WO2013070668A1 - Blowout preventer shut-in assembly of last resort - Google Patents
Blowout preventer shut-in assembly of last resort Download PDFInfo
- Publication number
- WO2013070668A1 WO2013070668A1 PCT/US2012/063814 US2012063814W WO2013070668A1 WO 2013070668 A1 WO2013070668 A1 WO 2013070668A1 US 2012063814 W US2012063814 W US 2012063814W WO 2013070668 A1 WO2013070668 A1 WO 2013070668A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bop
- control
- primary
- ram
- bop stack
- Prior art date
Links
- 238000005553 drilling Methods 0.000 claims abstract description 27
- 238000009844 basic oxygen steelmaking Methods 0.000 claims description 86
- 230000004044 response Effects 0.000 claims description 4
- 239000012530 fluid Substances 0.000 description 28
- 230000008878 coupling Effects 0.000 description 23
- 238000010168 coupling process Methods 0.000 description 23
- 238000005859 coupling reaction Methods 0.000 description 23
- 238000004891 communication Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 12
- 230000007257 malfunction Effects 0.000 description 4
- 238000007789 sealing Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004020 conductor Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/064—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
Definitions
- the present invention relates generally to the configuration, deployment, and operation of pressure control equipment used in drilling subsea wells. More particularly, the present invention relates to an independently controlled backup blowout preventer assembly that can assist containment of a subsea wellbore in the event of a failure or malfunction of the primary subsea blowout preventer stack, the primary blowout preventer control system, the subsea/surface communication conduits, the surface rig systems or combinations thereof.
- a wellhead at the sea floor is positioned at the upper end of the subterranean wellbore lined with casing, a blowout preventer (BOP) stack is mounted to the wellhead, and a lower marine riser package (LMRP) is mounted to the BOP stack.
- BOP blowout preventer
- LMRP lower marine riser package
- the upper end of the LMRP typically includes a flex joint coupled to the lower end of a drilling riser that extends upward to a drilling vessel at the sea surface.
- a drill string is hung from the drilling vessel through the drilling riser, the LMRP, the BOP stack, and the wellhead into the wellbore.
- drilling fluid or mud
- the BOP stack and/or LMRP may actuate to help seal the annulus and control the fluid pressure in the wellbore.
- the BOP stack and LMRP include closure members, or cavities, designed to help seal the wellbore and prevent the release of high-pressure formation fluids from the wellbore.
- the BOP stack and LMRP function as pressure control devices.
- the BOP stack and LMRP are operated with a common control system physically located on the surface drilling vessel.
- damage to the drilling vessel from a blowout, ballast control issue, collision, power failure, etc. may result in damage and/or complete loss of the control system and/or the ability to operate the BOP stack.
- the sub- sea BOP stack and LMRP may be rendered useless, even if intact, because there is no readily available means to actuate or operate them.
- the system comprises a primary BOP comprising a primary ram BOP.
- the system comprises a secondary BOP releasably connected to the primary BOP, the secondary BOP comprising a secondary ram BOP.
- the primary ram BOP is actuatable by a first control signal.
- the secondary ram BOP is actuatable by a second control signal.
- the secondary ram BOP is not actuatable by the first control signal.
- the method comprises (a) lowering a backup BOP subsea and mounting the backup BOP to a subsea wellhead at an upper end of the wellbore, wherein the backup BOP includes at least one ram BOP.
- the method comprises (b) lowering a primary BOP subsea and connecting the primary BOP to the backup BOP after (a).
- the primary BOP includes at least one ram BOP.
- the method comprises (c) coupling a first control system to the primary BOP.
- the method comprises (d) coupling a second control system to the backup BOP.
- the first control system is configured to only control the primary BOP and the second control system is configured to only control the backup BOP.
- the system comprises a primary BOP stack comprising a plurality of axially stacked ram BOPs.
- the system comprises a backup BOP releasably connected to the primary BOP stack, the secondary BOP comprising at least one ram BOP.
- the system comprises a first control system configured to operate each ram BOP of the primary BOP stack.
- the system comprises a second control system configured to operate each ram BOP of the backup BOP.
- the first control system includes an operator control panel disposed on a first vessel and a pair of redundant subsea control pods coupled to the primary BOP stack.
- the second control system includes an operator control panel disposed on a second vessel and a pair of redundant subsea control units coupled to the backup BOP.
- the system comprises a first control system configured to operate a plurality of ram BOPs of a primary BOP stack.
- the system comprises a second control system configured to operate at least one ram BOP of a backup BOP.
- the first control system includes an operator control panel disposed on a first vessel and a pair of redundant subsea control pods for operating the ram BOPs of the primary BOP stack.
- the second control system includes an operator control panel disposed on a second vessel and a pair of redundant subsea control units for operating the ram BOP of the backup BOP.
- Embodiments described herein comprise a combination of features and advantages intended to address various shortcomings associated with certain prior devices, systems, and methods.
- the various characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description, and by referring to the accompanying drawings.
- Figure 1 is a schematic view of an embodiment of an offshore system for drilling and/or producing a subterranean wellbore
- Figure 2 is an elevation view of an embodiment of the subsea BOP stack assembly of Figure 1;
- Figure 3 is a perspective exploded view of the subsea BOP stack assembly of Figures 1 and 2;
- Figure 4 is a schematic view of the control systems of the primary BOP stack and secondary BOP stack of Figures 1 and 2;
- Figures 5A and 5B are schematic illustrations of the deployment of the subsea BOP stack assembly of Figures 1 and 2.
- the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to... .”
- the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection, or through an indirect connection via other devices, components, and connec- tions.
- axial and axially generally mean along or parallel to a central axis (e.g., central axis of a body or a port), while the terms “radial” and “radially” generally mean perpendicular to the central axis.
- a central axis e.g., central axis of a body or a port
- radial radially
- perpendicular to the central axis e.g., an axial distance refers to a distance measured along or parallel to the central axis
- a radial distance means a distance measured perpendicular to the central axis.
- system 10 for drilling and/or producing a wellbore 11 is shown.
- system 10 includes an offshore vessel or platform 20 at the sea surface 12 and a subsea BOP stack assembly 100 mounted to a wellhead 30 at the sea floor 13.
- Platform 20 is equipped with a derrick 21 that supports a hoist (not shown).
- a tubular drilling riser 14 extends from platform 20 to BOP stack assembly 100.
- Riser 14 returns drilling fluid or mud to platform 20 during drilling operations.
- One or more hydraulic conduit(s) 15 extend along the outside of riser 14 from platform
- Conduit(s) 15 supply pressurized hydraulic fluid to assembly 100.
- Casing 31 extends from wellhead 30 into subterranean well- bore 11.
- Downhole operations are carried out by a tubular string 16 (e.g., drill- string, production tubing string, coiled tubing, etc.) that is supported by derrick
- downhole tool 17 is connected to the lower end of tubular string 16.
- downhole tool 17 may comprise any suitable downhole tool(s) for drilling, completing, evaluating and/or producing wellbore 11 including, without limitation, drill bits, packers, cementing tools, casing or tubing running tools, testing equipment, perforating guns, and the like.
- string 16, and hence tool 17 coupled thereto may move axially, radially, and/or rotationally relative to riser 14 and BOP stack assembly 100.
- BOP stack assembly 100 is mounted to wellhead 30 and is designed and configured to control and seal wellbore 11, thereby containing the hydrocarbon fluids (liquids and gases) therein.
- BOP stack assembly 100 comprises a lower marine riser package (LMRP) 110, a primary BOP or BOP stack 120, and a secondary BOP or BOP stack 150.
- LMRP lower marine riser package
- secondary BOP stack 150 serves as a backup to primary BOP stack 120 and LMRP 110 in the event primary BOP stack 120 and/or LMRP 110 fail, malfunction, or lose control communication with vessel 20.
- secondary BOP stack 150 may also be referred to as a backup BOP stack or a BOP stack of last resort.
- Secondary BOP stack 150 is releasably secured to wellhead 30, primary BOP stack 120 is releasably secured to LMRP 110 and secondary BOP stack 150, and LMRP 110 is releasably secured to primary BOP stack 120 and riser 14.
- the connections between wellhead 30, secondary BOP stack 150, primary BOP stack 120, and LMRP 110 comprise hydraulically actuated, mechanical wellhead-type connections 50.
- connections 50 may comprise any suitable releasable wellhead-type mechanical connection such as the DWHC or HC profile subsea wellhead system available from Cameron International Corporation of Houston, Texas, or any other such wellhead profile available from several subsea wellhead manufacturers.
- connections 50 comprise an upward-facing male connector or "hub,” labeled with reference numeral 50a herein, that is received by and releasably engages a downward-facing mating female connector or receptacle, labeled with reference numeral 50b herein.
- the connection between LMRP 110 and riser 14 is a flange connection that is not remotely controlled, whereas connections 50 may be remotely, hydraulically controlled.
- LMRP 110 comprises a riser flex joint 111, a riser adapter 112, an annular BOP 113, and a pair of redundant control units or pods 114.
- a flow bore 115 extends through LMRP 110 from riser 14 at the upper end of LMRP 110 to connection 50 at the lower end of LMRP 110.
- Riser adapter 112 extends upward from flex joint 111 and is coupled to the lower end of riser 14. Flex joint 111 allows riser adapter 112 and riser 14 connected thereto to deflect angularly relative to LMRP 110 while wellbore fluids flow from well- bore 11 through BOP stack assembly 100 into riser 14.
- Annular BOP 113 comprises an annular elastomeric sealing element that is mechanically squeezed radially inward to seal on a tubular extending through LMRP 110 (e.g., string 16, casing, drillpipe, drill collar, etc.) or seal off bore 115.
- LMRP 110 e.g., string 16, casing, drillpipe, drill collar, etc.
- seal off bore 115 e.g., seal off bore 115.
- annular BOP 113 has the ability to seal on a variety of pipe sizes and/or profiles, as well as perform a "Complete Shut-off" (CSO) to seal bore 115 when no tubular is extending therethrough.
- CSO Complete Shut-off
- primary BOP stack 120 comprises an annular BOP
- a main bore 125 extends through primary BOP stack 120 from LMRP 110 at the upper end of stack 120 to backup BOP stack 150 at the lower end of stack 120.
- primary BOP stack 120 includes a plurality of axially stacked ram BOPs 121. Each ram BOP 121 includes a pair of opposed rams and a pair of actuators 126 that actuate and drive the matching rams.
- primary BOP stack 120 includes four ram BOPs 121 - an upper ram BOP 121 including opposed blind shear rams or blades 121a for severing tubular string 16 and sealing off well- bore 11 from riser 14; and three lower ram BOPs 120 including opposed pipe rams 121c for engaging string 16 and sealing the annulus around tubular string 16.
- the primary BOP stack e.g., stack 120
- Opposed rams 121a, c are located in cavities that intersect main bore 125 and support rams 121a, c as they move into and out of main bore 125.
- Each set of rams 121a, c is actuated and transitioned between an open position and a closed position by matching actuators 126.
- each actuator 126 hy- draulically moves a piston within a cylinder to move a connecting rod coupled to one ram 121a, c.
- rams 121a, c are radially withdrawn from main bore 125.
- main bore 125 is substantially coaxially aligned with flow bore 115 of LMRP 110, and is in fluid communication with flow bore 115 when rams 121a, c are open.
- primary BOP stack 120 also includes a first set or bank 127 of hydraulic accumulators 127a mounted on primary BOP stack 120. While the primary hydraulic pressure supply is provided by hydraulic conduits 15 extending along riser 14, the accumulator bank 127 may be used to support operation of rams 121a, c (i.e., supply hydraulic pressure to actuators 126 that drive rams 121a, c of stack 120), choke/kill valves 131, connector 50b of primary BOP stack 120, and choke/kill connectors 130 of primary BOP stack 120. As will be explained in more detail below, accumulator bank 127 serves as a backup means to provide hydraulic power to operate rams 121a, c, valves 131, connector 50b, and connectors 130 of primary BOP stack 120.
- secondary BOP stack 150 comprises choke/kill valves 131, axially stacked ram BOPs 121, and a pair of control units 151.
- choke/kill line connections 130 connect the female choke/kill line connectors of primary BOP stack 120 with the male choke/kill adapters of secondary BOP stack 150, thereby placing the choke/kill lines 132 of primary BOP stack 120 in fluid communication with choke/kill valves 131 of secondary BOP stack 150.
- choke/kill lines separate and independent of choke/kill lines 132 of primary BOP stack 120 may be employed and placed in fluid communication with choke/kill valves 131 of the secondary BOP stack 150.
- a main bore 155 extends through secondary BOP stack 150 from primary BOP stack 120 at the upper end of stack 150 to wellhead 30 at the lower end of stack 150.
- secondary BOP stack 150 includes two ram BOPs 121 - one upper ram BOP 121 including opposed blind shear rams or blades 121a as previously described, and one lower ram BOP 121 including opposed blind shear rams or blades 121a as previously described.
- a ram BOP e.g., ram BOP 121) including opposed pipe rams (e.g., opposed pipe rams 121c) may also be included in the secondary BOP stack 150.
- the secondary BOP stack (e.g., stack 150) preferably includes at least one ram BOP including a pair of opposed blind shear rams.
- Opposed rams 121a of secondary BOP stack 150 are located in cavities that intersect main bore 155 and support rams 121a as they move into and out of main bore 155 between the closed and opened positions, respectively.
- Main bore 155 is coaxially aligned with main bore 125 of primary BOP stack 120 and wellhead 30, is in fluid communication with main bore 125 when opposed rams 121a are opened, and is in fluid communication with well- bore 11 via wellhead 30.
- control units 151 may be used to operate valves 131 and rams 121a of secondary BOP stack 150.
- control units 151 are physically mounted to and self- contained on secondary BOP stack 150.
- secondary BOP stack 150 includes a plurality of ram BOPs 121 in this embodiment, in other embodiments, the secondary BOP stack (e.g., secondary BOP stack 150) may include valves (e.g., gate valves) instead of ram BOPs (e.g., ram BOPs 121) to close and seal main bore 155.
- the valves in the secondary BOP stack may be controlled and operated in the same manner as ram BOPs 121.
- control units 151 may be used to operate choke/kill valves 131 of secondary BOP stack 150 in this embodiment
- the choke/kill valves of the secondary BOP stack may be operated by the control pods of the primary BOP stack (e.g., control pods 114 of primary BOP stack 120) and/or by one or more subsea remotely operated vehicles (ROVs).
- ROVs subsea remotely operated vehicles
- Exemplary devices and systems for remotely operating subsea valves (e.g., choke/kill valves 131 of secondary BOP stack 150) with an ROV are disclosed in U.S. Patent Application Serial No. 12/964,418 filed December 9, 2010, and entitled "BOP Stack with a Universal Intervention Interface," which is hereby incorporated herein by reference in its entirety for all purposes.
- secondary BOP stack 150 also includes an independent, dedicated set or bank 157 of hydraulic accumulators 157a mounted on secondary BOP stack 150.
- Accumulator bank 157 may be used to support operation of rams 121a of secondary BOP stack 150 (i.e., supply hydraulic pressure to actuators 126 that drive rams 121a), choke/kill valves 131 of stack 150, connector 50b of secondary BOP stack 150, choke/kill connector 130 of secondary BOP stack 150.
- primary BOP stack 120 includes one annular BOP 113 and four sets of rams (one set of shear rams 121a, and three sets of pipe rams 121c), and secondary BOP stack 150 includes two sets of rams (two sets of shear rams 121a) and no annular BOP 113.
- the primary and secondary BOP stacks e.g., stacks 120, 150
- LMRP 110 is shown and described as including one annular BOP 113, in other embodiments, the LMRP (e.g., LMRP 110) may include a different number of annular BOPs (e.g., two sets of annular BOPs 113).
- primary BOP 120 and secondary BOP 150 may be referred to as "stacks" since each contains a plurality of ram BOPs 121 in this embodiment, in other embodiments, primary BOP 120 and/or secondary BOP 150 may include only one ram BOP 121.
- Both LMRP 110 and primary BOP stack 120 comprise re-entry and alignment systems 140 that allow the LMRP 110-BOP stack 120 and stack 120-secondary BOP stack 150 connections to be made subsea with all the auxiliary connections (i.e. control units, choke/kill lines) aligned.
- Choke/kill line connectors 130 interconnect choke/kill lines 132 and choke/kill valves 131 on stack 120 and secondary BOP stack 150 to choke/kill lines 133 on riser adapter 112.
- choke/kill valves 131 of secondary BOP stack 150 are in fluid communication with choke/kill lines 133 on riser adapter 112 via choke/kill lines 132 of primary BOP stack 120 and connectors 130.
- the choke/kill valves of the secondary BOP stack may not be coupled to or in fluid communication with the choke/kill lines of the primary BOP stack (e.g., choke/kill lines 132 of primary BOP stack 120). Rather, the choke/kill valves of the secondary BOP stack may be connected to and in fluid communication with choke/kill lines that are completely separate and independent of the choke/kill lines of the primary BOP. Accordingly, in such alternative embodiments, no alignment system is provided between the primary BOP stack and the secondary BOP stack (e.g., primary BOP stack 120 includes no alignment system 140 to guide the orientation of stack 120 relative to secondary BOP stack 150).
- primary BOP stack 120 is operated by a first or primary control system 160
- secondary BOP stack 150 is operated by a second or backup control system 170 that is distinct and separate from control system 160.
- secondary BOP stack 150 is controlled and operated independently from primary BOP stack 120.
- primary control system 160 controls and operates the various actuators, valves, rams, connectors, and annular BOPs of LMRP 110 and primary BOP stack 120.
- control system 160 controls choke/kill valves 131, actuators 126 (and hence rams 121a, c), connectors 50b, and annular BOPs 113 of LMRP 110 and primary BOP stack 120.
- Backup control system 170 controls and operates the various actuators, valves, connectors, and rams of secondary BOP stack 150.
- backup control system 170 controls choke/kill valves 131, connector 50b, and actuators 126 (and hence rams 121a) of secondary BOP stack 150.
- control system 160 is only shown coupled to accumulator bank 127 and actuators 126 of primary BOP stack 120, and control system 170 is only shown coupled to accumulator bank 157 and actuators 126 of secondary BOP stack 150.
- primary control system 160 operates each ram BOP 121 of primary BOP stack 120 via actuators 126 of primary BOP stack 120, but does not operate, and is not capable of operating, ram BOPs 121 of secondary BOP stack 150; and backup control system 170 operates ram BOPs 121 of secondary BOP stack 150 via actuators 126 of secondary BOP stack 150, but does not operate, and is not capable of operating, ram BOPs 121 of primary BOP stack 120.
- primary BOP stack 120 is controlled by primary control system 160
- secondary BOP Stack 150 is controlled by secondary control system 170.
- first control system 160 comprises a primary control sub-system 161 and a secondary or backup control sub-system 165.
- Primary control sub-system 161 controls the operation of ram BOPs 121 of primary BOP stack 120 as well as the actuators, valves, rams, connectors, and annular BOPs of LMRP 110 and primary BOP stack 120.
- Secondary control sub-system 165 serves as a backup means to operate ram BOPs 121 of primary BOP stack 120 when primary control sub-system 161 is unable to operate ram BOPs 121 of primary BOP stack 120.
- Primary control sub-system 161 includes an operator control station or panel 162 disposed on platform 20 and the pair of subsea control pods 114 mounted to LMRP 110 as previously described.
- Central control pods 114 are redundant. Namely, each control pod 114 can perform all the functions of the other control pod 114. However, only one control pod 114 is used at a time, with the other control pod 114 providing backup.
- the term "active” may be used to describe a subsea control unit (e.g., control pod 114) that is in use, whereas the term “inactive” may be used to describe a subsea control unit that is not in use and is serving as a backup to the active control unit.
- the pair of central control pods 114 comprise blue and yellow control pods as are known in the art.
- Each control pod 114 is coupled to control panel 162, accumulator bank 127, and each actuator 126 of primary BOP stack 120.
- a coupling 163 couples each control pod 114 to control panel 162
- one or more hydraulic lines 164a couple each control pod 114 to accumulator bank 127
- hydraulic fluid supply lines 164b couple each control pod 114 to actuators 126 of primary BOP stack 120.
- One or more hydraulic conduit(s) 15 extending from vessel 20 supply pressurized hydraulic fluid to control pods 114 for actuating ram BOPs 121 via lines 164b and actuators 126 or charging accumulator bank 127 via lines 164a.
- Control pods 114 may also direct accumulator bank 127 to vent or dump pressurized hydraulic fluid to the surrounding sea.
- Control panel 162 includes a user interface that allows an operator aboard platform 20 to enter control commands into panel 162, which communicates the control commands to each subsea control pod 114 through couplings 163.
- each control pod 114 includes its own dedicated coupling 163 for communication with control panel 162, and further, each coupling 163 is an electrical conductor or cable that carries electronic control signals between panel 162 and control pods 114.
- the active control pod 114 controls actuators 126 with pressurized hydraulic fluid supplied through lines 15, 164b.
- the electronic signal from panel 162 may operate electrical solenoids in active control pod 114 that direct pressurized hydraulic fluid through the appropriate hydraulic circuit to control actuators 126.
- Any one or more actuators 126 of primary BOP stack 120 may be independently controlled by the active control pod 114.
- one set of opposed pipe rams 121c of primary BOP stack 120 may be actuated by themselves without actuating any of the other opposed rams 121a, c of primary BOP stack 120.
- Secondary or backup control sub-system 165 of control system 160 provides a backup means to operate ram BOPs 121 of primary BOP stack 120 (e.g., in the event primary control sub-system 161 is unable to operate ram BOPs 121).
- backup control sub-system 165 is coupled to accumulator bank 127 with a coupling 166, and actuators 126 of primary BOP stack 120 are coupled to accumulator bank 127 with hydraulic fluid supply lines 167.
- accumulator bank 127 supplies pressurized hydraulic fluid to actuators 126 to actuate ram BOPs 121.
- backup control sub-system 165 comprises a circuit that is electronically coupled to control pods 114 with couplings 168 and is automatically triggered to actuate one or more ram BOPs 121 of primary BOP stack 120 upon identification of a malfunction of primary control sub-system 161, inability of control sub-system 161 to actuate ram BOPs 121, or disconnection between control pods 114 and control panel 162.
- Coupling 166 is an electrical conductor or cable that transmits an electronic control signals from sub-system 165 to accumulator bank 127.
- backup control sub-system 165 communicates a control signal to accumulator bank 127 via coupling 166, and accumulator bank 127 actuates one or more ram BOPs 121 of primary BOP stack 120 via lines 167 and actuators 126. Any one or more actuators 126 of primary BOP stack 120 may be independently controlled by backup control sub-system 165.
- opposed blind shear rams 121a of primary BOP stack 120 may be actuated by themselves without actuating any of the other opposed rams 121c of primary BOP stack 120.
- backup control sub-system 165 is an Automatic Shearing System (Autoshear), however, in other embodiments, the backup control sub-system (e.g., sub-system 165 may comprise any type of known automatic backup circuit for shutting-in a wellbore including, without limitation, a High Pressure Shear System (HPS), an Automatic Disconnect System (ADS), a Deadman system, or an Emergency Disconnect Sequences (EDS).
- HPS High Pressure Shear System
- ADS Automatic Disconnect System
- Deadman system a Deadman system
- EDS Emergency Disconnect Sequences
- secondary control system 170 includes a primary control sub-system 171 and a secondary or backup control sub-system 175.
- Primary control sub-system 171 controls the operation of ram BOPs 121 of secondary BOP stack 150 as well as the actuators, valves, rams, connectors, and annular BOPs of secondary BOP stack 150.
- Secondary control sub-system 175 serves as a backup means to operate ram BOPs 121 of secondary BOP stack 150 when primary control sub-system 171 is unable to operate ram BOPs 121 of secondary BOP stack 150.
- Primary control sub-system 171 comprises a plurality of mobile operator control stations or panels 172 and subsea control units 151 mounted to secondary BOP stack 150.
- At least one control panel 172 is disposed on vessel 20 and at least one control panel 172 is disposed on a surface vessel 25 that is separate and spaced apart from vessel 20.
- One or more control panels 172 may also be located on other vessels or at remote locations.
- Control units 151 are redundant. Namely, each control unit 151 can perform all of the functions of the other control unit 151. However, only one control unit 151 is used at a time, with the other control unit 151 providing backup. Thus, one control unit 151 is "active," while the other control unit 151 is "inactive.”
- Each control unit 151 is coupled to each control panel 172 and accumulator bank 157 of secondary BOP stack 150.
- a coupling 173 couples each control unit 151 to each control panel 172 and a coupling 174 couples each control unit 151 to accumulator bank 157.
- couplings 174 are electrical wires or cables that transmit control signals between the active control unit 151 and accumulator bank 157.
- Actuators 126 of secondary BOP stack 150 are coupled to accumulator bank 127 with hydraulic fluid supply lines 167.
- Accumulator bank 157 supplies pressurized hydraulic fluid to actuators 126 to actuate ram BOPs 121 in response to control signals sent from the active control unit 151 via its corresponding coupling 174.
- Each control panel 172 includes a user interface that allows an operator to enter control commands into that panel 172, which communicates the control commands to each subsea control unit 151 through coupling 173.
- each control panel 172 communicates with subsea control units 151 with a dedicated coupling 174.
- each coupling 173 is a wireless, acoustic coupling including an acoustic transmitter/receiver 173a at or near the sea surface 12 and a subsea acoustic receiver 173b.
- One transmitter/receiver 173a is coupled to each control panel 172 and each transmitter/receiver 173b is coupled to one control unit 151.
- Each transmitter/receiver 173a, b is configured to both transmit and receive acoustic signals. However, for purposes of clarity and explanation, when a transmitter/receiver 173a, b is transmitting a signal, it may be referred to as a "transmitter,” and when it is receiving a signal, it may be referred to as a "receiver.”
- the active control unit 151 Based on the control commands sent from any one control panel 172 and associated transmitter 173 a, the active control unit 151 directs accumulator bank 157 via coupling 174 to control actuators 126 of secondary BOP stack 150 with pressurized hydraulic fluid supplied from accumulator bank 171 to actuators 126 via lines 167. Any one or more actuator 126 of secondary BOP stack 150 may be independently controlled by the active control unit 151. For example, opposed pipe rams 121c of secondary BOP stack 150 may be actuated by themselves without actuating the other opposed shear rams 121a of secondary BOP stack 150.
- Secondary or backup control sub-system 175 of control system 170 provides a backup means to operate ram BOPs 121 of secondary BOP stack 150 (e.g., in the event primary control sub-system 171 is unable to operate ram BOPs 121).
- backup control sub-system 175 is an emergency subsea ROV "hot stab" panel that allows a subsea ROV to directly actuate ram BOPs 121 via hydraulic lines 177 coupled to actuators 126.
- Accumulator bank 157 may also be charged via ROV panel 175 and hydraulic lines 176 extending from panel 175 to bank 157.
- a subsea ROV with a bladder, pump, or hot line from the surface may supply pressurized hydraulic fluid to bank 157 via panel 175 and line 176.
- the secondary control system e.g., system 170
- the secondary control system may further include a tertiary control system known in the art such as Automatic Shearing System (Autoshear), a High Pressure Shear System (HPS), an Automatic Disconnect System (ADS), a Deadman system, an acoustic system, or an Emergency Disconnect Sequences (EDS).
- Autoshear Automatic Shearing System
- HPS High Pressure Shear System
- ADS Automatic Disconnect System
- Deadman a Deadman system
- acoustic system an acoustic system
- EDS Emergency Disconnect Sequences
- primary BOP stack 120 and LMRP 110 are operated with control system 160, and secondary BOP stack 150 is operated control system 170.
- Control systems 160, 170 are completely independent of one another.
- secondary BOP stack 150 can be controlled with control system 170 and function as a last resort option to contain wellbore 11.
- at least one control panel 172 is physically located remote from platform 20 (i.e., control panel 172 is not disposed on platform 20), and thus, that remote control panel 172 can be employed to control secondary BOP stack 150 if platform 20 is evacuated, damaged, or sinks due to a blowout.
- control panel 172 is shown and described as being positioned in a vessel 25 at the sea surface 12, in general, control panel 172 may be positioned at any suitable location that is physically separated from platform 20.
- control panel 172 may be positioned in another offshore platform, an ROV, or on land, provided a mechanism is provided for communicating control commands to transmitter 174a.
- communication couplings 173 are wireless, and thus, offers the potential to communicate with control units 151 even if there is no physical connection (e.g., riser, wire, hydraulic line, etc.) extending from subsea stack assembly 100 to the surface 12.
- ROV panel 175 (and/or a tertiary control sub- system if provided) may be utilized to actuate ram BOPs 121 of secondary BOP stack 150.
- LMRP 110 and primary BOP stack 120 are similar to, and can operate as, a convention two-component stack assembly.
- Secondary BOP stack 150 is installed between wellhead 30 and primary BOP stack 120, and includes additional rams 121a, c to provide a backup or last resort option to contain and shut-in wellbore 11 in the event LMRP 110 and/or primary BOP stack 120 are unable to do so.
- secondary BOP stack 150 is lowered subsea and installed on wellhead 30 separately from primary BOP stack 120 and LMRP 110.
- Secondary BOP stack 120 is lowered subsea to wellhead 30 on a pipe string 180 supported by derrick 21. Secondary BOP stack 120 is coaxially aligned with wellhead 30 and securely attached to wellhead 30 with wellhead-type connection 50 previously described. One or more ROVs may assist in the positioning and coupling of secondary BOP stack 150 to wellhead 30.
- primary BOP stack 120 and LMRP 110 are lowered subsea together as a single assembly on conventional drilling riser 14, and landed on secondary BOP stack 150.
- the primary BOP stack 120 and LMRP 110 assembly is securely attached to secondary BOP stack 150 with wellhead-type connection 50 previously described.
- One or more ROVs may assist in the positioning and coupling of the primary BOP stack and LMRP 110 assembly to secondary BOP stack 150.
- LMRP 110 and primary BOP stack 120 provide first layer of protection against a subsea blowout.
- secondary BOP stack 150 may be relied on as a last resort option for controlling wellbore 11.
- Figures 5A and 5B illustrate an exemplary deployment method in which the secondary BOP stack 150 is deployed subsea and installed on wellhead 30, followed by subsea deployment and installation of primary BOP stack 120 and LMRP 110 onto secondary BOP stack 150 as a single assembly.
- secondary BOP stack 150, primary BOP stack 120, and LMRP 110 may be lowered subsea together as a single assembly on conventional drilling riser 14, and landed on wellhead 30 and securely attached to wellhead 30 with wellhead-type connection 50 previously described.
- One or more ROVs may assist in the positioning and coupling of the assembly to wellhead 30.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR112014011247A BR112014011247A2 (en) | 2011-11-10 | 2012-11-07 | built-in explosion prevention set of last resort |
SG11201401721UA SG11201401721UA (en) | 2011-11-10 | 2012-11-07 | Blowout preventer shut-in assembly of last resort |
GB1408801.7A GB2511004B (en) | 2011-11-10 | 2012-11-07 | Blowout preventer shut-in assembly of last resort |
NO20140567A NO20140567A1 (en) | 2011-11-10 | 2014-05-05 | BOP assembly for emergency shutdown |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/293,346 | 2011-11-10 | ||
US13/293,346 US9033049B2 (en) | 2011-11-10 | 2011-11-10 | Blowout preventer shut-in assembly of last resort |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013070668A1 true WO2013070668A1 (en) | 2013-05-16 |
Family
ID=48279521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2012/063814 WO2013070668A1 (en) | 2011-11-10 | 2012-11-07 | Blowout preventer shut-in assembly of last resort |
Country Status (6)
Country | Link |
---|---|
US (2) | US9033049B2 (en) |
BR (1) | BR112014011247A2 (en) |
GB (1) | GB2511004B (en) |
NO (1) | NO20140567A1 (en) |
SG (1) | SG11201401721UA (en) |
WO (1) | WO2013070668A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4105434A1 (en) * | 2021-05-19 | 2022-12-21 | Expro North Sea Limited | Control system for a well control device |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9322264B2 (en) | 2012-10-17 | 2016-04-26 | Transocean Innovation Labs Ltd | Communications systems and methods for subsea processors |
EP3004532B1 (en) * | 2013-06-06 | 2018-09-05 | Shell International Research Maatschappij B.V. | Propellant driven accumulator |
WO2015009410A1 (en) * | 2013-07-18 | 2015-01-22 | Conocophillips Company | Pre-positioned capping device for source control with independent management system |
US8727018B1 (en) * | 2013-07-19 | 2014-05-20 | National Oilwell Varco, L.P. | Charging unit, system and method for activating a wellsite component |
US10048673B2 (en) | 2014-10-17 | 2018-08-14 | Hydril Usa Distribution, Llc | High pressure blowout preventer system |
US10876369B2 (en) | 2014-09-30 | 2020-12-29 | Hydril USA Distribution LLC | High pressure blowout preventer system |
US10196871B2 (en) | 2014-09-30 | 2019-02-05 | Hydril USA Distribution LLC | Sil rated system for blowout preventer control |
US9803448B2 (en) | 2014-09-30 | 2017-10-31 | Hydril Usa Distribution, Llc | SIL rated system for blowout preventer control |
US9989975B2 (en) | 2014-11-11 | 2018-06-05 | Hydril Usa Distribution, Llc | Flow isolation for blowout preventer hydraulic control systems |
US9759018B2 (en) | 2014-12-12 | 2017-09-12 | Hydril USA Distribution LLC | System and method of alignment for hydraulic coupling |
US9528340B2 (en) | 2014-12-17 | 2016-12-27 | Hydrill USA Distribution LLC | Solenoid valve housings for blowout preventer |
US10202839B2 (en) | 2014-12-17 | 2019-02-12 | Hydril USA Distribution LLC | Power and communications hub for interface between control pod, auxiliary subsea systems, and surface controls |
GB2533783B (en) * | 2014-12-29 | 2019-06-05 | Cameron Tech Ltd | Subsea support |
KR20170135836A (en) * | 2015-02-15 | 2017-12-08 | 트랜스오션 이노베이션 랩스 리미티드 | BOP control systems and related methods |
US9828824B2 (en) * | 2015-05-01 | 2017-11-28 | Hydril Usa Distribution, Llc | Hydraulic re-configurable and subsea repairable control system for deepwater blow-out preventers |
WO2016176724A1 (en) * | 2015-05-01 | 2016-11-10 | Kinetic Pressure Control Limited | Choke and kill system |
GB201510673D0 (en) * | 2015-06-17 | 2015-07-29 | Enovate Systems Ltd | Improved pressure barrier system |
WO2017005262A1 (en) * | 2015-07-06 | 2017-01-12 | Maersk Drilling A/S | Blowout preventer control system and methods for controlling a blowout preventer |
US10337277B2 (en) * | 2015-11-19 | 2019-07-02 | Cameron International Corporation | Closed-loop solenoid system |
WO2018031296A1 (en) * | 2016-08-11 | 2018-02-15 | Noble Drilling Services Inc. | Method for assembling and disassembling marine riser and auxiliary lines and well pressure control system |
US10538986B2 (en) | 2017-01-16 | 2020-01-21 | Ensco International Incorporated | Subsea pressure reduction manifold |
WO2018160982A1 (en) * | 2017-03-02 | 2018-09-07 | Edward Ryan Hemphill | Wireless control system for subsea devices |
AU2017436083B2 (en) | 2017-10-17 | 2023-05-18 | Halliburton Energy Services, Inc. | Rapid response well control assembly |
WO2020251821A1 (en) * | 2019-06-13 | 2020-12-17 | National Oilwell Varco, L.P. | Subsea data acquisition pods |
WO2021045984A1 (en) * | 2019-09-04 | 2021-03-11 | Kinetic Pressure Control, Ltd. | Simultaneous multiple control signal blowout preventer actuation |
US11255144B2 (en) * | 2019-12-08 | 2022-02-22 | Hughes Tool Company LLC | Annular pressure cap drilling method |
US11555372B1 (en) | 2021-09-22 | 2023-01-17 | Saudi Arabian Oil Company | Smart blow off preventer shear ram system and methods |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1519002A1 (en) * | 2003-09-24 | 2005-03-30 | Cooper Cameron Corporation | BOP and separator combination |
US20070107904A1 (en) * | 2005-08-02 | 2007-05-17 | Donahue Steve J | Modular backup fluid supply system |
WO2010117350A1 (en) * | 2009-04-09 | 2010-10-14 | Fmc Technologies, Inc. | Nested cylinder compact blowout preventer |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4046191A (en) * | 1975-07-07 | 1977-09-06 | Exxon Production Research Company | Subsea hydraulic choke |
US4210208A (en) * | 1978-12-04 | 1980-07-01 | Sedco, Inc. | Subsea choke and riser pressure equalization system |
US5195361A (en) * | 1991-11-25 | 1993-03-23 | Petco Equipment Tools Co. | Test method and apparatus for BOP equipment |
US6202753B1 (en) * | 1998-12-21 | 2001-03-20 | Benton F. Baugh | Subsea accumulator and method of operation of same |
US6626245B1 (en) * | 2000-03-29 | 2003-09-30 | L Murray Dallas | Blowout preventer protector and method of using same |
US6772843B2 (en) * | 2000-12-05 | 2004-08-10 | Baker Hughes Incorporated | Sea-floor pressure head assembly |
US6478087B2 (en) * | 2001-03-01 | 2002-11-12 | Cooper Cameron Corporation | Apparatus and method for sensing the profile and position of a well component in a well bore |
US6725924B2 (en) * | 2001-06-15 | 2004-04-27 | Schlumberger Technology Corporation | System and technique for monitoring and managing the deployment of subsea equipment |
US6672390B2 (en) * | 2001-06-15 | 2004-01-06 | Shell Oil Company | Systems and methods for constructing subsea production wells |
US6752100B2 (en) * | 2002-05-28 | 2004-06-22 | Shell Oil Company | Apparatuses and methods of deploying and installing subsea equipment |
AU2003247022A1 (en) * | 2002-06-28 | 2004-01-19 | Vetco Aibel As | An assembly and a method for intervention of a subsea well |
US7032691B2 (en) * | 2003-10-30 | 2006-04-25 | Stena Drilling Ltd. | Underbalanced well drilling and production |
US7216714B2 (en) * | 2004-08-20 | 2007-05-15 | Oceaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
NO322519B1 (en) * | 2004-09-20 | 2006-10-16 | Fmc Kongsberg Subsea As | Device by joint |
US20100227551A1 (en) * | 2005-06-15 | 2010-09-09 | Mark Volanthen | Buoy supported underwater radio antenna |
US7921917B2 (en) * | 2007-06-08 | 2011-04-12 | Cameron International Corporation | Multi-deployable subsea stack system |
US20110088913A1 (en) * | 2009-10-16 | 2011-04-21 | Baugh Benton F | Constant environment subsea control system |
US8881829B2 (en) * | 2010-10-07 | 2014-11-11 | David B. Redden | Backup wellhead blowout prevention system and method |
US8448915B2 (en) * | 2011-02-14 | 2013-05-28 | Recl Power Licensing Corp. | Increased shear power for subsea BOP shear rams |
-
2011
- 2011-11-10 US US13/293,346 patent/US9033049B2/en active Active
-
2012
- 2012-11-07 WO PCT/US2012/063814 patent/WO2013070668A1/en active Application Filing
- 2012-11-07 GB GB1408801.7A patent/GB2511004B/en not_active Expired - Fee Related
- 2012-11-07 BR BR112014011247A patent/BR112014011247A2/en active Search and Examination
- 2012-11-07 SG SG11201401721UA patent/SG11201401721UA/en unknown
-
2014
- 2014-05-05 NO NO20140567A patent/NO20140567A1/en not_active Application Discontinuation
- 2014-08-26 US US14/469,516 patent/US9976375B2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1519002A1 (en) * | 2003-09-24 | 2005-03-30 | Cooper Cameron Corporation | BOP and separator combination |
US20070107904A1 (en) * | 2005-08-02 | 2007-05-17 | Donahue Steve J | Modular backup fluid supply system |
WO2010117350A1 (en) * | 2009-04-09 | 2010-10-14 | Fmc Technologies, Inc. | Nested cylinder compact blowout preventer |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4105434A1 (en) * | 2021-05-19 | 2022-12-21 | Expro North Sea Limited | Control system for a well control device |
Also Published As
Publication number | Publication date |
---|---|
SG11201401721UA (en) | 2014-08-28 |
US20130118755A1 (en) | 2013-05-16 |
BR112014011247A2 (en) | 2017-04-25 |
NO20140567A1 (en) | 2014-05-27 |
GB2511004B (en) | 2018-07-04 |
US9033049B2 (en) | 2015-05-19 |
GB2511004A (en) | 2014-08-20 |
US20140360731A1 (en) | 2014-12-11 |
GB201408801D0 (en) | 2014-07-02 |
US9976375B2 (en) | 2018-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9976375B2 (en) | Blowout preventer shut-in assembly of last resort | |
US7513308B2 (en) | Tubing running equipment for offshore rig with surface blowout preventer | |
US7909103B2 (en) | Retrievable tubing hanger installed below tree | |
US20080110633A1 (en) | Method of controlling landing strings in offshore operations | |
US10066458B2 (en) | Intervention system and apparatus | |
US9574426B2 (en) | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle | |
WO2008154486A2 (en) | Multi-deployable subsea stack system | |
GB2457349A (en) | A riserless subsea well blowout preventer | |
WO2014164223A2 (en) | Subsea well intervention systems and methods | |
US20170145773A1 (en) | Closed-Loop Solenoid System | |
US9004175B2 (en) | Method and system for rapid containment and intervention of a subsea well blowout | |
US20130168102A1 (en) | Drilling riser adapter with emergency functionality | |
WO2017137622A1 (en) | Device and method for enabling removal or installation of a horizontal christmas tree | |
EP1350918B1 (en) | A method of completing a subsea well | |
US11125041B2 (en) | Subsea module and downhole tool | |
WO2012177713A2 (en) | Subsea connector with an actuated latch cap assembly | |
WO2016106267A1 (en) | Riserless subsea well abandonment system | |
WO2014047594A1 (en) | An improved subsea connector system | |
WO2018222732A1 (en) | Method of drilling and completing a well | |
CA3037847A1 (en) | Subsea module and downhole tool | |
WO2018075267A1 (en) | Subsea module and downhole tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12847353 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase | ||
ENP | Entry into the national phase |
Ref document number: 1408801 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20121107 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1408801.7 Country of ref document: GB |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112014011247 Country of ref document: BR |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12847353 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 112014011247 Country of ref document: BR Kind code of ref document: A2 Effective date: 20140509 |