WO2014143908A1 - System and method for energy distribution - Google Patents

System and method for energy distribution Download PDF

Info

Publication number
WO2014143908A1
WO2014143908A1 PCT/US2014/028077 US2014028077W WO2014143908A1 WO 2014143908 A1 WO2014143908 A1 WO 2014143908A1 US 2014028077 W US2014028077 W US 2014028077W WO 2014143908 A1 WO2014143908 A1 WO 2014143908A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
load
controller
energy
energy resource
Prior art date
Application number
PCT/US2014/028077
Other languages
French (fr)
Inventor
Binayak Roy
Maksim Subbotin
Ashish KRUPADANAM
Jasim Ahmed
Original Assignee
Robert Bosch Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robert Bosch Gmbh filed Critical Robert Bosch Gmbh
Priority to EP14763819.1A priority Critical patent/EP2973932A4/en
Publication of WO2014143908A1 publication Critical patent/WO2014143908A1/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • This disclosure relates generally to the field of energy distribution and, more specifically, to systems and methods for controlling the storage and distribution of energy generated by multiple sources.
  • Existing energy system architectures can include a logic-based controller implementing simple control logic to dispatch energy from an energy storage device, such as electrochemical batteries, to a load.
  • the logic-based controller includes a predetermined set of thresholds and time stamps that define when a given energy storage device stores energy or is charged from available resources and when the storage device releases energy to a load.
  • Examples of such logic-based controllers include load following controllers and cycle-charging controllers.
  • load- following controller the storage device is charged with energy provided by renewable resources when the energy is available and is discharged during a specified time of the day or when the load exceeds a specified threshold.
  • a cycle-charging controller the storage device is charged when a dispatchable resource, such as a diesel generator, is running while also providing power to the load, and is discharged similarly to the load-following strategy.
  • a method for controlling energy distribution includes receiving with a controller first prediction data corresponding to available power generated from a renewable energy resource over a predetermined first time period and second prediction data corresponding to power demand for at least one load over the predetermined first time period, generating with the controller a first constraint model corresponding to power generation capacity of the renewable energy resource over the predetermined first time period with reference to the first prediction data, generating with the controller a second constraint model corresponding to power demand of the at least one load over the predetermined first time period with reference to the second prediction data, generating with the controller a first plurality of power control commands with reference to the first constraint model and the second constraint model, the first plurality of power control commands being generated to control operation of the renewable energy resource within constraints in the first constraint model to supply power to the at least one load within constraints in the second constraint model over the predetermined first time period, and operating with the controller the renewable energy resource with reference to the first plurality of power control commands to adjust a level of power output from the
  • FIG. 1 is schematic block diagram of an energy storage system.
  • FIG. 2 is a detailed schematic block diagram of the energy system of FIG. 1.
  • FIG. 3 is a schematic block diagram of an energy system controller. DETAILED DESCRIPTION
  • FIG. 1 illustrates an energy system 100 that maximizes benefits of an energy system having one or more integrated energy resources.
  • the energy system 100 includes an energy system controller 102 operatively coupled to an electrical load 104, through a communications line 103, which in one embodiment includes one or more electrical loads.
  • the energy system controller 102 is also operatively coupled to one or more energy resources, including renewable energy resources 106 through a communications line 113, dispatchable energy resources 108 through a communications line 115, and stored energy resources 110 through a communications line 117.
  • the electrical load 104, the renewable energy resources 106, the dispatchable energy resources 108, and the stored energy resources 110 are each operatively coupled to a power line 112 which provides for the transmission of energy from one or more of the energy resources to another energy resource and to the electrical load 104.
  • a user interface, or human machine interface (HMI), and a data storage device 114 are also operatively coupled to the energy system controller 102 through a communications line 119.
  • the communications lines 103, 113, 115, 117, and 119 are either hardwired or wireless or a combination thereof.
  • the energy system controller 102 integrates a plurality of components, devices or subsystems that provide for the prediction of energy generation, the planning of energy delivery and storage, and the selective transmission or delivery of power from an energy generation device or an energy storage device to a load or an energy generation device.
  • the components, devices or subsystems are integrated into a single control system, the flow of energy is seamlessly delivered between the load, energy storage devices, dispatchable energy resources, and renewable resources to the benefit of the user.
  • the controller 102 is operatively coupled to a controller 105 of the electrical load 104, a controller 107 of the renewable energy resources 106, a controller 109 of the dispatchable energy resources 108, and a controller 111 of the stored energy resources 110.
  • Each of the controllers, 105, 107, 109, and 111 in different embodiments, include processors and memories and receive and provide information in the form of signals to and from the controller 102.
  • the controllers 105, 107, 109, and 111 in different embodiments include control hardware, including switching devices to provide for the generation and transmission of energy or the storage of energy within the energy system 100.
  • the energy system 102 obtains status information from each of the resources 106, 108, and 110 as described later and also provides control signals to the controllers 105, 107, 109, and 111 for the generation and transmission or storage of energy in the system 100.
  • the controller 102 is also operatively coupled to the controller 105 to receive status information of the load 104 indicative of the energy required by the load.
  • the controller 102 in different embodiments includes a computer, computer system, or programmable device, e.g., multi-user or single-user computers, desktop computers, portable computers and other computing devices.
  • the controller 102 includes one or more individual controllers as described below and includes in different embodiments at least one processor coupled to a memory.
  • the controller 102 includes in different embodiments one or more processors (e.g. microprocessors), and the memory in different embodiments includes random access memory (RAM) devices comprising the main memory storage of the controller 102, as well as any supplemental levels of memory, e.g., cache memories, non-volatile or backup memories (e.g. programmable or flash memories), read-only memories, etc.
  • RAM random access memory
  • the memory in one embodiment includes a memory storage physically located elsewhere from the processing devices and includes any cache memory in a processing device, as well as any storage capacity used as a virtual memory, e.g., as stored on a mass storage device or another computer coupled to controller 102 via a network.
  • the mass storage device in one embodiment includes a cache or other dataspace including databases.
  • the stored energy resources 110 includes energy storage devices, such as electrochemical batteries such as those found in energy systems that supply electrical energy to residential loads, commercial loads or other types of loads and pumped hydro reserves. Utilization of the energy storage devices provides benefits in energy-savings by reducing the requirements for a distribution infrastructure and for integrating renewable energy resources into the electrical grid. Unlike conventional dispatchable resources which require a balance between the amount of energy generated and consumed by a grid at any instant of time, one or more storage devices enable the shifting of electrical energy consumption and energy generation from one period of time to another period of time.
  • energy storage devices such as electrochemical batteries such as those found in energy systems that supply electrical energy to residential loads, commercial loads or other types of loads and pumped hydro reserves. Utilization of the energy storage devices provides benefits in energy-savings by reducing the requirements for a distribution infrastructure and for integrating renewable energy resources into the electrical grid. Unlike conventional dispatchable resources which require a balance between the amount of energy generated and consumed by a grid at any instant of time, one or more storage devices enable the shifting of electrical energy consumption and energy generation from one
  • the energy generated by one or more renewable resources 106 which exceeds the amount of energy required by a given load at a certain time to satisfy energy demand is stored in the energy storage resources 110.
  • Renewable energy resources include wind turbines, solar panels, biomass plants, hydroelectric power plants, geothermal power installations, tidal power installations, and wave power installations.
  • low cost energy which is provided by the electrical grid at a low price during periods of low demand by the load 104 is also being stored. The stored energy is then being provided on demand when energy is required or when other forms of energy are more expensive.
  • Dispatchable energy resources also include hydro-power, coal power, diesel generators, electrical grid connection, and gas power.
  • the use of energy storage resources 110 also provides a reliable supply of electrical power to maximize the benefits provided to owners, managers, or users of the energy system 100. Consequently, the described system and method for energy distribution including the energy system controller 102 realize the benefits of an energy storage system represented, for example, by a battery installation, while providing a reliable source of energy that satisfies load demand at substantially any and at all times.
  • the energy system controller 102 is configured to plan for the optimal operation of many different types and configurations of energy systems.
  • the control system architecture 100 maximizes the benefits of an energy system with integrated stored energy resources 110, here labeled as energy storage devices 110.
  • energy storage modules 120 are operatively connected to the power line 112 which couples the electrical load 104 to an energy grid 124.
  • the module 120 represents different or similar types of energy storage devices.
  • the renewable energy resources 106 and the dispatchable energy resources 108 are also coupled to the power line 112.
  • energy system controller 102 includes three components or devices that individually and/or collectively solve the tasks of power prediction, power dispatch planning, and execution of power dispatch.
  • a load and renewable predictors module 130 provides for a prediction of the power which is generated by the renewable resources 106 which in different embodiments is dependent upon a weather forecast received at an input 132 to the module 130.
  • a dispatch planner module 134 provides for the planning of the generation and the release or discharge of energy to the load 104.
  • a dispatch controller 136 dispatches or directs the flow of energy provided by the renewable resources 106, the dispatchable resources 108, and the energy stored in the storage devices 110 to the power line 112.
  • Each of the load and renewable predictors module 130 and dispatch planner module 134 are embodied in one embodiment as modules including software resident in the controller 102 or which is one embodiment configured as individual device controllers.
  • the dispatch controller 136 in one embodiment is embodied as a module including software or as a device controller. While the modules 130, 134 and controller 136 in one embodiment are located at a single predetermined location, each of the modules 130. 134 and controller 136 in other embodiments are remotely located apart from each other if desired.
  • the modules 130, 134, and controller 136 in one embodiment direct the flow of energy and the amount of power available for the load 104 for/from the energy storage devices 1 lOand from the dispatchable resources 108, and the renewable resources 106 to maximize benefit of the user, which includes a cost benefit and an energy delivery benefit including the amount of electrical power and a time of its delivery.
  • FIG. 2 illustrates the power line 112 which provides the electrical power connections to the renewable resources 106, the dispatchable resources 108, the energy storage devices 110, and to the electrical grid 124.
  • the energy system controller 102 receives power measurements from the load, a status of renewable and dispatchable resources and storage devices, and receives historized operation and performance data from a data storage unit 140 coupled to the controller 102. In addition, the energy system controller 102 generates power control commands for the renewable resources 106, the dispatchable resources 108, and the storage devices 110.
  • the controller 102 includes a plurality of inputs to receive measurement and/or status signals.
  • the input 132 provides weather information to the predictors module 130.
  • the weather information is obtained from any number of providers including commercial weather prediction vendors and the NOAA National Weather Service.
  • An input 150 to the module 130 provides a signal indicative of the present or current power requirement or status of the load 104, which is also provided to a comparator 152 to be described later.
  • An input 154 to the predictors module 130 is received from the renewable resources 106 and provides status information of the amount of power currently being produced by the renewable resources 106. The status information provided by the input 154 is also provided to a comparator 156 to be described later.
  • Control commands are generated internally by the controller 102.
  • the predictor module 130 for instance, generates signals over first and second predictors module outputs 160 and 162 which are received as inputs by the planner module 134.
  • the planner module 134 in response to the signals received over the first and second predictors module 130 outputs 160, 162, the planner module 134 generates signals through planner module 134 outputs 164, 166, and 168.
  • the signal at the output 164 is applied to the comparator 156 and combined with the signal at the output 154 generated by the renewable resource 106.
  • the signal at the output 166 is applied to the comparator 152 and combined with the signal generated by the load 104 over the input 150.
  • An output 170 of the comparator 156 is applied as an input to the dispatch controller 136.
  • An output 172 of the comparator 152 is applied as an input to the dispatch controller 136.
  • the dispatch controller 136 includes an output 180 coupled to the load 104, an output 182 coupled to the renewable resources 106, an output 184 coupled to the dispatchable resources 108, and an output 186 coupled to the storage devices 110.
  • additional control information is transmitted over a data bus 190 coupled to the load 104, the renewable resources 106, the dispatchable resources 108, the storage devices 110, the data storage unit 140, the HMI 196, and the grid 124.
  • the data bus 190 which includes other types of communication channels, transmits data that is used to communicate command signals and variables required for operation of the system 100.
  • the data storage unit 140 stores data and transmits data upon demand from the controller 102.
  • An output 192 from unit 196 is coupled to the controller 102 and an input 194 to the unit 196 is coupled to the controller 102 to receive command signals.
  • a system operator or user accesses and/or manipulates data stored in the data storage unit 140 or data received from the controller 102 over the output 194.
  • a user interface 196 (HMI) enables a user to access information about the state of the system 100, which in one embodiment is stored in the data storage 140 or received over the output 194.
  • FIG. 3 illustrates a detailed view of the energy system controller 102 and the configuration and types of signals being transmitted internally between the modules 130, 134, and controller 136 and externally to and from the load 104, the resources 106, 108, and 110, and to and from the HMI 196 and data storage unit 140.
  • the load and renewables predictors module 130 generates a prediction of the requirements of the load, P L (z) over the output 162 on a predetermined prediction time period which is referred to as a time horizon, T H , and a prediction of the power to be generated or provided by the renewable resources P R (/) which is transmitted over the output 160 using the same time horizon as used for the load signal at 162.
  • These predictions are transmitted to the dispatch planner module 134 which processes the information and responsively generates a plurality of signals to control the operation of the energy system 100 on the time horizon T H .
  • the dispatch planner 134 generates baseline power control commands (a vector of reference signals) P (i) for the dispatchable resources 108 on the output 168 for transmission to the dispatch controller 136.
  • the dispatch planner module 134 also generates baseline power control commands (a vector of reference signals) for the renewable resources P R (z) over the output 164 which along with the load prediction P L (i) , transmitted on the output 166, are compared respectively with the corresponding measurements of the power provided by the renewable resources, P R (k) at comparator 156, and the load P L (£) at comparator 152, to generate error signals e R (k ) and e L (k ) respectively.
  • the error signals and the reference signal for the dispatchable resources are then provided to the dispatch controller 136 that computes control commands for transmission to the renewable resources 106 ( c R (k) ), dispatchable resources 108, ( c D (k) ), storage devices 110, ( c s (k) ), and the load 104, ( c L (k) ).
  • These control commands are provided to individual devices and implemented by the local controllers or a controller in communication with the device.
  • the associated controller controls at least one switch at each of the resources 106, 108, and storage devices 110 to control the release of energy to the power line 112.
  • the error signals indicate a difference between a predicted or planned power values and actual values of the load or power generation of the renewable resources, for instance.
  • the energy storage devices 110 In order to maximize the benefits provided by energy storage devices 110, operation of the energy storage devices 110 is planned on a sufficiently long time horizon, T H , in the future so that the storage devices 110 in one embodiment is charged when energy in the system 100 is most readily available and/or least expensive.
  • the time horizon includes one or more hours, one or more days, or one or more weeks or other long time horizons.
  • the stored energy is then provided on demand to the load 104 when the energy is most needed or when a predetermined level of savings is achieved if the load is being controlled to reduce load requirements.
  • the dispatch planner module 134 in one embodiment performs an optimized planning of power profiles for the energy storage devices and other energy resources in the system by solving a numerical optimization problem using an optimization program or algorithm resident in firmware or software of the module 130 including memory associated with the module 130.
  • Software resident at the user interface 114 in one embodiment is also used.
  • the long time horizon extends for one or more weeks, and the time periods used during the longer time horizon vary. For instance, during a first week, determinations of future power used and further power generation are made every hour. During a second week, determinations are made every six hours, and during a third week determinations are made very twelve hours. The determination of time periods in one embodiment is determined based on the accuracy of the weather predictions.
  • the optimization problem is formulated with a cost function and takes into account the cost of energy, demand charges, battery efficiencies and life to depletion, maintenance and replacement costs for each component of the energy system, and other parameters that influence operating costs of the energy system 100 for a specified time horizon T H .
  • the optimization program takes into account all the constraints imposed on different components of the system such as power limits for various resources, available amounts of energy stored in different energy storage devices, and safety constraints.
  • the dispatch planner module 134 receives a forecasted load profile over the specified time horizon T H , profiles of power that are forecasted to be generated by the renewable resources over the same time horizon, and present states of energy system components such as the amount of fuel available for dispatchable resources and the amount of energy available from various storage devices.
  • Information about the states of components of the energy system is provided to the dispatch planner module 134 by signal S(k) over the output 192 from data storage unit 140 of Figure 2.
  • Information indicative of the future load profile and power profiles from renewable resources 106 is provided to the dispatch planner module 134 by the load 104 and renewables predictors module 130.
  • the load and renewables predictors module 130 includes a number of predictor algorithms that generate forecasts of the future load requirements of load 104 and the power anticipated to be available from renewable resources 106 on the prediction time horizon T H .
  • the load and renewables predictors module 130 includes a number of predictor algorithms that generate forecasts of the future load requirements of load 104 and the power anticipated to be available from renewable resources 106 on the prediction time horizon T H .
  • PV photovoltaic
  • three predictors are provided for each one of these components.
  • Each of these predictors is represented by a mathematical model of the considered component (e.g.
  • the predictors module 130 receives measurements of the power available from or provided to the component as well as other inputs that influence the power profile and generates a prediction of the power profile. These predictions are provided to the dispatch planner module 134 in the form of signals P L (i) for the load 104 and P R (z ) for the renewable resources 106.
  • the load predictors module 130 in one embodiment is implemented with a neural network model of the load 104 that is populated or trained with historical load profiles of the energy system 100 and is capable of generating a forecast of the load 104 which occurs in the future on a timeline horizon of several hours or one or more days.
  • power requirements of a load are predicted based on power usage during a workweek as opposed to power usage during a weekend.
  • Neural networks are known and are used in one embodiment.
  • the load predictors module 130 in one embodiment utilizes past measurements of the load power requirements as well as other variables such as current and future time variables, day of the week, time of the year, weather forecast on the specified time future horizon and other variables to generate the prediction P L (i) .
  • a predictor algorithm for the PV installation in one embodiment is embodied by in program code providing a deterministic model that computes solar irradiance at a given geographical location for any time of the day and year which is adjusted by a weather forecast predicting cloud cover, humidity and other atmospheric parameters for time T H in the future.
  • the solar irradiance is considered in one embodiment as a part of the weather forecast.
  • the power provided by the PV installation is determined than from the solar irradiance utilizing the mathematical model mapping irradiance into the power output.
  • the wind power predictor in one embodiment utilizes a mathematical model of the installed wind turbine along with the weather forecasts about temperature, humidity, wind speed and direction for the next time horizon T H .
  • Signal P R (k) provides information about the power generation by renewable resources at time instant k that is used by the predictors of the renewable power.
  • a dispatch strategy computed by the dispatch planner module 134 relies on the prediction of load 104 and power available from the renewable resources 106. Due to prediction uncertainties and errors, modeling inaccuracies, and temporal variations in load profiles, and renewable profiles, a mismatch in one embodiment occurs between the predicted load and power profiles and the true load and power profiles. In addition to that mismatch, since both the predictors module 130 and dispatch planner module 134 need time to compute the predictions and the optimal dispatch strategy for the next time horizon, the predictors module 130 and dispatch planner module 134 of the energy system controller 102 in one embodiment operate at a sampling rate less than the speed required to compensate for an instantaneous variation of load demand and power supply.
  • the control system incorporates the dispatch controller 136.
  • the dispatch controller 136 uses optimally planned profiles generated by the dispatch planner module 134 as reference inputs, and computes the errors, e R (k ) and e L (k) , between the predicted profiles and the measurements collected at a high sampling rate, and generates final command inputs to the energy system resources.
  • the predictors module 130 and the dispatch planner module 134 operate at a sampling rate of approximately between 15 minutes and 1 hour. This sampling rate is limited by the update rate of forecasts for the load 104 and renewable resources 106 and by the amount of time required to perform the optimization.
  • the dispatch planner module 134 implements cost and constraint models for each energy resource and the system as a whole. As shown in FIG. 3, the dispatch planner module
  • P R (i) denotes the reference command for renewable resources
  • P ( ) denotes the reference commands for dispatchable resources
  • P L ( ) denotes the reference commands for loads.
  • the optimization process uses one or more constraints in constraint models to generate power variable values and corresponding operating commands that satisfy the constraints.
  • the constraints pertain either to individual resource constraints, such as constraints on the power generation capacity of renewable and non-renewable energy resources, constraints on the power consumption demands for loads, constraints on the capacity of energy storage resources, and to constraints for the entire energy storage system.
  • Resource constraints include storage state of charge constraints, storage power constraints, renewable power constraints, and grid power constraints.
  • the storage state of charge is a non-negative number that always lies between a lower bound (e.g. 20%) and an upper bound (e.g. 100% or fully charged).
  • the storage power constraints correspond to the maximum permissible power (charge or discharge) at the storage terminal is a function of the instantaneous storage state of charge.
  • the renewable power constraints correspond to the maximum permissible power available from a renewable resource, such as PV, which is dependent on the available solar irradiation.
  • the grid power constraints corresponding to the electrical grid 124 impose restrictions on the maximum power levels that are drawn from the energy grid 124 during operation. Alternative embodiments include additional restrictions, such as restrictions on the maximum amount of power that is fed into the energy grid 124 by the energy system.
  • System constraints pertain to deferrable and non-deferrable loads.
  • a non-deferrable load refers to a load that requires electrical power with substantially zero delay at levels that are determined by the requirements of the load.
  • a deferrable load refers to a load that requires electrical power but where the distribution of electrical power over time can be modified while satisfying the constraints for the load.
  • the constraints for the combination of the deferrable and non-deferrable loads correspond to the varying range of expected load demand levels for the loads including minimum demand levels and maximum demand levels over the time horizon.
  • the combined energy resources in the system need to satisfy non-deferrable loads, such as lighting and HVAC, at every instant.
  • Other loads may be deferrable and need to be satisfied only prior to a predetermined time deadline. For example, in one configuration the exact time of charging an electric vehicle during nighttime hours is not a high-priority constraint as long as a total amount of energy (e.g. 70 kWh) is delivered prior to a
  • the dispatch planner module 134 identifies predicted "off peak" periods of reduced utilization when the predicted demand for power from the renewable energy resource is less than the maximum available capacity for power generation that is predicted for the renewable energy resource 106.
  • the dispatch planner module 134 generates a profile with power control commands to increase the generation during the predicted off peak periods to accommodate the deferred load while operating the renewable energy resource 106 within the predicted maximum power generation constraint.
  • dispatch planner module 134 optimizes for minimizing the levelized cost of electricity (LCOE) given the system constraints.
  • the LCOE over a time horizon is defined as the cost of using the energy system per kWh of load supplied.
  • the LCOE has several components such as grid energy cost ($/kWh), grid demand charges ($/kW), storage cost ($/kWh), diesel fuel cost ($/kWh), and the like.
  • the dispatch planner module is configured to optimize the LCOE for different application cases including reduction in demand charges, time-of-usage tariffs, and optimized utilization of conventional power plants.
  • the reduction in demand charge optimization is directed to systems that are charged for energy consumption ($/kWh) and the peak energy consumption ($/kW) by the utilities.
  • the demand charges are made to recoup the costs of sizing the transmission and distribution infrastructure to accommodate the peak loads.
  • the system 100 uses the stored energy resources 110 to supply the peak loads while charging during off-peak times. This time shifting reduces the demand charges for the customer.
  • the time-of-usage tariffs are charged based on the variations in the costs of production and availability of renewable energy resources 106.
  • the dispatch planner module optimizes the usage of the energy storage assets 110 to enable the customer to realize benefits by moving consumption from the energy grid 124 from peak hours to off-peak hours.
  • the dispatch planner 134 performs optimization of the utilization of conventional power plants to minimize the need to increase or decrease the power demand for conventional power plants.
  • the dispatch planner 134 increases or decreases the usage of the energy storage assets 110 to reduce the variation in the load demand on the conventional power plants.
  • the dispatch planner module 134 optimizes for minimizing emissions from polluting energy resources given the system constraints. For example, energy resources, such as coal or gas-fired power plants, generate gas emissions that are harmful to the environment. Frequent ramping up or down of the polluting energy generation assets to satisfy the load results in a significant increase in emissions.
  • the dispatch planner module optimizes the power draw from the polluting energy resources to enable operation of the polluting resources within a predetermined load range and to supply the balance energy from a renewable source 106 or storage resource 110.
  • the predetermined load range refers to relative draw from an energy resource compared to the total power generation capacity of the resource and can be expressed as a percentage of the total capacity of the nonrenewable energy resource.
  • a coal-fired power generator resource is operates in a load range of 40% of the maximum load up to 80% of the maximum load over a predetermined period of time without dropping below the minimum 40% load or rising above the maximum 80% load. Operating the non-renewable resource within the predetermined load range reduces overall emissions that are incurred when the resource is deactivated and restarted or when the resource operates at maximum capacity.
  • the dispatch planner module uses standard or custom optimization processes to minimize the cost function or uses rule-based custom algorithms subject to the operating constraints.
  • the optimization processes include gradient-based or gradient-free methods, dynamic programming, integer programming, genetic algorithms, and simulated annealing.
  • the rule -based custom algorithms include storage charging and discharging schedules based on load thresholds and renewable availability.
  • the dispatch planner module 134 is implemented using one or more digital processing devices including, but not limited to desktop, server, and mobile personal computers (PCs), a Programmable Logic Controller (PLC), or a microprocessor or Electronic Control Unit (ECU).
  • PCs personal computers
  • PLC Programmable Logic Controller
  • ECU Electronic Control Unit
  • the dispatch controller 136 compares reference inputs from the dispatch planner with the measurements received from the load P L (k ) and renewable resources P R (k) , computes the corresponding errors e L (k) , e R (k) and augments reference commands from the dispatch planner module 134 with correction signals to generate power commands c D (k) to dispatchable resources 108, power commands c s (k) storage devices 110, throttling commands c R (k) to renewable resources 106 and, if load devices allow demand management, load regulation commands c L (k) to the load 104.
  • the throttling commands are generated in situations when the renewable resources 106 provide or are providing more power at a given sample time k than the amount of power than is capable of being absorbed by the load 104, storage devices 110 or the dispatchable resources 108.
  • the throttling commands are transmitted to the renewable resources 106 to reduce the amount of energy being generated by the renewable resources.
  • the alignment of the arrays with respect to the sun are adjusted to misalign the arrays with respect to the path of sunlight, or in another embodiment the connection to the power line 112 is disconnected.
  • the blade angle is adjusted to limit the amount of rotation or the blades are disconnected from the gearbox or generator.
  • sampling time for the dispatch controller 136 is denoted by k, while the sampling time for the predictors module 130 and the dispatch planner module 134 are denoted by i.
  • k the sampling time for the predictors module 130 and the dispatch planner module 134
  • i the sampling time for the predictors module 130 and the dispatch planner module 134
  • the sampling rate of the dispatch controller 136 is on the order of fractions of a minute to several seconds, milliseconds or other short time intervals.
  • This sampling rate is limited by the sampling rates of the measurement devices acquiring instantaneous power of the load and the renewable resources and the amount of time required to generate the control commands c R (k) , c D (k) , c s (k) , c L (k) .
  • the dispatchable energy resources 108 provide energy at times when the renewable energy resources 106, stored energy resources 110 are insufficient to meet the energy requirements of the load 104.
  • the dispatchable energy resource 108 provides a load matching function to provide an output to match the shape of the load demand.
  • peak matching is also provided to match the highest energy demand occurring during a certain time of day. Such time is predicted based on time of day, pattern of energy use, weather, and geographic location.
  • the dispatchable energy resource 108 in other embodiments also cover lead-in times where some resources, such as coal powered plants, take a certain amount of time to ramp up to the desired output. Frequency regulation is also provided in some embodiments.
  • the control system architecture 100 facilitates robust operation in the presence of potential problems or failures in individual system components.
  • each one of the three modules 130, 134, and the controller 136 are implemented on an individual processor, server, programmable logic controller (PLC) or another computing device such that when one of these modules or controllers fail, one or more of the other modules or controller continue operation.
  • PLC programmable logic controller
  • each of the three components 130, 134, and 136 of the control system are implemented on the same device, as hardware, firmware or software, each is implemented as individual devices or programs, or program code, running independently and exchanging information between each other in order to provide the robust operation, such that power continues to be supplied if one of the components fails.
  • each of the components 130, 134, and 136 are independent of the other to provide for the failure of one or more of the other components.
  • the dispatch planner module 134 uses the predictions stored in an associated memory, or stored in the data storage 140, from the previous forecast, extrapolates the predictions one unit of time into the future according to a chosen rule, and generates a set of new reference signals for the dispatch controller 136. Such operation continues until the predictors module 130 restores its functionality and starts providing the forecast again. In this situation, the operation of the energy system 100 deviates from an optimal operation, but the controller 102 continues to reliably coordinate the transfer of power between the load 104 and the resources 106, 108, and 110.
  • the dispatch controller 136 uses the planned profiles received from the dispatch planner module 134 during the previous period and continues control of the system power until the planner module 134 operation is restored. In another embodiment, if the predictors module 130 or the dispatch planner module 134 fails for a sufficiently long period of time, longer than the prediction horizon of several hours or days, the dispatch controller 136 resorts to a logic-based control of the power transmission until full functionality of the controller 102 is restored.
  • the dispatch controller 136 In terms of reliable operation of the energy system 100, a significant component of the control architecture is the dispatch controller 136. In general and in one embodiment, the control system controls power flow between the energy system resources as long as the dispatch controller 136 continues to be operational.

Abstract

A Dispatch Planner (DP) is a component in an Energy System Controller that controls the operation of energy resources interconnected into one energy system to provide optimal energy management for a customer. In one embodiment, the energy storage system includes an electric load, dispatchable sources of energy such as an electrical grid, diesel generators, combined heat and power generators; renewable sources of energy such as photo-voltaic cells and wind turbines; and stored energy resources such as electrochemical batteries or pumped hydro reserves.

Description

SYSTEM AND METHOD FOR ENERGY DISTRIBUTION
CLAIM OF PRIORITY
[0001] This application is a continuation-in-part application of copending U.S. Non- Provisional Patent Application No. 13/719,548, which is entitled "System and Method For Energy Distribution," and was filed on December 19, 2012, the entire contents of which are hereby incorporated by reference herein. This application claims further priority to U.S.
Provisional Patent Application No. 61/786,928, which is entitled "System and Method for Energy Distribution" and was filed on March 15, 2013, the entire contents of which are hereby incorporated by reference herein.
FIELD
[0002] This disclosure relates generally to the field of energy distribution and, more specifically, to systems and methods for controlling the storage and distribution of energy generated by multiple sources.
BACKGROUND
[0003] Existing energy system architectures can include a logic-based controller implementing simple control logic to dispatch energy from an energy storage device, such as electrochemical batteries, to a load. The logic-based controller includes a predetermined set of thresholds and time stamps that define when a given energy storage device stores energy or is charged from available resources and when the storage device releases energy to a load. Examples of such logic-based controllers include load following controllers and cycle-charging controllers. With a load- following controller, the storage device is charged with energy provided by renewable resources when the energy is available and is discharged during a specified time of the day or when the load exceeds a specified threshold. With a cycle-charging controller, the storage device is charged when a dispatchable resource, such as a diesel generator, is running while also providing power to the load, and is discharged similarly to the load-following strategy.
[0004] Utilization of energy storage devices, such as electrochemical batteries, in energy systems that supply electrical energy to residential, commercial or other loads brings many new opportunities in energy-savings, reduces requirements for distribution infrastructure, and integrates renewable resources into the electrical grid. Unlike conventional devices, which require a balance of the amount of energy generated and consumed in a grid at every instant of time, storage devices allow temporal shifting of electrical energy generation and consumption. As a consequence, excess renewable energy or low-priced electrical energy from the grid, can be stored, and provided on demand when this energy is required or expensive. At the same time, utilization of energy storage devices leads to new technical challenges related to the planning of optimal operation of these devices. Consequently, improvements to energy storage control systems that increase the efficiency of storage and utilization of energy from multiple energy generation sources would be beneficial.
SUMMARY
[0005] In one embodiment a method for controlling energy distribution has been developed. The method includes receiving with a controller first prediction data corresponding to available power generated from a renewable energy resource over a predetermined first time period and second prediction data corresponding to power demand for at least one load over the predetermined first time period, generating with the controller a first constraint model corresponding to power generation capacity of the renewable energy resource over the predetermined first time period with reference to the first prediction data, generating with the controller a second constraint model corresponding to power demand of the at least one load over the predetermined first time period with reference to the second prediction data, generating with the controller a first plurality of power control commands with reference to the first constraint model and the second constraint model, the first plurality of power control commands being generated to control operation of the renewable energy resource within constraints in the first constraint model to supply power to the at least one load within constraints in the second constraint model over the predetermined first time period, and operating with the controller the renewable energy resource with reference to the first plurality of power control commands to adjust a level of power output from the renewable energy resource within a first plurality of constraints in the first constraint model to provide power to the at least one load within a second plurality of constraints in the second constraint model.
BRIEF DESCRIPTION OF THE DRAWINGS
[0006] FIG. 1 is schematic block diagram of an energy storage system.
[0007] FIG. 2 is a detailed schematic block diagram of the energy system of FIG. 1. [0008] FIG. 3 is a schematic block diagram of an energy system controller. DETAILED DESCRIPTION
[0009] For the purposes of promoting an understanding of the principles of the embodiments disclosed herein, reference is now be made to the drawings and descriptions in the following written specification. No limitation to the scope of the subject matter is intended by the references. The present disclosure also includes any alterations and modifications to the illustrated embodiments and includes further applications of the principles of the disclosed embodiments as would normally occur to one skilled in the art to which this disclosure pertains.
[0010] FIG. 1 illustrates an energy system 100 that maximizes benefits of an energy system having one or more integrated energy resources. The energy system 100 includes an energy system controller 102 operatively coupled to an electrical load 104, through a communications line 103, which in one embodiment includes one or more electrical loads. The energy system controller 102 is also operatively coupled to one or more energy resources, including renewable energy resources 106 through a communications line 113, dispatchable energy resources 108 through a communications line 115, and stored energy resources 110 through a communications line 117. The electrical load 104, the renewable energy resources 106, the dispatchable energy resources 108, and the stored energy resources 110 are each operatively coupled to a power line 112 which provides for the transmission of energy from one or more of the energy resources to another energy resource and to the electrical load 104. A user interface, or human machine interface (HMI), and a data storage device 114 are also operatively coupled to the energy system controller 102 through a communications line 119. The communications lines 103, 113, 115, 117, and 119 are either hardwired or wireless or a combination thereof.
[0011] The energy system controller 102 integrates a plurality of components, devices or subsystems that provide for the prediction of energy generation, the planning of energy delivery and storage, and the selective transmission or delivery of power from an energy generation device or an energy storage device to a load or an energy generation device. When the components, devices or subsystems are integrated into a single control system, the flow of energy is seamlessly delivered between the load, energy storage devices, dispatchable energy resources, and renewable resources to the benefit of the user. The controller 102 is operatively coupled to a controller 105 of the electrical load 104, a controller 107 of the renewable energy resources 106, a controller 109 of the dispatchable energy resources 108, and a controller 111 of the stored energy resources 110. Each of the controllers, 105, 107, 109, and 111 in different embodiments, include processors and memories and receive and provide information in the form of signals to and from the controller 102. In addition, the controllers 105, 107, 109, and 111 in different embodiments include control hardware, including switching devices to provide for the generation and transmission of energy or the storage of energy within the energy system 100. The energy system 102 obtains status information from each of the resources 106, 108, and 110 as described later and also provides control signals to the controllers 105, 107, 109, and 111 for the generation and transmission or storage of energy in the system 100. The controller 102 is also operatively coupled to the controller 105 to receive status information of the load 104 indicative of the energy required by the load.
[0012] The controller 102 in different embodiments includes a computer, computer system, or programmable device, e.g., multi-user or single-user computers, desktop computers, portable computers and other computing devices. The controller 102 includes one or more individual controllers as described below and includes in different embodiments at least one processor coupled to a memory. The controller 102 includes in different embodiments one or more processors (e.g. microprocessors), and the memory in different embodiments includes random access memory (RAM) devices comprising the main memory storage of the controller 102, as well as any supplemental levels of memory, e.g., cache memories, non-volatile or backup memories (e.g. programmable or flash memories), read-only memories, etc. In addition, the memory in one embodiment includes a memory storage physically located elsewhere from the processing devices and includes any cache memory in a processing device, as well as any storage capacity used as a virtual memory, e.g., as stored on a mass storage device or another computer coupled to controller 102 via a network. The mass storage device in one embodiment includes a cache or other dataspace including databases.
[0013] The stored energy resources 110, in different embodiments, includes energy storage devices, such as electrochemical batteries such as those found in energy systems that supply electrical energy to residential loads, commercial loads or other types of loads and pumped hydro reserves. Utilization of the energy storage devices provides benefits in energy-savings by reducing the requirements for a distribution infrastructure and for integrating renewable energy resources into the electrical grid. Unlike conventional dispatchable resources which require a balance between the amount of energy generated and consumed by a grid at any instant of time, one or more storage devices enable the shifting of electrical energy consumption and energy generation from one period of time to another period of time. As a consequence, the energy generated by one or more renewable resources 106 which exceeds the amount of energy required by a given load at a certain time to satisfy energy demand, in one embodiment, is stored in the energy storage resources 110. Renewable energy resources include wind turbines, solar panels, biomass plants, hydroelectric power plants, geothermal power installations, tidal power installations, and wave power installations. In addition low cost energy which is provided by the electrical grid at a low price during periods of low demand by the load 104 is also being stored. The stored energy is then being provided on demand when energy is required or when other forms of energy are more expensive. Dispatchable energy resources also include hydro-power, coal power, diesel generators, electrical grid connection, and gas power.
[0014] The use of energy storage resources 110 also provides a reliable supply of electrical power to maximize the benefits provided to owners, managers, or users of the energy system 100. Consequently, the described system and method for energy distribution including the energy system controller 102 realize the benefits of an energy storage system represented, for example, by a battery installation, while providing a reliable source of energy that satisfies load demand at substantially any and at all times. The energy system controller 102 is configured to plan for the optimal operation of many different types and configurations of energy systems.
[0015] As illustrated in FIG. 2, the control system architecture 100 maximizes the benefits of an energy system with integrated stored energy resources 110, here labeled as energy storage devices 110. One or more energy storage modules 120 are operatively connected to the power line 112 which couples the electrical load 104 to an energy grid 124. The module 120 represents different or similar types of energy storage devices. In addition, the renewable energy resources 106 and the dispatchable energy resources 108 are also coupled to the power line 112. To provide for the distribution of energy from the grid 124 and the resources 106, 108, and 110, energy system controller 102 includes three components or devices that individually and/or collectively solve the tasks of power prediction, power dispatch planning, and execution of power dispatch. A load and renewable predictors module 130 provides for a prediction of the power which is generated by the renewable resources 106 which in different embodiments is dependent upon a weather forecast received at an input 132 to the module 130. A dispatch planner module 134 provides for the planning of the generation and the release or discharge of energy to the load 104. A dispatch controller 136 dispatches or directs the flow of energy provided by the renewable resources 106, the dispatchable resources 108, and the energy stored in the storage devices 110 to the power line 112. Each of the load and renewable predictors module 130 and dispatch planner module 134 are embodied in one embodiment as modules including software resident in the controller 102 or which is one embodiment configured as individual device controllers. In addition, the dispatch controller 136 in one embodiment is embodied as a module including software or as a device controller. While the modules 130, 134 and controller 136 in one embodiment are located at a single predetermined location, each of the modules 130. 134 and controller 136 in other embodiments are remotely located apart from each other if desired.
[0016] When the load and renewable predictors module 130, the dispatch planner module 134, and the dispatch controller 136 are integrated into the energy system controller 102, the modules 130, 134, and controller 136 in one embodiment direct the flow of energy and the amount of power available for the load 104 for/from the energy storage devices 1 lOand from the dispatchable resources 108, and the renewable resources 106 to maximize benefit of the user, which includes a cost benefit and an energy delivery benefit including the amount of electrical power and a time of its delivery.
[0017] Figure 2 illustrates the power line 112 which provides the electrical power connections to the renewable resources 106, the dispatchable resources 108, the energy storage devices 110, and to the electrical grid 124. The energy system controller 102 receives power measurements from the load, a status of renewable and dispatchable resources and storage devices, and receives historized operation and performance data from a data storage unit 140 coupled to the controller 102. In addition, the energy system controller 102 generates power control commands for the renewable resources 106, the dispatchable resources 108, and the storage devices 110.
[0018] The controller 102 includes a plurality of inputs to receive measurement and/or status signals. As described above, the input 132 provides weather information to the predictors module 130. The weather information is obtained from any number of providers including commercial weather prediction vendors and the NOAA National Weather Service. An input 150 to the module 130 provides a signal indicative of the present or current power requirement or status of the load 104, which is also provided to a comparator 152 to be described later. An input 154 to the predictors module 130 is received from the renewable resources 106 and provides status information of the amount of power currently being produced by the renewable resources 106. The status information provided by the input 154 is also provided to a comparator 156 to be described later.
[0019] Control commands are generated internally by the controller 102. The predictor module 130, for instance, generates signals over first and second predictors module outputs 160 and 162 which are received as inputs by the planner module 134. Similarly, in response to the signals received over the first and second predictors module 130 outputs 160, 162, the planner module 134 generates signals through planner module 134 outputs 164, 166, and 168. The signal at the output 164 is applied to the comparator 156 and combined with the signal at the output 154 generated by the renewable resource 106. The signal at the output 166 is applied to the comparator 152 and combined with the signal generated by the load 104 over the input 150. An output 170 of the comparator 156 is applied as an input to the dispatch controller 136. An output 172 of the comparator 152 is applied as an input to the dispatch controller 136. The dispatch controller 136 includes an output 180 coupled to the load 104, an output 182 coupled to the renewable resources 106, an output 184 coupled to the dispatchable resources 108, and an output 186 coupled to the storage devices 110.
[0020] In addition to the feedback and control commands described above, additional control information is transmitted over a data bus 190 coupled to the load 104, the renewable resources 106, the dispatchable resources 108, the storage devices 110, the data storage unit 140, the HMI 196, and the grid 124. The data bus 190, which includes other types of communication channels, transmits data that is used to communicate command signals and variables required for operation of the system 100. The data storage unit 140 stores data and transmits data upon demand from the controller 102. An output 192 from unit 196 is coupled to the controller 102 and an input 194 to the unit 196 is coupled to the controller 102 to receive command signals. A system operator or user accesses and/or manipulates data stored in the data storage unit 140 or data received from the controller 102 over the output 194. A user interface 196 (HMI) enables a user to access information about the state of the system 100, which in one embodiment is stored in the data storage 140 or received over the output 194.
[0021] FIG. 3 illustrates a detailed view of the energy system controller 102 and the configuration and types of signals being transmitted internally between the modules 130, 134, and controller 136 and externally to and from the load 104, the resources 106, 108, and 110, and to and from the HMI 196 and data storage unit 140. The load and renewables predictors module 130 generates a prediction of the requirements of the load, PL (z) over the output 162 on a predetermined prediction time period which is referred to as a time horizon, TH , and a prediction of the power to be generated or provided by the renewable resources PR (/) which is transmitted over the output 160 using the same time horizon as used for the load signal at 162. These predictions are transmitted to the dispatch planner module 134 which processes the information and responsively generates a plurality of signals to control the operation of the energy system 100 on the time horizon TH .
[0022] The dispatch planner 134 generates baseline power control commands (a vector of reference signals) P (i) for the dispatchable resources 108 on the output 168 for transmission to the dispatch controller 136. The dispatch planner module 134 also generates baseline power control commands (a vector of reference signals) for the renewable resources P R (z) over the output 164 which along with the load prediction PL (i) , transmitted on the output 166, are compared respectively with the corresponding measurements of the power provided by the renewable resources, P R (k) at comparator 156, and the load PL (£) at comparator 152, to generate error signals eR (k ) and eL (k ) respectively. The error signals and the reference signal for the dispatchable resources are then provided to the dispatch controller 136 that computes control commands for transmission to the renewable resources 106 ( c R (k) ), dispatchable resources 108, ( cD (k) ), storage devices 110, ( c s (k) ), and the load 104, ( c L (k) ). These control commands are provided to individual devices and implemented by the local controllers or a controller in communication with the device. The associated controller controls at least one switch at each of the resources 106, 108, and storage devices 110 to control the release of energy to the power line 112. The error signals indicate a difference between a predicted or planned power values and actual values of the load or power generation of the renewable resources, for instance.
[0023] In order to maximize the benefits provided by energy storage devices 110, operation of the energy storage devices 110 is planned on a sufficiently long time horizon, TH , in the future so that the storage devices 110 in one embodiment is charged when energy in the system 100 is most readily available and/or least expensive. In different embodiments, the time horizon includes one or more hours, one or more days, or one or more weeks or other long time horizons. The stored energy is then provided on demand to the load 104 when the energy is most needed or when a predetermined level of savings is achieved if the load is being controlled to reduce load requirements. The dispatch planner module 134 in one embodiment performs an optimized planning of power profiles for the energy storage devices and other energy resources in the system by solving a numerical optimization problem using an optimization program or algorithm resident in firmware or software of the module 130 including memory associated with the module 130. Software resident at the user interface 114 in one embodiment is also used. In one embodiment, the long time horizon extends for one or more weeks, and the time periods used during the longer time horizon vary. For instance, during a first week, determinations of future power used and further power generation are made every hour. During a second week, determinations are made every six hours, and during a third week determinations are made very twelve hours. The determination of time periods in one embodiment is determined based on the accuracy of the weather predictions. When weather predictions are more accurate, for instance during a first week in the future, the determinations are made more often than during a second week in the future when weather predictions become less accurate. [0024] The optimization problem is formulated with a cost function and takes into account the cost of energy, demand charges, battery efficiencies and life to depletion, maintenance and replacement costs for each component of the energy system, and other parameters that influence operating costs of the energy system 100 for a specified time horizon TH . In addition to the cost function, the optimization program takes into account all the constraints imposed on different components of the system such as power limits for various resources, available amounts of energy stored in different energy storage devices, and safety constraints. These algorithms and others described herein in one embodiment are embodied as program code or program instructions in software and/or firmware resident in one of the modules, the controller, in the user interface 1 14, or remote devices which are coupled to the system 100 through hardwired connections, connections to the internet, or other means of communication to software or firmware either wired or wireless.
[0025] To solve the described optimization problem, the dispatch planner module 134 receives a forecasted load profile over the specified time horizon TH, profiles of power that are forecasted to be generated by the renewable resources over the same time horizon, and present states of energy system components such as the amount of fuel available for dispatchable resources and the amount of energy available from various storage devices. Information about the states of components of the energy system is provided to the dispatch planner module 134 by signal S(k) over the output 192 from data storage unit 140 of Figure 2. Information indicative of the future load profile and power profiles from renewable resources 106 is provided to the dispatch planner module 134 by the load 104 and renewables predictors module 130. [0026] Since at any given instant of time, the future load profiles of the load 104 and the future power profiles available from the renewable resources 106 are unknown, such profiles are forecasted. The load and renewables predictors module 130 includes a number of predictor algorithms that generate forecasts of the future load requirements of load 104 and the power anticipated to be available from renewable resources 106 on the prediction time horizon TH . For example in an energy system 100 having one load connection, one photovoltaic (PV) installation, (typically including large arrays of PV cells), and one wind turbine, three predictors are provided for each one of these components. Each of these predictors is represented by a mathematical model of the considered component (e.g. load, PV installation, wind turbine) and models of physical processes that influence power consumption or generation of a given component. The predictors module 130 receives measurements of the power available from or provided to the component as well as other inputs that influence the power profile and generates a prediction of the power profile. These predictions are provided to the dispatch planner module 134 in the form of signals PL (i) for the load 104 and P R (z ) for the renewable resources 106.
[0027] For example, the load predictors module 130 in one embodiment is implemented with a neural network model of the load 104 that is populated or trained with historical load profiles of the energy system 100 and is capable of generating a forecast of the load 104 which occurs in the future on a timeline horizon of several hours or one or more days. In one example for instance, power requirements of a load are predicted based on power usage during a workweek as opposed to power usage during a weekend. Neural networks are known and are used in one embodiment. [0028] The load predictors module 130 in one embodiment utilizes past measurements of the load power requirements as well as other variables such as current and future time variables, day of the week, time of the year, weather forecast on the specified time future horizon and other variables to generate the prediction PL (i) . A predictor algorithm for the PV installation in one embodiment is embodied by in program code providing a deterministic model that computes solar irradiance at a given geographical location for any time of the day and year which is adjusted by a weather forecast predicting cloud cover, humidity and other atmospheric parameters for time TH in the future. The solar irradiance is considered in one embodiment as a part of the weather forecast. The power provided by the PV installation is determined than from the solar irradiance utilizing the mathematical model mapping irradiance into the power output. Similarly, the wind power predictor in one embodiment utilizes a mathematical model of the installed wind turbine along with the weather forecasts about temperature, humidity, wind speed and direction for the next time horizon TH . Signal P R (k) provides information about the power generation by renewable resources at time instant k that is used by the predictors of the renewable power.
[0029] In one embodiment, a dispatch strategy computed by the dispatch planner module 134 relies on the prediction of load 104 and power available from the renewable resources 106. Due to prediction uncertainties and errors, modeling inaccuracies, and temporal variations in load profiles, and renewable profiles, a mismatch in one embodiment occurs between the predicted load and power profiles and the true load and power profiles. In addition to that mismatch, since both the predictors module 130 and dispatch planner module 134 need time to compute the predictions and the optimal dispatch strategy for the next time horizon, the predictors module 130 and dispatch planner module 134 of the energy system controller 102 in one embodiment operate at a sampling rate less than the speed required to compensate for an instantaneous variation of load demand and power supply. To compensate for the potentially faster variations of load demand and power supply from the renewable resources, the control system incorporates the dispatch controller 136. The dispatch controller 136 uses optimally planned profiles generated by the dispatch planner module 134 as reference inputs, and computes the errors, eR (k ) and eL (k) , between the predicted profiles and the measurements collected at a high sampling rate, and generates final command inputs to the energy system resources. In one embodiment, the predictors module 130 and the dispatch planner module 134 operate at a sampling rate of approximately between 15 minutes and 1 hour. This sampling rate is limited by the update rate of forecasts for the load 104 and renewable resources 106 and by the amount of time required to perform the optimization.
[0030] The dispatch planner module 134 implements cost and constraint models for each energy resource and the system as a whole. As shown in FIG. 3, the dispatch planner module
134, receives information about predicted load (PL (i) ) and renewable power ( P R (i) ) from the predictors module 130. The dispatch planner module 134 uses the prediction data to implement cost and constraint models for generation of optimal reference power commands for the various resources 106 while ensuring that all constraints are satisfied. As used herein, P R (i) denotes the reference command for renewable resources, P ( ) denotes the reference commands for dispatchable resources, and P L ( ) denotes the reference commands for loads. The constraints and optimization processes for satisfying the constraints are described below.
[0031] The dispatch planner module 134 performs an optimization process with reference to a vector of power variables P = [P l , P 2 P n ] for various power resources 106 over a time horizon. The optimization process uses one or more constraints in constraint models to generate power variable values and corresponding operating commands that satisfy the constraints. Examples of constraint types that are included in the constraint models include bound constraints LB < P < UB , where LB and UB are vectors of power variables that correspond to lower and upper bounds, respectively, linear equality constraints AP = B , where A is a matrix and B is a vector, linear inequality constraints AP < B , where A is a matrix and B is a vector, non-linear equality constraints g(P) = 0 , and non- linear inequality constraints g(P) < 0 .
[0032] The constraints pertain either to individual resource constraints, such as constraints on the power generation capacity of renewable and non-renewable energy resources, constraints on the power consumption demands for loads, constraints on the capacity of energy storage resources, and to constraints for the entire energy storage system. Resource constraints include storage state of charge constraints, storage power constraints, renewable power constraints, and grid power constraints. The storage state of charge is a non-negative number that always lies between a lower bound (e.g. 20%) and an upper bound (e.g. 100% or fully charged). The storage power constraints correspond to the maximum permissible power (charge or discharge) at the storage terminal is a function of the instantaneous storage state of charge. The renewable power constraints correspond to the maximum permissible power available from a renewable resource, such as PV, which is dependent on the available solar irradiation. The grid power constraints corresponding to the electrical grid 124 impose restrictions on the maximum power levels that are drawn from the energy grid 124 during operation. Alternative embodiments include additional restrictions, such as restrictions on the maximum amount of power that is fed into the energy grid 124 by the energy system. [0033] System constraints pertain to deferrable and non-deferrable loads. A non-deferrable load refers to a load that requires electrical power with substantially zero delay at levels that are determined by the requirements of the load. A deferrable load refers to a load that requires electrical power but where the distribution of electrical power over time can be modified while satisfying the constraints for the load. The constraints for the combination of the deferrable and non-deferrable loads correspond to the varying range of expected load demand levels for the loads including minimum demand levels and maximum demand levels over the time horizon. The combined energy resources in the system need to satisfy non-deferrable loads, such as lighting and HVAC, at every instant. Other loads may be deferrable and need to be satisfied only prior to a predetermined time deadline. For example, in one configuration the exact time of charging an electric vehicle during nighttime hours is not a high-priority constraint as long as a total amount of energy (e.g. 70 kWh) is delivered prior to a
predetermined deadline while meeting constraints for the power distribution system such as the maximum power level that can be delivered to the vehicle through the electric grid. For charging the vehicle, the constraint is met as long as the system fully charges the battery in the vehicle by, for example, 6 AM local time in the location of the vehicle charger. The dispatch planner module 134 identifies predicted "off peak" periods of reduced utilization when the predicted demand for power from the renewable energy resource is less than the maximum available capacity for power generation that is predicted for the renewable energy resource 106. The dispatch planner module 134 generates a profile with power control commands to increase the generation during the predicted off peak periods to accommodate the deferred load while operating the renewable energy resource 106 within the predicted maximum power generation constraint. [0034] In one configuration, dispatch planner module 134 optimizes for minimizing the levelized cost of electricity (LCOE) given the system constraints. The LCOE over a time horizon is defined as the cost of using the energy system per kWh of load supplied. The LCOE has several components such as grid energy cost ($/kWh), grid demand charges ($/kW), storage cost ($/kWh), diesel fuel cost ($/kWh), and the like. The dispatch planner module is configured to optimize the LCOE for different application cases including reduction in demand charges, time-of-usage tariffs, and optimized utilization of conventional power plants. The reduction in demand charge optimization is directed to systems that are charged for energy consumption ($/kWh) and the peak energy consumption ($/kW) by the utilities. The demand charges are made to recoup the costs of sizing the transmission and distribution infrastructure to accommodate the peak loads. The system 100 uses the stored energy resources 110 to supply the peak loads while charging during off-peak times. This time shifting reduces the demand charges for the customer. The time-of-usage tariffs are charged based on the variations in the costs of production and availability of renewable energy resources 106. The dispatch planner module optimizes the usage of the energy storage assets 110 to enable the customer to realize benefits by moving consumption from the energy grid 124 from peak hours to off-peak hours. The dispatch planner 134 performs optimization of the utilization of conventional power plants to minimize the need to increase or decrease the power demand for conventional power plants. During operation of a conventional power plant, a rapid increase or decrease in the electrical demand on the power plant causes inefficient operation and increases the cost of operating the power plant. The dispatch planner 134 increases or decreases the usage of the energy storage assets 110 to reduce the variation in the load demand on the conventional power plants. [0035] In another configuration, the dispatch planner module 134 optimizes for minimizing emissions from polluting energy resources given the system constraints. For example, energy resources, such as coal or gas-fired power plants, generate gas emissions that are harmful to the environment. Frequent ramping up or down of the polluting energy generation assets to satisfy the load results in a significant increase in emissions. In an emission optimization process, the dispatch planner module optimizes the power draw from the polluting energy resources to enable operation of the polluting resources within a predetermined load range and to supply the balance energy from a renewable source 106 or storage resource 110. The predetermined load range refers to relative draw from an energy resource compared to the total power generation capacity of the resource and can be expressed as a percentage of the total capacity of the nonrenewable energy resource. For example, a coal-fired power generator resource is operates in a load range of 40% of the maximum load up to 80% of the maximum load over a predetermined period of time without dropping below the minimum 40% load or rising above the maximum 80% load. Operating the non-renewable resource within the predetermined load range reduces overall emissions that are incurred when the resource is deactivated and restarted or when the resource operates at maximum capacity.
[0036] In various embodiments, the dispatch planner module uses standard or custom optimization processes to minimize the cost function or uses rule-based custom algorithms subject to the operating constraints. The optimization processes include gradient-based or gradient-free methods, dynamic programming, integer programming, genetic algorithms, and simulated annealing. The rule -based custom algorithms include storage charging and discharging schedules based on load thresholds and renewable availability. The dispatch planner module 134 is implemented using one or more digital processing devices including, but not limited to desktop, server, and mobile personal computers (PCs), a Programmable Logic Controller (PLC), or a microprocessor or Electronic Control Unit (ECU).
[0037] To compensate for the errors which accumulate due to prediction inaccuracies and temporal variations, the dispatch controller 136 compares reference inputs from the dispatch planner with the measurements received from the load PL (k ) and renewable resources P R (k) , computes the corresponding errors eL (k) , eR (k) and augments reference commands from the dispatch planner module 134 with correction signals to generate power commands c D (k) to dispatchable resources 108, power commands c s (k) storage devices 110, throttling commands cR (k) to renewable resources 106 and, if load devices allow demand management, load regulation commands c L (k) to the load 104. In one embodiment command signals generated by the dispatch controller 136 are computed by augmenting the reference signals received from the dispatch planner module 134 with corrections that constitute fractions of the combined error, e(k) = eR (k) - eL (k) .
[0038] The throttling commands are generated in situations when the renewable resources 106 provide or are providing more power at a given sample time k than the amount of power than is capable of being absorbed by the load 104, storage devices 110 or the dispatchable resources 108. The throttling commands are transmitted to the renewable resources 106 to reduce the amount of energy being generated by the renewable resources. In the case of the PV arrays, in one embodiment the alignment of the arrays with respect to the sun are adjusted to misalign the arrays with respect to the path of sunlight, or in another embodiment the connection to the power line 112 is disconnected. In the case of wind turbines and in different embodiments, the blade angle is adjusted to limit the amount of rotation or the blades are disconnected from the gearbox or generator.
[0039] The sampling time for the dispatch controller 136 is denoted by k, while the sampling time for the predictors module 130 and the dispatch planner module 134 are denoted by i. This distinction is made to indicate that the sampling rate of the predictors module 130 and dispatch planner module 134 is slower than the faster sampling rate of the dispatch controller 136. In one embodiment, the sampling rate of the dispatch controller 136 is on the order of fractions of a minute to several seconds, milliseconds or other short time intervals. This sampling rate is limited by the sampling rates of the measurement devices acquiring instantaneous power of the load and the renewable resources and the amount of time required to generate the control commands c R (k) , c D (k) , c s (k) , c L (k) .
[0040] The dispatchable energy resources 108 provide energy at times when the renewable energy resources 106, stored energy resources 110 are insufficient to meet the energy requirements of the load 104. In one embodiment, the dispatchable energy resource 108 provides a load matching function to provide an output to match the shape of the load demand. In another embodiment, peak matching is also provided to match the highest energy demand occurring during a certain time of day. Such time is predicted based on time of day, pattern of energy use, weather, and geographic location. The dispatchable energy resource 108 in other embodiments also cover lead-in times where some resources, such as coal powered plants, take a certain amount of time to ramp up to the desired output. Frequency regulation is also provided in some embodiments.
[0041] The control system architecture 100 facilitates robust operation in the presence of potential problems or failures in individual system components. For example, in one embodiment each one of the three modules 130, 134, and the controller 136 are implemented on an individual processor, server, programmable logic controller (PLC) or another computing device such that when one of these modules or controllers fail, one or more of the other modules or controller continue operation. In one embodiment, when each of the three components 130, 134, and 136 of the control system are implemented on the same device, as hardware, firmware or software, each is implemented as individual devices or programs, or program code, running independently and exchanging information between each other in order to provide the robust operation, such that power continues to be supplied if one of the components fails. In one embodiment, each of the components 130, 134, and 136 are independent of the other to provide for the failure of one or more of the other components.
[0042] If, for example, the predictors module 130 does not receive a weather update or fails to provide a new prediction at a certain time, the dispatch planner module 134 uses the predictions stored in an associated memory, or stored in the data storage 140, from the previous forecast, extrapolates the predictions one unit of time into the future according to a chosen rule, and generates a set of new reference signals for the dispatch controller 136. Such operation continues until the predictors module 130 restores its functionality and starts providing the forecast again. In this situation, the operation of the energy system 100 deviates from an optimal operation, but the controller 102 continues to reliably coordinate the transfer of power between the load 104 and the resources 106, 108, and 110. In another embodiment, if the dispatch planner module 134 fails, then the dispatch controller 136 uses the planned profiles received from the dispatch planner module 134 during the previous period and continues control of the system power until the planner module 134 operation is restored. In another embodiment, if the predictors module 130 or the dispatch planner module 134 fails for a sufficiently long period of time, longer than the prediction horizon of several hours or days, the dispatch controller 136 resorts to a logic-based control of the power transmission until full functionality of the controller 102 is restored.
[0043] In terms of reliable operation of the energy system 100, a significant component of the control architecture is the dispatch controller 136. In general and in one embodiment, the control system controls power flow between the energy system resources as long as the dispatch controller 136 continues to be operational.
[0044] It will be appreciated that variants of the above-disclosed and other features and functions, or alternatives thereof, may be desirably combined into many other different systems, applications or methods. Various presently unforeseen or unanticipated alternatives, modifications, variations or improvements may be subsequently made by those skilled in the art that are also intended to be encompassed by the following claims.

Claims

What is claimed:
1. A method of controlling energy generation and distribution comprising:
receiving with a controller first prediction data corresponding to available power generated from a renewable energy resource over a predetermined first time period and second prediction data corresponding to power demand for at least one load over the predetermined first time period;
generating with the controller a first constraint model corresponding to power generation capacity of the renewable energy resource over the predetermined first time period with reference to the first prediction data;
generating with the controller a second constraint model corresponding to power demand of the at least one load over the predetermined first time period with reference to the second prediction data;
generating with the controller a first plurality of power control commands with reference to the first constraint model and the second constraint model, the first plurality of power control commands being generated to control operation of the renewable energy resource within constraints in the first constraint model to supply power to the at least one load within constraints in the second constraint model over the predetermined first time period; and operating with the controller the renewable energy resource with reference to the first plurality of power control commands to adjust a level of power output from the renewable energy resource within a first plurality of constraints in the first constraint model to provide power to the at least one load within a second plurality of constraints in the second constraint model.
2. The method of claim 1 , further comprising:
generating with the controller a third constraint model corresponding to power generation from a non-renewable energy resource;
generating with the controller the first plurality of power control commands to generate first portion of the power for the at least one load with the renewable energy resource;
generating with the controller a second plurality of power control commands for the non-renewable energy resource to generate a second portion of the power for the at least one load with the non-renewable energy resource; and
operating with the controller the non-renewable energy resource with reference to the second plurality of power control commands to adjust a level of power output from the nonrenewable energy resource within a third plurality of constraints in the third constraint model to provide power to the at least one load within the second plurality of constraints in the second constraint model.
3. The method of claim 2, the generation of the third constraint model further comprising: generating with the controller the third constraint model with a predetermined load range for the non-renewable energy resource to operate the non-renewable energy resource continuously without deactivating the non-renewable energy resource or operating the nonrenewable energy resource at a maximum capacity during the predetermined first time period.
4. The method of claim 1 further comprising:
receiving with the controller the second prediction data for the at least one load including prediction data for power demand of a deferrable load;
identifying with the controller a time deadline during the predetermined first time period for delivery of power to the deferrable load;
identifying with the controller a second time period prior to the time deadline during which the renewable energy resource is predicted to generate power with an available power level that is above a predicted demand level of the at least one load; and
generating with the controller the first plurality of power control commands to operate the renewable energy resource to generate power at a level that is greater than the predicted demand level during the second time period to provide power to the deferrable load.
5. The method of claim 1 further comprising:
receiving with the controller third prediction data for a capacity of an energy storage resource over the predetermined first time period, the energy storage resource being configured to receive power from the renewable energy resource at a first time and provide power to the at least one load at a second time after the first time;
identifying with the controller a second time period prior during which the renewable energy resource is predicted to generate power with an available power level that is above a predicted demand level of the at least one load; and generating with the controller the first plurality of power control commands to operate the renewable energy resource to generate power for at a level that is greater than the predicted demand level during the second time period to provide power to the energy storage resource.
6. The method of claim 5, the generation of the first plurality of power control commands further comprising:
generating with the controller the first plurality of power control commands to reduce generation of power from the renewable energy resource below a predicted power generation capacity for the renewable energy resource in the first prediction data in response to the predicted power generation capacity exceeding a first constraint for maximum power demand for the at least one load in the second constraint model and a second constraint for available storage capacity in the energy storage resource in the third constraint model.
7. The method of claim 1 , the generation of the first constraint model further comprising: generating with the controller the first constraint model for the renewable energy resource with reference to a plurality of constraints corresponding to available power generation levels for the renewable energy resource over the predetermined first time period and to the first prediction data.
8. The method of claim 1 , the generation of the second constraint model further comprising: generating with the controller the second constraint model for the at least one load with reference to a plurality of constraints corresponding to a range of load demand levels for the at least one load over the predetermined first time period and to the second prediction data.
9. The method of claim 1 the receiving of the first prediction data further comprising:
receiving weather prediction data corresponding to a geographic location of the renewable energy resource.
10. The method of claim 1 the receiving of the second prediction data further comprising: receiving weather prediction data corresponding to a geographic location of the at least one load.
11. The method of claim 1 , the generation of the first constraint model further comprising generating with the controller the first constraint model for the renewable energy resource with reference to the renewable energy resource being one of a photovoltaic array, a wind turbine, a hydroelectric power plant, a tidal power installation, and a wave power installation.
PCT/US2014/028077 2013-03-15 2014-03-14 System and method for energy distribution WO2014143908A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP14763819.1A EP2973932A4 (en) 2013-03-15 2014-03-14 System and method for energy distribution

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361786928P 2013-03-15 2013-03-15
US61/786,928 2013-03-15

Publications (1)

Publication Number Publication Date
WO2014143908A1 true WO2014143908A1 (en) 2014-09-18

Family

ID=51537559

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2014/028077 WO2014143908A1 (en) 2013-03-15 2014-03-14 System and method for energy distribution

Country Status (2)

Country Link
EP (1) EP2973932A4 (en)
WO (1) WO2014143908A1 (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104600747A (en) * 2015-01-21 2015-05-06 西安交通大学 Operation optimizing method capable of coordinating operation risk and wind energy consumption of power system
CN105469217A (en) * 2015-12-18 2016-04-06 中国电力科学研究院 Energy internet architecture model
EP3124918A1 (en) * 2015-07-28 2017-02-01 LSIS Co., Ltd. Power metering system, load power monitoring system using the same and operation method thereof
CN107104433A (en) * 2017-05-15 2017-08-29 国网江苏省电力公司电力科学研究院 A kind of light-preserved system participates in the acquisition methods of power distribution network Optimal Operation Strategies
CN107546763A (en) * 2016-06-24 2018-01-05 华北电力大学 Photovoltaic generation is maximum in the power distribution network of a kind of meter and different pressure regulation strategies receives capacity calculation method
EP3301635A1 (en) * 2016-09-29 2018-04-04 Siemens Aktiengesellschaft A system and method for aggregation of controllable distributed energy resources
EP3349168A1 (en) * 2017-01-12 2018-07-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
EP3238313A4 (en) * 2014-12-22 2018-08-08 Robert Bosch GmbH Method for adaptive demand charge reduction
CN109255487A (en) * 2018-09-21 2019-01-22 国网浙江省电力有限公司 A kind of integrated energy system optimization method based on normalized matrix model
CN111275578A (en) * 2020-02-17 2020-06-12 海南电网有限责任公司电力科学研究院 Dispatching automation system
CN111723992A (en) * 2020-06-23 2020-09-29 四川中电启明星信息技术有限公司 Park comprehensive energy scheduling method considering multi-energy coupling loss
US10890904B2 (en) 2017-05-25 2021-01-12 Johnson Controls Technology Company Model predictive maintenance system for building equipment
CN112350314A (en) * 2020-10-30 2021-02-09 广东电网有限责任公司电力调度控制中心 Scheduling method and device for power generation intelligent driving system of power system
US10949777B2 (en) 2017-06-07 2021-03-16 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization
US11010846B2 (en) 2017-01-12 2021-05-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US11036249B2 (en) 2017-01-12 2021-06-15 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization
US11061424B2 (en) 2017-01-12 2021-07-13 Johnson Controls Technology Company Building energy storage system with peak load contribution and stochastic cost optimization
CN113241788A (en) * 2021-06-04 2021-08-10 华能陇东能源有限责任公司 Asynchronous sampling real-time peak clipping and valley filling control method and device for wind power system and storage medium
US11120411B2 (en) 2017-05-25 2021-09-14 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with incentive incorporation
US11238547B2 (en) 2017-01-12 2022-02-01 Johnson Controls Tyco IP Holdings LLP Building energy cost optimization system with asset sizing
US11409274B2 (en) 2017-05-25 2022-08-09 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system for performing maintenance as soon as economically viable
US11416955B2 (en) 2017-05-25 2022-08-16 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with integrated measurement and verification functionality
US11636429B2 (en) 2017-05-25 2023-04-25 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance systems and methods with automatic parts resupply
CN116231763A (en) * 2023-05-08 2023-06-06 广州三晶电气股份有限公司 Household energy management system optimization scheduling method and device with self-learning capability
US11715950B2 (en) 2021-01-29 2023-08-01 ClearTrace Technologies, Inc. Sustainable energy physical delivery tracking and verification of actual environmental impact
US11720526B2 (en) 2019-11-12 2023-08-08 ClearTrace Technologies, Inc. Sustainable energy tracking system utilizing blockchain technology and Merkle tree hashing structure
US11747800B2 (en) 2017-05-25 2023-09-05 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with automatic service work order generation
US11847617B2 (en) 2017-02-07 2023-12-19 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with financial analysis functionality
US11900287B2 (en) 2017-05-25 2024-02-13 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with budgetary constraints

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050039787A1 (en) * 2003-08-20 2005-02-24 New Energy Options, Inc. Method and system for predicting solar energy production
US20100198421A1 (en) * 2009-01-30 2010-08-05 Board Of Regents, The University Of Texas System Methods and Apparatus for Design and Control of Multi-port Power Electronic Interface for Renewable Energy Sources
JP2011027376A (en) * 2009-07-29 2011-02-10 Panasonic Corp Operation planning device for cogeneration system, and cogeneration system
US20110307110A1 (en) * 2010-06-10 2011-12-15 Ratnesh Kumar Sharma Management of a virtual power infrastructure
JP2013027285A (en) * 2011-07-26 2013-02-04 Hitachi Ltd Load sharing method of power generator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9312698B2 (en) * 2012-12-19 2016-04-12 Robert Bosch Gmbh System and method for energy distribution

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050039787A1 (en) * 2003-08-20 2005-02-24 New Energy Options, Inc. Method and system for predicting solar energy production
US20100198421A1 (en) * 2009-01-30 2010-08-05 Board Of Regents, The University Of Texas System Methods and Apparatus for Design and Control of Multi-port Power Electronic Interface for Renewable Energy Sources
JP2011027376A (en) * 2009-07-29 2011-02-10 Panasonic Corp Operation planning device for cogeneration system, and cogeneration system
US20110307110A1 (en) * 2010-06-10 2011-12-15 Ratnesh Kumar Sharma Management of a virtual power infrastructure
JP2013027285A (en) * 2011-07-26 2013-02-04 Hitachi Ltd Load sharing method of power generator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2973932A4 *

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3238313A4 (en) * 2014-12-22 2018-08-08 Robert Bosch GmbH Method for adaptive demand charge reduction
CN104600747A (en) * 2015-01-21 2015-05-06 西安交通大学 Operation optimizing method capable of coordinating operation risk and wind energy consumption of power system
CN104600747B (en) * 2015-01-21 2016-09-28 西安交通大学 The Operation of Electric Systems optimization method that coordinated operation risk and wind energy are dissolved
EP3124918A1 (en) * 2015-07-28 2017-02-01 LSIS Co., Ltd. Power metering system, load power monitoring system using the same and operation method thereof
US10381868B2 (en) 2015-07-28 2019-08-13 Lsis Co., Ltd. Power metering system, load power monitoring system using the same and operation method thereof
CN105469217A (en) * 2015-12-18 2016-04-06 中国电力科学研究院 Energy internet architecture model
CN105469217B (en) * 2015-12-18 2020-11-03 中国电力科学研究院 Energy internet system
CN107546763A (en) * 2016-06-24 2018-01-05 华北电力大学 Photovoltaic generation is maximum in the power distribution network of a kind of meter and different pressure regulation strategies receives capacity calculation method
EP3301635A1 (en) * 2016-09-29 2018-04-04 Siemens Aktiengesellschaft A system and method for aggregation of controllable distributed energy resources
US10152076B2 (en) 2016-09-29 2018-12-11 Siemens Aktiengesellschaft System and method for aggregation of controllable distributed energy assets
US11010846B2 (en) 2017-01-12 2021-05-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US10909642B2 (en) 2017-01-12 2021-02-02 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
EP3349168A1 (en) * 2017-01-12 2018-07-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US11238547B2 (en) 2017-01-12 2022-02-01 Johnson Controls Tyco IP Holdings LLP Building energy cost optimization system with asset sizing
US11061424B2 (en) 2017-01-12 2021-07-13 Johnson Controls Technology Company Building energy storage system with peak load contribution and stochastic cost optimization
US10282796B2 (en) 2017-01-12 2019-05-07 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US11036249B2 (en) 2017-01-12 2021-06-15 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization
US11847617B2 (en) 2017-02-07 2023-12-19 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with financial analysis functionality
CN107104433A (en) * 2017-05-15 2017-08-29 国网江苏省电力公司电力科学研究院 A kind of light-preserved system participates in the acquisition methods of power distribution network Optimal Operation Strategies
CN107104433B (en) * 2017-05-15 2020-08-14 国网江苏省电力公司电力科学研究院 Method for acquiring optimal operation strategy of optical storage system participating in power distribution network
US10890904B2 (en) 2017-05-25 2021-01-12 Johnson Controls Technology Company Model predictive maintenance system for building equipment
US11747800B2 (en) 2017-05-25 2023-09-05 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with automatic service work order generation
US11487277B2 (en) 2017-05-25 2022-11-01 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system for building equipment
US11636429B2 (en) 2017-05-25 2023-04-25 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance systems and methods with automatic parts resupply
US11120411B2 (en) 2017-05-25 2021-09-14 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with incentive incorporation
US11900287B2 (en) 2017-05-25 2024-02-13 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with budgetary constraints
US11409274B2 (en) 2017-05-25 2022-08-09 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system for performing maintenance as soon as economically viable
US11416955B2 (en) 2017-05-25 2022-08-16 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with integrated measurement and verification functionality
US10949777B2 (en) 2017-06-07 2021-03-16 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization
CN109255487A (en) * 2018-09-21 2019-01-22 国网浙江省电力有限公司 A kind of integrated energy system optimization method based on normalized matrix model
US11720526B2 (en) 2019-11-12 2023-08-08 ClearTrace Technologies, Inc. Sustainable energy tracking system utilizing blockchain technology and Merkle tree hashing structure
CN111275578A (en) * 2020-02-17 2020-06-12 海南电网有限责任公司电力科学研究院 Dispatching automation system
CN111723992B (en) * 2020-06-23 2023-07-04 四川中电启明星信息技术有限公司 Park comprehensive energy scheduling method considering multi-energy coupling loss
CN111723992A (en) * 2020-06-23 2020-09-29 四川中电启明星信息技术有限公司 Park comprehensive energy scheduling method considering multi-energy coupling loss
CN112350314B (en) * 2020-10-30 2023-01-20 广东电网有限责任公司电力调度控制中心 Scheduling method and device for power generation intelligent driving system of power system
CN112350314A (en) * 2020-10-30 2021-02-09 广东电网有限责任公司电力调度控制中心 Scheduling method and device for power generation intelligent driving system of power system
US11715950B2 (en) 2021-01-29 2023-08-01 ClearTrace Technologies, Inc. Sustainable energy physical delivery tracking and verification of actual environmental impact
CN113241788A (en) * 2021-06-04 2021-08-10 华能陇东能源有限责任公司 Asynchronous sampling real-time peak clipping and valley filling control method and device for wind power system and storage medium
CN116231763A (en) * 2023-05-08 2023-06-06 广州三晶电气股份有限公司 Household energy management system optimization scheduling method and device with self-learning capability
CN116231763B (en) * 2023-05-08 2023-08-04 广州三晶电气股份有限公司 Household energy management system optimization scheduling method and device with self-learning capability

Also Published As

Publication number Publication date
EP2973932A4 (en) 2016-11-16
EP2973932A1 (en) 2016-01-20

Similar Documents

Publication Publication Date Title
US9438041B2 (en) System and method for energy distribution
WO2014143908A1 (en) System and method for energy distribution
US9312698B2 (en) System and method for energy distribution
US11201491B2 (en) Method for balancing frequency instability on an electric grid using networked distributed energy storage systems
KR102284634B1 (en) Method and apparatus for controlling power flow in a hybrid power system
US20160211664A1 (en) Dispatch Controller for an Energy System
US10857899B1 (en) Behind-the-meter branch loads for electrical vehicle charging
US11537091B2 (en) Multi-scale optimization framework for smart energy systems
US10756543B2 (en) Method and apparatus for stabalizing power on an electrical grid using networked distributed energy storage systems
US10389126B2 (en) Method and apparatus for damping power oscillations on an electrical grid using networked distributed energy storage systems
US11669920B2 (en) Computing component arrangement based on ramping capabilities
US10693294B2 (en) System for optimizing the charging of electric vehicles using networked distributed energy storage systems
Hug-Glanzmann Coordination of intermittent generation with storage, demand control and conventional energy sources
Elkholy et al. A resilient and intelligent multi-objective energy management for a hydrogen-battery hybrid energy storage system based on MFO technique
AU2021340055B2 (en) Power regulation method and power regulation device
AU2023203015B2 (en) Hybrid electrical power generation system and method of simulating the same

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2014763819

Country of ref document: EP

NENP Non-entry into the national phase