WO2014153612A1 - Air-cooled modular lng production facility - Google Patents

Air-cooled modular lng production facility Download PDF

Info

Publication number
WO2014153612A1
WO2014153612A1 PCT/AU2014/000328 AU2014000328W WO2014153612A1 WO 2014153612 A1 WO2014153612 A1 WO 2014153612A1 AU 2014000328 W AU2014000328 W AU 2014000328W WO 2014153612 A1 WO2014153612 A1 WO 2014153612A1
Authority
WO
WIPO (PCT)
Prior art keywords
module
heat exchanger
row
module base
section
Prior art date
Application number
PCT/AU2014/000328
Other languages
French (fr)
Inventor
Geoffrey Brian BYFIELD
Original Assignee
Woodside Energy Technologies Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2013901044A external-priority patent/AU2013901044A0/en
Priority to CA2882326A priority Critical patent/CA2882326C/en
Priority to AU2014245852A priority patent/AU2014245852B2/en
Priority to CN201480025598.8A priority patent/CN105190210B/en
Priority to BR112015024616-8A priority patent/BR112015024616B1/en
Priority to EP14774713.3A priority patent/EP2979049A4/en
Application filed by Woodside Energy Technologies Pty Ltd filed Critical Woodside Energy Technologies Pty Ltd
Priority to JP2016504420A priority patent/JP2016514823A/en
Priority to KR1020157030901A priority patent/KR102182637B1/en
Priority to AP2015008770A priority patent/AP2015008770A0/en
Publication of WO2014153612A1 publication Critical patent/WO2014153612A1/en
Priority to IL241778A priority patent/IL241778A0/en
Priority to US14/863,833 priority patent/US10060670B2/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/0002Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the fluid to be liquefied
    • F25J1/0022Hydrocarbons, e.g. natural gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0211Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle
    • F25J1/0212Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a single flow MCR cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0211Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle
    • F25J1/0214Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0211Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle
    • F25J1/0214Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle
    • F25J1/0215Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle with one SCR cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0211Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle
    • F25J1/0214Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle
    • F25J1/0215Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle with one SCR cycle
    • F25J1/0216Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a multi-component refrigerant [MCR] fluid in a closed vapor compression cycle as a dual level refrigeration cascade with at least one MCR cycle with one SCR cycle using a C3 pre-cooling cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0259Modularity and arrangement of parts of the liquefaction unit and in particular of the cold box, e.g. pre-fabrication, assembling and erection, dimensions, horizontal layout "plot"
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0275Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0275Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
    • F25J1/0277Offshore use, e.g. during shipping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0275Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
    • F25J1/0277Offshore use, e.g. during shipping
    • F25J1/0278Unit being stationary, e.g. on floating barge or fixed platform
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0279Compression of refrigerant or internal recycle fluid, e.g. kind of compressor, accumulator, suction drum etc.
    • F25J1/0296Removal of the heat of compression, e.g. within an inter- or afterstage-cooler against an ambient heat sink
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28BSTEAM OR VAPOUR CONDENSERS
    • F28B1/00Condensers in which the steam or vapour is separate from the cooling medium by walls, e.g. surface condenser
    • F28B1/06Condensers in which the steam or vapour is separate from the cooling medium by walls, e.g. surface condenser using air or other gas as the cooling medium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/26Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Definitions

  • the present invention relates to an air-cooled liquefied natural gas production process for producing a product stream of liquefied natural gas at a production location using a plurality of modules.
  • the present invention further relates to an air-cooled liquefied natural gas production plant for producing a product stream of liquefied natural gas at a production location using a plurality of modules.
  • Natural gas (“NG”) is routinely transported from one location to another location in its liquid state as “Liquefied Natural Gas” (LNG). Liquefaction of the natural gas makes it: more economical (o transport as LNG occupies only about l/60Q ,h of the volume, that the same amount of natural gas does in its gaseous state.
  • LNG is typically stored in cryogenic containers either at or slightly above atmospheric pressure. LNG is regasified before distribution to end users through a pipeline or other distribution network at a temperature and pressure that meets the delivery requirements of the end users.
  • Wellhead gas is subjected to ga pre-treatment to remove contaminants prior to liquefaction.
  • the hydrogen sulphide and carbon dioxide can be removed using a suitable process such as amine adsorption. Removal of water can be achieved using conventional methods, for example, a molecular sieve.
  • the inlet gas stream may be subjected to further pre- treatment to remove other contaminants, such as mercury and heavy hydrocarbons prior to liquefaction. Liquefaction is achieved using methods that are well established in the art which typically involve compression and cooling.
  • Such processes include the APCI C3/ R 7 * 1 or SplitMRTM or AP-XTM, processes, the ConoeoPhillips Optimized Cascade Process, the Linde Mixed Fluid Cascade process or the Shell Double Mixed Refrigerant or Parallel Mixed Refrigerant process.
  • refrigerants are used to reduce the temperature of the treated wellhead gas to a temperature of around -160°C to form LNG, resulting in warming of the refrigerant which must be compressed for recycle to the liquefaction process.
  • the compressors used for this duty are traditionally .steam turbines, gas turbines or electric motors depending on the power requirements and layout issues of a particular LNG production facility.
  • the coolers required for the variou compression and heat exchanger operations associated with an LNG plant may be air coolers or water coolers arranged in a heat exchanger bank.
  • Prior art modularised LNG production trains have been closely based upon the design and layout of the more traditional stick-built LNG production trains.
  • modularisation has been conducted by slicing up an existing stick built LNG train design into transportable sections, leading to some compromises regarding the placement of the module boundaries.
  • Prior art examples of modularization of a traditional stick-built air- cooled LNG train have relied on dividing the centrally located air-cooled heat exchanger bank into the smallest number of modules possible for a given size of air cooler within the air-cooled heat exchanger bank. The result is that the other process equipment i.s located in separate stand-alone modules as illustrated schematically in FIG I (a).
  • the disadvantage of this approach is a large number of piping connections between the air- cooled heat exchangers and the other associated processing equipment.
  • a liquefied natural gas production process for producing a product stream of liquefied natural ga at a production. location, said process comprising:
  • each module having a module base for mounting a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas* said selected function being assigned to said module, the plurality of modules including a first module assigned to perform a first selected function, and, a second module assigned to perform a second selected function;
  • the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having flammable inventory, a long lead-time piece of equipment, or, piece of equipment having an overall height that is taller than the height of the elevated level,
  • the process further comprises the step of sizing the second module base to include an uncovered section for mounting a selected piece of process equipment.
  • the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead- time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
  • the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two long sides.
  • the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides.
  • the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two short sides.
  • the second module base has a rectangular footprint comprising two long sides and two short, sides and the first edge of the second module base is arranged along one of the two short sides.
  • a second sub-section of the first or second row of heat exchanger bays is positioned on an adjacent module.
  • the first module is one of a plurality of first modules.
  • the second module i s one of a plurality of second modules.
  • the process further comprises the step of constructing at least one of the plurality of modules at. a construction location or assembling at least, one of the plurality of modules at an assembly location prior to transport to the production location, and testing the. at least one module for verification purposes at the construction or assembly location.
  • the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the first row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
  • the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the second row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
  • the first Sub-section of the first row of heat exchanger bays is the first row of heat exchanger bays.
  • the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays.
  • the first subsection of the first row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the first module base, and a gap is formed between the first module base and the second module base during step (d).
  • the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step (d).
  • the first sub-section of the first row of heat exchanger bays and the first ub- section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step (d).
  • the process further comprises the steps of arranging a plurality of third module heat exchangers operatively associated with a third selected function on a third module base to form a portion of the first ro of heat exchanger bays and a portion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a. covered section of the third module base.
  • the process further comprises the step of sizing the third module base such that the plurality of third module heat exchangers covers at least 90% of the third module, base to form a fully covered third module.
  • the third module is one of a plurality of third modules.
  • one of the plurality of modules is a pre-treatment module for removing contaminants from a natural gas feed stream to produce a pre-treated natural gas stream.
  • one of the plurality of modules i a first refrigerant condenser module for pre-cooling a pre-treated natural gas stream to produce a pre-cooled gas stream and a first refrigerant vapour stream.
  • one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream lo produce compressed first refrigerant stream for recycle to a first refrigerant condenser module.
  • one of the plurality of modules is a liquefaction module operatively associated with a main cryogenic heat exchanger for further cooling a pre-cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream
  • one of the plurality of modules is a second refrigerant compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger.
  • the first refrigerant is propane or nitrogen.
  • the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen, i one form, the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility.
  • a liquefied natural gas production plant for producing a product stream of liquefied natural gas installed at a production location comprising:
  • each module having a module base for mountin a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module, the plurality of modules including a first module assigned to perform a first selected function, and, a second module assigned to perform a second selected function;
  • an air-cooled heat exchanger bank designed for the installed production train, the heat exchanger bank including: a first row of air-cooled heat exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays;
  • first sub-section of the first row of heat exchanger bays arranged at an elevated level vertically offset from and towards a first edge f a first module base to form a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting a selected piece of process equipment, wherein the first module includes the first sub-section of the first row of heat exchanger bays without including a sub-section of the second row of heat exchanger bays;
  • first sub-section of the second row of heat, exchanger bays arranged at an elevated level vertically offset from and towards a first edge of a second module base to provide a covered section of the second module base, wherein the second module includes the first sub-section of the second row of heat exchanger bays without including a sub-seetion of the first row of heat exchanger bays;
  • the first edge of the second module base positioned at the production location towards the first edge of the first module base.
  • the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
  • the second module base is sized to include an uncovered section for mounting a selected piece of process equipment.
  • the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
  • the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two long sides.
  • the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides.
  • the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two short sides.
  • the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two short sides.
  • a second sub-section of the first or second row of heat exchanger bays is positioned on an adjacent module.
  • the first module is one of a plurality of first modules.
  • the second module is one of a plurality of second modules.
  • the installed production train has a longitudinal axis extending from a first end of the installed produetion train to a second end of the installed production train and the first row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
  • the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the second row of heal exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
  • the first sub-section of the first row of heat exchanger bays is the first row of heat exchanger bays.
  • the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays.
  • the first sub-section of the first row of heat exchanger bay is arranged to extend outwardly beyond the first edge of the first module base, and u gap is formed between the first module base and the second module, tn one form, the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base.
  • the first sub-section of the first row of heat exchanger bay and the first sub-section of the second raw of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first, module base and the second module base during step (d).
  • the production plant further comprises a plurality of third module heat, exchangers operatively associated with a third selected function arranged on a third module base to form a portion of the first row of heal exchanger bays and a porlion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a covered section of the third module base.
  • the third module base is sized such that the plurality of third module heat exchangers covers at least 90% of the third module base to form a fully covered third module.
  • the third module is one of a plurality of third modules.
  • one of the plurality of modules is a pre-treatrnent module for removing contaminants from a natural gas feed stream to produce a pre-treated natural gas stream.
  • one of the plurality of modules is a first refrigerant condenser module for pre-coalitig a pre-treatcd natural gas stream to produce a pre-cooled gas stream and a first, refrigerant vapour stream.
  • one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream to produce a compressed first refrigerant stream for recycle to a first refrigerant condenser module.
  • one of the plurality of modules is a liquefaction module operatively associated with a main cryogenic heat exchanger for further cooling a pre-cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural ga product stream and a second refrigerant vapour stream.
  • one of the plurality of modules is a second refrigerant compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger.
  • the first refrigerant is propane or nitrogen.
  • the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen.
  • the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility.
  • FrG, 1 (a) is a schematic plan view of a prior art production train
  • FIG. 1(b) is a schematic plan view of the prior art production train of FIG. 1 (a) with light grey shading to illustrate the location of the first row o heat exchanger bays and dark grey shading to illustrate the location of the second row of heat exchanger bays;
  • FIG. 2(a) is a schematic plan view of an alternative prior art production train
  • FIG, 2(b) is a schematic plan view of tire prior art production train of FIG. 2(a) with light grey shading to illustrate the location of the first row of heat exchanger bay and dark grey shading to illustrate the location of the second row of heat exchanger bays;
  • FIG. 3(a) is an isometric view from one direction of one of the plurality of modules of an LNG production train of the present invention showing a first module designed and sized to include a covered section and an uncovered section;
  • FIG. 3(b) is a plan view of the module of FIG. 3(a);
  • FIG. 4(a) is an isometric view from one direction of one of the plurality of modules of an LNG production train of the present invention showing a full covered module without an uncovered section;
  • FIG. 4(b) is a plan view of the module of FIG. 4(a);
  • FIG. 5(a) is a schematic plan vie of one embodiment of the present invention showing a first module with a covered and uncovered section and a second fully covered module;
  • FIG. 5(b) is a schematic side view of the embodiment of FIG. 5(a);
  • FIG. 6(a) is schematic plan view of one embodiment of the present invention showing a first module with a covered and uncovered section and a second module with a covered and uncovered section;
  • FIG. 6(b) is a schematic side view f the embodiment of FIG, 6(a);
  • FIG. 7 is a schematic plan view of one embodiment of the present invention showing a first module with a covered and uncovered section and a second fully covered module;
  • FIG. 8 is a schematic plan view of one embodiment of the present, invention showing a first module with a Covered and uncovered section and a second module with a covered and uncovered section;
  • FIG. 9(a) is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, two fully covered second modules and, and a third module;
  • FrG. 9(b) is a schematic plan view of one embodiment: of the present invention in which a first row of heat exchanger bays is shaded in light grey and in which a second row of heat exchanger bays is shaded in dark grey;
  • FIG. 9(c) is a schematic plan view of one embodiment of the present invention in which a first section of the first row of heat exchanger bays is shaded in light grey and in which a second plurality of heat exchangers operatively associated with the second selected function on the second module base is shaded in dark grey;
  • FIG. 10 is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, one second module vvith a covered and uncovered section, one fully covered Second module, and it third module;
  • FIG. 1 1 is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, two second modules, each with a covered and uncovered section, and, a third module;
  • FIG. 12 is a schematic plan view of one embodiment of tire present invention showing two first modules, each with a covered and uncovered section, two second modules, each with a covered and uncovered section, and, an additional module arranged towards one end of the installed production train;
  • FIG. 13 is a schematic plan view of one embodiment of the present invention showing one first module, including a first section of the first row of heat exchanger bays, one second module including a first section of the second row of heat exchanger bays which comprises the whole of the second row of heat exchangers bays, and two additional modules including heat exchanger bays which togelher with those in the first module comprise the first row of heat exchanger bays in a staggered manner;
  • FIG. 14 is a schematic plan view of one embodiment of the present invention showing one first module, including a first section of the. first row of heat exchanger bays which comprises the whole of the first row of heat exchangers bays, one second module, including a first section of the second row of heat exchanger bays, and two additional modules including heat exchanger bays which together with those in the second module comprise the second row of heat exchanger ba s, arranged in a linear manner;
  • FIG. 15 is a schematic plan view of one embodiment of the present invention showing one first module, one second module, one third module, one fourth module and one fifth module;
  • FIG. 16 is a schematic plan view of another embodiment of the present invention showing one first module, one second module, one third module, one fourth module and one fifth module;
  • FIG. 17 is a schematic plan view of one embodiment of the present invention showing one first module, two second modules, one third module, one fourth module and one fifth module;
  • FIG. 18 is a schematic plan view of one embodiment of the present invention showing one first module with a covered and uncovered section, one fully covered second module, and two fully covered third modules;
  • FIG. 19 is a schematic plan view of one embodiment of the present: invention showing one first module with a covered and uncovered section, one second module with a covered and uncovered section, and two fully covered third modules;
  • FIG. 20 i a schematic side view of one embodiment of the present invention showing d e first sub-section of the first row of heat exchanger bays extending outwardly beyond the first edge of the first module base to form a gap between the first module base and die second module base;
  • FIG. 21 i a schematic side view of one embodiment of the present invention showing the first sub-section of the second row of heat: exchanger bays arranged, to extend outwai'dlv beyond the first edge of the second module base to form a gap between the first module base and the sec nd module base; and,
  • FIG. 22 is a schematic side view of one embodiment of the present invention showing both the first section of the first row of heat exchanger hays arranged to extend outwardly beyond the first edge of the first module base and the first section of the Second row of heat exchanger bays arranged to extend outwardly beyond the first edge of the second module base to form a gap between the first module base and die second module base.
  • production train refers to facilities used for the pre-treatment of a natural gas feed stream to remove contaminants and facilities used for receiving pre-treated gas and subjecting the pre-treated gas to cooling to form liquefied natural gas.
  • heat exchanger bay refers to a heat exchanger having a plurality of tubes extending between flow headers with fluid being caused to flow through the plurality of tubes to exchange heat with a heat exchange medium that passes across the outside of the pluralit of tubes.
  • air-cooled heat exchanger bay refers to a heat exchanger bay having a single row of fans (usually 2-4) arranged within each heat exchanger bay between the headers to direct the flow of air across the plurality of tubes.
  • heat exchanger bank refers to a collection of air-cooled heat exchanger bays arranged adjacent to each other in a single or double row.
  • tick-built or off-module refers to a plant or a section f a plant that is constructed predominantly on a production location which the plant is intended to occupy upon completion of construction of the plant.
  • module refers to a section of a plant that is pre-assemhled at a construction or assembly location remote from the production location.
  • Each module is designed to be transported from the construction or assembly location to the production location b towing or on floating barges or by land using rail or truck. After each module is moved from the construction or assembly location to the production location, the module is positioned in a suitable pre- determined orientation to suit the needs of a given LNG production facility.
  • FIG. 1(a) and FIG. Kb The first example is illustrated schematically in FIG. 1(a) and FIG. Kb).
  • the second example is illustrated chematically in FIG. 2(a) and 2(b) and is the subject of a co-owned and co-pending patent application.
  • the facility includes Prior Art Module A ( 1 ), Prior Art Module B (2), Prior Art Module C (3), Prior Art Module D (4), and.
  • Prior Art Module E To keep the overall plot size of the LNG production facility to a minimum, it is known to arrange sub-sections of the air-cooled heat exchanger bank (6) over the top of selected modules so as to cover one hundred percent of the area defined by the base of said module with a view to making the air-cooled heal exchanger bank as large as possible for a given module size.
  • Prior Art Module C (3) is completely covered, whilst the other four modules extend beyond the sides of the air-cooled heat exchanger bank (6) in order to provide uncovered space to accommodate other processing equipment.
  • the air-cooled heat exchanger bank (6) is made up of a first row of heat exchanger bays (7) and a second row of heat exchanger bays (8).
  • the first and second rows of heat exchanger bays extend parallel to each other along the full length of fire production facility.
  • the first row of heat exchanger bays in FIG 2(b) is shaded in light grey with the second row of heat, exchanger bays shaded in dark grey.
  • each of Prior Art Module A (1), Prior Art Module B (2), Prior Art Module C (3), Prior Art Module D (4), and, Prior Art Module E (5) include a portion of the first row of heat exchanger bays (7) and a portion of the second row of heat exchanger bays (8).
  • the aii-cooled heat exchanger bank (6) is analogously made up of a first row of heat exchanger bays (7) and a second row of heat exchanger bays (8).
  • the first row of heat: exchanger bays in FIG 1(b) is shaded in light grey with the second row of heat exchanger bays shaded in dark grey.
  • each of Prior Art Module A ( 1 ), Prior Art Module B (2), and, Prior Art. Module C (3) include a portion of the first row of heat exchanger bays (7) and a portion of the second row of heat exchanger bays (8).
  • the present invention has been developed in part to provide an alternative to these prior art air-cooled heat exchanger bank arrangements.
  • FIGS. 3 to 5 schematically show a liquefied natural gas production process (10) for producing a product stream of liquefied natural ga at a production location (12).
  • the process includes designing a plurality of modules (14) for installation at the production location (12) to Form an installed production train ( 16) having a longitudinal axis (22).
  • Each module (14) has a module base (18) for mounting a plurality of plant equipment (20) associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module (14).
  • the plurality of modules (14) includes at least; a first module (24) assigned to perform a first selected function, a second module (26) assigned to perform a second selected function, and, optionally, a third module (30) assigned to perform a third selected function.
  • the number of modules within the plurality of modules may vary.
  • the production train ( 16) comprises three modules with the first module (24) and the second module (26) shown in solid lines and the third module (30) shown in dotted lines to indicate that this modules i optional or able to be added to the installed production train at a later date.
  • the production train (16) comprises three modules.
  • the production train (16) comprises four modules with two shown in solid lines and two shown in dotted lines to indicate that these modules are optional or able to be added to the production train at a later date.
  • the production train (16) comprises five modules.
  • the process of the present invention includes the step of designing an air-cooled heat: exchanger bank (32) including: a first row of heat exchanger bays (34) and, an adjacent parallel second row of heat exchanger bays (36).
  • the process of the present invention includes the step of arranging a first sub-section (38) of the first row of heat exchanger bays (.34) at an elevated level (40) vertically offset from and towards a first edge (42) of the first module base (44). This arrangement is used to provide a covered section (46) of the first module base (44). This arrangement is used to minimize the plot space required for the production train (16) and improve efficiency of air cooling by way of improved circulation.
  • the first module base is designed and sized to include an uncovered section (48) for mounting a selected piece of process equipment (50).
  • the selected piece Of equipment (50) may be selected from the group including, but not limited to: a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead- time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the ele ⁇ 'ated level (40).
  • the uncovered section (48) of the first module base (44) is further positioned away from the longitudinal axis of the installed production train (22) than the covered section (46) as best seen in FIG. 5.
  • the uncovered section of the first module base allows unobstructed overhead crane access to the selected pieces of equipment as well as improved side access making construction or maintenance activities for the selected pieces of equipment easier to perform.
  • Sizing the first module base to include an uncovered section in addition to the covered section allows for installation and positioning of the selected pieces of equipment in a less congested area of the module which has the flow-on benefit: of allowing the selected, pieces of equipment to be the last- pieces of equipment that are installed on the module.
  • Sizing the first module base to include an uncovered section in addition to the covered section also allows entire processing systems that include both air-cooled heat exchangers and other types of processing equipment that cannot be installed beneath the air-cooled heat exchanger bank to be installed within the ame module. This allows all of the interconnecting pipes between those related equipment items to be completed as part of module fabrication, thus eliminating the need to complete the pipework at the production location which provide significant cost and time savings over the prior art.
  • the process includes the step of arranging a first sub-section (56) of the second row of heat exchanger bays (36) at an elevated level (40) vertically offset from and towards a first edge (58) of the second module base (60).
  • This arrangement is used to provide a covered section (62) of the second module base (60).
  • the covered section (62) of the second module base (60) comprises at least 90% of the second module base.
  • the second module base (60) is designed and sized to include a covered section (62) and an uncovered section (64).
  • the uncovered section (64) may be provided for mounting the selected piece of process equipment (50) on the second module base (60).
  • the first edge (58) of the second module base (60) is positioned so that the first sub-section (56) form part of the second row of heat exchanger bays (36) of the installed production train ( 16) with the result that the covered section (62) of the second module base (60) is positioned closest to the longitudinal axis (22) of the installed production train (16) whilst the uncovered section (62) of the second module base (60) is positioned away from the longitudinal axis (22) of the installed produ ction train ( 16) .
  • the module base (18) of each of the plurality of modules ( 1.4) may have a generally rectangular or square footprint.
  • the first edge (42) of the first module base (44) may be arranged along one of the two long sides (68) as shown in FIG. 5 and 6 or, alternatively, may be arranged along one of the two short: sides (70) of the first module base (44) as shown in FIG. 7 and FIG. 8.
  • the second module base (60) has a rectangular footprint comprising two long ides (72) and two short sides (74
  • the first edge (58) of the second module base (60) may be arranged alon one of the two long sides (72) as shown in FIG.
  • first edge (42) of the first module base (44) is arranged along a short side (70) whilst the first edge (58) of the second module base (60) is arranged along one of the two long sides (72).
  • first edge (58) of the second module base (60) is positioned at the production location towards the first edge (42) of the first module base (44).
  • the air-cooled heat exchanger bank (36) is designed so that, the first module (24) does not include any heat exchanger from the second row of heat exchanger bays (42) and the second module (26) does not include any heat exchanger from the first row of heat exchanger bays (40).
  • FIG. 9(a) Shows an installed production train comprising two first modules (24' and 24"), two second modules (26 * and 26") and a third module (30).
  • FIG. 9(b) shows the installed production train of FIG. 9(a) with the entire first row of heat exchanger bays (34) shaded in light grey and the entire second row of heat exchanger bays (36) shaded in dark grey for clarity purposes.
  • FIG. 9(a) Shows an installed production train comprising two first modules (24' and 24"), two second modules (26 * and 26") and a third module (30).
  • FIG. 9(b) shows the installed production train of FIG. 9(a) with the entire first row of heat exchanger bays (34) shaded in light grey and the entire second row of heat
  • FIG. 9(c) shows only the first sub-section (38) of the first row of heat exchanger bays (34) is shaded in light grey for clarity purposes.
  • the first sub-section (56) of the second row of heat exchanger bays (36) is arranged on the second module base (60) whilst a second sub-section (76) of the second row of heat exchanger bays (36) is positioned on an adjacent third module (30).
  • the second module may be a propane condenser module which requires a large number of heat exchangers to be included in the second plurality of heat exchangers (56).
  • FIG. 9(c) shows the first sub-section (56) and the second sub-section (76) of (he second row of heat exchanger bays (36) shaded in dark grey for clarity purposes. It is apparent from FIG. 9(a) and 9(b), that the first module (24') includes a first sub- section of the first row of heat exchanger bays (34) without including a first sub-section of the second row of heat exchanger bays (36).
  • the process may include the step of arranging a plurality of third module heat exchangers (80) operatively associated with the third selected function of the third module (30) on the third module base (82).
  • the plurality of third module heat exchangers (80) includes both a second section (84) of the first row of heat exchanger bay (34) and a second section (76) of the second row of heat exchanger bays (36).
  • the plurality of third module heat exchangers are arranged on an elevated level (40) vertically offset from the third module base (82) to provide a covered section (86) of the third module base (82).
  • the third module base (82) is sized such that the plurality of third module heat exchangers (80) covers at least 90% of the third module base to form a fully covered third module.
  • the third module (30) includes sections of both the first and second rows of heat exchanger bays.
  • the third module is one of a plurality of third modules with two third modules (30' and 30") shown.
  • Each of the third modules (30' and 30") includes sections of both the first and second rows of heat exchanger bays.
  • One of the third modules (30') is arranged at a first end (88) of the installed production train (16) and the other third module (30") is arranged at a second end (90) of the installed production train (16).
  • the process of the present in vention allows for constructin at least one of the plurality of modules at a construction location or assembling at least one of the plurality of modules at an assembly location prior to transport to the production location, and testing the at least one module for verification purposes at the construction or assembly location.
  • the pieces of equipment required to perform the pre-determined function assigned to that module are arranged to minimize interfaces between modules so as to minimize the hook-up that is required to be completed when the modules are delivered from a construction location or assembly location to the production location.
  • a module can be essentially self-contained and provided with a temporary control system to allow the module to be switched on for loop Checks and commissioning at the construction or assembly location prior to transport to the production location.
  • wireless control may be used for inter-modular communication and control to further reduce the hook-up time.
  • the plurality of modules are spaced as closely as passible, while still allowing sufficient room at the production location to hook up the interconnections between modules.
  • FIG. 10 illustrates that the module bases of adjacent first- and second modules may be offset relative to each other along the longitudinal axis of the installed production train.
  • the first row of heat exchanger bays (34) which is designated by an arrow labelled with reference numeral (35) i non-linear and the second row of heat exchanger bays (36) is comprised entirely of the first sub-section (56) of the second row of heat exchanger bays (36). In other words, all of the second row of heat exchanger bays (34) is provided, on the second module base (60).
  • the first sub-section (38) of the first row of heat exchanger bays (34) is the first row of heat exchanger bays (34), In other words, all of the first row of heat exchanger bays (34) is provided on the first module base (44).
  • the installed production train (16) includes one first module (24), one second module (26), one third module (30), a fourth module (92) and a fifth module (94).
  • Each of the third, fourth and fifth modules are designed to include a sub-section of die first row of heat exchanger bays (34) and a subsection of the second row of heat exchanger bays (36).
  • both the fourth module and the fifth module include a covered section (96) and an uncovered section (98). Each uncovered section (98) is provided for mounting of one or more selected pieces of equipment (50) in an analogous manner to that described above.
  • both the fourth module and the fifth module include a covered section (96) and two uncovered sections (98' and 98") ⁇ Each uncovered section (98) is provided for mounting of one or more selected pieces of equipment (50) in an analogou manner to that described above.
  • the embodiment, illustrated in FIG. 17 shows one first module (24), two second modules (26' and 26"), one third module (30), one fourth module (92) and one fifth module (.94).
  • the embodiment illustrated in FIG. 1 shows one first module (24) with a covered and uncovered section, one fully covered second module (26), and two fully covered third modules (30' and 30").
  • the embodiment illustrated in FIG. 19 shows one first module (24) with a covered and uncovered section, one second, module (26) with a covered and uncovered section, and two fully covered third modules (30' and 30").
  • the first module (24) includes a first sub-section of the first row of heat exchanger bays (34) without including a first sub-section of the second row of heat, exchanger bays (36) and the second module (26) includes a first sub-section of the second row of heat exchanger bays (36) without including a section of the first row of heat exchanger bays (36).
  • the first sub-section (38) of the first row of heat exchanger bays (34) is arranged to extend outwardly beyond the first edge (42) of the first module base (44).
  • the first edge (42) of the first module base (44) is positioned towards the first a first edge (58) of the second module base (60) to form the installed production train (16)
  • the first sub-section (38) of the first row of heat exchanger bays (34) is adjacent to the first sub-section (56) of the second row of heat exchanger bays (36), whilst leaving a gap (97) between the first module base (44) and the second module base (60).
  • the first sub-section (56) of the second row of heat exchanger bays (36) is arranged to extend outwardly beyond the first edge (58) of the second module ba.se (60) to form the gap (97).
  • the first sub-section (38) of the first row of heat exchanger bays (34) is arranged to extend outwardly beyond the first edge (42) of the first module base (44)
  • the first sub-section (56) of the second row of heat exchanger bays (36) is arranged to extend outwardly beyond the first edge (58) of the second module base (60) to form the gap (97).
  • the gap (97) provides room for underground services (99), for example, electrical cables, to come up within the installed production train (16) without having a module positioned over them.
  • a process for liquefying a natural gas stream comprises the steps of:
  • iii condensing the first refrigerant vapour stream in a first refrigerant condenser module ( 104) to produce a compressed first, refrigerant, stream for recycle to step ii); iv) further cooling the pre-cooled gas stream in a main cryogenic heat exchanger (106) operatively associated with a liquefaction module ( 108) through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream; and,
  • step iv) compressing the second refrigerant vapour stream in a second refrigerant, compression module (1 10) to produce a compressed second refrigerant stream for recycle to step iv).
  • the production train ( 16) comprises the following modules:
  • a first refrigerant compression module ( 102), in this example, a propane compression module;
  • a first refrigerant condenser module (104), in this example, a propane condenser module;
  • a second refrigerant compression module ( 1 10), in this example, a mixed refrigerant (MR) compression module.
  • MR mixed refrigerant
  • the equivalent modules of a production train of the prior art are marked up in FIG. 2(a) with reference numerals 100, 1 2, 104, 108 and 1 1 .
  • the first refrigerant is propane while the second refrigerant is a mixed refrigerant hydrocarbon mixture, by way of example only.
  • This type of process is known a the propane pre- cooled mixed refrigerant, or C3MR process, which is used to manufacture most of the LNG produced worldwide and is a process that is not further discussed here is it considered to be well known lo the person skilled in the art.
  • propane propane
  • care is taken to ensure that propane does not leak because propane vapour i highly flammable.
  • the process equipment required for propane compression is grouped together within a propane compression module to facilitate the pre-commissioning and commissioning of that module— having all of the accessories that are needed to circulate fluid through the compressor at the construction or assembly location.
  • the main rotating equipment associated with the propane compression circuit is placed on an uncovered section of one of the plurality of modules rather than underneath the plurality of heal exchangers arranged on the elevated level.
  • the pretreatment module (100) is a first module (24'), the first refrigerant compression module ( 102) is a second module (26'), and the first refrigerant condenser module (104) is a third module (30).
  • the liquefaction module (108) is a first: module (24") and the second refrigerant compression module (110) is a second module (26").
  • the compressors arc long lead items.
  • This embodiment allows for the installation of the pretreatment module ( 00) and first refrigerant condenser module ( 104) to occur at the production location (12) without needing to wait for the installation of the first refrigerant: compression module (102).
  • the liquefaction module (108) can be installed at the production location (12) without the need to wait for the installation of the second refrigerant compression module (1 10).
  • This arrangement allows for direct fluid communication between the first refrigerant compression module (102) and the first refrigerant condenser module (104) without the need for the first refrigerant to be piped across the pretreatment module (100).
  • This arrangement further allows for direct fluid communication between the second refrigerant compression module ( 1 10) and the first refrigerant condenser module (104).
  • the second refrigerant to be cooled by the first refrigerant in heat exchangers either inside or adjacent to the first refrigerant compression module (102), it: only has to pass through one intermediate module, the first refrigerant condenser module ( KM ), rather than both the first refrigerant condenser module (104) and the liquefaction module (108).
  • This arrangement further allows for direct fluid communication between the liquefaction module ( 108) and the end of the LNG trains, from which the LNG will be piped to the LNG Storage tank.
  • the LNG product stream does not need to pass through the second refrigerant compression module (.1 10).
  • the arrangement illustrated in FIG. 1.1 allows a section of selected pipework (120) that runs along the length of the installed production train (16) to be completed with fewer hook-ups at the production location ( 12). For example, raw feed gas must be piped to the gas pretreatment module (100) which is positioned towards the first end (88) of the production train (16).
  • the raw feed gas pipework (120) will need to traverse through only two unrelated modules (108 and 104).
  • the same service would have to pass through four unrelated modules (110, 108, 104 and 102).
  • reducing the need for unrelated pipes to pass through modules assists to reduce the duration of Ore design process.
  • the layout of the plurality of modules can be advanced and completed without having to wait for additional details about unrelated services.
  • the pre -treatment module ' is one of two first modules (24' ) and the first module base (44) is sized to include a covered section (46) for mounting of the first sub-section (38) of the first row of heat exchanger bays (34) and an uncovered section (48) for mounting one or more selected pieces of process equipment (50), such as an acid gas removal unit column and its associated knock-out vessel and pumps, and/or one or more molecular sieve dehydration vessels.
  • process equipment such as an acid gas removal unit column and its associated knock-out vessel and pumps, and/or one or more molecular sieve dehydration vessels.
  • the first refrigerant compression module (102) is one of two second modules (26').
  • the second module base (60) is sized to include a covered section (62) for mounting of first sub-section (56) of the second row of heat exchanger bays (36) and an uncovered section (64) for mounting a selected piece of process equipment (50'), such one or more first refrigerant compressors.
  • the first refrigerant condenser module (104) is a third module (30) because this module requires a comparativel large number of heat exchangers to be included in the plurality of third module heat exchangers (80) compared with the other modules.
  • the first refrigerant condenser module (104) is aligned with the longitudinal axis (22) of the installed production train (16) to accommodate its requirement to include a second sub-section (84) of the first row of heat exchanger bays (34) and a second ib-section (76) of the second row of heat exchanger bays (36).
  • the first refrigerant condenser module (104) may include services that contain non-flammable inventories, such as steam for heating purposes or water for either heating or coolin purposes within the installed production train.
  • the plurality of plant equipment required for these services may be mounted underneath the first refrigerant condenser without significant safety risks due to potential leakage.
  • the Liquefaction module (108) is one of two first modules (24").
  • the process may include the step of locating the main cryogenic heat exchanger (106) off-module adjacent to the liquefaction module ( 108) due to its size and weight, delivery schedule, and/or to mitigate the potential for damage during transport.
  • the main cryogenic heat exchanger (106) may be positioned on the uncovered section (48") of the first module base (44").
  • Static equipment and pumps which are operatively associated with the main cryogenic heat exchanger are positioned on the liquefaction module (108) on the same side of the heat exchanger bank as the main cryogenic heat exchanger to minimise interconnecting piping runs.
  • Equipment (50) associated with end-flash gas compression, nitrogen and helium removal may also be positioned on the uncovered section (48 " ) of the liquefaction module (108) if required.
  • An end- flash gas compression system (107) requires only very few heat exchangers with the result that the liquefaction module (104) has space available for additional heat exchangers which are operatively associated with another system,
  • a selected function that may require additional space is the first refrigerant condenser, which makes positioning the liquefaction module (108) in direct contact with the first refrigerant condenser module (104) advantageous.
  • the second sub-section (84) of the first row of heat exchanger bays (34) which includes heat exchangers that are operatively associated with the fifst refrigerant condenser module (1 04) may span across to partially cover the module base (44") of the adjacent liquefaction module (108).
  • the second compression module (110) is one of the two second modules (26").
  • the second compression module includes all of the process equipment required to perform the functional requirement of this module including the gas turbine, the compressor, interconnecting pipework, waste heat recovery, and recycle valves which are arranged on the module base.
  • the plurality of heat exchangers operatively associated with the second compression module provides the required aftercooling and ntercooling for the second refrigerant compressors.
  • the second compression module (110) includes an uncovered section (64") of sufficient size to accommodate one or more refrigerant compressors (113).
  • Each module has been designed to ensure that the main hydrocarbon inventories and all rotating equipment are positioned on the uncovered sections Df the modules and not underneath the elevated heat exchanger bank. This permits good access for maintenance and allows the long lead items to be incorporated into the modules late in the construction sequence.
  • the significantly reduced hydrocarbon inventory provides improved Safet by way of making it easier to deal with the consequence of a leak, h addition to this, the overall layout of the production train of the present invention is designed to for modularisation, with small compact equipment selected to suit modularisation rather than adopting the prior art approach of relying on economy of scale. Instead, smaller, more intensive equipment has been selected in order to be able to fit more items inside modules of a limited size and weight.
  • Aero-derivative gas turbines have been integrated into the modules, complete with the all of the elements of each compression system. This permits the complicated, large-diameter compressor suction and discharge lines to be built at a construction location rather than having to be stick- built at the production location, whilst retaining a practical total module size/weight. Using Smaller units and keeping the gas turbine and compressor integrated in the same module minimises the number of connections at site, and it also makes it possible for the compression system to be fully tested up to a nitrogen test run stage at the construction.
  • the variable speed nature of the aero-derivative gas turbines simplifies the compressor start-up and eliminates the need to depressurise refrigerant. Removing the need for starter/helper motors for gas turbines used in prior art LNG trains also significantly reduces the maximum electrical power demand of the modularized LNG train and helps to keep the module size down.
  • the production location can be onshore, offshore on a floating facility, offshore on a fixed facility, or a barge -mounted or grounded facility, provided only that, the heat exchanger bank is an air-cooled heat exchanger bank.
  • the modules may be floated-in using steel or concrete gravity based structures with integrated LNG storage, loading and boi l-off gas re-liquefaction functionality with gas supplied to the production location via a subsea pipeline.
  • the LNG plant may further include optional treatment steps such as product purification steps (helium removal, nitrogen removal) and non-methane product; production steps (de-ethanizing, de-prapanizing, sulphur recovery) if desired.
  • the natural gas feed stream may be produced at and obtained from a natural gas or petroleum reservoir.
  • the natural gas feed stream may also be obtained from another source, also including a synthetic source such as a Fischer-Tropsch process wherein methane is produced from synthesis gas.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Combustion & Propulsion (AREA)
  • Separation By Low-Temperature Treatments (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

A liquefied natural gas production plant for producing a product stream of liquefied natural gas installed at a production location and a process for producing liquefied natural gas is described. The production plant includes a plurality of modules and an air-cooled heat exchanger bank designed for the installed production train, the heat exchanger bank including: a first row of air-cooled heat exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays, A first sub-section of the first row of heat exchanger bays is arranged at an elevated level vertically offset from and towards a first edge of a first module base to form a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting a selected piece of process equipment. A first sub-section of the second row of heat exchanger bays arranged at an elevated level vertically offset from and towards a first edge of a second module base to provide a covered section of the second module base. The first edge of the second module base positioned at the production location towards the first edge of the first module base The first module includes the first sub-section of the first row of heat exchanger bays without including a sub-Section of the second row of heat exchanger bays and the second module includes the first sub-section of the second row of heat exchanger hays without including a sub-section of the first row of heat exchanger bays.

Description

- I -
AIR-COOLED MODULAR LNG PRODUCTION FACILITY FIELD OF THE INVENTION
The present invention relates to an air-cooled liquefied natural gas production process for producing a product stream of liquefied natural gas at a production location using a plurality of modules. The present invention further relates to an air-cooled liquefied natural gas production plant for producing a product stream of liquefied natural gas at a production location using a plurality of modules.
BACKGROUND TO THE INVENTION
Natural gas ("NG") is routinely transported from one location to another location in its liquid state as "Liquefied Natural Gas" (LNG). Liquefaction of the natural gas makes it: more economical (o transport as LNG occupies only about l/60Q,h of the volume, that the same amount of natural gas does in its gaseous state. After liquefaction, LNG is typically stored in cryogenic containers either at or slightly above atmospheric pressure. LNG is regasified before distribution to end users through a pipeline or other distribution network at a temperature and pressure that meets the delivery requirements of the end users.
Wellhead gas is subjected to ga pre-treatment to remove contaminants prior to liquefaction. The hydrogen sulphide and carbon dioxide can be removed using a suitable process such as amine adsorption. Removal of water can be achieved using conventional methods, for example, a molecular sieve. Depending on the composition of contaminants present in the inlet gas stream, the inlet gas stream may be subjected to further pre- treatment to remove other contaminants, such as mercury and heavy hydrocarbons prior to liquefaction. Liquefaction is achieved using methods that are well established in the art which typically involve compression and cooling. Such processes include the APCI C3/ R7*1 or SplitMR™ or AP-X™, processes, the ConoeoPhillips Optimized Cascade Process, the Linde Mixed Fluid Cascade process or the Shell Double Mixed Refrigerant or Parallel Mixed Refrigerant process. Regardless of the choice of liquefaction process, refrigerants are used to reduce the temperature of the treated wellhead gas to a temperature of around -160°C to form LNG, resulting in warming of the refrigerant which must be compressed for recycle to the liquefaction process. The compressors used for this duty are traditionally .steam turbines, gas turbines or electric motors depending on the power requirements and layout issues of a particular LNG production facility. The coolers required for the variou compression and heat exchanger operations associated with an LNG plant may be air coolers or water coolers arranged in a heat exchanger bank.
Prior art modularised LNG production trains have been closely based upon the design and layout of the more traditional stick-built LNG production trains. Until now, modularisation has been conducted by slicing up an existing stick built LNG train design into transportable sections, leading to some compromises regarding the placement of the module boundaries. Prior art examples of modularization of a traditional stick-built air- cooled LNG train have relied on dividing the centrally located air-cooled heat exchanger bank into the smallest number of modules possible for a given size of air cooler within the air-cooled heat exchanger bank. The result is that the other process equipment i.s located in separate stand-alone modules as illustrated schematically in FIG I (a). The disadvantage of this approach is a large number of piping connections between the air- cooled heat exchangers and the other associated processing equipment.
There remains a need to explore alternative designs for a modular LNG production plant to alleviate this problem,
SUMMARY OF THE INVENTION
According to a first aspect of the present invention there is provided a liquefied natural gas production process for producing a product stream of liquefied natural ga at a production. location, said process comprising:
a) designing a plurality of modules for installation at the production location to form an installed production train, each module having a module base for mounting a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas* said selected function being assigned to said module, the plurality of modules including a first module assigned to perform a first selected function, and, a second module assigned to perform a second selected function;
(b) designing an air-cooled heat exchanger bank for the installed production train, the heat exchanger bank including: a first row of air-cooled heat exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays;
(c) arranging a first sub-section of the first row of heat exchanger bays at an elevated level vertically offset from and towards a first edge of a first module base to form a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting a selected piece of process equipment, wherein the first module includes the first sub-section of the first row of heat exchanger bays without including a sub-section of the second row of heat exchanger bays;
(d) arranging a first sub-section of the second row of heat exchanger bays at an elevated level vertically offset from and towards a first edge of a second module base to provide a covered section of the second module base, wherein the second module includes the first sub-section of the second row of heat exchanger bays without including a sub-section of the first row of heat exchanger bays; and,
(e) positioning, the first edge of the second module base at the production location towards the first edge of the first module base.
In one form, the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having flammable inventory, a long lead-time piece of equipment, or, piece of equipment having an overall height that is taller than the height of the elevated level,
In one form, the process further comprises the step of sizing the second module base to include an uncovered section for mounting a selected piece of process equipment. In one form, the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead- time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
In one form, the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two long sides. In one form, the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides. In one form, the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two short sides. In one form, the second module base has a rectangular footprint comprising two long sides and two short, sides and the first edge of the second module base is arranged along one of the two short sides. In one form, a second sub-section of the first or second row of heat exchanger bays is positioned on an adjacent module.
In one form, the first module is one of a plurality of first modules. In one form, the second module i s one of a plurality of second modules.
In one form, the process further comprises the step of constructing at least one of the plurality of modules at. a construction location or assembling at least, one of the plurality of modules at an assembly location prior to transport to the production location, and testing the. at least one module for verification purposes at the construction or assembly location.
In one form, the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the first row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train. In one form, the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the second row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
In one form, the first Sub-section of the first row of heat exchanger bays is the first row of heat exchanger bays. In one form, the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays. .In one form, the first subsection of the first row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the first module base, and a gap is formed between the first module base and the second module base during step (d). In one form, the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step (d).
In one form, the first sub-section of the first row of heat exchanger bays and the first ub- section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step (d).
In one form, the process further comprises the steps of arranging a plurality of third module heat exchangers operatively associated with a third selected function on a third module base to form a portion of the first ro of heat exchanger bays and a portion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a. covered section of the third module base. In one form, the process further comprises the step of sizing the third module base such that the plurality of third module heat exchangers covers at least 90% of the third module, base to form a fully covered third module. In one form, the third module is one of a plurality of third modules. lit one form, one of the plurality of modules is a pre-treatment module for removing contaminants from a natural gas feed stream to produce a pre-treated natural gas stream. In one form, one of the plurality of modules i a first refrigerant condenser module for pre-cooling a pre-treated natural gas stream to produce a pre-cooled gas stream and a first refrigerant vapour stream. In one form, one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream lo produce compressed first refrigerant stream for recycle to a first refrigerant condenser module. In oiie form, one of the plurality of modules is a liquefaction module operatively associated with a main cryogenic heat exchanger for further cooling a pre-cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream, In one form, one of the plurality of modules is a second refrigerant compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger. In one form, the first refrigerant is propane or nitrogen. Tn one form, the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen, i one form, the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility. According to a second aspect of the present invention there is provided a liquefied natural gas production plant for producing a product stream of liquefied natural gas installed at a production location comprising:
a plurality of modules designed for installation at the production location to form ah installed production train, each module having a module base for mountin a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module, the plurality of modules including a first module assigned to perform a first selected function, and, a second module assigned to perform a second selected function;
an air-cooled heat exchanger bank designed for the installed production train, the heat exchanger bank including: a first row of air-cooled heat exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays;
a first sub-section of the first row of heat exchanger bays arranged at an elevated level vertically offset from and towards a first edge f a first module base to form a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting a selected piece of process equipment, wherein the first module includes the first sub-section of the first row of heat exchanger bays without including a sub-section of the second row of heat exchanger bays;
a first sub-section of the second row of heat, exchanger bays arranged at an elevated level vertically offset from and towards a first edge of a second module base to provide a covered section of the second module base, wherein the second module includes the first sub-section of the second row of heat exchanger bays without including a sub-seetion of the first row of heat exchanger bays; and,
the first edge of the second module base positioned at the production location towards the first edge of the first module base.
In one form, the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
In one form, the second module base is sized to include an uncovered section for mounting a selected piece of process equipment. In one form, the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
In one form, the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two long sides. In one form, the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides. In one form, the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged along one of the two short sides. In one form, the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two short sides.
In one form, a second sub-section of the first or second row of heat exchanger bays is positioned on an adjacent module. In one form, the first module is one of a plurality of first modules. In one form, the second module is one of a plurality of second modules.
In one form, the installed production train has a longitudinal axis extending from a first end of the installed produetion train to a second end of the installed production train and the first row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train. In one form, the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the second row of heal exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
In one form, the first sub-section of the first row of heat exchanger bays is the first row of heat exchanger bays. In one form, the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays. hi one form, the first sub-section of the first row of heat exchanger bay is arranged to extend outwardly beyond the first edge of the first module base, and u gap is formed between the first module base and the second module, tn one form, the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base. In one form., the first sub-section of the first row of heat exchanger bay and the first sub-section of the second raw of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first, module base and the second module base during step (d). In one form, the production plant, further comprises a plurality of third module heat, exchangers operatively associated with a third selected function arranged on a third module base to form a portion of the first row of heal exchanger bays and a porlion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a covered section of the third module base. In one form, the third module base is sized such that the plurality of third module heat exchangers covers at least 90% of the third module base to form a fully covered third module. In one form, the third module is one of a plurality of third modules. In one form, one of the plurality of modules is a pre-treatrnent module for removing contaminants from a natural gas feed stream to produce a pre-treated natural gas stream. In one form, one of the plurality of modules is a first refrigerant condenser module for pre-coalitig a pre-treatcd natural gas stream to produce a pre-cooled gas stream and a first, refrigerant vapour stream. In one form, one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream to produce a compressed first refrigerant stream for recycle to a first refrigerant condenser module. In one form, one of the plurality of modules is a liquefaction module operatively associated with a main cryogenic heat exchanger for further cooling a pre-cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural ga product stream and a second refrigerant vapour stream. In one form, one of the plurality of modules is a second refrigerant compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger.
In one form, the first refrigerant is propane or nitrogen. In one form, the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen.
In one form, the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility.
BRIEF DESCRIPTION OF THE DRAWINGS
In order to facilitate a more detailed understanding of the nature of the invention several embodiments of the present invention will now be described in detail, by way of example only, with reference to the accompanying drawings, in which:
FrG, 1 (a) is a schematic plan view of a prior art production train;
FIG. 1(b) is a schematic plan view of the prior art production train of FIG. 1 (a) with light grey shading to illustrate the location of the first row o heat exchanger bays and dark grey shading to illustrate the location of the second row of heat exchanger bays;
FIG. 2(a) is a schematic plan view of an alternative prior art production train;
FIG, 2(b) is a schematic plan view of tire prior art production train of FIG. 2(a) with light grey shading to illustrate the location of the first row of heat exchanger bay and dark grey shading to illustrate the location of the second row of heat exchanger bays;
FIG. 3(a) is an isometric view from one direction of one of the plurality of modules of an LNG production train of the present invention showing a first module designed and sized to include a covered section and an uncovered section;
FIG. 3(b) is a plan view of the module of FIG. 3(a);
FIG. 4(a) is an isometric view from one direction of one of the plurality of modules of an LNG production train of the present invention showing a full covered module without an uncovered section;
FIG. 4(b) is a plan view of the module of FIG. 4(a);
FIG. 5(a) is a schematic plan vie of one embodiment of the present invention showing a first module with a covered and uncovered section and a second fully covered module;
FIG. 5(b) is a schematic side view of the embodiment of FIG. 5(a);
FIG. 6(a) is schematic plan view of one embodiment of the present invention showing a first module with a covered and uncovered section and a second module with a covered and uncovered section;
FIG. 6(b) is a schematic side view f the embodiment of FIG, 6(a);
FIG. 7 is a schematic plan view of one embodiment of the present invention showing a first module with a covered and uncovered section and a second fully covered module;
FIG. 8 is a schematic plan view of one embodiment of the present, invention showing a first module with a Covered and uncovered section and a second module with a covered and uncovered section;
FIG. 9(a) is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, two fully covered second modules and, and a third module;
FrG. 9(b) is a schematic plan view of one embodiment: of the present invention in which a first row of heat exchanger bays is shaded in light grey and in which a second row of heat exchanger bays is shaded in dark grey;
FIG. 9(c) is a schematic plan view of one embodiment of the present invention in which a first section of the first row of heat exchanger bays is shaded in light grey and in which a second plurality of heat exchangers operatively associated with the second selected function on the second module base is shaded in dark grey;
FIG. 10 is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, one second module vvith a covered and uncovered section, one fully covered Second module, and it third module;
FIG. 1 1 is a schematic plan view of one embodiment of the present invention showing two first modules, each with a covered and uncovered section, two second modules, each with a covered and uncovered section, and, a third module;
FIG. 12 is a schematic plan view of one embodiment of tire present invention showing two first modules, each with a covered and uncovered section, two second modules, each with a covered and uncovered section, and, an additional module arranged towards one end of the installed production train;
FIG. 13 is a schematic plan view of one embodiment of the present invention showing one first module, including a first section of the first row of heat exchanger bays, one second module including a first section of the second row of heat exchanger bays which comprises the whole of the second row of heat exchangers bays, and two additional modules including heat exchanger bays which togelher with those in the first module comprise the first row of heat exchanger bays in a staggered manner;
FIG. 14 is a schematic plan view of one embodiment of the present invention showing one first module, including a first section of the. first row of heat exchanger bays which comprises the whole of the first row of heat exchangers bays, one second module, including a first section of the second row of heat exchanger bays, and two additional modules including heat exchanger bays which together with those in the second module comprise the second row of heat exchanger ba s, arranged in a linear manner;
FIG. 15 is a schematic plan view of one embodiment of the present invention showing one first module, one second module, one third module, one fourth module and one fifth module;
FIG. 16 is a schematic plan view of another embodiment of the present invention showing one first module, one second module, one third module, one fourth module and one fifth module;
FIG. 17 is a schematic plan view of one embodiment of the present invention showing one first module, two second modules, one third module, one fourth module and one fifth module;
FIG. 18 is a schematic plan view of one embodiment of the present invention showing one first module with a covered and uncovered section, one fully covered second module, and two fully covered third modules; FIG. 19 is a schematic plan view of one embodiment of the present: invention showing one first module with a covered and uncovered section, one second module with a covered and uncovered section, and two fully covered third modules;
FIG. 20 i a schematic side view of one embodiment of the present invention showing d e first sub-section of the first row of heat exchanger bays extending outwardly beyond the first edge of the first module base to form a gap between the first module base and die second module base;
FIG. 21 i a schematic side view of one embodiment of the present invention showing the first sub-section of the second row of heat: exchanger bays arranged, to extend outwai'dlv beyond the first edge of the second module base to form a gap between the first module base and the sec nd module base; and,
FIG. 22 is a schematic side view of one embodiment of the present invention showing both the first section of the first row of heat exchanger hays arranged to extend outwardly beyond the first edge of the first module base and the first section of the Second row of heat exchanger bays arranged to extend outwardly beyond the first edge of the second module base to form a gap between the first module base and die second module base.
DETAILED DESCRIPTION OF PARTICULAR EMBODIMENTS
The present invention may be understood more readily by reference to the following detailed description of the invention taken in connection with the accompanying drawing figures, which form a part of this disclosure. It is to be understood that the present invention is not limited to the specific devices, methods, conditions or parameters described and/or shown herein, and that the terminology used herein is for the purpose of describing particular embodiments by way of example only and is not intended to be limiting of the claimed invention. Also, as used in the specification including the appended claims, the singular forms "a," "an," and "the" include the plural, and reference to a particular numerical value includes at least that particular value, unles the context clearly dictates otherwise. Unless defined otherwise, all technical and scientific terms used herein have the same meanings as commonly understood by one of ordinary skill in the art to which this invention belongs. Like reference numerals refer to like parts. The term "LNG" refers to liquefied natural gas.
The lerm "production train" refers to facilities used for the pre-treatment of a natural gas feed stream to remove contaminants and facilities used for receiving pre-treated gas and subjecting the pre-treated gas to cooling to form liquefied natural gas.
The term "heat exchanger bay" refers to a heat exchanger having a plurality of tubes extending between flow headers with fluid being caused to flow through the plurality of tubes to exchange heat with a heat exchange medium that passes across the outside of the pluralit of tubes. The term "air-cooled heat exchanger bay" refers to a heat exchanger bay having a single row of fans (usually 2-4) arranged within each heat exchanger bay between the headers to direct the flow of air across the plurality of tubes.
The term "heat exchanger bank" refers to a collection of air-cooled heat exchanger bays arranged adjacent to each other in a single or double row.
The term " tick-built" Or "off-module" refers to a plant or a section f a plant that is constructed predominantly on a production location which the plant is intended to occupy upon completion of construction of the plant. In contrast, the term "module" refers to a section of a plant that is pre-assemhled at a construction or assembly location remote from the production location. Each module is designed to be transported from the construction or assembly location to the production location b towing or on floating barges or by land using rail or truck. After each module is moved from the construction or assembly location to the production location, the module is positioned in a suitable pre- determined orientation to suit the needs of a given LNG production facility.
Before describing various embodiments of the present invention, two examples of prior art modular LNG. production facilities will be briefly described. The first example is illustrated schematically in FIG. 1(a) and FIG. Kb). The second example is illustrated chematically in FIG. 2(a) and 2(b) and is the subject of a co-owned and co-pending patent application. Referring to FIG. 2(a) and 2(b), the facility includes Prior Art Module A ( 1 ), Prior Art Module B (2), Prior Art Module C (3), Prior Art Module D (4), and. Prior Art Module E (5), To keep the overall plot size of the LNG production facility to a minimum, it is known to arrange sub-sections of the air-cooled heat exchanger bank (6) over the top of selected modules so as to cover one hundred percent of the area defined by the base of said module with a view to making the air-cooled heal exchanger bank as large as possible for a given module size. Prior Art Module C (3) is completely covered, whilst the other four modules extend beyond the sides of the air-cooled heat exchanger bank (6) in order to provide uncovered space to accommodate other processing equipment. The air-cooled heat exchanger bank (6) is made up of a first row of heat exchanger bays (7) and a second row of heat exchanger bays (8). The first and second rows of heat exchanger bays extend parallel to each other along the full length of lire production facility. For clarity purposes only, the first row of heat exchanger bays in FIG 2(b) is shaded in light grey with the second row of heat, exchanger bays shaded in dark grey. As is best seen front FIG. 2(b), each of Prior Art Module A (1), Prior Art Module B (2), Prior Art Module C (3), Prior Art Module D (4), and, Prior Art Module E (5) include a portion of the first row of heat exchanger bays (7) and a portion of the second row of heat exchanger bays (8). In the prior art arrangement illustrated in FIG 1(a), the aii-cooled heat exchanger bank (6) is analogously made up of a first row of heat exchanger bays (7) and a second row of heat exchanger bays (8). For clarity purposes only, the first row of heat: exchanger bays in FIG 1(b) is shaded in light grey with the second row of heat exchanger bays shaded in dark grey. A is best seen from FIG. 1(b), each of Prior Art Module A ( 1 ), Prior Art Module B (2), and, Prior Art. Module C (3) include a portion of the first row of heat exchanger bays (7) and a portion of the second row of heat exchanger bays (8). The present invention has been developed in part to provide an alternative to these prior art air-cooled heat exchanger bank arrangements.
A first embodiment of the present invention is now described with reference to FIGS. 3 to 5 which schematically show a liquefied natural gas production process (10) for producing a product stream of liquefied natural ga at a production location (12). The process includes designing a plurality of modules (14) for installation at the production location (12) to Form an installed production train ( 16) having a longitudinal axis (22). Each module (14) has a module base (18) for mounting a plurality of plant equipment (20) associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module (14). The plurality of modules (14) includes at least; a first module (24) assigned to perform a first selected function, a second module (26) assigned to perform a second selected function, and, optionally, a third module (30) assigned to perform a third selected function. The number of modules within the plurality of modules may vary. By way of example, in the embodiments illustrated in FIGS. 5-6, the production train ( 16) comprises three modules with the first module (24) and the second module (26) shown in solid lines and the third module (30) shown in dotted lines to indicate that this modules i optional or able to be added to the installed production train at a later date. In the embodiment illustrated in FIG. 7, the production train (16) comprises three modules. In the embodiment illustrated in FIG. 8, the production train (16) comprises four modules with two shown in solid lines and two shown in dotted lines to indicate that these modules are optional or able to be added to the production train at a later date. In the embodiment illustrated in FIG. 9, the production train (16) comprises five modules.
The process of the present invention includes the step of designing an air-cooled heat: exchanger bank (32) including: a first row of heat exchanger bays (34) and, an adjacent parallel second row of heat exchanger bays (36). Referring to FIG. 3(a) and 3(b), the process of the present invention includes the step of arranging a first sub-section (38) of the first row of heat exchanger bays (.34) at an elevated level (40) vertically offset from and towards a first edge (42) of the first module base (44). This arrangement is used to provide a covered section (46) of the first module base (44). This arrangement is used to minimize the plot space required for the production train (16) and improve efficiency of air cooling by way of improved circulation. In addition to this, the first module base is designed and sized to include an uncovered section (48) for mounting a selected piece of process equipment (50). The selected piece Of equipment (50) may be selected from the group including, but not limited to: a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead- time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the ele\'ated level (40). When the first module (24) is i nstalled at. the production location, the first edge (42) of the first module base (44) is positioned so that the first sub-section (38) forms part of the first row of heat exchanger bays (34) of the installed production train ( 16). Advantageously, the uncovered section (48) of the first module base (44) is further positioned away from the longitudinal axis of the installed production train (22) than the covered section (46) as best seen in FIG. 5. Using this arrangement, the uncovered section of the first module base allows unobstructed overhead crane access to the selected pieces of equipment as well as improved side access making construction or maintenance activities for the selected pieces of equipment easier to perform. Sizing the first module base to include an uncovered section in addition to the covered section, allows for installation and positioning of the selected pieces of equipment in a less congested area of the module which has the flow-on benefit: of allowing the selected, pieces of equipment to be the last- pieces of equipment that are installed on the module. Sizing the first module base to include an uncovered section in addition to the covered section, also allows entire processing systems that include both air-cooled heat exchangers and other types of processing equipment that cannot be installed beneath the air-cooled heat exchanger bank to be installed within the ame module. This allows all of the interconnecting pipes between those related equipment items to be completed as part of module fabrication, thus eliminating the need to complete the pipework at the production location which provide significant cost and time savings over the prior art.
Referring to FIG, 4(a) and 4(b) and FIG. 5, the process includes the step of arranging a first sub-section (56) of the second row of heat exchanger bays (36) at an elevated level (40) vertically offset from and towards a first edge (58) of the second module base (60). This arrangement is used to provide a covered section (62) of the second module base (60). When the second module (26) is installed at the production location, the first edge (58) of the second module base (60) is positioned so that the first sub-section (56) forms part of the second row of heat exchanger bays (36) of the installed production train (16), In embodiment illustrated in FIG. 4(a), 4(b) and FIG 5, the covered section (62) of the second module base (60) comprises at least 90% of the second module base. In ah alternative embodiment illustrated in FIG. 6, the second module base (60) is designed and sized to include a covered section (62) and an uncovered section (64). The uncovered section (64) may be provided for mounting the selected piece of process equipment (50) on the second module base (60). As can be seen from FIG. 6, when the second module is installed at the production location, the first edge (58) of the second module base (60) is positioned so that the first sub-section (56) form part of the second row of heat exchanger bays (36) of the installed production train ( 16) with the result that the covered section (62) of the second module base (60) is positioned closest to the longitudinal axis (22) of the installed production train (16) whilst the uncovered section (62) of the second module base (60) is positioned away from the longitudinal axis (22) of the installed produ ction train ( 16) .
The module base (18) of each of the plurality of modules ( 1.4) may have a generally rectangular or square footprint. When the first module base (44) has a rectangular footprint comprising two long sides (68) and two short sides (70), the first edge (42) of the first module base (44) may be arranged along one of the two long sides (68) as shown in FIG. 5 and 6 or, alternatively, may be arranged along one of the two short: sides (70) of the first module base (44) as shown in FIG. 7 and FIG. 8. In an analogous manner, when the second module base (60) has a rectangular footprint comprising two long ides (72) and two short sides (74), the first edge (58) of the second module base (60) may be arranged alon one of the two long sides (72) as shown in FIG. 5 and 6 or, alternatively, may be arranged along one of the two short sides of the first module base (74) as shown in FIG. 8. In the embodiment illustrated in FIG. 7, the first edge (42) of the first module base (44) is arranged along a short side (70) whilst the first edge (58) of the second module base (60) is arranged along one of the two long sides (72). In each embodiment, the first edge (58) of the second module base (60) is positioned at the production location towards the first edge (42) of the first module base (44).
In all embodiments of the present invention, the air-cooled heat exchanger bank (36) is designed so that, the first module (24) does not include any heat exchanger from the second row of heat exchanger bays (42) and the second module (26) does not include any heat exchanger from the first row of heat exchanger bays (40). To illustrate this, FIG. 9(a) Shows an installed production train comprising two first modules (24' and 24"), two second modules (26* and 26") and a third module (30). FIG. 9(b) shows the installed production train of FIG. 9(a) with the entire first row of heat exchanger bays (34) shaded in light grey and the entire second row of heat exchanger bays (36) shaded in dark grey for clarity purposes. In an analogous manner, FIG. 9(c) shows only the first sub-section (38) of the first row of heat exchanger bays (34) is shaded in light grey for clarity purposes. In the event that there is insufficient space available on the second module base (60) to accommodate the heat exchangers required to perform the second selected duty, the first sub-section (56) of the second row of heat exchanger bays (36) is arranged on the second module base (60) whilst a second sub-section (76) of the second row of heat exchanger bays (36) is positioned on an adjacent third module (30). By way of example, the second module may be a propane condenser module which requires a large number of heat exchangers to be included in the second plurality of heat exchangers (56). FIG. 9(c) shows the first sub-section (56) and the second sub-section (76) of (he second row of heat exchanger bays (36) shaded in dark grey for clarity purposes. It is apparent from FIG. 9(a) and 9(b), that the first module (24') includes a first sub- section of the first row of heat exchanger bays (34) without including a first sub-section of the second row of heat exchanger bays (36).
Referring to FIG. 7, the process may include the step of arranging a plurality of third module heat exchangers (80) operatively associated with the third selected function of the third module (30) on the third module base (82). The plurality of third module heat exchangers (80) includes both a second section (84) of the first row of heat exchanger bay (34) and a second section (76) of the second row of heat exchanger bays (36). The plurality of third module heat exchangers are arranged on an elevated level (40) vertically offset from the third module base (82) to provide a covered section (86) of the third module base (82). In this embodiment, the third module base (82) is sized such that the plurality of third module heat exchangers (80) covers at least 90% of the third module base to form a fully covered third module. As best seen in FIG. 7, the third module (30) includes sections of both the first and second rows of heat exchanger bays. In the embodiment illustrated in FIG. 8, the third module is one of a plurality of third modules with two third modules (30' and 30") shown. Each of the third modules (30' and 30") includes sections of both the first and second rows of heat exchanger bays. One of the third modules (30') is arranged at a first end (88) of the installed production train (16) and the other third module (30") is arranged at a second end (90) of the installed production train (16). The process of the present in vention allows for constructin at least one of the plurality of modules at a construction location or assembling at least one of the plurality of modules at an assembly location prior to transport to the production location, and testing the at least one module for verification purposes at the construction or assembly location. Within each module, the pieces of equipment required to perform the pre-determined function assigned to that module are arranged to minimize interfaces between modules so as to minimize the hook-up that is required to be completed when the modules are delivered from a construction location or assembly location to the production location. In this way, a module can be essentially self-contained and provided with a temporary control system to allow the module to be switched on for loop Checks and commissioning at the construction or assembly location prior to transport to the production location. Upon arrival at the production location, wireless control may be used for inter-modular communication and control to further reduce the hook-up time. At a production location where it is important to minimize the length of interconnecting pipe runs between modules, the plurality of modules are spaced as closely as passible, while still allowing sufficient room at the production location to hook up the interconnections between modules.
Further alternative embodiments are illustrated in FIG. 10 to FIG. 1 for which like references refer to like parts, In each of the embodiments illustrated in FIG. 10, FIG. 1 1, and FIG. 12. the first module is one of a plurality of first modules with two first modules (24' and 24") being shown by way of example only. The second module is similarly one of a plurality of second modules with two second modules (26' and 26") being shown by way of example only, only with one third module (30). In FIG. 11, all of the first modules and all of the second module include covered and uncovered sections whilst in FIG. 10, one of the plurality of second modules (26') i fully covered by a first sub-section of the second row of heat exchanger bays. FIG. 12 illustrates that the module bases of adjacent first- and second modules may be offset relative to each other along the longitudinal axis of the installed production train.
Whilst it is preferable for one or both of the first row of heat exchanger bays or the second row of heat exchanger bays to be arranged in a straight line as illustrated in FIG. 5 to 12, this is. not essential. In die embodiment: illustrated in FIG. 13, the first row of heat exchanger bays (34) which is designated by an arrow labelled with reference numeral (35) i non-linear and the second row of heat exchanger bays (36) is comprised entirely of the first sub-section (56) of the second row of heat exchanger bays (36). In other words, all of the second row of heat exchanger bays (34) is provided, on the second module base (60). In the embodiment illustrated in FIG. 14, the first sub-section (38) of the first row of heat exchanger bays (34) is the first row of heat exchanger bays (34), In other words, all of the first row of heat exchanger bays (34) is provided on the first module base (44).
In the embodiments illustrated in FIG. 15 and FIG 16, the installed production train (16) includes one first module (24), one second module (26), one third module (30), a fourth module (92) and a fifth module (94). Each of the third, fourth and fifth modules are designed to include a sub-section of die first row of heat exchanger bays (34) and a subsection of the second row of heat exchanger bays (36). In the embodiment illustrated in FIG. 15, both the fourth module and the fifth module include a covered section (96) and an uncovered section (98). Each uncovered section (98) is provided for mounting of one or more selected pieces of equipment (50) in an analogous manner to that described above. In the embodiment illustrated in FIG. 16, both the fourth module and the fifth module include a covered section (96) and two uncovered sections (98' and 98")· Each uncovered section (98) is provided for mounting of one or more selected pieces of equipment (50) in an analogou manner to that described above.
The embodiment, illustrated in FIG. 17 shows one first module (24), two second modules (26' and 26"), one third module (30), one fourth module (92) and one fifth module (.94). The embodiment illustrated in FIG. 1 shows one first module (24) with a covered and uncovered section, one fully covered second module (26), and two fully covered third modules (30' and 30"). The embodiment illustrated in FIG. 19 shows one first module (24) with a covered and uncovered section, one second, module (26) with a covered and uncovered section, and two fully covered third modules (30' and 30"). As with all other embodiments, the first module (24) includes a first sub-section of the first row of heat exchanger bays (34) without including a first sub-section of the second row of heat, exchanger bays (36) and the second module (26) includes a first sub-section of the second row of heat exchanger bays (36) without including a section of the first row of heat exchanger bays (36).
In the embodiments illustrated in FIG. 20, the first sub-section (38) of the first row of heat exchanger bays (34) is arranged to extend outwardly beyond the first edge (42) of the first module base (44). Using this arrangement, when the first edge (42) of the first module base (44) is positioned towards the first a first edge (58) of the second module base (60) to form the installed production train (16), the first sub-section (38) of the first row of heat exchanger bays (34) is adjacent to the first sub-section (56) of the second row of heat exchanger bays (36), whilst leaving a gap (97) between the first module base (44) and the second module base (60). In (he embodiment illustrated in FIG. 21, the first sub-section (56) of the second row of heat exchanger bays (36) is arranged to extend outwardly beyond the first edge (58) of the second module ba.se (60) to form the gap (97). In the embodiment illustrated in FIG. 22, the first sub-section (38) of the first row of heat exchanger bays (34) is arranged to extend outwardly beyond the first edge (42) of the first module base (44), and, the first sub-section (56) of the second row of heat exchanger bays (36) is arranged to extend outwardly beyond the first edge (58) of the second module base (60) to form the gap (97). Advantageously, the gap (97) provides room for underground services (99), for example, electrical cables, to come up within the installed production train (16) without having a module positioned over them.
One embodiment of the use of the production train ( 16) for the production of LNG is now described with reference to FIG. 11 , by way of example only. In general terms, a process for liquefying a natural gas stream comprises the steps of:
i) pre-treating a natural gas feed stream in a pre-treatment module (100) to produce a pre-treated natural gas stream:
ii) pre-cooling the pre-treated natural gas stream in a first refrigerant compression module (102) to produce a pre-cooled gas stream and a first refrigerant vapour stream which is compressed therein;
iii) condensing the first refrigerant vapour stream in a first refrigerant condenser module ( 104) to produce a compressed first, refrigerant, stream for recycle to step ii); iv) further cooling the pre-cooled gas stream in a main cryogenic heat exchanger (106) operatively associated with a liquefaction module ( 108) through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream; and,
v) compressing the second refrigerant vapour stream in a second refrigerant, compression module (1 10) to produce a compressed second refrigerant stream for recycle to step iv).
Referring to FIG. 1 1, the production train ( 16) comprises the following modules:
a) a pretreatmerit module (100);
b) a first refrigerant compression module ( 102), in this example, a propane compression module;
c) a first refrigerant condenser module (104), in this example, a propane condenser module;
d) a liquefaction module (108); and,
e) a second refrigerant compression module ( 1 10), in this example, a mixed refrigerant (MR) compression module.
For comparison purposes only, the equivalent modules of a production train of the prior art, are marked up in FIG. 2(a) with reference numerals 100, 1 2, 104, 108 and 1 1 . In embodiment of the present invention now described with reference to FIG. 1 1, the first refrigerant is propane while the second refrigerant is a mixed refrigerant hydrocarbon mixture, by way of example only. This type of process is known a the propane pre- cooled mixed refrigerant, or C3MR process, which is used to manufacture most of the LNG produced worldwide and is a process that is not further discussed here is it considered to be well known lo the person skilled in the art. When using propane as the first refrigerant, care is taken to ensure that propane does not leak because propane vapour i highly flammable. Using the process of the present invention, the process equipment required for propane compression is grouped together within a propane compression module to facilitate the pre-commissioning and commissioning of that module— having all of the accessories that are needed to circulate fluid through the compressor at the construction or assembly location. To further improve safely, the main rotating equipment associated with the propane compression circuit is placed on an uncovered section of one of the plurality of modules rather than underneath the plurality of heal exchangers arranged on the elevated level.
In the embodiment illustrated in FIG. 1 1, the pretreatment module (100) is a first module (24'), the first refrigerant compression module ( 102) is a second module (26'), and the first refrigerant condenser module (104) is a third module (30). In addition to this the liquefaction module (108) is a first: module (24") and the second refrigerant compression module (110) is a second module (26"). In terms of construction scheduling, the compressors arc long lead items. This embodiment allows for the installation of the pretreatment module ( 00) and first refrigerant condenser module ( 104) to occur at the production location (12) without needing to wait for the installation of the first refrigerant: compression module (102). In an analogous manner, the liquefaction module (108) can be installed at the production location (12) without the need to wait for the installation of the second refrigerant compression module (1 10).
This arrangement allows for direct fluid communication between the first refrigerant compression module (102) and the first refrigerant condenser module (104) without the need for the first refrigerant to be piped across the pretreatment module (100). This arrangement further allows for direct fluid communication between the second refrigerant compression module ( 1 10) and the first refrigerant condenser module (104). Thus in order for the second refrigerant to be cooled by the first refrigerant in heat exchangers either inside or adjacent to the first refrigerant compression module (102), it: only has to pass through one intermediate module, the first refrigerant condenser module ( KM ), rather than both the first refrigerant condenser module (104) and the liquefaction module (108). This is an advantage of the present invention compared to the prior ar illustrated in FIG. 2(a). This arrangement further allows for direct fluid communication between the liquefaction module ( 108) and the end of the LNG trains, from which the LNG will be piped to the LNG Storage tank. Thus the LNG product stream does not need to pass through the second refrigerant compression module (.1 10). This is an advantage of the present invention compared to the prior art illustrated in FIG. 2(a). The arrangement illustrated in FIG. 1.1 allows a section of selected pipework (120) that runs along the length of the installed production train (16) to be completed with fewer hook-ups at the production location ( 12). For example, raw feed gas must be piped to the gas pretreatment module (100) which is positioned towards the first end (88) of the production train (16). If the interconnections with the main plant piperack (122) occur at the second opposite end (90) of the installed production train (16), the raw feed gas pipework (120) will need to traverse through only two unrelated modules (108 and 104). In contrast, using the prior art arrangement illustrated in FIG. 2(a), the same service would have to pass through four unrelated modules (110, 108, 104 and 102). In addition to the direct site labour savings, reducing the need for unrelated pipes to pass through modules assists to reduce the duration of Ore design process. The layout of the plurality of modules can be advanced and completed without having to wait for additional details about unrelated services.
Tit the embodiment illustrated in FIG. 1 1, the pre -treatment module' is one of two first modules (24' ) and the first module base (44) is sized to include a covered section (46) for mounting of the first sub-section (38) of the first row of heat exchanger bays (34) and an uncovered section (48) for mounting one or more selected pieces of process equipment (50), such as an acid gas removal unit column and its associated knock-out vessel and pumps, and/or one or more molecular sieve dehydration vessels.
In the embodiment illustrated in FIG. 11 , the first refrigerant compression module (102) is one of two second modules (26'). The second module base (60) is sized to include a covered section (62) for mounting of first sub-section (56) of the second row of heat exchanger bays (36) and an uncovered section (64) for mounting a selected piece of process equipment (50'), such one or more first refrigerant compressors.
In the embodiment illustrated in FIG. 1 1 , the first refrigerant condenser module (104) is a third module (30) because this module requires a comparativel large number of heat exchangers to be included in the plurality of third module heat exchangers (80) compared with the other modules. In these embodiments, the first refrigerant condenser module (104) is aligned with the longitudinal axis (22) of the installed production train (16) to accommodate its requirement to include a second sub-section (84) of the first row of heat exchanger bays (34) and a second ib-section (76) of the second row of heat exchanger bays (36). The first refrigerant condenser module (104) may include services that contain non-flammable inventories, such as steam for heating purposes or water for either heating or coolin purposes within the installed production train. The plurality of plant equipment required for these services may be mounted underneath the first refrigerant condenser without significant safety risks due to potential leakage.
In the embodiment illustrated in FIG. 1.1, the Liquefaction module (108) is one of two first modules (24"). The process may include the step of locating the main cryogenic heat exchanger (106) off-module adjacent to the liquefaction module ( 108) due to its size and weight, delivery schedule, and/or to mitigate the potential for damage during transport. Alternatively, the main cryogenic heat exchanger (106) may be positioned on the uncovered section (48") of the first module base (44"). Static equipment and pumps which are operatively associated with the main cryogenic heat exchanger are positioned on the liquefaction module (108) on the same side of the heat exchanger bank as the main cryogenic heat exchanger to minimise interconnecting piping runs. Equipment (50") associated with end-flash gas compression, nitrogen and helium removal may also be positioned on the uncovered section (48") of the liquefaction module (108) if required. An end- flash gas compression system (107) requires only very few heat exchangers with the result that the liquefaction module (104) has space available for additional heat exchangers which are operatively associated with another system,
A selected function that may require additional space is the first refrigerant condenser, which makes positioning the liquefaction module (108) in direct contact with the first refrigerant condenser module (104) advantageous. If required, the second sub-section (84) of the first row of heat exchanger bays (34) which includes heat exchangers that are operatively associated with the fifst refrigerant condenser module (1 04) may span across to partially cover the module base (44") of the adjacent liquefaction module (108).
The second compression module (110) is one of the two second modules (26"). The second compression module includes all of the process equipment required to perform the functional requirement of this module including the gas turbine, the compressor, interconnecting pipework, waste heat recovery, and recycle valves which are arranged on the module base. The plurality of heat exchangers operatively associated with the second compression module provides the required aftercooling and ntercooling for the second refrigerant compressors. In this embodiment, the second compression module (110) includes an uncovered section (64") of sufficient size to accommodate one or more refrigerant compressors (113).
Each module has been designed to ensure that the main hydrocarbon inventories and all rotating equipment are positioned on the uncovered sections Df the modules and not underneath the elevated heat exchanger bank. This permits good access for maintenance and allows the long lead items to be incorporated into the modules late in the construction sequence. The significantly reduced hydrocarbon inventory provides improved Safet by way of making it easier to deal with the consequence of a leak, h addition to this, the overall layout of the production train of the present invention is designed to for modularisation, with small compact equipment selected to suit modularisation rather than adopting the prior art approach of relying on economy of scale. Instead, smaller, more intensive equipment has been selected in order to be able to fit more items inside modules of a limited size and weight. One example of selecting smaller, more intensive equipment that is easier to modularise is the main refrigerant gas turbines. The starting point for this work was to utilise smaller more efficient aero-derivative ga turbines that can be completely integrated into modules of a practical size. Aero-derivative gas turbines have been integrated into the modules, complete with the all of the elements of each compression system. This permits the complicated, large-diameter compressor suction and discharge lines to be built at a construction location rather than having to be stick- built at the production location, whilst retaining a practical total module size/weight. Using Smaller units and keeping the gas turbine and compressor integrated in the same module minimises the number of connections at site, and it also makes it possible for the compression system to be fully tested up to a nitrogen test run stage at the construction. or assembly location. Thi extra level of commissioning and testing at the construction or assembly location is beneficial in reducing the amount of carry-over work that has to be done at a significantly higher labour rate at the production site. The variable speed nature of the aero-derivative gas turbines simplifies the compressor start-up and eliminates the need to depressurise refrigerant. Removing the need for starter/helper motors for gas turbines used in prior art LNG trains also significantly reduces the maximum electrical power demand of the modularized LNG train and helps to keep the module size down. The production location can be onshore, offshore on a floating facility, offshore on a fixed facility, or a barge -mounted or grounded facility, provided only that, the heat exchanger bank is an air-cooled heat exchanger bank. By way of example, the modules may be floated-in using steel or concrete gravity based structures with integrated LNG storage, loading and boi l-off gas re-liquefaction functionality with gas supplied to the production location via a subsea pipeline. The LNG plant may further include optional treatment steps such as product purification steps (helium removal, nitrogen removal) and non-methane product; production steps (de-ethanizing, de-prapanizing, sulphur recovery) if desired. The natural gas feed stream may be produced at and obtained from a natural gas or petroleum reservoir. As an. alternative, the natural gas feed stream may also be obtained from another source, also including a synthetic source such as a Fischer-Tropsch process wherein methane is produced from synthesis gas.
It will be clearly understood that, although a number of prior art publications are referred to herein, this reference does not constitute an admission that any of these documents forms part of the common general knowledge in the art, in Australia or in any other country, hi the summary- of the invention, the description and claims which follow, except where the context requires otherwise due to express language or necessary implication, the word "comprise" or variations such as "comprises" or "comprising" is used in an inclusive sense, i.e. to specify the presence of the stated features but not to preclude the presence or addition of further features in various embodiments of the invention.

Claims

Claims defining the Invention;
1. A liquefied natural gas production process for producing a product stream of liquefied natural gas at a production location, said process comprising:
a) designing a plurality of modules for installation at the production location to form an installed production train, each module having a module base for mounting a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module, the plurality of modules includin a first module assigned to perfonn a first selected function, and, a second module assigned to perform a second selected function;
(b) designing an air-cooled heat exchanger bank for the installed production train, the heat: exchanger bank including: a first: row of air-cooled heat exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays;
(c) arranging a first sub-section Of the first row of heat exchanger bays at an elevated level vertically offset from and towards a first edge of a first module base to form a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting a selected piece of process equipment, wherein the first module includes the first sub-section of the first row of heat exchanger bays without: including a sub-section of the second row of heat: exchanger bays;
(d) arranging a first sub-section of the second row of heat exchanger bays at an elevated level vertically offset from and towards a first edge of a second module base to provide a covered section of the second module base, wherein the second module includes the first sub-section of the second row of heat, exchanger bays without including a sub-section of the first row of heat exchanger bays; and,
(e) positioning the first edge of the second module base at the production location towards the first edge of the first module base.
2. The process of claim 1 wherein the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment having an overall height that is taller than the height of the elevated level.
3. The process of any one of the preceding claims further comprising the step of sizing the second module base to include an uncovered section for mounting a selected piece of process equipment.
4. The process of claim 3 wherein the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment or, a piece of equipment having an overall height that is taller than the height of the elevated level.
5. The process of any one of the preceding claims wherein the first module base has a rectangular footprint comprising two long sides and two short- sides and the first edge of the first module base is arranged along one of the two long sides.
6. The process of any one of the preceding claims wherein the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides.
7. The process of any one of the preceding claims wherein the first module base has a rectangular footprint comprising two long sides and two short: sides and the first edge of the first module base is arranged along one of the two short sides.
8. The process of any one of the preceding claims wherein the second module base has a rectangular footprint comprising two long sides and two short sides and the. first edge of the second module base is arranged along one of the two short sides,
9. The process of any one of the preceding claims wherein a second sub- ection of the first or second row of heat exchanger bays is positioned on an adjacent module.
10. The process of any one of the preceding claims wherein the first module is one of a plurality of first modules.
1 1 . The process of an}' one of the preceding claims wherein the second module is one of a plurality of second modules.
12. The process of any one of the preceding claims further comprising the step of constructing at least one of the plurality of modules at a construction location or assembling at least one of the pluralit of modules at an assembly location prior to transport to the production location, and testing the at least one module for verification purposes at the construction or assembly location.
13. The process of any one of the preceding claims wherein the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the first row of heal exchanger bays i arranged in a straight line parallel or peipendicular to the longitudinal axis of Ihe installed production train.
14. The process of any one of the preceding claims wherein the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed .production train and Ihe second row of heat exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
15. The process of any one of the preceding claims wherein the first sub-section of the first row of heat exchanger bays is the first row of heat exchanger bays.
16. The process of any one of the preceding claims wherein the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays.
17. The process of any one of the preceding claims wherein the first sub-section of the first row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the first module base, and a gap is formed between the first module base and the second module base during step (d).
18. The process of any one of the preceding claims wherein the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module ba&e and the second module base during step (d).
19. The process of any one of the preceding claims wherein the first sub-section of the first row of heat exchanger bays and the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step (d).
20. The process of any one of the preceding further comprising the steps of arranging a plurality of third module heat exchangers operatively associated with a third selected function on a third module base to form a portion of the first row of heat exchanger bays and a portion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a covered section of the third module base.
21. The process of claim 20 further comprising the steps of sizing the third module base such that the plurality of third module heat exchangers covers at least 90% of the third module base to form a fully covered third module.
22. The process of claim 20 or 21 wherein the third module is one of a plurality of third modules.
23. The proces of any one of the preceding claims wherein one of the plurality of modules is a pre-treatment module lor removing contaminants from a natural gas feed stream to produce a pre-treated natural gas stream.
24. The process of any one of the preceding claims wherein one of the plurality of modules is a first refrigerant condenser module for pie-cooling a pre-treated natural gas stream to produce a pre-coolccl gas stream and a first refrigerant vapour stream.
25. The process of any one of the preceding claims wherein one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream to produce a compressed first refrigerant stream for recycle to a first, refrigerant condenser module.
26. The process of any one of the preceding claims wherein one of the plurality of modules is a liquefaction module operatively associated, with a main cryogenic heat exchanger for further cooling a pre -cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream.
27. The process of any one of the preceding claims wherein one of the plurality of modules is a second refrigerant compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger.
28. The process of any one of the preceding claims wherein the first refrigerant is propane or nitrogen.
29. The process of any one of the preceding claim wherein the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen.
30. The process of any one of the preceding claims wherein the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility.
31. A liquefied natural gas production plant, for producing a product stream of liquefied natural gas installed at a production location comprising:
a plurality of modules designed for installation at the production location to form an installed production train, each module having a module base for mounting a plurality of plant equipment associated with a selected function associated with the production of liquefied natural gas, said selected function being assigned to said module, the plurality of inodulcs including a first, module assigned to perform a first selected function, and, a second module assigned to perform a second selected function;
an air-cooled heat exchanger bank designed for the installed production train, the heat exchanger bank, including: a first row of air-cooled heal exchanger bays, and, an adjacent parallel second row of air-cooled heat exchanger bays;
a first sub-section of the first row of heat exchanger bays arranged at an elevated level vertically offset from and towards a first edge of a first module base to fonn a covered section of the first module base, the first module base being designed and sized to include an uncovered section for mounting selected piece of process equipment, wherein the first module include the first sub-section of the first row of heat exchanger bays without including a sub-section of the second row of heat exchanger bays;
a first sub-section of the second row of heat exchanger bays arranged at an elevated level vertically Offset from and towards a first edge of a second module base to provide a covered section of the second module base, wherein the second module includes the first sub-section of the second row of heat exchanger bays without including a sub-section of the first row of heat exchanger bays; and,
the first edge of the second module ba.se positioned at the production location towards the first edge f the first module base.
32, The production plant of claim 31. wherein the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equipment having a flammable inventory, a long lead-time piece of equipment, or, a piece o equipment, having an overall height that, is taller than the height of the elevated level.
33. The production plant of claim 31 or 32 wherein the second module base is sized to include an uncovered section for mounting a selected piece of process equipment.
34. The production plant of claim 3 1 or 32 wherein the selected piece of equipment is; a rotating piece of equipment associated with a circulating refrigerant, a piece of equi ment having a flammable inventory, a long lead-time piece of equipment, or, a piece of equipment: having an overall height, that is taller than the height of the elevated level.
35. The production plant, of any one of claims 31 to 34 wherein the first module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the first module base is arranged. long one of the two long sides.
36. The production plant of any one of claims 31 to 34 wherein the second module base has a rectangular footprint comprising two long sides and two short sides and the first edge of the second module base is arranged along one of the two long sides.
37. The production plant of any one of claims 31 to 34 wherein the first module base has a rectangular footprint comprising two long sides and two short, sides and the first edge of the first module base is arranged along one of the two short sides.
38. The production plant of any one of claims 31 to 34 wherein the. second module base has a rectangular footprint comprising two long sides and two short sides and the first edge, of the second module base is arranged along one of the two short sides.
39. The production plant, of any one of claims 31. to 38 wherein a second sub-section of the first or second row of heat exchanger bays is positioned on an adjacent module.
40. The production plant of any one of claim 31 to 39 wherein the first module is one of a plurality of first modules.
41. The production plant of any one of claims 3 1 to 40 wherein the second module is one of a plurality of second modules.
42. The production plant of any one of claims 3 J to 41 wherein the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the first row of heat exchanger bays is an-anged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
43. The production plant of any one of claims 3 1 to 42 wherein the installed production train has a longitudinal axis extending from a first end of the installed production train to a second end of the installed production train and the second row of heat: exchanger bays is arranged in a straight line parallel or perpendicular to the longitudinal axis of the installed production train.
44, The production plant of any one of claims 31 to 43 wherein the first sub- section of the first row of heat exchanger bays is the first row of heat exchanger bays,
45. The production plant of any one of claims 31 to 44 wherein the first sub-section of the second row of heat exchanger bays is the second row of heat exchanger bays.
46. The production plant of any one of claims 31 to 45 wherein the first sub-section of the first row of heat exchanger bays is arranged to extend outwardly .beyond the first edge of the first module base, and a gap is formed between the first module base and the second module.
47. The production plant of any one of claims 1 to 46 wherein the first ub-section of the second row of heat exchanger bays i arranged to extend outwardly beyond the first edge of the second module base, and a gap is fonned between the first module base and the second module base.
48. The production plant of any one of claims 31 to 47 wherein the first sub-section of the first row of heat exchanger bays and the first sub-section of the second row of heat exchanger bays is arranged to extend outwardly beyond the first edge of the second module base, and a gap is formed between the first module base and the second module base during step .(d).
49. The production plant of any one of claims 31 to 48 further comprising a plurality of third module heat exchangers operatively associated with a third selected function arranged oh a third module base to form a portion of the first row of heat exchanger bays and a portion of the second row of heat exchanger bays, the plurality of third module heat exchangers being arranged on an elevated level vertically offset from the third module base to provide a covered section of the third module base.
50. The production plant of claim 49 wherein the third module base is sized such that the plurality of third module heat exchangers covers at least 90% of die third module base to form a fully covered third module.
51. The production plant of claim 49 or 50 wherein the third module is one of a plurality of third modules.
52. The production plant of any one of claims 31 to 51 wherein one of the plurality of modules is a pre-treatment module for removing contaminants from a natural ga feed stream to produce a pre-treated natural gas stream.
53. The production plant of any one of claims 31 to 52 wherein one of the plurality of modules is a first refrigerant condenser module for pre-cooling a pre-treated natural gas stream to produce a pre -cooled gas stream and a first refrigerant vapour stream.
54. The production plant of any one of claims 31 to 53 wherein one of the plurality of modules is a first refrigerant compression module for compressing a first refrigerant vapour stream to produce a compressed first refrigerant stream for recycle to a first refrigerant conden er module.
55. The production plant of any one of claims 31 to 54 wherein one of the plurality of modules is a liquefaction module operatively associated with a main cryogenic heat exchanger for further cooling a pre-cooled gas stream through indirect heat exchange with a second refrigerant to produce a liquefied natural gas product stream and a second refrigerant vapour stream.
56. The production plant of any one of claims 31 to 55 wherein one of the plurality of modules is a second refrigerant. Compression module for compressing a second refrigerant vapour stream to produce a compressed second refrigerant stream for recycle to a main cryogenic heat exchanger.
57. The production plant of any one of claims 31 to 56 wherein the first refrigerant: is propane or nitrogen.
58. The production plant of any one of claims 31 to 57 wherein the second refrigerant is a mixed refrigerant hydrocarbon mixture or nitrogen.
59. The production plant, of any one of claims 3.1 to 58 wherein the production location is onshore, offshore on a floating facility, offshore on a fixed facility, barge-mounted or grounded facility.
PCT/AU2014/000328 2013-03-27 2014-03-27 Air-cooled modular lng production facility WO2014153612A1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
AP2015008770A AP2015008770A0 (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility
AU2014245852A AU2014245852B2 (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility
CN201480025598.8A CN105190210B (en) 2013-03-27 2014-03-27 air cooling modular LNG production equipment
BR112015024616-8A BR112015024616B1 (en) 2013-03-27 2014-03-27 METHOD FOR PRODUCING LIQUEFIED NATURAL GAS AND PRODUCTION PLANT FOR THE SAME
EP14774713.3A EP2979049A4 (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility
CA2882326A CA2882326C (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility
JP2016504420A JP2016514823A (en) 2013-03-27 2014-03-27 Air-cooled modular LNG production facility
KR1020157030901A KR102182637B1 (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility
IL241778A IL241778A0 (en) 2013-03-27 2015-09-21 Air-cooled modular lng production facility
US14/863,833 US10060670B2 (en) 2013-03-27 2015-09-24 Air-cooled modular LNG production facility

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AUAU2013901044 2013-03-27
AU2013901044A AU2013901044A0 (en) 2013-03-27 Modular lng production facility

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/863,833 Continuation US10060670B2 (en) 2013-03-27 2015-09-24 Air-cooled modular LNG production facility

Publications (1)

Publication Number Publication Date
WO2014153612A1 true WO2014153612A1 (en) 2014-10-02

Family

ID=51622281

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2014/000328 WO2014153612A1 (en) 2013-03-27 2014-03-27 Air-cooled modular lng production facility

Country Status (11)

Country Link
US (1) US10060670B2 (en)
EP (1) EP2979049A4 (en)
JP (1) JP2016514823A (en)
KR (1) KR102182637B1 (en)
CN (1) CN105190210B (en)
AP (1) AP2015008770A0 (en)
AU (1) AU2014245852B2 (en)
BR (1) BR112015024616B1 (en)
CA (1) CA2882326C (en)
IL (1) IL241778A0 (en)
WO (1) WO2014153612A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016038193A (en) * 2014-08-11 2016-03-22 日揮株式会社 Liquefied gas manufacturing equipment
WO2017062155A1 (en) * 2015-10-06 2017-04-13 Exxonmobil Upstream Research Company Modularization of a hydrocarbon processing plant
JP2018531355A (en) * 2015-10-06 2018-10-25 エクソンモービル アップストリーム リサーチ カンパニー Integrated refrigeration and liquefaction module in a hydrocarbon processing plant
GB2571945A (en) * 2018-03-13 2019-09-18 Linde Ag Method for operating a natural gas processing plant
EP3577289A4 (en) * 2017-01-31 2021-01-13 Fluor Technologies Corporation Modular processing facility with distributed cooling systems

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016032952A1 (en) * 2014-08-26 2016-03-03 Oxicool, Inc. Molecular sieve chamber
ITUB20160847A1 (en) * 2016-02-18 2017-08-18 Nuovo Pignone Tecnologie Srl COMPLETE TURBOMACCHINARY MODULE FOR LNG AND SIMILAR SYSTEMS
JP6910633B2 (en) * 2017-02-07 2021-07-28 株式会社ササクラ Evaporation concentrator
MX2019010835A (en) * 2017-03-14 2019-12-19 Woodside Energy Technologies Pty Ltd A containerised lng liquefaction unit and associated method of producing lng.
JP2018185102A (en) 2017-04-26 2018-11-22 千代田化工建設株式会社 Construction method of natural gas liquefaction plant
JP2018185103A (en) * 2017-04-26 2018-11-22 千代田化工建設株式会社 Natural gas liquefaction plant
RU2747868C1 (en) * 2017-05-30 2021-05-17 ДжГК Корпорейшн Module for natural gas liquefaction device and natural gas liquefaction device
WO2018235267A1 (en) * 2017-06-23 2018-12-27 日揮株式会社 Natural gas liquefaction device
AU2017422728B2 (en) * 2017-07-06 2023-04-13 Jgc Corporation Module for natural gas liquefaction devices, natural gas liquefaction device, and method for manufacturing natural gas liquefaction devices
JP6360987B1 (en) * 2017-11-14 2018-07-18 日揮株式会社 Natural gas liquefaction device and method for designing natural gas liquefaction device
WO2019110770A1 (en) 2017-12-07 2019-06-13 Shell Internationale Research Maatschappij B.V. Method of operating a liquefied natural gas production facility
CA3083578A1 (en) 2017-12-07 2019-06-13 Shell Internationale Research Maatschappij B.V. Compact lng production train and method
KR20240033112A (en) 2018-06-01 2024-03-12 스틸헤드 엘엔지 (에이에스엘엔지) 엘티디. Liquefaction apparatus, methods, and systems
WO2020188805A1 (en) * 2019-03-20 2020-09-24 日揮グローバル株式会社 Method for designing heat exchanger group and treatment plant
US11634646B2 (en) 2019-04-29 2023-04-25 Chrisma Energy Solutions, LP Oilfield natural gas processing and product utilization
WO2020249848A1 (en) * 2019-06-12 2020-12-17 Wärtsilä Finland Oy Power plant construction
US11913717B2 (en) * 2019-10-29 2024-02-27 Jgc Corporation Natural gas liquefying apparatus
US11725411B2 (en) * 2020-08-17 2023-08-15 Terrapower, Llc Nuclear fuel assembly with multi-pitch wire wrap
US20230392860A1 (en) 2020-10-26 2023-12-07 Shell Oil Company Compact system and method for the production of liquefied natural gas
US20230235954A1 (en) * 2022-01-21 2023-07-27 Technip Energies France Modular mid-scale liquefied natural gas production system and method
WO2023249510A1 (en) * 2022-06-20 2023-12-28 Публичное акционерное общество "НОВАТЭК" Liquefied natural gas production facility on gravity-based structures

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010059059A1 (en) * 2008-11-19 2010-05-27 Moss Maritime As Device for floating production of lng and method for converting a lng-carrier to such a device
WO2012072292A1 (en) * 2010-11-30 2012-06-07 Single Buoy Moorings Inc. Floating lng plant
KR20130009064A (en) * 2011-07-14 2013-01-23 삼성중공업 주식회사 Vessel having lng facility arrangement sturcutre
WO2014028961A1 (en) 2012-08-22 2014-02-27 Woodside Energy Technologies Pty Ltd Modular lng production facility

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3161492A (en) * 1961-08-25 1964-12-15 Hydrocarbon Research Inc Mobile gas liquefaction platform
FR2108901A1 (en) * 1970-10-19 1972-05-26 Technip Cie Natural gas liquefaction - using independent modular liquefaction units
US6382310B1 (en) * 2000-08-15 2002-05-07 American Standard International Inc. Stepped heat exchanger coils
CN101338965A (en) * 2008-01-31 2009-01-07 杭州福斯达气体设备有限公司 Medium air separation equipment fractionating tower cold box assembling method
US10780955B2 (en) * 2008-06-20 2020-09-22 Seaone Holdings, Llc Comprehensive system for the storage and transportation of natural gas in a light hydrocarbon liquid medium
US20110094261A1 (en) * 2009-10-22 2011-04-28 Battelle Energy Alliance, Llc Natural gas liquefaction core modules, plants including same and related methods
CA2724938C (en) * 2009-12-18 2017-01-24 Fluor Technologies Corporation Modular processing facility
JP2011235675A (en) * 2010-05-06 2011-11-24 Mitsubishi Heavy Ind Ltd Lng floating production, storage and offloading facility and lng floating production, storage and offloading method
CN201992949U (en) * 2011-02-11 2011-09-28 张家港富瑞特种装备股份有限公司 Skid-mounted natural gas liquefaction device
CN102878779B (en) * 2012-10-16 2015-01-14 中山大学 Overlapped natural gas liquified system in mixed refrigerant cycling expansion machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010059059A1 (en) * 2008-11-19 2010-05-27 Moss Maritime As Device for floating production of lng and method for converting a lng-carrier to such a device
WO2012072292A1 (en) * 2010-11-30 2012-06-07 Single Buoy Moorings Inc. Floating lng plant
KR20130009064A (en) * 2011-07-14 2013-01-23 삼성중공업 주식회사 Vessel having lng facility arrangement sturcutre
WO2014028961A1 (en) 2012-08-22 2014-02-27 Woodside Energy Technologies Pty Ltd Modular lng production facility
AU2012216352A1 (en) * 2012-08-22 2014-03-13 Woodside Energy Technologies Pty Ltd Modular LNG production facility

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"English Abstract retrived from PAJ website, Machine Translation of English specification para.", 12 February 2014 (2014-02-12), Retrieved from the Internet <URL:http://www4.ipdl.inpit.gojp/Tokujitu/PAJdetail.ipdl?N0000=60&N0120=01&N2001-2&N3001=2011-235675> *
"Machine Translation of English Abstract and specification", 12 February 2014 (2014-02-12), pages 5 - 7, Retrieved from the Internet <URL:http://kposd.kipo.go.kr:8088/kiponet/up/kpion/pdtView.do?langCd=EN&pdtFileName =out_PDF_cw_gaz_p_1020110069870_EN.pdf&applno=1020110069870&pdfDocTyp e=0&docKind=KPIONPUBEAPD> *
See also references of EP2979049A4

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016038193A (en) * 2014-08-11 2016-03-22 日揮株式会社 Liquefied gas manufacturing equipment
WO2017062155A1 (en) * 2015-10-06 2017-04-13 Exxonmobil Upstream Research Company Modularization of a hydrocarbon processing plant
JP2018531355A (en) * 2015-10-06 2018-10-25 エクソンモービル アップストリーム リサーチ カンパニー Integrated refrigeration and liquefaction module in a hydrocarbon processing plant
JP2018531356A (en) * 2015-10-06 2018-10-25 エクソンモービル アップストリーム リサーチ カンパニー Modularization of hydrocarbon processing plant
AU2016335111B2 (en) * 2015-10-06 2019-03-07 Exxonmobil Upstream Research Company Modularization of a hydrocarbon processing plant
TWI656313B (en) * 2015-10-06 2019-04-11 美商艾克頌美孚上游研究公司 Modularization of a hydrocarbon processing plant
EP3577289A4 (en) * 2017-01-31 2021-01-13 Fluor Technologies Corporation Modular processing facility with distributed cooling systems
GB2571945A (en) * 2018-03-13 2019-09-18 Linde Ag Method for operating a natural gas processing plant

Also Published As

Publication number Publication date
EP2979049A4 (en) 2016-11-30
US20160010916A1 (en) 2016-01-14
KR20150135503A (en) 2015-12-02
CN105190210A (en) 2015-12-23
BR112015024616B1 (en) 2022-12-06
CN105190210B (en) 2017-03-08
CA2882326C (en) 2018-10-02
EP2979049A1 (en) 2016-02-03
AU2014245852A1 (en) 2015-10-01
AU2014245852B2 (en) 2017-10-05
CA2882326A1 (en) 2014-10-02
JP2016514823A (en) 2016-05-23
US10060670B2 (en) 2018-08-28
IL241778A0 (en) 2015-11-30
BR112015024616A2 (en) 2017-07-18
KR102182637B1 (en) 2020-11-25
AP2015008770A0 (en) 2015-09-30

Similar Documents

Publication Publication Date Title
US10060670B2 (en) Air-cooled modular LNG production facility
CA2794218C (en) Modular lng production facility
AU2016335111B2 (en) Modularization of a hydrocarbon processing plant
AU2017422728B2 (en) Module for natural gas liquefaction devices, natural gas liquefaction device, and method for manufacturing natural gas liquefaction devices
WO2009059985A2 (en) Method and apparatus for cooling and liquefying a hydrocarbon stream
AU2013202033A1 (en) Modular lng production facility
AU2015252986B2 (en) Liquid drains in core-in-shell heat exchanger
US11408677B2 (en) Module for natural gas liquefier apparatus and natural gas liquefier apparatus
KR20120005158A (en) Method and apparatus for liquefying natural gas
AU2017419936B2 (en) Natural gas liquefaction device
US20230392860A1 (en) Compact system and method for the production of liquefied natural gas
JP6887071B1 (en) Module for natural gas plant
JP2020159647A (en) Natural gas liquefaction device

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480025598.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14774713

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2882326

Country of ref document: CA

REEP Request for entry into the european phase

Ref document number: 2014774713

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014774713

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 241778

Country of ref document: IL

ENP Entry into the national phase

Ref document number: 2016504420

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2014245852

Country of ref document: AU

Date of ref document: 20140327

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20157030901

Country of ref document: KR

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015024616

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112015024616

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150925