WO2016202058A1 - 校验处理方法、装置及系统 - Google Patents

校验处理方法、装置及系统 Download PDF

Info

Publication number
WO2016202058A1
WO2016202058A1 PCT/CN2016/078691 CN2016078691W WO2016202058A1 WO 2016202058 A1 WO2016202058 A1 WO 2016202058A1 CN 2016078691 W CN2016078691 W CN 2016078691W WO 2016202058 A1 WO2016202058 A1 WO 2016202058A1
Authority
WO
WIPO (PCT)
Prior art keywords
verified
information
maintenance device
verification
site maintenance
Prior art date
Application number
PCT/CN2016/078691
Other languages
English (en)
French (fr)
Inventor
张高科
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2016202058A1 publication Critical patent/WO2016202058A1/zh

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/07Arrangements for monitoring or testing transmission systems; Arrangements for fault measurement of transmission systems

Definitions

  • the present invention relates to the field of communications, and in particular, to a verification processing method, apparatus, and system.
  • Optical fiber communication is the main transmission method of various communication networks. Optical fiber communication plays a vital role in the construction of information highways. The strategic position of national development. Today, the use of optical fiber is not limited to land. Cables have been widely deployed in the Atlantic Ocean and the Pacific Ocean. These submarine cables make global communication very simple and fast. Today, many developed countries have put fiber optic cables in front of their homes to realize fiber-to-the-office and fiber-to-the-home.
  • Each fiber is tested during the attenuation of the optical fiber line of the hop section.
  • the sampling test shall be no less than 25% of the number of fiber cores during acceptance.
  • the backscattered signal curve of the hop fiber should be inspected for each fiber when it is completed.
  • the check at the acceptance should be no less than 25% of the number of cores.
  • the above-mentioned traditional optical cable construction acceptance method requires two people to separately record two ports corresponding to the acceptance optical cable, and communicate and coordinate through telephone or short message, realize simultaneous operation on the corresponding port and record the detection result, and then perform complicated manual calculation to generate Acceptance report.
  • due to the large number of optical fibers only partial sampling can be performed, and full coverage cannot be achieved.
  • Since the number of ports on the field device for acceptance can be large, it is not easy to find the port at the time of acceptance and it is extremely error-prone. Operators are inefficient through telephone or text messaging.
  • the acceptance report also requires complicated manual calculations, and it cannot be reported in real time, and the requirements for operators are relatively high.
  • the embodiment of the invention provides a verification processing method, device and system, so as to at least solve the problem that the verification of the optical fiber in the related art is complicated and low in efficiency.
  • a verification processing method including: transmitting information to be verified to an on-site maintenance device, wherein the information to be verified is used by the on-site maintenance device according to the The verification information is to be verified by the device to be verified.
  • the on-site maintenance device includes at least a first on-site maintenance device and a second on-site maintenance device, where the device to be verified includes at least a first end to be verified device and a device The second end of the optical fiber is to be verified; and the verification result that the on-site maintenance device performs verification processing on the to-be-verified device according to the to-be-checked information.
  • the receiving, by the on-site maintenance device, the verification process of the device to be verified according to the to-be-checked information includes: receiving, by the first on-site maintenance device, the a first verification result parameter that is to be verified by the device to be verified at one end; the first verification result parameter is sent to the second on-site maintenance device; and the second on-site maintenance device is received according to the second verification a result of the verification of the result of the first verification result parameter, wherein the second verification result parameter is that the second field maintenance device treats the second end according to the information to be verified The result parameter of the verification device for the verification process.
  • the to-be-checked information includes at least one of the following: a name of the device to be verified, a geographical location information of the device to be verified, and port information of the device to be verified.
  • a verification processing method including: receiving information to be verified sent by a system; performing verification processing on the device to be verified according to the information to be verified; The verification result is reported to the system.
  • performing the verification process on the device to be verified according to the information to be verified includes: performing a verification process on the device to be verified according to the information to be verified by means of a luminescence test.
  • the method further includes: prompting the to-be-checked information by controlling the device to be verified to be lit or voice broadcasted.
  • the to-be-checked information includes at least one of the following: a name of the device to be verified, a geographical location information of the device to be verified, and port information of the device to be verified.
  • a verification processing apparatus which is applied to a control system, and includes: a first sending module, configured to send information to be verified to an on-site maintenance device, wherein the to-be-calibrated The inspection information is used by the on-site maintenance device to perform verification processing on the device to be verified according to the to-be-verified information, the on-site maintenance device includes at least a first on-site maintenance device and a second on-site maintenance device, and the device to be verified The first end to be verified device and the second end of the optical fiber to be verified; the first receiving module is configured to receive the on-site maintenance device to verify the to-be-checked according to the to-be-checked information The verification result of the device for verification processing.
  • a verification processing apparatus including: a second receiving module, configured to receive information to be verified sent by the system; and a verification processing module, configured to be verified according to the to-be-checked The information is to be verified by the verification device; the reporting module is configured to report the verification result of the verification process to the system.
  • a verification processing system including at least: a control system, a first on-site maintenance device, and a second on-site maintenance device, wherein the first on-site maintenance device and the optical fiber
  • the first end to be verified device is connected, the second on-site maintenance device is connected to the second to be verified device of the optical fiber, and the control system is used for Performing information exchange with the first on-site maintenance device and the second on-site maintenance device, the control system is configured to send information to be verified to the on-site maintenance device, wherein the information to be verified is used in the site
  • the maintenance device performs a verification process on the device to be verified according to the information to be verified
  • the site maintenance device includes at least a first site maintenance device and a second site maintenance device
  • the device to be verified includes at least the first end a device to be verified and a device to be verified by the second end
  • the first field maintenance device is configured to perform a first calibration process on the device to be verified according to the information to be verified
  • the information to be verified is sent to the on-site maintenance device, where the information to be verified is used by the on-site maintenance device to perform verification processing on the device to be verified according to the information to be verified.
  • the field maintenance device includes at least a first field maintenance device and a second field maintenance device, where the device to be verified includes at least a first end to be verified device of the optical fiber and a second end to be verified device of the optical fiber;
  • FIG. 1 is a first flowchart of a verification processing method according to an embodiment of the present invention
  • FIG. 2 is a second flowchart of a verification processing method according to an embodiment of the present invention.
  • FIG. 3 is a block diagram 1 of a verification processing apparatus according to an embodiment of the present invention.
  • FIG. 4 is a block diagram 2 of a verification processing apparatus according to an embodiment of the present invention.
  • FIG. 5 is a block diagram of a verification processing system in accordance with an embodiment of the present invention.
  • FIG. 6 is a flow chart of a fiber optic network completion acceptance process in accordance with a preferred embodiment of the present invention.
  • FIG. 1 is a flowchart 1 of a verification processing method according to an embodiment of the present invention. As shown in FIG. 1 , the flow includes the following steps:
  • Step S102 Send the information to be verified to the on-site maintenance device, where the information to be verified is used for the on-site maintenance device Performing a verification process on the device to be verified according to the information to be verified, the site maintenance device comprising at least a first field maintenance device and a second site maintenance device, the device to be verified at least comprising a device for verifying the first end of the optical fiber And the second end of the optical fiber to be verified;
  • Step S104 Receive a verification result that the on-site maintenance device performs a verification process on the device to be verified according to the information to be verified.
  • the information to be verified is sent to the on-site maintenance device, and the verification result of the verification process of the device to be verified according to the information to be verified is received by the on-site maintenance device, and the optical fiber calibration in the related art is solved.
  • the more complex and inefficient problems are reduced, the complexity is reduced and the efficiency of the verification is improved.
  • receiving the result that the on-site maintenance device performs the verification process on the device to be verified according to the information to be verified may include: receiving, by the first field maintenance device, the first end to be verified according to the to-be-checked information The first verification result parameter of the device performing the verification process; sending the first verification result parameter to the second on-site maintenance device; receiving the second on-site maintenance device according to the second verification result parameter and the first verification The result of the verification of the result of the parameter calculation, wherein the second verification result parameter is a result parameter of the second field maintenance device performing verification processing on the second end to be verified device according to the to-be-checked information.
  • the information to be verified includes at least one of the following: a name of the device to be verified, a geographical location information of the device to be verified, and port information of the device to be verified.
  • FIG. 2 is a second flowchart of a verification processing method according to an embodiment of the present invention. As shown in FIG. 2, the flow includes the following steps:
  • Step S202 receiving information to be verified sent by the system
  • Step S204 performing a verification process on the device to be verified according to the information to be verified;
  • step S206 the verification result of the verification process is reported to the system.
  • the device to be verified may be verified according to the information to be verified by means of the illuminating test.
  • the illuminating test is implemented by: the field maintenance device is connected to the corresponding port of the designated device. , to the port to illuminate.
  • the on-site maintenance device 2 is connected to the corresponding port of the designated device, and measures the received optical information. The measurement result is obtained by calculating the optical information parameters at both ends.
  • the method for prompting the information to be verified is more than one type.
  • the device to be verified may be prompted to check whether the device to be verified is lit or voiced.
  • the information to be verified includes at least one of the following: a name of the device to be verified, a geographical location information of the device to be verified, and port information of the device to be verified.
  • FIG. 3 is a block diagram of a verification processing apparatus according to an embodiment of the present invention. As shown in FIG. 3, the method includes:
  • the first sending module 32 is configured to send the information to be verified to the on-site maintenance device, where the information to be verified is used by the on-site maintenance device to perform verification processing on the device to be verified according to the information to be verified, the on-site maintenance
  • the device includes at least An on-site maintenance device and a second on-site maintenance device, the device to be verified includes at least a first end to be verified device of the optical fiber and a second end to be verified device of the optical fiber;
  • the first receiving module 34 is configured to receive a verification result that the on-site maintenance device performs a verification process on the device to be verified according to the information to be verified.
  • FIG. 4 is a second block diagram of a verification processing device according to an embodiment of the present invention. As shown in FIG. 4, the method includes:
  • the second receiving module 42 is configured to receive information to be verified sent by the system
  • the verification processing module 44 is configured to perform verification processing on the device to be verified according to the information to be verified;
  • the reporting module 46 is configured to report the verification result of the verification process to the system.
  • FIG. 5 is a block diagram of a verification processing system according to an embodiment of the present invention.
  • the method includes at least a control system 52, a first on-site maintenance device 54 and a second on-site maintenance device 56, wherein the first on-site maintenance device 54 is connected to the first end to-be-verified device 58 of the optical fiber, and the second on-site maintenance device 56 is connected to the second to-be-verified device 510 of the optical fiber,
  • the control system 52 is configured to perform information interaction with the first on-site maintenance device 54 and the second on-site maintenance device 56,
  • the control system 52 is configured to send the information to be verified to the on-site maintenance device, where the information to be verified is used by the on-site maintenance device to perform verification processing on the device to be verified according to the information to be verified, where the on-site maintenance device is at least The first field maintenance device and the second field maintenance device are included, and the device to be verified includes at least the first end to be verified device 58 and the second end to be verified device 510;
  • the first field maintenance device 54 is configured to send a first verification result parameter to the first end to be verified device 58 according to the information to be verified to the control system 52;
  • the control system 52 is configured to send the first verification result parameter to the second on-site maintenance device 56;
  • the second field maintenance device 56 is configured to calculate a verification result according to the second verification result parameter and the first verification result parameter, and send the verification result to the control system 52, wherein the second verification result
  • the parameter is a result parameter of the second field maintenance device 56 performing verification processing on the second end to be verified device 510 according to the to-be-checked information
  • the control system 52 is configured to receive the verification result.
  • the optional embodiment proposes an automated intelligent acceptance method, which only needs to perform simple plugging and unplugging operation according to the prompt of the on-site maintenance device to complete the acceptance, and can realize the real-time feedback of the acceptance result to the upper layer software management system, which is extremely Increased accuracy and efficiency.
  • the main components of the optional embodiment include: an upper layer software management system and an on-site maintenance device, wherein the upper layer software management system imports the optical cable information as resource information into the upper layer software management system after the completion of the optical cable construction, and the information is maintained on site.
  • the device interacts.
  • the on-site maintenance device queries the optical cable information from the upper software management system, and guides the operator to perform the acceptance work according to the actual operation.
  • FIG. 6 is a flowchart of a completion check process of a fiber optic network according to a preferred embodiment of the present invention, as shown in FIG. 6 , on the premise that the resource information of the optical network has been recorded in the upper software management system and can be exchanged with the information on the on-site maintenance device. Includes the following steps:
  • the upper layer software management system notifies the on-site maintenance device of the resource information and the acceptance parameter.
  • the upper layer software management system contains information about the fiber to be inspected, mainly including the device port information connected to both ends of the fiber.
  • the maintenance personnel can view the equipment information corresponding to the fiber that needs to be checked, including the station, equipment room, and specific port information of the equipment. With this information the constructor can find the equipment to be operated.
  • Step S604 the first on-site maintenance device searches for a device connection device. After the construction personnel 1 finds the equipment to be operated, it uses the maintenance device to connect to the port specified in this operation. In this process, the maintenance device can guide the operator to connect the device by controlling the device to light or voice broadcast. If the operator is not connected properly, the operator can be prompted by buzzer or light until it is properly connected.
  • step S606 the first on-site maintenance device notifies the upper layer software management system that the connection is OK. After the connection of the first on-site maintenance device is successful, the upper-layer software management system is notified, and the local device is successfully connected. The upper software management system calculates the device port that the construction personnel 2 needs to connect based on the fiber information based on the port information notified by the construction personnel 1.
  • Step S608 the second on-site maintenance device searches for the device connection device.
  • the upper software management system notifies the constructor 2 that after finding the device to be operated, the maintenance device is connected to the port specified by the current operation.
  • the constructor 1 needs to first query the opposite port, notify the construction worker 2 by telephone/sms to find the port and connect the port with the measuring device. Inefficient and error prone.
  • Step S610 the second on-site maintenance device notifies the upper layer software management system that the connection is OK. After the connection of the second on-site maintenance device is successful, the upper-layer software management system is notified, and the local device is successfully connected.
  • step S612 when both ends of the maintenance device query that they are all connected, the acceptance is started.
  • the acceptance test can be started.
  • the acceptance test can be divided into various types, such as termination relationship test, attenuation value test, etc. Different test types have different parameter information.
  • the parameter information corresponding to the attenuation value can be the attenuation threshold
  • the parameter information corresponding to the OTDR test can be Test methods (both pulse and sequence), wavelength, range, fiber index, pulse width, test duration, sequence symbol width, etc.
  • step S614 the first on-site maintenance device starts the acceptance test.
  • the first on-site maintenance device begins to illuminate the connected port, and the information for the illumination varies depending on the type of test.
  • Step S616 the first on-site maintenance device notifies the upper software management system to measure the parameters.
  • the first on-site maintenance device reports the parameters of its own illumination to the upper software management system.
  • the constructor 1 is required to record the illuminating information of the local end for subsequent calculation. And it is necessary to notify the construction personnel of the light-emitting information parameters of the light-emitting end by telephone/sms.
  • step S618 the second on-site maintenance device starts the acceptance test.
  • the second on-site maintenance device measures the optical information received in this segment, records (or performs certain calculations) to obtain relevant information.
  • step S620 the second on-site maintenance device notifies the upper software management system to measure the parameters.
  • the second on-site maintenance device reports the information obtained by the local end to the upper layer software management system.
  • the constructor 2 needs to notify the construction personnel 1 of the measurement parameters of the local end by telephone/sms to calculate the result.
  • Step S622 the maintenance device calculates the acceptance result according to the measurement parameter and the acceptance parameter, and reports the result to the upper layer software management system.
  • the first on-site maintenance device calculates the acceptance result of the current measurement based on the measurement result information reported by the second on-site maintenance device obtained from the upper software management system. The results are reported online to the upper software management system.
  • the first on-site maintenance device When the first on-site maintenance device emits light and the second on-site maintenance device is capable of receiving optical information, it indicates that the termination relationship is correct.
  • Pi is the input optical power value (w watts)
  • Po is the output optical power value (w watts);
  • P i is the input optical power value (w watts) and P o is the output optical power value (w watts). If the input input filter is 1 and the output measurement is 0.5, the calculated fiber attenuation is obtained. Is -3.01db.
  • modules or steps of the present invention described above can be implemented by a general-purpose computing device that can be centralized on a single computing device or distributed across a network of multiple computing devices. Alternatively, they may be implemented by program code executable by the computing device such that they may be stored in the storage device by the computing device and, in some cases, may be different from the order herein.
  • the steps shown or described are performed, or they are separately fabricated into individual integrated circuit modules, or a plurality of modules or steps thereof are fabricated as a single integrated circuit module.
  • the invention is not limited to any specific combination of hardware and software.
  • the foregoing embodiments of the present invention can be applied to the field of communications, and solve the problem that the verification of the optical fiber in the related art is complicated and low in efficiency, which reduces the complexity and improves the efficiency of the verification.

Landscapes

  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Optical Communication System (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

本发明公开了一种校验处理方法、装置及系统,其中,该方法包括:将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果,解决了相关技术中对光纤的校验较复杂且效率低的问题,降低了复杂度且提高了校验的效率。

Description

校验处理方法、装置及系统 技术领域
本发明涉及通信领域,具体而言,涉及校验处理方法、装置及系统。
背景技术
随着通信技术的发展,人们对通信带宽的要求越来越高。有人提出这样的观点:“总有一天光通信会取代有线和微波通信而成为通信主流”。该观点反映出光纤通信技术在未来通信中已显示出其重要性。今天,光通信技术已经很成熟,光纤通信已是各种通信网的主要传输方式,光纤通信在信息高速公路的建设中扮演着至关重要的角色,欧美等发达国家已经把光纤通信放在了国家发展的战略地位。现在光纤的使用已不只限于陆地,光缆已广泛铺设到了大西洋、太平洋海底,这些海底光缆使得全球通信变得非常简单快捷。现在不少发达国家又把光缆铺设到住宅前,实现了光纤到办公室、光纤到家庭。
在人们日益增长的信息传输和交换需要的驱动下,通信网络中的光纤网络节点越来越多,关联关系越来越复杂。建设施工完成后,需要对其中一些节点之间的连通性、传输特性进行检验,以便进行后续网络开通工作。
在相关技术中,在完工验收时,主要通过光纤以下主要传输特性进行验收:
1、中继段光纤线路衰减竣工时每根光纤都进行测试,验收时抽测应不少于光纤芯数的25%;
2、中继段光纤背向散射信号曲线竣工时应对每根光纤进行检查,验收时抽查应不少于光纤芯数的25%。
上述传统的光缆建设验收方法需要两个人分别记录需要验收光缆对应的两个端口,通过电话或者短信沟通协调,实现同时在对应端口进行操作并记录检测结果,之后还需要进行复杂的人工计算来生成验收报告。此外,由于光纤数量巨大,只能进行部分抽查,不能达到全部覆盖,由于验收现场设备的端口数量可能很大,验收时查找端口很不容易并且极容易出错。操作人员通过电话或者短信沟通效率低下。同时验收报告也需要进行复杂的人工计算,也不能实时上报,对操作人员的要求比较高。
针对相关技术中对光纤的校验较复杂且效率低的问题,还未提出有效的解决方案。
发明内容
本发明实施例提供了一种校验处理方法、装置及系统,以至少解决相关技术中对光纤的校验较复杂且效率低的问题。
根据本发明实施例的一个方面,提供了一种校验处理方法,包括:将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果。
进一步地,接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的结果包括:接收所述第一现场维护装置根据所述待校验信息对所述第一端待校验设备进行校验处理的第一校验结果参数;将所述第一校验结果参数发送给所述第二现场维护装置;接收所述第二现场维护装置根据第二校验结果参数与所述第一校验结果参数计算得到的校验结果,其中,所述第二校验结果参数是所述第二现场维护装置根据所述待校验信息对所述第二端待校验设备进行校验处理的结果参数。
进一步地,所述待校验信息包括以下至少之一:待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
根据本发明实施例的另一个方面,提供了一种校验处理方法,包括:接收系统发送的待校验信息;根据所述待校验信息对待校验设备进行校验处理;将校验处理的校验结果上报给所述系统。
进一步地,根据所述待校验信息对所述待校验设备进行校验处理包括:通过发光测试的方式根据所述待校验信息对待校验设备进行校验处理。
进一步地,在根据所述待校验信息对待校验设备进行校验处理之前,所述方法还包括:通过控制所述待校验设备亮灯或者语音播报的方式提示所述待校验信息。
进一步地,所述待校验信息包括以下至少之一:待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
根据本发明实施例的另一个方面,提供了一种校验处理装置,应用于控制系统,包括:第一发送模块,设置为将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;第一接收模块,设置为接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果。
根据本发明实施例的另一个方面,提供了一种校验处理装置,包括:第二接收模块,设置为接收系统发送的待校验信息;校验处理模块,设置为根据所述待校验信息对待校验设备进行校验处理;上报模块,设置为将校验处理的校验结果上报给所述系统。
根据本发明实施例的再一个方面,还提供了一种校验处理系统,至少包括:控制系统、第一现场维护装置和第二现场维护装置,其中,所述第一现场维护装置与光纤的第一端待校验设备连接,所述第二现场维护装置与所述光纤的第二待校验设备连接,所述控制系统用于 与所述第一现场维护装置和所述第二现场维护装置进行信息交互,所述控制系统用于将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括所述第一端待校验设备和所述第二端待校验设备;所述第一现场维护装置用于将根据所述待校验信息对所述第一端待校验设备进行校验处理的第一校验结果参数发送给所述控制系统;所述控制系统用于将所述第一校验结果参数发送所述第二现场维护装置;所述第二现场维护装置用于根据第二校验结果参数与所述第一校验结果参数计算得到校验结果并将所述校验结果发送给所述控制系统,其中,所述第二校验结果参数是所述第二现场维护装置根据所述待校验信息对所述第二端待校验设备进行校验处理的结果参数;所述控制系统用于接收所述校验结果。
通过本发明实施例,采用将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果,解决了相关技术中对光纤的校验较复杂且效率低的问题,降低了复杂度且提高了校验的效率。
附图说明
此处所说明的附图用来提供对本发明的进一步理解,构成本申请的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:
图1是根据本发明实施例的校验处理方法的流程图一;
图2是根据本发明实施例的校验处理方法的流程图二;
图3是根据本发明实施例的校验处理装置的框图一;
图4是根据本发明实施例的校验处理装置的框图二;
图5是根据本发明实施例的校验处理系统的框图;
图6是根据本发明优选实施例的光纤网完工验收流程的流程图。
具体实施方式
下文中将参考附图并结合实施例来详细说明本发明。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。
在本实施例中提供了一种校验处理方法,图1是根据本发明实施例的校验处理方法的流程图一,如图1所示,该流程包括如下步骤:
步骤S102,将待校验信息发送给现场维护装置,其中,该待校验信息用于该现场维护装 置根据该待校验信息对待校验设备进行校验处理,该现场维护装置至少包括第一现场维护装置和第二现场维护装置,该待校验设备至少包括光纤的第一端待校验设备和该光纤的第二端待校验设备;
步骤S104,接收该现场维护装置根据该待校验信息对该待校验设备进行校验处理的校验结果。
通过上述步骤,将待校验信息发送给现场维护装置,接收该现场维护装置根据该待校验信息对该待校验设备进行校验处理的校验结果,解决了相关技术中对光纤的校验较复杂且效率低的问题,降低了复杂度且提高了校验的效率。
进一步地,接收该现场维护装置根据该待校验信息对该待校验设备进行校验处理的结果可以包括:接收该第一现场维护装置根据该待校验信息对该第一端待校验设备进行校验处理的第一校验结果参数;将该第一校验结果参数发送给该第二现场维护装置;接收该第二现场维护装置根据第二校验结果参数与该第一校验结果参数计算得到的校验结果,其中,该第二校验结果参数是该第二现场维护装置根据该待校验信息对该第二端待校验设备进行校验处理的结果参数。
上述的待校验信息包括以下至少之一:待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
本发明实施例还提供了一种校验处理方法,图2是根据本发明实施例的校验处理方法的流程图二,如图2所示,该流程包括如下步骤:
步骤S202,接收系统发送的待校验信息;
步骤S204,根据该待校验信息对待校验设备进行校验处理;
步骤S206,将校验处理的校验结果上报给该系统。
在一个可选的实施例中,可以通过发光测试的方式根据该待校验信息对待校验设备进行校验处理,具体地,发光测试通过以下方式实现:现场维护装置一连接到指定设备对应端口,向该端口发光。现场维护装置二连接到该指定设备的对应端口,测量接受到的光信息。通过两端的光信息参数进行计算得到测量结果。
上述的待校验信息提示的方式不只一种,在根据该待校验信息对待校验设备进行校验处理之前,可以通过控制该待校验设备亮灯或者语音播报的方式提示该待校验信息。该待校验信息包括以下至少之一:待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
本发明实施例提供了一种校验处理装置,应用于控制系统,图3是根据本发明实施例的校验处理装置的框图一,如图3所示,包括:
第一发送模块32,设置为将待校验信息发送给现场维护装置,其中,该待校验信息用于该现场维护装置根据该待校验信息对待校验设备进行校验处理,该现场维护装置至少包括第 一现场维护装置和第二现场维护装置,该待校验设备至少包括光纤的第一端待校验设备和该光纤的第二端待校验设备;
第一接收模块34,设置为接收该现场维护装置根据该待校验信息对该待校验设备进行校验处理的校验结果。
本发明实施例还提供了一种校验处理装置,图4是根据本发明实施例的校验处理装置的框图二,如图4所示,包括:
第二接收模块42,设置为接收系统发送的待校验信息;
校验处理模块44,设置为根据该待校验信息对待校验设备进行校验处理;
上报模块46,设置为将校验处理的校验结果上报给该系统。
本发明实施例还提供了一种校验处理系统,图5是根据本发明实施例的校验处理系统的框图,如图5所示,至少包括:控制系统52、第一现场维护装置54和第二现场维护装置56,其中,该第一现场维护装置54与光纤的第一端待校验设备58连接,该第二现场维护装置56与该光纤的第二待校验设备510连接,该控制系统52用于与该第一现场维护装置54和该第二现场维护装置56进行信息交互,
该控制系统52用于将待校验信息发送给现场维护装置,其中,该待校验信息用于该现场维护装置根据该待校验信息对待校验设备进行校验处理,该现场维护装置至少包括第一现场维护装置和第二现场维护装置,该待校验设备至少包括该第一端待校验设备58和该第二端待校验设备510;
该第一现场维护装置54用于将根据该待校验信息对该第一端待校验设备58进行校验处理的第一校验结果参数发送给该控制系统52;
该控制系统52用于将该第一校验结果参数发送该第二现场维护装置56;
该第二现场维护装置56用于根据第二校验结果参数与该第一校验结果参数计算得到校验结果并将该校验结果发送给该控制系统52,其中,该第二校验结果参数是该第二现场维护装置56根据该待校验信息对该第二端待校验设备510进行校验处理的结果参数;
该控制系统52用于接收该校验结果。
针对相关技术中存在的上述问题,下面以控制系统为上层软件管理系统为例,结合具体的可选实施例进行进一步说明,下述可选实施例结合了上述可选实施例及其可选实施方式。
针对在验收现场时如何准确快速确定待验收的设备端口以及现场维护装置之间信息交互,传统验收方法需要进行人工沟通(电话、短信等),效率低下而且容易出错,验收结果也不能实现电子化实时上报。本可选实施例提出了一种自动化的智能验收方法,只需要按照现场维护装置的提示进行简单的插拔操作即可完成验收,并且能够实现验收结果实时反馈给上层软件管理系统,极大的提高了准确率和效率。
本可选实施例的主要组成部分包括:上层软件管理系统和现场维护装置,其中,上层软件管理系统在光缆建设完成后,光缆信息作为资源信息导入上层软件管理系统,并将此信息与现场维护装置进行交互。现场维护装置从上层软件管理系统查询光缆信息,并根据此信息指导操作人员进行实际操作完成验收工作。
本可选实施例提供了在光缆建设完成后,进行智能化完工验收的方法。通过上层软件管理系统内部的数据以及与现场维护装置系统之间的信息交互,即可实现大规模光纤的智能化验收工作。比较以往的验收方法,省去了人工沟通这样低效且不准确的过程,提高了效率和准确性,具有非常好的实用价值。上层软件管理系统中已经录入光纤网的资源信息并能够与现场维护装置进行信息交互的前提下,图6是根据本发明优选实施例的光纤网完工验收流程的流程图,如图6所示,包括以下步骤:
步骤S602,上层软件管理系统将资源信息和验收参数通知现场维护装置。首先,上层软件管理系统包含了待验收光纤的信息,主要包括光纤两端所连接的设备端口信息。当一个光纤验收任务被下达给两位施工人员后,施工人员通过维护装置可以查看到自己需要验收的光纤对应的设备信息,包括设备所在局站、机房、以及具体端口信息。通过此信息施工人员可以找到待操作的设备。
步骤S604,第一现场维护装置查找设备连接设备。施工人员1查找到待操作设备后,用维护装置连接对应本次操作所指定的端口。此过程中,维护装置可以通过控制设备亮灯或者语音播报的方式指导操作人员连接设备。如果操作人员连接不正确,可以通过蜂鸣或者亮灯的方式提示操作人员,直到正确连接为止。
步骤S606,第一现场维护装置通知上层软件管理系统连接OK。第一现场维护装置连接端口成功后,通知上层软件管理系统,本端设备已经连接成功。上层软件管理系统根据施工人员1所通知的端口信息,根据光纤信息计算施工人员2需要连接的设备端口。
步骤S608,第二现场维护装置查找设备连接设备。上层软件管理系统通知施工人员2查找到待操作设备后,用维护装置连接对应本次操作所指定的端口。传统的测量方法中,施工人员1需要首先查询对端端口,通过电话/短信通知施工人员2找到该端口并用测量设备连接该端口。效率低下,并且容易出错。
步骤S610,第二现场维护装置通知上层软件管理系统连接OK。第二现场维护装置连接端口成功后,通知上层软件管理系统,本端设备已经连接成功。
步骤S612,当两端维护装置查询到都已连接时,开始进行验收。当两端维护装置从上层软件管理系统查询得知(或者上层软件主动通知两端维护装置)光纤两端都已经连接成功后,可以开始验收测试。验收测试可以分为多种,比如端接关系测试、衰减值测试等,不同的测试种类有不同的参数信息,例如:衰减值对应的参数信息可以为衰减阈值,OTDR测试对应的参数信息可以为测试方法(包括脉冲法和序列法两种类型),波长,量程,光纤折射率,脉宽,测试时长,序列码元宽度等。
步骤S614,第一现场维护装置开始验收测试。第一现场维护装置开始向所连接端口发光,根据不同的测试类型,发光的信息会有所不同。
步骤S616,第一现场维护装置通知上层软件管理系统测量参数。第一现场维护装置将自己发光的参数上报给上层软件管理系统。传统的测量方法中,需要施工人员1记录本端的发光信息以备后续计算。并且需要通过电话/短信通知施工人员2发光端的发光信息参数。
步骤S618,第二现场维护装置开始验收测试。第二现场维护装置测量本段收到的光信息,记录(或者进行一定的计算)得到相关的信息。
步骤S620,第二现场维护装置通知上层软件管理系统测量参数。第二现场维护装置将本端得到的信息上报给上层软件管理系统。传统的测量方法中,施工人员2需要电话/短信通知施工人员1本端的测量参数,以便进行结果计算。
步骤S622,维护装置根据测量参数和验收参数,计算验收结果,并上报上层软件管理系统。第一现场维护装置根据从上层软件管理系统得到的第二现场维护装置上报的测量结果信息,计算本次测量的验收结果。并将结果在线上报至上层软件管理系统。
端接关系测试得到校验结果的实施方式为:
当第一现场维护装置发光,而第二现场维护装置能够接收到光信息时,表明端接关系正确。Pi为输入光功率值(w瓦特),Po为输出光功率值(w瓦特);
Po>0  表示端接关系正确
Po=0  表示端接关系不正确。
光衰减测试得到校验结果的实施方式为:
计算公式:a=10lg(Pi/Po),单位为db/km;
其中,Pi为输入光功率值(w瓦特),Po为输出光功率值(w瓦特),如果输入端输入过滤为1,而输出端测量结果为0.5,则经过计算得到改光纤的衰减为-3.01db。
传统测量方法中,需要双方进行电话/短信沟通测量结果进行结果计算,并通过手工方式将测量结果录入上层软件管理系统。相比较而言,新的测量方式省去了大量人工传统方式(电话/短信)的沟通,所有的信息交互都在维护装置和上册软件管理系统之间在线完成,极大的提高了效率和准确性。
显然,本领域的技术人员应该明白,上述的本发明的各模块或各步骤可以用通用的计算装置来实现,它们可以集中在单个的计算装置上,或者分布在多个计算装置所组成的网络上,可选地,它们可以用计算装置可执行的程序代码来实现,从而,可以将它们存储在存储装置中由计算装置来执行,并且在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤,或者将它们分别制作成各个集成电路模块,或者将它们中的多个模块或步骤制作成单个集成电路模块来实现。这样,本发明不限制于任何特定的硬件和软件结合。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
工业实用性
上述的本发明实施例,可以应用于通信领域,解决了相关技术中对光纤的校验较复杂且效率低的问题,降低了复杂度且提高了校验的效率。

Claims (10)

  1. 一种校验处理方法,包括:
    将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;
    接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果。
  2. 根据权利要求1所述的方法,其中,接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的结果包括:
    接收所述第一现场维护装置根据所述待校验信息对所述第一端待校验设备进行校验处理的第一校验结果参数;
    将所述第一校验结果参数发送给所述第二现场维护装置;
    接收所述第二现场维护装置根据第二校验结果参数与所述第一校验结果参数计算得到的校验结果,其中,所述第二校验结果参数是所述第二现场维护装置根据所述待校验信息对所述第二端待校验设备进行校验处理的结果参数。
  3. 根据权利要求1或2所述的方法,其中,所述待校验信息包括以下至少之一:
    待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
  4. 一种校验处理方法,包括:
    接收系统发送的待校验信息;
    根据所述待校验信息对待校验设备进行校验处理;
    将校验处理的校验结果上报给所述系统。
  5. 根据权利要求4所述的方法,其中,根据所述待校验信息对所述待校验设备进行校验处理包括:
    通过发光测试的方式根据所述待校验信息对待校验设备进行校验处理。
  6. 根据权利要求4所述的方法,其中,在根据所述待校验信息对待校验设备进行校验处理之前,所述方法还包括:
    通过控制所述待校验设备亮灯或者语音播报的方式提示所述待校验信息。
  7. 根据权利要求4至6中任一项所述的方法,其中,所述待校验信息包括以下至少之一:
    待校验设备的名称、待校验设备所处地理位置信息、待校验设备的端口信息。
  8. 一种校验处理装置,应用于控制系统,包括:
    第一发送模块,设置为将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括光纤的第一端待校验设备和所述光纤的第二端待校验设备;
    第一接收模块,设置为接收所述现场维护装置根据所述待校验信息对所述待校验设备进行校验处理的校验结果。
  9. 一种校验处理装置,其中,包括:
    第二接收模块,设置为接收系统发送的待校验信息;
    校验处理模块,设置为根据所述待校验信息对待校验设备进行校验处理;
    上报模块,设置为将校验处理的校验结果上报给所述系统。
  10. 一种校验处理系统,所述系统至少包括:控制系统、第一现场维护装置和第二现场维护装置,其中,所述第一现场维护装置与光纤的第一端待校验设备连接,所述第二现场维护装置与所述光纤的第二待校验设备连接,所述控制系统用于与所述第一现场维护装置和所述第二现场维护装置进行信息交互,
    所述控制系统用于将待校验信息发送给现场维护装置,其中,所述待校验信息用于所述现场维护装置根据所述待校验信息对待校验设备进行校验处理,所述现场维护装置至少包括第一现场维护装置和第二现场维护装置,所述待校验设备至少包括所述第一端待校验设备和所述第二端待校验设备;
    所述第一现场维护装置用于将根据所述待校验信息对所述第一端待校验设备进行校验处理的第一校验结果参数发送给所述控制系统;
    所述控制系统用于将所述第一校验结果参数发送所述第二现场维护装置;
    所述第二现场维护装置用于根据第二校验结果参数与所述第一校验结果参数计算得到校验结果并将所述校验结果发送给所述控制系统,其中,所述第二校验结果参数是所述第二现场维护装置根据所述待校验信息对所述第二端待校验设备进行校验处理的结果参数;
    所述控制系统用于接收所述校验结果。
PCT/CN2016/078691 2015-06-16 2016-04-07 校验处理方法、装置及系统 WO2016202058A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510333185.2A CN106257845B (zh) 2015-06-16 2015-06-16 校验处理方法、装置及系统
CN201510333185.2 2015-06-16

Publications (1)

Publication Number Publication Date
WO2016202058A1 true WO2016202058A1 (zh) 2016-12-22

Family

ID=57544784

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/078691 WO2016202058A1 (zh) 2015-06-16 2016-04-07 校验处理方法、装置及系统

Country Status (2)

Country Link
CN (1) CN106257845B (zh)
WO (1) WO2016202058A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111060865B (zh) * 2019-12-05 2022-11-29 国网北京市电力公司 基于电能计量装置的检验系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103067073A (zh) * 2011-10-19 2013-04-24 中兴通讯股份有限公司 一种黑链路光接口的管理方法及装置
CN103248420A (zh) * 2012-02-14 2013-08-14 华为技术有限公司 检测光纤连接的方法、标识光纤连接的方法及系统和装置
CN103339876A (zh) * 2012-11-26 2013-10-02 华为技术有限公司 光端口连接管理方法、法兰盘、跳纤和光网络设备
CN104485989A (zh) * 2014-12-05 2015-04-01 国家电网公司 一种智能变电站光纤链路自动校核装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7684401B2 (en) * 2003-07-21 2010-03-23 Qlogic, Corporation Method and system for using extended fabric features with fibre channel switch elements
CN103516551B (zh) * 2013-10-15 2016-07-13 南京普天通信股份有限公司 利用无源双rfid标签对光纤物理端口智能管理系统
CN103997417B (zh) * 2014-02-17 2018-06-26 华信咨询设计研究院有限公司 光网络资源连接状态管理方法
CN103929326B (zh) * 2014-03-18 2017-06-13 烽火通信科技股份有限公司 通信网传输类告警统一分析的装置及方法
CN103957474B (zh) * 2014-04-11 2017-08-01 烽火通信科技股份有限公司 一种光分路器的端口标签管理方法
CN104301143A (zh) * 2014-10-14 2015-01-21 烽火通信科技股份有限公司 一种不同场景的odn网络管理方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103067073A (zh) * 2011-10-19 2013-04-24 中兴通讯股份有限公司 一种黑链路光接口的管理方法及装置
CN103248420A (zh) * 2012-02-14 2013-08-14 华为技术有限公司 检测光纤连接的方法、标识光纤连接的方法及系统和装置
CN103339876A (zh) * 2012-11-26 2013-10-02 华为技术有限公司 光端口连接管理方法、法兰盘、跳纤和光网络设备
CN104485989A (zh) * 2014-12-05 2015-04-01 国家电网公司 一种智能变电站光纤链路自动校核装置

Also Published As

Publication number Publication date
CN106257845B (zh) 2020-11-06
CN106257845A (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN105338432B (zh) 一种光网络智能化的实现方法以及装置
AU2014218403B2 (en) Optical fiber testing using OTDR instrument
CN104144013A (zh) Pon网络故障诊断方法、装置和系统
CN108512597B (zh) 一种光纤线路损耗及光纤端面损耗检测系统
WO2016184228A1 (zh) 光网络拓扑图的部署方法及装置
US9485016B2 (en) Hands-free optical fiber testing using optical loss test instrument
CN104079346A (zh) Epon多级非均分光纤链路故障远程判断定位方法及装置
WO2016023331A1 (zh) 一种光网络连接关系确定方法、设备以及系统
WO2016202058A1 (zh) 校验处理方法、装置及系统
CN108833002B (zh) 一种基于无源光网络的光链路检测方法及系统
JP5315269B2 (ja) 光設備判定システム及び判定方法
CN108123751B (zh) 光缆故障快速定位的方法、设备及系统
RU2628767C2 (ru) Способ и устройство для конфигурирования набора параметров тестирования с использованием оптического временного рефлектометра (otdr)
WO2017211232A1 (zh) 测试参数处理方法、装置、测试器和计算机存储介质
JP2016076841A (ja) 光ファイバ試験装置及び光ファイバ試験システム
CN103384166B (zh) 光纤接入网的光纤端口线序测试仪
CN204286753U (zh) 远端语音光缆识别仪
CN101931462A (zh) 光传输网络测试控制方法及装置
CN203399116U (zh) 光纤接入网的光纤端口线序测试仪
WO2018001228A1 (zh) 光纤连接检测方法、网络管理服务器及接收端网元和计算机存储介质
CN110736609A (zh) 一种基于自动匹配的光口功率测试方法
CN106685525A (zh) 一种基于宽带工程的线路质量挂测方法
CN1983971A (zh) 一种获知网元间连接关系的方法和系统
CN116980033B (zh) 一种plc光分路器测试系统
CN203166961U (zh) 带有光纤故障定位功能的通信网络检测维护装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16810799

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16810799

Country of ref document: EP

Kind code of ref document: A1