WO2014197930A1 - A train loading system - Google Patents
A train loading system Download PDFInfo
- Publication number
- WO2014197930A1 WO2014197930A1 PCT/AU2014/000604 AU2014000604W WO2014197930A1 WO 2014197930 A1 WO2014197930 A1 WO 2014197930A1 AU 2014000604 W AU2014000604 W AU 2014000604W WO 2014197930 A1 WO2014197930 A1 WO 2014197930A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- mass
- car
- bin
- train
- loaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/02—Loading or unloading land vehicles
- B65G67/04—Loading land vehicles
- B65G67/22—Loading moving vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/02—Loading or unloading land vehicles
- B65G67/04—Loading land vehicles
- B65G67/06—Feeding articles or materials from bunkers or tunnels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G11/00—Apparatus for weighing a continuous stream of material during flow; Conveyor belt weighers
- G01G11/003—Details; specially adapted accessories
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G13/00—Weighing apparatus with automatic feed or discharge for weighing-out batches of material
- G01G13/02—Means for automatically loading weigh pans or other receptacles, e.g. disposable containers, under control of the weighing mechanism
- G01G13/04—Means for automatically loading weigh pans or other receptacles, e.g. disposable containers, under control of the weighing mechanism involving dribble-feed means controlled by the weighing mechanism to top up the receptacle to the target weight
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G13/00—Weighing apparatus with automatic feed or discharge for weighing-out batches of material
- G01G13/24—Weighing mechanism control arrangements for automatic feed or discharge
- G01G13/28—Weighing mechanism control arrangements for automatic feed or discharge involving variation of an electrical variable which is used to control loading or discharge of the receptacle
- G01G13/295—Weighing mechanism control arrangements for automatic feed or discharge involving variation of an electrical variable which is used to control loading or discharge of the receptacle for controlling automatic loading of the receptacle
- G01G13/2957—Arrangements for compensating for material suspended at cut-off, i.e. for material which is still falling from the feeder when the weigher stops the feeder
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/02—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles
- G01G19/04—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles for weighing railway vehicles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G23/00—Auxiliary devices for weighing apparatus
- G01G23/18—Indicating devices, e.g. for remote indication; Recording devices; Scales, e.g. graduated
Definitions
- the cars of such trains have an associated overload mass limit that for safety reasons should not be exceeded, and train loadout operators are typically responsible for ensuring that the mass of each train car is below the overload limit.
- each car mass is below the overload mass limit is not simple because the material tends to be loaded into the cars at high speed, and the density of the material loaded into the cars is variable.
- each car is typically weighed when the car has moved away from the material flow, for example 4 car lengths away. As a consequence, the mass of material in a car can vary significantly and a car overload situation may not be detected until several more cars have been filled.
- a mine operation means any operation or facility associated with extracting, handling, processing and/or transporting bulk commodities in a resource extraction environment or part of such a process, for example mine sites, rail facilities, port facilities, and associated
- a train loading system for loading material onto cars of a train, the system
- a material bin arranged to receive material to be loaded onto the train
- a closure device arranged to facilitate control by an operator of the amount of material loaded into each car from the material bin;
- a car mass estimator arranged to estimate the mass of material loaded into each car
- a display arranged to communicate to the operator the estimated mass of material loaded into each car.
- the closure device is arranged so as to facilitate closing of the closure device in response to operator control.
- the closure device is arranged so as to facilitate opening of the closure device in response to operator control.
- the car mass estimator is arranged to estimate the mass of material loaded into the material bin, to estimate a change in mass of the material bin and to use the estimate of the mass of material loaded into the material bin and the estimate of the change in mass of the material bin to calculate an estimated car mass value indicative of an estimate of the material loaded into a car .
- the tram loading system includes a conveyor arranged to transport material to the material bin, and the car mass estimator includes a weightometer associated with the conveyor and arranged to measure the mass of material on the conveyor as the material passes over the weightometer.
- the car mass estimator is arranged to apply a delay to each weightometer measurement and to use the delayed
- the system includes at least one bin level sensor arranged to pro ⁇ uce bin mass data indicative of a change in bin mass, and the system is arranged to process the bin mass data so as to reduce noise.
- the system includes a car weigher arranged to measure the mass of a loaded car, and the system is arranged to display measured car mass values on the display. In an embodiment, the system is arranged to calculate a variability value indicative of the variability of the measured car mass values and/or the estimated car mass values.
- the variability value may be a standard deviation value .
- the system is arranged to use a desired probability value indicative of the probability of occurrence of a car overload and the variability value to calculate an aim set point mass indicative of a target car mass .
- the system is arranged to display the aim set point mass on the display.
- the system is arranged to calculate a reliability value indicative of the degree of correlation between estimated car mass values and corresponding measured car mass values, and to display information indicative of the reliability value on the display.
- system is arranged to automatically open and close the closure device in synchronization with movement of a train.
- the system comprises an overload
- controller arranged to monitor the estimated car mass as the car is loaded with material and to automatically close the closure device when an estimated car mass value reaches a defined overload car mass.
- a method of loading a train at a mine operation including:
- Figure 1 is a diagrammatic representation of a train loading facility including a train loading system
- Figure 2 shows plots illustrating a first example of loading performance of a conventional train loading facility
- Figure 3 shows plots illustrating a second example of loading performance of a conventional train loading facility
- Figure 4 is a block diagram of a train loading system according to an embodiment of the present invention.
- FIG. 5 is a block diagram illustrating functional components implemented by the train loading system shown in Figure 4;
- Figure 6 is a representation of a display showing train loading information for use by an operator during a train car loading operation
- Figure 7 is a block diagram of a car mass estimator of the train loading system shown in Figure 4;
- Figure 8 is a block diagram illustrating a car mass calculation algorithm used by the car mass estimator shown in Figure 7 ;
- Figure 9 shows a plot of measured car mass during car loading that is used by an overload controller to control deactivation of material flow during car loading
- Figure 10 shows plots of measured car mass relative to a car mass overload limit during loading of several train cars
- Figure 11 is a flow diagram illustrating a method of loading a train in accordance with an embodiment of the present invention.
- Figure 12 is a flow diagram illustrating a method of assisting an operator to load a train car as part of the method shown in Figure 11.
- the train loading facility 10 includes a train loading system 11 arranged to load a train 12 with material, in this example ore derived from one or more mine sites.
- Each train 12 includes a plurality of cars 14 and at least one, and typically three (3), locomotives 16. Material to be disposed in the cars 14 is transported to the train loading facility 10 using a conveyor 18 that delivers the material to a material bin 20.
- the material bin 20 is of a type arranged to hold about 2000 tonnes, although it will be understood that other types of material bin are possible.
- the bin 20 is associated with a closure device, in this example in the form of a clam 22, that is controllable using a closure control device 24.
- the closure control device 24 is arranged to automatically open the clam 22 when a car 14 arrives under the clam 22, and to automatically close the clam 22 before the car moves away from the clam 22.
- the closure control device 24 in this example uses signals from train location sensors 33 to synchronise opening and closing of the clam 22 with movement of the train 12.
- the closure control device 24 is also arranged such that the amount of
- material delivered to a car 14 is manually adjustable by an operator by enabling the operator to open or close the clam 22 early, or override automatic opening of the clam 22 in response to the position of the car and allow the operator to open or close the clam late, that is, after the clam 22 is intended to automatically open or close in response to the position of the car determined by the train location sensors 33.
- the train loading system 11 also includes a dust filter 26, a moisture analyser 34 and a car weigher 28 arranged to weigh each train car 14 as the train car 14 passes.
- the car weigher 28 is disposed a sufficient distance away from the bin 20 so as to avoid undue interference caused by material loading, in this example a distance equivalent to 4 cars away from the bin 20.
- the train loading system 11 also includes a weightometer 30 arranged to weigh material on the conveyor 18 as the material is transported on the conveyor 18 to the bin 20.
- the weightometer 30 produces a mass value indicative of the mass flow rate of material that passes over the weightometer 30.
- the train loading system 11 also includes at least one bin mass sensor 32, in this example arranged to measure a change in mass of the bin 20 as a result of differences between the mass of material flowing into the bin 20 and material flowing out of the bin 20. Using the mass value produced by the weightometer 30, the speed of the conveyor 18, and a mass change value produced by the bin mass sensor (s) 32, the train loading system 11 calculates an estimated mass value indicative of an estimate of the mass of material that has been loaded into each car 14 and stores the estimated mass values.
- bin mass sensor 32 in this example arranged to measure a change in mass of the bin 20 as a result of differences between the mass of material flowing into the bin 20 and material flowing out of the bin 20.
- a train arrives at a train loading facility and a clam associated with a loading bin opens as a train car arrives under the clam to commence loading. The train then continues to move slowly relative to the clam until an end of the car is disposed under the clam. When this occurs, the clam automatically closes.
- a car weigher is provided at least 4 cars ahead to weigh the loaded car.
- the operator is able to modify the amount of material in the car by causing the clam 22 to open before the clam 22 is set to automatically open in response to the position of the car, and/or by closing the clam 22 before the clam 22 is automatically closed in response to the position of the car 14.
- the operator may also be able to override automatic operation of the clam by opening the clam 22 after the clam is intended to automatically open in response to the position of the car 14, and/or closing the clam 22 after the clam is intended to automatically close in response to the position of the car 14.
- FIG. 2 Graphs illustrating first and second examples of loading performance of a conventional train loading facility are shown in Figures 2 and 3.
- the graphs include car mass values 40, 48 indicative of actual mass values of train cars measured by the car weigher, an overload probability plot 42, 50 indicative of the calculated probability of overload based on the variability of the car mass values 40, 48, and an aim mass plot 44, 52 indicative of a relatively safe mass that the operator should have aimed for in order for the likelihood of a car mass overload to be statistically small, in this example a probability of 0.01.
- Arrows 46, 54 illustrate the aim overload
- the defined car overload mass is 120 tonnes.
- Figure 2 have a relatively large standard deviation and therefore a relatively high degree of variability. As a consequence, in order to reduce the likelihood of
- Figure 3 have a relatively small standard deviation and therefore a relatively low degree of variability. As a consequence, a higher average car mass could have been selected after about the 75 th car whilst still maintaining a relatively low likelihood of overload. This is
- the aim mass plot 52 which shows an aim car mass after about the 75 th car that is generally higher than the car mass values 48
- the overload probability plot 50 which illustrates that the overload probability has decreased significantly below the defined acceptable overload probability limit 0.01.
- the desired average car mass that is the aim car mass
- the desired average car mass should be reduced in order that the likely number of car mass values above the overload mass is maintained relatively low
- the desired average car mass that is the aim car mass
- the mass of material loaded into a train can be increased without unduly affecting the probability of train overloads.
- the train loading system includes a control unit 62 for controlling and
- a display 64 for displaying train loading information to an operator during a train loading operation.
- the control unit 62 may include associated data storage 63 and memory necessary for storing data and/or programs usable by the control unit 62 to implement desired
- control unit 62 is arranged to control automatic opening and closing of the clam 22 in response to signals received from the train position sensors 33; to facilitate manual opening and/or closing of the clam 22 by an operator so as to modify the total amount of material in a car 14; to store car mass values produced by the car weigher 28 and calculate a mass variability value indicative of the variability of the measured car mass values, in this example in the form of a standard deviation of the measured car mass values; to calculate estimated mass values for each car 14 based on the conveyor weightometer 34, conveyor speed 35 and the bin level sensors 32; to calculate an estimated aim set point indicative of a suggested average car mass that a train loading operator should aim for in order to maintain an overload probability at a defined level, in this example 0.01, whilst achieving a relatively high car mass; and to control display of train loading information on the display 64.
- Functional components 65 implemented by the train loading system, in this example using the control unit 62 are shown in Figure 5.
- the functional components 65 include a car mass estimator 66 arranged to calculate the estimated
- an aim set point estimator 68 arranged to calculate an aim set point indicative of a suggested average car mass that a train loading operator should aim for in order to maintain an overload probability at a defined level; a data plotter 70 arranged to control display of the train loading
- calculator 72 arranged to calculate a reliability value based on the degree of correlation between the measured car mass values and the corresponding estimated car mass values.
- the aim set point is calculated in this example by the aim set point estimator 68 which determines a variability value indicative of the variability of the measured car values, in this example the standard deviation of the measured car mass values and estimated car mass values, and uses the variability value with a defined probability of occurrence of an overload to determine a car set point mass value to be used by an operator as a target car mass.
- Railcar masses tend to approximate a normal distribution, and as such a 1% probability of exceeding a defined value occurs at a value equal to the mean value of the mass values plus 2.33 ⁇ , where ⁇ is the standard deviation of the mass values. Accordingly, for mass values that have high variability, the average railcar mass must be lower than for mass values that have low variability, in order to maintain the same 1% probability of overload.
- an average mass value can be calculated that is appropriate to use as the aim mass value.
- the train loading information displayed to an operator includes a full train graph 76 and a recent cars graph 78.
- Each of the graphs includes an estimated mass values plot 80 indicative of the
- the recent cars graph 78 shows information for the last 20 cars of a train.
- the train loading information may also include a
- reliability indicator 88 (not shown) used to communicate the reliability value to the operator.
- the estimated mass values plot 80 is 4 cars ahead of the measured mass values 82 because the car weigher 28 is 4 cars ahead of the bin 20 and associated clam 22.
- the functional components 66 include a conveyor model 90 arranged to calculate a mass value indicative of the mass that is added to the bin 20 by the conveyor 18 based on the mass data provided by the weightometer 30.
- the functional components 66 also include processing components 92 arranged to process bin level information from the bin level sensors 32 in order to produce a processed bin level value indicative of a mass change of the bin 20 as material is loaded into the bin 20 and material is removed from the bin 20 during loading.
- the processing components 92 are arranged to at least
- an estimated car mass value 94 is produced that is stored and shown on the display 64.
- the estimated car mass value is equal to the mass of ore delivered to the bin while the car is present minus the change in bin mass during this time.
- the algorithm includes applying a first saturation filter 104 to the mass flow rate value received from the
- a weightometer 30 to remove spurious values from the mass flow rate, and applying a second saturation filter 106 to the belt speed 100 to remove spurious values from the belt speed 100.
- a divider 108 divides the mass flow rate produced by the weightometer 30 by the belt speed 100 to produce a mass value indicative of the mass per metre on the conveyor 18.
- a divider 110 divides the distance between the
- the weightometer 30 and the bin 20 by the belt speed 100 to produce a time value indicative of the amount of time taken for the mass of material on the weightometer 30 to reach the bin 20.
- the distance between the weightometer 30 and the bin 20 is treated as a series of consecutive material portions with each portion having an associated mass per metre value associated with it.
- a delay component 112 applies the calculated delay to the mass per metre value, and a multiplier 114 multiplies the delayed mass per metre value by the belt speed 100 to produce an estimated value for the mass added to the bin 20.
- the functional components also include an overload controller 74 that in this example is implemented by the control unit 62. However, as an alternative it will be understood that the overload controller 74 may be implemented by a separate component to the control unit 62.
- the overload controller 74 is arranged to cause the clam 22 to close before a signal to close the clam 22 is received from the train position sensors 33, if the current mass of the car 14 estimated using the conveyor weightometer 34 and the bin level sensors 32 indicates that the car 14 is likely to overload.
- the overload controller 74 is arranged to cause the clam 22 to close when the estimated mass reaches 110 tonnes.
- a train loading mass graph 120 is shown in Figure 10.
- the graph 120 shows an overload mass level 122, in this example set at 123 tonnes, and includes several plots 124, 126, 128 of estimated car mass over time.
- a first plot 124 indicates a car mass that increases to a relatively low but acceptable final car mass of about 118 tonnes
- second plots 126 indicate car masses that increase to acceptable final car masses of about 122 and 123 tonnes respectively
- third plots 128 indicate car masses that are increasing too quickly and have reached the overload limit 122 after only 85% of the full travel distance of a car during loading.
- the overload controller 74 causes the clam 22 to close. In the present example, this equates to closing the clam 22 1.5 seconds early.
- controller to filter out any spurious values, and when the filtered signal reached about 123 tonnes, the clam 22 is caused to close.
- an overload controller 74 arranged to intervene if a car is expected to overload, in effect the normal distribution of loaded car masses centered around the aim car mass is skewed towards higher car masses whilst providing a very low probability of occurrence of an overloaded car.
- providing an overload controller has the effect of automatically increasing the aim car mass if the overload controller is successful because preventing car overloads from occurring has the effect of causing the standard deviation to reduce.
- the system is also self-correcting in that if an overload situation occurs, the aim car mass is not increased.
- providing an overload controller 74 provides a high probability that the train loading system will fail well in that car overloads are prevented from occurring even if the decision made by the operator in relation to opening or closing of the clam is incorrect, because in an overload situation the clam 22 is closed prematurely by the overload controller 74.
- control unit 62 may be implemented using appropriate hardware, for example a personal computing type architecture or using a programmable logic controller (PLC) .
- PLC programmable logic controller
- a flow diagram 130 illustrating steps 132 to 148 of a example method of loading a train is shown in Figure 11, and a flow diagram illustrating steps 152 to 170 of an example method of assisting an operator to load a train car according to the method of Figure 11 is shown in
- the operator monitors the cars 14 and has manual control of the clam 22.
- the system calculates and displays car mass estimate values 136, and the operator views 138 the displayed car mass estimates, and adjusts automatic clam opening and closing settings using the estimated values with a view to preventing car mass overloading.
- the operator then activates automatic control 140.
- automatic control mode in response to signals provided by the train position sensors 33, the clam is caused to automatically open 142 as the train 12 reaches a defined location relative to the clam 22, which causes material in the bin 20 to flow into the car 14.
- the mass of material in the car 14 is estimated 152, stored 154 and displayed 156.
- the actual mass of material in the cars is then measured and stored 160 and a variability value, in this example a standard deviation, is calculated 162 based on the measured car mass values and the estimated car mass values.
- the variability value is used with a defined overload
- a reliability value is also calculated 166 based on the estimated mass values and the measured mass values, and the car mass values 82, the aim mass set point 84 and a reliability indicator 88 are displayed 168 to an operator as train loading information.
- the operator views 143 the train loading information shown on the display, and makes a decision 138 using the train loading information as to whether the clam should be opened late and/or early and/or closed late and/or early in order to maintain a relatively high car mass whilst maintaining a low probability of car overload, for example that is less than the defined amount 0.01.
- the clam is caused to automatically close 144, 148.
- the overload controller 74 Notwithstanding that the operator has used the displayed train loading information to control the amount of material flowing into a car 14, if the overload controller 74 nevertheless determines 146 that the car 14 is likely to overload before automatic closure of the clam 22, the overload controller 74 intervenes, overrides the automatic clam control process and causes the clam 22 to close prematurely 148, thereby preventing a car overload from occurring.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Loading Or Unloading Of Vehicles (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
Abstract
Description
Claims
Priority Applications (7)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/897,475 US10221023B2 (en) | 2013-06-11 | 2014-06-11 | Train Loading System |
| DE112014002784.7T DE112014002784B4 (en) | 2013-06-11 | 2014-06-11 | Train loading system |
| AU2014280839A AU2014280839B2 (en) | 2013-06-11 | 2014-06-11 | A train loading system |
| CA2914509A CA2914509C (en) | 2013-06-11 | 2014-06-11 | A train loading system |
| BR112015030725-6A BR112015030725B1 (en) | 2013-06-11 | 2014-06-11 | train loading system for loading train cars with material, and method for loading a train in mine operation |
| ZA2016/00131A ZA201600131B (en) | 2013-06-11 | 2016-01-07 | A train loading system |
| AU2018205096A AU2018205096A1 (en) | 2013-06-11 | 2018-07-10 | A train loading system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2013902113 | 2013-06-11 | ||
| AU2013902113A AU2013902113A0 (en) | 2013-06-11 | A train loading system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014197930A1 true WO2014197930A1 (en) | 2014-12-18 |
Family
ID=52021487
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/AU2014/000604 Ceased WO2014197930A1 (en) | 2013-06-11 | 2014-06-11 | A train loading system |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US10221023B2 (en) |
| AU (2) | AU2014280839B2 (en) |
| BR (1) | BR112015030725B1 (en) |
| CA (1) | CA2914509C (en) |
| DE (1) | DE112014002784B4 (en) |
| WO (1) | WO2014197930A1 (en) |
| ZA (1) | ZA201600131B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105151832A (en) * | 2015-06-29 | 2015-12-16 | 朱庭家 | A clay storage and bulk system |
| CN105565002A (en) * | 2016-03-09 | 2016-05-11 | 深圳市安顺节能科技发展有限公司 | Train bulk cargo loading system of rail break type rail meter |
| WO2016070236A1 (en) * | 2014-11-05 | 2016-05-12 | Technological Resources Pty. Limited | A train loading system |
| WO2018209396A1 (en) * | 2017-05-17 | 2018-11-22 | Technological Resources Pty. Limited | A train loading system |
| CN110817483A (en) * | 2019-11-11 | 2020-02-21 | 天地科技股份有限公司 | Real-time unbalance loading prevention system and method for train loading station |
| CN110836636A (en) * | 2019-10-18 | 2020-02-25 | 中交机电工程局有限公司 | Laser scanning type train loading detection device |
| AU2016200664B2 (en) * | 2015-02-03 | 2020-10-22 | Sandpit Innovation Pty Ltd | System and method for loading particulate material |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105775791B (en) * | 2016-03-17 | 2017-02-22 | 天地科技股份有限公司 | Discontinuous accumulated loading system and method for coal train loading |
| CN106628988A (en) * | 2017-02-22 | 2017-05-10 | 上海索力迪紧固件系统有限公司 | Automatic material receiving device |
| WO2018209385A1 (en) * | 2017-05-17 | 2018-11-22 | Technological Resources Pty. Limited | A train loading system |
| CN109896308B (en) * | 2019-03-05 | 2021-06-25 | 洛阳矿山机械工程设计研究院有限责任公司 | A fully automatic control method for quantitative loading of aggregate and sand and gravel |
| CN111220248A (en) * | 2019-12-03 | 2020-06-02 | 恒大智慧科技有限公司 | Weight-based train overload detection method and device and readable storage medium |
| US12037029B2 (en) | 2022-01-20 | 2024-07-16 | Tsg Canada Holdings Inc. | Railcar systems and cargo transportation methods |
| CN115367494A (en) * | 2022-08-19 | 2022-11-22 | 国能包头能源有限责任公司煤炭洗选分公司 | Train intelligent loading command system and method |
| CN116767898B (en) * | 2023-06-27 | 2025-10-17 | 中煤科工智能储装技术有限公司 | Rapid quantitative loading system and method for empty rail freight container |
| CN117068793B (en) * | 2023-09-26 | 2024-03-08 | 南京移腾电力技术有限公司 | Automatic loading method and system for bridge type grab bucket of ore bin |
| CN117699511A (en) * | 2023-12-18 | 2024-03-15 | 国家能源集团煤焦化有限责任公司 | Automatic blanking method, device, system and storage medium |
| WO2025245581A1 (en) * | 2024-05-29 | 2025-12-04 | Technological Resources Pty Ltd | A train loading system |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU659489A1 (en) * | 1976-10-27 | 1979-04-30 | Государственный проектно-конструкторский и научно-исследовательский институт по автоматизации угольной промышленности "Гипроуглеавтоматизация" | Apparatus for loading loose material into railway cars |
| US4629392A (en) * | 1984-07-16 | 1986-12-16 | Kerr-Mcgee Coal Corporation | System for batch loading coal into railroad cars |
| US5909999A (en) * | 1995-02-24 | 1999-06-08 | Luossavaara-Kiirunavaara Ab (Lkab) | Method to maximally utilize the loading capacity of an individual wagon and the train when loading with bulk material |
| US6155767A (en) * | 2000-03-10 | 2000-12-05 | Walker; Harold A. | Three-batch coal loadout system and method |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3430751A (en) * | 1967-09-28 | 1969-03-04 | Gen Mills Inc | Variable speed feeder control |
| US4284380A (en) * | 1979-08-27 | 1981-08-18 | Allen & Garcia Company | Multi-car train loading station |
| US20090078410A1 (en) * | 2007-09-21 | 2009-03-26 | David Krenek | Aggregate Delivery Unit |
-
2014
- 2014-06-11 US US14/897,475 patent/US10221023B2/en active Active
- 2014-06-11 DE DE112014002784.7T patent/DE112014002784B4/en active Active
- 2014-06-11 WO PCT/AU2014/000604 patent/WO2014197930A1/en not_active Ceased
- 2014-06-11 CA CA2914509A patent/CA2914509C/en active Active
- 2014-06-11 BR BR112015030725-6A patent/BR112015030725B1/en active IP Right Grant
- 2014-06-11 AU AU2014280839A patent/AU2014280839B2/en active Active
-
2016
- 2016-01-07 ZA ZA2016/00131A patent/ZA201600131B/en unknown
-
2018
- 2018-07-10 AU AU2018205096A patent/AU2018205096A1/en not_active Abandoned
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU659489A1 (en) * | 1976-10-27 | 1979-04-30 | Государственный проектно-конструкторский и научно-исследовательский институт по автоматизации угольной промышленности "Гипроуглеавтоматизация" | Apparatus for loading loose material into railway cars |
| US4629392A (en) * | 1984-07-16 | 1986-12-16 | Kerr-Mcgee Coal Corporation | System for batch loading coal into railroad cars |
| US5909999A (en) * | 1995-02-24 | 1999-06-08 | Luossavaara-Kiirunavaara Ab (Lkab) | Method to maximally utilize the loading capacity of an individual wagon and the train when loading with bulk material |
| US6155767A (en) * | 2000-03-10 | 2000-12-05 | Walker; Harold A. | Three-batch coal loadout system and method |
Non-Patent Citations (1)
| Title |
|---|
| DATABASE WPI Derwent World Patents Index; AN 1980-D3124C * |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016070236A1 (en) * | 2014-11-05 | 2016-05-12 | Technological Resources Pty. Limited | A train loading system |
| AU2016200664B2 (en) * | 2015-02-03 | 2020-10-22 | Sandpit Innovation Pty Ltd | System and method for loading particulate material |
| CN105151832A (en) * | 2015-06-29 | 2015-12-16 | 朱庭家 | A clay storage and bulk system |
| CN105565002A (en) * | 2016-03-09 | 2016-05-11 | 深圳市安顺节能科技发展有限公司 | Train bulk cargo loading system of rail break type rail meter |
| WO2018209396A1 (en) * | 2017-05-17 | 2018-11-22 | Technological Resources Pty. Limited | A train loading system |
| RU2755429C2 (en) * | 2017-05-17 | 2021-09-15 | Технолоджикал Ресорсиз Пти. Лимитед | System for loading railway train |
| AU2018267691B2 (en) * | 2017-05-17 | 2023-09-07 | Technological Resources Pty. Limited | A train loading system |
| CN110836636A (en) * | 2019-10-18 | 2020-02-25 | 中交机电工程局有限公司 | Laser scanning type train loading detection device |
| CN110836636B (en) * | 2019-10-18 | 2021-02-09 | 中交机电工程局有限公司 | Laser scanning type train loading detection device |
| CN110817483A (en) * | 2019-11-11 | 2020-02-21 | 天地科技股份有限公司 | Real-time unbalance loading prevention system and method for train loading station |
| CN110817483B (en) * | 2019-11-11 | 2021-05-04 | 天地科技股份有限公司 | Real-time unbalance loading prevention system and method for train loading station |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2014280839A1 (en) | 2016-01-21 |
| US20160130096A1 (en) | 2016-05-12 |
| BR112015030725B1 (en) | 2021-02-02 |
| AU2018205096A1 (en) | 2018-07-26 |
| BR112015030725A2 (en) | 2017-07-25 |
| US10221023B2 (en) | 2019-03-05 |
| CA2914509A1 (en) | 2014-12-18 |
| CA2914509C (en) | 2021-06-29 |
| DE112014002784B4 (en) | 2024-05-08 |
| ZA201600131B (en) | 2018-05-30 |
| AU2014280839B2 (en) | 2018-05-24 |
| DE112014002784T5 (en) | 2016-03-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2914509C (en) | A train loading system | |
| RU2768069C2 (en) | Control system and control method for rotary car dumpers | |
| US20200079601A1 (en) | Train Load-Out Arrangement | |
| US11111044B2 (en) | Method of determining the volume flow and the filling degree at a packaging machine | |
| CN105483301B (en) | Charging of blast furnace charge personal distance control method | |
| AU2018267691B2 (en) | A train loading system | |
| AU2015342731B2 (en) | A train loading system | |
| AU2018271139B2 (en) | A train loading system | |
| CN110161959B (en) | Unloading trolley control method and system for avoiding runaway | |
| OA19956A (en) | A train loading system | |
| WO2025245581A1 (en) | A train loading system | |
| OA19955A (en) | A train loading system. | |
| BR112019024047B1 (en) | TRAIN LOADING SYSTEM AND METHOD OF LOADING MATERIAL INTO THE CARS OF A TRAIN IN A MINE OPERATION | |
| CN105314403B (en) | Method for delivering tobacco |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14811107 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2914509 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14897475 Country of ref document: US |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 112014002784 Country of ref document: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112015030725 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 2014280839 Country of ref document: AU Date of ref document: 20140611 Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14811107 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 112015030725 Country of ref document: BR Kind code of ref document: A2 Effective date: 20151209 |