WO2014130972A1 - Method and apparatus for power management using distributed generation - Google Patents
Method and apparatus for power management using distributed generation Download PDFInfo
- Publication number
- WO2014130972A1 WO2014130972A1 PCT/US2014/018115 US2014018115W WO2014130972A1 WO 2014130972 A1 WO2014130972 A1 WO 2014130972A1 US 2014018115 W US2014018115 W US 2014018115W WO 2014130972 A1 WO2014130972 A1 WO 2014130972A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- control period
- load
- during
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in networks by storage of energy
- H02J3/32—Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/061—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/10—Dispersed power generation using fossil fuels, e.g. diesel generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2105/00—Networks for supplying or distributing electric power characterised by their spatial reach or by the load
- H02J2105/40—Networks for supplying or distributing electric power characterised by their spatial reach or by the load characterised by the loads connecting to the networks or being supplied by the networks
- H02J2105/42—Home appliances
- H02J2105/425—Home appliances the loads being an Information and Communication Technology [ICT] facility
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
- H02J3/466—Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Definitions
- DG Distributed generation
- EPA U.S. Environmental Protection Agency
- DG system encompasses a wide range of green energy technologies, such as photovoltaic module (PV), wind power, fuel cell, and bio-fuel based gas turbine. While PV/wind power depends on environmental condition, the outputs of fuel cells and gas turbines are tunable. They can provide a key supporting service called load following [12], which, refers to the use of online generation equipment to track the changes in customer loads. Therefore, one can take advantage of the load fbUowing capabilities of these tunable DG systems to meet the time-varying IT power demand. Such design is non-trivial because it enables data center to run on renewable energy sources without compromising workload performance.
- PV photovoltaic module
- Figure 2 shows typical load, following scenario that tracks customer load every 30 minutes.
- DG systems cannot provide fine-grained load demand following due to their limited response speed.
- DG systems typically rely on large energy storage elements [12].
- TCO due to storage cost
- DG systems typically rely on large energy storage elements [12].
- Such design not only increases the TCO (due to storage cost), but also incurs up to 25% roundtrip energy loss.
- the disturbing load can cause frequent and excessive battery discharging actives, which may degrade the lifetime of these expensive electrical elements and quickly deplete the stored energy that is crucial for handling emergencies.
- DG Distributed generation
- DERs distributed energy resources
- microgrid In order to harness clea energy from DERs, microgrid is proposed as a local electricity distribution network that focuses on flexible and intelligent management of DG systems. The responsibility of microgrid is to dynamically control the po were flow in response to any disturbance and load changes, Although microgrid can import/export power from/to the utility power line, it is usually the last resort due to the low transmission efficiency, high peak power cost, and sustamability consideration [12].
- Embodiments of the subject invention relate to a method and apparatus for providing a power demand shaping (PDS) technique by utilizing load following with distributed generation (DG) systems, to meet time-varying power demand.
- PDS power demand shaping
- DG distributed generation
- Embodiments of the subject invention can intelligently trim power load of DG powered computing infrastructures and enable DG systems to follow power demand efficiently.
- Embodiments of the subject invention feature two adaptive load tuning schemes that can boost power load performance and enable a high percentage performance of an ideal oracle design operation during power demand trimming process.
- Embodiments of the subject invention can be implemented as a cross-layer power management module residing between a front-end distributed generation and back-end computing facilities to provide a coordinated tuning between supply and load, Embodiments of the subject invention can avoid high performance penalty issue incurred during supply tracking.
- Embodiments of the subject invention can be applied to applications including, but not liraited to, DG powered data center, DG powered cloud computing infrastructure and green and sustainable facilities.
- Embodiments of the subject invention pertain to distributed generation powered data centers that leverage the load following capability of onsite renewable generation, and optional interconnection with a standard power grid, to achieve low carbon footprint while maintaining sufficient performance.
- Specific embodiments incorporate a power demand shaping technique (PDS) to improve the load following efficiency in data centers while boosting the workload performance.
- Further specific embodiments utilize power demand shaping techniques incorporate one or both of two adaptive load tuning schemes: DGR. Boost and UPS Boost.
- DGR. Boost power demand shaping techniques
- UPS Boost UPS Boost
- the use of embodiments of the subject PDS techniques can achieve 98,8% performance of an ideal oracle design and outperform existing supply-tracking based approach by 37%.
- a design incorporating embodiments of the subject power demand shaping techniques can reduce electrical stress on batteries and improve battery lifetime by up to 26%.
- Figure 1 shows a distributed generation powered data center, where the system can follow customers' load power demand.
- Figure 2 shows a load following scenario, where frequent IT load fluctuation hinders efficient load following.
- Figure 3 shows CDF of workload runtime in a zoomed view, where short jobs may result in fme-grained load fluctuations, and 3 A shows short-running traces and 3B shows long-rumiing traces.
- Figure 5 shows performance data of VRLA battery, where high DOD and discharge rate will shorten the battery lifespan
- Figure 6 shows normalized battery lifespan under different load following intervals, where conventional load following schemes cannot handle the bursty load and therefore incur varying degree of battery wear-out.
- Figure 7 shows battery cost under different load following intervals and capacity, where due to frequent power demand fluctuation, small battery capacity does not show the cost advantage it should have, and 7A shows LANL (short-running workload) and 7B shows Seth (Song-running workload).
- FIG. 8 shows architecture of a distributed generation (DG) powered data center according to an embodiment of the invention.
- DG distributed generation
- Figures 9A-B respectively show an example of time-DG Power Output curve of Power Demand Shaping (PDS) technique and an example of time-Average CPU Frequency curve of Power Demand Shaping (PDS) technique according to an embodiment of the invention.
- Figure 1.0 shows pseudo programming code of Power Demand Shaping (PDS) technique according to an embodiment of the invention.
- Figure 11 shows a process flow diagram of DGR Boost scheme according to an embodiment of the invention.
- igure 12 shows a process flow diagram of UPS Boost scheme according to an embodiment of the invention.
- Figure 13 shows a chart of job turnaround time with various load following intervals for various workload traces where all results are normalized with respect to results of Oracle design-
- Figures 14A-B respectively show a chart of mean turnaround time of the worst 5% jobs of PDS-s ( Figure 14 A) and of PDS-r ( Figure 14B) where all results are normalized with respect to results of Oracle design.
- Figure 15 shows a chart of dependence on utility power for various workload traces.
- Fig res 3 A.-B respectively show a chart of battery lifetime degradation under various power management schemes with distributed UPS for 1,1 ⁇ based design (Figure 16A) and for PDS based design ( Figure 1.6B).
- Figure 17 shows a chart of battery lifetime degradation under various power management schemes for various designs with, centralized UPS.
- Figure 18 shows a chart of annual greenhouse gas emission savings for various types of fuels according to an embodiment of the invention.
- Embodiments of the invention relate to a method and system for power demand shaping (PDS) so as to manage power generation and use.
- PDS power demand shaping
- Specific embodiments relate to data center power demand shaping to achieve, high-performance low-overhead data center operation.
- Further specific embodiments can incorporate standard (utility power) energy sources, renewable energy sources, or a combination of standard (utility power) energy sources and renewable energy sources.
- Embodiments of the subject PDS techniques can incorporate trimming the data center load power so as to allow DG systems to follow the power demand efficiently and/or incorporate two adaptive load tuning schemes that can boost data center performance and enable near-oracle operation during power demand trimming process.
- embodimenis of the subject invention relate to a power management module that can reside between front-end distributed generation and back-end computing facilities to provide a coordinated tuning between the supply and load.
- Embodiments to data centers can utilize onsite distributed generators and incorporate a load power management scheme that uses load following.
- Embodiments can use a power demand shaping (PDS) mechanism for optimizing load following efficiency and workload performance in DG-powered systems, such as data centers.
- PDS power demand shaping
- Embodiments using the subject PDS mechanism can achieve at least 90%, at least 95%, at least 96%, at least 97%, at least 98%, at least 98.5%, and/or 98.8% of the performance of an ideal oracle design.
- embodiments using the subject PDS mechanism can improve job turnaround time by 37% on average.
- the state-of-the-art green data centers have to rely on ut lity power for about 50% of its runtime.
- utilizing embodiments of the subject PDS techniques can reduce the overhead on energy storage devices, and improves the battery lifespan by up to 26%.
- Embodiments of the invention can reduce a data center's reliance on conventional utility grid, thus reducing the data center's carbon footprint. Embodiments of the invention are useful when the utility power is less reliable, as in some developing countries. Further, for data centers thai are built in remote areas, an operation that does not depend on the conventional utility grid can help to eliminate the expensive utility power line extensions (around $10k per km) [16],
- Embodiments of the present invention relate to a method and apparatus for fine-tuning load following functionalities of tunable distributed generation (IDG) systems to meet time- varying power demand.
- IDG distributed generation
- Embodiments of the present invention provide a power demand shaping (PDS) technique for fine-tuning load following functionalities of tunable DG systems.
- Embodiments of the present invention can include first maintaining constant power demand and second rescheduling power generation of DG systems.
- embodiments of the subject invention feature two adaptive power management schemes: DGR Boost and UPS Boost.
- DGR Boost and UPS Boost.
- embodiments of the subject methods can adaptively fine-tune load following capabilities of tunable DG systems ei ther by leveraging build-in overclocking capabilities of microprocessor under the DGR Boost scheme or by leveraging stored energy of energy storage elements, such as uninterni able power supply (UPS), battery or flywheel under the UPS Boost scheme.
- the subject methods can be applied to both distributed energy storage elements and centralized energy storage elements,
- the subject methods can be applied to data centers powered by DG systems.
- the subject methods can also be applied to other infrastructures powered by DG systems.
- embodiments of the subject method can remove needs for large energy storage elements, trim load power, fine-tune DG systems to boost performance and energy utilization, and extend lifespan of energy storage elements associated with DG systems,
- Figure 8 depicts an architecture of a DG powered data center with a microgrid power provisioning hierarchy for managing various distributed energy resources.
- the distributed energy resources or microsourees, such as wind turbine, solar panel, gas turbine and fuel cell, are connected to a group of feeders that provide power to electrical loads.
- the electrical loads can be nodes of a plurality of computing infrastructures, The nodes may include, but not limited to servers, microprocessors or other electronic devices.
- the distributed energy resources are connected to the feeder via circuit breakers and appropriate power electronic interfaces (PET). All the circuit breakers and power electronic interfaces are coordinated by a microgrid energy management module (EMM), which provides real-time monitoring and autonomic control of power generation.
- EMM microgrid energy management module
- microgrid can either stand alone or connect to a main grid of utility through, for example, a point of common coupling (PCC).
- PCC point of common coupling
- the EMM and PDC can be merged into a single processor or can shift features between them and/or with one or more other processors.
- the connected electrical loads may include both critical loads and/or non-critical loads.
- high performance computer (HPC) servers are generally sensitive and mission-critical loads and can require stringent power quality and sufficient power budget.
- controllable and stable microsourees such as gas turbines, fuel cells, that can follow demand of critical load can be allocated for HPC' servers.
- each server cluster can be connected to a power distribution unit (PDU) via redundant power delivery paths to ensure uninterrupted operation in event of PDU failure.
- PDU power distribution unit
- a specific embodiment relates to utilizing controllable microsourees to follow the demand of critical data center load.
- a power demand controller (PDC) is used to manage the server clusters.
- the PDC can track job running status of the server cluster and overall cluster power demand, The PDC can also coordinate with job schedulers to optimize computing resource allocation. In addition, the PDC communicates with die EMM of microgrid to obtain current distributed generation levels and dynamically inform the EMM of necessary power generation adjustment.
- non-critical loads such as normal data processing machines
- operations of non-critical loads can be regulated or restricted without significantly affecting the needs of users when power generation is not sufficient.
- non-critical loads can be powered by intermittent renewable power supplies such as wind turbine or solar panel.
- the EMM monitors and adjusts on-site power generation with, for example, frequency droop control.
- Frequency droop control uses a small change in the power bus frequency to determine the amount of power that each generator should put into the power bus.
- the microgrid also includes energy storage elements, such as UPS system, to provide stored energy for necessary start up time for generators' output to ramp up when system changes, such as temporary power differences between supply and load. This can avoid the need for bulky energy storage devices.
- UPS system energy storage elements
- Both, centralized UPS systems and. distributed UPS systems can. he utilized, though distributed UPS system is preferred due to its higher efficiency and better power management capability,
- power management that leverages load following capability of DG systems can be carried out by PDS technique, which dynamically and aptly shapes power demand to match the planned power usage curve that yields high load following effectiveness.
- PDS technique dynamically and aptly shapes power demand to match the planned power usage curve that yields high load following effectiveness.
- Specific embodiments can use a power demand shaping technique to better utilize onsite distributed generation in HPC data centers.
- Embodiments of a power demand shaping technique can include two steps. First, during each control period, the PDS controller can use power capping to maintain a constant power demand, or maintained at or below a target power demand. Second, the power generation level is adjusted for the next load folio wing period by the controller informing the distributed generation EMM to adjust the generation level. This can result in better matching of energy generation with energy load to allow a high-performance sustainable computing.
- a PDS based controller can transform the power demand with respective to time into one of a variety of shapes.
- Figure 9A illustrates a time-varying power demand shaping mechanism resulting in a square-wave-like demand curve. Such a square- wave-like curve is preferred for its convenience, but other shapes can be utilized. Irs the square- wave-like DC power output shown in Figure 9 A, the amplitude of power output alternates between multiple values. Unlike an ideal square wave, transitions between values of the square-wave-like DC power output is not instantaneous, as changes in power output needs time to ramp up to a higher value or ramp down to a lower value.
- Time-varying power demand shaping may he represented by other curves including, but not limit to, sine or sine-like waveforms, triangle or triangle-iike waveforms, or sawtooth or sawtooth-like waveforms.
- the time duration of load tuning cycle can vary depending on a variety of factors, such as rnicrosourees and loads, In specific embodiments, the load tuning cycle can be 5 minutes, 10 minutes, 15 minutes, 20 minutes, 5-20 minutes, or other desired duration, Since load power demand becomes less bursty and fluctuating after tuning, it may be possible to avoid the need to install large energy storage elements onsite. Relatively small energy storage elements, such as UPS may be used to handle the ramping period and the temporary power discrepancy between supply and load. By eliminating unnecessary energy storage capacity, PDS based design becomes more cost-effective and sustainable.
- PDS technique is carried out by first executing power capping to maintain power demand at a constant level at or below a target power level, during each control period.
- L expected power consumption without any load tuning
- D load performance will be scaled down.
- L drops below D
- the load performance will be increased to revert to the original power demand level.
- node performance level can be dynamically tuned in response to load changes such as when data center load varies.
- Such dynamic tuning of performance may be achieved via a variety of scheduling schemes.
- dynamic tuning can be implemented by adjusting the node frequency in a round-robin manner or other maimer based on the priorities of system users.
- computing infrastructure may include a plurality of computing nodes, various scheduling schemes may be used for efficiently adjusting the node frequency.
- each computing node can be associated with a priority and and the system can make scheduling choices based on the assigned priorities, adjustment of frequency for each computing node is based on the computing node's priority.
- a group of nodes with higher priority may be adjusted to run at a higher frequency.
- Performance states for example the capability of a microprocessor to switch between different supported operating frequencies to modulate power consumption, may be used to dynamically adjust the CPU frequency of the microprocessor to match the required power budget.
- P-staies for example the capability of a microprocessor to switch between different supported operating frequencies to modulate power consumption
- frequency seeking can be utilized based on an approximation of the power-to- frequency curve for both DFS and DYFS as a linear function.
- Other power management techniques such as voltage scaling where voltage used in a component is increased or decreased to regulate power consumption may also be used.
- the PDS controller monitors power load at every tick, for example, every second, and adjusts the microprocessor's frequency in response to discrepancy between budget and demand.
- Embodiments of the subject PDS utilize a time-varying power capping budget.
- the PDC controller will signal the distributed generation EMM to adjust the DC generation level for the next load following period.
- the amount of generation adjustment, or scheduled generation level adjustment is determined by calculating th mean value of the original power demand in the preceding control period, and then the DG power generation level adjustment is the greater of the calculated mean value and the current demand measurement.
- the distributed generation will gradually increase its output over a ramp-up period, in an embodiment, a one minute ramp-up duration is assumed for the power generators. During this ramp-up period, the onsite UPS storage is used to provide necessary power support.
- the PDC controller can also signal the EMM to adjust a bonus power budget.
- a bonus power budget as shown in Figure 9 A. can address the issue that, after a period of time, the UPS requires recharge to retain its full capacity.
- the PDC can signal the EMM to produce additional generation in the next period based on the required UPS charging power.
- the bonus power budget can also relate to an adaptive load performance scaling scheme that intelligently utilizes DG energy and UPS energy for boosting the load performance. Further details of such adaptive load performance scaling are discussed below.
- the PDC controller monitors the data center load every tick and adjusts node frequency based on the discrepancy beiween the power budget and the original power demand. In an embodiment, such monitoring can occur every second. Other periods can also be implemented. At the end of each cycle ⁇ , or at some other desired, frequency and/or timing, the PDC controller adjusts the power budget for a new power demand goal.
- the cycle TL can be, for example, the cycle time of the PDC and/or EMM, or other devices in the system, which can be less than 0.002, 0.003, 0.004, 0.005, 0.01 , 0.1, 0.02, 0.03, 0.04, 0.05, 0.06, 0.07, 0.08, 0.09, 1.0, 1.5, 2.0, 2.5, 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, and/or 10 seconds.
- Power demand shaping can facilitate load following, but can degrade performance in one or more aspect.
- Adaptive load performance scaling can help the PDS system to improve job performance while maintaining high load following effectiveness, it can be useful for the power demand shaping protocol to allow the workload, to explore additional energy and opportunities.
- Server power states control motherboard on/off cycling hard disk drive speed modulation, and/or virtual machine migration and consolidation can be used for load control.
- the distributed generation level can be fine-tuned. If the DG generation is adjusted based solely on historical average, prediction error is often unavoidable, resulting in all of the active jobs suffering low processor speed for the duration of the load tuning interval.
- Figure 11 shows one technique to address this problem.
- the technique shown in Figure 1 1 can be referred to as DGR Boost optimization.
- DGR boost can leverage the build-in over-clocking capabilities of modern processor nodes to minimize the job delay.
- the PDS PDC controller keeps the timing statistics of each active job during runtime.
- the associated computing node may spend different time periods /, ⁇ on different frequency F Di' due to the time-varying demand- supply mismatch, if we assume F is the full frequency without performance scaling, we can define a job's normalized progress as:
- I ⁇ is the time the task spends under power demand shaping and T is the time the program would spend if no perfonnance scaling were applied. Since frequency scaling only changes the CPU time, we can use mean CPU utilization ⁇ to estimate the proportion of runtime that is affected by power demand shaping, if NP always equals to i then PDS is equivalent to a normal job dispatcher that has no perfonnance scaling.
- STP System throughput
- the PDS PDC controller can assign bonus power budget to the load. Meanwhile, to actually leverage this power bonus, the PDC controller can further enable CPU frequency boost mode on each node. Such frequency boost mode is well supported in the AMD Turbo Core [25] and the Intel Turbo Boost Technology [26] . By occasionally increasing the CPU speed, important deadlines can be caught up and performance degradation incurred in strict demand shaping can be reduced or avoided.
- a scheme to fine-tune intra-cycle load power can be implemented.
- the UPS stored energy can be used to avoid significant, performance degradation by a scheme referred to as UPS boost.
- job runtime can be used to sort out short jobs.
- Short jobs can be defined as tasks that will finish before the current load following cycle ends.
- UPS Boost Boost
- UPS Boost can improve job performance based on accurate runtime estimates, it encourages users to not over-estimate their job runtime.
- Figures 3A-3B show the cumulative distribution functions (CDFs) of job runtime in HPC data centers. Both short-running workload (average job runtime ⁇ 1h) and long-running workload (average job runtime > Hi) traces are considered. For short-running workload traces, more tha 40% submitted jobs are finished with 100 seconds. For long-running workload traces, nearly 30% of the submitted jobs show short runtime that does not exceed 10 minutes. Most of these short jobs will be granted with individual computing nodes, resulting in transient load power demand fluctuation.
- CDFs cumulative distribution functions
- FIG. 4 shows the energy utilization of data center with varying load following intervals.
- the DG power output is dynamically adj usted based on the peak power demand of the last load following period, For a 15 -min load following, the energy utilization is 97% on average. For a 60-min ad following, the energy utilization drops to 90% on average. Apparently, the energy efficiency decreases as load following becomes coarse-grained. However, even if load following is performed on an hourly basis, the energy utilization still outperforms over-provisioning (Qver-P) based design, which has an average energy utilization of 66%.
- Qver-P over-provisioning
- DOD depth of discharge
- the second factor is the discharge current, which represents the rate of discharging.
- the battery lifetime will be decreased whenever the battery cell is discharged at a faster rate than the rated rate [20].
- This technique predicts the battery lifespan based on manufacture's battery performance data and the measured battery usage record of duration T, Assume the rated charge life (in Ah) is LR.
- the estimated lifetime, L is given by:
- df ⁇ is the effective discharge of a. single discharge event
- d l is the measured actual discharge
- A. is the scaling factor that represents the capacity degradation effect under high, discharging rate
- B- is the scaling factor that represents the lifetime degradation effect under high DOD
- A- is a function of the rated amp-hour capacity ( €3 ⁇ 4 and the actual discharging current (.3 ⁇ 4; B, is a function of the rated depth of discharge ( j 3 ⁇ 4) and the measured actual depth of discharge (!3 ⁇ 4).
- V LA 12V 6-cell valve-regulated lead-acid battery
- the load following policy is to adjust the distributed generation, output based on the mean power demand of the last period.
- the minimal load following interval is 5 ⁇ min and all the results at other interval values are normalized to it. Since the actual granularity of load following depends on several factors (e.g., the generator characteristic, control latency, and operation policy), the battery lifespan can vary significantly. If the best achievable (or economically feasible) load following interval is 30-min, the system will incur 57% battery lifetime degradation. This also implies that if the load power demand becomes less fluctuating, we can achieve L3X lifetime improvement.
- TCO total cost of ownership
- Figure 7 shows the amortized capital expenditure (CapEx) of batteries under varying capacities and load following intervals.
- CapEx the minimum required battery capacity (i.e., IX) that can safely meet the load power regulation requirement.
- IX minimum required battery capacity
- 2X the battery installation capacity
- a HPC data center simulation infrastructure that takes real-world workload traces as input ca be utilized to model the performance of systems using PDS.
- a discrete-event simulator can be used and can put each user ' s request into a queue and wait to grant allocation if computing nodes are available. Each job request in the trace can have exclusive access to its granted nodes for a bounded duration.
- Such a trace-drive discrete-event simulation framework has been adopted by several prior studies on investigating data center behaviors and facility-level design effectiveness [6, 27, 28],
- UPS's with up to a 20 VA out, up to a 200 VA, up to a 250 VA, up to a 1000VA, up to a lOk ' VA, up to a 25kV A, and/or up to a 50 kVA output capability.
- Table 2 shows the performance parameters we used in our evaluation. All the parameter values are carefully selected based on manufacturer specifications, government publications and industry datasheet, For example, we use published emission factors to calculate carbon emissions [34], We assume a 1-minute constant duration for the distributed generation to ramp up when performing load following.
- the battery cycle life is set to be 10,000 times and we calculate the capacity degradation of battery ceil based on its discharging profi le which includes detailed information of each discharging event.
- Oracle is defined as an ideal design that has a priori knowledge of load patterns and. can always meet the fluctuating data center power demand with no performance overhead.
- Oracle represents the optimal energy balance scenario that one can achieve with renewable energy resources.
- LF is defined as a conventional load following based scheme that has heavy reliance on energy storage.
- ST represents existing power supply driven design that aims at managing the computational workload to match the renewable energy supply [4, 6, 8].
- PDS-s is an embodiment of the subject power demand shaping technique without optimization.
- PDS-r is an embodiment of the subject power shaping technique, referred to as relaxed power demand shaping, that features adaptive workload-aware performance scaling.
- Performance is important for various embodiments of the subject power demand shaping technique. Although the then-novel concept of tracking renewable power budget has shown great success on reducing IT carbon footprint, it has difficulty ensuring improved performance and sustainabiiity simultaneously.
- Table 5 evaluates the performance degradation of supply tracking based design under different wind energy intensity. We have scaled the wind power traces so that the average wind power budget equals the average data, center power demand. When renewable energy generation drops or is intermittently unavailable, we scale down the node frequency and defers j oh execution if it i s necessary.
- Figure 13 shows the mean job turnaround time under varying load following interval. All the results are normalized to Oracle, which has no performance scaling and maintains full-speed server operation with sufficient power budget. The average job turnaround time increase of PDS-s is 8.0%, which outperforms supply tracking based design most of the time.
- An embodiment of the subject power demand shaping technique, PDS-r shows 1.2% mean performance degradation compared to Oracle. This means that the subject power demand shaping technique with, adaptive load tuning (i.e., DGR Boost and UPS Boost) can yield 37% improvement over existing supply-tracking based designs.
- Figures 14A and 14B show the results for the worst-ease scenario in terms of the mean job turnaround time of the worst 5% jobs.
- PDS-s and PDS-r show 47% and 9.6% performance degradation, respectively. Therefore, PDS-r shows a better performance guarantee in terms of the worst-case performance degradation,
- FIG. 17 Another advantage of embodiments of the subject power demand shaping techniques is that conventional centralized UPS systems can be used to assist power demand shaping.
- a drawback of centralized UPS systems is that they cannot provide a fraction amount of energy - ail the data center load has to be switched between the main supply and UPS. Consequently, during each UPS ride-through, the battery cells have to experience much higher discharge current. The immediate result of this is significantly decreased UPS lifetime.
- LF results in 35% lifetime degradation on average.
- the lifetime degradation of PDS-s and PDS-r when using a centralized UPS system is 6% and 7%, respectively, Therefore, embodiments of the subject power demand shaping techniques still maintain acceptable overhead and can be utilized with centralized UPS systems.
- Specifica embodiments can use the mean of the total power usage for the last two control periods, or other functions of the total power usage to determine the power generation level for the next control cycle.
- the length of the control periods can change, can change dynamically, or can remain the same.
- the period at which the total power usage is measured during the control period can be the same, for example at the clock cycle, or change change depending on the circumstances.
- program modules include routines, programs, objects, components, data structures, etc., that perform particular jobs or implement particular abstract data types.
- program modules include routines, programs, objects, components, data structures, etc., that perform particular jobs or implement particular abstract data types.
- program modules include routines, programs, objects, components, data structures, etc., that perform particular jobs or implement particular abstract data types.
- program modules include routines, programs, objects, components, data structures, etc., that perform particular jobs or implement particular abstract data types.
- the invention may be practiced with a variety of computer-system configurations, including multiprocessor systems, microprocessor-based or programmable- consumer electronics, minicomputers, mainfram computers, and the like. Any number of computer-systems and computer networks are acceptable for use with the present invention.
- embodiments of the present invention may he embodied as, among other things: a method, system, or computer-program product. Accordingly, the embodiments may take the form of a hardware embodiment, a software embodiment, or an embodiment combining software and hardware, in an embodiment, the present invention takes the form of a computer-program product that includes computer- useable instructions embodied on one or more computer-readable media.
- Computer-readable media include both volatile and nonvolatile media, transient and non-transient media, removable and nonremovable media, and contemplate media readable by a database, a switch, and various other network devices.
- computer-readable media comprise media implemented in any method or technology for storing information. Examples of stored information include computer-useable instructions, data structures, program modules, and other data representations.
- Media examples include, but are not limited to, information-delivery media, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile discs (DVD), holographic media or other optical disc storage, magnetic cassettes, magnetic tape, magnetic disk storage, and other magnetic storage devices. These teclmologies can store data momentarily, temporarily, or permanently.
- the invention may be practiced in distributed-computing environments where tasks are performed by remote-processing devices that are linked through a communications network
- program modules may be located in both local and remote computer-storage media including memory storage devices.
- the computer- useable instructions form an. interface to allow a computer to react according to a source of input.
- the instructions cooperate with other code segments to initiate a variety of jobs in response to data received in conjunction with the source of the received data.
- the present invention may be practiced in a network environment such as a communications network.
- a network environment such as a communications network.
- Such networks are widely used to connect various types of network elements, such as routers, servers, gateways, and so forth.
- the invention may he practiced in a multi-network environment having various, connected public and/or private networks.
- Communication between network elements may be wireless or wireline (wired).
- communication networks may take several different forms and may use several different communication protocols. And the present invention is not limited by the forms and communication protocols described herein.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Embodiments relate to a method and system for power demand shaping (PDS) so as to manage power generation and use. Specific embodiments relate to data center power demand shaping to achieve high-performance low-overhead data center operation. Specific embodiments can incorporate standard (utility power) energy sources, renewable energy sources, or a combination of standard (utility power) energy sources and renewable energy sources. Embodiments of the subject PDS techniques can incorporate trimming the data center load power so as to allow DG systems to follow the power demand efficiently and/or incorporate two adaptive load tuning schemes that can boost data center performance and enable near-oracle operation during power demand trimming process. To implement a cross-layer power optimization scheme, embodiments of the subject invention relate to a power management module that can reside between front-end distributed generation and back-end computing facilities to provide a coordinated tuning between the supply and load.
Description
DESCRIPTION
METHOD AND APPARATUS FOR POWER MANAGEMENT USING DISTRIBUTED GENERATION
This invention was made with government support under CSR-111726.1 awarded by National Science Foundation. The government has certain rights in this matter,
CROSS-REFERENCE TO RELATED APPLICATION The present application claims the benefit of U.S. Provisional Application Serial No. 61/768.209 filed February 22, 201 3, which is hereby incorporated by reference herein in lis entirety, including any figures, tables, or drawings.
BACKGROUND OF INVENTION
Computer system design inevitably enters the landscape of design for sustainability as the data center power footprint has become a global concern. In the past ten years, Google server's electricity demand has increased almost 20-fold [1], The huge IT energy consumption not only increases the total cost of ownership (TCO) but also leaves profound impact on the environment. According to a McKinsey Quarterly report, the annual C02 emissions of computing systems will research 1.54 metric gigatons within eight years, which could make IT companies among the biggest greenhouse gas emitters by 2020 [2]. Consequently, renewable energy powered data centers are gaining growing popularity In both the IT industry and acaderaia, as a way to tackle the dual challenges of reducing energy consumption and environmental issues [3-9].
Existing proposals on renewable energy-aware power management schemes largely emphasize adapting the computer load to the time- varying power budget [3-9]. We broadly categorize these techniques into two types: 1) load tuning based design; and 2) job scheduling based design. While the former approach leverages performance scaling techniques (e.g., DVFS and server power state tuning) to track the time-varying renewable power budget [3- 5], the later approach schedules job requests based on the renewable energy availability [6-9]. Since these techniques are driven by variable and intermittent power supply, they typically
suffer extended job turnaround time. They can hardly maintain desired instantaneous throughput and service availability without substantial utility grid support.
The IT industry is actively looking for opportunities in non-conventional power provisioning solutions such as distributed generation.
Distributed generation (DG) refers to a variety of small, modular electric generators near the point of use. In recent years, DG has gained tremendous interest as an alternative source of power for IT industry. According to the U.S. Environmental Protection Agency (EPA), using DG in data center design could achieve great energy savings, significant environmental benefits, and high power reliability [11].
As shown in Figure 1, DG system encompasses a wide range of green energy technologies, such as photovoltaic module (PV), wind power, fuel cell, and bio-fuel based gas turbine. While PV/wind power depends on environmental condition, the outputs of fuel cells and gas turbines are tunable. They can provide a key supporting service called load following [12], which, refers to the use of online generation equipment to track the changes in customer loads. Therefore, one can take advantage of the load fbUowing capabilities of these tunable DG systems to meet the time-varying IT power demand. Such design is non-trivial because it enables data center to run on renewable energy sources without compromising workload performance.
When employing distributed generation to build a better data center power provisioning architecture, challenges arise due to the unpredictable and fluctuating data center load. Figure 2 shows typical load, following scenario that tracks customer load every 30 minutes. As can be seen, DG systems cannot provide fine-grained load demand following due to their limited response speed.
To handle the moment-to-moment load power demand, DG systems typically rely on large energy storage elements [12]. Such design not only increases the TCO (due to storage cost), but also incurs up to 25% roundtrip energy loss. More importantly, without careful power management, the disturbing load can cause frequent and excessive battery discharging actives, which may degrade the lifetime of these expensive electrical elements and quickly deplete the stored energy that is crucial for handling emergencies.
Distributed generation (DG) [10, 11] is an emerging trend of generating power locally to provide reliable, secure, and sustainable electrical energy to its consumers. Distributed generation encompasses several promising clean energy technologies such as gas turbine,
biomass power, and fuel cell. These non-conventional power generators are known as microsources or distributed energy resources (DERs), and are typically Modular units of small capacity (typically between several kilowatts to tens of megawatts) [16],
In order to harness clea energy from DERs, microgrid is proposed as a local electricity distribution network that focuses on flexible and intelligent management of DG systems. The responsibility of microgrid is to dynamically control the po wer flow in response to any disturbance and load changes, Although microgrid can import/export power from/to the utility power line, it is usually the last resort due to the low transmission efficiency, high peak power cost, and sustamability consideration [12].
In contrast with a conventional bulk grid, which, has large amount of capacity inertia, distributed generation typically does not have reserved capacity [1 1], The supply and storage of energy is generally planned carefully in microgrid to ensure instantaneous demand and long-term energy balance [10].
In Table 1 we show the response speed of typical DG systems. Most energy storage devices have very fast response speed that could release power almost immediately (in ms level). As a result, they are widely used to handle moment-to-moment load oscillation and disturbances, which is referred to as regulation [12], In contrast, gas turbines and fuel cells are typically too slow to meet the load power variation since the change of the engine speed or the chemical reaction in (he fuel requires time. Therefore, they are generally used to track the intra- and inter-hour changes in customer loads, which is referred to as load following [12],
Although there is no strict rule to define the temporal boundary between regulation and load following, typically load following occurs every KM 5 minutes or more, It is not usually economically feasible to frequently adjust the output of distributed generators due to the increased performance cost and decreased fuel utilization efficiency.
The energy balance issue arises due to the fluctuating load in data centers and other computerized environments. Dynamic power tuning techniques (e.g., DVFS), frequent on/off power cycles, stochastic user requests, and data migration activities can cause varying degree of load power variation. Since distributed generators are generally placed near or at the point of energy consumption, they are often exposed to the full fluctuation of local IT loads rather than experiencing the averaging effect seen by larger, centralized power system. As a result, energy balancing becomes rather difficult in distributed generation powered data centers.
DG Systems I Res onse Tstartu
Lead-acid battery immediate N/A
Flywheel N/A
Fuel cs!i 30 S miff 20-50 rnin
Gas turbine 1 Qs of ssconife 2-10 rniii
Table 1 : Response speed of DG systems
Accordingly, there exists a need in the art for optimization to improve efficiency and workload performance in DG systems.
BRIEF SUMMARY
Embodiments of the subject invention relate to a method and apparatus for providing a power demand shaping (PDS) technique by utilizing load following with distributed generation (DG) systems, to meet time-varying power demand. Load following refers to using online power generation equipment to track changes in customer loads.
Embodiments of the subject invention can intelligently trim power load of DG powered computing infrastructures and enable DG systems to follow power demand efficiently. Embodiments of the subject invention feature two adaptive load tuning schemes that can boost power load performance and enable a high percentage performance of an ideal oracle design operation during power demand trimming process. Embodiments of the subject invention can be implemented as a cross-layer power management module residing between a front-end distributed generation and back-end computing facilities to provide a coordinated tuning between supply and load, Embodiments of the subject invention can avoid high performance penalty issue incurred during supply tracking.
Embodiments of the subject invention can be applied to applications including, but not liraited to, DG powered data center, DG powered cloud computing infrastructure and green and sustainable facilities.
Embodiments of the subject invention pertain to distributed generation powered data centers that leverage the load following capability of onsite renewable generation, and optional interconnection with a standard power grid, to achieve low carbon footprint while maintaining sufficient performance. Specific embodiments incorporate a power demand shaping technique (PDS) to improve the load following efficiency in data centers while boosting the workload performance. Further specific embodiments utilize power demand shaping techniques incorporate one or both of two adaptive load tuning schemes: DGR. Boost
and UPS Boost. The use of embodiments of the subject PDS techniques can achieve 98,8% performance of an ideal oracle design and outperform existing supply-tracking based approach by 37%. in addition, a design incorporating embodiments of the subject power demand shaping techniques can reduce electrical stress on batteries and improve battery lifetime by up to 26%.
BRIEF DESCRIPTION OF DRAWINGS
Figure 1 shows a distributed generation powered data center, where the system can follow customers' load power demand.
Figure 2 shows a load following scenario, where frequent IT load fluctuation hinders efficient load following.
Figure 3 shows CDF of workload runtime in a zoomed view, where short jobs may result in fme-grained load fluctuations, and 3 A shows short-running traces and 3B shows long-rumiing traces.
Figur 4 shows the energy utilization decreases when load following becomes coarsegrained, where over-provisioning based design (Over-P) is the worst-case which always generates the peak power (no load following capacity).
Figure 5 shows performance data of VRLA battery, where high DOD and discharge rate will shorten the battery lifespan,
Figure 6 shows normalized battery lifespan under different load following intervals, where conventional load following schemes cannot handle the bursty load and therefore incur varying degree of battery wear-out.
Figure 7 shows battery cost under different load following intervals and capacity, where due to frequent power demand fluctuation, small battery capacity does not show the cost advantage it should have, and 7A shows LANL (short-running workload) and 7B shows Seth (Song-running workload).
Figure 8 shows architecture of a distributed generation (DG) powered data center according to an embodiment of the invention.
Figures 9A-B respectively show an example of time-DG Power Output curve of Power Demand Shaping (PDS) technique and an example of time-Average CPU Frequency curve of Power Demand Shaping (PDS) technique according to an embodiment of the invention.
Figure 1.0 shows pseudo programming code of Power Demand Shaping (PDS) technique according to an embodiment of the invention.
Figure 11 shows a process flow diagram of DGR Boost scheme according to an embodiment of the invention.
igure 12 shows a process flow diagram of UPS Boost scheme according to an embodiment of the invention.
Figure 13 shows a chart of job turnaround time with various load following intervals for various workload traces where all results are normalized with respect to results of Oracle design- Figures 14A-B respectively show a chart of mean turnaround time of the worst 5% jobs of PDS-s (Figure 14 A) and of PDS-r (Figure 14B) where all results are normalized with respect to results of Oracle design.
Figure 15 shows a chart of dependence on utility power for various workload traces.
Fig res 3 A.-B respectively show a chart of battery lifetime degradation under various power management schemes with distributed UPS for 1,1· based design (Figure 16A) and for PDS based design (Figure 1.6B).
Figure 17 shows a chart of battery lifetime degradation under various power management schemes for various designs with, centralized UPS.
Figure 18 shows a chart of annual greenhouse gas emission savings for various types of fuels according to an embodiment of the invention.
DETAILED DISCLOSURE.
Embodiments of the invention relate to a method and system for power demand shaping (PDS) so as to manage power generation and use. Specific embodiments relate to data center power demand shaping to achieve, high-performance low-overhead data center operation. Further specific embodiments can incorporate standard (utility power) energy sources, renewable energy sources, or a combination of standard (utility power) energy sources and renewable energy sources. Embodiments of the subject PDS techniques can incorporate trimming the data center load power so as to allow DG systems to follow the power demand efficiently and/or incorporate two adaptive load tuning schemes that can boost data center performance and enable near-oracle operation during power demand trimming process. To implement a cross-layer power optimization scheme, embodimenis of the subject
invention relate to a power management module that can reside between front-end distributed generation and back-end computing facilities to provide a coordinated tuning between the supply and load.
Embodiments to data centers can utilize onsite distributed generators and incorporate a load power management scheme that uses load following.
Embodiments can use a power demand shaping (PDS) mechanism for optimizing load following efficiency and workload performance in DG-powered systems, such as data centers. Embodiments using the subject PDS mechanism can achieve at least 90%, at least 95%, at least 96%, at least 97%, at least 98%, at least 98.5%, and/or 98.8% of the performance of an ideal oracle design. Compared to recent supply tracking based approach, embodiments using the subject PDS mechanism can improve job turnaround time by 37% on average. To achieve the same performance as such embodiments of the subject PDS mechanism, the state-of-the-art green data centers have to rely on ut lity power for about 50% of its runtime. Furthermore, utilizing embodiments of the subject PDS techniques can reduce the overhead on energy storage devices, and improves the battery lifespan by up to 26%.
Embodiments of the invention can reduce a data center's reliance on conventional utility grid, thus reducing the data center's carbon footprint. Embodiments of the invention are useful when the utility power is less reliable, as in some developing countries. Further, for data centers thai are built in remote areas, an operation that does not depend on the conventional utility grid can help to eliminate the expensive utility power line extensions (around $10k per km) [16],
Embodiments of the present invention relate to a method and apparatus for fine-tuning load following functionalities of tunable distributed generation (IDG) systems to meet time- varying power demand.
Embodiments of the present invention provide a power demand shaping (PDS) technique for fine-tuning load following functionalities of tunable DG systems. Embodiments of the present invention can include first maintaining constant power demand and second rescheduling power generation of DG systems.
In addition, embodiments of the subject invention PDS feature two adaptive power management schemes: DGR Boost and UPS Boost. Thus, embodiments of the subject methods can adaptively fine-tune load following capabilities of tunable DG systems ei ther by leveraging build-in overclocking capabilities of microprocessor under the DGR Boost scheme
or by leveraging stored energy of energy storage elements, such as uninterni able power supply (UPS), battery or flywheel under the UPS Boost scheme. The subject methods can be applied to both distributed energy storage elements and centralized energy storage elements,
The subject methods can be applied to data centers powered by DG systems. The subject methods can also be applied to other infrastructures powered by DG systems.
Advantageously, embodiments of the subject method can remove needs for large energy storage elements, trim load power, fine-tune DG systems to boost performance and energy utilization, and extend lifespan of energy storage elements associated with DG systems,
Figure 8 depicts an architecture of a DG powered data center with a microgrid power provisioning hierarchy for managing various distributed energy resources. The distributed energy resources, or microsourees, such as wind turbine, solar panel, gas turbine and fuel cell, are connected to a group of feeders that provide power to electrical loads. In specific embodiments, the electrical loads can be nodes of a plurality of computing infrastructures, The nodes may include, but not limited to servers, microprocessors or other electronic devices. The distributed energy resources are connected to the feeder via circuit breakers and appropriate power electronic interfaces (PET). All the circuit breakers and power electronic interfaces are coordinated by a microgrid energy management module (EMM), which provides real-time monitoring and autonomic control of power generation. As can be seen in Figure 8, microgrid can either stand alone or connect to a main grid of utility through, for example, a point of common coupling (PCC). Micogrid featuring islanded mode, i.e.. where the microgrid stands alone, is preferred in certain cases since it may avoid power quality issue- in main grid of utility. The EMM and PDC can be merged into a single processor or can shift features between them and/or with one or more other processors.
The connected electrical loads may include both critical loads and/or non-critical loads. As an example, high performance computer (HPC) servers are generally sensitive and mission-critical loads and can require stringent power quality and sufficient power budget. Thus, controllable and stable microsourees, such as gas turbines, fuel cells, that can follow demand of critical load can be allocated for HPC' servers. For critical loads, each server cluster can be connected to a power distribution unit (PDU) via redundant power delivery paths to ensure uninterrupted operation in event of PDU failure. A specific embodiment relates to utilizing controllable microsourees to follow the demand of critical data center load.
In Figure 8, a power demand controller (PDC) is used to manage the server clusters. The PDC" can track job running status of the server cluster and overall cluster power demand, The PDC can also coordinate with job schedulers to optimize computing resource allocation. In addition, the PDC communicates with die EMM of microgrid to obtain current distributed generation levels and dynamically inform the EMM of necessary power generation adjustment.
On the other hand, operations of non-critical loads, such as normal data processing machines, can be regulated or restricted without significantly affecting the needs of users when power generation is not sufficient. Thus, as shown in Figure 8, non-critical loads can be powered by intermittent renewable power supplies such as wind turbine or solar panel.
Referring to Figure 8, the EMM monitors and adjusts on-site power generation with, for example, frequency droop control. Frequency droop control uses a small change in the power bus frequency to determine the amount of power that each generator should put into the power bus. The microgrid also includes energy storage elements, such as UPS system, to provide stored energy for necessary start up time for generators' output to ramp up when system changes, such as temporary power differences between supply and load. This can avoid the need for bulky energy storage devices. Both, centralized UPS systems and. distributed UPS systems can. he utilized, though distributed UPS system is preferred due to its higher efficiency and better power management capability,
According to an embodiment of the subject invention, power management that leverages load following capability of DG systems can be carried out by PDS technique, which dynamically and aptly shapes power demand to match the planned power usage curve that yields high load following effectiveness. Specific embodiments can use a power demand shaping technique to better utilize onsite distributed generation in HPC data centers. Embodiments of a power demand shaping technique can include two steps. First, during each control period, the PDS controller can use power capping to maintain a constant power demand, or maintained at or below a target power demand. Second, the power generation level is adjusted for the next load folio wing period by the controller informing the distributed generation EMM to adjust the generation level. This can result in better matching of energy generation with energy load to allow a high-performance sustainable computing.
A PDS based controller can transform the power demand with respective to time into one of a variety of shapes. Figure 9A illustrates a time-varying power demand shaping
mechanism resulting in a square-wave-like demand curve. Such a square- wave-like curve is preferred for its convenience, but other shapes can be utilized. Irs the square- wave-like DC power output shown in Figure 9 A, the amplitude of power output alternates between multiple values. Unlike an ideal square wave, transitions between values of the square-wave-like DC power output is not instantaneous, as changes in power output needs time to ramp up to a higher value or ramp down to a lower value. Time-varying power demand shaping may he represented by other curves including, but not limit to, sine or sine-like waveforms, triangle or triangle-iike waveforms, or sawtooth or sawtooth-like waveforms.
With a square- wave-like, or oilier shape, power demand shaping, a DG system only needs to increase or decrease its generation at each end of the load tuning cycle to meet a new power budget goal. The time duration of load tuning cycle can vary depending on a variety of factors, such as rnicrosourees and loads, In specific embodiments, the load tuning cycle can be 5 minutes, 10 minutes, 15 minutes, 20 minutes, 5-20 minutes, or other desired duration, Since load power demand becomes less bursty and fluctuating after tuning, it may be possible to avoid the need to install large energy storage elements onsite. Relatively small energy storage elements, such as UPS may be used to handle the ramping period and the temporary power discrepancy between supply and load. By eliminating unnecessary energy storage capacity, PDS based design becomes more cost-effective and sustainable.
Referring to Figure 9 A, PDS technique is carried out by first executing power capping to maintain power demand at a constant level at or below a target power level, during each control period. When the expected power consumption without any load tuning, L, exceeds a. predetermined power demand goal, D, load performance will be scaled down. Whereas when L drops below D, the load performance will be increased to revert to the original power demand level.
In order to maintain power demand at a constant level, node performance level can be dynamically tuned in response to load changes such as when data center load varies. Such dynamic tuning of performance may be achieved via a variety of scheduling schemes. In a specific embodiment, dynamic tuning can be implemented by adjusting the node frequency in a round-robin manner or other maimer based on the priorities of system users. Since computing infrastructure may include a plurality of computing nodes, various scheduling schemes may be used for efficiently adjusting the node frequency. In an embodiment using a priority-based scheme each computing node can be associated with a priority and and the
system can make scheduling choices based on the assigned priorities, adjustment of frequency for each computing node is based on the computing node's priority. In such an embodiment, a group of nodes with higher priority may be adjusted to run at a higher frequency.
Actual performance tuning policies adopted in various scenarios may vary depending on computing node's hardware characteristics, BIOS support, firmware support, and/or software support. Performance states, known as P-staies, for example the capability of a microprocessor to switch between different supported operating frequencies to modulate power consumption, may be used to dynamically adjust the CPU frequency of the microprocessor to match the required power budget. By using this technique to run the processor at a 1 ess-ihan-maximum clock frequency, power can be managed, In an embodiment, frequency seeking can be utilized based on an approximation of the power-to- frequency curve for both DFS and DYFS as a linear function. Other power management techniques such as voltage scaling where voltage used in a component is increased or decreased to regulate power consumption may also be used. In an embodiment, the PDS controller monitors power load at every tick, for example, every second, and adjusts the microprocessor's frequency in response to discrepancy between budget and demand.
Embodiments of the subject PDS utilize a time-varying power capping budget. In a specific embodiment, at the end of each control period, the PDC controller will signal the distributed generation EMM to adjust the DC generation level for the next load following period.
In an embodiment, the amount of generation adjustment, or scheduled generation level adjustment, is determined by calculating th mean value of the original power demand in the preceding control period, and then the DG power generation level adjustment is the greater of the calculated mean value and the current demand measurement. The distributed generation will gradually increase its output over a ramp-up period, in an embodiment, a one minute ramp-up duration is assumed for the power generators. During this ramp-up period, the onsite UPS storage is used to provide necessary power support.
In addition to the scheduled generation level adjustment, the PDC controller can also signal the EMM to adjust a bonus power budget. Such a bonus power budget, as shown in Figure 9 A. can address the issue that, after a period of time, the UPS requires recharge to retain its full capacity. In this case, the PDC can signal the EMM to produce additional
generation in the next period based on the required UPS charging power. The bonus power budget can also relate to an adaptive load performance scaling scheme that intelligently utilizes DG energy and UPS energy for boosting the load performance. Further details of such adaptive load performance scaling are discussed below.
In Figure 10, the pseudo code for an embodiment of power demand shaping is shown.
The PDC controller monitors the data center load every tick and adjusts node frequency based on the discrepancy beiween the power budget and the original power demand. In an embodiment, such monitoring can occur every second. Other periods can also be implemented. At the end of each cycle Ί\, or at some other desired, frequency and/or timing, the PDC controller adjusts the power budget for a new power demand goal. The cycle TL can be, for example, the cycle time of the PDC and/or EMM, or other devices in the system, which can be less than 0.002, 0.003, 0.004, 0.005, 0.01 , 0.1, 0.02, 0.03, 0.04, 0.05, 0.06, 0.07, 0.08, 0.09, 1.0, 1.5, 2.0, 2.5, 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, and/or 10 seconds.
Power demand shaping can facilitate load following, but can degrade performance in one or more aspect. Adaptive load performance scaling can help the PDS system to improve job performance while maintaining high load following effectiveness, it can be useful for the power demand shaping protocol to allow the workload, to explore additional energy and opportunities. Server power states control motherboard on/off cycling hard disk drive speed modulation, and/or virtual machine migration and consolidation can be used for load control. in an embodiment, the distributed generation level can be fine-tuned. If the DG generation is adjusted based solely on historical average, prediction error is often unavoidable, resulting in all of the active jobs suffering low processor speed for the duration of the load tuning interval. Figure 11 shows one technique to address this problem. The technique shown in Figure 1 1 can be referred to as DGR Boost optimization. DGR boost can leverage the build-in over-clocking capabilities of modern processor nodes to minimize the job delay.
To enable DGR Boost, the PDS PDC controller keeps the timing statistics of each active job during runtime. In any give control period, the associated computing node may spend different time periods /,· on different frequency F Di' due to the time-varying demand- supply mismatch, if we assume F is the full frequency without performance scaling, we can define a job's normalized progress as:
n equation 1 , I^ is the time the task spends under power demand shaping and T is the time the program would spend if no perfonnance scaling were applied. Since frequency scaling only changes the CPU time, we can use mean CPU utilization μ to estimate the proportion of runtime that is affected by power demand shaping, if NP always equals to i then PDS is equivalent to a normal job dispatcher that has no perfonnance scaling.
In an embodiment using a DGR Boost scheme, we use NP to evaluate the degree of job slowdown. System throughput (STP) is then defined as the mean NP across all the active jobs.
At each end of the load following cycle, if STP is lower than a preset goal, the PDS PDC controller can assign bonus power budget to the load. Meanwhile, to actually leverage this power bonus, the PDC controller can further enable CPU frequency boost mode on each node. Such frequency boost mode is well supported in the AMD Turbo Core [25] and the Intel Turbo Boost Technology [26] . By occasionally increasing the CPU speed, important deadlines can be caught up and performance degradation incurred in strict demand shaping can be reduced or avoided.
In a specific embodiment, a scheme to fine-tune intra-cycle load power can be implemented. For short jobs that cannot gain the benefits of DGR Boost, the UPS stored energy can be used to avoid significant, performance degradation by a scheme referred to as UPS boost.
In typical HPC data centers, users are required to submit their job runtime estimations to enable backfilling, which can help maximize cluster utilization. In specific embodiments of PDS, job runtime can be used to sort out short jobs. Short jobs can be defined as tasks that will finish before the current load following cycle ends. Irs Figure 12, a specific UPS Boost scheme will first find out all the short jobs that have low normalized progress. These jobs are very likely to miss their deadline without additional performance boost. Afterwards, the controller will check available UPS stored energy and use bin-packing method to power a group of selected short jobs.
Since UPS Boost can improve job performance based on accurate runtime estimates, it encourages users to not over-estimate their job runtime. One can use a pricing model [8] to further improve runtime estimation accuracy and increase the effectiveness of UPS Boost, implementing load following in data centers is a challenging task, as conventional load following scheme results in sub-optimal energy utilization, low energy storage lifetime, and poor cost-effectiveness.
The energy utilization problem when using load following in data centers arises because typical niicrosources are not able to respond rapidly to the frequent IT load variation. Figures 3A-3B show the cumulative distribution functions (CDFs) of job runtime in HPC data centers. Both short-running workload (average job runtime < 1h) and long-running workload (average job runtime > Hi) traces are considered. For short-running workload traces, more tha 40% submitted jobs are finished with 100 seconds. For long-running workload traces, nearly 30% of the submitted jobs show short runtime that does not exceed 10 minutes. Most of these short jobs will be granted with individual computing nodes, resulting in transient load power demand fluctuation.
Workload fluctuation can be the major obstacle of achieving high renewable energy utilization in a distributed generation powered data center. Figure 4 shows the energy utilization of data center with varying load following intervals. The DG power output is dynamically adj usted based on the peak power demand of the last load following period, For a 15 -min load following, the energy utilization is 97% on average. For a 60-min ad following, the energy utilization drops to 90% on average. Apparently, the energy efficiency decreases as load following becomes coarse-grained. However, even if load following is performed on an hourly basis, the energy utilization still outperforms over-provisioning (Qver-P) based design, which has an average energy utilization of 66%.
Batteries are critical components in both distributed generation systems and uninterruptable power supply (UPS) systems. 'These energy storage devices are prone to electrical wear out under irregular charging and discharging regime [19]. Throughout the history of battery discharge event, two factors affect the battery failure rate significantly. The first is the depth of discharge (DOD), which indicates how much stored energy has been used (0% DOD = full capacity, 100% DOD = empty). The second factor is the discharge current, which represents the rate of discharging. The battery lifetime will be decreased whenever the battery cell is discharged at a faster rate than the rated rate [20].
Using a battery lifetime evaluation method that captures the aforementioned two primary determinants of battery failure [20]. This technique predicts the battery lifespan based on manufacture's battery performance data and the measured battery usage record of duration T, Assume the rated charge life (in Ah) is LR. The estimated lifetime, L, is given by:
where df} is the effective discharge of a. single discharge event, d l is the measured actual discharge, A. is the scaling factor that represents the capacity degradation effect under high, discharging rate, and B- is the scaling factor that represents the lifetime degradation effect under high DOD, Both scaling factors are calculated from the best-fit functions of the manufacture ' s data sheets :
A^ j iCR i id) (4)
/¾ = -(¾ ./ ¾) (5)
In equations 4 and 5, A- is a function of the rated amp-hour capacity (€¾ and the actual discharging current (.¾; B, is a function of the rated depth of discharge (j¾) and the measured actual depth of discharge (!¾). We model a 12V 6-cell valve-regulated lead-acid battery (V LA), which, is widely used in today's UPS systems. Figure 5 shows the battery behavior under varying discharging current and. DOD, While the rated capacity is 24Ah at a 20-hour discharging rate, the capacity drops to only 12 Ah at a 15-min discharging rate (15 mitt is the typical UPS ride-though duration), Compared to the 40% constant DOD operation, the battery life will decrease by 50% at constant 80% DOD.
In Figure 6, the load following policy is to adjust the distributed generation, output based on the mean power demand of the last period. The minimal load following interval is 5~min and all the results at other interval values are normalized to it. Since the actual granularity of load following depends on several factors (e.g., the generator characteristic, control latency, and operation policy), the battery lifespan can vary significantly. If the best achievable (or economically feasible) load following interval is 30-min, the system will incur 57% battery lifetime degradation. This also implies that if the load power demand becomes less fluctuating, we can achieve L3X lifetime improvement.
Depending upon the load following schemes, the total cost of ownership (TCO) may vary. The main reason is that each load following scheme requires different amount of onsite battery capacity. Poor load, following management and bursty load power demand increase
the burden of regulation significantly, and therefore require high-capacity energy storage devices.
Figure 7 shows the amortized capital expenditure (CapEx) of batteries under varying capacities and load following intervals. We assume a iOMW data center scale for both short- running and long-running workloads. For each load tuning interval value, we calculate the minimum required battery capacity (i.e., IX) that can safely meet the load power regulation requirement, We then scale up the battery installation capacity (up to 2X) to perform a sensitivity analysis, We calculate the amortized cost over the battery's lifetime. As shown in Figure 7, small capacity does not necessarily mean cost saving since each battery cell in this case experiences more regulation events and fails quickly. Compared to battery capacity scaling, load following shows greater influence on the CapEx and results in up to 50% cost savings on batteries.
Due to data center load power fluctuation, peak power based load following incurs energy cost, while mean power based load following incurs battery capacity cost. Batteries are crucial energy regulation components but incur up to 57% lifetime degradation under fluctuating IT load. Overall design efficiency can be improved by integrating load following into dat center operatio in accordance with various embodiments of the invention.
We model implementation of embodiments of systems utilizing power demand shaping techniques in accordance with embodiments of the invention. A HPC data center simulation infrastructure that takes real-world workload traces as input ca be utilized to model the performance of systems using PDS. A discrete-event simulator can be used and can put each user's request into a queue and wait to grant allocation if computing nodes are available. Each job request in the trace can have exclusive access to its granted nodes for a bounded duration. Such a trace-drive discrete-event simulation framework has been adopted by several prior studies on investigating data center behaviors and facility-level design effectiveness [6, 27, 28],
We model an IBM System x3650 M2 (2.93G Intel Xeon X5570 processor) high- performance server that supports Intel Turbo Boost technology. While the number of processor performance states (P-states) is processor specific, we assume 12 different P-states as indicated in [29]. The minimum frequency is 1.0GHz and the normal frequency is 2,9GHz. in Turbo Boost mode, the processor could temporarily increase the CPU frequency by up to
14%, For this model, we only increase the frequency moderately (i.e., 10%) when turbo boost is enabled.
Our power model uses CPU utilization as the main signal of machine-level activity. There has been prior work showing that CPU utilization traces (sampling periods range from tens of seconds to minutes) can provide fairly accurate server-level power prediction [30]. According to the published SPEC power data, the modeled system consumes 244 Watts at 100% utilization and 76.3 Walts when idle [3 1 ]. Note that our estimates of benefits from power demand shaping are conservative; in real applications, data center workload can cause much more brief power spikes than what the simulator can capture [32], causing even worse performance degradation on a non-PDS based design. Specific embodiments utilize UPS's with up to a 20 VA out, up to a 200 VA, up to a 250 VA, up to a 1000VA, up to a lOk'VA, up to a 25kV A, and/or up to a 50 kVA output capability.
We simulate the power behavior of distributed generation system on per-second time scale, which is in tune with our data center simulator. The distributed generator adjusts its output on a coarse-grained interval (10-mhmte as default value) and batteries respond to the fluctuating computing load. We adopt microsource optimization model HOMER in our simulator [33]. Developed by the National. Renewable Energy Laboratory, HOMER simulates both conventional and renewable energy technologies and evaluates the economic and technical feasibili ty of a large number of power system options.
Table 2 shows the performance parameters we used in our evaluation. All the parameter values are carefully selected based on manufacturer specifications, government publications and industry datasheet, For example, we use published emission factors to calculate carbon emissions [34], We assume a 1-minute constant duration for the distributed generation to ramp up when performing load following. The battery cycle life is set to be 10,000 times and we calculate the capacity degradation of battery ceil based on its discharging profi le which includes detailed information of each discharging event.
Tabte 2: DG parameters used the evaluation [16-20]
We use a real- world workload trace from a well-established online repository [35], These workload logs are collected from large production systems around the world and have been scrubbed by the administrator to remove anomalous data that could skew the performance evaluation on different scheduling schemes [36], We use five key task parameters of each trace file: job arrival time, job start time, job completion time, requested duration, and job size in number of granted computing nodes, As shown in Table 4, we select six 1 -week workload traces that have diiferent mean utilization level and mean job runtime. Our simulator uses batch scheduling, the standard method for sharing computing resources among multiple users. The job scheduling policy is first come first serve (FCFS). We examine the data center load and distributed generation budget at each fine-grained simulated timestamp.
Table 3: The evaluated data center workload traces [3S]
Table 4: The eva uate power m nageme
sc emes The benefits of applying power demand shaping in accordance with specific embodiments of the subject invention to distributed generation powered data centers have been modeled and will be discussed. In 'Table 4, Oracle is defined as an ideal design that has a priori knowledge of load patterns and. can always meet the fluctuating data center power demand with no performance overhead. Oracle represents the optimal energy balance scenario that one can achieve with renewable energy resources. Different from Oracle, LF is defined as a conventional load following based scheme that has heavy reliance on energy storage. ST represents existing power supply driven design that aims at managing the computational workload to match the renewable energy supply [4, 6, 8]. PDS-s is an embodiment of the subject power demand shaping technique without optimization. PDS-r is an embodiment of the subject power shaping technique, referred to as relaxed power demand shaping, that features adaptive workload-aware performance scaling.
T le S: Mem job turnaround time of ST
under different renewable generation levels
{ normalized to Oracle )
Performance is important for various embodiments of the subject power demand shaping technique. Although the then-novel concept of tracking renewable power budget has shown great success on reducing IT carbon footprint, it has difficulty ensuring improved performance and sustainabiiity simultaneously.
Table 5 evaluates the performance degradation of supply tracking based design under different wind energy intensity. We have scaled the wind power traces so that the average wind power budget equals the average data, center power demand. When renewable energy generation drops or is intermittently unavailable, we scale down the node frequency and defers j oh execution if it i s necessary.
T he results in Table 5 show that data centers designed to track the variable power supply may incur up to 8X job runtime increase. The geometric mean value of turnaround time increase is 59%. It also shows that workload performance heavily depends on renewable power variation behavior and data center load pattern. We have observed thai occasionally the renewable energy variation pattern is totally uncorrelated with the load power demand. There is no guaranteed performance lower bound since both the user behavior and environment conditions are stochastic.
In contrast to supply tracking based design, load following fundamentally changes this situation. Figure 13 shows the mean job turnaround time under varying load following interval. All the results are normalized to Oracle, which has no performance scaling and maintains full-speed server operation with sufficient power budget. The average job turnaround time increase of PDS-s is 8.0%, which outperforms supply tracking based design most of the time. An embodiment of the subject power demand shaping technique, PDS-r, shows 1.2% mean performance degradation compared to Oracle. This means that the subject power demand shaping technique with, adaptive load tuning (i.e., DGR Boost and UPS Boost) can yield 37% improvement over existing supply-tracking based designs.
in addition to the mean performance statistics, Figures 14A and 14B show the results for the worst-ease scenario in terms of the mean job turnaround time of the worst 5% jobs. PDS-s and PDS-r show 47% and 9.6% performance degradation, respectively. Therefore, PDS-r shows a better performance guarantee in terms of the worst-case performance degradation,
The state-of-the-art green energy-aware scheduling schemes normally rely on die utility grid as backup [4, 6, 8]. To achieve the same performance as PDS-r, these designs
have to increase their reliance on the utility, as shown in Figure 15. The percentage of time that utility power is used is between 30% and 70%. The geometric mean value across all workloads and renewable generation levels is 51%. Heavy reliance on utility means increased carbon footprint, which goes against the original intention of sustainability.
Existing ad following schemes require substantial support from batteries.
Aggressive charging/discharging events typically result from IT load fluctuations, which can shorten the lifetime of these expensive batteries, or other energy storing devices, and deplete the stored energy quickly. Embodiments of power demand shaping techniques require much fewer regulation services and allow one to have- better UPS-based energy balance management. In the following discussion, we assume the UPS experiences 4 discharge cycles per day on average due to normal data center operation and maintenance needs. We evaluate the UPS lifetime based on the additional effective discharge cycles that result from load following and PDS.
in Figure 16A the impact of load following on the lifetime degradation of distributed UPS systems is shown. The lifetime degradation due to load following varies between 3% and 21%, depending on the data center load behavior. When we increase the interval of load following cycles, the battery wear out is intensified. This is because too much of the load power fluctuation will show up as intra-cycle regulation if the time chosen for load following is too long,
Compared to conventional load following, embodiments of the PDS techniques result in much lower UPS stress. In Figure 16B, both PDS-s and PDS-r show less than 3% battery lifetime degradation. Although PDS-r explores additional, stored energy to perform performance boost, its impact on UPS system is very similar to that of PDS-s. Note that for embodiments of the subject power demand shaping technique, the battery wear out problem is alleviated when we increase the interval of load following cycles. This trend is different from what we observed in LF. The reason is that batteries are mainly used to provide power shortfall during generator's ramp-up period in PDS based systems, When we increase the load following intervals, we also lower the frequency of generator ramp-up, the dominant factor of battery discharging.
Another advantage of embodiments of the subject power demand shaping techniques is that conventional centralized UPS systems can be used to assist power demand shaping. A drawback of centralized UPS systems is that they cannot provide a fraction amount of energy
- ail the data center load has to be switched between the main supply and UPS. Consequently, during each UPS ride-through, the battery cells have to experience much higher discharge current. The immediate result of this is significantly decreased UPS lifetime. As shown in Figure 17, when using a centralized UPS system, LF results in 35% lifetime degradation on average. The lifetime degradation of PDS-s and PDS-r when using a centralized UPS system is 6% and 7%, respectively, Therefore, embodiments of the subject power demand shaping techniques still maintain acceptable overhead and can be utilized with centralized UPS systems.
We evaluate the environmental impact of DG powered data centers in terms of the annua! emission savings. We mainly consider carbon dioxide, which is the most important gas within the context of greenhouse gas emissions. Since the distributed generation system support a variety of fuels, the carbon footprint may vary. The results shown in Figure 18 are based on a 1GMW data center. Low-carbon fossil fuels such as natural gas and diesel, although not 100% sustainable, can still reduce 38 and 12 metric tons of CO ? per year. If we use bio-fuel (as well as hydrogen) based distributed generation, we can achieve 100 metric tons per year on average. Note that with embodiments of the subject power demand shaping techniques, neither of these emission savings is at the cost of decreased data center performance or availability. Specifica embodiments can use the mean of the total power usage for the last two control periods, or other functions of the total power usage to determine the power generation level for the next control cycle. The length of the control periods can change, can change dynamically, or can remain the same. The period at which the total power usage is measured during the control period can be the same, for example at the clock cycle, or change change depending on the circumstances.
Aspects of the invention may be described in the general context of computer- executable instructions, such as program modules, being executed by a computer. Generally, program modules include routines, programs, objects, components, data structures, etc., that perform particular jobs or implement particular abstract data types. Moreover, those skilled in the art will appreciate that the invention may be practiced with a variety of computer-system configurations, including multiprocessor systems, microprocessor-based or programmable-
consumer electronics, minicomputers, mainfram computers, and the like. Any number of computer-systems and computer networks are acceptable for use with the present invention.
Specific hardware devices, programming languages, components, processes, protocols, and numerous details including operating environments and the like are set forth to provide a thorough understanding of die present invention. In other instances, structures, devices, and processes are shown in block-diagram form, rather than in detail, to avoid obscuring the present invention. But an ordinary-skilled artisan would understand that the present invention may be practiced without these specific details. Computer systems, servers, work stations, and other machines may be connected to one another across a communication medium including, for example, a network or networks.
As one skilled in the art will appreciate, embodiments of the present invention may he embodied as, among other things: a method, system, or computer-program product. Accordingly, the embodiments may take the form of a hardware embodiment, a software embodiment, or an embodiment combining software and hardware, in an embodiment, the present invention takes the form of a computer-program product that includes computer- useable instructions embodied on one or more computer-readable media.
Computer-readable media include both volatile and nonvolatile media, transient and non-transient media, removable and nonremovable media, and contemplate media readable by a database, a switch, and various other network devices. By way of example, and not limitation, computer-readable media comprise media implemented in any method or technology for storing information. Examples of stored information include computer-useable instructions, data structures, program modules, and other data representations. Media examples include, but are not limited to, information-delivery media, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile discs (DVD), holographic media or other optical disc storage, magnetic cassettes, magnetic tape, magnetic disk storage, and other magnetic storage devices. These teclmologies can store data momentarily, temporarily, or permanently.
The invention may be practiced in distributed-computing environments where tasks are performed by remote-processing devices that are linked through a communications network, in a distributed-computing environment, program modules may be located in both local and remote computer-storage media including memory storage devices. The computer- useable instructions form an. interface to allow a computer to react according to a source of
input. The instructions cooperate with other code segments to initiate a variety of jobs in response to data received in conjunction with the source of the received data.
The present invention may be practiced in a network environment such as a communications network. Such networks are widely used to connect various types of network elements, such as routers, servers, gateways, and so forth. Further, the invention may he practiced in a multi-network environment having various, connected public and/or private networks.
Communication between network elements may be wireless or wireline (wired). As will be appreciated by those skilled in the art, communication networks may take several different forms and may use several different communication protocols. And the present invention is not limited by the forms and communication protocols described herein.
All patents, patent applications, provisional applications, and publications referred to or cited herein are incorporated by reference in their entirety, including all figures and tables, to the extent they are not inconsistent with the explicit teachings of this specification.
It should be understood that the examples and embodiments described herein are for illustrative purposes only and that various .modifications or changes in light thereof will be suggested to persons skilled in the art and are to be included within the spirit and purview of this application.
Claims
1. A method for managing a power generation system and at least one load, comprising:
providing a power demand controller: and
providing an energy management module,
controlling one or more of at least one power usage used by a corresponding at least one load during a control period via the power demand controller, wherein the power demand controller controls the one or more of the at least one power usage such that a total power usage used by the at least one load during the control period is less than or equal to a power generation level for the control period;
controlling one or more of at least one power output of a corresponding at least one power generator during the control period via the energy management module, wherein the energy management module controls the one or more of the at least one power output such, that a total power output of the at least one power generator during the n,h control period is at least the power generation level for the nih control period.
2, The method according to claim 1 , wherein the control period is a n:h control period of a plurality of consecutive control periods, (a first control period, a second control period, ... , a (n l)ih control period, the nth control period, a (η÷1)ώ control period, ... ), wherein each control period of the plurality of control periods has a time duration of Tcp.
3. The method according to claim 2, wherein the power generation level for the control period is determined prior to the control period, wherein the power generation level for th ntn control period is based on at least, a total power usage for the (n-l )th control period, wherein the power demand controller signals the energy management module the power generation level for the nth control period during the (n-1 )lh control period.
4, The method according to claim 3, further comprising determining a power generation level for the (n+l)ta control period, wherein the power generation level for the (n-† l)th control period is hased on at least the total power usage for the nth control period,
wherein the power generation level for the next (n+l)tn control period is based on at. least, the total power usage for the nih control period, wherein the power demand controller signals the energy management module the power generation level for the (n+V)tn control period at, or before, an end of the ntn control period.
5. The method according to claim 2, wherein the at least one load is two or more loads, wherein the power demand controller controls one or more of a corresponding two or more power usages used by the two or more loads, wherein the total power usage is the total power usage used by the two or more loads, wherein the at least one power generator is two or more power generators, wherein the energy management module controls one or more of a corresponding two or more power outputs of the two or more power generators, wherein the total power output is the total power output, of the two or more generators.
6. The method according to claim 4, wherein the power generation level for the (n+l)ih control period is a greater of a mean value of the total power usage during the nA control period and the total power usage at a point in time during the n!h control period, wherein the point in time during the nlh control period is an end of the nth control period, further comprising:
monitoring the total power usage during the nth control period; and
calculating the mean value of the total power usage during the nth control period.
7. The method according to claim 2, further comprising:
providing one or more energy storage elements configured to provide power to at least one of the two or more loads, such that the total power usage is higher than the total power output at at least one point in time during the n* control period.
8. The method according to claim 7, wherein the one or more energy storage elements are configured to receive power from the at least one generator,
9. The method according to claim 7, wherein the power demand controller controls providing power from the one or more energy storage elements to the at. least one of the at least one load,
10. The meihod according to claim 5, further comprising:
monitoring the total power usage at one or more points in time during the nih control period ,
1 1 . The method according to claim 10, further comprising;
providing one or more energy storage elements configured to provide power to at least one of the at least one load, such that the total po wer usage can be higher than the total power output.
12. The meihod according to claim 1, wherein the control period is a n'h control period of a plurality of consecutive control periods, (a first control period, a second control period, ... , a (n~l)ih control period, the ntJl control period, a (n+l)ih control period, , , , ).
13. The method according to claim 1, further comprising determining a power generation level for the i n ; ] control period.
14. The method according to claim 13, wherein the power generation level for the (n+1 )ih control period is based on at least the total power usage for the ntn control period,
15. The method according to claim 13, wherein the power demand controller signals the energy management modul the power generation level for the (n+l)!h control period during the nth control period.
16. The method according to claim 15, wherein the power demand controller signals the energy management module the power generation level for the (n-H)th control period at. or before, an end of the nth control period.
17. The method according to claim 2, wherein each control period of the plurality of control periods has a time duration of Tcp.
18. The method according to claim 1 ,
wherein the at least one load is two or more loads, wherein the power demand controller controls one or more of a corresponding two or more power usages used by the two or more loads, wherein the total power usage is the total power usage used by the two or more loads.
19. The method according to claim 1 , wherein the at least one power generator is two or more power generators, wherein the energy management module controls one or more of a corresponding two or more power outputs of the two or more power generators, wherein the total power output is the total power output of the two or more generators,
20. The method according to claim 1 , wherein the at least one power generator is two or more power generators, wherein the energy management module controls one or more of a corresponding two or more power outputs of the two or more power generators, wherein the total power output is the total power output of the two or more generators.
21. The method according to claim. 14, wherein the power generation level for the (n+l)ii: control period is a greater of a mean value of the total power usage during the ηίΏ control period and the total power usage at a point in time during the n control period,
22. The method according to claim 21 , wherein the point in time during the n control period is an end of the control period.
23. The method according to claim 21, further comprising monitoring the total power usage during the n:h control period.
24. The method according to claim 23, further comprising calculating the mean value of the total power usage during the nth control period.
25. The method according to claim 1 , wherein the at least one power generator comprises one or more of the following: a wind turbine, a solar panel, a gas turbine, a fuel cell, a micro-turbine, a reciprocating engine, and a steam engine.
26. The method according to claim 1 , further comprising at least one feeder configured to provide the total output power to the at least one load, wherein each of the at least one power generator is connected to a feeder of the at least one feeder.
27. The method according to claim 1, wherein the at least one load comprises nodes of a plurality of computing infrastructures.
28. The method according to claim 27, wherein the nodes include one or more of the following: a server, a microprocessor, and an electronic device.
29. The method according to claim 26, wherein each of the at least one power generator is connected to the feeder via a corresponding at least one circuit breaker and/or power electronic interface.
30. The method according to claim 29, wherein the at least one feeder is connected to the at least one load via a second con'esponding at least one circuit breaker and/or power electronic interface.
3.1. The method according to claim 29, wherem the at least one circuit breaker and/or power electronic interface is coordinated by the energy management module.
32. The method according to claim 1, wherein the power generation level for the nth control period is based on at least a. total power usage for the (n-l)ih control period.
33. The method according to claim 31 , wherein the at least one feeder is interconnected to a utility main grid,
34. The method according to claim 33, wherein the at least one feeder is interconnected to the utility main grid via a point of common coupling.
35. The method according to claim 1, wherein the at least one load comprises at least one critical load.
36. The method according to claim 1, wherein the at least one load comprises at least one non-critical load,
37. The method according to claim 35, wherein the at least one power generator comprises one or more gas turbine and/or fuel cell, wherein the one or more gas turbine and/or fuel cell is allocated for the at least one critical load.
38. The method according to claim 35, wherein the at least one feeder is connected to the at least one load via a second corresponding at least one circuit breaker and/or power electronic interface, wherein each critical load of the at least one critical load is connected to a power distribution unit, wherein the power distribution unit is between one of the second at least one circuit breaker and/or power electronic interface and the each critical load.
39. The method according to claim 35, wherein the at least one critical load is a data center load.
40. The method according to claim 39, wherein the data center load comprises a plurality of server clusters, wherein the power demand controller manages the plurality server clusters by
i. tracking a job running status of each server cluster of the plurality server clusters:
ii. tracking power demand of each server cluster of the plurality of server clusters; and
iii. coordinating with job schedulers to optimize computing resource allocation.
41. The method according to claim 2, wherein the power demand controller signals the energy management module the power generation level for the nth control period by providing the energy management module with a power generation adjustment for the nth control period, wherein the energy management module controls the one or more of the at least one generator to adjust the total power output during the ηω control period such that the
power generation level for the nEh control period is the power generation level for the (n l)th control period adjusted by the power generation adjustment for the nth control period.
42. The method according to claim 36, wherein one or more of the at least one non-critical load is one or more data processing machines.
43. The method according to claim 36, wherein the at least one power generator comprises one or more wind turbine and/or solar panel, wherein the one or more wind turbine and/or solar panel are allocated to power the at least one non-critical load.
44. The method according to claim I , wherein the at feast one feeder is connected to the at least one load via a second corresponding at least one circuit breaker and/or power electronic interface.
45. The method according to claim 44, further comprising:
providing one or more energy storage elements are configured to provide power to at least one of the at least one load, such that the total power usage can he higher than the total power output,
46. The method according to claim 11 , wherein the one or more energy storage elements comprise a UPS system.
47. The method according to claim 1 1 , wherein the one or more energy storage elements provide stored energy during a startup time during which a power output of one of the at least one power generator ramps up when total power usage is higher than total power output.
48. The method according to claim 41 , wherein during the startup time, the power output of one of the at least one power generator ramps up to contribute to the power generation level of the nm control period being adjusted up from the power generation level of the (n~iyh control period; during which the total power output is lower than the power generation level of the ntri control period.
49. The method according to claim 47, wherein the UPS system comprises a centralized UPS system,
50. The method according to claim 47, wherein the UPS system comprises a distributed UPS system.
51. The method according to claim 3, wherein the power demand controller signals the energy management module the power generation level for the (n+l)th control period by providing a power generation adjustment for the (rs÷l)th control period, wherein the power generation level for the (n-H)ih control period is the power generation level for the nih control period adjusted by the power generation adjustment for the {rHT fh control period.
52. The method according to claim 2, wherein the total power usage over two or more control periods is a square- wave-like curve.
53. The method according to claim 52, wherein the square-wave-like curve differs from an ideal square wave due to a transition from the power generation level for the nth control period to the power genera don level for the (n÷l)E con trol period not being instantaneous, as changing an output power for one of the at least one power generator takes time to ramp up to a higher value or ramp down to a lower value.
54. The method according to claim 2, wherein the total power usage over two or more control periods is a curve selected from the following: a sine curve, a sine-like curve, a triangle curve, a triangle-like curve, a saw tooth curve, and a saw tooth-like curve,
55. The method according to claim 2, wherein each control period has a time duration in the range of 5 minutes to 20 minutes.
56. The method according to claim 2, wherein each control period has a time duration selected from the group consisting of the following: in the range of 5 minutes to 10
minutes, in the range of 10 minutes to 1.5 minutes, in the range of 15 minutes to 20 minutes, in the range of 5 minutes to 15 minutes, and in the range of 10 minutes to 20 minutes.
57. The method according to claim 7, wherein when the total power usage of the at least one load during the nth control period exceeds the power generation level for the nlh control period, the power deinand controller adj usts one or more of the at least one load during the nih control period so as to maintain the total power usage equal to or less than the power generation level for the nih control period.
58. The method according to claim 57, wherein when the total power usage of the at least one load during the nih control period does not exceed the power generation level for the nt!' control period, the power demand controller does not adjust the one or more of the at least one load during the ntn control period.
59. The method according to claim 10, wherein the at least one load comprises at least one node, wherein when the total power usage during the nth control period exceeds the power generator level for the nih control period, the power demand controller adjusts the one or more of the at least one Load so as to maintain the total power usage to be equal to or less than the power generator level for the nth control period by timing a node performance level of one or more of the at least one node.
60. The method according to claim 59, wherein tuning the node performance level of one or more of the at least one node is accomplished by adjusting a node frequency of the one or more of the at least one node.
61. The method according to claim 60, wherein adj usting a node frequency of the one or more of the at least one node comprises adjusting the node frequency of the one or more of the at least one node in a round-robin manner.
62. The method according to claim 60, wherein adjusting a node frequency of the one or more of the at least one node comprises adjusting the node frequency of the one or more of the at least one node based on priorities of users of the at least one loads.
63. The method according to claim 59, wherein the at least one load, comprises a plurality of nodes.
64. The method according to claim 62, wherein the at least one node comprises a plurality of nodes, wherein each node is associated with a priority of at least two priorities, wherein adjustment of a frequency for eac node is based on the priority of the node.
65. The method according to claim 64, wherein a group of nodes with higher priority are adjusted to run at a higher frequency than a second group of nodes with lower priority.
66. The method according to claim 1, wherein the power demand controller and the energy management module comprise a single processor.
67. The method according to claim 10, wherein the one or snore points in time is a plurality of points in time that occurs every Tc seconds.
68. The method according to claim 11, wherein when the one or more storage elements provide power to at least one of the at least one load during the (n~l)Ji control period, the power demand controller communicates with the energy management module to provide the energy management module wit a bonus power budget for the n control period, wherein the energy management module controls the one or more of the at least, one generator to adjust the total power output during the n control period, such that the power generation level for the Μ control period is the power generation level for the (n-i)ih control period adjusted by the power generation level adjustment for the nth control period and adjusted for the bonus power budget for the ;f " control period,
69. The method according to claim 68, wherein the power level generation and adjustment for the n h control period better matches the total power output to the total power usage, wherein the bonus power budget for the n ' control period causes the total power output to provide extra power output for recharging one or more energy storage elements.
70. The method according to claim 1. wherein at leasi one generator is within 10 miles of the at least one load,
71 . The method according to claim 1 1 , wherein Tc is a clock cycle,
72. The method according to claim 71, wherein Tc is one second.
73. The method according to claim 60, wherein the power demand controller keeps the timing statistics of each active job during runtime, wherein during the n control period, wherein the at least one load comprises a computing node, wherein the computing node spends different control periods r, on different frequency ffDS, wherein a normalized progress of a job at the computing node is defined as:
where F is a full node frequency without adjusting. Ί ΐΜ is a time the job spends when the node frequency is adjusted, and T is a time the job would spend if the node frequency is not adjusted.
74. The method according to claim 73, further comprising evaluating a degree of job slowdown, where system throughput (STP) is defined as a mean NP across all jobs, as:
J
"
75. The method according to claim 74, wherein at an end of the nlh control period, if STP is lower than a preset goal, the power demand controller signals the energy management module with a load bonus power budget for the (n+l)th control period such that the power generation level for the (η-Η)ίη control period is increased by the load bonus power budget for the (η÷ 1)ϋι control period, wherein the load bonus power budget is available to provide extra power to the at least one load during the in- 1 f' control period.
76. The method according to claim 75, wherein di power demand controller enables CPU frequency boost mode on each node.
77. The method according to claim 74, further comprising sorting short jobs using ob runtime estimates, where short jobs are tasks that will finish before the n,h control period ends.
78. The method according to claim 77, further comprising determining all the short jobs that have low normalized progress, wherein the power demand controller checks available UPS stored energy arid uses bin-packing to power a group of selected short jobs.
79. The method according to claim I , wherein the energy management module controls the one or more of the at least one power outputs by adjusting a power output of at least one of the one or more of the at least one power generators with frequency droop control,
80. The method according to claim 44, wherein frequency droop control changes a power bus frequency to adjust the power output.
81. A non-transitory computer readable medium containing a set of instructions that when executed cause a computer to perform a method for managing a power generation system and at least one load, comprising;
controlling one or more of at least one power usage used by a corresponding at least one load during a control period, wherein the one or more of the at least one power usage are controlled such that a total power usage used by the at least one load during the control period is less than or equal to a power generation level for the control period;
controlling one or more of at least one power output of a corresponding at least one power generator during the control period, wherein the one or more of the at least one power output are controlled such that a total power output of the at least one power generator during the nlh control period is at least the power generation ievel for the nt!1 control period.
82, A system for managing a power generation system and at least one load, comprising:
a power demand controller; and
a energy .management, module,
wherein the power demand controller is configured to control one or more of at least one power usage used by a corresponding at least one load during a control period, wherein the power demand controller is configured to control the one or more of the at least one power usage such that a total power usage used by the at least one load during the control period is less than or equal to a power generation level for the control period;
wherein the energy management module is configured to control one or more of at least one power output of a corresponding at least one power generator during the control period, wherein the energy management module is configured to control the one or more of the at least one power output such that a total power output of the at least one power generator during the nth control period is at least the power generation level for the nth control period,
83, The method according to claim 2, wherein the nih control period includes a ramp up period during which the power generation level for the nlh control period is higher than the power generation level for the (n~H)i control period, wherein the ramp up period is a period the one or more of at least one power generator are ramping up the total power output until the toial power output reaches the power generation, level for the ntri control period,
84, The method according to claim 83, wherein during the ramp up period the total power output is below the power generation level for the n l control period,
85, The method according to claim 84, further comprising:
controlling the one or more of at least one load to maintain the total power usage at or helow the total power output during the ramp up period.
86. The method according to claim 84, further comprising:
providing a difference between the power generation level during the nih control period and the total power usage to the at least one load during the ramp up period via one or more energy storage units.
87. The method according to claim. 84, further comprising:
controlling the one or more of at least one load to maintain the total power usage at or below the total power output during the ramp up period; and
providing at least a portion of the difference between the power generation level during the n; control period and the total power usage to the at least one load during the ramp up period via one or more energy storage units,
such that the total power usage is below the total power outpu during the ramp up period.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/770,001 US9800052B2 (en) | 2013-02-22 | 2014-02-24 | Method and apparatus for power management using distributed generation |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201361768209P | 2013-02-22 | 2013-02-22 | |
| US61/768,209 | 2013-02-22 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014130972A1 true WO2014130972A1 (en) | 2014-08-28 |
Family
ID=51391896
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2014/018115 Ceased WO2014130972A1 (en) | 2013-02-22 | 2014-02-24 | Method and apparatus for power management using distributed generation |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US9800052B2 (en) |
| WO (1) | WO2014130972A1 (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10142401B2 (en) | 2015-04-12 | 2018-11-27 | Nokia Of America Corporation | Management of computing infrastructure under emergency peak capacity conditions |
| JP6591133B1 (en) * | 2018-06-14 | 2019-10-16 | 三菱電機株式会社 | Power management system |
| WO2019239664A1 (en) * | 2018-06-14 | 2019-12-19 | 三菱電機株式会社 | Electric power management system |
| WO2021016068A1 (en) * | 2019-07-19 | 2021-01-28 | Equinix, Inc. | Data center energy management system |
| US11011768B2 (en) | 2016-01-25 | 2021-05-18 | Microsoft Technology Licensing, Llc | Power modulation for fuel cell powered datacenters |
| US11574372B2 (en) | 2017-02-08 | 2023-02-07 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| WO2023215215A1 (en) * | 2022-05-03 | 2023-11-09 | Enphase Energy, Inc. | Methods and apparatus for auditing and tracking clean energy flow amongst distributed energy resources |
| US11907029B2 (en) | 2019-05-15 | 2024-02-20 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| US12207433B2 (en) | 2020-03-21 | 2025-01-21 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| CN121349600A (en) * | 2025-12-19 | 2026-01-16 | 贵州大学 | A method for dynamic migration of virtual machines oriented towards energy coordination |
Families Citing this family (74)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8849469B2 (en) | 2010-10-28 | 2014-09-30 | Microsoft Corporation | Data center system that accommodates episodic computation |
| US10074984B2 (en) * | 2013-04-09 | 2018-09-11 | Nec Corporation | Electric power control system |
| US10852805B2 (en) * | 2017-07-30 | 2020-12-01 | Nautilus Data Technologies, Inc. | Data center total resource utilization efficiency (TRUE) system and method |
| US11847007B2 (en) * | 2014-01-09 | 2023-12-19 | Nautilus True, Llc | Data center total resource utilization efficiency (TRUE) system and method |
| US10447074B2 (en) * | 2014-02-27 | 2019-10-15 | Hewlett Packard Enterprise Development Lp | Behavior modification of a power supply in response to a detected condition |
| US20150339266A1 (en) * | 2014-05-23 | 2015-11-26 | King Fahd University Of Petroleum And Minerals | Ranking method for hybrid renewable distributed generation systems |
| US10234835B2 (en) | 2014-07-11 | 2019-03-19 | Microsoft Technology Licensing, Llc | Management of computing devices using modulated electricity |
| US20160011617A1 (en) * | 2014-07-11 | 2016-01-14 | Microsoft Technology Licensing, Llc | Power management of server installations |
| US9933804B2 (en) | 2014-07-11 | 2018-04-03 | Microsoft Technology Licensing, Llc | Server installation as a grid condition sensor |
| US9985437B2 (en) * | 2014-09-26 | 2018-05-29 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
| US10423184B1 (en) * | 2014-12-16 | 2019-09-24 | Amazon Technologies, Inc. | Operating temperature-based data center design management |
| KR101809787B1 (en) * | 2015-03-10 | 2017-12-15 | 엘에스산전 주식회사 | Electricity providing system including battery energy storage system |
| US10148092B2 (en) * | 2016-01-27 | 2018-12-04 | Alliance For Sustainable Energy, Llc | Real time voltage regulation through gather and broadcast techniques |
| US11455021B2 (en) * | 2016-08-18 | 2022-09-27 | Cato | Datacenter power management using AC and DC power sources |
| US10585468B2 (en) * | 2016-08-18 | 2020-03-10 | Virtual Power Systems, Inc. | Datacenter power management using dynamic redundancy |
| US10516269B2 (en) | 2016-11-16 | 2019-12-24 | Alliance For Sustainable Energy, Llc | Real time feedback-based optimization of distributed energy resources |
| US10221769B2 (en) | 2016-12-02 | 2019-03-05 | General Electric Company | System and apparatus for gas turbine combustor inner cap and extended resonating tubes |
| US10228138B2 (en) | 2016-12-02 | 2019-03-12 | General Electric Company | System and apparatus for gas turbine combustor inner cap and resonating tubes |
| US10220474B2 (en) | 2016-12-02 | 2019-03-05 | General Electricd Company | Method and apparatus for gas turbine combustor inner cap and high frequency acoustic dampers |
| US10935945B2 (en) * | 2017-07-19 | 2021-03-02 | Arizona Public Service Company | Methods and apparatus for power generation and distribution |
| US11005288B2 (en) * | 2017-07-19 | 2021-05-11 | Arizona Public Service Company | Methods and apparatus for power generation and distribution |
| US11418054B2 (en) * | 2017-07-19 | 2022-08-16 | Arizona Public Service Company | Methods and apparatus for power generation and distribution |
| US11962157B2 (en) * | 2018-08-29 | 2024-04-16 | Sean Walsh | Solar power distribution and management for high computational workloads |
| EP4451551A3 (en) | 2018-01-11 | 2025-01-22 | Lancium Llc | Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources |
| US11544782B2 (en) | 2018-05-06 | 2023-01-03 | Strong Force TX Portfolio 2018, LLC | System and method of a smart contract and distributed ledger platform with blockchain custody service |
| US11550299B2 (en) | 2020-02-03 | 2023-01-10 | Strong Force TX Portfolio 2018, LLC | Automated robotic process selection and configuration |
| WO2019217323A1 (en) | 2018-05-06 | 2019-11-14 | Strong Force TX Portfolio 2018, LLC | Methods and systems for improving machines and systems that automate execution of distributed ledger and other transactions in spot and forward markets for energy, compute, storage and other resources |
| US11669914B2 (en) | 2018-05-06 | 2023-06-06 | Strong Force TX Portfolio 2018, LLC | Adaptive intelligence and shared infrastructure lending transaction enablement platform responsive to crowd sourced information |
| US12412120B2 (en) | 2018-05-06 | 2025-09-09 | Strong Force TX Portfolio 2018, LLC | Systems and methods for controlling rights related to digital knowledge |
| US11196258B2 (en) | 2018-08-03 | 2021-12-07 | Sacramento Municipal Utility District | Energy control and storage system for controlling power based on a load shape |
| US11025060B2 (en) | 2018-09-14 | 2021-06-01 | Lancium Llc | Providing computational resource availability based on power-generation signals |
| US11016553B2 (en) | 2018-09-14 | 2021-05-25 | Lancium Llc | Methods and systems for distributed power control of flexible datacenters |
| US11031787B2 (en) | 2018-09-14 | 2021-06-08 | Lancium Llc | System of critical datacenters and behind-the-meter flexible datacenters |
| US10873211B2 (en) * | 2018-09-14 | 2020-12-22 | Lancium Llc | Systems and methods for dynamic power routing with behind-the-meter energy storage |
| US11133705B2 (en) | 2018-09-27 | 2021-09-28 | Amazon Technologies, Inc. | Facility internal cooling grid |
| US10734837B2 (en) * | 2018-09-27 | 2020-08-04 | Amazon Technologies, Inc. | Facility power distribution grid |
| US10367353B1 (en) | 2018-10-30 | 2019-07-30 | Lancium Llc | Managing queue distribution between critical datacenter and flexible datacenter |
| US11031813B2 (en) | 2018-10-30 | 2021-06-08 | Lancium Llc | Systems and methods for auxiliary power management of behind-the-meter power loads |
| JP7110963B2 (en) * | 2018-12-11 | 2022-08-02 | トヨタ自動車株式会社 | Wind power generation system using a hovering kite-shaped structure |
| US10452127B1 (en) | 2019-01-11 | 2019-10-22 | Lancium Llc | Redundant flexible datacenter workload scheduling |
| US11287863B2 (en) | 2019-02-06 | 2022-03-29 | Google Llc | Fuel cell power management |
| US10923750B2 (en) * | 2019-02-14 | 2021-02-16 | Doosan Fuel Cell America, Inc. | DC voltage brownout protection for parallel-connected fuel-cell power plants in islanded mode |
| US11677265B2 (en) | 2019-02-25 | 2023-06-13 | Eaton Intelligent Power Limited | Controllers for uninterruptible power supplies and methods of operating the same |
| US11128165B2 (en) | 2019-02-25 | 2021-09-21 | Lancium Llc | Behind-the-meter charging station with availability notification |
| US11239665B2 (en) * | 2019-02-25 | 2022-02-01 | Eaton Intelligent Power Limited | Grid-edge controllers for uninterruptible power supplies and methods of operating the same |
| JP7259184B2 (en) * | 2019-03-14 | 2023-04-18 | 株式会社ダイヘン | Power system and power controller |
| JP7243361B2 (en) * | 2019-03-25 | 2023-03-22 | 富士通株式会社 | Job scheduler and job schedule control method |
| CN110247425B (en) * | 2019-06-10 | 2025-09-19 | 中国电力科学研究院有限公司 | Wind power fluctuation stabilizing method and device for wind power plant |
| US11320893B2 (en) * | 2019-06-25 | 2022-05-03 | University Of Tennessee Research Foundation | Systems and methods for solar energy-based computation |
| US11228180B2 (en) * | 2019-07-09 | 2022-01-18 | Alliance For Sustainable Energy, Llc | Hierarchical distributed voltage regulation |
| US11508021B2 (en) * | 2019-07-22 | 2022-11-22 | Vmware, Inc. | Processes and systems that determine sustainability of a virtual infrastructure of a distributed computing system |
| US11868106B2 (en) | 2019-08-01 | 2024-01-09 | Lancium Llc | Granular power ramping |
| US11397999B2 (en) | 2019-08-01 | 2022-07-26 | Lancium Llc | Modifying computing system operations based on cost and power conditions |
| CN110705866B (en) * | 2019-09-27 | 2022-04-29 | 新奥数能科技有限公司 | Method for evaluating matching degree of energy production equipment configuration and load of comprehensive energy system |
| US10618427B1 (en) | 2019-10-08 | 2020-04-14 | Lancium Llc | Behind-the-meter branch loads for electrical vehicle charging |
| US11016458B2 (en) | 2019-10-28 | 2021-05-25 | Lancium Llc | Methods and systems for adjusting power consumption based on dynamic power option agreement |
| US11735919B2 (en) | 2019-11-27 | 2023-08-22 | Robert F. Cruickshank, III | Optimized load shaping system, method and apparatus for optimizing production and consumption of energy |
| US12355289B2 (en) | 2019-11-27 | 2025-07-08 | Robert F. Cruickshank | Autonomous battery charging and discharging system using a load shaping signal |
| US11196256B2 (en) * | 2019-11-27 | 2021-12-07 | Mitsubishi Electric Research Laboratories, Inc. | Methods and systems for a holistic framework for parameter coordination of interconnected microgrid systems against disasters |
| US11982993B2 (en) | 2020-02-03 | 2024-05-14 | Strong Force TX Portfolio 2018, LLC | AI solution selection for an automated robotic process |
| CN111342485B (en) * | 2020-02-24 | 2023-07-07 | 国网浙江嘉善县供电有限公司 | A distributed power distribution method based on edge computing |
| US11042948B1 (en) | 2020-02-27 | 2021-06-22 | Lancium Llc | Computing component arrangement based on ramping capabilities |
| CN113270879B (en) * | 2020-07-31 | 2022-08-05 | 三峡大学 | Dynamic partitioning method based on modularity |
| CA3189144A1 (en) | 2020-08-14 | 2022-02-17 | Andrew GRIMSHAW | Power aware scheduling |
| EP4374669A4 (en) | 2021-07-19 | 2025-05-21 | Soluna Computing, Inc. | MODULAR DATA CENTER |
| CN113765125B (en) * | 2021-09-23 | 2023-06-30 | 北方工业大学 | Cluster power distribution method for hydrogen energy storage system |
| US12602304B2 (en) * | 2022-04-26 | 2026-04-14 | Hewlett Packard Enterprise Development Lp | Self-learning green application workloads |
| JP7824837B2 (en) * | 2022-07-01 | 2026-03-05 | 株式会社東芝 | Information processing device, information processing method, computer program, and information processing system |
| CN115411833B (en) * | 2022-10-14 | 2025-02-11 | 安徽农业大学 | Multi-mode simplified operation control method for photovoltaic-hybrid energy storage-grid-connected and off-grid systems |
| CN115912428A (en) * | 2022-12-20 | 2023-04-04 | 国网上海市电力公司 | Configuration method of energy storage devices in resilient distribution network based on global sensitivity index |
| CN115833117B (en) * | 2023-02-13 | 2023-04-25 | 广东电网有限责任公司中山供电局 | Distributed unit power control method, device, equipment and medium |
| CN116544953A (en) * | 2023-05-19 | 2023-08-04 | 深圳职业技术学院 | Flexible resource robust scheduling method for large-scale data center micro-grid group |
| US12373188B2 (en) | 2023-07-06 | 2025-07-29 | Bank Of America Corporation | Systems, methods, and apparatuses for improving computer energy consumption and computer processing by implementing a pluggable carbon emission gateway |
| CN120237793B (en) * | 2025-05-28 | 2025-10-10 | 微控飞轮(沈阳)技术开发有限公司 | An energy adaptive control method for a hydrogen fuel power generation flywheel UPS system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007129873A (en) * | 2005-11-07 | 2007-05-24 | Nippon Telegr & Teleph Corp <Ntt> | Energy demand management apparatus and method |
| US20110035073A1 (en) * | 2009-01-14 | 2011-02-10 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
| JP2012060789A (en) * | 2010-09-09 | 2012-03-22 | Toshiba Corp | Supply-demand balance control device |
| US20130006431A1 (en) * | 2011-06-29 | 2013-01-03 | Acciona Energia, S.A. | Procedure for supply control and storage of power provided by a renewable energy generation plant |
| US20130046415A1 (en) * | 2011-08-16 | 2013-02-21 | Peter M. Curtis | Programmable power management controller |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2728091A1 (en) | 2008-06-25 | 2010-01-21 | Versify Solutions, Inc. | Aggregator, monitor, and manager of distributed demand response |
| US20100191998A1 (en) | 2009-01-23 | 2010-07-29 | Microsoft Corporation | Apportioning and reducing data center environmental impacts, including a carbon footprint |
| US8600572B2 (en) * | 2010-05-27 | 2013-12-03 | International Business Machines Corporation | Smarter-grid: method to forecast electric energy production and utilization subject to uncertain environmental variables |
| ES2617753T3 (en) * | 2010-07-29 | 2017-06-19 | Spirae Llc | Dynamic control system of distributed electricity networks |
| US9200621B2 (en) * | 2012-02-16 | 2015-12-01 | Spyros James Lazaris | Transmission system for delivery of dynamic demand response in a renewable energy-based electricity grid infrastructure |
| US9887544B2 (en) * | 2013-04-15 | 2018-02-06 | Lockheed Martin Corporation | System and method for mathematical predictive analytics and computational energy modeling |
-
2014
- 2014-02-24 US US14/770,001 patent/US9800052B2/en active Active
- 2014-02-24 WO PCT/US2014/018115 patent/WO2014130972A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007129873A (en) * | 2005-11-07 | 2007-05-24 | Nippon Telegr & Teleph Corp <Ntt> | Energy demand management apparatus and method |
| US20110035073A1 (en) * | 2009-01-14 | 2011-02-10 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
| JP2012060789A (en) * | 2010-09-09 | 2012-03-22 | Toshiba Corp | Supply-demand balance control device |
| US20130006431A1 (en) * | 2011-06-29 | 2013-01-03 | Acciona Energia, S.A. | Procedure for supply control and storage of power provided by a renewable energy generation plant |
| US20130046415A1 (en) * | 2011-08-16 | 2013-02-21 | Peter M. Curtis | Programmable power management controller |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10367881B2 (en) | 2015-04-12 | 2019-07-30 | Nokia Of America Corporation | Management of computing infrastructure under emergency peak capacity conditions |
| US10142401B2 (en) | 2015-04-12 | 2018-11-27 | Nokia Of America Corporation | Management of computing infrastructure under emergency peak capacity conditions |
| US11011768B2 (en) | 2016-01-25 | 2021-05-18 | Microsoft Technology Licensing, Llc | Power modulation for fuel cell powered datacenters |
| US12437349B2 (en) | 2017-02-08 | 2025-10-07 | Upstream Data Inc. | Blockchain mining system with load modulation |
| US12462312B2 (en) | 2017-02-08 | 2025-11-04 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| US12437348B2 (en) | 2017-02-08 | 2025-10-07 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| US11574372B2 (en) | 2017-02-08 | 2023-02-07 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| WO2019239664A1 (en) * | 2018-06-14 | 2019-12-19 | 三菱電機株式会社 | Electric power management system |
| JP6591133B1 (en) * | 2018-06-14 | 2019-10-16 | 三菱電機株式会社 | Power management system |
| US11907029B2 (en) | 2019-05-15 | 2024-02-20 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| US12040611B2 (en) | 2019-07-19 | 2024-07-16 | Equinix, Inc. | Data center energy management system using an energy flow configuration |
| WO2021016068A1 (en) * | 2019-07-19 | 2021-01-28 | Equinix, Inc. | Data center energy management system |
| US12207433B2 (en) | 2020-03-21 | 2025-01-21 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| WO2023215215A1 (en) * | 2022-05-03 | 2023-11-09 | Enphase Energy, Inc. | Methods and apparatus for auditing and tracking clean energy flow amongst distributed energy resources |
| CN121349600A (en) * | 2025-12-19 | 2026-01-16 | 贵州大学 | A method for dynamic migration of virtual machines oriented towards energy coordination |
Also Published As
| Publication number | Publication date |
|---|---|
| US9800052B2 (en) | 2017-10-24 |
| US20160013652A1 (en) | 2016-01-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9800052B2 (en) | Method and apparatus for power management using distributed generation | |
| Li et al. | Enabling distributed generation powered sustainable high-performance data center | |
| US20220366517A1 (en) | Modifying computing system operations based on cost and power conditions | |
| US11581734B2 (en) | Methods and systems for adjusting power consumption based on a dynamic power option agreement | |
| Liu et al. | HEB: Deploying and managing hybrid energy buffers for improving datacenter efficiency and economy | |
| Peng et al. | Exploiting renewable energy and UPS systems to reduce power consumption in data centers | |
| Li et al. | Enabling datacenter servers to scale out economically and sustainably | |
| Li et al. | iSwitch: Coordinating and optimizing renewable energy powered server clusters | |
| Wang et al. | Energy storage in datacenters: what, where, and how much? | |
| US20160109916A1 (en) | Method and apparatus for sustainable scale-out datacenters | |
| Li et al. | Towards sustainable in-situ server systems in the big data era | |
| Li et al. | Managing green datacenters powered by hybrid renewable energy systems | |
| Zheng et al. | Hybrid energy storage with supercapacitor for cost-efficient data center power shaving and capping | |
| Liu et al. | RE-UPS: an adaptive distributed energy storage system for dynamically managing solar energy in green datacenters | |
| Li et al. | Managing server clusters on renewable energy mix | |
| Peng et al. | Energy efficient data centers powered by on-site renewable energy and UPS devices | |
| CN107086587B (en) | A kind of data center's dominant eigenvalues control method based on Demand Side Response | |
| Pahlevan et al. | Joint computing and electric systems optimization for green datacenters | |
| Peng et al. | REDUX: Managing renewable energy in data centers using distributed UPS systems | |
| Li et al. | Oasis: Scaling out datacenter sustainably and economically | |
| Liu et al. | Exploring highly dependable and efficient datacenter power system using hybrid and hierarchical energy buffers | |
| Liu et al. | Towards an adaptive multi-power-source datacenter | |
| Cai et al. | GreenHetero: Adaptive power allocation for heterogeneous green datacenters | |
| Li et al. | Coordinating workload balancing and power switching in renewable energy powered data center | |
| Xiang et al. | Harvesting-aware energy management for multicore platforms with hybrid energy storage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14753596 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14770001 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14753596 Country of ref document: EP Kind code of ref document: A1 |






