David MATHEW
Helmet Gunar DAMBERGS
Original Assignee
Wds (Oil & Gas) Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2013903886A external-priority patent/AU2013903886A0/en
Application filed by Wds (Oil & Gas) Pty Ltd filed Critical Wds (Oil & Gas) Pty Ltd
Publication of WO2015051416A1 publication Critical patent/WO2015051416A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/046Couplings; joints between rod or the like and bit or between rod and rod or the like with ribs, pins, or jaws, and complementary grooves or the like, e.g. bayonet catches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • E21B7/061Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock

Definitions

  • This invention is concerned with an orientation assembly.
  • the invention is concerned particularly, although not exclusively, with a gas well orientation assembly.
  • Coal seam gas is gas trapped in underground coal seams.
  • unconventional gas can be trapped in shale and sandstone reservoirs and conventional gas can be trapped in sandstone reservoirs. It is desirable to utilise this gas, as gas fired power stations create less greenhouse gas emissions than coal fired power station.
  • a vertical well is drilled.
  • a surface to inseam lateral hole is then drilled from the surface remote from the vertical well, having a relatively large radius and then running horizontally along the coal seam for a relatively long distance (e.g. 1000m) to intersect the vertical well.
  • the wells are drilled such that they are initially vertical and then turn in a large radius to run horizontally along the coal seam. These wells are typically spaced at set intervals, for example at 500m x 1000m. Gas trapped in the coal seam, shale or sandstone reservoirs then typically permeates into the lateral hole and is extracted via the vertical well.
  • a problem with existing wells is that the turning of the inseam lateral hole or the well from vertical to horizontal must be carefully controlled so that the horizontal section runs along the coal seam, and in the case of a surface to inseam lateral hole, that the lateral hole also intersects the vertical well.
  • a gas well orientation assembly comprising: an upper orientation subassembly;
  • one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin. More preferably the upper orientation subassembly has the orientation pin and the lower subassembly has the slot to receive the orientation pin.
  • the orientation pin may be of any suitable shape, including substantially rectangular, square, circular and/or the like.
  • on of the upper orientation subassembly or the lower subassembly has a shank and the other of the upper orientation subassembly or the lower subassembly has a receiving recess.
  • the orientation pin extends from the shank and the slot is formed in the receiving recess.
  • the slot may be formed on the shank and the orientation pin may be formed or located within the receiving recess.
  • An advantage of having the slot formed on the shank is that the slot is easier to access for cleaning purposes.
  • the receiving recess is adapted to receive the shank.
  • the receiving recess has a tapered opening. Typically the tapered opening aids in locating the shank relative to the receiving recess.
  • the upper orientation assembly has the receiving recess and the lower subassembly has the shank.
  • the slot is formed on the shank and the orientation pin is located within the receiving recess.
  • the slot is formed such that the orientation pin is initially received in a direction parallel to a longitudinal axis of the receiving recess.
  • the slot is formed such that the orientation pin moves in a radial direction relative to the longitudinal axis of the receiving recess to secure the upper orientation subassembly to the Sower orientation subassembly.
  • the slot is "J" shaped, having a longitudinal component and a radial component relative to the longitudinal axis of the receiving recess.
  • the upper orientation subassembly has a shear pin hole.
  • the lower orientation subassembly has a shear pin hole.
  • the shear pin hole of the upper orientation subassembly aligns with the shear pin hole of the lower orientation subassembly when the upper orientation subassembly is in a predetermined orientation relative to the lower orientation subassembly.
  • the orientation assembly further comprises a shear pin that is adapted to be inserted into the shear pin hole of the upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembly.
  • the shear pin is adapted to shear when a predetermined force is applied to the upper orientation subassembly relative to the lower orientation subassembly.
  • the shear pin may be adapted to shear when predetermined downward force is applied to the upper orientation subassembly relative to the lower orientation subassembly.
  • the upper orientation subassembly has an upper coupling adapted to be operatively attached to a wedge assembly.
  • the wedge assembly is a wedge assembly as described in this specification.
  • the lower subassembly has a lower coupling adapted to be operatively attached to an anchor.
  • the anchor is secured toward the bottom of a gas well casing.
  • the gas well casing is a gas well casing as described in this specification.
  • the gas well casing may be a steel gas well casing.
  • the wedge assembly comprises a wedge having a deflection face adapted to deflect a casing bit.
  • the deflection face of the wedge is contoured to the shape of the casing bit.
  • the wedge is adapted to deflect the casing bit into an inner surface of the gas well casing to create an opening in the casing.
  • the deflection face is set at a predetermined angle relative to the longitudinal axis of the wedge assembly, the longitudinal axis of the wedge assembly being parallel to the longitudinal axis of the gas well casing when the wedge assembly is located in the gas well casing.
  • the predetermined angle forms an acute angle.
  • the wedge is formed from a cylindrical material. More preferably, th wedge is formed from a cylindrical piece of steel. Typically the defiection face is machined into the cylindricaJ material.
  • the wedge is secured to a wedge casing. More preferably the wedge is welded into a wedge casing.
  • the wedge casing will have an opening such that the deflection face is open to the gas well casing.
  • the casing bit is a casing mill bit. More preferably, the casing bit is a casing mill bit and reamer assembly. Preferably the casing bit forms an aperture in a portion of the gas well casing that is made from a matenal that is softer than the predominant material used for the gas well casing. Preferably the gas well casing is predominantly made of steel. Preferably the softer materia! is a composite material. Preferably the composite material is a fibreg!ass composite material. Alternatively, the gas well casing may be a steel gas well casing and the casing bit forms an aperture in the steel material of the gas well casing.
  • the wedge assembly further comprises a packer located near a lower end of the wedge.
  • the packer is adapted to seal a space between the gas well casing and the wedge assembly to prevent drill cuttings from migrating down the gas well casing.
  • the packer is attached to the wedge casing.
  • the wedge assembly further comprises a spacer operatively attached to a lower end of the wedge.
  • the spacer is adapted to position the wedge at a predetermined location within the gas well casing.
  • different length spacers may be utilised to position the wedge at different predetermined locations within the gas well casing.
  • the wedge assembly further comprises a direction assembly adapted to set the direction of the deflection face relative to the gas well casing.
  • the direction assembly is provided between the spacer and the wedge. More preferably, the direction assembly is provided between the spacer and the packer.
  • the direction assembly is adapted to rotatably connect the upper part of the wedge assembly with the lower part of the wedge assembly such that once a predetermined direction of the upper part of the wedge assembly is achieved relative to the lower part, the direction assembly can be releasably locked to prevent further rotation.
  • the wedge assembly further comprises a deployment casing adapted to lower the wedge assembly down the gas well casing.
  • the deployment casing is hollow so that a casing bit can be lowered through the deployment casing and deflected by the deflection face of the wedge.
  • the deployment casing will also acts as a conduit for drilling fluids.
  • an orientation indicator is provided towards the top of the deployment casing to aid in the orientation or to check the orientation of the wedge assembly.
  • the orientation indicator is an orientation flange attached to the top of the deployment casing.
  • the deployment casing has plurality of ports through which hig pressure air is injected. The hig pressure air typically mingles with the drilling fluid returning to the surface to make this fluid lighter.
  • the wedge assembly further comprises a plurality of centralisers adapted to centralise the wedge assembly in the gas well casing.
  • the centralisers may be attached to the deployment casing such that they are positioned between the deployment casing and the gas well casing.
  • the gas well casing has at least one portion of material that is softer than the predominant material used for the gas well casing.
  • the gas well casing is predominantly formed of steel.
  • the softer material is a composite material.
  • the composite material is a fibreg!ass composite material.
  • each of the at least one portion of softer material is located at a predetermined location where it is desirable to form an aperture in the gas well casing. More preferably, each of the at least one portion of composite material is located at a predetermined location where it is desirable to form an aperture in the gas well casing such that a lateral hole can be drilled outwardly from the gas well casing.
  • each of the at least one portion of softer material may be a tubular section of material.
  • each of the at least one portion of softer material is disposed between sections of the gas well casing formed of steel.
  • the gas well casing may have a section formed of steel attached to a top part of a tubular section of composite material and another section formed of steel attached to the bottom part of the tubular section of composite material.
  • a casing bit forms the desired number of apertures through each of the tubular sections of material.
  • the gas well casing is a gas well casing used in a gas well for coal seam gas.
  • the gas well casing may be a gas well casing used in gas well for unconventional or conventional gas.
  • the gas well casing may be a gas well casing used in a gas well for sequestration of gas or liquids into suitable formations.
  • the invention resides in amethod of installing a gas well orientation assembly, the method including the steps of:
  • a gas well orientation assembly having an upper orientation subassembly having a shear pin hole and a lower orientation subassembly having a shear pin hole, and wherein one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin;
  • the method further comprising the steps of providing a gas well casing and securing the lower orientation subassembly to a bottom portion of the gas well casing.
  • th step of securing the lower orientation subassembly to a bottom portion of the gas well casing involves securing the lower orientation subassembly to an anchor.
  • the step further involves secu ring the anchor to a bottom portion of the gas well casing.
  • the anchor is lowered to a bottom portion of the gas well casing using the gas well orientation assembly and is secured to the gas well casing.
  • the method includes the step of orienting the gas well orientation assembly in a predetermined orientation relative to the gas well casing.
  • the anchor is secured to a bottom portion of the gas well casing once the gas well orientation assembly is oriented in a predetermined orientation relative to the gas well casing.
  • the method includes the step of shearing the shear pin.
  • the step of shearing the shear pin is performed after the lower orientation subassembly is secured to a bottom portion of the gas well casing.
  • the gas well orientation assembly is a gas well orientation assembly as described in this specification
  • the gas well casing is a gas well casing as described in this specification.
  • the gas well casing may be a steel gas well casing.
  • the method includes the step of forming a gas well casing.
  • th ste of forming a gas well casing includes the step of providing at least one portion of material that is softer than the predominant material used for the gas well casing.
  • the gas well casing is predominantly made of steel.
  • the softer material is a composite material,
  • the composite material is a fibregiass composite material.
  • the step of providing at least one portion of material that is softer than the predominant material used for the gas well casing involves each of the at least one portion of softer material being a tubular section of material, and each of the tubular sections of materia! being disposed between steel gas well casing sections.
  • the method includes the ste of locating the gas well casing in a well.
  • the well is a gas well for coal seam gas.
  • the well may be a gas well for unconventional or conventional gas.
  • the well may be a gas well for sequestration of gas or liquids into suitable formations.
  • the method further includes the step of forming at least one aperture through each of the at least one portion of softer material.
  • the step of forming at least one aperture through each of the at least one portion of softer material involves using a wedge assembly to deflect a casing bit into each of the at least one portion of softer material.
  • the wedge assembly has a deflection face to deflect the casing bit.
  • the wedge assembly may be a wedge assembly as described in this specification.
  • the method includes the step of forming an aperture in the gas well casing.
  • the step further includes th steps of locating a wedge assembly within the gas well casing, providing a casing bit, and deflecting the casing bit with the wedge assembly, such that the casing bit forms an aperture in the gas well casing.
  • the step of deflecting the casing bit with the wedge assembly, such that the casing bit forms an aperture in the gas well casing involves deflecting the casing bit such that it contacts an inner surface of the gas well casing.
  • the step further includes milling the gas well casing with the casing bit such that an aperture is formed from the inner surface of the gas well casing to an outer surface of the gas well casing. It will be appreciated that in this context, milling can include drilling.
  • a deflection face of the wedge assembly deflects the casing bit.
  • the step of locating a wedge assembly within the gas well casing involves spacing the wedge assembly from the bottom of the gas well casing using a spacer.
  • the step further includes releasabiy securing the spacer relative to the bottom of the gas well casing.
  • the step further includes using a direction assembly to set a predetermined radial direction of the wedge assembly relative to the gas well casing.
  • the step of locating a wedge assembly within the gas well casing involves lowering the wedge assembly using a deployment casing.
  • the method includes the step of using a packer to seal an upper part of the wedge assembly from the gas well casing below to prevent drill cuttings from the forming of the aperture from migrating down the gas well casing.
  • the method includes the step of providing the gas well casing with portions of material that is softer than the predominant material used for the gas well casing in the areas where an aperture is to be formed.
  • the gas well casing is predominantly made of steel.
  • the softer material is a composite material.
  • the composite material is a fibreglass composite material.
  • the method may include the step of providing a steel gas well casing.
  • the method includes the step of forming a gas well.
  • the step further includes the steps of providing a gas well casing in a well.
  • the well is a vertical well
  • the method includes the step of drilling a pluralit of lateral holes outwardly from the gas well casing.
  • the plurality of lateral holes extend outwardly from at least one aperture in the gas well casing. More preferably the method includes forming at least one aperture in the gas well casing and then drilling a plurality of lateral holes outwardly from the gas well casing, the plurality of lateral holes extending from the at least one aperture in the gas well casing.
  • the method includes the step of drilling at least one branch lateral hole outwardly from at least one of the plurality of lateral holes,
  • a benefit of this is that only one aperture may to be formed for a single lateral hole extending outwardly from the gas well casing and having at least one branch lateral hole extending from the lateral hole (i.e. no additional aperture needs to be formed in the gas well casing for the at least one branch lateral hole).
  • the plurality of lateral holes extend outwardly from the gas well casing spaced over 360° when viewed in plan view.
  • the plurality of lateral holes may extend outwardly from the gas well casing spaced over substantially 180° or 90° when viewed in plan view. Having the plurality of lateral holes extend outwardly from the gas well casing spaced over substantially 180° or 90° when viewed in plan view may be beneficial when the gas well casing is located near a boundary. It will be appreciated that the plurality of lateral holes may extend outwardly from the gas well casing spaced over a predetermined angle depending on other factors such as geological formations
  • the step of providing a gas well casing in a well involves forming the well.
  • the step further includes lowering the gas well casing in the well.
  • the step of forming a plurality of lateral holes outwardly from the gas well casing includes the step of forming apertures in the gas well casing at predetermined locations.
  • the step of forming apertures in the gas well casing at predetermined locations involves deflecting a casing bit into an inner surface of the gas well casing using a wedge assembly.
  • the step of forming apertures in the gas well casing at predetermined locations involves forming apertures through portions of the gas well casing that are formed of material that is softer than the predominant material used for the gas well casing.
  • the softer material is a composite material.
  • the composite material is a fibreglass composite material.
  • the step of forming a pluralit of lateral holes outwardl from the gas well casing involves drilling a plurality of lateral holes such that they diverge from one another.
  • the step of forming a plurality of lateral holes outwardly f om the gas well casing involves drilling a plurality of lateral holes such that each hole runs substantially parallel to at least one other lateral hole.
  • the step of forming a plurality of lateral holes outwardly from the gas well casing involves drilling a plurality of lateral holes such that they initially diverge from one another and then run substantially parallel to at least one other lateral hole.
  • the step of forming a plurality of lateral holes outwardly from the gas well casing involves drilling a plurality of lateral holes initially in a downwards direction relative to the gas well casing and then transitioning to a direction that is transverse to the gas well casing.
  • the transverse direction is substantially orthogonal to the gas well casing.
  • the transition has a radius in the range of 20 to 40 meters. More preferably the transition has a radius in the range of 25 to 35 meters. Even more preferably, the transition has a radius of approximately 30 meters.
  • the gas well casing is a gas well casing as described in this specification.
  • the gas well casing may be a steel gas well casing.
  • FIG 1 shows a schematic sectioned view of a wedge assembly located in a gas well casing
  • FIG 2 shows a schematic cross sectional view of part of a wedge assembly
  • FIG 3 shows a schematic cross sectional view of a wedge assembly located in a gas well casing
  • FIG 4 shows a schematic perspective view of a gas well according to an embodiment of the invention
  • FIG 5 shows a schematic cross sectional view of a gas well
  • FIG 6 shows a schematic cross sectional view of an orientation assembly
  • FIG 7 shows a plan view of prior art vertical well spacing for gas extraction
  • FIG 8 shows a schematic plan view of vertical well spacing for gas extraction according to an embodiment of the invention
  • FIG 9 shows a schematic plan view of a. well design for gas extraction according to an embodiment of the invention.
  • FIG 10 shows a plan view of a well design for gas extraction according to an embodiment of the invention
  • FI 1 1 shows a schematic plan view of a well design for mine degassing according to an embodiment of the invention
  • FIG 12 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention
  • FIG 13 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention
  • FIG 14 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention.
  • FIG 15 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention.
  • FIG 16 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention.
  • FIG 17 shows a schematic plan view of a lateral hole having branched lateral holes according to an embodiment of the invention.
  • Figure 1 shows a schematic sectioned view of a wedge assembly 100 located in a gas well casing 200.
  • the wedge assembly 100 ha a wedge 102 having a deflection face 104.
  • the deflection face 104 is adapted to deflect a casing bit (not shown) such that the casing bit can form an aperture 224 in the gas well casing 200.
  • the gas well casing 200 has a 7" (approx. 178mm) external diameter.
  • the wedge assembly 100 has packer 112 located near a lower end of the wedge 102.
  • the packer 112 isolates and seals the upper part of the wedge assembly 100 from the gas well casing 200 below to prevent drill cuttings (not shown) from the forming of the aperture 224 from migrating down the gas well casing 200.
  • the wedge assembly 100 has a direction assembly 114 that can set the direction of the defiection face 104 relative to a spacer.
  • the direction of the deflection face 104 is set by rotating part of the direction assembly 1 14 relative to a spacer 1 16 and locking the direction assembly 1 14 in position once the deflection face 104 is facing the desired direction, !t will be appreciated that changing the direction of the defiection face 104 will change the radial location of where the casing bit (not shown) would form an aperture in the gas well casing 200,
  • the spacer 1 16 is connected to a lower part of the direction assembly 1 14, The length of the spacer 1 16 determines the vertical location of the deflection face 104 in the gas well casing, as the spacer 1 16 is releasably secured relative to the bottom of the gas well casing 200. It will be appreciated that using different length spacers will change the vertical location of where the casing bit (not shown) would form an aperture in the gas well casing 200.
  • the spacer 1 16 is made from one or more lengths of 5,5" (approx 1 0mm) diameter casing. It will also be appreciated that in an alternative embodiment (not shown), the spacer may also be drill pipe or drill collars.
  • the spacer 1 16 is radially oriented and releasably secured relative to the bottom of the gas well casing 200 by an orientation assembly 400.
  • the orientation assembly 400 has an upper orientation subassembly 420 attached to the spacer 1 1 6 and a lower orientation subassembly 440 attached to a mechanical set anchor 260 near the bottom of the gas well casing 200.
  • the orientation assembly 400 will be expiained in more detail videow with reference to figure 6.
  • the wedge assembly 100 has a deployment casing 1 18 extending from the top end of the wedge 102 to the surface 310 when the wedge assembly 100 is located in the gas well casing 200.
  • the deployment casing 118 is used to lower the wedge assembly 100 into the gas well casing 200,
  • the deployment casing 1 18 is hollow so that a casing bit (not shown) can be lowered through the deployment casing 118 and deflected by the deflection face 104 of the wedge 102.
  • the deployment casing 1 18 also acts as a conduit for drilling fluids (not shown) used in drilling lateral holes such as lateral hole 240. It will be appreciated that a different length deployment casing 118 may be used if the length of the spacer 116 is changed.
  • the deployment casing 1 18 is made from one or more lengths of 5.5" (approx 140mm) diameter casing that has an internal diameter of 5" (approx. 127mm).
  • the deployment casing 1 18 has ports 120 located at a predetermined depths. High pressure air is injected through these ports1 0 to mingle with the drilling fluid that is returning to the surface to make this fluid lighter and to control the hydrostatic pressure.
  • the hydrostatic pressure can also be adjusted by the number, size and location (e.g. depth) of ports 120.
  • An orientation flange 122 is located at the top of the deployment casing 118 to orientate or check the orientation of the deflection face 104.
  • the wedge assembly 100 has centralisers 1 4 located above and below the wedge 102 to ensure that the wedge assembly 100 is held rigidly and centrally within the gas well casing 200.
  • the gas well casing 200 has a steel casing 210 and a section of composite casing in the form of a fibreglass casing 220 in the area where the aperture 224 is to be formed.
  • a casing bit (not shown) does not have to drill through the steel casing 210.
  • Figure 1 schematically shows the fibreglass casing 220, it will be appreciated that the fibreglass casing 220 can be flush with the outside surface of the steel casing 210.
  • the section of composite casing can be a tubular section disposed between two sections of steel casing.
  • the gas well casing 200 has perforations 230 that are positioned adjacent the coal seam 320 to assist in the extraction of gas from the coal seam 320. ft will be appreciated that in an alternate embodiment (not shown) the perforations 230 ma be omitted, to for example prevent possible ingress of coal fines from a coal seam.
  • a lateral hole 240 is drilled that follows the coal seam 320.
  • the wedge 102 is made from a piece of steel having an external diameter of 5" (approx. 127mm).
  • the wedge 102 is welded into a wedge casing 106.
  • the wedge casing 106 is made from a length of 5.5" (approx T40mm) diameter casing that has an internal diameter of 5" (approx. 127mm).
  • the wedge casing 106 has an opening formed that corresponds to the deflection face 104 of the wedge 102.
  • the deflection face 104 has a concave shape (not shown) to suit a casing bit having a 4.75" (approx. 121 mm) external diameter.
  • An upper coupling 108 is located at the upper end of the wedge casing 106.
  • the upper coupling 108 is a 5.5" BTC Coupling.
  • the upper coupling 108 connects the wedge casing 106 to the deployment casing (1 18 as seen in figure 1 ).
  • a lower coupling 1 10 is located at the lower end of the wedge casing 106.
  • the lower coupling 1 10 connects the wedge casing 106 to the packer (1 12 as seen in figure 1 ).
  • Figure 3 shows a schematic cross sectional view of part of a wedge assembly 100 located in a gas well casing 200.
  • the spacer 1 16 is of a predetermined length and the direction assembly 1 14 is set to a predetermined angle such that the deflection face 104 of the wedge 102 is orientated to deflect a casing bit (not shown) into the top right aperture 224 and lateral hole 240.
  • the Packer 1 12 prevents excess drill cuttings from migrating to the gas well casing 200 below.
  • FIG. 4 shows a schematic perspective view
  • Figure 5 shows a schematic cross sectional view
  • the gas well 10 has a well head 12 attached to the top of the gas well casing 200 near the surface 310.
  • Lateral drill holes 240 are drilled outwards from apertures 224 in the gas well casing 200.
  • the lateral drill holes 240 initially have a "short" radius of approximately 30 meters and then follow the coal seams 320.
  • a production string 14 is located in the gas well casing 200 and a progressive cavity pump 16 is located at the bottom of the production string.
  • the orientation assembly 400 has an upper orientation subassembly 420 that can be re!easably secured to a iower orientation subassembly 440.
  • the upper orientation subassembly 420 has an upper coupling 424 that connects to a spacer (1 16 as seen in figure 1 ).
  • the upper orientation subassembly 420 has a shank 426 that can be received by a receiving recess 442 of the lower orientation subassembly 440.
  • the shank 426 has a shear pin hole 428 to receive a shear pin (not shown) which can secure the upper orientation subassembly 420 to the Iower orientation subassembly 440.
  • the shank 426 also has an orientation pin 422, which can be received into a "J" slot 444 in the receiving recess 442 of the lower orientation subassembly 440.
  • the orientation pin 422 and the slot 444 ensure that the upper orientation subassembly 420 can only be received by the lower orientation subassembly 440 in a predetermined orientation.
  • the lower orientation subassembly 440 has a tapering opening 446 to assist in guiding the shank 426 of the upper orientation subassembly 420 into the receiving recess 442.
  • the lower orientation subassembly 440 has a shear pin hole 448, which aligns with the shear pin hole 428 of the upper orientation subassembly 420 when the orientation pin 422 is located in the bottom left part of the "J" slot 444.
  • the lower orientation subassembly has a lower coupling 450 that secures to a packer or a mechanical set anchor (260 as seen in figure T) secured to a bottom section of the gas well casing (200 as seen in figure 1 ).
  • the packer or mechanical set anchor (not shown) is usually secured in the bottom of the gas well casing (not shown) by rotation or a downward force.
  • the shank 426 of the upper orientation subassembly 420 is inserted into the receiving recess 442 of the lower orientation subassembly 440 such that the orientation pin 422 slides to the bottom of the "J" slot, the upper orientation subassembly 420 is then rotated relative to the lower orientation subassembl such that the orientation pin is located at the left end of the "J" slot 444.
  • the shear pin holes 428 and 448 align and a shear pin (not shown) can be inserted into the holes 428,448 to secure the upper orientation subassembly 420 to the lower orientation subassembly 440.
  • the lower orientation subassembly 440 is connected to an anchor (not shown), the wedge assembly (100 5 see figure 1 ⁇ is then lowered into a gas well casing (not shown). Once the wedge assembly is oriented correctly, the anchor (not shown) is set.
  • the shear pin (not shown) can then be sheared by providing the upper orientation subassembly 420 with a downward force relative to the lower orientation subassembly 440.
  • the upper orientation subassembly 420 can then be rotated relative to the lower orientation subassembly 440 such that the orientation pin 422 is in line with the vertical part of the "J" slot 444.
  • the upper orientation subassembly 420 can then be removed from the lower orientation subassembly 440.
  • the lower orientation subassembly 440 remains at the bottom of the gas well casing (not shown) to act as an orientation reference point. If a lateral hole (not shown) should fail, the lower orientation subassembly 440 can be used as a reference point to orient the wedge assembly (100, see figure 1 ) such that the lateral hole (not shown) can be re-drilled.
  • FIG 7 there is shown a plan view of prior art vertical well spacing for gas extraction.
  • the vertical wells 500 are spaced 500m apart in the Y direction and 1000m apart in the X direction.
  • the vertical wells 500 have a horizontal component 510 that runs for approximatel 1000m along a coal seam.
  • the horizontal component 510 is either a surface to inseam lateral hole that is drilled from the surface, remote from the vertical well 500, to intersect the vertical well 500, or, alternatively, the horizontal component 500 is a single continuation of the vertical well 500 which turns a large radius to continue horizontally along the coal seam.
  • Figure 8 s ows a schematic plan view of vertical well spacing for gas extraction according to an embodiment of the invention.
  • the vertical portions of the gas wells 10 are spaced 500m apart in the Y direction and 1000m apart in the X direction.
  • Lateral holes 240 are drilled outwardly from the vertical portions of the gas wells 10. As can be seen from the figure, lateral holes 240 on the left sides of the gas wells 10 diverge from each other and then run parallel to each other. Similarly, the lateral holes 240 on the right sides of the gas wells 10 diverge from each other and then run parallel to each other.
  • Such well spacing and lateral hole drilling results in much earlier peak gas production compared to the prior art well placements with the same number of vertical drilling placements.
  • the direction of lateral holes (while they are being drilled) is easier to control over shorter distances (eg 500m compared to 1000m).
  • shorter distances eg 500m compared to 1000m.
  • the lateral holes 240 are drilled outwardly from the vertical well 10.
  • the lateral holes 240 diverge from one another from the vertical well 10 to approximately 70-150m left or right of the vertical well. After this, the lateral holes 240 run parallel for approximately 400m. Having 4 lateral holes 240 reduces the risk of production failure if a single lateral hole 240 fails.
  • FIG 11 there is shown a schematic plan view of a well design for mine degassing according to an embodiment of the invention.
  • vertical wells 10 are drilled down through the longwall 322 that is to be degassed
  • lateral holes 240 are drilled outwardly from the vertical wells 10.
  • the lateral holes extend outwardly in an "X" shaped formation.
  • FIG. 12 With reference to figures 12 and 13 there is shown a schematic plan view of a well design for gas extraction according to an embodiment of the invention.
  • a vertical well 10 (including a gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown).
  • Figure 12 shows 5 lateral holes 240 extending outwardly, spaced over 180° and figure 13 shows 9 lateral holes 240 extending outwardly, spaced over 180 e .
  • a vertical well 10 (including a gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown). Branch lateral holes 242 extend outwardly from the lateral holes 240.
  • the well designs of figures 12-13 can be used near boundaries or geological formations where it may be desirable to have the lateral holes 240 and branch lateral holes 242 extend over a predetermined angle. It will also be appreciated that the well design of figure 14 will require less apertures in the gas well casing (not shown) compared to the well design of figure 13. Typically, forming apertures in a gas well casing is more expensive and time consuming than initiating a branc lateral hole 242 from a lateral hole 240.
  • a vertical well 10 (including a .gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown).
  • the lateral holes 240 extending outwardly, spaced over 360°.
  • Figure 15 shows branch lateral holes 242 extending outwardly from the lateral holes.
  • a schematic plan view of a lateral hole 240 having branched lateral holes 242 according to an embodiment of the invention.
  • the lateral hole 240 extends from a gas well (not shown).
  • Each branched lateral hole 242 extends from the lateral hole 240,
  • the branched lateral holes 24 alternately extend from opposed sides of the lateral hole 240 to form a "herringbone" pattern.

Abstract

A gas well orientation assembly comprising an upper orientation subassembly having a shear pin hole and a lower orientation subassembly having a shear pin hole and adapted to be refeasably secured to the upper orientation subassembly, a shear pin adapted to be inserted into the shear pin hole of the upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembly, wherein one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin, and wherein the upper orientation subassembly is in a predetermined orientation relative to the lower orientation subassembly when secured to the lower orientation subassembly.

Description

TITLE
"ORIENTATION ASSEMBLY"
FIELD OF THE INVENTION
This invention is concerned with an orientation assembly. The invention is concerned particularly, although not exclusively, with a gas well orientation assembly.
BACKGROUND OF THE INVENTION
Coal seam gas (CSG) is gas trapped in underground coal seams. Similarly, unconventional gas can be trapped in shale and sandstone reservoirs and conventional gas can be trapped in sandstone reservoirs. It is desirable to utilise this gas, as gas fired power stations create less greenhouse gas emissions than coal fired power station. In some coal seams, it is also desirable to extract the gas before the seam is mined to prevent excess gas escaping to the atmosphere during the mining phase and to mitigate the risk of fire or explosion.
Typically, to extract the coal seam gas or the unconventional gas, a vertical well is drilled. A surface to inseam lateral hole is then drilled from the surface remote from the vertical well, having a relatively large radius and then running horizontally along the coal seam for a relatively long distance (e.g. 1000m) to intersect the vertical well. Alternatively, the wells are drilled such that they are initially vertical and then turn in a large radius to run horizontally along the coal seam. These wells are typically spaced at set intervals, for example at 500m x 1000m. Gas trapped in the coal seam, shale or sandstone reservoirs then typically permeates into the lateral hole and is extracted via the vertical well.
A problem with existing wells is that the turning of the inseam lateral hole or the well from vertical to horizontal must be carefully controlled so that the horizontal section runs along the coal seam, and in the case of a surface to inseam lateral hole, that the lateral hole also intersects the vertical well.
Any discussion of documents, acts, materials, devices, articles or the like which has been included in the present specification is solely for the purpose of providing a context for the present invention. It is not to be taken as an admission that any or all of these matters form part of the prior art base o were common general knowledge in the field relevant to the present invention as it existed before the priorit date of each ciaim of this application,
OBJECT OF THE INVENTION
it is an object of the invention to overcome or at least alleviate one or more of the above problems and/or provide the consumer with a useful or commercial choice.
Other preferred objects of the present invention will become apparent from the following description.
SUMMARY OF THE INVENTION
In one form, although it need not be the only or indeed the broadest form, the invention resides in a gas well orientation assembly comprising: an upper orientation subassembly; and
a lower orientation subassembly adapted to be releasably secured to the upper orientation subassembly,
wherein the upper orientation subassembly is in a predetermined orientation relative to the lower orientation subassembly when secured to the lower orientation subassembly.
Preferably, one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin. More preferably the upper orientation subassembly has the orientation pin and the lower subassembly has the slot to receive the orientation pin. It will be appreciated that the orientation pin may be of any suitable shape, including substantially rectangular, square, circular and/or the like. Preferably, on of the upper orientation subassembly or the lower subassembly has a shank and the other of the upper orientation subassembly or the lower subassembly has a receiving recess. Preferably, the orientation pin extends from the shank and the slot is formed in the receiving recess. Alternatively, the slot may be formed on the shank and the orientation pin may be formed or located within the receiving recess. An advantage of having the slot formed on the shank is that the slot is easier to access for cleaning purposes. Preferably, the receiving recess is adapted to receive the shank. Preferably, the receiving recess has a tapered opening. Typically the tapered opening aids in locating the shank relative to the receiving recess.
in one embodiment, the upper orientation assembly has the receiving recess and the lower subassembly has the shank. Preferably in this embodiment, the slot is formed on the shank and the orientation pin is located within the receiving recess.
Preferably, the slot is formed such that the orientation pin is initially received in a direction parallel to a longitudinal axis of the receiving recess. Preferably the slot is formed such that the orientation pin moves in a radial direction relative to the longitudinal axis of the receiving recess to secure the upper orientation subassembly to the Sower orientation subassembly. Preferably the slot is "J" shaped, having a longitudinal component and a radial component relative to the longitudinal axis of the receiving recess.
Preferabl the upper orientation subassembly has a shear pin hole. Preferably, the lower orientation subassembly has a shear pin hole. Preferably the shear pin hole of the upper orientation subassembly aligns with the shear pin hole of the lower orientation subassembly when the upper orientation subassembly is in a predetermined orientation relative to the lower orientation subassembly. Preferably the orientation assembly further comprises a shear pin that is adapted to be inserted into the shear pin hole of the upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembly. Preferably the shear pin is adapted to shear when a predetermined force is applied to the upper orientation subassembly relative to the lower orientation subassembly. For example, the shear pin may be adapted to shear when predetermined downward force is applied to the upper orientation subassembly relative to the lower orientation subassembly.
Preferably, the upper orientation subassembly has an upper coupling adapted to be operatively attached to a wedge assembly. Preferably the wedge assembly is a wedge assembly as described in this specification.
Preferably, the lower subassembly has a lower coupling adapted to be operatively attached to an anchor. Preferably, the anchor is secured toward the bottom of a gas well casing. Preferably the gas well casing is a gas well casing as described in this specification. Alternatively, the gas well casing may be a steel gas well casing.
in one embodiment, the wedge assembly comprises a wedge having a deflection face adapted to deflect a casing bit.
Preferably, the deflection face of the wedge is contoured to the shape of the casing bit. Typically, when the wedge is located in a gas well casing, the wedge is adapted to deflect the casing bit into an inner surface of the gas well casing to create an opening in the casing. Preferably the deflection face is set at a predetermined angle relative to the longitudinal axis of the wedge assembly, the longitudinal axis of the wedge assembly being parallel to the longitudinal axis of the gas well casing when the wedge assembly is located in the gas well casing. Preferably the predetermined angle forms an acute angle.
Preferably the wedge is formed from a cylindrical material. More preferably, th wedge is formed from a cylindrical piece of steel. Typically the defiection face is machined into the cylindricaJ material. Preferably the wedge is secured to a wedge casing. More preferably the wedge is welded into a wedge casing. Preferably the wedge casing will have an opening such that the deflection face is open to the gas well casing.
Preferably, the casing bit is a casing mill bit. More preferably, the casing bit is a casing mill bit and reamer assembly. Preferably the casing bit forms an aperture in a portion of the gas well casing that is made from a matenal that is softer than the predominant material used for the gas well casing. Preferably the gas well casing is predominantly made of steel. Preferably the softer materia! is a composite material. Preferably the composite material is a fibreg!ass composite material. Alternatively, the gas well casing may be a steel gas well casing and the casing bit forms an aperture in the steel material of the gas well casing.
Preferably, the wedge assembly further comprises a packer located near a lower end of the wedge. Preferably the packer is adapted to seal a space between the gas well casing and the wedge assembly to prevent drill cuttings from migrating down the gas well casing. Preferably the packer is attached to the wedge casing.
Preferably, the wedge assembly further comprises a spacer operatively attached to a lower end of the wedge. Preferabl the spacer is adapted to position the wedge at a predetermined location within the gas well casing. Typically, different length spacers may be utilised to position the wedge at different predetermined locations within the gas well casing.
Preferably, the wedge assembly further comprises a direction assembly adapted to set the direction of the deflection face relative to the gas well casing. Preferably the direction assembly is provided between the spacer and the wedge. More preferably, the direction assembly is provided between the spacer and the packer. Typically the direction assembly is adapted to rotatably connect the upper part of the wedge assembly with the lower part of the wedge assembly such that once a predetermined direction of the upper part of the wedge assembly is achieved relative to the lower part, the direction assembly can be releasably locked to prevent further rotation.
Preferably, the wedge assembly further comprises a deployment casing adapted to lower the wedge assembly down the gas well casing. Preferably the deployment casing is hollow so that a casing bit can be lowered through the deployment casing and deflected by the deflection face of the wedge. Typically the deployment casing will also acts as a conduit for drilling fluids. Preferably an orientation indicator is provided towards the top of the deployment casing to aid in the orientation or to check the orientation of the wedge assembly. Preferably the orientation indicator is an orientation flange attached to the top of the deployment casing. Preferably the deployment casing has plurality of ports through which hig pressure air is injected. The hig pressure air typically mingles with the drilling fluid returning to the surface to make this fluid lighter.
Preferably, the wedge assembly further comprises a plurality of centralisers adapted to centralise the wedge assembly in the gas well casing. For example, the centralisers may be attached to the deployment casing such that they are positioned between the deployment casing and the gas well casing.
in another embodiment, the gas well casing has at least one portion of material that is softer than the predominant material used for the gas well casing.
Preferably, the gas well casing is predominantly formed of steel. Preferably the softer material is a composite material. Preferably the composite material is a fibreg!ass composite material.
Preferably, each of the at least one portion of softer material is located at a predetermined location where it is desirable to form an aperture in the gas well casing. More preferably, each of the at least one portion of composite material is located at a predetermined location where it is desirable to form an aperture in the gas well casing such that a lateral hole can be drilled outwardly from the gas well casing.
Preferably, each of the at least one portion of softer material may be a tubular section of material. Preferably each of the at least one portion of softer material is disposed between sections of the gas well casing formed of steel. For example, the gas well casing may have a section formed of steel attached to a top part of a tubular section of composite material and another section formed of steel attached to the bottom part of the tubular section of composite material. Preferably, once the gas well casing is in position, a casing bit forms the desired number of apertures through each of the tubular sections of material.
Preferably the gas well casing is a gas well casing used in a gas well for coal seam gas. Alternatively, the gas well casing may be a gas well casing used in gas well for unconventional or conventional gas. Alternatively the gas well casing may be a gas well casing used in a gas well for sequestration of gas or liquids into suitable formations.
In another form, the invention resides in amethod of installing a gas well orientation assembly, the method including the steps of:
providing a gas well orientation assembly having an upper orientation subassembly having a shear pin hole and a lower orientation subassembly having a shear pin hole, and wherein one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin;
inserting the orientation pin in the slot; and
inserting a shear pin into the shear pin hole of the upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembly, reieasably securing the upper orientation subassembly to the lower orientation subassembly.
Preferably the method further comprising the steps of providing a gas well casing and securing the lower orientation subassembly to a bottom portion of the gas well casing.
Preferably, th step of securing the lower orientation subassembly to a bottom portion of the gas well casing involves securing the lower orientation subassembly to an anchor. Preferably the step further involves secu ring the anchor to a bottom portion of the gas well casing. Preferably the anchor is lowered to a bottom portion of the gas well casing using the gas well orientation assembly and is secured to the gas well casing.
Preferably, the method includes the step of orienting the gas well orientation assembly in a predetermined orientation relative to the gas well casing. Preferably the anchor is secured to a bottom portion of the gas well casing once the gas well orientation assembly is oriented in a predetermined orientation relative to the gas well casing. Preferably, the method includes the step of shearing the shear pin. Preferably the step of shearing the shear pin is performed after the lower orientation subassembly is secured to a bottom portion of the gas well casing.
Preferably, the gas well orientation assembly is a gas well orientation assembly as described in this specification
Preferably, the gas well casing is a gas well casing as described in this specification. Alternatively, the gas well casing may be a steel gas well casing.
in another embodiment, the method includes the step of forming a gas well casing. Preferably th ste of forming a gas well casing includes the step of providing at least one portion of material that is softer than the predominant material used for the gas well casing. Preferably the gas well casing is predominantly made of steel. Preferably the softer material is a composite material, Preferably the composite material is a fibregiass composite material. Preferably, the step of providing at least one portion of material that is softer than the predominant material used for the gas well casing involves each of the at least one portion of softer material being a tubular section of material, and each of the tubular sections of materia! being disposed between steel gas well casing sections.
Preferably, the method includes the ste of locating the gas well casing in a well. Preferably the well is a gas well for coal seam gas. Alternatively, the well may be a gas well for unconventional or conventional gas. Alternatively the well may be a gas well for sequestration of gas or liquids into suitable formations. Preferably the method further includes the step of forming at least one aperture through each of the at least one portion of softer material. Preferably the step of forming at least one aperture through each of the at least one portion of softer material involves using a wedge assembly to deflect a casing bit into each of the at least one portion of softer material. Preferably the wedge assembly has a deflection face to deflect the casing bit. Alternatively, the wedge assembly may be a wedge assembly as described in this specification.
In one embodiment, the method includes the step of forming an aperture in the gas well casing. Preferably the step further includes th steps of locating a wedge assembly within the gas well casing, providing a casing bit, and deflecting the casing bit with the wedge assembly, such that the casing bit forms an aperture in the gas well casing.
Preferably the step of deflecting the casing bit with the wedge assembly, such that the casing bit forms an aperture in the gas well casing involves deflecting the casing bit such that it contacts an inner surface of the gas well casing. Preferably the step further includes milling the gas well casing with the casing bit such that an aperture is formed from the inner surface of the gas well casing to an outer surface of the gas well casing. It will be appreciated that in this context, milling can include drilling. Preferably a deflection face of the wedge assembly deflects the casing bit.
Preferably the step of locating a wedge assembly within the gas well casing involves spacing the wedge assembly from the bottom of the gas well casing using a spacer. Preferably the step further includes releasabiy securing the spacer relative to the bottom of the gas well casing. Preferably the step further includes using a direction assembly to set a predetermined radial direction of the wedge assembly relative to the gas well casing.
Preferably the step of locating a wedge assembly within the gas well casing involves lowering the wedge assembly using a deployment casing.
Preferably the method includes the step of using a packer to seal an upper part of the wedge assembly from the gas well casing below to prevent drill cuttings from the forming of the aperture from migrating down the gas well casing.
Preferably the method includes the step of providing the gas well casing with portions of material that is softer than the predominant material used for the gas well casing in the areas where an aperture is to be formed. Preferably the gas well casing is predominantly made of steel. Preferably the softer material is a composite material. Preferably the composite material is a fibreglass composite material. Alte natively, the method may include the step of providing a steel gas well casing.
In a further embodiment, the method includes the step of forming a gas well. Preferabl the step further includes the steps of providing a gas well casing in a well. Preferably the well is a vertical well
Preferably the method includes the step of drilling a pluralit of lateral holes outwardly from the gas well casing. Preferably the plurality of lateral holes extend outwardly from at least one aperture in the gas well casing. More preferably the method includes forming at least one aperture in the gas well casing and then drilling a plurality of lateral holes outwardly from the gas well casing, the plurality of lateral holes extending from the at least one aperture in the gas well casing.
Preferably, the method includes the step of drilling at least one branch lateral hole outwardly from at least one of the plurality of lateral holes, A benefit of this is that only one aperture may to be formed for a single lateral hole extending outwardly from the gas well casing and having at least one branch lateral hole extending from the lateral hole (i.e. no additional aperture needs to be formed in the gas well casing for the at least one branch lateral hole).
Preferably the plurality of lateral holes extend outwardly from the gas well casing spaced over 360° when viewed in plan view. Alternatively, the plurality of lateral holes may extend outwardly from the gas well casing spaced over substantially 180° or 90° when viewed in plan view. Having the plurality of lateral holes extend outwardly from the gas well casing spaced over substantially 180° or 90° when viewed in plan view may be beneficial when the gas well casing is located near a boundary. It will be appreciated that the plurality of lateral holes may extend outwardly from the gas well casing spaced over a predetermined angle depending on other factors such as geological formations
Preferably, the step of providing a gas well casing in a well involves forming the well. Preferably the step further includes lowering the gas well casing in the well.
Preferably, the step of forming a plurality of lateral holes outwardly from the gas well casing includes the step of forming apertures in the gas well casing at predetermined locations. Preferably the step of forming apertures in the gas well casing at predetermined locations involves deflecting a casing bit into an inner surface of the gas well casing using a wedge assembly. Preferably the step of forming apertures in the gas well casing at predetermined locations involves forming apertures through portions of the gas well casing that are formed of material that is softer than the predominant material used for the gas well casing. Preferably the softer material is a composite material. Preferably the composite material is a fibreglass composite material.
Preferably the step of forming a pluralit of lateral holes outwardl from the gas well casing involves drilling a plurality of lateral holes such that they diverge from one another. Preferably, the step of forming a plurality of lateral holes outwardly f om the gas well casing involves drilling a plurality of lateral holes such that each hole runs substantially parallel to at least one other lateral hole. More preferably, the step of forming a plurality of lateral holes outwardly from the gas well casing involves drilling a plurality of lateral holes such that they initially diverge from one another and then run substantially parallel to at least one other lateral hole.
Preferably the step of forming a plurality of lateral holes outwardly from the gas well casing involves drilling a plurality of lateral holes initially in a downwards direction relative to the gas well casing and then transitioning to a direction that is transverse to the gas well casing. Preferably the transverse direction is substantially orthogonal to the gas well casing. Preferably the transition has a radius in the range of 20 to 40 meters. More preferably the transition has a radius in the range of 25 to 35 meters. Even more preferably, the transition has a radius of approximately 30 meters.
Preferably, the gas well casing is a gas well casing as described in this specification. Alternatively, the gas well casing may be a steel gas well casing.
BRIEF DESCRIPTION OP THE DRAWINGS
To assist in understanding the invention and to enable a person skilled in the art to put the invention into practical effect, preferred embodiments of the invention will be described by way of example only with reference to the accompanying drawings, wherein:
FIG 1 shows a schematic sectioned view of a wedge assembly located in a gas well casing; FIG 2 shows a schematic cross sectional view of part of a wedge assembly;
FIG 3 shows a schematic cross sectional view of a wedge assembly located in a gas well casing;
FIG 4 shows a schematic perspective view of a gas well according to an embodiment of the invention;
FIG 5 shows a schematic cross sectional view of a gas well;
FIG 6 shows a schematic cross sectional view of an orientation assembly;
FIG 7 shows a plan view of prior art vertical well spacing for gas extraction;
FIG 8 shows a schematic plan view of vertical well spacing for gas extraction according to an embodiment of the invention;
FIG 9 shows a schematic plan view of a. well design for gas extraction according to an embodiment of the invention;
FIG 10 shows a plan view of a well design for gas extraction according to an embodiment of the invention;
FI 1 1 shows a schematic plan view of a well design for mine degassing according to an embodiment of the invention;
FIG 12 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention;
FIG 13 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention;
FIG 14 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention;
FIG 15 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention;
FIG 16 shows a schematic plan view of a well design for gas extraction according to an embodiment of the invention; and
FIG 17 shows a schematic plan view of a lateral hole having branched lateral holes according to an embodiment of the invention.
DETAILED DESCRIPTION OF THE DRAWINGS
Figure 1 shows a schematic sectioned view of a wedge assembly 100 located in a gas well casing 200. The wedge assembly 100 ha a wedge 102 having a deflection face 104. The deflection face 104 is adapted to deflect a casing bit (not shown) such that the casing bit can form an aperture 224 in the gas well casing 200. The gas well casing 200 has a 7" (approx. 178mm) external diameter.
The wedge assembly 100 has packer 112 located near a lower end of the wedge 102. The packer 112 isolates and seals the upper part of the wedge assembly 100 from the gas well casing 200 below to prevent drill cuttings (not shown) from the forming of the aperture 224 from migrating down the gas well casing 200.
The wedge assembly 100 has a direction assembly 114 that can set the direction of the defiection face 104 relative to a spacer. The direction of the deflection face 104 is set by rotating part of the direction assembly 1 14 relative to a spacer 1 16 and locking the direction assembly 1 14 in position once the deflection face 104 is facing the desired direction, !t will be appreciated that changing the direction of the defiection face 104 will change the radial location of where the casing bit (not shown) would form an aperture in the gas well casing 200,
The spacer 1 16 is connected to a lower part of the direction assembly 1 14, The length of the spacer 1 16 determines the vertical location of the deflection face 104 in the gas well casing, as the spacer 1 16 is releasably secured relative to the bottom of the gas well casing 200. It will be appreciated that using different length spacers will change the vertical location of where the casing bit (not shown) would form an aperture in the gas well casing 200. The spacer 1 16 is made from one or more lengths of 5,5" (approx 1 0mm) diameter casing. It will also be appreciated that in an alternative embodiment (not shown), the spacer may also be drill pipe or drill collars.
The spacer 1 16 is radially oriented and releasably secured relative to the bottom of the gas well casing 200 by an orientation assembly 400. The orientation assembly 400 has an upper orientation subassembly 420 attached to the spacer 1 1 6 and a lower orientation subassembly 440 attached to a mechanical set anchor 260 near the bottom of the gas well casing 200. The orientation assembly 400 will be expiained in more detail beiow with reference to figure 6.
The wedge assembly 100 has a deployment casing 1 18 extending from the top end of the wedge 102 to the surface 310 when the wedge assembly 100 is located in the gas well casing 200. The deployment casing 118 is used to lower the wedge assembly 100 into the gas well casing 200, The deployment casing 1 18 is hollow so that a casing bit (not shown) can be lowered through the deployment casing 118 and deflected by the deflection face 104 of the wedge 102. The deployment casing 1 18 also acts as a conduit for drilling fluids (not shown) used in drilling lateral holes such as lateral hole 240. It will be appreciated that a different length deployment casing 118 may be used if the length of the spacer 116 is changed. The deployment casing 1 18 is made from one or more lengths of 5.5" (approx 140mm) diameter casing that has an internal diameter of 5" (approx. 127mm).
The deployment casing 1 18 has ports 120 located at a predetermined depths. High pressure air is injected through these ports1 0 to mingle with the drilling fluid that is returning to the surface to make this fluid lighter and to control the hydrostatic pressure. The hydrostatic pressure can also be adjusted by the number, size and location (e.g. depth) of ports 120.
An orientation flange 122 is located at the top of the deployment casing 118 to orientate or check the orientation of the deflection face 104. The wedge assembly 100 has centralisers 1 4 located above and below the wedge 102 to ensure that the wedge assembly 100 is held rigidly and centrally within the gas well casing 200.
The gas well casing 200 has a steel casing 210 and a section of composite casing in the form of a fibreglass casing 220 in the area where the aperture 224 is to be formed. An advantage of this is that a casing bit (not shown) does not have to drill through the steel casing 210. Figure 1 schematically shows the fibreglass casing 220, it will be appreciated that the fibreglass casing 220 can be flush with the outside surface of the steel casing 210. It will also be appreciated that the section of composite casing can be a tubular section disposed between two sections of steel casing. The gas well casing 200 has perforations 230 that are positioned adjacent the coal seam 320 to assist in the extraction of gas from the coal seam 320. ft will be appreciated that in an alternate embodiment (not shown) the perforations 230 ma be omitted, to for example prevent possible ingress of coal fines from a coal seam.
Once the aperture 224 has been formed, a lateral hole 240 is drilled that follows the coal seam 320.
With reference to figure 2, there is shown part of the wedge assembly 100 in more detail. The wedge 102 is made from a piece of steel having an external diameter of 5" (approx. 127mm). The wedge 102 is welded into a wedge casing 106. The wedge casing 106 is made from a length of 5.5" (approx T40mm) diameter casing that has an internal diameter of 5" (approx. 127mm).
The wedge casing 106 has an opening formed that corresponds to the deflection face 104 of the wedge 102. The deflection face 104 has a concave shape (not shown) to suit a casing bit having a 4.75" (approx. 121 mm) external diameter.
An upper coupling 108 is located at the upper end of the wedge casing 106. The upper coupling 108 is a 5.5" BTC Coupling. The upper coupling 108 connects the wedge casing 106 to the deployment casing (1 18 as seen in figure 1 ). A lower coupling 1 10 is located at the lower end of the wedge casing 106. The lower coupling 1 10 connects the wedge casing 106 to the packer (1 12 as seen in figure 1 ).
Figure 3 shows a schematic cross sectional view of part of a wedge assembly 100 located in a gas well casing 200. The spacer 1 16 is of a predetermined length and the direction assembly 1 14 is set to a predetermined angle such that the deflection face 104 of the wedge 102 is orientated to deflect a casing bit (not shown) into the top right aperture 224 and lateral hole 240. The Packer 1 12 prevents excess drill cuttings from migrating to the gas well casing 200 below.
As can be seen in figure 3, the upper apertures 224 and lateral holes
240 are staggered to avoid excess weakening of the gas well casing 200.
With reference to figures 4 and 5, there is shown schematic views of a gas well 10 according to an embodiment of the invention, Figure 4 shows a schematic perspective view and Figure 5 shows a schematic cross sectional view. The gas well 10 has a well head 12 attached to the top of the gas well casing 200 near the surface 310. Lateral drill holes 240 are drilled outwards from apertures 224 in the gas well casing 200. The lateral drill holes 240 initially have a "short" radius of approximately 30 meters and then follow the coal seams 320. A production string 14 is located in the gas well casing 200 and a progressive cavity pump 16 is located at the bottom of the production string.
With reference to figure 6, there is shown a schematic cross sectional view of an orientation assembly 400. The orientation assembly 400 has an upper orientation subassembly 420 that can be re!easably secured to a iower orientation subassembly 440.
The upper orientation subassembly 420 has an upper coupling 424 that connects to a spacer (1 16 as seen in figure 1 ). The upper orientation subassembly 420 has a shank 426 that can be received by a receiving recess 442 of the lower orientation subassembly 440. The shank 426 has a shear pin hole 428 to receive a shear pin (not shown) which can secure the upper orientation subassembly 420 to the Iower orientation subassembly 440. The shank 426 also has an orientation pin 422, which can be received into a "J" slot 444 in the receiving recess 442 of the lower orientation subassembly 440. The orientation pin 422 and the slot 444 ensure that the upper orientation subassembly 420 can only be received by the lower orientation subassembly 440 in a predetermined orientation.
The lower orientation subassembly 440 has a tapering opening 446 to assist in guiding the shank 426 of the upper orientation subassembly 420 into the receiving recess 442. The lower orientation subassembly 440 has a shear pin hole 448, which aligns with the shear pin hole 428 of the upper orientation subassembly 420 when the orientation pin 422 is located in the bottom left part of the "J" slot 444. The lower orientation subassembly has a lower coupling 450 that secures to a packer or a mechanical set anchor (260 as seen in figure T) secured to a bottom section of the gas well casing (200 as seen in figure 1 ). The packer or mechanical set anchor (not shown) is usually secured in the bottom of the gas well casing (not shown) by rotation or a downward force.
In use, the shank 426 of the upper orientation subassembly 420 is inserted into the receiving recess 442 of the lower orientation subassembly 440 such that the orientation pin 422 slides to the bottom of the "J" slot, the upper orientation subassembly 420 is then rotated relative to the lower orientation subassembl such that the orientation pin is located at the left end of the "J" slot 444. In this position, the shear pin holes 428 and 448 align and a shear pin (not shown) can be inserted into the holes 428,448 to secure the upper orientation subassembly 420 to the lower orientation subassembly 440. The lower orientation subassembly 440 is connected to an anchor (not shown), the wedge assembly (1005 see figure 1 } is then lowered into a gas well casing (not shown). Once the wedge assembly is oriented correctly, the anchor (not shown) is set. The shear pin (not shown) can then be sheared by providing the upper orientation subassembly 420 with a downward force relative to the lower orientation subassembly 440. The upper orientation subassembly 420 can then be rotated relative to the lower orientation subassembly 440 such that the orientation pin 422 is in line with the vertical part of the "J" slot 444. The upper orientation subassembly 420 can then be removed from the lower orientation subassembly 440. The lower orientation subassembly 440 remains at the bottom of the gas well casing (not shown) to act as an orientation reference point. If a lateral hole (not shown) should fail, the lower orientation subassembly 440 can be used as a reference point to orient the wedge assembly (100, see figure 1 ) such that the lateral hole (not shown) can be re-drilled.
With reference to figure 7, there is shown a plan view of prior art vertical well spacing for gas extraction. The vertical wells 500 are spaced 500m apart in the Y direction and 1000m apart in the X direction. The vertical wells 500 have a horizontal component 510 that runs for approximatel 1000m along a coal seam. The horizontal component 510 is either a surface to inseam lateral hole that is drilled from the surface, remote from the vertical well 500, to intersect the vertical well 500, or, alternatively, the horizontal component 500 is a single continuation of the vertical well 500 which turns a large radius to continue horizontally along the coal seam.
Figure 8 s ows a schematic plan view of vertical well spacing for gas extraction according to an embodiment of the invention. The vertical portions of the gas wells 10 are spaced 500m apart in the Y direction and 1000m apart in the X direction. Lateral holes 240 are drilled outwardly from the vertical portions of the gas wells 10. As can be seen from the figure, lateral holes 240 on the left sides of the gas wells 10 diverge from each other and then run parallel to each other. Similarly, the lateral holes 240 on the right sides of the gas wells 10 diverge from each other and then run parallel to each other. Such well spacing and lateral hole drilling results in much earlier peak gas production compared to the prior art well placements with the same number of vertical drilling placements. Additionally, the direction of lateral holes (while they are being drilled) is easier to control over shorter distances (eg 500m compared to 1000m). The risk of not intersecting a vertical well, which is present when drilling a surface to inseam lateral hole that intersect the vertical well is also eliminated.
With reference to figures 9 and 10, there is shown a more detailed plan view of a well design for gas extraction according to an embodiment of the invention. The lateral holes 240 are drilled outwardly from the vertical well 10. The lateral holes 240 diverge from one another from the vertical well 10 to approximately 70-150m left or right of the vertical well. After this, the lateral holes 240 run parallel for approximately 400m. Having 4 lateral holes 240 reduces the risk of production failure if a single lateral hole 240 fails.
With reference to figure 11 , there is shown a schematic plan view of a well design for mine degassing according to an embodiment of the invention. In this embodiment, vertical wells 10 are drilled down through the longwall 322 that is to be degassed, lateral holes 240 are drilled outwardly from the vertical wells 10. The lateral holes extend outwardly in an "X" shaped formation.
With reference to figures 12 and 13 there is shown a schematic plan view of a well design for gas extraction according to an embodiment of the invention. A vertical well 10 (including a gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown). Figure 12 shows 5 lateral holes 240 extending outwardly, spaced over 180° and figure 13 shows 9 lateral holes 240 extending outwardly, spaced over 180e.
With reference to figure 14, there is shown a schematic plan view of a well design for gas extraction according to an embodiment of the invention. A vertical well 10 (including a gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown). Branch lateral holes 242 extend outwardly from the lateral holes 240.
It will be appreciated that the well designs of figures 12-13 can be used near boundaries or geological formations where it may be desirable to have the lateral holes 240 and branch lateral holes 242 extend over a predetermined angle. It will also be appreciated that the well design of figure 14 will require less apertures in the gas well casing (not shown) compared to the well design of figure 13. Typically, forming apertures in a gas well casing is more expensive and time consuming than initiating a branc lateral hole 242 from a lateral hole 240.
With reference to figures 15 and 16 there is shown a schematic plan vie of a well design for gas extraction according to an embodiment of the invention. A vertical well 10 (including a .gas well casing) has lateral holes 240 extending from apertures in the gas well casing (not shown). The lateral holes 240 extending outwardly, spaced over 360°. Figure 15 shows branch lateral holes 242 extending outwardly from the lateral holes.
With reference to figur 1 there is shown a schematic plan view of a lateral hole 240 having branched lateral holes 242 according to an embodiment of the invention. The lateral hole 240 extends from a gas well (not shown). Each branched lateral hole 242 extends from the lateral hole 240, The branched lateral holes 24 alternately extend from opposed sides of the lateral hole 240 to form a "herringbone" pattern.
Throughout the specification the aim has been to describe the invention without limiting the invention to any one embodiment or specific collection of features. Persons skilled in the relevant art may realize variations from the specific embodiments that will nonetheless fall within the scope of the invention. For example, individual features from one embodiment may be combined with another embodiment. it will be appreciated that various other changes and modifications may be made to the embodiment described without departing from the spirit and scope of the invention.
Throughout this specification the word "comprise", or variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated element, integer or step, or group of elements,, integers or steps, but not the exclusion of an other element, integer or step, or group of elements, integers or steps.

Claims

1 . A gas well orientation assembly comprising:
an upper orientation subassembly having a shear pin hole; and a lower orientation subassembly having a shear pin hole and adapted to be releasably secured to the upper orientation subassembly;
a shear pin adapted to be inserted into the shear pin hole of t e upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembiy
wherein one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin, and wherein the upper orientation subassembly is in a predetermined orientation relative to the lower orientation subassembly when secured to the lower orientation subassembiy.
2. A gas well orientation assembly as claimed in claim 1 , wherein one of the upper orientation subassembly or the lower subassembly has a shank and the other of the upper orientation subassembly or the lower subassembly has a receiving recess adapted to receive the shank.
3. A gas well orientation assembiy as claimed in claim 2, wherein the orientation pin extends from the shank and the slot is formed in the receiving recess.
4. A gas well orientation assembly as claimed in claim 2, wherein the slot is formed on the shank and the orientation pin is located within the receiving recess.
5. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the upper orientation subassembly has the orientation pin and the lower orientation subassembly has the slot.
6. A gas well orientation assembly as claimed in any one of claims 1 to 4, wherein the lower orientation subassembly has the orientation pin and the upper orientation subassembly has the slot.
7. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the slot is formed such that the orientation pin is initially received in a direction parallel to a longitudinal axis of the receiving recess and then moves in a radial direction relative to the longitudinal axis of the receiving recess to secure the upper orientation subassembly to the lower orientation subassembly.
8. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the shear pin is adapted to shear when a predetermined force is applied to the upper orientation subassembly relative to the lower orientation subassembly.
9. A gas well orientation assembly as claimed in claim 8, wherein the shear pin is adapted to shear when a predetermined downward force is applied to the u per orientation subassembly relative to the lower orientation subassembly.
10. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the upper orientation subassembly has an upper coupling adapted to be operativefy attached to a wedge assembly.
11. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the lower subassembly has a lower coupling adapted to be operattveiy attached to an anchor secured towards a bottom of a gas well casing,
12. A gas well orientation assembly as claimed in any one of the preceding claims, wherein the orientation pin has a substantially rectangular shape.
13. A method of installing a gas well onentation assembly, the method including the steps of:
providing a gas well orientation assembly having an upper orientation subassembly having a shear pin hole and a lower orientation subassembly having a shear pin hole, and wherein one of the upper orientation subassembly or the lower subassembly has an orientation pin and the other of the upper orientation subassembly or the lower subassembly has a slot to receive the orientation pin;
inserting the orientation pin in the slot; and
inserting a shear pin into the shear pin hole of the upper orientation subassembly and the shear pin hole of the lower orientation subassembly when aligned to secure the upper orientation subassembly to the lower orientation subassembly, releasably securing the upper orientation subassembly to the lower orientation subassembly.
14. A method as claimed in claim 13, further comprising the steps of providing a gas well casing; and
securing the lower orientation subassembly to a bottom portion of the gas well casing.
15. A method as claimed in claim 14, wherein the step of securing the lower orientation subassembly to a bottom portion of the gas well casing involves securing the lower orientation subassembly to an anchor.
16. A method as claimed in claim 15, wherein the step further involves securing the anchor to a bottom portion of the gas well casing.
17. A method as claimed in claim 16, further including the step of lowering the anchor to the bottom portion of the gas well using the gas well orientation assembly.
18. A method as claimed in claim 17, further including the ste of orienting the gas well orientation assembly in a predetermined orientation relative to the gas well casing.
19. A method as claimed in any one of claims 14 to 185 further including the step of shearing the shear pin after the lower orientation subassembly is secured to the bottom portion of the gas well casing.
PCT/AU2014/050277 2013-10-09 2014-10-09 Orientation assembly WO2015051416A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2013903886A AU2013903886A0 (en) 2013-10-09 Orientation assembly
AU2013903886 2013-10-09

Publications (1)

Publication Number Publication Date
WO2015051416A1 true WO2015051416A1 (en) 2015-04-16

Family

ID=52812368

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2014/050277 WO2015051416A1 (en) 2013-10-09 2014-10-09 Orientation assembly

Country Status (1)

Country Link
WO (1) WO2015051416A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10786594B2 (en) 2016-04-08 2020-09-29 H.B. Fuller Company High cohesive strength polyolefin construction adhesive

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5439051A (en) * 1994-01-26 1995-08-08 Baker Hughes Incorporated Lateral connector receptacle
US5806600A (en) * 1996-01-24 1998-09-15 Halford, Sr.; Hubert E. Whipstock system
US6073691A (en) * 1998-03-11 2000-06-13 Halliburton Energy Services, Inc. Torque resistant retrievable whipstock
US6564871B1 (en) * 1999-04-30 2003-05-20 Smith International, Inc. High pressure permanent packer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5439051A (en) * 1994-01-26 1995-08-08 Baker Hughes Incorporated Lateral connector receptacle
US5806600A (en) * 1996-01-24 1998-09-15 Halford, Sr.; Hubert E. Whipstock system
US6073691A (en) * 1998-03-11 2000-06-13 Halliburton Energy Services, Inc. Torque resistant retrievable whipstock
US6564871B1 (en) * 1999-04-30 2003-05-20 Smith International, Inc. High pressure permanent packer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10786594B2 (en) 2016-04-08 2020-09-29 H.B. Fuller Company High cohesive strength polyolefin construction adhesive

Similar Documents

Publication Publication Date Title
USRE40067E1 (en) Downhole equipment tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes
CA2614569C (en) Method of increasing reservoir permeability
EP0996812B1 (en) Deformed multiple well template and process of use
CN102852490A (en) High gas suction and discharge process method for complex well
CN102086774A (en) Drainage method of gas in coal bed
CN104405281B (en) One crosses goaf casing drilling process
CA2464105A1 (en) An entry well with slanted well bores and method
AU2002349947A1 (en) An entry well with slanted well bores and method
GB2514075A (en) High pressure large bore well conduit system
CN107387082A (en) A kind of method for weakening coal seam tight roof
PL200785B1 (en) Method and system for enhanced access to a subterranean zone
CN108756884A (en) Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN111058819B (en) Method for covering hard top plate on hydraulic fracturing treatment working face
CN104196453A (en) Coalbed methane development well
CN104265357B (en) Anti-burst method is taken out in a kind of strong prominent coal seam in advance
WO2015051416A1 (en) Orientation assembly
CN103266913B (en) A kind of gas pumping method
EP2447465B1 (en) System and method for opening a window in a casing string for multilateral wellbore construction
WO2015051417A1 (en) Drilling method
WO2015051414A1 (en) A wedge assembly and method
WO2015051415A1 (en) A gas well casing and method
CN108798625A (en) Mine and mining construction method
CN109209274B (en) Double-layer casing directional perforation auxiliary windowing method
CN102227541B (en) Self-stabilized and anti-whirl drill bits and bottom-hole assemblies and systems for using same
RU2616016C1 (en) Recovery method for solid carbonate reservoirs

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14853043

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14853043

Country of ref document: EP

Kind code of ref document: A1