WO2016182890A1 - Real-time annulus pressure while drilling for formation integrity test - Google Patents

Real-time annulus pressure while drilling for formation integrity test Download PDF

Info

Publication number
WO2016182890A1
WO2016182890A1 PCT/US2016/031147 US2016031147W WO2016182890A1 WO 2016182890 A1 WO2016182890 A1 WO 2016182890A1 US 2016031147 W US2016031147 W US 2016031147W WO 2016182890 A1 WO2016182890 A1 WO 2016182890A1
Authority
WO
WIPO (PCT)
Prior art keywords
pump
pressure data
pressure
bits
compression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2016/031147
Other languages
French (fr)
Inventor
Yong Sun
Bo Yu
Sandra REYES-RIBERA
Aldrick GARCIA-MAYANS
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Original Assignee
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd, Services Petroliers Schlumberger SA, Schlumberger Technology BV, Schlumberger Technology Corp filed Critical Schlumberger Canada Ltd
Publication of WO2016182890A1 publication Critical patent/WO2016182890A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H03ELECTRONIC CIRCUITRY
    • H03MCODING; DECODING; CODE CONVERSION IN GENERAL
    • H03M7/00Conversion of a code where information is represented by a given sequence or number of digits to a code where the same, similar or subset of information is represented by a different sequence or number of digits
    • H03M7/30Compression; Expansion; Suppression of unnecessary data, e.g. redundancy reduction
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/14Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves
    • E21B47/18Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves through the well fluid, e.g. mud pressure pulse telemetry
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Definitions

  • aspects of the disclosure relate to oil and gas drilling and the recovery of hydrocarbons. More specifically, aspects relate to real-time annulus pressure which drilling for formation integrity tests.
  • Oil wells are created by drilling a hole into the earth using a drilling rig that rotates a drill string (e.g., drill pipe) having a drill bit attached thereto.
  • the drill bit aided by the weight of pipes (e.g., drill collars), cuts into rock within the earth to create a wellbore.
  • Drilling fluid e.g., mud
  • the drilling fluid may be used to cool the bit, lift rock cuttings to the surface, at least partially prevent destabilization of the rock in the wellbore, and/or at least partially overcome the pressure of fluids inside the rock so that the fluids do not enter the wellbore.
  • these drilling rigs can measure the physical properties of the well environment. Data representing the measurements can be transmitted to the surface as pressure pulses in a mud system (e.g., mud pulse telemetry) of the oil well.
  • a process may include measuring pump-off pressure data.
  • the pump-off pressure data represents the pump-off pressure profile.
  • the method also includes determining, from the pump-off pressure data, a pump-off pressure data portion corresponding to a formation integrity testing characteristic.
  • the method also includes compressing pump-off pressure data portion with a compression protocol to produce compression bits.
  • the compression bits representing the pump-off pressure data portion corresponding to the formation integrity testing characteristic.
  • the method also includes transmitting, via a communication module, the compression bits to a computing device.
  • FIG. 1 illustrates an example formation integrity test pressure curve and a real-time pumps-off annulus pressure while drilling pressure curve.
  • FIG. 2 illustrates an example diagram for measuring pump-off pressured data, compressing the pump-off pressure data, and transmitting the compressed pump-off pressure data uphole in accordance with an example embodiment of the present disclosure.
  • FIG. 3 illustrates a graph where the start of a formation integrity test is detected in accordance with an example embodiment of the present disclosure.
  • FIG. 4 is a graph, where a portion of the pressure curve corresponding to the formation integrity test annulus pressure while drilling is selected to be transmitted uphole in accordance with an example embodiment of the present disclosure.
  • FIG. 5 is a frequency analysis of formation integrity test data in accordance with an example embodiment of the present disclosure.
  • FIG. 6 illustrates various histograms of difference values corresponding to a formation integrity test data in accordance with an example embodiment of the present disclosure.
  • FIGS. 7 A and 7B illustrates various Huffman code design models corresponding to formation integrity test data in accordance with an example embodiment of the present disclosure.
  • FIG. 8 illustrates an example of coding six (6) items using Huffman model (a) shown in FIG. 7A in accordance with an example embodiment of the present disclosure.
  • FIG. 9 illustrates an example histogram of seven (7) difference values in accordance with an example embodiment of the present disclosure.
  • FIG. 10 illustrates an example code design for difference values shown in FIG. 9 using Huffman model (d) shown in FIG. 7 A in accordance with an example embodiment of the present disclosure.
  • FIGS. 11 A and 1 IB illustrate three (3) example bit layout protocols in accordance with an example embodiment of the present disclosure.
  • FIG. 12 illustrates an example block diagram of a multiple on-demand frame utilized for transmitting compressed pump-off pressure data corresponding to a formation integrity test in accordance with an example embodiment of the present disclosure.
  • FIG. 13 is a block diagram illustrating an example transmission of a sequence of multiple on-demand frames in accordance with an example embodiment of the present disclosure.
  • FIG. 14 illustrates a graph showing a fixed pressure increase rate before leak-off pressure in accordance with an example embodiment of the present disclosure.
  • FIG. 15 illustrates a graph showing a varying pressure increase rate in accordance with an example embodiment of the present disclosure.
  • FIG. 16 illustrates a graph showing various pressure changes in accordance with an example embodiment of the present disclosure.
  • FIG. 17 illustrates two graphs, each graph showing a respective test cycle in accordance with an example embodiment of the present disclosure.
  • Embodiments described herein generally relate to methods for measuring pressure within a wellbore. More particularly, embodiments described herein relate to a system and a method for transmitting a pump-off pressure profile in a wellbore.
  • Formation integrity tests can be performed during pumps-off to determine the maximum annular pressure that can be applied to the formation.
  • Many measurements regarding formation properties e.g., leak-off pressure, formation fracture pressure, minimum horizontal stress (ah), formation permeability, etc.
  • the synthetic "downhole" pressure curve may not represent the data properly in most cases and, sometimes, can lead to highly- deviated results.
  • Many factors, such as mud compressibility, gel strength, mud type, and borehole temperature, can contribute to the large discrepancy.
  • RT real-time
  • a large amount of annular pressure data may be accumulated during FITs. For example, a 1-hour FIT generates 1,800 pressure points at a sampling period of 2 seconds. Each pressure point utilizes 15 bits to cover the range of 0 psi to 30,000 psi with 1-psi resolution. The total transmission would take 37.5 minutes at a rate of 12 bits/second. Such delays can impact the normal drilling operations since the data from other measurements cannot be sent in a long time period after pumping resumes.
  • pressure data representing major turning points along the pressure curve can be transmitted uphole to provide suitable compression ratios and reduce real-time transmission time.
  • the pressure data representing the major turning points allow tracing of the pressure changes and identifying some key measurements, such as leak-off pressure, formation fracture pressure, and so on.
  • the sparse samples may not provide enough information.
  • FIG. 1 From the pressure curve from realtime pumps-off annulus pressure while drilling, the major changes along the FIT can be represented. But for the differential pressure (see the bottom of FIG. 1), the real-time pumps-off annulus pressure while drilling pressure curve shows steps in long time intervals and the subtle changes may be missing.
  • the present disclosure discloses transmitting a portion of the FIT pressure curve profile.
  • the present disclosure can be independent of real-time pumps-off annulus pressure while drilling due to different field usages.
  • the present disclosure transmits the FIT section from the start of FIT to the maximum pressure point (P max ), as indicated in FIG. 1. Extensions on both sides are allowed and an operator can configure their time lengths according to the job requirements.
  • the present disclosure detects the FIT section automatically and then performs compression.
  • the compression bits are encapsulated into a sequence of multiple on-demand frames (MODFs) for real-time transmission.
  • MODFs on-demand frames
  • Respective MODFs can be decompressed independently into a part of pressure curve as this can be useful to reduce telemetry noise because part of FIT APWD data is available from the correctly-received MODFs. If a significant portion of the data is missing or corrupted, an operator can downlink to a logging while drilling (LWD) tool and request retransmission of the real-time FIT annulus pressure while drilling pressure curve.
  • LWD logging while drilling
  • the annular pressure data is acquired by the pressure board in the LWD tool.
  • the present disclosure searches the pumps-off pressure profile and identifies (e.g., determines) the FIT section from the start of FIT test to P ma x (as shown the red curve in FIG. 2).
  • the operator is allowed to configure extensions on both sides to allow additional pressure data to be included to help the FIT analysis.
  • the pressure data is filtered to remove the measurement noise and then decimated to a preselected sampling period.
  • the preselected sampling period may be a 4-second sampling period.
  • the sampling period can be modified according to the requirements of the data density. Thus, other sampling periods may be utilized.
  • differential coding can be applied for data compression because due to the continuity along the FIT annulus pressure while drilling curve.
  • the compression bits are then encapsulated into a sequence of MODFs for realtime (or near real-time) transmission.
  • Independent MODFs can represent a portion of the FIT annulus pressure while drilling (APWD) curve independently. Thus, if one or more MODFs are lost or corrupted, other parts of FIT curve can still be reconstructed correctly from the available MODF(s).
  • the LWD transmits the MODFs to a measuring while drilling (MWD) via a suitable transmission protocol (e.g., Opcode 97), and the MWD arranges the MODFs to send the MODFs up-hole through mud-pulse telemetry.
  • a suitable transmission protocol e.g., Opcode 97
  • a computing device decodes the MODFs and then decompresses each MODF into part of the FIT curve and causes display of the real-time FIT annular while drilling curve in its time-domain log or in a cross-plot of pressure-vs-time.
  • the computing device can also provide a FIT analysis.
  • the present disclosure first discusses detection of pump-off pressure data corresponding to a formation integrity test (e.g., pump-off pressure data having a formation integrity test characteristic) and compression of the pump-off pressure data having a formation integrity test characteristic.
  • the present disclosure then discusses transmission protocols for transmitting the compressed pump-off pressure data uphole.
  • a compression protocol is now described for transmitting pressure data in realtime (or near real-time) representing the FIT annular pressure while drilling pressure curve utilizing mud-pulse telemetry.
  • the compression protocol can comprise: 1) detection of the FIT section; 2) filtering and decimation of the pressure data; 3) quantization of the pressure data; and 4) differential coding of the pressure data.
  • the FIT section can be defined from the start of pressure build-up in FIT to P ma x in the pumps-off pressure profile.
  • the start of pressure build-up for a FIT is defined as a turning point where a substantial pressure change occurs.
  • the turning point can be assumed between the minimum pressure before P ma x (denoted as Pmm) and P ma x, as shown in FIG. 3.
  • the pressure points can be downsampled at 20-second sampling periods.
  • a moving averaging can be taken during downsampling (e.g., the average value of respective pressure data in each 20-second window is assigned to the center point in that window).
  • the searching range is set from P m in to a middle pressure point at (P m in+Pmax)/2, as shown as the red circles in FIG. 3. In cases where multiple middle points are available, the last middle point is selected as the end of searching range.
  • FIG. 4 shows an example of FIT annular pressure while drilling curve with 1 -minute extension before the start of FIT and a 5-minute extension after P ma x.
  • the annular pressure while drilling data may contain measurement noise that can lower the compression efficiency. Moreover, the high sampling rate of original data might not be required for FIT analysis. Thus, in one or more embodiments, the pressure data having the FIT characteristics is filtered and decimated as described herein.
  • a 10th order low-pass FIR filter may be applied to the pressure data at the cut-off frequency of 1/16 Hz and with the following coefficients:
  • the low-pass filter can also serve as an anti-aliasing filter for downsampling purposes.
  • Presoiution is set as 1 psi in order to favor an accurate FIT analysis and the quantization error is +/- 0.5 psi.
  • each type of histogram may utilize a specific entropy coding for compression performance.
  • an adaptive entropy code design that is adaptable to various data statistics is described.
  • the adaptive entropy code design can be applied to the quantized pressure data.
  • the adaptive entropy code design evaluates the histogram of difference values and generates a set of entropy codebooks from suitable Huffman code models. In an embodiment, there may be nine (9) Huffman code models utilized.
  • the codebook using the least bits is selected to encode the data.
  • the index of the optimal codebook in the set and the parameters to generate the codebook set are encoded and transmitted. During decompression, the codebook set is re-generated given the received parameters and the index is used to retrieve the codebook for decoding the difference values.
  • FIG. 7 illustrates the nine (9) Huffman code models used to design the entropy codebook set.
  • An example of coding six (6) items based on Huffman model (a) is shown in FIG. 8.
  • the Huffman model first expands the model with binary splitting and generates enough branches for available items. Then, the coding bits for each item are constructed by outputting bit 0 or 1 on respective branches from left to right. Note that the binary splitting is performed downward and thus an increasing code length is expected from bottom to top. Histogram Evaluation
  • the statistics histogram of difference values can be different from case to case.
  • an efficient entropy code design utilizes the structure of statistics histogram of quantized differential values.
  • the statistics histograms vary from case to case. For simplicity purposes, three parameters are used in the present disclosure:
  • Do The difference value of the highest occurrence. In case that multiple values have the same highest occurrence, the lowest one is selected as Do.
  • Dmax and D m in: The maximum and minimum difference value, respectively.
  • FIG. 9 An example of histogram is shown in FIG. 9, where Di, D 2 , .. . , Dmax denote the difference values higher than Do and D-i, D -2 , ... , D m in denote the difference values lower than Do.
  • Dmin is encoded by applying the Huffman code model (a) on possible values of D max, Dmax"
  • Do is encoded by applying the Huffman code model (a) on possible values of D m in, Dmin+1,
  • the next step is to design entropy codebooks for respective difference values from Dmin to Dmax. A lower number of occurrences is assumed for a value farther away from Do. The difference values are sorted in a decreasing order of occurrence based on their distance to Do. Then, an entropy codebook is designed by assigning less bits to values nearer to Do and more bits for ones farther from Do. A set of entropy codebooks are available from various sorting results and Huffman code models. Sorting of Difference Values
  • the sorting of difference values is performed as follows:
  • Wings are defined as values on the left or right side of Do, i.e., the left wing contains D-i, D -2 , .. . , Dmin and the right wing contains Di, D 2 , ... , D ma x.
  • a long wing is on the right if Dmax - Do > Do - Dmin and on the left if D ma x - Do ⁇ Do - D m in.
  • NistGroup the number of the 1 st group of difference values (starting from Do) to output for sorting.
  • NLongWinginThisStep and NshortwinginThisStep the number of difference values to output in one step on the long and short wing, respectively.
  • the sorting process may comprise:
  • the final order of difference values is: ⁇ Do, Di ⁇ , ⁇ D 2 , D 3 ⁇ , ⁇ D-i ⁇ , ⁇ D ma x, Dmin ⁇ , where ⁇ ... ⁇ denote the values output in the same step.
  • one codebook can be designed for the sorted difference values.
  • the difference values are assumed to be sorted in the order of decreasing occurrence, so more bits are assigned to values which are output later, and the values which are output in the same step share the same "header" bits from the Huffman code model.
  • Huffman code model (a) is used to code the "index" for each value if two or more values are in that group.
  • the optimal entropy codebook is selected as the entropy codebook that encodes the most difference values within the available bandwidth.
  • a binary searching protocol can be applied to code as many values as possible.
  • Step 7 From the results in Step 7, determine the optimal codebook Codebook that generates the minimum number of bits N*diff.
  • the compression bitstream corresponding to the pressure data can be constructed by concatenating coding bits as output (as described above).
  • different statistics histogram are expected before and after P ma x
  • two independent entropy coding schemes can be applied when P ma x is included within the available bandwidth.
  • the pressure points before and at Pmax are first compressed into the minimum number of bits. Then, the remaining bits are used to code respective difference values after Pmax.
  • the position of P ma x is utilized to separate the two bitstreams.
  • the compression bits are encapsulated into a sequence of MODFs for real-time transmission.
  • the MODFs can employ error protection to reduce bit errors from noisy mud-pulse telemetry.
  • the MODFs can employ a product single-parity check (PSPC) code error protection in accordance with an embodiment of the present disclosure.
  • PSPC product single-parity check
  • Respective MODFs can be decompressed independently to reconstruct respective portions of the pressure curve. In the event that MODFs are missing or corrupted, the remaining MODFs can be used to reconstruct part of pressure curve, which may be sufficient for a FIT analysis.
  • the extension data after P ma x is configurable in order to include additional information after the FIT section. In an embodiment, if extension data has been utilized and there is still space in the MODF, additional extension data after P ma x can included until the remaining bits are used up.
  • a single MODF definition can be utilized in accordance with the present disclosure, as shown in FIG. 12.
  • the MODF can constructed with a frame synchronization word (24 bits for QPSK modulation), a 12-bit SubMODFID dpoint (4 bits are used to identify up-to 16 MODF definitions shared by the tools in the bottom hole assembly and the remaining 8 bits are parity bits for error protection), a 5-bit sequence number dpoint, a 12-bit timestamp dpoint, and 42 8-bit compression dpoints.
  • the 42 compression dpoints can contain 300 information bits and 36 parity bits from a 17x 18 PSPC error correcting code. These 300 information bits represent the available bandwidth in each MODF and are used to code the pressure points as described above.
  • the 5-bit sequence number dpoint is used to identify up-to 31 MODFs in a sequence. Its full-scaled value 31 is to indicate an LTB error during tool communication. This dpoint can be used to monitor the MODF sequence in field and help calculate the remaining time to compete the sequence. It also provides the possibility to re-call a specific missing or corrupted MODF by downlinking with its sequence number.
  • the 12-bit timestamp dpoint is used to compute the time span from the acquisition of reference pressure to the time when MWD requests this dpoint.
  • the MODF sequence is transmitted following the survey and utility frames after the telemetry resumes, as illustrated in FIG. 13.
  • the transmission of the first MODF can be delayed if compression cannot be finished in time or MWD fails to obtain the MODF correctly upon the completion of utility frame.
  • repeating MODF frames are transmitted instead to avoid telemetry interference.
  • dpoints from other measurements e.g., tool face
  • the MODFs and repeating frames can be transmitted in an interleaving manner and mud pulse system dpoints (single-curve compression) in repeating frames can be used to fill up-to 200-second gaps.
  • the time interval between MODFs is programmable in order to adapt with various telemetry speeds.
  • the time interval may be set to zero so that the whole MODF sequence is transmitted before any repeating frame and the latency of real-time FIT annular pressure while drilling pressure curve is minimized.
  • FIG. 14 illustrates a FIT annulus pressure while drilling curve, where the annulus pressure is increased at an almost fixed rate until it reaches the leak-off pressure.
  • the blue curve is the recorded-mode (RM) data from a tool dump file and the red curve represents the real-time curve. From the differential pressure curve as shown at the bottom of FIG. 14, the change at around 4,800 seconds indicates the presence of the leak-off pressure.
  • the total time length of real-time FIT annulus pressure while drilling pressure curve data is 51 minutes. This pressure cure utilizes five (5) MODFs, and transmission uphole takes 5.4 minutes at a 6 bits/second telemetry speed.
  • FIG. 15 illustrates a case of a varying pressure increasing rate during FIT. As shown, the pressure changes are captured in the differential pressure curve. In this embodiment, the 23.9-minute FIT annulus pressure while drilling data is transmitted utilizing three (3) MODFs in a time of 3.2 minutes at a 6 bits/second telemetry speed.
  • FIG. 16 A case of large pressure difference (up-to 30 psi after filtering) is shown in FIG. 16. As shown, two (2) MODFs are used to send the 9.4-minute FIT annulus pressure while drilling pressure curve at a transmission time or 2.2 minutes at a 6 bits/second telemetry speed.
  • FIG. 17 shows an example of two FIT cycles. The FIT part with the highest Pmax is selected for RT transmission. It uses 2 MODFs and takes 2.2 minutes to send the 13.3- minute FIT annulus pressure while drilling pressure profile curve at a 6 bits/second telemetry speed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • Acoustics & Sound (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Theoretical Computer Science (AREA)
  • Compression, Expansion, Code Conversion, And Decoders (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

Aspects of the disclosure can relate to a process for transmitting a pump-off pressure profile for formation integrity testing within a limited bandwidth. For example, a process may include measuring pump-off pressure data. The pump-off pressure data represents the pump-off pressure profile. The method also includes determining, from the pump-off pressure data, a pump-off pressure data portion corresponding to a formation integrity testing characteristic. The method also includes compressing pump-off pressure data portion with a compression protocol to produce compression bits. The compression bits representing the pump-off pressure data portion corresponding to the formation integrity testing characteristic. The method also includes transmitting, via a communication module, the compression bits to a computing device.

Description

REAL-TIME ANNULUS PRESSURE WHILE DRILLING FOR FORMATION
INTEGRITY TEST
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] The present application claims priority to United States Provisional Application
62/158,614 filed May 8, 2015 the entirety of which is incorporated by reference and to the United States Application 15/146,590 filed May 4, 2016.
FIELD OF THE INVENTION
[0002] Aspects of the disclosure relate to oil and gas drilling and the recovery of hydrocarbons. More specifically, aspects relate to real-time annulus pressure which drilling for formation integrity tests.
BACKGROUND
[0003] Oil wells are created by drilling a hole into the earth using a drilling rig that rotates a drill string (e.g., drill pipe) having a drill bit attached thereto. The drill bit, aided by the weight of pipes (e.g., drill collars), cuts into rock within the earth to create a wellbore. Drilling fluid (e.g., mud) is pumped into the drill pipe and exits at the drill bit. The drilling fluid may be used to cool the bit, lift rock cuttings to the surface, at least partially prevent destabilization of the rock in the wellbore, and/or at least partially overcome the pressure of fluids inside the rock so that the fluids do not enter the wellbore. During the creation of the wellbore, these drilling rigs can measure the physical properties of the well environment. Data representing the measurements can be transmitted to the surface as pressure pulses in a mud system (e.g., mud pulse telemetry) of the oil well.
SUMMARY
[0004] This summary is provided to introduce a selection of concepts that are further described below in the detailed description. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of the claimed subject matter.
[0005] Aspects of the disclosure can relate to a process for transmitting a pump-off pressure profile for formation integrity testing within a limited bandwidth. For example, a process may include measuring pump-off pressure data. The pump-off pressure data represents the pump-off pressure profile. The method also includes determining, from the pump-off pressure data, a pump-off pressure data portion corresponding to a formation integrity testing characteristic. The method also includes compressing pump-off pressure data portion with a compression protocol to produce compression bits. The compression bits representing the pump-off pressure data portion corresponding to the formation integrity testing characteristic. The method also includes transmitting, via a communication module, the compression bits to a computing device.
BRIEF DESCRIPTION OF THE DRAWINGS
[0006] So that the recited features may be understood in detail, a more particular description, briefly summarized above, may be had by reference to one or more embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate example embodiments, and are, therefore, not to be considered limiting of its scope.
[0007] FIG. 1 illustrates an example formation integrity test pressure curve and a real-time pumps-off annulus pressure while drilling pressure curve.
[0008] FIG. 2 illustrates an example diagram for measuring pump-off pressured data, compressing the pump-off pressure data, and transmitting the compressed pump-off pressure data uphole in accordance with an example embodiment of the present disclosure.
[0009] FIG. 3 illustrates a graph where the start of a formation integrity test is detected in accordance with an example embodiment of the present disclosure.
[0010] FIG. 4 is a graph, where a portion of the pressure curve corresponding to the formation integrity test annulus pressure while drilling is selected to be transmitted uphole in accordance with an example embodiment of the present disclosure.
[0011] FIG. 5 is a frequency analysis of formation integrity test data in accordance with an example embodiment of the present disclosure. [0012] FIG. 6 illustrates various histograms of difference values corresponding to a formation integrity test data in accordance with an example embodiment of the present disclosure.
[0013] FIGS. 7 A and 7B illustrates various Huffman code design models corresponding to formation integrity test data in accordance with an example embodiment of the present disclosure.
[0014] FIG. 8 illustrates an example of coding six (6) items using Huffman model (a) shown in FIG. 7A in accordance with an example embodiment of the present disclosure.
[0015] FIG. 9 illustrates an example histogram of seven (7) difference values in accordance with an example embodiment of the present disclosure.
[0016] FIG. 10 illustrates an example code design for difference values shown in FIG. 9 using Huffman model (d) shown in FIG. 7 A in accordance with an example embodiment of the present disclosure.
[0017] FIGS. 11 A and 1 IB illustrate three (3) example bit layout protocols in accordance with an example embodiment of the present disclosure.
[0018] FIG. 12 illustrates an example block diagram of a multiple on-demand frame utilized for transmitting compressed pump-off pressure data corresponding to a formation integrity test in accordance with an example embodiment of the present disclosure.
[0019] FIG. 13 is a block diagram illustrating an example transmission of a sequence of multiple on-demand frames in accordance with an example embodiment of the present disclosure.
[0020] FIG. 14 illustrates a graph showing a fixed pressure increase rate before leak-off pressure in accordance with an example embodiment of the present disclosure.
[0021] FIG. 15 illustrates a graph showing a varying pressure increase rate in accordance with an example embodiment of the present disclosure. [0022] FIG. 16 illustrates a graph showing various pressure changes in accordance with an example embodiment of the present disclosure.
[0023] FIG. 17 illustrates two graphs, each graph showing a respective test cycle in accordance with an example embodiment of the present disclosure.
DETAILED DESCRIPTION
[0024] Embodiments described herein generally relate to methods for measuring pressure within a wellbore. More particularly, embodiments described herein relate to a system and a method for transmitting a pump-off pressure profile in a wellbore.
[0025] Formation integrity tests (FITs) can be performed during pumps-off to determine the maximum annular pressure that can be applied to the formation. Many measurements regarding formation properties (e.g., leak-off pressure, formation fracture pressure, minimum horizontal stress (ah), formation permeability, etc.) can be evaluated from a pumps-off annular pressure profile. The synthetic "downhole" pressure curve, however, may not represent the data properly in most cases and, sometimes, can lead to highly- deviated results. Many factors, such as mud compressibility, gel strength, mud type, and borehole temperature, can contribute to the large discrepancy. Thus, the present disclosure discloses transmitting an annular pressure profile in real-time (RT) for an accurate FIT analysis.
[0026] A large amount of annular pressure data may be accumulated during FITs. For example, a 1-hour FIT generates 1,800 pressure points at a sampling period of 2 seconds. Each pressure point utilizes 15 bits to cover the range of 0 psi to 30,000 psi with 1-psi resolution. The total transmission would take 37.5 minutes at a rate of 12 bits/second. Such delays can impact the normal drilling operations since the data from other measurements cannot be sent in a long time period after pumping resumes.
[0027] Thus, pressure data representing major turning points along the pressure curve can be transmitted uphole to provide suitable compression ratios and reduce real-time transmission time. The pressure data representing the major turning points allow tracing of the pressure changes and identifying some key measurements, such as leak-off pressure, formation fracture pressure, and so on. In some embodiments, however, where high-density pressure points are utilized for a detailed FIT analysis, the sparse samples may not provide enough information. An example is shown in FIG. 1. From the pressure curve from realtime pumps-off annulus pressure while drilling, the major changes along the FIT can be represented. But for the differential pressure (see the bottom of FIG. 1), the real-time pumps-off annulus pressure while drilling pressure curve shows steps in long time intervals and the subtle changes may be missing.
[0028] The present disclosure discloses transmitting a portion of the FIT pressure curve profile. Thus, the present disclosure can be independent of real-time pumps-off annulus pressure while drilling due to different field usages. For example, the present disclosure transmits the FIT section from the start of FIT to the maximum pressure point (Pmax), as indicated in FIG. 1. Extensions on both sides are allowed and an operator can configure their time lengths according to the job requirements. The present disclosure detects the FIT section automatically and then performs compression. The compression bits are encapsulated into a sequence of multiple on-demand frames (MODFs) for real-time transmission. Respective MODFs can be decompressed independently into a part of pressure curve as this can be useful to reduce telemetry noise because part of FIT APWD data is available from the correctly-received MODFs. If a significant portion of the data is missing or corrupted, an operator can downlink to a logging while drilling (LWD) tool and request retransmission of the real-time FIT annulus pressure while drilling pressure curve.
[0029] During FIT, the annular pressure data is acquired by the pressure board in the LWD tool. When the pumps-up is detected (e.g., LTB power on), the present disclosure searches the pumps-off pressure profile and identifies (e.g., determines) the FIT section from the start of FIT test to Pmax (as shown the red curve in FIG. 2). According to the job requirements, the operator is allowed to configure extensions on both sides to allow additional pressure data to be included to help the FIT analysis.
[0030] To achieve a high compression efficiency, the pressure data is filtered to remove the measurement noise and then decimated to a preselected sampling period. For example, the preselected sampling period may be a 4-second sampling period. The sampling period, however, can be modified according to the requirements of the data density. Thus, other sampling periods may be utilized. Additionally, differential coding can be applied for data compression because due to the continuity along the FIT annulus pressure while drilling curve.
[0031] The compression bits are then encapsulated into a sequence of MODFs for realtime (or near real-time) transmission. Independent MODFs can represent a portion of the FIT annulus pressure while drilling (APWD) curve independently. Thus, if one or more MODFs are lost or corrupted, other parts of FIT curve can still be reconstructed correctly from the available MODF(s).
[0032] When the MODFs are ready, the LWD transmits the MODFs to a measuring while drilling (MWD) via a suitable transmission protocol (e.g., Opcode 97), and the MWD arranges the MODFs to send the MODFs up-hole through mud-pulse telemetry.
[0033] At the surface, a computing device decodes the MODFs and then decompresses each MODF into part of the FIT curve and causes display of the real-time FIT annular while drilling curve in its time-domain log or in a cross-plot of pressure-vs-time. The computing device can also provide a FIT analysis.
[0034] The present disclosure first discusses detection of pump-off pressure data corresponding to a formation integrity test (e.g., pump-off pressure data having a formation integrity test characteristic) and compression of the pump-off pressure data having a formation integrity test characteristic. The present disclosure then discusses transmission protocols for transmitting the compressed pump-off pressure data uphole.
Compression Protocol
[0035] A compression protocol is now described for transmitting pressure data in realtime (or near real-time) representing the FIT annular pressure while drilling pressure curve utilizing mud-pulse telemetry. As described below, the compression protocol can comprise: 1) detection of the FIT section; 2) filtering and decimation of the pressure data; 3) quantization of the pressure data; and 4) differential coding of the pressure data.
Detection of FIT Section
[0036] The FIT section can be defined from the start of pressure build-up in FIT to Pmax in the pumps-off pressure profile. The start of pressure build-up for a FIT is defined as a turning point where a substantial pressure change occurs. For example, the turning point can be assumed between the minimum pressure before Pmax (denoted as Pmm) and Pmax, as shown in FIG. 3.
[0037] To accelerate the detection process, in an example embodiment, the pressure points can be downsampled at 20-second sampling periods. To avoid the impact from measurement noise, a moving averaging can be taken during downsampling (e.g., the average value of respective pressure data in each 20-second window is assigned to the center point in that window).
[0038] The searching range is set from Pmin to a middle pressure point at (Pmin+Pmax)/2, as shown as the red circles in FIG. 3. In cases where multiple middle points are available, the last middle point is selected as the end of searching range.
[0039] Then, let Pd(i), i = 0, 1 , . . . ,Nd denote the Nd pressure points after downsampling. An initial threshold of pressure may be set as Pth = 5 psi by the compression protocol and may be defined at the start of the FIT curve as:
1. Compute the pressure difference APd(i) = Pd(i+1) - Pd(i), i = 0, 1,.. . ,Nd-2.
2. Find the latest index i* where APd(i*) < Pth.
3. If APd(i) > Pth, set i* = 0 as the start of FIT and stop.
4. Else if APd(i) < Pth (i.e., i* = Nd-2), reduce the pressure threshold by half (i.e., Pth =
Figure imgf000009_0001
5. Else, set i* as the start of FIT and stop.
[0040] The compression protocol allows extension data to be included on both sides of the FIT section in order to include more data according to the job requirements. FIG. 4 shows an example of FIT annular pressure while drilling curve with 1 -minute extension before the start of FIT and a 5-minute extension after Pmax.
Filtering and Decimation
[0041] The annular pressure while drilling data may contain measurement noise that can lower the compression efficiency. Moreover, the high sampling rate of original data might not be required for FIT analysis. Thus, in one or more embodiments, the pressure data having the FIT characteristics is filtered and decimated as described herein.
[0042] The frequency analysis directed to the FIT annular pressure while drilling data sets is shown in FIG. 5. A 10th order low-pass FIR filter may be applied to the pressure data at the cut-off frequency of 1/16 Hz and with the following coefficients:
{-0.003871323167475, 0, 0.032087799410030, 0.1 16708621643743,
0.220701186106900, 0.268747432013603, 0.220701186106900, 0.116708621643743, 0.032087799410030, 0, -0.003871323167475} .
[0043] The low-pass filter can also serve as an anti-aliasing filter for downsampling purposes.
Quantization
[0044] The filtered pressure data can be quantized as discussed herein. For example, let Pf(i), i = 0, 1,... , Nf denote the Nf pressure points after filtering and decimation. The quantization values can be calculated as q(i) = round(Pf(i)/Presoiution), i = 0, 1,... , Nf, where Presolution IS the pre-defined quantization stepsize or resolution. In an example embodiment, Presoiution is set as 1 psi in order to favor an accurate FIT analysis and the quantization error is +/- 0.5 psi.
[0045] During decompression, the de-quantization is performed on the decoded quantization values, Pr(i) = q(i) · "resolution, 1 = 0, 1 , ... ,Nf, where Pr(i), i = 0, 1 , ... ,Nf denote the reconstructed pressure values.
Differential Coding and Adaptive Entropy Code Design
[0046] As shown in FIG. 6, different statistics histograms can be observed from various data sets. Each type of histogram may utilize a specific entropy coding for compression performance.
[0047] As such, an adaptive entropy code design that is adaptable to various data statistics is described. The adaptive entropy code design can be applied to the quantized pressure data. The adaptive entropy code design evaluates the histogram of difference values and generates a set of entropy codebooks from suitable Huffman code models. In an embodiment, there may be nine (9) Huffman code models utilized. The codebook using the least bits is selected to encode the data. The index of the optimal codebook in the set and the parameters to generate the codebook set are encoded and transmitted. During decompression, the codebook set is re-generated given the received parameters and the index is used to retrieve the codebook for decoding the difference values.
[0048] FIG. 7 illustrates the nine (9) Huffman code models used to design the entropy codebook set. An example of coding six (6) items based on Huffman model (a) is shown in FIG. 8. The Huffman model first expands the model with binary splitting and generates enough branches for available items. Then, the coding bits for each item are constructed by outputting bit 0 or 1 on respective branches from left to right. Note that the binary splitting is performed downward and thus an increasing code length is expected from bottom to top. Histogram Evaluation
[0049] The statistics histogram of difference values can be different from case to case. In one or more embodiments, an efficient entropy code design utilizes the structure of statistics histogram of quantized differential values. The statistics histograms vary from case to case. For simplicity purposes, three parameters are used in the present disclosure:
Do: The difference value of the highest occurrence. In case that multiple values have the same highest occurrence, the lowest one is selected as Do.
Dmax and Dmin: The maximum and minimum difference value, respectively.
[0050] An example of histogram is shown in FIG. 9, where Di, D2, .. . , Dmax denote the difference values higher than Do and D-i, D-2, ... , Dmin denote the difference values lower than Do.
[0051] These three parameters are encoded and transmitted to describe the basic structure of a histogram. Let D*max and D*min denote the maximum value of Dmax and the minimum value of Dmin, respectively. In this work, they are set as D*max = 512 and D*min = -512. Then, Dmax is encoded by applying the Huffman code model (a) on possible values of 0, 1, -1, 2, -2, 3, -3, ... , D max, D mm,
Dmin is encoded by applying the Huffman code model (a) on possible values of D max, Dmax"
1 , ... , D minj
Do is encoded by applying the Huffman code model (a) on possible values of Dmin, Dmin+1,
Codebook Set Design
[0052] The next step is to design entropy codebooks for respective difference values from Dmin to Dmax. A lower number of occurrences is assumed for a value farther away from Do. The difference values are sorted in a decreasing order of occurrence based on their distance to Do. Then, an entropy codebook is designed by assigning less bits to values nearer to Do and more bits for ones farther from Do. A set of entropy codebooks are available from various sorting results and Huffman code models. Sorting of Difference Values
[0053] In an embodiment, the sorting of difference values is performed as follows:
1. Starting from Do, output a certain number of difference values as the 1st group.
2. Output the remaining values on both sides of Do alternatively.
3. To accelerate the ordering, the number of values to output on each side of Do is doubled after each output.
[0054] Definitions:
[0055] Wings: a wing is defined as values on the left or right side of Do, i.e., the left wing contains D-i, D-2, .. . , Dmin and the right wing contains Di, D2, ... , Dmax. A long wing is on the right if Dmax - Do > Do - Dmin and on the left if Dmax - Do < Do - Dmin.
[0056] NistGroup: the number of the 1st group of difference values (starting from Do) to output for sorting.
[0057] NLongWinginThisStep and NshortwinginThisStep: the number of difference values to output in one step on the long and short wing, respectively.
Sorting process:
[0058] In an example embodiment, the sorting process may comprise:
1. Output the 1st group of NistGroup values by starting from Do on the long wing. If the size of long wing is lower than NistGroup, (i.e., Dmax or Dmin is reached before NistGroup values are output) continue to output the remaining values on the short wing in the direction away from Do.
2. Output NLongWinginThisStep or NshortwinginThisStep values by starting from next value to the last output one in this wing in the direction away from Do. If Dmax or Dmin is reached before the specific number of values are output, move to the opposite wing and output the remaining values in the direction away from Do.
3. Multiply NLongWinginThisStep or NshortwinginThisStep by 2 (i.e., double the number of values to output on this wing in the next step).
4. Move to the opposite wing if Dmax or Dmin has not been reached on that wing. Otherwise, stay on the same wing as the last output value.
5. Repeat the steps from 2 by swinging between two wings until the difference values are output for sorting. In an embodiment, an example with N tGroup = 2, NLongWinginThisStep = 2 and NshortWinginThisStep = 1 is given based on the histogram in FIG. 9:
1. Output N tGroup = 2 values of Do and Di on the long (right) wing.
2. Output NLongWinginThisStep = 2 values of D2 and D3 on the long (right) wing
3. Update NLongWinginThisStep = 4;
4. Move to the short (left) wing and output NshortWinginThisStep = 1 value of D.L
5. Update NshortWinginThisStep = 2;
6. Move to the long (right) wing and suppose to output NLongWinginThisStep = 4 values in this step. However, one value may within that wing. After outputting Dmax, move to the short (left) wing and continue to output Dmin.
7. Stop since values have been output for sorting.
[0059] The final order of difference values is: {Do, Di }, {D2, D3 }, {D-i }, {Dmax, Dmin}, where { ... } denote the values output in the same step.
[0060] For respective Huffman code models, one codebook can be designed for the sorted difference values. In an example embodiment, the difference values are assumed to be sorted in the order of decreasing occurrence, so more bits are assigned to values which are output later, and the values which are output in the same step share the same "header" bits from the Huffman code model. Then Huffman code model (a) is used to code the "index" for each value if two or more values are in that group.
[0061] The code design for the above example based on Huffman code model (d) is illustrated in FIG. 10.
[0062] Given Do, Dmin, and Dmax, a set of codebooks are available with various Huffman code models and parameters of (NutGroup, NLongWinginThisStep, NshortWinginThisStep). In an example, the maximum numbers are set as 6, 2 and 1, respectively, and the codebook set is designed as follows:
Initialization: empty the codebook sets CodebookSet.
For NutGroup = 1 :6
For NLongWinginThisStep = 1 :2
For NshortWinginThisStep = 1 : 1
• Sort the difference values as described above
• For each one of 9 Huffman code models (in FIG. 7) o Design a codebook for values as described above
o If this new codebook is NOT in CodebookSet (i.e., the code length for each value is different from previous codebooks), add this new codebook to CodebookSet.
Optimal Codebook Selection
[0063] In the codebook set (e.g., CodebookSet), the optimal entropy codebook is selected as the entropy codebook that encodes the most difference values within the available bandwidth. In practice, a binary searching protocol can be applied to code as many values as possible.
[0064] Let q(i), i = 0,1, ... ,Nq-l denote Nq quantization values and N denote the available number of bits. Then, he binary searching protocol can comprise:
1. Encode the reference quantization value q(0) using Nref bits. In an embodiment, Nref can be set to 15 bits to cover a pressure range of 0 psi to 30,000 psi with a quantization stepsize of Presoiution = 1 psi.
2. Compute the difference values Aq(i) = q(i+l) - q(i), i = 0, 1,... ,Nq-2.
3. Set io = 0, ii = i2 = Nq-2.
4. Evaluate the histogram of Aq(i), i = 0, 1 , ... , and compute Do, Dmin and Dmax.
5. Encode Dmax, Dmin and Do and generate Nhist coding bits in total.
6. Design the entropy codebook set.
7. For each codebook in the set, evaluate the number of bits to code respective values Aq(i), i = 0,1, ..., ii including the bits to index this codebook in the set (the index is encoded based on Huffman code model (a) as illustrated in FIG. 8).
8. From the results in Step 7, determine the optimal codebook Codebook that generates the minimum number of bits N*diff.
9. If (Nref + Nhist + N*diff) > Nb, a. If ii > io + 1, update i2 = , = floor((io + i2)/2) and goto Step 4. b. Else, set i = io as the index of last difference value to be coded. 10. Else, a. If ii < i2 - 1, update io = , = floor((io + )l2) and goto Step 4. b. Else, set i* = as the index of last difference value to be coded. Output the compression bits for q(i), i = 0,1, ...,i*
Compression Bit Layout
[0065] The compression bitstream corresponding to the pressure data (e.g., the pressure data corresponding to the FIT section) can be constructed by concatenating coding bits as output (as described above). In some instances, different statistics histogram are expected before and after Pmax, two independent entropy coding schemes can be applied when Pmax is included within the available bandwidth. In this case, the pressure points before and at Pmax are first compressed into the minimum number of bits. Then, the remaining bits are used to code respective difference values after Pmax. As illustrated in FIGs 11 A and 1 IB, the position of Pmax is utilized to separate the two bitstreams. In this work, 8 bits are used to index up-to 256 points away from the reference pressure (i.e., a value 0 indicates Pmax is the 1st one after the reference point). For the portion after Pmax, the coding of the reference pressure may not be included.
Real-Time Transmission
[0066] Once compressed, the compression bits are encapsulated into a sequence of MODFs for real-time transmission. In an embodiment, the MODFs can employ error protection to reduce bit errors from noisy mud-pulse telemetry. For example, the MODFs can employ a product single-parity check (PSPC) code error protection in accordance with an embodiment of the present disclosure.
[0067] Respective MODFs can be decompressed independently to reconstruct respective portions of the pressure curve. In the event that MODFs are missing or corrupted, the remaining MODFs can be used to reconstruct part of pressure curve, which may be sufficient for a FIT analysis. [0068] The extension data after Pmax is configurable in order to include additional information after the FIT section. In an embodiment, if extension data has been utilized and there is still space in the MODF, additional extension data after Pmax can included until the remaining bits are used up.
MODF Definition
[0069] A single MODF definition can be utilized in accordance with the present disclosure, as shown in FIG. 12. For instance, the MODF can constructed with a frame synchronization word (24 bits for QPSK modulation), a 12-bit SubMODFID dpoint (4 bits are used to identify up-to 16 MODF definitions shared by the tools in the bottom hole assembly and the remaining 8 bits are parity bits for error protection), a 5-bit sequence number dpoint, a 12-bit timestamp dpoint, and 42 8-bit compression dpoints. The 42 compression dpoints can contain 300 information bits and 36 parity bits from a 17x 18 PSPC error correcting code. These 300 information bits represent the available bandwidth in each MODF and are used to code the pressure points as described above.
[0070] The 5-bit sequence number dpoint is used to identify up-to 31 MODFs in a sequence. Its full-scaled value 31 is to indicate an LTB error during tool communication. This dpoint can be used to monitor the MODF sequence in field and help calculate the remaining time to compete the sequence. It also provides the possibility to re-call a specific missing or corrupted MODF by downlinking with its sequence number. The 12-bit timestamp dpoint is used to compute the time span from the acquisition of reference pressure to the time when MWD requests this dpoint.
Transmission of Multiple On-Demand Frame
[0071] The MODF sequence is transmitted following the survey and utility frames after the telemetry resumes, as illustrated in FIG. 13.
[0072] The transmission of the first MODF can be delayed if compression cannot be finished in time or MWD fails to obtain the MODF correctly upon the completion of utility frame. In an embodiment, repeating MODF frames are transmitted instead to avoid telemetry interference. Additionally, dpoints from other measurements (e.g., tool face) can be embedded in MODF to meet possible requirements on update rates. To avoid the gaps in real-time logs during the MODF transmission, the MODFs and repeating frames can be transmitted in an interleaving manner and mud pulse system dpoints (single-curve compression) in repeating frames can be used to fill up-to 200-second gaps.
[0073] The time interval between MODFs is programmable in order to adapt with various telemetry speeds. The time interval may be set to zero so that the whole MODF sequence is transmitted before any repeating frame and the latency of real-time FIT annular pressure while drilling pressure curve is minimized.
Experimental Results
[0074] During simulation, 1 -minute and 5-minute extensions are assumed before the start of FIT and after Pmax, respectively. However it is understood that the extension after Pmax can be longer than 5 minutes in order to fill (e.g., complete) the last MODF.
[0075] FIG. 14 illustrates a FIT annulus pressure while drilling curve, where the annulus pressure is increased at an almost fixed rate until it reaches the leak-off pressure. The blue curve is the recorded-mode (RM) data from a tool dump file and the red curve represents the real-time curve. From the differential pressure curve as shown at the bottom of FIG. 14, the change at around 4,800 seconds indicates the presence of the leak-off pressure. In this embodiment, the total time length of real-time FIT annulus pressure while drilling pressure curve data is 51 minutes. This pressure cure utilizes five (5) MODFs, and transmission uphole takes 5.4 minutes at a 6 bits/second telemetry speed.
[0076] FIG. 15 illustrates a case of a varying pressure increasing rate during FIT. As shown, the pressure changes are captured in the differential pressure curve. In this embodiment, the 23.9-minute FIT annulus pressure while drilling data is transmitted utilizing three (3) MODFs in a time of 3.2 minutes at a 6 bits/second telemetry speed.
[0077] A case of large pressure difference (up-to 30 psi after filtering) is shown in FIG. 16. As shown, two (2) MODFs are used to send the 9.4-minute FIT annulus pressure while drilling pressure curve at a transmission time or 2.2 minutes at a 6 bits/second telemetry speed. [0078] FIG. 17 shows an example of two FIT cycles. The FIT part with the highest Pmax is selected for RT transmission. It uses 2 MODFs and takes 2.2 minutes to send the 13.3- minute FIT annulus pressure while drilling pressure profile curve at a 6 bits/second telemetry speed.
[0079] Although only a few example embodiments have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the example embodiments without materially departing from the present disclosure. Accordingly, all such modifications are intended to be included within the scope of this disclosure as defined in the following claims. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. Thus, although a nail and a screw may not be structural equivalents in that a nail employs a cylindrical surface to secure wooden parts together, whereas a screw employs a helical surface, in the environment of fastening wooden parts, a nail and a screw may be equivalent structures.

Claims

What is claimed is:
1. A process for transmitting a pump-off pressure profile for formation integrity testing, comprising:
measuring pump-off pressure data, the pump-off pressure data representing the pump-off pressure profile;
determining, from the pump-off pressure data, a pump-off pressure data portion corresponding to a formation integrity testing characteristic;
compressing the pump-off pressure data portion with a compression protocol to produce a plurality of compression bits, the plurality of compression bits representing the pump-off pressure data portion corresponding to the formation integrity testing characteristic; and
transmitting the plurality of compression bits to a computing device.
2. The process of claim 1, further comprising transmitting the compression bits with a sequence of multiple on-demand frames.
3. The process of claim 1, wherein identifying the formation integrity testing portion of the pump-off pressure data further comprises: determining a minimum pressure data point from the pump-off pressure and a maximum pressure data from the pump-off pressure data, and selecting data having a value greater than the minimum pressure data and less than the maximum pressure data as the pump-off pressure data portion.
4. The process of claim 1, wherein compressing the pump-off pressure data portion further comprises applying a filter to pump-off pressure data comprising the pump-off pressure data portion to generate filtered pump-off pressure data; and applying a quantization protocol to the filtered pump-off pressure data to generate quantized pump- off pressure data.
5. The process of claim 4, further comprising: applying a differential coding protocol to the quantized pump-off pressure data.
6. The process of claim 5, wherein the differential coding protocol comprises an adaptive entropy code protocol.
7. The process of claim 1, wherein the transmission is performed via a communication module,
PCT/US2016/031147 2015-05-08 2016-05-06 Real-time annulus pressure while drilling for formation integrity test Ceased WO2016182890A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201562158614P 2015-05-08 2015-05-08
US62/158,614 2015-05-08
US15/146,590 2016-05-04
US15/146,590 US10419018B2 (en) 2015-05-08 2016-05-04 Real-time annulus pressure while drilling for formation integrity test

Publications (1)

Publication Number Publication Date
WO2016182890A1 true WO2016182890A1 (en) 2016-11-17

Family

ID=57248417

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2016/031147 Ceased WO2016182890A1 (en) 2015-05-08 2016-05-06 Real-time annulus pressure while drilling for formation integrity test

Country Status (2)

Country Link
US (1) US10419018B2 (en)
WO (1) WO2016182890A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083957A (en) * 2017-05-25 2017-08-22 电子科技大学 The pump impulse interference elimination method and system of drilling fluid following drill signal

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2546335B (en) 2016-01-18 2021-08-04 Equinor Energy As Method and apparatus for pressure integrity testing
RU2692574C1 (en) * 2018-07-27 2019-06-25 Акционерное общество "Российская корпорация ракетно-космического приборостроения и информационных систем" (АО "Российские космические системы") Telemetric information collection and transmission system
NO20211599A1 (en) 2019-06-12 2021-12-29 Baker Hughes Oilfield Operations Llc Compressing data collected downhole in a wellbore
CN119907930A (en) 2022-09-21 2025-04-29 贝克休斯油田作业有限责任公司 System and method for data processing in downhole operations
WO2024196343A1 (en) 2023-03-17 2024-09-26 Halliburton Energy Services, Inc. Wellbore downlink communication

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020011333A1 (en) * 1997-03-25 2002-01-31 Ward Christopher D. Subsurface measurement apparatus, system, and process for improved well drilling, control, and production
WO2003098266A1 (en) * 2002-05-17 2003-11-27 Halliburton Energy Services, Inc. Formation testing while drilling data compression
US20060235618A1 (en) * 2005-03-31 2006-10-19 Schlumberger Technology Corporation Pump off measurements for quality control and wellbore stability prediction
US20090101340A1 (en) * 2007-10-23 2009-04-23 Schlumberger Technology Corporation Technique and apparatus to perform a leak off test in a well
US20140286538A1 (en) * 2013-03-25 2014-09-25 Schlumberger Technology Corporation LWD Real-Time Borehole Image Transmission

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4302757A (en) 1979-05-09 1981-11-24 Aerospace Industrial Associates, Inc. Bore telemetry channel of increased capacity
US5252031A (en) 1992-04-21 1993-10-12 Gibbs Sam G Monitoring and pump-off control with downhole pump cards
US6453240B1 (en) 1999-04-12 2002-09-17 Joakim O. Blanch Processing for sonic waveforms
US6932167B2 (en) 2002-05-17 2005-08-23 Halliburton Energy Services, Inc. Formation testing while drilling data compression
US6832515B2 (en) 2002-09-09 2004-12-21 Schlumberger Technology Corporation Method for measuring formation properties with a time-limited formation test
US7805247B2 (en) 2002-09-09 2010-09-28 Schlumberger Technology Corporation System and methods for well data compression
GB0306973D0 (en) 2003-03-26 2003-04-30 British Telecomm Transmitting video
GB2405725B (en) 2003-09-05 2006-11-01 Schlumberger Holdings Borehole telemetry system
GB0407511D0 (en) 2004-04-02 2004-05-05 Qinetiq Ltd Improved millimetre wave illumination system
US7107153B2 (en) 2004-04-02 2006-09-12 Schlumberger Technology Corporation Data compression methods and systems
US7283910B2 (en) 2004-07-15 2007-10-16 Baker Hughes Incorporated Incremental depth measurement for real-time calculation of dip and azimuth
US7265682B2 (en) 2004-09-14 2007-09-04 Halliburton Energy Services, Inc. Joint source-channel coding for multicarrier modulation
US7673215B2 (en) 2004-12-17 2010-03-02 Samsung Electronics Co., Ltd. Apparatus and method for using an error correcting code to achieve data compression in a data communication network
US8620636B2 (en) 2005-08-25 2013-12-31 Schlumberger Technology Corporation Interpreting well test measurements
US8044821B2 (en) 2005-09-12 2011-10-25 Schlumberger Technology Corporation Downhole data transmission apparatus and methods
KR100837410B1 (en) 2006-11-30 2008-06-12 삼성전자주식회사 Subjective lossless image data compression method and apparatus
US9541658B2 (en) 2007-08-02 2017-01-10 Westerngeco L. L. C. Dynamically allocating different numbers of bits to windows of a series representing a seismic trace
US8136395B2 (en) 2007-12-31 2012-03-20 Schlumberger Technology Corporation Systems and methods for well data analysis
US8788206B2 (en) * 2008-01-25 2014-07-22 Schlumberger Technology Corporation Data compression transforms for use in downhole applications
US20090294174A1 (en) * 2008-05-28 2009-12-03 Schlumberger Technology Corporation Downhole sensor system
KR101543298B1 (en) 2008-10-13 2015-08-10 에스케이 텔레콤주식회사 / Video encoding/decoding apparatus and Variable OBMC apparatus and method
US8654838B2 (en) 2009-08-31 2014-02-18 Nxp B.V. System and method for video and graphic compression using multiple different compression techniques and compression error feedback
US8899348B2 (en) * 2009-10-16 2014-12-02 Weatherford/Lamb, Inc. Surface gas evaluation during controlled pressure drilling
US8616274B2 (en) 2010-05-07 2013-12-31 Halliburton Energy Services, Inc. System and method for remote wellbore servicing operations
US20120251335A1 (en) 2011-04-01 2012-10-04 Gregg Hurst Pump controller with multiphase measurement
WO2013052423A2 (en) 2011-10-05 2013-04-11 Halliburton Energy Services, Inc. Methods and apparatus having borehole seismic waveform compression
US9951607B2 (en) 2013-01-31 2018-04-24 Baker Hughes, LLC System and method for characterization of downhole measurement data for borehole stability prediction
EP3014065A4 (en) 2013-06-29 2017-03-01 Services Pétroliers Schlumberger Optical interface system for communicating with a downhole tool
US10125558B2 (en) * 2014-05-13 2018-11-13 Schlumberger Technology Corporation Pumps-off annular pressure while drilling system
CA2974724C (en) 2015-01-30 2021-07-06 Scientific Drilling International, Inc. Collaborative telemetry

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020011333A1 (en) * 1997-03-25 2002-01-31 Ward Christopher D. Subsurface measurement apparatus, system, and process for improved well drilling, control, and production
WO2003098266A1 (en) * 2002-05-17 2003-11-27 Halliburton Energy Services, Inc. Formation testing while drilling data compression
US20060235618A1 (en) * 2005-03-31 2006-10-19 Schlumberger Technology Corporation Pump off measurements for quality control and wellbore stability prediction
US20090101340A1 (en) * 2007-10-23 2009-04-23 Schlumberger Technology Corporation Technique and apparatus to perform a leak off test in a well
US20140286538A1 (en) * 2013-03-25 2014-09-25 Schlumberger Technology Corporation LWD Real-Time Borehole Image Transmission

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083957A (en) * 2017-05-25 2017-08-22 电子科技大学 The pump impulse interference elimination method and system of drilling fluid following drill signal

Also Published As

Publication number Publication date
US20170170842A1 (en) 2017-06-15
US10419018B2 (en) 2019-09-17

Similar Documents

Publication Publication Date Title
US10419018B2 (en) Real-time annulus pressure while drilling for formation integrity test
US10125558B2 (en) Pumps-off annular pressure while drilling system
US7107153B2 (en) Data compression methods and systems
RU2014110956A (en) METHOD AND DEVICE FOR COMPRESSING A SEISMIC SIGNAL IN A WELL
US9932824B2 (en) Compression and transmission of measurements from downhole tool
US9835026B2 (en) High-speed transmission of annulus pressure-while-drilling by data compression
US9866835B2 (en) Borehole image compression
US9784097B2 (en) Compressed telemetry for time series downhole data using variable scaling and grouped words
GB2363458A (en) Processing sonic waveform measurements
US7068182B2 (en) Method and apparatus for mud pulse telemetry
CN105227503B (en) A kind of underground Joint Source/channel Coding Design method based on wireless drilling measuring system
CA2984296C (en) Systems and methods for communicating downhole data
US9923575B2 (en) Compression of multidimensional sonic data
US7167101B2 (en) Method and apparatus for telemetry
CN114650103B (en) Mud pulse data transmission method, device, equipment and storage medium
US12516602B2 (en) High-reliability data compression and telemetry scheme for real-time logging data transmission
US20250308376A1 (en) Encoding or decoding communication data
CA2857317C (en) Data compression methods and systems
EP3642451A1 (en) Downhole data transmission and surface synchronization
US11664817B2 (en) Method and system for telemetry enhancement
Zhang et al. Cst: Compressive sensing transmission for real time m/lwd communication
Le Peng et al. Interference Analysis of LWD Transmission Signal in Bohai X Oilfield
CN108463613A (en) Position scrambling in Differential Pulse Position Modulation
GB2429474A (en) Method and Apparatus for Mud Pulse Telemetry

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16793241

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16793241

Country of ref document: EP

Kind code of ref document: A1