WO2016208990A1 - 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법 - Google Patents

사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법 Download PDF

Info

Publication number
WO2016208990A1
WO2016208990A1 PCT/KR2016/006682 KR2016006682W WO2016208990A1 WO 2016208990 A1 WO2016208990 A1 WO 2016208990A1 KR 2016006682 W KR2016006682 W KR 2016006682W WO 2016208990 A1 WO2016208990 A1 WO 2016208990A1
Authority
WO
WIPO (PCT)
Prior art keywords
anchor
hydraulic plate
fixing body
packer
tension member
Prior art date
Application number
PCT/KR2016/006682
Other languages
English (en)
French (fr)
Inventor
서동현
Original Assignee
(주)현이앤씨
서동현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)현이앤씨, 서동현 filed Critical (주)현이앤씨
Priority to US15/577,997 priority Critical patent/US20180291582A1/en
Priority to CN201680037144.1A priority patent/CN108474192A/zh
Publication of WO2016208990A1 publication Critical patent/WO2016208990A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/805Ground anchors with deformable anchoring members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Definitions

  • the present invention relates to an earth structure for reinforcing a slope, and more particularly, to an anchor provided with a fixture on the hydraulic plate side for pressing the slope and an anchor construction method for constructing the anchor on the slope.
  • cut slopes or fill slopes often occur in civil works that construct roads, railways, embankments, tunnel entrances, apartment complexes, and the like. Such cut slopes and fill slopes are caused to slide and erosion, and at the same time has been required environmentally friendly slope reinforcement method in harmony with the natural environment.
  • Soil nailing method which has been conventionally constructed as a slope reinforcement method, has a problem in that it is necessary to reinforce a larger number of nails than a structure reinforcing the slope only by the frictional force of the anchor as a structure that reinforces the slope only by the frictional force of the nail.
  • Reinforced concrete retaining wall has been mainly used as another method of reinforcing slopes.
  • this reinforcement method also has a disadvantage in that a large amount of cost is required for the pit and fill work, and also the structure as a whole.
  • An object of the present invention is to solve the problems of the prior art, anchored by installing a friction-type fixture in the form of a steel pipe pipe integrated with a hydraulic plate on the tension side of the anchor and installing a primary packer in the middle of the anchor anchor After pressing and fixing the front side fixing body by pressing grouting, the large hydraulic plate which compresses the slope is pressed together with the hydraulic plate side fixing body by introducing a tension force to the tension member of the anchor, then inflating the secondary packer and performing the second pressure grouting. It is therefore an object of the present invention to provide an anchor provided with a fixing member on the hydraulic plate side for compressing a slope for preventing loss of tension of the anchor and a construction method thereof.
  • the part fixed by grouting or acupressure on the ground is called a fixing body, and the fixing body at the right end of FIG. 1 is called the tip side fixing body 6, and the hydraulic plate on the left side is
  • the head-fixed fixture is called the hydraulic plate side fixture 5.
  • the soft ground refers to the ground on which the hydraulic plate is settled by the long-term anchor force due to the earth or sand of the exposed surface of the slope.
  • the present invention for achieving the above object of the present invention is an anchor consisting of a tension member for introducing a tensile force by connecting the hydraulic pressure plate and the base plate and the front end fixing which is fixed by grouting is installed to compress the slope, the front end side Coupling to the hydraulic plate compression ring, which is fixed by the secondary packer, which is configured to act integrally with the primary packer installed in the middle of the tension member to grout and fix the fixture first, and the hydraulic plate capable of exerting support even on soft ground slopes. It is characterized by further comprising a pressure plate side fixing body.
  • a friction type fixing body in the form of a steel pipe is integrated with the hydraulic plate on the tension side of the anchor, the soil is softened by repeating freeze-thawing in the four seasons. Since it is installed, it is effective to prevent settlement from the East Sea.
  • the friction type fixture in the form of a steel pipe has the effect of reinforcing the bearing capacity of the soft ground with friction.
  • the tension-side fixture has the same effect as nailing, and the hydraulic plate is fixed to the friction type fixture in the form of a steel pipe, so that the tension can be secured even when re-tensioning is required without a position shift. It works.
  • FIG. 1 is a view showing an overall state of pressing the hydraulic plate with an anchor provided with a fixture on the hydraulic plate side for pressing the slope according to the present invention.
  • Fig. 2 is a diagram illustrating the hydraulic plate side fixing member separated.
  • FIG. 3 is a view showing the friction type tip-side fixing body of the anchor of the present invention.
  • FIG. 4 is a cross-sectional view taken along the line A-A of FIG. 1, and is a cross-sectional view of a position where the bag packer is mounted with the tip fixing body 6 fixed by grouting and the hydraulic plate side fixing body 5 installed in the drilling hole.
  • FIG. 5 is a cross-sectional view taken along the line BB of FIG. 1, and includes a primary injection hose 12, a primary packer injection hose 11, a discharge hose 14, and a tension member 9 for grouting and fixing the tip fixing body first. ), A cross section of a tension member composed of a secondary injection hose 13 is shown.
  • FIG. 6 is a cross-sectional view taken along the line C-C of FIG. 1 showing the tip-side fixing body 6;
  • FIG. 7 is a view showing a hose cutter installed at an angle of 40 to 50 degrees on a long rod, but an inner side of a perforated iron plate having a sharp blade formed so that the hose is cut and cut when the hose is inserted into the hole.
  • FIG. 8 is a diagram illustrating various types of hydraulic plate embodiments.
  • FIG 1 to 8 are views showing the anchor 50 according to the present invention which presses the hydraulic plate 1 to the slope by inserting and grouting the anchor in the drilled drill hole 22.
  • FIG. 1 is a view showing the anchor 50 according to the present invention as a whole, by connecting the hydraulic plate (1) is installed to compress the slope and the base side and the front side fixing body (6) fixed by grouting to introduce a tensile force
  • the anchor composed of a tension member (9) for carrying out, the primary packer (7) installed in the middle of the tension member (9) for grouting and fixing the tip-side fixing member (6) first, and the support force on the soft ground slope
  • the hydraulic plate pressing ring 4 which is configured to behave integrally with the hydraulic plate 1 that can be exerted and is fixed by secondary grouting, the hydraulic plate side fixing body 5 is joined by a joining means such as welding or screws.
  • It is an anchor characterized by including.
  • the anchor 50 is a tension member (9) longer than the length of the drilled hole 22 and the thickness of the hydraulic plate (1), the anchor head (2) formed at both ends of the tension member (9) and Anchor cap (3) covered on the tip side anchor head (15) and the anchor head (2), a hydraulic plate (1) for pressing a slope on the right side of the tension member (9), and the hydraulic plate (1) of Hydraulic plate fixing body (5) coupled to the hydraulic plate pressing ring (4) fitted in the hole (19) by welding or screwing means, and the front end side fixing body (6) in contact with the hydraulic plate fixing body (5) ), A primary packer 7 positioned at an intermediate position of the tension member 9, and two contracting tubes 10 fitted to the tension member 9 at both sides of the primary packer 7 and positioned at a predetermined distance.
  • a secondary packer 8 positioned adjacent to the hydraulic plate 1, a secondary injection hose 13 installed inside the anchor 50, and the hydraulic plate fixing body 5. Tip side corresponding to Primary packer injection hoses 11, primary injection hoses 12, discharge hoses 14 and secondary packer injection hoses 16 extending over the complex 6 and hydraulic plate press ring during secondary grouting temporarily stopping the packer, and a tubing cutter 21 for cutting the primary injection hose (12).
  • the tension member 9 is formed of a single line or a plurality of lines and is coated with a PE tube 24 so as to smoothly stretch when tensioned after cement grouting so that the injection material is not attached.
  • the tension member 9 which consists of four tanks is illustrated.
  • the hydraulic plate pressing ring 4 in the form of a flange is joined to the hydraulic plate hole 19 by a coupling means such as welding or screws at the tip of the steel pipe 18.
  • the plate pressing ring 4 and the steel tube-like fixture are configured to behave integrally when the tension member 9 is tensioned using the anchor head 2.
  • the pressure plate pressing ring is not necessarily circular, but may be of various shapes such as a square hexagon.
  • the steel pipe of the hydraulic plate-side fixing member 5 is configured to have a large frictional force by grouting by placing unevenness on the outside, and a steel pipe hole is formed in the tip-side steel pipe from the secondary packer 8 so that the injection material inside is also injected into the outside of the steel pipe during grouting. 17) is formed and the secondary packer (8) is a bag packer form outside the non-porous steel pipe portion is composed of a secondary packer injection hose and a secondary discharge hose through the packer, and additionally the primary injection hose and the primary packer injection hose Is installed through.
  • the secondary packer drills the primary injection hose 12 and the primary packer injection hose 11 having the primary injection into the hose cutter 21 to prevent the leak of the packer.
  • the hydraulic plate-side fixing body 5 is cut to have a depth of about 2 m of holes and mounted only with a secondary packer.
  • FIG. 3 shows the friction type in the tip side fixture 6 of FIG. 3, in which the tip anchor head 15 fixes the tension member 9 and the fixture outside the tension member 9 is acupressure type and acupressure type.
  • Various types of fixtures can be applied, such as a complex of molds.
  • FIG. 4 is a cross-sectional view taken along line AA of FIG. 1 and is a cross-sectional view of a position where the secondary bag packer is mounted with the tip fixing body 6 fixed by grouting and the hydraulic plate fixing body 5 installed in the drilling hole 22. to be.
  • FIG. 5 is a cross-sectional view taken along the line BB of FIG. 1, with a primary bag packer, a primary injection hose 12, a primary packer injection hose 11, and a discharge hose for first grouting and fixing the tip fixing body 6.
  • the cross section of the tension material which consists of 14, the tension material 9, and the secondary injection hose 13 is shown.
  • FIG. 6 is a cross-sectional view taken along the line CC of FIG. 1 showing the tip-side fixing body 6;
  • FIG. 7 is installed at the angle bar 23 at an angle of 40 to 50 degrees, preferably 45 degrees, as the hose cutter 21, but the inner side of the perforated iron plate is formed with a sharp blade so that the injection hose 11, 12) or the discharge hose 14 is inserted into the hole and pulled, so that the injection hoses 11 and 12 and the discharge hose 14 are cut and cut. It is used to cut the injection hoses 11 and 12 and the discharge hose 14 in the drilling hole 22.
  • FIG. 8 is a view illustrating various types of hydraulic plates 1, such as a quadrangle and a cross, and may be connected to each other by a grid.
  • the main technical idea and feature of the present invention is that when the slope is cut, the restrained stress is released, the stress distribution is changed, the groundwater level is lowered, and the soft ground is plastically deformed. This phenomenon occurs remarkably in relatively soft soil and weathered rocks. Accordingly, even when the slope 50 is excavated and the slope is pressed by the large hydraulic plate 1, the hydraulic plate 1 is submerged over time, and as a result, the tension force of the anchor 50 is lost. There will be no.
  • the friction type hydraulic plate side fixing body 5 in the form of a steel pipe pipe integrated with the hydraulic plate is installed on the tension side of the anchor 50 to prevent the loss of tension of the anchor 50.
  • the large hydraulic plate 1 for pressing the slope is fixed to the hydraulic plate side.
  • the secondary packer 8 is inflated and subjected to secondary pressure grouting.
  • the drill hole 22 is formed on the slope of the soft ground condition such as earth and sand, and the anchor 50 in which the tip fixing member 6 and the tension member 9 are inserted is inserted. Grouting up to the portion where the primary packer 7 is mounted in the middle portion of the anchor 50 for grouting the tip-side fixing body 6 of the anchor;
  • the second grouting step consists of:
  • the hydraulic plate-side fixing body 5 is a hydraulic plate pressing ring 4 of the flange type to the end of the steel pipe welded or screwed, the hydraulic plate pressing ring 4 and the steel pipe form coupled to the hydraulic plate hole
  • the hydraulic plate side fixing member 5 is configured to behave integrally when the tension member 9 is tensioned by the hydraulic jack using the anchor head 2.
  • the steel pipe 18 of the hydraulic plate-side fixing member 5 is configured to have a large frictional force by grouting by placing irregularities on the outside, and the tip-side steel pipe 18 from the packer so that the injection material inside is also injected outside the steel pipe 18 during grouting.
  • the secondary packer 8 has a secondary packer injection hose 16 and a secondary discharge hose penetrating the packer as a bag packer outside the non-porous steel pipe portion. ) And the primary packer injection hose 11 are installed through.
  • the primary injection hose 12 and the primary packer injection hose 11 having the primary injection completed with the hose cutter 21 are drilled into the hole cutter 22 with the hose cutter 21.
  • the front end side fixture 6 can use a variety of existing fixtures.
  • 3 shows the friction type as the tip side fixing body 6 of the anchor 50.
  • the tip side anchor head 15 serves to fix the tension member 9 and is external to the tension member engaged with the anchor head 2.
  • Steel pipe-type fixture 20 of the can be applied to replace the various types of fixtures such as a combination of acupressure type, acupressure type and friction type.
  • the method of designing the anchor should be designed so that the hydraulic plate and the hydraulic plate side fixing body have a greater ability to support the tensile load of the tension member, and the tip side fixing body should also be larger than the load introduced into the tension member.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 사면을 보강하기 위한 토류 구조물에 관한 것으로서, 더욱 상세하게는 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 상기 앵커를 사면에 시공하기 위한 시공 방법에 관한 것이다. 앵커의 수압판측에 수압판과 일체화된 강관 파이프 형태의 마찰형 정착체를 설치하고 앵커의 중간 부위에 1차 팩커를 설치하여 앵커 선단측 정착체를 가압 그라우팅을 실시하여 고정한 후, 사면을 압착하는 대형 수압판을 수압판측 정착체와 함께 앵커의 인장재에 인장력을 도입하여 압착한 후, 2차 팩커를 부풀리고, 2차 압력 그라우팅을 함으로써 앵커의 긴장력 소실을 방지하는 사면을 압착하기 위한 수압판측에 정착체를 구비한 앵커가 제공된다.

Description

[규칙 제26조에 의한 보정 18.08.2016] 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법
본 발명은 사면을 보강하기 위한 토류 구조물에 관한 것으로서, 더욱 상세하게는 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 상기 앵커를 사면에 시공하기 위한 앵커 시공 방법에 관한 것이다.
일반적으로, 도로, 철도, 제방, 터널의 입출구, 아파트 단지 등을 시공하는 토목 공사에서 종종 절토 사면이나 성토 사면이 발생하게 된다. 이러한 절토 사면이나 성토 사면은 슬라이드와 침식이 발생하게 되는 데, 이를 방지함과 동시에 자연 환경과 조화되는 환경 친화적인 사면 보강 공법이 요구되어 왔다.
이러한 사면 보강 공법으로 통상적으로 시공되어 왔던 쏘일 네일링 공법은 네일의 마찰력으로만 사면을 보강하는 구조로 앵커의 긴장력으로 보강하는 구조보다 더많은 수량의 네일을 보강해야하는 문제점을 내포하고 있었다.
또 다른 사면 보강 방법으로 철근 콘크리트 옹벽이 주로 이용되어 왔는데, 철근 콘크리트 구조물의 설치에 막대한 비용과 시간이 소모되며 막대한 공사비가 소요되는 단점이 있어 앵커를 옹벽과 일체로 추가 설치하여 시행되고 있다. 그러나, 이러한 보강 방법도 굴토 및 성토 작업에 많은 비용이 소모되고, 또한 전체적으로 구조물이 커지게 되는 단점이 있었다.
사면을 절취하면 응력 분포가 변경되고 지하 수위가 낮아져 지반이 침하하게 된다. 이와 같은 현상은 비교적 연약한 토사 지반과 풍화암 지반에서 현저하게 발생한다. 따라서, 사면을 굴착하면서 앵커를 설치하여 대형 수압판으로 사면을 압착하여도 시간 경과에 따라 수압판 부위가 침하되어 앵커의 긴장력이 소실되어 보강 효과가 없게 되는 문제점이 있었다.
또한, 사계절이 뚜렷한 지방에서는 토사 지반이 동결 융해를 반복하면서 연약해지므로 지속적인 압착을 받는 수압판이 침하하면서 앵커의 긴장력이 소실되는 문제점이 발생한다.
본 발명의 목적은 상기 종래 기술의 문제점들을 해결하고자 창안한 것으로서, 앵커의 인장측에 수압판과 일체화된 강관 파이프 형태의 마찰형 정착체를 설치하고 앵커의 중간 부위에 1차 팩커를 설치하여 앵커 선단측 정착체를 가압 그라우팅을 실시하여 고정한 후, 사면을 압착하는 대형 수압판을 수압판측 정착체와 함께 앵커의 인장재에 인장력을 도입하여 압착한 후, 2차 팩커를 부풀리고, 2차 압력 그라우팅을 함으로써 앵커의 긴장력 소실을 방지하는 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법을 제공하는 데 있다.
본 발명에서 용어를 구체적으로 정의하면, 지반에 그라우팅으로 또는 지압으로 고정되는 부위를 정착체라고 명명하며 도 1의 우측 선단의 정착체를 선단측 정착체(6)라 하며, 좌측의 수압판과 헤드가 있는 정착체를 수압판측 정착체(5)라 한다. 본 발명에서 연약 지반이라 함은 사면의 노출 부위가 토사이거나 풍화암으로 장기적인 앵커의 긴장력에 의해 수압판이 침하되는 지반을 말한다.
본 발명의 상기 목적을 달성하기 위한 본 발명은 사면을 압착하기 위해 설치되는 수압판과 원지반과 그라우팅으로 고정되는 선단측 정착체를 연결하여 인장력을 도입하기 위한 인장재로 구성되는 앵커로서, 상기 선단측 정착체를 먼저 그라우팅 및 고정하기 위해 인장재의 중간에 설치하는 1차 팩커와, 연약 지반 사면에서도 지지력을 발휘할 수 있는 수압판과 일체로 거동하도록 구성된 2차 그라우팅으로 고정되는, 수압판 압착링에 결합된 수압판측 정착체를 추가로 구비한 것을 특징으로 한다.
앵커의 인장측에 수압판과 일체화된 강관 파이프 형태의 마찰형 정착체를 설치하면 사계절이 뚜렷한 지방에서는 토사 지반이 동결 융해를 반복하면서 연약해지는 현상을 동결심도 보다 깊게 강관 파이프 형태의 수압판측 정착체를 설치하므로 동해로부터 침하를 방지할 수 있는 효과가 있다.
수압판의 지압력을 견디지 못하는 연약 지반에서도 강관 파이프 형태의 마찰형 정착체는 마찰력으로 연약 지반의 지지력을 보강하는 효과가 있다.
지하 수위 저하와 절취에 따른 응력 변화에도 사면으로부터 영향 범위보다 깊게 수압판과 일체화된 강관 파이프 형태의 마찰형 정착체를 설치하므로써 지속적인 압착을 받는 수압판의 추가 침하와 앵커의 긴장력 소실을 방지하는 효과가 있다.
또한, 인장측 정착체는 네일링을 한 것과 같은 역할을 하는 효과가 있으며 수압판이 강관 파이프 형태의 마찰형 정착체에 고정되어 있어 인장시 위치 이동이 발생하지 않고 재인장 필요시에도 안전하게 인장이 가능한 효과가 있다.
도 1은 본 발명에 따른 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커로 수압판을 압착하는 상태를 전체적으로 도시한 도면이다.
도 2는 수압판측 정착체를 분리 도시한 도면이다.
도 3은 본 발명의 앵커의 마찰형 선단측 정착체를 도시한 도면이다.
도 4는 도 1의 A-A선 단면도로서, 선단측 정착체(6)를 그라우팅으로 고정하고 수압판측 정착체(5)를 천공홀 내에 설치한 상태의 포대 팩커가 장착된 위치의 단면도이다.
도 5는 도 1의 B-B선을 취한 단면도로서, 선단측 정착체를 먼저 그라우팅하여 고정하기 위한 1차 주입 호스(12)와 1차 팩커 주입 호스(11), 토출 호스(14)와 인장재(9), 2차 주입 호스(13)로 구성된 인장재의 단면을 도시한 것이다.
도 6은 선단측 정착체(6)를 도시한 도 1의 C-C선을 취한 단면도이다.
도 7은 긴쇠막대에 40 내지 50도의 각도를 가지고 설치되되 구멍이 뚤린 철판의 내측은 예리한 칼날이 형성되어 호스를 구멍에 넣고 잡아당기면 호스가 베어져 잘리도록 구성된 호스 커팅기를 도시한 도면이다.
도 8은 다양한 형태의 수압판 실시 형태를 도시한 도면이다.
이하에서, 본 발명에 따른 앵커를 첨부된 도면을 참조하여 상세히 설명한다.
도 1 내지 도 8은 천공된 천공 홀(22)에 앵커를 삽입하고 그라우팅하여 수압판(1)을 사면에 압착하는 본 발명에 따른 앵커(50)를 전체적으로 도시한 도면이다.
도 1은 본 발명에 따른 앵커(50)를 전체적으로 도시한 도면으로서, 사면을 압착하기 위해 설치되는 수압판(1)과 원지반과 그라우팅으로 고정되는 선단측 정착체(6)를 연결하여 인장력을 도입하기 위한 인장재(9)로 구성되는 앵커에 있어서, 선단측 정착체(6)를 먼저 그라우팅 및 고정하기 위해 인장재(9)의 중간에 설치하는 1차 팩커(7)와, 연약지반 사면에서도 지지력을 발휘할 수 있는 수압판(1)과 일체로 거동하도록 구성되어 2차 그라우팅으로 고정되는, 수압판 압착링(4)에 용접 또는 나사와 같은 결합 수단으로 결합되는 수압판측 정착체(5)를 추가로 구비한 것을 특징으로 하는 앵커이다.
본 발명에 따른 앵커(50)는 천공된 천공 홀(22)의 길이와 수압판(1)의 두께보다 긴 인장재(9)와, 상기 인장재(9)의 양측단에 형성된 앵커 헤드(2) 및 선단측 앵커 헤드(15)와 상기 앵커 헤드(2)에 씌워지는 앵커캡(3)과, 상기 인장재(9)의 우측면에서 사면을 압착하는 수압판(1)과, 상기 수압판(1)의 구멍(19)에 끼워지는 수압판 압착링(4)에 용접 또는 나사와 같은 결합 수단으로 결합된 수압판 정착체(5)와, 상기 수압판 정착체(5)와 맞닿는 선단측 정착체(6)와, 상기 인장재(9)의 중간 위치에 위치하는 1차 팩커(7)와, 상기 1차 팩커(7)의 양측에 상기 인장재(9)에 끼워져 일정 거리에 위치하는 두 개의 수축관(10)과, 상기 수압판(1)에 근접하게 위치하는 2차 팩커(8)를 구비하고, 상기 앵커(50)의 내부에 설치되는 2차 주입 호스(13)와, 상기 수압판 정착체(5)에 대응하는 선단측 정착체(6)에 걸쳐 연장되어 있는 1차 팩커 주입 호스(11), 1차 주입 호스(12), 토출 호스(14) 및 2차 팩커 주입 호스(16)와, 2차 그라우팅시 수압판 압착링을 막는 임시 팩커, 상기 1차 주입 호스(12)를 절단하기 위한 호스 커팅기(21)를 구비한다.
상기 인장재(9)는 단선 또는 복수의 선으로 이루어지며 시멘트 그라우팅 후에도 인장시 신장이 원활하도록 PE관(24)으로 피복하여 주입재가 부착되지 않도록한다. 본원에서는 4개의 조로 이루어진 인장재(9)가 설치된 것을 예시하고 있다.
도 2의 수압판측 정착체(5)는 강관(18)의 선단에 플랜지 형태의 수압판 압착링(4)이 용접 또는 나사와 같은 결합 수단으로 결합되어, 수압판 구멍(19)에 결합된 수압판 압착링(4)과 강관 형태의 정착체가 앵커 헤드(2)를 이용하여 인장재(9)를 인장시킬 때, 일체로 거동하도록 구성된다. 이때 수압판 압착링은 반드시 원형이 아니고 사각형 육각형 등 다양한 형상의 것을 사용할 수 있다.
수압판측 정착체(5)의 강관은 외부에 요철을 두어 그라우팅에 의해 마찰력이 크도록 구성되고 그라우팅시 내부의 주입재가 강관 외부로도 주입되도록 2차 팩커(8)로부터 선단측 강관에는 강관 구멍(17)이 형성되고 2차 팩커(8)는 무공 강관부 외부에 포대 팩커 형태로서 2차 팩커 주입 호스와 팩커를 관통한 2차 토출 호스가 구성되며 추가로 1차 주입 호스와 1차 팩커 주입 호스가 관통하여 설치된다. 더좋은 실시 예는 2차 팩커는 팩커의 누수를 막기 위해서는 호스 커팅기(21)로 1차 주입이 완료된 1차 주입 호스(12)와 1차 팩커 주입 호스(11)를 호스 커팅기(21)로 천공홀의 약 2m 깊이에서 커팅하고 2차 팩커만 장착된 수압판측 정착체(5)를 구성한다.
도 3의 선단측 정착체(6)는 마찰형을 나타낸 도면으로 선단측 앵커 헤드(15)가 인장재(9)를 고정하는 역할과 인장재(9) 외부의 정착체는 지압형, 지압형과 마찰형의 복합형 등 여러 가지 형태의 정착체를 적용할 수 있다.
도 4는 도 1의 A-A선 단면도로서 선단측 정착체(6)를 그라우팅으로 고정하고 수압판측 정착체(5)를 천공 홀(22) 내에 설치한 상태의 2차 포대 팩커가 장착된 위치의 단면도이다.
도 5는 도 1의 B-B선을 취한 단면도로서 선단측 정착체(6)를 먼저 그라우팅하여 고정하기 위한 1차 포대 팩커와 1차 주입 호스(12)와 1차 팩커 주입 호스(11), 토출 호스(14)와 인장재(9), 2차 주입 호스(13)로 구성된 인장재의 단면을 도시한 것이다.
도 6은 선단측 정착체(6)를 도시한 도 1의 C-C선을 취한 단면도이다.
도 7은 호스 커팅기(21)로서 긴쇠막대(23)에 40 내지 50도의 각도, 바람직하게는 45도 정도의 각도를 가지고 설치되되 구멍이 뚤린 철판의 내측은 예리한 칼날이 형성되어 주입 호스(11, 12)나 토출 호스(14)를 구멍에 넣고 잡아당기면 주입 호스(11, 12)나 토출 호스(14)가 베어져 잘리도록 구성되어 있다. 천공 홀(22) 내에 있는 주입 호스(11, 12) 및 토출 호스(14)를 잘라낼 때 사용한다.
도 8은 사각형, 십자형 등 다양한 형태의 수압판(1)을 도시한 도면으로 격자로 십자형 수압판(1)을 서로 연결할 수도 있다.
본 발명의 주요한 기술적 사상과 특징은, 사면은 절취를 하면 구속된 응력이 해방되어 응력 분포가 변경되고 지하 수위가 낮아지며 연약 지반은 소성 변형을 하게 된다. 이와 같은 현상은 비교적 연약한 토사 지반과 풍화암 지반에서 현저하게 발생한다. 따라서, 사면을 굴착하면서 앵커(50)를 설치하여 대형 수압판(1)으로 사면을 압착하여도 시간 경과에 따라 수압판(1) 부위가 침하 됨에 따라 앵커(50)의 긴장력이 소실되어 보강 효과가 없게 된다.
또한, 사계절이 뚜렷한 지방에서는 토사 지반이 동결 융해를 반복하면서 연약해지므로 지속적인 압착을 받는 수압판(1)이 침하하면서 앵커(50)의 긴장력이 소실된다.
이와 같은 문제를 해결하고자 앵커(50)의 인장측에 수압판과 일체화된 강관 파이프 형태의 마찰형 수압판측 정착체(5)를 설치하여 앵커(50)의 긴장력 소실을 방지하는 것이다.
또한, 앵커(50)의 중간부위에 1차 팩커(7)를 설치하여 앵커 선단측 정착체(6)를 가압 그라우팅을 실시하여 고정한 후, 사면을 압착하는 대형 수압판(1)을 수압판측 정착체(5)와 함께 앵커의 인장재(9)에 인장력을 도입하여 압착한 후, 2차 팩커(8)를 부풀리고 2차 압력 그라우팅을 하여 완성하는 것이다.
최선의 실시예를 서술하면, 토사, 풍화암과 같은 연약 지반 조건의 사면에서 천공 홀(22)을 형성하고 선단측 정착체(6)와 인장재(9)가 결합된 앵커(50)를 삽입한 후, 앵커의 선단측 정착체(6)를 그라우팅하기 위한 앵커(50)의 중간부에 1차 팩커(7)가 장착된 부분까지 그라우팅하는 단계;
앵커의 인장재(9)에 수압판(1)을 설치하고 수압판측 정착체(5)를 인장재(9)에 끼워 천공홀(22)에 삽입 설치하는 단계;
수압판측 정착체(5)에 장착된 2차 팩커(8)를 팽창시키는 단계;
수압판(1)에 앵커 헤드(2)를 설치하고 인장재(9)를 인장하는 단계;
2차 그라우팅을 하는 단계:로 이루어진다.
현장 여건에 따라 제2 실시예는 사면에서 선단측 정착체(6)와 인장재(9) 및 수압판측 정착체(5)를 일체로 조립한 앵커(50)를 천공 홀(22)에 삽입 후, 팩커를 팽창시켜 그라우팅을 하는 단계:
수압판측 정착체(5)에 수압판(1)을 끼운 후, 수압판 압착링을 나사 결합하여 조이는 단계:
수압판 구멍(19)에 돌출된 앵커 인장재(9)를 앵커 헤드(2)를 이용하여 인장 및 고정하는 단계:로 이루어진다.
상기의 수압판측 정착체(5)는 강관의 선단에 플랜지 형태의 수압판 압착링(4)이 용접 결합되거나 나사 형태로 결합되어, 수압판 구멍에 결합된 수압판 압착링(4)과 강관 형태의 수압판측 정착체(5)가 앵커 헤드(2)를 이용하여 인장재(9)를 유압잭으로 인장시 일체로 거동하도록 구성된다.
수압판측 정착체(5)의 강관(18)은 외부에 요철을 두어 그라우팅에 의해 마찰력이 크도록 구성되고 그라우팅시 내부의 주입재가 강관(18) 외부로도 주입되도록 팩커로부터 선단측 강관(18)에는 강관 구멍(17)으로 형성되고 2차 팩커(8)는 무공 강관부 외부에 포대 팩커로서 2차 팩커 주입 호스(16)와 팩커를 관통한 2차 토출 호스가 구성되며 1차 주입 호스(12)와 1차 팩커 주입 호스(11)가 관통하여 설치된다. 더욱 바람직한 실시예는 팩커의 누수를 막기 위해서는 호스 커팅기(21)로 1차 주입이 완료된 1차 주입 호스(12)와 1차 팩커 주입 호스(11)를 호스 커팅기(21)로 천공 홀(22)의 약 2m 깊이에서 커팅한다. 상기와 같이 호스들을 절단함으로써 1차 팩커 주입 호스(11)와 1차 주입 호스(12)가 2차 팩커(8)를 관통되지 않게 됨으로써 간단하게 2차 팩커(7)를 구성하게 되며 2차 팩커(8)의 시공이 용이해진다. 2차 그라우팅시는 토출 호스가 필요없이 수압판측 정착체(5)의 수압판 압착링에 임시 팩커를 설치하여 그라우트액을 주입한다. 2차 주입시 수압판(1)과 사면이 빈틈없이 압착이 되는 지반은 2차 팩커(8)를 생략할 수도 있다.
선단측 정착체(6)는 기존의 다양한 정착체를 사용할 수 있다. 도 3은 앵커(50)의 선단측 정착체(6)로서 마찰형을 나타낸 도면으로 선단측 앵커 헤드(15)가 인장재(9)를 고정하는 역할을 하고 앵커 헤드(2)와 결합하는 인장재 외부의 강관형 정착체(20)는 지압형, 지압형과 마찰형의 복합형 등 여러 가지 형태의 정착체를 대체하여 적용할 수 있다.
앵커를 설계하는 방법은 수압판과 수압판측 정착체가 인장재의 인장 하중 보다 지지하는 능력이 크게 되도록 설계해야만 하며, 선단측 정착체도 인장재에 도입되는 하중보다 커야 한다.

Claims (4)

  1. 사면을 압착하기 위해 설치되는 수압판(1)과 원지반과 그라우팅으로 고정되는 선단측 정착체(6)를 연결하여 인장력을 도입하기 위한 인장재로 구성되는 앵커에 있어서,
    상기 선단측 정착체(6)를 먼저 그라우팅 및 고정하기 위해 인장재(9)의 중간에 설치하는 1차 팩커(7)와, 연약 지반 사면에서도 지지력을 발휘할 수 있는 수압판(1)과 일체로 거동하도록 구성된 2차 그라우팅으로 고정되는, 수압판 압착링(4)에 결합된 수압판측 정착체(5)를 추가로 구비한 것을 특징으로 하는 수압판측에 정착체가 구비된 사면을 압착하기 위한 앵커.
  2. 청구항 1에 있어서,
    상기 수압판측 정착체(5)의 강관은 그라우팅시 강관 내부의 주입재가 강관 외부로도 주입되도록 제2 팩커(8)로부터 강관의 선단측에는 강관 구멍(17)이 형성되어 있는 것을 특징으로 하는 수압판측에 정착체가 구비된 사면을 압착하기 위한 앵커.
  3. 연약 지반 조건의 사면에서 천공홀(22)을 형성하고, 선단측 정착체(6)와 인장재(9)가 결합된 앵커(50)를 삽입한 후, 앵커의 선단측 정착체(6)를 그라우팅하기 위한 앵커(50)의 중간부에 1차 팩커(7)가 장착된 부분까지 그라우팅하는 단계:
    상기 앵커(50)의 인장재(9)에 수압판(1)을 설치하고 수압판측 정착체(5)를 인장재(9)에 끼워 천공홀(22)에 삽입 설치하는 단계와;
    수압판측 정착체(5)에 장착된 2차 팩커(8)를 팽창시키는 단계;
    수압판(1)에 앵커 헤드(2)를 설치하고 인장재(9)를 인장하는 단계;
    수압판측 정착체(5)에 2차 그라우팅을 하는 단계를 구비한 것을 특징으로 하는 수압판측에 정착체가 구비된 사면을 압착하기 위한 앵커 시공 방법.
  4. 현장 여건에 따라 사면에서 선단측 정착체(6)와 인장재(9) 및 수압판측 정착체(5)를 일체로 조립한 앵커(50)를 천공홀(22)에 삽입 후, 1차 팩커(7)를 팽창시켜 그라우팅을 하는 단계:
    수압판측 정착체(6)에 수압판(1)을 끼운 후, 수압판 압착링을 나사 결합하여 조이는 단계:
    수압판 구멍(19)에 돌출된 앵커 인장재(9)를 앵커 헤드(2)를 이용하여 인장 및 고정하고 앵커캡(3)을 씌우는 단계:
    수압판측 정착체(5)에 2차 그라우팅을 하는 단계를 구비한 것을 특징으로 하는 수압판측에 정착체가 구비된 사면을 압착하기 위한 앵커 시공 방법.
PCT/KR2016/006682 2015-06-25 2016-06-23 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법 WO2016208990A1 (ko)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US15/577,997 US20180291582A1 (en) 2015-06-25 2016-06-23 Anchor having fixing device at side of pressure plate to depress land slope and method of installing same
CN201680037144.1A CN108474192A (zh) 2015-06-25 2016-06-23 在用于压低地面斜坡的压板侧具有固定装置的锚固器及其安装方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020150090250A KR101757975B1 (ko) 2015-06-25 2015-06-25 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법
KR10-2015-0090250 2015-06-25

Publications (1)

Publication Number Publication Date
WO2016208990A1 true WO2016208990A1 (ko) 2016-12-29

Family

ID=53793775

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/006682 WO2016208990A1 (ko) 2015-06-25 2016-06-23 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법

Country Status (4)

Country Link
US (1) US20180291582A1 (ko)
KR (1) KR101757975B1 (ko)
CN (1) CN108474192A (ko)
WO (1) WO2016208990A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939600A (zh) * 2017-03-20 2017-07-11 长江大学 一种液压膨胀锚杆

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302039A (zh) * 2020-10-26 2021-02-02 中交路桥建设有限公司 隧道洞口浅埋崩坡积体处理施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100221013B1 (ko) * 1997-02-18 1999-09-15 고영균 하수관내의 돌출 플라스틱관 절단장치
KR100576053B1 (ko) * 2003-09-24 2006-05-08 한주이엔씨 주식회사 패커식 쏘일 네일체 및 시공방법
KR100756493B1 (ko) * 2007-02-08 2007-09-07 주식회사 도담이앤씨 발포 팽창제를 이용한 지하수 심정의 오염을 방지하기 위한 그라우팅 장치 및 그 시공 방법
KR100965273B1 (ko) * 2009-11-04 2010-06-22 주식회사 에스지오텍 사면 보강장치를 이용한 사면 보강방법
KR100992999B1 (ko) * 2009-08-31 2010-11-09 김성례 소일 네일링 보강효과를 얻는 사면보강용 영구앵커 및 그 시공방법

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2423591A1 (fr) * 1978-04-18 1979-11-16 Sif Entreprise Bachy Ameliorations a la realisation de tirants ancres
SE527424C2 (sv) * 2004-07-08 2006-02-28 Atlas Copco Rocktech Ab Anordning och förfarande vid injektering och fastsättning av armerings- och/eller förankringselement i bergvägg
CN102003189A (zh) * 2010-12-20 2011-04-06 中铁隧道集团有限公司 一种快速均匀加固软弱地层的模袋注浆方法和装置
CL2011000042A1 (es) * 2011-01-07 2011-06-17 Sistema de fortificacion que comprende una barra helicoidal estandar, una cabeza de expansion adaptada a la rosca de la barra, un elemento de material plastico, un tubo de plastico corrugado, una placa de fortificacion estandar y una tuerca de fortificacion roscada segun el perno helicoidal que utiliza.
CN104295309B (zh) * 2014-10-30 2017-06-09 安徽理工大学 一种带钢筋骨架的聚能射孔中空注浆锚杆及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100221013B1 (ko) * 1997-02-18 1999-09-15 고영균 하수관내의 돌출 플라스틱관 절단장치
KR100576053B1 (ko) * 2003-09-24 2006-05-08 한주이엔씨 주식회사 패커식 쏘일 네일체 및 시공방법
KR100756493B1 (ko) * 2007-02-08 2007-09-07 주식회사 도담이앤씨 발포 팽창제를 이용한 지하수 심정의 오염을 방지하기 위한 그라우팅 장치 및 그 시공 방법
KR100992999B1 (ko) * 2009-08-31 2010-11-09 김성례 소일 네일링 보강효과를 얻는 사면보강용 영구앵커 및 그 시공방법
KR100965273B1 (ko) * 2009-11-04 2010-06-22 주식회사 에스지오텍 사면 보강장치를 이용한 사면 보강방법

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939600A (zh) * 2017-03-20 2017-07-11 长江大学 一种液压膨胀锚杆
CN106939600B (zh) * 2017-03-20 2019-02-26 长江大学 一种液压膨胀锚杆

Also Published As

Publication number Publication date
CN108474192A (zh) 2018-08-31
KR20150082152A (ko) 2015-07-15
KR101757975B1 (ko) 2017-07-13
US20180291582A1 (en) 2018-10-11

Similar Documents

Publication Publication Date Title
KR100740200B1 (ko) 선지보 터널 공법 및 이에 적합한 장치
EP3382143A1 (en) Tunnel construction method using pre-support and post-support and apparatus suitable for same
KR101605028B1 (ko) 개선된 구조의 영구앵커 공법용 선단정착앵커
CN104389628A (zh) 滑坡地段隧道加固装置及加固施工方法
KR100966148B1 (ko) 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법
KR200426634Y1 (ko) 영구앵커 구조
WO2016208990A1 (ko) 사면을 압착하기 위한 수압판측에 정착체가 구비된 앵커 및 그 시공 방법
CN206360720U (zh) 一种新型柔性充填隔离挡墙
KR102079563B1 (ko) 압축마찰형 앵커 패널 지반 보강 시스템
KR100862387B1 (ko) 지압형 영구 앵커의 탑다운 시공을 위한 긴장용 키트와이를 이용한 지압형 영구 앵커의 탑다운 시공 방법
KR100912482B1 (ko) 이중 날개형 앵커
KR101297679B1 (ko) 와이어를 이용한 자립식 가시설 구조 및 그 공법
KR100951872B1 (ko) 지반 보강 장치 및 이를 이용한 지반 보강 방법
KR100710867B1 (ko) 수평배수공 역할을 겸한 상향식 지반보강공법 및 그 구조
KR100776620B1 (ko) 바타입 앵커
CN214741347U (zh) 一种用于水工盾构建筑结构加强固定装置
CN113605934B (zh) 一种防止隧道仰坡溜塌的加固结构及其施工方法
CN112813984B (zh) 复杂地质条件下深基坑施工方法
KR200381572Y1 (ko) 밀크그라우팅을 이용하여 가압을 할 수 있는 패커
CN108360558A (zh) 浅埋暗挖隧道洞内端头墙桩锚一体支护结构及其施工工艺
CN109653193B (zh) 逆作地下连续墙施工方法
KR200381571Y1 (ko) 수평배수공 역할을 겸한 상향식 지반보강구조
KR20110029424A (ko) 마이크로파일 기초공법 및 이에 사용되는 파일 조립체
KR102639738B1 (ko) 개선된 확장형 지압식 영구앵커의 시공방법
KR100637899B1 (ko) 교각 직접 기초 가시설 및 그 시공방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16814703

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15577997

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16814703

Country of ref document: EP

Kind code of ref document: A1