WO2015058382A1 - Changing semi-persistent scheduling interval - Google Patents

Changing semi-persistent scheduling interval Download PDF

Info

Publication number
WO2015058382A1
WO2015058382A1 PCT/CN2013/085839 CN2013085839W WO2015058382A1 WO 2015058382 A1 WO2015058382 A1 WO 2015058382A1 CN 2013085839 W CN2013085839 W CN 2013085839W WO 2015058382 A1 WO2015058382 A1 WO 2015058382A1
Authority
WO
WIPO (PCT)
Prior art keywords
network node
sps
interval
sps interval
wireless device
Prior art date
Application number
PCT/CN2013/085839
Other languages
French (fr)
Inventor
Jun Wang
Peng Chen
Shan Li
Original Assignee
Telefonaktiebolaget L M Ericsson (Publ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telefonaktiebolaget L M Ericsson (Publ) filed Critical Telefonaktiebolaget L M Ericsson (Publ)
Priority to EP13896037.2A priority Critical patent/EP3061294A4/en
Priority to US15/030,104 priority patent/US10009909B2/en
Priority to PCT/CN2013/085839 priority patent/WO2015058382A1/en
Publication of WO2015058382A1 publication Critical patent/WO2015058382A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J11/00Orthogonal multiplex systems, e.g. using WALSH codes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L2101/00Indexing scheme associated with group H04L61/00
    • H04L2101/60Types of network addresses
    • H04L2101/618Details of network addresses
    • H04L2101/622Layer-2 addresses, e.g. medium access control [MAC] addresses
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/02Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
    • H04W84/04Large scale networks; Deep hierarchical networks
    • H04W84/042Public Land Mobile systems, e.g. cellular systems

Definitions

  • the invention relates to a method, a network node, a computer program and a computer program product for changing a semi-persistent scheduling interval.
  • 3GPP 3rd Generation Partnership Project
  • LTE Long Term Evolution
  • OFDM Orthogonal Frequency Division Multiple Access
  • the resource allocation to wireless devices (also known as user equipment, UEs) on both downlink and uplink is generally performed adaptively using fast scheduling, taking into account the instantaneous traffic pattern and radio propagation characteristics of each wireless device.
  • Assigning resources in both downlink and uplink is performed in the scheduler situated in the radio base station.
  • periodic low volume traffic such as for voice (e.g. using VoLTE, Voice over LTE) and other QoS (Quality of Service) applications
  • QoS Quality of Service
  • SPS semi- persistent scheduling
  • a method for changing a semi- persistent scheduling, SPS, interval for a wireless device from an original SPS interval to a new SPS interval is performed in a network node and comprises the steps of: determining that the SPS interval is to be changed; generating a message element comprising an indicator of the new SPS interval; and transmitting a signal comprising the message element to the wireless device over a user plane.
  • the step of determining may comprise determining that the SPS interval for a downlink connection is to be changed.
  • the step of determining may comprise determining that the SPS interval for an uplink connection is to be changed.
  • the step of determining may comprise determining that SPS is to be deactivated and the step of generating may comprise providing an indicator of a new SPS interval indicating a deactivation of SPS.
  • the message element may be a media access control element, MCE.
  • the indicator of a new SPS interval may be four bits in size.
  • the method may further comprise the step of switching to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device.
  • the method may further comprise the step of keeping the original SPS interval when an acknowledgement, indicating successful receipt of the is not received from the wireless device.
  • the method may further comprise the step of: detecting a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and restarting the method from the step of generating a message element when a mismatch is detected.
  • the step of detecting a mismatch may comprise detecting a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
  • a network node for changing a semi-persistent scheduling, SPS, for a wireless device from an original SPS interval to a new SPS interval.
  • the network node comprises: a processor; and a memory storing instructions that, when executed by the processor, causes the network node to: determine that the SPS interval is to be changed;
  • the instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that the SPS interval for a downlink connection is to be changed.
  • the instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that the SPS interval for an uplink connection is to be changed.
  • the instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that SPS is to be deactivated and the instructions to generate may comprise instructions that, when executed by the processor, causes the network node to provide an indicator of a new SPS interval indicating a deactivation of SPS.
  • the message element may be a media access control element, MCE.
  • the indicator of a new SPS interval may be four bits in size.
  • the network node may further comprise instructions that, when executed by the processor, causes the network node to switch to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device.
  • the network node may further comprise instructions that, when executed by the processor, causes the network node to keep the original SPS interval when an acknowledgement, indicating successful receipt of the signal, is not received from the wireless device.
  • the network node may further comprise instructions that, when executed by the processor, causes the network node to: detect a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and to restart the execution from the instructions to generate a message element, when a mismatch is detected.
  • the instructions to detect a mismatch may comprise instructions that, when executed by the processor, causes the network node to detect a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
  • a network node comprising: means for determining that an SPS, Semi-Persistent Scheduling interval for a wireless device is to be changed, from an original SPS interval to a new SPS interval; means for generating a message element comprising an indicator of the new SPS interval; and means for transmitting a signal comprising the message element to the wireless device over a user plane.
  • the means for determining may comprise means for determining that the SPS interval for a downlink connection is to be changed.
  • the means for determining may comprise means for determining that the SPS interval for an uplink connection is to be changed.
  • the means for determining may comprise means for determining that SPS is to be deactivated and the means for generating may comprise means for providing an indicator of a new SPS interval indicating a deactivation of SPS.
  • the message element may be a media access control element, MCE.
  • MCE media access control element
  • the indicator of a new SPS interval may be four bits in size.
  • the network node may further comprise means for switching to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device.
  • the network node may further comprise means for keeping the original SPS interval when an acknowledgement, indicating successful receipt of the signal, is not received from the wireless device.
  • the network node may further comprise the means for: detecting a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and means for restarting from
  • the means for detecting a mismatch may comprise detecting a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
  • a computer program for changing a semi-persistent scheduling, SPS, interval for a wireless device from an original SPS interval to a new SPS interval.
  • the computer program comprises computer program code which, when run on a network node causes the network node to: determine that the SPS interval is to be changed; generate a message element comprising an indicator of the new SPS interval; and transmit a signal comprising the message element to the wireless device over a user plane.
  • a computer program product comprising a computer program according to the fourth aspect and a computer readable means on which the computer program is stored.
  • Fig l is a schematic diagram illustrating a cellular network
  • Fig 2 is a schematic graph illustrating packets for voice transmissions
  • Fig 3 is a schematic signalling diagram illustrating signalling for changing an SPS interval according to the prior art
  • Fig 4 is a schematic signalling diagram illustrating signalling for changing an SPS interval for downlink transmissions according one embodiment, initiated by the network node of Fig 1;
  • Fig 5 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink transmissions according one embodiment, initiated by the network node of Fig 1;
  • Fig 6 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink transmissions according one embodiment, initiated by the wireless device of Fig 1;
  • Figs 7A-B are flow charts illustrating methods performed in the network node of Fig 1 for changing an SPS interval;
  • Fig 8 is a schematic diagram showing some components of the network node of Fig 1;
  • Fig 9 is a schematic diagram showing functional modules of the network node of Figs 1 and 8; and
  • Fig 10 shows one example of a computer program product comprising computer readable means.
  • Fig 1 is a schematic diagram illustrating a cellular network 8
  • the cellular network 8 comprises a core network 3 and one or more network nodes 1, here in the form of radio base stations being evolved Node Bs, also known as eNode Bs or eNBs.
  • the network node 1 could also be in the form of Node Bs, BTSs (Base Transceiver Stations) and/or BSSs (Base Station Subsystems), etc.
  • the network node 1 provides radio connectivity to a plurality of wireless devices 2.
  • the term wireless device is also known as mobile communication terminal, user equipment (UE), mobile terminal, user terminal, user agent, wireless terminal, machine-to-machine devices etc., and can be, for example, what today are commonly known as a mobile phone or a tablet/laptop with wireless connectivity or fixed mounted terminal.
  • the cellular network 8 may e.g. comply with any one or a combination of LTE (Long Term Evolution), W-CDMA (Wideband Code Division Multiplex), EDGE (Enhanced Data Rates for GSM (Global System for Mobile
  • CDMA2000 Code Division Multiple Access 2000
  • LTE-Advanced Long Term Evolution
  • Uplink (UL) 4a communication from the wireless device 2and downlink (DL) 4b communication to the wireless device 2between the wireless device 2 and the network node 1 occur over a wireless radio interface.
  • the quality of the wireless radio interface to each wireless device 2 can vary over time and depending on the position of the wireless device 2, due to effects such as fading, multipath propagation, interference, etc.
  • the network node 1 is also connected to the core network 3 for connectivity to central functions and a wide area network 7, such as the Internet.
  • Fig 2 is a schematic graph illustrating packets for voice transmissions.
  • VoLTE voice over LTE
  • traffic is delivered using IP (Internet Protocol).
  • IP Internet Protocol
  • a voice encoder on the transmitter side encodes the speech into packets with a typical periodicity of 20 ms. This is shown in Fig 2 as voice frames 10.
  • the speech encoders also uses Voice Activity
  • SID Silence Indication Descriptor
  • Fig 3 is a schematic signalling diagram illustrating signalling for changing an SPS interval according to the prior art.
  • the signalling occurs between the network node 1 and the wireless device 2.
  • SPS is set up from the network node l, sending an SPS config message 20 over RRC (Radio Resource Control) to the wireless device 2.
  • This message 20 comprises SPS parameters for DL/UL such as
  • the network node 1 sends an SPS activate message 21 as a DCI (Downlink Control Information) message to the wireless device 2.
  • This message 21 includes some SPS related parameters used for the SPS transmissions, such as MCS (Modulation and Coding Scheme), allocated PRBs (Physical Resource Blocks), HARQ (Hybrid
  • SPS is now active and data 25 is periodically transmitted in accordance with the SPS session from the network node 1 to the wireless terminal 2, i.e. without using dynamic scheduling.
  • the network node 1 sends an SPS release message 22 as a DCI message, followed by a new SPS config message 20 over RRC specifying the new SPS interval. Only after SPS is again activated using a new SPS activate message 21, can data 25 be sent again using SPS, but now using the new SPS interval.
  • That procedure causes unexpected traffic interruption and unnecessary activation/deactivation overhead, which is particularly troublesome, e.g. for the frequent SPS interval changes required for transitions between the talk state and the silence state during VoLTE calls.
  • Fig 4 is a schematic signalling diagram illustrating signalling for changing an SPS interval for downlink according one embodiment, initiated by the network node l of Fig l.
  • the initial SPS config message 20, the SPS activate message 21 and the first set of data 25 correspond to what is shown in Fig 5.
  • the network node 1 sends a change interval message 28 to the wireless device 2over a user plane.
  • the change interval message 28 can be sent over the MAC (Media Access Control) layer.
  • the change interval message comprises an indicator of the new SPS interval.
  • the wireless device 2 receives the change interval message 28 and responds with an acknowledgement 29, in accordance with HARQ. In this way, the network node 1 knows that the wireless device 2 in question has correctly received the change interval message 28.
  • Fig 5 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink according one embodiment, initiated by the network node 1 of Fig 1.
  • the network node 1 sends an SPS config message 20 and an SPS activate message 21.
  • the wireless device 2 sends uplink data 26 in accordance with how SPS is set up.
  • the network node 1 determines that the SPS interval needs to change, the network node 1 sends a change interval message 28 over the user plane and the wireless device 2 sends an acknowledgement 29, as in Fig 4.
  • Fig 6 is a schematic signalling diagram illustrating signalling for changing an SPS interval according one embodiment.
  • the procedure to change SPS interval is initiated by the wireless device 2.
  • the network node 1 sends an SPS config message 20 and an SPS activate message 21, after which the wireless device 2 sends uplink data 26 in accordance with how SPS is set up.
  • the wireless device 2 determines that the SPS interval should be changed and sends an uplink change interval request 28' as an MCE over MAC, comprising an indicator of the new SPS interval to the network node 1 over the user plane, after which the network node 1 responds with an acknowledgement 29' to the wireless device 2 if it decides to accept request from the wireless device.
  • the change interval request 28' is only a suggestion from the wireless device perspective and the network node 1 can either fully accept, override or reject the change interval request 28'. If the network node 1 fully accepts the change interval request 28', the network node 1 sends a grant 30 to the wireless device 2, e.g. as part of a DCI format o (DCIo) message.
  • DCIo DCI format o
  • the wireless device 2 sends future uplink data 26 using the new SPS interval. If the network node has different interval decision then what is included in the change interval request 28', the network node can override it by including a MCE (MAC Control Element) with overridden interval in PDSCH (Physical Downlink Shared Channel) to wireless device like it does in Fig 5. If the network node rejects change interval request 28', the network node just ignores the request without any response.
  • MCE MAC Control Element
  • PDSCH Physical Downlink Shared Channel
  • the switch between states is typically first detected by the wireless device 2, which can make it more appropriate for the wireless device 2to trigger the SPS interval change.
  • Figs 7A-B are flow charts illustrating methods performed in the network node of Fig 1 for changing an SPS interval.
  • the network node 1 determines that the SPS interval is to be changed. This may comprise determining that the SPS interval for a downlink connection is to be changed, e.g. due to a switch between the talk state and the silence state in VoLTE. Alternatively or additionally, this comprises determining that the SPS interval for an uplink connection is to be changed.
  • this step comprises determining that SPS is to be deactivated. In this way, the SPS interval is to be changed from an existing interval to a new interval, where the new interval can be considered to be to infinite. In other words, it is clear that a deactivation of SPS is also a change of SPS interval.
  • a message element is generated comprising an indicator of the new SPS interval.
  • this step comprises providing an indicator of a special SPS interval indicating a deactivation of SPS.
  • the message element is a media access control element, MCE, such as a new SPS interval MCE.
  • MCE has the advantage that the SPS parameter can be freely changed per each SPS transmission period without extra PDCCH signalling overhead.
  • the SPS interval MAC control element can e.g. be identified by a MAC PDU subheader with LCID (Logical Channel ID) 0x11010.
  • the SPS interval MCE can e.g. be a single octet where the first four bits are reserved bits, set to "o" and the remaining four bits are used to indicate the SPS interval. Other structures of the SPS interval MCE are equally possible.
  • the downlink SPS interval can be indicated by the following enumeration: semiPersistSchedlntervalDL ENUMERATED ⁇ sflO, sf20, sf32, sf40, sf64, sf80, sfl28, sfl60, sf320, sf640, spare6, spare5, spare4, spare3, spare2,
  • the uplink SPS interval can be indicated by the following enumeration: semiPersistSchedlntervalDL ENUMERATED ⁇ sflO, sf20, sf32, sf40, sf64, sf80, sfl28, sfl60, sf320, sf640, spare6, spare5, spare4, spare3, spare2,
  • a transmit step 54 a signal comprising the message element is transmitted to the wireless device (2) over a user plane. This signal corresponds to the change interval message 28 of Figs 4 and 5.
  • the signal can be sent as a MAC PDU (Protocol Data Unit) over PDCCH (Physical Downlink Control Channel).
  • Fig 7B illustrates a method for changing an SPS interval according to one embodiment. This method is similar to the method illustrated in Fig 7A, and only new or modified steps, in relation to Fig 7A, will be described.
  • conditional ack step 55 it is checked whether an acknowledgement (se ack 29 in Figs 4 and 5), indicating successful receipt of the signal (sent in the transmit step 54) is received from the wireless device. Since the MCE is part of a MAC PDU, the existing HARQ retransmission mechanism can be reused to verify correct reception of the MCE containing the new SPS interval. If wireless device fails to successfully decode the MAC PDU, a NACK HARQ is fed back from the wireless device, indicating a failure of the reception of MAC PDU and the HARQ retransmission mechanism can be triggered to
  • the method continues to a switch interval step 56. Otherwise, the method continues to a keep original interval step 57.
  • the SPS interval for SPS transmissions is switched to the new SPS interval.
  • the method continues to a conditional mismatch step 58.
  • the original SPS interval is kept. In fact, this step does not need to involve any actions and can be considered to only be shown in Fig 7B to explain the effects of the method.
  • the method returns to the generate step 52 to reattempt changing the SPS interval.
  • the conditional mismatch step 58 it is determined whether there is a mismatch between the new SPS interval which the network node uses and the SPS interval used by the wireless device.
  • the mismatch can e.g. occur if the network node 1 erroneously interprets an ACK as a NACK or vice versa.
  • This mismatch can e.g. be detected using DTX (discontinuous transmission)
  • DTX HARQ acknowledgement For downlink, the network node would receive DTX HARQ acknowledgement from the wireless device and for the uplink, the network node would receive DTX PUSCH (Physical Uplink Shared Channel) transmission from the wireless device, indicating that the wireless device is not using the same SPS interval as the network node.
  • DTX PUSCH Physical Uplink Shared Channel
  • Fig 8 is a schematic diagram showing some components of the network node 1 of Fig 1.
  • a processor 60 is provided using any combination of one or more of a suitable central processing unit (CPU), multiprocessor, microcontroller, digital signal processor (DSP), application specific integrated circuit etc., capable of executing software instructions 66 stored in a memory 64, which can thus be a computer program product.
  • the processor 60 can be configured to execute the method described with reference to Figs 7A-B above.
  • the memory 64 can be any combination of read and write memory (RAM) and read only memory (ROM).
  • the memory 64 also comprises persistent storage, which, for example, can be any single one or combination of magnetic memory, optical memory, solid state memory or even remotely mounted memory.
  • a data memory 63 is also provided for reading and/or storing data during execution of software instructions in the processor 60.
  • the data memory 63 can be any combination of read and write memory (RAM) and read only memory (ROM).
  • the network node 1 further comprises an I/O interface 62 for communicating with other external entities.
  • the I/O interface 62 also includes a user interface.
  • the network node 1 also comprises one or more transceivers 61, comprising analogue and digital components, and a suitable number of antennas 65 for wireless communication with wireless devices as shown in Fig 1.
  • Fig 9 is a schematic diagram showing functional modules of the network node 1 of Figs 1 and 8.
  • the modules can be implemented using software instructions such as a computer program executing in the network node 1 and/or using hardware, such as application specific integrated circuits, field programmable gate arrays, discrete logical components, etc.
  • the modules correspond to the steps in the methods illustrated in Figs 7A-B.
  • a determiner 70 is arranged to determine that the SPS interval needs to be changed. This module corresponds to the determine step 50 of Figs 7A-B.
  • a generator 72 is arranged to generate a message element comprising an indicator of the new SPS interval. This module corresponds to the generate step of Figs 7A-B.
  • a transmitter 74 is arranged to transmit a signal comprising the message element to the wireless device over a user plane. This module corresponds to the transmit step of Figs 7A-B.
  • a receiver 76 is arranged to receive acknowledgements (ACKs) and/or non acknowledgements (NACKs) from a wireless device. This module
  • a switcher 78 is arranged to switch to the new SPS interval. This module corresponds to the switch interval step 56 of Fig 7B.
  • a mismatch detector 79 is arranged to detect a mismatch in SPS interval between the network node and the wireless device. This module corresponds to the conditional mismatch step 58 of Fig 7B.
  • Fig 10 shows one example of a computer program product 90 comprising computer readable means.
  • a computer program 91 can be stored, which computer program can cause a processor to execute a method according to embodiments described herein.
  • the computer program product is an optical disc, such as a CD (compact disc) or a DVD (digital versatile disc) or a Blu-Ray disc.
  • the computer program product could also be embodied in a memory of a device, such as the computer program product 64 of Fig 8.
  • the computer program 91 is here schematically shown as a track on the depicted optical disk, the computer program can be stored in any way which is suitable for the computer program product, such as a removable solid state memory.
  • the procedures described in embodiments herein have several beneficial effects compared to the prior art.
  • the SPS session no longer need suspend-resume mode to handle the SPS interval change, significantly reducing the risk of any service interruption.
  • the change of SPS interval can be performed very often with minimal overhead, even as often as for each normal SPS transmission.
  • No longer relying on the RRC and SPS reactivation procedure the existing signaling overhead is greatly decreased.
  • the MAC signalling can be performed using a MAC PDU whose PRB resources have already been reserved.
  • MAC solution decreases the RRC/MAC signaling overhead greatly and utilises the existing HARQ retransmission to verify successful SPS interval change.
  • the procedure shown can support more intervals and state transitions between any of these intervals during an existing SPS session in a piggyback fashion along with normal SPS transmission. This facilitates future more complex application scenarios where more SPS intervals may need to be supported and where the SPS intervals need to be changed often

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

It is presented a method for changing a semi-persistent scheduling, SPS, interval for a wireless device from an original SPS interval to a new SPS interval. The method is performed in a network node and comprises the steps of: determining that the SPS interval is to be changed; generating a message element comprising an indicator of the new SPS interval; and transmitting a signal comprising the message element to the wireless device over a user plane. A corresponding network node, computer program and computer program product are also presented.

Description

CHANGING SEMI-PERSISTENT SCHEDULING INTERVAL
TECHNICAL FIELD
The invention relates to a method, a network node, a computer program and a computer program product for changing a semi-persistent scheduling interval.
BACKGROUND
Cellular communication networks evolve towards higher data rates, together with improved capacity and coverage. In the 3rd Generation Partnership Project (3GPP) standardization body, several technologies have been and are also currently being developed.
LTE (Long Term Evolution) is a recent standardised technology. It uses an access technology based on OFDM (Orthogonal Frequency Division
Multiplexing) for the downlink and Single Carrier FDMA (SC-FDMA) for the uplink. The resource allocation to wireless devices (also known as user equipment, UEs) on both downlink and uplink is generally performed adaptively using fast scheduling, taking into account the instantaneous traffic pattern and radio propagation characteristics of each wireless device.
Assigning resources in both downlink and uplink is performed in the scheduler situated in the radio base station. However, for periodic low volume traffic, such as for voice (e.g. using VoLTE, Voice over LTE) and other QoS (Quality of Service) applications, such dynamic scheduling consumes a significant amount of overhead in
comparison to the payload traffic. In order to reduce this problem, semi- persistent scheduling (SPS) has been introduced to reduce the signaling overhead for periodic traffic.
On the one hand, SPS takes care of stable periodic transmissions efficiently. On the other hand, SPS does not efficiently handle variations in the periodicity very well, often causing a fall back to the dynamic scheduling with a relatively high overhead. SUMMARY
It is an object to improve how SPS intervals are changed.
According to a first aspect, it is presented a method for changing a semi- persistent scheduling, SPS, interval for a wireless device from an original SPS interval to a new SPS interval. The method is performed in a network node and comprises the steps of: determining that the SPS interval is to be changed; generating a message element comprising an indicator of the new SPS interval; and transmitting a signal comprising the message element to the wireless device over a user plane.
The step of determining may comprise determining that the SPS interval for a downlink connection is to be changed.
The step of determining may comprise determining that the SPS interval for an uplink connection is to be changed.
The step of determining may comprise determining that SPS is to be deactivated and the step of generating may comprise providing an indicator of a new SPS interval indicating a deactivation of SPS.
In the step of generating, the message element may be a media access control element, MCE.
In the step of generating, the indicator of a new SPS interval may be four bits in size.
The method may further comprise the step of switching to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device.
The method may further comprise the step of keeping the original SPS interval when an acknowledgement, indicating successful receipt of the is not received from the wireless device. The method may further comprise the step of: detecting a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and restarting the method from the step of generating a message element when a mismatch is detected. The step of detecting a mismatch may comprise detecting a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
According to a second aspect, it is presented a network node for changing a semi-persistent scheduling, SPS, for a wireless device from an original SPS interval to a new SPS interval. The network node comprises: a processor; and a memory storing instructions that, when executed by the processor, causes the network node to: determine that the SPS interval is to be changed;
generate a message element comprising an indicator of the new SPS interval; and transmit a signal comprising the message element to the wireless device over a user plane. The instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that the SPS interval for a downlink connection is to be changed.
The instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that the SPS interval for an uplink connection is to be changed.
The instructions to determine may comprise instructions that, when executed by the processor, causes the network node to determine that SPS is to be deactivated and the instructions to generate may comprise instructions that, when executed by the processor, causes the network node to provide an indicator of a new SPS interval indicating a deactivation of SPS.
The message element may be a media access control element, MCE.
The indicator of a new SPS interval may be four bits in size. The network node may further comprise instructions that, when executed by the processor, causes the network node to switch to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device. The network node may further comprise instructions that, when executed by the processor, causes the network node to keep the original SPS interval when an acknowledgement, indicating successful receipt of the signal, is not received from the wireless device.
The network node may further comprise instructions that, when executed by the processor, causes the network node to: detect a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and to restart the execution from the instructions to generate a message element, when a mismatch is detected.
The instructions to detect a mismatch may comprise instructions that, when executed by the processor, causes the network node to detect a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
According to a fourth aspect, it is presented a network node comprising: means for determining that an SPS, Semi-Persistent Scheduling interval for a wireless device is to be changed, from an original SPS interval to a new SPS interval; means for generating a message element comprising an indicator of the new SPS interval; and means for transmitting a signal comprising the message element to the wireless device over a user plane.
The means for determining may comprise means for determining that the SPS interval for a downlink connection is to be changed.
The means for determining may comprise means for determining that the SPS interval for an uplink connection is to be changed. The means for determining may comprise means for determining that SPS is to be deactivated and the means for generating may comprise means for providing an indicator of a new SPS interval indicating a deactivation of SPS.
The message element may be a media access control element, MCE. The indicator of a new SPS interval may be four bits in size.
The network node may further comprise means for switching to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device.
The network node may further comprise means for keeping the original SPS interval when an acknowledgement, indicating successful receipt of the signal, is not received from the wireless device.
The network node may further comprise the means for: detecting a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and means for restarting from
generating a message element when a mismatch is detected.
The means for detecting a mismatch may comprise detecting a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
According to a fourth aspect, it is presented a computer program for changing a semi-persistent scheduling, SPS, interval for a wireless device from an original SPS interval to a new SPS interval. The computer program comprises computer program code which, when run on a network node causes the network node to: determine that the SPS interval is to be changed; generate a message element comprising an indicator of the new SPS interval; and transmit a signal comprising the message element to the wireless device over a user plane. According to a fifth aspect, it is presented a computer program product comprising a computer program according to the fourth aspect and a computer readable means on which the computer program is stored.
Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a/an/the element, apparatus, component, means, step, etc." are to be interpreted openly as referring to at least one instance of the element, apparatus, component, means, step, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not have to be performed in the exact order disclosed, unless explicitly stated.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention is now described, by way of example, with reference to the accompanying drawings, in which:
Fig l is a schematic diagram illustrating a cellular network where
embodiments presented herein may be applied,
Fig 2 is a schematic graph illustrating packets for voice transmissions;
Fig 3 is a schematic signalling diagram illustrating signalling for changing an SPS interval according to the prior art;
Fig 4 is a schematic signalling diagram illustrating signalling for changing an SPS interval for downlink transmissions according one embodiment, initiated by the network node of Fig 1;
Fig 5 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink transmissions according one embodiment, initiated by the network node of Fig 1; Fig 6 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink transmissions according one embodiment, initiated by the wireless device of Fig 1; Figs 7A-B are flow charts illustrating methods performed in the network node of Fig 1 for changing an SPS interval;
Fig 8 is a schematic diagram showing some components of the network node of Fig 1; Fig 9 is a schematic diagram showing functional modules of the network node of Figs 1 and 8; and
Fig 10 shows one example of a computer program product comprising computer readable means.
DETAILED DESCRIPTION
The invention will now be described more fully hereinafter with reference to the accompanying drawings, in which certain embodiments of the invention are shown. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided by way of example so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. Like numbers refer to like elements throughout the description.
Fig 1 is a schematic diagram illustrating a cellular network 8 where
embodiments presented herein may be applied. The cellular network 8 comprises a core network 3 and one or more network nodes 1, here in the form of radio base stations being evolved Node Bs, also known as eNode Bs or eNBs. The network node 1 could also be in the form of Node Bs, BTSs (Base Transceiver Stations) and/or BSSs (Base Station Subsystems), etc. The network node 1 provides radio connectivity to a plurality of wireless devices 2. The term wireless device is also known as mobile communication terminal, user equipment (UE), mobile terminal, user terminal, user agent, wireless terminal, machine-to-machine devices etc., and can be, for example, what today are commonly known as a mobile phone or a tablet/laptop with wireless connectivity or fixed mounted terminal. The cellular network 8 may e.g. comply with any one or a combination of LTE (Long Term Evolution), W-CDMA (Wideband Code Division Multiplex), EDGE (Enhanced Data Rates for GSM (Global System for Mobile
communication) Evolution), GPRS (General Packet Radio Service),
CDMA2000 (Code Division Multiple Access 2000), or any other current or future wireless network, such as LTE-Advanced, as long as the principles described hereinafter are applicable.
Uplink (UL) 4a communication from the wireless device 2and downlink (DL) 4b communication to the wireless device 2between the wireless device 2 and the network node 1 occur over a wireless radio interface. The quality of the wireless radio interface to each wireless device 2 can vary over time and depending on the position of the wireless device 2, due to effects such as fading, multipath propagation, interference, etc.
The network node 1 is also connected to the core network 3 for connectivity to central functions and a wide area network 7, such as the Internet.
Fig 2 is a schematic graph illustrating packets for voice transmissions. For VoLTE, voice over LTE, traffic is delivered using IP (Internet Protocol). In a typical VoLTE arrangement, a voice encoder on the transmitter side encodes the speech into packets with a typical periodicity of 20 ms. This is shown in Fig 2 as voice frames 10. The speech encoders also uses Voice Activity
Detection in order to identify when there are talk spurts, denoted a talk state, and when there is only silence, denoted silence state. During the silence state, the voice encoder generates Silence Indication Descriptor (SID) frames 11 that the receiver uses to generate comfort noise. The SID frames 11 have a much longer spacing, 160 ms compared to 20ms in the talk state, and are also smaller -400 bits compared to ~6oo bits in the talk state.
Fig 3 is a schematic signalling diagram illustrating signalling for changing an SPS interval according to the prior art. The signalling occurs between the network node 1 and the wireless device 2. Initially, SPS is set up from the network node l, sending an SPS config message 20 over RRC (Radio Resource Control) to the wireless device 2. This message 20 comprises SPS parameters for DL/UL such as
semiPersistSchedlntervalDL or semiPersistSchedlntervalUL which define the interval between SPS transmissions. After that, the network node 1 sends an SPS activate message 21 as a DCI (Downlink Control Information) message to the wireless device 2. This message 21 includes some SPS related parameters used for the SPS transmissions, such as MCS (Modulation and Coding Scheme), allocated PRBs (Physical Resource Blocks), HARQ (Hybrid
Automatic Repeat Request) Process, etc. SPS is now active and data 25 is periodically transmitted in accordance with the SPS session from the network node 1 to the wireless terminal 2, i.e. without using dynamic scheduling.
If the SPS interval then needs to change, i.e. due to going from a talk state to a silent state from the transmission side for VoLTE, the network node 1 sends an SPS release message 22 as a DCI message, followed by a new SPS config message 20 over RRC specifying the new SPS interval. Only after SPS is again activated using a new SPS activate message 21, can data 25 be sent again using SPS, but now using the new SPS interval.
Only one SPS interval is supported for UL and DL respectively. Whenever there is a transition between the talk state and the silence state in the prior art and the SPS interval needs to change, the suspend-resume procedure and RRC-based reconfiguration mechanism shown in Fig 3 is followed.
That procedure causes unexpected traffic interruption and unnecessary activation/deactivation overhead, which is particularly troublesome, e.g. for the frequent SPS interval changes required for transitions between the talk state and the silence state during VoLTE calls.
One way to handle the problems with the overhead problems for switching the SPS interval could be to instead use dynamic scheduling for one or both of the talk state and the silence state. However, then the benefits from SPS are not fully utilised. Fig 4 is a schematic signalling diagram illustrating signalling for changing an SPS interval for downlink according one embodiment, initiated by the network node l of Fig l.
In this embodiment, the initial SPS config message 20, the SPS activate message 21 and the first set of data 25 correspond to what is shown in Fig 5.
However, when it is determined that the SPS interval needs to be changed, the network node 1 sends a change interval message 28 to the wireless device 2over a user plane. For example, the change interval message 28 can be sent over the MAC (Media Access Control) layer. In this way, there is neither any need to send any SPS release message (22 of Fig 3) which deactivates SPS nor any need to send the new RRC SPS reconfig message to specify the new interval as well as SPS reactivation message to resume SPS. The change interval message comprises an indicator of the new SPS interval.
The wireless device 2 receives the change interval message 28 and responds with an acknowledgement 29, in accordance with HARQ. In this way, the network node 1 knows that the wireless device 2 in question has correctly received the change interval message 28.
After the acknowledgement 29, the network node 1 sends data 25 in accordance with the new SPS interval. Fig 5 is a schematic signalling diagram illustrating signalling for changing an SPS interval for uplink according one embodiment, initiated by the network node 1 of Fig 1. As for Fig 4, the network node 1 sends an SPS config message 20 and an SPS activate message 21. Here however, since it is uplink data, the wireless device 2 sends uplink data 26 in accordance with how SPS is set up. When the network node 1 determines that the SPS interval needs to change, the network node 1 sends a change interval message 28 over the user plane and the wireless device 2 sends an acknowledgement 29, as in Fig 4. The wireless device 2 is then ready to send further uplink data 26 in accordance with the new SPS interval. Fig 6 is a schematic signalling diagram illustrating signalling for changing an SPS interval according one embodiment. In this embodiment, the procedure to change SPS interval is initiated by the wireless device 2. As for Fig 5, the network node 1 sends an SPS config message 20 and an SPS activate message 21, after which the wireless device 2 sends uplink data 26 in accordance with how SPS is set up. Here, however, it is the wireless device 2that determines that the SPS interval should be changed and sends an uplink change interval request 28' as an MCE over MAC, comprising an indicator of the new SPS interval to the network node 1 over the user plane, after which the network node 1 responds with an acknowledgement 29' to the wireless device 2 if it decides to accept request from the wireless device. The change interval request 28' is only a suggestion from the wireless device perspective and the network node 1 can either fully accept, override or reject the change interval request 28'. If the network node 1 fully accepts the change interval request 28', the network node 1 sends a grant 30 to the wireless device 2, e.g. as part of a DCI format o (DCIo) message. After such a grant 30, the wireless device 2 sends future uplink data 26 using the new SPS interval. If the network node has different interval decision then what is included in the change interval request 28', the network node can override it by including a MCE (MAC Control Element) with overridden interval in PDSCH (Physical Downlink Shared Channel) to wireless device like it does in Fig 5. If the network node rejects change interval request 28', the network node just ignores the request without any response.
Concerning uplink data, the switch between states, such as between the talk state and the silence state, is typically first detected by the wireless device 2, which can make it more appropriate for the wireless device 2to trigger the SPS interval change.
Besides the normal Power Control indication in DCIo, the wireless device 2can proactively decide to increase the transmission power of the specific UL transmission including the MCE with new interval request to increase the chance of the network node 1 being able to successfully decode the MCE. Figs 7A-B are flow charts illustrating methods performed in the network node of Fig 1 for changing an SPS interval.
In a determine step 50, the network node 1 determines that the SPS interval is to be changed. This may comprise determining that the SPS interval for a downlink connection is to be changed, e.g. due to a switch between the talk state and the silence state in VoLTE. Alternatively or additionally, this comprises determining that the SPS interval for an uplink connection is to be changed.
In one embodiment, this step comprises determining that SPS is to be deactivated. In this way, the SPS interval is to be changed from an existing interval to a new interval, where the new interval can be considered to be to infinite. In other words, it is clear that a deactivation of SPS is also a change of SPS interval.
In a generate step 52, a message element is generated comprising an indicator of the new SPS interval. When it has previously been determined that SPS is to be deactivated, this step comprises providing an indicator of a special SPS interval indicating a deactivation of SPS.
In one embodiment, the message element is a media access control element, MCE, such as a new SPS interval MCE. Compared with DCI, MCE has the advantage that the SPS parameter can be freely changed per each SPS transmission period without extra PDCCH signalling overhead. The SPS interval MAC control element can e.g. be identified by a MAC PDU subheader with LCID (Logical Channel ID) 0x11010. The SPS interval MCE can e.g. be a single octet where the first four bits are reserved bits, set to "o" and the remaining four bits are used to indicate the SPS interval. Other structures of the SPS interval MCE are equally possible.
For example, the downlink SPS interval can be indicated by the following enumeration: semiPersistSchedlntervalDL ENUMERATED {sflO, sf20, sf32, sf40, sf64, sf80, sfl28, sfl60, sf320, sf640, spare6, spare5, spare4, spare3, spare2,
invalid_sf}
For example, the uplink SPS interval can be indicated by the following enumeration: semiPersistSchedlntervalDL ENUMERATED {sflO, sf20, sf32, sf40, sf64, sf80, sfl28, sfl60, sf320, sf640, spare6, spare5, spare4, spare3, spare2,
invalid_sf }
In both enumerations, the digit parts indicate the SPS interval in ms and the invalid_sf (binary value 1111) indicates that SPS is to be deactivated. In a transmit step 54, a signal comprising the message element is transmitted to the wireless device (2) over a user plane. This signal corresponds to the change interval message 28 of Figs 4 and 5. The signal can be sent as a MAC PDU (Protocol Data Unit) over PDCCH (Physical Downlink Control Channel).
Fig 7B illustrates a method for changing an SPS interval according to one embodiment. This method is similar to the method illustrated in Fig 7A, and only new or modified steps, in relation to Fig 7A, will be described.
After the transmit step 54, there is here a conditional ack step 55. In the conditional ack step 55, it is checked whether an acknowledgement (se ack 29 in Figs 4 and 5), indicating successful receipt of the signal (sent in the transmit step 54) is received from the wireless device. Since the MCE is part of a MAC PDU, the existing HARQ retransmission mechanism can be reused to verify correct reception of the MCE containing the new SPS interval. If wireless device fails to successfully decode the MAC PDU, a NACK HARQ is fed back from the wireless device, indicating a failure of the reception of MAC PDU and the HARQ retransmission mechanism can be triggered to
retransmit previous MAC PDU again. After a maximum number of HARQ retransmissions, if the wireless device still feeds back NACK, it indicates that the procedure to change the SPS interval has failed and the network node need restart interval change procedure at a later stage.
If an acknowledgement is received, the method continues to a switch interval step 56. Otherwise, the method continues to a keep original interval step 57.
In the switch interval step 56, the SPS interval for SPS transmissions is switched to the new SPS interval. After this step, the method continues to a conditional mismatch step 58.
In the keep original interval step 57, the original SPS interval is kept. In fact, this step does not need to involve any actions and can be considered to only be shown in Fig 7B to explain the effects of the method. After this step, the method returns to the generate step 52 to reattempt changing the SPS interval.
In the conditional mismatch step 58, it is determined whether there is a mismatch between the new SPS interval which the network node uses and the SPS interval used by the wireless device. The mismatch can e.g. occur if the network node 1 erroneously interprets an ACK as a NACK or vice versa. This mismatch can e.g. be detected using DTX (discontinuous transmission) For downlink, the network node would receive DTX HARQ acknowledgement from the wireless device and for the uplink, the network node would receive DTX PUSCH (Physical Uplink Shared Channel) transmission from the wireless device, indicating that the wireless device is not using the same SPS interval as the network node.
If there is a mismatch, the method returns to the generate step 52 to reattempt changing the SPS interval. Otherwise, the method continues to perform the conditional mismatch step 58, optionally via an idle period (not shown). Fig 8 is a schematic diagram showing some components of the network node 1 of Fig 1. A processor 60 is provided using any combination of one or more of a suitable central processing unit (CPU), multiprocessor, microcontroller, digital signal processor (DSP), application specific integrated circuit etc., capable of executing software instructions 66 stored in a memory 64, which can thus be a computer program product. The processor 60 can be configured to execute the method described with reference to Figs 7A-B above.
The memory 64 can be any combination of read and write memory (RAM) and read only memory (ROM). The memory 64 also comprises persistent storage, which, for example, can be any single one or combination of magnetic memory, optical memory, solid state memory or even remotely mounted memory.
A data memory 63 is also provided for reading and/or storing data during execution of software instructions in the processor 60. The data memory 63 can be any combination of read and write memory (RAM) and read only memory (ROM).
The network node 1 further comprises an I/O interface 62 for communicating with other external entities. Optionally, the I/O interface 62 also includes a user interface. The network node 1 also comprises one or more transceivers 61, comprising analogue and digital components, and a suitable number of antennas 65 for wireless communication with wireless devices as shown in Fig 1.
Other components of the network node 1 are omitted in order not to obscure the concepts presented herein. Fig 9 is a schematic diagram showing functional modules of the network node 1 of Figs 1 and 8. The modules can be implemented using software instructions such as a computer program executing in the network node 1 and/or using hardware, such as application specific integrated circuits, field programmable gate arrays, discrete logical components, etc. The modules correspond to the steps in the methods illustrated in Figs 7A-B.
A determiner 70 is arranged to determine that the SPS interval needs to be changed. This module corresponds to the determine step 50 of Figs 7A-B. A generator 72 is arranged to generate a message element comprising an indicator of the new SPS interval. This module corresponds to the generate step of Figs 7A-B.
A transmitter 74 is arranged to transmit a signal comprising the message element to the wireless device over a user plane. This module corresponds to the transmit step of Figs 7A-B.
A receiver 76 is arranged to receive acknowledgements (ACKs) and/or non acknowledgements (NACKs) from a wireless device. This module
corresponds to the conditional ack step 55 of Fig 7B.
A switcher 78 is arranged to switch to the new SPS interval. This module corresponds to the switch interval step 56 of Fig 7B.
A mismatch detector 79 is arranged to detect a mismatch in SPS interval between the network node and the wireless device. This module corresponds to the conditional mismatch step 58 of Fig 7B.
Fig 10 shows one example of a computer program product 90 comprising computer readable means. On this computer readable means a computer program 91 can be stored, which computer program can cause a processor to execute a method according to embodiments described herein. In this example, the computer program product is an optical disc, such as a CD (compact disc) or a DVD (digital versatile disc) or a Blu-Ray disc. As explained above, the computer program product could also be embodied in a memory of a device, such as the computer program product 64 of Fig 8. While the computer program 91 is here schematically shown as a track on the depicted optical disk, the computer program can be stored in any way which is suitable for the computer program product, such as a removable solid state memory.
The procedures described in embodiments herein have several beneficial effects compared to the prior art. By moving the SPS interval change procedure to the user plane, e.g. from RRC to MAC, the SPS session no longer need suspend-resume mode to handle the SPS interval change, significantly reducing the risk of any service interruption. In fact, the change of SPS interval can be performed very often with minimal overhead, even as often as for each normal SPS transmission. No longer relying on the RRC and SPS reactivation procedure, the existing signaling overhead is greatly decreased. The MAC signalling can be performed using a MAC PDU whose PRB resources have already been reserved. Hence, MAC solution decreases the RRC/MAC signaling overhead greatly and utilises the existing HARQ retransmission to verify successful SPS interval change.
The procedure shown can support more intervals and state transitions between any of these intervals during an existing SPS session in a piggyback fashion along with normal SPS transmission. This facilitates future more complex application scenarios where more SPS intervals may need to be supported and where the SPS intervals need to be changed often
The invention has mainly been described above with reference to a few embodiments. However, as is readily appreciated by a person skilled in the art, other embodiments than the ones disclosed above are equally possible within the scope of the invention, as defined by the appended patent claims.

Claims

l8 CLAIMS
1. A method for changing a semi-persistent scheduling, SPS, interval for a wireless device (2) from an original SPS interval to a new SPS interval, the method being performed in a network node (1) and comprising the steps of: determining (50) that the SPS interval is to be changed;
generating (52) a message element comprising an indicator of the new SPS interval; and
transmitting (54) a signal comprising the message element to the wireless device (2) over a user plane.
2. The method according to claim 1, wherein the step of determining (50) comprises determining that the SPS interval for a downlink (4b) connection is to be changed.
3. The method according to any one of the preceding claims, wherein the step of determining (50) comprises determining that the SPS interval for an uplink (4a) connection is to be changed.
4. The method according to any one of the preceding claims, wherein the step of determining (50) comprises determining that SPS is to be deactivated and the step of generating (52) comprises providing an indicator of a new SPS interval indicating a deactivation of SPS.
5. The method according to any one of the preceding claims, wherein, in the step of generating (52), the message element is a media access control element, MCE.
6. The method according to any one of the preceding claims, wherein, in the step of generating (52), the indicator of a new SPS interval is four bits in size.
7. The method according to any one of the preceding claims, further comprising the step of switching (56) to the new SPS interval when an acknowledgement, indicating successful receipt of the signal, is received from the wireless device (2).
8. The method according to any one of the preceding claims further comprising the step of keeping (57) the original SPS interval when an acknowledgement, indicating successful receipt of the signal, is not received from the wireless device (2).
9. The method according to any one of the preceding claims, further comprising the step of:
detecting (58) a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and
restarting the method from the step of generating (52) a message element when a mismatch is detected.
10. The method according to claim 9, wherein the step of detecting (58) a mismatch comprises detecting a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
11. A network node (1) for changing a semi-persistent scheduling, SPS, for a wireless device (2) from an original SPS interval to a new SPS interval, the network node (1) comprising:
a processor (60); and
a memory (64) storing instructions (66) that, when executed by the processor, causes the network node (1) to:
determine that the SPS interval is to be changed;
generate a message element comprising an indicator of the new SPS interval; and
transmit a signal comprising the message element to the wireless device (2) over a user plane.
12. The network node (1) according to claim 11, wherein the instructions to determine comprise instructions that, when executed by the processor, causes the network node (1) to determine that the SPS interval for a downlink (4b) connection is to be changed.
13. The network node (1) according to claim 11 or 12, wherein the
instructions to determine comprise instructions that, when executed by the processor, causes the network node (1) to determine that the SPS interval for an uplink (4a) connection is to be changed.
14. The network node (1) according to any one of claims 11 to 13, wherein the instructions to determine comprise instructions that, when executed by the processor, causes the network node (1) to determine that SPS is to be deactivated and the instructions to generate comprise instructions that, when executed by the processor, causes the network node (1) to provide an indicator of a new SPS interval indicating a deactivation of SPS.
15. The network node (1) according to any one of any one of claims 11 to 14, wherein the message element is a media access control element, MCE.
16. The network node (1) according to any one of claims 11 to 15, wherein the indicator of a new SPS interval is four bits in size.
17 The network node (1) according to any one of any one of claims 11 to 16, further comprising instructions that, when executed by the processor, causes the network node (1) to switch to the new SPS interval when an
acknowledgement, indicating successful receipt of the signal, is received from the wireless device (2).
18 The network node (1) according to any one of any one of claims 11 to 16, further comprising instructions that, when executed by the processor, causes the network node (1) to keep the original SPS interval when an
acknowledgement, indicating successful receipt of the signal, is not received from the wireless device (2).
19. The network node (1) according to any one of claims 11 to 16, further comprising instructions that, when executed by the processor, causes the network node to: detect a mismatch between the new SPS interval which is used for by network node and an SPS interval used by the wireless device; and to restart the execution from the instructions to generate a message element, when a mismatch is detected.
20. The network node (l) according to claim 19, wherein the instructions to detect a mismatch comprise instructions that, when executed by the processor, causes the network node to detect a mismatch when discontinuous transmission, DTX, is detected to or from the wireless terminal.
21 A computer program (66, 91) for changing a semi-persistent scheduling, SPS, interval for a wireless device (2) from an original SPS interval to a new SPS interval, the computer program comprising computer program code which, when run on a network node (1) causes the network node (1) to:
determine that the SPS interval is to be changed;
generate a message element comprising an indicator of the new SPS interval; and
transmit a signal comprising the message element to the wireless device (2) over a user plane.
22. A computer program product (66, 90) comprising a computer program according to claim 21 and a computer readable means on which the computer program is stored.
PCT/CN2013/085839 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval WO2015058382A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13896037.2A EP3061294A4 (en) 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval
US15/030,104 US10009909B2 (en) 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval
PCT/CN2013/085839 WO2015058382A1 (en) 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2013/085839 WO2015058382A1 (en) 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval

Publications (1)

Publication Number Publication Date
WO2015058382A1 true WO2015058382A1 (en) 2015-04-30

Family

ID=52992143

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/085839 WO2015058382A1 (en) 2013-10-24 2013-10-24 Changing semi-persistent scheduling interval

Country Status (3)

Country Link
US (1) US10009909B2 (en)
EP (1) EP3061294A4 (en)
WO (1) WO2015058382A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017131495A1 (en) * 2016-01-28 2017-08-03 엘지전자 주식회사 Method for operating terminal in accordance with semi-persistent scheduling in wireless communication system, and terminal device using method
WO2017135677A1 (en) 2016-02-03 2017-08-10 Lg Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
WO2017173616A1 (en) * 2016-04-07 2017-10-12 Nokia Technologies Oy Semi-persistent resource allocation enhancement for v2x communication
WO2017191917A1 (en) * 2016-05-02 2017-11-09 엘지전자 주식회사 Method and apparatus for changing sps operation in wireless communication system
CN107454679A (en) * 2016-06-01 2017-12-08 宏达国际电子股份有限公司 Handle the device and method that wireless heterogeneous networks link recovery routine
WO2018099237A1 (en) * 2016-12-02 2018-06-07 索尼公司 Device in wireless communication system, and wireless communication method
EP3340677A4 (en) * 2015-11-25 2019-03-20 Guangdong OPPO Mobile Telecommunications Corp., Ltd. Method for wireless communication, network device and terminal device
EP3506695A4 (en) * 2016-09-29 2019-07-31 Huawei Technologies Co., Ltd. Method and device for releasing semi-persistent scheduling resource
WO2021098719A1 (en) * 2019-11-19 2021-05-27 Jrd Communication (Shenzhen) Ltd Feedback for periodic resources

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10660115B1 (en) * 2016-10-19 2020-05-19 Sprint Spectrum L.P. Systems and methods for configuring a semi-persistent scheduler
US11284416B2 (en) 2016-12-22 2022-03-22 Qualcomm Incorporated Adaptive ultra-reliable low-latency communications (URLLC) semi-persistent scheduling
US11356993B2 (en) 2019-05-03 2022-06-07 Qualcomm Incorporated Reconfiguration signaling of semi-persistent scheduling
US12010678B2 (en) * 2022-01-27 2024-06-11 Mitsubishi Electric Research Laboratories, Inc. Systems, apparatuses, and methods for semi-persistent scheduling in communication networks

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101547135A (en) * 2008-03-25 2009-09-30 中兴通讯股份有限公司 Uplink dispatching method for wireless communication system
CN101677460A (en) * 2008-09-18 2010-03-24 中兴通讯股份有限公司 Configuration method, terminal and base station of radio resource scheduling
WO2010102447A1 (en) * 2009-03-11 2010-09-16 华为终端有限公司 Method, device and system for releasing the resource

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009053930A2 (en) * 2007-10-23 2009-04-30 Nokia Corporation Improved re-transmission capability in semi-persistent transmission
CN101742697B (en) * 2008-11-04 2014-05-28 宏达国际电子股份有限公司 Method of improving a semi-persistent scheduling (sps) resource release process and related apparatus
CN103875298B (en) 2011-10-04 2018-04-20 瑞典爱立信有限公司 The scheduling of communication base station
EP3937570B1 (en) * 2011-12-22 2024-01-31 InterDigital Patent Holdings, Inc. Resource grant cancellation
US8929319B2 (en) * 2011-12-23 2015-01-06 Blackberry Limited Updating scheduling request resources

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101547135A (en) * 2008-03-25 2009-09-30 中兴通讯股份有限公司 Uplink dispatching method for wireless communication system
CN101677460A (en) * 2008-09-18 2010-03-24 中兴通讯股份有限公司 Configuration method, terminal and base station of radio resource scheduling
WO2010102447A1 (en) * 2009-03-11 2010-09-16 华为终端有限公司 Method, device and system for releasing the resource

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3061294A4 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3340677A4 (en) * 2015-11-25 2019-03-20 Guangdong OPPO Mobile Telecommunications Corp., Ltd. Method for wireless communication, network device and terminal device
US10813117B2 (en) 2015-11-25 2020-10-20 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method for wireless communication, network device and terminal device
US10820301B2 (en) 2016-01-28 2020-10-27 Lg Electronics Inc. Method for operating terminal in accordance with semi-persistent scheduling in wireless communication system, and terminal device using method
WO2017131495A1 (en) * 2016-01-28 2017-08-03 엘지전자 주식회사 Method for operating terminal in accordance with semi-persistent scheduling in wireless communication system, and terminal device using method
KR102124944B1 (en) * 2016-02-03 2020-06-22 엘지전자 주식회사 Method and apparatus for performing semi-static scheduling activation triggered by a terminal in a wireless communication system
WO2017135677A1 (en) 2016-02-03 2017-08-10 Lg Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
CN108141877A (en) * 2016-02-03 2018-06-08 Lg 电子株式会社 The method and apparatus that the semi-persistent scheduling activation of user equipment triggering is performed in wireless communication system
KR20180086521A (en) * 2016-02-03 2018-07-31 엘지전자 주식회사 Method and apparatus for performing semi-static scheduling activation triggered by a terminal in a wireless communication system
JP2019504573A (en) * 2016-02-03 2019-02-14 エルジー エレクトロニクス インコーポレイティド Method and apparatus for performing semi-static scheduling activation triggered by a terminal in a wireless communication system
US11785586B2 (en) 2016-02-03 2023-10-10 Lg Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
EP3412096A4 (en) * 2016-02-03 2019-07-31 LG Electronics Inc. -1- Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
EP4167673A1 (en) * 2016-02-03 2023-04-19 LG Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
US11388714B2 (en) 2016-02-03 2022-07-12 Lg Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
US10721731B2 (en) 2016-02-03 2020-07-21 Lg Electronics Inc. Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in wireless communication system
CN108141877B (en) * 2016-02-03 2022-03-18 Lg 电子株式会社 Method and apparatus for performing user equipment triggered semi-persistent scheduling activation in a wireless communication system
WO2017173616A1 (en) * 2016-04-07 2017-10-12 Nokia Technologies Oy Semi-persistent resource allocation enhancement for v2x communication
US11350389B2 (en) 2016-04-07 2022-05-31 Nokia Technologies Oy Semi-persistent resource allocation enhancement for V2X communication
US10813123B2 (en) 2016-05-02 2020-10-20 Lg Electronics Inc. Method and apparatus for changing SPS operation in wireless communication system
WO2017191917A1 (en) * 2016-05-02 2017-11-09 엘지전자 주식회사 Method and apparatus for changing sps operation in wireless communication system
CN107454679A (en) * 2016-06-01 2017-12-08 宏达国际电子股份有限公司 Handle the device and method that wireless heterogeneous networks link recovery routine
EP3506695A4 (en) * 2016-09-29 2019-07-31 Huawei Technologies Co., Ltd. Method and device for releasing semi-persistent scheduling resource
US10820337B2 (en) 2016-12-02 2020-10-27 Sony Corporation Device in wireless communication system, and wireless communication method
WO2018099237A1 (en) * 2016-12-02 2018-06-07 索尼公司 Device in wireless communication system, and wireless communication method
WO2021098719A1 (en) * 2019-11-19 2021-05-27 Jrd Communication (Shenzhen) Ltd Feedback for periodic resources

Also Published As

Publication number Publication date
US10009909B2 (en) 2018-06-26
US20160270093A1 (en) 2016-09-15
EP3061294A4 (en) 2017-06-21
EP3061294A1 (en) 2016-08-31

Similar Documents

Publication Publication Date Title
US10009909B2 (en) Changing semi-persistent scheduling interval
US11943058B2 (en) Methods of retransmission in semi-persistent scheduling without explicit HARQ feedback
JP7100710B2 (en) Scheduling request and ACK / NACK prioritization
JP6165256B2 (en) System and method for dynamically setting flexible subframes
JP2018523406A (en) Flexible coding method
EP3353933B1 (en) Lte harq feedback for configured uplink grants
JP2018520570A (en) Techniques for adjusting a clear channel assessment (CCA) window for transmission in a shared radio frequency spectrum band
US10349439B2 (en) Release of semi-persistent scheduling
CN110214432B (en) Method and node for activation or deactivation of a carrier in a communication network
KR20090057395A (en) Resource allocation, scheduling, and signaling for grouping real time services
JP2023100907A (en) Wireless communication method, terminal device, and network device
KR20190117534A (en) Post-Function Marking for Mobile Broadband and Low Latency Communication Multiplexing
WO2016115498A1 (en) Channel state information for enhanced carrier aggregation
KR20220076490A (en) Wireless communication method, apparatus and communication system
US20130329656A1 (en) Common orders for a shared control channel
WO2010035496A1 (en) Radio transmission device and radio transmission method
US11825297B2 (en) Method and apparatus of handling control signaling for inter-user equipment (UE) coordination information in a wireless communication system
US9451548B2 (en) Method, wireless device computer program and computer program product for use with discontinuous reception
US20230199749A1 (en) Configured grant enhancements in unlicensed band
US20240172194A1 (en) Repetition factor adaptation for mini-slot-based transport block transmission
CN114765841B (en) Apparatus for handling detection of physical downlink control channel
WO2022151165A1 (en) Apparatus, method, and computer program
CN118104372A (en) Method, communication device and infrastructure equipment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13896037

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2013896037

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2013896037

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15030104

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE