메시지 또는 Beam Measurement Configuration 메시지의 내용을 사전에 기지국(3620, 3630, 3640)과 단말(3610)이 모두 인지할 수도 있다.
Central Node(3640)와 Node(3620, 3630)의 분산된 구조로 인해, 3715 단계 및 3717 단계에서 Central Node(3640)가 Node(3620, 3630)에게 단말(3610)의 빔 피드백 정보를 전달할 것을 요청할 수도 있다. 이러한 빔 피드백 정보는 단말(3610)의 서빙 Node가 변경되는 경우 등 여러 이유로 필요할 수 있다. Central Node(3640)가 Node(3620, 3630)에게 단말(3610)의 빔 피드백 정보를 전달할 것을 요청하는 정보가 포함된 메시지를 노드 피드백 설정(Node Feedback Configuration) 메시지라고 할 수 있다. 상기 Node Feedback Configuration 메시지에는 1) 해당하는 특정 단말 ID 또는 임의의 단말에 적용할지 여부에 대한 정보, 2) Node(3620, 3630)가 Central Node(3640)에게 피드백을 보내야 하는 조건(예를 들면, 항상 보낼지, 특정 조건을 만족할 때만 보낼지 등), 3) Node(3620, 3630)가 Central Node(3640)에게 피드백을 보낼 때 포함되어야 하는 값(예를 들면, 단말(3610)의 최적 빔 식별 정보(Best Beam ID), 단말(3610)의 임계 값 이상 빔의 수 및 상기 임계 값, Best Beam으로 수신한 신호 세기(예를 들면, RSRP, RSSI, RSRQ 등), 신호 품질(예를 들면, CQI, PMI, RI 등), n번째(n은 자연수) 신호 세기가 높은 Beam으로 수신한 신호 세기, 모든 빔의 신호 세기, 측정이 가능한 빔의 신호 세기 등), 4) Beam 피드백 데이터를 L1, L3 Filtering 등으로 가공하여 보내야 하는지 또는 Node(3620, 3630)가 가지고 있는 원 자료(Raw Data)의 일부를 보내야 하는지에 대한 정보, 5) 특정 시간 동안 조건이 만족되어야 하는지에 대한 정보 및 상기 특정 시간에 대한 정보, 중 적어도 하나의 정보가 포함될 수 있다. 이 정보를 바탕으로 Node(3620, 3630)는 Central Node(3640)에게 단말(3610)의 Beam 피드백 상황을 알릴 수 있다. 그리고, 상기 Node(3620, 3630)가 Central Node(3640)에게 단말(3610)의 Beam 피드백 상황을 알리는 것을 노드 피드백(Node Feedback)이라고 할 수 있다. 또한 Node(3620, 3630)가 단말(3610)에게 Beam Feedback Configuration 메시지를 보내게 된다면, Beam Feedback Configuration 메시지에 포함되는 메시지의 일부 정보가 Node Feedback Configuration 메시지에 포함될 수도 있다.
이러한 정보들의 바탕으로, 본 실시 예에서는 단말(3610)이 3720 단계 및 3723 단계에서 하향링크 Beam Training Signal을 수신할 수 있다. 그리고, Beam Feedback Configuration 정보에서 정해준 조건이 만족되면 3735 단계에서 단말(3610)은 Node1(3620)에게 Beam Feedback을 전송할 수 있다. 이때, 단말(3610)이 데이터 수신을 하기 위해서, 3640 단계에서 Central Node(3640)는 단말(3610)에게 하향링크 모니터링 설정(DL(downlink) Monitoring Configuration) 메시지를 전송할 수 있다.
이와 더불어 3730 단계 및 3733 단계에서 Central Node(3640)는 Node 1(3620), Node2(3630) 및 단말(3610)과 사용자 컨텍스트(User Context) 정보(또는 단말 컨텍스트(UE context) 정보)를 교환하여 정보를 저장할 수 있다. User Context 정보는 1) Security 정보(예를 들면, AS Security Key 등), 2) 단말 Capability(예를 들면, Beam 정보, Tx/Rx 정보 등), 3) QoS 정보, 4) 단말 히스토리 정보(UE History Info)(예를 들면, Tracking Area 정보 등), 5) 사용자 정보(User Information), 중 적어도 하나를 포함할 수 있다. 뿐만 아니라, 상기 User context 정보가 포함되는 메시지에는 단말(3610)의 bearer 정보 등 데이터 플로우에 관한 정보가 포함될 수도 있다. 예를 들면, 6) Radio Bearer 정보(예를 들면, Node1(3620) 또는 Node2(3630)로 전송되고 있는 DRB ID / SRB ID 등), 7) Layer 정보(예를 들면, PDCP/RLC/RRC/MAC/PHY 등의 설정(Configuration) 정보 등), 8) 단말(3610)과 통신하고 있는 Node에서 사용하던 Bearer 관련 정보, 9) 해당 단말(3610)에 대한 정보를 공유하고 있는 Node ID, 10) 해당 정보가 언제까지 유효한지에 해당하는 시간 길이에 대한 정보, 11) 타 Node에 공유된 1)~10)에 해당하는 정보 중 적어도 하나가 포함될 수도 있다. 실시 예에 따라, 상기 User context 정보가 포함되는 메시지는 Central Node(3640)에서 생성된 후 Node들(3620, 3630)에게 공유할 수도 있다. 어떤 실시 예에서는 Node(3620, 3630)에서 이 메시지를 생성하고 단말(3610) 및 Central Node(3640)에게 전송하여 공유할 수도 있다. UE Context가 전달되면 만약 한 Node에서 다른 Node로 빔 피드백, 데이터 전송, 전송 재개 요청, 링크 복구 요청 등을 수행할 때 해당 Node가 UE Context에 대한 추가적인 요청 없이 해당 역할을 수행할 수 있다. 만약 사전에 UE Context의 일부 또는 전부를 받아와야 할 필요가 없다면, 단말(3610) 또는 Node(3620, 3630)가 필요할 때 Central Node(3640)에게 이 정보를 요청하여 받아올 수도 있다.
단말(3610)이 3735 단계에서 Node1(3620)에게 Beam Feedback 메시지를 전송하였을 때, 단말(3610)은 3745 단계에서 예를 들면, Beam Feedback Confirm 메시지를 수신하여 빔 피드백이 성공적으로 전달되었음을 알 수 있다. 실시 예에 따라, 단말(3610)은 Beam Feedback 메시지를 전송한 후, Beam Feedback Confirm이 수신할 때까지 타이머(3737)를 동작시킬 수 있다. 단말(3610)은 타이머(3737)가 만료될 때까지 Beam Feedback Confirm 메시지를 수신하지 못한 경우, 빔 피드백이 성공적으로 전달되지 않은 것으로 간주하고 빔 피드백을 재전송할 수 있다.
또한 단말(3610)이 Node1(3620)에게 Beam Feedback 메시지를 전송하였을 때, 3740 단계에서 Node1(3620)는 Central Node(3640)에게 Node Feedback 메시지를 전송할 수 있다. Node Feedback 메시지에 포함되는 정보는 Node Feedback Configuration 정보에 명시된 정보일 수 있다. 노드 피드백 이후에 노드가 변경될 경우, 3743 단계에서 Central Node(3640)는 변경 전 Node(3620)에게 Node Change Indication 정보가 포함된 메시지를 전송할 수 있다. 그리고, Node Change Indication이 Node1(3620)에 전송된 후에 Node1(3620)이 단말(3610)에게 Beam Feedback Confirm을 전송할 수도 있다.
한편, Node가 변경될 경우 ARQ 동작이 추가적으로 수행해야 할 수도 있다. 하지만 Node가 변경됨을 단말(3610)이 인식하지 못하고 빔만 변경된 것으로 인식할 수 있다. 때문에 Central Node(3640)는 3760 단계에서 단말(3610)에게 하향링크 상태 리포트(Status Report) 메시지의 전송을 요청할 수 있다(예를 들면, DL-RX status report request 메시지를 통해서). 실시 예에 따라, 상기 DL-RX status report request 메시지는 다른 메시지에 포함되어 단말(3610)에게 전송될 수도 있다. 또한, 실시 예에 따라 Central Node(3640)는 3755 단계에서 단말(3610)에게 UE context를 전송할 수 있다. 이를 기반으로 단말(3610)은 3765 단계에서 Central Node(3640)에게 하향링크 Status Report를 전송하여(예를 들면, DL-RX status report 메시지를 통해서), ARQ에 필요한 메시지들을 전달할 수 있다.
이에 동반해서, 3770 단계 및 3775 단계에서 현재 단말(3610)이 통신하는 Node1(3620)에서 새롭게 통신할 예정인 Node2(3630)로 데이터 포워딩을 해야할 수도 있다. 그리고, 상기 시그널링이 완료된 후에 단말(3610)은 3780 단계에서 Node2(3630)와의 통신을 정상적으로 수행할 수 있다.
도 38은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 트레이닝 준비과정의 예시이다.
도 38을 참고하면, Node(3620, 3630), Central Node(3640), 단말(3610)이 빔 트레이닝을 위한 준비 과정에 대한 세부 실시 예로, 도 36의 3660 단계인 "Beam Training 준비 과정"에 대해 예시되어 있다.
3810 단계, 3813 단계 및 3815 단계에서 단말(3610)이 접속할 시 단말(3610)의 Beamforming 관련 능력(Capability)에 대한 정보는 Node(3620, 3630) 및/또는 Central Node(3640) 중 적어도 하나에게 전송될 수 있다. 상기 단말(3610)의 빔포밍 관련 능력에 대한 정보는, 예를 들면, UE Beam Capability 메시지를 통해 전송될 수 있다. 상기 UE Beam Capability 메시지에는 1) 단말 빔의 수, 2) 단말의 빔 이득, 3) 단말이 동시에 측정이 가능한 빔의 수, 4) RF 체인의 수, 5) 단말의 전송 전력, 6) 단말이 다른 Node에게 이미 할당 받은 Beam Feedback 자원이 있는지, 중 하나 이상의 정보가 포함될 수 있다. 이 때 단말(3610)을 구분하기 위해서 C-RNTI, IMSI(international mobile subscriber identity), GUTI(globally unique temporary identity), S-TMSI 등과 같은 단말 ID가 UE Beam Capability 메시지에 포함되어 전송될 수 있다. 어떤 실시 예에서는 UE Beam Capability 정보를 단말(3610)이 적어도 하나의 Node(3620, 3630)에게 전송하고, Node(3620, 3630)가 수신한 정보를 변형하거나 다른 메시지에 넣어서 Central Node(3640)에게 전송할 수 있다.
3820 단계 및 3825 단계에서 각 Node(3620, 3630)는 Central Node(3640)에게 Node(3620, 3630)의 빔 트레이닝 관련된 정보(beam training information)가 포함된 메시지를 전송할 수 있다. Central Node(3640)가 Node(3620, 3630)의 빔 트레이닝 Capability를 알 수 있게 할 수 있다. 상기 Beam Training Information은 1) Node의 빔의 수, 2) Sector의 수, 3) Beam Training을 모두 전송하는데 걸리는 주기, 4) Beam Training 주파수/시간 자원 정보, 5) Node의 RF 체인의 수, 6) Node의 전송 전력, 7) Node의 Beam Gain, 8) 동시에 전송할 수 있는 Beam Training Signal의 수, 9) 사용하는 Beam ID의 범위, 10) 주파수, 11) 대역폭, 중 하나 이상의 정보가 포함될 수 있다. 실시 예에 따라, Beam Training Information은 Node(3620, 3630)의 ID로 구분될 수도 있다.
또한 어떤 실시 예에서는 Node(3620, 3630)가 특정 단말(3610)에게 할당 가능한 상향/하향 빔 트레이닝 신호에 정보를 Central Node(3640)에게 전송할 수 있다. 이것은 특정 단말(3610)에게 할당되거나 특정 다수의 단말(3610)에게 Beam training Signal이 할당된 경우 적용할 수 있다. 1) 사용하지 않는 Beam Training Code(Sequence) ID, 2) 사용하지 않는 Beam Training Code(Sequence) 수, 3) Beam Training Sequence를 전송할 주파수/시간 자원 위치, 4) Beam Training Sequence를 전송할 주파수/시간 자원 위치에 대한 Index, 5) 현재 Beam Training Signal을 할당한 단말의 수 등이 메시지에 포함되어 Central Node(3640)에게 전송될 수도 있다.
Central Node(3640) 또는 Node(3620, 3630)는 단말(3610)의 UE Beam Capability 정보와 Node의 Beam Training Information 중 하나 이상을 바탕으로 Beam Training을 실제로 수행할 수 있다. 도 38의 실시 예에서는, Central Node(3640)가 Beam Training을 결정하여 Node(3620, 3630)에게 지시하게 되는 것으로 묘사하고 있으나, 실시 예에 따라 Node(3620, 3630)가 Beam Training을 결정할 수도 있다. 이 경우 Central Node(3640)에서는 실제 Beam Training을 실시하는 Node(3620, 3630)와 단말(3610)에게 빔 트레이닝의 방법을 전달해야 한다. 도 38의 실시 예에서, 3830 단계 및 3835 단계에서 Central Node(3640)가 Node(3620, 3630)에게 빔 트레이닝 방법을 전달하는 메시지를 빔 트레이닝 명령(Beam Training Command) 메시지라고 하고, 3840 단계, 3843 단계 및 3845 단계에서 Central Node(3640) 또는 Node(3620, 3630)가 단말(3610)에 빔 트레이닝 하는 방법을 전달하는 메시지를 빔 측정 설정(Beam Measurement Configuration) 메시지이라고 하였다.
Node(3620, 3630)가 3830 단계 및 3835 단계에서 Central Node(3640)로부터 Beam Training Command 메시지를 받는다면 이 메시지에 포함된 내용에 맞게 Beam Training을 수행할 수 있다. 이 Beam Training Command 메시지에 포함될 수 있는 정보는 1) 특정한 하나 이상의 단말에 해당하는지(하향링크로 Node가 특정 단말에 전송하거나 상향링크로 특정 단말이 Node에 전송하는 참조신호 전송 등)/모든 단말에게 해당되는 것인지(예를 들면, Broadcast 참조 신호 전송 등), 2) 빔 트레이닝에 사용할 참조 신호가 상향/하향 링크인지 여부에 대한 정보, 3) 사용할 Beam의 수 또는 Beam Index, 4) 동작 주파수, 5) 참조 신호에 사용하는 주파수/시간 자원에 대한 정보, 6) Node(3620, 3630)가 동시에 전송하는 참조 신호 수, 7) 참조 신호에 사용하는 Code 종류, 8) 단말 ID, 9) 서빙 Node가 아닌 다른 Node에 대한 Node ID, 중 하나 이상의 정보가 포함될 수 있다. 실시 예에 따라, Central Node(3640)에서 Node(3620, 3630)로 전송되는 메시지는 한 Node(3620, 3630)에서 다른 Node(3620, 3630)로 포워딩해서 전송할 수도 있다. 실시 예에 따라, 이 메시지를 기반으로 실제 빔 트레이닝이 적용되는 데에는 일정 시간이 소요될 수 있으며, 그 특정 시간 또는 Beam Training Information이 적용되는 프레임 번호(Frame Number), 서브프레임 번호(Subframe Number), 실제 시간 중 적어도 하나를 Beam Training Information에 삽입하여 정확히 그 시간 후에 Beam Training Information이 새롭게 적용됨을 알게 할 수도 있다. Beam Training Command를 기반으로 Node(3620, 3630)는 하향링크 Beam Training Signal을 전송하거나 Beam Training Command에 명시된 상향링크 Beam Training Signal을 수신할 수 있다.
그리고 Central Node(3640) 또는 Node(3620, 3630)는 단말(3610)에게 빔 트레이닝 방법에 대한 정보를 전송할 수 있다(Beam Measurement Configuration). 단말(3610)은 이 정보를 적어도 한 번 수신함으로써 빔 트레이닝을 정확히 수행할 수 있다. 이 메시지에 포함될 수 있는 정보로는 1) 특정한 하나 이상의 단말에 해당하는지/모든 단말에게 해당되는 것인지에 대한 정보, 2) 빔 트레이닝에 사용할 참조 신호가 상향/하향 링크인지에 대한 정보, 3) Node(3620, 3630)가 사용할 Beam의 수, 4) 동작 주파수, 5) 참조 신호에 사용하는 주파수/시간 자원, 6) Node(3620, 3630)가 동시에 전송하는 참조 신호 수, 7) 참조 신호에 사용하는 Code 종류, 8) 단말 ID, 9) 서빙 Node가 아닌 다른 Node에 대한 Node ID, 하나 이상의 정보가 포함될 수 있다. 실시 예에 따라, 이 메시지를 기반으로 실제 빔 트레이닝이 적용되는데는 일정 시간이 소요될 수 있으며, 그 특정 시간 또는 Beam Measurement Configuration이 적용되는 Frame Number, Subframe Number, 실제 시간 중 적어도 하나를 Beam Measurement Configuration에 삽입하여 정확히 그 시간 후에 Beam Measurement Configuration이 새롭게 적용됨을 알게 할 수도 있다.
도 38의 Node1(3620), Node2(3630)와 단말(3610) 사이에 전송되는 무선 신호는 빔 트레이닝과 피드백을 하는 주파수 대역이 아닌 다른 주파수 대역에서 송/수신될 수도 있다. 예를 들어 LTE 주파수 대역에서 LTE 메시지로 전송될 수도 있다.
도 39는 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백 및 노드 피드백 준비과정의 예시이다.
도 39를 참고하면, 단말(3610) 또는 Node(3620, 3630)에서 빔 피드백이 필요한 경우, 빔 피드백에 관한 설정을 하는 과정이 예시되어 있다.
만약, 단말(3610)이 Node(3620, 3630)의 무선 링크를 사용하여 빔 피드백을 하기 위하여 어떤 무선 자원이 사용 가능한지를 Central Node(3640)이 알아야 할 경우, Central Node(3640)은 3910 단계 및 3915 단계에서 Beam Feedback Resource Request 메시지를 Node(3620, 3630)에게 전송하여, Node(3620, 3630)의 빔 피드백 자원에 대한 정보를 요청할 수 있다. Beam Feedback Resource Request 메시지에는 1) 단말의 식별 정보(ID), 2) Beam Feedback Resource Report에 포함될 내용 중 적어도 하나가 포함될 수도 있다. 실시 예에 따라 Beam Feedback Resource Request 메시지의 전송은 생략될 수도 있다.
그리고, Node(3620, 3630)가 특정 단말(3610)에 대한 빔 피드백 자원 정보를 Central Node(3640)에게 알려야 할 경우, Node(3620, 3630)는 3920 단계 및 3925 단계에서 Beam Feedback Resource Report 메시지를 Central Node(3640)에게 전송할 수 있다. 이 Beam Feedback Resource Report 메시지에는 빔 피드백을 하는 1) 단말의 식별 정보(ID), 2) 빔 피드백을 위한 자원 정보(예를 들면, PUCCH 자원 정보), 3) 빔 피드백 시 사용할 Random Access Preamble ID, 4) 빔 피드백 시 사용할 Node 또는 단말의 Beam ID, 중 적어도 하나가 포함될 수 있다. 어떤 실시 예에서는 Beam Feedback Resource Report 메시지가 특정 단말에 대한 자원 정보가 아닌 해당 Node(3620, 3630)에서 사용 가능한 Beam Feedback Resource 정보가 포함될 수도 있다. 이 때에는 1) 사용 가능한 빔 피드백 자원 정보, 2) 빔 피드백으로 사용 가능한 자원 정보(예를 들면, PUCCH 자원 정보, 주파수, 시간, PUCCH Index 등), 3) 빔 피드백 시 사용할 Random Access Preamble ID, 4) 현재 사용되고 있는 빔 피드백 자원 정보, 5) 현재 사용되고 있는 PUCCH 자원 정보, 6) 현재 사용하고 있는 Random Access Preamble ID 등 중 적어도 하나의 정보가 상기 Beam Feedback Resource Report 메시지에 포함될 수 있다.
단말(3610)로부터 Beam Feedback을 수신하거나 다른 Node(3620, 3630)로부터 단말(3610)의 Beam Feedback을 수신한 Node(3620, 3630)는, 필요에 따라 Central Node(3640)에게 수신한 Beam Feedback의 정보의 전체 또는 일부를 전송해야 할 수도 있다. 본 발명에서는 이것을 Node Feedback이라고 명명할 수 있다.
3930 단계 및 3935 단계에서 Central Node(3640)는 Node(3620, 3630)에게 Node Feedback Configuration 메시지를 전송할 수 있다. 상기 Node Feedback Configuration 메시지는 Node(3620, 3630)가 Central Node(3640)에게 단말(3610)의 빔 피드백 결과의 전체 또는 일부를 전달하기 위한 조건에 대한 정보가 포함된 메시지이다. 상기 Node Feedback Configuration 메시지에는 1) 해당하는 특정 단말 ID 또는 임의의 단말에 적용할지 여부에 대한 정보, 2) Node(3620, 3630)가 Central Node(3640)에게 피드백을 보내야 하는 조건(예를 들면, 항상 보낼지, 특정 조건을 만족할 때만 보낼지 등), 3) Node(3620, 3630)가 Central Node(3640)에게 피드백을 보낼 때 포함되어야 하는 값(예를 들면, 단말(3610)의 Best Beam ID, 단말(3610)의 임계 값 이상 빔의 수 및 상기 임계 값, Best Beam으로 수신한 신호 세기(예를 들면, RSRP, RSSI, RSRQ 등), 신호 품질(예를 들면, CQI, PMI, RI 등), n번째(n은 자연수) 신호 세기가 높은 Beam으로 수신한 신호 세기, 모든 빔의 신호 세기, 측정이 가능한 빔의 신호 세기 등), 4) Beam 피드백 데이터를 L1, L3 Filtering 등으로 가공하여 보내야 하는지 또는 Node(3620, 3630)가 가지고 있는 Raw Data의 일부를 보내야 하는지에 대한 정보, 5) 특정 시간 동안 조건이 만족되어야 하는지에 대한 정보 및 상기 특정 시간에 대한 정보, 중 적어도 하나의 정보가 포함될 수 있다. 이 정보를 바탕으로 Node(3620, 3630)는 Central Node(3640)에게 단말(3610)의 Beam 피드백 상황을 알릴 수 있다. 또한 Node(3620, 3630)가 단말(3610)에게 Beam Feedback Configuration 메시지를 보내게 된다면, Beam Feedback Configuration 메시지에 포함되는 메시지의 일부 정보가 Node Feedback Configuration 메시지에 포함될 수도 있다.
구체적으로 Node(3620, 3630)가 Central Node(3640)에게 Node Feedback을 보내야 하는 조건은 다음과 같은 예로 중 적어도 하나가 포함될 수도 있다. 1) 해당 Node의 Beam 중 가장 우수한 품질(예를 들면, 가장 Beam RSRP가 높은 Beam, MIMO(multi-input multi-output) Rank가 가장 높은 Beam, 예측되는 전송률이 가장 높은 Beam, 사용 가능한 MCS(modulation and coding scheme) Index가 가장 우수한 Beam 등)을 가진 Beam보다 일정 오프셋(Offset)(또는 임계 값) 이상 우수한 타 Node의 Beam이 있을 경우, 2) 일정 시간 동안 특정 단말(3610)로부터 Beam Feedback이 수신되지 않을 경우, 3) 일정 시간 동안 특정 단말(3610)로부터 Beam Feedback이 수신되는 경우, 4) 해당 Node의 Beam 중 가장 우수한 품질(예를 들면, 가장 Beam RSRP가 높은 Beam, MIMO Rank가 가장 높은 Beam, 예측되는 전송률이 가장 높은 Beam, 사용 가능한 MCS Index가 가장 우수한 Beam 등)을 가진 Beam이 특정 임계 값 품질보다 낮을 때, 5) Node의 해당 빔에 대하여 임계 값 이상의 피드백 값을 가지는 단말(3610)이 일정 개수 이상일 경우, 6) 특정 단말(3610)이 임계 값(예를 들면, Beam RSRP -85dBm 등) 이상의 피드백 값을 가지는 빔의 수가 또 다른 임계값(예를 들면, Beam의 개수가 3개 등) 이상일 때 등이 될 수도 있다. 위 실시 예의 임계 값들은 Node Feedback Configuration 메시지에 포함될 수 있다.
실시 예에 따라 위의 1)-6)의 조건 중 하나 이상이 정해진 시간 이상 지속될 경우에 Node(3620, 3630)가 Central Node(3640)에게 Node Feedback을 보낼 수도 있다. 이 때 해당 정해진 시간은 Node Feedback Configuration 메시지에 포함될 수 있다.
3950 단계, 3953 단계, 3955 단계 중 적어도 하나의 단계에서, Node(3620, 3630) 및 Central Node(3640) 중 적어도 하나는 단말(3610)에게 단말(3610)이 빔 피드백을 하는 방법에 대한 설정 정보를 포함하는 메시지인 Beam Feedback Configuration 메시지를 전송할 수 있다.
실시 예에 따라, Central Node(3640)가 Beam Feedback Configuration 메시지를 생성하여 3940 단계 및/또는 3945 단계에서 Node1(3620) 및/또는 Node2(3630)에게 전송할 수 있다. 그리고, 상기 Node1(3620) 및/또는 Node2(3630)는 Central Node(3640)로부터 수신한 Beam Feedback Configuration 메시지를 3953 단계 및/또는 3955 단계에서 단말(3610)에게 전송할 수도 있다. 상기 Node(3620, 3630)가 단말(3610)에게 전송하는 Beam Feedback Configuration 메시지에는 단말(3610)이 하향 링크 참조 신호를 사용한 빔 측정 후, 빔 피드백을 하는 상향 링크 자원을 예약받을 수 있도록 하는 정보가 포함될 수 있다.
Beam Feedback Configuration 메시지에 포함될 수 있는 정보는 1) 해당 Node(3620, 3630)의 상향 링크 빔 피드백 자원(예를 들면, 시간/주파수 정보, PUCCH 자원에 대한 정보 등)에 대한 정보, 2) Random Access가 필요할 경우 사용할 Random Access Preamble ID, 3) 빔 피드백 시 사용할 Code 정보, 4) Node(3620, 3630)와 단말(3610)의 상향 링크 동기화 정보(예를 들면, Timing Alignment 등), 5) 단말(3610)이 사용할 단말 ID 정보(예를 들면, C-RNTI, S-TMSI 등), 6) 단말(3610)이 특정 방법의 빔 피드백 방법이 실패할 때 재시도를 해야 할 횟수(예를 들면, PUCCH 자원을 사용하여 빔 피드백을 시도했으나 실패할 경우 동일 Node 또는 타 Node에 Random Access를 수행해야 할 수 있는데 몇 번 재시도 할 시에 이런 과정을 적용할지 등), 7) 빔 피드백 시 측정 양으로 사용하는 것(예를 들면, RSRP, RSRQ, RSSI 등), 8) 측정할 때 빔 별 Filtering(예를 들면, L1, L3 필터링 등)을 적용할 지 여부에 대한 정보, 9) 빔 피드백이 발생하는 조건(예를 들면, 동일 기지국 내 사용하고 있지 않은 다른 빔이 사용 중인 빔보다 일정크기 이상 우수함으로 판단될 때 등), 10) 빔 피드백에 포함시켜야 하는 정보(예를 들면, RSRP, RSRQ, RSSI, CQI, PMI, RI 등), 중 적어도 하나 이상의 정보가 포함될 수 있다. 이러한 정보는 특정 Node에 대한 정보일 수도 있고 여러 Node에 동일하게 적용되는 정보일 수도 있다. 만약 특정 Node에 대한 정보일 경우 각 Node 별로 다른 내용이 하나의 Beam Feedback Configuration 메시지에 포함될 수 있다. 예를 들어 Node 1(3620)이 Beam Feedback Configuration 메시지를 보내지만, 이 메시지에는 단말(3610)이 Node 1(3620)에게 빔 피드백을 하는 정보와 단말(3610)이 Node 2(3630)에게 빔 피드백을 하는 정보가 별도로 포함될 수 있다. 실시 예에 따라 Beam Feedback Configuration 메시지는 Central Node(3640)에서 생성될 수도 있고, Node(3620, 3630)에게 전달된 후 Node(3620, 3630)가 변형하여 단말(3610)에게 전송하나 아니면 변형 없이 전송할 수도 있다. 또는 Beam Feedback Configuration 메시지는 별도의 메시지가 아닌 다른 어떤 메시지에도 포함되어 전송될 수도 있다.
실시 예에 따라 단말(3610)이 인지하는 빔의 Index를 Node들(3620, 3630)이 공유할 수도 있다. 예를 들어 Node 1(3620)은 Beam Index 1-10, Node 2(3630)는 Beam Index 11-20과 같은 식으로 공유될 수도 있다. 이 때 단말(3610)은 Beam Index 1-20으로 동작하는 하나의 Node로 인식할 수도 있다. 하지만 Node 1(3620)과 Node 2(3630)는 물리적으로 다른 위치에 존재할 수 있기 때문에, Node 1(3620)의 빔에서 Node 2(3630)의 빔으로 옮겨가는 데에는 시간이 필요하다. 그러한 이유로 인해 단말(3610)에서 Beam Index를 구분해서 알아야 할 수도 있다. 이때, Node의 구분이 없이 Beam Index를 그룹화하여 운영할 수도 있다. 예를 들어 Beam Index Group 1은 1-10, Beam Index Group 2는 11-20 같은 식이다. 이것은 Node 내에서도 Beam Index Group으로 운영할 수도 있는데 이것은 공간 재사용이나 빔 별 트래픽 분산 등 다양한 방법을 목적으로 그룹화할 수 있다. 이렇게 그룹화 한 후 Beam Feedback에서도 그룹 별로 Beam Feedback 조건을 설정하거나 그룹별로 Beam Feedback을 받을 수도 있을 것이다.
도 40은 본 발명의 일 실시 예에 따른 통신 시스템에서 하향링크 빔 트레이닝 신호 송수신 예시이다.
도 40을 참고하면, 하향링크 빔 트레이닝 신호가 전송되는 것이 예시되어 있다. 도 36의 3660 단계인 "Beam Training 준비과정", 즉 도 38의 과정 후 단말(3610)은 도 40에 예시된 빔 트레이닝을 수행할 수 있다. 예를 들면, 4010 단계 및 4020 단계에서 단말(3610)은 Node1(3620) 및 Node2(3630)으로부터 하향링크 빔 트레이닝 신호(Beam Training Signal)를 수신하여 빔 트레이닝을 수행할 수 있다.
도 41은 본 발명의 일 실시 예에 따른 통신 시스템에서 상향링크 빔 트레이닝 신호 송수신 예시이다.
도 41을 참고하면, 상향 링크 빔 트레이닝 신호가 전송되는 것이 예시되어 있다. 도 36의 3660 단계인 "Beam Training 준비과정", 즉 도 38의 과정 후 단말(3610)은 도 41에 예시된 것과 같이 4110 단계 및 4120 단계에서 Beam Training Signal을 Node1(3620) 및 Node2(3630)에게 전송할 수 있다. 그리고, Node들(3620, 3630)은 빔 트레이닝을 수행할 수 있다.
도 42는 본 발명의 일 실시 예에 따른 통신 시스템에서 데이터 송/수신을 위한 준비과정의 예시이다.
도 42를 참고하면, Node(3620)와 단말(3610) 사이에 데이터 송/수신을 수행하는 과정이 예시되어 있다. 이 과정은 통상적으로 빔포밍 관련 설정이 끝난 후에 일어나야 하나, 실시 예에 따라 도 38 내지 도 41에 예시된 빔포밍 과정에 영향을 받지 않는 실시 예의 경우 빔포밍 과정과 독립적으로 일어날 수도 있다.
데이터 송/수신을 위해서는 4210 단계에서 Central Node(3640)에서 하향 링크 모니터링 설정(Downlink(DL) Monitoring Configuration) 정보가 포함된 메시지(예를 들면, DL monitoring configuration 메시지)가 단말(3610)에게 전송되어야 한다. 하향 링크 모니터링 설정 정보에는 1) 모니터링을 해야 하는 위치(예를 들면, 주파수, 대역폭, 자원 위치 등), 2) 모니터링 주기, 3) UE Specific 정보(예를 들면, Downlink 제어 정보를 디코딩하기 위한 C-RNTI 등, C-RNTI같은 경우 Node(3620, 3630) 간에 다른 C-RNTI일 수도 있으며 Central Node(3640)가 할당하거나 Node들(3620, 3630) 간 협력을 통해 만들어진 Common C-RNTI가 될 수 있다.)를 포함할 수 있다. 이 메시지에 포함된 하향 링크 모니터링 설정 정보를 단말(3610)이 수신하면, 상/하향링크 통신을 위한 자원 할당의 모니터링을 할 수 있다.
실시 예에 따라, DL monitoring configuration 정보는 Central Node(3640)에서 생성된 후 4213 단계 및 4215 단계에서 적어도 하나의 Node(3620, 3630)에게 전송될 수 있다. 실시 예에 따라, Node(3620, 3630)가 DL monitoring configuration 정보를 생성하고, 생성된 DL monitoring configuration 정보를 단말(3610) 및 Central Node(3640)에게 전송하여 공유될 수도 있다.
이와 더불어 Central Node(3640)는 4220 단계, 4223 단계 및 4225 단계 중 적어도 하나의 단계에서 Node 1(3620), Node2(3630) 및 단말(3610) 중 적어도 하나에게 User Context 정보(또는 UE context 정보)를 전송하고, 이를 수신한 엔터티는 수신한 정보를 저장할 수 있다.
User Context 정보(UE Context 정보)는 1) Security 정보(예를 들면, AS Security Key 등), 2)단말 Capability(예를 들면, Beam 정보, Tx/Rx 정보 등), 3) QoS 정보, 4) UE History Info(예를 들면, Tracking Area 정보 등), 5) User Information, 중 적어도 하나를 포함할 수 있다. 뿐만 아니라 상기 User context 정보가 포함되는 메시지에는 단말(3610)의 Bearer 정보 등 데이터 플로우에 관한 정보가 포함될 수도 있다. 예를 들면, 6) Radio Bearer 정보(예를 들면, Node1(3620) 또는 Node2(3630)로 전송되고 있는 DRB ID / SRB ID 등), 7) Layer 정보(예를 들면, PDCP/RLC/RRC/MAC/PHY 등의 설정(Configuration) 정보 등), 8) 단말(3610)과 통신하고 있는 Node에서 사용하던 Bearer 관련 정보, 9) 해당 단말(3610)에 대한 정보를 공유하고 있는 Node ID, 10) 해당 정보가 언제까지 유효한지에 해당하는 시간 길이에 대한 정보, 11) 타 Node에 공유된 1)~10)에 해당하는 정보 중 적어도 하나가 포함될 수도 있다.
실시 예에 따라, 상기 UE context 정보는 Central Node(3640)에서 생성된 후, 4223 단계 및 4225 단계 중 적어도 하나의 단계에서 적어도 하나의 Node(3620, 3630)에게 전송될 수도 있다. 실시 예 따라, Node(3620, 3630)가 UE context 정보를 생성하고, 생성된 User context 정보를 단말(3610) 및 Central Node(3640)에게 전송하여 공유될 수도 있다. UE Context가 전달되면, 만약 한 Node에서 다른 Node로 빔 피드백, 데이터 전송, 전송 재개 요청, 링크 복구 요청 등을 수행할 때 해당 Node가 UE Context에 대한 추가적인 요청 없이 해당 역할을 수행할 수 있다. 만약 사전에 UE Context의 일부 또는 전부를 받아와야 할 필요가 없다면, 단말(3610) 또는 Node(3620, 3630)가 필요할 때 Central Node(3640)에게 이 정보를 요청하여 받아올 수도 있다.
이후, 단말(3610)은 예를 들면 Node1(3620)과 데이터를 송수신할 수 있다.
도 43은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백 및 노드 피드백 예시이다.
도 43을 참고하면, 단말(3610)이 빔 피드백을 하는 과정과 Node(3620, 3630)가 Central Node(3640)에 단말의 빔 트레이닝 결과를 피드백하는 Node Feedback 과정이 예시되어 있다.
만약 Node(3620, 3630)에서 단말(3610)에게 하향링크 Beam Training Signal이 전송되고, Beam Feedback 조건이 만족될 경우, 4310 단계에서 단말(3610)은 Beam Feedback을 결정하게 된다. 이때, 단말(3610)은 4320 단계 및/또는 4325 단계에서 Beam Feedback을 여러 Node(3620, 3630)들 중 적어도 한 Node에게 전송할 수 있다. 만약 단말(3610)이 Node1(3620)과 데이터 송/수신을 하고 있다고 가정했을 때, 실시 예에 따라 단말(3610)은 Node1(3620)에게 Beam Feedback을 전송할 수 있다. 그러나, 필요에 따라 단말(3610)은 Node2(3630)에게 Beam Feedback을 전송할 수도 있다. 실시 예에 따라서, 4330 단계 및/또는 4335 단계에서 필요에 따라 Beam Feedback을 받은 Node(3620, 3630)가 다른 Node에게 수신한 Beam Feedback을 전송(전달)할 수도 있다.
Beam Feedback을 기반으로, Beam Feedback을 수신한 Node(3620, 3630)에서는 Beam Feedback의 수신이 성공적으로 되었다는 Beam Feedback Confirm 메시지를 4340 단계 및/또는 4335 단계에서 단말(3610)에게 전송할 수 있다. 이때, Beam Feedback으로부터 Beam Feedback Confirm까지 걸리는 시간이 사전에 설정될 수도 있다. 또는 실시 예에 따라, Beam Feedback을 보낸 시간으로부터 Beam Feedback Confirm을 받는데 걸리는 시간이 유동적일 수도 있으므로 Beam Feedback Confirm을 기다리는데 필요한 시간이 사전에 설정될 수도 있다. 상기 미리 설정된 시간 이내에 Beam Feedback Confirm 메시지를 수신하지 못한 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단할 수 있다. 실시 예에 따라, 단말(3610)이 미리 설정된 시간 이내에 Beam Feedback Confirm을 받지 못했을 경우, 단말(3610)은 Beam Feedback을 Node(3620, 3630)에게 재전송할 수도 있다. 실시 예에 따라, Beam Feedback이 특정 회수 이상 연속적 또는 비연속적으로 실패했을 경우 단말(3610)은 초기 접속 절차에 들어가거나 링크 복구 절차에 들어갈 수도 있다. 이때 Beam Feedback이 실패하는 특정 회수가 사전에 설정될 수도 있다. 또는 특정 회수 이상 Beam Feedback이 실패했을 때, 단말(3610)은 Beam 피드백 방법을 변경할 수도 있다. 예를 들어, Beam Feedback을 PUCCH 채널을 사용하여 보내다가 사전에 설정된 특정 회수 이상 연속적으로 Beam Feedback이 실패했음을 인지하면, 단말(3610)은 Random Access를 통하여 Beam Report를 하거나 LTE 망에서 Beam Feedback을 하는 방법이 있을 수 있다.
Beam Feedback 메시지에는 1) 단말 ID, 2) 빔 피드백 전송을 결정하게 된 조건, 3) 단말(3610)의 Best Beam ID, 단말(3610)의 임계 값 이상 빔의 수 및 상기 임계 값, Best Beam으로 수신한 신호 세기(예를 들면, RSRP, RSSI, RSRQ 등), 신호 품질(예를 들면, CQI, PMI, RI 등), n번째(n은 자연수) 신호 세기가 높은 Beam으로 수신한 신호 세기, 모든 빔의 신호 세기, 측정이 가능한 빔의 신호 세기, 4) Beam 피드백 데이터가 L1, L3 Filtering 등으로 가공된 값인지 Raw Data인지에 대한 정보, 중 적어도 하나가 포함될 수 있다.
이러한 Beam Feedback의 방법은 도 39의 Beam Feedback Configuration 정보에서 설정된 내용이 있다면 단말(3610)은 그에 따를 것이다.
만약 Beam Training 방법을 도 41의 상향링크 Beam Training Signal에 기반한다면, Beam Feedback Configuration이 Node(3620, 3630)가 빔 측정을 한 결과로 변경될 수도 있다. 이 때 Node(3620, 3630)에서 빔 측정을 하는 방법은 도 39에서 예시된 Central Node(3640)에서 Node(3620, 3630)로 보낸 Beam Feedback Configuration 메시지에 포함된 내용일 수도 있다.
단말(3610)로부터 Beam Feedback을 받거나, 다른 Node(3620, 3630)로부터 단말(3610)의 Beam Feedback을 받은 Node(3620, 3630)는 필요에 따라 Central Node(3640)에게 Beam Feedback의 정보의 전체 또는 일부를 보내야 할 수도 있다. 본 발명에서는 이것을 Node Feedback이라고 명명할 수 있다. 이를 위해, Node(3620, 3630) 중 적어도 하나는 4350 단계 및/또는 4355 단계에서 Node Feedback을 할지 여부를 결정할 수 있다. 이때, Node(3620, 3630)는 Node Feedback의 조건을 도 39의 Node Feedback Configuration 정보에 따라 적용하거나, Node Feedback Configuration 정보가 없을 경우 또는 예외 상황에서는 Node(3620, 3630)가 자체적으로 Node Feedback을 결정할 수 있다. 어떤 실시 예에서는 Node(3620, 3630)는 Beam Feedback을 받을 경우 항상 그 Beam Feedback의 전체 또는 일부 정보를 Central Node(3640)에게 보내야 할 수도 있다. Node Feedback의 결정과 Node Feedback은 빔 트레이닝을 상향 링크에 기반할지 하향 링크에 기반할지에 관계없이 Beam Feedback 또는 빔 측정 결과가 있을 경우 수행할 수 있다.
4360 단계 및/또는 4365 단계에서 Node(3620, 3630)가 Central Node(3640)에게 전송할 수 있다. 상기 Node Feedback 메시지에는 1) 단말 ID, 2) Node(3620, 3630)가 Node Feedback을 결정하게 된 조건 또는 단말(3610)이 Beam Feedback을 결정하게 된 조건, 3) 단말(3610)의 Best Beam ID, 단말(3610)의 임계 값 이상 빔의 수 및 상기 임계 값, Best Beam으로 수신한 신호 세기(예를 들면, RSRP, RSSI, RSRQ 등), 신호 품질(예를 들면, CQI, PMI, RI 등), n번째(n은 자연수) 신호 세기가 높은 Beam으로 수신한 신호 세기, 모든 빔의 신호 세기, 측정이 가능한 빔의 신호 세기, 4) Node Feedback의 데이터가 L1, L3 Filtering 등으로 가공된 값인지 Raw Data인지여부에 대한 정보, 5) Beam Feedback 또는 Node Feedback이 발생한 시점, 중 적어도 하나의 정보가 포함될 수 있다.
만약 단말(3610)이 전송한 Beam Feedback이 Node(3620, 3630)에서 Central Node(3640)에게 Node Feedback으로 전송되고, Central Node(3640)가 Beam Feedback에 대한 Confirm을 보내야 하는 상황일 경우, Beam Feedback Confirm은 Central Node(3640)가 단말(3610)에게 전송해야 할 수도 있다. 이 경우에는 Beam Feedback의 전송으로부터 Beam Feedback Confirm까지 단말(3610)이 Beam Feedback Confirm을 기다려야 하는 시간이 설정될 수 있다. 이 시간은 Node 내에서 Beam Feedback Confirm을 보내는데 걸리는 시간과는 다른(예를 들면, 통상적으로 조금 더 긴) 시간이 설정될 수 있다.
도 44는 본 발명의 일 실시 예에 따른 통신 시스템에서 데이터 송/수신 경로 전환 과정의 예시이다.
도 44를 참고하면, Central Node(3640)에서 데이터 전송 및 빔 트레이닝을 수행하는 Node를 변경하는 Node Change 절차와 그에 수반되는 절차들이 예시되어 있다.
도 44의 시작 시점에서, 단말(3610)은 Node1(3620)과 데이터 송/수신을 수행하고 있는 것을 가정한다(4410 단계). 그리고, 도 44에서는 Node2(3630)가 단말(3610)과 데이터 송/수신을 수행하는 것으로 변경되는 것을 가정하도록 한다. 하지만, 단말(3610)이 반드시 하나의 Node와 데이터의 송/수신을 수행할 필요는 없고 여러 Node들과 단말(3610)이 동시에 데이터 송/수신을 수행하는 경우에도 절차는 동일할 수 있다.
4415 단계에서 Central Node(3640)는 Beam Feedback 정보 또는 Node Feedback 정보 등에 의해 Data 경로를 새롭게 결정할 수 있다. Central Node(3640)가 Data 경로를 변경하는 것을 결정할 경우, 4420 단계 및 4425 단계에서 Central Node(3640)는 기존에 데이터 송/수신을 수행하던 Node1(3620)과 새롭게 데이터 송/수신을 수행해야 할 Node2(3630)에게 노드 변경 식별 정보(Node Change Indication)가 포함된 메시지를 전송할 수 있다. 이 메시지에는 1) 단말 ID, 2) 변경될 Node ID, 3) TX 또는 RX의 Status Report 요청 정, 4) 데이터 포워딩(Data Forwarding) 요청 정보, 중 적어도 하나 이상의 정보가 포함될 수 있다. 만약에 단말(3610)이 Node2(3630)에서 사용해야 할 빔에 대한 확정이 필요한 경우, Beam Feedback Confirm 메시지를 Central Node(3640)가 단말(3610)에게 전송할 수 있다. Beam Feedback Confirm 메시지는 단말(3610)이 접근 가능한 Node 중 하나를 통해서 전달될 수 있다.
Node의 변경으로 데이터 재전송 및 잔여 데이터 처리가 필요할 수 있기 때문에, 4440 단계에서 Node1(3620)은 하향 링크로 송신하던 TX buffer 및 하향 링크 데이터의 전송 상태(DL-TX status)를 Central Node(3640)에게 전송할 수 있다. LTE의 경우 RLC 소계층의 변수 값 또는 ACK을 받은 SN나 NACK을 받은 SN의 값이 될 수 있다. 또한, 4443 단계에서 Node1(3620)은 상향 링크로 수신하던 데이터의 수신 상태(UL-RX status)를 Central Node(3640)에게 전송할 수 있다. LTE의 경우 RLC Status PDU가 UL-RX Status Report가 될 수 있을 것이다. 그리고, Node1(3620)가 단말(3610)로부터 수신한 상향 링크 데이터의 경우, Node1(3620)가 성공적으로 수신한 데이터 상향 링크 패킷을 4445 단계에서 Central Node(3640)에게 전송할 수 있을 것이다(UL Data Forwarding). 그리고, 데이터 송/수신에 참여할 Node가 변경되었을 때 사용할 DL Monitoring Configuration 정보와 UE Context 정보는 도 42의 예시에서와 유사하게,4450 단계, 4453 단계, 4455 단계, 4460 단계, 4463 단계, 4465 단계에서 Central Node(3640)가 단말(3610)과 Node들(3620, 3630)에게 전송할 수 있다. 그리고, 단말(3610)과 Node들(3620, 3630)은 수신한 DL Monitoring Configuration 정보와 UE Context 정보에 따라 설정을 할 수 있을 것이다.
만약 Central Node(3640)나 Node(3620)가 하향 링크에서의 단말(3610)의 데이터 송/수신 상태 보고를 필요요 하는 경우, Central Node(3640)는 단말(3610)에게 4470 단계에서 상태 보고를 요청할 수 있다(예를 들면, 하향 링크 수신 상태 보고 요청(DL-RX Status Report Request) 메시지). 단말(3610)이 상기 DL-RX Status Report Request 메시지를 수신하거나 사전에 약속되어 있을 경우, 4475 단계에서 단말(3610)은 DL-RX Status Report를 Central Node(3640)에게 전송하여 현재까지 수신한 하향 링크 데이터와 미수신한 하향 링크 데이터에 대한 정보를 알려줄 수 있다. 필요할 경우, 4485 단계에서 Node1(3620)은 현재까지 ACK을 받지 못한 하향 링크 데이터를 Node2(3630)에게 포워딩 해 줄 수도 있다. 실시 예에 따라, 상기 하향 링크 데이터 포워딩(DL Data Forwarding)은 4480 단계 및 4483 단계에서 Central Node(3640)를 거쳐서 Node2(3630)에게 전송될 수도 있다. 만약 Node1(3620)과 Node2(3630) 간 Interface가 있을 경우 직접 송신할 수도 있다. 이후 4490 단계에서 Node2(3630)는 단말(3610)과 데이터 송/수신을 정상적으로 수행할 수 있다.
도 45 내지 도 48은 본 발명의 일 실시 예에 따른 통신 시스템에서 빔 피드백과 관련한 타이머 동작 과정 예시이다.
도 45 내지 도 48을 참고하면, 빔 피드백과 Node Feedback, 그리고 Beam Feedback Confirm이 동작하는 개별 실시 예를 나타낸 것으로, 도 43의 설명들이 실시 예에 따라 나타난 수 있는 변형들을 나타낸 것이다. 도 45 내지 도 48의 실시 예들에서는 단말(3610)이 Beam Feedback을 보내는 Node와 Beam Feedback Confirm 메시지를 받는 과정이 각각 다르다. 여기에서 단말(3610)이 Beam Feedback을 전송한 후, Beam Feedback Confirm 메시지를 받기까지 단말(3610)이 기다리는 시간을 Timer for Confirm으로 표시할 수 있다. 그리고, 이 Timer가 만료될 때까지 단말(3610)이 Beam Feedback Confirm 메시지를 수신하지 못하면 단말(3610)은 Beam Feedback을 다시 시도할 수 있다. 또는, Beam Feedback이 특정 회수 이상 연속적 또는 비연속적으로 실패했을 경우, 그 횟수가 미리 설정한 회수 이상(초과)인 경우, Beam Feedback 방법을 다르게 하거나 링크 복구(예를 들면, RLF) 절차에 들어가거나 초기 접속 절차에 들어갈 수도 있다.
각 실시 예에 대해서 구체적으로 살펴보도록 한다.
도 45를 참고하면, 단말(3610)은 4510 단계에서 빔 피드백을 결정하고, 4520 단계에서 단말(3610)이 현재 연결된 노드인 Node1(3620)에게 빔 피드백을 전송할 수 있다. 예를 들면, 상기 빔 피드백은 Node2(3630)의 빔 A가 최적의 빔이라는 정보가 포함될 수 있다. 그리고, 단말(3610)은 상기 빔 피드백을 전송한 후, 타이머(4525)를 구동할 수 있다. 이때, 타이머(4525)를 Timer for Confirm이라고 할 수 있다.
이 경우, 4530 단계에서 Node1(3620)은 Central Node(3640)에게 Node Feedback을 전송할 수 있다. 상기 Node Feedback은, Node2(3620)의 빔이 더 좋은 빔이라고 단말(3610)이 판단하여, 단말(3610)이 Node2(3620)와 통신을 할 것을 요청한다는 정보가 포함될 수 있다.
4540 단계에서 Central Node(3640)는 Node1(3620)에게 노드 변경 지시(Node change indication) 메시지를 전송할 수 있다. 이때, 상기 메시지에는 단말(3610)이 Node2(3640)와 통신을 하는 것을 승인하는 정보가 포함될 수 있다. 그리고, 4545 단계에서 Central Node(3640)는 단말(3610)이 통신 하기를 원하는 Node2(3630)에게도 노드 변경 지시 메시지를 전송할 수 있다.
Node1(3620)은 4550 단계에서 단말(3610)에게 Beam Feedback Confirm 메시지를 전송할 수 있다. 그리고, 상기 Beam Feedback Confirm 메시지는 단말(3610)이 Node2(3640)와 통신을 하는 것이 승인되었음을 지시하는 정보가 포함될 수 있다. 이때, 상기 Beam Feedback Confirm 메시지가 타이머(4525)의 만료 전에 단말(3610)에 수신된 경우, 단말(3610)은 빔 피드백이 성공한 것으로 판단할 수 있다. 반면, 상기 Beam Feedback Confirm 메시지가 타이머(4525)의 만료되기 전까지 단말(3610)에 수신되지 않은 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단하고, 그에 따른 동작을 수행할 수 있다.
도 46을 참고하면, 단말(3610)은 4610 단계에서 빔 피드백을 결정하고, 4620 단계에서 단말(3610)이 현재 연결된 노드인 Node1(3620)에게 빔 피드백을 전송할 수 있다. 예를 들면, 상기 빔 피드백은 Node2(3630)의 빔 A가 최적의 빔이라는 정보가 포함될 수 있다. 그리고, 단말(3610)은 상기 빔 피드백을 전송한 후, 타이머(4625)를 구동할 수 있다. 이때, 타이머(4625)를 Timer for Confirm이라고 할 수 있다.
이 경우, 4630 단계에서 Node1(3620)은 Central Node(3640)에게 Node Feedback을 전송할 수 있다. 상기 Node Feedback은, Node2(3620)의 빔이 더 좋은 빔이라고 단말(3610)이 판단하여, 단말(3610)이 Node2(3620)와 통신을 할 것을 요청한다는 정보가 포함될 수 있다.
4640 단계에서 Central Node(3640)는 Node1(3620)에게 노드 변경 지시(Node change indication) 메시지를 전송할 수 있다. 이때, 상기 메시지에는 단말(3610)이 Node2(3640)와 통신을 하는 것을 승인하는 정보가 포함될 수 있다. 그리고, 4645 단계에서 Central Node(3640)는 단말(3610)이 통신 하기를 원하는 Node2(3630)에게도 노드 변경 지시 메시지를 전송할 수 있다.
Node2(3630)은 4650 단계에서 단말(3610)에게 Beam Feedback Confirm 메시지를 전송할 수 있다. 그리고, 상기 Beam Feedback Confirm 메시지는 단말(3610)이 Node2(3640)와 통신을 하는 것이 승인되었음을 지시하는 정보가 포함될 수 있다. 이때, 상기 Beam Feedback Confirm 메시지가 타이머(4625)의 만료 전에 단말(3610)에 수신된 경우, 단말(3610)은 빔 피드백이 성공한 것으로 판단할 수 있다. 반면, 상기 Beam Feedback Confirm 메시지가 타이머(4625)의 만료되기 전까지 단말(3610)에 수신되지 않은 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단하고, 그에 따른 동작을 수행할 수 있다.
도 47를 참고하면, 단말(3610)은 4710 단계에서 빔 피드백을 결정할 수 있다. 예를 들면, 단말(3610)은 Node2(3630)의 빔 A가 최적의 빔이라고 판단하고, 그에 대한 정보를 피드백할 것을 결정할 수 있다. 4720 단계에서 단말(3610)은 현재 연결된 Node1(3620)이 아닌, 최적의 빔이 포함된 것으로 판단된 Node2(3630)에게 빔 피드백을 전송할 수 있다. 예를 들면, 상기 빔 피드백은 Node2(3630)의 빔 A가 최적의 빔이라는 정보가 포함될 수 있다. 그리고, 단말(3610)은 상기 빔 피드백을 전송한 후, 타이머(4725)를 구동할 수 있다. 이때, 타이머(4725)를 Timer for Confirm이라고 할 수 있다.
이 경우, 4730 단계에서 Node2(3630)은 Central Node(3640)에게 Node Feedback을 전송할 수 있다. 상기 Node Feedback은, Node2(3620)의 빔이 더 좋은 빔이라고 단말(3610)이 판단하여, 단말(3610)이 Node2(3620)와 통신을 할 것을 요청한다는 정보가 포함될 수 있다.
4740 단계에서 Central Node(3640)는 Node1(3620)에게 노드 변경 지시(Node change indication) 메시지를 전송할 수 있다. 이때, 상기 메시지에는 단말(3610)이 Node2(3640)와 통신을 하는 것을 승인하는 정보가 포함될 수 있다. 그리고, 4745 단계에서 Central Node(3640)는 단말(3610)이 통신 하기를 원하는 Node2(3630)에게도 노드 변경 지시 메시지를 전송할 수 있다.
Node2(3630)은 4750 단계에서 단말(3610)에게 Beam Feedback Confirm 메시지를 전송할 수 있다. 그리고, 상기 Beam Feedback Confirm 메시지는 단말(3610)이 Node2(3640)와 통신을 하는 것이 승인되었음을 지시하는 정보가 포함될 수 있다. 이때, 상기 Beam Feedback Confirm 메시지가 타이머(4725)의 만료 전에 단말(3610)에 수신된 경우, 단말(3610)은 빔 피드백이 성공한 것으로 판단할 수 있다. 반면, 상기 Beam Feedback Confirm 메시지가 타이머(4725)의 만료되기 전까지 단말(3610)에 수신되지 않은 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단하고, 그에 따른 동작을 수행할 수 있다.
도 48을 참고하면, 단말(3610)은 4810 단계에서 빔 피드백을 결정할 수 있다. 예를 들면, 단말(3610)은 Node2(3630)의 빔 A가 최적의 빔이라고 판단하고, 그에 대한 정보를 피드백할 것을 결정할 수 있다. 4820 단계에서 단말(3610)은 단말(3610)이 현재 연결된 노드인 Node1(3620)에게 빔 피드백을 전송할 수 있다. 예를 들면, 상기 빔 피드백은 Node2(3630)의 빔 A가 최적의 빔이라는 정보가 포함될 수 있다. 그리고, 단말(3610)은 상기 빔 피드백을 전송한 후, 제1 타이머(4825)를 구동할 수 있다. 이때, 제1 타이머(4825)를 Timer for Confirm이라고 할 수 있다.
그리고, 4830 단계에서 단말(3610)은 Node1(3620)로부터 Beam Feedback Confirm 메시지를 수신할 수 있다. 상기 Beam Feedback Confirm 메시지는 단말(3610)이 Node2(3640)와 통신을 하는 것이 승인되었음을 지시하는 정보가 포함될 수 있다. 상기 4830 단계에서 단말(3610)은 Beam Feedback Confirm 메시지를 실제 옮겨 갈 Node인 Node2(3630)에서 받는 것이 아니라, Node1(3620)으로부터 수신한 것이다. 이 경우 실제 옮겨 갈 Node2(3630)에서 Beam이 준비될 때까지 걸리는 시간이 필요할 수 있다. 따라서, 단말(3610)은 Node1(3620)으로부터 Beam Feedback Confirm 메시지를 수신한 경우, 제2 타이머(4835)를 구동할 수 있다. 이때 사용하는 제2 타이머(4835)를 Timer for Indication이라고 할 수 있다. 상기 제2 타이머(4835)가 만료된 후에 단말(3610)은 Node2(3630)와 빔 관련 동작 과정을 수행할 수 있을 것이다. 실시 예에 따라, Node2(3630)는 4860 단계에서 지시 정보(Indication)가 포함된 메시지를 단말(3610)에게 전송하여 빔 관련 동작의 시작을 알려줄 수도 있고, 이 메시지는 생략될 수도 있다.
한편, 4840 단계에서 Node1(3620)은 Central Node(3640)에게 Node Feedback을 전송할 수 있다. 상기 Node Feedback은, Node2(3620)의 빔이 더 좋은 빔이라고 단말(3610)이 판단하여, 단말이 Node2(3620)와 통신을 할 것을 요청한다는 정보가 포함될 수 있다.
4850 단계에서 Central Node(3640)는 Node1(3620)에게 노드 변경 지시(Node change indication) 메시지를 전송할 수 있다. 이때, 상기 메시지에는 단말(3610)이 Node2(3640)와 통신을 하는 것을 승인하는 정보가 포함될 수 있다.
그리고, 4855 단계에서 Central Node(3640)는 단말(3610)이 통신 하기를 원하는 Node2(3630)에게도 노드 변경 지시 메시지를 전송할 수 있다. 상기 Node2(3630)가 노드 변경 지시 메시지를 수신한 이후에, Node2(3630)는 빔 관련 동작 과정을 수행할 수 있는 상태가 될 수 있다.
한편, 상기 Beam Feedback Confirm 메시지가 제1 타이머(4825)의 만료 전에 단말(3610)에 수신된 경우, 단말(3610)은 빔 피드백이 성공한 것으로 판단할 수 있다. 반면, 상기 Beam Feedback Confirm 메시지가 제1 타이머(4825)의 만료되기 전까지 단말(3610)에 수신되지 않은 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단하고, 그에 따른 동작을 수행할 수 있다.
상술한 것과 같이, 단말(3610)은 제2 타이머(4835)가 만료된 후에 단말(3610)은 Node2(3630)와 빔 관련 동작 과정을 수행할 수 있다. 또는, 실시 예에 따라 제2 타이머(4835)가 만료되기 전까지, Node2(3630)로부터 지시 정보(Indication)가 포함된 메시지가 수신되지 않은 경우, 단말(3610)은 빔 피드백이 실패한 것으로 판단하고, 그에 따른 동작을 수행할 수 있다.
도 49은 본 발명의 일 실시 예에 따른 기지국의 블록 구성도를 도시한 도면이다.
도 49를 참고하면, 본 발명의 일 실시 예에 따른 기지국은 송수신부(4910) 및 기지국의 전반적인 동작을 제어하는 제어부(4920)를 포함할 수 있다. 그리고, 상기 송수신부(4910)는 송신부(4913) 및 수신부(4915)를 포함할 수 있다. 또한, 기지국은 저장부(4930)를 더 포함할 수 있다.
상기 기지국의 제어부(4920)는 상술한 실시 예들 중 어느 하나의 동작을 수행하도록 기지국을 제어한다. 예를 들면, 기지국의 제어부(4920)는, 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 단말에게 전송하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 단말에게 전송하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 단말에게 전송하도록 제어할 수 있다. 또한, 기지국의 제어부(4920)는, 상기 단말로부터 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 수신하고, 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 상기 페이징 신호를 상기 단말에게 전송할지 여부를 결정하고, 상기 단말에게 상기 페이징 신호를 전송할 수 있다. 또한, 기지국의 제어부(4920)는, 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 결정하기 위한 정보를, 상기 단말 및 상기 단말의 페이징 신호를 제어하는 엔터티 중 적어도 하나로부터 수신하고, 상기 기지국이 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 경우, 상기 단말에게 상기 페이징 신호를 전송할 수 있다.
또한, 기지국의 송수신부(4910)는 상술한 실시 예들 중 어느 하나의 동작에 따라 신호를 송수신할 수 있다.
한편, 상기 제어부(4920) 및 송수신부(4910)는 반드시 별도의 모듈들로 구현되어야 하는 것은 아니고, 단일 칩과 같은 형태로 하나의 구성부로 구현될 수 있음은 물론이다. 그리고, 상기 제어부(4920) 및 송수신부(4910)는 전기적으로 연결될 수 있다.
그리고, 예를 들면 제어부(4920)는 회로(circuit), 어플리케이션 특정(application-specific) 회로, 또는 적어도 하나의 프로세서(processor)일 수 있다. 또한, 기지국의 동작들은 해당 프로그램 코드를 저장한 메모리 장치(저장부, 4930)를 기지국 내의 임의의 구성부에 구비함으로써 실현될 수 있다. 즉, 제어부(4920)는 메모리 장치 내에 저장된 프로그램 코드를 프로세서 혹은 CPU(central processing unit) 등에 의해 읽어내어 실행함으로써 앞서 설명한 동작들을 실행할 수 있다.
도 50은 본 발명의 일 실시 예에 따른 단말의 블록 구성도를 도시한 도면이다.
도 50을 참고하면, 본 발명의 일 실시 예에 따른 단말은 송수신부(5010) 및 단말의 전반적인 동작을 제어하는 제어부(5020)를 포함할 수 있다. 그리고, 상기 송수신부(5010)는 송신부(5013) 및 수신부(5015)를 포함할 수 있다.
상기 단말의 제어부(5020)는 상술한 실시 예들 중 어느 하나의 동작을 수행하도록 단말을 제어한다. 예를 들면, 단말의 제어부(5020)는 제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 기지국으로부터 수신하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 기지국으로부터 수신하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 기지국으로부터 수신하도록 제어할 수 있다. 또한, 단말의 제어부(5020)는 상기 기지국에게 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 전송하고, 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 전송된 상기 페이징 신호를 상기 기지국으로부터 수신할 수 있다. 또한, 단말의 제어부(5020)는 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 확인하고, 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 기지국으로부터 상기 페이징 신호를 수신할 수 있다.
또한, 단말의 송수신부(5010)는 상술한 실시 예들 중 어느 하나의 동작에 따라 신호를 송수신할 수 있다.
한편, 상기 제어부(5020) 및 송수신부(5010)는 반드시 별도의 모듈들로 구현되어야 하는 것은 아니고, 단일 칩과 같은 형태로 하나의 구성부로 구현될 수 있음은 물론이다. 그리고, 상기 제어부(5020) 및 송수신부(5010)는 전기적으로 연결될 수 있다.
그리고, 예를 들면 제어부(5020)는 회로(circuit), 어플리케이션 특정(application-specific) 회로, 또는 적어도 하나의 프로세서(processor)일 수 있다. 또한, 단말의 동작들은 해당 프로그램 코드를 저장한 메모리 장치(저장부, 5030)를 단말 내의 임의의 구성부에 구비함으로써 실현될 수 있다. 즉, 제어부(5020)는 메모리 장치 내에 저장된 프로그램 코드를 프로세서 혹은 CPU(central processing unit) 등에 의해 읽어내어 실행함으로써 앞서 설명한 동작들을 실행할 수 있다.
본 명세서와 도면에 개시된 실시 예는 기술 내용을 쉽게 설명하고, 이해를 돕기 위해 특정 예를 제시한 것일 뿐이며, 본 발명의 범위를 한정하고자 하는 것은 아니다. 여기에 개시된 실시 예들 이외에도 본 발명의 기술적 사상에 바탕을 둔 다른 변형 예들이 실시 가능하다는 것은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 자명한 것이다.
한편, 본 명세서와 도면에는 본 발명의 바람직한 실시 예에 대하여 개시하였으며, 비록 특정 용어들이 사용되었으나, 이는 단지 본 발명의 기술 내용을 쉽게 설명하고 발명의 이해를 돕기 위한 일반적인 의미에서 사용된 것이지, 본 발명의 범위를 한정하고자 하는 것은 아니다. 여기에 개시된 실시 예 외에도 본 발명의 기술적 사상에 바탕을 둔 다른 변형 예들이 실시 가능하다는 것은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 자명한 것이다.
한편, 본 명세서와 도면에 개시된 본 발명의 실시 예들은 본 발명의 기술 내용을 쉽게 설명하고 본 발명의 이해를 돕기 위해 특정 예를 제시한 것일 뿐이며, 본 발명의 범위를 한정하고자 하는 것은 아니다. 즉 본 발명의 기술적 사상에 바탕을 둔 다른 변형 예들이 실시 가능하다는 것은 본 발명의 속하는 기술 분야에서 통상의 지식을 가진 자에게 자명한 것이다. 또한 상기 각각의 실시 예는 필요에 따라 서로 조합되어 운용할 수 있다. 예컨대, 본 발명의 실시 예들의 일부분들이 서로 조합되어 기지국과 단말이 운용될 수 있다.

Claims (15)

  1. 단말의 통신 방법에 있어서,
    제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 기지국으로부터 수신하는 단계;
    상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 기지국으로부터 수신하는 단계; 및
    상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 기지국으로부터 수신하는 단계;
    를 포함하는 단말의 통신 방법.
  2. 제1 항에 있어서, 상기 페이징 신호를 수신하는 단계는,
    상기 기지국에게 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 전송하는 단계; 및
    상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 전송된 상기 페이징 신호를 상기 기지국으로부터 수신하는 단계;
    를 포함하는 것을 특징으로 하는 단말의 통신 방법.
  3. 제1 항에 있어서,
    상기 제2 방송 신호는, 상기 단말이 속한 페이징 영역에 대한 페이징 신호가 전송되는지 여부에 대한 정보를 포함하고,
    상기 페이징 신호를 수신하는 단계는,
    상기 단말이 속한 페이징 영역에서 페이징 신호가 전송되는 경우, 상기 기지국으로부터 페이징 신호를 페이징 신호를 수신하는 것을 특징으로 하는 단말의 통신 방법.
  4. 제1 항에 있어서,
    상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 확인하는 단계; 및
    상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 기지국으로부터 상기 페이징 신호를 수신하는 단계;
    를 더 포함하는 것을 특징으로 하는 단말의 통신 방법.
  5. 기지국의 통신 방법에 있어서,
    제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 단말에게 전송하는 단계;
    상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 단말에게 전송하는 단계; 및
    상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 단말에게 전송하는 단계;
    를 포함하는 기지국의 통신 방법.
  6. 제5 항에 있어서, 상기 페이징 신호를 전송하는 단계는,
    상기 단말로부터 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 수신하는 단계; 및
    상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 상기 페이징 신호를 상기 단말에게 전송할지 여부를 결정하고, 상기 단말에게 상기 페이징 신호를 전송하는 단계;
    를 포함하는 것을 특징으로 하는 기지국의 통신 방법.
  7. 제5 항에 있어서, 상기 페이징 신호를 전송하는 단계는,
    상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 결정하기 위한 정보를, 상기 단말 및 상기 단말의 페이징 신호를 제어하는 엔터티 중 적어도 하나로부터 수신하는 단계; 및
    상기 기지국이 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 경우, 상기 단말에게 상기 페이징 신호를 전송하는 단계;
    를 포함하는 것을 특징으로 하는 기지국의 통신 방법.
  8. 단말에 있어서,
    신호를 송수신하는 송수신부; 및
    제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 기지국으로부터 수신하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 기지국으로부터 수신하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 기지국으로부터 수신하는 제어부;
    를 포함하는 단말.
  9. 제8 항에 있어서, 상기 제어부는,
    상기 기지국에게 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 전송하고, 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 전송된 상기 페이징 신호를 상기 기지국으로부터 수신하는 것을 특징으로 하는 단말.
  10. 제8 항에 있어서,
    상기 제2 방송 신호는, 상기 단말이 속한 페이징 영역에 대한 페이징 신호가 전송되는지 여부에 대한 정보를 포함하고,
    상기 제어부는,
    상기 단말이 속한 페이징 영역에서 페이징 신호가 전송되는 경우, 상기 기지국으로부터 페이징 신호를 페이징 신호를 수신하는 것을 특징으로 하는 단말.
  11. 제8 항에 있어서, 상기 제어부는,
    상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 확인하고, 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 기지국으로부터 상기 페이징 신호를 수신하는 것을 특징으로 하는 단말.
  12. 기지국에 있어서,
    신호를 송수신하는 송수신부; 및
    제2 방송 신호의 전송 정보를 포함하는 제1 방송 신호를 단말에게 전송하고, 상기 제2 방송 신호의 전송 정보에 따라, 페이징 신호의 전송 정보를 포함하는 제2 방송 신호를 상기 단말에게 전송하고, 상기 페이징 신호의 전송 정보에 따라, 페이징 신호를 상기 단말에게 전송하는 제어부;
    를 포함하는 기지국.
  13. 제12 항에 있어서, 상기 제어부는,
    상기 단말로부터 상기 단말의 식별 정보 또는 페이징 식별 정보 중 적어도 하나가 포함된 메시지를 수신하고, 상기 단말의 식별 정보 또는 상기 페이징 식별 정보 중 적어도 하나에 따라 상기 페이징 신호를 상기 단말에게 전송할지 여부를 결정하고, 상기 단말에게 상기 페이징 신호를 전송하는 것을 특징으로 하는 기지국.
  14. 제12 항에 있어서, 상기 제어부는,
    상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT(radio access technology)를 결정하기 위한 정보를, 상기 단말 및 상기 단말의 페이징 신호를 제어하는 엔터티 중 적어도 하나로부터 수신하고, 상기 기지국이 상기 단말이 상기 페이징 신호를 수신하기를 원하는 RAT에 포함되는 경우, 상기 단말에게 상기 페이징 신호를 전송하는 것을 특징으로 하는 기지국.
  15. 제12 항에 있어서,
    상기 제2 방송 신호는, 상기 단말이 속한 페이징 영역에 대한 페이징 신호가 전송되는지 여부에 대한 정보를 포함하는 것을 특징으로 하는 기지국.
PCT/KR2017/011088 2016-09-29 2017-09-29 4g와 5g 공존 시스템에서 통신 방법 및 그 장치 WO2018062977A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/338,391 US10856254B2 (en) 2016-09-29 2017-09-29 Method for communication in system in which 4G and 5G coexist, and device therefor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2016-0125919 2016-09-29
KR1020160125919A KR102462764B1 (ko) 2016-09-29 2016-09-29 4g와 5g 공존 시스템에서 통신 방법 및 그 장치

Publications (1)

Publication Number Publication Date
WO2018062977A1 true WO2018062977A1 (ko) 2018-04-05

Family

ID=61762913

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2017/011088 WO2018062977A1 (ko) 2016-09-29 2017-09-29 4g와 5g 공존 시스템에서 통신 방법 및 그 장치

Country Status (3)

Country Link
US (1) US10856254B2 (ko)
KR (1) KR102462764B1 (ko)
WO (1) WO2018062977A1 (ko)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11147041B2 (en) 2019-02-27 2021-10-12 At&T Intellectual Property I, L.P. Device contexts, operational modes, and policy driven enhancements for paging in advanced networks
CN114302505A (zh) * 2021-12-30 2022-04-08 中国联合网络通信集团有限公司 会话连接方法及网络功能实体
CN114651397A (zh) * 2019-12-06 2022-06-21 高通股份有限公司 被协调波束细化和被协调波束故障恢复
US11930412B2 (en) 2019-02-18 2024-03-12 Sony Group Corporation System and method for communicating radio access technology characteristics

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018138381A1 (en) 2017-01-30 2018-08-02 Telefonaktiebolaget Lm Ericsson (Publ) Wireless communications
EP3689055B1 (en) * 2017-09-28 2022-01-19 Telefonaktiebolaget LM Ericsson (PUBL) Configuration of paging transmissions for wideband and narrowband ues in nr
JP2021016011A (ja) * 2017-10-10 2021-02-12 株式会社Nttドコモ 基地局、及び通信制御装置
CN109803371B (zh) * 2017-11-17 2023-06-09 华为技术有限公司 一种通信处理方法和装置
CN110034798A (zh) 2018-01-11 2019-07-19 索尼公司 电子设备、无线通信方法和计算机可读存储介质
WO2019157624A1 (en) * 2018-02-13 2019-08-22 Zte Corporation System and method for performing communications in a multi-rat network
CN110389531B (zh) * 2018-04-16 2022-05-27 洪宜邦 受控装置的管控方法与系统
CN110581725B (zh) * 2018-06-08 2023-08-22 华为技术有限公司 用于波束训练的方法和通信装置
CN110740452A (zh) * 2018-07-20 2020-01-31 中兴通讯股份有限公司 发现干扰的方法、装置、接收设备、发射设备及存储介质
AU2019325356B2 (en) * 2018-08-23 2021-10-21 Google Llc Managing inter-radio access technology capabilities of a user equipment
KR102084969B1 (ko) 2018-10-10 2020-03-05 주식회사 엘지유플러스 통신 셀 연동 처리를 수행하는 통신 서비스 장치 및 그 제어방법
US10912005B2 (en) * 2019-05-31 2021-02-02 Mediatek Inc. Apparatuses and methods for fast recovery to a certain radio access technology (RAT)
CN114339725A (zh) * 2019-06-04 2022-04-12 华为技术有限公司 射频能力配置方法及装置
KR102222567B1 (ko) * 2019-07-24 2021-03-04 에스케이텔레콤 주식회사 이동성관리장치 및 이동성관리장치의 접속 관리 방법
CN110945927B (zh) * 2019-11-15 2022-06-03 北京小米移动软件有限公司 寻呼信令发送方法、寻呼方法、信息发送方法及装置
KR102332270B1 (ko) 2019-11-28 2021-11-30 주식회사 엘지유플러스 복수의 통신 방식을 지원하는 통신 단말기 및 그 제어방법
US11496966B2 (en) * 2020-02-11 2022-11-08 Qualcomm Incorporated Power control for shared feedback
CN114830714A (zh) * 2020-02-12 2022-07-29 苹果公司 在新空口(nr)中进行搜索器数量交换来进行小区检测和测量的机制
WO2021193106A1 (ja) * 2020-03-27 2021-09-30 シャープ株式会社 端末、通信システム、および制御方法
US20220191775A1 (en) * 2020-12-10 2022-06-16 Mediatek Inc. Cell search based on spatial-temporal statistical information
US11799710B2 (en) * 2020-12-10 2023-10-24 Qualcomm Incorporated Techniques for signaling a source of dominant noise at a user equipment
WO2023001353A1 (en) * 2021-07-19 2023-01-26 Nokia Technologies Oy Ue persistent information storage across cm state transitions
US11621752B1 (en) * 2022-03-28 2023-04-04 Qualcomm Incorporated Transmit power violation protection mechanism in a radio unit of a disaggregated base station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120082037A1 (en) * 2007-01-31 2012-04-05 Interdigital Technology Corporation Method and apparatus for paging group handling
US20130136072A1 (en) * 2010-03-26 2013-05-30 Panasonic Corporation Group-based paging for machine-type-communication (mtc) devices
WO2015034195A1 (ko) * 2013-09-04 2015-03-12 엘지전자 주식회사 멀티 rat 환경에서 위치 갱신 (location area update) 방법 및 페이징을 송수신하는 방법
WO2016003174A1 (ko) * 2014-07-01 2016-01-07 엘지전자(주) 무선 통신 시스템에서 그룹 메시징 송수신 방법 및 이를 위한 장치
WO2016036103A1 (ko) * 2014-09-01 2016-03-10 엘지전자 주식회사 반송파 집성을 지원하는 무선 통신 시스템에서 신호 송수신 방법 및 이를 위한 장치

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010002229A2 (en) 2008-07-04 2010-01-07 Lg Electronics Inc. Method for transmitting information for inter-radio access technology handover
US8509821B1 (en) * 2009-09-11 2013-08-13 Sprint Spectrum L.P. Method for increasing the number of concurrent page records sent to mobile stations
CN107071705B (zh) 2012-05-23 2021-02-23 华为技术有限公司 寻呼窄带终端的方法、网络设备、基站及系统
KR101640681B1 (ko) 2014-01-16 2016-07-19 주식회사 케이티 듀얼 커넥티비티에서 기지국 변경 방법 및 그 장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120082037A1 (en) * 2007-01-31 2012-04-05 Interdigital Technology Corporation Method and apparatus for paging group handling
US20130136072A1 (en) * 2010-03-26 2013-05-30 Panasonic Corporation Group-based paging for machine-type-communication (mtc) devices
WO2015034195A1 (ko) * 2013-09-04 2015-03-12 엘지전자 주식회사 멀티 rat 환경에서 위치 갱신 (location area update) 방법 및 페이징을 송수신하는 방법
WO2016003174A1 (ko) * 2014-07-01 2016-01-07 엘지전자(주) 무선 통신 시스템에서 그룹 메시징 송수신 방법 및 이를 위한 장치
WO2016036103A1 (ko) * 2014-09-01 2016-03-10 엘지전자 주식회사 반송파 집성을 지원하는 무선 통신 시스템에서 신호 송수신 방법 및 이를 위한 장치

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11930412B2 (en) 2019-02-18 2024-03-12 Sony Group Corporation System and method for communicating radio access technology characteristics
US11147041B2 (en) 2019-02-27 2021-10-12 At&T Intellectual Property I, L.P. Device contexts, operational modes, and policy driven enhancements for paging in advanced networks
US11611951B2 (en) 2019-02-27 2023-03-21 At&T Intellectual Property I, L.P. Device contexts, operational modes, and policy driven enhancements for paging in advanced networks
US11997647B2 (en) 2019-02-27 2024-05-28 At&T Intellectual Property I, L.P. Device contexts, operational modes, and policy driven enhancements for paging in advanced networks
CN114651397A (zh) * 2019-12-06 2022-06-21 高通股份有限公司 被协调波束细化和被协调波束故障恢复
CN114651397B (zh) * 2019-12-06 2024-02-13 高通股份有限公司 被协调波束细化和被协调波束故障恢复
CN114302505A (zh) * 2021-12-30 2022-04-08 中国联合网络通信集团有限公司 会话连接方法及网络功能实体

Also Published As

Publication number Publication date
KR20180035607A (ko) 2018-04-06
US20200029297A1 (en) 2020-01-23
KR102462764B1 (ko) 2022-11-03
US10856254B2 (en) 2020-12-01

Similar Documents

Publication Publication Date Title
WO2018062977A1 (ko) 4g와 5g 공존 시스템에서 통신 방법 및 그 장치
WO2018174642A1 (ko) 무선 통신 시스템에서 무선 경로 변경 방법 및 장치
WO2018174676A1 (ko) 제 1 무선접속기술과 제 2 무선접속기술을 통해 데이터를 송수신하는 단말이 측정 결과를 보고하는 방법 및 장치
WO2018084599A1 (en) Method and apparatus for supporting vehicle to everything service
WO2018128442A1 (en) Method, apparatus, and system for terminal identification and paging signal transmission for terminal in power saving state
WO2018056785A1 (en) Method and apparatus for communication in next-generation mobile communication system
EP3479647A1 (en) Method for establishing a fronthaul interface, method for performing access for a ue, method and apparatus for performing a handover for a ue, data forwarding method, user equipment and base station
WO2021091224A1 (en) Method and apparatus for performing handover in wireless communication system
WO2018117313A1 (ko) 무선 통신 시스템에서 단말의 무선 링크 및 무선 연결을 제어하기 위한 방법 및 이를 지원하는 장치
WO2018216871A1 (en) Method and apparatus for transmitting and receiving a wake-up signal in a wireless communication system
EP3656178A1 (en) Dual-connectivity establishment method and device
WO2018203739A1 (en) Method for establishing a fronthaul interface, method for performing access for a ue, method and apparatus for performing a handover for a ue, data forwarding method, user equipment and base station
WO2020060178A1 (en) Method and apparatus for reporting selected plmn of rrc-inactive mode ue in next-generation communication system
WO2022015057A1 (en) Method and apparatus for handling response timer and cell reselection for small data transmission
WO2020184954A1 (ko) 통신 시스템에서 단말의 접속 제어 방법
WO2021049841A1 (ko) 비-3gpp 상의 ims 음성 세션을 3gpp 액세스로 이동시키기 위한 방안
WO2020145682A1 (en) Method and apparatus for performing communication in wireless communication system
WO2018164499A1 (ko) 버퍼 상태 리포트 전송 방법 및 그 장치
WO2021075822A1 (ko) 다중 연결을 지원하는 이동통신 시스템에서 단말의 발열 관련 정보를 제공하는 방법 및 장치
EP3878212A1 (en) Method and apparatus for performing handover in wireless communication system
WO2020130754A1 (en) Method and apparatus of handling multiple active bwps
WO2021145591A1 (en) Apparatus and method of random access procedure
EP3549375A1 (en) Method, apparatus, and system for terminal identification and paging signal transmission for terminal in power saving state
WO2020060289A1 (ko) 무선 통신 시스템에서 통신을 수행하는 방법 및 장치
WO2018231035A1 (en) Method and device for switching a serving cell and method and device supporting on-demand system information message

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17856863

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17856863

Country of ref document: EP

Kind code of ref document: A1