WO2012170345A1 - Superconducting fault current limiter recovery system - Google Patents

Superconducting fault current limiter recovery system Download PDF

Info

Publication number
WO2012170345A1
WO2012170345A1 PCT/US2012/040725 US2012040725W WO2012170345A1 WO 2012170345 A1 WO2012170345 A1 WO 2012170345A1 US 2012040725 W US2012040725 W US 2012040725W WO 2012170345 A1 WO2012170345 A1 WO 2012170345A1
Authority
WO
WIPO (PCT)
Prior art keywords
fault current
current limiter
condition
switch
superconducting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2012/040725
Other languages
French (fr)
Inventor
Paul J. Murphy
Gary E. Dickerson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Varian Semiconductor Equipment Associates Inc
Original Assignee
Varian Semiconductor Equipment Associates Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Varian Semiconductor Equipment Associates Inc filed Critical Varian Semiconductor Equipment Associates Inc
Priority to BR112013031515A priority Critical patent/BR112013031515A2/en
Priority to KR1020137033794A priority patent/KR20140040167A/en
Priority to AU2012268585A priority patent/AU2012268585B2/en
Priority to CN201280029018.3A priority patent/CN103636091B/en
Publication of WO2012170345A1 publication Critical patent/WO2012170345A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/001Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for superconducting apparatus, e.g. coils, lines, machines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H9/00Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
    • H02H9/04Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess voltage
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H9/00Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
    • H02H9/02Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess current
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H9/00Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
    • H02H9/02Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess current
    • H02H9/023Current limitation using superconducting elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/60Superconducting electric elements or equipment; Power systems integrating superconducting elements or equipment

Definitions

  • This disclosure relates to superconducting fault current limiters, and more particularly to a superconducting fault current limiter recovery system.
  • a superconducting fault current limiter is a device that limits fault currents in a power system.
  • the power system may include transmission and distribution networks to deliver power to differing industrial, commercial, and residential loads.
  • a fault current is an abnormal current in an electrical circuit due to a fault such as a short circuit resulting in a short circuit current.
  • a fault current may occur due to any number of events or failures such as severe weather damaging power lines and components, e.g., lighting striking the power system.
  • the network in response, delivers a large amount of current (i.e. fault current) to this load or, in this case, the faults.
  • This surge or fault current condition is undesirable since it may damage the network or equipment connected to the network.
  • a SCFCL includes a superconductor positioned in a cryogenic tank.
  • the superconductor is in a superconducting state having zero resistance during a steady state condition.
  • the superconductor is operated below its critical temperature, critical current density, and critical magnetic field. If any one of these three is exceeded, the superconductor quenches from its superconducting state to a normal state and exhibits a resistance.
  • a refrigeration system provides a cryogenic cooling fluid to the cryogenic tank housing the superconductor.
  • FIG. 1 is a circuit diagram of one power system 100 of the prior art.
  • the power system 100 includes a SCFCL 106, an AC power generator 102, a shunt 1 14 in parallel with the SCFCL 106, a circuit breaker 108 which is normally closed, and differing loads 1 10.
  • the AC power generator 102 provides power to the loads 1 10.
  • the circuit breaker 108 is closed and load current flows through conductor 103, the SCFCL 106, and conductor 105 to the loads 1 10.
  • the superconductor of the SCFCL 106 is in a superconducting state exhibiting zero resistance during the steady state condition.
  • a fault condition may occur as illustrated by the inadvertent path to ground at location 1 12.
  • the AC power generator 102 attempts to deliver a large amount of fault current.
  • the superconductor quenches and exhibits a resistance much larger than the resistance of the shunt 1 14.
  • the fault current is commutated into the shunt 1 14 which limits the fault current to an acceptable level by reducing the peak to peak value of the fault current before the circuit breaker 108 can open (a conventional circuit breaker 108 typically takes 2 to 3 cycles before opening when operating at a conventional 60 Hz).
  • the SCFCL 106 may not be prepared to quickly return to normal protective operations.
  • the superconductor of the SCFCL 106 may increase in temperature to a level above its critical temperature during the fault condition.
  • the temperature of the superconductor must be returned to a level below its critical temperature in order to return to its superconducting state.
  • An associated refrigeration system takes time to cool the superconductor back to a temperature below its critical temperature. This delays return to the steady state condition and may delay closing of the circuit breaker 108 after recovery from a fault condition.
  • a superconducting fault current limiter recovery system includes a superconducting fault current limiter, a shunt electrically coupled in parallel with the superconducting fault current limiter, and a bypass path also electrically coupled in parallel with the superconducting fault current limiter.
  • the superconducting fault current limiter recovery system includes a superconducting fault current limiter, a shunt electrically coupled in parallel with the superconducting fault current limiter, a bypass path also electrically coupled in parallel with the superconducting fault current limiter, the bypass path having a first switch, a second switch electrically coupled in series with the superconducting fault current limiter, the second switch also electrically coupled in parallel with the bypass path, and a controller.
  • the controller is configured to control a state of the first switch and the second switch to open the first switch and close the second switch during a steady state condition so a load current flows through the superconducting fault current limiter during the steady state condition, and to close the first switch and open the second switch during a bypass condition occurring after a fault condition so the load current flows through the bypass path during the bypass condition.
  • FIG. 1 is a diagram of a SCFCL power system of the prior art
  • FIG. 2 is a diagram of a SCFCL recovery system consistent with an embodiment of the disclosure operating in a steady state condition
  • FIG. 3 is a diagram of the SCFCL recovery system of FIG. 2 operating in a bypass condition
  • FIG. 4 is a diagram of another SCFCL recovery system consistent with an embodiment of the disclosure.
  • the SCFCL recovery system 200 may include a bypass path 250 electrically coupled in parallel with the SCFCL 206.
  • the bypass path may include a first switch SI and a fuse 232 electrically coupled in series with the first switch S I .
  • the SCFCL recovery system 200 may also include a SCFCL 206, and the shunt 114 also electrically coupled in parallel with the SCFCL 206.
  • the shunt 1 14 is schematically illustrated as a resistor but may also be an inductor in other embodiments.
  • the SCFCL system 200 may also include a second switch S2 and a controller 230. The second switch S2 is electrically coupled in series with the SCFCL 206 and in parallel with the bypass path 250.
  • the SCFCL 206 may include a cryogenic tank 202 defining a chamber 203, a superconductor 209 positioned in the chamber 203, a refrigeration system 212, a temperature sensor 208, and a current sensor 226.
  • a cryogenic tank 202 defining a chamber 203
  • a superconductor 209 positioned in the chamber 203
  • a refrigeration system 212 positioned in the chamber 203
  • a temperature sensor 208 positioned in the chamber 203
  • a current sensor 226 For clarity of illustration, only one SCFCL 206 for one phase is illustrated. Those skilled in the art will recognize that there may be three SCFCLs (one for each phase) of a three phase AC power system.
  • the cryogenic tank 202 may be fabricated of differing materials such as dielectric materials and/or thermally insulating materials.
  • the superconductor 209 may be any type of superconducting material such as yttrium barium copper oxide (YBCO) that exhibits superconducting properties when held below its critical temperature, critical current density, and critical magnetic field.
  • YBCO yttrium barium copper oxide
  • the superconductor 209 may have different modules depending on the amount of superconducting material required.
  • the refrigeration system 212 is configured to provide a cryogenic liquid to the cryogenic tank 202 via a supply conduit 216 and to receive the same via a return conduit 214.
  • the refrigeration system 212 may include a cryogenic cooling unit to cool the input cryogenic fluid received from the return conduit 214 before providing cooled cryogenic fluid back via the supply conduit 216.
  • the refrigeration system 212 may include valves, pumps, and sensors.
  • the refrigeration system 212 may also include a storage tank to store additional cryogenic cooling fluid.
  • the cryogenic cooling fluid may be liquid nitrogen, liquid helium, liquid argon, liquid neon, etc. and/or mixtures of the same.
  • the controller 230 can be or include a general-purpose computer or network of general- purpose computers that may be programmed to perform desired input/output functions.
  • the controller 230 can also include other electronic circuitry or components, such as application specific integrated circuits, other hardwired or programmable electronic devices, discrete element circuits, etc.
  • the controller 230 may also include communication devices, data storage devices, and software.
  • the controller 230 may receive input signals from a variety of systems and components such as the first switch SI , the second switch S2, the refrigeration system 212, the temperature sensor 208, the current sensor 226, etc. to determine a condition of one or more components and also to control the same.
  • the temperature sensor 208 is illustrated as being on the outside of the cryogenic tank 202 but may be positioned in other locations as well to monitor the temperature of the superconductor 209 and/Or the cryogenic cooling fluid inside the chamber 203.
  • the current sensor 226 may be positioned to monitor in real time the current draw on conductor 105. Any type of current sensor may be utilized such as a current transformer positioned about the conductor 105.
  • the fuse 232 may be an electrical protection device selected to provide protection to loads when current is bypassing the SCFCL 206. In one embodiment, the fuse 232 may include a superconductor that electrically opens if a fault occurs during a bypass condition when load current is flowing through the bypass path 250.
  • the superconductor 209 In operation, during a steady state condition the superconductor 209 is in a superconducting state.
  • the refrigeration system 212 provides a cryogenic liquid to the cryogenic tank 202 via the supply conduit 216 and receives return cryogenic liquid to be re-cooled via the return conduit 214.
  • the temperature of the superconductor 209 remains below its critical temperature.
  • the critical temperature may be between about 77° and 93°K for high temperature superconductors.
  • the controller 230 maintains the first switch S I (normally open) in an open state and the second switch S2 (normally closed) in a closed state as illustrated in FIG. 2. Accordingly, a load current flows through the SCFCL 206 along path 270 to the loads of the system 200 during the steady state condition.
  • a fault current causes the temperature of the superconductor 209 to nearly instantaneously exceed its critical temperature, and hence the superconductor 209 quenches.
  • the superconductor 209 in this state exhibits a much higher resistance than the shunt 1 14.
  • the fault current is commutated through the shunt 1 14 which effectively limits the peak to peak value of the fault current before the circuit breaker 108 is opened.
  • the SCFCL recovery system 200 is illustrated operating during a bypass condition which occurs after the fault condition.
  • the controller 230 is configured to cause the first switch S 1 to close and the second switch S2 to open.
  • the bypass condition may be initiated in response to a monitored condition representative of dissipation in the fault current.
  • the current sensor 226 may provide a signal to the controller 230 representative of dissipation in the fault current.
  • the bypass condition may also be initiated in response to the re-closing of the circuit breaker 108.
  • the SCFCL 206 has an additional recovery time interval to return the superconductor 209 to a superconducting state.
  • the superconductor 209 may need to be re-cooled by the refrigeration system 212 back down below its critical temperature to return it to its superconducting state.
  • the controller 230 may wait a predetermined recovery time interval after initiating the bypass condition to enable the SCFCL 206 to return to a superconducting state before switching back to the steady state condition.
  • the controller 230 may be responsive to a monitored condition representative of a superconducting state of the superconductor 209 before terminating the bypass condition and returning to the steady state condition.
  • the temperature sensor 208 may provide a signal to the controller 230 representative of the temperature of the superconductor 209. Once this temperature is below the critical temperature of the
  • the controller 230 may initiate termination of the bypass condition (FIG. 3) and a return to the steady state condition (FIG. 2) by opening the first switch SI and closing the second switch S2.
  • the fuse 232 may blow or open causing fault current to be commutated back through the shunt 114 before the circuit breaker 108 re-opens.
  • the fuse 232 may be an electrical protection device selected to provide protection to loads during this bypass condition.
  • the fuse 232 may include a superconductor that electrically opens if a fault occurs during the bypass condition.
  • FIG. 4 is a block diagram of another embodiment of the disclosure consistent with FIGs. 2 and 3 illustrating the SCFCL 206 on insulating pedestals 404.
  • a SCFCL recovery system having a bypass path electrically coupled in parallel with a SCFCL.
  • the bypass path may include a first switch S I operable to selectively employ the bypass path.
  • the bypass path enables the SCFCL to be bypassed for a recovery time interval as it returns the superconductor to a superconducting state after a fault condition. In this way, the time for recovery after a fault condition is minimized. In one example, the time to recover from a fault condition may be on the order of only milliseconds as opposed to seconds.
  • the a refrigeration system of the SCFCL may cool a heated superconductor back down below its critical temperature before the SCFCL recovery system returns to a steady state condition.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Containers, Films, And Cooling For Superconductive Devices (AREA)

Abstract

A superconducting fault current limiter recovery system includes a superconducting fault current limiter, a shunt electrically coupled in parallel with the superconducting fault current limiter, and a bypass path also electrically coupled in parallel with the superconducting fault current limiter. The bypass path enables a load current to flow through the bypass path during a bypass condition. Thus, load current may be quickly reestablished to serve loads after a fault condition via the bypass path while a superconductor of the superconductor fault current limiter has time to return to a superconducting state after the fault condition.

Description

SUPERCONDUCTING FAULT CURRENT LIMITER RECOVERY SYSTEM
Field
This disclosure relates to superconducting fault current limiters, and more particularly to a superconducting fault current limiter recovery system.
Background
A superconducting fault current limiter (SCFCL) is a device that limits fault currents in a power system. The power system may include transmission and distribution networks to deliver power to differing industrial, commercial, and residential loads. A fault current is an abnormal current in an electrical circuit due to a fault such as a short circuit resulting in a short circuit current. A fault current may occur due to any number of events or failures such as severe weather damaging power lines and components, e.g., lighting striking the power system. When faults occur, a large load appears instantaneously. The network, in response, delivers a large amount of current (i.e. fault current) to this load or, in this case, the faults. This surge or fault current condition is undesirable since it may damage the network or equipment connected to the network.
A SCFCL includes a superconductor positioned in a cryogenic tank. The superconductor is in a superconducting state having zero resistance during a steady state condition. To maintain the superconductor in the superconducting state, the superconductor is operated below its critical temperature, critical current density, and critical magnetic field. If any one of these three is exceeded, the superconductor quenches from its superconducting state to a normal state and exhibits a resistance. To maintain the superconductor at a temperature below its critical temperature, a refrigeration system provides a cryogenic cooling fluid to the cryogenic tank housing the superconductor.
FIG. 1 is a circuit diagram of one power system 100 of the prior art. The power system 100 includes a SCFCL 106, an AC power generator 102, a shunt 1 14 in parallel with the SCFCL 106, a circuit breaker 108 which is normally closed, and differing loads 1 10. Under steady state conditions, the AC power generator 102 provides power to the loads 1 10. The circuit breaker 108 is closed and load current flows through conductor 103, the SCFCL 106, and conductor 105 to the loads 1 10. The superconductor of the SCFCL 106 is in a superconducting state exhibiting zero resistance during the steady state condition. A fault condition may occur as illustrated by the inadvertent path to ground at location 1 12. In response, the AC power generator 102 attempts to deliver a large amount of fault current. The superconductor quenches and exhibits a resistance much larger than the resistance of the shunt 1 14. Hence, the fault current is commutated into the shunt 1 14 which limits the fault current to an acceptable level by reducing the peak to peak value of the fault current before the circuit breaker 108 can open (a conventional circuit breaker 108 typically takes 2 to 3 cycles before opening when operating at a conventional 60 Hz).
Although the power system 100 is effective, it is sometimes necessary for the power system 100 to quickly recover from fault conditions. However, the SCFCL 106 may not be prepared to quickly return to normal protective operations. For instance, the superconductor of the SCFCL 106 may increase in temperature to a level above its critical temperature during the fault condition. The temperature of the superconductor must be returned to a level below its critical temperature in order to return to its superconducting state. An associated refrigeration system takes time to cool the superconductor back to a temperature below its critical temperature. This delays return to the steady state condition and may delay closing of the circuit breaker 108 after recovery from a fault condition.
Accordingly, there is a need in the art for an SCFCL recovery system that overcomes the above-described inadequacies and shortcomings.
Summary
According to a one aspect of the disclosure, a superconducting fault current limiter recovery system is provided. The superconducting fault current limiter recovery system includes a superconducting fault current limiter, a shunt electrically coupled in parallel with the superconducting fault current limiter, and a bypass path also electrically coupled in parallel with the superconducting fault current limiter.
According to another aspect of the disclosure, another superconducting fault current limiter recovery system is provided. The superconducting fault current limiter recovery system includes a superconducting fault current limiter, a shunt electrically coupled in parallel with the superconducting fault current limiter, a bypass path also electrically coupled in parallel with the superconducting fault current limiter, the bypass path having a first switch, a second switch electrically coupled in series with the superconducting fault current limiter, the second switch also electrically coupled in parallel with the bypass path, and a controller. The controller is configured to control a state of the first switch and the second switch to open the first switch and close the second switch during a steady state condition so a load current flows through the superconducting fault current limiter during the steady state condition, and to close the first switch and open the second switch during a bypass condition occurring after a fault condition so the load current flows through the bypass path during the bypass condition.
Brief Description of the Drawings
For a better understanding of the present disclosure, reference is made to the accompanying drawings, in which like elements are referenced with like numerals, and in which:
FIG. 1 is a diagram of a SCFCL power system of the prior art; FIG. 2 is a diagram of a SCFCL recovery system consistent with an embodiment of the disclosure operating in a steady state condition;
FIG. 3 is a diagram of the SCFCL recovery system of FIG. 2 operating in a bypass condition; and
FIG. 4 is a diagram of another SCFCL recovery system consistent with an embodiment of the disclosure.
Detailed Description
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which embodiments of the invention are shown. This invention, however, may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. In the drawings, like numbers refer to like elements throughout.
Turning to FIG. 2, a block diagram of a SCFCL recovery system 200 consistent with an embodiment of disclosure is illustrated. The SCFCL recovery system 200 may include a bypass path 250 electrically coupled in parallel with the SCFCL 206. The bypass path may include a first switch SI and a fuse 232 electrically coupled in series with the first switch S I . The SCFCL recovery system 200 may also include a SCFCL 206, and the shunt 114 also electrically coupled in parallel with the SCFCL 206. The shunt 1 14 is schematically illustrated as a resistor but may also be an inductor in other embodiments. The SCFCL system 200 may also include a second switch S2 and a controller 230. The second switch S2 is electrically coupled in series with the SCFCL 206 and in parallel with the bypass path 250.
Only selected portions of the SCFCL 206 are illustrated and those skilled in the art will recognize the SCFCL 206 may include other components. The SCFCL 206 may include a cryogenic tank 202 defining a chamber 203, a superconductor 209 positioned in the chamber 203, a refrigeration system 212, a temperature sensor 208, and a current sensor 226. For clarity of illustration, only one SCFCL 206 for one phase is illustrated. Those skilled in the art will recognize that there may be three SCFCLs (one for each phase) of a three phase AC power system.
The cryogenic tank 202 may be fabricated of differing materials such as dielectric materials and/or thermally insulating materials. The superconductor 209 may be any type of superconducting material such as yttrium barium copper oxide (YBCO) that exhibits superconducting properties when held below its critical temperature, critical current density, and critical magnetic field. The superconductor 209 may have different modules depending on the amount of superconducting material required. The refrigeration system 212 is configured to provide a cryogenic liquid to the cryogenic tank 202 via a supply conduit 216 and to receive the same via a return conduit 214. The refrigeration system 212 may include a cryogenic cooling unit to cool the input cryogenic fluid received from the return conduit 214 before providing cooled cryogenic fluid back via the supply conduit 216. The refrigeration system 212 may include valves, pumps, and sensors. The refrigeration system 212 may also include a storage tank to store additional cryogenic cooling fluid. The cryogenic cooling fluid may be liquid nitrogen, liquid helium, liquid argon, liquid neon, etc. and/or mixtures of the same.
The controller 230 can be or include a general-purpose computer or network of general- purpose computers that may be programmed to perform desired input/output functions. The controller 230 can also include other electronic circuitry or components, such as application specific integrated circuits, other hardwired or programmable electronic devices, discrete element circuits, etc. The controller 230 may also include communication devices, data storage devices, and software. The controller 230 may receive input signals from a variety of systems and components such as the first switch SI , the second switch S2, the refrigeration system 212, the temperature sensor 208, the current sensor 226, etc. to determine a condition of one or more components and also to control the same. The temperature sensor 208 is illustrated as being on the outside of the cryogenic tank 202 but may be positioned in other locations as well to monitor the temperature of the superconductor 209 and/Or the cryogenic cooling fluid inside the chamber 203. The current sensor 226 may be positioned to monitor in real time the current draw on conductor 105. Any type of current sensor may be utilized such as a current transformer positioned about the conductor 105. The fuse 232 may be an electrical protection device selected to provide protection to loads when current is bypassing the SCFCL 206. In one embodiment, the fuse 232 may include a superconductor that electrically opens if a fault occurs during a bypass condition when load current is flowing through the bypass path 250.
In operation, during a steady state condition the superconductor 209 is in a superconducting state. The refrigeration system 212 provides a cryogenic liquid to the cryogenic tank 202 via the supply conduit 216 and receives return cryogenic liquid to be re-cooled via the return conduit 214. The temperature of the superconductor 209 remains below its critical temperature. The critical temperature may be between about 77° and 93°K for high temperature superconductors.
During this steady state condition, the controller 230 maintains the first switch S I (normally open) in an open state and the second switch S2 (normally closed) in a closed state as illustrated in FIG. 2. Accordingly, a load current flows through the SCFCL 206 along path 270 to the loads of the system 200 during the steady state condition.
During a fault condition, a fault current causes the temperature of the superconductor 209 to nearly instantaneously exceed its critical temperature, and hence the superconductor 209 quenches. The superconductor 209 in this state exhibits a much higher resistance than the shunt 1 14. Hence, the fault current is commutated through the shunt 1 14 which effectively limits the peak to peak value of the fault current before the circuit breaker 108 is opened.
Turning to FIG. 3, the SCFCL recovery system 200 is illustrated operating during a bypass condition which occurs after the fault condition. During the bypass condition, the controller 230 is configured to cause the first switch S 1 to close and the second switch S2 to open. The bypass condition may be initiated in response to a monitored condition representative of dissipation in the fault current. For example, the current sensor 226 may provide a signal to the controller 230 representative of dissipation in the fault current. The bypass condition may also be initiated in response to the re-closing of the circuit breaker 108. When the first switch S I is closed and the second switch S2 is open, load current will flow through the bypass path 250 to the loads as illustrated by path 272.
During this bypass condition (with the first switch S 1 closed and the second switch S2 open as illustrated in FIG. 3), the SCFCL 206 has an additional recovery time interval to return the superconductor 209 to a superconducting state. In one instance, the superconductor 209 may need to be re-cooled by the refrigeration system 212 back down below its critical temperature to return it to its superconducting state. The controller 230 may wait a predetermined recovery time interval after initiating the bypass condition to enable the SCFCL 206 to return to a superconducting state before switching back to the steady state condition. Alternatively, the controller 230 may be responsive to a monitored condition representative of a superconducting state of the superconductor 209 before terminating the bypass condition and returning to the steady state condition. For instance, the temperature sensor 208 may provide a signal to the controller 230 representative of the temperature of the superconductor 209. Once this temperature is below the critical temperature of the
superconductor 209, the controller 230 may initiate termination of the bypass condition (FIG. 3) and a return to the steady state condition (FIG. 2) by opening the first switch SI and closing the second switch S2.
If a fault occurs during the bypass condition when the first switch S 1 is closed and the second switch S2 is open, the fuse 232 may blow or open causing fault current to be commutated back through the shunt 114 before the circuit breaker 108 re-opens. As earlier detailed, in one embodiment the fuse 232 may be an electrical protection device selected to provide protection to loads during this bypass condition. In one embodiment, the fuse 232 may include a superconductor that electrically opens if a fault occurs during the bypass condition.
FIG. 4 is a block diagram of another embodiment of the disclosure consistent with FIGs. 2 and 3 illustrating the SCFCL 206 on insulating pedestals 404.
Accordingly, there has been provided a SCFCL recovery system having a bypass path electrically coupled in parallel with a SCFCL. The bypass path may include a first switch S I operable to selectively employ the bypass path. Advantageously, the bypass path enables the SCFCL to be bypassed for a recovery time interval as it returns the superconductor to a superconducting state after a fault condition. In this way, the time for recovery after a fault condition is minimized. In one example, the time to recover from a fault condition may be on the order of only milliseconds as opposed to seconds. While the bypass path is utilized, the a refrigeration system of the SCFCL may cool a heated superconductor back down below its critical temperature before the SCFCL recovery system returns to a steady state condition.
The present disclosure is not to be limited in scope by the specific embodiments described herein. Indeed, other various embodiments of and modifications to the present disclosure, in addition to those described herein, will be apparent to those of ordinary skill in the art from the foregoing description and accompanying drawings. Thus, such other embodiments and modifications are intended to fall within the scope of the present disclosure. Further, although the present disclosure has been described herein in the context of a particular implementation in a particular environment for a particular purpose, those of ordinary skill in the art will recognize that its usefulness is not limited thereto and that the present disclosure may be beneficially implemented in any number of environments for any number of purposes.

Claims

What is claimed is:
1. A superconducting fault current limiter recovery system comprising:
a superconducting fault current limiter;
a shunt electrically coupled in parallel with the superconducting fault current limiter; and a bypass path also electrically coupled in parallel with the superconducting fault current limiter.
2. The superconducting fault current limiter recovery system of claim 1 , wherein the bypass path comprises a first switch that is open during a steady state condition so a load current flows through the superconducting fault current limiter during the steady state condition.
3. The superconducting fault current limiter recovery system of claim 2, wherein the first switch is closed during a bypass condition occurring after a fault condition so the load current flows through the bypass path during the bypass condition.
4. The superconducting fault current limiter recovery system of claim 3, further comprising a second switch electrically coupled in series with the superconducting fault current limiter, the second switch also electrically coupled in parallel with the bypass path, and wherein the second switch is open during the bypass condition.
5. The superconducting fault current limiter recovery system of claim 4, wherein the superconductor fault current limiter comprises a superconductor disposed in a chamber of a cryogenic tank, and wherein the superconducting fault current limiter system further comprises a controller configured to control a state of the first switch and the second switch, wherein the controller is configured to maintain the bypass condition with the first switch closed and the second switch open for a recovery time interval sufficient to enable the superconductor to return to a superconducting state after the fault condition.
6. The superconducting fault current limiter recovery system of claim 5, wherein the controller is configured to control the state of the first switch and the second switch in response to a monitored condition representative of the superconducting state of the superconductor.
7. The superconducting fault current limiter recovery system of claim 6, wherein the monitored condition is a temperature of the superconductor.
8. The superconducting fault current limiter recovery system of claim 7, wherein the controller is configured to terminate the bypass condition and initiate the steady state condition once the temperature of the superconductor is cooled below a critical temperature of the superconductor.
9. The superconducting fault current limiter recovery system of claim 6, wherein the controller is configured to terminate the bypass condition and initiate the steady state condition after the superconductor has returned to the superconducting state.
10. The superconducting fault current limiter recovery system of claim 1, wherein the bypass path comprises a fuse electrically coupled in series with the first switch.
1 1. A superconducting fault current limiter recovery system comprising:
a superconducting fault current limiter;
a shunt electrically coupled in parallel with the superconducting fault current limiter;
a bypass path also electrically coupled in parallel with the superconducting fault current limiter, the bypass path having a first switch;
a second switch electrically coupled in series with the superconducting fault current limiter, the second switch also electrically coupled in parallel with the bypass path; and
a controller configured to control a state of the first switch and the second switch to open the first switch and close the second switch during a steady state condition so a load current flows through the superconducting fault current limiter during the steady state condition, and to close the first switch and open the second switch during a bypass condition occurring after a fault condition so the load current flows through the bypass path during the bypass condition.
12. The superconducting fault current limiter recovery system of claim 1 1, wherein the superconductor fault current limiter comprises a superconductor disposed in a chamber of a cryogenic tank, and wherein the controller is configured to maintain the bypass condition for a recovery time interval sufficient to enable the superconductor to return to a superconducting state after the fault condition.
13. The superconducting fault current limiter recovery system of claim 12, wherein the controller is configured to control the state of the first switch and the second switch in response to a monitored condition representative of the superconducting state of the superconductor.
1 . The superconducting fault current limiter recovery system of claim 13, wherein the controller is configured to terminate the bypass condition and initiate the steady state condition after the superconductor has returned to the superconducting state.
15. The superconducting fault current limiter recovery system of claim 13, wherein the monitored condition is a temperature of the superconductor, and the controller is configured to terminate the bypass condition and initiate the steady state condition Once the temperature of the superconductor is cooled below a critical temperature of the superconductor.
16. The superconducting fault current limiter recovery system of claim 1 1 , wherein ihe bypass path comprises a fuse electrically coupled in series with the first switch.
PCT/US2012/040725 2011-05-31 2012-06-04 Superconducting fault current limiter recovery system Ceased WO2012170345A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BR112013031515A BR112013031515A2 (en) 2011-05-31 2012-06-04 superconducting fault current limiter recovery system
KR1020137033794A KR20140040167A (en) 2011-06-09 2012-06-04 Superconducting fault current limiter recovery system
AU2012268585A AU2012268585B2 (en) 2011-06-09 2012-06-04 Superconducting fault current limiter recovery system
CN201280029018.3A CN103636091B (en) 2011-06-09 2012-06-04 Superconductive fault current limit answering system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201161495192P 2011-06-09 2011-06-09
US61/495,192 2011-06-09
US13/485,550 2012-05-31
US13/485,550 US8718733B2 (en) 2011-06-09 2012-05-31 Superconducting fault current limiter recovery system

Publications (1)

Publication Number Publication Date
WO2012170345A1 true WO2012170345A1 (en) 2012-12-13

Family

ID=47293652

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2012/040725 Ceased WO2012170345A1 (en) 2011-05-31 2012-06-04 Superconducting fault current limiter recovery system

Country Status (6)

Country Link
US (1) US8718733B2 (en)
KR (1) KR20140040167A (en)
CN (1) CN103636091B (en)
AU (1) AU2012268585B2 (en)
TW (1) TWI542103B (en)
WO (1) WO2012170345A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116685983A (en) * 2020-12-24 2023-09-01 国际商业机器公司 Programmable and reprogrammable quantum circuits

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9478378B2 (en) * 2013-01-04 2016-10-25 Schweitzer Engineering Laboratories, Inc. Preventing out-of-synchronism reclosing between power systems
US9912148B2 (en) * 2013-03-15 2018-03-06 Varian Semiconductor Equipment Associates, Inc. Superconducting fault current limiter system
KR101622187B1 (en) * 2014-05-13 2016-05-18 엘에스산전 주식회사 Fault current limiter
EP2978091B1 (en) * 2014-07-22 2020-04-01 Nexans Method for the transmission of electric power
DE102015213494A1 (en) * 2015-07-17 2017-01-19 Siemens Aktiengesellschaft Current limiter device with coil and switch
CN110880735B (en) * 2019-12-20 2022-08-30 深圳供电局有限公司 Method for self-starting superconducting cable of medium-voltage power distribution network
CN112635151A (en) * 2020-11-28 2021-04-09 安徽信息工程学院 Temperature-measuring and automatic-cooling impedance type superconducting current limiter

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0926797A2 (en) * 1997-12-19 1999-06-30 Abb Research Ltd. Devices for limiting overcurrents
GB2439764A (en) * 2006-03-25 2008-01-09 Rolls Royce Plc Fault current limiting
US20080103051A1 (en) * 2006-10-25 2008-05-01 Ls Industrial Systems Co., Ltd. Half wave expulsion (non-fault current limiting) type superconducting fault current limiter having integral high speed switch module
WO2010081162A1 (en) * 2009-01-12 2010-07-15 Grid Logic Method and devices for stabilizing electric grid power

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0926797A2 (en) * 1997-12-19 1999-06-30 Abb Research Ltd. Devices for limiting overcurrents
GB2439764A (en) * 2006-03-25 2008-01-09 Rolls Royce Plc Fault current limiting
US20080103051A1 (en) * 2006-10-25 2008-05-01 Ls Industrial Systems Co., Ltd. Half wave expulsion (non-fault current limiting) type superconducting fault current limiter having integral high speed switch module
WO2010081162A1 (en) * 2009-01-12 2010-07-15 Grid Logic Method and devices for stabilizing electric grid power

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116685983A (en) * 2020-12-24 2023-09-01 国际商业机器公司 Programmable and reprogrammable quantum circuits
US12418290B2 (en) 2020-12-24 2025-09-16 International Business Machines Corporation Programmable and reprogrammable quantum circuit

Also Published As

Publication number Publication date
TWI542103B (en) 2016-07-11
CN103636091A (en) 2014-03-12
US20120316069A1 (en) 2012-12-13
AU2012268585A1 (en) 2013-12-19
US8718733B2 (en) 2014-05-06
AU2012268585B2 (en) 2015-08-27
TW201310842A (en) 2013-03-01
KR20140040167A (en) 2014-04-02
CN103636091B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
US8718733B2 (en) Superconducting fault current limiter recovery system
AU2016210745B2 (en) Current splitting device, system for carrying current, and fault current limiter system with the current splitting device
US8654486B2 (en) Superconducting fault current limiter system
US7538991B2 (en) Half wave expulsion (non-fault current limiting) type superconducting fault current limiter having integral high speed switch module
US5414586A (en) Superconducting current limiting device
US8914085B2 (en) Superconducting fault current limiter monitoring
US8611056B2 (en) Superconducting fault current limiter
KR100819346B1 (en) Power supply stabilization device
CN107851992B (en) Current limiting device with coil and switch
Ayachi Amor et al. Study on the alliance between sfcl and hybrid dc circuit breaker for protecting hvdc grid
GB2439764A (en) Fault current limiting
WO2013139382A1 (en) Current control apparatus
JPH01185128A (en) Self-reset current limiter
Vojenčiak et al. Indirect cooling of superconducting fault current limiter
JPH01198229A (en) superconducting current limiter

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12728149

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2012268585

Country of ref document: AU

Date of ref document: 20120604

Kind code of ref document: A

Ref document number: 20137033794

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 12728149

Country of ref document: EP

Kind code of ref document: A1

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013031515

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013031515

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20131206