WO2013036473A1 - Method to estimate pore pressure uncertainty from trendline variations - Google Patents
Method to estimate pore pressure uncertainty from trendline variations Download PDFInfo
- Publication number
- WO2013036473A1 WO2013036473A1 PCT/US2012/053644 US2012053644W WO2013036473A1 WO 2013036473 A1 WO2013036473 A1 WO 2013036473A1 US 2012053644 W US2012053644 W US 2012053644W WO 2013036473 A1 WO2013036473 A1 WO 2013036473A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- depth interval
- depth
- trendlines
- pore pressure
- trendline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B45/00—Measuring the drilling time or rate of penetration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V3/00—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
- G01V3/18—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Definitions
- Geologic formations are used for many purposes such as hydrocarbon production, geothermal production and carbon dioxide sequestration. Boreholes are typically drilled into the earth in order to access the formations. Prior to a borehole being drilled, forces or loads in the rock mass of a formation are in equilibrium with each other to keep the rock mass in static equilibrium. When the borehole is drilled, the loads must be evenly distributed to adjacent rock and materials in order to keep the formation in static equilibrium. Keeping the drilled formation stable generally requires a support pressure be applied by drilling mud in the borehole. The proper support pressure is related to the pressure of the formation fluid in the pores of the formation (i.e., pore pressure). If the applied support pressure is insufficient, the formation surrounding the borehole may become unstable and collapse into the borehole damaging equipment and causing costly delays.
- the method includes: conveying a carrier through the borehole; performing formation measurements relating to porosity at a plurality of depths in the borehole using a downhole tool coupled to the carrier; defining a first depth interval and a second depth interval deeper than the first depth interval, the first depth interval comprising a first set of formation measurement points and the second depth interval comprising a second set of formation measurement points; establishing a plurality of trendlines of depth versus porosity-related measurements using a processor with each trendline in the plurality of trendlines extending from a point in the first depth interval through a point in the second depth interval; and calculating a pore pressure line and associated uncertainty using the plurality of trendlines.
- the apparatus includes: a carrier configured to be conveyed through the borehole; a downhole tool coupled to the carrier and configured to perform formation measurements related to porosity at a plurality of depths in the borehole; and a processor coupled to the downhole tool and configured to implement a method.
- the method includes: receiving formation measurements from the downhole tool at a plurality of depths in the borehole; defining a first depth interval and a second depth interval deeper than the first depth interval, the first depth interval comprising a first set of formation measurement points and the second depth interval comprising a second set of formation measurement points;
- a non-transitory computer-readable medium having computer-executable instructions for estimating a pore pressure of an earth formation penetrated by a borehole and an associated uncertainty by implementing a method that includes: receiving formation measurements from a downhole tool configured to perform formation measurements related to porosity at a plurality of depths in the borehole; defining a first depth interval and a second depth interval deeper than the first depth interval, the first depth interval comprising a first set of formation measurement points and the second depth interval comprising a second set of formation measurement points; establishing a plurality of trendlines of depth versus porosity- related measurements using a processor with each trendline in the plurality of trendlines extending from a point in the first depth interval through a point in the second depth interval; calculating a pore pressure line and associated uncertainty using the plurality of trendlines.
- FIG. 1 illustrates an exemplary embodiment of a downhole porosity tool disposed in a borehole penetrating the earth
- FIG. 2 presents a flow chart depicting aspects of a method for estimating formation pore pressure and an associated uncertainty
- FIG. 3 depicts aspects of one approach for estimating formation pore pressure and an associated uncertainty
- FIG. 4 depicts aspects of another approach for estimating formation pore pressure and an associated uncertainty.
- FIG. 1 illustrates an exemplary embodiment of a bottom hole assembly (BHA) 9 disposed in a borehole 2 penetrating the earth 3, which includes an earth formation 4.
- the BHA 9 is conveyed through the borehole 2 by a drill string 5 for logging-while-drilling applications.
- a drill bit 6 is disposed at the distal end of the drill string 5 for drilling the borehole 2.
- a drill rig 17 rotates the drill string 5 to drill the borehole 2 and pumps drilling fluid 18 through the drill string 5 in order to lubricate the drill bit 6 and flush cuttings from the borehole 2.
- a downhole tool 10 is disposed in the BHA 9 and configured to perform measurements of the formation 4 at various depths to produce a measurement log.
- the downhole formation measurements are related to the porosity of the formation 4. That is the porosity of the formation 4 can be deduced from those measurements.
- Non-limiting embodiments of those formation measurements include resistivity measurements, acoustic measurements, and density measurements using a radiation source.
- the downhole tool 10 or another downhole tool 10 may be configured to discriminate or identify the presence of shale in the formation 4 by natural gamma-ray logging in order to apply the methods disclosed herein.
- a downhole electronic unit 11 is disposed in the BHA 9.
- the downhole electronic unit 11 is configured to operate the downhole tool 10 and/or process measurement data.
- raw or processed measurement data can be transmitted to a computer processing system 12 disposed at the surface of the earth 3 via a telemetry system 13.
- the telemetry system 13 can be wired drill pipe 14 for real time communications or pulsed-mud as non-limiting examples.
- Data processing functions can be performed by the downhole electronic unit 11, the computer processing system 12 or some combination of both.
- the downhole electronic unit 11 and/or the computer processing system 12 includes a processor for executing an algorithm that implements a method for estimating the pore pressure of the formation 4 as a function of depth and an associated uncertainty. The pore pressure and uncertainty are then provided to update a mud program for maintaining the drilling fluid pressure within the pressure window.
- Pore pressure in the underground can be hydrostatic, over pressure, or under pressure, and different mechanisms exist that can cause a deviation of the pore pressure from hydrostatic.
- One such mechanism is based on the compaction of sedimentary material, which is transported into sedimentary basins. Compaction is referred to as the settlement of fine or coarse sedimentary material and continuous burial of the settled material with increasing addition of further sedimentary material. Under normal conditions, fluid existing in the pore space in the sedimentary material will be squeezed out of the material, so that the porosity of the sediment will decrease with increasing load from above sediments. This mechanism of normal compaction results in a hydrostatic pore pressure distribution.
- overpressure is generated whenever the fluid within the pore space is trapped with continuous burial of the sediment.
- Logs can be the resistivity or acoustic slowness of the formation, the bulk density or others.
- a drilling curve example is the corrected drilling exponent DXC.
- an overpressure zone is indicated by a decrease in resistivity from what would be expected in a normal compaction zone (i.e., a trend of an increase in resistivity with increasing depth as pore size decreases).
- the disclosed techniques for estimating pore pressure and associated uncertainty are applied only to shale in shale containing formations. Hence, in these
- the porosity-related formation measurements are filtered to exclude measurements performed on non-shale portions of the formation.
- FIG. 2 presents a flow chart depicting aspects of a method 20 for determining pore pressure and pore pressure uncertainty as a function of depth.
- Step 21 in method 20 calls for conveying a carrier coupled to the downhole tool 10 through a borehole.
- Step 22 calls for performing formation measurements using the downhole tool 10 to obtain a log of formation measurements related to porosity of the formation.
- Step 23 calls for defining a first or upper depth interval and a second or lower depth interval that is deeper in the borehole than the upper depth interval. Each depth interval includes a plurality of formation measurements made within those intervals.
- Step 24 calls for establishing a plurality of compaction trendlines extending from the upper depth interval to the lower depth interval and beyond. Each trendline is defined by a unique set of measurement points with one measurement point being in the upper depth interval and one measurement point being in the lower depth interval. Each trendline may be parameterized by a slope and an intercept of a Y-depth axis as shown in Track 1 in FIG. 3.
- One way is to determine the set of points (i.e., one point in the upper depth interval and one point in the lower depth interval) that establishes a first trendline having a minimum slope and minimum intercept and the set of points that establishes a second trendline having a maximum slope and maximum intercept from all sets of points in the upper and lower depth intervals as shown in Track 3 in FIG. 4.
- the first trendline may be established having a minimum slope and maximum intercept and the second trendline may be established having a maximum slope and minimum intercept.
- the combination providing the widest spread in values may be selected to provide the basis for calculating a representative trendline (e.g., representing the most likely trendline) and associated uncertainty.
- FIG. 3 in Track 1 illustrates an average trendline calculated from the plurality of trendlines and the standard deviation from the average trendline.
- the representative trendline illustrated in Track 1 in FIG.3 is the average trendline.
- Step 25 in method 20 calls for calculating a pore pressure line (i.e., most likely estimate of pore pressure as a function of depth) and associated uncertainty using the plurality of trendlines.
- a pore pressure line i.e., most likely estimate of pore pressure as a function of depth
- Various methods are known in the art for converting porosity to pore pressure.
- One method is referred to as Eaton's method.
- Eaton's method can be used with resistivity logs, conductivity logs, acoustic velocity logs, acoustic slowness logs, or drilling exponent data.
- Equations (l)-(5) list various forms of equations in Eaton's method for calculating pore pressure (PP) depending on the type of log used to measure porosity.
- Eaton's method uses the overburden gradient as an input to the method. The overburden gradient is determined using established techniques and is shown in Track 2 in FIG. 3 and Track 4 in FIG. 4.
- OBG overburden gradient (ppg, kPa/m, or g/cm 3 );
- PP N normal pore pressure gradient (ppg, kPa/m, or g/cm 3 );
- Ro observed resistivity (overpressured interval, ⁇ );
- V 0 observed interval velocity (overpressured interval; m/s or ft/s);
- V N "normal" (expected) interval velocity (m/s or ft/s);
- DT 0 observed transit time (overpressured interval; ⁇ / ⁇ );
- a representative trendline is calculated from the first trendline having the minimum slope and the second trendline having a maximum slope.
- the representative trendline can be an average of the two trendlines in one embodiment. It can be appreciated that other mathematical techniques can be used to determine the representative trendline such as calculating a mean trendline.
- the uncertainty associated with the average trendline is the spread between the first trendline and the second trendline.
- Eaton's method can be applied to determine the pore pressure line (i.e., the representative pore pressure line). Similarly, Eaton's method can be applied to the first trendline and the second trendline to determine the spread of values or uncertainty about the pore pressure line.
- the plurality of trendlines involves generating trendlines through every combination of measurement points in the upper and lower depth intervals
- two approaches may be used to determine the pore pressure line and associated uncertainty.
- Eaton's method using constant parameters is applied to each trendline in the plurality of trendlines to generate a plurality of corresponding pore pressure lines.
- the representative pore pressure line such as an average pore pressure line for example, is then calculated from the plurality of pore pressure lines.
- a statistical method is then applied to the plurality of pore pressure lines to calculate the standard deviation of the plurality of pore pressure lines.
- the standard deviation is one example of the uncertainty associated with the representative or calculated pore pressure line.
- the second approach Eaton's method using a random varying parameter such as Eaton's exponent is applied to each trendline in the plurality of trendlines to generate a plurality of corresponding pore pressure lines.
- the pore pressure line can be calculated as an average of the plurality of corresponding pore pressure lines.
- a statistical method is then applied to the plurality of pore pressure lines to calculate the standard deviation of the plurality of pore pressure lines where the standard deviation represents the uncertainty.
- This approach is illustrated in Tracks 1 and 2 in FIG. 3 with Histogram 3 illustrating the distribution of the Eaton exponents.
- the second depth interval can be continuously shifted deeper into the earth 3 or widened so that the lower part of the interval extends deeper into the borehole 2.
- the first depth interval may also be shifted or widened deeper into the borehole 2. As the depth intervals are shifted or widened, these new intervals are continuously populated with formation measurements performed within these intervals.
- the second depth interval maintains a constant length and is continuously shifted to be at the deepest point of the drilling run up to where the normal compaction trend ends.
- the depth intervals are changed with drilling such as to maintain a predefined ratio of the lengths of the depth intervals to the total drilling depth (e.g., the lengths of the depth intervals are maintained at 0.1 times the total drilling depth).
- the upper depth interval and the upper point of the lower depth interval remain fixed while the lower point of the lower depth interval is continuously moved deeper in the borehole. It can be appreciated that there are many approaches to shift or widen the depth intervals either continuously as the borehole is being drill or at certain time or drilling distance intervals and that these additional approaches are inherently include in this disclosure.
- the method 20 can be performed using more than one porosity log and that a combined statistical analysis can be performed on all pluralities of trendlines established from each log.
- the pore pressure line e.g., the average pore pressure line
- its associated uncertainty can be calculated from these pluralities of trendlines.
- trendlines can be established by linear regression of all measurement points in the upper and lower depth intervals in lieu of a selection of only one measurement point in each interval to establish a trendline. As the depth intervals are shifted or widened and more formation measurement points are obtained, a plurality of trendlines are established and used to determine the pore pressure line and the associated uncertainty.
- the porosity- indicating logs for the use in the method 20 can be obtained from boreholes different from the borehole being drilled (e.g., offset boreholes or wells).
- the analysis of trendlines can be performed on porosity-indicating logs from offset wells in combination with porosity-indicating logs from the target borehole being drilled. If the porosity-indicating logs originate from different locations, a weighting function may be applied to the derived trendlines in order to represent the
- the method 20 can include a step for identifying the presence of shale such as with a gamma-ray log for example and for filtering out those porosity- related measurements performed on non-shale portions of the formation.
- various analysis components may be used, including a digital and/or an analog system.
- the downhole electronic unit 1 1, the surface computer processing 12, or the downhole tool 10 may include the digital and/or analog system.
- the system may have components such as a processor, storage media, memory, input, output, communications link (wired, wireless, pulsed mud, optical or other), user interfaces, software programs, signal processors (digital or analog) and other such components (such as resistors, capacitors, inductors and others) to provide for operation and analyses of the apparatus and methods disclosed herein in any of several manners well-appreciated in the art.
- a power supply e.g., at least one of a generator, a remote supply and a battery
- cooling component heating component
- magnet, electromagnet, sensor, electrode, transmitter, receiver, transceiver, antenna controller
- optical unit, electrical unit or electromechanical unit may be included in support of the various aspects discussed herein or in support of other functions beyond this disclosure.
- carrier means any device, device component, combination of devices, media and/or member that may be used to convey, house, support or otherwise facilitate the use of another device, device component, combination of devices, media and/or member.
- Other exemplary non-limiting carriers include drill strings of the coiled tube type, of the jointed pipe type and any combination or portion thereof.
- Other carrier examples include casing pipes, wirelines, wireline sondes, slickline sondes, drop shots, bottom-hole- assemblies, drill string inserts, modules, internal housings and substrate portions thereof.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Geophysics (AREA)
- General Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Acoustics & Sound (AREA)
- Geophysics And Detection Of Objects (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Lifting Devices For Agricultural Implements (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20140166A NO346016B1 (en) | 2011-09-09 | 2012-09-04 | Estimation of uncertainty at the pore pressure of the subsoil based on trend line variations |
| BR112014004667-0A BR112014004667B1 (en) | 2011-09-09 | 2012-09-04 | method and apparatus for estimating pressure pores of an earth formation |
| GB1401788.3A GB2507893B (en) | 2011-09-09 | 2012-09-04 | Method to estimate pore pressure uncertainty from trendline variations |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/229,212 | 2011-09-09 | ||
| US13/229,212 US8788208B2 (en) | 2011-09-09 | 2011-09-09 | Method to estimate pore pressure uncertainty from trendline variations |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013036473A1 true WO2013036473A1 (en) | 2013-03-14 |
Family
ID=47830583
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2012/053644 Ceased WO2013036473A1 (en) | 2011-09-09 | 2012-09-04 | Method to estimate pore pressure uncertainty from trendline variations |
Country Status (5)
| Country | Link |
|---|---|
| US (2) | US8788208B2 (en) |
| BR (1) | BR112014004667B1 (en) |
| GB (1) | GB2507893B (en) |
| NO (1) | NO346016B1 (en) |
| WO (1) | WO2013036473A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107191184A (en) * | 2017-07-14 | 2017-09-22 | 西安石油大学 | A kind of improved burial history reconstruction method |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8788208B2 (en) * | 2011-09-09 | 2014-07-22 | Baker Hughes Incorporated | Method to estimate pore pressure uncertainty from trendline variations |
| US20140076632A1 (en) * | 2012-09-20 | 2014-03-20 | Baker Hughes Incoroporated | Method to predict overpressure uncertainty from normal compaction trendline uncertainty |
| US9951607B2 (en) * | 2013-01-31 | 2018-04-24 | Baker Hughes, LLC | System and method for characterization of downhole measurement data for borehole stability prediction |
| US10072481B2 (en) | 2013-08-29 | 2018-09-11 | Baker Hughes, A Ge Company, Llc | Modeling and production of tight hydrocarbon reservoirs |
| US10385678B2 (en) * | 2014-03-21 | 2019-08-20 | Conocophillips Company | Method for analysing pore pressure in shale formations |
| CN106326601B (en) * | 2016-09-23 | 2023-07-14 | 长春一汽富晟李尔汽车座椅系统有限公司 | Detection device and method for measuring uncertainty improved automobile seat static load |
| US11035966B2 (en) * | 2017-10-17 | 2021-06-15 | Ha Dinh Nguyen | Method for estimating reservoir formation quality using seismic velocities |
| CN110188499B (en) * | 2019-06-05 | 2023-01-31 | 中北大学 | A Composite Single Pile Settlement Calculation Method for Grouting Cast-in-situ Pile after Squeeze and Expansion Branch Plate |
| US11920461B2 (en) * | 2021-05-25 | 2024-03-05 | Saudi Arabian Oil Company | Determining pressure in subterranean formations |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5128866A (en) * | 1989-09-20 | 1992-07-07 | Chevron Corporation | Pore pressure prediction method |
| US6808028B2 (en) * | 2002-12-03 | 2004-10-26 | Schlumberger Technology Corporation | Method and apparatus utilizing NMR measurements to gather information on a property of the earth formation surrounding a wellbore |
| US6826486B1 (en) * | 2000-02-11 | 2004-11-30 | Schlumberger Technology Corporation | Methods and apparatus for predicting pore and fracture pressures of a subsurface formation |
| US6954066B2 (en) * | 2003-04-01 | 2005-10-11 | Halliburton Energy Services, Inc. | Abnormal pressure determination using nuclear magnetic resonance logging |
| US20070118292A1 (en) * | 2005-11-22 | 2007-05-24 | Geomechanics International, Inc. | Stress and pore pressure limits using a strength of materials approach |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7349807B2 (en) | 2004-03-08 | 2008-03-25 | Geomechanics International, Inc. | Quantitative risk assessment applied to pore pressure prediction |
| US8818779B2 (en) * | 2009-12-21 | 2014-08-26 | Baker Hughes Incorporated | System and methods for real-time wellbore stability service |
| US9200510B2 (en) * | 2010-08-18 | 2015-12-01 | Baker Hughes Incorporated | System and method for estimating directional characteristics based on bending moment measurements |
| US8788208B2 (en) * | 2011-09-09 | 2014-07-22 | Baker Hughes Incorporated | Method to estimate pore pressure uncertainty from trendline variations |
-
2011
- 2011-09-09 US US13/229,212 patent/US8788208B2/en not_active Expired - Fee Related
-
2012
- 2012-09-04 WO PCT/US2012/053644 patent/WO2013036473A1/en not_active Ceased
- 2012-09-04 NO NO20140166A patent/NO346016B1/en unknown
- 2012-09-04 GB GB1401788.3A patent/GB2507893B/en active Active
- 2012-09-04 BR BR112014004667-0A patent/BR112014004667B1/en active IP Right Grant
-
2014
- 2014-07-17 US US14/334,202 patent/US9353619B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5128866A (en) * | 1989-09-20 | 1992-07-07 | Chevron Corporation | Pore pressure prediction method |
| US6826486B1 (en) * | 2000-02-11 | 2004-11-30 | Schlumberger Technology Corporation | Methods and apparatus for predicting pore and fracture pressures of a subsurface formation |
| US6808028B2 (en) * | 2002-12-03 | 2004-10-26 | Schlumberger Technology Corporation | Method and apparatus utilizing NMR measurements to gather information on a property of the earth formation surrounding a wellbore |
| US6954066B2 (en) * | 2003-04-01 | 2005-10-11 | Halliburton Energy Services, Inc. | Abnormal pressure determination using nuclear magnetic resonance logging |
| US20070118292A1 (en) * | 2005-11-22 | 2007-05-24 | Geomechanics International, Inc. | Stress and pore pressure limits using a strength of materials approach |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107191184A (en) * | 2017-07-14 | 2017-09-22 | 西安石油大学 | A kind of improved burial history reconstruction method |
| CN107191184B (en) * | 2017-07-14 | 2021-04-23 | 西安石油大学 | An Improved Buried History Restoration Method |
Also Published As
| Publication number | Publication date |
|---|---|
| US8788208B2 (en) | 2014-07-22 |
| GB201401788D0 (en) | 2014-03-19 |
| US9353619B2 (en) | 2016-05-31 |
| US20140330521A1 (en) | 2014-11-06 |
| NO20140166A1 (en) | 2014-02-27 |
| GB2507893A (en) | 2014-05-14 |
| BR112014004667B1 (en) | 2020-12-01 |
| BR112014004667A2 (en) | 2017-03-28 |
| US20130066558A1 (en) | 2013-03-14 |
| GB2507893B (en) | 2017-05-17 |
| NO346016B1 (en) | 2021-12-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11591900B2 (en) | Method to predict overpressure uncertainty from normal compaction trendline uncertainty | |
| US9353619B2 (en) | Method to estimate pore pressure uncertainty from trendline variations | |
| US10928537B2 (en) | Prediction of formation and stratigraphic layers while drilling | |
| US10445669B2 (en) | System and method for mapping reservoir properties away from the wellbore | |
| US7996199B2 (en) | Method and system for pore pressure prediction | |
| US10385678B2 (en) | Method for analysing pore pressure in shale formations | |
| US9341739B2 (en) | Apparatus and method for estimating geologic boundaries | |
| US20130027043A1 (en) | Methods and systems for estimating formation resistivity and porosity | |
| Peters et al. | Criteria to determine borehole formation temperatures for calibration of basin and petroleum system models | |
| US10370955B2 (en) | Method of calculating pore pressure while drilling | |
| US20210270998A1 (en) | Automated production history matching using bayesian optimization | |
| US8682588B2 (en) | Method and apparatus for geobaric analysis | |
| US10450861B2 (en) | Systems and methods for determining dielectric constant or resistivity from electromagnetic propagation measurement using contraction mapping | |
| US9551213B2 (en) | Method for estimation of bulk shale volume in a real-time logging-while-drilling environment | |
| US11520071B2 (en) | Multi-step inversion using electromagnetic measurements |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12830400 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 1401788 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20120904 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1401788.3 Country of ref document: GB |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112014004667 Country of ref document: BR |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12830400 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 112014004667 Country of ref document: BR Kind code of ref document: A2 Effective date: 20140227 |
