WO2018024039A1 - 风力发电机组塔底冷却装置及控制方法 - Google Patents

风力发电机组塔底冷却装置及控制方法 Download PDF

Info

Publication number
WO2018024039A1
WO2018024039A1 PCT/CN2017/088234 CN2017088234W WO2018024039A1 WO 2018024039 A1 WO2018024039 A1 WO 2018024039A1 CN 2017088234 W CN2017088234 W CN 2017088234W WO 2018024039 A1 WO2018024039 A1 WO 2018024039A1
Authority
WO
WIPO (PCT)
Prior art keywords
air
tower
cooling device
air inlet
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2017/088234
Other languages
English (en)
French (fr)
Inventor
吴立洲
潘大志
许名扬
李晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Goldwind Science and Technology Co Ltd
Original Assignee
Jiangsu Goldwind Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Goldwind Science and Technology Co Ltd filed Critical Jiangsu Goldwind Science and Technology Co Ltd
Priority to ES17836222T priority Critical patent/ES2797323T3/es
Priority to EP17836222.4A priority patent/EP3339641B1/en
Priority to KR1020187009958A priority patent/KR102057794B1/ko
Priority to US15/761,956 priority patent/US10711768B2/en
Priority to AU2017307124A priority patent/AU2017307124B2/en
Publication of WO2018024039A1 publication Critical patent/WO2018024039A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03D—WIND MOTORS
    • F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • F03D80/60—Cooling or heating of wind motors
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03D—WIND MOTORS
    • F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02K—DYNAMO-ELECTRIC MACHINES
    • H02K9/00—Arrangements for cooling or ventilating
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00—Components
    • F05B2240/90—Mounting on supporting structures or systems
    • F05B2240/91—Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2260/00—Function
    • F05B2260/20—Heat transfer, e.g. cooling
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2260/00—Function
    • F05B2260/60—Fluid transfer
    • F05B2260/64—Aeration, ventilation, dehumidification or moisture removal of closed spaces
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/72—Wind turbines with rotation axis in wind direction
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/728—Onshore wind turbines

Definitions

  • the invention relates to the technical field of wind power, in particular to a cooling device and a control method for a bottom of a wind turbine tower.
  • the unit gradually becomes larger, and the power of the single machine will increase the heat generation of each sub-component, and the number of components that need active heat dissipation will increase.
  • the invention patent application with the publication number CN105179180A discloses "a high-power offshore wind turbine tower bottom cooling system", which integrates a converter radiator and a box-changing radiator to share a set of radiators.
  • the system is placed outside the tower, and a closed loop air system is installed in the three floors of the tower to place the electric control cabinet to control the temperature and humidity in the lower three-layer space of the tower.
  • this technical solution will externally install the radiator, which requires more time for hoisting and requires more space. Especially for the offshore unit, it will occupy more space on the external platform and increase the construction of the external external platform. Cost; Moreover, if the radiator is externally installed, it is necessary to open a large number of holes in the tower for the water inlet and outlet pipes of the water-cooled radiator and the cable for supplying power to the water-cooling fan. In addition, this technical solution can only control the temperature and humidity in the three confined spaces under the tower, and cannot adjust the temperature and humidity of other spaces in the tower.
  • the tower bottom cooling device is built in the tower to improve the integration of the heat dissipation system.
  • the construction cost of the foundation external platform and the time required for offshore lifting can be reduced, and the tower is used for the inlet and outlet pipes and cables. The number of openings required to wear out and the sealing problems that follow.
  • Another object of the present invention is to provide a control method for the above-described wind turbine bottom cooling device.
  • the present invention provides a wind turbine bottom cooling device including a tower and a radiator for cooling a heat generating component provided at a bottom of the tower; a duct, the radiator is built in the main duct; a first fan is disposed in the main duct, and the radiator is driven by the first fan to drive air flow in the main duct;
  • the main air duct and the outer environment of the tower form an open cycle.
  • the tower is provided with an air inlet and an air outlet
  • the radiator is bounded by the radiator, the passage of the air inlet to the radiator forms an air inlet section, and the passage of the radiator to the air outlet forms In the air outlet section, the air inlet section, the radiator section and the air outlet section constitute the main air duct.
  • the tower is provided with a tower door and a layered platform corresponding to the tower door; the air inlet is disposed on a side wall of the lower space of the layered platform.
  • a first ventilation pipe is disposed between the radiator and the first fan, and a second ventilation pipe is disposed between the first fan and the air outlet.
  • the tower door is a double door
  • the first door is a full door
  • the second door is an airtight door
  • the full door forms the air outlet
  • the fully open door and the airtight door
  • a passage connecting the air outlet is formed between the side wall surface and the top portion.
  • the heat sink and the first fan are disposed in a lower space of the layered platform.
  • the first fan is a parallel two-way fan or a multi-channel fan, and the air outlets of each of the first fans are respectively connected with the lower bottom surface of the double-layer door through the corresponding second ventilation pipe. path.
  • the heat sink and the first fan are disposed in an upper space of the layered platform, and a third ventilation line is disposed between the air inlet and the heat sink.
  • the air outlet of the first fan is connected to the top of the double door to form a passage.
  • the main air duct is provided with a side air passage; the side air passage is provided with a second air blower, and the air inlet of the side air passage is provided with a air passage switching device, and the air outlet of the side air passage leads to The upper space of the layered platform.
  • the air duct switching device has three working states:
  • the bypass air passage is in communication with an air inlet section of the main air duct, and is closed with an air outlet section of the main air duct;
  • bypass air passage is in communication with an air outlet section of the main air duct, and is closed with an air inlet section of the main air duct;
  • the bypass air passage is provided with a salt spray filter.
  • the bypass air passage is further provided with a dehumidifier and/or an electric heating device.
  • the bypass air passage is provided with a one-way valve, a first air inlet for connecting the air inlet section of the main air duct, and a second air inlet for connecting the air outlet section of the main air duct;
  • the air duct switching device includes a cover plate and a motor that drives the cover plate to rotate by a rotating shaft, the cover plate is fixed on the rotating shaft, and the rotating shaft is connected to the motor;
  • the one-way valve In the first working state, the one-way valve is turned on, and the motor drives the cover plate to rotate to a position where the second air inlet is closed;
  • the one-way valve is turned on, and the motor drives the cover plate to rotate to a position where the first air inlet is closed;
  • the one-way valve is closed.
  • the bypass air passage is provided with a first air inlet for connecting the air inlet section of the main air duct. And a second air inlet for connecting the air outlet section of the main air duct;
  • the air duct switching device includes a first one-way valve disposed at the first air inlet and a second air inlet Two check valve
  • the first one-way valve is turned on, and the second one-way valve is closed;
  • the second one-way valve In the second working state, the second one-way valve is turned on, and the first one-way valve is closed;
  • the first one-way valve and the second one-way valve are both closed.
  • the airflow in the main air duct is redirected, and the air inlet section becomes an air outlet section, and the air outlet section becomes an air inlet section.
  • the present invention provides a control method for controlling a wind turbine bottom cooling device according to the above-mentioned plurality of aspects, wherein the water inlet of the radiator is provided with a temperature sensor, including:
  • the first fan is activated when T (water, in) is higher than a set temperature value
  • the T (water, in) is a temperature value measured by the temperature sensor.
  • the present invention provides another control method for controlling the wind turbine tower bottom cooling device according to the above-mentioned plurality of aspects, wherein the bypass air passage leads to a temperature sensor in the bottom space of the tower and Humidity sensors, including:
  • the air duct switching device switches to the air inlet section of the main air duct to introduce cold air, and is filtered and supplied to the internal environment of the tower for cooling the internal environment of the tower;
  • the air duct switching device switches to the main air duct outlet section to introduce hot air, and is filtered to provide the internal environment of the tower. To reduce the relative humidity of the internal environment of the tower;
  • the air duct switching device switches to the main air duct inlet section to introduce cold air, and is filtered to provide the internal environment of the tower. Used to cool the internal environment of the tower and reduce the humidity inside the tower;
  • the T is a measured value of a single of the temperature sensors or a plurality of measured values of the plurality of temperature sensors, the RH being a measured value of a single of the humidity sensors or a plurality of values measured by the plurality of humidity sensors.
  • the invention provides a main air duct inside the tower, and the heat sink of the large heat generating component at the bottom of the tower is placed in the main air duct. Thanks to the built-in heatsink, the assembly can be completed on the dock, reducing the time required for hoisting at sea, while reducing the heat sink to the platform outside the tower, reducing The size of the platform outside the tower. In addition, after the radiator is built in, the inlet and outlet pipes and cables are no longer required to pass through the tower wall, thereby improving the sealing performance of the tower.
  • the double-door design can effectively reduce the number and area of openings in the tower wall while ensuring the required ventilation cross-sectional area of the inlet and outlet.
  • the side air passage composed of the air duct switching device, the second air fan, and the salt mist filter can cool the air in the tower by introducing cold air into the air inlet portion of the main air duct according to working conditions. Or introduce hot air from the main air duct outlet to reduce the relative humidity inside the tower.
  • FIG. 1 is a half cross-sectional view of a tower bottom cooling device for a wind power generator set according to an embodiment of the present invention
  • FIG 2 is a perspective view of the tower bottom cooling device of the wind turbine shown in Figure 1 (the tower is hidden in the figure);
  • Figure 3 is an isometric view of the wind turbine bottom cooling device of Figure 1 at another angle (also concealing the tower);
  • FIG. 4 is a schematic structural view of a side air passage according to an embodiment of the present invention.
  • FIG. 5 is a schematic diagram of a air passage switching device according to an embodiment of the present invention.
  • FIG. 6 is a schematic diagram of another air passage switching device according to an embodiment of the present invention.
  • FIG. 7 is a schematic structural view of a unitary heat sink
  • Figure 8 is a schematic structural view of a assembled heat sink
  • FIG. 9 is a schematic structural view of a series heat sink
  • Figure 10 is a schematic view showing the position of the side air passage in the main air passage
  • Figure 11 is a schematic diagram of the air path of the bypass air passage shown in Figure 10;
  • FIG. 12 is a half cross-sectional view showing a second type of wind turbine generator tower bottom cooling device according to an embodiment of the present invention.
  • Figure 13 is a perspective view of the wind turbine bottom cooling device shown in Figure 12 (the tower is hidden in the figure);
  • Figure 14 is an isometric view of the wind turbine bottom cooling device of Figure 12 at another angle (also concealing the tower).
  • the wind turbine bottom cooling device mainly comprises two parts: a main air passage and a side air passage.
  • the main air duct and the outside air form an open cycle, and a large amount of unfiltered cold air is introduced from the outside, mainly for heat dissipation, and the cold air flows through the radiator in the main air duct and then is discharged to the outside of the tower; Ventilation ducts are used to extract part of the air from the main duct and filter it to provide the internal environment of the tower.
  • Ventilation ducts are used to extract part of the air from the main duct and filter it to provide the internal environment of the tower.
  • FIG. 1 is a half cross-sectional view of a tower bottom cooling device for a wind power generator set according to an embodiment of the present invention
  • FIG. 2 is a perspective view of a tower bottom cooling device of the wind power generator set illustrated in FIG. 1
  • FIG. 3 is an isometric view of the wind turbine bottom cooling device of FIG. 1 at another angle.
  • the main heat-generating components at the bottom of the tower are carried by the water-cooling heat dissipation system to the radiator 2 (typically a water-air heat exchanger). Cooling.
  • the heat sink 2 is placed inside the tower 1 in a lower space of the layered platform 4 where the tower door 3 is located. Here, it is named as a negative layer, and the negative layer is sealed from other spaces in the upper layer of the tower, along the airflow direction.
  • the radiator 2 is followed by a first ventilation pipe 5, and a first fan 6 is mounted behind the first ventilation pipe 5.
  • the tower door 3 adopts a double door
  • the first door 31 adopts a fully open structure to form the air outlet 10
  • the second door 32 adopts an airtight door, which is connected by a passage formed between the side wall surface and the top between the two doors.
  • the air outlet 10, the first fan 6 is a centrifugal fan, the number of which is two, the air outlets of the two centrifugal fans are respectively connected with the lower bottom surface of the double door to form a passage, and the air inlet 7 is located on the side wall of the tower below the pedal 8. .
  • the number of the first fan 6 may be one, and then the air outlet is divided into two paths, respectively connected to the lower bottom surface of the double door to form a passage, or two or more centrifugal fans are used.
  • the air inlet 7 the space of the negative layer serves as the air inlet section, the first air duct 5 after the radiator 2, the two centrifugal fans, the two centrifugal fans, and the second bottom of the double bottom door.
  • the air duct 9 and the passage and the air outlet 10 in the double door form an air section, and the air inlet section, the radiator 2 and the air outlet section constitute the entire main air duct, and the first fan 6 in the air outlet section is used for driving the main wind.
  • the air flow in the road causes the outside cold air to continuously enter from the air inlet 7, flows through the air inlet section, cools the radiator 2, turns into hot air, flows through the air outlet section, and finally flows out from the air outlet 10, and the whole main
  • the air duct and the air outside the tower form a cycle, which continuously cools the radiator 2 in the main air duct.
  • FIG. 4 is a schematic structural diagram of a side air passage according to an embodiment of the present invention
  • FIG. 5 is a schematic diagram of a air passage switching device according to an embodiment of the present invention.
  • the air inlet of the side air passage is provided with a duct switching device 11 for determining whether the side air passage is from the air inlet section (cold air) of the main air duct or the main air duct.
  • the air outlet section (hot air) is induced by the air, and the air duct switching device 11 is followed by a salt mist filter 12 and a second fan 13, wherein the salt mist filter 12 functions to remove droplets and salt particles in the air, and the second fan 13 is used for driving the gas flow in the bypass air passage, and a part of the gas drawn from the main air passage flows through the air passage switching device 11, the salt spray filter 12, and the second air blower 13, and is supplied to the internal environment of the tower 1.
  • FIG. 10 is a schematic diagram of the position of the side air passage in the main air duct
  • FIG. 11 is a schematic diagram of the air path of the side air passage shown in FIG.
  • the air duct switching device 11 is mainly composed of a box body 111, a stepping motor 112, a rotating shaft 113, a cover plate 114, a check valve 115, and the like.
  • the cover plate 114 is fixed on the rotating shaft 113, and the rotating shaft 113 and the stepping motor 112 are provided.
  • the stepping motor 112 rotates, and the rotating shaft 113 and the cover plate 114 are rotated together to open one air inlet and close the other air inlet, thereby switching the air inlet, and the two air inlets are respectively the first The air inlet 116 and the second air inlet 117, wherein the first air inlet 116 is located at the lower end of the casing 111, the second air inlet 117 is located at the side of the casing 111, and the check valve 115 is located at the top of the casing 111 in the airflow direction. It is downstream of the first air inlet 116 and the second air inlet 117.
  • the check valve 115 is closed when the bypass air passage does not need to be drained from the main air duct.
  • the way to switch between cold air and hot air is as follows:
  • the stepping motor 112 operates to drive the cover plate 114 to rotate downward.
  • the first air inlet 116 ie, the hot air inlet
  • the second air inlet 117 ie, the cold air inlet
  • the switching device introduces cold air into the side air duct.
  • the stepping motor 112 operates to drive the cover plate 114 to rotate upward.
  • the first air inlet 116 is closed, the second air inlet 117 is opened, and the air passage switching device introduces hot air into the side air passage.
  • the air passage switching device 11 stops introducing cold air or hot air into the side air passage.
  • the air passage switching device 11 can also have other implementation forms.
  • the air passage switching device 11' is mainly composed of a casing 111' and two one-way valves, wherein the first one-way valve 112' is disposed at the first air inlet 116, and the second one-way valve 113' It is disposed at the second air inlet 117.
  • the two check valves are simultaneously closed, and the cold air and hot air switching modes are as follows:
  • the second one-way valve 113' When the first one-way valve 112' is opened, the second one-way valve 113' is closed, at which time the first air inlet 116 is opened and the second air inlet 117 is closed, and the air passage switching device introduces hot air into the side air passage.
  • the duct switching device stops introducing cold air or hot air into the side air passage.
  • an electric heating device may be installed in the side air passage for heating the air when the temperature of the hot air introduced from the main air duct is insufficient, for reducing the relative humidity of the internal environment of the tower, and the electric heating device may be integrated into the salt mist filter.
  • a dehumidifier can be added in the device 12, and in order to obtain a better dehumidification effect.
  • the top and side wall surfaces of the double-layer door may be provided with louvers.
  • the louver When there is exhaust on the air outlet 10, the louver is opened, and when the air outlet 10 is not exhausted, the louver is closed to prevent rain and debris from entering, and a filter may be provided. It is used to prevent foreign matter from entering; the pedal 8 is used for the operation and maintenance personnel to stand in front of the tower door, and is used to separate the air inlet and outlet to prevent "thermal short circuit".
  • the air inlet 7 can also be designed.
  • louvers may be provided, or may be provided.
  • the filter screen can also be equipped with a water flap or a combination of several forms.
  • FIG. 7 is a schematic structural view of the integrated heat sink
  • FIG. 8 is a schematic structural view of the assembled heat sink
  • FIG. 9 is a schematic structural view of the serial heat sink.
  • the radiator 2 in the main duct can be realized in three different forms depending on the water-cooling and heat-dissipating system used for the large heat-generating components at the bottom of the tower (typically, the box-changing and converter at the bottom of the tower).
  • the radiator 2 in the main duct adopts an integral radiator.
  • the radiator 2 in the main duct can be assembled and dissipated. , or a series radiator.
  • the assembled radiator uses a plurality of radiators to be installed side by side, the cooling air passes through the respective radiators, the radiators are independent of each other, and each has an independent inlet and outlet pipe; the series radiators install the plurality of radiators in series Together, the cooling air flows through the various radiators in turn, and the radiators are independent of each other, each having an independent inlet and outlet pipe.
  • the present invention incorporates a heat sink 2 (typically a water-to-air heat exchanger for heat dissipation of a box and a heat exchanger) originally placed outside the tower 1 in the tower 1 to improve system integration.
  • a heat sink 2 typically a water-to-air heat exchanger for heat dissipation of a box and a heat exchanger
  • the construction cost of the base external platform will be reduced (the outer platform can be made smaller) and the time required for offshore hoisting (because of the current offshore hoisting, the external radiator can be hoisted after the tower is hoisted).
  • it is necessary to install the required water inlet and outlet pipes and cables at sea. It requires a lot of offshore working time. After the radiator is built in, it can be assembled at the dock and it is not necessary to install the radiator at sea.
  • the radiator 2 is built into the inside of the tower 1, and the number of openings required for the passage of the water pipes and cables for the inlet and outlet of the tower 1 and the consequent sealing problems can be reduced.
  • the top and side wall surfaces of the double-layer door are connected to the air outlet 10, and the number and area of the openings in the tower wall can be effectively reduced while ensuring the ventilation cross-sectional area of the inlet and outlet ports required for the main air passage.
  • a side air passage is arranged beside the main air passage, and part of the gas introduced from the main air duct can be filtered and supplied to the internal environment of the tower 1 according to the working condition.
  • the bypass air passage introduces cold air from the air inlet section of the main air passage through the air passage switching device 11, 11', and is filtered to cool the internal environment of the tower 1. .
  • the tower 1 is internally opposite The humidity is higher than the set value, and the side air passages introduce hot air from the air outlet section of the main air duct through the air duct switching devices 11, 11', and are filtered to reduce the relative humidity of the internal environment of the tower 1.
  • FIG. 12 is a half cross-sectional view of a second type wind turbine generator tower bottom cooling device according to an embodiment of the present invention
  • FIG. Axonometric view Figure 14 is an isometric view of the wind turbine bottom cooling device of Figure 12 at another angle.
  • the heat sink 2 can be located in the upper space of the layered platform 4 corresponding to the tower door 3, the heat sink 2 is connected to the air inlet 7 through the third air duct 14, and the first fan 6 is disposed behind the radiator 2. (The position is shown in the figure, the fan is not shown), the first door 31 still forms the air outlet 10, which communicates with the passage formed by the top and side wall surfaces of the double door, and the air inlet 7 is still located below the pedal 8
  • the air inlet and the third air duct 14 serve as an air inlet section, and the first air duct 5, the first fan 6, the second air duct 9 and the like are connected to the radiator 2
  • the passage in the double-layered door and the air outlet 10 form a wind section, and the air inlet section, the radiator 2 and the air outlet section constitute the entire main air duct, and the rest of the structure is substantially the same as that of the first embodiment, please refer to the above description.
  • the centrifugal fan may also be located in the air inlet section; or the second fan 13 in the side air passage may be an axial flow fan or a centrifugal fan; or, the air flow in the main air channel may flow in a reverse direction, so that the air inlet section becomes In the wind section, the wind section becomes the wind inlet section, and so on. Since there are many ways to implement, there is no longer an example here.
  • the present invention also provides a control method for controlling the same, including main air passage control and side air passage control, as follows:
  • a temperature sensor is provided in advance at the water inlet of the radiator 2, and the measured temperature value is represented by T (water, in) .
  • Temperature and humidity sensors are respectively arranged in several layers of the bottom of the tower 1 in a typical manner. Typically, a temperature and humidity sensor is arranged in the three-layer space at the bottom of the tower, and the measured temperature values are represented by T 1 , T 2 , T 3 respectively . The measured relative humidity values are represented by RH 1 , RH 2 , and RH 3 , respectively.
  • the air passage switching device 11 , 11 ′ switches to the air inlet section of the main air duct to introduce cold air, and is filtered to provide the internal environment of the tower. In the cooling tower internal environment.
  • the air passage switching device 11, 11' Switching to the main air duct outlet section introduces hot air, which is filtered and supplied to the internal environment of the tower to reduce the relative humidity of the internal environment of the tower.
  • the invention provides a main air duct inside the tower, and the heat sink of the large heat generating component at the bottom of the tower is placed in the main air duct. Thanks to the built-in heatsink, the assembly can be completed on the dock, reducing the time required for hoisting at sea and reducing the size of the platform outside the tower since the radiator is no longer placed on the platform outside the tower. In addition, after the radiator is built in, the inlet and outlet pipes and cables are no longer required to pass through the tower wall, thereby improving the sealing performance of the tower.
  • the number and area of openings in the tower wall can be effectively reduced while ensuring the required ventilation cross-sectional area of the inlet and outlet.
  • the cold air of the main duct inlet air section can be introduced according to the working condition to cool the air in the tower or introduce the main wind.
  • the hot air from the wind section reduces the relative humidity inside the tower.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Power Engineering (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Central Air Conditioning (AREA)
  • Drying Of Gases (AREA)
  • Wind Motors (AREA)

Abstract

风力发电机组塔底冷却装置及控制方法,包括塔架(1)和散热器(2),所述塔架(1)内部设有主风道,所述散热器(2)内置于所述主风道中;所述主风道中设有第一风机(6),并通过所述第一风机(6)驱动所述主风道中的空气流动冷却所述散热器(2);所述主风道与所述塔架(1)外环境组成开式循环。该塔底冷却装置将散热器内置于塔架内,可以提高散热系统集成度,对于海上机组,可降低基础外平台建造成本及海上吊装所需时间,同时减少塔架上用于进出水管及电缆的穿出而所需的开孔数量以及随之而来的密封问题。

Description

风力发电机组塔底冷却装置及控制方法
本申请要求2016年08月05日提交中国专利局、申请号为201610641196.1、发明名称为“风力发电机组塔底冷却装置及控制方法”的发明专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本发明涉及风电技术领域,特别涉及风力发电机组塔架底部的冷却装置及控制方法。
背景技术
随着陆上风资源开发日趋饱和,风电开发逐渐转到海上。但是海上风电面临成本高、维护难、环境恶劣等挑战。
为降低海上风电单位千瓦投资成本,机组逐渐趋于大型化,而提升单机功率,会使各个子部件发热量增大,需要主动散热的部件增多。
目前,大功率风电机组内各个发热部件往往单独设置散热系统。这种分散式冷却方式不仅成本高,而且故障点也较多,海上的高湿环境还容易造成凝露,导致电子元件短路。另外,海上风机维护难度大,出海维护频次不宜过高,因此要求系统具备较高的可靠性。
针对这一问题,申请公布号为CN105179180A的发明专利申请公开了“一种大功率海上风力发电机组塔底冷却系统”,其将变流散热器和箱变散热器进行集成设计共用一套散热器系统并放置于塔架外部,另外在塔架放置电控柜体的三层内设置密闭循环风路系统,来控制塔架下部三层空间内的温度和湿度。
但是,这种技术方案将散热器外置,在吊装时需要花费更多时间,并需要占用较多空间,尤其对于海上机组而言,会占用基础外平台较多空间,增大基础外平台建造成本;而且,散热器外置,还需要在塔架上开较多的孔洞用于布设水冷散热器的进出水管以及给水冷风扇提供电源的电缆。另外,此技术方案仅能控制塔架下面三层密闭空间中的温度和湿度,无法调节塔架内其它空间的温度和湿度。
此外,其虽然提出在塔架底部三层内实行密闭风循环环路,但实际上, 运维人员是需要进入这一层空间内进行作业的,在人员进出时,必然带来外界气体(盐雾,高湿)进入,另外为维持人员在其中作业时的生存需要,在人员作业时,也无法做到完全密封(由于人员呼吸需要氧气),所以难以控制这三层密封循环风路系统中的空气洁净度。
因此,如何克服风力发电机组塔底冷却装置存在的上述不足,是本领域技术人员需要解决的技术问题。
发明内容
本发明的目的是提供风力发电机组塔底冷却装置。该塔底冷却装置将散热器内置于塔架内,可以提高散热系统集成度,对于海上机组,可降低基础外平台建造成本及海上吊装所需时间,同时减少塔架上用于进出水管及电缆的穿出而所需的开孔数量以及随之而来的密封问题。
本发明的另一目的是提供用于上述风力发电机组塔底冷却装置的控制方法。
为实现上述目的,本发明提供风力发电机组塔底冷却装置,包括塔架和散热器,所述散热器用于对设于所述塔架底部的发热部件进行冷却;所述塔架内部设有主风道,所述散热器内置于所述主风道中;所述主风道中设有第一风机,并通过所述第一风机驱动所述主风道中的空气流动冷却所述散热器;所述主风道与所述塔架外环境组成开式循环。
优选地,所述塔架设有进风口和出风口,以所述散热器为界,所述进风口至所述散热器的通路形成进风段,所述散热器至所述出风口的通路形成出风段,所述进风段、散热器和出风段组成所述主风道。
优选地,所述塔架设有塔架门以及对应于所述塔架门的分层平台;所述进风口设于所述分层平台下层空间的侧壁上。
优选地,所述散热器与所述第一风机之间设有第一通风管,所述第一风机与所述出风口之间设有第二通风管。
优选地,所述塔架门为双层门,其第一道门为全开门,第二道门为气密门;所述全开门形成所述出风口,所述全开门与所述气密门的侧壁面和顶部之间形成连通所述出风口的通路。
优选地,所述散热器和所述第一风机设于所述分层平台的下层空间。
优选地,所述第一风机为并列的双路风机或多路风机,各所述第一风机的出风口分别通过相对应的所述第二通风管与所述双层门的下底面连接形成通路。
优选地,所述散热器和所述第一风机设于所述分层平台的上层空间,所述进风口与所述散热器之间设有第三通风管路。
优选地,所述第一风机的所述出风口与所述双层门的顶部连接形成通路。
优选地,所述主风道上设置有旁通风道;所述旁通风道设有第二风机,所述旁通风道的进风口设有风道切换装置,所述旁通风道的出风口通往所述分层平台的上层空间。
优选地,所述风道切换装置具有三种工作状态:
在第一工作状态,所述旁通风道与所述主风道的进风段连通,并与所述主风道的出风段关闭;
在第二工作状态,所述旁通风道与所述主风道的出风段连通,并与所述主风道的进风段关闭;
在第三工作状态,所述旁通风道与所述主风道的进风段和出风段均关闭。
优选地,所述旁通风道设有盐雾过滤器。
优选地,所述旁通风道进一步设有除湿机和/或电加热装置。
优选地,所述旁通风道设有单向阀、用于连通所述主风道进风段的第一进风口,以及用于连通所述主风道出风段的第二进风口;所述风道切换装置包括盖板以及通过旋转轴驱动所述盖板转动的电机,所述盖板固定在所述旋转轴上,所述旋转轴与所述电机连接;
在第一工作状态,所述单向阀导通,所述电机驱动所述盖板转动至关闭所述第二进风口的位置;
在第二工作状态,所述单向阀导通,所述电机驱动所述盖板转动至关闭所述第一进风口的位置;
在第三工作状态,所述单向阀关闭。
优选地,所述旁通风道设有用于连通所述主风道进风段的第一进风口, 以及用于连通所述主风道出风段的第二进风口;所述风道切换装置包括设于所述第一进风口的第一单向阀和设于所述第二进风口的第二单向阀;
在第一工作状态,所述第一单向阀导通,且所述第二单向阀关闭;
在第二工作状态,所述第二单向阀导通,且所述第一单向阀关闭;
在第三工作状态,所述第一单向阀和第二单向阀均关闭。
优选地,所述主风道中的气流改向,其进风段变为出风段、出风段变为进风段。
为实现上述第二目的,本发明提供控制方法,用于控制上述多项方案所述的风力发电机组塔底冷却装置,所述散热器的进水口设置温度传感器,包括:
当T(水,in)低于设定的温度值时,关闭所述第一风机;
当T(水,in)高于设定的温度值时,启动所述第一风机;
所述T(水,in)为所述温度传感器测量的温度值。
为实现上述第二目的,本发明提供另一控制方法,用于控制上述多项方案所述的风力发电机组塔底冷却装置,所述旁通风道通往的塔架底部空间内设置温度传感器和湿度传感器,包括:
当T高于设定温度值时,所述风道切换装置切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境;
当RH高于设定相对湿度值时,同时T低于设定的温度值时,所述风道切换装置切换到主风道出风段引入热空气,过滤后提供给塔架内部环境,用于降低塔架内部环境的相对湿度;
当RH高于设定的相对湿度值时,同时T高于设定的温度值时,所述风道切换装置切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境,并降低塔架内部环境的湿度;
所述T为单个所述温度传感器的测量值或多个所述温度传感器测量的最大值,所述RH为单个所述湿度传感器的测量值或多个所述湿度传感器测量的最大值。
本发明在塔架内部设置主风道,并将塔架底部大发热量部件的散热器放置于主风道中。由于散热器内置,可以在码头上完成组装,从而降低了在海上吊装时所需时间,同时由于散热器不再放置到塔架外平台上,减小 了塔架外平台尺寸。另外,散热器内置后,不再需要进出水管及电缆在塔架壁上穿出,由此提高了塔架的密封性。
在优选方案中,通过双层门设计,在保证进出风口所需通风截面积的情况下,可有效的减少塔架壁上的开孔数量及面积。
在另一优选方案中,由风道切换装置、第二风机以及盐雾过滤器等组成的旁通风道,可以根据工况需要引入主风道进风段的冷风来冷却塔架内的空气,或引入主风道出风段的热空气来降低塔架内的相对湿度。
附图说明
图1为本发明实施例公开的风力发电机组塔底冷却装置的半剖图;
图2为图1所示风力发电机组塔底冷却装置的轴测图(在图中隐藏了塔架);
图3为图1所示风力发电机组塔底冷却装置在另一角度下的轴测图(同样隐藏了塔架);
图4为本发明实施例公开的一种旁通风道的结构示意图;
图5为本发明实施例公开的一种风道切换装置的示意图;
图6为本发明实施例公开的另一种风道切换装置的示意图;
图7为整体式散热器的结构示意图;
图8为拼装式散热器的结构示意图;
图9为串联式散热器的结构示意图;
图10为旁通风道在主风道中的位置示意图;
图11为图10所示旁通风道的风路原理图;
图12为本发明实施例公开的第二种风力发电机组塔底冷却装置的半剖图;
图13为图12所示风力发电机组塔底冷却装置的轴测图(在图中隐藏了塔架);
图14为图12所示风力发电机组塔底冷却装置在另一角度下的轴测图(同样隐藏了塔架)。
图中:
1.塔架  2.散热器  3.塔架门  31.第一道门  32.第二道门  4.分层平台  5.第一通风管  6.第一风机  7.进风口  8.踏板  9.第二通风管  10.出风口  11、11’.风道切换装置  111、111’.箱体  112.步进电机  113.旋转轴  114.盖板  115.单向阀  116.第一进风口  117.第二进风口  12.盐雾过滤器  13.第二风机  112’.第一单向阀  113’.第二单向阀  14.第三通风管
具体实施方式
为了使本技术领域的人员更好地理解本发明方案,下面结合附图和具体实施方式对本发明作进一步的详细说明。
本发明提供的风力发电机组塔底冷却装置主要有两部分组成:主风道和旁通风道。其中,主风道与外界空气组成一个开式循环,从外界引入大量未经过滤的冷空气,主要用于散热,冷空气流经主风道内的散热器后,再排到塔架外;旁通风道用于从主风道中引出部分空气,并将其过滤后提供给塔架内部环境。下面对两个风道的构造和工作方式分别进行描述。
请参考图1、图2、图3,图1为本发明实施例公开的风力发电机组塔底冷却装置的半剖图;图2为图1所示风力发电机组塔底冷却装置的轴测图;图3为图1所示风力发电机组塔底冷却装置在另一角度的轴测图。
如图所示,塔架底部的主要发热部件(典型的如风机塔架底部的箱变、变流器等)通过水冷散热系统将热量带到散热器2(典型的如水空换热器)进行散热。将该散热器2放置于塔架1内部,具体位置在塔架门3所在分层平台4的下层空间,这里命名为负一层,负一层与塔架上层其它空间隔离密封,沿气流方向,散热器2后面为第一通风管5,第一通风管5后面安装有第一风机6。
塔架门3采用双层门,第一道门31采用全开式结构来形成出风口10,第二道门32采用气密门,利用两道门之间的侧壁面和顶部之间形成的通路连通出风口10,第一风机6为离心风机,其数量为两个,两个离心风机的出风口分别与双层门的下底面连接形成通路,进风口7位于踏板8下方的塔架侧壁上。
这里需要说明的是,第一风机6的数量可以为一个,然后将出风口分成两路,分别与双层门的下底面连接形成通路,或者使用两个以上离心风机。
以散热器2为界,进风口7、负一层的空间作为进风段,散热器2之后的第一通风管5,两个离心风机、连接离心风机和双层门下底面的两个第二通风管9以及双层门内的通路、出风口10形成出风段,进风段、散热器2和出风段组成整个主风道,出风段内的第一风机6用于驱动主风道中的空气流动,使外界的冷空气不断从进风口7进入,流经进风段、冷却散热器2后,变成热空气,再流经出风段,最后从出风口10流出,整个主风道与塔架外空气组成一个循环,源源不断的冷却主风道中的散热器2。
请参考图4、图5,图4为本发明实施例公开的一种旁通风道的结构示意图;图5为本发明实施例公开的一种风道切换装置的示意图。
如图所示,旁通风道的进风口设置风道切换装置11,该风道切换装置用于决定旁通风道是从主风道的进风段(冷空气)引风还是从主风道的出风段(热空气)引风,风道切换装置11之后是盐雾过滤器12和第二风机13,其中盐雾过滤器12的作用是除去空气中的液滴和盐颗粒,第二风机13用于驱动旁通风道中的气体流动,将从主风道中引出的部分气体,流经风道切换装置11、盐雾过滤器12、第二风机13之后,提供给塔架1内部环境。
请一并参考图10、图11,图10为旁通风道在主风道中的位置示意图;图11为图10所示旁通风道的风路原理图。
风道切换装置11主要由箱体111、步进电机112、旋转轴113、盖板114、单向阀115等组成,其中盖板114固定在旋转轴113上,旋转轴113与步进电机112连接,进行切换时,步进电机112旋转,带动旋转轴113以及盖板114一起旋转,打开一个进风口,同时关闭另一个进风口,从而实现进风口的切换,两个进风口分别为第一进风口116和第二进风口117,其中第一进风口116位于箱体111的下端,第二进风口117位于箱体111的侧面,单向阀115位于箱体111的顶部,在气流方向上处于第一进风口116和第二进风口117的下游。当旁通风道不需要从主风道中引流时,单向阀115关闭。其冷风、热风切换方式如下:
当单向阀115开启时,步进电机112动作,带动盖板114向下旋转,此时第一进风口116(即热风进口)关闭,第二进风口117(即冷风进口)开启,风道切换装置将冷风引入旁通风道。
当单向阀115开启时,步进电机112动作,带动盖板114向上旋转,此时第一进风口116关闭,第二进风口117开启,风道切换装置将热风引入旁通风道。
当单向阀115关闭时,风道切换装置11停止将冷风或热风引入旁通风道。
当然,风道切换装置11还可以有其他实现形式。如图6所示,该风道切换装置11’主要由箱体111’和两个单向阀组成,其中第一单向阀112’设于第一进风口116,第二单向阀113’设于第二进风口117,进行切换时,一个单向阀开启,另一个单向阀关闭,从而实现进风口的切换。当旁通风道不需要从主风道中引流时,两个单向阀同时关闭,其冷风、热风切换方式如下:
当第一单向阀112’开启时,第二单向阀113’关闭,此时第一进风口116开启,第二进风口117关闭,风道切换装置将热风引入旁通风道。
当第二单向阀113’开启时,第一单向阀112’关闭,此时第二进风口117开启,第一进风口116关闭,风道切换装置将冷风引入旁通风道。
当第一单向阀112’和第二单向阀113’都关闭时,风道切换装置停止将冷风或热风引入旁通风道。
这里,可以在旁通风道加装电加热装置,用于从主风道中引入的热空气温度不足时,加热空气,用于降低塔架内部环境的相对湿度,电加热装置可以集成到盐雾过滤器12中,而且,为获得更好的除湿效果,还可以加装除湿机。
上述双层门的顶部和侧壁面可以设置百叶窗,在出风口10上有排气时,百叶窗打开,在出风口10不排气时,百叶窗关闭,防止雨水和杂物进入,也可以设置滤网,用于防止异物进入;踏板8用于运维人员在塔架门前站立,同时用于隔开进出风口,防止“热短路”,为了防止“热短路”,也可以将进风口7不设计在塔架门的正下方,而是与塔架门3在周向上相互错开;在踏板8下面塔架侧壁上的进风口处,可以设置百叶窗,也可以设 置滤网,还可以设置挡水板,也可以是几种形式的组合。
请参考图7、图8、图9,图7为整体式散热器的结构示意图;图8为拼装式散热器的结构示意图;图9为串联式散热器的结构示意图。
如图所示,主风道中的散热器2依据塔架底部大发热部件(典型如塔架底部的箱变、变流器)所采用的水冷散热系统的不同,可以有三种实现形式。
当塔架底部的大发热部件所采用的水冷系统为集中式散热系统(典型的如箱变和变流器共用一套水冷散热系统)时,主风道中的散热器2采用整体式散热器。
当塔架底部的大发热部件所采用的水冷系统为分布式散热系统(典型的如箱变和变流器分别拥有各自的水冷散热系统)时,主风道中的散热器2可以采用拼装式散热器,或者串联式散热器。
其中,拼装式散热器使用多块散热器并列安装在一起,冷却空气分别通过各个散热器,散热器之间相互独立,各自拥有独立的进出水管;串联式散热器将多块散热器串联安装在一起,冷却空气依次流经各个散热器,散热器之间相互独立,各自拥有独立的进出水管。
综上所述,本发明将原来放置于塔架1外部的散热器2(典型的如用于给箱变和变流散热的水空换热器)内置于塔架1内部,可以提高系统集成度,对于海上机组,将降低基础外平台建造成本(基础外平台可以做的更小)及海上吊装所需时间(因目前的海上吊装,外置的散热器要在塔架吊装完后才能吊装,同时还要在海上去安装所需的进出水管以及电缆等,需要较多的海上作业时间,散热器内置后,在码头就可以组装完毕,在海上没有安装散热器的时间花费)。同时,散热器2内置于塔架1内部,还可以减少塔架1上用于进出水管及电缆的穿出而所需的开孔数量以及随之而来的密封问题。另外,使用双层门的顶部及侧壁面与出风口10连通,在保证主风道所需的进出风口通风截面积的情况下,可有效减少塔架壁上的开孔数量及面积。此外,在主风道旁设置旁通风道,可以根据工况需求,从主风道中引入部分气体经过滤后提供给塔架1内部环境。当塔架1内部环境温度高于设定值时,旁通风道通过风道切换装置11、11’从主风道的进风段引入冷空气,经过滤后,用以冷却塔架1内部环境。当塔架1内部相对 湿度高于设定值,旁通风道通过风道切换装置11、11’从主风道的出风段引入热空气,经过滤后,用以降低塔架1内部环境的相对湿度。
请参考图12、图13、图14,图12为本发明实施例公开的第二种风力发电机组塔底冷却装置的半剖图;图13为图12所示风力发电机组塔底冷却装置的轴测图;图14为图12所示风力发电机组塔底冷却装置在另一角度的轴测图。
在另一实施例中,散热器2可以位于塔架门3所对应分层平台4的上层空间,散热器2通过第三通风管14与进风口7连通,散热器2后设置第一风机6(图中示意的是位置,风机未画出),第一道门31依然形成出风口10,与双层门的顶部及侧壁面形成的通路相连通,进风口7依然位于踏板8下方的塔架侧壁上,以散热器2为界,进风口、第三通风管14作为进风段,散热器2之后的第一通风管5、第一风机6、第二通风管9以及与之相连的双层门内的通路、出风口10形成出风段,进风段、散热器2和出风段组成整个主风道,其余结构与第一实施例大体相同,请参考上文的描述。
上述实施例仅是本发明的优选方案,具体并不局限于此,在此基础上可根据实际需要作出具有针对性的调整,从而得到不同的实施方式。例如离心风机也可以位于进风段;或者,旁通风道中的第二风机13可以为轴流风机,也可以为离心风机;又或者,主风道中的气流可以逆向流动,使进风段变为出风段,出风段变为进风段,等等。由于可能实现的方式较多,这里就不再一一举例说明。
除了上述风力发电机组塔底冷却装置,本发明还提供对其进行控制的控制方法,包括主风道控制和旁通风道控制,具体如下:
1)主风道控制:
预先在散热器2的进水口,设置温度传感器,其测量的温度值用T(水, in)表示。
当T(水,in)低于设定的温度值时,第一风机关闭;
当T(水,in)高于设定的温度值时,第一风机启动。
2)旁通风道控制:
预先在塔架1底部的几层空间内分别设置温湿度传感器,典型情况为在塔架底部的三层空间内设置温湿度传感器,其测量的温度值分别用T1, T2,T3表示,其测量的相对湿度值分别用RH1,RH2,RH3表示。
当max(T1,T2,T3)高于设定温度值时,风道切换装置11、11’切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境。
当max(RH1,RH2,RH3)高于设定相对湿度值时,同时max(T1,T2,T3)低于设定的温度值时,风道切换装置11、11’切换到主风道出风段引入热空气,过滤后提供给塔架内部环境,用于降低塔架内部环境的相对湿度。
当max(RH1,RH2,RH3)高于设定的相对湿度值时,同时max(T1,T2,T3)高于设定的温度值时,风道切换装置11、11’切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境,用于降低塔架内部环境的湿度。
本发明在塔架内部设置主风道,并将塔架底部大发热量部件的散热器放置于主风道中。由于散热器内置,可以在码头上完成组装,从而降低了在海上吊装时所需时间,同时由于散热器不再放置到塔架外平台上,减小了塔架外平台尺寸。另外,散热器内置后,不再需要进出水管及电缆在塔架壁上穿出,由此提高了塔架的密封性。
此外,通过双层门设计,在保证进出风口所需通风截面积的情况下,可有效的减少塔架壁上的开孔数量及面积。
通过进一步设置由风道切换装置、第二风机以及盐雾过滤器等组成的旁通风道,可以根据工况需要引入主风道进风段的冷风来冷却塔架内的空气,或引入主风道出风段的热空气来降低塔架内的相对湿度。
以上对本发明所提供的风力发电机组塔底冷却装置及控制方法进行了详细介绍。本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。

Claims (18)

  1. 风力发电机组塔底冷却装置,包括塔架(1)和散热器(2),所述散热器(2)用于对设于所述塔架(1)底部的发热部件进行冷却;其特征在于,所述塔架(1)内部设有主风道,所述散热器(2)内置于所述主风道中;所述主风道中设有第一风机(6),并通过所述第一风机(6)驱动所述主风道中的空气流动以冷却所述散热器(2);所述主风道与所述塔架(1)外环境组成开式循环。
  2. 根据权利要求1所述的风力发电机组塔底冷却装置,其特征在于,所述塔架(1)设有进风口(7)和出风口(10),以所述散热器(2)为界,所述进风口(7)至所述散热器(2)的通路形成所述主风道的进风段,所述散热器(2)至所述出风口(10)的通路形成所述主风道的出风段。
  3. 根据权利要求2所述的风力发电机组塔底冷却装置,其特征在于,所述塔架(1)设有塔架门(3)以及对应于所述塔架门(3)的分层平台(4);所述进风口(7)设于所述分层平台(4)下层空间的侧壁上。
  4. 根据权利要求3所述的风力发电机组塔底冷却装置,其特征在于,所述散热器(2)与所述第一风机(6)之间设有第一通风管(5),所述第一风机(6)与所述出风口(10)之间设有第二通风管(9)。
  5. 根据权利要求4所述的风力发电机组塔底冷却装置,其特征在于,所述塔架门(3)为双层门,其第一道门(31)为全开门,第二道门(32)为气密门;所述全开门形成所述出风口(10),所述全开门与所述气密门的侧壁面和顶部之间形成连通所述出风口(10)的通路。
  6. 根据权利要求5所述的风力发电机组塔底冷却装置,其特征在于,所述散热器(2)和所述第一风机(6)设于所述分层平台(4)的下层空间。
  7. 根据权利要求6所述的风力发电机组塔底冷却装置,其特征在于,所述第一风机(6)为并列的双路风机或多路风机,各所述第一风机(6)的出风口分别通过所述第二通风管(9)与所述双层门的下底面连接形成通路。
  8. 根据权利要求5所述的风力发电机组塔底冷却装置,其特征在于,所述散热器(2)和所述第一风机(6)设于所述分层平台(4)的上层空间,所述进风口(7)与所述散热器(2)之间设有第三通风管路(14)。
  9. 根据权利要求8所述的风力发电机组塔底冷却装置,其特征在于,所述第一风机(6)的所述出风口(10)与所述双层门的顶部连接形成通路。
  10. 根据权利要求3至9任一项所述的风力发电机组塔底冷却装置,其特征在于,所述主风道上设置有旁通风道;所述旁通风道设有第二风机(13),所述旁通风道的进风口设有风道切换装置(11、11’),所述旁通风道的出风口通往所述分层平台(4)的上层空间。
  11. 根据权利要求10所述的风力发电机组塔底冷却装置,其特征在于,所述风道切换装置(11、11’)具有三种工作状态:
    在第一工作状态,所述旁通风道与所述主风道的进风段连通,并与所述主风道的出风段关闭;
    在第二工作状态,所述旁通风道与所述主风道的出风段连通,并与所述主风道的进风段关闭;
    在第三工作状态,所述旁通风道与所述主风道的进风段和出风段均关闭。
  12. 根据权利要求11所述的风力发电机组塔底冷却装置,其特征在于,所述旁通风道设有盐雾过滤器(12)。
  13. 根据权利要求12所述的风力发电机组塔底冷却装置,其特征在于,所述旁通风道进一步设有除湿机和/或电加热装置。
  14. 根据权利要求11所述的风力发电机组塔底冷却装置,其特征在于,所述旁通风道设有用于连通所述主风道进风段的第一进风口,以及用于连通所述主风道出风段的第二进风口;所述风道切换装置(11)包括单向阀(115)、盖板(114)以及通过旋转轴(113)驱动所述盖板(114)的电机(112),所述盖板(114)固定在所述旋转轴(113)上,所述旋转轴(113)与所述电机(112)连接;
    在第一工作状态,所述单向阀(115)导通,所述电机(112)驱动所述盖板(114)转动至关闭所述第二进风口的位置;
    在第二工作状态,所述单向阀(115)导通,所述电机(112)驱动所述盖板(114)转动至关闭所述第一进风口的位置;
    在第三工作状态,所述单向阀(115)关闭。
  15. 根据权利要求11所述的风力发电机组塔底冷却装置,其特征在于, 所述旁通风道设有用于连通所述主风道进风段的第一进风口,以及用于连通所述主风道出风段的第二进风口;所述风道切换装置(11’)包括设于所述第一进风口的第一单向阀(112’)和设于所述第二进风口的第二单向阀(113’);
    在第一工作状态,所述第一单向阀(112’)导通,且所述第二单向阀(113’)关闭;
    在第二工作状态,所述第二单向阀(113’)导通,且所述第一单向阀(112’)关闭;
    在第三工作状态,所述第一单向阀(112’)和第二单向阀(113’)均关闭。
  16. 根据权利要求2至9任一项所述的风力发电机组塔底冷却装置,其特征在于,将所述主风道的进风口(7)用于出风,使其进风段变为出风段,并将所述主风道的出风口(10)用于进风,使其出风段变为进风段。
  17. 控制方法,用于控制上述权利要求1至16任一项所述的风力发电机组塔底冷却装置,所述散热器(2)的进水口设置温度传感器,包括:
    当T(水,in)低于设定的温度值时,关闭所述第一风机(6);
    当T(水,in)高于设定的温度值时,启动所述第一风机(6);
    所述T(水,in)为所述温度传感器测量的温度值。
  18. 控制方法,用于控制上述权利要求10至16任一项所述的风力发电机组塔底冷却装置,所述旁通风道通往的塔架底部空间内设置温度传感器和湿度传感器,包括:
    当T高于设定温度值时,所述风道切换装置(11、11’)切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境;
    当RH高于设定相对湿度值时,同时T低于设定的温度值时,所述风道切换装置(11、11’)切换到主风道出风段引入热空气,过滤后提供给塔架内部环境,用于降低塔架内部环境的相对湿度;
    当RH高于设定的相对湿度值时,同时T高于设定的温度值时,所述风道切换装置(11、11’)切换到主风道进风段引入冷空气,过滤后提供给塔架内部环境,用于冷却塔架内部环境,并降低塔架内部环境的湿度;
    所述T为单个所述温度传感器的测量值或多个所述温度传感器测量的 最大值,所述RH为单个所述湿度传感器的测量值或多个所述湿度传感器测量的最大值。
PCT/CN2017/088234 2016-08-05 2017-06-14 风力发电机组塔底冷却装置及控制方法 Ceased WO2018024039A1 (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
ES17836222T ES2797323T3 (es) 2016-08-05 2017-06-14 Dispositivo de refrigeración de fondo de torre para unidad de generador de energía eólica y procedimiento de control
EP17836222.4A EP3339641B1 (en) 2016-08-05 2017-06-14 Tower bottom cooling device for wind power generator unit, and control method
KR1020187009958A KR102057794B1 (ko) 2016-08-05 2017-06-14 풍력 발전기 유닛용 타워 저부 냉각 디바이스, 및 제어 방법
US15/761,956 US10711768B2 (en) 2016-08-05 2017-06-14 Tower bottom cooling device for wind power generator unit, and control method
AU2017307124A AU2017307124B2 (en) 2016-08-05 2017-06-14 Tower bottom cooling device for wind power generator unit, and control method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610641196.1 2016-08-05
CN201610641196.1A CN106150929B (zh) 2016-08-05 2016-08-05 风力发电机组塔底冷却装置及控制方法

Publications (1)

Publication Number Publication Date
WO2018024039A1 true WO2018024039A1 (zh) 2018-02-08

Family

ID=57329367

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/088234 Ceased WO2018024039A1 (zh) 2016-08-05 2017-06-14 风力发电机组塔底冷却装置及控制方法

Country Status (7)

Country Link
US (1) US10711768B2 (zh)
EP (1) EP3339641B1 (zh)
KR (1) KR102057794B1 (zh)
CN (1) CN106150929B (zh)
AU (1) AU2017307124B2 (zh)
ES (1) ES2797323T3 (zh)
WO (1) WO2018024039A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112628094A (zh) * 2020-11-25 2021-04-09 天津瑞能电气有限公司 一种风力发电机组塔筒通风散热系统
CN114562424A (zh) * 2021-11-23 2022-05-31 浙江运达风电股份有限公司 一种风机塔筒
CN115750241A (zh) * 2022-11-03 2023-03-07 太原重工股份有限公司 风电机组的轮毂散热装置

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015217035A1 (de) * 2015-09-04 2017-03-09 Wobben Properties Gmbh Windenergieanlage und Verfahren zum Steuern einer Kühlung einer Windenergieanlage
CN106150929B (zh) 2016-08-05 2020-12-01 江苏金风科技有限公司 风力发电机组塔底冷却装置及控制方法
CN106704112A (zh) * 2016-12-21 2017-05-24 中国电建集团贵阳勘测设计研究院有限公司 一种用于解决高寒山区风力发电机组高潮湿的除湿系统
EP3672000B1 (en) 2018-12-17 2022-11-30 Siemens Gamesa Renewable Energy A/S Method for installing an offshore installation
US10954922B2 (en) * 2019-06-10 2021-03-23 General Electric Company System and method for cooling a tower of a wind turbine
CN110425095B (zh) * 2019-08-23 2024-05-14 射阳远景能源科技有限公司 海上风力发电机组塔底开式冷却系统
CN112484530A (zh) * 2020-12-08 2021-03-12 山东超龙环保科技有限公司 一种无人船用通风防水散热器
CN113111451B (zh) * 2021-03-18 2022-06-14 中国电力工程顾问集团西南电力设计院有限公司 输电塔塔脚板式靴板条带式计算方法
CN113175420A (zh) * 2021-06-09 2021-07-27 天津瑞能电气有限公司 用于风机塔筒门板智能控制系统装置
CN116906288B (zh) * 2023-08-30 2025-04-04 华锐风电科技(集团)股份有限公司 风电机组塔筒的散热系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101970869A (zh) * 2008-01-30 2011-02-09 再生动力系统股份公司 风能设备和用于风能设备的塔、塔段和门框
CN102165539A (zh) * 2008-08-07 2011-08-24 强电流设备制造有限公司 变压器系统
CN102753822A (zh) * 2010-02-08 2012-10-24 三菱重工业株式会社 风力发电装置
CN102834609A (zh) * 2010-02-08 2012-12-19 三菱重工业株式会社 风力发电装置
CN203476619U (zh) * 2013-09-10 2014-03-12 国电联合动力技术有限公司 一种风力发电机组塔底散热装置
DE102015200347A1 (de) * 2014-01-15 2015-07-16 Hitachi, Ltd. Windkraftanlage
CN105179180A (zh) 2015-08-20 2015-12-23 远景能源(江苏)有限公司 一种大功率海上风力发电机组塔底冷却系统及控制方法
CN106150929A (zh) * 2016-08-05 2016-11-23 江苏金风科技有限公司 风力发电机组塔底冷却装置及控制方法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7436084B2 (en) * 2003-02-01 2008-10-14 Aloys Wobben Wind energy plant and method for use in erection of a wind energy plant
PT2002120E (pt) * 2006-03-25 2010-01-07 Clipper Windpower Technology Sistema de gestão térmica para turbina eólica
DE102006043936C5 (de) 2006-09-14 2017-03-30 Senvion Gmbh Belüftung einer Windenergieanlage
US20110204652A1 (en) * 2009-08-18 2011-08-25 Mitsubishi Heavy Industries, Ltd. Wind power generator
KR20110114427A (ko) 2010-02-08 2011-10-19 미츠비시 쥬고교 가부시키가이샤 풍력 발전 장치
US9574551B2 (en) * 2011-12-16 2017-02-21 Gtherm, Inc. Power tower—system and method of using air flow generated by geothermal generated heat to drive turbines generators for the generation of electricity
CN104047811A (zh) * 2013-03-12 2014-09-17 上海电气风能有限公司 一种风力发电机塔底通风过滤系统
EP2808543B1 (en) * 2013-05-28 2017-11-01 Siemens Aktiengesellschaft De-humidifying system
CN203420834U (zh) * 2013-07-24 2014-02-05 国电联合动力技术有限公司 一种风冷散热装置以及应用该散热装置的风电机组塔筒
CN203809213U (zh) * 2013-12-19 2014-09-03 浙江海得新能源有限公司 一种低压穿越变流器塔筒散热装置
WO2016000715A1 (en) 2014-07-02 2016-01-07 Vestas Wind Systems A/S A wind turbine with a tower-mounted heat exchange structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101970869A (zh) * 2008-01-30 2011-02-09 再生动力系统股份公司 风能设备和用于风能设备的塔、塔段和门框
CN102165539A (zh) * 2008-08-07 2011-08-24 强电流设备制造有限公司 变压器系统
CN102753822A (zh) * 2010-02-08 2012-10-24 三菱重工业株式会社 风力发电装置
CN102834609A (zh) * 2010-02-08 2012-12-19 三菱重工业株式会社 风力发电装置
CN203476619U (zh) * 2013-09-10 2014-03-12 国电联合动力技术有限公司 一种风力发电机组塔底散热装置
DE102015200347A1 (de) * 2014-01-15 2015-07-16 Hitachi, Ltd. Windkraftanlage
CN105179180A (zh) 2015-08-20 2015-12-23 远景能源(江苏)有限公司 一种大功率海上风力发电机组塔底冷却系统及控制方法
CN106150929A (zh) * 2016-08-05 2016-11-23 江苏金风科技有限公司 风力发电机组塔底冷却装置及控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3339641A4

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112628094A (zh) * 2020-11-25 2021-04-09 天津瑞能电气有限公司 一种风力发电机组塔筒通风散热系统
CN114562424A (zh) * 2021-11-23 2022-05-31 浙江运达风电股份有限公司 一种风机塔筒
CN115750241A (zh) * 2022-11-03 2023-03-07 太原重工股份有限公司 风电机组的轮毂散热装置
CN115750241B (zh) * 2022-11-03 2024-04-02 太原重工股份有限公司 风电机组的轮毂散热装置

Also Published As

Publication number Publication date
AU2017307124A1 (en) 2018-04-12
KR20180052681A (ko) 2018-05-18
AU2017307124B2 (en) 2019-05-02
KR102057794B1 (ko) 2019-12-19
EP3339641A1 (en) 2018-06-27
ES2797323T3 (es) 2020-12-01
EP3339641B1 (en) 2020-05-13
EP3339641A4 (en) 2019-04-24
US20180283361A1 (en) 2018-10-04
CN106150929A (zh) 2016-11-23
CN106150929B (zh) 2020-12-01
US10711768B2 (en) 2020-07-14

Similar Documents

Publication Publication Date Title
CN106150929B (zh) 风力发电机组塔底冷却装置及控制方法
JP6285058B2 (ja) サーバファーム冷却システムのための冷気列封入
JP2012060027A (ja) 電子機器装置
WO2022027890A1 (zh) 充电设备
CN108266337A (zh) 风力发电机组及其冷却方法
CN206212521U (zh) 一种电控柜
WO2015146344A1 (ja) パッケージ収納型エンジン発電機
CN210866855U (zh) 一种便于降温的配电柜
CN116767479A (zh) 机舱通风结构、船舶和控制方法
JP2005139952A (ja) 空冷式インタークーラを備えた建設機械
CN106972372A (zh) 变电站
CN201821014U (zh) 上下结构的高压电容器室
CN116507076A (zh) 探测器ct导轨结构及ct扫描设备
CN115296189A (zh) 一种建筑电气绝缘柜
CN115066148A (zh) 用于数据中心的集装箱移动式水冷系统
JP5453560B2 (ja) ポンプ施設
JP3361575B2 (ja) 車両用機器冷却装置
JP5025337B2 (ja) ポンプ設備
CN105438192B (zh) 一种机车用换热模块
CN224218698U (zh) 一种显示屏用散热结构和显示设备
CN219741047U (zh) 一种塔机电控柜散热排风结构及塔机电控柜
CN105025688A (zh) 一种带隔热功能的柜体装置及使用柜体装置的汇控柜
CN104564538A (zh) 用于风力发电机组的散热装置及风力发电机组
JP2013053629A (ja) ポンプ施設
CN219741040U (zh) 一种塔机电控柜散热排风结构及塔机电控柜

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2017836222

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15761956

Country of ref document: US

ENP Entry into the national phase

Ref document number: 20187009958

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2017307124

Country of ref document: AU

Date of ref document: 20170614

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17836222

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE