WO2014004092A1 - High strain rate method of producing optimized fracture networks in reservoirs - Google Patents
High strain rate method of producing optimized fracture networks in reservoirs Download PDFInfo
- Publication number
- WO2014004092A1 WO2014004092A1 PCT/US2013/045476 US2013045476W WO2014004092A1 WO 2014004092 A1 WO2014004092 A1 WO 2014004092A1 US 2013045476 W US2013045476 W US 2013045476W WO 2014004092 A1 WO2014004092 A1 WO 2014004092A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- borehole
- geological formation
- fracturing
- proximate
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/263—Methods for stimulating production by forming crevices or fractures using explosives
Definitions
- the present invention r l tes to geologic reservoir stimulation and more particularly to geologic reservoir stimulation by explosively-augmented fracturing in wellbore sidetracks.
- United States Patent No. 6,732,799 for apparatus for stimulating oil extraction by increasing oil. well permeability using specialized explosive detonating cord provides the state of technology information reproduced below.
- the disclosure of United States Patent . o. 6,732,799 is incorporated herein in its entirety by this reference.
- Oil wells have been known to produce oil for nearly seventy-five (75) years. Oil wells that have been producing oil for several years often experience a reduction in oil extraction or production as the years progress. When the oil production is reduced, remedial action in the form of stimulation to improve the oil production output of the oil we ' ll is undertaken.
- such stimulation may involve improvement of the permeability or transmissibility of the reservoir itself or merely clearing the casing perforations of accumulated production-restricting contaminants, such as heavy hydrocarbons, paraffins, tars, mineral depositions, or formational fines in or near the casing perforations, by the use of vibratory explosive forces created by the ignition of a detonator and detonating cord.
- production-restricting contaminants such as heavy hydrocarbons, paraffins, tars, mineral depositions, or formational fines in or near the casing perforations
- the methods used to increase the fransmissibilitv of sand, shale or rock formation are shock treatments using explosives, acid washes, hydraulic fracturing, and high energy gas fracturing.
- the flow rate of a fluid such as oil through a porous medium, such as a sand, shale or rock formation is a function of the permeability or transmissibility of that particular formation. If the transmissibility of oil from an oil bearing formational reservoir can be increased, more fluid can be recovered. It is well known that over the life of an oil or gas well, with continued pumping or removal of the oil or gas from that well, the
- permeability of the surrounding formation may be economically insufficient to justify continued production, even though a large percentage of fluid hydrocarbons remain.
- the oil well operator can either abandon the oil well or can attempt to increase the permeability of that formation to rejuvenate the flow of liquid hydrocarbons there through.
- Hydraulic fracturing is a process used for increasing the permeability of a rock formation by a slow introduction of a highly viscous fluid that is pumped into the area of a well bore between packings, in the hydraulic fracturing technique, the combined fluid pressure is steadily increased until the tensile strength of that particular rock material is exceeded. When this occurs, a fracture will be initiated which propagates from opposite sides of the well bore into the formation; this is known a a biwing fracture. This fracture is induced at a point of least resistance in the rock material.
- a fluid used in practicing such a method is one selected to be sufficiently viscous to enable the suspension arid mass transport of proppants suspended therein.
- proppant materials are either sand grains or grains of a synthetic material and are made to pass into and settle in the induced fracture. So arranged, the proppants prevent the induced .fracture from totally closing once the pressure on the fluid is reduced and the normal closing pressures of the rock formation are re-exerted. Hydraulic fracturing generally involves the generation of the single biwing fracture that extends in a vertical plane from opposite sides of the well bore into the rock formation.
- Acid fracturing is a process which is utilized to increase permeability by dissolving reactive materials in a rock formation to create conductive passageways or " worm holes" and for chemically etching the oppositely disposed faces of a rock formation fracture.
- the acids which are frequently used are concentrated solutions of hydrofluoric and hydrochloric acid, either of which can, of course, create serious safety problems in the transportation and conveyance of such highly corrosive fluids to a desired location in an oil well bore-
- acidizing is limited by a danger of formation matrix collapse due to excessive rock dissolution near the well bore as a consequence of a preferential invasion of the acid used into zones of high, rather than low, permeability.
- Propeliant deflagration is a recent technology that has been developed to produce a good distribution of fractures in the oil-bearing rock formation around a well, bore without the problems that have been inherent in the explosive and acid processes.
- the propellant can be burned radially from a longitudinal center cavity within the propellant, or can be homed from one end. as in a cigarette burn., or a combination of both processes can be employed to develop the high energy fracturing process.
- high-energy gas fracturing involves the placement o a canister of a propellant adjacent to a perforated wall of a well bore in the zone where it is desired to increase the permeability of the oil-bearing rock formation.
- An igniter rod is then implanted adjacent to the canister containing the propellant.
- an electrical current is transmitted over one or more electrical wires from the surface above the entrance to the oil well bore to instantaneously detonate an electric blasting cap which initiates deflagration thereof in a period of milliseconds. Once deflagration occurs, a high volume of pressurized gas and water is generated at near sonic velocities.
- the energ loading in the oil well bore will be propagated much faster than that which occurs during hydraulic fracturing.
- Such an increase in the propagation speed of the energy loading produces multiple fractures in directions other than in the plane of least resistance through the oil-bearing rock formation surrounding the oil well bore.
- the propellant is selected from a group of propellants which will burn at a far slower rate than those propellants used for typical explosive detonations. No destructive shock wave will, therefore, be generated in a propellant deflagration which would cause crumbling of the material around the w ll bore.
- United States Patent No, 3,771,600 for a me hod of explosively fracturing from drain holes using reflective fractures provides the state of technology information reproduced below.
- Extraction of oil or gas as well as the leaching of underground minerals is often compl icated by the lack of permeability in the formation.
- it is often necessary to fracture the formation and thereby increase permeability.
- Explosive well stimulation has been used for many years. However, explosive stimulation has not been entirely successful As a result, hydraulic fracturing introduced over 20 years ago has been the standard stimulation mode, due mainly to the high degree of success of this method. Recently, however, new interest in stimulating wells with explosives has been generated by the development of improved explosives and new methods of using them.
- a method of detonating explosives in the formation adjacent the wellbore is to hydraulically fracture the formation, and then load the fracture zone with an explosive material
- the rock matrix adjacent to an explosive charge, will be shattered as the shock wave moves through it.
- the shock wave consists of two components, compression wave and a shear wave. W hen the energy level of either of these waves exceeds the strength of the rock under dynamic loading, the rock will fail, thus creating a fracture network.
- the gases generated in the explosion obtain a pressure on the order of one million pounds per square inch, which pushes against the exposed surfaces of the fractured rock matrix. The expansion of gases will extend th .fractures until its energy for doing work is dissipated.
- a rubble zone When the explosives are placed in the formation, usually in a fracture created by hydraulic .means, a rubble zone will be created in the fracture area upon detonation, of the explosive.
- a high pressure shock wave shatters the adjacent, surfaces of the fracture, as the shock wave moves upward and downward from the plane of detonation., it will tra verse various strata.
- part of the wave will be reflected back as a tension wave.
- the tensile strength of rock is several orders of magnitude less than the compressive strength, therefore new fractures will be created by the tension wave.
- Explosive detonations occurring in vertical fractures yield similar results as those occurring in horizontal fractures. Lateral expansion of the original fracture occurs more readily, however, since the vertical height of the fracture is confined by the stratographic boundaries, thus requiring a smaller volumetric increase for fracture extension. Placement of explosives in fractures is not entirely satisfactory due to the limited amount of explosives that can be placed in a -fracture created by hydraulic means.
- the width of fracture controls the net thickness of the explosive layer and th us limits the volume of gas products available for fracture extension. Since the explosive is present as a thin layer, a limited quantity of gas is available per unit surface area of the fracture. It thus can be seen that it wilt be advantageous to be able to place a larger volume of explosive in the formation. Additionally it is preferable to locate the explosive in the formation rather than in the vvellbore so as to prevent wellbore damage and sloughing of the formation adjacent the wellbore.
- Drain holes are simply boreholes drilled along a horizontal piano into the formation being produced to provide for more efficient recovery through increased drainage area.
- the history of drain holes goes hack past the turn of the century with early work done in the 1930's. This work was largely unsuccessful due to the economies of the reservoir in which it was used. Revival of drain holes occurred in the 1950's for a brief period and had some success.
- drain hole drilling is not limited to new wells. Since explosive stimulation is often used in fields that have already been drilled, the casing window feature of drain holes is extremely advantageous.
- the present invention provides a method, apparatus, and system of fracturing a. geological formation. At least one borehole is drilled extending into or proximate the geological formation. An energetic charge is placed in the borehole. The energetic charge is detonated fracturing the geologicai formation.
- the present invention provides a method, apparatus, and system of fracturing a geological formation penetrated, by a main borehoie or proximate the main borehole. At least one side borehole is drilled extending .from the main borehole in to or proximate the geological formation. An energetic charge is placed in the side borehoie away from the main borehole. The side borehole is isolated from the mai borehole. The energetic charge is detonated fracturing the geologicai formation.
- the present invention provides a method, apparatus, and system of fracturing a geological formation penetra ed by a welt or proximate the well including the steps of drilling a side borehole from the well so that the side borehole extends into or proximate the geological formation, hycirofracking the geological formation resulting in a fluid in the geological fonnation, isolating the side borehole from the well with the fluid pressurized and producing a stress field in the geological formation, and energetically stimulating the fluid in the geologicai formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
- the method, apparatus, and system in one embodiment include predetermining the location of the side borehole to increase expanding and enhancing fracturing die geological formation.
- the method, apparatus, and system in one embodiment includes pre-determining the location of the explosive charge to maximize the step of energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in: the stress field in the geological formation being enhanced.
- the method., apparatus, and system in one embodiment includes pre-determining the timing of detonation of the explosive charge to maximize the step of energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
- the present invention provides a method, apparatus, and system of fracturing a geological formation penetrated by a main borehole or proxima e the main borehole .
- a method, apparatus, and system of fracturing a geological formation penetrated by a main borehole or proxima e the main borehole including the steps of drilling a pattern of side boreholes from the main borehole into or proximate the geological formation, em lacing energetic charges in the side boreholes away from the main borehole, isolating the side boreholes from the main borehole, and detonating the energetic charges and fracturing the geological formation.
- the method, apparatus, and system in one embodiment include pre-detemiining the location of the side boreholes to enhance fracturing the geological formation.
- the method, apparatus, and system in one embodime includes pre-determining the location of the energetic charges in the side boreholes to enhance fracturing the geological formation.
- the method, apparatus, and system in one embodiment includes predetermining the timing of detonating the energetic charges to enhance fracturing the geological forma lion.
- the present invention has use in all applications that currently use conventional hydrofracturing techniques and in applications that do not currently use conventional hydrofractiiring techniques.
- One of the main applications is oil and gas well stimulatio where hydraulic fracture stimulation is used to increase oil and gas recover ⁇ -'.
- the present invention is of particular interest in tight gas formations where, conventional hydrofractiiring techniques do not appear to produce the desired results.
- Another application is in Enhanced Geofhermal Systems (ECS) where hydraulic fractuiing is also used to creat fracture networks which enhance the permeability of the rock and are used in the generation of geothermal energy
- the invention is susceptible to modifications and alternative forms.
- FIG. 1 illustrates a system of the present invention.
- FIG. 2 illustrates an embodiment of a system of the present invention.
- FIG. 3 illustrates another embodiment of a system of the present invention.
- FIG. 4 illustrates yet another embodiment of a system of the present invention.
- FIG. 5 illustrates an example of the present invention.
- FIG. 6 illustrates another example of the present invention.
- FIG. 7 illustrates a example of the present invention used in connection with a geotherrna! formation.
- FIG. 8 illustrates another example of the present in ention used in connection with a geothermal formation.
- FIGS. 9 and 10 illustrate another example of the present invention.
- FIGS. IlA, LIB, and 12 illustrate yet another example of the present invention.
- FIG. 13 illustrate another example of the present invention.
- the present invention provides a method, apparatus, and system for fracturing a geological formation wherein at least one borehole is drilled extending into or proximate the geological formation and an energetic charge is placed in the borehole. When the energetic charge is properly placed, and detonated it results in improved fracturing the geological formation.
- Explosives are widely used to break up various types of rock in mining operations. They have also been utilized to a much lesser extent, and with less success to create fracture networks in the subsurface. The main difference betwee the successfui use of explosives in mining applications and the less successful use of explosives to create fracture networks in the subsurface is the in situ stress field. In mining, explosi ves are most commonly utilized near the ground surface where the in situ stresses are low and where wave reflections from free surfaces in the vicinity of the explosion lead to the propagation of release waves back toward the detonation point giving rise?
- the resource of interest in most energy applications is located deep beneath die ground surface, where there are no free surfaces to promote wave reflections, and where the in situ stress field is in a
- the present invention provides a method, apparatus, and system of fracturing a geological formation.
- a least one borehole is drilled extending into or proximate the geological formation.
- An energetic charge is placed in the borehole.
- the energetic charge Is detonated fracturin the geological formation.
- FIG. 1 a flow chart illustrates a system representing an example of one embodiment of the present invention.
- the system is designated geiierali by the reference numeral " 100,
- the system 100 is a system of fracturing a geological formation.
- the system " 100 includes the steps shown in the flow chart.
- Step 1 is designated by the reference numeral 102 in the flow chart of FIG. 1.
- the size and location of the borehole or boreholes is determined based on a multiplicity of factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, density, existing fractures), the type of energetic materials being utilized (e.g., energy conten per unit volume, energy release rate), and die in situ stress field. Detonation of the energetic materials in the borehole or boreholes can be synchronized to maximize the surface area of the fracture network.
- Step 2 comprises drilling the borehole or borehole in the locations that have been determined. Step 2 is designated by the reference numeral 104 in the f low chart of FIG. 1.
- step 3 the energetic chargefs) Is placed in the borehole or boreholes.
- Step 3 is designated by the reference numeral " 106 in the flow chart of FIG. 1.
- Step 4 comprises detonating the energetic charge.
- Step 4 is designated by the reference numeral 108 in the flow chart of FIG. 1.
- the step 108 comprises detonating an explosive in the borehole or boreholes.
- the present invention provides a system using explosives, or other energetic materials, to greatly expand and enhance a preexisting fracture network.
- the present invention can combine explosive and/or other energetic material with other fracturing techniques to eniiance the fracture network well beyond what could be achieved without the present invention.
- the system of the present invention involves placing an explosive or energetic charge within the borehole and detonating the charge.
- the charges are placed in small sidetrack boreholes that are cemented off.
- the smaller boreholes are cheaper to drill, can be arranged in an. optimal pattern,, and there is no damage to the main borehole while still achieving the desired result.
- the smaller sidetrack boreholes are sacrificed during the detonation. Arranging the smaller boreholes in a pattern and detonating with specific and carefull planned timing enables the establishment of interfering waves to further control the resulting damage zone and fracture pattern.
- a flow chart illustrates another example of a system representing another embodiment of the present invention.
- the system is designated generally by the reference numeral 200.
- the system 200 is a system of fracturing a geological formation penetrated by a well or proximate the well.
- the system. 200 includes the steps shown in the flow chart. in step 1 the location of the side borehole is predetermined so the location increases the expanding and enhances the fracturing the geological formation. Step 1 is designated by the reference numeral 202 in the flow chart of FIG. 2.
- step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological formation.
- Step 2 is designated by the reference numeral 204 in the flow chart of FIG. 2.
- Step 3 comprises modifying the stress state of the formation. This can be done utilizing the fluid in the geological formation that is in fluid communication with the borehole. Step 3 is designated by the reference numeral 206 in the flow chart of FIG. 2. In one embodiment the step 206 comprises hydrofrackfng the geological formation.
- step 4 the side borehole is isolated from the well with stress field in the geological formation modified.
- Step 4 is designated by the reference numeral 208 in the flow chart of FIG. 2.
- the step 208 of isolating the side borehole from the well comprises cementing off the side borehole from the well.
- Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
- Step 5 is designated by the reference numeral 210 in the flow chart of FIG. 2.
- the step 210 of energetically stimulating the fluid in the geological formation comprises detonating a explosive in the borehole.
- FIG. 3 a flow chart illustr tes an example of a system representing another embodiment of the present invention.
- the system is designated generally by the reference numeral 300,
- the system 300 is a system of fracturing a geological formation penetrated by a well or proximate the well.
- the system 30(3 Includes the steps shown in the flow chart.
- step 1 the location of the location of the explosive charge in the side borehole is predetermined so the location increases the expanding and enhances the ftactii.ri.ng the geological formation.
- Step I is designated by the reference numeral 302 in the flow chart of FIG. 3,
- step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological formation.
- Step 3 is designated by the reference numeral 304 in the flow chart of FIG- 3.
- Step 3 comprises modifying the stress state of the formation.
- Step 3 is designated by the reference numeral 306 in the flow chart of FIG. 3.
- the step 306 comprises h drofracktng the geological formation.
- the side borehole is isol ted from the well with the fluid pressurized producing a stress field in the geological formation.
- Step 4 is designated by the reference numeral 308 in the flow chart of FIG. 3.
- the step 308 of isolating the side borehole from the well comprises cementing off the side borehole from the well
- Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
- Step 5 is designated by the reference numeral 310 in the flow chart of FIG. 3.
- the ste 310 of energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
- Example 4 a flow chart illustrates an example of a system representing another embodiment of the prese t invention.
- Th system is designated generally by the reference numeral 400.
- the system 400 is a system of fracturing a geological formation penetrated by a well or proximate the well.
- the system 400 includes the steps shown in the flow chart.
- Step 1 the timing of detonatio of the explosive charge is predetermined to increase the expanding and enhances the fracturing the geological formation.
- Step 1 is designated by the reference numeral 402 in the flow chart of FIG. 4.
- step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological forma lion.
- Step 4 is designated by the reference numeral 404 in the flow chart of FIG. 4.
- Step 3 comprises hydrof racking the geological formation. This assures there is a fluid in the geological formation that is in fluid communication with the borehole that has been drilled into the formation and modifying the stress state of th formation.
- Step 4 is designated by the reference numeral 406 in the flow chart of FIG. 4.
- step 4 the side borehole is isolated from the well with the fluid pressurized maintaining the stress field in the geological formation.
- Step 4 is designated by the reference umeral 408 in the flow char of FIG. 4.
- the step 408 of isolating the side borehole from the well comprises cementing off the side borehole from the well.
- Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
- Step 5 is designated by the reference numeral 10 in the flow chart of FIG. 4.
- the step 410 of energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
- FIG. 5 one example of a system of the present invention is illustrated.
- This example is designated generally by the reference .numeral 500.
- the system 500 provides a method, apparatus, and system of fracturing a geological formatio penetrated by a main borehole or proximate the mai borehole.
- a well 504 is shown extending into the earth 512 and into or proximate a formation 514 penetrated by the well 504 or proximate the well 504.
- a derrick 502 is shown above the well 504 tor performing operations on the well 504.
- a side borehole 506 extends into or proximate the formation 514.
- An energetic charge 508 is placed in the side borehole 506 away from the main borehole 504.
- the side borehole 506 is isolated from the main borehole 504 as illustrated by the blocking section 510.
- the side borehole 506 can be isolated from the main borehole 504 by cementing off the side borehole 506 from the main borehole 504 as illustrated by the cemented section 510.
- a fluid 516 extends into the geological formation 514.
- the fluid 514 is isolated from the main borehole 505 by the blocking section 510.
- the fluid 514 is pressurized producing a stress field in the geological formation 514.
- the charge 508 is detonated energetically stimulating the fluid. 516 in the geological formation 514 fracturing the geological formation 514 resu lting in. the stress field in the geological formation being enhanced.
- Example 6 Referring now to FIG. 6, another example of a system of the present invention is illustrated.
- This example is designated generally by the reference numeral 600.
- the system 600 provides a method, apparatus,, and system of fracturing a geological formation penetrated by a main borehole or proximate the main, borehole.
- a first well 604a and a second well 604b are shown extending into the earth 612 and into or proximate a formation having pre-existing fracture network of a well having a hydrauiicaily fractured productive zone 614 penetrated b the well or wells.
- the derrick or rigs 602a and 602b are used for the various oper ions on the well or wells.
- the first well 604a penetrate the hydrauiicaily fractured productive zone 614,
- the first well 604a is shown having a side borehole 606 extending into the formation 614 having pre-existing fracture .network.
- the first well 604a also has additional side boreholes 60S and 610 extending into the formation 614 having pre-existing fracture network.
- the system 600 provides fracturing the geological formation and expanding and enhancing the pre-existing fracture network of the well having a. hydrauiicaily fractured productive zone 614 penetrated by or proximate the well 604a.
- the system 600 includes the steps of placing an explosive or energetic charge within one or more of the side boreholes 606, 608 a d /or 610, and detona ing the charge producing a detonation that is transferred to the preexisting fracture network 614 in the productive zone penetrated by the well expanding and enhancing a pre-existing fracture network.
- Hydraulic fracturing is a well stimulation process used to maximize the extraction of underground resources; includedin oil, natural gas, geothermal energy, and even water.
- the oil and gas industry uses hydraulic fracturing to enhance subsurface fracture systems to allow oil or natural gas to move more freely from the rock pores to production wells that bring the oil or gas to the surface.
- the process of hydraulic fracturing begins with building the necessary site infrastructure including well construction such as wells 604a and 604b.
- Productio wells may be drilled in the vertical direction only or paired with horizontal or directional sections.
- Vertical well sections may be drilled hundreds to thousands of feet below the land suriace and lateral sections ma extend .1,000 to 6000 feet away from the well.
- Fluids commonly made u of wa er and chemical additives .
- Disposal options fo flowback include discharge into surface water or underground injection.
- Example 7 is an example of energetic stimulation in a geothermal reservoir setting.
- the goal of a geothermal power plant is to extract hot fluids from, the reservoir at a sufficient rate so that the heat can be used to generate electricity. O en times the reservoir contains sufficient heat, but lacks the fracture permeability necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system, The rate of heat ex raction depends on the temperature of the host formation, the fracture permeability and porosity,, and the fracture surface area.
- the standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or hydroshearing.
- the system 700 described here relies o higher strain rate stimulation methods that may include, solid, liquid, or gas propellants, explosives, and energetic materials. These methods provide fracture networks for the extraction of heat from the reservoir superior to those created by standard methods.
- One im lementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal drilling technology can be accurately placed . The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the main borehole. This eliminates one prior problem of using energetic materials for stimulation and adds the advantages of creating the fracture network in a location between injection and extraction boreholes. Thus, once the reservoir is stimulated, the operator can produce fluids from one set of boreholes and reinject the fluids in other boreholes creating a sustainable heat extraction process.
- the detonations in the parallel sidetracks can be spatially arranged and tinted to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume.
- the detonations can be used to create constructive or destructive interference patterns of energy propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main borehole is preserved and larger portions of the target reservoir are accessible for heat extraction,
- a single sidetrack can extend away from the borehole into the formation and multiple charges can be placed along this borehole.
- the charges can then be detonated simultaneously or one-at-a-time to create the fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired fracture network.
- This single borehole strategy may be advantageous in some situations. For instance, in a reservoir where a fracture networks exists but it does not access portions of the reservoir, this method could target these isolated regions.
- Example 7 is illustrated in FIG. 7.
- the system of Example 7 is designated by the reference numeral 700.
- a first borehole 704a and a second borehole 704b are shown extending into the earth 712 and into or proximate a geo hermal formation penetrated by the boreholes 704a and 704b.
- the first borehole 704a is an injection borehole and the second borehole 704b is an extraction borehole.
- the derrick or derrick or rigs 702a and 702b are used for the various operations on the boreholes.
- the first borehole 704a is shown having a first side borehole 706, a second side borehole 706a and a third side borehole 706b extending into the earth 712 and into the geotherma! formation.
- the present invention provides a system 700 for expanding and enhancing a fracture network of a borehole having a geotherma! section penetrated by or proximate the borehole including the step of placing an explosive or energetic charge 70S, 708a, and 708b through the borehole main borehole 704a and into the first side borehole 706, into the second side borehole 706a and into the third side borehole 706b.
- the first side borehole 706, the second side borehole 706a and the third side borehole 706b can be sealed off from the main borehole 704a as illustrated by the blocking sections 710, 710a nd 710b.
- the system 700 expands and enhances a fracture network of a borehole having a geothermal section penetrated by or proximate the borehole by detonating the charges 708, 708a, and 708B producing a detonation that is transferred to the geothermal formation penetrated by the borehole expanding and enhancing a fracture network.
- the system 700 of the present invention can be used for creating a fracture network in geothermal section and/or for expanding and enhancing a pre-existing fracture network- Example 8
- Example 8 is another example of energetic stimulation in a geothermal reservoir setting.
- Example 8 is a more detailed example than example 7.
- Example 8 is illustrated in FIG. 8.
- the system of Example 8 is designated by the reference numeral 800,
- An injection borehole 804a and an extraction borehol 804b are show extending into the earth 802 and into a geothermal formation 806.
- Fluid ca be pumped down the injection borehole 804a, into and through the geothermal formatio 806, and draw up the extraction borehole 804b as illustrated by the arrows 816a and 816b.
- the injection borehole 804a is shown having a first side borehole 808 extending into tire geothermal formation 806.
- the first side borehole 808 is shown having an additional side borehole 808a and an additional side borehole 808b extending into the geothermal formation 806.
- the injection borehole 804a is shown having a second side borehole 810 extending into the geothermal formation 806.
- the second side borehole 810 is shown having an additional side borehole 8 0a and an additional side borehole 810b extending into the geothermal formation 806.
- the injection borehole 804a is shown ha ving a third side borehole 812 extending into the geothermal formation 806,
- the third side borehole 812 is shown having an additional side borehole 812a and an additional side borehole 812b extending into the geothermal formation 806,
- Multiple explosive charges 814 are positioned in the multiplicity of different side boreholes 808, 808a, 808b, 810, 810a., 810b, 812, 12a, and 812b.
- the multiple explosive charges 814 are utilized to enhance the fracture network in the geomermai zone 806,
- the charges 814 ar placed in the sidetrack boreholes and the sid etrack boreholes can be cemented off.
- the sidetrack borehole 808a is shown having been cemented off at location 818.
- Th prese t inventio provides the system 800 for expanding and enhancing a fracture network in the geothermal zone 806 penetrated by the boreholes.
- the goal of a geothermal power plant is to extract hot fluids from the reservoir at a sufficient rate so that the heat can be used to generate electricity. Often times the reservoir contains sufficient heat, but lacks the fracture permeability necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system. The rate of heat extraction depends on. the temperature of the host formation, the fracture permeability and porosity, and the fracture surface area.
- the standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or hydroshearing.
- the system 800 described here relies on higher strain rate stimulation methods that may include, solid,, liquid, or gas propellants, explosives, and energetic materials. These methods provide fracture networks fo the extraction of heat from the reservoir superior to those created by standard methods,
- One implementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal drilling technology can be accurately placed, The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the mai borehole.
- Explosives are widely used to break up various types of rock in mining operations. They have also been utilized to a much lesser extent, and with less success to create fracture networks in the subsurface.
- the main difference between the successful use of explosives in. " mining plications and the les successful use of explosives to create fracture networks in the subsurface is the i situ stress field.
- explosives are most commonly utilized near the ground surface where the i situ stresses are low and where wave reflections from free surfaces in the vicinity of the explosion lead to the propagation of release waves back toward the detonation point, giving rise to fracture-enhaiidng tensile stress states within the geologic medium.
- the resource of interest in most energy applications whether it is oil, gas or geothemial energy, is located deep beneath the ground surface, where there are no free surfaces to promote wave reflections, and when? the in situ, stress field is in a
- the present invention provides the use of explosives, or cither energetic materials, to greatly expand and enhance a pre-existing fracture network created through conventional hydrofracturing techniques or other means, in the system 800, explosives that exploit more effective means of energy axtpling, including the use of a working fluid as the energy transfer medium and the use of multiple charges and precision timing sequences to exploit wave interactions are used.
- the pre-existing fracture network 806 is first injected with a working fluid, an explosive charge 814 is then placed in the borehole within the fluid and the borehole is sealed at the top of the .fluid. Upon detonation, the rapid expansion of the explosi ve gases leads to a pressure spike within the fluid, which is then transmitted by th fluid into the fracture network. The rapid application of this high intensity pressure pulse will lead to the initia tion and propagation of new fractures connected to the pre-existing fracture network.
- hydrofracturing involves the injection of water under high pressure through, a borehole into a geologic formation.
- the pressurized water propagates into fractures, causing an increase in size and extent of the fracture network.
- the present inventio combines explosive and/or another energetic material with conventional hydrofracturing techniques to enhance the fracture network borehole bevond what could be achieved throu g h conventional means. This technique works by placing an explosive or energetic charge within the borehole,, then detonating the charge. The energy released b the detonation will be transferred to the surrounding rock formatio generating a pressure wave which will cause a significant transient increase in pressure thus leading to enhancement of the fracture network.
- An addi ional advantage of this technique is that charges can be placed in small sidetrack boreholes that are cemented off.
- the smaller boreholes are cheaper to drill, can be arranged in an optimal pattern., and there is no damage to the main borehole while still achieving the desired resul -
- the smaller sidetrack boreholes are sacrificed during the detonation.
- Arranging the smaller boreholes in a pattern and detonating wi h specific and carefull planned timing enables the establishment of interfering waves to further control the resulting damage zone and fracture pattern.
- multiple explosive charges 814 located in a multiplicity of different side boreholes 808, 808a, 808b, 810, 810a, 810b, 812, 812a, and 812b are utilized to enhance the fracture network in the productive geothermal zone 806, .
- the charges 814 are placed in. the small sidetrack boreholes and the sidetrack boreholes can be cemented off.
- the sidetrack borehole 80Sa is shown having been cemented off at location 818.
- the detonations in. the parallel sidetracks can be spatially arranged and timed to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume.
- the detonations can be used to create constructive or destructive interference patterns of energ propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main, borehole is preserved, and larger portions of the target reservoir are accessible for hea extraction.
- a single sidetrack ca extend awa from the borehole into the formation and multiple charges can. be placed along this borehole. ' The charges can then be detonated simultaneously or one-at-a-time to create the fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired fracture network.
- This single borehole strategy may be advantageous in some situations. For instance, in a. reservoir where a fracture networks exists but it does not access portions of the reservoir, this method could target these isolated regions.
- the goal of a geothermal power plant is to extract hot fluids from the reservoir at a sufficient rate so that the heat can be used to generate electricity. Often times the reservoir contains sufficient heat but lacks the fracture permeabilit necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system. The rate of heat extraction depends on the temperature of the host formation, the fracture permeability and porosity, and the fracture surface area.
- the standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or h droshearing.
- the system 800 described here relies on higher strain rate stimulation methods that may include, solid, liquid, or gas propeliants, explosives,, and energetic materials. These methods provide fracture networks for the extraction of heat from the reservoir superior to those created by standard methods.
- One im lementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal, drilling technology can be accurately placed. The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the main borehole. This eliminates one prior problem of using energetic materials for stimulation and adds the advantages of creating the fracture network in a location between injectio and extraction boreholes. Thus, once the reservoir is stimulated, the operator can produce fluids from one set of boreholes and reinject the fluids in ther boreholes creating a sustainabl he t extraction process.
- the detonations in the parallel sidetrack can be spatially arranged and timed to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume.
- the detonations can be used t create constructive or destructive interference patterns of energy propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main borehole is preserved and larger portions of the target reservoir are accessible for heat extraction.
- a single sidetrack can extend away from the borehole into the formation and multiple charges can be placed along this borehole.
- the charges can then be detonated simultaneously or one-at-a-time to cre te the fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired, fracture network.
- This single borehole strategy may be advantageous in some situations. For instance, in a reservoir where a fracture networks exists b t it does not access portions of the reservoir, this method could target these isolated regions.
- the system of Example 9 is designated generally by the reference numeral 900.
- the system 900 involves arranging a multiplicity of boreholes in a pattern and detonating an energetic charge in said multiplicity of boreholes with specific and carefully planned timing enables the establishment of interfering waves to further control the resul ing damage zone and fracture pattern.
- the system. 900 provides a method and apparatus for pre-determining the location of explosive charges to maximize energetically stimulating the geological formation, fracturing the geological formation resulting in the stress field in the geological formation being enhanced .
- a main well 904 is shown extending into the earth 912 and into or proximate a formation 914 penetrated by the main well 904 or proximate the main well 904.
- the main well 904 is shown having side boreholes 906, 908, and 91.0 extending into the formation 914.
- a drilling ri 91.6 is illustrated drilling a multiplicity of boreholes 918 in a predetermined pattern in the vicinity of the main well 904.
- the boreholes 918 are located with specific and carefully planning so that th detonation of energetic charges in the multiplicity of boreholes 918 produces interfering waves to control the resulting damage zone and fracture pattern in the formation 914.
- Some of the tools used in the planning of th pattern of the boreholes 918 in the vicinity of the main well 904 are seismographic studies, reservoir analysis studies, and computer modeling.
- FIG, 10 is a plan view of the multiplicity of boreholes 918 being drilled in a predetermined pattern in the vicinity of the main well 904.
- the boreholes 918 are located with specific and carefully planning so that the detonation of energetic charges in the multiplicity of boreholes 918 produces interfering waves t control the resulting damage zone and fracture pattern in the formation 914.
- the location of explosive charges in the boreholes 918 maximizes the probability that the multiplicity of boreholes 918.
- FIGS. ⁇ and 2 additional examples of systems of the present invention are illustrated.
- the systems i llustrated in FIGS, 11. and 12 provide applications that utilizes energetic materials as a means to stimulate fracture propagation in a low permeability shale formation for the purpose of extracting oil and/or gas contained, in the shale.
- Several different variants of the application of energetic materials to stimulate the well are described.
- the technology could be applied to stimulate a new well,, or as a post-production step to re-stimu late a well that was first produced using conventional hydraulic fracturing techniques.
- a main borehole 1104 is shown extending into the earth 1 1.10 and into or proximate a formation 11.1.2 penetrated by the main borehole 1104 or proximate the main borehole 1.1.04.
- This technology is shown applied in horizontal sacrificial boreholes 1106a,. 1106b, ,1 :106c, 1106d.. 1.106c, 1 106 f, llO&g, and 1 106h.
- This technology can also be applied in vertical boreholes holes which can be desirable, especially where the production zone is of sufficient thickness to render a. vertical hole economical, in this case the explosives can be arranged i vertical sacrificial holes, the size and location of which are determined as was done in the case of horizont l production wells.
- the series of horizontal sacrificial boreholes 1.106a, 1.106b, 1106c, 1106d, !106e, " i ' lOof, 1106g, and 1106h are drilled at specific locations extending from the production hole 1104,
- the system " 1100 includes the steps of placing an explosive or energetic charge 1108a, 1108b, 108c, 11 6d, 1106e, ll06f, ll06g, and 1106h within the sacrificial boreholes 1106a, 1106b, 1106c, 11.06d, 1106e, I 106f, i l06g, and 110611, and detonating the charges producing a detonation that creates a fracture network in the formation 1112.
- the production hole 1104 can be drilled and cased either before or after completion of explosive operations.
- the production hole can be drilled at the location that optimizes gas production from the newly created fracture network.
- the size and location of the sacrificial holes 1 106a, 1.106b, 1106c, 1106d, 11 6e, 1106f, li06g, and 1106h relative to the production hole 1104 are determined based on several factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, densi ty, existing fractures), the type of energetic materials being utilized (e.g., energy content per unit volume, energy release rate), and the in. situ stress field.
- Detonation of the energetic .materials in the different holes can be synchronized to maximize the surface area of the fracture network. Other factors can also be taken into account in She placement and detonation of the energetic materials, such as to maximize propagation of self-propped "shear fractures.”
- Another variant of this approach involves the utilization of explosives placed in discrete locations within a drill hole, as opposed to being placed uniformly throughout the entire length of the hole. In this ease, widening of the hole to accommodate larger amounts of explosives at desirable locations may be required to achieve desired results.
- Yet another variant could involve the utilization of explosives in the entire length of the sacrificial hole, except at discrete 3ocation(s), pre-determined based on site-specific information gathered prior to well stimulation. For instance, if a geologic fault intersects the resource-bearing rock, it may be desirable not to stimulate the fault zone to avoid the risk of acti ating the fault, and/or having the fault compromise the se l integrity of the well.
- the fluidless well stimu lation method described above can he slightly modified and applied in combination with conventional hydraulic fracturing techniques to produce a more extensive fracture network and increase well production.
- a production well is drilled, cased and completed using conventional hydraulic fracturing techniques.
- This i followed with another stimulation regiment using energetic materials.
- the ex losive stimulation can be applied immedia ely following the hydraulic fracturing stimulation, or after the well is produced, and the yield has dropped off to sufficiently low levels to justify re-stimulation.
- sacrificial explosive emplacement holes are drilled in the vicinity of the production well and filled with explosives. Fluid is pumped into the production well so as to flood and fully saturate the existing fracture network.
- the explosives are detonated while maintaining a fluid pressure in the fracture network at or near the same level used i the initial hydrauiic fracturing stage.
- the existing fracture network will be at or near the threshold of crack growth, thus providing favorable conditions for the explosive stimulation to produce additional ne fractures.
- the new fracture network will be more extensive than the original, with many branching cracks emanating from the original long fractures produced using hydraulic fracturing techniques.
- the size and location of the sacrificial holes relative to the production hole are determined based on several factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, density, existing fractures), the type of energetic materials being utilized (e.g., energy content per unit volume, energ release rate), and the in situ, stress field. Detonation of the energetic materials in the different holes can be synchronized to maximize the surface area of the fracture network. Other factors can also be taken into account in the placement and detonation of the energetic materials., such as to maximize propagation of self-propped ' " 'shear fractures;'' "
- This technology can also be applied in vertical production holes, especially where the production zone is of sufficient thickness to render a vertical hole economical, in this case the explosives can be arranged in vertic l sacrificial holes, the* size and location of which are determined as was done in the case of horizontal production wells described above.
- Another varian of this approach involves the utiliz ion of explosives placed in discrete locations within a drill hole, as opposed to being placed uniformly throughout the entire length of the hole, in this case, widening of the hole to accommodate larger amounts of explosives at desirable locations may be required to achieve desired results.
- Yet another variant could involve the utilization of explosives in the entire lengt of the sacrificial hole, except at discrete location(s), pr -determined based on site-specific information gathered prior to well stimulation. For instance, if a geologic fault intersects the resource-bearing rock, it may be desirable not to stimulate the fault zone to avoid the risk of activating the fault and/or having the fault compromise the seal Integrity of the well.
- Example 10 illustrated in FIG. 12 is designated generally by the reference numeral 1200.
- the use of this technolog applied in vertical boreholes can be desirable, especially where the production zone is of sufficient thickness to render a vertical hole economical, in this case the explosives can be arranged in vertical sacrificial holes, the size and location of which are determined as was done in the case of horizontal productio wells.
- the series of vertical boreholes 1208 are drilled at specific locations at predetermined locations around the production hole 1204.
- the system 200 includes the steps of placing an explosive or energetic charge within the boreholes 1208 and detonating the charges producing a detonation that creates a f acture network .
- the system .1200 involves arranging a multiplicity of boreholes in a pattern and detonating an energetic charge in said nvulti lkity of boreholes with specific and carefully planned timing enables the establishment of Interfering waves to further control the resulting damage zone and fracture pattern.
- the system 1200 provides a method and apparatus for predetermining the location of explosive charges to maximize energetically stimulating the geological formation fracturing the geological formation resulting in the st ess field in the geological formation being enhanced.
- the main well 1204 is shown extending into the earth 1210 and into or proximate a formation 1212 penetrated by the main well 1204 or proximate the main well 1204.
- a drilling derrick or rig 1206 is illustrated drilling a multiplicity of boreholes 1208 in a predetermined pattern in the vicinity of the main well 1204.
- the boreholes 1208 are located with specific and carefully planning so that the detonation of energetic charges in the multiplicity of boreholes 1208 produces interfering waves to control the resultin damage zone and fracture pa tern in the formation 1212.
- the system of example 11 is designated generally by the reference numeral 1.100
- the system 1100 is a system of fracturing a geological formation penetrated by a well or proximate the well.
- the present invention provides a method, apparatus, and system of fracturing a geological formation penetrated by a main borehole or proximate the main borehole. Relatively inexpensive smaller diameter sidetrack boreholes are drilled away from the main bore hole. Explosive charges are placed in these sidetrack boreholes, which are then cemented in. The detonation creates a fracture network with the desired qualities while preserving the integrity of the main borehole.
- the system 11 includes the steps shown in the flow chart.
- step 1 a side borehole is drilled from the well so that the side borehole extends Into or proximate the geological formation. Step 1 is designated by the reference numeral 1102 in the flow chart of FIG, 13.
- Step 2 comprises modifying the stress field in the geological formation by assuring there is a fluid in the geological formation that is in fluid
- Step 2 is designated by die reference numeral 1104 in the flow chart of FIG, 13,
- the step 1104 of modifying the stress field in the geological- formation and assuring there is a fluid in the geological formation that is in fluid communication with the borehole comprises hydrof racking the geological formation.
- step 3 the side borehole is isolated from the well with the fluid pressurized producing a stress field in the geological formation.
- Step 3 is designated by the reference numeral 1106 in the flow chart of FIG. 13.
- the step 1106 of isolating the side borehole from the well comprises cementing off the side borehole from the well
- Step 4 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resul ing in the stress field in the geological formation being enhanced.
- Step 4 is designated by the reference numeral 108 in the flow chart of FIG. 13.
- the ste 1108 of energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
HIGH STRAIN RATE METHOD OF PRODUCING OPTIMIZED FRACTURE NE TWORKS IN RESERVOIRS
STATEMENT AS TO RIGHTS TO INVENTIONS MADE UNDER FEDERALLY SPONSORED RESEARCH AND DEVELOPMENT
The United States Government has rights in this invention pursuant to Contract No. DE-AC52-07NA27344 between the United States Department of Energy and Lawrence Livermore National Security, LLC for the operation of Lawrence Livermore National Laboratory.
BACKGROUND
Field of Endeavor
The present invention, r l tes to geologic reservoir stimulation and more particularly to geologic reservoir stimulation by explosively-augmented fracturing in wellbore sidetracks.
State of Technology
United States Patent No. 6,732,799 for apparatus for stimulating oil extraction by increasing oil. well permeability using specialized explosive detonating cord provides the state of technology information reproduced below. The disclosure of United States Patent . o. 6,732,799 is incorporated herein in its entirety by this reference.
Oil wells have been known to produce oil for nearly seventy-five (75) years. Oil wells that have been producing oil for several years often experience a reduction in oil extraction or production as the years progress. When the oil production is reduced, remedial action in the form of stimulation to improve the oil production output of the oil we'll is undertaken.
Generally, such stimulation may involve improvement of the permeability or transmissibility of the reservoir itself or merely clearing the casing perforations of
accumulated production-restricting contaminants, such as heavy hydrocarbons, paraffins, tars, mineral depositions, or formational fines in or near the casing perforations, by the use of vibratory explosive forces created by the ignition of a detonator and detonating cord.
Typically, the methods used to increase the fransmissibilitv of sand, shale or rock formation are shock treatments using explosives, acid washes, hydraulic fracturing, and high energy gas fracturing.
The flow rate of a fluid such as oil through a porous medium, such as a sand, shale or rock formation, is a function of the permeability or transmissibility of that particular formation. If the transmissibility of oil from an oil bearing formational reservoir can be increased, more fluid can be recovered. It is well known that over the life of an oil or gas well, with continued pumping or removal of the oil or gas from that well, the
permeability of the surrounding formation may be economically insufficient to justify continued production, even though a large percentage of fluid hydrocarbons remain. When this occurs, the oil well operator can either abandon the oil well or can attempt to increase the permeability of that formation to rejuvenate the flow of liquid hydrocarbons there through.
There are currently a number of techniques or processes for mechanically increasing permeability. The best known processes are: (3 ) hydraulic fracturing; (2) explosive fracturing; (3) acidizing, and (4) high energy gas fracturing.
HYDRAULIC; FRACTURING
Hydraulic fracturing is a process used for increasing the permeability of a rock formation by a slow introduction of a highly viscous fluid that is pumped into the area of a well bore between packings, in the hydraulic fracturing technique, the combined fluid pressure is steadily increased until the tensile strength of that particular rock material is exceeded. When this occurs, a fracture will be initiated which propagates from opposite sides of the
well bore into the formation; this is known a a biwing fracture. This fracture is induced at a point of least resistance in the rock material.
A fluid used in practicing such a method is one selected to be sufficiently viscous to enable the suspension arid mass transport of proppants suspended therein. Such proppant materials are either sand grains or grains of a synthetic material and are made to pass into and settle in the induced fracture. So arranged, the proppants prevent the induced .fracture from totally closing once the pressure on the fluid is reduced and the normal closing pressures of the rock formation are re-exerted. Hydraulic fracturing generally involves the generation of the single biwing fracture that extends in a vertical plane from opposite sides of the well bore into the rock formation. In such fracturing, the injected fluids will, by and large, remain in the formation, and the proppants used to support the fracture may, due to compaction, actually come to restrict the permeability of that rock formation rather than enhance or improve us permeability. Another drawback to die use of hydraulic fracturing, and of major consideration in selecting a rock formation fracturing process, s the extent and expense of the equipment, and labor involved, since the hydraulic fracturing method requires the use of hydraulic pumps with a high pressure capability along with the temporary positioning of a packer above the oil bearing strata,
EXPLOS IVE F ACTURIN G
In an attempt to overcome the limitations of hydraulic fracturing where generally only a single biwing fracture is produced, explosives have been used for dynamically loading a rock formation. Because of the speed ofburning of an explosive, and the shock wave produced thereby, it has been found that explosive compaction of the formation rock: around the well bore opposite the explosion may actually decrease rather than increase the permeability of the rock formation. Therefore, while explosive fracturing may provide a greater circumferential fracturing effect in a rock, formation, it may also depredate the permeability of the rock formation to the point where most,, if not all, permeability is lost. Explosive fracturing has been, therefore in the past, generally considered unpredictable and unreliable.
ACID FRACTURING
Acid fracturing is a process which is utilized to increase permeability by dissolving reactive materials in a rock formation to create conductive passageways or " worm holes" and for chemically etching the oppositely disposed faces of a rock formation fracture. The acids which are frequently used are concentrated solutions of hydrofluoric and hydrochloric acid, either of which can, of course, create serious safety problems in the transportation and conveyance of such highly corrosive fluids to a desired location in an oil well bore- Furthermore, acidizing is limited by a danger of formation matrix collapse due to excessive rock dissolution near the well bore as a consequence of a preferential invasion of the acid used into zones of high, rather than low, permeability.
Another limitation found in the use of the acidizing technique, is that, the depth of penetration is limited by the type of rock in the rock formation and the degree of the strength of the acid. Many times, these acidizing processes have been found to cause extensive damage to the well bore due to the geochemical reactions produced. Therefore, the nature of the materials at the location where the fracture is to be induced must be identified prior to selection of the acid to be used. Where such unwanted geochemical reactions take place, they can create damage, leading even to a loss of permeability.
HIGH ENERGY GAS FRACTURING
Propeliant deflagration is a recent technology that has been developed to produce a good distribution of fractures in the oil-bearing rock formation around a well, bore without the problems that have been inherent in the explosive and acid processes.
In the use of high energy gas fracturing, a significant amount of high energy is created by a deflagrated propeliant that is ignited in a well bore adjacent to a rock formation to be fractured. Upon ignition of the propeliant in the canister, high-energy gas and other
products of this combustion process, such as water vapor or steam, ar driven to near sonic velocities.
The propellant can be burned radially from a longitudinal center cavity within the propellant, or can be homed from one end. as in a cigarette burn., or a combination of both processes can be employed to develop the high energy fracturing process.
In practice, high-energy gas fracturing involves the placement o a canister of a propellant adjacent to a perforated wall of a well bore in the zone where it is desired to increase the permeability of the oil-bearing rock formation. An igniter rod is then implanted adjacent to the canister containing the propellant. To ignite the propellant, an electrical current is transmitted over one or more electrical wires from the surface above the entrance to the oil well bore to instantaneously detonate an electric blasting cap which initiates deflagration thereof in a period of milliseconds. Once deflagration occurs, a high volume of pressurized gas and water is generated at near sonic velocities. By such deflagration, the energ loading in the oil well bore will be propagated much faster than that which occurs during hydraulic fracturing. Such an increase in the propagation speed of the energy loading produces multiple fractures in directions other than in the plane of least resistance through the oil-bearing rock formation surrounding the oil well bore. The propellant is selected from a group of propellants which will burn at a far slower rate than those propellants used for typical explosive detonations. No destructive shock wave will, therefore, be generated in a propellant deflagration which would cause crumbling of the material around the w ll bore.
United States Patent No, 3,771,600 for a me hod of explosively fracturing from drain holes using reflective fractures provides the state of technology information reproduced below. The disclosure of United States Patent No.
3,771,600 is incorporated herein in its entirety by t is reference.
Extraction of oil or gas as well as the leaching of underground minerals is often compl icated by the lack of permeability in the formation. In order to maximize
production from such low permeability formation, it is often necessary to fracture the formation and thereby increase permeability. There are two basic methods of creating fractures in a formation. One is to create hydraulic fractures by applying a pressurized fluid against the formation until the formation parts, Another method is to detonate explosives in the formation or wellbore to create a shock wave which fractures the rock matrix of the formation,
Explosive well stimulation has been used for many years. However, explosive stimulation has not been entirely successful As a result, hydraulic fracturing introduced over 20 years ago has been the standard stimulation mode, due mainly to the high degree of success of this method. Recently, however, new interest in stimulating wells with explosives has been generated by the development of improved explosives and new methods of using them. There are presently two basic methods of explosive .fracturing. One is to detonate the explosive in the wellbore, and the other is to detonate the explosive in the formation adjacent to the wellbore. A method of detonating explosives in the formation adjacent the wellbore is to hydraulically fracture the formation, and then load the fracture zone with an explosive material
When the explosi ve is confined in the wellbore, the result of detonation is a cylindrical rubble zone in the vicinity of the wellbore surrounded fay a system of vertical fractures radiating .like wheel spokes from the .rubble zone. This result i achieved by the explosive undergoing a very rapid self-propagating decomposition. This decomposition yields more stable products in the form of gases which exert tremendous pressure as they expand at the high temperature generated by the release of heat. This rapid release of energ creates a shock, wave.
The rock matrix, adjacent to an explosive charge, will be shattered as the shock wave moves through it. The shock wave consists of two components, compression wave and a shear wave. W hen the energy level of either of these waves exceeds the strength of the rock under dynamic loading, the rock will fail, thus creating a fracture network. The
gases generated in the explosion obtain a pressure on the order of one million pounds per square inch, which pushes against the exposed surfaces of the fractured rock matrix. The expansion of gases will extend th .fractures until its energy for doing work is dissipated.
When the explosives are placed in the formation, usually in a fracture created by hydraulic .means, a rubble zone will be created in the fracture area upon detonation, of the explosive. When an explosive is located in a horizontal fracture and detonated, a high pressure shock wave shatters the adjacent, surfaces of the fracture, as the shock wave moves upward and downward from the plane of detonation., it will tra verse various strata. As the wave moves through a density discontinuity, part of the wave will be reflected back as a tension wave. The tensile strength of rock is several orders of magnitude less than the compressive strength, therefore new fractures will be created by the tension wave.
Explosive detonations occurring in vertical fractures yield similar results as those occurring in horizontal fractures. Lateral expansion of the original fracture occurs more readily, however, since the vertical height of the fracture is confined by the stratographic boundaries, thus requiring a smaller volumetric increase for fracture extension. Placement of explosives in fractures is not entirely satisfactory due to the limited amount of explosives that can be placed in a -fracture created by hydraulic means. The width of fracture controls the net thickness of the explosive layer and th us limits the volume of gas products available for fracture extension. Since the explosive is present as a thin layer, a limited quantity of gas is available per unit surface area of the fracture. It thus can be seen that it wilt be advantageous to be able to place a larger volume of explosive in the formation. Additionally it is preferable to locate the explosive in the formation rather than in the vvellbore so as to prevent wellbore damage and sloughing of the formation adjacent the wellbore.
Since the tensile strength of rock is appreciably less than its compressive strength, it would be preferable to devise a process of explosive fracturing which utilizes a tension
wave to a greater degree than is now being practiced. The use of more explosives in the formation together with greater use of tension waves wouki result in more effective stimulation of the formation.
One method of providing space for more explosives in the ibnnaiioii is by use of drain holes. Drain holes are simply boreholes drilled along a horizontal piano into the formation being produced to provide for more efficient recovery through increased drainage area. The history of drain holes goes hack past the turn of the century with early work done in the 1930's. This work was largely unsuccessful due to the economies of the reservoir in which it was used. Revival of drain holes occurred in the 1950's for a brief period and had some success.
Since a 51/2 inch hole can be easily drilled b presently known drain hole drilling methods, it can. readily he seen that s significantly increased amount of explosives can be located in such a drain hole. Since windows can be cut in the casing and drain holes drilled through the casing window, drain hole drilling is not limited to new wells. Since explosive stimulation is often used in fields that have already been drilled, the casing window feature of drain holes is extremely advantageous.
SUMMARY
Features and advantages of the present invention will become apparent from the following description. Applicants are providing this description, which includes drawings and examples of specific embodiments, to give a broad representation of the invention . Various changes and modifications within the spirit and scope of the invention will become apparent to those skilled in the art from this description and b practice of the invention. The scope of the invention is not intended to be limited to the particular forms disclosed and the invention covers all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the claims.
The present invention provides a method, apparatus, and system of fracturing a. geological formation. At least one borehole is drilled extending into or proximate the geological formation. An energetic charge is placed in the borehole. The energetic charge is detonated fracturing the geologicai formation.
In one embodiment, the present invention provides a method, apparatus, and system of fracturing a geological formation penetrated, by a main borehoie or proximate the main borehole. At least one side borehole is drilled extending .from the main borehole in to or proximate the geological formation. An energetic charge is placed in the side borehoie away from the main borehole. The side borehole is isolated from the mai borehole. The energetic charge is detonated fracturing the geologicai formation.
In one embodiment the present invention provides a method, apparatus, and system of fracturing a geological formation penetra ed by a welt or proximate the well including the steps of drilling a side borehole from the well so that the side borehole extends into or proximate the geological formation, hycirofracking the geological formation resulting in a fluid in the geological fonnation, isolating the side borehole from the well with the fluid pressurized and producing a stress field in the geological formation, and energetically stimulating the fluid in the geologicai formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced. The method, apparatus, and system in one embodiment include predetermining the location of the side borehole to increase expanding and enhancing fracturing die geological formation. The method, apparatus, and system in one embodiment includes pre-determining the location of the explosive charge to maximize the step of energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in: the stress field in the geological formation
being enhanced. The method., apparatus, and system in one embodiment includes pre-determining the timing of detonation of the explosive charge to maximize the step of energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced.
in another embodiment the present invention provides a method, apparatus, and system of fracturing a geological formation penetrated by a main borehole or proxima e the main borehole .including the steps of drilling a pattern of side boreholes from the main borehole into or proximate the geological formation, em lacing energetic charges in the side boreholes away from the main borehole, isolating the side boreholes from the main borehole, and detonating the energetic charges and fracturing the geological formation. The method, apparatus, and system in one embodiment include pre-detemiining the location of the side boreholes to enhance fracturing the geological formation. The method, apparatus, and system in one embodime includes pre-determining the location of the energetic charges in the side boreholes to enhance fracturing the geological formation. The method, apparatus, and system in one embodiment includes predetermining the timing of detonating the energetic charges to enhance fracturing the geological forma lion.
The present invention has use in all applications that currently use conventional hydrofracturing techniques and in applications that do not currently use conventional hydrofractiiring techniques. One of the main applications is oil and gas well stimulatio where hydraulic fracture stimulation is used to increase oil and gas recover}-'. The present invention is of particular interest in tight gas formations where, conventional hydrofractiiring techniques do not appear to produce the desired results. Another application is in Enhanced Geofhermal Systems (ECS) where
hydraulic fractuiing is also used to creat fracture networks which enhance the permeability of the rock and are used in the generation of geothermal energy
The invention is susceptible to modifications and alternative forms.
Specific embodiments are shown by way of example. It is to be understood that the invention is not limited to the particula forms disclosed. The inventio covers all modifications., equivalents, and alternatives falling within, the spirit and scope of the invention as defined by the claims.
BRIEF DESCRIPTION OF THE DRAWINGS
The accompanying drawings, which are incorpora ed into and constitute a part of the specification, illustrate specific embodiments of the invention and, together with the general description of the invention given above, and the detailed description of the specific embodiments, serve to explain the principles of the invention.
FIG. 1 illustrates a system of the present invention.
FIG. 2 illustrates an embodiment of a system of the present invention.
FIG. 3 illustrates another embodiment of a system of the present invention.
FIG. 4 illustrates yet another embodiment of a system of the present invention.
FIG. 5 illustrates an example of the present invention.
FIG. 6 illustrates another example of the present invention.
FIG. 7 illustrates a example of the present invention used in connection with a geotherrna! formation.
FIG. 8 illustrates another example of the present in ention used in connection with a geothermal formation.
FIGS. 9 and 10 illustrate another example of the present invention.
FIGS. IlA, LIB, and 12 illustrate yet another example of the present invention,
FIG, 13 illustrate another example of the present invention.
DETAILED DESCRIPTION OF SPECIFIC EMBODIMENT'S
Referring to the drawings, to the following detailed description, and to incorporated materials, detailed information abou the invention is provided including the description of specific embodiments. The detailed descri tion serves to explain the principles of the invention. The invention is susceptible to modifications and alternative forms. The invention is not limited to the particular forms disclosed. The invention covers all modifications, equivalents, and alternatives failing within the spirit and scope of the invention as defined by the claims.
The present invention, provides a method, apparatus, and system for fracturing a geological formation wherein at least one borehole is drilled extending into or proximate the geological formation and an energetic charge is placed in the borehole. When the energetic charge is properly placed, and detonated it results in improved fracturing the geological formation.
DEFINITIONS
The terms below used in this patent application have the .following meanings: Optimal, Optimize, Optimized, Optimizing - The point at which the condition, degree, or amount is the most favorable or is an improvement over the prior art.
Hydraulic fracturing, hydrofracklng, f racking, hydroshearing ~ Forcing open of fissures I subterranean formations.
Energetic Charge - Release of energy in a sudden manner with the generation of high pressure.
Pressurized - Produce or maintain raised pressure.
Geothermal ~ Of or relating to the internal heat of the earth.
Explosives are widely used to break up various types of rock in mining operations. They have also been utilized to a much lesser extent, and with less success to create fracture networks in the subsurface. The main difference betwee the successfui use of explosives in mining applications and the less successful use of explosives to create fracture networks in the subsurface is the in situ stress field. In mining, explosi ves are most commonly utilized near the ground surface where the in situ stresses are low and where wave reflections from free surfaces in the vicinity of the explosion lead to the propagation of release waves back toward the detonation point giving rise? to fracture-enhancing tensile stress states within the geologic medium, in contrast, the resource of interest in most energy applications, whether it is oil gas or geothermal energy, is located deep beneath die ground surface, where there are no free surfaces to promote wave reflections, and where the in situ stress field is in a
predominantly compressive stress state, which tends to suppress and inhibit fracture propagation. For these reasons, simply detonating an explosive charge in the bottom of a borehole in the subsurface is not likely to produce the desired effects.
The present invention provides a method, apparatus, and system of fracturing a geological formation. A least one borehole is drilled extending into or proximate the geological formation. An energetic charge is placed in the borehole. The energetic charge Is detonated fracturin the geological formation. The present invention will be further explained., illustrated, and described in the following examples of systems of the present invention.
Example 1
Referring now to the drawings., and in particular to FIG. 1, a flow chart illustrates a system representing an example of one embodiment of the present
invention. The system is designated geiierali by the reference numeral "100, The system 100 is a system of fracturing a geological formation. The system "100 includes the steps shown in the flow chart.
The location of the borehole or boreholes is determined in step 1. Step 1 is designated by the reference numeral 102 in the flow chart of FIG. 1. The size and locatio of the borehole or boreholes is determined based on a multiplicity of factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, density, existing fractures), the type of energetic materials being utilized (e.g., energy conten per unit volume, energy release rate), and die in situ stress field. Detonation of the energetic materials in the borehole or boreholes can be synchronized to maximize the surface area of the fracture network. Other factors can also be taken into account in the placement and detonation of the energetic materials, such as to maximize propagation of self-propped "shear fractures," Another variant of this approach involves the utilisation of explosives placed in discrete locations within a drill hole, as opposed, to being placed uniformly throughout the entire length of the hole. In this case, widening of the hole to accommodate larger amounts of explosives at desirable locations may be required to achieve desired results.
Step 2 comprises drilling the borehole or borehole in the locations that have been determined. Step 2 is designated by the reference numeral 104 in the f low chart of FIG. 1.
In step 3 the energetic chargefs) Is placed in the borehole or boreholes. Step 3 is designated by the reference numeral "106 in the flow chart of FIG. 1.
Step 4 comprises detonating the energetic charge. Step 4 is designated by the reference numeral 108 in the flow chart of FIG. 1. In one embodiment the step 108 comprises detonating an explosive in the borehole or boreholes.
In one embodiment, the present invention provides a system using explosives, or other energetic materials, to greatly expand and enhance a preexisting fracture network. The present invention can combine explosive and/or other energetic material with other fracturing techniques to eniiance the fracture network well beyond what could be achieved without the present invention. The system of the present invention involves placing an explosive or energetic charge within the borehole and detonating the charge. The energy released by the detonation will be transferred to the surrounding rock formation generating a pressure wave which will cause a significant transient increase in pressure thus leading to enhancement of the fracture network, in one embodimen of the present invention, the charges are placed in small sidetrack boreholes that are cemented off. The smaller boreholes are cheaper to drill, can be arranged in an. optimal pattern,, and there is no damage to the main borehole while still achieving the desired result. The smaller sidetrack boreholes are sacrificed during the detonation. Arranging the smaller boreholes in a pattern and detonating with specific and carefull planned timing enables the establishment of interfering waves to further control the resulting damage zone and fracture pattern.
Example 2
Referring now to FIG, 2, a flow chart illustrates another example of a system representing another embodiment of the present invention. The system is designated generally by the reference numeral 200. 'The system 200 is a system of fracturing a geological formation penetrated by a well or proximate the well. The system. 200 includes the steps shown in the flow chart.
in step 1 the location of the side borehole is predetermined so the location increases the expanding and enhances the fracturing the geological formation. Step 1 is designated by the reference numeral 202 in the flow chart of FIG. 2.
In step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological formation. Step 2 is designated by the reference numeral 204 in the flow chart of FIG. 2.
Step 3 comprises modifying the stress state of the formation. This can be done utilizing the fluid in the geological formation that is in fluid communication with the borehole. Step 3 is designated by the reference numeral 206 in the flow chart of FIG. 2. In one embodiment the step 206 comprises hydrofrackfng the geological formation.
in step 4 the side borehole is isolated from the well with stress field in the geological formation modified. Step 4 is designated by the reference numeral 208 in the flow chart of FIG. 2. In. one embodiment the step 208 of isolating the side borehole from the well comprises cementing off the side borehole from the well.
Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced. Step 5 is designated by the reference numeral 210 in the flow chart of FIG. 2. In one embodiment the step 210 of energetically stimulating the fluid in the geological formation comprises detonating a explosive in the borehole.
Example 3
Referring now to FIG. 3, a flow chart illustr tes an example of a system representing another embodiment of the present invention. The system is designated generally by the reference numeral 300, The system 300 is a system of
fracturing a geological formation penetrated by a well or proximate the well. 'The system 30(3 Includes the steps shown in the flow chart.
In step 1 the location of the location of the explosive charge in the side borehole is predetermined so the location increases the expanding and enhances the ftactii.ri.ng the geological formation. Step I is designated by the reference numeral 302 in the flow chart of FIG. 3,
In step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological formation. Step 3 is designated by the reference numeral 304 in the flow chart of FIG- 3.
Step 3 comprises modifying the stress state of the formation. Step 3 is designated by the reference numeral 306 in the flow chart of FIG. 3. In one embodiment the step 306 comprises h drofracktng the geological formation. in step 4 the side borehole is isol ted from the well with the fluid pressurized producing a stress field in the geological formation. Step 4 is designated by the reference numeral 308 in the flow chart of FIG. 3. In one embodiment the step 308 of isolating the side borehole from the well comprises cementing off the side borehole from the well
Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced. Step 5 is designated by the reference numeral 310 in the flow chart of FIG. 3. In one embodiment the ste 310 of energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
Example 4
Referring now to FIG. 4, a flow chart illustrates an example of a system representing another embodiment of the prese t invention. Th system is designated generally by the reference numeral 400. The system 400 is a system of fracturing a geological formation penetrated by a well or proximate the well. The system 400 includes the steps shown in the flow chart.
I step 1 the timing of detonatio of the explosive charge is predetermined to increase the expanding and enhances the fracturing the geological formation. Step 1 is designated by the reference numeral 402 in the flow chart of FIG. 4.
In step 2 the side borehole is drilled from the well so that the side borehole extends into or proximate the geological forma lion. Step 4 is designated by the reference numeral 404 in the flow chart of FIG. 4.
Step 3 comprises hydrof racking the geological formation. This assures there is a fluid in the geological formation that is in fluid communication with the borehole that has been drilled into the formation and modifying the stress state of th formation. Step 4 is designated by the reference numeral 406 in the flow chart of FIG. 4.
In step 4 the side borehole is isolated from the well with the fluid pressurized maintaining the stress field in the geological formation. Step 4 is designated by the reference umeral 408 in the flow char of FIG. 4. In one embodiment the step 408 of isolating the side borehole from the well comprises cementing off the side borehole from the well.
Step 5 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resulting in the stress field in the geological formation being enhanced. Step 5 is designated by the reference numeral 10 in the flow chart of FIG. 4. In one embodiment the step 410 of
energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
Example 5
Referring now to FIG. 5, one example of a system of the present invention is illustrated. This example is designated generally by the reference .numeral 500. The system 500 provides a method, apparatus, and system of fracturing a geological formatio penetrated by a main borehole or proximate the mai borehole. A well 504 is shown extending into the earth 512 and into or proximate a formation 514 penetrated by the well 504 or proximate the well 504. A derrick 502 is shown above the well 504 tor performing operations on the well 504.
A side borehole 506 extends into or proximate the formation 514. An energetic charge 508 is placed in the side borehole 506 away from the main borehole 504. The side borehole 506 is isolated from the main borehole 504 as illustrated by the blocking section 510. The side borehole 506 can be isolated from the main borehole 504 by cementing off the side borehole 506 from the main borehole 504 as illustrated by the cemented section 510. A fluid 516 extends into the geological formation 514. The fluid 514 is isolated from the main borehole 505 by the blocking section 510. The fluid 514 is pressurized producing a stress field in the geological formation 514. The charge 508 is detonated energetically stimulating the fluid. 516 in the geological formation 514 fracturing the geological formation 514 resu lting in. the stress field in the geological formation being enhanced.
Example 6
Referring now to FIG. 6, another example of a system of the present invention is illustrated. This example is designated generally by the reference numeral 600. The system 600 provides a method, apparatus,, and system of fracturing a geological formation penetrated by a main borehole or proximate the main, borehole. A first well 604a and a second well 604b are shown extending into the earth 612 and into or proximate a formation having pre-existing fracture network of a well having a hydrauiicaily fractured productive zone 614 penetrated b the well or wells. The derrick or rigs 602a and 602b are used for the various oper ions on the well or wells.
The first well 604a penetrate the hydrauiicaily fractured productive zone 614, The first well 604a is shown having a side borehole 606 extending into the formation 614 having pre-existing fracture .network. The first well 604a also has additional side boreholes 60S and 610 extending into the formation 614 having pre-existing fracture network.
The system 600 provides fracturing the geological formation and expanding and enhancing the pre-existing fracture network of the well having a. hydrauiicaily fractured productive zone 614 penetrated by or proximate the well 604a. The system 600 includes the steps of placing an explosive or energetic charge within one or more of the side boreholes 606, 608 a d /or 610, and detona ing the charge producing a detonation that is transferred to the preexisting fracture network 614 in the productive zone penetrated by the well expanding and enhancing a pre-existing fracture network.
Hydraulic fracturing is a well stimulation process used to maximize the extraction of underground resources; includin oil, natural gas, geothermal energy, and even water. The oil and gas industry uses hydraulic fracturing to enhance subsurface fracture systems to allow oil or natural gas to move more
freely from the rock pores to production wells that bring the oil or gas to the surface.
The process of hydraulic fracturing begins with building the necessary site infrastructure including well construction such as wells 604a and 604b.
Productio wells may be drilled in the vertical direction only or paired with horizontal or directional sections. Vertical well sections may be drilled hundreds to thousands of feet below the land suriace and lateral sections ma extend .1,000 to 6000 feet away from the well.
Fluids, commonly made u of wa er and chemical additives., are pumped into a geologic formation at high pressure during hydraulic fracturing. When the pressure exceeds the rock strength, the fluids open or enlarge fractures that can extend several hundred feet away from the well. After the fractures are created, a propping agent is pumped into the fractures to keep them from closing when the pumping pressure is released. After fracturing is completed, the internal pressure of the geologic formation cause the injected fracturing fluids to rise to the surface where it may be stored in tanks or pits prior to disposal or recycling. Recovered fracturing fluids are referred to as flow ack. Disposal options fo flowback include discharge into surface water or underground injection.
Example 7
Example 7 is an example of energetic stimulation in a geothermal reservoir setting. The goal of a geothermal power plant is to extract hot fluids from, the reservoir at a sufficient rate so that the heat can be used to generate electricity. O en times the reservoir contains sufficient heat, but lacks the fracture permeability necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture
network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system, The rate of heat ex raction depends on the temperature of the host formation, the fracture permeability and porosity,, and the fracture surface area. The standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or hydroshearing. The system 700 described here relies o higher strain rate stimulation methods that may include, solid, liquid, or gas propellants, explosives, and energetic materials. These methods provide fracture networks for the extraction of heat from the reservoir superior to those created by standard methods.
One im lementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal drilling technology can be accurately placed . The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the main borehole. This eliminates one prior problem of using energetic materials for stimulation and adds the advantages of creating the fracture network in a location between injection and extraction boreholes. Thus, once the reservoir is stimulated, the operator can produce fluids from one set of boreholes and reinject the fluids in other boreholes creating a sustainable heat extraction process.
The detonations in the parallel sidetracks can be spatially arranged and tinted to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume. The detonations can be used to create constructive or destructive interference patterns of energy propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main borehole is preserved and larger portions of the target reservoir are accessible for heat extraction,
fry
Alternatively, a single sidetrack can extend away from the borehole into the formation and multiple charges can be placed along this borehole. The charges can then be detonated simultaneously or one-at-a-time to create the fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired fracture network. This single borehole strategy may be advantageous in some situations. For instance, in a reservoir where a fracture networks exists but it does not access portions of the reservoir, this method could target these isolated regions.
Example 7 is illustrated in FIG. 7. The system of Example 7 is designated by the reference numeral 700. A first borehole 704a and a second borehole 704b are shown extending into the earth 712 and into or proximate a geo hermal formation penetrated by the boreholes 704a and 704b. The first borehole 704a is an injection borehole and the second borehole 704b is an extraction borehole. The derrick or derrick or rigs 702a and 702b are used for the various operations on the boreholes.
The first borehole 704a is shown having a first side borehole 706, a second side borehole 706a and a third side borehole 706b extending into the earth 712 and into the geotherma! formation. The present invention provides a system 700 for expanding and enhancing a fracture network of a borehole having a geotherma! section penetrated by or proximate the borehole including the step of placing an explosive or energetic charge 70S, 708a, and 708b through the borehole main borehole 704a and into the first side borehole 706, into the second side borehole 706a and into the third side borehole 706b. The first side borehole 706, the second side borehole 706a and the third side borehole 706b can be sealed off from the main borehole 704a as illustrated by the blocking sections 710, 710a nd 710b.
The system 700 expands and enhances a fracture network of a borehole having a geothermal section penetrated by or proximate the borehole by detonating the charges 708, 708a, and 708B producing a detonation that is transferred to the geothermal formation penetrated by the borehole expanding and enhancing a fracture network. The system 700 of the present invention can be used for creating a fracture network in geothermal section and/or for expanding and enhancing a pre-existing fracture network- Example 8
Example 8 is another example of energetic stimulation in a geothermal reservoir setting. Example 8 is a more detailed example than example 7. Example 8 is illustrated in FIG. 8. The system of Example 8 is designated by the reference numeral 800, An injection borehole 804a and an extraction borehol 804b are show extending into the earth 802 and into a geothermal formation 806. Fluid ca be pumped down the injection borehole 804a, into and through the geothermal formatio 806, and draw up the extraction borehole 804b as illustrated by the arrows 816a and 816b.
The injection borehole 804a is shown having a first side borehole 808 extending into tire geothermal formation 806. The first side borehole 808 is shown having an additional side borehole 808a and an additional side borehole 808b extending into the geothermal formation 806.
The injection borehole 804a is shown having a second side borehole 810 extending into the geothermal formation 806. The second side borehole 810 is shown having an additional side borehole 8 0a and an additional side borehole 810b extending into the geothermal formation 806.
The injection borehole 804a is shown ha ving a third side borehole 812 extending into the geothermal formation 806, The third side borehole 812 is shown having an additional side borehole 812a and an additional side borehole 812b extending into the geothermal formation 806,
Multiple explosive charges 814, are positioned in the multiplicity of different side boreholes 808, 808a, 808b, 810, 810a., 810b, 812, 12a, and 812b. The multiple explosive charges 814 are utilized to enhance the fracture network in the geomermai zone 806, The charges 814 ar placed in the sidetrack boreholes and the sid etrack boreholes can be cemented off. For example, the sidetrack borehole 808a is shown having been cemented off at location 818.
Th prese t inventio provides the system 800 for expanding and enhancing a fracture network in the geothermal zone 806 penetrated by the boreholes. The goal of a geothermal power plant is to extract hot fluids from the reservoir at a sufficient rate so that the heat can be used to generate electricity. Often times the reservoir contains sufficient heat, but lacks the fracture permeability necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system. The rate of heat extraction depends on. the temperature of the host formation, the fracture permeability and porosity, and the fracture surface area. The standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or hydroshearing. The system 800 described here relies on higher strain rate stimulation methods that may include, solid,, liquid, or gas propellants, explosives, and energetic materials. These methods provide fracture networks fo the extraction of heat from the reservoir superior to those created by standard methods,
One implementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal drilling technology can be accurately placed, The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the mai borehole. This eliminates one prio problem of using energetic materials for stimulatio and adds the advantages of creating the fracture network in a location between injection and extraction boreholes. Thus, onc the reservoir is stimulated, the operator can produce fluids from one set of boreholes and reinject the fluids in other boreholes crea ing a sustainable heat extraction process.
Explosives are widely used to break up various types of rock in mining operations. They have also been utilized to a much lesser extent, and with less success to create fracture networks in the subsurface. The main difference between the successful use of explosives in. "mining plications and the les successful use of explosives to create fracture networks in the subsurface is the i situ stress field. In mining, explosives are most commonly utilized near the ground surface where the i situ stresses are low and where wave reflections from free surfaces in the vicinity of the explosion lead to the propagation of release waves back toward the detonation point, giving rise to fracture-enhaiidng tensile stress states within the geologic medium. In. contrast the resource of interest in most energy applications, whether it is oil, gas or geothemial energy, is located deep beneath the ground surface, where there are no free surfaces to promote wave reflections, and when? the in situ, stress field is in a
predominantly compressive stress state, which tends to suppress and inhibit fracture propagation. For these reasons, simply detonating an explosive charge in. the bottom of a borehole in the subsurface is not likely to produce the desired effects.
As illustrated in FIG.8, multiple explosive charges, either in the same borehole or in several different 'boreholes are utilized to create a fracture network in the subsurface This approach relies on the interaction of stress waves emanating from multiple explosive charges to create tensile loading in regions in the vicinity of the explosi es where it is desired to create a fracture network. The domain size can be controlled by varying the charge size, spacing, and timing sequence. Pulse duration can also be controlled by using different types of explosives.
in one embodiment, the present invention provides the use of explosives, or cither energetic materials, to greatly expand and enhance a pre-existing fracture network created through conventional hydrofracturing techniques or other means, in the system 800, explosives that exploit more effective means of energy axtpling, including the use of a working fluid as the energy transfer medium and the use of multiple charges and precision timing sequences to exploit wave interactions are used. The pre-existing fracture network 806 is first injected with a working fluid, an explosive charge 814 is then placed in the borehole within the fluid and the borehole is sealed at the top of the .fluid. Upon detonation, the rapid expansion of the explosi ve gases leads to a pressure spike within the fluid, which is then transmitted by th fluid into the fracture network. The rapid application of this high intensity pressure pulse will lead to the initia tion and propagation of new fractures connected to the pre-existing fracture network.
In a conventional sense, hydrofracturing involves the injection of water under high pressure through, a borehole into a geologic formation. The pressurized water propagates into fractures, causing an increase in size and extent of the fracture network. The present inventio combines explosive and/or another energetic material with conventional hydrofracturing techniques to enhance the fracture network borehole bevond what could be achieved through
conventional means. This technique works by placing an explosive or energetic charge within the borehole,, then detonating the charge. The energy released b the detonation will be transferred to the surrounding rock formatio generating a pressure wave which will cause a significant transient increase in pressure thus leading to enhancement of the fracture network. An addi ional advantage of this technique is that charges can be placed in small sidetrack boreholes that are cemented off. The smaller boreholes are cheaper to drill, can be arranged in an optimal pattern., and there is no damage to the main borehole while still achieving the desired resul - The smaller sidetrack boreholes are sacrificed during the detonation. Arranging the smaller boreholes in a pattern and detonating wi h specific and carefull planned timing enables the establishment of interfering waves to further control the resulting damage zone and fracture pattern.
Upon detonation, explosive materials undergo a rapid exothermic reaction that releases a significant amount of energy and causes a near-instantaneous rise in pressure and temperature in the detonation products. In turn, this gives rise to stress waves which propagate away from the detonation, point and. into the materials adjacent to the explosive. The interaction of the stress waves with the geologic medium often lead to stress states In excess of the elastic limit leadin to inelastic deformation and material damage. These inelastic processes can take man forms, including plastic deformation, porous compaction, and tensile fracture. Fracture propagation can occur under both shear and tensile loading, and the creation of optimal fracture networks under borehole controlled explosive loading conditions is the main focus of this invention.
Referring again to FIG.8, multiple explosive charges 814, located in a multiplicity of different side boreholes 808, 808a, 808b, 810, 810a, 810b, 812, 812a, and 812b are utilized to enhance the fracture network in the productive geothermal zone
806, . The charges 814 are placed in. the small sidetrack boreholes and the sidetrack boreholes can be cemented off. For example, the sidetrack borehole 80Sa is shown having been cemented off at location 818.
The detonations in. the parallel sidetracks can be spatially arranged and timed to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume. The detonations can be used to create constructive or destructive interference patterns of energ propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main, borehole is preserved, and larger portions of the target reservoir are accessible for hea extraction.
Alternatively, a single sidetrack ca extend awa from the borehole into the formation and multiple charges can. be placed along this borehole. 'The charges can then be detonated simultaneously or one-at-a-time to create the fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired fracture network. This single borehole strategy may be advantageous in some situations. For instance, in a. reservoir where a fracture networks exists but it does not access portions of the reservoir, this method could target these isolated regions.
The goal of a geothermal power plant is to extract hot fluids from the reservoir at a sufficient rate so that the heat can be used to generate electricity. Often times the reservoir contains sufficient heat but lacks the fracture permeabilit necessary to extract the volume of water needed for economic electrical generation. Stimulation of the reservoir to create a fracture network that accesses more of the hot reservoir volume is a technique often used to enhance a geothermal system. The rate of heat extraction depends on the temperature of the host formation, the fracture permeability and porosity, and
the fracture surface area. The standard method for improving fracture networks in a geothermal reservoir is hydro fracturing or h droshearing. The system 800 described here relies on higher strain rate stimulation methods that may include, solid, liquid, or gas propeliants, explosives,, and energetic materials. These methods provide fracture networks for the extraction of heat from the reservoir superior to those created by standard methods.
One im lementation strategy is to drill parallel slim-hole sidetracks that extend from the main borehole. These holes are cheaper to drill and using directional horizontal, drilling technology can be accurately placed. The holes will extend into the reservoir at a distance such that the emplacement and detonation of an explosive charge will not damage the main borehole. This eliminates one prior problem of using energetic materials for stimulation and adds the advantages of creating the fracture network in a location between injectio and extraction boreholes. Thus, once the reservoir is stimulated, the operator can produce fluids from one set of boreholes and reinject the fluids in ther boreholes creating a sustainabl he t extraction process.
The detonations in the parallel sidetrack can be spatially arranged and timed to create an evolving stress state that enables subsequent detonations to more effectively stimulate the rock volume. The detonations can be used t create constructive or destructive interference patterns of energy propagation to create fractures in regions away from the sidetracks. In this way the integrity of the main borehole is preserved and larger portions of the target reservoir are accessible for heat extraction.
Alternatively, a single sidetrack can extend away from the borehole into the formation and multiple charges can be placed along this borehole. The charges can then be detonated simultaneously or one-at-a-time to cre te the
fracture network and to modify the stress field so that subsequent detonations are more effective at creating the desired, fracture network. This single borehole strategy may be advantageous in some situations. For instance, in a reservoir where a fracture networks exists b t it does not access portions of the reservoir, this method could target these isolated regions.
Example 9
Referring now to FIGS, 9 and K), another example of a system of the present invention is illustrated. The system of Example 9 is designated generally by the reference numeral 900. The system 900 involves arranging a multiplicity of boreholes in a pattern and detonating an energetic charge in said multiplicity of boreholes with specific and carefully planned timing enables the establishment of interfering waves to further control the resul ing damage zone and fracture pattern. The system. 900 provides a method and apparatus for pre-determining the location of explosive charges to maximize energetically stimulating the geological formation, fracturing the geological formation resulting in the stress field in the geological formation being enhanced .
A main well 904 is shown extending into the earth 912 and into or proximate a formation 914 penetrated by the main well 904 or proximate the main well 904. The main well 904 is shown having side boreholes 906, 908, and 91.0 extending into the formation 914. A drilling ri 91.6 is illustrated drilling a multiplicity of boreholes 918 in a predetermined pattern in the vicinity of the main well 904. The boreholes 918 are located with specific and carefully planning so that th detonation of energetic charges in the multiplicity of boreholes 918 produces interfering waves to control the resulting damage zone and fracture pattern in the formation 914. Some of the tools used in the planning of th pattern
of the boreholes 918 in the vicinity of the main well 904 are seismographic studies, reservoir analysis studies, and computer modeling.
FIG, 10 is a plan view of the multiplicity of boreholes 918 being drilled in a predetermined pattern in the vicinity of the main well 904. The boreholes 918 are located with specific and carefully planning so that the detonation of energetic charges in the multiplicity of boreholes 918 produces interfering waves t control the resulting damage zone and fracture pattern in the formation 914. The location of explosive charges in the boreholes 918 maximizes the
energetically stimulation of the geological formation resulting in. the stress field in the geological formation being enhanced.
Example 10
Referring now to FIGS. Π and 2, additional examples of systems of the present invention are illustrated. The systems i llustrated in FIGS, 11. and 12 provide applications that utilizes energetic materials as a means to stimulate fracture propagation in a low permeability shale formation for the purpose of extracting oil and/or gas contained, in the shale. Several different variants of the application of energetic materials to stimulate the well are described. The technology could be applied to stimulate a new well,, or as a post-production step to re-stimu late a well that was first produced using conventional hydraulic fracturing techniques.
Fluidiess well stimulation:
Referring to PIGS. Ί Ί A A MD 1.1 B, a main borehole 1104 is shown extending into the earth 1 1.10 and into or proximate a formation 11.1.2 penetrated by the main borehole 1104 or proximate the main borehole 1.1.04. This technology is shown applied in horizontal sacrificial boreholes 1106a,. 1106b, ,1 :106c, 1106d..
1.106c, 1 106 f, llO&g, and 1 106h. This technology can also be applied in vertical boreholes holes which can be desirable, especially where the production zone is of sufficient thickness to render a. vertical hole economical, in this case the explosives can be arranged i vertical sacrificial holes, the size and location of which are determined as was done in the case of horizont l production wells.
The series of horizontal sacrificial boreholes 1.106a, 1.106b, 1106c, 1106d, !106e, "i'lOof, 1106g, and 1106h are drilled at specific locations extending from the production hole 1104, The system "1100 includes the steps of placing an explosive or energetic charge 1108a, 1108b, 108c, 11 6d, 1106e, ll06f, ll06g, and 1106h within the sacrificial boreholes 1106a, 1106b, 1106c, 11.06d, 1106e, I 106f, i l06g, and 110611, and detonating the charges producing a detonation that creates a fracture network in the formation 1112. It it is desired to protect the production borehole 1104 sections 1114a, 1114b, 1114c, 1114d, 11146, 1114f, 1114g, and 111 h of horizontal sacrificial boreholes 6a, 1106b, 1.1.06c, 1106d, 1106e, 1106f, 1106g, and i.'i.06h may be sealed off, for example by cementing.
The production hole 1104 can be drilled and cased either before or after completion of explosive operations. The production hole can be drilled at the location that optimizes gas production from the newly created fracture network. The size and location of the sacrificial holes 1 106a, 1.106b, 1106c, 1106d, 11 6e, 1106f, li06g, and 1106h relative to the production hole 1104 are determined based on several factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, densi ty, existing fractures), the type of energetic materials being utilized (e.g., energy content per unit volume, energy release rate), and the in. situ stress field. Detonation of the energetic .materials in the different holes can be synchronized to maximize the surface area of the fracture network. Other factors can also be taken into account in She
placement and detonation of the energetic materials, such as to maximize propagation of self-propped "shear fractures."
Another variant of this approach involves the utilization of explosives placed in discrete locations within a drill hole, as opposed to being placed uniformly throughout the entire length of the hole. In this ease, widening of the hole to accommodate larger amounts of explosives at desirable locations may be required to achieve desired results.
Yet another variant could involve the utilization of explosives in the entire length of the sacrificial hole, except at discrete 3ocation(s), pre-determined based on site-specific information gathered prior to well stimulation. For instance, if a geologic fault intersects the resource-bearing rock, it may be desirable not to stimulate the fault zone to avoid the risk of acti ating the fault, and/or having the fault compromise the se l integrity of the well.
Explosive stimulation applied synergisticaily with conventional stimulation techniques
The fluidless well stimu lation method described above can he slightly modified and applied in combination with conventional hydraulic fracturing techniques to produce a more extensive fracture network and increase well production. With this technique, a production well is drilled, cased and completed using conventional hydraulic fracturing techniques. This i followed with another stimulation regiment using energetic materials. The ex losive stimulation can be applied immedia ely following the hydraulic fracturing stimulation, or after the well is produced, and the yield has dropped off to sufficiently low levels to justify re-stimulation. In either case, sacrificial explosive emplacement holes are drilled in the vicinity of the production well and filled with explosives. Fluid is pumped into the production well so as to flood and
fully saturate the existing fracture network. The explosives are detonated while maintaining a fluid pressure in the fracture network at or near the same level used i the initial hydrauiic fracturing stage. By maintaining a high level of fluid pressure, the existing fracture network will be at or near the threshold of crack growth, thus providing favorable conditions for the explosive stimulation to produce additional ne fractures. Additionally, due to the extremely high strain rates associated with explosive loading, the new fracture network will be more extensive than the original, with many branching cracks emanating from the original long fractures produced using hydraulic fracturing techniques. As in the previous case, the size and location of the sacrificial holes relative to the production hole are determined based on several factors including structural geology of the reservoir, the properties of the rock (e.g., sound speed, strength, density, existing fractures), the type of energetic materials being utilized (e.g., energy content per unit volume, energ release rate), and the in situ, stress field. Detonation of the energetic materials in the different holes can be synchronized to maximize the surface area of the fracture network. Other factors can also be taken into account in the placement and detonation of the energetic materials., such as to maximize propagation of self-propped '"'shear fractures;''"
This technology can also be applied in vertical production holes, especially where the production zone is of sufficient thickness to render a vertical hole economical, in this case the explosives can be arranged in vertic l sacrificial holes, the* size and location of which are determined as was done in the case of horizontal production wells described above.
Another varian of this approach involves the utiliz ion of explosives placed in discrete locations within a drill hole, as opposed to being placed uniformly throughout the entire length of the hole, in this case, widening of the
hole to accommodate larger amounts of explosives at desirable locations may be required to achieve desired results.
Yet another variant could involve the utilization of explosives in the entire lengt of the sacrificial hole, except at discrete location(s), pr -determined based on site-specific information gathered prior to well stimulation. For instance, if a geologic fault intersects the resource-bearing rock, it may be desirable not to stimulate the fault zone to avoid the risk of activating the fault and/or having the fault compromise the seal Integrity of the well.
Referring now to FIG. 12, this technology is illustrated applied in vertical boreholes. The system of Example 10 illustrated in FIG. 12 is designated generally by the reference numeral 1200. The use of this technolog applied in vertical boreholes can be desirable, especially where the production zone is of sufficient thickness to render a vertical hole economical, in this case the explosives can be arranged in vertical sacrificial holes, the size and location of which are determined as was done in the case of horizontal productio wells.
The series of vertical boreholes 1208 are drilled at specific locations at predetermined locations around the production hole 1204. The system 200 includes the steps of placing an explosive or energetic charge within the boreholes 1208 and detonating the charges producing a detonation that creates a f acture network .
The system .1200 involves arranging a multiplicity of boreholes in a pattern and detonating an energetic charge in said nvulti lkity of boreholes with specific and carefully planned timing enables the establishment of Interfering waves to further control the resulting damage zone and fracture pattern. The system 1200 provides a method and apparatus for predetermining the location of explosive charges to maximize energetically stimulating the geological
formation fracturing the geological formation resulting in the st ess field in the geological formation being enhanced.
The main well 1204 is shown extending into the earth 1210 and into or proximate a formation 1212 penetrated by the main well 1204 or proximate the main well 1204. A drilling derrick or rig 1206 is illustrated drilling a multiplicity of boreholes 1208 in a predetermined pattern in the vicinity of the main well 1204. The boreholes 1208 are located with specific and carefully planning so that the detonation of energetic charges in the multiplicity of boreholes 1208 produces interfering waves to control the resultin damage zone and fracture pa tern in the formation 1212. Some of the tools used in the planning of the pattern of the boreholes 1208 in the vicinity of the main well 1204 are
s ismographic studies, reservoir analysis studies, and computer modeling.
Example
Referring now to FIG. 13, a flow chart illustr es an. example of a system of another embodiment of the present invention. The system of example 11 is designated generally by the reference numeral 1.100, The system 1100 is a system of fracturing a geological formation penetrated by a well or proximate the well. The present invention provides a method, apparatus, and system of fracturing a geological formation penetrated by a main borehole or proximate the main borehole. Relatively inexpensive smaller diameter sidetrack boreholes are drilled away from the main bore hole. Explosive charges are placed in these sidetrack boreholes, which are then cemented in. The detonation creates a fracture network with the desired qualities while preserving the integrity of the main borehole. Multiple side-tracks can be drilled in a pattern arranged to achieve an optimal fracture network. An additional control is the timing of the detonations to create constructively
interfering energy patterns within the formation, thereby extending the stimulated zone in the subsurface. The system 11(30 includes the steps shown in the flow chart.
In step 1 a side borehole is drilled from the well so that the side borehole extends Into or proximate the geological formation. Step 1 is designated by the reference numeral 1102 in the flow chart of FIG, 13.
Step 2 comprises modifying the stress field in the geological formation by assuring there is a fluid in the geological formation that is in fluid
communieation with the borehole that has been, drilled into the formation. Step 2 is designated by die reference numeral 1104 in the flow chart of FIG, 13, In one embodiment the step 1104 of modifying the stress field in the geological- formation and assuring there is a fluid in the geological formation that is in fluid communication with the borehole comprises hydrof racking the geological formation.
In step 3 the side borehole is isolated from the well with the fluid pressurized producing a stress field in the geological formation. Step 3 is designated by the reference numeral 1106 in the flow chart of FIG. 13. In one embodiment the step 1106 of isolating the side borehole from the well comprises cementing off the side borehole from the well
Step 4 comprises energetically stimulating the fluid in the geological formation fracturing the geological formation resul ing in the stress field in the geological formation being enhanced. Step 4 is designated by the reference numeral 108 in the flow chart of FIG. 13. In one embodiment the ste 1108 of energetically stimulating the fluid in the geological formation comprises detonating an explosive in the borehole.
While the invention may be susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and have been described in detail herein. However, i should be understood that the invention is not intended to be limited to the particular forms disclosed. Rather., the i.nvention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the following appended claims.
Claims
Claim 1. A method of fracturing a geological formation, comprising the steps of:
pre-determining the location of a pattern of boreholes in or proximate the geological formation,
drilling said pattern of boreholes into or proximate the geological formation,
emplacing energetic charges in said boreholes, and
detonating said energetic charges and fracturing the geological formation.
Claim 2. The method of fracturing a geological formation of claim 1 wherein, said step of pre-cletermining the location of a patter of boreholes in or proximate the geological formation includes pre-determining the location of said energetic charges in said boreholes in said step of emplacing energetic charges in said boreholes.
Claim 3. The method of fracturing a geological formation of claim 1 wherein said step of includes pre-determini.ng the timing of detonating said energetic charges to enhance fracturing the geological formation.
Claim 4. The method of fracturing a geological formation of claim 1 wherein said step of drilling said pattern of boreholes into or proximate the geological formation comprises drilling a pattern of side boreholes from a main borehole into or proximate the geological formation.
Claim 5, The method of fracturing a geological formation of claim 4 further comprising the step of isolating said side boreholes from said main borehole.
Claim 6. The method of fracturing a geological formation of claim 5 wherein said step of isolating said side boreholes from said main borehole comprises cementing off said side boreholes from the main borehole.
Claim 7, The method of fracturing a geological formation of claim 4, further comprising predetermining the location of said side boreholes to enhance fracturing the geological, formation.
Claim 8. An a paratus for fracturing a geological formation, comprising: means for determining the location of a borehole in or proximate the geological formation,
means for drilling said borehole into or proximate the geological formation,
means for emplacing an energetic charge in said borehole, and means for detonating said energetic charge and fracturing the geological formation.
Claim 9. The apparatus for fracturing a geological forma ion of claim 8 wherein said means for detonating said energetic charge and fracturing the geological includes means for pre-determining the timing of detonating said energetic charges to enhance fracturing the geological formation.
Claim.
10. A method of fracturing a geological formation penetrated by a well or proximate the well, comprising the steps of:
drilling a side borehole from the well so that said side borehole extends into or proximate the geological formation,
modifying the stress field in the geological formation,
isolating said side borehole from the well with said modified stress field maintained in the geological formation, and
energetically stimulating said fluid in the geological formation fracturing the geological formation resulting in said stress field in the geological formation being enhanced.
Claim 11. The method of fracturing a geological formation penetrated, by a well or proximate the well of claim 10 wherein said step of isolating said side borehole from the well comprises cementing off said side borehole from the well.
Claim 12. The method of fracturing a geological formation penetrated by a well o proximate the well of claim 10 wherein said step of modifying the stress field in the geological, formation comprises hydrofracking the geological formation.
Claim 13. The method of fracturing a geological formation penetrated by a well or proximate the well of claim 10, further comprising pre-determining the location of said side borehole to increase expanding and enhancing fracturing the geological formation.
Claim 14. The method of expanding and enhancing a well of claim 10, fu.rth.er comprising predetermining the location of said explosive charge to maximize said step of energetically stimulating said fluid in the geological formation fracturing the geological formation resulting in said stress field in the geological formation being enhanced.
Claim 15. The method of expanding and enhancing a well of claim 10, further comprising predetermining the timing of detonation of said explosive charge to maximize said step of energetically stimulating said fluid in the geological formation fracturing the geological formation resulting in said stress field in die geological formation being enhanced.
Claim 16. A method of fracturing a geological formation penetrated by a main borehole or proximate the main borehole,, comprising the steps of:
drilling a pattern of side boreholes from the main borehole into or proximate the geological formation,,
empiacing energetic charges in said side boreholes away from the main borehole.,
isolating said side boreholes from the main borehole, and
detonating said energetic charges and fracturing the geological formation.
Claim 17. The method of fracturing a geological formation penetrated by a mai borehole or proximate the main borehole of claim 16 wherein said step of isolating said side boreholes from the main borehole comprises cementing off said side boreholes from the main borehole.
Claim 18. The method of fracturing a geological iormation penetrated by a main borehole or proximate the main borehole of claim 16, further comprising pre-determining the location of said side boreholes to enhance fracturing the geological formation .
Claim .
19. The method of fracturing a geological formation penetrated by a main borehole or proximate the main borehole of claim .1.6, further comprising pre-determining the location of said energetic charges in said side boreholes to enhance fracturing the geological formation.
Claim.
20. The method of fracturing a. geological formation penetrated by a main borehole or proximate the main borehole of claim 16, further comprising pre-determining the timing of detonating said energetic charges to enhance fracturing the geological formation.
Claim 21. A method of fracturing a desired fracture zone penetrated by a well or proximate the well, comprising the steps of:
providing a borehole in or proximate the desired fracture zone, assuring there is a fluid within, the desired fracture zone,
placing an explosive o energetic charge within said borehole, and detonating said charge producing a pressure wave in said fluid causing a transient increase in pressure that is transferred through said fluid within the desired fracture zone resulting in fracturing the desired fracture zone.
Claim 22. A method of fracturing a geological formation penetrated by a well or proximate the well, comprising the steps of:
drilling a side borehole from the well so that said side borehole extends into or proximate the geological formation,
hydrofracking the geological formation resulting in a fluid in the geological formation,
isolating said side borehole from the well with said fluid pressurized and producing a stress field in the geological formation, and
energetically stimulating said fluid in the geological formation fracturing the geological formation resulting in said stress field in the geological formation being enhanced .
Claim 23. A method of producing optimized fracture networks in a reservoir, comprising the steps of:
providing a borehole in or proximate the reservoir,
assuring there is a fluid within the fracture networks in the reservoir, placing an explosive or energetic charge within said borehole, and detonating said charge producing a pressure wave in said, fluid causing a transient increase in pressure thai is transferred through said fluid within the fracture networks in the reservoir resulting in optimized fracture networks i the reservoir.
Claim 24, The method of producing optimized fracture networks in a reservoir of claim 23, further comprising sealing off said borehole prior to detonating said charge.
Claim 25. The method of producing optimized fracture networks in a reservoir of claim 23 wherein said step of providing a borehole in or proximate
the desired fracture zone comprises providing a borehole that is a side borehole that extends from a main borehole.
Claim 26, The method of producing optimized fracture networks in a reservoir of claim 23, further comprising pre-determining the location of said borehole to enhance producing optimized fracture networks in the reservoir.
Claim 27. The method of producing optimized fracture networks in a reservoir of claim 23, further comprising pre-determining the location of said explosive charge to enhance producing optimized fracture networks in the reservoir.
Claim 28, The method of producing optimized fracture networks in a reservoir of claim 23,. further comprising pre-determining the timing of detonation of said explosive charge to enhance producing optimized fracture networks in the reservoir.
Claim 29. The method of producing optimized fracture networks i a reservoir of claim 23,, further comprising providing at least one additional borehole in or proximate the desired fracture zone, placing at least one additional explosive or energetic charge within said at least one additional borehole, and detonating said at least one additional charge.
Claim 30. The method of producing optimized fracture networks in a reservoir of claim 23, further comprising sealing off said at least one additional borehole prior to detonating said at least one additional charge.
Claim 31. The method of producing optimized fracture networks in a reservoir of claim 23, further comprising pre-determining the location of said borehole and said at least one additional borehole to enhance producing optimized fracture networks in the reservoir.
Claim 32, The method of producing optimized fracture networks in a reservoir of claim 23, further comprising pre-determining the location of said explosive charge and said at least one additiona! explosive charge to enhance producing optimized fracture networks in the reservoir.
Claim 33. The method of producing optimized fracture networks in a reservoir of ciaim 23, further comprising pre-d.etermin.ing the timing of detonation of said explosive charge and said at: least one additional explosive charge to enhance producing optimized fracture networks in the reservoir.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/533,795 | 2012-06-26 | ||
| US13/533,795 US9062545B2 (en) | 2012-06-26 | 2012-06-26 | High strain rate method of producing optimized fracture networks in reservoirs |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014004092A1 true WO2014004092A1 (en) | 2014-01-03 |
Family
ID=49773438
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2013/045476 Ceased WO2014004092A1 (en) | 2012-06-26 | 2013-06-12 | High strain rate method of producing optimized fracture networks in reservoirs |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US9062545B2 (en) |
| WO (1) | WO2014004092A1 (en) |
Cited By (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018162645A1 (en) | 2017-03-08 | 2018-09-13 | Amazentis Sa | Skin treatment methods |
| US10169541B2 (en) | 2014-10-21 | 2019-01-01 | uBiome, Inc. | Method and systems for characterizing skin related conditions |
| US10242160B2 (en) | 2014-10-21 | 2019-03-26 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10246753B2 (en) | 2015-04-13 | 2019-04-02 | uBiome, Inc. | Method and system for characterizing mouth-associated conditions |
| US10268803B2 (en) | 2014-10-21 | 2019-04-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10290376B2 (en) | 2014-10-21 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10287639B2 (en) | 2014-01-25 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome analysis |
| US10325685B2 (en) | 2014-10-21 | 2019-06-18 | uBiome, Inc. | Method and system for characterizing diet-related conditions |
| US10327642B2 (en) | 2014-10-21 | 2019-06-25 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for conditions associated with functional features |
| US10347362B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10347366B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics, and therapeutics for cardiovascular disease conditions |
| US10347379B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for cutaneous conditions |
| US10358682B2 (en) | 2014-10-21 | 2019-07-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with microbiome functional features |
| US10366793B2 (en) | 2014-10-21 | 2019-07-30 | uBiome, Inc. | Method and system for characterizing microorganism-related conditions |
| US10381112B2 (en) | 2014-10-21 | 2019-08-13 | uBiome, Inc. | Method and system for characterizing allergy-related conditions associated with microorganisms |
| US10388407B2 (en) | 2014-10-21 | 2019-08-20 | uBiome, Inc. | Method and system for characterizing a headache-related condition |
| US10786195B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with mircrobiome taxonomic features |
| US10790060B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for mental health associated conditions |
| US10789334B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbial pharmacogenomics |
| US10795972B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for locomotor system conditions |
| US11783914B2 (en) | 2014-10-21 | 2023-10-10 | Psomagen, Inc. | Method and system for panel characterizations |
Families Citing this family (81)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2791646C (en) * | 2010-03-19 | 2016-08-16 | Exxonmobil Upstream Research Company | System and method for fracturing rock in tight reservoirs |
| US9920574B2 (en) | 2012-07-24 | 2018-03-20 | Robertson Intellectual Properties, LLC | In situ pump for downhole applications |
| US10232332B2 (en) | 2012-11-16 | 2019-03-19 | U.S. Well Services, Inc. | Independent control of auger and hopper assembly in electric blender system |
| US9840901B2 (en) | 2012-11-16 | 2017-12-12 | U.S. Well Services, LLC | Remote monitoring for hydraulic fracturing equipment |
| US10526882B2 (en) | 2012-11-16 | 2020-01-07 | U.S. Well Services, LLC | Modular remote power generation and transmission for hydraulic fracturing system |
| US9970278B2 (en) | 2012-11-16 | 2018-05-15 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
| US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
| US9611728B2 (en) | 2012-11-16 | 2017-04-04 | U.S. Well Services Llc | Cold weather package for oil field hydraulics |
| US11959371B2 (en) | 2012-11-16 | 2024-04-16 | Us Well Services, Llc | Suction and discharge lines for a dual hydraulic fracturing unit |
| US10020711B2 (en) | 2012-11-16 | 2018-07-10 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
| US10036238B2 (en) | 2012-11-16 | 2018-07-31 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
| US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
| US9410410B2 (en) | 2012-11-16 | 2016-08-09 | Us Well Services Llc | System for pumping hydraulic fracturing fluid using electric pumps |
| US9745840B2 (en) | 2012-11-16 | 2017-08-29 | Us Well Services Llc | Electric powered pump down |
| US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
| US9650879B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Torsional coupling for electric hydraulic fracturing fluid pumps |
| US9650871B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Safety indicator lights for hydraulic fracturing pumps |
| US10254732B2 (en) | 2012-11-16 | 2019-04-09 | U.S. Well Services, Inc. | Monitoring and control of proppant storage from a datavan |
| US9995218B2 (en) | 2012-11-16 | 2018-06-12 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
| US9893500B2 (en) | 2012-11-16 | 2018-02-13 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
| US10119381B2 (en) | 2012-11-16 | 2018-11-06 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
| US11125471B2 (en) * | 2014-06-04 | 2021-09-21 | The Johns Hopkins University | Method for a radiator EGS to harvest geothermal energy |
| CA2908276C (en) | 2014-10-14 | 2022-11-01 | Us Well Services Llc | Parallel power and blackout protection for electric hydraulic fracturing |
| US10815766B2 (en) * | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
| US20170030180A1 (en) * | 2015-07-27 | 2017-02-02 | William C. Maurer | Drain Hole Drilling in a Fractured Reservoir |
| US12078110B2 (en) | 2015-11-20 | 2024-09-03 | Us Well Services, Llc | System for gas compression on electric hydraulic fracturing fleets |
| US12027831B2 (en) | 2016-04-15 | 2024-07-02 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
| US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
| US11181107B2 (en) | 2016-12-02 | 2021-11-23 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
| EA201991640A1 (en) | 2017-01-04 | 2019-11-29 | LINE INTENSIFICATION, INCLUDING HYDRAULIC BREAKTHROUGH LAYER THROUGH SPEED CHANNELS | |
| WO2018136100A1 (en) | 2017-01-23 | 2018-07-26 | Halliburton Energy Services, Inc. | Fracturing treatments in subterranean formations using inorganic cements and electrically controlled propellants |
| US10738581B2 (en) | 2017-01-23 | 2020-08-11 | Halliburton Energy Services, Inc. | Fracturing treatments in subterranean formations using electrically controlled propellants |
| CA3046917C (en) | 2017-01-23 | 2021-03-30 | Halliburton Energy Services, Inc. | Enhancing complex fracture networks in subterranean formations |
| US10280724B2 (en) | 2017-07-07 | 2019-05-07 | U.S. Well Services, Inc. | Hydraulic fracturing equipment with non-hydraulic power |
| WO2019014161A1 (en) | 2017-07-10 | 2019-01-17 | Schlumberger Technology Corporation | Controlled release of hose |
| US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
| CA3066346C (en) | 2017-08-04 | 2022-05-03 | Halliburton Energy Services, Inc. | Methods for enhancing hydrocarbon production from subterranean formations using electrically controlled propellant |
| US12228026B2 (en) | 2017-09-14 | 2025-02-18 | Saudi Arabian Oil Company | Modeling reservoir permeability through estimating natural fracture distribution and properties |
| US11067481B2 (en) | 2017-10-05 | 2021-07-20 | U.S. Well Services, LLC | Instrumented fracturing slurry flow system and method |
| CA3078879A1 (en) | 2017-10-13 | 2019-04-18 | U.S. Well Services, LLC | Automated fracturing system and method |
| WO2019084283A1 (en) | 2017-10-25 | 2019-05-02 | U.S. Well Services, LLC | Smart fracturing system and method |
| WO2019113147A1 (en) | 2017-12-05 | 2019-06-13 | U.S. Well Services, Inc. | Multi-plunger pumps and associated drive systems |
| US10648311B2 (en) | 2017-12-05 | 2020-05-12 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
| US11114857B2 (en) | 2018-02-05 | 2021-09-07 | U.S. Well Services, LLC | Microgrid electrical load management |
| US10907460B2 (en) | 2018-02-12 | 2021-02-02 | The Johns Hopkins University | Energetic charge for propellant fracturing |
| CN110344806B (en) * | 2018-04-02 | 2021-11-26 | 中国石油化工股份有限公司 | Auxiliary hydraulic fracturing method for small borehole explosion seam construction |
| US11035207B2 (en) | 2018-04-16 | 2021-06-15 | U.S. Well Services, LLC | Hybrid hydraulic fracturing fleet |
| WO2019241783A1 (en) | 2018-06-15 | 2019-12-19 | U.S. Well Services, Inc. | Integrated mobile power unit for hydraulic fracturing |
| US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
| WO2020056258A1 (en) | 2018-09-14 | 2020-03-19 | U.S. Well Services, LLC | Riser assist for wellsites |
| CA3115669A1 (en) | 2018-10-09 | 2020-04-16 | U.S. Well Services, LLC | Modular switchgear system and power distribution for electric oilfield equipment |
| WO2020081313A1 (en) | 2018-10-09 | 2020-04-23 | U.S. Well Services, LLC | Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform |
| CN109779610B (en) * | 2019-02-01 | 2022-09-06 | 西安闪光能源科技有限公司 | Method for measuring effective action radius of anti-reflection drilling hole based on controllable shock wave technology |
| CN109882133A (en) * | 2019-03-06 | 2019-06-14 | 大连理工大学 | A device and method for exploiting natural gas hydrate by utilizing abandoned high temperature and high pressure gas reservoir |
| CN109958418A (en) * | 2019-03-12 | 2019-07-02 | 中国科学院武汉岩土力学研究所 | An umbrella-type EGS system for improving heat exchange area and heat extraction flow |
| US11578577B2 (en) | 2019-03-20 | 2023-02-14 | U.S. Well Services, LLC | Oversized switchgear trailer for electric hydraulic fracturing |
| WO2020197607A1 (en) | 2019-03-27 | 2020-10-01 | Halliburton Energy Services, Inc. | Enhancing treatment fluid placement in a subterranean formation |
| US11728709B2 (en) | 2019-05-13 | 2023-08-15 | U.S. Well Services, LLC | Encoderless vector control for VFD in hydraulic fracturing applications |
| AR119134A1 (en) | 2019-06-10 | 2021-11-24 | U S Well Services Llc | INTEGRATED COMBUSTION GAS HEATER FOR MOBILE FUEL CONDITIONING EQUIPMENT |
| WO2021022048A1 (en) | 2019-08-01 | 2021-02-04 | U.S. Well Services, LLC | High capacity power storage system for electric hydraulic fracturing |
| US11352859B2 (en) | 2019-09-16 | 2022-06-07 | Halliburton Energy Services, Inc. | Well production enhancement systems and methods to enhance well production |
| US11459863B2 (en) | 2019-10-03 | 2022-10-04 | U.S. Well Services, LLC | Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump |
| US12012952B2 (en) | 2019-11-18 | 2024-06-18 | U.S. Well Services, LLC | Electrically actuated valves for manifold trailers or skids |
| US12509974B2 (en) | 2019-12-27 | 2025-12-30 | U.S. Well Services, LLC | Systems and methods for fluid end health monitoring |
| US11009162B1 (en) | 2019-12-27 | 2021-05-18 | U.S. Well Services, LLC | System and method for integrated flow supply line |
| US11885206B2 (en) | 2019-12-30 | 2024-01-30 | U.S. Well Services, LLC | Electric motor driven transportation mechanisms for fracturing blenders |
| US11846167B2 (en) | 2019-12-30 | 2023-12-19 | U.S. Well Services, LLC | Blender tub overflow catch |
| US11560887B2 (en) | 2019-12-31 | 2023-01-24 | U.S. Well Services, LLC | Segmented fluid end plunger pump |
| US11492886B2 (en) | 2019-12-31 | 2022-11-08 | U.S. Wells Services, LLC | Self-regulating FRAC pump suction stabilizer/dampener |
| US11960305B2 (en) | 2019-12-31 | 2024-04-16 | U.S. Well Services, LLC | Automated blender bucket testing and calibration |
| US11053786B1 (en) | 2020-01-08 | 2021-07-06 | Halliburton Energy Services, Inc. | Methods for enhancing and maintaining effective permeability of induced fractures |
| US11525935B1 (en) | 2021-08-31 | 2022-12-13 | Saudi Arabian Oil Company | Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties |
| PE20241928A1 (en) * | 2021-12-22 | 2024-09-20 | Daniel B Palmer | UNDERGROUND MINING METHODS THROUGH MULTILATERAL SURVEYS AND HOLES |
| US11921250B2 (en) | 2022-03-09 | 2024-03-05 | Saudi Arabian Oil Company | Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation |
| US12560741B2 (en) | 2022-04-04 | 2026-02-24 | Saudi Arabian Oil Company | System and method to develop naturally fractured hydrocarbon reservoirs using a fracture density index |
| US12461268B2 (en) | 2022-08-29 | 2025-11-04 | Saudi Arabian Oil Company | Determining hydrocarbon production zones in a subterranean reservoir |
| US12385392B2 (en) | 2022-09-22 | 2025-08-12 | Saudi Arabian Oil Company | Determining a three-dimensional fracability index for identifying fracable areas in a subsurface region |
| US12529296B2 (en) * | 2023-02-03 | 2026-01-20 | Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College | System and method for using controlled fractures in enhanced geothermal systems |
| WO2025171364A1 (en) * | 2024-02-08 | 2025-08-14 | Stealth Critical Metals Inc. | Methods for efficient mining and leaching of minerals utilizing advanced directional drilling technology and extraction via boreholes |
| US12312951B1 (en) | 2024-04-26 | 2025-05-27 | Saudi Arabian Oil Company | Fracture reactivation index (FRI) for seal integrity analysis in carbon capture and storage (CCS) |
| US12493137B1 (en) | 2024-06-11 | 2025-12-09 | Saudi Arabian Oil Company | Building natural fractures model using 3D stacked geological models |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1996029567A1 (en) * | 1995-03-23 | 1996-09-26 | Bofors Liab Ab | Method and arrangement for supplying reinforcing charges to boreholes |
| US20110277996A1 (en) * | 2010-05-11 | 2011-11-17 | Halliburton Energy Services, Inc. | Subterranean flow barriers containing tracers |
| US20120073836A1 (en) * | 2008-11-21 | 2012-03-29 | James Kenneth Sanders | Methods for increasing oil production |
| US20120111560A1 (en) * | 2009-05-27 | 2012-05-10 | Qinetiq Limited | Fracture Monitoring |
| US20120152570A1 (en) * | 2010-12-21 | 2012-06-21 | Chevron U.S.A. Inc. | System and Method For Enhancing Oil Recovery From A Subterranean Reservoir |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3771600A (en) | 1971-07-02 | 1973-11-13 | Sun Oil Co | Method of explosively fracturing from drain holes using reflective fractures |
| US4239286A (en) * | 1973-07-26 | 1980-12-16 | E. I. Du Pont De Nemours And Company | In situ leaching of ore bodies |
| US3951458A (en) | 1974-07-31 | 1976-04-20 | Kennecott Copper Corporation | Method of explosive fracturing of a formation at depth |
| US4223734A (en) | 1978-11-09 | 1980-09-23 | Geokinetics Inc. | Process of breaking and rendering permeable a subterranean rock mass |
| US4220205A (en) | 1978-11-28 | 1980-09-02 | E. I. Du Pont De Nemours And Company | Method of producing self-propping fluid-conductive fractures in rock |
| US5722490A (en) | 1995-12-20 | 1998-03-03 | Ely And Associates, Inc. | Method of completing and hydraulic fracturing of a well |
| US6230805B1 (en) | 1999-01-29 | 2001-05-15 | Schlumberger Technology Corporation | Methods of hydraulic fracturing |
| US6732799B2 (en) | 2001-10-24 | 2004-05-11 | Bradley J. Challacombe | Apparatus for stimulating oil extraction by increasing oil well permeability using specialized explosive detonating cord |
-
2012
- 2012-06-26 US US13/533,795 patent/US9062545B2/en not_active Expired - Fee Related
-
2013
- 2013-06-12 WO PCT/US2013/045476 patent/WO2014004092A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1996029567A1 (en) * | 1995-03-23 | 1996-09-26 | Bofors Liab Ab | Method and arrangement for supplying reinforcing charges to boreholes |
| US20120073836A1 (en) * | 2008-11-21 | 2012-03-29 | James Kenneth Sanders | Methods for increasing oil production |
| US20120111560A1 (en) * | 2009-05-27 | 2012-05-10 | Qinetiq Limited | Fracture Monitoring |
| US20110277996A1 (en) * | 2010-05-11 | 2011-11-17 | Halliburton Energy Services, Inc. | Subterranean flow barriers containing tracers |
| US20120152570A1 (en) * | 2010-12-21 | 2012-06-21 | Chevron U.S.A. Inc. | System and Method For Enhancing Oil Recovery From A Subterranean Reservoir |
Cited By (62)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10287639B2 (en) | 2014-01-25 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome analysis |
| US10294532B2 (en) | 2014-01-25 | 2019-05-21 | uBiome, Inc. | Method and system for microbiome analysis |
| US10169541B2 (en) | 2014-10-21 | 2019-01-01 | uBiome, Inc. | Method and systems for characterizing skin related conditions |
| US10242160B2 (en) | 2014-10-21 | 2019-03-26 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10268803B2 (en) | 2014-10-21 | 2019-04-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10282520B2 (en) | 2014-10-21 | 2019-05-07 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10290376B2 (en) | 2014-10-21 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10289805B2 (en) | 2014-10-21 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10290375B2 (en) | 2014-10-21 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10290374B2 (en) | 2014-10-21 | 2019-05-14 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10297351B2 (en) | 2014-10-21 | 2019-05-21 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10325684B2 (en) | 2014-10-21 | 2019-06-18 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10325071B2 (en) | 2014-10-21 | 2019-06-18 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10325685B2 (en) | 2014-10-21 | 2019-06-18 | uBiome, Inc. | Method and system for characterizing diet-related conditions |
| US10325683B2 (en) | 2014-10-21 | 2019-06-18 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10327642B2 (en) | 2014-10-21 | 2019-06-25 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for conditions associated with functional features |
| US10332635B2 (en) | 2014-10-21 | 2019-06-25 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10327641B2 (en) | 2014-10-21 | 2019-06-25 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for conditions associated with functional features |
| US10331857B2 (en) | 2014-10-21 | 2019-06-25 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10340045B2 (en) | 2014-10-21 | 2019-07-02 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for autoimmune system conditions |
| US10347362B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10346588B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10347366B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics, and therapeutics for cardiovascular disease conditions |
| US10346589B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10347379B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for cutaneous conditions |
| US10347367B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics, and therapeutics for cardiovascular disease conditions |
| US10347368B2 (en) | 2014-10-21 | 2019-07-09 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics, and therapeutics for cardiovascular disease conditions |
| US10354756B2 (en) | 2014-10-21 | 2019-07-16 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for cutaneous conditions |
| US10354757B2 (en) | 2014-10-21 | 2019-07-16 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for cutaneous conditions |
| US10360348B2 (en) | 2014-10-21 | 2019-07-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10360346B2 (en) | 2014-10-21 | 2019-07-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics |
| US10360347B2 (en) | 2014-10-21 | 2019-07-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10358682B2 (en) | 2014-10-21 | 2019-07-23 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with microbiome functional features |
| US10366782B2 (en) | 2014-10-21 | 2019-07-30 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics, and therapeutics for cardiovascular disease conditions |
| US10366793B2 (en) | 2014-10-21 | 2019-07-30 | uBiome, Inc. | Method and system for characterizing microorganism-related conditions |
| US10366789B2 (en) | 2014-10-21 | 2019-07-30 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for neurological health issues |
| US10381112B2 (en) | 2014-10-21 | 2019-08-13 | uBiome, Inc. | Method and system for characterizing allergy-related conditions associated with microorganisms |
| US10380325B2 (en) | 2014-10-21 | 2019-08-13 | uBiome, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10381117B2 (en) | 2014-10-21 | 2019-08-13 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for cutaneous conditions |
| US10383519B2 (en) | 2014-10-21 | 2019-08-20 | uBiome, Inc. | Method and system for microbiome-derived characterization, diagnostics and therapeutics for conditions associated with functional features |
| US10388407B2 (en) | 2014-10-21 | 2019-08-20 | uBiome, Inc. | Method and system for characterizing a headache-related condition |
| US10790043B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10786195B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with mircrobiome taxonomic features |
| US10790060B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for mental health associated conditions |
| US10790061B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for mental health associated conditions |
| US10789334B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbial pharmacogenomics |
| US10787714B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with microbiome functional features |
| US10786194B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for conditions associated with microbiome taxonomic features |
| US10790042B2 (en) | 2014-10-21 | 2020-09-29 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10796786B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10796800B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for mental health associated conditions |
| US10795972B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for locomotor system conditions |
| US10796785B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US10795971B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for locomotor system conditions |
| US10795970B2 (en) | 2014-10-21 | 2020-10-06 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for locomotor system conditions |
| US10803991B2 (en) | 2014-10-21 | 2020-10-13 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics |
| US10803992B2 (en) | 2014-10-21 | 2020-10-13 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for mental health associated conditions |
| US10803147B2 (en) | 2014-10-21 | 2020-10-13 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for locomotor system conditions |
| US10902938B2 (en) | 2014-10-21 | 2021-01-26 | Psomagen, Inc. | Method and system for microbiome-derived diagnostics and therapeutics for endocrine system conditions |
| US11783914B2 (en) | 2014-10-21 | 2023-10-10 | Psomagen, Inc. | Method and system for panel characterizations |
| US10246753B2 (en) | 2015-04-13 | 2019-04-02 | uBiome, Inc. | Method and system for characterizing mouth-associated conditions |
| WO2018162645A1 (en) | 2017-03-08 | 2018-09-13 | Amazentis Sa | Skin treatment methods |
Also Published As
| Publication number | Publication date |
|---|---|
| US9062545B2 (en) | 2015-06-23 |
| US20130341029A1 (en) | 2013-12-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9062545B2 (en) | High strain rate method of producing optimized fracture networks in reservoirs | |
| US12078034B2 (en) | Cracking permeability increasing method combining hydraulic fracturing and methane in-situ combustion explosion | |
| CA2791646C (en) | System and method for fracturing rock in tight reservoirs | |
| US7740069B2 (en) | Process for two-step fracturing of subsurface formations | |
| RU2704997C1 (en) | Method and device for control of coal bed upper part collapse area due to application of technology of pulsed hydraulic fracturing of a formation | |
| US4185693A (en) | Oil shale retorting from a high porosity cavern | |
| US3434757A (en) | Shale oil-producing process | |
| CN102301088A (en) | Method For The Enhancement Of Injection Activities And Stimulation Of Oil And Gas Production | |
| CN110344806B (en) | Auxiliary hydraulic fracturing method for small borehole explosion seam construction | |
| RU2740630C1 (en) | Method for reduction of excessive elastic energy in deep seismic dangerous segments of fractures | |
| RU2432460C2 (en) | Procedures for formation fracturing and extraction of hydrocarbon fluid medium from formation | |
| US4714114A (en) | Use of a proppant with controlled pulse fracturing | |
| US3771600A (en) | Method of explosively fracturing from drain holes using reflective fractures | |
| Mahmud et al. | A Review of Fracturing Technologies Utilized in Shale Gas | |
| US3066733A (en) | Method of explosively fracturing a productive oil and gas formation | |
| GB2634155A (en) | Method of controlling tensile-splitting and hydro-shearing parameters during completion of enhanced geothermal system wells | |
| CN107288606B (en) | Method for artificially building hot dry rock thermal reservoir | |
| US3674089A (en) | Method for stimulating hydrocarbon-bearing formations | |
| RU2464421C2 (en) | Extraction of ore using explosion and thermal fragmentation | |
| US3533471A (en) | Method of exploding using reflective fractures | |
| RU2503799C2 (en) | Method for shale gas production | |
| US3630283A (en) | Method of producing particles of rock in a subterranean situs | |
| CN112360424B (en) | Through-layer fracturing method, apparatus, device and readable storage medium | |
| US3999803A (en) | In situ leaching of explosively fractured ore bodies | |
| RU2163968C2 (en) | Method of cover caving |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13808925 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 13808925 Country of ref document: EP Kind code of ref document: A1 |