WO2014094985A1 - A method of out of step detection in electrical power network - Google Patents

A method of out of step detection in electrical power network Download PDF

Info

Publication number
WO2014094985A1
WO2014094985A1 PCT/EP2013/003668 EP2013003668W WO2014094985A1 WO 2014094985 A1 WO2014094985 A1 WO 2014094985A1 EP 2013003668 W EP2013003668 W EP 2013003668W WO 2014094985 A1 WO2014094985 A1 WO 2014094985A1
Authority
WO
WIPO (PCT)
Prior art keywords
frequency
local
difference
terminal
remote terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2013/003668
Other languages
French (fr)
Inventor
Jaroslaw Krata
Przemyslaw Balcerek
Zoran Gajic
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Technology AG
Original Assignee
ABB Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Technology AG filed Critical ABB Technology AG
Publication of WO2014094985A1 publication Critical patent/WO2014094985A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/48Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to loss of synchronism
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/18Indicating phase sequence; Indicating synchronism

Definitions

  • the invention relates to a method of detecting out of step presence in an electric power network.
  • the electrical power network may be formed from two separate power systems connected together by a multiphase transmission line or from one power system and transmission line to which a generator is connected.
  • the invention can be used also in the power network with multiple transmission lines connected to many generators, motors and loads, and in which a part of a system needs to be isolated in case of an occurrence of out of step.
  • the invented method is used to protect a power system against the out of step condition.
  • the method detects the out of step condition by utilizing frequency differences between current and voltages in local and remote locations.
  • the known methods for detecting out of step in a power system and/or transmission line are mainly based on measurements from one end of the power system and/or transmission line.
  • an impedance method utilized local measurements of current and voltage of the system in order to calculate impedance.
  • the impedance trajectory is monitored and basing on certain allowed area of operation the condition of the appearance of the out of step is determined.
  • Power swing is located on a motor side if the frequency of the current measured is higher than the frequency of the voltage. Conversely, power swing is located on a generator side, if the frequency of the current is lower than the frequency of the voltage.
  • the method can determine the described phenomenon only if the protected motor/generator is the source of the power swing. Additionally, the method utilizes relative angle criteria, which require additional settings for determination of increasing or decreasing angle.
  • the detection of out of step is based on measurements from two locations in the electrical power system. Voltage measurements may be received from the first and the second IED. The measurements may be time synchronized and utilized to calculate the difference of the angles of the voltage positive sequences between the first and the second location in the electrical power system. From the difference in angle between a local and remote IED a slip frequency and acceleration may be obtained. This allows the trajectory of slip frequency and acceleration to be monitored and compared to the operating region and a swing detection region.
  • the angle difference, slip frequency, and acceleration may be used to detect an out of step condition in the electrical power system and/or power swing between the first location and the second location in the electrical power system.
  • the angle difference, slip frequency and acceleration may also be used to predict the occurrence of out of step conditions in the future.
  • calculating the second derivative i.e. acceleration can cause numerical errors
  • problem associated with the differentiation is the amplification of high frequency noise or significant computation delay.
  • Another disadvantage of this solution is that the efficiency of the method depends on the correct setting of the operating region and swing detection region being made.
  • the essence of the inventive method for detecting out of step presence in an electric power network involves the use of a protection device having means for measurement voltage, VA, VB and currents signals, IA, IB of electric lines at a local and remote terminals of the electric network and having a computer means for data processing and calculating a frequency of current f n and a frequency of voltage f m at the local terminal and a frequency of current f, r and a frequency of voltage f Ur at the remote terminal, calculating a value of a frequency difference Afi at local terminal and a value of a frequency difference Af r at remote terminal, is that it performs the following steps:
  • Critl has a form:
  • abs( f ) is the absolute value of frequency difference in local terminal
  • fvaiue thr is a threshold value for frequency difference in local terminal set by a user
  • Crit2 has a form:
  • ai - is monotonicity coefficient of the frequency difference for the local terminal
  • a r - is monotonicity coefficient of the frequency difference for a remote terminal
  • fdirjhr - is a threshold value for monotonicity coefficient set by a user
  • Af r - is frequency difference at remote terminal
  • Crit4 has a form:
  • Af - is value of difference of frequency differences in local and remote terminal
  • abs( f) - is absolute value of difference of frequency differences in local and remote terminal, fdiff hr - is a threshold value for difference of frequency difference setting by a user;
  • a monotonicity coefficient a t of the frequency difference for the local terminal is calculated according a numerical implementation of the Least Squares method according to formulas:
  • a monotonicity coefficient a r of the frequency difference for remote terminal is calculated according a numerical implementation of Least Squares method according to formulas:
  • n - number of samples used in the calculation typically set as 5, t k - k-time instant, i - number of iteration in formula.
  • a difference of frequency differences Af in local and remote terminal is calculated in the following way:
  • Af Af, - Af r
  • Afi - is frequency difference at local terminal
  • Af r - is frequency difference at remote terminal.
  • a device for implementing the method according to claims 1-3 of out of step detection in an electric power network comprising means for measuring electric data in a local and a remote terminal and a computer means for processing the measured data in the form of a protection relay, is that it also comprises the following means embedded in the functional modules of the protection system of the protection relay,
  • Crit1 , Crit2, Crit3, Crit4 are embedded in an out of step detection module and in a setting module of the protection system
  • the input of the out of step detection module is connected with the setting module and with a frequency differences calculating module.
  • the protection relay has a form of Intelligent Electronic Device IED.
  • the Intelligent Electronic Device IED is IED670 produced by ABB company.
  • the local and remote terminals are electrically connected by communications link through protective relays.
  • a computer program product comprising computer code which when executed in a computing device caries out of the steps of a method according to the claims 1-3.
  • the invented method has a number of advantages over other known methods.
  • the set of different criteria ensures that the method does not cause false alarm signals.
  • the method is easily configured as it only requires a few settings.
  • Fig.1 - shows schematically the first electrical power network with two power systems
  • Fig.2 the second electrical power network with one power system and one generator
  • Fig.4 - a schematic diagram of a protection relay device adapted to execute the method according to the invention
  • Fig.5 the sequence of actions performed to execute the method according to the invention
  • Fig.6 the details of step S6 from fig.5,
  • Fig.7 diagram of out of step determination for the function of frequency differences in the time domain.
  • the invention is presented in exemplary embodiments where three different electrical power networks are used.
  • the electrical power network has two power systems, a first power system PS1 and a second power systems PS2.
  • the two power systems PS1 and PS2 are connected together by a three-phase transmission line 1.
  • the transmission line is equipped with two measuring terminals, a first local terminal A and the second remote terminal B.
  • Local terminal A can also be the remote terminal B where the remote terminal B plays the role of local terminal A.
  • Each of the terminals have an electrical connection with commonly known protection relays 2.
  • the sensors 3 for measuring voltage and current from the power systems PS1 and PS2 are located. Such sensors 3 may be connected to the protection relays 2, or other microcomputer devices for gathering and processing the measured data.
  • each of the relays 2 has special modules for detecting an out of step condition in the power system PS1 or PS2. The details of such module are explained in other parts of the description.
  • Both protection relays 2 have communications means for providing communication link between them, which for example may be a wire link 4. Instead of wire link 4 the communication may be realized by wireless connection means.
  • the electrical power network has the power system PS1 which is connected with the generating unit 5 through transmission line 1.
  • the local terminal A is located directly in powers system PS1 , which is indicated in a symbolic way placing the letter A in the box PS1
  • the remote terminal B is located on the line 1 between the power system PS1 and the generating unit 5.
  • the terminals A and B are connected with the protection relays 2 playing a similar role as that which was described in the first embodiment of the invention.
  • Both protection relays 2 have means for providing communication links between them, which for example may be a wire link 4. Instead of wire link 4 the communication may be realized by wireless connection means.
  • the electrical power network has a form of many transmission lines 1 where each of the lines connects the power systems PS1 ... PS N (where N is a natural number) with another power system, or with the generating units 5 or with loads 6.
  • the transmission lines 1 have local terminals A and remote terminal B located on at least one the same line 1.
  • the terminals A and B are connected with the protection relay 2 playing the similar role as in the first and second embodiment.
  • the communication may be realized by wireless connection means.
  • the first and the second protection relays 2 are used as devices for measuring, gathering and processing data. It is not important which protection relay 2 is the first or second relay because all relays used in the invented method are identical devices.
  • the relays 2 are electrically connected to the line 1 in the measuring terminals A or B directly with all three phases of the line 1. Located in each of the measured terminals is a means for measuring current and voltage and these means are electrically connected with means for receiving a value of the measured data, located in the protection relay 2.
  • the means for receiving values of the measured data in terminal A and B are placed in the protection system 21 of the relay 2, in which many functional modules are implemented.
  • a data acquisition module 22 for local measurement is placed in the protection system 21.
  • the data acquisition module 22 is synchronized by clock 23, placed inside the protection relay 2, with or without the protection system 21.
  • the data acquisition module 22 is connected with a data synchronization and integrity module 24 for time synchronization of local and remote measured data with utilization of the clock 23.
  • the data synchronization and integrity module 24 is connected with a communication module 25 for receiving remote measurements of voltage and current.
  • the data synchronization and integrity module 24 also is connected with a frequency calculation module 26 for calculating the frequency of measured signals and for processing the data for subsequent steps realized in the method.
  • the frequency calculation module 26 is connected with a frequency differences calculation module 27 for calculating the frequency differences between local and remote measured data.
  • the frequency differences calculation module 27 is connected with an out of step detection module 28 for comparing the values of the measured and processed data and to determine out of step detection criteria Critl , Crit2, Crit3, Crit4, implemented by the inventive method and for receiving the logic value of such a comparison.
  • the out of step detection module 28 is also connected with a setting module 29 for determining an occurrence of out of step phenomenon.
  • Module 28 is connected to signal 30 for activating a remedial action by sending an appropriate alarm from the out of step detection module 28 to outside the protection system 21.
  • the alarm signal 30 is also connected with the communication module 25 for communicating a detection of out of step.
  • the protection system 21 is connected also with means for visualizing the result of the detection, which is not presented in the drawing.
  • protection relay 2 contains many other functional modules which are not the subject of the invention.
  • Protection relay 2 could be any device in the form of an IED devices (Intelligent Electronic Device).
  • IED devices Intelligent Electronic Device
  • the IED device known under the name IED670 series produced by ABB is used as the protection relay 2.
  • the invention is realized in the following steps S1-S8
  • Step S1 Data measurement at a local terminal A and a remote terminal B
  • the three phase current l A and voltage V A signals at a local terminal A of a transmission line 1 are measured by common known sensors 3.
  • the measured signals from terminal A are transmitted to the device for measuring and processing data, this device being a first protection relay 2 equipped with protection system 21.
  • the measured signals are acquired by module 22.
  • Terminal A can be located on the transmission line between two power systems PS1 and PS2 as presented in fig.1 , or between the power system PS1 and generating unit 5 as presented in fig.2, or in any place of the multiterminal power system PS1 ... PSn as presented in fig.3.
  • the protection system 21 the values of the measured the three phase voltage signal V A and the measured three phase current signal l A are gathered and recorded.
  • the current l B and voltage V B signals at a remote terminal B of the transmission line 1 are measured by common known sensors 3.
  • the measured signals are acquired by module 22 of the protection system of the second protection relay 2 in the same way as for terminal A.
  • the signals l A, l B V A, V B are sampled and digitalized using the protection relay 2.
  • sampling frequency f s can be fixed or variable and it is established by user - typical values of sampling frequency are between 1 kHz-10kHz.
  • the three phase measured signals l B and V B are transmitted from terminal B to the terminal A for further processing utilizing communication link 4.
  • the measured signals are received by a communication module 25 of protection system 21 of the first protection relay 2.
  • the protection system 21 of the first protection relay 2 the values of the received signals at the terminal B are gathered and recorded.
  • step S3 which is executed in module 24 of protection system 21 of protection relay 2, the data from local terminal A and the remote terminal B is time-synchronized in order to run further processes on the data with the same time stamps.
  • the data is synchronized according to the clock 23.
  • a frequency of current and a frequency of voltage from both terminals A and B is calculated using the data obtained in step 3.
  • the calculation takes place in frequency calculation module 26 of the protection system 21 and is realized in one of known way.
  • the following values are obtained: fui - frequency of voltage in local terminal, f n - frequency of current in local terminal, f Ur - frequency of voltage in remote terminal.
  • step S5 a value of difference of frequency differences in local and remote terminals A and B are calculated from data obtained in step S4.
  • the step is executed in the frequency differences calculation module 27 of the protection system 21.
  • a value of a frequency difference at local terminal A is calculating according to the formula:
  • Afi - is a value of the frequency difference at local terminal A presented in fig.7a
  • fui - is a value of the frequency of voltage in local terminal A
  • fn - is the frequency of current in local terminal A.
  • a value of a frequency difference at remote terminal B is calculating according to the formula:
  • ⁇ / ⁇ - is frequency difference at remote terminal B presented in fig.7a
  • fn - is the frequency of current in local terminal A.
  • the frequency difference direction expresses the monotonicity of frequency difference and is determined for local terminal A by a monotonicity coefficient of the frequency difference ; and for remote terminal B by the monotonicity coefficient of the frequency difference a r .
  • the linear regression coefficient method is calculated using the numerical implementation of Least Squares method known in the state of the art according to formulas:
  • the difference of frequency difference M is calculated in order to avoid false out of step detection when frequency differences are close together and small disturbances in direction and values could trigger certain other criteria.
  • Af - is difference of frequency differences in local and remote terminal
  • Afi - is frequency difference at local terminal A
  • Af r - is frequency difference at remote terminal B.
  • step S6 the four criteria Critl , Crit2, Crit3, Crit4 are checked in order to prepare the signals of logic value "1 " or "0".
  • the step S6 is executed in the out of step detection module 28 of protection system 21 and is described in details in fig.6.
  • the first criterion Critl relies on comparison of an absolute value of frequency difference in local terminal abs(Af ) with the value of a threshold f va iue hr given by the user in module 29 of protection system 21.
  • abs(Afi) - is an absolute value of frequency difference in local terminal
  • fvaiue thr - is a threshold value for frequency difference in local terminal A setting by a user in the module 29, typically set to 0.4Hz.
  • the second criterion Crit2 relies on the determination of the frequency difference direction.
  • the monotonicity coefficients calculated for local and remote frequency differences are compared with the value of a threshold fair.t r given by the user in the setting module 29 of protection system 21 .
  • Out of step existence is considered if following formula is fulfilled:
  • a x - is monotonicity coefficient of the frequency difference for local terminal A
  • a r - is monotonicity coefficient of the frequency difference for remote terminal B
  • fdirjhr - is a threshold value for monotonicity coefficient, setting by a user in the module 29 and is typically 0.0001 Hz.
  • the third criterion Crit3 relies on examination of the sign of the frequencies difference.
  • the criterion describes the situation in which frequency differences at local and remote terminal have opposite signs.
  • the fourth criterion Crit4 relies on comparison of absolute value of difference of frequency differences at local and remote terminals with the threshold fdiff hr 9 iven by the user in module 29 of protection system 21 of protection relay 2.
  • ifdiff hr - is a threshold value for difference of frequency difference setting by a user in the module 29.
  • the typical value is 0.5Hz
  • step S6 the all criteria Critl , Crit2, Crit3, Crit4 are checked during the action of the system and the result "0" or "1" is checking in continuous way.
  • the step S6 gives signal of logic 1 - true.
  • step S6 gives the signal of logic 0 - false.
  • Step S7 the condition for appearance of out of step is checked in such a way that when result of step S6 is "1 " then the out of step is determined for a detection time t d , what is presented in fig.7b and then the next step S8 is performed. In the opposite situation, the method returns back to step S1 and processes the method in iterative way.
  • Step S7 is executed in module 28 of protection system 21.
  • the step S8 is presented as the output signal 30 of protection system 21 which can be set on the output of the protection system 21 in protection relay 2 or send to communication module for further processes.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The invention relates to method of detecting out of step presence in an electric power network. The method is based on a protection device (2, 3) having means (3) for measuring voltage and currents signals of the electric lines (1) at a local (A) and remote (B) terminals and having a computer means for data processing and calculation frequency of current and voltage at the local terminal (A) and at the remote terminal (B) and for calculating a value of the frequency. The method further comprises the following steps: calculating a value of difference of frequency differences Af between the local (A) and remote (B) terminals, determination criteria Critl, Crit2, Crit3, Crit4 for out of step detection and configuration of special thresholds for each criterion by a user, determination of the presence of out of step through a logic sum of the results of the all criteria and automatically creating a signal for activating remedial action, triggering an alarm or passing the signal indicating the out of step detection to other protection devices.

Description

A method of out of step detection in electrical power network
The invention relates to a method of detecting out of step presence in an electric power network. The electrical power network may be formed from two separate power systems connected together by a multiphase transmission line or from one power system and transmission line to which a generator is connected. The invention can be used also in the power network with multiple transmission lines connected to many generators, motors and loads, and in which a part of a system needs to be isolated in case of an occurrence of out of step. The invented method is used to protect a power system against the out of step condition. The method detects the out of step condition by utilizing frequency differences between current and voltages in local and remote locations.
The known methods for detecting out of step in a power system and/or transmission line are mainly based on measurements from one end of the power system and/or transmission line. For example, an impedance method utilized local measurements of current and voltage of the system in order to calculate impedance. The impedance trajectory is monitored and basing on certain allowed area of operation the condition of the appearance of the out of step is determined.
From patent application WO2010/145684 there is a known arrangement for protecting equipment of an electrical power system comprising of electric machines. This arrangement provides information about a known method for determination of power swing and/or to provide information relating to the occurrence of a pole slip in the electric power system through the utilization of the frequency of the current and the frequency of the voltage. The described patent application refers to protection equipment that is configured to measure the frequency of the current and voltage in at least one location in the electrical power system. Power swing is detected if values of the frequency of the current and voltage show that the measured current phasor starts to rotate at a different rate to the measured voltage phasor and if the relative angle between the electro-motive forces of said two theoretical electrical machines thereof is continuously increasing or decreasing. Power swing is located on a motor side if the frequency of the current measured is higher than the frequency of the voltage. Conversely, power swing is located on a generator side, if the frequency of the current is lower than the frequency of the voltage. The method can determine the described phenomenon only if the protected motor/generator is the source of the power swing. Additionally, the method utilizes relative angle criteria, which require additional settings for determination of increasing or decreasing angle.
Utilization of measurements from both ends of the power system and/or transmission line increases protection reliability and efficiency.
From patent description US 7,930, 117 there is a known method for detecting power swing and out of step using an intelligent electric device IED in the power system. The detection of out of step is based on measurements from two locations in the electrical power system. Voltage measurements may be received from the first and the second IED. The measurements may be time synchronized and utilized to calculate the difference of the angles of the voltage positive sequences between the first and the second location in the electrical power system. From the difference in angle between a local and remote IED a slip frequency and acceleration may be obtained. This allows the trajectory of slip frequency and acceleration to be monitored and compared to the operating region and a swing detection region. The angle difference, slip frequency, and acceleration may be used to detect an out of step condition in the electrical power system and/or power swing between the first location and the second location in the electrical power system. The angle difference, slip frequency and acceleration may also be used to predict the occurrence of out of step conditions in the future. However, calculating the second derivative i.e. acceleration can cause numerical errors, problem associated with the differentiation is the amplification of high frequency noise or significant computation delay. Another disadvantage of this solution is that the efficiency of the method depends on the correct setting of the operating region and swing detection region being made.
The essence of the inventive method for detecting out of step presence in an electric power network involves the use of a protection device having means for measurement voltage, VA, VB and currents signals, IA, IB of electric lines at a local and remote terminals of the electric network and having a computer means for data processing and calculating a frequency of current fn and a frequency of voltage fm at the local terminal and a frequency of current f,r and a frequency of voltage fUr at the remote terminal, calculating a value of a frequency difference Afi at local terminal and a value of a frequency difference Afr at remote terminal, is that it performs the following steps:
- calculating a value of difference of frequency differences M between the local and between remote terminals,
- determination of criteria Critl , Crit2, Crit3, Crit4 for out of step detection with the user setting special thresholds for each criterion, where: Critl has a form:
(Critl == 1) (afcs(A/i) > fvalue where:
abs( f ) is the absolute value of frequency difference in local terminal, fvaiue thr is a threshold value for frequency difference in local terminal set by a user;
Crit2 has a form:
Figure imgf000004_0001
where:
ai - is monotonicity coefficient of the frequency difference for the local terminal, ar - is monotonicity coefficient of the frequency difference for a remote terminal, fdirjhr - is a threshold value for monotonicity coefficient set by a user;
- Crit3 has a form:
(Crit3 == 1) <S (sgn fi ≠ sgn (Δ/Γ)) where:
sgn{ fi) - signum function for local terminal,
sgn(Afr) - signum function for remote terminal,
fi - is frequency difference at local terminal,
Afr - is frequency difference at remote terminal;
Crit4 has a form:
(Crit4 == !) *> ( abs(Af) > fdiff.thr) where:
Af - is value of difference of frequency differences in local and remote terminal,
abs( f) - is absolute value of difference of frequency differences in local and remote terminal, fdiff hr - is a threshold value for difference of frequency difference setting by a user;
- determination out of step presence by making a logic product of the results of all of the criteria Critl , Crit2, Crit3, Crit4 for each sample of interest at the same time instant and when the result of the logic sum is "1 " the out of step is detected,
- automatically creating a signal to activate remedial action, triggering an alarm and/or passing the signal indicating the out of step detection to other protection devices.
Preferably a monotonicity coefficient at of the frequency difference for the local terminal is calculated according a numerical implementation of the Least Squares method according to formulas:
Figure imgf000005_0001
where:
n - number of samples used in the calculation, given by user,
tk - k-time instant,
i - number of iteration,
and a monotonicity coefficient ar of the frequency difference for remote terminal is calculated according a numerical implementation of Least Squares method according to formulas:
Figure imgf000005_0002
∑Π=ι ffc-ii+i- (∑i-=i tk-n+i)
where:
n - number of samples used in the calculation, given by user, typically set as 5, tk - k-time instant, i - number of iteration in formula.
Preferably a difference of frequency differences Af in local and remote terminal is calculated in the following way:
Af = Af, - Afr
where:
Afi - is frequency difference at local terminal,
Afr - is frequency difference at remote terminal.
The essence of a device for implementing the method according to claims 1-3 of out of step detection in an electric power network, comprising means for measuring electric data in a local and a remote terminal and a computer means for processing the measured data in the form of a protection relay, is that it also comprises the following means embedded in the functional modules of the protection system of the protection relay,
- means for calculating an absolute value of frequency difference abs{Af ) in the local terminal,
- means for calculating monotonicity coefficients of the frequency difference at of the frequency difference for a local terminal and ar for a remote terminal,
- means for calculating signum functions sgn(Af ) for a local terminal and sgn(Afr) for a remote terminal,
- means for calculating an absolute value of difference of frequency differences abs(Af) in a local and a remote terminal, and where:
- means for setting and checking the criteria Crit1 , Crit2, Crit3, Crit4 are embedded in an out of step detection module and in a setting module of the protection system,
- means for calculating a logic product of the all criteria Critl , Crit2, Crit3, Crit4 are embedded in an out of step detection module,
- means for activation of remedial action and/or alarming the user by signal when the result of the logic sum is "1" are embedded in the out of step detection module. Preferably the input of the out of step detection module is connected with the setting module and with a frequency differences calculating module.
Preferably the protection relay has a form of Intelligent Electronic Device IED.
Preferably the Intelligent Electronic Device IED is IED670 produced by ABB company.
Preferably the local and remote terminals are electrically connected by communications link through protective relays.
A computer program product comprising computer code which when executed in a computing device caries out of the steps of a method according to the claims 1-3.
The invented method has a number of advantages over other known methods. First, due to the utilization of measurements from more than one point in the system it is able to achieve high reliability. The set of different criteria ensures that the method does not cause false alarm signals. There are no unstable mathematical operations such as derivative calculation that may cause instability of the method. Moreover, the method is easily configured as it only requires a few settings.
The method for executing the invention is presented in exemplary embodiments in the drawings where:
Fig.1 - shows schematically the first electrical power network with two power systems,
Fig.2 - the second electrical power network with one power system and one generator,
Fig.3 - the third electrical power network with multiple transmission lines,
Fig.4 - a schematic diagram of a protection relay device adapted to execute the method according to the invention,
Fig.5 - the sequence of actions performed to execute the method according to the invention, Fig.6 - the details of step S6 from fig.5,
Fig.7 - diagram of out of step determination for the function of frequency differences in the time domain.
The invention is presented in exemplary embodiments where three different electrical power networks are used. In the first embodiment of the invention the electrical power network has two power systems, a first power system PS1 and a second power systems PS2. The two power systems PS1 and PS2 are connected together by a three-phase transmission line 1. The transmission line is equipped with two measuring terminals, a first local terminal A and the second remote terminal B. Local terminal A can also be the remote terminal B where the remote terminal B plays the role of local terminal A. Each of the terminals have an electrical connection with commonly known protection relays 2. In both terminals A and B the sensors 3 for measuring voltage and current from the power systems PS1 and PS2 are located. Such sensors 3 may be connected to the protection relays 2, or other microcomputer devices for gathering and processing the measured data. In order to simplify the understanding of the invention only the protection relay 2 is presented as such a device. Each of the relays 2 has special modules for detecting an out of step condition in the power system PS1 or PS2. The details of such module are explained in other parts of the description. Both protection relays 2 have communications means for providing communication link between them, which for example may be a wire link 4. Instead of wire link 4 the communication may be realized by wireless connection means.
In the second embodiment of the invention the electrical power network has the power system PS1 which is connected with the generating unit 5 through transmission line 1. In this embodiment the local terminal A is located directly in powers system PS1 , which is indicated in a symbolic way placing the letter A in the box PS1 , and the remote terminal B is located on the line 1 between the power system PS1 and the generating unit 5. The terminals A and B are connected with the protection relays 2 playing a similar role as that which was described in the first embodiment of the invention. Both protection relays 2 have means for providing communication links between them, which for example may be a wire link 4. Instead of wire link 4 the communication may be realized by wireless connection means.
In the third embodiment of the invention the electrical power network has a form of many transmission lines 1 where each of the lines connects the power systems PS1 ... PSN ( where N is a natural number) with another power system, or with the generating units 5 or with loads 6. The transmission lines 1 have local terminals A and remote terminal B located on at least one the same line 1. The terminals A and B are connected with the protection relay 2 playing the similar role as in the first and second embodiment. Instead of wire link 4 the communication may be realized by wireless connection means.
In all exemplary embodiments of the invention, the first and the second protection relays 2 are used as devices for measuring, gathering and processing data. It is not important which protection relay 2 is the first or second relay because all relays used in the invented method are identical devices. The relays 2 are electrically connected to the line 1 in the measuring terminals A or B directly with all three phases of the line 1. Located in each of the measured terminals is a means for measuring current and voltage and these means are electrically connected with means for receiving a value of the measured data, located in the protection relay 2. The means for receiving values of the measured data in terminal A and B are placed in the protection system 21 of the relay 2, in which many functional modules are implemented.
A data acquisition module 22 for local measurement is placed in the protection system 21. The data acquisition module 22 is synchronized by clock 23, placed inside the protection relay 2, with or without the protection system 21. The data acquisition module 22 is connected with a data synchronization and integrity module 24 for time synchronization of local and remote measured data with utilization of the clock 23. The data synchronization and integrity module 24 is connected with a communication module 25 for receiving remote measurements of voltage and current. The data synchronization and integrity module 24 also is connected with a frequency calculation module 26 for calculating the frequency of measured signals and for processing the data for subsequent steps realized in the method. The frequency calculation module 26 is connected with a frequency differences calculation module 27 for calculating the frequency differences between local and remote measured data. The frequency differences calculation module 27 is connected with an out of step detection module 28 for comparing the values of the measured and processed data and to determine out of step detection criteria Critl , Crit2, Crit3, Crit4, implemented by the inventive method and for receiving the logic value of such a comparison. The out of step detection module 28 is also connected with a setting module 29 for determining an occurrence of out of step phenomenon. Module 28 is connected to signal 30 for activating a remedial action by sending an appropriate alarm from the out of step detection module 28 to outside the protection system 21. The alarm signal 30 is also connected with the communication module 25 for communicating a detection of out of step. The protection system 21 is connected also with means for visualizing the result of the detection, which is not presented in the drawing. Besides incorporating the protection system, the protection relay 2 contains many other functional modules which are not the subject of the invention. Protection relay 2 could be any device in the form of an IED devices (Intelligent Electronic Device). Preferably, the IED device known under the name IED670 series produced by ABB is used as the protection relay 2.
The invention is realized in the following steps S1-S8
Step S1 Data measurement at a local terminal A and a remote terminal B
First, the three phase current lA and voltage VA signals at a local terminal A of a transmission line 1 are measured by common known sensors 3. The measured signals from terminal A are transmitted to the device for measuring and processing data, this device being a first protection relay 2 equipped with protection system 21. The measured signals are acquired by module 22. Terminal A can be located on the transmission line between two power systems PS1 and PS2 as presented in fig.1 , or between the power system PS1 and generating unit 5 as presented in fig.2, or in any place of the multiterminal power system PS1 ... PSn as presented in fig.3. In the protection system 21 the values of the measured the three phase voltage signal VA and the measured three phase current signal lA are gathered and recorded.
Second, the current lB and voltage VB signals at a remote terminal B of the transmission line 1 are measured by common known sensors 3. The measured signals are acquired by module 22 of the protection system of the second protection relay 2 in the same way as for terminal A.
After the measurements, the signals lA, lB VA, VB are sampled and digitalized using the protection relay 2. For this purpose in every time instant tk, where k is a present time instant, according to sampling frequency fs the data is digitized in a known way. The sampling frequency fs can be fixed or variable and it is established by user - typical values of sampling frequency are between 1 kHz-10kHz.
Step S2
Data transmission from the remote terminal B to the local terminal A
Next, the three phase measured signals lB and VB are transmitted from terminal B to the terminal A for further processing utilizing communication link 4. The measured signals are received by a communication module 25 of protection system 21 of the first protection relay 2. In the protection system 21 of the first protection relay 2 the values of the received signals at the terminal B are gathered and recorded.
Step S3
Synchronization and integration of data At the step S3 which is executed in module 24 of protection system 21 of protection relay 2, the data from local terminal A and the remote terminal B is time-synchronized in order to run further processes on the data with the same time stamps. The data is synchronized according to the clock 23.
Step S4
Frequency calculation
At step S4 a frequency of current and a frequency of voltage from both terminals A and B is calculated using the data obtained in step 3. The calculation takes place in frequency calculation module 26 of the protection system 21 and is realized in one of known way. As the result of calculation of frequencies the following values are obtained: fui - frequency of voltage in local terminal, fn - frequency of current in local terminal, fUr - frequency of voltage in remote terminal.
Step S5
Frequency difference, monotonicity coefficients and difference of frequency difference calculation
At step S5 a value of difference of frequency differences in local and remote terminals A and B are calculated from data obtained in step S4. The step is executed in the frequency differences calculation module 27 of the protection system 21.
First, a value of a frequency difference at local terminal A is calculating according to the formula:
Figure imgf000011_0001
where:
Afi - is a value of the frequency difference at local terminal A presented in fig.7a,
fui - is a value of the frequency of voltage in local terminal A, fn - is the frequency of current in local terminal A.
Second, a value of a frequency difference at remote terminal B is calculating according to the formula:
Δ/r = fur - fll (2) where:
Δ/Γ - is frequency difference at remote terminal B presented in fig.7a, fUr - frequency of voltage in remote terminal B, fn - is the frequency of current in local terminal A.
Next, a frequency difference direction is calculated. The frequency difference direction expresses the monotonicity of frequency difference and is determined for local terminal A by a monotonicity coefficient of the frequency difference ; and for remote terminal B by the monotonicity coefficient of the frequency difference ar . In order to receive such coefficients one of the methods of monotonicity implementation should be applied. There are many known methods for calculating monotonicity. In this invention, the linear regression coefficient method is calculated using the numerical implementation of Least Squares method known in the state of the art according to formulas:
Figure imgf000012_0001
where:
n - number of samples used in the calculation, given by user, typically set as 5, tk - k-time instant,
i - number of iteration.
Figure imgf000012_0002
where:
n - number of samples used in the calculation, given by user, typically set as 5, tk - k-time instant,
i - number of iteration in formula.
Next, the difference of frequency difference M is calculated in order to avoid false out of step detection when frequency differences are close together and small disturbances in direction and values could trigger certain other criteria. The difference of frequency differences in a local and a remote terminal is calculated in the following way: Af = Af, - Afr (5) where:
Af - is difference of frequency differences in local and remote terminal,
Afi - is frequency difference at local terminal A,
Afr - is frequency difference at remote terminal B.
Step S6
Determination of Out of step conditions
At step S6 the four criteria Critl , Crit2, Crit3, Crit4 are checked in order to prepare the signals of logic value "1 " or "0". The step S6 is executed in the out of step detection module 28 of protection system 21 and is described in details in fig.6.
- The first criterion Critl relies on comparison of an absolute value of frequency difference in local terminal abs(Af ) with the value of a threshold fvaiue hr given by the user in module 29 of protection system 21.
(Critl == 1) (absiAf > fvalueJhr) (6) where:
abs(Afi) - is an absolute value of frequency difference in local terminal, fvaiue thr - is a threshold value for frequency difference in local terminal A setting by a user in the module 29, typically set to 0.4Hz.
When Critl == 1 it means true.
When the criterion Critl is met, the result of this step is 1 . In the opposite case the result is 0.
- The second criterion Crit2 relies on the determination of the frequency difference direction. The monotonicity coefficients calculated for local and remote frequency differences are compared with the value of a threshold fair.t r given by the user in the setting module 29 of protection system 21 . Out of step existence is considered if following formula is fulfilled:
Figure imgf000014_0001
where:
ax - is monotonicity coefficient of the frequency difference for local terminal A,
ar - is monotonicity coefficient of the frequency difference for remote terminal B, fdirjhr - is a threshold value for monotonicity coefficient, setting by a user in the module 29 and is typically 0.0001 Hz.
Crit2 == 1 - means true
When the criterion Crit2 is met the result of this step is 1 . In the opposite case the result is 0.
- The third criterion Crit3 relies on examination of the sign of the frequencies difference. The criterion describes the situation in which frequency differences at local and remote terminal have opposite signs.
(Crit3 == 1) (sgniAft) ≠ sgn (Δ/Γ)) (8) where:
sgn(Afi - signum function for local terminal A,
sgn(Afr) - signum function for remote terminal B,
- is frequency difference at local terminal A,
- is frequency difference at remote terminal B.
When CritS == 1 - it means true
When the criterion Crit3 is met the result of this step is 1 . In the opposite case the result is 0.
- The fourth criterion Crit4 relies on comparison of absolute value of difference of frequency differences at local and remote terminals with the threshold fdiff hr 9iven by the user in module 29 of protection system 21 of protection relay 2.
(Crit4 == l) <* ( abs(Af) > fdi„ (9) where: Af - is value of difference of frequency differences in local and remote terminal, abs(&f) - is absolute value of difference of frequency differences in local and remote terminal,
ifdiff hr - is a threshold value for difference of frequency difference setting by a user in the module 29. The typical value is 0.5Hz
When Crit4 == 1 - it means true.
When the criterion Crit4 is met the result of this step is 1. In opposite case the result is 0.
At the step S6 the all criteria Critl , Crit2, Crit3, Crit4 are checked during the action of the system and the result "0" or "1" is checking in continuous way. When all the criteria are fulfilled, the step S6 gives signal of logic 1 - true. In opposite situation step S6 gives the signal of logic 0 - false.
Step S7
Out of step determination
At the step S7 the condition for appearance of out of step is checked in such a way that when result of step S6 is "1 " then the out of step is determined for a detection time td, what is presented in fig.7b and then the next step S8 is performed. In the opposite situation, the method returns back to step S1 and processes the method in iterative way. Step S7 is executed in module 28 of protection system 21.
Step S8
Activation of remedial action and/or alarming
At this step the detection signal is automatically released in order to activate remedial action, alarm or pass the tripping signal further to next devices e.g. circuit breakers. The step S8 is presented as the output signal 30 of protection system 21 which can be set on the output of the protection system 21 in protection relay 2 or send to communication module for further processes.

Claims

Claims
1 . A method of detecting out of step presence in an electric power network making use of a protection device having means for measuring voltage (VA, VB) and current signals (lA, IB) of electric lines at a local and remote terminals (A) and (B) of the electric network and having a computer means for data processing and calculation a frequency of current fn and a frequency of voltage ful at the local terminal (A) and a frequency of current fIr) and a frequency of voltage fUr at the remote terminal (B), a calculating a value of a frequency difference Δ j at local terminal (A) and a value of a frequency difference Afr at remote terminal (B), the method further comprises the following steps:
- calculating a value of difference of frequency differences Ai between the local and between remote terminals,
- determination criteria Critl , Crit2, Crit3, Crit4 for out of step detection and set up by user a special thresholds for each criterion, where:
-Critl has a form:
(Critl == 1) ^> {abs{Afd > fvalue where: absiAfa is the absolute value of frequency difference in local terminal, fvaiue thr is a threshold value for frequency difference in local terminal settm§ by a user;
Crit2 has a form: (ar < - irthr)
Figure imgf000016_0001
D (ar > fdirjhr) where: at - is a monotonicity coefficient of the frequency difference for local terminal,
ar - is a monotonicity coefficient of the frequency difference for remote terminal, fdir thr - is a threshold value for monotonicity coefficient set by a user; Crit3 has a form:
(Crit3 == 1) <¾> (s<7n(A/,) ≠ sgn (Δ/Γ))
where:
sgn(Af{) - signum function for local terminal,
sgn{Afr) - signum function for remote terminal,
Afi - is a frequency difference at local terminal,
Δ/Γ - is a frequency difference at remote terminal;
Crit4 has a form:
(Crit4 == 1) ( abs(Af) > fdiff_thr)
where:
Αϊ - is value of difference of frequency differences in local and remote terminal, abs(Af) - is absolute value of difference of frequency differences in local and remote terminal,
fdiff thr - is a threshold value for difference of frequency difference set by a user;
determination out of step presence by making a logic product of the results of the all criteria Crit1 , Crir2, Crit3, Crit4 for each sample of interest at the same time instant and when the result of the logic sum is "1 " the out of step is detected,
- automatically creating a signal for activate remedial action, triggering alarm or pass the signal indicating the out of step detection to other protection devices.
2. The method according to claim 1 , characterized in that:
a monotonicity coefficient at of the frequency difference for local terminal is calculated according a numerical implementation of Least Squares method according to formulas:
Figure imgf000017_0001
where: n - number of samples used in the calculation, given by user,
tk - k-time instant,
i - number of iteration,
and a monotonicity coefficient ar of the frequency difference for remote terminal is calculated according a numerical implementation of Least Squares method according to formulas:
Figure imgf000018_0001
where:
n - number of samples used in the calculation, given by user,
tk - k-time instant, i - number of iteration in formula.
3. The method according to claim 1 -2, characterized in that a difference of frequency differences Ai in local and remote terminal is calculated in the following way:
Af = Αϊχ - MT
where:
Af - is difference of frequency differences in local and remote terminal,
Afi - is frequency difference at local terminal,
Afr - is frequency difference at remote terminal.
4. A device for implementing the method according to claims 1 -3 of detecting out of step presence in an electric power network comprising means for measuring electric data in in both local and remote terminals and computer means for processing measured data in the form of a protection relay (2), where means for calculation a frequency of current fn and a frequency of voltage fm at the local terminal and a frequency of current f,r and a frequency of voltage fUr at the remote terminal , and means for calculating a value of difference of frequency differences Af between local and between remote terminals are embedded, characterized in that it further comprises the following means embedded in the functional modules of the protection system (21 ) of the protection relay (2),
- means for calculating an absolute value of frequency difference abs(Afi) in local terminal,
- means for calculating monotonicity coefficients of the frequency difference ax for local terminal and ar for remote terminal,
- means for calculating signum functions sgn Af ) for local terminal and s#n(A/r) for remote terminal,
- means for calculating an absolute value of difference of frequency differences abs(Af) in local and remote terminal, and where:
- means for setting and checking the criteria Critl , Crit2, Crit3, Crit4 are embedded in an out of step detection module (28) and in a setting module (29) of the protection system (21 ),
- means for calculating a logic product of the all criteria Critl , Crit2, Crit3, Crit4 are embedded in an out of step detection module (28),
- means for activation of remedial action and/or alarming the user by signal (30) when the result of the logic product is "1 " are embedded in the out of step detection module (28).
5. A device according to claim 4, characterized in that the input of the out of step detection module (28) is connected with the setting module (29) and with a frequency differences calculating module (27).
6. A device according to claim 4, characterized in that the protection relay (2) has a form of Intelligent Electronic Device IED.
7. A device according to claim 4-6, characterized in that the local and remote terminals are electrically connected by a communications link (4) through protective relays (2).
8. A computer program product comprising computer code which when executed in a computing device caries out of the steps of a method according to the claims 1 -3.
PCT/EP2013/003668 2012-12-21 2013-12-04 A method of out of step detection in electrical power network Ceased WO2014094985A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP12460091.7 2012-12-21
EP12460091.7A EP2746788B1 (en) 2012-12-21 2012-12-21 A method of out of step detection in electrical power network

Publications (1)

Publication Number Publication Date
WO2014094985A1 true WO2014094985A1 (en) 2014-06-26

Family

ID=47563150

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2013/003668 Ceased WO2014094985A1 (en) 2012-12-21 2013-12-04 A method of out of step detection in electrical power network

Country Status (2)

Country Link
EP (1) EP2746788B1 (en)
WO (1) WO2014094985A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113311220A (en) * 2021-05-26 2021-08-27 上海红檀智能科技有限公司 Method, system, medium, and electronic device for diagnosing voltage sag

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111244971B (en) * 2020-01-13 2023-05-02 中国南方电网有限责任公司 A system and method for longitudinal out-of-step separation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010145684A1 (en) 2009-06-15 2010-12-23 Abb Technology Ag An arrangement for protecting equipment of a power system
US7930117B2 (en) 2007-09-28 2011-04-19 Schweitzer Engineering Laboratories, Inc. Systems and methods for power swing and out-of-step detection using time stamped data

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7930117B2 (en) 2007-09-28 2011-04-19 Schweitzer Engineering Laboratories, Inc. Systems and methods for power swing and out-of-step detection using time stamped data
WO2010145684A1 (en) 2009-06-15 2010-12-23 Abb Technology Ag An arrangement for protecting equipment of a power system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113311220A (en) * 2021-05-26 2021-08-27 上海红檀智能科技有限公司 Method, system, medium, and electronic device for diagnosing voltage sag
CN113311220B (en) * 2021-05-26 2024-04-19 上海红檀智能科技有限公司 Voltage sag diagnosis method, system, medium and electronic equipment

Also Published As

Publication number Publication date
EP2746788A1 (en) 2014-06-25
EP2746788B1 (en) 2016-04-06

Similar Documents

Publication Publication Date Title
US11307264B2 (en) Phase selection for traveling wave fault detection systems
US10935609B2 (en) Methods and systems for ground fault detection in a power distribution system
EP3350897A1 (en) Time-domain line protection of electric power delivery systems
RU2009135639A (en) DIRECTED DETECTION OF CLOSING TO EARTH
JP4657151B2 (en) Rotational phase angle measuring device, frequency measuring device using the same, synchronous phasor measuring device, switching pole phase control device, synchronous input device and phase discrimination device
WO2016180921A1 (en) Improvements in or relating to direct current protection schemes
CN107683418B (en) Leakage current detection device
US10338122B2 (en) Method and device for detecting a fault in an electrical network
RU2421737C1 (en) Method of measuring potential of underground structure and device for implementing said method
CN106165230B (en) Differential protection method and differential protection device
EP2746788B1 (en) A method of out of step detection in electrical power network
EP2747230B1 (en) A power-based method of out of step detection in electrical power network
Rathore et al. Alienation based fault detection and classification in transmission lines
CN104377722B (en) System and method for swing angle estimation in power systems
US10228406B2 (en) Detecting a fault, in particular a transient fault, in an electrical network
JP6570476B2 (en) Current differential protection relay device
EP2984719A1 (en) A method for detecting fault and current differential protection system thereof
JP5971692B2 (en) Method and system for monitoring short-circuit capacity of power system
US9843335B2 (en) Supervision of input signal channels
CA2907443C (en) Systems and methods for swing angle estimation in an electrical power system
Pati et al. A Superimposed Components based Fault Detector for Power System Applications
JP4868227B2 (en) Distance relay device
RU160093U1 (en) DEVICE FOR LIQUIDATION OF ASYNCHRONOUS REGIME AT THE SITE OF THE GENERATOR POWER UNIT
WO2016029466A1 (en) Method and device for determining fault direction of power transmission line
KR20080042202A (en) Effective Leakage Current Extraction Method and Apparatus

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13815688

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13815688

Country of ref document: EP

Kind code of ref document: A1