WO2014164758A2 - Cement plug location - Google Patents
Cement plug location Download PDFInfo
- Publication number
- WO2014164758A2 WO2014164758A2 PCT/US2014/023402 US2014023402W WO2014164758A2 WO 2014164758 A2 WO2014164758 A2 WO 2014164758A2 US 2014023402 W US2014023402 W US 2014023402W WO 2014164758 A2 WO2014164758 A2 WO 2014164758A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- signal
- cement plug
- time
- wellbore
- receiver
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
- E21B33/16—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes using plugs for isolating cement charge; Plugs therefor
Definitions
- the technical field relates to the field of cement plugs in oil and gas wellbores. More particularly, the present invention relates to an improved system for identifying the location of a cement plug and the like within a wellbore.
- a casing is inserted into the wellbore to stabilize the structure of the wellbore. Cementing is further required to adequately support the casing, provide zone isolation and prevent mixing of fluids.
- the process of cementing is well known in the art.
- the casing is filled with drilling fluid or mud (hereinafter referred to as "drilling fluid").
- a bottom cement plug containing a rupturable disk or diaphragm is then inserted into the casing.
- the bottom cement plug may also be referred to as a displacement plug.
- Cement slurry is pumped on top of the bottom plug to move the plug downwards and to displace the drilling fluid out of the casing and into the annulus between the casing and the wellbore rock.
- a top cement plug is then positioned on top of the cement slurry and additional drilling fluid is pumped into the casing to move the top cement plug, the cement slurry, and the bottom cement plug through the casing.
- Float equipment at the bottom of the casing prevents the bottom cement plug from further movement upon contact. With the combination of the continuous pumping of drilling fluid, this causes a build-up of pressure sufficient to breach the rupture disk within the bottom cement plug.
- Optimal cementing jobs rely on accurate identification of the location of the cement plugs. Cementing operations currently rely on volumetric displacement calculations to determine the location of the cement plugs. However, this method suffers from low accuracy due to factors including long casing strings, large diameter casing, and variable diameter within casings. Accurate identification of the location of the bottom cement plug is important to prevent over- and underdisplacement of the cement. Overdisplacement occurs when all the cement slurry is moved outside the casing and may result a cement deficiency around the bottom of the casing. Underdisplacement leaves cement within the casing which needs to be later removed. Both over- and underdisplacement require remedial operations which are often expensive and time consuming.
- Prior disclosures of cement plug location systems are not practical in an industrial setting, thus prompting a need for an improved system.
- preexisting cement plug location systems are effective at the scale needed, or that they are used commercially in any significant measure.
- Some examples of such prior systems include: systems that rely on signals reflected over great distances; systems that rely on measuring hard wiring or cable, or using the wire or cable to transmit a signal; or systems which use a dual telemetry system.
- These prior systems suffer from problems such as: significant signal attenuation, cost inefficiency and/or physical impossibility at drill sites. As such, modern oil well drilling operations continue to use volumetric displacement calculations to determine the cement plug location, instead of implementing the aforementioned systems.
- the disclosure describes a system and a method for locating a cement plug within a wellbore.
- the system includes a signal transmitter mounted to the cement plug, a receiver at the opening to the wellbore, one clock positioned on the cement plug and in communication with the transmitter, a second clock which is synchronized to the first clock and in communication with the receiver, and a controller for triggering the transmittal of the signal.
- the disclosure relates to a cement plug location system which addresses the shortcomings of previous systems.
- the disclosed system utilizes a modified time of flight method which minimizes processing time and signal attenuation.
- the classic time of flight method consists of transmitting a signal from the top of the wellbore to the cement plug and back and measuring the total time.
- the "total time” constitutes the time required for the signal to reach the cement plug, and the time required for the signal to return from the cement plug to the top of the wellbore. Because of the constraints involved in oilfield wells, the classic time of flight method suffers from significant signal attenuation because the signal must travel the lengthy distance between the two points twice.
- the method described in this disclosure synchronizes two clocks, one on a system near the top of the wellbore and one on the cement plug.
- the synchronization of the two clocks is critical to the success and accuracy of the disclosed method.
- the time of flight under the disclosed method is the travel time of the signal from the cement plug to the top of the wellbore. Thus, the signal only needs to travel the distance between the two points once. There is no need to reflect the signal, nor is there excess processing time.
- the disclosed method results in a measurement which can accurately locate a cement plug to within one foot (approximately thirty centimeters) or less.
- currently used volumetric displacement calculations may have results that range from ten to twenty feet (approximately three to six meters) of the actual location of the cement plug.
- this disclosure can also identify washouts, corrosion related issues, and other problems encountered down hole as well as verify volumetric displacement calculations.
- the term "transmitter” includes any device which is capable of communicating signal(s) or wave(s) from one point to another, and in addition, may also be a source of, or produce signal(s) or wave(s) itself.
- the signal may be acoustic, heat, pressure, visual, or any other suitable sign or data form capable of being transmitted and may be the result of a chemical reaction, a sound wave, an electromagnetic wave, a mechanical action, or any other suitable process.
- the signal produced may be a pulse. It is to be understood, however, that the signal cannot be coded or modulated.
- Example embodiments of transmitters which may be implemented into various embodiments of the system include firing mechanisms that would fire a bullet-like object or that trigger energy stored as chemical energy or battery.
- the term “medium” includes any fluids or liquids used in drilling operations, casing material (wherein the term “casing material” or “casing” includes, but is not limited to liner hangers, subsea casing hanger running tools, running strings of drill pipe, and common casing), void space or vacuum, geologic formations surrounding the wellbore, or any combination of the foregoing.
- Figure 1 depicts a schematic view of a wellbore and cement plug location system according to an embodiment.
- Figure 2 depicts a schematic wellbore with two cement plugs and a shoe in another embodiment.
- Figure 3 depicts a flowchart illustrating a method of using the cement plug location system in an embodiment.
- Figure 1 depicts an exemplary schematic view of a drill site 100 having a wellbore 102 lined with a casing 104.
- the wellbore 102 may be formed in the earth or seafloor and has a top system 108 near the wellbore 102 opening.
- a cement plug 106 Within casing 104 is a cement plug 106.
- the casing 104 may also have a fluid 105 above and/or below the cement plug 106.
- the fluid 105 may be any fluid mixture used in drilling operations, including drilling fluid or drilling mud or cement or cement slurry.
- the cement plug 106 is down hole from the top system 108 and is movable within the casing 104.
- Cement plug 106 may be a top plug 106a and/or a bottom cement plug 106b (which may contact a shoe 107). Further, as shown, a transmitter 1 10, a clock 1 12a, and a controller 1 14 are mounted on cement plug 106. The transmitter 1 10, clock 1 12a, and controller 1 14 are engaged together and configured to enable communication between those elements.
- the top system 108 consists of a receiver 1 18, a clock 1 12b, a processor 120 and a display 122. The receiver 1 18, clock 1 12b, processor 120, and display 122 are engaged together and configured to enable communication between those elements.
- the controller 1 14 and/or processor 120 may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a "circuit,” "module” or “system.”
- embodiments of the inventive subject matter may take the form of a computer program product embodied in any tangible medium of expression having computer usable program code embodied in the medium.
- the described embodiments may be provided as a computer program product, or software, that may include a machine-readable medium having stored thereon instructions, which may be used to program a computer system (or other electronic device(s)) to perform a process according to embodiments, whether presently described or not, since every conceivable variation is not enumerated herein.
- a machine readable medium includes any mechanism for storing or transmitting information in a form (e.g., software, processing application) readable by a machine (e.g., a computer).
- the machine-readable medium may include, but is not limited to, magnetic storage medium (e.g., hard disk); optical storage medium (e.g., CD-ROM); magneto-optical storage medium; read only memory (ROM); random access memory (RAM); erasable programmable memory (e.g., EPROM and EEPROM); flash memory; or other types of medium suitable for storing electronic instructions.
- controller 1 14 and/or processor 120 may be embodied in an electrical, optical, acoustical or other form of propagated signal (e.g., carrier waves, infrared signals, digital signals, etc.), or wire line, wireless, or other communications medium.
- Computer program code for carrying out operations of the embodiments may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, C++ or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages.
- the program code may execute entirely on a user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server.
- the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN), a personal area network (PAN), or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider).
- LAN local area network
- PAN personal area network
- WAN wide area network
- Internet Service Provider an Internet Service Provider
- clock 1 12a on cement plug 106 is initially synchronized to clock 1 12b at the top system 108 located at the top of the wellbore 130.
- the synchronization of clock 1 12a and clock 1 12b enable a precise measurement of the change in time and thus the identification of the distance between the cement plug 106 and the top of the wellbore 130 for time of flight calculations (the time of flight calculations are further described in paragraphs below).
- the clocks 1 12a and/or 1 12b may be battery-powered in certain embodiments.
- the operator of drill site 100 or the processor 120 inputs into controller 1 14 one or more times for the release or trigger of the signal 124.
- the controller 1 14 communicates to transmitter 1 10 to produce and send a signal 124 to the top of the wellbore 130.
- the time of trigger or release of signal 124 may be at any point during the cementing operation.
- the signal 124 may be triggered before the rupture disk on the cement plug 106 is breached; the signal 124 may be triggered after the cement is displaced out into the annulus between the wellbore 102 and the casing 104; and/or the signal 124 could be sent at various established intervals (e.g.
- the transmitter 1 10 may be a bullet-type fired into the casing 104 wall, thereby creating a pulse or signal 124.
- two transmitters 1 10 may be implemented with one bullet -type transmitter 1 10 creating a signal through the wall of casing 104 and a second transmitter 1 10 creating an acoustic signal 124 traveling through the fluid 105.
- the receiver 1 18 at the top of the wellbore 130 accepts the signal 124 and then communicates the data to processor 120.
- the processor 120 records the time that signal 124 was received based on synchronized clock 1 16.
- the processor 120 then calculates the exact time of flight traveled by signal 124 by the difference in the time that the signal 124 was set to be sent by transmitter 1 10, and the time the signal 124 was collected by receiver 1 18.
- the processor 120 can determine or deduce the distance traveled by signal 124 between the cement plug 106 and the top system 108.
- the distance traveled by signal 124 represents the location of cement plug 106 at the time of transmittal.
- a display 122 may be connected to processor 120 as an interface to present the results, or for an operator of drill site 100 to manipulate processor 120.
- Figure 2 depicts a schematic wellbore 102 with two cement plugs 106a and 106b and a shoe 107.
- the bottom cement plug 106b has reached the bottom of the casing 104 where the shoe 107 is located.
- the shoe 107 stops the bottom cement plug 106b from further progressing along the casing 104.
- the pressure causes the rupture disk (not shown) within bottom cement plug 106b to collapse.
- the cement 105b flows through the bottom cement plug 106b where the rupture disk had been breached.
- the shoe 107 as seen, has an aperture that allows cement 105b to flow through after passing the bottom cement plug 106b.
- cement plug 106a contains transmitter 1 10, clock 1 12a, and controller 1 14. While the transmitter 1 10, clock 1 12a and controller 1 14 are located on cement plug 106a, the top cement plug, in the embodiment of Figure 2, it is to be appreciated that the transmitter 1 10, clock 1 12a, and controller 1 14 may also be located on cement plug 106b, the bottom cement plug, or both in plural. In the embodiment shown in Figure 2, the signal (represented by line 124) is transmitted by cement plug 106a through the drilling mud 105c.
- a vacuum or low pressure region 105a may exist when the casing 104 is not filled with fluid 105, which can happen when cement plug 106 free-falls during displacement, creating a vacuum 105a.
- Algorithm 1 is a simple method to calculate the distance function of time of flight when ⁇ is known.
- Algorithm 2 is a method to calculate the distance when ⁇ is unknown.
- V V T + K * ⁇ .
- Algorithm 2 solves for d in situations where the temperature, ⁇ , is not known. While the coefficient K m may be known in the literature for certain media, such as steel, the coefficient K m may not be known for other media, for example, but not limited to, drilling fluid or drilling mud, which may be complex mixtures of water, oils, air, and other liquids or solids. Where the coefficient K m is unknown, it may be solved theoretically or determined experimentally for the particular medium through techniques known to those skilled in the art. Algorithm 2 utilizes at least two signals and the following equations to solve for d, assuming little knowledge of the coefficient for the media in which the signals travel.
- the following embodiment for an algorithm which may be implemented shows a signal traveling through the casing, c, as the first possible medium, and another signal traveling through the drilling fluid, f, as another possible medium.
- the time of trigger of the signals, t l t is the same for both signals.
- At c t 2c - t-L , where At c is the difference in time between the time of trigger of a signal through a casing, t l t and the time of reception of the signal, t 2c ;
- V c the velocity of the signal in the casing
- V cT the velocity of the signal in the casing at temperature 7
- K c is a constant based on the properties of the casing
- t f t 2 f - t-L
- At f is the difference in time between the time of trigger of a signal through a drilling fluid, t l t and the time of reception of the signal, t 2 ;
- V f V fT + K f * ⁇
- V f the velocity of the signal in the drilling fluid
- V fT the velocity of the signal in the drilling fluid at temperature 7
- K f is a constant based on the properties of the drilling fluid
- ⁇ is the difference between the temperature of the known velocity in the drilling fluid, V fT , and the average temperature of the bore (top to downhole)
- K c and K f Determining K c and K f through literature or calculations (if known), or experimentally through techniques known to those skilled in the art.
- the coefficient should be determined experimentally for each particular type of drilling mud because drilling mud is typically a mixture of at least water, oil, air plus other component(s).
- FIG. 3 is a flowchart illustrating a method 300 of using the cement plug location system in an embodiment.
- the flow starts at block 302 where a clock 1 12a positioned on the cement plug 106 is synchronized to another clock 1 12b at the top of the wellbore 130 (the synchronization of clock 1 12a to clock 1 12b is critical to the methodology).
- the flow then continues at block 304, where the operator of the drill site 100 or a processor 120 will set at least one time of trigger for a signal 124.
- the flow then continues at block 306, where a signal 124 is triggered from the cement plug 106 at the predetermined trigger time.
- the flow then continues at block 308, where the signal 124 is transmitted from the cement plug 106.
- steps within block 306 and block 308 may also occur simultaneously, that is, that the signal 124 may be both triggered and transmitted at the same time, in addition to the option of occurring in sequence.
- the flow then continues at block 310, where the signal 124 is received from a receiver 1 18 at the top of the wellbore 130 at a time of reception.
- the flow then continues at block 312 where the time of reception is recorded.
- the flow then continues at block 314 where the time of flight is calculated by finding the difference between the time of trigger and the time of reception of the signal 124.
- the flow then continues at block 316 where the distance between the cement plug 105 and the top of the wellbore 130 is determined based on the time of flight and a known velocity of the signal through the medium traveled.
- the steps of method 300 may be repeated as needed to obtain multiple distances for the purposes of comparison and increasing accuracy.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Earth Drilling (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Stored Programmes (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CA2904483A CA2904483C (en) | 2013-03-11 | 2014-03-11 | Cement plug location |
| GB1517880.9A GB2529324B (en) | 2013-03-11 | 2014-03-11 | Cement plug location |
| NO20151181A NO340826B1 (en) | 2013-03-11 | 2015-09-14 | System and method for cement plug location |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201361775906P | 2013-03-11 | 2013-03-11 | |
| US61/775,906 | 2013-03-11 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2014164758A2 true WO2014164758A2 (en) | 2014-10-09 |
| WO2014164758A3 WO2014164758A3 (en) | 2015-03-26 |
Family
ID=50489397
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2014/023402 Ceased WO2014164758A2 (en) | 2013-03-11 | 2014-03-11 | Cement plug location |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9347309B2 (en) |
| CA (1) | CA2904483C (en) |
| GB (1) | GB2529324B (en) |
| NO (1) | NO340826B1 (en) |
| WO (1) | WO2014164758A2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025181480A1 (en) * | 2024-03-01 | 2025-09-04 | Raptor Data Limited | Method and apparatus |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2483675A (en) * | 2010-09-16 | 2012-03-21 | Bruce Arnold Tunget | Shock absorbing conductor orientation housing |
| US9726004B2 (en) * | 2013-11-05 | 2017-08-08 | Halliburton Energy Services, Inc. | Downhole position sensor |
| GB2537494B (en) | 2013-12-23 | 2020-09-16 | Halliburton Energy Services Inc | Downhole signal repeater |
| GB2536817B (en) | 2013-12-30 | 2021-02-17 | Halliburton Energy Services Inc | Position indicator through acoustics |
| WO2015112127A1 (en) | 2014-01-22 | 2015-07-30 | Halliburton Energy Services, Inc. | Remote tool position and tool status indication |
| GB2540081B (en) * | 2014-06-05 | 2020-12-09 | Halliburton Energy Services Inc | Locating a downhole tool in a wellbore |
| WO2016148701A1 (en) * | 2015-03-17 | 2016-09-22 | Halliburton Energy Services, Inc. | Cementing methods and systems employing a smart plug |
| GB2549049B (en) * | 2015-03-31 | 2020-12-09 | Halliburton Energy Services Inc | Underground GPS for use in plug tracking |
| AU2015390037B2 (en) * | 2015-03-31 | 2018-09-20 | Halliburton Energy Services, Inc. | Plug tracking using through-the-earth communication system |
| US9869174B2 (en) | 2015-04-28 | 2018-01-16 | Vetco Gray Inc. | System and method for monitoring tool orientation in a well |
| US10100634B2 (en) * | 2015-09-18 | 2018-10-16 | Baker Hughes, A Ge Company, Llc | Devices and methods to communicate information from below a surface cement plug in a plugged or abandoned well |
| US12060786B2 (en) * | 2018-02-08 | 2024-08-13 | Halliburton Energy Services, Inc. | Wellbore inspection system |
| CN114341462A (en) | 2019-08-28 | 2022-04-12 | 斯伦贝谢技术有限公司 | Method for determining the position of a lowerable object in a wellbore |
| US11078752B2 (en) | 2019-12-16 | 2021-08-03 | Saudi Arabian Oil Company | Smart cementing wiper plug |
| US20220178220A1 (en) * | 2020-12-08 | 2022-06-09 | Chevron U.S.A. Inc. | Wiper Barrier Plug Assemblies |
| US11454109B1 (en) * | 2021-04-21 | 2022-09-27 | Halliburton Energy Services, Inc. | Wireless downhole positioning system |
| WO2022250664A1 (en) | 2021-05-26 | 2022-12-01 | Halliburton Energy Services, Inc. | Traceability of cementing plug using smart dart |
| CN115822514A (en) * | 2021-09-16 | 2023-03-21 | 中国石油化工股份有限公司 | A metering well cementing head and its application |
| CN119801495B (en) * | 2023-10-10 | 2025-11-18 | 中国石油天然气股份有限公司 | Method for calculating blocking position of shaft of natural gas well |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2999557A (en) | 1956-05-28 | 1961-09-12 | Halliburton Co | Acoustic detecting and locating apparatus |
| US4468967A (en) | 1982-11-03 | 1984-09-04 | Halliburton Company | Acoustic plug release indicator |
| US6585042B2 (en) | 2001-10-01 | 2003-07-01 | Jerry L. Summers | Cementing plug location system |
| US6634425B2 (en) | 2000-11-03 | 2003-10-21 | Noble Engineering & Development, Ltd. | Instrumented cementing plug and system |
| US7013989B2 (en) | 2003-02-14 | 2006-03-21 | Weatherford/Lamb, Inc. | Acoustical telemetry |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6597175B1 (en) * | 1999-09-07 | 2003-07-22 | Halliburton Energy Services, Inc. | Electromagnetic detector apparatus and method for oil or gas well, and circuit-bearing displaceable object to be detected therein |
-
2014
- 2014-03-11 US US14/204,686 patent/US9347309B2/en not_active Expired - Fee Related
- 2014-03-11 CA CA2904483A patent/CA2904483C/en not_active Expired - Fee Related
- 2014-03-11 WO PCT/US2014/023402 patent/WO2014164758A2/en not_active Ceased
- 2014-03-11 GB GB1517880.9A patent/GB2529324B/en not_active Expired - Fee Related
-
2015
- 2015-09-14 NO NO20151181A patent/NO340826B1/en not_active IP Right Cessation
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2999557A (en) | 1956-05-28 | 1961-09-12 | Halliburton Co | Acoustic detecting and locating apparatus |
| US4468967A (en) | 1982-11-03 | 1984-09-04 | Halliburton Company | Acoustic plug release indicator |
| US6634425B2 (en) | 2000-11-03 | 2003-10-21 | Noble Engineering & Development, Ltd. | Instrumented cementing plug and system |
| US6585042B2 (en) | 2001-10-01 | 2003-07-01 | Jerry L. Summers | Cementing plug location system |
| US7013989B2 (en) | 2003-02-14 | 2006-03-21 | Weatherford/Lamb, Inc. | Acoustical telemetry |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025181480A1 (en) * | 2024-03-01 | 2025-09-04 | Raptor Data Limited | Method and apparatus |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2014164758A3 (en) | 2015-03-26 |
| NO340826B1 (en) | 2017-06-26 |
| CA2904483C (en) | 2016-10-04 |
| GB2529324A (en) | 2016-02-17 |
| GB2529324B (en) | 2017-04-05 |
| US20140251603A1 (en) | 2014-09-11 |
| US9347309B2 (en) | 2016-05-24 |
| CA2904483A1 (en) | 2014-10-09 |
| GB201517880D0 (en) | 2015-11-25 |
| NO20151181A1 (en) | 2015-09-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9347309B2 (en) | Cement plug location | |
| US12534999B2 (en) | Methods for determining a position of a droppable object in a wellbore | |
| EP3426889B1 (en) | Downhole production logging tool | |
| US10526884B2 (en) | Systems and methods for monitoring cement quality in a cased well environment with integrated chips | |
| CA2681622C (en) | Wireless logging of fluid filled boreholes | |
| US20140260589A1 (en) | Downhole tool for determining flow velocity | |
| CN108112260A (en) | Method and apparatus for obtaining measurements of downhole properties in a subterranean well | |
| US10047601B2 (en) | Moving system | |
| CN103748319B (en) | Apparatus and method for controlling completion practice | |
| US11459879B2 (en) | Mud pulse transmission time delay correction | |
| US20240035371A1 (en) | Methods for determining a position of a droppable object in a wellbore | |
| US11781424B2 (en) | Registering fiber position to well depth in a wellbore | |
| NL2031366B1 (en) | Wireless downhole positioning system | |
| US20250347217A1 (en) | Methods for determining a position of a droppable object in a wellbore | |
| WO2017105461A1 (en) | Systems and methods for wellbore logging to adjust for downhole clock drift | |
| RU2332563C1 (en) | Method for monitoring near wellbore payzone region treatment in well and device therefor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14717916 Country of ref document: EP Kind code of ref document: A2 |
|
| ENP | Entry into the national phase |
Ref document number: 2904483 Country of ref document: CA |
|
| ENP | Entry into the national phase |
Ref document number: 1517880 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20140311 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1517880.9 Country of ref document: GB |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14717916 Country of ref document: EP Kind code of ref document: A2 |