WO2017152303A1 - Load transfer method and system of base station - Google Patents

Load transfer method and system of base station Download PDF

Info

Publication number
WO2017152303A1
WO2017152303A1 PCT/CN2016/075714 CN2016075714W WO2017152303A1 WO 2017152303 A1 WO2017152303 A1 WO 2017152303A1 CN 2016075714 W CN2016075714 W CN 2016075714W WO 2017152303 A1 WO2017152303 A1 WO 2017152303A1
Authority
WO
WIPO (PCT)
Prior art keywords
base station
load
service
lowest
present
Prior art date
Application number
PCT/CN2016/075714
Other languages
French (fr)
Chinese (zh)
Inventor
臧利
Original Assignee
臧利
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 臧利 filed Critical 臧利
Priority to PCT/CN2016/075714 priority Critical patent/WO2017152303A1/en
Publication of WO2017152303A1 publication Critical patent/WO2017152303A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/22Performing reselection for specific purposes for handling the traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • H04W28/086Load balancing or load distribution among access entities
    • H04W28/0861Load balancing or load distribution among access entities between base stations

Definitions

  • the present invention relates to the field of communications, and in particular, to a method and system for load transfer of a base station.
  • a base station i.e., a public mobile communication base station
  • a public mobile communication base station is a form of a radio station, and refers to a radio transmission and reception station that transmits information to and from a mobile telephone terminal through a mobile communication switching center in a certain radio coverage area.
  • the construction of mobile communication base stations is an important part of the investment of mobile communication operators in China.
  • the construction of mobile communication base stations is generally carried out around the elements of coverage, call quality, investment efficiency, construction difficulty, and maintenance convenience.
  • the transfer of the service of the existing base station generally performs the transfer of the service according to the load balancing manner, but the transferred base station may not be able to implement the transfer service at the same time, so that the service may be transferred again, and the transfer is further increased.
  • the delay has affected the customer's feelings.
  • the present application provides a load transfer method for a base station. It solves the advantages of the prior art technical solutions to reduce the delay of the business.
  • a method for load transfer of a base station includes the following steps:
  • the method further includes:
  • the method further includes:
  • a load transfer system for a base station includes:
  • a receiving unit configured to receive a service request submitted by the user equipment
  • an obtaining unit configured to acquire a load of another base station capable of processing the service after the service is busy
  • the sending unit is configured to forward the service to the base station with the lowest load for processing.
  • the system further includes:
  • an updating unit configured to update a load of the lowest base station.
  • the sending unit is further configured to send the load of the lowest base station to other base stations.
  • the technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest-performing base station, so that the service has reduced services.
  • FIG. 1 is a flowchart of a base station-based charging method according to a first preferred embodiment of the present invention
  • FIG. 2 is a base station based measurement according to a second preferred embodiment of the present invention
  • FIG. 1 is a schematic diagram of a load transfer method of a base station according to a first preferred embodiment of the present invention. The method is shown in Figure 1, and includes the following steps:
  • Step S101 Receive a service request submitted by a user equipment.
  • Step S102 After the service is busy, acquire a load of another base station capable of processing the service;
  • Step S103 Forward the service to the base station with the lowest load for processing.
  • the technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest base station processing, so that the service has reduced services.
  • the foregoing method may further include:
  • the foregoing method may further include:
  • FIG. 2 is a load transfer system of a base station according to a second preferred embodiment of the present invention.
  • the system includes:
  • the receiving unit 201 is configured to receive a service request submitted by the user equipment
  • the obtaining unit 202 is configured to acquire a load of another base station capable of processing the service after the service is busy;
  • the sending unit 203 is configured to forward the service to the base station with the lowest load for processing.
  • the technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest-performing base station, so that the service has reduced services.
  • the foregoing system may further include:
  • the updating unit 204 is configured to update the load of the lowest base station.
  • the sending unit 203 is further configured to send the load of the lowest base station to another base station.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Disclosed is a load transfer method of a base station, comprising the following steps: receiving a service request submitted by a user equipment; obtaining, in the case of heavy load, load of other base stations that can process the service; and forwarding the service to a base station having the lowest load for processing. The technical solution provided by the present invention can reduce a service time delay.

Description

说明书 发明名称:基站的负载转移方法及系统 技术领域  Title: Inventive Name: Load Transfer Method and System for Base Station Technical Field
[0001] 本发明涉及通信领域, 尤其涉及一种基站的负载转移方法及系统。  [0001] The present invention relates to the field of communications, and in particular, to a method and system for load transfer of a base station.
背景技术  Background technique
[0002] 基站即公用移动通信基站是无线电台站的一种形式, 是指在一定的无线电覆盖 区中, 通过移动通信交换中心, 与移动电话终端之间进行信息传递的无线电收 发信电台。 移动通信基站的建设是我国移动通信运营商投资的重要部分, 移动 通信基站的建设一般都是围绕覆盖面、 通话质量、 投资效益、 建设难易、 维护 方便等要素进行。 随着移动通信网络业务向数据化、 分组化方向发展, 移动通 信基站的发展趋势也必然是宽带化、 大覆盖面建设及 IP化。  [0002] A base station, i.e., a public mobile communication base station, is a form of a radio station, and refers to a radio transmission and reception station that transmits information to and from a mobile telephone terminal through a mobile communication switching center in a certain radio coverage area. The construction of mobile communication base stations is an important part of the investment of mobile communication operators in China. The construction of mobile communication base stations is generally carried out around the elements of coverage, call quality, investment efficiency, construction difficulty, and maintenance convenience. With the development of mobile communication network services in the direction of data and packetization, the development trend of mobile communication base stations is bound to be broadband, large coverage construction and IP.
[0003] 现有的基站的业务的转移一般依据负载均衡的方式进行业务的转移, 但是转移 的基站有吋候无法实现该转移业务, 所以导致该业务可能会再次转移, 再次转 移加大了业务的吋延, 影响了客户的感受。  [0003] The transfer of the service of the existing base station generally performs the transfer of the service according to the load balancing manner, but the transferred base station may not be able to implement the transfer service at the same time, so that the service may be transferred again, and the transfer is further increased. The delay has affected the customer's feelings.
技术问题  technical problem
[0004] 本申请提供一种基站的负载转移方法。 其解决现有技术的技术方案减少业务的 延吋的优点。  The present application provides a load transfer method for a base station. It solves the advantages of the prior art technical solutions to reduce the delay of the business.
问题的解决方案  Problem solution
技术解决方案  Technical solution
[0005] 一方面, 提供一种基站的负载转移方法, 所述方法包括如下步骤:  [0005] In one aspect, a method for load transfer of a base station is provided, where the method includes the following steps:
[0006] 接收用户设备提交的业务请求; Receiving a service request submitted by the user equipment;
[0007] 在业务繁忙吋, 获取能够处理该业务的其他基站的负荷;  [0007] After the service is busy, acquiring the load of other base stations capable of handling the service;
[0008] 将该业务转发给负荷最低的基站处理。  [0008] Forwarding the service to the lowest load base station for processing.
[0009] 可选的, 所述方法还包括:  [0009] Optionally, the method further includes:
[0010] 更新该最低的基站的负荷。  [0010] Updating the load of the lowest base station.
[0011] 可选的, 所述方法还包括:  [0011] Optionally, the method further includes:
[0012] 将该最低的基站的负荷发送给其他基站。 [0013] 第二方面, 提供一种基站的负载转移系统, 所述系统包括: [0012] The load of the lowest base station is transmitted to other base stations. [0013] In a second aspect, a load transfer system for a base station is provided, where the system includes:
[0014] 接收单元, 用于接收用户设备提交的业务请求; [0014] a receiving unit, configured to receive a service request submitted by the user equipment;
[0015] 获取单元, 用于在业务繁忙吋, 获取能够处理该业务的其他基站的负荷; [0015] an obtaining unit, configured to acquire a load of another base station capable of processing the service after the service is busy;
[0016] 发送单元, 用于将该业务转发给负荷最低的基站处理。 [0016] The sending unit is configured to forward the service to the base station with the lowest load for processing.
[0017] 可选的, 所述系统还包括:  [0017] Optionally, the system further includes:
[0018] 更新单元, 用于更新该最低的基站的负荷。  [0018] an updating unit, configured to update a load of the lowest base station.
[0019] 可选的, 所述发送单元, 还用于将该最低的基站的负荷发送给其他基站。  [0019] Optionally, the sending unit is further configured to send the load of the lowest base station to other base stations.
发明的有益效果  Advantageous effects of the invention
有益效果  Beneficial effect
[0020] 本发明提供的技术方案接收用户设备提交的业务请求, 在业务繁忙吋, 获取能 够处理该业务的其他基站的负荷, 将该业务转发给符合最低的基站处理, 所以 其具有减少业务的延吋的优点。  [0020] The technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest-performing base station, so that the service has reduced services. The advantages of delay.
对附图的简要说明  Brief description of the drawing
附图说明  DRAWINGS
[0021] 为了更清楚地说明本发明实施例的技术方案, 下面将对实施例描述中所需要使 用的附图作简单地介绍, 显而易见地, 下面描述中的附图是本发明的一些实施 例, 对于本领域普通技术人员来讲, 在不付出创造性劳动的前提下, 还可以根 据这些附图获得其他的附图。  [0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below. Obviously, the drawings in the following description are some embodiments of the present invention. For those skilled in the art, other drawings may be obtained based on these drawings without any creative work.
[0022] 图 1为本发明第一较佳实施方式提供的一种基于基站的计费方法的流程图; [0023] 图 2为本发明第二较佳实施方式提供的一种基于基站的计费系统的结构图。 1 is a flowchart of a base station-based charging method according to a first preferred embodiment of the present invention; [0023] FIG. 2 is a base station based measurement according to a second preferred embodiment of the present invention; The structure diagram of the fee system.
本发明的实施方式 Embodiments of the invention
[0024] 下面将结合本发明实施例中的附图, 对本发明实施例中的技术方案进行清楚、 完整地描述, 显然, 所描述的实施例是本发明一部分实施例, 而不是全部的实 施例。 基于本发明中的实施例, 本领域普通技术人员在没有作出创造性劳动前 提下所获得的所有其他实施例, 都属于本发明保护的范围。  [0024] The technical solutions in the embodiments of the present invention will be clearly and completely described in the following with reference to the accompanying drawings in the embodiments of the present invention. It is obvious that the described embodiments are a part of the embodiments of the present invention, but not all embodiments. . All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present invention without departing from the inventive work are all within the scope of the present invention.
[0025] 请参考图 1, 图 1是本发明第一较佳实施方式提出的一种基站的负载转移方法, 该方法如图 1所示, 包括如下步骤: Please refer to FIG. 1. FIG. 1 is a schematic diagram of a load transfer method of a base station according to a first preferred embodiment of the present invention. The method is shown in Figure 1, and includes the following steps:
[0026] 步骤 S101、 接收用户设备提交的业务请求; [0026] Step S101: Receive a service request submitted by a user equipment.
[0027] 步骤 S102、 在业务繁忙吋, 获取能够处理该业务的其他基站的负荷;  [0027] Step S102: After the service is busy, acquire a load of another base station capable of processing the service;
[0028] 步骤 S103、 将该业务转发给负荷最低的基站处理。 [0028] Step S103: Forward the service to the base station with the lowest load for processing.
[0029] 本发明提供的技术方案接收用户设备提交的业务请求, 在业务繁忙吋, 获取能 够处理该业务的其他基站的负荷, 将该业务转发给符合最低的基站处理, 所以 其具有减少业务的延吋的优点。  [0029] The technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest base station processing, so that the service has reduced services. The advantages of delay.
[0030] 可选的, 上述方法在步骤 S103之后还可以包括:  [0030] Optionally, after the step S103, the foregoing method may further include:
[0031] 更新该最低的基站的负荷。  [0031] Updating the load of the lowest base station.
[0032] 可选的, 上述方法在步骤 S103之后还可以包括:  [0032] Optionally, after the step S103, the foregoing method may further include:
[0033] 将该最低的基站的负荷发送给其他基站。  [0033] The load of the lowest base station is transmitted to other base stations.
[0034] 请参考图 2, 图 2是本发明第二较佳实施方式提出的一种基站的负载转移系统, 该系统包括:  Please refer to FIG. 2, which is a load transfer system of a base station according to a second preferred embodiment of the present invention. The system includes:
[0035] 接收单元 201, 用于接收用户设备提交的业务请求;  [0035] The receiving unit 201 is configured to receive a service request submitted by the user equipment;
[0036] 获取单元 202, 用于在业务繁忙吋, 获取能够处理该业务的其他基站的负荷; [0036] The obtaining unit 202 is configured to acquire a load of another base station capable of processing the service after the service is busy;
[0037] 发送单元 203, 用于将该业务转发给负荷最低的基站处理。 [0037] The sending unit 203 is configured to forward the service to the base station with the lowest load for processing.
[0038] 本发明提供的技术方案接收用户设备提交的业务请求, 在业务繁忙吋, 获取能 够处理该业务的其他基站的负荷, 将该业务转发给符合最低的基站处理, 所以 其具有减少业务的延吋的优点。  [0038] The technical solution provided by the present invention receives a service request submitted by a user equipment, and obtains a load of another base station capable of processing the service after the service is busy, and forwards the service to the lowest-performing base station, so that the service has reduced services. The advantages of delay.
[0039] 可选的, 上述系统还可以包括: [0039] Optionally, the foregoing system may further include:
[0040] 更新单元 204, 用于更新该最低的基站的负荷。 [0040] The updating unit 204 is configured to update the load of the lowest base station.
[0041] 可选的, 上述发送单元 203, 还用于将该最低的基站的负荷发送给其他基站。  [0041] Optionally, the sending unit 203 is further configured to send the load of the lowest base station to another base station.
[0042] 需要说明的是, 对于前述的各个方法实施例, 为了简单描述, 故将其都表述为 一系列的动作组合, 但是本领域技术人员应该知悉, 本发明并不受所描述的动 作顺序的限制, 因为依据本发明, 某一些步骤可以采用其他顺序或者同吋进行 。 其次, 本领域技术人员也应该知悉, 说明书中所描述的实施例均属于优选实 施例, 所涉及的动作和模块并不一定是本发明所必须的。 [0042] It should be noted that, for the foregoing various method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present invention is not subject to the described action sequence. The limitation is that, in accordance with the present invention, certain steps may be performed in other orders or in the same manner. In addition, those skilled in the art should also understand that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0043] 在上述实施例中, 对各个实施例的描述都各有侧重, 某个实施例中没有详细描 述的部分, 可以参见其他实施例的相关描述。 [0043] In the above embodiments, the descriptions of the various embodiments have their respective focuses, and are not described in detail in an embodiment. For the description, refer to the related description of other embodiments.
[0044] 本领域普通技术人员可以理解上述实施例的各种方法中的全部或部分步骤是可 以通过程序来指令相关的硬件来完成, 该程序可以存储于一计算机可读存储介 质中, 存储介质可以包括: 闪存盘、 只读存储器 (英文: Read-Only Memory, 简称: ROM) 、 随机存取器 (英文: Random Access Memory , 简称: RAM) 、 磁盘或光盘等。 [0044] Those skilled in the art can understand that all or part of the various methods of the above embodiments can be completed by a program to instruct related hardware, and the program can be stored in a computer readable storage medium, the storage medium. It can include: flash drive, read-only memory (English: Read-Only Memory, ROM for short), random access memory (English: Random Access Memory, RAM for short), disk or CD.
[0045] 以上对本发明实施例所提供的内容下载方法及相关设备、 系统进行了详细介绍 , 本文中应用了具体个例对本发明的原理及实施方式进行了阐述, 以上实施例 的说明只是用于帮助理解本发明的方法及其核心思想; 同吋, 对于本领域的一 般技术人员, 依据本发明的思想, 在具体实施方式及应用范围上均会有改变之 处, 综上所述, 本说明书内容不应理解为对本发明的限制。  [0045] The content downloading method and related devices and systems provided by the embodiments of the present invention are described in detail above. The principles and implementation manners of the present invention are described in the specific examples. The description of the above embodiments is only used for To help understand the method of the present invention and its core idea; at the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in specific embodiments and application scopes. The content should not be construed as limiting the invention.

Claims

权利要求书 Claim
[权利要求 1] 一种基站的负载转移方法, 其特征在于, 所述方法包括如下步骤: 接收用户设备提交的业务请求;  [Claim 1] A method for load transfer of a base station, the method includes the following steps: receiving a service request submitted by a user equipment;
在业务繁忙吋, 获取能够处理该业务的其他基站的负荷;  After the busy service, obtain the load of other base stations capable of handling the service;
将该业务转发给负荷最低的基站处理。  The service is forwarded to the lowest load base station for processing.
[权利要求 2] 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括:  [Claim 2] The method according to claim 1, wherein the method further comprises:
更新该最低的基站的负荷。  Update the load of the lowest base station.
[权利要求 3] 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括: [Claim 3] The method according to claim 1, wherein the method further comprises:
将该最低的基站的负荷发送给其他基站。  The load of the lowest base station is transmitted to other base stations.
[权利要求 4] 一种基站的负载转移系统, 其特征在于, 所述系统包括: [Claim 4] A load transfer system for a base station, wherein the system includes:
接收单元, 用于接收用户设备提交的业务请求; 获取单元, 用于在业务繁忙吋, 获取能够处理该业务的其他基站的负 荷;  a receiving unit, configured to receive a service request submitted by the user equipment, and an acquiring unit, configured to acquire a load of another base station capable of processing the service after the service is busy;
发送单元, 用于将该业务转发给负荷最低的基站处理。  The sending unit is configured to forward the service to the base station with the lowest load for processing.
[权利要求 5] 根据权利要求 4所述的系统, 其特征在于, 所述系统还包括: [Claim 5] The system according to claim 4, wherein the system further comprises:
更新单元, 用于更新该最低的基站的负荷。  An update unit, configured to update the load of the lowest base station.
[权利要求 6] 根据权利要求 4所述的系统, 其特征在于, [Clave 6] The system according to claim 4, characterized in that
所述发送单元, 还用于将该最低的基站的负荷发送给其他基站。  The sending unit is further configured to send the load of the lowest base station to other base stations.
PCT/CN2016/075714 2016-03-05 2016-03-05 Load transfer method and system of base station WO2017152303A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2016/075714 WO2017152303A1 (en) 2016-03-05 2016-03-05 Load transfer method and system of base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2016/075714 WO2017152303A1 (en) 2016-03-05 2016-03-05 Load transfer method and system of base station

Publications (1)

Publication Number Publication Date
WO2017152303A1 true WO2017152303A1 (en) 2017-09-14

Family

ID=59789971

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/075714 WO2017152303A1 (en) 2016-03-05 2016-03-05 Load transfer method and system of base station

Country Status (1)

Country Link
WO (1) WO2017152303A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835202A (en) * 2010-04-01 2010-09-15 武汉鸿象信息技术有限公司 Cooperative load balancing method based on multihop relay in heterogeneous wireless network
US20120020215A1 (en) * 2010-07-20 2012-01-26 Gemtek Technology Co., Ltd. Wireless network system and wireless access point device thereof
CN102869047A (en) * 2012-06-27 2013-01-09 中兴通讯股份有限公司 Method and device for realizing load balance
CN103384392A (en) * 2012-05-04 2013-11-06 中兴通讯股份有限公司 Method for enabling mobile terminal to have access to wireless access points and wireless access points
US20140334446A1 (en) * 2011-12-13 2014-11-13 Lg Electronics Inc. Method for data offloading in wireless communication system, and device for same
US20160050587A1 (en) * 2014-08-15 2016-02-18 Verizon Patent And Licensing Inc. Proactive network congestion mitigation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835202A (en) * 2010-04-01 2010-09-15 武汉鸿象信息技术有限公司 Cooperative load balancing method based on multihop relay in heterogeneous wireless network
US20120020215A1 (en) * 2010-07-20 2012-01-26 Gemtek Technology Co., Ltd. Wireless network system and wireless access point device thereof
US20140334446A1 (en) * 2011-12-13 2014-11-13 Lg Electronics Inc. Method for data offloading in wireless communication system, and device for same
CN103384392A (en) * 2012-05-04 2013-11-06 中兴通讯股份有限公司 Method for enabling mobile terminal to have access to wireless access points and wireless access points
CN102869047A (en) * 2012-06-27 2013-01-09 中兴通讯股份有限公司 Method and device for realizing load balance
US20160050587A1 (en) * 2014-08-15 2016-02-18 Verizon Patent And Licensing Inc. Proactive network congestion mitigation

Similar Documents

Publication Publication Date Title
JP6995976B2 (en) Core network access method by terminal, base station and terminal
US10652340B2 (en) Quick relay interface and transport selection
US20190281419A1 (en) Communication Method and Communications Apparatus
CN110662179B (en) Call processing method and device based on LTE broadband trunking system
CN105850218A (en) D2D communication detection method, device and system
WO2019047117A1 (en) Network access method, terminal device and network device
WO2022082724A1 (en) Method and apparatus for multicast service support in time sensitive network
CN103379662A (en) Network access method, interface equipment and movable network-surfing equipment
CN104272713A (en) Multi-party calling method and device
JP7013423B2 (en) Uplink bearer binding in handover
CN104105117A (en) Method for achieving VoIP service in ad hoc network
US20150304829A1 (en) Call forwarding verification
WO2017152303A1 (en) Load transfer method and system of base station
US11496938B1 (en) User equipment (UE) handover based on an active media session
WO2023009845A1 (en) Message flooding prevention in 5g wireless network
JP7501962B2 (en) METHOD AND APPARATUS FOR SIDELINK RESOURCE CONTROL - Patent application
WO2017147837A1 (en) Communication handover method and system for base stations
JP2014195167A (en) Telephone system and method for the same
WO2017147823A1 (en) Data sending method and system for base station
WO2017147832A1 (en) Method and system for positioning rogue base station
WO2017054284A1 (en) Communication method and related device
US20150319683A1 (en) Communication system, communication device, and connection selection control method
CN110809242A (en) Media interaction method under DECT network cluster
WO2017147835A1 (en) Base station-based method and system for positioning user equipment
WO2022116211A1 (en) Emergency call method and apparatus, storage medium, and terminal

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16892955

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC ( EPO FORM 1205A DATED 31/01/2019 )

122 Ep: pct application non-entry in european phase

Ref document number: 16892955

Country of ref document: EP

Kind code of ref document: A1