WO2014007645A1 - Monitoring of multilayer reservoirs - Google Patents

Monitoring of multilayer reservoirs Download PDF

Info

Publication number
WO2014007645A1
WO2014007645A1 PCT/NO2013/050121 NO2013050121W WO2014007645A1 WO 2014007645 A1 WO2014007645 A1 WO 2014007645A1 NO 2013050121 W NO2013050121 W NO 2013050121W WO 2014007645 A1 WO2014007645 A1 WO 2014007645A1
Authority
WO
WIPO (PCT)
Prior art keywords
tracer
production
well
flow
reservoir
Prior art date
Application number
PCT/NO2013/050121
Other languages
French (fr)
Inventor
Fridtjof Nyhavn
Original Assignee
Resman As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Resman As filed Critical Resman As
Priority to EP13812901.0A priority Critical patent/EP2867453A4/en
Priority to US14/412,040 priority patent/US9664035B2/en
Publication of WO2014007645A1 publication Critical patent/WO2014007645A1/en
Priority to NO20150093A priority patent/NO20150093A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/11Locating fluid leaks, intrusions or movements using tracers; using radioactivity
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Definitions

  • Figure 1 a shows an enlarged view of the influx zone 34 from Figure 1 .
  • the tracer system with distinct tracer materials 44 m distinct for influx zone 34 are arranged in a known position in the influx zone 34.
  • An entry point e44 for the leakout of the influx from zone 34 is provided also in a known position.
  • a delay path is provided by the distance between the position of the distinct tracer material source 44m and the entry point e44 for the influx from zone 34 into the production baseline.

Landscapes

  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Measuring Volume Flow (AREA)
  • Complex Calculations (AREA)

Abstract

A method and a system is described for estimating flow rates of fluids from each of separate influx zones (3, 31, 32, 33, 34) in a multilayered reservoir to a production flow (Q) in a well (Wr) in the reservoir, the well having at least two separate influx zones (3, 31, 32, 33, 34) from the multilayer reservoir of known positions along the well, the well being provided with distinct tracer sources (41, 42, 43, 44) with distinct tracer materials (41 m, 42m, 43m, 44m) of known positions in each of the at least two separate influx zones (31, 32, 33, 34). Each influx zone is provided with a delay path for a tracer leakout stream flow from that influx zone. The method comprising providing a global production flow change for the production flow in the well, establishing tracer concentrations in the production flow of the distinct tracer materials (41 m, 42m, 43m, 44m) as a function of time, and estimating the production rates from each of the separate influx zones (31, 32, 33, 34) in the reservoir.

Description

Monitoring of multilayer reservoirs
INTRODUCTION
The present invention concerns a method and a system for estimating flow rates of fluids from each of separate influx zones in a multilayered reservoir to a production flow in a well in the reservoir.
The method and system may be used for indicating potential crossflow in wells that are draining multilayered reservoirs. The method and system may further be used for estimating influx volumes of fluids from zones in a multilayered reservoir with potential crossflow to a production flow in a well. The fluids may be water, oil, gas.
BACKGROUND
In multilayered reservoirs the hydrocarbon production flow may be produced from multiple zones having different properties and different backpressures. This results in a situation where the produced hydrocarbons from a zone may flow into the well and out into other zones in the formation, - a phenomenon called crossflow. The effect is mostly experienced when wells are shut in and at low flow rates.
A method for monitoring and characterizing multilayered reservoirs are described in SPE 132596 "Best practices in Testing and Analyzing Multilayer Reservoirs" by Pan et al. and is based on testing and analyzing the pressure transient behavior of the multilayer reservoir in combination with the Selective Inflow Performance (SIP) production logging technique (PLT). In this paper, a production logging tool are measuring the flow profile and well hole pressures in the well during various flow rates. The logging tool is lowered down into the well and dragged up and down in the well providing measurements in the different zones in the well during the procedure. This procedure is very expensive and time consuming and the running of a PLT is not always an option due to poor accessibility. The procedure requires the logging tool inside the well, and thus the use of large equipment for handling the tool; e.g. a drilling vessel. There is also the risk of the logging tool getting stuck in the well with the possible result of completely abandonment of the well. SUMMARY OF THE INVENTION
The present invention provides an optional solution to the problem above without well intervention. The inventive method and system is based on studying tracer flowback behaviour with altering production rates from the well.
The invention provides a method for estimating flow rates of fluids from each of separate influx zones in a multilayered reservoir to a production flow in a well in the reservoir, the well having at least two separate influx zones from the multilayer reservoir of known positions along the well, the well being provided with distinct tracer sources with distinct tracer materials of known positions in each of the at least two separate influx zones. The method comprising providing a global production flow change for the production flow in the well, establishing tracer concentrations in the production flow of the distinct tracer materials as a function of time during the global flow change, and estimating the production rates from each of the separate influx zones in the reservoir. A delay path for a tracer leakout stream flow from each zone in the reservoir may be provided.
In an aspect the invention provides a method for estimating flow rates of fluids from each of separate influx zones in a multilayered reservoir to a production flow in a well in the reservoir, the well having at least two separate influx zones from the multilayer reservoir of known positions along the well, the well being provided with distinct tracer sources with distinct tracer materials of known positions in each of the at least two separate influx zones wherein each influx zone being provided with a delay path for a tracer leakout stream flow from that influx zone, the method comprising:
a) providing a global production flow change for the production flow in the well, b) establishing tracer concentrations in the production flow of the distinct tracer materials as a function of time, and measuring time delays for tracer concentration changes of the distinct tracer materials from each zone resulting from the global production flow change; and
c) estimating the production rates from each of the separate influx zones in the reservoir. Each zone may further be provided with a specific entry point for a tracer leakout stream flow from each zone. The tracers may be arranged in the at least two separate influx zones in the multilayer reservoir during completion of the well. The tracers may in an embodiment be arranged in well equipment provided in the well.
In a further embodiment the method may further comprise:
i) - flowing the well at a high production rate,
- collecting consecutive samples of said high production flow at the topside as a function of time or collecting cumulative production volumes of said high
production flow at the topside, and
- establishing concentrations of the distinct tracer materials from each of the at least two separate influx zones during the high production rate, and
ii) - flowing the well at a lower well production rate,
- collecting consecutive samples of said lower production flow at the topside as a function of time or collecting cumulative production volumes of said lower production flow at the topside, and
- establishing the concentrations of the distinct tracer materials during the lower well production rate.
The method may further comprise repeating the steps i) and ii) for a number of decreasing production rates, monitoring tracer concentration transients in the production flow after each production rate decrease, and estimating the flow contributions from each of the at least two separate influx zones.
Decreasing production rates may comprise gradually decreasing the production flow rate. In an embodiment, the method may comprise establishing the flow rate for which the tracer concentration of at least one of the distinct tracer materials is disappearing from the production flow. In an embodiment the method may comprise gradually decreasing the production flow rate until the at least one distinct tracer material is disappearing from the production flow.
In an embodiment, the method may further comprise gradually decreasing the production flow rate until a tracer concentration of at least one of the specific tracer materials in a sample of the production flow becomes zero. Decreasing production rates may comprise stepwise decreasing the production flow rate.
The production flow change may comprise stepwise, gradually or continuously decreasing the production flow rate. The production flow change may comprise stepwise, gradually or continuously increasing the production flow rate.
The global production flow change may be provided by a ramp-up.
In an even further embodiment, the method comprising based on said
concentrations and their sampling times during gradually decreasing flow rates, establishing the tracer concentration transients after each rate change, and based on the tracer concentration transients after each rate change estimate the flow contributions from each zone, note the rate on which the tracer in a specific zone is disappearing and establishing rate-pressure curves for the different zones in the multilayer reservoir.
The global production flow change may be provided by a flush-out of the tracers. The tracers may be mechanically released from the tracer systems. The fluids may be at least one of water, oil or gas.
In a further aspect the invention provides a system for estimating flow rates of fluids from each of separate influx zones in a multilayered reservoir to a production flow in a well in the reservoir, where the well has at least two separate influx zones from the multilayer reservoir of known positions along the well. The system comprising: distinct tracer sources with distinct tracer materials arranged in known positions in each of the at least two separate influx zones of the well; apparatus for establishing tracer concentrations in the production flow of the distinct tracer materials as a function of time during a global flow change for the production flow in the well; and estimating the production rates from each of the separate influx zones in the reservoir. A delay path is provided for a tracer leakout stream flow from the distinct tracer sources in each influx zone in the reservoir. The delay path in an influx zone may be provided by a distance between the distinct tracer sources and an entry point for the tracer leakout stream flow into a production baseline of the well.
The tracers may be arranged in the at least two separate influx zones in the multilayer reservoir during completion of the well. The tracers may be arranged in the reservoir formation, in a completion, a casing, a liner, or in equipment provided in the well. The tracers may be mechanically released or released upon interaction with a well fluid.
The method and system above may be used for indicating potential crossflow in wells that are draining multilayered reservoirs. The method and system may also be used for estimating influx volumes of fluids from zones in a multilayered reservoir with potential crossflow to a production flow in a well.
The fluids may be at least one of water, oil or gas.
BRIEF DESCRIPTION OF DRAWINGS
Example embodiments of the invention will now be described with reference to the followings drawings, where:
Figure 1 illustrates a multilayer reservoir with a number of influx zones provided with tracer materials distinct for each influx zone according to an embodiment of the invention;
Figure 1 a shows an enlarged view of one of the influx zones from Figure 1 illustrating a flux contribution from the zone and a distance between the tracer materials and an entry point for the flux contribution into the reservoir according to an embodiment of the invention;
Figure 1 b shows an enlarged view of one of the influx zones from Figure 1 with a zonal contribution and a delay path for the tracer materials into a production baseline, according to an embodiment of the invention;
Figure 1 c illustrates a tracer concentration flow rate (dotted lines C t C e) as a function of time in the zone in Figure 1 b resulting from a flow rate change (choke setting), where C44t is the tracer concentration at a tracer system in the zone and C44e the tracer concentration in an entry point for the influx from the zone into the reservoir baseline and thus the topside tracer concentration, according to an embodiment of the invention;
Figure 1 d illustrates tracer concentration flow rates (dotted lines C44t C4ie C42e C 3e) as a function of time from the different zones in the multilayer reservoir illustrated in Figure 1 resulting from a flow rate change due to a choke setting, where C44t is the tracer concentration at a tracer system in the zone according to an embodiment of the invention;
Figure 2 illustrates a multilayered reservoir having four zones with possible different reservoir pressures and formation flow resistivities, where distinct tracer materials are arranged in each zone;
Figure 3a shows rate pressure curves p1 , p2, p3 and p4 for a multilayered reservoir with four zones together with indications of the full rate contributions and shutin cross flows for the different zones;
Figure 3b illustrates creation of rate pressure curves p1 , p2, p3 and p4 by step rate changes of the well production rate according to an embodiment of the invention;
Figure 4 shows an example of tracer concentrations as a function of time for the multilayer reservoir in Figure 2 during a well production ramp-up according to an example embodiment of the invention; and
Figure 5 illustrates an example embodiment of stepping down of production rate followed by sampling. After each down-step there is a sequence of samples to catch tracer responses as indicated in Figures 1 c and 1 d.
DETAILED DESCRIPTION
The present invention will be described with reference to the drawings. The same reference numerals are used for the same or similar features in all the drawings and throughout the description.
The present invention provides the use of tracers combined with production flow rate changes for the production flow in the production well, and monitoring tracer concentrations. The invention will be explained in detail below. While the tracer systems are exposed to/wetted by their target fluid (e.g. water or hydrocarbons) there will be a leakage of tracer material from the zones in the reservoir/well. The leak-out rate of tracer material has been tuned to give a detectable signal at the sampling point for a given production rate over the lifetime for the tracer systems. The leakage rate is not dependent on the fluid velocity past the tracer systems, and no such velocity is required for the tracer material to leak into the surrounding fluids as long as the fluids are the target fluids for the given system. For an oil system, oil would be the target fluid and for a water system, water would be the target fluid.
This independence of fluid velocity means that while the well is shut-in and there are no flow past the tracer systems (assuming no cross-flow in the well), a high concentration of tracer material will build up in the vicinity of the tracer systems, - a tracer shot. When the well is opened and the fluids flow towards the surface, the tracer shot will also migrate towards the sampling point of the well. If the tracer concentration in the fluids at the sampling point is measured as a function of time or volume, then the high concentration fluids passing the sampling point will give concentration peaks for each tracer in the well. The tracer concentration peaks and their arrival timing may carry information on zonal contribution.
However, with serious crossflows fluids may never be still and shots may not be able to build. Shutin may also be a scenario that should be avoided from a production angle as explained earlier.
The tracers that may be used in the present invention may be any kind of tracer influenced by the well fluids and for which the concentrations of tracer may be determined.
Non-limiting examples of tracers that may be used in the present invention are described in e.g. WO0181914 and WO2010005319 (both belonging to the applicant of the present invention; Resman AS) which are hereby included by reference in their entirety. Once arranged in the well these tracers may enable monitoring of the well or reservoir for decades. The tracers used in the present invention may be arranged in the reservoir for the purpose of the invention. Alternatively, tracers already present in the different zones in the reservoir may be used. The tracers may be arranged in the reservoir during completion or in well equipment later installed in the well or reservoir. The tracers may be arranged in the influx zones in the multilayer reservoir during completion of the well. Further, the tracers may be arranged in the reservoir formation, in a completion, a casing, a liner, or in equipment provided in the well.
It may also be envisaged mechanically release of tracers, and establishing tracer transients by using tracer shots.
Figure 1 illustrates a multilayer reservoir with a number of influx zones 3, (31 , 32, 33, 34). Each influx zone is provided with tracer systems 4 (41 m, 42m, 43m, 44m) with tracer materials distinct for each influx zone.
The multilayered reservoir is in figure 1 shown with four influx zones 3 (31 , 32, 33, 34). The flow rates q, (q4-i , q42, q43, q44) of fluids from the influx zones of the multilayered reservoir flows into a well Wr, the flow rates constituting a production flow Q of the well. The number four is for illustration purposes only, and a multilayer reservoir may have a large number of different influx zones. The influx zones have known positions along the well Wr. The fluids from the influx zones leak out into a basepipe flow through entry points of known locations provided in each zone. The four influx zones represent four completion zones, where each completion zone is separated from each other by flow isolation (e.g. packers). A choke 30 is provided for controlling the production flow from the well. As non- limiting examples, the entry points may be provided by apertures, openings in a completion, pipe, screen, provided by valves, etc. The multilayer reservoir may be a hydrocarbon reservoir. The fluids may be at least one of water, oil or gas.
Tracer sources 41 , 42, 43, 44 with distinct tracer materials 41 m, 42m, 43m, 44m distinct for each zone are arranged in each influx zone 31 , 32, 33, 34. The tracer sources are arranged in known positions in each zone. Each of the distinct tracer materials 41 m, 42m, 43m, 44m have known tracer leak-out flux rates ft4-i , ft42, ft43, ft44 .. to the surrounding influx fluids in the zone. The tracer leak-out flux rates are independent of fluid flow velocities. Each tracer leakout stream is flushed into the basepipe flow at a velocity proportional to the production rate in the zone and with corresponding flux contributions n, f∞n42, f∞n43, f∞n44- The tracer leakout streams flow into the basepipe flow at known entry points in each zone together with the production flow from the zone.
A valve 30 is in the embodiment in Figure 1 arranged at the topside for controlling the production flow. The valve is used in the procedure for global choking of the production flow. During the global choking procedure, the distinct tracer materials from each zone in the production flow are monitored as a function of time. The monitoring of the distinct tracer materials in the production flow provides a basis for estimating the fluid influx from each of the zones. An analysing apparatus for identifying each distinct tracer material and measuring the concentration of each of the identified distinct tracer materials in the production flow is provided. The procedure will be further explained below. Samples (ci , c2, c3, c4...) of the production flow Q may be collected topside. The samples may be collected consecutively at sampling times (t-i , t2, t3, t ...). Continuous online measurements may also be envisaged. Alternatively, cumulative production volumes (f-i , h, , ) of the production flow Q may be collected topside. The samples are analysed identifying types of tracer material (4m, 41 m, 42m, 43m) and the concentration of each of the identified tracer materials (4C, 41c, 42c, 43c). Sampling equipment for sampling the tracer materials as a function of time in the production flow is arranged topside, but may also be arranged downhole in the well. Alternatively, cumulative production volumes may be collected. The samples or cumulative production volumes may be analysed online, during sampling or retained for later analyses in appropriate analyzing equipment.
The invention will for ease of explanation be further explained in detail below with reference to one of the influx zones in the multilayer reservoir. This is not to be considered limiting for the invention and the principles of the description below holds for all the different influx zones in the multilayer reservoir.
Figure 1 a shows an enlarged view of the influx zone 34 from Figure 1 . The tracer system with distinct tracer materials 44m distinct for influx zone 34 are arranged in a known position in the influx zone 34. An entry point e44 for the leakout of the influx from zone 34 is provided also in a known position. A delay path is provided by the distance between the position of the distinct tracer material source 44m and the entry point e44 for the influx from zone 34 into the production baseline.
In Figure 1 a it is indicated that the tracer system is arranged in a distance of typically 5-25 meters from the entry point, providing a delay path of 5-25 meters. A typical length of a tracer system is 1 meter. A typical length of an influx zone is 50- 300 meters. The delay path may be adapted to the flow conditions and other well characteristics particular for a well.
There is a tracer leak-out flux rate ft44 from the tracers arranged in influx zone 34.
Figure 1 b shows an enlarged view of the influx zone 34 from Figure 1 . A delay path for the distinct tracer materials in zone 34 is indicated.
The zonal contribution to the production flow Q in the well from the production zone 44 is the flow rate q from the formation in this production zone as illustrated in Figure 1 b. ft44 is the tracer flux (mass/time unit) from the tracer system 44m arranged in this production zone. As long as the tracer system is constantly wetted with a flow from the formation in production zone 44, the tracer system will always release the same tracer flux ft44. This tracer flux will set up a tracer concentration C t right after the tracer release system in the influx zone. The tracer
concentration C t is inversely proportional to the flow rate q . With steady-state (constant over some time) flow rate q44 the tracer concentration C44t will be the same as the tracer concentration at an entry point C44e to the basepipe flow in the well.
If the flow rate q is changed due to some change in topside or entry point choke setting, this change will immediately impact the tracer concentration C t (inversely proportional to q44) in the influx ( production) zone 34 shown in Figure 1 c. The tracer concentration C44t is inversely proportional to the flow rate q44.The tracer system in the zone will immediately be affected, but there is a time delay dt before the tracer concentration change C44e is seen in the production flow topside. This delay is mainly due to the delay path as will be explained below. This is reflected in Figure 1 c showing the tracer concentrations C44t, C44e as a function of time at the tracer system (C44t) in the influx zone and at the entry point (C44e), together with the choke setting curve plotted as flow rate q as a function of time. The tracer concentration change will travel like a "wave" and with a speed that is proportional to the tracer flux/zonal flow q . After some time dt the concentration change "wave" will reach the entry point e to the basepipe flow and the tracer concentration C e will change to the same new level as C t . This is shown in Figure 1 C illustrating the tracer concentration C44 as a function of time t. The tracer leakout streams flow into the basepipe flow at specific entry points in each zone together with the production flow from the zone.The term "immediate" influence on the tracer system in this context may be in the order of minutes, e.g. due to the length of the tracer system in the zone and the flow rate in the zone. The time it takes for the tracer "wave" to reach the entry point, the delay time dt, depends on the influx flow rate, the length of the tracer system and the delay path for that particular influx zone, and well characteristics. The delay time may typically be in the range from about 5-15 minutes and up to several hours. Delay times below 5 minutes, and down to one minute may also be possible.
If multiple zones are flowed simultaneously in the same well in a multilayered reservoir and during a global choke change, the different tracer concentrations c4-ie, c 2e, c 3e, from each zone will all appear at different times and according to the rates in the different zones. This situation is shown in Figure 1 D, which illustrates the tracer concentrations as a function of time from the different zones in the multilayer reservoir together with the flow rate decrease. When the topside valve is choked to reduce the production flow rate in the reservoir (choke setting curve), the tracer concentrations C41 e, C42e, C43e from the different zones in the reservoir increase. The delay time dt between the flow rate decrease and the tracer concentration increase (the concentration change wave as explained above) for a zone, will depend upon the flow rate in that zone. C44t shows the immediate tracer concentration increase in the tracer system in a zone as explained above in relation to Figure 1 c. The specific tracer materials are arranged in the different production zones at known positions, and the entry points e44, e41 , e42, e43 for the leakout flows of the tracer materials are known for each zone. The distance between the known positions for the specific tracers and the entry points for the tracers in each zone provide known delay paths for the tracer materials in each of the zones. By registering the time delays for the tracer concentration changes from each zone resulting from the global topside choke change as explained above, the production flow rate from each zone can thus be estimated. The production flow rate from a zone may be estimated from model based interpretation methodology where the basic principle is based on the measurement of the time delays. The method may provide absolute flow rates if zone responses are calibrated. Otherwise the measurement of these delays may give relative numbers.
In an embodiment of the invention, a number of repeating measurements may typically be made. The measurements may be performed for a number of decreasing rates down to zero flow rate Q if possible. The lower flow rate from the present measurement may provide a starting point for the following measurement. The measurements may also be performed for various flow rates serving as starting point for the measurement.
The method of obtaining the rates at varying flow rates as described above may be combined with the principles of Selective Inflow Performance (SIP) method known from Wireline Production Logging, See also SPE 132596 "Best practices in testing and analyzing Multilayer Reservoirs"
The further embodiment of the invention provides choking back the production flow from full rate and monitoring changes in tracer concentration in the fluid flow from each influx zone until the time the concentration of distinct tracer materials from an influx zone (layer 2 in Figure 3a) becomes zero (disappears). When the concentration of the tracer from the influx zone (layer 2 in Figure 3a) becomes zero, the well pressure is approaching zero pressure from the zone (p2 in Figure 3a). When the tracer concentration from influx zone 2 becomes zero (disappears), this implies that a cross flow from influx zone 2 into one of the other zones 1 or 3 has been established in the reservoir. This will be explained in detail below.
The production rate contributions from each zone in the reservoir is determined based on the method explained above in relation to Figures 1 a-1 d by measuring the delay times for the tracer concentration transients from the different zones in the reservoir which follows a production flow change. The further embodiment of the invention thus registers the flow rates for which the different tracers in the different influx zones/layers disappear due to the onset of crossflow as the flow rate is lowered. The production flow is choked back until one of the tracer concentrations becomes zero, and the tracer responses monitored for each flow rate step change. It is thus possible to estimate the zonal contributions estimated from the tracer flowback transients in the wells in a layered reservoir with shut-in crossflows.
The change in production rate may be accomplished by controlling the valve 30 in the well. The following explanation of the method is for simplicity explained in view of a multilayer reservoir with four zones 44, 43, 42, 41 as illustrated in Figure 2. The multilayered reservoir in Figure 2 has four zones with different backpressures p (p44, p43, p42, p41 ) and formation flow resistivity I (11 , I2, I3, I4).
Figure 3a shows the pressures p1 , p2, p3, p4 from the different zones in the multilayer reservoir from Figure 2 plotted as a function of the well production rate. The straight lines of the production pressures p1 , p2, p3, p4 from each influx zone are plotted, where the starting point of each straight line is the full rate pressure from each of the zones. Topside valve is then in full open position. The slope of each straight line provides a layer production index from that influx zone. The slope of each of these lines provides the basis for estimating the influx from each of the zones. As shown in Figure 3a, when producing at full rate we may have a flow distribution with the best production rate from influx zone 1 (layerl ) and the poorest from influx zone 2 (Iayer2). This is shown by the intersection of the graphs (marked as p1 , p2, p3, p4) for the different influx zones with the dotted line marked as full rate pressure in Figure 3a. A shut-in pressure for each influx zone is shown with the dotted lines (shutin crossflows) in Figure 3a. Shut-in means that valve 30 is closed. In a shut-in well we would normally see a shut-in pressure (neglecting pressure drawdown along the well) that is something between the reservoir pressures given by the zonal production indexes. The plot in Figure 3a shows that during shut-in there will be a crossflow from influx zone 3 into both influx zone 1 and 2.The well contributions from zones 1 and 2 are negative. (Negative pro- duction rates for p1 and p2). The invention is able to estimate the zonal contributions from each layer by recording tracer concentrations at a few production rates. The production flow from an oil well has a dynamic behavior. The changes in the fluid production rate and the fluid sampling are thus adapted to each well.
Figure 3a is only for illustration purposes and not limiting for the invention. Other multilayer wells with a multitude of zones may have a different zone for which the tracer concentration is disappearing first. The changes in tracer concentration in the fluid flow may also in this embodiment be monitored online or monitored by taking samples from the fluid flow for later analyses.
The invention may also be performed for increasing pressure changes. The pressure changes may be performed in steps, gradually or continuously. The requirement is a pressure change.
In order to establish the pressure curves p1 , p2, p3, p4 from each zone as a function of well production rate a number of repeating measurements (samples) will typically be made. Tracer concentration transients after each rate change are established based on the concentrations and their sampling times during gradually decreasing flow rates, and used in estimating the flow contributions from each zone. The flow rate on which the tracer in a specific zone is disappearing (when the tracer concentration from the zone in a flow becomes zero) is used in establishing the shutin pressure for that zone.
Figure 3b shows how a measurement during a step rate change creates a point for each zone in the diagram. When a number of points have been established for decreasing step rate changes, the straight lines of the production pressures p1 , p2, p3, p4 (rate-pressure curves) from each influx zone are established by drawing up a straight line between the points.
Figure 4 is a real field data example of the reservoir illustrated in Figure 2. The tracer concentrations [in ppb] for the tracers from each zone, tracer 41 , tracer 42, tracer 43 and tracer 44 are plotted as a function of time (hours) during a well production (Q) ramp-up. Ramp-up is initiated by full opening of the topside valve controlling the production flow. Full opening of the topside valve results in initiation of production from the different zones in the multilayer reservoir. During ramp-up the production flow rate from the multilayer reservoir will typically gradually increase as shown in Figure 4 thus providing the production flow change required for estimating the flow rates from each section based on the tracer concentrations. The tracer systems in the zones will immediately be affected when the production is started, but there is a time delay before the tracer concentrations are seen in the production flow topside. The tracer concentrations are inversely proportional to the flow rate from each zone. In figure 4, the tracer 44 from zone 44 has a fast response indicating a high pressure from zone 44. The tracer 41 from zone 41 has a medium response indicating a medium pressure from zone 41 . The tracers 42 and 43 from zones 42 and 43 respectively, have a slow response indicating a low pressure from these zones.
Sampling programs performing the number of repeating measurements are tailor- made for each well. Typical sampling programs are as follows:
Option 1 : Fluids are sampled during production ramp-up as shown in Figure 4 and described above. A large number of samples are taken, out of which typically 20-40 samples are analyzed to describe the different zonal tracer flowback concentrations during the production ramp-up. This will give qualitative indications of zonal contributions and possible crossflow between zones in the reservoir. The sampling period may often be extended to also get a better definition of the tail end of the curves.
Option 2: Production rates are changed in steps and fluids are sampled. After each down-step there is a sequence of samples to catch tracer responses as indicated in Figures 1 c and 1 d and described above. An example of such a procedure of stepping down of production rate is shown in Figure 5. Note that stepping up the rates would in theory be equal. Before down-stepping the production rate, a number of samples are analyzed for establishing a base line. The procedure starts at time=0 with the measurements for establishing the baseline. Normally, 4-6 samples are sufficient for this purpose and the samples are typically sampled during a time interval of 1 -2 hours. The production rate is thereafter reduced in a first down-step starting at about t=2 hours. In the example in Figure 5 the first down-step is performed from full production rate to a rate 1 . Repeating measurements are performed and 20-40 samples are analyzed. The repeating measurements are performed in a time window of about 3 hours. At about t=5 hours the production rate is further stepped down to a rate 2. Repeating measurements are performed and 20-40 samples are analyzed. The repeating measurements are performed in a time window of about 8 hours. At about t=13 hours the production rate is further stepped down to a rate 3. Repeating
measurements are performed and 20-40 samples are analyzed. The repeating measurements are performed in a time window of about 14 hours.
The down-steps are performed relatively quickly in view of the entire sampling procedure. Typically each down-step is performed in about 15-30 minutes in order to have a controlled and smooth reduction of production flow. The time for each down-step is however tailormade for each well. An (in theory) equal number of samples are taken after each rate step-down. In practice there may be deviations from this, but a small deviation will not have any significance for the functionality. Normally 60-100 samples are taken after each production rate out of which 20-40 samples are analyzed. To establish a base line a more limited number of samples and analyzed samples are normally required. In the example in Figure 5, 4-6 samples are analyzed for establishing the base line. The sampling frequency will be higher for high rates and lower for low rates. This is also seen in the example in Figure 5 where the sampling frequency is indicated with a wavepattern overlying the bold line. Note that a sequence of different production steps will normally take more time than a ramp-up.
The method and system may be used for indicating potential crossflow in wells that are draining multilayered reservoirs. The method and system may further be used for estimating influx volumes of fluids from zones in a multilayered reservoir with potential crossflow to a production flow in a well. The fluids may be at least one of water, oil or gas.
Having described preferred embodiments of the invention it will be apparent to those skilled in the art that other embodiments incorporating the concepts may be used. These and other examples of the invention illustrated above are intended by way of example only and the actual scope of the invention is to be determined from the following claims.

Claims

1 . Method for estimating flow rates of fluids from each of separate influx zones (3, 31 , 32, 33, 34) in a multilayered reservoir to a production flow (Q) in a well (Wr) in the reservoir, the well having at least two separate influx zones (3, 31 , 32, 33, 34) from the multilayer reservoir of known positions along the well, the well being provided with distinct tracer sources (41 , 42, 43, 44) with distinct tracer materials (41 m, 42m, 43m, 44m) of known positions in each of the at least two separate influx zones (31 , 32, 33, 34), wherein each influx zone being provided with a delay path for a tracer leakout stream flow from that influx zone, the method comprising:
a) providing a global production flow change for the production flow in the well, b) establishing tracer concentrations in the production flow of the distinct tracer materials (41 m, 42m, 43m, 44m) as a function of time, and measuring time delays for tracer concentration changes of the distinct tracer materials (41 m, 42m, 43m, 44m) from each zone resulting from the global production flow change; and
c) estimating the production rates from each of the separate influx zones (31 , 32, 33, 34) in the reservoir.
2. Method according to claim 1 , wherein each zone is provided with a specific entry point for a tracer leakout stream flow from each zone.
3. Method according to claim 1 or claim 2, wherein the tracers are arranged in the at least two separate influx zones (31 , 32, 33, 34) in the multilayer reservoir during completion of the well.
4. Method according to one of claims 1 -3, wherein the tracers are arranged in well equipment provided in the well.
5. Method according to any of claims 1 -4, the method further comprising:
i)
- flowing the well at a high production rate,
- collecting consecutive samples (c-i , C2, C3, c4...) of said high production flow (Q) at the topside as a function of time (t-i , t2, t3, t4...) or collecting cumulative production volumes (f-i , f2, h, ) of said high production flow (Q) at the topside, and
- establishing concentrations of the distinct tracer materials (4C, 41 c, 42c, 43c) from each of the at least two separate influx zones (31 , 32, 33, 34) during the high production rate, and
ϋ)
- flowing the well at a lower well production rate,
- collecting consecutive samples of said lower production flow (Q) at the topside as a function of time (t-i , t2, t3, t4...) or collecting cumulative production volumes (f-i , f2, f3, f4) of said lower production flow (Q) at the topside, and
- establishing the concentrations of the distinct tracer materials (4m, 41 m, 42m, 43m) during the lower well production rate.
6. Method according to claim 5, further comprising:
- repeating the steps i) and ii) for a number of decreasing production rates,
- monitoring tracer concentration transients in the production flow (Q) after each production rate decrease, and
- estimating the flow contributions from each of the at least two separate influx zones (31 , 32, 33, 34).
7. Method according to claim 5 or 6, wherein decreasing production rates comprising gradually decreasing the production flow rate.
8. Method according to any of claims 1 -7, further comprising establishing the flow rate for which the tracer concentration of at least one of the distinct tracer materials is disappearing from the production flow.
9. Method according to claim 8, further comprising gradually decreasing the production flow rate until the at least one distinct tracer material is disappearing from the production flow.
10. Method according to any one of claims 1 -7, further comprising gradually decreasing the production flow rate until a tracer concentration of at least one of the specific tracer materials in a sample of the production flow becomes zero.
1 1 . Method according to any one of claims 5-7, wherein decreasing production rates comprising stepwise decreasing the production flow rate.
12. Method according to any one of claims 1 -10, wherein the production flow change comprising stepwise, gradually or continuously decreasing the production flow rate.
13. Method according to any one of claims 1 -10, wherein the production flow change comprising stepwise, gradually or continuously increasing the production flow rate.
14. Method according to any one of claims 1 -4, wherein the global topside production flow change is provided by a ramp-up.
15. Method according to any one of claims 1 -4, further comprising based on said concentrations and their sampling times during gradually decreasing flow rates, establish the tracer concentration transients after each rate change, and based on the tracer concentration transients after each rate change estimate the flow contributions from each zone, note the rate on which the tracer in a specific zone is disappearing and establishing rate-pressure curves for the different zones in the multilayer reservoir.
16. Method according to any one of claim 1 -4, wherein the global production flow change provides a flush-out of the tracers.
17. Method according to any one of claims 1 -16, wherein the tracers are mechanically released from the tracer systems.
18. Method according to any one of claims 1 -17, wherein the fluids are at least one of water, oil or gas.
19. System for estimating flow rates of fluids from each of separate influx zones (3, 31 , 32, 33, 34) in a multilayered reservoir to a production flow (Q) in a well (Wr) in the reservoir, where the well has at least two separate influx zones (3, 31 , 32, 33, 34) from the multilayer reservoir of known positions along the well, the system comprising:
- distinct tracer sources (41 , 42, 43, 44) with distinct tracer materials (41 m, 42m, 43m, 44m) arranged in known positions in each of the at least two separate influx zones (31 , 32, 33, 34) of the well, wherein a delay path is provided for a tracer leakout stream flow from the distinct tracer sources (41 , 42, 43, 44) in each influx zone in the reservoir; and
- apparatus for establishing tracer concentrations in the production flow of the distinct tracer materials (41 m, 42m, 43m, 44m) as a function of time during a global flow change for the production flow in the well, and estimating the production rates from each of the separate influx zones (31 , 32, 33, 34) in the reservoir.
20. System according to claim 19, wherein the delay path in an influx zone is provided by a distance between the distinct tracer sources (41 , 42, 43, 44) and an entry point for the tracer leakout stream flow into a production baseline of the well.
21 . System according to claim 19 or 20, wherein the tracers are arranged in the at least two separate influx zones (31 , 32, 33, 34) in the multilayer reservoir during completion of the well.
22. System according to one of claims 19-21 , wherein the tracers are arranged in the reservoir formation, in a completion, a casing, a liner, or in equipment provided in the well.
23. System according to one of claims 19-22, wherein the tracers are mechanically released or released upon interaction with a well fluid.
24. System according to one of claims 19-23, wherein the fluids are at least one of water, oil or gas.
25. Use of the method according to one of claims 1 -18 for indicating potential crossflow in wells that are draining multilayered reservoirs.
26. Use of the method according to one of claims 1 -18 for estimating influx volumes of fluids from zones in a multilayered reservoir with potential crossflow to a production flow in a well.
27. Use of the system according to one of claims 19-24 for indicating potential crossflow in wells that are draining multilayered reservoirs.
28. Use of the system according to one of claims 19-24 for estimating influx volumes of fluids from zones in a multilayered reservoir with potential crossflow to a production flow in a well.
PCT/NO2013/050121 2012-07-02 2013-07-01 Monitoring of multilayer reservoirs WO2014007645A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13812901.0A EP2867453A4 (en) 2012-07-02 2013-07-01 Monitoring of multilayer reservoirs
US14/412,040 US9664035B2 (en) 2012-07-02 2013-07-01 Monitoring of multilayer reservoirs
NO20150093A NO20150093A1 (en) 2012-07-02 2015-01-20 Monitoring or multilayer reservoirs.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20120763A NO335874B1 (en) 2012-07-02 2012-07-02 A method and system for estimating fluid flow rates from each of several separate inflow zones in a multilayer reservoir to a production flow in a well in the reservoir, as well as applications thereof.
NO20120763 2012-07-02

Publications (1)

Publication Number Publication Date
WO2014007645A1 true WO2014007645A1 (en) 2014-01-09

Family

ID=49882292

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2013/050121 WO2014007645A1 (en) 2012-07-02 2013-07-01 Monitoring of multilayer reservoirs

Country Status (4)

Country Link
US (1) US9664035B2 (en)
EP (1) EP2867453A4 (en)
NO (2) NO335874B1 (en)
WO (1) WO2014007645A1 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112014010067B1 (en) * 2011-10-28 2020-11-24 Resman As method and system for using tracker shots to estimate volumes of fluid inflows from different inflow zones for a production flow in a well
CA2954736C (en) * 2014-08-20 2020-01-14 Halliburton Energy Services, Inc. Flow sensing in subterranean wells
WO2016028289A1 (en) * 2014-08-20 2016-02-25 Halliburton Energy Services, Inc. Opto-acoustic flowmeter for use in subterranean wells
NO342249B1 (en) * 2016-02-24 2018-04-30 Scale Prot As Inflow Indicator Device
US10392935B2 (en) * 2016-03-24 2019-08-27 Expro North Sea Limited Monitoring systems and methods
US20180080314A1 (en) * 2016-09-21 2018-03-22 Spectrum Tracer Services, Llc Method of allocating individual oil or water production contributions from multiple combined sources
WO2020013922A1 (en) * 2018-07-12 2020-01-16 Exxonmobil Upstream Research Company Hydrocarbon wells and methods for identifying production from a region of a subterranean formation
US11326440B2 (en) 2019-09-18 2022-05-10 Exxonmobil Upstream Research Company Instrumented couplings
CN110644975B (en) * 2019-09-27 2022-10-21 西安石油大学 Fracture-cavity type oil reservoir tracer curve quantitative interpretation method
CN112324431B (en) * 2020-09-27 2023-01-10 四川瑞都石油工程技术服务有限公司 Multi-spectral-band high-resolution intelligent production test method for oil and gas well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030056952A1 (en) * 2000-01-24 2003-03-27 Stegemeier George Leo Tracker injection in a production well
US20100147066A1 (en) * 2008-12-16 2010-06-17 Schlumberger Technology Coporation Method of determining end member concentrations
WO2012057634A1 (en) * 2010-10-29 2012-05-03 Resman As Method for using tracer flowback for estimating influx volumes of fluids from different influx zones

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3134904A (en) * 1959-12-18 1964-05-26 Well Surveys Inc Method of radioactivity tracer logging
GB2232241B (en) * 1989-05-27 1993-06-02 Schlumberger Ltd Method for determining dynamic flow characteristics of multiphase flows
US6003365A (en) * 1995-01-23 1999-12-21 Board Of Regents, The University Of Texas System Characterization of organic contaminants and assessment of remediation performance in subsurface formations
NO305181B1 (en) * 1996-06-28 1999-04-12 Norsk Hydro As Method for determining the inflow of oil and / or gas into a well
EP1277051B1 (en) 2000-04-26 2006-08-23 ResMan AS Reservoir monitoring
NO20002137A (en) * 2000-04-26 2001-04-09 Sinvent As Reservoir monitoring using chemically intelligent tracer release
US7337660B2 (en) * 2004-05-12 2008-03-04 Halliburton Energy Services, Inc. Method and system for reservoir characterization in connection with drilling operations
NO333424B1 (en) 2008-07-10 2013-06-03 Resman As A tracer system and method for tracing a tracer compound in a petroleum production fluid system
US8596354B2 (en) * 2010-04-02 2013-12-03 Schlumberger Technology Corporation Detection of tracers used in hydrocarbon wells
US20110257887A1 (en) * 2010-04-20 2011-10-20 Schlumberger Technology Corporation Utilization of tracers in hydrocarbon wells
US8464581B2 (en) * 2010-05-13 2013-06-18 Schlumberger Technology Corporation Passive monitoring system for a liquid flow
RU2572867C2 (en) * 2010-06-11 2016-01-20 Эбсолют Кэмплишн Текнолоджиз Лтд. Tubular product and method for processing fluid in wellbore
US9422793B2 (en) * 2010-10-19 2016-08-23 Schlumberger Technology Corporation Erosion tracer and monitoring system and methodology
US9194226B2 (en) * 2013-08-01 2015-11-24 Tyler W. Blair Oil and gas fracture liquid tracing using DNA
US9267371B2 (en) * 2013-08-01 2016-02-23 Trace Logic, Inc Oil and gas fracture liquid tracing with oligonucleotides
US9206683B2 (en) * 2013-08-01 2015-12-08 Trace Logic, Inc. Oil and gas well fracture liquid tracing using DNA

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030056952A1 (en) * 2000-01-24 2003-03-27 Stegemeier George Leo Tracker injection in a production well
US20100147066A1 (en) * 2008-12-16 2010-06-17 Schlumberger Technology Coporation Method of determining end member concentrations
WO2012057634A1 (en) * 2010-10-29 2012-05-03 Resman As Method for using tracer flowback for estimating influx volumes of fluids from different influx zones

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2867453A4 *

Also Published As

Publication number Publication date
NO20120763A1 (en) 2014-01-03
US20150176396A1 (en) 2015-06-25
US9664035B2 (en) 2017-05-30
EP2867453A1 (en) 2015-05-06
NO20150093A1 (en) 2015-01-20
NO335874B1 (en) 2015-03-09
EP2867453A4 (en) 2016-07-20

Similar Documents

Publication Publication Date Title
US9664035B2 (en) Monitoring of multilayer reservoirs
US10895148B2 (en) Online tracer monitoring and tracer meter
CA2405775C (en) Downhole flow meter
EP1327054B1 (en) Method for determining pressure profiles in wellbores, flowlines and pipelines, and use of such method
US8781747B2 (en) Method of determining parameters of a layered reservoir
US12018561B2 (en) Tracer release system and method of detection
US6216782B1 (en) Apparatus and method for verification of monophasic samples
RU2455482C2 (en) Method of determination of fluid-movement profile and parameters of near-wellbore
Hashemi et al. Well-test analysis of horizontal wells in gas/condensate reservoirs
US20090000785A1 (en) Method and Apparatus to Quantify Fluid Sample Quality
US20220228478A1 (en) Tracer release system and method of use
US20230137185A1 (en) Dual Pump Reverse Flow Through Phase Behavior Measurements With A Formation Tester
US11125058B2 (en) Method of wellbore operations
Kalyani et al. Fluidic Diode Autonomous ICD Selection Criteria, Design Methodology, and Performance Analysis for Multiple Completion Designs: Case Studies
Muradov et al. Some case studies of temperature and pressure transient analysis in Horizontal, multi-zone, intelligent wells
Simmons Interpretation of Underbalanced Surge Pressure Data by Rate-Time Convolution
RU2814684C2 (en) Indicator release system and method of use
Gudmundsson et al. Pressure pulse analysis of flow in tubing and casing of gas lift wells
NO347216B1 (en) An apparatus, a production string comprising the apparatus, and a method for estimating a production flow rate at a certain position of a well
Alshaer et al. Advanced Multi-Lateral Monitoring Using Intelligent Inflow Tracers with Production Log Comparison in a Carbonate Reservoir
EA027083B1 (en) Method for determining near-wellbore reservoir pressure in multi-zone wells
RU2021136362A (en) INDICATOR RELEASE SYSTEM AND DETECTION METHOD
Denney Investigating Liquid Loading in Tight Horizontal Gas Wells
Gudmundsson et al. Pressure Pulse Analysis of Gas Lift Wells
Denney Flow Profiling Gas Wells With Distributed-Temperature-Sensing Data

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13812901

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14412040

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013812901

Country of ref document: EP