WO2016014447A1 - Methods and cables for use in fracturing zones in a well - Google Patents

Methods and cables for use in fracturing zones in a well Download PDF

Info

Publication number
WO2016014447A1
WO2016014447A1 PCT/US2015/041220 US2015041220W WO2016014447A1 WO 2016014447 A1 WO2016014447 A1 WO 2016014447A1 US 2015041220 W US2015041220 W US 2015041220W WO 2016014447 A1 WO2016014447 A1 WO 2016014447A1
Authority
WO
WIPO (PCT)
Prior art keywords
cable
optical fiber
conductors
well
jacket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2015/041220
Other languages
French (fr)
Inventor
Paul Wanjau
Joseph Varkey
David Kim
Maria GRISANTI
Sheng Chang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Original Assignee
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/628,732 external-priority patent/US10001613B2/en
Application filed by Schlumberger Canada Ltd, Services Petroliers Schlumberger SA, Schlumberger Technology BV, Schlumberger Technology Corp, Schlumberger Holdings Ltd, Prad Research and Development Ltd filed Critical Schlumberger Canada Ltd
Publication of WO2016014447A1 publication Critical patent/WO2016014447A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/01Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for anchoring the tools or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/116Gun or shaped-charge perforators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • E21B47/07Temperature
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
    • E21B47/135Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency using light waves, e.g. infrared or ultraviolet waves

Definitions

  • the disclosure generally relates to methods and cables for use in fracturing zones in a well.
  • Zones in a well are often fractured to increase production and/or allow production of hydrocarbon reservoirs adjacent a well. To ensure proper fracturing of zones it is useful to monitor the fracturing operations.
  • An example cable for use in fracturing zones in a well includes a cable core.
  • the cable core includes an optical fiber conductor.
  • the optical fiber conductor includes a pair of half-shell conductors.
  • An insulated optical fiber is located between the pair of half-shell conductors.
  • the insulated optical fiber is coupled with the pair of half-shell conductors.
  • the optical fiber conductor also includes an optical fiber conductor jacket disposed about the pair of half-shell conductors.
  • An example of a system for monitoring fracturing operations includes a cable.
  • the cable comprises a cable core having an optical fiber conductor.
  • the optical fiber conductor includes a pair of half-shell conductors.
  • An insulated optical fiber is located between the pair of half-shell conductors.
  • the insulated optical fiber is coupled with the pair of half-shell conductors, and an optical fiber conductor jacket is disposed about the pair of half-shell conductors.
  • a tool string is connected with the cable, and the tool string has an anchor
  • An example method of fracturing a well includes conveying a cable and tool string into a well to a first zone adjacent a heel of a horizontal portion of the well.
  • the method also includes anchoring the cable and tool string in the well.
  • the method also includes applying fracturing fluid to the first zone, and monitoring the fracturing by using the an optical fiber conductor of the cable to acquire cable temperature data, temperature increase and decrease data, vibration data, strain data, or combinations thereof.
  • FIG. 1 depicts a schematic of an optical fiber conductor.
  • FIG. 2 depicts a cable for use in fracturing operations according to one or more embodiments.
  • FIG. 3 depicts a schematic of another cable for use in fracturing operations according to one or more embodiments.
  • FIG. 4 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments.
  • FIG. 5 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments.
  • FIG. 6A depicts an example system for monitoring fracturing operations according to one or more embodiments.
  • FIG. 6b depicts another example system for use in well to perform operations on the well.
  • FIG. 7 depicts an example method of fracturing zones in a well according to one or more embodiments.
  • FIG. 8 depicts an example method of placing a cable in well for monitoring.
  • FIG. 9 depicts an example method of placing a cable in a well for hydraulic fracturing and logging in a horizontal well.
  • FIG. 10 depicts an example cable with a hepta core for monitoring in a well.
  • An example cable for use in fracturing zones in a well includes a cable core that has an optical fiber conductor.
  • the optical fiber conductor includes a pair of half-shell conductors.
  • the half-shell conductors can be made from any conductive material. Illustrative conductive materials include copper, steel, or the like.
  • the half- shell conductors can be used to provide data, power, heat or combinations thereof. The material of the conductors can be selected to accommodate the desired resistance of the cable.
  • the half-shell conductors can be used to provide heat, and the heating of the cable can be controlled by selective adjustment of current passing through the half-shell conductors.
  • An insulated optical fiber is located between the pair of half-shell conductors.
  • the insulated optical fiber can be insulated with a polymer or other insulating material.
  • the insulated optical fiber can be coupled with the pair of half- shell conductors.
  • the insulation of the optical fiber can be bonded with the optical fiber and the inner surfaces of the half-shell conductors. Coupled as used herein can mean physically connected or arranged such that stress or force applied to the half-shell conductors is also applied to the optical fiber.
  • the space between the insulated optical fiber and the half-shell conductors can be minimal to allow coupling of the insulated optical fiber and half-shell conductors.
  • the optical fiber can be a single optical fiber or a plurality of optical fibers.
  • the optical fiber can be a bundle of optical fibers.
  • An optical fiber conductor jacket can be disposed about the pair of half- shell conductors.
  • the optical fiber conductor jacket can be made from polymer or other materials.
  • An example cable core can also include a plurality of optical fiber conductors and cable components located in interstitial spaces between the plurality of optical fiber conductors.
  • the cable components can be glass-fiber yarn, polymer, polymer covered metal tubes, composite tubes, metal tubes, or the like.
  • a central cable component can be located between the plurality of optical fiber conductors.
  • a non-conductive material can be located in the cable core to fill void spaces therein.
  • a foamed-cell polymer, a core jacket, an outer jacket, or combinations thereof can be located about the cable core.
  • the core jacket can be a polymer, a fiber reinforced polymer, a cabling tape, or combinations thereof.
  • a seam-weld tube can be located about an outer jacket.
  • the seam- welded tube can at least partially embed into the outer jacket.
  • FIG. 1 depicts a schematic of an optical fiber conductor.
  • the optical fiber conductor 100 has a first half-shell conductor 110, a second half-shell conductor 112, an insulated optical fiber 114, and an optical fiber conductor jacket 116.
  • Fig. 2 depicts a cable for use in fracturing operations according to one or more embodiments.
  • the cable 200 includes a plurality of optical fiber conductors 100, a plurality of cable components 210, a core jacket 220, a non-conductive material 230, a foamed-cell polymer 240, an outer jacket 250, and a seam-welded tube 260.
  • the plurality of optical fiber conductors 100 and the plurality of cable components 210 are cabled about a central cable component 212.
  • the non- conductive material 230 is used to fill spaces or voids in the cable core during cabling.
  • the core jacket 220 is extruded or otherwise placed about the plurality of optical fiber conductors 100, the cable components 220, the central cable component 212, and the non-conductive material 230.
  • the foamed-cell polymer 240 is placed about the core jacket 220, and an outer jacket 250 is placed about the foamed-cell polymer 240.
  • a seam-welded tube 260 is placed about the outer jacket 250.
  • the seam-welded tube 260 can at least partially embed into the outer jacket 250. For example, a weld bead can embed into the outer jacket 250.
  • the cable 200 can be connected to a downhole tool and can be arranged to heat and power delivery.
  • a power source at surface can be connected with two of the optical fiber conductors 100, such that one is positive and the other is negative, the third can be used for grounding or floating.
  • the paths can be in a series loop for heating application, and when power needs to be delivered to downhole tools a switch can open the series conductor path and connect each path to designated tool circuit for power delivery.
  • the self-heating and power supply can be performed concurrently.
  • one conductor can be connected to positive terminal at a power supply at surface and to a designated tool circuit downhole, and another conductor can be connected to a negative terminal at the surface and to a designated tool circuit downhole.
  • power can be delivered downhole and one of the conductor paths can be a return; in one embodiment, if the downhole tool is a tractor, the tractor can be stopped and the wheels closed allowing power to be delivered without movement and at same time the self-heating can occur.
  • FIG. 3 depicts a schematic of another cable for use in fracturing operations according to one or more embodiments.
  • the cable 300 includes the plurality of optical fiber conductors 100, the plurality of cable components 210, the center component 212, the core jacket 220, the non-conductive material 230, the foamed-cell polymer 240, the outer jacket 250, the seam- welded tube 260, a reinforced jacket 310, an additional jacket 320, and an additional seam- welded tube 330.
  • FIG. 4 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments.
  • the cable 400 includes a plurality of optical fiber conductors 100, the plurality of cable components 210, the core jacket 220, a first jacket 420, a first layer of strength members 410, a second jacket 422, a second layer of strength members 430, a third jacket 424, and a reinforced outer jacket 440.
  • the plurality of optical fiber conductors 100 and the plurality of cable components 210 can be cabled about the central component 212.
  • the non-conductive material 230 is used to fill spaces or voids in the cable core during cabling.
  • a core jacket 220 is extruded or otherwise placed about the plurality of optical fiber conductors 100, the cable components 220, the central cable component 212, and the non-conductive material 230.
  • a first jacket 420 can be placed about the cable core jacket 220.
  • the first jacket 420 can be a reinforced polymer, a pure polymer, or the like.
  • the first layer of strength members 410 can be cabled about the first jacket 420.
  • the first layer of strength members 410 can at least partially embed into the first jacket 420.
  • a second jacket 422 can be placed about the first layer of strength members 410.
  • the second jacket 422 can at least partially bond with the first jacket 420.
  • a second layer of strength members 430 can be cabled about the second jacket 422.
  • the second jacket 422 can separate the first layer of strength members 410 from the second layer of strength members 430 from each other.
  • the strength members in the first strength member layer and the second strength member layer can be coated armor wire, steel armor wire, corrosion resistant armor wire, composite armor wire, or the like.
  • a third jacket 424 can be placed about the second layer of strength members 420.
  • the third jacket 424 can bond with the second jacket 422.
  • a reinforced outer jacket 430 can be placed about the third jacket 424.
  • the quad type cable can be connected to a tool string using a 1 by 1 configuration, a 2 by 2 configuration, or a 3 by 1 configuration.
  • a series loop can be formed by connecting two conductors to positive and two conductors to negative in a closed loop and a switching device can be used to open the loop and connect with the downhole tools.
  • two of the conductors can be looped for heat generation and two of the conductors can be connected to the downhole tools for power deliver; if the downhole tool is a tractor, the tractor can be stopped and the wheels closed allowing power to be delivered without movement and at same time the self -heating can occur.
  • two conductor paths can be connected to power at surface and a third to negative at surface, and each of the conductors can be connected to designated tool circuits downhole for power delivery using one of the conductive paths as a return.
  • FIG. 5 depicts cable according to one or more embodiments.
  • the cable 500 includes one or more optical fiber conductors 100, a double jacket 510, wires 520, an insulating layer 530, a first jacket 540, a first layer of strength members 550, a second jacket 560, a second layer of strength members 570, a third jacket 580, and an outer jacket 590.
  • the optical fiber conductor 100 has the double jacket 510 located thereabout.
  • the double jacket can include two polymers of differing strength.
  • the wires 520 can be served helically over the double jacket 510.
  • the insulating layer 530 can be placed about the wires 520.
  • the insulating layer can be a polymer or like material.
  • the first jacket 540 can be placed about the insulating layer.
  • the first jacket 540 can be a fiber reinforced polymer.
  • the first strength member layer 540 can be cabled about the first jacket 540.
  • the first strength member layer 540 can at least partially embed into the first jacket 540.
  • the second jacket 560 can be placed about the first strength member layer 540.
  • the second jacket 560 can bond with the first jacket 540.
  • the second layer of strength members 570 can be cabled about the second jacket 560, and the second layer of strength members 570 can at least partially embed into the second jacket 560.
  • the third jacket 580 can be placed about the second layer of strength members 570.
  • the third jacket 580 can bond with the second jacket 560.
  • the outer jacket 590 can be placed about the third jacket 580.
  • the outer jacket 580 can be a fiber reinforced polymer.
  • FIG. 6A depicts an example system for monitoring fracturing operations according to one or more embodiments.
  • the system 600 includes a cable 610 and a tool string 620.
  • the tool string 620 includes an anchoring device 622 and a logging tool 624.
  • the cable 610 can be any of those disclosed herein or a cable having an optical fiber conductor as described herein.
  • the anchoring device 622 can be a centralizer, a spike, an anchor, or the like.
  • the tool string 620 can have a flow meter and a tension measuring device.
  • the cable 610 and tool string 620 can be conveyed into a wellbore 630.
  • the wellbore 630 has a heel 632, a plurality of zones 634, and a toe 636.
  • the cable 610 and tool string 620 can be conveyed into the wellbore 630 using any method of conveyance, such as pump down, tractors, or the like.
  • the tool string 620 can be stopped adjacent a first zone adjacent the heel 632.
  • Fracturing fluid can be pumped into the well to open the zone, and the cable 610 can be used to monitor the fracturing operation.
  • diverter fluid can be provided to the well to plug the fractures.
  • the tool string and cable can be conveyed further into the well towards the toe 636 and stopped at intermediate zones. At each of the zones the fracturing operations and diverting can be repeated.
  • the plugged fractures can be unplugged.
  • the plugged fractures can be unplugged using now known or future known techniques.
  • the tool string 620 and cable 610 can be left in the wellbore and the zones can be produced, and the logging tool 624 can be used to acquire data.
  • the logging tool 624 can acquire data before the zones are fractured, as the zones are fractured, after the zones are fractured, or combinations thereof.
  • FIG. 6b depicts another example system for use in well to perform operations on the well.
  • the system includes a tool string 640.
  • the tool string 640 includes a tractor 642, a logging tool 644, and a plug 648.
  • the tool string 640 can include other equipment to perform additional downhole services.
  • the downhole services can include intervention operations, completion operations, monitoring operations, or the like.
  • a cable 650 can be connected with the tool string 640.
  • the cable 650 can be any of those disclosed therein or substantially similar cables.
  • FIG. 7 depicts an example method of fracturing zones in a well according to one or more embodiments.
  • the method 700 includes conveying a cable and tool string into a well to a first zone adjacent a heel of a horizontal portion of the well (Block 710).
  • the tension on the cable and the flow of fluid can be measured.
  • Fluid flow and cable tension can predict the cable status. For example, if a high flow rate is measured but the cable loses tension, it would indicate the cable is buckling or stuck downhole; if the cable is under tension and low or no flow is detected, the fractures before the cable anchoring mechanism are taking most of the fluid; if the cable is under tension and high flow rate is measured it would indicate that there are no open fractures before the cable anchoring mechanism and the cable should be moving towards the toe of the well.
  • the fluid flow can be measured using a flow meter in the tool string or the self-heated capability of the cable can be used to predict the flow velocity around the cable based on the rate of increase or decrease of the temperature using distributed temperature sensing.
  • the method can also include anchoring the cable and tool string in the well (Block 720).
  • the method can also include applying fracturing fluid to the first zone (Block 730).
  • the method also includes monitoring the fracturing by using an optical fiber conductor of the cable to acquire cable temperature data, temperature increase and decrease data, vibration data, strain data, or combinations thereof (Block 740).
  • the hydraulic fracturing process is monitored using the heat-enabled fiber-optic cable. Real-time measurements of cable temperature, temperature increase or decrease rate, vibration, and strain measurements are available to predict which fracture is taking more fluid.
  • FIG. 8 depicts an example method of placing a cable in well for monitoring.
  • the method 800 includes conveying a cable and tractor into a well (Block 810).
  • the conveying can be performed using pump down, a tractor, gravity, other known or future known methods, or combinations thereof.
  • the method can include anchoring the tractor in place (Block 820).
  • the tractor can be anchored in place using anchoring spikes, anchoring pads, or the like.
  • the method can also include removing slack from the cable after the tractor is anchored in place (Block 830).
  • the slack can be removed from the cable by pulling at the surface or using other known or future know techniques.
  • the method can also include monitoring the well conditions, operation parameters, or combinations thereof.
  • the monitoring can include hydraulic fracturing monitoring, detecting leaks in a casing, gas production, oil production, electrical submersible pump monitoring, gas lift mandrel monitoring, injection water breakthrough, cross flow shut-in, gas breakthrough, injection profile of water injection wells, steam injection monitoring, C02 injection performance, zonal isolation monitoring, monitoring for flow behind casing, or other temporary or permanent monitoring operations.
  • the cable can acquire data to aid in fracture height determination, zonal flow contribution determination, evaluation of well stimulation, optimization of gas lift operations, optimization of electrical submersible pumps, other wellbore data, operation data, or production data, or combinations thereof.
  • the monitoring can be performed in any type of well.
  • Illustrative wells include subsea wells, vertical wells, and horizontal wells.
  • the monitoring can be permanent monitoring or temporary monitoring.
  • FIG. 9 depicts an example method of placing a cable in a well for hydraulic fracturing and logging in a horizontal well.
  • the method 900 includes connecting the cable with a plug, tractor, and logging tool (Block 910).
  • the plug can be a packer or other sealing device.
  • the tractor can be battery operated or powered by the cable.
  • the method 900 also includes conveying the tractor, plug, and logging tool to a desired location within a well (Block 920).
  • the desired location can be any location in the well.
  • the desired location can be at the toe of a horizontal portion of the well, within an intermediate location of a horizontal portion of the well, or any other portion of the well.
  • the method also includes anchoring the tractor and removing slack from the cable (Block 930).
  • the method also includes setting the plug (Block 940).
  • the plug can isolate the tractor and logging tool from pressure in the well, corrosive fracturing fluids, or other wellbore condition uphole of the tractor and logging tool.
  • the method includes pumping fracturing fluid into the well (Block 950).
  • the method also includes monitoring the fracturing operation using the cable (Block 960). The monitoring can include obtaining real-time measurements of cable temperature, temperature increase or decrease, vibration, strain measurement, or other parameters.
  • the method also includes pumping diverter fluid into the well (Block 950).
  • the method also includes repeating the fracturing and pumping of divert fluid until desired state of production is obtained (Block 970).
  • the method also includes deactivating the plug and reversing the tractor out of the well (Block 980).
  • the method also includes logging with the logging tool as the tractor is reversed out of the well (Block 990).
  • the method can also include monitoring production with the cable as the tractor is reversed out of the well.
  • the cable can be connected with the tractor, a perforating gun, a logging tool, or combinations thereof.
  • the cable can be connected with a perforating gun and tractor, and the perforating gun can be used to perforate the well before the well is fractured.
  • the cable can be connected with a perforating gun, tractor, logging tool, and a plug.
  • the well can be perforated, the plug can be set, fracturing operations carried out, and logging can be performed as the tractor is reversed out of the well.
  • other combinations of downhole hole equipment can be added to the tool string allowing for real-time monitoring using the cable and performance of multiple operations to be performed on a well in a single trip.
  • FIG. 10 depicts an example cable for monitoring in a well.
  • the cable 1000 can include a cable core that includes a plurality of conductors 1100 and a plurality of cable components 1200.
  • the conductors 1100 can be any conductor. Illustrative conductors include stranded conductors, fiber optic conductors, other conductors described herein, other know or future known conductors, or combinations thereof.
  • the cable components 1200 can be filler rods, incompressible polymer rods, metallic rods, other now known or future known components, or any combination thereof.
  • the cable core can have a first armor layer 1300 and a second armor layer 1400 disposed thereabout.
  • the armor layers 1300 and 1400 can include any number of armor wires.
  • the armor layers can be filled with polymer, and the polymer in each armor layer can be bond together.
  • a jacket or the like can separate the first armor layer 1300 from the second armor layer 1400.
  • the cable can be connected with the downhole tool in surface power supply using a 3 by 3 configuration.
  • Three conductors can be used for power delivery and 3 conductors can be used for heating.
  • Other configuration can be used.
  • all conductors can be used for heating by connecting in loop, where three conductors are connected to positive of power supply and three conductors are connected to negative of the power supply, and at the tool string a switch can be used to open the loop and connect the conductors to the a designated circuit for power delivery.
  • power delivery and heating can be done at the same time.
  • three conductors can be connected to positive at the surface and three conductors can be connected to negative at surface, two or more conductors can be in series for heating application, and the remaining conductive paths can connected to designated tool circuit for power delivery using one conductive path as the return; and when the tractor is stopped the wheels can be retracted allowing for power delivery while avoiding movement.
  • the cables disclosed herein can be connected with downhole tools and surface power in various ways allowing for continuous power delivery and heating, selective power delivery and heating, or combinations thereof.
  • the connections can be made using now known or future known techniques.
  • the connections can include switches, microprocessors, or other devices to control power delivery and heating.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • Electromagnetism (AREA)
  • Measuring Temperature Or Quantity Of Heat (AREA)
  • Communication Cables (AREA)

Abstract

A cable having a cable core for use in fracturing zones in a well, wherein the cable core includes an optical fiber conductor. The optical fiber conductor has a pair of half-shell conductors. An insulated optical fiber located between the pair of half-shell conductors. The insulated optical fiber is coupled with the pair of half-shell conductors. An optical fiber conductor jacket is disposed about the pair of half-shell conductors.

Description

METHODS AND CABLES FOR USE IN FRACTURING ZONES IN A WELL
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This Application claims the benefit of U.S. Provisional Patent Application No. 62/027,696 that was filed on July 22, 2014, U.S. Non-Provisional Patent Application No. 14/628,732 that was filed on February 23, 2015, and U.S. Continuation-In-Part Application No. 14/709,879 filed May 12, 2015. U.S. Provisional Patent Application No. 62/027,696, U.S. Non-Provisional Application No. 14/628,732, and U.S. Continuation-In-Part Application No. 14/709,879 are incorporated in their entirety herein by reference.
FIELD OF THE DISCLOSURE
[0002] The disclosure generally relates to methods and cables for use in fracturing zones in a well.
BACKGROUND
[0003] Zones in a well are often fractured to increase production and/or allow production of hydrocarbon reservoirs adjacent a well. To ensure proper fracturing of zones it is useful to monitor the fracturing operations.
SUMMARY
[0004] An example cable for use in fracturing zones in a well includes a cable core. The cable core includes an optical fiber conductor. The optical fiber conductor includes a pair of half-shell conductors. An insulated optical fiber is located between the pair of half-shell conductors. The insulated optical fiber is coupled with the pair of half-shell conductors. The optical fiber conductor also includes an optical fiber conductor jacket disposed about the pair of half-shell conductors. [0005] An example of a system for monitoring fracturing operations includes a cable. The cable comprises a cable core having an optical fiber conductor. The optical fiber conductor includes a pair of half-shell conductors. An insulated optical fiber is located between the pair of half-shell conductors. The insulated optical fiber is coupled with the pair of half-shell conductors, and an optical fiber conductor jacket is disposed about the pair of half-shell conductors. A tool string is connected with the cable, and the tool string has an anchor.
[0006] An example method of fracturing a well includes conveying a cable and tool string into a well to a first zone adjacent a heel of a horizontal portion of the well. The method also includes anchoring the cable and tool string in the well. The method also includes applying fracturing fluid to the first zone, and monitoring the fracturing by using the an optical fiber conductor of the cable to acquire cable temperature data, temperature increase and decrease data, vibration data, strain data, or combinations thereof.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007] FIG. 1 depicts a schematic of an optical fiber conductor.
[0008] Fig. 2 depicts a cable for use in fracturing operations according to one or more embodiments.
[0009] FIG. 3 depicts a schematic of another cable for use in fracturing operations according to one or more embodiments.
[0010] FIG. 4 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments.
[0011] FIG. 5 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments.
[0012] FIG. 6A depicts an example system for monitoring fracturing operations according to one or more embodiments.
[0013] FIG. 6b depicts another example system for use in well to perform operations on the well.
[0014] FIG. 7 depicts an example method of fracturing zones in a well according to one or more embodiments. [0015] FIG. 8 depicts an example method of placing a cable in well for monitoring.
[0016] FIG. 9 depicts an example method of placing a cable in a well for hydraulic fracturing and logging in a horizontal well.
[0017] FIG. 10 depicts an example cable with a hepta core for monitoring in a well.
DETAILED DESCRIPTION
[0018] Certain examples are shown in the above-identified figures and described in detail below. In describing these examples, like or identical reference numbers are used to identify common or similar elements. The figures are not necessarily to scale and certain features and certain views of the figures may be shown exaggerated in scale or in schematic for clarity and/or conciseness.
[0019] An example cable for use in fracturing zones in a well includes a cable core that has an optical fiber conductor. The optical fiber conductor includes a pair of half-shell conductors. The half-shell conductors can be made from any conductive material. Illustrative conductive materials include copper, steel, or the like. The half- shell conductors can be used to provide data, power, heat or combinations thereof. The material of the conductors can be selected to accommodate the desired resistance of the cable. The half-shell conductors can be used to provide heat, and the heating of the cable can be controlled by selective adjustment of current passing through the half-shell conductors.
[0020] An insulated optical fiber is located between the pair of half-shell conductors. The insulated optical fiber can be insulated with a polymer or other insulating material. The insulated optical fiber can be coupled with the pair of half- shell conductors. For example, the insulation of the optical fiber can be bonded with the optical fiber and the inner surfaces of the half-shell conductors. Coupled as used herein can mean physically connected or arranged such that stress or force applied to the half-shell conductors is also applied to the optical fiber. For example, the space between the insulated optical fiber and the half-shell conductors can be minimal to allow coupling of the insulated optical fiber and half-shell conductors. The optical fiber can be a single optical fiber or a plurality of optical fibers. The optical fiber can be a bundle of optical fibers.
[0021] An optical fiber conductor jacket can be disposed about the pair of half- shell conductors. The optical fiber conductor jacket can be made from polymer or other materials.
[0022] An example cable core can also include a plurality of optical fiber conductors and cable components located in interstitial spaces between the plurality of optical fiber conductors. The cable components can be glass-fiber yarn, polymer, polymer covered metal tubes, composite tubes, metal tubes, or the like. A central cable component can be located between the plurality of optical fiber conductors. In one or more embodiments, a non-conductive material can be located in the cable core to fill void spaces therein.
[0023] A foamed-cell polymer, a core jacket, an outer jacket, or combinations thereof can be located about the cable core. The core jacket can be a polymer, a fiber reinforced polymer, a cabling tape, or combinations thereof.
[0024] In one or more embodiments, a seam-weld tube can be located about an outer jacket. The seam- welded tube can at least partially embed into the outer jacket.
[0025] FIG. 1 depicts a schematic of an optical fiber conductor. The optical fiber conductor 100 has a first half-shell conductor 110, a second half-shell conductor 112, an insulated optical fiber 114, and an optical fiber conductor jacket 116.
[0026] Fig. 2 depicts a cable for use in fracturing operations according to one or more embodiments. The cable 200 includes a plurality of optical fiber conductors 100, a plurality of cable components 210, a core jacket 220, a non-conductive material 230, a foamed-cell polymer 240, an outer jacket 250, and a seam-welded tube 260.
[0027] The plurality of optical fiber conductors 100 and the plurality of cable components 210 are cabled about a central cable component 212. The non- conductive material 230 is used to fill spaces or voids in the cable core during cabling. The core jacket 220 is extruded or otherwise placed about the plurality of optical fiber conductors 100, the cable components 220, the central cable component 212, and the non-conductive material 230. [0028] The foamed-cell polymer 240 is placed about the core jacket 220, and an outer jacket 250 is placed about the foamed-cell polymer 240. A seam-welded tube 260 is placed about the outer jacket 250. The seam-welded tube 260 can at least partially embed into the outer jacket 250. For example, a weld bead can embed into the outer jacket 250.
[0029] The cable 200 can be connected to a downhole tool and can be arranged to heat and power delivery. For example, a power source at surface can be connected with two of the optical fiber conductors 100, such that one is positive and the other is negative, the third can be used for grounding or floating. The paths can be in a series loop for heating application, and when power needs to be delivered to downhole tools a switch can open the series conductor path and connect each path to designated tool circuit for power delivery.
[0030] The self-heating and power supply can be performed concurrently. For example, one conductor can be connected to positive terminal at a power supply at surface and to a designated tool circuit downhole, and another conductor can be connected to a negative terminal at the surface and to a designated tool circuit downhole. Accordingly, power can be delivered downhole and one of the conductor paths can be a return; in one embodiment, if the downhole tool is a tractor, the tractor can be stopped and the wheels closed allowing power to be delivered without movement and at same time the self-heating can occur.
[0031] FIG. 3 depicts a schematic of another cable for use in fracturing operations according to one or more embodiments. The cable 300 includes the plurality of optical fiber conductors 100, the plurality of cable components 210, the center component 212, the core jacket 220, the non-conductive material 230, the foamed-cell polymer 240, the outer jacket 250, the seam- welded tube 260, a reinforced jacket 310, an additional jacket 320, and an additional seam- welded tube 330.
[0032] FIG. 4 depicts a schematic of a cable for use in fracturing operations according to one or more embodiments. The cable 400 includes a plurality of optical fiber conductors 100, the plurality of cable components 210, the core jacket 220, a first jacket 420, a first layer of strength members 410, a second jacket 422, a second layer of strength members 430, a third jacket 424, and a reinforced outer jacket 440. [0033] The plurality of optical fiber conductors 100 and the plurality of cable components 210 can be cabled about the central component 212. The non-conductive material 230 is used to fill spaces or voids in the cable core during cabling. A core jacket 220 is extruded or otherwise placed about the plurality of optical fiber conductors 100, the cable components 220, the central cable component 212, and the non-conductive material 230. A first jacket 420 can be placed about the cable core jacket 220. The first jacket 420 can be a reinforced polymer, a pure polymer, or the like.
[0034] The first layer of strength members 410 can be cabled about the first jacket 420. The first layer of strength members 410 can at least partially embed into the first jacket 420. A second jacket 422 can be placed about the first layer of strength members 410. The second jacket 422 can at least partially bond with the first jacket 420. A second layer of strength members 430 can be cabled about the second jacket 422. The second jacket 422 can separate the first layer of strength members 410 from the second layer of strength members 430 from each other. The strength members in the first strength member layer and the second strength member layer can be coated armor wire, steel armor wire, corrosion resistant armor wire, composite armor wire, or the like.
[0035] A third jacket 424 can be placed about the second layer of strength members 420. The third jacket 424 can bond with the second jacket 422. A reinforced outer jacket 430 can be placed about the third jacket 424.
[0036] The quad type cable can be connected to a tool string using a 1 by 1 configuration, a 2 by 2 configuration, or a 3 by 1 configuration. For example, a series loop can be formed by connecting two conductors to positive and two conductors to negative in a closed loop and a switching device can be used to open the loop and connect with the downhole tools. In another configuration two of the conductors can be looped for heat generation and two of the conductors can be connected to the downhole tools for power deliver; if the downhole tool is a tractor, the tractor can be stopped and the wheels closed allowing power to be delivered without movement and at same time the self -heating can occur.
[0037] In one example, two conductor paths can be connected to power at surface and a third to negative at surface, and each of the conductors can be connected to designated tool circuits downhole for power delivery using one of the conductive paths as a return.
[0038] FIG. 5 depicts cable according to one or more embodiments. The cable 500 includes one or more optical fiber conductors 100, a double jacket 510, wires 520, an insulating layer 530, a first jacket 540, a first layer of strength members 550, a second jacket 560, a second layer of strength members 570, a third jacket 580, and an outer jacket 590.
[0039] The optical fiber conductor 100 has the double jacket 510 located thereabout. The double jacket can include two polymers of differing strength. The wires 520 can be served helically over the double jacket 510. The insulating layer 530 can be placed about the wires 520. The insulating layer can be a polymer or like material. The first jacket 540 can be placed about the insulating layer. The first jacket 540 can be a fiber reinforced polymer.
[0040] The first strength member layer 540 can be cabled about the first jacket 540. The first strength member layer 540 can at least partially embed into the first jacket 540. The second jacket 560 can be placed about the first strength member layer 540. The second jacket 560 can bond with the first jacket 540.
[0041] The second layer of strength members 570 can be cabled about the second jacket 560, and the second layer of strength members 570 can at least partially embed into the second jacket 560.
[0042] The third jacket 580 can be placed about the second layer of strength members 570. The third jacket 580 can bond with the second jacket 560. The outer jacket 590 can be placed about the third jacket 580. The outer jacket 580 can be a fiber reinforced polymer.
[0043] FIG. 6A depicts an example system for monitoring fracturing operations according to one or more embodiments. The system 600 includes a cable 610 and a tool string 620. The tool string 620 includes an anchoring device 622 and a logging tool 624. The cable 610 can be any of those disclosed herein or a cable having an optical fiber conductor as described herein. The anchoring device 622 can be a centralizer, a spike, an anchor, or the like. The tool string 620 can have a flow meter and a tension measuring device. [0044] The cable 610 and tool string 620 can be conveyed into a wellbore 630. The wellbore 630 has a heel 632, a plurality of zones 634, and a toe 636. The cable 610 and tool string 620 can be conveyed into the wellbore 630 using any method of conveyance, such as pump down, tractors, or the like. The tool string 620 can be stopped adjacent a first zone adjacent the heel 632. Fracturing fluid can be pumped into the well to open the zone, and the cable 610 can be used to monitor the fracturing operation. After fracturing, diverter fluid can be provided to the well to plug the fractures. The tool string and cable can be conveyed further into the well towards the toe 636 and stopped at intermediate zones. At each of the zones the fracturing operations and diverting can be repeated.
[0045] Once all zones are fractured, the plugged fractures can be unplugged. The plugged fractures can be unplugged using now known or future known techniques. The tool string 620 and cable 610 can be left in the wellbore and the zones can be produced, and the logging tool 624 can be used to acquire data. In one or more embodiments, the logging tool 624 can acquire data before the zones are fractured, as the zones are fractured, after the zones are fractured, or combinations thereof.
[0046] FIG. 6b depicts another example system for use in well to perform operations on the well. The system includes a tool string 640. The tool string 640 includes a tractor 642, a logging tool 644, and a plug 648. The tool string 640 can include other equipment to perform additional downhole services. The downhole services can include intervention operations, completion operations, monitoring operations, or the like. A cable 650 can be connected with the tool string 640. The cable 650 can be any of those disclosed therein or substantially similar cables.
[0047] FIG. 7 depicts an example method of fracturing zones in a well according to one or more embodiments.
[0048] The method 700 includes conveying a cable and tool string into a well to a first zone adjacent a heel of a horizontal portion of the well (Block 710). As the cable and tool string are conveyed into the well, the tension on the cable and the flow of fluid can be measured. Fluid flow and cable tension can predict the cable status. For example, if a high flow rate is measured but the cable loses tension, it would indicate the cable is buckling or stuck downhole; if the cable is under tension and low or no flow is detected, the fractures before the cable anchoring mechanism are taking most of the fluid; if the cable is under tension and high flow rate is measured it would indicate that there are no open fractures before the cable anchoring mechanism and the cable should be moving towards the toe of the well. The fluid flow can be measured using a flow meter in the tool string or the self-heated capability of the cable can be used to predict the flow velocity around the cable based on the rate of increase or decrease of the temperature using distributed temperature sensing.
[0049] The method can also include anchoring the cable and tool string in the well (Block 720). The method can also include applying fracturing fluid to the first zone (Block 730).
[0050] The method also includes monitoring the fracturing by using an optical fiber conductor of the cable to acquire cable temperature data, temperature increase and decrease data, vibration data, strain data, or combinations thereof (Block 740). The hydraulic fracturing process is monitored using the heat-enabled fiber-optic cable. Real-time measurements of cable temperature, temperature increase or decrease rate, vibration, and strain measurements are available to predict which fracture is taking more fluid.
[0051] Operations above can be repeated for each zone. Cable tension measurement and fluid flow can be monitored after each zone to prevent damage to the cable.
[0052] FIG. 8 depicts an example method of placing a cable in well for monitoring. The method 800 includes conveying a cable and tractor into a well (Block 810). The conveying can be performed using pump down, a tractor, gravity, other known or future known methods, or combinations thereof.
[0053] Once the tractor and at least a portion of the cable or located at a desired location in the well, the method can include anchoring the tractor in place (Block 820). The tractor can be anchored in place using anchoring spikes, anchoring pads, or the like.
[0054] The method can also include removing slack from the cable after the tractor is anchored in place (Block 830). The slack can be removed from the cable by pulling at the surface or using other known or future know techniques.
[0055] The method can also include monitoring the well conditions, operation parameters, or combinations thereof. The monitoring can include hydraulic fracturing monitoring, detecting leaks in a casing, gas production, oil production, electrical submersible pump monitoring, gas lift mandrel monitoring, injection water breakthrough, cross flow shut-in, gas breakthrough, injection profile of water injection wells, steam injection monitoring, C02 injection performance, zonal isolation monitoring, monitoring for flow behind casing, or other temporary or permanent monitoring operations. The cable can acquire data to aid in fracture height determination, zonal flow contribution determination, evaluation of well stimulation, optimization of gas lift operations, optimization of electrical submersible pumps, other wellbore data, operation data, or production data, or combinations thereof.
[0056] The monitoring can be performed in any type of well. Illustrative wells include subsea wells, vertical wells, and horizontal wells. The monitoring can be permanent monitoring or temporary monitoring.
[0057] FIG. 9 depicts an example method of placing a cable in a well for hydraulic fracturing and logging in a horizontal well. The method 900 includes connecting the cable with a plug, tractor, and logging tool (Block 910). The plug can be a packer or other sealing device. The tractor can be battery operated or powered by the cable.
[0058] The method 900 also includes conveying the tractor, plug, and logging tool to a desired location within a well (Block 920). The desired location can be any location in the well. The desired location can be at the toe of a horizontal portion of the well, within an intermediate location of a horizontal portion of the well, or any other portion of the well.
[0059] The method also includes anchoring the tractor and removing slack from the cable (Block 930). The method also includes setting the plug (Block 940). The plug can isolate the tractor and logging tool from pressure in the well, corrosive fracturing fluids, or other wellbore condition uphole of the tractor and logging tool. The method includes pumping fracturing fluid into the well (Block 950). The method also includes monitoring the fracturing operation using the cable (Block 960). The monitoring can include obtaining real-time measurements of cable temperature, temperature increase or decrease, vibration, strain measurement, or other parameters.
[0060] The method also includes pumping diverter fluid into the well (Block 950). The method also includes repeating the fracturing and pumping of divert fluid until desired state of production is obtained (Block 970). The method also includes deactivating the plug and reversing the tractor out of the well (Block 980). The method also includes logging with the logging tool as the tractor is reversed out of the well (Block 990).
[0061] In one or more embodiments of the method, the method can also include monitoring production with the cable as the tractor is reversed out of the well.
[0062] In one or more embodiments of the methods disclosed herein the cable can be connected with the tractor, a perforating gun, a logging tool, or combinations thereof. For example, the cable can be connected with a perforating gun and tractor, and the perforating gun can be used to perforate the well before the well is fractured. In another example, the cable can be connected with a perforating gun, tractor, logging tool, and a plug. The well can be perforated, the plug can be set, fracturing operations carried out, and logging can be performed as the tractor is reversed out of the well. Of course, other combinations of downhole hole equipment can be added to the tool string allowing for real-time monitoring using the cable and performance of multiple operations to be performed on a well in a single trip.
[0063] FIG. 10 depicts an example cable for monitoring in a well. The cable 1000 can include a cable core that includes a plurality of conductors 1100 and a plurality of cable components 1200. The conductors 1100 can be any conductor. Illustrative conductors include stranded conductors, fiber optic conductors, other conductors described herein, other know or future known conductors, or combinations thereof. The cable components 1200 can be filler rods, incompressible polymer rods, metallic rods, other now known or future known components, or any combination thereof.
[0064] The cable core can have a first armor layer 1300 and a second armor layer 1400 disposed thereabout. The armor layers 1300 and 1400 can include any number of armor wires. The armor layers can be filled with polymer, and the polymer in each armor layer can be bond together. In one or more embodiments, a jacket or the like can separate the first armor layer 1300 from the second armor layer 1400.
[0065] For a hepta cable the cable can be connected with the downhole tool in surface power supply using a 3 by 3 configuration. Three conductors can be used for power delivery and 3 conductors can be used for heating. Other configuration can be used. For example, all conductors can be used for heating by connecting in loop, where three conductors are connected to positive of power supply and three conductors are connected to negative of the power supply, and at the tool string a switch can be used to open the loop and connect the conductors to the a designated circuit for power delivery.
[0066] In another embodiment, power delivery and heating can be done at the same time. For example, three conductors can be connected to positive at the surface and three conductors can be connected to negative at surface, two or more conductors can be in series for heating application, and the remaining conductive paths can connected to designated tool circuit for power delivery using one conductive path as the return; and when the tractor is stopped the wheels can be retracted allowing for power delivery while avoiding movement.
[0067] The cables disclosed herein can be connected with downhole tools and surface power in various ways allowing for continuous power delivery and heating, selective power delivery and heating, or combinations thereof. The connections can be made using now known or future known techniques. The connections can include switches, microprocessors, or other devices to control power delivery and heating.
[0068] Although example assemblies, methods, systems have been described herein, the scope of coverage of this patent is not limited thereto. On the contrary, this patent covers every method, nozzle assembly, and article of manufacture fairly falling within the scope of the appended claims either literally or under the doctrine of equivalents.

Claims

What is claimed is:
1. A cable for use in a well, wherein the cable comprises: a cable core comprising: a pair of half-shell conductors; an insulated optical fiber located between the pair of half-shell conductors; and an optical fiber conductor jacket disposed about the pair of half-shell conductors.
2. The cable of claim 1, wherein the cable core comprises a plurality of optical fiber conductors.
3. The cable of claim 2, wherein the cable core comprises cable components located in interstitial spaces between the plurality of optical fiber conductors.
4. The cable of claim 3, wherein the cable core comprises a non-conductive material filling void spaces in the cable core.
5. The cable of claim 4, wherein a core jacket is disposed about the plurality of optical fiber conductors, the cable components, and the non-conductive material.
6. The cable of claim 5, a layer of foamed-cell polymer disposed about the core jacket.
7. The cable of claim 6, further comprising an outer jacket disposed about the layer of foamed-cell polymer.
8. The cable of claim 7, further comprising a seam- weld tube about the outer jacket, wherein the seam-welded tube is at least partially embedded into the outer jacket.
9. The cable of claim 3, further comprising a layer of foamed-cell polymer disposed about the cable components and the plurality of optical fiber conductors.
A system for monitoring fracturing operations, wherein the system comprises a cable comprising: a pair of half-shell conductors; an insulated optical fiber located between the pair of half-shell conductors; and an optical fiber conductor jacket disposed about the pair of half-shell conductors; and a tool string connected with the cable, wherein the tool string comprises an anchor.
11. The system of claim 10, wherein the tool string comprises a logging tool.
12. A method of fracturing a well, wherein the method comprises: conveying a cable and tool string to a first zone of the well; anchoring the cable and tool string in the well; applying fracturing fluid to the first zone; and monitoring the fracturing by using the optical fiber conductor of the cable to acquire cable temperature data, temperature increase data, temperature decrease data, vibration data, strain data, or combinations thereof.
13. The method of claim 12, further comprising plugging fractures in the first zone.
14. The method of claim 13, further comprising moving the cable and tool string to a second zone, and monitoring the fracturing of the second zone.
15. The method of claim 14, further comprising opening the plugged fractures in the first zone, and producing the first zone and second zone with the cable and tool string in the well.
PCT/US2015/041220 2014-07-22 2015-07-21 Methods and cables for use in fracturing zones in a well Ceased WO2016014447A1 (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US201462027696P 2014-07-22 2014-07-22
US62/027,696 2014-07-22
US14/628,732 2015-02-23
US14/628,732 US10001613B2 (en) 2014-07-22 2015-02-23 Methods and cables for use in fracturing zones in a well
US14/709,879 2015-05-12
US14/709,879 US10738577B2 (en) 2014-07-22 2015-05-12 Methods and cables for use in fracturing zones in a well

Publications (1)

Publication Number Publication Date
WO2016014447A1 true WO2016014447A1 (en) 2016-01-28

Family

ID=55163606

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2015/041220 Ceased WO2016014447A1 (en) 2014-07-22 2015-07-21 Methods and cables for use in fracturing zones in a well

Country Status (2)

Country Link
US (1) US10738577B2 (en)
WO (1) WO2016014447A1 (en)

Families Citing this family (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12163394B2 (en) 2009-04-17 2024-12-10 Schlumberger Technology Corporation Reduced torque wireline cable
US10808497B2 (en) 2011-05-11 2020-10-20 Schlumberger Technology Corporation Methods of zonal isolation and treatment diversion
US10001613B2 (en) * 2014-07-22 2018-06-19 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US10738577B2 (en) 2014-07-22 2020-08-11 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US20160333680A1 (en) * 2015-05-12 2016-11-17 Schlumberger Technology Corporation Well re-fracturing method
US10415382B2 (en) 2016-05-03 2019-09-17 Schlumberger Technology Corporation Method and system for establishing well performance during plug mill-out or cleanout/workover operations
US10422220B2 (en) 2016-05-03 2019-09-24 Schlumberger Technology Corporation Method and systems for analysis of hydraulically-fractured reservoirs
US11150425B2 (en) * 2016-06-03 2021-10-19 Afl Telecommunications Llc Downhole strain sensing cables
US11156057B2 (en) 2017-01-15 2021-10-26 Jeffrey Bruce Wensrich Downhole tool including a resettable plug with a flow-through valve
US11719084B2 (en) * 2017-01-15 2023-08-08 Jeffrey Bruce Wensrich Bottom hole assembly including a resttable plug and associated methods of use
US10557343B2 (en) * 2017-08-25 2020-02-11 Schlumberger Technology Corporation Sensor construction for distributed pressure sensing
US11384625B2 (en) * 2017-11-21 2022-07-12 Geodynamics, Inc. Device and method for angularly orientating wellbore perforating guns
MX2020012975A (en) * 2018-05-31 2021-05-27 Schlumberger Technology Bv Conductive Outer Jacket for Wireline Cable.
US11346168B2 (en) * 2018-12-20 2022-05-31 Schlumberger Technology Corporation Self-propelling perforating gun system
CN111980684B (en) * 2019-05-05 2023-09-26 中国石油天然气股份有限公司 A kind of continuous tube temperature and pressure monitoring optical cable and its manufacturing method
US12436347B2 (en) 2019-06-28 2025-10-07 Schlumberger Technology Corporation Stranded fiber-optic cable
NO20211578A1 (en) 2019-08-06 2021-12-22 Halliburton Energy Services Inc Expandable metal gas lift mandrel plug
GB2604814B (en) 2020-01-17 2024-10-09 Halliburton Energy Services Inc Heaters to accelerate setting of expandable metal
NO20220612A1 (en) 2020-01-17 2022-05-24 Halliburton Energy Services Inc Voltage to accelerate/decelerate expandable metal
NO20220804A1 (en) 2020-02-28 2022-07-15 Halliburton Energy Services Inc Textured surfaces of expanding metal for centralizer, mixing, and differential sticking
US11248453B2 (en) * 2020-06-22 2022-02-15 Halliburton Energy Service, Inc. Smart fracturing plug with fracturing sensors
GB2611689B (en) 2020-08-13 2024-06-26 Halliburton Energy Services Inc Expandable metal displacement plug
US20220178222A1 (en) * 2020-12-08 2022-06-09 Halliburton Energy Services, Inc. Expanding metal for plug and abandonment
CA3190403A1 (en) * 2020-12-08 2022-06-16 Halliburton Energy Services, Inc. Expanding metal for plug and abandonment
MX2023009992A (en) 2021-04-12 2023-09-06 Halliburton Energy Services Inc Expandable metal as backup for elastomeric elements.
GB2617770B (en) 2021-05-21 2025-12-03 Halliburton Energy Services Inc A wellbore anchor including one or more activation chambers
BR112023020413A2 (en) 2021-05-28 2023-12-12 Halliburton Energy Services Inc DOWNHOLE TOOL, METHOD FOR SEALING WITHIN A WELL SYSTEM, AND, WELL SYSTEM
CA3213939A1 (en) 2021-05-28 2022-12-01 Stephen Michael Greci Individual separate chunks of expandable metal
CA3216086A1 (en) 2021-05-29 2022-12-08 Halliburton Energy Services, Inc. Using expandable metal as an alternate to existing metal to metal seals
US11697915B2 (en) 2021-06-01 2023-07-11 Halliburton Energy Services, Inc. Expanding metal used in forming support structures
US12321028B2 (en) * 2021-06-10 2025-06-03 Schlumberger Technology Corporation Electro-optical wireline cables
WO2023059312A1 (en) 2021-10-05 2023-04-13 Halliburton Energy Services, Inc. Expandable metal sealing/anchoring tool
CN114016932B (en) * 2021-11-05 2023-11-21 中煤科工集团西安研究院有限公司 Cable disengaging device, cable conveying assembly and timing recovery method
CN114016931B (en) * 2021-11-05 2023-10-31 中煤科工集团西安研究院有限公司 Monitoring cable time delay disengaging device, conveying assembly and timing recovery method
US12305459B2 (en) 2022-06-15 2025-05-20 Halliburton Energy Services, Inc. Sealing/anchoring tool employing an expandable metal circlet
CN115116667B (en) * 2022-06-30 2024-07-12 齐鲁电缆有限公司 Signal transmission monitoring data detection integrated power cable
US12001067B2 (en) * 2022-07-26 2024-06-04 Halliburton Energy Services, Inc. Method and system for detecting one or more properties, positioning, and minimizing tension of a waveguide
US12385340B2 (en) 2022-12-05 2025-08-12 Halliburton Energy Services, Inc. Reduced backlash sealing/anchoring assembly
US12529302B2 (en) 2023-07-05 2026-01-20 Halliburton Energy Services, Inc. System and method for deploying sensing cable into a well
CN119860173B (en) * 2023-10-19 2025-11-18 中国石油集团渤海钻探工程有限公司 A packer with multiple unsealing methods
US20250369342A1 (en) * 2024-05-31 2025-12-04 Conocophillips Company Offset pressure response

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6070666A (en) * 1998-04-30 2000-06-06 Atlantic Richfield Company Fracturing method for horizontal wells
US20060280412A1 (en) * 2005-06-09 2006-12-14 Joseph Varkey Ruggedized optical fibers for wellbore electrical cables
US20090196557A1 (en) * 2008-02-05 2009-08-06 Joseph Varkey Dual conductor fiber optic cable
US20090283258A1 (en) * 2008-05-15 2009-11-19 Schlumberger Technology Corporation Continuous fibers for use in hydraulic fracturing applications
US20120085531A1 (en) * 2010-10-07 2012-04-12 Leising Larry J Cable Monitoring in Coiled Tubing

Family Cites Families (146)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2778433A (en) * 1953-08-10 1957-01-22 Cicero C Brown Well tools
US3207224A (en) * 1955-12-19 1965-09-21 Otis Eng Co Locking mechanisms for well devices
US3316967A (en) 1964-09-30 1967-05-02 Gulf Research Development Co Process for fracturing and propping an unconsolidated subterranean formation
US4051900A (en) 1974-06-13 1977-10-04 Dale Hankins Propping material for hydraulic fracturing
US4102401A (en) 1977-09-06 1978-07-25 Exxon Production Research Company Well treatment fluid diversion with low density ball sealers
US4139060A (en) 1977-11-14 1979-02-13 Exxon Production Research Company Selective wellbore isolation using buoyant ball sealers
FR2422969A1 (en) 1978-03-31 1979-11-09 Kokusai Denshin Denwa Co Ltd FIBER OPTIC UNDERWATER CABLE
US4716964A (en) 1981-08-10 1988-01-05 Exxon Production Research Company Use of degradable ball sealers to seal casing perforations in well treatment fluid diversion
US4504112A (en) 1982-08-17 1985-03-12 Chevron Research Company Hermetically sealed optical fiber
NL193388C (en) 1986-11-12 1999-08-03 Mobil Oil Corp A method for forcing fractures in an underground extraction formation according to preferred fracture surfaces present in that formation.
US4867241A (en) 1986-11-12 1989-09-19 Mobil Oil Corporation Limited entry, multiple fracturing from deviated wellbores
US4832121A (en) * 1987-10-01 1989-05-23 The Trustees Of Columbia University In The City Of New York Methods for monitoring temperature-vs-depth characteristics in a borehole during and after hydraulic fracture treatments
US4957165A (en) 1988-02-16 1990-09-18 Conoco Inc. Well treatment process
US4848467A (en) 1988-02-16 1989-07-18 Conoco Inc. Formation fracturing process
US4986355A (en) 1989-05-18 1991-01-22 Conoco Inc. Process for the preparation of fluid loss additive and gel breaker
US4938286A (en) 1989-07-14 1990-07-03 Mobil Oil Corporation Method for formation stimulation in horizontal wellbores using hydraulic fracturing
US4951751A (en) 1989-07-14 1990-08-28 Mobil Oil Corporation Diverting technique to stage fracturing treatments in horizontal wellbores
GB9114972D0 (en) 1991-07-11 1991-08-28 Schlumberger Ltd Fracturing method and apparatus
US5463711A (en) 1994-07-29 1995-10-31 At&T Ipm Corp. Submarine cable having a centrally located tube containing optical fibers
US5862861A (en) 1995-11-14 1999-01-26 Kalsi; Manmohan S. Plug apparatus suitable for sealing holes of variable or roughened diameter
US6435277B1 (en) 1996-10-09 2002-08-20 Schlumberger Technology Corporation Compositions containing aqueous viscosifying surfactants and methods for applying such compositions in subterranean formations
US5964295A (en) 1996-10-09 1999-10-12 Schlumberger Technology Corporation, Dowell Division Methods and compositions for testing subterranean formations
CA2264632C (en) 1997-05-02 2007-11-27 Baker Hughes Incorporated Wellbores utilizing fiber optic-based sensors and operating devices
US6258859B1 (en) 1997-06-10 2001-07-10 Rhodia, Inc. Viscoelastic surfactant fluids and related methods of use
EP0995140B1 (en) 1997-07-18 2003-03-26 PIRELLI S.p.A. Optical fibre cable having high tracking resistance
US6506710B1 (en) 1997-12-19 2003-01-14 Akzo Nobel N.V. Viscoelastic surfactants and compositions containing same
US6239183B1 (en) 1997-12-19 2001-05-29 Akzo Nobel Nv Method for controlling the rheology of an aqueous fluid and gelling agent therefor
US7060661B2 (en) 1997-12-19 2006-06-13 Akzo Nobel N.V. Acid thickeners and uses thereof
US6060662A (en) 1998-01-23 2000-05-09 Western Atlas International, Inc. Fiber optic well logging cable
US6392151B1 (en) 1998-01-23 2002-05-21 Baker Hughes Incorporated Fiber optic well logging cable
US6404961B1 (en) 1998-07-23 2002-06-11 Weatherford/Lamb, Inc. Optical fiber cable having fiber in metal tube core with outer protective layer
US6006838A (en) 1998-10-12 1999-12-28 Bj Services Company Apparatus and method for stimulating multiple production zones in a wellbore
US6651747B2 (en) * 1999-07-07 2003-11-25 Schlumberger Technology Corporation Downhole anchoring tools conveyed by non-rigid carriers
US6399546B1 (en) 1999-10-15 2002-06-04 Schlumberger Technology Corporation Fluid system having controllable reversible viscosity
US6394184B2 (en) * 2000-02-15 2002-05-28 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
US7451819B2 (en) * 2000-03-02 2008-11-18 Schlumberger Technology Corporation Openhole perforating
DZ3387A1 (en) 2000-07-18 2002-01-24 Exxonmobil Upstream Res Co PROCESS FOR TREATING MULTIPLE INTERVALS IN A WELLBORE
WO2003027431A2 (en) 2001-09-26 2003-04-03 Cooke Claude E Jr Method and materials for hydraulic fracturing of wells
CA2412072C (en) 2001-11-19 2012-06-19 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US6903054B2 (en) 2002-08-30 2005-06-07 Schlumberger Technology Corporation Reservoir treatment fluids
US6978832B2 (en) * 2002-09-09 2005-12-27 Halliburton Energy Services, Inc. Downhole sensing with fiber in the formation
US7051812B2 (en) 2003-02-19 2006-05-30 Schlumberger Technology Corp. Fracturing tool having tubing isolation system and method
GB2398805B (en) * 2003-02-27 2006-08-02 Sensor Highway Ltd Use of sensors with well test equipment
US7036587B2 (en) 2003-06-27 2006-05-02 Halliburton Energy Services, Inc. Methods of diverting treating fluids in subterranean zones and degradable diverting materials
US7303018B2 (en) 2003-07-22 2007-12-04 Bj Services Company Method of acidizing a subterranean formation with diverting foam or fluid
US7829507B2 (en) 2003-09-17 2010-11-09 Halliburton Energy Services Inc. Subterranean treatment fluids comprising a degradable bridging agent and methods of treating subterranean formations
US6978831B2 (en) * 2003-09-17 2005-12-27 Halliburton Energy Services, Inc. System and method for sensing data in a well during fracturing
US7324730B2 (en) * 2004-05-19 2008-01-29 Schlumberger Technology Corporation Optical fiber cables for wellbore applications
US7243723B2 (en) 2004-06-18 2007-07-17 Halliburton Energy Services, Inc. System and method for fracturing and gravel packing a borehole
US7273104B2 (en) 2004-07-30 2007-09-25 Key Energy Services, Inc. Method of pumping an “in-the-formation” diverting agent in a lateral section of an oil and gas well
US7380600B2 (en) 2004-09-01 2008-06-03 Schlumberger Technology Corporation Degradable material assisted diversion or isolation
US7775278B2 (en) 2004-09-01 2010-08-17 Schlumberger Technology Corporation Degradable material assisted diversion or isolation
US7543635B2 (en) * 2004-11-12 2009-06-09 Halliburton Energy Services, Inc. Fracture characterization using reservoir monitoring devices
US7380602B2 (en) 2004-11-18 2008-06-03 Schlumberger Technology Corporation Composition and method for treating a subterranean formation
US7273099B2 (en) 2004-12-03 2007-09-25 Halliburton Energy Services, Inc. Methods of stimulating a subterranean formation comprising multiple production intervals
US8413723B2 (en) * 2006-01-12 2013-04-09 Schlumberger Technology Corporation Methods of using enhanced wellbore electrical cables
RU2433157C2 (en) 2005-01-21 2011-11-10 Фэйрмаунт Минералз, Лтд. Deflecting fluid
US7267170B2 (en) 2005-01-31 2007-09-11 Halliburton Energy Services, Inc. Self-degrading fibers and associated methods of use and manufacture
US7506689B2 (en) 2005-02-22 2009-03-24 Halliburton Energy Services, Inc. Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations
US7640988B2 (en) 2005-03-18 2010-01-05 Exxon Mobil Upstream Research Company Hydraulically controlled burst disk subs and methods for their use
US7235743B2 (en) * 2005-04-14 2007-06-26 Schlumberger Technology Corporation Resilient electrical cables
US7296625B2 (en) 2005-08-02 2007-11-20 Halliburton Energy Services, Inc. Methods of forming packs in a plurality of perforations in a casing of a wellbore
BRPI0618659B1 (en) * 2005-11-21 2017-12-05 Shell Internationale Research Maatschappij B.V. METHOD FOR MONITORING FLUID PROPERTIES WITH A DISTRIBUTED SENSOR IN A WELL HOLE
US7836952B2 (en) 2005-12-08 2010-11-23 Halliburton Energy Services, Inc. Proppant for use in a subterranean formation
US7647964B2 (en) 2005-12-19 2010-01-19 Fairmount Minerals, Ltd. Degradable ball sealers and methods for use in well treatment
US20070215345A1 (en) 2006-03-14 2007-09-20 Theodore Lafferty Method And Apparatus For Hydraulic Fracturing And Monitoring
US7845413B2 (en) 2006-06-02 2010-12-07 Schlumberger Technology Corporation Method of pumping an oilfield fluid and split stream oilfield pumping systems
US7478676B2 (en) 2006-06-09 2009-01-20 Halliburton Energy Services, Inc. Methods and devices for treating multiple-interval well bores
RU2345115C2 (en) 2006-06-29 2009-01-27 Шлюмбергер Текнолоджи Б.В. Proppant material and method of hydraulic formation breakdown (versions)
US20080031578A1 (en) 2006-08-02 2008-02-07 Joseph Varkey Packaging for encasing an optical fiber in a cable
US9201207B2 (en) 2006-08-02 2015-12-01 Schlumberger Technology Corporation Packaging for encasing an optical fiber in a cable
US8281860B2 (en) 2006-08-25 2012-10-09 Schlumberger Technology Corporation Method and system for treating a subterranean formation
US8737774B2 (en) * 2006-08-30 2014-05-27 Weatherford/Lamb, Inc. Array temperature sensing method and system
US8562900B2 (en) 2006-09-01 2013-10-22 Imerys Method of manufacturing and using rod-shaped proppants and anti-flowback additives
US20080066910A1 (en) 2006-09-01 2008-03-20 Jean Andre Alary Rod-shaped proppant and anti-flowback additive, method of manufacture, and method of use
US7571766B2 (en) 2006-09-29 2009-08-11 Halliburton Energy Services, Inc. Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage
US7565929B2 (en) 2006-10-24 2009-07-28 Schlumberger Technology Corporation Degradable material assisted diversion
CA2677478C (en) 2007-02-12 2013-04-16 Weatherford/Lamb, Inc. Apparatus and methods of flow testing formation zones
US20080196896A1 (en) 2007-02-15 2008-08-21 Oscar Bustos Methods and apparatus for fiber-based diversion
US8726991B2 (en) 2007-03-02 2014-05-20 Schlumberger Technology Corporation Circulated degradable material assisted diversion
US7786050B2 (en) 2007-05-11 2010-08-31 Schlumberger Technology Corporation Well treatment with ionic polymer gels
US8697610B2 (en) 2007-05-11 2014-04-15 Schlumberger Technology Corporation Well treatment with complexed metal crosslinkers
US8929702B2 (en) 2007-05-21 2015-01-06 Schlumberger Technology Corporation Modular opto-electrical cable unit
US7860362B2 (en) 2007-06-08 2010-12-28 Westerngeco L.L.C. Enhanced fiber optic seismic land cable
US7784541B2 (en) 2007-07-25 2010-08-31 Schlumberger Technology Corporation System and method for low damage fracturing
US7612021B2 (en) 2007-08-24 2009-11-03 Halliburton Energy Services, Inc. Methods and compositions utilizing lost-circulation materials comprising composite particulates
US7737091B2 (en) 2007-08-28 2010-06-15 Imerys Proppants and anti-flowback additives made from sillimanite minerals, methods of manufacture, and methods of use
US7496258B1 (en) * 2007-11-09 2009-02-24 Schlumberger Technology Corporation Hydrocarbon monitoring cable
WO2009088317A1 (en) 2007-12-29 2009-07-16 Schlumberger Canada Limited Elongated particles for fracturing and gravel packing
US7950455B2 (en) 2008-01-14 2011-05-31 Baker Hughes Incorporated Non-spherical well treating particulates and methods of using the same
US8607864B2 (en) * 2008-02-28 2013-12-17 Schlumberger Technology Corporation Live bottom hole pressure for perforation/fracturing operations
US8369667B2 (en) 2008-05-23 2013-02-05 Halliburton Energy Services, Inc. Downhole cable
CA2778426C (en) * 2008-11-18 2016-10-25 Ziebel As Real time downhole intervention during wellbore stimulation operations
US8631867B2 (en) 2008-12-23 2014-01-21 Halliburton Energy Services, Inc. Methods for cooling measuring devices in high temperature wells
US8887803B2 (en) 2012-04-09 2014-11-18 Halliburton Energy Services, Inc. Multi-interval wellbore treatment method
US20100212906A1 (en) 2009-02-20 2010-08-26 Halliburton Energy Services, Inc. Method for diversion of hydraulic fracture treatments
US8109335B2 (en) 2009-07-13 2012-02-07 Halliburton Energy Services, Inc. Degradable diverting agents and associated methods
US8016034B2 (en) 2009-09-01 2011-09-13 Halliburton Energy Services, Inc. Methods of fluid placement and diversion in subterranean formations
US20110090496A1 (en) * 2009-10-21 2011-04-21 Halliburton Energy Services, Inc. Downhole monitoring with distributed optical density, temperature and/or strain sensing
US9920609B2 (en) 2010-03-12 2018-03-20 Baker Hughes, A Ge Company, Llc Method of re-fracturing using borated galactomannan gum
US20110284214A1 (en) 2010-05-19 2011-11-24 Ayoub Joseph A Methods and tools for multiple fracture placement along a wellbore
CA2814750A1 (en) 2010-10-20 2012-04-26 Exxonmobil Upstream Research Company Methods for establishing a subsurface fracture network
US20120097452A1 (en) 2010-10-26 2012-04-26 Baker Hughes Incorporated Downhole Tool Deployment Measurement Method and Apparatus
GB2484990A (en) * 2010-11-01 2012-05-02 Zenith Oilfield Technology Ltd Distributed Fluid Velocity Sensor and Associated Method
GB201020358D0 (en) 2010-12-01 2011-01-12 Qinetiq Ltd Fracture characterisation
US9090810B2 (en) 2010-12-14 2015-07-28 Altarock Energy, Inc. High temperature temporary diverter and lost circulation material
US9382790B2 (en) * 2010-12-29 2016-07-05 Schlumberger Technology Corporation Method and apparatus for completing a multi-stage well
US20120217014A1 (en) 2011-02-28 2012-08-30 Frac Advantage Stimulation Tools Inc. Wellbore tool for fracturing hydrocarbon formations, and method for fracturing hydrocarbon formations using said tool
US8905133B2 (en) 2011-05-11 2014-12-09 Schlumberger Technology Corporation Methods of zonal isolation and treatment diversion
US9109992B2 (en) 2011-06-10 2015-08-18 Halliburton Energy Services, Inc. Method for strengthening a wellbore of a well
WO2013009773A1 (en) 2011-07-12 2013-01-17 Weatherford/Lamb, Inc. Multi-zone screened frac system
EP2590178A1 (en) * 2011-07-21 2013-05-08 Services Pétroliers Schlumberger Equipment and methods for deploying line in a wellbore
ES2731696T3 (en) 2011-08-04 2019-11-18 Fiber optic bypass cable with reduced fire risk
US9033041B2 (en) * 2011-09-13 2015-05-19 Schlumberger Technology Corporation Completing a multi-stage well
US10364629B2 (en) 2011-09-13 2019-07-30 Schlumberger Technology Corporation Downhole component having dissolvable components
US9752407B2 (en) 2011-09-13 2017-09-05 Schlumberger Technology Corporation Expandable downhole seat assembly
EP2769386A4 (en) 2011-10-17 2016-02-17 Services Petroliers Schlumberger DUAL-USE CABLE WITH FIBER OPTIC ENCAPSULATION FOR USE IN WELLBORE OPERATIONS
US9920610B2 (en) 2012-06-26 2018-03-20 Baker Hughes, A Ge Company, Llc Method of using diverter and proppant mixture
US8789596B2 (en) 2012-01-27 2014-07-29 Baker Hughes Incorporated Method of increasing efficiency in a hydraulic fracturing operation
CA2810045A1 (en) 2012-03-21 2013-09-21 Oiltool Engineering Services, Inc. Multizone frac system
US8967249B2 (en) 2012-04-13 2015-03-03 Schlumberger Technology Corporation Reservoir and completion quality assessment in unconventional (shale gas) wells without logs or core
US20130272898A1 (en) 2012-04-17 2013-10-17 Schlumberger Technology Corporation Instrumenting High Reliability Electric Submersible Pumps
WO2014004026A1 (en) 2012-06-28 2014-01-03 Schlumberger Canada Limited High power opto-electrical cable with multiple power and telemetry paths
WO2014051564A1 (en) 2012-09-26 2014-04-03 Halliburton Energy Services, Inc. Single trip multi-zone completion systems and methods
GB2522145A (en) 2012-10-04 2015-07-15 Nexen Energy Ulc Improved hydraulic fracturing process for deviated wellbores
US9222333B2 (en) * 2012-11-27 2015-12-29 Baker Hughes Incorporated Monitoring system for borehole operations
WO2014099207A1 (en) 2012-12-21 2014-06-26 Exxonmobil Upstream Research Company Fluid plugs as downhole sealing devices and systems and methods including the same
CA2900968C (en) 2013-02-12 2022-07-26 Devon Canada Corporation Well injection and production method and system
WO2014193577A1 (en) * 2013-05-31 2014-12-04 Conocophillips Company Method of hydraulic fracture identification using temperature
GB201312549D0 (en) 2013-07-12 2013-08-28 Fotech Solutions Ltd Monitoring of hydraulic fracturing operations
EP3044403B1 (en) 2013-09-13 2020-05-27 Services Petroliers Schlumberger Electrically conductive fiber optic slickline for coiled tubing operations
US10316643B2 (en) 2013-10-24 2019-06-11 Baker Hughes, A Ge Company, Llc High resolution distributed temperature sensing for downhole monitoring
EP3060744B1 (en) 2013-10-25 2018-04-11 Weatherford Technology Holdings, LLC Re-fracture apparatus and method for wellbore
US20150122541A1 (en) * 2013-11-05 2015-05-07 Schlumberger Technology Corporation Conductor Component
US9714559B2 (en) 2013-11-11 2017-07-25 Weatherford Technology Holdings, Llc Method and apparatus for hydraulic fracturing
US10294768B2 (en) * 2013-11-14 2019-05-21 Halliburton Energy Services, Inc. Adaptation of fracturing fluids
US9366124B2 (en) 2013-11-27 2016-06-14 Baker Hughes Incorporated System and method for re-fracturing multizone horizontal wellbores
US9859037B2 (en) 2014-04-09 2018-01-02 Schlumberger Technology Corporation Downhole cables and methods of making the same
US10001613B2 (en) 2014-07-22 2018-06-19 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US10738577B2 (en) 2014-07-22 2020-08-11 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US20160186511A1 (en) * 2014-10-23 2016-06-30 Hydrawell Inc. Expandable Plug Seat
US9695681B2 (en) 2014-10-31 2017-07-04 Baker Hughes Incorporated Use of real-time pressure data to evaluate fracturing performance
WO2016076747A1 (en) 2014-11-14 2016-05-19 Schlumberger Canada Limited Chemical assisted selective diversion during multistage well treatments
US20160177693A1 (en) 2014-12-17 2016-06-23 Baker Hughes Incorporated Compositions and methods of improving hydraulic fracture network
US20160333680A1 (en) 2015-05-12 2016-11-17 Schlumberger Technology Corporation Well re-fracturing method
US10557079B2 (en) 2016-07-22 2020-02-11 Schlumberger Technology Corporation Method of making rod-shaped particles for use as proppant and anti-flowback additive

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6070666A (en) * 1998-04-30 2000-06-06 Atlantic Richfield Company Fracturing method for horizontal wells
US20060280412A1 (en) * 2005-06-09 2006-12-14 Joseph Varkey Ruggedized optical fibers for wellbore electrical cables
US20090196557A1 (en) * 2008-02-05 2009-08-06 Joseph Varkey Dual conductor fiber optic cable
US20090283258A1 (en) * 2008-05-15 2009-11-19 Schlumberger Technology Corporation Continuous fibers for use in hydraulic fracturing applications
US20120085531A1 (en) * 2010-10-07 2012-04-12 Leising Larry J Cable Monitoring in Coiled Tubing

Also Published As

Publication number Publication date
US10738577B2 (en) 2020-08-11
US20160024902A1 (en) 2016-01-28

Similar Documents

Publication Publication Date Title
US10001613B2 (en) Methods and cables for use in fracturing zones in a well
WO2016014447A1 (en) Methods and cables for use in fracturing zones in a well
US9638021B2 (en) Pump deployment via cable
US7493962B2 (en) Control line telemetry
RU2413071C2 (en) Signal transmission pipe and its manufacturing method (versions)
US9140115B2 (en) Methods of using enhanced wellbore electrical cables
US9926769B2 (en) Systems and methods for downhole communication
US4716960A (en) Method and system for introducing electric current into a well
US8931552B2 (en) Cables for downhole use
US10844673B2 (en) Fiber reinforced and powered coil tubing
NO20221147A1 (en) Obtain connecting parts along a structure
US20160208588A1 (en) Subterranean Heating with Dual-Walled Coiled Tubing
EP2517212A1 (en) Intervention device for use in a fluid exploitation well in the subsoil, and associated intervention assembly
CA3189514A1 (en) Electrical transmission in a well using wire mesh
RU2549944C1 (en) Electronic probe for boring heads of horizontal directional drilling units
RU2644366C1 (en) Multi-channel demountable long-length flexible column
US12338690B1 (en) Conductive bridging of a tubing encapsulated conductor for powering equipment in wellbore operations
US20250215756A1 (en) Low-resistance encapsulation of a tubing encapsulated conductor for powering equipment in wellbore operations
RU2337236C2 (en) Device for well operation
US12331596B2 (en) Conductive encapsulation of a tubing encapsulated conductor for powering equipment in wellbore operations
US20090084542A1 (en) Wellbore power and/or data transmission devices and methods
GB2510952A (en) Pump deployment via cable

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15824798

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15824798

Country of ref document: EP

Kind code of ref document: A1