- WO2017058092A1 WO2017058092A1 PCT/SE2016/050929 SE2016050929W WO2017058092A1 WO 2017058092 A1 WO2017058092 A1 WO 2017058092A1 SE 2016050929 W SE2016050929 W SE 2016050929W WO 2017058092 A1 WO2017058092 A1 WO 2017058092A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- sector
- drilling plan
- drilling
- new
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
Definitions
- the present invention relates to a method for drilling plan generation.
- the invention also relates to a computer program product comprising program code for a computer for implementing a method according to the invention.
- the invention also relates to a system and a drilling rig being equipped with the system.
- BACKGROUND Electronic drilling plans are today used in for example the mining industry. These drilling plans are used as instructions and means for per segment drilling a number of holes in the body which is to be blasted and emptied on material. Said drilling plans comprise information about for example where starting points and end points are positioned and which diameter each said drilling hole shall present. Hereby such start points for drilling holes and direction, length and diameter of each drilling hole are specified. Hereby is also presented the distribution of said drilling holes in said body.
- An operator of a drilling rig may hereby use a sequence of different predetermined drilling plans so as to subsequently drill a number of predefined holes for blasting, whereby a desired tunnel or drift may be created in for example a mountain or a mine.
- Said electronic drilling plans are today developed in advance at for example a planning centre, whereby said drilling plans are stored on a portable memory and brought by the operator to the drilling rig which is to be used for drilling. Thereafter said electronic drilling plans are loaded into a computer arranged at the drilling rig for use during operation of the drilling rig.
- a drilling plan may be presented in two or three dimensions on a presentation screen of said computer.
- the drilling plan may comprise a number of different sectors which may be presented as a surface in two dimensions or as a volume in three dimensions.
- One such sector is denoted wedge.
- a number of adjacent sectors are also specified.
- Other sectors in the drilling plan are denoted stopes.
- a common set of stopes of a drilling plan defines a left and right stope, which are positioned to the left and right of said wedge, respectively.
- a sector positioned adjacently above said left stope, wedge and right stope usually is denoted upper stope.
- a sector beneath said left stope, wedge and right stope is denoted lower stope.
- Said four sectors may be surrounded by a so called inner contour and an outer contour.
- Said outer contour is defining an outermost boundary for starting points of drilling holes.
- a part of said outer contour may be denoted bottom row, defining a lowest boundary, i. e. corresponding to the ground.
- An object of the present invention is to provide a new and advantageous method for drilling plan generation.
- Another object of the invention is to provide a new and advantageous system for drilling plan generation and a new and advantageous computer program for drilling plan generation.
- Another object of the invention is to provide an alternative method for drilling plan generation, an alternative system for drilling plan generation and an alternative computer program for drilling plan generation of a drilling rig.
- Yet another object on the invention is to provide a method, a system and a computer program for flexible drilling plan generation wherein a new drilling plan may be generated, which new drilling plan hereby may be adapted to existing circumstances during operation of a drilling rig.
- Another object of the invention is to provide a method, a system and a computer program for drilling plan generation so as to achieve a more time-effective, and hereby cost-effective, operation of a drilling rig.
- a drilling plan is specifying a number of drilling holes having a starting point and an end point, which drilling holes are distributed within sectors specified in the drilling plan, which sectors comprise a first sector specifying a so called wedge and at least one second sector adjacent to said first sector, comprising the steps of:
- Said existing drilling plan and said new drilling plan are electronic drilling plans.
- Said existing drilling plan is an in advanced specified drilling plan.
- Said new drilling plan may be generated on site for drilling of a drilling rig. By allowing generation of said new drilling plan on site for drilling an operator of the drilling rig may adapt positioning of said first sector to prevailing circumstances. Hereby position of a wedge of said existing drilling plan may be changed, wherein an adaptation of said at least one second sector may be performed dynamically in dependence thereof.
- an operator may hereby, by means of for example a presentation screen where said existing drilling plan is presented, change position, and potentially dimensions, of said first sector in a desired way, whereby a new drilling plan automatically may be generated where adaptations are performed in relation to said changed position. It may be desired to change position of said first sector of the existing drilling plan considering cracks of the body where drills are to be positioned to start a hole. It may also be desired to change position of said first sector of the existing drilling plan when the surface of the body where drills are to be positioned to start a hole is presenting a non- favourable surface structure which make starting a hole and initial drilling more difficult.
- a more advantageous position of said wedge in successive drilling plans may be achieved in a time-effective and user-friendly manner.
- drilling holes of different sectors in the original drilling plan may be specified according to unique rules for each sector.
- Said rules may for example relate to desired row distances (burden) and hole distances as well as which dimension drilling holes within said sector shall have. It should be noted that rows of holes do not necessarily need to be horizontal and vertical even if this is often the case. Determination of said rules may be initiated manually by an operator of a drilling rig where said new drilling plan is generated.
- predetermined rules may be used for adaptation of a drilling plan to prevailing circumstances on site for drilling.
- the method may comprise the steps of:
- said existing drilling plan in such a way that it comprises said first sector and four more sectors, comprising a sector on each side of said first sector and an upper sector, positioned above said first sector and the sectors on each side of said first sector, and a lower sector positioned under said first sector and the sectors on each side of said first sector;
- an existing drilling plan may be used as basis for specifying a new drilling plan, which is both time-effective and user-friendly.
- the method may comprise the steps of:
- the method may comprise the steps of:
- the first sector of the existing drilling plan may be moved both horizontally and vertically, i. e. diagonally.
- dimensions and positions of a provided upper and lower stope and dimensions and positions of said side stopes may be affected.
- a flexible and user-friendly method according to an aspect of the present invention is provided.
- the method may comprise the steps of:
- dimensions of said first sector may be changed, i.e. the size of the first sector represented in two dimensions may be made larger or smaller.
- the rules which have been determined for drilling holes of the first sector in the existing drilling plan may be used for generating a new set of drilling holes for the first sector in the new drilling plan.
- the number of drilling holes associated with the first sector which has been changed in size in the new drilling plan may be larger or smaller.
- Sectors defining adjacent stopes in the new drilling plan may hereby be adapted dynamically to the new dimensions and position of the first sector.
- a wedge being defined of a first sector in the existing drilling plan may be replaced by another wedge, which hereby may have a different size than the wedge in the existing drilling plan.
- This new wedge, and hereto associated rules for drilling holes may hereby be introduced in new drilling plan, whereby adaptation of positions and dimensions of the other sectors of the new drilling plan may be performed automatically.
- This new wedge may have predetermined dimensions and a predetermined drilling hole distribution, where the new wedge thus may be based on predetermined rules.
- rules for a new wedge may be determined and applied on site at the drilling rig.
- a drilling plan is specifying a number of drilling holes having starting points and end points, which drilling holes are distributed within sectors specified in the drilling plan, which sectors comprise a first sector specifying a so called wedge and at least one second sector adjacent said first sector.
- the method comprises the steps of:
- the method may comprise the steps of: - determining rules specifying drilling holes of said existing drilling plan;
- a drilling plan is specifying a number of drilling holes having starting points and end points, which drilling holes are distributed within sectors specified in said drilling plan, which sectors comprise a first sector specifying a so called wedge and at least one second sector adjacent said first sector, comprising:
- a drilling plan is specifying a number of drilling holes with starting points and end points, which drilling holes are distributed within sectors specified in the drilling plan, which sectors comprise a first sector specifying a so called wedge and at least one second sector adjacent said first sector, comprising:
- Said means for generating a new drilling plan may be denoted first drilling plan generating means.
- Said means for adapting dimensions and position may be denoted first adaptation means.
- the system may comprise:
- Said means for determining rules may be denoted rule determining means.
- Said means for applying the thus determined rules may be denoted rule application means.
- the system may comprise:
- first specifying means means arranged to specify said existing drilling plan in such a way that it comprises said first sector and four additional sectors, comprising a sector on each side of said first sector and an upper sector, positioned above the first sector and the sectors on each side on said first sector, and a lower sector positioned under said first sector and a sector on each side of said first sector, which means may be denoted first specifying means;
- the system may comprise:
- second adaptation means means arranged to adapt dimensions and positions of the sectors on each side of the new position of said first sector, which means may be denoted second adaptation means.
- the system may comprise: - means arranged to specify said new drilling plan in such a way that said first sector is moved vertically upwards or downwards, which means may be denoted fifth specifying means; and
- third adaptation means means arranged to adapt dimensions and positions of all sectors surrounding said first sector and its new position, which means may be denoted third adaptation means.
- the system may comprise:
- second drilling plan generation means means arranged to, on the basis of said existing drilling plan, generate said new drilling plan where said first sector has new dimensions compared to said existing drilling plan, which means may be denoted second drilling plan generation means;
- a drilling rig comprising a system for drilling plan generation according to what is disclosed herein.
- a drilling rig comprising a system for drilling plan generation according to what is disclosed herein.
- Said drilling rig may also be denoted drifting configuration or drifting drilling rig.
- a computer program for drilling plan generation comprising program code for causing an electronic control unit or another computer connected to the electronic control unit to perform the steps according to anyone of the claims 1-5.
- a computer program for drilling plan generation comprising program code for causing an electronic control unit or another computer connected to the electronic control unit to perform the steps according to anyone of the claims 1-5, when said program code is run on said control unit or said computer.
- a computer program for drilling plan generation comprising program code stored on a, by a computer readable, medium for causing an electronic control unit or another computer connected to the electronic control unit to perform the steps according to anyone of the claims 1-5.
- a computer program for drilling plan generation wherein said computer program comprises program code stored on a, by a computer readable, medium for causing an electronic control unit or another computer connected to the electronic control unit to perform any of the steps according to anyone of the claims 1-5, when said program code is run on said control unit or said computer.
- a computer program product comprising a program code stored on a, by a computer readable, medium for performing the method steps according to anyone of claims 1-5, when said computer program is run on an electronic control unit or another computer connected to the electronic control unit.
- a computer program product comprising a program code non-volatile stored on a, by a computer readable, medium for performing the method steps according to anyone of claims 1-5, when said program code is run on an electronic control unit or another computer connected to the electronic control unit.
- Figure 1 schematically illustrates a drilling rig, according to an embodiment on the invention
- Figure 2 schematically illustrates a system of the drilling rig presented in Figure 1, according to an embodiment of the invention
- Figure 3a schematically illustrates an existing drilling plan
- Figure 3b schematically illustrates a changed drilling plan, according to an aspect of the invention
- Figure 3c schematically illustrates a changed drilling plan, according to an aspect of the invention
- Figure 3d schematically illustrates a changed drilling plan, in according to an aspect of the invention
- Figure 3e schematically illustrates a side view of a drilling plan
- Figure 4a schematically illustrates a flowchart of a method, according to an embodiment of the invention
- Figure 4b in greater detail schematically illustrates a flowchart of a method, according to an embodiment of the invention.
- Figure 5 schematically illustrates a computer, according to an embodiment of the invention.
- the illustrated drilling rig 100 may be a so called drifting configuration or drifting drilling rig.
- the drilling rig 100 is arranged with a number of arms.
- said drilling rig is arranged with three arms, namely a first arm 110a, a second arm 110b and a third arm 110c, which are arranged to hold a respective drilling arrangement comprising a drilling machine and a thereto associated feeder arrangement.
- said drilling rig 100 may be equipped with an arbitrary number of arms having a drilling arrangement, for example one, two, three or four arms.
- Said drilling arrangements may be arranged to drill holes with a determined length, for example two, five or ten meters. Said holes may be intended to in a suitable way at least partially be filled with explosives for mining of desired determined drifts.
- the drilling rig 100 may be arranged for operation in a tunnel under ground or in mountains. Said arms and drilling arrangements may according to an example be operated substantially
- Operation of said drilling rig 100 may be performed manually by an operator. Operation of said drilling rig 100 may according to an embodiment be performed automatically or semi-automatically.
- link refers to a communications link which may be a physical wire, such as an optoelectronic communication wire, or a non-physical wire, such as a wireless connection, such as a radio link or microwave link.
- a system 299 for drilling plan generation at the drillin rig 100 The system 299 is arranged at the drilling rig 100.
- the system 299 may hereby constitute a part of the herein inventive system for drilling plan generation in accordance with an aspect of the present invention.
- the system 299 comprises a first control unit 200.
- One example embodiment is disclosed with reference to Figure 5.
- a sensor configuration 220 is arranged for communication with the first control unit 200 via a link 220.
- Said sensor configuration 220 may comprise a number of different sensors, which are required for operating said drilling rig 100.
- Said sensor configuration 220 may for example comprise distance readers for determining distances between said drilling arrangements and the body which is to be drilled in.
- Said distance readers may for example comprise laser devices for measuring relevant distances for manoeuvring said arms of said drilling rig and/or said drilling arrangements.
- Said sensor configuration 220 may also comprise position determining means for determining positions regarding said drilling rig 100.
- Said sensor configuration 220 is arranged to continuously or intermittently send signals S200 comprising relevant and detected information to the first control unit 200 via said link L220.
- the first control unit 200 is arranged to use said received information for operating said drilling rig 100.
- Manoeuvre means 230 is arranged for communication with said first control unit 200 via a link L230.
- An operator can hereby control operation of said drilling rig 100 by means of said manoeuvre means 230.
- Said manoeuvre means 230 may for example comprise at least one of control sticks (for example a so called joystick), buttons, handles, steering wheel, paddles, accelerator pedal, breaking pedal, transmission control devices, etc.
- said operator of the drilling rig 100 may manoeuvre, propel, operate and control said drilling rig 100 in a desired way.
- said operator for example may position, direct and operate said arms 110, 110b, 110c, drilling arrangements and feeder devices of said drilling rig 100.
- said manoeuvre means 230 is arranged to send control signals S230 to different systems of said drilling rig 100 for operator requested affection of said system, for example hydraulic systems for said feeder devices.
- Presentation means 240 is arranged for communication with said first control unit 200 via a link L240.
- Said presentation means 240 may comprise a presentation screen.
- Said presentation means 240 may according to an embodiment comprise a touch screen.
- Said presentation means 240 is arranged to present information for said operator for allowing adequate operation of said drilling rig 100. For example information relevant for positioning and orientation of said drilling arrangements may be presented. An operator may by suitable means, for example a so called mouse or by means of the screen as such, choose different views.
- said presentation means 240 is arranged to present information regarding for example the different drilling arrangements of the drilling rig 100, for example drilled length for a certain drilling arrangement, rotational speed of said drilling
- Said first control unit 200 is arranged to present a drilling plan by means of said presentation means 240. Examples of said drilling plan are described in greater detail with reference to Figures 3a-e.
- An operator of the drilling rig 100 may hereby change an existing drilling plan by for example affecting said presentation means 240 or by suitable means associated with said presentation means 240.
- a new drilling plan may be generated. This is described in greater detail with reference to for example Figures 3a-e and 4a and 4b.
- the first control unit 200 is arranged to receive existing drilling plans intended as instructions for operation of said drilling rig 100. This may for example be performed by loading said existing drilling plans from a detachable USB-memory. Said first control unit 200 is hereby arranged to receive said USB-memory, or any other suitable means serving as carrier of information comprising existing drilling plans.
- a communication means 250 is arranged for communication with the first control unit 200 via a link L250.
- Said communication means is arranged for wireless communication with a service centre from which existing drilling plans may be loaded into a memory of said first control unit 200.
- relevant existing drilling plans may be sent from said service centre to said first control unit 200 continuously, intermittently or when necessary.
- An operator of said drilling rig 100 may handle said downloading of relevant drilling plans by means of for example said presentation means 240.
- a second control unit 210 is arranged for communication with the first control unit 200 via a link L210.
- the second control unit 210 may be detachably connected to the first control unit 200.
- the second control unit 210 may be a to the vehicle 100 external control unit.
- the second control unit 210 may be arranged to perform the inventive method steps.
- the second control unit 210 may be used for loading program code to the first control unit 200, in particularly program code for executing the inventive method.
- the second control unit 210 may alternatively be arranged for communication with the first control unit 200 via an internal network of the drilling rig 100.
- the second control unit 210 may be arranged to perform substantially similar functions as the first control unit 200.
- FIG. 3a schematically illustrates an example of an electronic drilling plan PBP.
- Said drilling plan PBP is hereby an existing drilling plan.
- Said existing drilling plan PBP is generated in advance.
- said drilling plan PBP may be generated at a planning centre which is located remotely from the site of drilling with said drilling rig 100.
- Said drilling plan PBP may be provided to said first control unit 200 in any suitable way, for example by means of a portable memory or via a link communication, such as a wireless link or a physical wire.
- a drilling plan is a model presenting how a number of holes are to be drilled in a segment of a tunnel.
- a segment may for example be 5 meters long, and hereby corresponds to a length of a body which is desired to first be drilled, then blasted and thereafter emptied of material.
- the illustrated drilling plan PBP is hereby illustrated in a view in a main direction of a thought tunnel.
- the drilling plan PBP is presented in a vertical view (comprising a local 2D projection).
- starting points of a number of drilling holes and how each such drilling hole is to be directed are presented.
- a starting point is presented as a circle in a drilling plan.
- an end point is illustrated by a projection of a drilling hole running from said starting point.
- Such a projection of a drilling hole is illustrated as a line projecting from said circle regarding entry position of a drilling hole.
- a direction and end point of a certain drilling hole may be read out from said drilling plan.
- a drilling hole is running orthogonally to said vertical plan, i. e.
- the existing drilling plan PBP is presenting a first sector W, a so called wedge.
- Said first sector W presents a number of drilling holes to be drilled.
- said first sector comprises five drilling holes.
- the respective projections of the drilling holes are showing that all drilling holes of the first sector are directed slightly obliquely upwards at a certain angle.
- a drilling plan existing or generated, is presenting at least one second sector.
- four such sectors are presented, according to below.
- the drilling plan PBP comprises a left stope LS.
- Said left stope LS is presenting four drilling holes, where two are to be drilled obliquely upwards and two are to be drilled obliquely upwards to the left.
- the drilling plan comprises a right stope RS.
- Said right stope RS is presenting four drilling holes, where two are to be drilled obliquely upwards and two are to be drilled obliquely upwards to the right.
- said left stope LS and said right stope RS have substantially the same height as said first sector W.
- said left stope LS and said right stope RS may have mutually different shapes, which also are different from said first sector W.
- the drilling plan comprises an upper stope US.
- Said upper stope US comprises a number of drilling holes.
- a drilling plan comprises a lower stope BS.
- Said lower stope BS comprises a number of drilling holes.
- said first sector W is adjacent the left stope LS and the right stope RS as presented in Figure 3a.
- Said upper stope US is defined by a sector which is positioned above said first sector W, said left stope LS and said right stope RS.
- Said lower stope BS is positioned under said first sector W, said left stope LS and said right stope RS.
- an outer first contour IC in said drilling plan PBP.
- a number of drilling holes comprising hole starting points and said respective drilling hole projection are defined.
- an inner second contour 2C is presented inside said first outer first contour IC.
- a number of hole start points and said respective drilling hole projection are defined.
- a part of said second contour 2C is illustrated with a broken line.
- the part of said outer first contour 1C, which is running horizontally under said lower stope BS may be denoted bottom row.
- the illustrated existing drilling plan is according to an aspect of the invention subject for a change meaning that an operator who is using drilling plans for operating said drilling rig 100 wants to move said first sector W to a more suitable position in the drilling plan.
- the operator may also change dimensions of said first sector W and hereby achieve a new drilling plan, according to an aspect of the present invention.
- the operator may exchange said first sector W of the existing drilling plan and hereby achieve a new drilling plan, according to an aspect of the present invention.
- a so called wedge of the original drilling plan is exchanged with a new, different wedge in the new drilling plan.
- a distribution, positioning, dimension and orientation of a number of drilling holes are specified according to unique rules for each such sector or contour. Such different rules may be predetermined.
- drilling holes of said first sector are specified according to a certain set of rules WR.
- drilling holes of said left stope are specified according to a set of rules LSR.
- drilling holes of said right stope are specified according to a set of rules RSR.
- drilling holes of said upper stope are specified according to a set of rules USR.
- drilling holes of said lower stope are specified according to a set of rules BSR.
- drilling holes of said first outer contour 1C are specified according to a set of rules ICR.
- drilling holes of said inner contour 2C are specified according to a set of rules 2CR.
- Figure 3b is schematically illustrating a changed, new, drilling plan NBP, according to an aspect of the invention.
- said first sector W has been moved in a horizontal direction to the right in the original drilling plan PBP.
- This movement may be performed by the operator at the drilling rig 100 by means of said presentation means 240.
- rules are associated with said left stope LS and with rules are associated with said right stope RS, namely LSR and RSR. These rules may be the same rules.
- a new left stope LS and a new right stope RS are generated on the basis of said new position of said first sector W where drilling holes for said new left stope LS and said new right stope RS are generated on the basis of said respective determined rules.
- FIGs 3b-3d it is illustrated a part of a contour B1C which will define the first outer contour in a subsequent segment of the body, which contour B1C may define an outer contour 1C for said subsequent segment of the body. This is also illustrated in Figure 3e in greater detail.
- Figure 3c schematically illustrates a changed, new, drilling plan NBP, according to an aspect of the invention.
- said first sector W has been moved in a vertical direction upwards in the original drilling plan PBP.
- This movement may be performed by the operator at the drilling rig 100 by means of said presentation means 240.
- a new left stope LS and a new right stope RS are generated on the basis of said new position of said first sector W where drilling holes of said new left stope LS and said new right stope RS are generated on the basis of said respective determined rules.
- a new upper stope US and a new lower stope BS on the basis of said new position of said first sector W where drilling holes for said new upper stope US and said new lower stope BS are generated on the basis of said respective determined rules.
- Figure 3d schematically illustrates a changed, new, drilling plan NBP, according to an aspect of the invention.
- said first sector W has been moved in a diagonal direction obliquely upwards to the right in the original drilling plan PBP.
- corresponding relevant steps which have been described with reference to Figure 3b and Figure 3c are performed.
- FIG 3e schematically illustrates a side view of a drilling plan NBP.
- drilling holes HlCl, H2C1 and H3C1 which have been illustrated with reference to Figure 3b are illustrated.
- the distance between 1C defining a start plane for drilling and B1C defining an end plane for drilling may be an arbitrarily suitable distance, for example 5 meters. It is thus the length of the segment of the body to be drilled and blasted.
- said drilling hole HlCl has a direction to some extent inclined upwards.
- said drilling hole H2C1 has a direction to some extent inclined downwards.
- said drilling hole H3C1 has a direction running orthogonally to said start plan (which in this case is vertical) in to the body.
- start plane and said end plane may present an orientation which is not vertically orientated.
- an electronic drilling plan may relate to a segment where said start plane and said end plan are not vertically oriented.
- Figure 4a schematically illustrates a flowchart of a method for drilling plan generation where a drilling plan is specifying a number of drilling holes having starting points and end points, which drilling holes are distributed within sectors specified in the drilling plan, which sectors comprise a first sector W specifying a so called wedge and at least one second sector adjacent to said first sector W.
- the method comprises a first method step s401.
- the step s401 comprises the steps of:
- Figure 4b schematically illustrates a flowchart of a method for drilling plan generation where a drilling plan is specifying a number of drilling holes having starting points and end points, which drilling holes are distributed within sectors specified in the drilling plan, which sectors comprise a first sector specifying a so called wedge and at least one second sector adjacent to said first sector.
- the method comprises a first method step s410.
- the method step s410 may comprise the step of providing an existing drilling plan PBP. This may be performed by loading said existing drilling plan PBP into the first control unit 200 and presenting said existing drilling plan PBP by means of said presentation means 240. Such an existing drilling plan PBP is described in greater detail with reference to Figure 3a.
- a subsequent method step s420 is performed.
- the method step s420 may comprise the step of determining rules specifying drilling holes of said existing drilling plan PBP.
- said first sector W in the existing drilling plan PBP is identified and thereto associated rules for drilling holes of said first sector W are determined.
- said rules for drilling holes of said first sector W does not need to be determined.
- said at least one second sector in the existing drilling plan PBP is identified and thereto associated rules for drilling holes of said second sector are determined.
- said existing drilling plan is specified in such a way that it comprises a first sector as well as four additional sectors, comprising an sector of each side of said first sector and an upper sector, positioned above said first sector and the sectors on each side of said first sector, and a lower sector positioned under said first sector and the sectors on each side on the first sector.
- the step s420 comprises to determine rules of drilling holes of respective identified sector of the existing drilling plan PBP. After the method step s420 a subsequent method step s430 is performed.
- the method step S430 may comprise the step of changing position of said sector W in the existing drilling plan. This may be performed by the operator by means of said presentation means 240. Hereby said first sector W in the existing drilling plan PBP may be moved in any way specified in Figure 3b-3d, i. e., to the right or left, vertically upwards or downwards, or in a diagonal direction.
- the method step s430 may comprise the step of exchanging said first sector W in the existing drilling plan PBP with another first sector with determined rules for drilling holes in said first sector.
- the method step s430 may comprise the step of changing size of said first sector W in the existing drilling plan PBP. After the method step s430 a subsequent method step s440 is performed.
- the method step s440 may comprise the step of applying the thus determined rules and generating a new drilling plan on the basis of said existing drilling plan PBP and the determined rules for each and one of the identified sectors in the existing drilling plan and the identified sectors in said existing drilling plan.
- the method step s440 comprises the step of, were applicable, adapting the identified sectors of the existing drilling plan to dimensions and position of said first sector in the new drilling plan and hereby generating a new drilling plan NBP.
- said new drilling plan is specified in a corresponding way as the existing drilling plan, but with a moved (and potentially dimension changed) first sector and thereto adapted other identified sectors.
- a distribution of drilling holes of said contours 1C and 2C does not need to be adapted to said change regarding said first sector W.
- FIG. 5 shows a diagram of one version of a device 500.
- the control units 200 and 210 described with reference to Figure 2 may in one version comprise the device 500.
- the device 500 comprises a non-volatile memory 520, a data processing unit 510 and a read/write memory 550.
- the non-volatile memory 520 has a first memory element 530 in which a computer program, e.g. an operating system, is stored for controlling the function of the device 500.
- the device 500 further comprises a bus controller, a serial communication port, I/O means, an A/D converter, a time and date input and transfer unit, an event counter and an interruption controller (not shown).
- the non-volatile memory 520 has also a second memory element 540.
- a computer program P for drilling plan generation where a drilling plan is specifying a number of drilling holes each having a start point and an end point, which drilling holes are distributed within specified sectors of the drilling plan, which sectors comprise a first sector W specifying a so called wedge and at least one second sector adjacent to said first sector.
- the computer program P may comprise routines for on the basis of an existing drilling plan PBP, automatically generating a new drilling plan NBP where said first sector W is positioned in a new position compared to said existing drilling plan PBP.
- the computer program P may comprise routines for determining rules specifying drilling holes of said existing drilling plan PBP.
- the computer program P may comprise routines for applying the thus determined rules in said new drilling plan NBP.
- the computer program P may comprise routines for adapting dimensions and position of said at least one second sector to said new position of said first sector in said new drilling plan NBP.
- the computer program P may comprise routines for specifying said existing drilling plan PBP in such a way that it comprises said first sector W and four more sectors comprising an sector on each side of said first sector and an upper sector, positioned above said first sector and the sectors on each side of said first sector, and a lower sector positioned under said first sector and the sectors on each side of said first sector.
- the computer program P may comprise routines for, in said existing drilling plan, specifying said sectors within the frame of an outer contour 1C.
- the computer program P may comprise routines for specifying said new drilling plan NBP in a corresponding way.
- the computer program P may comprise routines for specifying said new drilling plan NBP in such a way that said first sector is moved horizontally to the right or to the left.
- the computer program P may comprise routines for adapting dimensions and positions of sectors on each side of the new position of said first sector.
- the computer program P may comprise routines for specifying said new drilling plan NBP in such a way that said first sector is moved vertically in a direction upwards or downwards.
- the computer program P may comprise routines for adapting dimensions of and positions of all sectors surrounding said first sector and its new position.
- the computer program P may comprise routines for, on the basis of said existing drilling plan PBP, generating said new drilling plan NBP wherein said first sector has new dimensions compared to said existing drilling plan PBP.
- the computer program P may comprise routines for adapting dimensions and position of said at least one second sector to the new dimensions of said first sector in said new drilling plan NBP.
- the program P may be stored in an executable form or in compressed form in a memory 560 and/or in a read/write memory 550.
- the data processing unit 510 performs a certain function, it means that it conducts a certain part of the program which is stored in the memory 560 or a certain part of the program which is stored in the read/write memory 550.
- the data processing device 510 can communicate with a data port 599 via a data bus 515.
- the nonvolatile memory 520 is intended for communication with the data processing unit 510 via a data bus 512.
- the separate memory 560 is intended to communicate with the data processing unit via a data bus 511.
- the read/write memory 550 is arranged to communicate with the data processing unit 510 via a data bus 514.
- the links L210, L220, L230, L240 and L250 for example, may be connected to the data port 599 (see Fig. 2).
- the signals received on the data port 599 comprises information about an existing drilling plan.
- the signals received on the data port 599 comprises information about by an operator requested changes regarding an existing drilling plan, e.g. information regarding how a wedge of the existing drilling plan is desired to be moved, changed regarding dimensions or exchanged to a different wedge.
- Parts of the methods herein described may be conducted by the device 500 by means of the data processing unit 510 which runs the program stored in the memory 560 or the read/write memory 550.
- the device 500 runs the program, method steps and process steps herein described are executed.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Drilling And Boring (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims
Priority Applications (7)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201680056732.XA CN108138560A (en) | 2015-09-30 | 2016-09-29 | For the system and method for drilling plans generation |
| FI20185388A FI131046B1 (en) | 2015-09-30 | 2016-09-29 | System and method for drilling plan generation |
| AU2016330210A AU2016330210A1 (en) | 2015-09-30 | 2016-09-29 | System and method for drilling plan generation |
| CA3000446A CA3000446C (en) | 2015-09-30 | 2016-09-29 | System and method for drilling plan generation |
| NO20180530A NO20180530A1 (en) | 2015-09-30 | 2018-04-18 | System and method for drilling plan generation |
| ZA2018/02620A ZA201802620B (en) | 2015-09-30 | 2018-04-19 | System and method for drilling plan generation |
| AU2022205150A AU2022205150A1 (en) | 2015-09-30 | 2022-07-11 | System and method for drilling plan generation |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE1551253-6 | 2015-09-30 | ||
| SE1551253A SE541053C2 (en) | 2015-09-30 | 2015-09-30 | System and method for drilling plan generation, drilling rig, computer program and computer program product |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2017058092A1 true WO2017058092A1 (en) | 2017-04-06 |
Family
ID=58424218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/SE2016/050929 Ceased WO2017058092A1 (en) | 2015-09-30 | 2016-09-29 | System and method for drilling plan generation |
Country Status (7)
| Country | Link |
|---|---|
| CN (1) | CN108138560A (en) |
| AU (2) | AU2016330210A1 (en) |
| FI (1) | FI131046B1 (en) |
| NO (1) | NO20180530A1 (en) |
| SE (1) | SE541053C2 (en) |
| WO (1) | WO2017058092A1 (en) |
| ZA (1) | ZA201802620B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110159204A (en) * | 2019-06-28 | 2019-08-23 | 中交路桥建设有限公司 | Face hole-drilling system |
| US10894797B2 (en) | 2018-09-18 | 2021-01-19 | Nikang Therapeutics, Inc. | Fused tricyclic ring derivatives as SRC homology-2 phosphatase inhibitors |
| EP4343108A1 (en) * | 2022-09-21 | 2024-03-27 | Sandvik Mining and Construction Oy | An apparatus and a method for selecting a position for a mining vehicle |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SE544076C2 (en) | 2019-07-05 | 2021-12-14 | Epiroc Rock Drills Ab | Method and system for estimating wear of a drill bit |
| EP3789579B1 (en) * | 2019-09-05 | 2023-01-11 | Sandvik Mining and Construction Oy | Apparatus, method and software product for drilling sequence planning |
| WO2026011211A1 (en) * | 2024-07-09 | 2026-01-15 | Technological Resources Pty Ltd | A drilling management system |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003025341A1 (en) * | 2001-09-21 | 2003-03-27 | Atlas Copco Rock Drills Ab | Method for automatic generation of a drill pattern |
| US20040216922A1 (en) * | 2001-12-03 | 2004-11-04 | Sandvik Tamrock Oy | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
| US20080230270A1 (en) * | 2005-06-29 | 2008-09-25 | Erkki Eilo | Arrangement for Positioning Rock Drilling Rig on Drilling Site |
| US20090078438A1 (en) * | 2005-06-27 | 2009-03-26 | Jouko Muona | Arrangement for Positioning Drilling Unit |
| US20100126769A1 (en) * | 2007-04-17 | 2010-05-27 | Sandvik Mining And Construction Oy | Method of modifying drilling pattern, rock drilling rig, and software product |
| US20140137759A1 (en) * | 2011-06-14 | 2014-05-22 | Sandvik Mining And Construction Oy | Method and arrangement for preparing a charging plan |
| WO2014206471A1 (en) * | 2013-06-27 | 2014-12-31 | Sandvik Mining And Construction Oy | Arrangement for controlling percussive drilling process |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101419040A (en) * | 2008-11-19 | 2009-04-29 | 中煤第一建设公司第四十九工程处 | Deep hole blasting method in large aperture composite undermine |
| US9772608B2 (en) * | 2010-12-20 | 2017-09-26 | Joe Spacek | Oil well improvement system—well monitor and control subsystem |
| FI124169B (en) * | 2011-06-14 | 2014-04-15 | Sandvik Mining & Constr Oy | Procedure for setting up a drilling plan |
| CN102564251B (en) * | 2011-11-24 | 2013-10-23 | 北京交通大学 | Single-hole continuous initiation method of electronic detonators in tunnel |
-
2015
- 2015-09-30 SE SE1551253A patent/SE541053C2/en unknown
-
2016
- 2016-09-29 CN CN201680056732.XA patent/CN108138560A/en active Pending
- 2016-09-29 FI FI20185388A patent/FI131046B1/en active
- 2016-09-29 AU AU2016330210A patent/AU2016330210A1/en not_active Abandoned
- 2016-09-29 WO PCT/SE2016/050929 patent/WO2017058092A1/en not_active Ceased
-
2018
- 2018-04-18 NO NO20180530A patent/NO20180530A1/en unknown
- 2018-04-19 ZA ZA2018/02620A patent/ZA201802620B/en unknown
-
2022
- 2022-07-11 AU AU2022205150A patent/AU2022205150A1/en not_active Abandoned
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003025341A1 (en) * | 2001-09-21 | 2003-03-27 | Atlas Copco Rock Drills Ab | Method for automatic generation of a drill pattern |
| US20040216922A1 (en) * | 2001-12-03 | 2004-11-04 | Sandvik Tamrock Oy | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
| US20090078438A1 (en) * | 2005-06-27 | 2009-03-26 | Jouko Muona | Arrangement for Positioning Drilling Unit |
| US20080230270A1 (en) * | 2005-06-29 | 2008-09-25 | Erkki Eilo | Arrangement for Positioning Rock Drilling Rig on Drilling Site |
| US20100126769A1 (en) * | 2007-04-17 | 2010-05-27 | Sandvik Mining And Construction Oy | Method of modifying drilling pattern, rock drilling rig, and software product |
| US20140137759A1 (en) * | 2011-06-14 | 2014-05-22 | Sandvik Mining And Construction Oy | Method and arrangement for preparing a charging plan |
| WO2014206471A1 (en) * | 2013-06-27 | 2014-12-31 | Sandvik Mining And Construction Oy | Arrangement for controlling percussive drilling process |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10894797B2 (en) | 2018-09-18 | 2021-01-19 | Nikang Therapeutics, Inc. | Fused tricyclic ring derivatives as SRC homology-2 phosphatase inhibitors |
| US11034705B2 (en) | 2018-09-18 | 2021-06-15 | Nikang Therapeutics, Inc. | Fused tricyclic ring derivatives as Src homology-2 phosphate inhibitors |
| US11459340B2 (en) | 2018-09-18 | 2022-10-04 | Nikang Therapeutics, Inc. | Tri-substituted heteroaryl derivatives as Src homology-2 phosphatase inhibitors |
| US11518772B2 (en) | 2018-09-18 | 2022-12-06 | Nikang Therapeutics, Inc. | Fused tricyclic ring derivatives as Src homology-2 phosphate inhibitors |
| US12264167B2 (en) | 2018-09-18 | 2025-04-01 | Nikang Therapeutics, Inc. | Fused tricyclic ring derivatives as SRC homology-2 phosphate inhibitors |
| CN110159204A (en) * | 2019-06-28 | 2019-08-23 | 中交路桥建设有限公司 | Face hole-drilling system |
| CN110159204B (en) * | 2019-06-28 | 2024-05-31 | 中交路桥建设有限公司 | Using method of face drilling system |
| EP4343108A1 (en) * | 2022-09-21 | 2024-03-27 | Sandvik Mining and Construction Oy | An apparatus and a method for selecting a position for a mining vehicle |
| WO2024062040A1 (en) * | 2022-09-21 | 2024-03-28 | Sandvik Mining And Construction Oy | An apparatus and a method for selecting a position for a mining vehicle |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2016330210A1 (en) | 2018-05-10 |
| NO20180530A1 (en) | 2018-04-18 |
| ZA201802620B (en) | 2020-10-28 |
| FI20185388A7 (en) | 2018-04-25 |
| CA3000446A1 (en) | 2017-04-06 |
| AU2022205150A1 (en) | 2022-07-28 |
| FI20185388L (en) | 2018-04-25 |
| FI131046B1 (en) | 2024-08-15 |
| CN108138560A (en) | 2018-06-08 |
| SE541053C2 (en) | 2019-03-19 |
| SE1551253A1 (en) | 2017-03-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20180530A1 (en) | System and method for drilling plan generation | |
| JP5037678B2 (en) | Drilling pattern orientation method in curved tunnel, rock drilling device and software product | |
| CA2837905C (en) | Method and arrangement for preparing a charging plan | |
| US20240003225A1 (en) | Method of generating a drill hole sequence plan and drill hole sequence planning equipment | |
| JP5763836B2 (en) | Method and equipment for designing drilling plans | |
| US10208595B2 (en) | Arrangement and method of utilizing rock drilling information | |
| US8733473B2 (en) | Sequencing algorithm for planned drill holes | |
| CN116181338A (en) | Unmanned drilling and blasting tunnel construction scheme and system | |
| CN108138561B (en) | System and method for drilling plan generation | |
| CA3000446C (en) | System and method for drilling plan generation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16852188 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 3000446 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 20185388 Country of ref document: FI |
|
| ENP | Entry into the national phase |
Ref document number: 2016330210 Country of ref document: AU Date of ref document: 20160929 Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 16852188 Country of ref document: EP Kind code of ref document: A1 |