WO2012134680A2 - Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed - Google Patents

Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed Download PDF

Info

Publication number
WO2012134680A2
WO2012134680A2 PCT/US2012/026462 US2012026462W WO2012134680A2 WO 2012134680 A2 WO2012134680 A2 WO 2012134680A2 US 2012026462 W US2012026462 W US 2012026462W WO 2012134680 A2 WO2012134680 A2 WO 2012134680A2
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
spool
seabed
manipulator
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2012/026462
Other languages
English (en)
French (fr)
Other versions
WO2012134680A3 (en
Inventor
Stephen LISO
Eric HARDING
Thomas O'donnell
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chevron USA Inc
Original Assignee
Chevron USA Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron USA Inc filed Critical Chevron USA Inc
Priority to BR112013020754A priority Critical patent/BR112013020754A2/pt
Priority to AU2012233099A priority patent/AU2012233099B2/en
Priority to GB1314432.4A priority patent/GB2503126B/en
Publication of WO2012134680A2 publication Critical patent/WO2012134680A2/en
Publication of WO2012134680A3 publication Critical patent/WO2012134680A3/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/26Repairing or joining pipes on or under water

Definitions

  • the invention relates to systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed, such as pipe used in an oil and gas transportation pipeline.
  • a method for repairing, repositioning and/or replacing a section of pipe or equipment located on a seabed with a replacement spool, the method including the following steps: a. partially driving at least two piles into the seabed adjacent a section of pipe or equipment to be repaired, repositioned and/or replaced such that each of the piles has an exposed pile top above the seabed;
  • a hydraulically controlled manipulator arm including a proximal arm pivotally connected to the base, a distal arm pivotally connected to the proximal arm, a swivel joint connected to the distal arm and a grapple connected to the swivel joint capable of grasping and repositioning the section of pipe or equipment;
  • a method for replacing a section of pipe within a pipeline located on a seabed with a replacement spool including the following steps: a. grasping a pipe at locations upstream and downstream of a section of pipe to be replaced and lifting the pipe off the seabed using a plurality of manipulator assemblies each manipulator assembly having a base for receiving the pile top, a hydraulically controlled manipulator arm including a proximal arm pivotally connected to the base, a distal arm pivotally connected to the proximal arm, a swivel joint connected to the distal arm and a grapple connected to the swivel joint capable of grasping and repositioning a section of pipe wherein each manipulator assembly is installed on a pile top adjacent the pipe;
  • each spool support has a base for receiving a spool support pile top, a restraint mounted to the base capable of securely holding the replacement spool and a hydraulically controlled pushoff mechanism integral to the restraint comprising two pistons capable of pushing in an axial direction along the length of the replacement spool and wherein each connector is positioned between a spool support and one end of the replacement spool;
  • a spool support apparatus for securely supporting a replacement spool of pipe during a pipe spool replacement operation, the apparatus comprising: a. a pile capable of being partially driven into a seabed thereby providing an exposed pile top above the seabed; and
  • a spool support having a base for receiving a spool support pile top, a restraint mounted to the base capable of securely holding the replacement spool and a hydraulically controlled pushoff mechanism integral to the restraint comprising two pistons capable of pushing in an axial direction along the length of the replacement spool.
  • a manipulator apparatus for grasping and repositioning a section of pipe during a pipe spool replacement operation, the apparatus comprising: a. a pile capable of being partially driven into a seabed; and
  • a manipulator assembly having a base for receiving the pile top, a hydraulically controlled manipulator arm including a proximal arm pivotally connected to the base, a distal arm pivotally connected to the proximal arm, a swivel joint connected to the distal arm and a grapple connected to the swivel joint capable of grasping and repositioning a section of pipe.
  • a system for replacing a section of pipe located on a seabed with a replacement spool, the system including: a. at least six piles capable of being partially driven into a seabed adjacent a section of pipe thereby providing a plurality of exposed pile tops above the seabed;
  • each manipulator assembly having a base for receiving the pile top, a hydraulically controlled manipulator arm including a proximal arm pivotally connected to the base, a distal arm pivotally connected to the proximal arm, a swivel joint connected to the distal arm and a grapple connected to the swivel joint capable of grasping and repositioning a section of pipe;
  • each spool support having base for receiving a spool support pile top, a restraint mounted to the base capable of securely holding the replacement spool and a hydraulically controlled pushoff mechanism integral to the restraint comprising two pistons capable of pushing in an axial direction along the length of the replacement spool;
  • each connector capable of slideably fitting around the replacement spool.
  • a control system for directing a sequence of steps in a subsea pipe repair system, the control system including: a. a computer located on a surface vessel for directing a subsea pipe repair operation; b. a computer program in a computer readable media capable of transmitting
  • a telemetry line connecting the computer and a submerged interface apparatus
  • a telemetry line connecting the submerged interface apparatus and the manipulator assembly for providing hydraulic control of the manipulator assembly.
  • Figure 1 illustrates the equipment components to be used in a pipe repair system according to an embodiment of the present invention.
  • Figure 2 illustrates the installation of piles into a seabed adjacent a pipeline to be repaired for use in a method for the replacement of a section of pipe according to an embodiment of the present invention.
  • Figure 3 illustrates the installation of manipulator assemblies on pile tops for use in a method for the replacement of a section of pipe according to an embodiment of the present invention.
  • Figure 4 illustrates the lowering into place of a replacement spool of pipe to replace a damaged section of pipe as part of a method for the replacement of a section of pipe according to an embodiment of the present invention.
  • Figure 5 illustrates a stage in a method for the replacement of a section of pipe according to an embodiment of the present invention after the replacement spool has been connected to the existing pipeline.
  • Figure 6 illustrates a pipeline after a section of pipe has been replaced according to an embodiment of the present invention.
  • Figures 7A-7B illustrate control schemes for controlling manipulator assemblies in a method for the replacement of a section of pipe, according to alternative embodiments of the present invention.
  • subsea pipe located on, near or beneath a seabed, for convenience, simply referred to herein as "on a seabed.”
  • Such subsea pipe also referred to interchangeably as “pipe,” is employed as part of a greater pipeline for transporting liquid and/or gas.
  • the pipeline can be used for transporting hydrocarbon products such as oil, water or gas between offshore production facilities or between a platform and a shore facility.
  • such pipe is made from steel or suitable alloy and has a diameter between about 2 in (5 cm) and about 50 in (127 cm).
  • the methods and systems disclosed herein have particular advantages when the pipe is located on an area of seabed having a slope up to about 30° with respect to the horizontal.
  • a system which utilizes certain equipment components to replace, reposition and/or repair a section of subsea pipe.
  • Figure 1 illustrates the equipment components utilized by the system.
  • Surface vessel 12 delivers the system components to the vicinity of the needed pipeline repair at the surface of the ocean.
  • the vessel 12 is equipped with a crane/winch 14 for lifting and lowering equipment via deployment rigging 16.
  • the steps of the methods of the embodiments disclosed herein are carried out in conjunction with the surface vessel as described hereinafter.
  • Standard remotely operated vehicles (ROV's) 120 including known ROV tooling suites, hydraulic controls and interfaces and pipe preparation tooling can be used with the system components in order to carry out the methods disclosed herein.
  • ROV's are connected to the surface or a control module via tether 122.
  • Piles 118 are used to anchor load-bearing equipment into the seabed 1.
  • the piles can be suction-type piles.
  • the methods used for driving piles by suction are well known in the art and will not be described in detail. Examples of such piles and their operation are described in U.S. Patent Nos. 4,575,282 and 6,719,496.
  • the number of piles utilized depends on the objective and magnitude of a given embodiment. For instance, merely repositioning a section of pipe or repairing a pinhole leak in a pipe requires at least two piles, while replacing a section of pipe requires at least six piles. Each of these scenarios will be described further herein.
  • Manipulator assemblies 100 are used to grasp, lift and hold a section of pipe during the replacing, repositioning and/or repairing methods.
  • the number of manipulator assemblies utilized depends on the objective of a given embodiment. At least two manipulator assemblies are utilized for repositioning or repairing a pinhole leak, while at least four manipulator assemblies are utilized for replacing a section of pipe.
  • each manipulator assembly 100 has an azimuthing base 110 and a manipulator arm controllable by hydraulics 114, the manipulator arm including a proximal arm 112 pivotally connected to the base 110 and a distal arm 113 pivotally connected to the proximal arm 112.
  • a swivel joint 116 and a grapple 111 capable of securely grasping a pipe located on the seabed, and lifting, maneuvering and holding the pipe.
  • the base 110 has up to 360° nominal rotation adapted to receive the top end of a pile.
  • the base is preferably keyed in order to lock the manipulator assembly in place.
  • the base encapsulates the top end of a pile, also referred to herein as a "pile top,” and allows the grapple loads to react against the partially driven pile.
  • the manipulator assembly could alternatively be fixed to the pile top by the use of other suitable means, including the use of bolts and the like.
  • the proximal and distal arms of the manipulator arm can extend the grapple up to the full length of the manipulator arm, for instance up to about 20 feet (6 m), even up to about 14 feet (4 m) from the base 110.
  • Each manipulator arm has a hydraulic tool receptacle (not shown) for receiving hydraulic control, for instance from a remotely operated vehicle via a tool for establishing a hydraulic connection commonly referred to as a "hot stab.”
  • a pair of spool supports 130 is used to support a replacement spool 2' during the replacement method.
  • Each spool support 130 has a base 132 similar to the base 110 of the manipulator assemblies, a brace or restraint formed by the cooperation of 138 and 134 capable of securely holding the pipe circumferentially, and a hydraulically controlled pushoff mechanism 136 consisting of two pistons capable of pushing connectors axially along the length of the replacement spool.
  • a pair of connectors 150 is used to connect the replacement spool 2' to the surrounding cut ends of the existing pipe between which the replacement spool is to be inserted.
  • Each connector 150 is configured to fit slideably over the gap between a section of pipe and a replacement spool and consists of means for gripping and sealing both the pipe and replacement spool.
  • Such connectors are known for connecting subsea pipe. A description of an exemplary connector and its operation can be found in U.S. Patent No. 4,076,130.
  • a holdback yoke 160 capable of being securely and permanently attached to a pipe at a particular location can be attached to at least one permanent partially driven pile by holdback lines 162 in order to stabilize pipe movement on sloping seabed surfaces after the replacement or repair operation is completed.
  • a method is provided for replacing a section of subsea pipe located on a seabed. This section of pipe to be replaced is an integral part of a greater subsea pipeline, also referred to interchangeably as pipe.
  • a section of pipe to be replaced is first identified. With the assistance of an ROV, marker buoys can be placed to identify the location of the cuts to be made in the pipe.
  • the ROV will move along the length of the pipe by a distance from the damaged section of pipe (also referred to as the section to be replaced) and then test the pipe for straightness and ovality. In one embodiment, the ROV moves up to about 40 feet (12 m) from the damaged section. If the straightness and ovality are not acceptable, the ROV will continue moving along the length of the pipe until the pipe dimensions fall within predetermined specifications. In one embodiment, this distance is up to about 90 feet (27 m) from the damaged section of pipe. When the pipe dimensions are found to be acceptable, the ROV will mark locations for the insertion of spool support piles into the seabed.
  • the ROV will then continue along the pipe axis, a further distance, such as for instance up to about 25 feet (7.6 m), on either side of the section to be replaced, and mark locations for a first set of manipulator assembly support piles.
  • These markers are preferably on the opposite side of the pipe from the spool support piles. In one embodiment, the markers are placed approximately 12 feet (3.6 m) from the pipe center line.
  • the ROV will continue along the pipe axis an additional distance, such as for instance up to about 100 feet (30 m) from both of the spool markers, and mark locations for a second set of manipulator assembly support piles. In one embodiment, the markers are placed approximately 12 feet (3.6 m) from the pipe centerline.
  • manipulator support piles are intended for supporting manipulator assemblies, also referred to herein as "manipulator support piles.”
  • the piles are lowered from the surface using rigging 16.
  • the manipulator support piles are partially driven into the seabed 1 adjacent the pipeline 2, with at least two piles upstream and at least two piles downstream of the section of pipe to be replaced 2b having crack c.
  • the two piles are partially driven into the seabed 1 adjacent the pipeline 2, with at least two piles upstream and at least two piles downstream of the section of pipe to be replaced 2b having crack c.
  • manipulator support piles upstream of the section of pipe to be replaced are adjacent the pipeline portion 2a which is upstream of the damaged section of pipe, also referred to as the uphill section of pipe.
  • the two manipulator support piles downstream of the section of pipe to be replaced are adjacent the pipeline portion 2c which is downstream of the damaged section of pipe, also referred to as the downhill section of pipe.
  • adjacent is meant within 10 feet (3 m) of the axis of the pipe.
  • partially driven is meant inserted substantially vertically into the seabed by any known means such that one end of the pile is exposed above the seabed. The exposed pile end is also referred to as a "pile top.”
  • At least two of the piles 118 are intended for supporting spool supports, also referred to herein as "spool support piles.”
  • the spool support piles are partially driven into the seabed adjacent the section of pipe to be replaced 2b between the ends of the damaged section of pipe.
  • a holdback yoke 160 is installed onto the downhill portion 2c of the pipeline for purposes of holding the repaired pipeline in place after the repair operations are completed by attaching the yoke to two pile tops which will be left in place permanently.
  • the yoke is installed so that it is securely attached about a section of the pipe downhill of the damaged section of pipe.
  • Two securing means 162 such as wires, chains or the like, referred to as holdback lines, are attached to each of two piles intended to be left in place and to the holdback yoke. .
  • the holdback lines can be installed and tightened by the ROV tooling.
  • manipulator assemblies 100 are lowered into place on the manipulator support piles 118 beginning with the most downhill manipulator support pile. Once the base of each manipulator assembly has encapsulated the pile, the ROV will then rotate the base into alignment for the orientation key to allow seating of the manipulator assembly onto the pile. This process is repeated for the remaining three manipulator assemblies.
  • Each manipulator assembly can be lowered using rigging cable 16 attached to a hook or loop on the
  • manipulator assembly which is raised and lowered by the crane/winch 14 aboard surface vessel 12.
  • the hydraulic controls of the manipulator arms can be engaged by the ROV to securely grasp the pipe at two locations upstream and two locations downstream of the section of pipe to be replaced.
  • the manipulator arms can be controlled to lift the pipe off the seabed into a desired position so that two cuts can be made through the pipe in the desired locations at the ends of the damaged section.
  • Any suitable known technology for cutting subsea pipe and preparing the cut pipe ends can be used.
  • the damaged section of pipe to be replaced can be set aside on the seabed and/or removed to the surface vessel.
  • the distance between the upstream cut end of pipe (i.e., cut end of uphill section of pipe 2a) and the downstream cut end of pipe (i.e., cut end of downhill section of pipe 2c) can be measured.
  • Spool length metrology is done coarsely using the spool support piles where accuracies in measurement of the support piles centers can accommodate errors of +/- 24 inches (61 cm) over 160 foot (49 m) spool lengths. This method removes the necessity for accurate spool length metrology.
  • the measured distance is used to size the replacement spool to the appropriate length.
  • the replacement spool can be fabricated on the surface vessel 12 using any suitable known techniques.
  • the replacement spool is then fitted with two spool supports 130 adjacent each other on the spool and two connectors 150 on either side of the spool supports.
  • the ROV will operate the manipulator assemblies 100 to manipulate the cut pipe ends into realignment.
  • replacement spool 2b' is then lowered with the rigging 16 so that the spool supports 130 land onto the spool support piles 118.
  • the ends of the replacement spool 2b' are then brought into alignment with the cut ends by controlling the manipulator assemblies holding the pipe on either side of the replacement spool.
  • the replacement spool is connected to the existing pipe using the connectors 150 at each end of the replacement spool.
  • the pushoff mechanism on each spool support 130 is activated by the ROV such that the pistons stroke the connector 150 onto the ends of pipe sections 2a and 2c.
  • the action of the pistons pushes the connectors from the replacement spool onto the pipe ends so that the connectors bridge the gaps between the replacement spool and the pipe both upstream and downstream of the replacement spool.
  • the connectors are then set by the ROV using hydraulic pressure and finally pressure tested by the ROV.
  • the replacement spool 2b' has been connected with the pipeline and is still supported by the spool supports 130 on spool support piles 118.
  • the manipulator assemblies 100 will take the load from the spool supports 130.
  • TheROV will then release the spool 2b' from the spool supports 130 which can then be removed.
  • the manipulator arms are then engaged to lower the pipe complete with the new replacement spool to the seabed.
  • the surface vessel will then lower the rigging 16, and the ROV will commence operations to attach the rigging to the manipulator assemblies and spool supports and recover the equipment to the surface vessel 12.
  • the ROV will commence operations to recover the piles. It may be preferred to remove the piles from the seabed once the pipe replacement is completed.
  • At least one pile in place to serve to prevent the down slope movement of the pipe.
  • two piles can be left in place in the seabed for the purpose of supporting pipeline loads via a holdback yoke 160 attached to the piles via lines 162.
  • the piles and manipulator assemblies can be reused repeatedly.
  • the above described sequence of operations is suitable for a standard straight replacement spool installation, assuming a replacement spool piece up to about 200 feet (61 m) in length and a pipe outer diameter of up to about 24 inches (61 cm). Greater lengths will require additional piles and additional manipulator assemblies as will be readily appreciated by the skilled artisan.
  • two replacement spools can be used to connect the long section with the existing pipe as will be readily appreciated by the skilled artisan.
  • the manipulator assembly functions are hydraulically driven by the ROV hydraulic system; however, various hydraulic controls and alignment sensor systems can be installed from partial automation to complete automation of the system in the pipe lift and alignment process.
  • the methods and systems disclosed herein can be generally configured in three different modes of control.
  • the pipe replacement, repositioning and/or repair system is configured with no autonomous controls in which case all equipment is independently operated and all functions are activated locally at the equipment (e.g., manipulator arm, spool support, connector) by the ROV via the ROV hydraulic supply.
  • Figure 5 illustrates this mode of control.
  • the system is configured such that the manipulator assemblies 100 are controlled by means of lines 142 connected to an umbilical termination adapter 140 connected to umbilical 144 containing power and telemetry lines.
  • each manipulator arm is controlled by the umbilical termination adapter rather than by an ROV.
  • the system is configured with semi-automatic control wherein the manipulator assemblies 100 are equipped with integrated sensors and hydraulic circuits which are linked together via jumper lines or cables 141 so that each manipulator arm can be controlled remotely or indirectly by the ROV 120.
  • the system is configured with automatic control as described in the semi-automatic control mode, further including power and telemetry connections to a computer (depicted as 14 in Figure 1) on the surface vessel 12.
  • a computer depictted as 14 in Figure 1
  • the grasping, moving and releasing steps performed by the hydraulically controlled manipulator arm are controlled by a preprogrammed sequence prescribed or directed by a computer program in a computer readable media.
  • An operator on the surface vessel initiates the pipe replacement sequencing, repositioning, alignment and stroking operation by initiating the computer program.
  • Power and telemetry umbilical 144 connects a power source and the computer, respectively, to a submerged interface apparatus, also referred to as an umbilical termination adapter 140.
  • a power line connects the submerged interface apparatus and each manipulator assembly 100 for providing power to drive the hydraulically controlled manipulator arm.
  • a telemetry line connects the submerged interface apparatus and each manipulator assembly for providing hydraulic control of the manipulator arm .
  • the system can optionally be equipped with mechanical lock systems in order to maintain precision load holding while holding equipment in place over prolonged periods of time.
  • systems and methods disclosed herein can also be used to replace, reposition and/or repair other pieces of subsea equipment having dimensions susceptible to manipulation by the presently disclosed systems.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
PCT/US2012/026462 2011-03-30 2012-02-24 Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed Ceased WO2012134680A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
BR112013020754A BR112013020754A2 (pt) 2011-03-30 2012-02-24 sistemas e métodos para a substituição, reposicionamento e reparação de uma seção de tubagem submarina localizada no leito do mar
AU2012233099A AU2012233099B2 (en) 2011-03-30 2012-02-24 Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed
GB1314432.4A GB2503126B (en) 2011-03-30 2012-02-24 System and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US13/076,008 US8517634B1 (en) 2011-03-30 2011-03-30 Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed
US13/076,008 2011-03-30

Publications (2)

Publication Number Publication Date
WO2012134680A2 true WO2012134680A2 (en) 2012-10-04
WO2012134680A3 WO2012134680A3 (en) 2013-04-04

Family

ID=46932219

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2012/026462 Ceased WO2012134680A2 (en) 2011-03-30 2012-02-24 Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed

Country Status (6)

Country Link
US (1) US8517634B1 (https=)
AU (1) AU2012233099B2 (https=)
BR (1) BR112013020754A2 (https=)
GB (1) GB2503126B (https=)
NO (1) NO20131284A1 (https=)
WO (1) WO2012134680A2 (https=)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105485423A (zh) * 2015-12-14 2016-04-13 山河智能装备股份有限公司 一种管道抓取摆放装置
WO2021191475A1 (en) 2020-03-27 2021-09-30 Subsea 7 Norway As Lifting systems for subsea pipelines

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2016012264A (es) * 2014-03-26 2017-04-27 Superior Energy Services Llc Métodos de localización y estimulación y aparatos que utilizan herramientas de fondo de pozo.
GB201517554D0 (en) * 2015-10-05 2015-11-18 Connector As Riser methods and apparatuses
US10184587B1 (en) * 2016-04-28 2019-01-22 Versabar, Inc. Underwater pipe lifting and cutting apparatus and method
EP4170213A1 (en) * 2021-10-19 2023-04-26 Siemens Gamesa Renewable Energy A/S Subsea pipeline connector apparatus

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4109480A (en) 1975-06-20 1978-08-29 The Sea Horse Corporation Under water crane
US4076130A (en) 1976-02-27 1978-02-28 Hydrotech International, Inc. Apparatus for mounting a coupling member over a pipe end in a subsea location
US4218158A (en) * 1977-10-14 1980-08-19 Tesson Prosper A Pipe handling method and apparatus
IT1097789B (it) * 1978-07-28 1985-08-31 Saipem Spa Apparecchiatura per il supporto di tubazioni sospese su avvallamenti situati anche alle grandi profondita' del mare e metodo per l'installazione di essa
IT1166864B (it) * 1979-05-29 1987-05-06 Saipem Spa Apparecchiatura perfezionata per il supporto di tubazioni sospese su avvallamenti situati anche a grandi profondita' del mare e metodo perfezionato per l'installazione di essa
US4310264A (en) * 1980-03-31 1982-01-12 Brownlee William L Buoyant pipe system
US6290431B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system with lateral pipe tie-in
US6422315B1 (en) * 1999-09-14 2002-07-23 Quenton Wayne Dean Subsea drilling operations
BR0117167B1 (pt) * 2001-11-06 2011-11-16 aparelho de conexão remota de flange aparafusada e métodos de operação do mesmo.
WO2004106696A1 (en) * 2003-05-28 2004-12-09 Vetco Aibel As A spool piece termination structure, a connection arrangement comprising such a termination structure and a pipeline termination
US7891429B2 (en) * 2005-03-11 2011-02-22 Saipem America Inc. Riserless modular subsea well intervention, method and apparatus
WO2009029527A1 (en) 2007-08-24 2009-03-05 Oceaneering International, Inc. Subsea suction pile crane system
US9299480B2 (en) * 2007-11-13 2016-03-29 Chevron U.S.A. Inc. Subsea power umbilical

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105485423A (zh) * 2015-12-14 2016-04-13 山河智能装备股份有限公司 一种管道抓取摆放装置
WO2021191475A1 (en) 2020-03-27 2021-09-30 Subsea 7 Norway As Lifting systems for subsea pipelines
US12378098B2 (en) 2020-03-27 2025-08-05 Subsea 7 Norway As Lifting systems for subsea pipelines and methods for installing lifting systems

Also Published As

Publication number Publication date
US8517634B1 (en) 2013-08-27
GB201314432D0 (en) 2013-09-25
AU2012233099A1 (en) 2013-08-29
NO20131284A1 (https=) 2013-09-25
GB2503126A (en) 2013-12-18
AU2012233099B2 (en) 2017-04-20
BR112013020754A2 (pt) 2016-10-18
GB2503126B (en) 2015-10-21
WO2012134680A3 (en) 2013-04-04

Similar Documents

Publication Publication Date Title
US6234717B1 (en) Method and apparatus for connecting underwater conduits
EP2430347B1 (en) Method of joining two portions of an underwater pipeline for conducting fluids and/or gas
AU2012233099B2 (en) Systems and methods for replacing, repositioning and repairing a section of subsea pipe located on a seabed
US5425599A (en) Method for repairing a submerged pipeline
EP2534400B1 (en) Method of laying a hybrid pipeline on the seabed
EP2547937B1 (en) Sub-sea apparatus and operating method
US8636447B1 (en) System and method for repairing and extended length of a subsea pipeline
US8449221B1 (en) Method and apparatus for repairing a damaged section of a subsea pipeline
GB2323907A (en) Method and apparatus for connecting underwater conduits
EP3781778B1 (en) Underwater scr lifting frame
AU2020204672B2 (en) Subsea connection of pipeline sections
AU2007244951B2 (en) Towing and recovery method for deepwater pipelines and risers
WO2012134640A2 (en) Systems and methods for repositioning and repairing a section of subsea pipe located on a seabed
Corbetta et al. A new approach to capex and opex reduction: an integrated system for remote tie-ins and pipeline repair
Norman The Statoil deepwater pipeline repair system
Lomenech et al. Diverless Installation Of Templates And Pipelines On East Frigg Field

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 1314432

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20120224

WWE Wipo information: entry into national phase

Ref document number: 1314432.4

Country of ref document: GB

ENP Entry into the national phase

Ref document number: 2012233099

Country of ref document: AU

Date of ref document: 20120224

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013020754

Country of ref document: BR

122 Ep: pct application non-entry in european phase

Ref document number: 12763475

Country of ref document: EP

Kind code of ref document: A2

ENP Entry into the national phase

Ref document number: 112013020754

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130814