- WO2012174755A1 WO2012174755A1 PCT/CN2011/076614 CN2011076614W WO2012174755A1 WO 2012174755 A1 WO2012174755 A1 WO 2012174755A1 CN 2011076614 W CN2011076614 W CN 2011076614W WO 2012174755 A1 WO2012174755 A1 WO 2012174755A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- ship
- belt conveyor
- loader
- loading
- barge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/04—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-horizontal transit by bridges equipped with conveyors
- B65G63/047—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-horizontal transit by bridges equipped with conveyors for bulk material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/22—Arrangement of ship-based loading or unloading equipment for cargo or passengers of conveyers, e.g. of endless-belt or screw-type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/06—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit
- B65G63/067—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit for bulk material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/28—Arrangement of ship-based loading or unloading equipment for cargo or passengers of chutes
Definitions
- the invention relates to the technical field of port machinery, in particular to a bridge type loading and unloading ship machine.
- unloading and loading of barges are usually performed by a ship unloader (or crane), a ship loader and a belt conveyor.
- the ship unloader (or crane) is located on one side of the barge, close to the ship to be unloaded, the ship loader is located on the other side of the barge, close to the ship to be loaded, the belt conveyor is located on the barge of the ship, and one end is close to the ship unloading At the funnel of the machine (or crane), the other end is close to the telescopic boom conveyor of the ship loader.
- the boom of the ship unloader moves to the cabin of the ship to be unloaded, the grab grabs the material from the ship, then walks along the boom through the trolley, and then removes the material through the funnel of the ship unloader;
- the belt conveyor transports the unloaded material to the telescopic boom conveyor of the ship loader;
- the telescopic arm of the ship loader is slid by the rotary motion and the pitching motion to the ship to be loaded, and the telescopic belt conveyor transports the material to it.
- the free end of the slide the material slides from the inside of the slide to the cabin to be loaded, and the entire transfer operation is completed.
- the above-mentioned transfer operation system includes three devices: a ship unloader (or a crane), a ship loader and a belt conveyor.
- the structure of the ship transfer machine is complicated, the work of the barge operation is cumbersome, the efficiency is low, and the cost of the transfer operation system is high; Since the belt conveyor is located under the cabin of the barge, the space occupied by the ship is large, and the barge can only carry the barge operation equipment, and the material cannot be stored in a small amount, which restricts the development space of the bulk cargo transfer operation.
- the technical problem to be solved by the invention is to provide a bridge-type loading and unloading ship machine, which has the advantages of simple structure, low cost, capable of tubular handling, improved efficiency of the barge operation, and greatly enhanced storage materials of the barge. Ability.
- the present invention provides a docking crane loading and unloading machine, including a ship unloader, the ship unloader including an interconnecting support frame and a tilting arm frame, the support frame being disposed on the deck of the barge
- the tilting arm is erected on the barge and one side of the ship to be unloaded; and further includes:
- a ship loader disposed at a side of the ship unloader, and a swingable and tiltable telescopic boom belt machine is disposed above the barge and the other side of the ship to be loaded;
- An intermediate belt conveyor is disposed between the ship unloader and the ship loader, one end of which is disposed below a funnel discharge opening of the ship loader, and the other end of which is connected to the telescopic arm of the ship loader Belt conveyor;
- Both the ship loader and the intermediate belt conveyor are coupled to the support frame.
- the intermediate belt conveyor is provided with a bucket for discharging from the end of the funnel, and the intermediate belt conveyor is connected to the telescopic boom belt conveyor through the bucket.
- the intermediate belt conveyor is welded to the support frame.
- the end of the intermediate belt conveyor adjacent the funnel is lower than the end remote from the funnel.
- a support plate is arranged under the rotary table of the ship loader, and the rotary table is fixedly connected to the support frame through the support plate.
- the deck is provided with a track
- the bottom end of the support frame is provided with a walking wheel, and the walking wheel is slidably connected with the track.
- the top end of the ship unloader is provided with a positioning component, and the positioning component is connected to the tilting boom when the tilting arm is rotated upward.
- the positioning component is a safety hook
- the tilting arm is provided with a hanging shaft, and the safety hook hooks the hanging shaft when the tilting arm is rotated upward.
- the invention provides a barge loading and unloading ship machine, including a ship unloader, and a ship loader disposed under the side of the ship unloader, the telescopic boom belt conveyor being arranged on the barge and the other side thereof Above the loading; further comprising an intermediate belt conveyor between the ship unloader and the ship loader, one end of which is disposed below the funnel discharge opening of the ship loader, and the other end of which is connected to the telescopic boom conveyor of the ship loader; Both the ship machine and the intermediate belt conveyor are connected to the support frame.
- the utility model adopts an integrated structure of a ship unloader, a ship loader and an intermediate belt conveyor.
- the tilting boom of the ship unloader moves to the top of the ship to be unloaded, and the grab is discharged from the ship.
- the trolley on the tilting arm frame drives the grab to walk along the tilting arm.
- the grab falls to the designated position to unload the material, and the material is loaded.
- the material in the funnel is dropped by the vibrating feeder onto the conveyor belt of the lower intermediate belt conveyor, and the intermediate belt conveyor conveys the material from the funnel end to the telescopic boom conveyor of the ship loader; the telescopic belt conveyor passes the rotation
- the movements such as pitching and telescoping are adjusted to the top of the cabin to be loaded, and then the material is loaded onto the ship to be loaded by the roller.
- the three-in-one loading and unloading ship machine of the ship unloader, the ship loader and the intermediate belt conveyor has a single and continuous continuous barge operation process, thereby improving the efficiency of the barge operation; most importantly, Both the ship loader and the intermediate belt conveyor are supported on the support frame of the ship unloader.
- the entire transfer operation system only includes one device, and the ship loader only retains the slewing mechanism.
- the pitching mechanism, the telescopic boom belt conveyor and the slide tube eliminate a lot of cumbersome metal structures such as support mechanism, running mechanism and tail car, which reduces the quality of the self-reducing system by about three-quarters.
- the compact structure of the structure is small and takes up less space, which greatly reduces the production cost of the shuttle system.
- the intermediate belt machine is disposed between the ship unloader and the ship loader, and the ship that does not occupy the barge is robbed compared to the prior art. Therefore, the ship's cabin can be used to store materials.
- the ship unloader can not only grab the material from the ship to be unloaded, but also grab the material from the barge.
- the above-mentioned ship loader can not only discharge the material to be loaded into the ship through the swinging, pitching and telescopic movement of the telescopic boom conveyor, but also can rush the unloading of the ship to the barge ship.
- the loading and unloading process lines for the shuttle operation are increased to the following three items:
- the ship to be unloaded ⁇ the unloader grab ⁇ the unloader funnel ⁇ the intermediate belt conveyor ⁇ the telescopic boom conveyor of the ship loader ⁇ the slide ⁇ the ship to be loaded;
- the barge cabin ⁇ the ship unloader grab ⁇ the ship unloader funnel ⁇ the intermediate belt conveyor ⁇ the telescopic boom conveyor of the ship loader ⁇ the slide ⁇ the ship to be loaded;
- the ship to be unloaded the ship unloading machine, the unloader, the funnel, the intermediate belt conveyor, the telescopic boom conveyor of the ship loading machine, the slide, the barge boat, and the barge ship;
- the above-mentioned three-in-one bridge loading and unloading ship machine can also enhance the capacity of the barge to store materials, increase the working space of the bulk cargo transfer operation, and greatly improve the efficiency of the barge operation, compared with the prior art. , enhances the flexibility and convenience of the transfer operation.
- FIG. 1 is a schematic structural view of a specific embodiment of a shuttle-type loading and unloading ship machine provided by the present invention
- Figure 2 is a left side view of Figure 1;
- Figure 3 is a partial enlarged view of the intersection of the intermediate belt conveyor and the telescopic boom belt conveyor of Figure 2;
- Figure 4 is a schematic structural view of the bridge loading and unloading ship machine of Figure 1 when it is not in operation;
- Figure 5 is Figure 1 A partial enlarged view of the contact of the support frame with the barge deck.
- the core of the invention is to provide a process for the bridge-type loading and unloading ship machine, which has a compact structure, a low cost, and a large tubular transfer operation, improves the efficiency of the barge operation, and enhances the barge storage. The ability of the material.
- FIG. 1 is a schematic structural view of a specific embodiment of a bridge loading and unloading ship according to the present invention
- FIG. 2 is a left side view of FIG.
- the bridge loading and unloading machine mainly comprises three parts: a ship unloader 1, a ship loader 2 and an intermediate belt conveyor 3, and the ship unloader 1 is responsible for unloading from the ship unloading 5
- the device comprises an interconnecting support frame 11 and a tilting arm frame 12, the support frame 11 is arranged on the deck of the barge 4, and the tilting arm frame 12 is arranged above the barge 4 and the ship to be unloaded 5 on one side thereof;
- 2 is a device responsible for loading the ship to be loaded 6, which is disposed below the side of the ship unloader 1, and its swingable and tiltable telescopic boom belt conveyor 21 is provided on the barge 4 and the other side of the ship to be loaded 6;
- the intermediate belt conveyor 3 is a device for transporting goods from the ship unloader 1 to the ship loader 2, and is disposed between the ship unloader 1 and the ship loader 2, one end of which is disposed in the funnel 13 of the ship unloader 1 Below the discharge port, the other
- the structure of the ship unloader 1, the ship loader 2 and the intermediate belt conveyor 3 is integrated.
- the tilting boom 12 of the ship unloader 1 is moved to the upper part of the ship to be unloaded 5
- the trolley 14 on the tilting boom 12 drives the grab 14 to walk along the tilting arm 12, and after reaching the funnel 13, the trolley 17 stops.
- the grab 14 is lowered to the designated position to unload the material, and the material is loaded into the funnel 13; the material in the funnel 13 is dropped by the vibrating feeder 18 onto the conveyor belt of the lower intermediate belt conveyor 3, and the intermediate belt conveyor 3 Near the funnel 13 end, it is transported to the telescopic boom conveyor 21 of the ship loader 2; the telescopic boom conveyor 21 is adjusted to the upper part of the cabin to be loaded 6 by the movements of rotation, pitching and telescopic, and then passed through the slide 24 The material is loaded onto the ship to be loaded 6.
- the entire barge operation process is single and continuous, which improves the efficiency of the barge operation;
- the ship loader 2 and the intermediate belt conveyor 3 are both supported on the support frame 11 of the ship unloader 1, and the entire transfer operation system includes only one device, compared with the three independent devices in the prior art.
- the ship machine 2 only retains the slewing mechanism, the pitching mechanism, the telescopic boom belt conveyor 21 and the slide cylinder 24, eliminating a lot of cumbersome metal structures such as the supporting mechanism, the traveling mechanism and the tail car, thereby reducing the quality of the ship itself.
- the structure of the transfer operation system is compact, occupying a small space and greatly reducing the space. The production cost of the transfer operating system.
- the intermediate belt conveyor 3 is disposed between the ship unloader 1 and the ship loader 2, which is not compared with the prior art.
- the ship that occupies the barge 4 is robbed. Therefore, the ship's cabin of the barge 4 can be used for storing materials.
- the ship unloader 1 can not only be grasped from the ship to be unloaded 5 by the pitching motion of the tilting arm frame 12.
- the material can also be grabbed from the barge 4; the ship loader 2 can be unloaded from the ship to be loaded 6 by the swinging, pitching and telescopic movement of the telescopic boom conveyor 21, and can also be used for the other of the barge 4 Cabin unloading, in summary, after the above-mentioned bridge loading and unloading ship machine, the loading and unloading process lines of the barge operation are increased to the following three items:
- the ship to be unloaded ⁇ the unloader grab ⁇ the unloader funnel ⁇ the intermediate belt conveyor ⁇ the telescopic boom conveyor of the ship loader ⁇ the slide ⁇ the ship to be loaded;
- the barge cabin ⁇ the ship unloader grab ⁇ the ship unloader funnel ⁇ the intermediate belt conveyor ⁇ the telescopic boom conveyor of the ship loader ⁇ the slide ⁇ the ship to be loaded;
- the ship to be unloaded the ship unloading machine, the unloader, the funnel, the intermediate belt conveyor, the telescopic boom conveyor of the ship loading machine, the slide, the barge boat, and the barge ship;
- the above-mentioned three-in-one bridge loading and unloading ship machine can also enhance the storage material capacity of the barge 4, increase the working space of the bulk cargo transfer operation, and greatly improve the efficiency of the barge operation, compared with the prior art. It says that the flexibility and convenience of the transfer operation is enhanced. Since the loading and unloading process of the second and third loading and unloading process lines is similar to that of the first loading and unloading process line, it will not be repeated here.
- intermediate belt conveyor 3 and the ship loader are not limited in the above specific embodiments.
- the specific connection form of the telescopic boom conveyor 21 of 2 does not limit the specific connection form of the ship loader 2 and the support frame 11.
- the ship unloader 1, the ship loader 2 and the intermediate belt conveyor 3 are integrated.
- the loading and unloading ship machine which is integrated and supported on the deck of the barge 4 is within the protection scope of the present invention.
- Figure 3 is a partial enlarged view of the intersection of the intermediate belt conveyor and the telescopic boom conveyor in Figure 2.
- the intermediate belt conveyor 3 is provided with a bucket 31 for discharging the material away from the end of the funnel 13, and the intermediate belt conveyor 3 passes through the bucket 31 and the telescopic boom. Belt conveyor connection.
- the intermediate belt conveyor 3 conveys the material to the hopper 31, discharges the material into the hopper 31, and the material traverses the hopper 31 to the conveying groove of the telescopic boom belt conveyor 21 of the ship loader 2. Therefore, the docking of the intermediate belt conveyor 3 and the telescopic boom belt conveyor 21 is realized.
- the above-mentioned intermediate belt conveyor 3 and the telescopic boom belt conveyor 21 of the ship loader 2 are not limited to the use of the bucket 31, and other methods, such as a drum, can also be used as the joint butt joint intermediate belt machine 3 and shipping.
- the end of the intermediate belt conveyor 3 adjacent the funnel 13 may be lower than the end away from the funnel 13.
- the funnel 13 of the ship unloader 1 can be disposed downwardly compared to the layout form in which both ends are flush or near the funnel end is higher than the far funnel end, so that the main structure of the entire ship unloader 1 is set downward. , can reduce the center of gravity of the loading and unloading ship, and enhance the stability of the whole machine.
- the above intermediate belt conveyor 3 can also adopt other layout forms.
- the intermediate belt conveyor 3 can be fixedly coupled to the support frame 11 by welding.
- the intermediate belt conveyor 3 can also be detachably connected to the support frame 11 by a plurality of bolting connections or the like, and the connection manner of the intermediate belt conveyor 3 supported on the support frame 11 is within the protection scope of the present invention.
- a support plate 23 is provided under the turntable 22 of the ship loader 2, and the turntable 22 is fixedly coupled to the support frame 11 via the support plate 23.
- the support plate 23 can be welded to the support frame 11 such that the turntable 22 of the ship loader 2 is supported on the support plate 23 to enhance its stability, thereby realizing the rotation, pitch, and the like of the telescopic boom conveyor 21.
- the above-mentioned ship loader 2 can also be supported on the support frame 11 by other connection means.
- FIG. 4 is a schematic structural view of the bridge loading and unloading ship of FIG. 1 when it is in a non-working state.
- the top end of the ship unloader 1 is provided with a positioning member 16, and when the tilting arm frame 12 is rotated upward, the positioning member 16 is connected to the tilting arm frame 12.
- the positioning component 16 can be a safety hook
- the tilting arm frame 12 is provided with a hanging shaft. When the tilting arm frame 12 is rotated upward, the safety hook hooks the hanging shaft.
- the telescopic boom conveyor 21 of the ship loader 2 is operated to be contracted to the minimum length and then stopped at the position within the ship's side of the barge 4, and placed in a horizontal position to be anchored;
- the tilting boom 12 of the ship unloader 1 is rotated upwards and lifted by a safety hook.
- the entire loading and unloading ship is within the range of the ship's side of the barge 4 when it is not in operation, and it takes up less space and does not interfere with the ships on both sides of the barge 4, ensuring smooth sailing of the ships on both sides of the barge 4.
- the positioning component 16 is not limited to the structural form of the safety hook hooking the hanging shaft, and may be other structural forms, for example, a socket and a hanging shaft connection, or a safety hook and a lifting ring may be connected.
- Figure 5 is a partial enlarged view of the contact frame of the support frame and the ship's deck in Figure 1.
- the deck may be provided with a track 41.
- the bottom end of the support frame 11 is provided with a running wheel 15, and the traveling wheel 15 is slidably coupled to the track 41.
- the loading and unloading ship machine can walk along the track 41 of the deck to adjust the position according to actual needs, further expanding the working range of the barge operation, and increasing the work adaptability and work reliability of the loading and unloading ship machine.
- the above-mentioned loading and unloading ship and barge 4 deck are not limited to the above-mentioned supporting mode, and other structural forms may be employed.
- orientation word "front” in the above specific embodiment refers to the direction perpendicular to the paper surface in FIG. 1 and the paper surface is emitted, and the “rear” refers to the paper perpendicular to the paper surface in FIG. In the direction of the paper, it should be understood that the appearance of these orientation words is established on the basis of the drawings of the specification, and their appearance should not affect the scope of protection of the present invention.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
Description
一种过驳作业桥式装卸船机 本申请要求于 2011 年 6 月 23 日提交中国专利局、 申请号为 201110171492.7、发明名称为"一种过驳作业桥式装卸船机 "的中国专利申请 的优先权, 其全部内容通过引用结合在本申请中。 技术领域 The present invention claims to be submitted to the Chinese Patent Office on June 23, 2011, the application number is 201110171492.7, and the invention name is "a type of transfer operation bridge loading and unloading ship machine" Chinese patent application Priority is hereby incorporated by reference in its entirety. Technical field
本发明涉及港口机械技术领域,尤其涉及一种过驳作业桥式装卸船机。 The invention relates to the technical field of port machinery, in particular to a bridge type loading and unloading ship machine.
背景技术 Background technique
随着散货运输业的发展, 超大型散货船舶逐渐增多, 很多港口对于这 样的船舶是无法靠泊装卸的,为此就要解决这些船舶的装货和卸货的问题。 利用趸船过驳作业是解决这类问题的最佳手段之一, 如何设计制造高效的 过驳作业设备更是散货设备制造商急于解决的难题之一。 With the development of the bulk cargo transportation industry, the number of super large bulk cargo ships has gradually increased. Many ports cannot handle the loading and unloading of such ships. To solve the problem of loading and unloading of these ships. The use of barge shuttles is one of the best ways to solve such problems. How to design and manufacture efficient transfer equipment is one of the problems that bulk equipment manufacturers are eager to solve.
现有技术中, 通常采用卸船机(或吊车)、 装船机和皮带输送机共同 作业完成驳船的卸货和装货。 卸船机(或吊车)设于趸船的一侧, 靠近待 卸船, 装船机设于趸船的另一侧, 靠近待装船, 皮带输送机设于趸船的船 抢, 其一端靠近卸船机(或吊车) 的漏斗处, 其另一端靠近装船机的伸缩 臂架皮带机。 In the prior art, unloading and loading of barges are usually performed by a ship unloader (or crane), a ship loader and a belt conveyor. The ship unloader (or crane) is located on one side of the barge, close to the ship to be unloaded, the ship loader is located on the other side of the barge, close to the ship to be loaded, the belt conveyor is located on the barge of the ship, and one end is close to the ship unloading At the funnel of the machine (or crane), the other end is close to the telescopic boom conveyor of the ship loader.
在工作过程中, 卸船机的臂架俯仰运动至待卸船的船舱, 抓斗从船抢 内抓取物料, 然后通过小车沿臂架行走,再通过卸船机的漏斗将物料卸下; 皮带输送机将卸下的物料输送至装船机的伸缩臂架皮带机处; 装船机的伸 缩臂通过回转运动和俯仰运动至待装船的船抢, 伸缩皮带机再将物料输送 至其自由端的溜筒, 物料从溜筒内滑落到待装船的船舱, 整个过驳作业完 成。 During the working process, the boom of the ship unloader moves to the cabin of the ship to be unloaded, the grab grabs the material from the ship, then walks along the boom through the trolley, and then removes the material through the funnel of the ship unloader; The belt conveyor transports the unloaded material to the telescopic boom conveyor of the ship loader; the telescopic arm of the ship loader is slid by the rotary motion and the pitching motion to the ship to be loaded, and the telescopic belt conveyor transports the material to it. The free end of the slide, the material slides from the inside of the slide to the cabin to be loaded, and the entire transfer operation is completed.
上述过驳作业系统包括卸船机(或吊车)、 装船机和皮带输送机三个 设备, 其结构复杂, 过驳作业过程繁瑣, 效率较低, 且过驳作业系统造价 较高; 此外, 由于皮带输送机设在趸船的船舱下, 占用船舶空间较大, 导 致趸船只能承载过驳作业设备, 无法或只能少量储存物料, 制约了散货过 驳作业的发展空间。 有鉴于此, 亟待针对上述技术问题, 改进现有过驳作业系统的结构形 式, 使其结构筒单、 造价较低, 筒化过驳作业的过程, 提高过驳作业效率, 且增强趸船储存物料的能力。 发明内容 The above-mentioned transfer operation system includes three devices: a ship unloader (or a crane), a ship loader and a belt conveyor. The structure of the ship transfer machine is complicated, the work of the barge operation is cumbersome, the efficiency is low, and the cost of the transfer operation system is high; Since the belt conveyor is located under the cabin of the barge, the space occupied by the ship is large, and the barge can only carry the barge operation equipment, and the material cannot be stored in a small amount, which restricts the development space of the bulk cargo transfer operation. In view of this, it is urgent to solve the above technical problems, improve the structural form of the existing transfer operation system, make the structure of the single-barrel, the cost is low, the process of the tubular transfer operation, improve the efficiency of the barge operation, and enhance the storage materials of the barge. Ability. Summary of the invention
本发明要解决的技术问题为提供一种过驳作业桥式装卸船机, 其结构 筒单、 造价较低, 能筒化过驳作业的过程, 提高过驳作业效率, 并大大增 强趸船储存物料的能力。 The technical problem to be solved by the invention is to provide a bridge-type loading and unloading ship machine, which has the advantages of simple structure, low cost, capable of tubular handling, improved efficiency of the barge operation, and greatly enhanced storage materials of the barge. Ability.
为解决上述技术问题, 本发明提供一种过驳作业桥式装卸船机, 包括 卸船机, 所述卸船机包括相互连接的支撑架和俯仰臂架, 所述支撑架设于 趸船的甲板上, 所述俯仰臂架设于所述趸船和其一侧的待卸船上方; 还包 括: In order to solve the above technical problems, the present invention provides a docking crane loading and unloading machine, including a ship unloader, the ship unloader including an interconnecting support frame and a tilting arm frame, the support frame being disposed on the deck of the barge The tilting arm is erected on the barge and one side of the ship to be unloaded; and further includes:
装船机, 设于所述卸船机的侧下方, 其可回转且可俯仰的伸缩臂架皮 带机设于所述趸船和其另一侧的待装船上方; a ship loader, disposed at a side of the ship unloader, and a swingable and tiltable telescopic boom belt machine is disposed above the barge and the other side of the ship to be loaded;
中间皮带机, 设于所述卸船机和所述装船机之间, 其一端设于所述装 船机的漏斗出料口下方,其另一端连接所述装船机的所述伸缩臂架皮带机; 且 An intermediate belt conveyor is disposed between the ship unloader and the ship loader, one end of which is disposed below a funnel discharge opening of the ship loader, and the other end of which is connected to the telescopic arm of the ship loader Belt conveyor;
所述装船机和所述中间皮带机均与所述支撑架连接。 Both the ship loader and the intermediate belt conveyor are coupled to the support frame.
优选地, 所述中间皮带机远离所述漏斗的端部设有用于卸料的溜斗, 所述中间皮带机通过所述溜斗与所述伸缩臂架皮带机连接。 Preferably, the intermediate belt conveyor is provided with a bucket for discharging from the end of the funnel, and the intermediate belt conveyor is connected to the telescopic boom belt conveyor through the bucket.
优选地, 所述中间皮带机与所述支撑架焊接。 Preferably, the intermediate belt conveyor is welded to the support frame.
优选地, 所述中间皮带机的靠近所述漏斗的端部低于远离所述漏斗的 端部。 Preferably, the end of the intermediate belt conveyor adjacent the funnel is lower than the end remote from the funnel.
优选地, 所述装船机的回转台下设有支撑板, 所述回转台通过所述支 撑板与所述支撑架固定连接。 Preferably, a support plate is arranged under the rotary table of the ship loader, and the rotary table is fixedly connected to the support frame through the support plate.
优选地, 所述甲板上设有轨道, 所述支撑架的底端设有行走轮, 所述 行走轮与所述轨道可滚动连接。 Preferably, the deck is provided with a track, and the bottom end of the support frame is provided with a walking wheel, and the walking wheel is slidably connected with the track.
优选地,所述卸船机的顶端设有定位部件,所述俯仰臂架向上旋转时, 所述定位部件连接所述俯仰臂架。 优选地, 所述定位部件为安全钩, 所述俯仰臂架上设有挂轴, 所述俯 仰臂架向上旋转时, 所述安全钩钩住所述挂轴。 Preferably, the top end of the ship unloader is provided with a positioning component, and the positioning component is connected to the tilting boom when the tilting arm is rotated upward. Preferably, the positioning component is a safety hook, and the tilting arm is provided with a hanging shaft, and the safety hook hooks the hanging shaft when the tilting arm is rotated upward.
本发明提供一种过驳作业桥式装卸船机, 包括卸船机, 还包括设于卸 船机的侧下方的装船机, 其伸缩臂架皮带机设于趸船和其另一侧的待装船 上方; 还包括设于卸船机和装船机之间的中间皮带机, 其一端设于装船机 的漏斗出料口下方, 其另一端连接装船机的伸缩臂架皮带机; 装船机和中 间皮带机均与支撑架连接。 The invention provides a barge loading and unloading ship machine, including a ship unloader, and a ship loader disposed under the side of the ship unloader, the telescopic boom belt conveyor being arranged on the barge and the other side thereof Above the loading; further comprising an intermediate belt conveyor between the ship unloader and the ship loader, one end of which is disposed below the funnel discharge opening of the ship loader, and the other end of which is connected to the telescopic boom conveyor of the ship loader; Both the ship machine and the intermediate belt conveyor are connected to the support frame.
采用卸船机、 装船机和中间皮带机三者集成的结构, 上述桥式装卸船 机在过驳作业时, 首先卸船机的俯仰臂架运动至待卸船上方, 抓斗从待卸 船的船抢抓取物料提升到一定高度后, 由俯仰臂架上的小车带动抓斗沿俯 仰臂架行走, 到达漏斗上方后, 小车停止, 抓斗下降到指定位置卸下物料, 物料就装入漏斗中; 漏斗内的物料通过振动给料器下落至下方中间皮带机 的输送带上, 中间皮带机把物料由靠近漏斗端输送至装船机的伸缩臂架皮 带机上; 伸缩皮带机通过回转、 俯仰和伸缩等运动, 调整至待装船的船舱 上方, 再通过溜筒把物料装到待装船上。 The utility model adopts an integrated structure of a ship unloader, a ship loader and an intermediate belt conveyor. When the bridge type loading and unloading ship machine is in the barge operation, first, the tilting boom of the ship unloader moves to the top of the ship to be unloaded, and the grab is discharged from the ship. After the ship's ship grabs the material and raises it to a certain height, the trolley on the tilting arm frame drives the grab to walk along the tilting arm. After reaching the top of the funnel, the car stops, the grab falls to the designated position to unload the material, and the material is loaded. Into the funnel; the material in the funnel is dropped by the vibrating feeder onto the conveyor belt of the lower intermediate belt conveyor, and the intermediate belt conveyor conveys the material from the funnel end to the telescopic boom conveyor of the ship loader; the telescopic belt conveyor passes the rotation The movements such as pitching and telescoping are adjusted to the top of the cabin to be loaded, and then the material is loaded onto the ship to be loaded by the roller.
由上述工作过程可以看出, 采用卸船机、 装船机和中间皮带机三合一 的装卸船机, 整个过驳作业过程筒单而连续, 提高了过驳作业效率; 最重 要的是, 装船机和中间皮带机均支撑于卸船机的支撑架上, 相比现有技术 中三个独立的设备来说, 整个过驳作业系统仅包括一个设备, 装船机仅保 留回转机构、 俯仰机构、 伸缩臂架皮带机和溜筒四部分, 省去了大量的支 撑机构、 行走机构和尾车等繁瑣的金属结构, 使其自身质量减少了四分之 三左右, 使过驳作业系统结构筒单紧凑, 占用空间较小, 大大降低了过驳 作业系统的生产成本。 It can be seen from the above work process that the three-in-one loading and unloading ship machine of the ship unloader, the ship loader and the intermediate belt conveyor has a single and continuous continuous barge operation process, thereby improving the efficiency of the barge operation; most importantly, Both the ship loader and the intermediate belt conveyor are supported on the support frame of the ship unloader. Compared with the three independent devices in the prior art, the entire transfer operation system only includes one device, and the ship loader only retains the slewing mechanism. The pitching mechanism, the telescopic boom belt conveyor and the slide tube eliminate a lot of cumbersome metal structures such as support mechanism, running mechanism and tail car, which reduces the quality of the self-reducing system by about three-quarters. The compact structure of the structure is small and takes up less space, which greatly reduces the production cost of the shuttle system.
除此之外, 由于上述桥式装卸船机的支撑架设于趸船的甲板上, 中间 皮带机设于卸船机和装船机之间,相比现有技术来说, 不占用趸船的船抢, 因此, 趸船的船舱可以全部用来储存物料, 在过驳作业时, 上述卸船机通 过俯仰臂架的俯仰运动, 不仅可以从待卸船中抓取物料, 还可以从趸船中 抓取物料; 上述装船机通过伸缩臂架皮带机的回转、 俯仰和伸缩运动, 不 仅可以向待装船中卸料, 还可以向趸船船抢卸料, 总结而言, 采用上述桥 式装卸船机后, 过驳作业的装卸工艺线路增加为下述三条: In addition, since the support of the above-mentioned bridge loading and unloading ship is erected on the deck of the barge, the intermediate belt machine is disposed between the ship unloader and the ship loader, and the ship that does not occupy the barge is robbed compared to the prior art. Therefore, the ship's cabin can be used to store materials. During the shuttle operation, the ship unloader can not only grab the material from the ship to be unloaded, but also grab the material from the barge. The above-mentioned ship loader can not only discharge the material to be loaded into the ship through the swinging, pitching and telescopic movement of the telescopic boom conveyor, but also can rush the unloading of the ship to the barge ship. After loading and unloading the ship, the loading and unloading process lines for the shuttle operation are increased to the following three items:
第一, 待卸船船抢→卸船机抓斗→卸船机漏斗→中间皮带机→装船机 的伸缩臂架皮带机→溜筒→待装船船舱; First, the ship to be unloaded → the unloader grab → the unloader funnel → the intermediate belt conveyor → the telescopic boom conveyor of the ship loader → the slide → the ship to be loaded;
第二, 趸船船舱→卸船机抓斗→卸船机漏斗→中间皮带机→装船机的 伸缩臂架皮带机→溜筒→待装船船舱; Second, the barge cabin → the ship unloader grab → the ship unloader funnel → the intermediate belt conveyor → the telescopic boom conveyor of the ship loader → the slide → the ship to be loaded;
第三, 待卸船船抢→卸船机抓斗→卸船机漏斗→中间皮带机→装船机 的伸缩臂架皮带机→溜筒→趸船船抢; Third, the ship to be unloaded, the ship unloading machine, the unloader, the funnel, the intermediate belt conveyor, the telescopic boom conveyor of the ship loading machine, the slide, the barge boat, and the barge ship;
由此可见, 采用上述三合一的桥式装卸船机还能够增强趸船的储存物 料的能力, 增大散货过驳作业的作业空间, 大大提高过驳作业效率, 相比 现有技术来说, 增强了过驳作业的灵活性和便捷性。 It can be seen that the above-mentioned three-in-one bridge loading and unloading ship machine can also enhance the capacity of the barge to store materials, increase the working space of the bulk cargo transfer operation, and greatly improve the efficiency of the barge operation, compared with the prior art. , enhances the flexibility and convenience of the transfer operation.
附图说明 DRAWINGS
图 1为本发明所提供过驳作业桥式装卸船机的一种具体实施方式的结 构示意图; 1 is a schematic structural view of a specific embodiment of a shuttle-type loading and unloading ship machine provided by the present invention;
图 2为图 1的左视图; Figure 2 is a left side view of Figure 1;
图 3为图 2中的中间皮带机和伸缩臂架皮带机交接处的局部放大图; 图 4为图 1 中的桥式装卸船机处于非工作状态时的结构示意图; 图 5 为图 1中的支撑架与趸船甲板接触处的局部放大图。 Figure 3 is a partial enlarged view of the intersection of the intermediate belt conveyor and the telescopic boom belt conveyor of Figure 2; Figure 4 is a schematic structural view of the bridge loading and unloading ship machine of Figure 1 when it is not in operation; Figure 5 is Figure 1 A partial enlarged view of the contact of the support frame with the barge deck.
其中, 图 1至图 5中的附图标记与部件名称之间的对应关系为: 1卸船机; 2装船机; 3中间皮带机; 4趸船; 5待卸船; 6待装船; Wherein, the correspondence between the reference numerals in FIG. 1 to FIG. 5 and the component names is: 1 ship unloader; 2 ship loader; 3 intermediate belt conveyor; 4 barge; 5 ship to be unloaded;
11支撑架; 12俯仰臂架; 13漏斗; 14抓斗; 15行走轮; 16定位部件; 17 小车; 18振动给料器; 21伸缩臂架皮带机; 22回转台; 23支撑板; 24溜 筒; 31溜斗; 41轨道。 11 support frame; 12 pitch arm frame; 13 funnel; 14 grab; 15 walking wheel; 16 positioning parts; 17 trolley; 18 vibrating feeder; 21 telescopic boom conveyor; 22 rotary table; 23 support plate; Tube; 31 hopper; 41 track.
具体实施方式 detailed description
本发明的核心为提供一种用于过驳作业桥式装卸船机, 其结构紧凑筒 单、 造价较低, 大大筒化过驳作业的过程, 提高过驳作业的效率, 并增强 了趸船储存物料的能力。 The core of the invention is to provide a process for the bridge-type loading and unloading ship machine, which has a compact structure, a low cost, and a large tubular transfer operation, improves the efficiency of the barge operation, and enhances the barge storage. The ability of the material.
为了使本领域的技术人员更好地理解本发明的技术方案, 下面结合附 图和具体实施例对本发明作进一步的详细说明。 In order to enable those skilled in the art to better understand the technical solution of the present invention, the following is attached The invention and further embodiments are described in further detail.
请参考图 1和图 2, 图 1为本发明所提供桥式装卸船机的一种具体实 施方式的结构示意图; 图 2为图 1的左视图。 1 and FIG. 2, FIG. 1 is a schematic structural view of a specific embodiment of a bridge loading and unloading ship according to the present invention; FIG. 2 is a left side view of FIG.
在一种具体实施方式中, 本发明所提供的桥式装卸船机主要包括卸船 机 1、 装船机 2和中间皮带机 3三部分, 卸船机 1是负责从待卸船 5上卸 货的装置, 其包括相互连接的支撑架 11和俯仰臂架 12, 支撑架 11设于趸 船 4的甲板上,俯仰臂架 12设于趸船 4和其一侧的待卸船 5上方; 装船机 2是负责向待装船 6装货的装置, 其设于卸船机 1的侧下方, 其可回转且 可俯仰的伸缩臂架皮带机 21设于趸船 4和其另一侧的待装船 6上方;中间 皮带机 3是负责将货物从卸船机 1运输至装船机 2的装置, 其设于卸船机 1和装船机 2之间, 其一端设于卸船机 1的漏斗 13出料口下方, 其另一端 连接装船机 2的伸缩臂架皮带机; 且上述装船机 2和中间皮带机 3均支撑 于卸船机 1的支撑架 11上。 In a specific embodiment, the bridge loading and unloading machine provided by the present invention mainly comprises three parts: a ship unloader 1, a ship loader 2 and an intermediate belt conveyor 3, and the ship unloader 1 is responsible for unloading from the ship unloading 5 The device comprises an interconnecting support frame 11 and a tilting arm frame 12, the support frame 11 is arranged on the deck of the barge 4, and the tilting arm frame 12 is arranged above the barge 4 and the ship to be unloaded 5 on one side thereof; 2 is a device responsible for loading the ship to be loaded 6, which is disposed below the side of the ship unloader 1, and its swingable and tiltable telescopic boom belt conveyor 21 is provided on the barge 4 and the other side of the ship to be loaded 6; the intermediate belt conveyor 3 is a device for transporting goods from the ship unloader 1 to the ship loader 2, and is disposed between the ship unloader 1 and the ship loader 2, one end of which is disposed in the funnel 13 of the ship unloader 1 Below the discharge port, the other end is connected to the telescopic boom conveyor of the ship loader 2; and the ship loader 2 and the intermediate belt conveyor 3 are supported on the support frame 11 of the ship unloader 1.
采用卸船机 1、 装船机 2和中间皮带机 3三者集成的结构, 上述桥式 装卸船机在过驳作业时,首先卸船机 1的俯仰臂架 12运动至待卸船 5上方, 抓斗 14从待卸船 5的船抢抓取物料提升到一定高度后, 由俯仰臂架 12上 的小车 17带动抓斗 14沿俯仰臂架 12行走, 到达漏斗 13上方后, 小车 17 停止, 抓斗 14下降到指定位置卸下物料, 物料就装入漏斗 13中; 漏斗 13 内的物料通过振动给料器 18下落至下方中间皮带机 3的输送带上,中间皮 带机 3把物料由靠近漏斗 13端输送至装船机 2的伸缩臂架皮带机 21上; 伸缩臂架皮带机 21通过回转、俯仰和伸缩等运动,调整至待装船 6的船舱 上方, 再通过溜筒 24把物料装到待装船 6上。 The structure of the ship unloader 1, the ship loader 2 and the intermediate belt conveyor 3 is integrated. When the bridge loading and unloading machine is in the shuttle operation, first, the tilting boom 12 of the ship unloader 1 is moved to the upper part of the ship to be unloaded 5 After the grab 14 lifts the material from the ship to be unloaded 5 to a certain height, the trolley 14 on the tilting boom 12 drives the grab 14 to walk along the tilting arm 12, and after reaching the funnel 13, the trolley 17 stops. The grab 14 is lowered to the designated position to unload the material, and the material is loaded into the funnel 13; the material in the funnel 13 is dropped by the vibrating feeder 18 onto the conveyor belt of the lower intermediate belt conveyor 3, and the intermediate belt conveyor 3 Near the funnel 13 end, it is transported to the telescopic boom conveyor 21 of the ship loader 2; the telescopic boom conveyor 21 is adjusted to the upper part of the cabin to be loaded 6 by the movements of rotation, pitching and telescopic, and then passed through the slide 24 The material is loaded onto the ship to be loaded 6.
由上述工作过程可以看出, 采用卸船机 1、 装船机 2和中间皮带机 3 三合一的装卸船机,整个过驳作业过程筒单而连续,提高了过驳作业效率; 最重要的是, 装船机 2和中间皮带机 3均支撑于卸船机 1的支撑架 11上, 相比现有技术中三个独立的设备来说,整个过驳作业系统仅包括一个设备, 装船机 2仅保留回转机构、 俯仰机构、 伸缩臂架皮带机 21和溜筒 24四部 分, 省去了大量的支撑机构、 行走机构和尾车等繁瑣的金属结构, 使其自 身质量减轻, 使过驳作业系统结构筒单紧凑, 占用空间较小, 大大降低了 过驳作业系统的生产成本。 It can be seen from the above work process that the three-in-one loading and unloading ship machine of the ship unloader 1, the ship loader 2 and the intermediate belt conveyor 3, the entire barge operation process is single and continuous, which improves the efficiency of the barge operation; The ship loader 2 and the intermediate belt conveyor 3 are both supported on the support frame 11 of the ship unloader 1, and the entire transfer operation system includes only one device, compared with the three independent devices in the prior art. The ship machine 2 only retains the slewing mechanism, the pitching mechanism, the telescopic boom belt conveyor 21 and the slide cylinder 24, eliminating a lot of cumbersome metal structures such as the supporting mechanism, the traveling mechanism and the tail car, thereby reducing the quality of the ship itself. The structure of the transfer operation system is compact, occupying a small space and greatly reducing the space. The production cost of the transfer operating system.
除此之外, 由于上述桥式装卸船机的支撑架 11设于趸船 4的甲板上, 中间皮带机 3设于卸船机 1和装船机 2之间, 相比现有技术来说, 不占用 趸船 4的船抢, 因此, 趸船 4的船舱可以全部用来储存物料, 在过驳作业 时,上述卸船机 1通过俯仰臂架 12的俯仰运动, 不仅可以从待卸船 5中抓 取物料, 还可以从趸船 4中抓取物料; 上述装船机 2通过伸缩臂架皮带机 21的回转、 俯仰和伸缩运动, 不仅可以向待装船 6中卸料, 还可以向趸船 4 的其他船舱卸料, 总结而言, 采用上述桥式装卸船机后, 过驳作业的装 卸工艺线路增加为下述三条: In addition, since the support frame 11 of the bridge loading and unloading ship is provided on the deck of the barge 4, the intermediate belt conveyor 3 is disposed between the ship unloader 1 and the ship loader 2, which is not compared with the prior art. The ship that occupies the barge 4 is robbed. Therefore, the ship's cabin of the barge 4 can be used for storing materials. When the barge operation is carried out, the ship unloader 1 can not only be grasped from the ship to be unloaded 5 by the pitching motion of the tilting arm frame 12. The material can also be grabbed from the barge 4; the ship loader 2 can be unloaded from the ship to be loaded 6 by the swinging, pitching and telescopic movement of the telescopic boom conveyor 21, and can also be used for the other of the barge 4 Cabin unloading, in summary, after the above-mentioned bridge loading and unloading ship machine, the loading and unloading process lines of the barge operation are increased to the following three items:
第一, 待卸船船抢→卸船机抓斗→卸船机漏斗→中间皮带机→装船机 的伸缩臂架皮带机→溜筒→待装船船舱; First, the ship to be unloaded → the unloader grab → the unloader funnel → the intermediate belt conveyor → the telescopic boom conveyor of the ship loader → the slide → the ship to be loaded;
第二, 趸船船舱→卸船机抓斗→卸船机漏斗→中间皮带机→装船机的 伸缩臂架皮带机→溜筒→待装船船舱; Second, the barge cabin → the ship unloader grab → the ship unloader funnel → the intermediate belt conveyor → the telescopic boom conveyor of the ship loader → the slide → the ship to be loaded;
第三, 待卸船船抢→卸船机抓斗→卸船机漏斗→中间皮带机→装船机 的伸缩臂架皮带机→溜筒→趸船船抢; Third, the ship to be unloaded, the ship unloading machine, the unloader, the funnel, the intermediate belt conveyor, the telescopic boom conveyor of the ship loading machine, the slide, the barge boat, and the barge ship;
由此可见, 采用上述三合一的桥式装卸船机还能够增强趸船 4的储存 物料的能力, 增大散货过驳作业的作业空间, 大大提高过驳作业效率, 相 比现有技术来说, 增强了过驳作业的灵活性和便捷性。 鉴于第二、 第三装 卸工艺线路的装卸过程与第一装卸工艺线路的过程相似, 这里不再赘述。 It can be seen that the above-mentioned three-in-one bridge loading and unloading ship machine can also enhance the storage material capacity of the barge 4, increase the working space of the bulk cargo transfer operation, and greatly improve the efficiency of the barge operation, compared with the prior art. It says that the flexibility and convenience of the transfer operation is enhanced. Since the loading and unloading process of the second and third loading and unloading process lines is similar to that of the first loading and unloading process line, it will not be repeated here.
需要说明的是, 上述具体实施方式中并未限定中间皮带机 3与装船机 It should be noted that the intermediate belt conveyor 3 and the ship loader are not limited in the above specific embodiments.
2的伸缩臂架皮带机 21的具体连接形式,也并未限定装船机 2与支撑架 11 的具体连接形式, 事实上, 凡是将卸船机 1、 装船机 2和中间皮带机 3集 成于一体, 且支撑于趸船 4甲板上的装卸船机, 均属于本发明的保护范围 内。 The specific connection form of the telescopic boom conveyor 21 of 2 does not limit the specific connection form of the ship loader 2 and the support frame 11. In fact, the ship unloader 1, the ship loader 2 and the intermediate belt conveyor 3 are integrated. The loading and unloading ship machine which is integrated and supported on the deck of the barge 4 is within the protection scope of the present invention.
还可以进一步设置上述过驳作业桥式装卸船机各个装置之间的具体连 接形式。 请参考图 3 , 图 3为图 2中的中间皮带机和伸缩臂架皮带机交接 处的局部放大图。 It is also possible to further provide a specific connection form between the respective devices of the above-mentioned transfer bridge loader. Please refer to Figure 3, Figure 3 is a partial enlarged view of the intersection of the intermediate belt conveyor and the telescopic boom conveyor in Figure 2.
在另一种具体实施方式中, 如图 3所示, 上述中间皮带机 3远离漏斗 13的端部设有用于卸料的溜斗 31 , 中间皮带机 3通过溜斗 31与伸缩臂架 皮带机连接。 采用这种结构, 上述中间皮带机 3将物料运送至溜斗 31处, 将物料卸入溜斗 31中, 物料顺着溜斗 31溜到装船机 2的伸缩臂架皮带机 21的输送槽内, 从而实现了中间皮带机 3与伸缩臂架皮带机 21的对接。 当然,上述中间皮带机 3与装船机 2的伸缩臂架皮带机 21的对接并不仅限 于采用溜斗 31 , 还可以采用其他方式, 例如转筒, 同样能够作为接头对接 中间皮带机 3和装船机 2的伸缩臂架皮带机 21。 In another embodiment, as shown in FIG. 3, the intermediate belt conveyor 3 is provided with a bucket 31 for discharging the material away from the end of the funnel 13, and the intermediate belt conveyor 3 passes through the bucket 31 and the telescopic boom. Belt conveyor connection. With this configuration, the intermediate belt conveyor 3 conveys the material to the hopper 31, discharges the material into the hopper 31, and the material traverses the hopper 31 to the conveying groove of the telescopic boom belt conveyor 21 of the ship loader 2. Therefore, the docking of the intermediate belt conveyor 3 and the telescopic boom belt conveyor 21 is realized. Of course, the above-mentioned intermediate belt conveyor 3 and the telescopic boom belt conveyor 21 of the ship loader 2 are not limited to the use of the bucket 31, and other methods, such as a drum, can also be used as the joint butt joint intermediate belt machine 3 and shipping. The telescopic boom conveyor 21 of the machine 2.
在另一种具体实施方式中,上述中间皮带机 3靠近漏斗 13的端部可以 低于远离漏斗 13的端部。采用这种布局,相比两端部齐平或者近漏斗端高 于远漏斗端的布局形式,可以使卸船机 1的漏斗 13向下设置,从而使整个 卸船机 1的主体结构向下设置, 能够降低装卸船机的重心, 增强整机的稳 定性。 当然, 上述中间皮带机 3也可以采用其他的布局形式。 In another embodiment, the end of the intermediate belt conveyor 3 adjacent the funnel 13 may be lower than the end away from the funnel 13. With this arrangement, the funnel 13 of the ship unloader 1 can be disposed downwardly compared to the layout form in which both ends are flush or near the funnel end is higher than the far funnel end, so that the main structure of the entire ship unloader 1 is set downward. , can reduce the center of gravity of the loading and unloading ship, and enhance the stability of the whole machine. Of course, the above intermediate belt conveyor 3 can also adopt other layout forms.
进一步的方案中, 上述中间皮带机 3可以通过焊接的方式固定连接于 上述支撑架 11上。 当然,上述中间皮带机 3也可以通过多个螺栓连接等其 他连接方式与支撑架 11可拆卸地连接, 凡是中间皮带机 3支撑于支撑架 11上的连接方式均属于本发明的保护范围内。 In a further aspect, the intermediate belt conveyor 3 can be fixedly coupled to the support frame 11 by welding. Of course, the intermediate belt conveyor 3 can also be detachably connected to the support frame 11 by a plurality of bolting connections or the like, and the connection manner of the intermediate belt conveyor 3 supported on the support frame 11 is within the protection scope of the present invention.
如图 2所示, 上述装船机 2的回转台 22下设有支撑板 23 , 回转台 22 通过支撑板 23与支撑架 11 固定连接。 例如, 可以将支撑板 23与支撑架 11焊接, 这样, 上述装船机 2的回转台 22支撑于支撑板 23上, 增强其稳 定性, 从而实现伸缩臂架皮带机 21的回转、 俯仰等运动。 当然, 上述装船 机 2还可以通过其他连接方式支撑于支撑架 11上。 As shown in Fig. 2, a support plate 23 is provided under the turntable 22 of the ship loader 2, and the turntable 22 is fixedly coupled to the support frame 11 via the support plate 23. For example, the support plate 23 can be welded to the support frame 11 such that the turntable 22 of the ship loader 2 is supported on the support plate 23 to enhance its stability, thereby realizing the rotation, pitch, and the like of the telescopic boom conveyor 21. . Of course, the above-mentioned ship loader 2 can also be supported on the support frame 11 by other connection means.
还可以进一步设置上述装卸船机的非工作状态时的具体结构形式。 请 参考图 4, 图 4为图 1中的桥式装卸船机处于非工作状态时的结构示意图。 It is also possible to further provide a specific structural form when the above-described loading and unloading ship machine is in a non-operating state. Please refer to FIG. 4, which is a schematic structural view of the bridge loading and unloading ship of FIG. 1 when it is in a non-working state.
在另一种具体实施方式中, 如图 4所示, 上述卸船机 1的顶端设有定 位部件 16, 俯仰臂架 12向上旋转时, 定位部件 16连接俯仰臂架 12。 具体 地, 该定位部件 16可以为安全钩, 俯仰臂架 12上设有挂轴, 俯仰臂架 12 向上旋转时, 安全钩钩住挂轴。 In another embodiment, as shown in Fig. 4, the top end of the ship unloader 1 is provided with a positioning member 16, and when the tilting arm frame 12 is rotated upward, the positioning member 16 is connected to the tilting arm frame 12. Specifically, the positioning component 16 can be a safety hook, and the tilting arm frame 12 is provided with a hanging shaft. When the tilting arm frame 12 is rotated upward, the safety hook hooks the hanging shaft.
采用这种结构,在非工作状态时,操作装船机 2的伸缩臂架皮带机 21 , 使其收缩到最小长度后回转趸船 4船舷以内的位置停下, 并放置到水平位 置锚定;操作卸船机 1的俯仰臂架 12,使其向上旋转仰起后由安全钩挂牢。 这样, 整个装卸船机在非工作状态时位于趸船 4的船舷范围之内, 其占用 空间较小, 不会与趸船 4两侧的船只发生干涉, 保证趸船 4两侧的船只顺 利航行。 当然, 上述定位部件 16并不仅限于安全钩钩住挂轴的结构形式, 还可以为其他结构形式, 例如还可以采用圏套和挂轴连接, 或者安全钩与 吊环连接等其他的方式。 With this configuration, in the non-operating state, the telescopic boom conveyor 21 of the ship loader 2 is operated to be contracted to the minimum length and then stopped at the position within the ship's side of the barge 4, and placed in a horizontal position to be anchored; The tilting boom 12 of the ship unloader 1 is rotated upwards and lifted by a safety hook. In this way, the entire loading and unloading ship is within the range of the ship's side of the barge 4 when it is not in operation, and it takes up less space and does not interfere with the ships on both sides of the barge 4, ensuring smooth sailing of the ships on both sides of the barge 4. Of course, the positioning component 16 is not limited to the structural form of the safety hook hooking the hanging shaft, and may be other structural forms, for example, a socket and a hanging shaft connection, or a safety hook and a lifting ring may be connected.
还可以进一步设置上述装卸船机与趸船 4甲板的具体支撑方式。 请参 考图 5 , 图 5为图 1中的支撑架与趸船甲板接触处的局部放大图。 It is also possible to further set the specific support mode of the above-mentioned loading and unloading ship machine and the bunker 4 deck. Please refer to Figure 5, which is a partial enlarged view of the contact frame of the support frame and the ship's deck in Figure 1.
在另一种具体实施方式中, 上述甲板上可以设有轨道 41 , 支撑架 11 的底端设有行走轮 15 , 行走轮 15与轨道 41可滚动连接。 采用这种结构形 式,上述装卸船机可以沿甲板的轨道 41前后行走,使其根据实际需要调整 位置, 进一步扩大了过驳作业的作业范围, 增加了装卸船机的工作适应性 和工作可靠性。 当然, 上述装卸船机和趸船 4甲板并不仅限于上述支撑方 式, 还可以采用其他结构形式。 In another embodiment, the deck may be provided with a track 41. The bottom end of the support frame 11 is provided with a running wheel 15, and the traveling wheel 15 is slidably coupled to the track 41. With this type of structure, the loading and unloading ship machine can walk along the track 41 of the deck to adjust the position according to actual needs, further expanding the working range of the barge operation, and increasing the work adaptability and work reliability of the loading and unloading ship machine. . Of course, the above-mentioned loading and unloading ship and barge 4 deck are not limited to the above-mentioned supporting mode, and other structural forms may be employed.
需要说明的是, 上述具体实施方式中的方位词 "前" 指的是图 1中垂 直于纸面、 且射出纸面的方向, "后"指的是图 1中垂直于纸面、 且射入纸 面的方向,应当理解,这些方位词的出现是以说明书附图为基准而设立的, 它们的出现不应当影响本发明的保护范围。 It should be noted that the orientation word "front" in the above specific embodiment refers to the direction perpendicular to the paper surface in FIG. 1 and the paper surface is emitted, and the "rear" refers to the paper perpendicular to the paper surface in FIG. In the direction of the paper, it should be understood that the appearance of these orientation words is established on the basis of the drawings of the specification, and their appearance should not affect the scope of protection of the present invention.
以上对本发明所提供的一种过驳作业桥式装卸船机进行了详细介绍。 例的说明只是用于帮助理解本发明的方法及其核心思想。 应当指出, 对于 本技术领域的普通技术人员来说, 在不脱离本发明原理的前提下, 还可以 对本发明进行若干改进和修饰, 这些改进和修饰也落入本发明权利要求的 保护范围内。 The above is a detailed introduction of a shuttle-type bridge loading and unloading ship provided by the present invention. The description of the examples is only to assist in understanding the method of the present invention and its core idea. It should be noted that those skilled in the art can make various modifications and changes to the present invention without departing from the spirit and scope of the invention.
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110171492.7 | 2011-06-23 | ||
| CN2011101714927A CN102229392A (en) | 2011-06-23 | 2011-06-23 | Lighterage operation bridge type loading and unloading ship machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012174755A1 true WO2012174755A1 (en) | 2012-12-27 |
Family
ID=44842015
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2011/076614 Ceased WO2012174755A1 (en) | 2011-06-23 | 2011-06-30 | Bridge type ship loading and unloading machine for lightering |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN102229392A (en) |
| WO (1) | WO2012174755A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116788875A (en) * | 2023-02-03 | 2023-09-22 | 安徽省中冶重工机械有限公司 | Movable ship loader |
| CN120517878A (en) * | 2025-07-11 | 2025-08-22 | 连云港东粮码头有限公司 | A dual-purpose machine for loading and unloading bulk grain at a terminal |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103287984B (en) * | 2013-05-31 | 2015-02-25 | 江苏海隆重机有限公司 | Bridge type grab bucket ship unloader |
| CN103738745A (en) * | 2013-12-27 | 2014-04-23 | 珠海三一港口机械有限公司 | Ship loading and unloading machine |
| CN104291128B (en) * | 2014-09-30 | 2017-02-15 | 泰富国际工程有限公司 | Multi-functional boat integrating loading, unloading and conveying |
| CN104229096B (en) * | 2014-09-30 | 2017-03-15 | 泰富国际工程有限公司 | Transfer and load and unload the overturn-preventing mechanism of cargo ship and the cargo ship with the mechanism |
| CN104555495B (en) * | 2015-01-20 | 2016-08-17 | 广州港集团有限公司 | Ship borne type spiral shipment machinery of unloading a ship is transferred system |
| CN104773518B (en) * | 2015-03-31 | 2017-01-18 | 江苏鼎盛重工有限公司 | Seaborne multifunctional efficient dry bulk transshipment integrated equipment and control method thereof |
| CN105236163B (en) * | 2015-11-16 | 2017-10-03 | 泰富重工制造有限公司 | A kind of material is bypassed the dam site or gap bridge movement system |
| CN105383955B (en) * | 2015-11-18 | 2017-12-29 | 中交第三航务工程勘察设计院有限公司 | Harbour bulk goods unloading and shipment transhipment all-in-one |
| CN105584856A (en) * | 2015-12-04 | 2016-05-18 | 江苏通达机械设备制造有限公司 | Bridge type telescopic ship loader |
| CN106586839B (en) * | 2017-02-06 | 2018-04-17 | 大连华锐重工集团股份有限公司 | A kind of control method of continuous ship discharging machine linkage row control system |
| CN108791739B (en) * | 2018-06-19 | 2019-07-19 | 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) | A kind of floating platform transferred between ship for vehicle and reject mode |
| CN114084701A (en) * | 2021-12-22 | 2022-02-25 | 大连华锐重工集团股份有限公司 | Ship loading and unloading integrated machine and ship loading and unloading method |
| CN114955607B (en) * | 2022-06-30 | 2023-06-27 | 无锡松邦科技有限公司 | Double-arm frame ship loader |
| CN117163683A (en) * | 2023-08-21 | 2023-12-05 | 湖北祥云(集团)化工股份有限公司 | Wharfboat loading device capable of distributing materials in fan-shaped area |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5544411A (en) * | 1978-09-19 | 1980-03-28 | Ishikawajima Harima Heavy Ind Co Ltd | Operating method of cargo-handling machine |
| DE8518141U1 (en) * | 1985-06-22 | 1985-10-10 | PHB Weserhütte AG, 5000 Köln | Combined unloading and loading device |
| JPS648127A (en) * | 1987-06-30 | 1989-01-12 | Ishikawajima Harima Heavy Ind | Supporting device for boom of unloader |
| CN2192655Y (en) * | 1994-05-27 | 1995-03-22 | 谢刚正 | Double-island ship to ship worker-bee transport platform |
| CN1663893A (en) * | 2005-01-19 | 2005-09-07 | 上海港机重工有限公司 | Bridge ship loader-unloader |
| CN2797296Y (en) * | 2005-06-08 | 2006-07-19 | 杭州华新机电工程有限公司 | Dual purpose machine for loading and unloading ship |
| CN1884001A (en) * | 2006-06-22 | 2006-12-27 | 上海公茂起重设备有限公司 | Marine bulk cargo transferring system ship |
| EP1958915A2 (en) * | 2005-02-11 | 2008-08-20 | Isam Aktiengesellschaft | Device for loading and/or unloading a cargo hold or storage space and method for loading and/or unloading a cargo hold or storage space |
| CN101850908A (en) * | 2010-05-27 | 2010-10-06 | 陈锡建 | Method for shipping and unshipping sacked goods at wharf and ship loader and ship unloader |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4432773A1 (en) * | 1993-11-18 | 1995-05-24 | Pwh Anlagen & Systeme Gmbh | Loading and unloading device for ships and similar large-capacity transport vehicles |
| US6132156A (en) * | 1998-04-15 | 2000-10-17 | Shehata; S. Ramsis | Ecological shiploader |
-
2011
- 2011-06-23 CN CN2011101714927A patent/CN102229392A/en active Pending
- 2011-06-30 WO PCT/CN2011/076614 patent/WO2012174755A1/en not_active Ceased
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5544411A (en) * | 1978-09-19 | 1980-03-28 | Ishikawajima Harima Heavy Ind Co Ltd | Operating method of cargo-handling machine |
| DE8518141U1 (en) * | 1985-06-22 | 1985-10-10 | PHB Weserhütte AG, 5000 Köln | Combined unloading and loading device |
| JPS648127A (en) * | 1987-06-30 | 1989-01-12 | Ishikawajima Harima Heavy Ind | Supporting device for boom of unloader |
| CN2192655Y (en) * | 1994-05-27 | 1995-03-22 | 谢刚正 | Double-island ship to ship worker-bee transport platform |
| CN1663893A (en) * | 2005-01-19 | 2005-09-07 | 上海港机重工有限公司 | Bridge ship loader-unloader |
| EP1958915A2 (en) * | 2005-02-11 | 2008-08-20 | Isam Aktiengesellschaft | Device for loading and/or unloading a cargo hold or storage space and method for loading and/or unloading a cargo hold or storage space |
| CN2797296Y (en) * | 2005-06-08 | 2006-07-19 | 杭州华新机电工程有限公司 | Dual purpose machine for loading and unloading ship |
| CN1884001A (en) * | 2006-06-22 | 2006-12-27 | 上海公茂起重设备有限公司 | Marine bulk cargo transferring system ship |
| CN101850908A (en) * | 2010-05-27 | 2010-10-06 | 陈锡建 | Method for shipping and unshipping sacked goods at wharf and ship loader and ship unloader |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116788875A (en) * | 2023-02-03 | 2023-09-22 | 安徽省中冶重工机械有限公司 | Movable ship loader |
| CN120517878A (en) * | 2025-07-11 | 2025-08-22 | 连云港东粮码头有限公司 | A dual-purpose machine for loading and unloading bulk grain at a terminal |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102229392A (en) | 2011-11-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2012174755A1 (en) | Bridge type ship loading and unloading machine for lightering | |
| CN103449204B (en) | A kind of bucket continuous ship unloader | |
| CN105383955B (en) | Harbour bulk goods unloading and shipment transhipment all-in-one | |
| WO2022047781A1 (en) | System and method for transporting, loading and unloading container | |
| CN110642152A (en) | Large-span bulk cargo conveying system | |
| WO2015096517A1 (en) | Ship loading and unloading machiner | |
| CN114314046A (en) | Container transportation loading and unloading system and method | |
| CN205346399U (en) | Portable bag package, dual -purpose shipment of bulk cargo machine | |
| CN114084701A (en) | Ship loading and unloading integrated machine and ship loading and unloading method | |
| JPWO2016139701A1 (en) | Handling method | |
| CN203079346U (en) | Overside loading and unloading transportation self-propelled ship | |
| CN104291128B (en) | Multi-functional boat integrating loading, unloading and conveying | |
| CN204823331U (en) | Harbour handling machine | |
| CN104229096B (en) | Transfer and load and unload the overturn-preventing mechanism of cargo ship and the cargo ship with the mechanism | |
| CN204057317U (en) | One is transferred handling carrying ship | |
| JPWO2016139698A1 (en) | Cargo container | |
| CN204056248U (en) | A kind of transfer system loading and unloading carrier and carrier with this system of transferring | |
| CN118850803A (en) | A multi-purpose scraper-type ship loading and unloading machine | |
| CN204150732U (en) | A kind of multifunctional ship integrating shipment, unload a ship, transport | |
| CN111332974B (en) | A reversible unloading device for conveying floating objects on water to shore | |
| CN102674164B (en) | Bucket crane with conveyor | |
| CN218707439U (en) | Inland river rotary telescopic ship loader | |
| CN204096048U (en) | To transfer handling carrier | |
| TWI848250B (en) | Extendable bulk material transfer machine structure | |
| JP6126323B2 (en) | Handling equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11868070 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11868070 Country of ref document: EP Kind code of ref document: A1 |