WO2014046426A1 - 베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법 - Google Patents
베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법 Download PDFInfo
- Publication number
- WO2014046426A1 WO2014046426A1 PCT/KR2013/008330 KR2013008330W WO2014046426A1 WO 2014046426 A1 WO2014046426 A1 WO 2014046426A1 KR 2013008330 W KR2013008330 W KR 2013008330W WO 2014046426 A1 WO2014046426 A1 WO 2014046426A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- horizontal
- horizontal member
- base plate
- vertical
- column
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/10—Devices for levelling, e.g. templates or boards
Definitions
- the present invention relates to a base plate combined reference frame that can serve as a base plate for the installation of the column while precisely determining the standard such as vertical, horizontal, etc. in building construction and a building construction method using the same.
- the foundation is installed horizontally, and a reference frame (normative framework) is installed to display the center line, foundation width, etc. of the foundation on the ground.
- Figure 1 shows a conventional reference frame installation state. As you can see, we pile the pile around the foundation around the foundation and install the horizontal chord horizontally, and then mark the position of the foundation centerline on the horizontal chord and float the horizontal chamber along the centerline to establish the construction position of the foundation.
- This reference frame installation work is not only troublesome work, but also has a problem of inferior accuracy. In addition, it is required to dismantle work in the future because it proceeds with a separate construction work.
- the base plate is fixed with anchor bolts in order to install the steel pillars on the foundation in the steel structure. It is important to install the base plate at the horizontal level, and it is important to install the steel column at the vertical position at the correct position.
- the present invention was developed to improve the installation work of the reference frame and the base plate, which was conventionally performed in a separate process, and has the following technical problems.
- the present invention as a base plate combined reference frame for the fixed installation of the column while setting the standard of building construction, a plurality of anchor bolts protruding to the base surface to be constructed; A bolt hole is formed at one side so that the upper surface is fixed to the anchor bolt to pass through the bolt hole in accordance with the lower level of the column at the column position.
- the horizontal member is fixedly spaced apart from the base surface while adjusting; And a vertical member fixedly installed at the anchor bolt in the same manner as the horizontal member but coupled to one end of the horizontal member so that the upper level is coincident with the horizontal member; It provides a base plate combined reference frame, characterized in that configured to include.
- both ends of the brace material is screwed to one side of the horizontal member and the vertical member, characterized in that the position of the horizontal member and the longitudinal member is fixed.
- the present invention is to extend from the other end of at least one or more of the cross member and the longitudinal member is installed to extend the length is fixed to the anchor bolt in the same way as the horizontal member, the length of the upper level is installed to match the cross member and longitudinal member ashes; And connecting reinforcing members fixedly installed by screwing on at least one or more of the horizontal member and the longitudinal member and the length extension member. It may be configured to further include, the horizontal member and the vertical member may be formed with a coupling hole in the upper surface.
- the present invention is a method for constructing a building using the base plate combined reference frame, while connecting one end of the cross member and the vertical member to each other, the fastening nut to the anchor bolt installed on the base fastened at a predetermined distance from the base surface
- the anchor bolt is installed in the upper part of the fastening nut so as to be spaced apart from the base surface by penetrating through the bolt hole of the horizontal material and the vertical material, and the fastening nut is fastened to the anchor bolt at the upper surface of the horizontal material and the vertical material by the fastening nut.
- It provides a building construction method comprising a.
- the first step is to connect the ends of the cross member and the longitudinal member to each other and then screw the two ends of the bracing member on the cross member and the longitudinal member respectively to fix the position of the cross member and the longitudinal member
- the third step is a screw
- the column can be constructed after removing the brace by dismantling the fastener.
- the third step may be carried out further comprising the step of connecting the adjacent pillars with a banding material.
- the first step is carried out using the horizontal member and the longitudinal member having a coupling hole formed on the upper surface
- the third step is inserted into the coupling hole of the horizontal member and the longitudinal member by a coupling protrusion with a column having a coupling protrusion protruding from the lower end thereof.
- the first step is to extend from the at least one other end of the cross member and the longitudinal member to be installed to extend the length is fixed to the anchor bolt in the same way as the cross member, the upper level is installed to match the cross member and longitudinal member
- the third step is connected by disassembling the screw fastening After removing the reinforcement, the column can be constructed.
- the second step may be carried out while installing the base to be spaced apart from the outside of the horizontal member and the vertical member, while placing the base concrete as a formwork.
- the frame and base plate can be installed at the same time by holding the corners by simple method of screwing the brace material and connecting the fastening nut to the anchor bolt by connecting the horizontal material and vertical material. It can be installed while adjusting horizontal level and vertical level easily with pillars or strips.
- the base plate combined reference frame according to the present invention can be used as a standard for selecting the construction location of the facility, so the facilities around the building can also be accurately constructed.
- the construction position of the building structure such as columns and walls can be displayed on the base plate combined frame, it is possible to construct the building accurately and quickly.
- the coupling position of the pillar can be displayed by forming a coupling hole or the like in the base plate combined reference frame in advance, a separate column position selection is unnecessary.
- the installed base plate combined reference frame is capable of displaying all the marks necessary for the construction, such as the column, the wall, and the location of the facility piping.
- Figure 1 shows a state of installation of a conventional basic reference frame.
- Figure 2 shows the installation state of the base plate combined frame according to the invention.
- 3 to 8 illustrate the construction of the foundation and pillar using the base plate combined frame according to the present invention in the construction of traditional wooden buildings.
- the base plate combined reference frame of the present invention is a base plate combined reference frame for fixing the installation of the pillar while setting the standard of building construction, a plurality of anchor bolts protruding to the base surface to be constructed; A bolt hole is formed at one side so that the upper surface is fixed to the anchor bolt to pass through the bolt hole in accordance with the lower level of the column at the column position.
- the horizontal member is fixedly spaced apart from the base surface while adjusting; And a vertical member fixedly installed at the anchor bolt in the same manner as the horizontal member but coupled to one end of the horizontal member so that the upper level is coincident with the horizontal member; Characterized in that comprises a.
- Figure 2 shows the installation state of the base plate combined frame according to the invention.
- the present invention relates to a base plate combined reference frame for fixing the installation of the column 240 while determining the standard of building construction, anchor bolt 110, horizontal member 120, vertical member 130, brace member 140 It is configured to include, it may be configured to further include a length extension member 150 and the connection reinforcement 160.
- Reference frame according to the present invention is also installed in the installation position of the column because it also serves as the base plate of the column.
- Anchor bolt 110 is installed to protrude on the base surface 210, a plurality of pillars will be constructed. If the pillars are constructed on the foundation, the base surface 210 becomes a foundation ground that is flattened by flattening rubble or casting concrete, and the base surface 210 becomes a floor slab if the pillar is constructed on a general floor slab.
- the anchor bolt 110 may be fixedly installed on the base surface 210 as well as fixedly installed on the structure to be constructed on the base surface 210, and may also be installed by simply placing it on the base surface 210. .
- the anchor bolt 110 is suitable, but is not limited to computer bolts to freely adjust the fastening height of the fastening nuts (N1, N2).
- the horizontal member 120 and the vertical member 130 is a member that determines the standard of the building, such as foundation, column, wall, etc., the horizontal member 120 and the vertical member 130 is installed so that the upper level is matched with one end of each other. do.
- the horizontal member 120 and the vertical member 130 may be coupled to each other by forming one end of the edges to be mutually coupled to each other.
- the abutment surface on which the horizontal member 120 and the vertical member 130 are connected is determined according to the plane of the building. For example, both the horizontal member 120 and the vertical member 130 are cut at 45 ° corners or cut at 30 ° and 60 °, respectively, so that the horizontal member 120 and the vertical member 130 are naturally formed at right angles so that they are installed at the corners of the building. Suitable.
- the abutment surfaces of the horizontal member 120 and the vertical member 130 are cut to have 45 ° corners, respectively, and the horizontal member 120 and the vertical member 130 are provided as joints.
- the horizontal member 120 and the vertical member 130 are respectively installed so that the bolt hole (BH) is penetrated through the anchor bolt 110 in accordance with the lower level of the column at the column position, the upper anchor bolt 110, respectively It is fixedly spaced apart from the base surface 210 while adjusting the horizontal level with the fastening nuts (N1, N2) fastened on the surface and the lower surface, respectively.
- a screw hole PH may be formed in the horizontal member 120 and the vertical member 130 in addition to the bolt hole BH, and the horizontal member 120 and the vertical member 130 may have a coupling hole CH at an upper surface thereof. This can be formed.
- the screw hole (PH) is for screwing the brace 140 and the connecting reinforcement 160
- the coupling hole (CH) is to simply set the position of the column in a way to fit the column 240. In particular, since the position of the column is indicated by the coupling hole CH, a separate operation for positioning the column becomes unnecessary.
- the cutting of the horizontal member 120 and the vertical member 130 and the formation of various holes are preferably performed by laser processing for precise processing.
- the horizontal member 120 and the vertical member 130 are provided as plates, and the horizontal member 120 and the vertical member 130 may be applicable to other steel materials such as a square tube and a shaped steel member.
- the brace member 140 is a member that connects the horizontal member 120 and the vertical member 130 to fix the position of the horizontal member 120 and the vertical member 130, the brace member 140 is both ends of the horizontal member ( 120 and screwed to one side of the longitudinal member 130, respectively.
- the brace 140 is screwed with a screw (P) in a state located on the upper surface of the horizontal member 120 and the vertical member 130 is fixed. In accordance with the installation of the brace 140, the joint of the horizontal member 120 and the vertical member 130 is more stably maintained.
- the brace 140 may also be provided with steel materials such as plates, square tubes, and shaped steels.
- the length extension member 150 is a member installed to extend in length from at least one end of at least one of the horizontal member 120 and the vertical member 130 and is fixed to the anchor bolt 110 in the same manner as the horizontal member 120. It is installed, but the upper level is installed to match the cross member (120).
- the connection reinforcement 160 is a member fixedly installed by screwing on at least one or more of the horizontal member 120 and the longitudinal member 130 and the length extension member 150.
- the length extension member 150 is preferably provided with the same member as the horizontal member 120 or the vertical member 130, and the connecting reinforcement member 160 is also provided with the same width as the length extension member 150 to the screw (P). It is preferable to be fixed by screwing by.
- the length extension member 150 is also installed in accordance with the horizontal level using the anchor bolt 110 and the fastening nuts (N2, N2) like the horizontal member 120 or the longitudinal member 130.
- the reference frame according to the present invention can be installed to surround the outer periphery of the building to be constructed.
- the standard frame installed in this way can mark all positions necessary for the construction of the building, such as columns, walls, and facility piping.
- 3 to 8 shows the construction process of the foundation and the pillar using the base plate combined frame according to the present invention in the construction of traditional wooden building, with reference to this the construction process of the building.
- the upper structure on the base plate combined reference frame will be described as an example of a steel frame structure, but if the structure can be combined with the base plate combined frame of the present invention, the upper structure may be other structural methods such as a wooden structure.
- the base plate combined reference frame according to the present invention is installed on the base surface 210 on which the column 240 will be constructed (first step). If the base plate combined reference frame of the present invention is used as a basic reference frame, the base surface 210 proceeds in advance by selecting a method of crushing rubble or casting concrete.
- the base plate combined reference frame is connected to one end of the horizontal member 120 and the vertical member 130 (FIG. 3), while the fastening nut N1 is installed on the anchor bolt 110 installed on the base surface 210.
- the fastening nut (N1) Fastening at a predetermined distance from the 210, and through the anchor bolt 110 through the bolt hole (BH) of the horizontal member 120 and the vertical member 130, the fastening nut (N1) to be spaced apart from the base surface 210 It is installed on the upper part, the fastening nut (N2) is fastened to the anchor bolt 110 from the upper surface of the horizontal member 120 and the vertical member 130 by the fastening nuts (N1, N2) the horizontal member 120 and the vertical member ( The horizontal level of 130 is adjusted according to the construction level of the column 240 (Fig. 4).
- the horizontal member 120 and the vertical member 130 are installed to be positioned at the position of the column 240, so that it can serve as a reference frame and a base plate. This completes the installation of the base plate combined frame of reference.
- the one end of the horizontal member 120 and the vertical member 130 is connected to each other and then screwed both ends of the brace member 140 on the horizontal member 120 and the vertical member 130 It can be carried out by fixing the position of the ash 120 and the longitudinal member 130 (Fig. 3).
- the first step is to be installed in the anchor bolt 110 in the same way as the horizontal member 120 is installed to extend from the other end of at least one or more of the horizontal member 120 and vertical member 130.
- the upper level is installed to match the horizontal member 120 and the vertical member 130, at least any one or more of the horizontal member 120 and the vertical member 130 and the length extension. It can be carried out further comprising the step of screwing the connection reinforcement 160 on the ash 150 (FIG. 4).
- the foundation is constructed after the installation of the base plate combined reference frame is completed.
- the foundation is constructed by placing the foundation reinforcement on the base surface 210 under the horizontal member 120 and the vertical member 130 and placing the foundation concrete 230 (second step).
- the foundation concrete 230 is placed while placing the space below the horizontal member 120 and the vertical member 130, so that the horizontal member 120 and vertical member (while adjusting the fastening nuts (N1, N2) in the pillar construction process) 130 may be finely adjusted.
- the foundation concrete 230 is poured into the formwork. (FIG. 6).
- the base end 220 is installed by setting the position and horizontal level based on the horizontal member 120 and the vertical member 130. This completes the construction of the foundation.
- the building is constructed while constructing the column 240 using the horizontal member 120 and the vertical member 130 as a base plate (third step).
- the brace member 140 is installed in the first step, the brace member 140 is removed by disassembling the screw, and the connecting reinforcement member 160 is installed in the first step. In this case, after dismantling the screw to remove the connection reinforcement 160, and then to the column 240. At this time, if necessary, the length extension member 150 installed at a position other than the column 240 may be removed together. Removed brace material 140, length extension material 150, connecting reinforcing material 160 may be dedicated to other construction.
- the belt member 250 may be further constructed.
- the belt member 250 is installed to connect the adjacent pillars 240, and if the band member 250 is installed, the horizontal level is roughly adjusted to the horizontal level.
- the fastening nuts (N1, N2) After connecting to the column 240 to fine-tune the fastening nuts (N1, N2) to obtain a horizontal level.
- the belt member 250 can be correctly installed to accurately grasp the horizontal level, and accordingly, the verticality of the column 240 can be more accurately grasped.
- Belt strip 250 is to be precisely cut to be installed between the adjacent pillars 240 from the bottom of the column 240, so that the horizontal level and the verticality of the column 240 can be more easily and accurately grasped.
- the horizontal reinforcement between the columns 240 by the installation of the strip member 250 is completed as a solid building frame.
- After adjusting the vertical degree of the column 240 may be reinforced with a non-shrink mortar and the like under the column 240 and the vertical member.
- the column 240 and the strip member 250 may be constructed of various materials, as well as steel frame, and illustrates the case of constructing the steel frame member in FIGS. 7 and 8.
- the steel column 240 is installed to meet the vertical angle on the horizontal member 120 and vertical member 130, but in this case the horizontal member 120 and vertical member formed with a coupling hole (CH) in the upper surface If the 130 is used, the steel column 240 is provided so that the coupling protrusion (CP) protrudes at the lower end to fit the coupling protrusion (CP) to the coupling hole (CH) of the cross member 120 and the longitudinal member 130. Install the junction.
- Coupling protrusion (CP) of the strip material 250 is installed in the coupling hole (CH) of the steel column (240) or, on the contrary, the coupling hole (CP) of the steel frame (240) is the coupling hole of the strip material 250 ( It is installed so that it fits in CH).
- the third step is composed of steel frame, including the steel frame pillar 240, steel frame beam, steel frame purlin, steel frame (eg, lintel, long tongue, etc.), and add a wooden finishing board to the steel frame shell
- the construction is carried out in the form of traditional wooden buildings.
- it is to construct a building by constructing a basic skeleton with steel frame and adding a finish wood.
- constructing a steel frame can be assembled while fitting the structure between each other frame members, for example, as shown in Figs. 7 and 8, the coupling protrusion of the lower steel frame 250 in the coupling hole (CH) of the steel column (240) Insert (CP).
- the base plate combined reference frame of the present invention and the building construction method using the same are intended to facilitate the fixing and installation of the column, which is applicable to the building pillar construction, there is industrial applicability.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
본 발명은 건물 시공의 기준을 정할 수 있으면서도 기둥의 정착 설치를 위해 베이스플레이트를 겸할 수 있는 베이스플레이트 겸용 기준틀과 이를 바람직하게 이용한 건물 시공방법에 관한 것이다. 본 발명에 따른 베이스플레이트 겸용 철골 기초기준틀은, 건물 시공의 기준을 정하면서 기둥의 정착 설치를 위한 베이스플레이트 겸용 기준틀로서, 기둥이 시공될 바탕면에 돌출되게 설치되는 복수개의 앵커볼트; 일측에 볼트구멍이 형성되어 상부면이 기둥위치에서 기둥의 하부레벨에 맞춰 상기 앵커볼트에 상기 볼트구멍이 관통되도록 고정 설치되되 앵커볼트에 상부면 및 하부면에서 각각 체결되는 체결너트로 수평레벨을 조절하면서 바탕면에서 이격하여 고정 설치되는 가로재; 및 상기 가로재와 동일하게 앵커볼트에 고정 설치되되 가로재 일단부와 결합되어 상부레벨이 가로재와 일치되게 설치되는 세로재; 를 포함하여 구성되는 것을 특징으로 한다.
Description
본 발명은 건물 시공에서 수직, 수평 등의 기준을 정밀하게 정할 수 있으면서도 기둥의 정착 설치를 위해 베이스플레이트를 겸할 수 있는 베이스플레이트 겸용 기준틀과 이를 바람직하게 이용한 건물 시공방법에 관한 것이다.
건축공사에서 기초를 수평으로 설치하고, 기초의 중심선, 기초폭 등을 지상에 표시하기 위해 기준틀(규준틀)을 설치한다.
도 1은 종래 기준틀 설치상태를 보여준다. 보는 바와 같이 시공한 기초 주변 지반에 말뚝을 박고 수평꿸대를 수평으로 설치한 후, 수평꿸대에 기초 중심선 위치를 표시하고 그 중심선을 따라 수평실을 띄워 기초의 시공위치를 잡는다. 이러한 기준틀 설치작업은 작업이 번거로울 뿐만 아니라 정확도가 떨어지는 문제가 있다. 또한 별도의 가설작업으로 진행되므로 향후 해체작업이 요구된다.
한편 철골구조에서 기초 위에 철골기둥을 설치하기 위해 앵커볼트로 베이스플레이트를 고정 설치한다. 베이스플레이트는 수평레벨을 맞춰 설치하는 것이 중요하고, 철골기둥은 정확한 위치에 수직도를 맞춰 설치하는 것이 중요하다.
본 발명은 종래 별개의 공정으로 진행되던 기준틀과 베이스플레이트의 설치작업을 개선하고자 개발된 것으로서, 다음과 같은 기술적 과제를 갖는다.
첫째, 건물 시공에서 기초, 기둥, 벽체 등의 수평, 수직 등을 위한 기준을 정밀하게 정할 수 있으면서도 기둥의 정착 설치를 위해 베이스플레이트를 겸할 수 있는 베이스플레이트 겸용 기준틀을 제공하고자 한다.
둘째, 베이스플레이트 겸용 기준틀을 바람직하게 이용한 건물 시공방법을 제공하고자 한다.
상기한 기술적 과제를 해결하기 위해 본 발명은, 건물 시공의 기준을 정하면서 기둥의 정착 설치를 위한 베이스플레이트 겸용 기준틀로서, 기둥이 시공될 바탕면에 돌출되게 설치되는 복수개의 앵커볼트; 일측에 볼트구멍이 형성되어 상부면이 기둥위치에서 기둥의 하부레벨에 맞춰 상기 앵커볼트에 상기 볼트구멍이 관통되도록 고정 설치되되 앵커볼트에 상부면 및 하부면에서 각각 체결되는 체결너트로 수평레벨을 조절하면서 바탕면에서 이격하여 고정 설치되는 가로재; 및 상기 가로재와 동일하게 앵커볼트에 고정 설치되되 가로재 일단부와 결합되어 상부레벨이 가로재와 일치되게 설치되는 세로재; 를 포함하여 구성되는 것을 특징으로 하는 베이스플레이트 겸용 기준틀을 제공한다. 이때, 상기 가로재와 세로재의 일측에 가새재의 양단이 각각 나사체결되어 상기 가로재와 세로재의 위치가 고정되는 것을 특징으로 한다. 본 발명은 상기 가로재 및 세로재 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 것으로 가로재와 동일하게 앵커볼트에 고정 설치되되 상부레벨이 가로재 및 세로재와 일치되게 설치되는 길이연장재; 및 상기 가로재 및 세로재 중 적어도 어느 하나 이상과 길이연장재 위에서 나사체결로 고정 설치되는 연결보강재; 를 더 포함하여 구성될 수 있으며, 상기 가로재 및 세로재는 상부면에 결합구멍이 형성될 수 있다.
또한 본 발명은 상기 베이스플레이트 겸용 기준틀을 이용하여 건물을 시공하는 방법으로, 가로재와 세로재 일단을 서로 연결하는 한편, 바탕면에 설치된 앵커볼트에 체결너트를 바탕면으로부터 일정간격 떨어진 위치에 체결하고, 앵커볼트를 가로재와 세로재의 볼트구멍에 관통시켜 바탕면과 이격되도록 체결너트 상부에 설치하며, 체결너트를 가로재와 세로재 상부면에서 앵커볼트에 체결하여 체결너트로 가로재와 세로재의 수평레벨을 기둥의 시공레벨에 맞춰 조절하는 제1단계; 가로재와 세로재 하부에 간격을 두고 상기 바탕면 상부에 기초콘크리트를 타설하는 제2단계; 및 가로재와 세로재 위에 기둥을 시공하면서 건물을 시공하는 제3단계; 를 포함하여 이루어지는 것을 특징으로 하는 건물 시공방법을 제공한다. 이때, 상기 제1단계는 가로재와 세로재 일단을 서로 연결한 후 가로재와 세로재 위에 가새재의 양단을 각각 나사체결하여 가로재와 세로재의 위치를 고정하여 실시하며, 상기 제3단계는 나사체결을 해체하여 가새재를 제거한 후 기둥을 시공할 수 있다. 그리고 상기 제3단계는 인접 기둥 사이를 띠장재로 연결하는 과정을 더 포함하면서 실시할 수 있다.
아울러 상기 제1단계는 상부면에 결합구멍이 형성된 가로재와 세로재를 이용하면서 실시하며, 상기 제3단계는 하단부에 결합돌기가 돌출 형성된 기둥을 결합돌기로 가로재와 세로재의 결합구멍에 끼워 맞추면서 실시할 수 있다. 또한, 상기 제1단계는 가로재 및 세로재 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 것으로 가로재와 동일하게 앵커볼트에 고정 설치되되 상부레벨이 가로재 및 세로재와 일치되게 설치되는 길이연장재를 배치하여, 상기 가로재 및 세로재 중 적어도 어느 하나 이상과 상기 길이연장재 위에서 연결보강재를 나사체결하는 과정을 더 포함하면서 실시하며, 상기 제3단계는 나사체결을 해체하여 연결보강재를 제거한 후 기둥을 시공 가능하다. 나아가 본 발명에서 상기 제2단계는 가로재와 세로재의 외측으로 이격하게 기단을 설치한 후 기단을 거푸집으로 하여 기초콘크리트를 타설하면서 실시할 수 있다.
본 발명에 따르면 다음과 같은 효과를 기대할 수 있다.
첫째, 건축공사에서 기준틀 설치작업과 기둥의 베이스플레이트 설치작업을 일원화할 수 있기 때문에 기존의 수직, 수평 기준을 잡기 위한 별도의 작업이 불필요하며, 이에 따라 관련 공사를 단순화하고 간소화할 수 있다. 특히 가로재와 세로재를 이음하여 가새재를 나사조립하고 앵커볼트에 체결너트를 체결하는 단순방법으로 모서리를 잡으면서 기준틀과 베이스플레이트 설치작업을 동시에 수행할 수 있으며, 이로써 가로재와 세로재 위에 기둥 내지 띠장재 등으로 간편하게 수평레벨과 수직레벨을 맞추면서 설치할 수 있다.
둘째, 건물 둘레에 기단 등의 시설물을 설치할 경우에도 본 발명에 따른 베이스플레이트 겸용 기준틀을 시설물의 시공위치 선정을 위한 기준으로 활용할 수 있기 때문에 건물 둘레의 시설물도 정확하게 시공할 수 있다.
셋째, 베이스플레이트 겸용 기준틀에 기둥, 벽체 등 건물 구조체의 시공위치를 표시할 수 있기 때문에 정확하고 신속하게 건물을 시공할 수 있다. 특히 베이스플레이트 겸용 기준틀에 미리 결합구멍 등을 형성시켜 기둥의 결합 위치를 표시할 수 있기 때문에 별도의 기둥위치 선정을 위한 작업이 불필요하다.
넷째, 설치된 베이스플레이트 겸용 기준틀은 그 위에 기둥, 벽체, 설비배관위치 등 건축시공에 필요한 모든 표시가 가능하다.
다섯째, 기둥 하부를 띠장재로 엮어 일체화시키면 구조적으로 안전성이 더 확보된다.
여섯째, 철골조는 물론, 목구조, 철근콘크리트조 등 다양한 구조방식의 건물시공에 유연하게 적용할 수 있다.
도 1은 종래 기초기준틀 설치상태를 도시한다.
도 2는 본 발명에 따른 베이스플레이트 겸용 기준틀의 설치상태를 도시한다.
도 3 내지 도 8는 전통 목조 건축물 시공에서 본 발명에 따른 베이스플레이트 겸용 기준틀을 이용한 기초 및 기둥의 시공과정을 도시한다.
본 발명의 베이스플레이트 겸용 기준틀은 건물 시공의 기준을 정하면서 기둥의 정착 설치를 위한 베이스플레이트 겸용 기준틀로서, 기둥이 시공될 바탕면에 돌출되게 설치되는 복수개의 앵커볼트; 일측에 볼트구멍이 형성되어 상부면이 기둥위치에서 기둥의 하부레벨에 맞춰 상기 앵커볼트에 상기 볼트구멍이 관통되도록 고정 설치되되 앵커볼트에 상부면 및 하부면에서 각각 체결되는 체결너트로 수평레벨을 조절하면서 바탕면에서 이격하여 고정 설치되는 가로재; 및 상기 가로재와 동일하게 앵커볼트에 고정 설치되되 가로재 일단부와 결합되어 상부레벨이 가로재와 일치되게 설치되는 세로재; 를 포함하여 구성되는 것을 특징으로 한다.
이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.
도 2는 본 발명에 따른 베이스플레이트 겸용 기준틀의 설치상태를 도시한다. 본 발명은 건물 시공의 기준을 정하면서 기둥(240)의 정착 설치를 위한 베이스플레이트 겸용 기준틀에 관한 것으로서, 앵커볼트(110), 가로재(120), 세로재(130), 가새재(140)를 포함하여 구성되며, 여기에 길이연장재(150) 및 연결보강재(160)를 더 포함하여 구성될 수 있다. 본 발명에 따른 기준틀은 기둥의 베이스플레이트를 겸하므로 기둥의 설치위치에 설치된다.
앵커볼트(110)는 복수개가 기둥이 시공될 바탕면(210)에 돌출되게 설치된다. 기초 위에 시공되는 기둥이라면 바탕면(210)은 잡석으로 다짐하거나 버림콘크리트를 타설하여 평탄하게 고르기 작업된 기초 지반이 되고, 일반 바닥슬래브 위에 시공되는 기둥이라면 바탕면(210)은 바닥슬래브가 된다. 앵커볼트(110)는 바탕면(210)에 고정 설치되는 것은 물론, 바탕면(210) 위에 시공되는 구조체에 고정 설치될 수 있으며, 또한 바탕면(210) 위에 단순히 올려놓는 방법으로 설치될 수 있다. 가령 기초 지반에 형성시킨 앵커홀에 박아 고정 설치하거나, 기초철근이나 슬래브철근 등에 결속시켜 고정 설치하며, 또는 가로재(120), 세로재(130), 길이연장재(150) 내지 연결보강재(160)와 조립한 상태에서 그대로 바탕면(210) 위에 올려놓는 것이다. 앵커볼트(110)에는 체결너트(N1, N2)가 체결되므로, 앵커볼트(110)는 체결너트(N1, N2)의 체결높이를 자유롭게 조절하기 위해 전산볼트가 적당하나 이에 국한되는 것은 아니다.
가로재(120)와 세로재(130)는 기초, 기둥, 벽체 등 건물의 기준을 정하는 부재가 되는데, 가로재(120)와 세로재(130)는 서로 일단부가 결합되어 상부레벨이 일치되게 설치된다. 특히, 가로재(120)와 세로재(130)는 서로 결합되는 일단부 모서리가 상호 맞댐면을 형성하여 이들을 서로 이음 결합할 수 있다. 가로재(120)와 세로재(130)가 이음되는 맞댐면은 건물의 평면에 따라 결정된다. 가령 가로재(120)와 세로재(130)가 모두 45°모서리로 재단되거나 각각 30°와 60° 등으로 재단되어 모서리에서 서로 이음하면 자연스럽게 직각모서리를 형성하면서 설치되므로, 직각모서리의 건물평면에 적합하다. 물론 직각뿐만 아니라 예각, 둔각 등의 모서리 각도를 갖는 다양한 건물 평면에도 적용가능하다. 도 2에서는 가로재(120)와 세로재(130)의 맞댐면이 각각 45°모서리를 갖도록 재단되어, 가로재(120)와 세로재(130)가 이음으로 설치되고 있다. 가로재(120)와 세로재(130)는 각각 상부면이 기둥위치에서 기둥의 하부레벨에 맞춰 앵커볼트(110)에 상기 볼트구멍(BH)이 관통되도록 고정 설치되며, 앵커볼트(110) 상부면 및 하부면에서 각각 체결되는 체결너트(N1, N2)로 수평레벨을 조절하면서 바탕면(210)에서 이격하여 고정 설치한다. 더불어 가로재(120) 및 세로재(130)에는 볼트구멍(BH) 외에 나사구멍(PH)이 형성될 수 있으며, 가로재(120) 및 세로재(130)는 상부면에 결합구멍(CH)이 형성될 수 있다. 여기서 나사구멍(PH)은 가새재(140)와 연결보강재(160)를 나사체결하기 위함이고, 결합구멍(CH)은 기둥(240)을 끼움 설치하는 방식으로 간단하게 기둥 위치를 잡기 위함이다. 특히 결합구멍(CH)으로 기둥 위치가 표시되므로 기둥 위치를 잡기 위한 별도의 작업은 불필요해진다. 가로재(120)와 세로재(130)의 재단과 각종 구멍 형성은 정밀하게 처리하기 위해 레이저 가공하는 것이 바람직하다. 한편 도 2에서는 가로재(120)와 세로재(130)가 플레이트로 마련되고 있는데, 가로재(120)와 세로재(130)는 각관, 형강재 등 기타 철골자재도 적용 가능하다.
가새재(140)는 가로재(120) 및 세로재(130)를 연결하여 가로재(120)와 세로재(130)의 위치를 고정하는 부재로, 가새재(140)는 양단이 가로재(120)와 세로재(130)의 일측에 각각 나사체결된다. 가새재(140)는 가로재(120)와 세로재(130)의 상면에 위치시킨 상태에서 나사못(P)으로 나사체결되어 고정 설치된다. 가새재(140)의 설치에 따라 가로재(120)와 세로재(130)의 이음이 더욱 안정적으로 유지된다. 가새재(140)도 플레이트, 각관, 형강재 등의 철골자재로 마련하면 된다.
길이연장재(150)는 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 부재로, 가로재(120)와 동일하게 앵커볼트(110)에 고정 설치되되 상부레벨이 가로재(120)와 일치되게 설치된다. 그리고 연결보강재(160)는 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상과 길이연장재(150) 위에서 나사체결로 고정 설치되는 부재이다.
길이연장재(150)는 가로재(120) 또는 세로재(130)와 동일한 부재로 마련하면 바람직하고, 연결보강재(160)도 길이연장재(150)와 동일한 너비로 마련하여 나사못(P)에 의한 나사체결로 고정 설치되는 것이 바람직하다. 한편 기둥 위치에는 길이연장재(150)도 가로재(120)나 세로재(130)와 마찬가지로 앵커볼트(110)와 체결너트(N2, N2)를 이용하면서 수평레벨에 맞춰 설치한다. 길이연장재(150)와 연결보강재(160)의 설치로 본 발명에 따른 기준틀은 시공할 건물의 외곽 둘레를 둘러싸도록 설치될 수 있다. 이렇게 설치된 기준틀은 그 위에 기둥, 벽체, 설비배관 등 건물 시공에 필요한 모든 위치의 표시가 가능하다.
도 3 내지 도 8는 전통 목조 건축물 시공에서 본 발명에 따른 베이스플레이트 겸용 기준틀을 이용한 기초 및 기둥의 시공과정을 보여주는데, 이를 참고하여 건물의 시공과정을 살펴본다. 아래에서는 베이스플레이트 겸용 기준틀 위의 상부구조를 철골구조로 예시하여 설명하지만, 본 발명의 베이스플레이트 겸용 기준틀과 결합 가능한 구조라면 상부구조는 목구조 등 다른 구조방식도 가능하다. 철근콘크리트로 시공하는 경우에는 가로재(120)와 세로재(130)에 있는 기둥위치에 동자주(짧은 기둥)와 띠장재로 하부구조를 연결하여 수직, 수평을 잡은 뒤 동자주를 철거하고 기둥철근을 배근한 후 콘크리트를 타설하는 방식으로 시공할 수 있다.
먼저 본 발명에 따른 베이스플레이트 겸용 기준틀을 기둥(240)이 시공될 바탕면(210)에 설치한다(제1단계). 본 발명의 베이스플레이트 겸용 기준틀을 기초기준틀로 활용하는 경우라면 바탕면(210)은 잡석을 다지거나 버림콘크리트를 타설하는 방법으로 고르기 작업을 사전에 진행한다. 베이스플레이트 겸용 기준틀은, 가로재(120)와 세로재(130) 일단을 서로 연결하는 한편(도 3), 바탕면(210)에 설치된 앵커볼트(110)에 체결너트(N1)를 바탕면(210)으로부터 일정간격 떨어진 위치에 체결하고, 앵커볼트(110)를 가로재(120)와 세로재(130)의 볼트구멍(BH)에 관통시켜 바탕면(210)과 이격되도록 체결너트(N1) 상부에 설치하며, 체결너트(N2)를 가로재(120)와 세로재(130) 상부면에서 앵커볼트(110)에 체결하여 체결너트(N1, N2)로 가로재(120)와 세로재(130)의 수평레벨을 기둥(240)의 시공레벨에 맞춰 조절한다(도 4). 여기서 가로재(120)와 세로재(130)가 기둥(240) 위치에 위치하도록 설치하며, 그래야 기준틀과 베이스플레이트를 겸할 수 있다. 이로써 베이스플레이트 겸용 기준틀의 설치가 완료된다.
이때, 상기 제1단계는, 가로재(120)와 세로재(130) 일단을 서로 연결한 후 가로재(120)와 세로재(130) 위에 가새재(140)의 양단을 각각 나사체결하여 가로재(120)와 세로재(130)의 위치를 고정하여 실시할 수 있다(도 3).
그리고 상기 제1단계는, 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 것으로 가로재(120)와 동일하게 앵커볼트(110)에 고정 설치되되 상부레벨이 가로재(120) 및 세로재(130)와 일치되게 설치되는 길이연장재(150)를 배치하여, 상기 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상과 상기 길이연장재(150) 위에서 연결보강재(160)를 나사체결하는 과정을 더 포함하면서 실시할 수 있다(도 4).
본 발명의 베이스플레이트 겸용 기준틀을 기초기준틀로 활용한다면 베이스플레이트 겸용 기준틀의 설치가 완료된 후에 기초를 시공한다. 기초는 가로재(120)와 세로재(130)의 아래로 바탕면(210) 위에 기초철근을 배근하고 기초콘크리트(230)를 타설하여 시공한다(제2단계). 기초콘크리트(230)는 가로재(120)와 세로재(130) 아래로 이격공간을 두면서 타설하며, 그래야 기둥 시공과정에서 체결너트(N1, N2)를 조절하면서 가로재(120)와 세로재(130)의 수평레벨을 미세 조절할 수 있다. 전통 건축물로 시공한다면 가로재(120)와 세로재(130)의 외측으로 이격하게 기단(220)을 설치한 후(도 5)에 기단(220)을 거푸집으로 하여 기초콘크리트(230)를 타설한다(도 6). 기단(220)은 가로재(120)와 세로재(130)를 기준으로 위치 및 수평레벨을 정하여 설치한다. 이로써 기초의 시공이 완성된다.
이어 가로재(120)와 세로재(130)를 베이스플레이트로 활용하여 기둥(240)을 시공하면서 건물을 시공한다(제3단계).
기초의 시공이 끝난 후에 제3단계에서는 제1단계에서 가새재(140)를 설치한 경우, 나사체결을 해체하여 가새재(140)를 제거하며, 제1단계에서 연결보강재(160)를 설치한 경우에는 나사체결을 해체하여 연결보강재(160)를 제거한 다음 기둥(240)을 시공한다. 이때, 필요에 따라 기둥(240) 위치가 아닌 곳에 설치된 길이연장재(150)도 함께 제거할 수 있다. 제거한 가새재(140), 길이연장재(150), 연결보강재(160)는 다른 공사에 전용할 수 있다.
제3단계에서는 가로재(120)와 세로재(130) 아래에 체결된 체결너트(N1)를 미세 조정하면서 기둥(240)의 수직도를 맞추도록 한다. 기둥(240)과 함께 띠장재(250)를 더 시공할 수 있는데 띠장재(250)는 인접 기둥(240) 사이를 연결하도록 설치하며, 띠장재(250)를 설치한다면 앞서 개략적으로 수평레벨을 맞춘 기둥(240)에 연결한 후에 체결너트(N1, N2)를 미세 조정하여 수평레벨을 잡는다. 이로써 띠장재(250)가 올바로 설치되면서 더욱 정확하게 수평레벨을 잡을 수 있게 되고, 이에 따라 궁극적으로 기둥(240)의 수직도도 더욱 정확하게 잡을 수 있게 된다. 띠장재(250)는 정확하게 재단하여 기둥(240) 하부에서 인접 기둥(240) 사이에 맞춤 설치되어야 할 것인데, 그래야 수평레벨 및 기둥(240)의 수직도를 더욱 쉽고 정확하게 잡을 수 있다. 또한 띠장재(250)의 설치로 기둥(240) 상호 간에 수평보강되면서 일체화되기 때문에 견고한 건물 골조로 완성된다. 기둥(240)의 수직도를 맞춘 후에는 기둥(240) 하부 가로재와 세로재 아래를 무수축 몰탈 등으로 보강할 수 있다.
제3단계에서 기둥(240)과 띠장재(250)는 철골은 물론 다양한 자재로 시공가능하며, 도 7와 도 8에서는 철골부재로 시공한 경우를 예시한다. 보는 바와 같이 철골기둥(240)은 가로재(120)와 세로재(130) 위에서 수직도를 맞추면서 접합 설치하며, 다만 이 경우 상부면에 결합구멍(CH)이 형성된 가로재(120)와 세로재(130)를 이용하였다면 철골기둥(240)은 하단부에 결합돌기(CP)가 돌출되게 마련하여 결합돌기(CP)를 가로재(120)와 세로재(130)의 결합구멍(CH)에 끼워 맞추면서 접합 설치한다. 철골기둥(240)의 결합돌기(CP)를 결합구멍(CH)에 끼움 설치하는 것만으로 기둥(240)의 수직도를 잡을 수 있기 때문에 작업이 수월해져 시공성이 향상된다. 띠장재(250)도 철골기둥(240)에 끼움 설치하는 방식으로 간단하게 설치한다. 철골기둥(240)의 결합구멍(CH)에 띠장재(250)의 결합돌기(CP)를 끼움 설치하거나, 반대로 철골기둥(240)의 결합돌기(CP)를 띠장재(250)의 결합구멍(CH)에 끼움되도록 설치하는 것이다.
한편, 전통 건축물을 시공한다면 제3단계는 철골기둥(240)과 함께 철골보, 철골도리, 철골수장(인방, 장혀 등)을 포함하는 철골조로 뼈대를 구성하고, 상기 철골조 외피에 목재마감판을 덧붙이면서 전통 목조 건축물 외관으로 시공하는 과정으로 실시한다. 즉, 특허 제10-0934458호와 같이 철골조로 기본 뼈대를 구성하고 마감목재를 덧붙이는 방식으로 건축물을 구축하는 것이다. 특히 철골골조를 시공할 때에는 골조부재 상호 간 결구식으로 끼움 설치하면서 조립할 수 있는데, 가령 도 7 및 도 8에서와 같이 철골기둥(240)의 결합구멍(CH)에 철골하방(250)의 결합돌기(CP)를 끼움 설치한다.
이상에서 본 발명은 구체적인 실시예를 참조하여 상세히 설명되었으나, 실시예는 본 발명을 예시하기 위한 것일 뿐이므로, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 치환, 부가 및 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호범위에 속한다고 할 것이다.
본 발명의 베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법은 기둥의 정착 및 설치를 용이하게 하기 위한 것으로서 건물 기둥공사에 적용 가능한 것이어서 산업상 이용가능성이 있다.
Claims (11)
- 건물 시공의 기준을 정하면서 기둥의 정착 설치를 위한 베이스플레이트 겸용 기준틀로서,기둥이 시공될 바탕면(210)에 돌출되게 설치되는 복수개의 앵커볼트(110);일측에 볼트구멍(BH)이 형성되어 상부면이 기둥위치에서 기둥의 하부레벨에 맞춰 상기 앵커볼트(110)에 상기 볼트구멍(BH)이 관통되도록 고정 설치되되 앵커볼트(110)에 상부면 및 하부면에서 각각 체결되는 체결너트(N1, N2)로 수평레벨을 조절하면서 바탕면(210)에서 이격하여 고정 설치되는 가로재(120); 및상기 가로재(120)와 동일하게 앵커볼트(110)에 고정 설치되되 가로재(120) 일단부와 결합되어 상부레벨이 가로재(120)와 일치되게 설치되는 세로재(130); 를 포함하여 구성되는 것을 특징으로 하는 베이스플레이트 겸용 기준틀.
- 제1항에서,상기 가로재(120)와 세로재(130)의 일측에 가새재(140)의 양단이 각각 나사체결되어 상기 가로재(120)와 세로재(130)의 위치가 고정되는 것을 특징으로 하는 베이스플레이트 겸용 기준틀.
- 제1항에서,상기 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 것으로 가로재(120)와 동일하게 앵커볼트(110)에 고정 설치되되 상부레벨이 가로재(120) 및 세로재(130)와 일치되게 설치되는 길이연장재(150); 및상기 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상과 길이연장재(150) 위에서 나사체결로 고정 설치되는 연결보강재(160); 를 더 포함하여 구성되는 것을 특징으로 하는 베이스플레이트 겸용 기준틀.
- 제1항에서,상기 가로재(120) 및 세로재(130)는 상부면에 결합구멍(CH)이 형성되는 것을 특징으로 하는 베이스플레이트 겸용 기준틀.
- 제1항에 따른 베이스플레이트 겸용 기준틀을 이용하여 건물을 시공하는 방법으로,가로재(120)와 세로재(130) 일단을 서로 연결하는 한편, 바탕면(210)에 설치된 앵커볼트(110)에 체결너트(N1)를 바탕면(210)으로부터 일정간격 떨어진 위치에 체결하고, 앵커볼트(110)를 가로재(120)와 세로재(130)의 볼트구멍(BH)에 관통시켜 바탕면(210)과 이격되도록 체결너트(N1) 상부에 설치하며, 체결너트(N2)를 가로재(120)와 세로재(130) 상부면에서 앵커볼트(110)에 체결하여 체결너트(N1, N2)로 가로재(120)와 세로재(130)의 수평레벨을 기둥(240)의 시공레벨에 맞춰 조절하는 제1단계;가로재(120)와 세로재(130) 하부에 간격을 두고 상기 바탕면(210) 상부에 기초콘크리트(230)를 타설하는 제2단계; 및가로재(120)와 세로재(130) 위에 기둥(240)을 시공하면서 건물을 시공하는 제3단계; 를 포함하여 이루어지는 것을 특징으로 하는 건물 시공방법.
- 제5항에서,상기 제1단계는, 가로재(120)와 세로재(130) 일단을 서로 연결한 후 가로재(120)와 세로재(130) 위에 가새재(140)의 양단을 각각 나사체결하여 가로재(120)와 세로재(130)의 위치를 고정하여 실시하며,상기 제3단계는, 나사체결을 해체하여 가새재(140)를 제거한 후 기둥(240)을 시공하는 것을 특징으로 하는 건물 시공방법.
- 제5항 또는 제6항에서,상기 제3단계는, 인접 기둥(240) 사이를 띠장재(250)로 연결하는 과정을 더 포함하면서 실시하는 것을 특징으로 하는 건물 시공방법.
- 제5항 또는 제6항에서,상기 제1단계는, 상부면에 결합구멍(CH)이 형성된 가로재(120)와 세로재(130)를 이용하면서 실시하며,상기 제3단계는, 하단부에 결합돌기(CP)가 돌출 형성된 기둥(240)을 결합돌기(CP)로 가로재(120)와 세로재(130)의 결합구멍(CH)에 끼워 맞추면서 실시하는 것을 특징으로 하는 건물 시공방법.
- 제5항 또는 제6항에서,상기 제1단계는, 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상의 타단부에서 이어져 길이 연장되게 설치되는 것으로 가로재(120)와 동일하게 앵커볼트(110)에 고정 설치되되 상부레벨이 가로재(120) 및 세로재(130)와 일치되게 설치되는 길이연장재(150)를 배치하여, 상기 가로재(120) 및 세로재(130) 중 적어도 어느 하나 이상과 상기 길이연장재(150) 위에서 연결보강재(160)를 나사체결하는 과정을 더 포함하면서 실시하며,상기 제3단계는, 나사체결을 해체하여 연결보강재(160)를 제거한 후 기둥(240)을 시공하는 것을 특징으로 하는 건물 시공방법.
- 제5항 또는 제6항에서,상기 제2단계는, 가로재(120)와 세로재(130)의 외측으로 이격하게 기단(220)을 설치한 후 기단(220)을 거푸집으로 하여 기초콘크리트(230)를 타설하면서 실시하는 것을 특징으로 하는 건물 시공방법.
- 제5항 또는 제6항에서,상기 제3단계는, 기둥(240)을 철골기둥으로 하고, 철골기둥과 함께 철골보, 철골도리, 철골수장을 포함하는 철골조로 뼈대를 구성하고, 상기 철골조 외피에 목재마감판을 덧붙이면서 전통 목조 건축물 외관으로 시공하면서 실시하는 것을 특징으로 하는 건물 시공방법.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2012-0105842 | 2012-09-24 | ||
KR1020120105842A KR101265977B1 (ko) | 2012-09-24 | 2012-09-24 | 베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014046426A1 true WO2014046426A1 (ko) | 2014-03-27 |
Family
ID=48666529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2013/008330 WO2014046426A1 (ko) | 2012-09-24 | 2013-09-16 | 베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR101265977B1 (ko) |
WO (1) | WO2014046426A1 (ko) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0988191A (ja) * | 1995-09-21 | 1997-03-31 | Inukai Kensetsu Kk | 土台プレート |
JP2002115324A (ja) * | 2000-10-11 | 2002-04-19 | Sanbase Corp | 柱脚ユニット並びにこの柱脚ユニットを用いた柱一体型柱脚固定基礎構造並びにその施工方法。 |
KR100787178B1 (ko) * | 2006-12-22 | 2007-12-21 | 전남대학교산학협력단 | 경량철골구조 기초바닥판 및 그 시공 방법 |
KR20090008072U (ko) * | 2008-02-04 | 2009-08-07 | 주식회사 우진공영 | 테이블베이스 |
-
2012
- 2012-09-24 KR KR1020120105842A patent/KR101265977B1/ko active IP Right Grant
-
2013
- 2013-09-16 WO PCT/KR2013/008330 patent/WO2014046426A1/ko active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0988191A (ja) * | 1995-09-21 | 1997-03-31 | Inukai Kensetsu Kk | 土台プレート |
JP2002115324A (ja) * | 2000-10-11 | 2002-04-19 | Sanbase Corp | 柱脚ユニット並びにこの柱脚ユニットを用いた柱一体型柱脚固定基礎構造並びにその施工方法。 |
KR100787178B1 (ko) * | 2006-12-22 | 2007-12-21 | 전남대학교산학협력단 | 경량철골구조 기초바닥판 및 그 시공 방법 |
KR20090008072U (ko) * | 2008-02-04 | 2009-08-07 | 주식회사 우진공영 | 테이블베이스 |
Also Published As
Publication number | Publication date |
---|---|
KR101265977B1 (ko) | 2013-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7908804B2 (en) | Structural lintel assembly and building construction method using the same | |
US8074414B2 (en) | Precast wall panels and method of erecting a high-rise building using the panels | |
CN101949212B (zh) | 楼板可拆模板支撑系统及其施工方法 | |
CN202706198U (zh) | 一种建筑结构 | |
US20130283724A1 (en) | Utility dowel bracket | |
CN110409811B (zh) | 含钢筋笼免拆成型柱模板、模板结构及建筑工艺 | |
WO2011127522A1 (en) | A method of forming a structural element and a method of building a structure | |
WO2002066757A1 (en) | A load bearing building panel | |
US20100037538A1 (en) | Temporary adjustable support brace | |
CN212866842U (zh) | 一种框构式建筑脚手架 | |
WO2014046426A1 (ko) | 베이스플레이트 겸용 기준틀 및 이를 이용한 건물 시공방법 | |
KR20200107332A (ko) | 건축 구조물의 벽체 및 바닥 슬래브 동시 시공방법 | |
US20090121373A1 (en) | Method and Apparatus for Construction | |
US20090165408A1 (en) | Construction elements and methods of construction | |
KR101880813B1 (ko) | 샌드위치 피씨 패널 구조물 및 이를 이용한 구조물 시공방법 | |
CN209891381U (zh) | 一种建筑结构 | |
CN212336729U (zh) | 支模支撑系统 | |
KR20120020758A (ko) | 콘크리트 건물의 건축공법 | |
KR101033530B1 (ko) | 천장 거푸집 지지용 써포트의 안전키트 | |
CN111364758A (zh) | 支模支撑系统 | |
RU2597650C1 (ru) | Каркас щита опалубки | |
KR101285189B1 (ko) | Pc 라멘조를 위한 외부 건식벽체 유닛 구조, 및 이의 시공방법 | |
AU2005287894B2 (en) | Method and apparatus for construction | |
KR101320697B1 (ko) | 거푸집 연결구 및 이를 이용한 거푸집 연결 방법 | |
KR102242175B1 (ko) | 조립식 더블 월 pc 제조 금형 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13838133 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13838133 Country of ref document: EP Kind code of ref document: A1 |