WO2013147652A3 - Subway station and method for constructing same - Google Patents
Subway station and method for constructing same Download PDFInfo
- Publication number
- WO2013147652A3 WO2013147652A3 PCT/RU2013/000345 RU2013000345W WO2013147652A3 WO 2013147652 A3 WO2013147652 A3 WO 2013147652A3 RU 2013000345 W RU2013000345 W RU 2013000345W WO 2013147652 A3 WO2013147652 A3 WO 2013147652A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- structures
- underground
- subway station
- station
- stopping point
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D29/055—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
Abstract
The invention relates to the field of construction, more particularly to underground buildings and complex multi-purpose buildings, and specifically to a subway station situated deep underground. The subway station, having a structural system comprised of an underground vehicle stopping point with safety devices for civil defence, includes structures, devices and premises for passenger services and use by station personnel. The subway station is in the form of a single structural complex consisting of an underground vehicle stopping point with safety devices for civil defence and an additional system of structures which is disposed in a vertical excavation above the stopping point. The structural complex comprises uniform external load-bearing wall structures, situated around the perimeter of the structural complex, uniform intermediate load-bearing member structures, situated between the external load-bearing wall structures, and a foundation component. The technical result is the effective protection of the station against the dynamic impact of vehicles and as a deep underground civil defence facility.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2012112354 | 2012-03-30 | ||
RU2012112354/03A RU2505646C2 (en) | 2012-03-30 | 2012-03-30 | Subway station and method of its construction (device and method named after yurkevich pb) |
RU2012117629 | 2012-04-28 | ||
RU2012117629 | 2012-04-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2013147652A2 WO2013147652A2 (en) | 2013-10-03 |
WO2013147652A3 true WO2013147652A3 (en) | 2014-01-03 |
Family
ID=49261365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/RU2013/000345 WO2013147652A2 (en) | 2012-03-30 | 2013-04-23 | Metro station and method for constructing same |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2013147652A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234082A (en) * | 2014-08-29 | 2014-12-24 | 中国电建集团华东勘测设计研究院有限公司 | Jump-layer reversed construction method for deep foundation pit |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105240028A (en) * | 2015-11-18 | 2016-01-13 | 上海市城市建设设计研究总院 | Design method of subway station by adopting undercutting method in soft soil area |
CN106499199A (en) * | 2016-12-14 | 2017-03-15 | 上海建工二建集团有限公司 | Close on the interim support replacement of subway ultra-deep foundation pit mid-board and its construction method |
CN106930318A (en) * | 2017-03-27 | 2017-07-07 | 中铁隧道勘测设计院有限公司 | A kind of buried Room platform channel design in interface water condition subway station and its construction method |
CN106836465A (en) * | 2017-04-06 | 2017-06-13 | 铁道第三勘察设计院集团有限公司 | Subway station extra exit device of electric sliding door |
CN107630707A (en) * | 2017-10-26 | 2018-01-26 | 上海市隧道工程轨道交通设计研究院 | A kind of single arch Station section arrangement and its application process |
CN110106919A (en) * | 2019-05-28 | 2019-08-09 | 成都市建筑设计研究院 | A kind of lid digs the building enclosure and its construction method at station |
CN110159297B (en) * | 2019-07-09 | 2023-12-01 | 煤炭工业太原设计研究院集团有限公司 | Coal mine vertical shaft arrangement structure |
CN110486034A (en) * | 2019-09-19 | 2019-11-22 | 北京市政建设集团有限责任公司 | Subway station and construction method based on pile foundation in four pilot tunnel of single layer and middle drift |
CN111926858A (en) * | 2020-08-11 | 2020-11-13 | 中铁八局集团昆明铁路建设有限公司 | Construction method for dismantling concrete support of assembled subway station |
CN113089719B (en) * | 2021-02-23 | 2022-09-06 | 中铁十九局集团第三工程有限公司 | Laminated wall structure and construction method thereof |
CN113153384A (en) * | 2021-03-24 | 2021-07-23 | 中交路桥建设有限公司 | Construction method for deep-buried subway station under rock geology |
CN113153383A (en) * | 2021-03-24 | 2021-07-23 | 中交路桥建设有限公司 | Construction method for deep-buried large-section subway station |
CN113293766B (en) * | 2021-03-30 | 2022-12-30 | 内蒙古科技大学 | Comprehensive earth excavation method for large-scale cover-excavation top-down T-shaped transfer subway station |
CN113152476A (en) * | 2021-05-10 | 2021-07-23 | 中铁九局集团第六工程有限公司 | Excavation construction method for soft geological foundation pit of existing line station |
CN113818468B (en) * | 2021-08-11 | 2022-11-04 | 广州地铁设计研究院股份有限公司 | First-stage construction method for flexibly reserving metro vehicle section structure of floor type high-rise building |
CN114108642B (en) * | 2021-12-08 | 2023-04-25 | 北京市市政四建设工程有限责任公司 | Parallel construction method for ramp bridge and underground complex structure |
CN114934543A (en) * | 2022-06-07 | 2022-08-23 | 广州地铁设计研究院股份有限公司 | Station transfer node structure and construction method thereof |
CN115125995A (en) * | 2022-06-13 | 2022-09-30 | 中电建南方建设投资有限公司 | Construction method for entrance and exit ring frame of assembled station |
CN116517325B (en) * | 2022-09-07 | 2024-01-19 | 金陵科技学院 | Novel assembled steel-wood stair for existing building additionally provided with elevator and construction method thereof |
CN117189189B (en) * | 2023-11-06 | 2024-02-20 | 北京城建设计发展集团股份有限公司 | Dark-cover excavation half reverse construction method for cross transfer subway station |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2540330A1 (en) * | 1974-10-17 | 1976-04-22 | R Walther Und H Mory Dr | Erection of multi stores undergrown structures - features sinking of bore pile foundations with spaced supports for various floors |
RU2220258C1 (en) * | 2003-04-04 | 2003-12-27 | Зеге Сергей Олегович | Process of erection of multilevel underground structure ( variants ) |
RU94281U1 (en) * | 2010-02-15 | 2010-05-20 | Общество С Ограниченной Ответственностью "Стройгород" | TUNNEL TYPE |
RU2414563C1 (en) * | 2009-10-02 | 2011-03-20 | Андрей Викторович Карпов | Method to erect multistory subsurface structure |
-
2013
- 2013-04-23 WO PCT/RU2013/000345 patent/WO2013147652A2/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2540330A1 (en) * | 1974-10-17 | 1976-04-22 | R Walther Und H Mory Dr | Erection of multi stores undergrown structures - features sinking of bore pile foundations with spaced supports for various floors |
RU2220258C1 (en) * | 2003-04-04 | 2003-12-27 | Зеге Сергей Олегович | Process of erection of multilevel underground structure ( variants ) |
RU2414563C1 (en) * | 2009-10-02 | 2011-03-20 | Андрей Викторович Карпов | Method to erect multistory subsurface structure |
RU94281U1 (en) * | 2010-02-15 | 2010-05-20 | Общество С Ограниченной Ответственностью "Стройгород" | TUNNEL TYPE |
Non-Patent Citations (1)
Title |
---|
JU. S. FROLOV ET AL., METROPOLITENY., 2001, MOSKVA, pages 183 - 228, 435-447 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234082A (en) * | 2014-08-29 | 2014-12-24 | 中国电建集团华东勘测设计研究院有限公司 | Jump-layer reversed construction method for deep foundation pit |
Also Published As
Publication number | Publication date |
---|---|
WO2013147652A2 (en) | 2013-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2013147652A3 (en) | Subway station and method for constructing same | |
MX2016012073A (en) | Vehicle sill reinforcement. | |
MX2014003620A (en) | Tower erection system and method. | |
EP2861391A4 (en) | A method for dividing a board into a first panel and a second panel, a method of forming a mechanical locking system for locking of a first and a second panel, and building panels | |
BR112013017053A2 (en) | wireless power transmission equipment, and wireless power transmission system | |
MX2017001511A (en) | Load bearing interlocking structural blocks and modular building system. | |
WO2014084891A3 (en) | Methods and systems of modifying air flow at building structures | |
NZ713217A (en) | A noise barrier and a method of construction thereof | |
WO2013150533A3 (en) | Hybrid metal and metal oxide layers with enhanced activity | |
WO2013150304A3 (en) | Wellbore completion | |
WO2011162925A3 (en) | Safety devices comprising a load-bearing composite polymeric housing and a load-bearing anchorage plate | |
LT2711485T (en) | Hybrid tower structure and method for building the same | |
MX2015003008A (en) | Buckling-restrained brace assembly. | |
WO2012134862A3 (en) | Method for isolating and completing multi-zone gravel packs | |
WO2014072510A3 (en) | Improved geofencing | |
PL399850A1 (en) | Method of manufacturing a building ceiling on the point foundations and the structural assembly using mentioned method | |
AT513576A3 (en) | Wall formwork system and a method for producing a wall section with a Isolierschalung | |
CA2863806A1 (en) | A scaffold with an automatic installation characteristic | |
PL392968A1 (en) | Set for attaching a measuring device, especially a rangefinder, to a monitored building element of a civil structure, especially a roof, method for attaching a measuring device using such a set and a sling for attaching the measuring device | |
Lee et al. | A study on the application of the in-fill construction method to high-rise unit modular buildings | |
WO2013172806A8 (en) | Earthquake resistant building system with flexible entry / exit installations and staircase connections | |
WO2012052993A3 (en) | Fillable geomesh immovable vehicle barrier system and method | |
EP2759319A3 (en) | Barrier system | |
GB201301735D0 (en) | Building structure | |
UA79061U (en) | Mobile robotic complex of engineering survey and mine clearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13767590 Country of ref document: EP Kind code of ref document: A2 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13767590 Country of ref document: EP Kind code of ref document: A2 |