WO2012118891A2 - Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors - Google Patents
Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors Download PDFInfo
- Publication number
- WO2012118891A2 WO2012118891A2 PCT/US2012/027110 US2012027110W WO2012118891A2 WO 2012118891 A2 WO2012118891 A2 WO 2012118891A2 US 2012027110 W US2012027110 W US 2012027110W WO 2012118891 A2 WO2012118891 A2 WO 2012118891A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- clock
- borehole
- downhole tool
- frequency
- iii
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/08—Measuring diameters or related dimensions at the borehole
Definitions
- this disclosure generally relates methods and apparatuses for downhole tools, more specifically, for operating downhole tools by synchronizing clocks in tool subsystems.
- Downhole tools may be used to determine parameters of earth formations and the boreholes that may penetrate the earth formations.
- electromagnetic induction resistivity instruments can be used to determine the electrical conductivity of earth formations surrounding a borehole.
- An electromagnetic induction well logging instrument may include a transmitter coil and a plurality of receiver coils positioned at axially spaced apart locations along the instrument housing. An alternating current may then be passed through the transmitter coil. Voltages which are induced in the receiver coils as a result of alternating magnetic fields induced in the earth formations are then measured. The magnitude of certain phase and amplitude components of the induced receiver voltages are related to the conductivity of the media surrounding the instrument.
- Multiple downhole tools may be positioned along a carrier, such as a drill string or a wireline, and an individual downhole tool may be divided into two or more subsections. Subsections of a particular tool may be located adjacent to one another or separated by an intervening object, such as an unrelated subsystem, a length of pipe, a spacer, collar section, etc.
- the present disclosure is related to an apparatus and method for downhole tool operation in a borehole. More specifically, the present disclosure relates to operating a downhole tool configured to estimate parameters of a borehole or the earth formation that is penetrated by the borehole that has two or more clocks which may be synchronized through a modulator-demodulator device.
- One embodiment according to the present disclosure includes a method for operating a downhole tool in a borehole in an earth formation, comprising: operating the downhole tool in the borehole by at least synchronizing a first clock with a second clock in the downhole tool, wherein the first and second clocks communicate through a modulator/demodulator device.
- Another embodiment according to the present disclosure includes an apparatus for operation in a borehole in an earth formation, comprising: a carrier configured to be conveyed in a borehole; a first clock at a first frequency; and a downhole tool disposed on the carrier, the downhole tool comprising: a second clock at a second frequency, and a modulator-demodulator device configured to allow the second clock to be synchronized with the first clock.
- FIG. 1 shows a schematic of a drilling rig with a downhole tool according to one embodiment of the present disclosure
- FIG. 2 shows a schematic of a downhole tool according to one embodiment of the present disclosure
- FIG. 3 shows a flow chart of a method of synchronizing two clocks in a downhole tool according to one embodiment of the present disclosure
- FIG. 4 shows a data flow chart of a method of synchronizing two clocks in a downhole tool according to one embodiment of the present disclosure.
- the present disclosure relates to apparatuses and methods for operating a downhole tool in a borehole. More specifically, the present disclosure relates to operating a downhole tool configured to estimate at least one parameter of interest of a subsurface feature using at least two clocks which may be synchronized through a modulator-demodulator device.
- the present disclosure is susceptible to embodiments of different forms. There are shown in the drawings, and herein will be described in detail, specific embodiments of the present disclosure with the understanding that the present disclosure is to be considered an exemplification of the principles of the present disclosure and is not intended to limit the present disclosure to that illustrated and described herein.
- the present disclosure may include a downhole tool configured to acquire information about a subsurface feature that may include at least one of: (i) a resistivity measurement, (ii) an acoustic measurement, and (iii) a nuclear measurement.
- a subsurface feature may relate to one or more of: (i) downhole equipment, (ii) drilling fluid, (iii) borehole casing, (iv) an earth formation, and (v) a borehole.
- the present disclosure may include a downhole tool configured to acquire information about the borehole that may include at least one of: (i) borehole geometry, (ii) borehole inclination, (iii) borehole azimuth, (iv) borehole diameter, (v) borehole ovality, and (vi) borehole trajectory.
- the term "information" may relate to one or more of: (i) raw data, (ii) processed data, and (iii) signals.
- Downhole conditions such as heat and pressure, may cause a clock to drift in terms of phase or frequency. When one or more clocks drift, the lack of agreement between the clocks may result in a loss or corruption of information.
- clock refers to devices that keep time and/or provide a time signal to other devices. Clock drift may render information unusable.
- the present disclosure includes methods and apparatuses for synchronizing two clocks that are separated by a modulator-demodulator device such that a high frequency signal (a clocking signal) may be transmitted from a first clock to a second clock without requiring a dedicated communication line designed to carry high frequency signals.
- Dedicated communication lines may require closer proximity of the clocks (less than 5 meters) or special types of wiring (coaxial cables, twisted pairs, etc.). In circumstances where the clocks may be separated by an intervening object, such as a section of pipe or another tool, the use of a dedicated line may be impractical or impossible.
- Benefits of the proposed technique may include the use of a low frequency communication line between clocks located downhole that require synchronization and longer distances between downhole clocks while maintaining synchronized operation.
- One non-limiting embodiment of an apparatus configured to use the proposed technique is described below.
- Fig. 1 shows a schematic diagram of a drilling system 10 according to one embodiment of the present disclosure.
- Fig. 1 shows a borehole 12 in an earth formation 24 that includes a casing 14 with a carrier 16.
- carrier as used herein means any device, device component, combination of devices, media and/or member that may be used to convey, house, support, or otherwise facilitate the use of another device, device component, combination of devices, media and/or member.
- Exemplary non-limiting carriers include drill strings of the coiled tube type, of the jointed pipe type, and any combination or portion thereof.
- the drill string 16 may include a tubular member 18 that carries a BHA 50 at a distal end.
- the tubular member 18 may be made up by joining drill pipe sections.
- the drill string 16 extends to a rig 30 at the surface 32.
- the drill string 16, which may be jointed tubulars or coiled tubing, may include power and/or data conductors such as wires for providing bidirectional communication and power transmission.
- a top drive (not shown), or other suitable rotary power source, may be utilized to rotate the drill string 16.
- a controller 34 may be placed at the surface 32 for receiving and processing downhole data.
- the controller 34 may include a processor, a storage device for storing data and computer programs.
- the processor may access the data and programs from the storage device and executes the instructions contained in the programs to control the drilling operations.
- a suitable drilling fluid 36 is circulated under pressure through a bore in the drill string 16 by a mud pump 38.
- the drilling fluid 36 is discharged at the borehole bottom through an opening in the drill bit 40.
- the drilling fluid 36 circulates uphole through the annular space 42 between the drill string 16 and a wall of the borehole 12.
- the BHA 50 may include a downhole tool 100.
- Downhole tool 100 may be configured to acquire information related to the borehole 12, the earth formation, or both. Downhole tool 100 may be configured to perform one or more operations within the borehole 12 including, but not limited to, adjusting stabilizers, extending extensible arms, and geosteering. Downhole tool 100 may includes a downhole controller, which may include a controller, a data storage medium, such as a solid state memory, and associated electronic circuitry for processing the measurements taken by the tool. Downhole tool 100 may include a circuit configured with one or more clocks.
- Fig. 2 shows an exemplary schematic of tool 100.
- the tool 100 may be configured for resistivity measurements may include a transmitter 210 and at least one receiver 220 disposed along drill string 16.
- the tool 100 may be divided into two or more subs, such that a first sub 215 includes transmitter 210 and the second sub 225 includes receiver 220.
- the transmitter 210 may need to be synchronized with the at least one receiver 220 despite being separated by an intervening piece of equipment 235.
- a clock 240 on first sub 215 may be associated with transmitter 210 and another clock 250 on second sub 225 may be associated with at least one receiver 220.
- Sub 215 may include at least one controller 245 configured to generate a reference signal using an output from clock 240.
- the at least one controller 245 may include at least one processor (not shown).
- a processor may relate to any integrated circuit computing device, including, but not limited to, (i) a microprocessor, (ii) a field- programmable gate array (FPGA), (iii) an application specific integrated circuit (ASIC), (iv) a reduced instruction set computer (RISC), (v) a programmable logic array (PAL), and (vi) a Bit Slice processor.
- the controller 245 may also include a computer storage medium configured to store instructions that may be executed by the at least one processor of controller 245.
- the computer storage medium may include any non-transitory machine-readable storage medium known to those of skill in the art, including but not limited to one or more of: (i) a ROM, (ii) an EPROM, (iii) an EEPROM, (iv) a flash memory, and (v) an optical disk.
- the output from clock 240 may serve as the reference signal without the use of controller 245.
- the reference signal may be configured to cause another clock 250 to be synchronized with the first clock 240 in terms of frequency and/or phase.
- Clock 250 may be synchronized with clock 240 across a modulator/demodulator device 260.
- the modulator/demodulator 260 may be configured to modulate and demodulate a high frequency signal using any appropriate modulation/demodulation techniques known to one of skill in the art.
- Modulation/demodulation techniques that may be used in modulator/demodulator 260 may include, but are not limited to, one of: (i) frequency- shift keying (FSK), (ii) amplitude- shift keying (ASK), (iii) phase-shift keying (PSK), (iv) continuous-phase frequency-shift keying (CPFSK), (v) orthogonal frequency division multiplexing (OFDM), (vi) amplitude modulation (AM), (vii) frequency modulation (FM), (viii) quadrature amplitude modulation (QAM), and (ix) minimum-shift keying (MSK).
- FSK frequency- shift keying
- ASK amplitude- shift keying
- PSK phase-shift keying
- CPFSK continuous-phase frequency-shift keying
- OFDM orthogonal frequency division multiplexing
- AM amplitude modulation
- FM frequency modulation
- QAM quadrature amplitude modulation
- MSK minimum-shift keying
- the modulator/demodulator device 260 may include a modem 270 associated with clock 240 and configured to modulate and transmit a reference signal across a low frequency conductor 280 to a modem 290 associated with clock 250.
- Modem 290 may be configured to demodulate the reference signal and communicate the signal to clock 250.
- the reference signal may be used to generate a synchronization signal, such as through a phase lock loop circuit, which may be used to synchronize clock 250.
- the synchronization signal may be related to the reference signal such that the synchronization signal has at least one of: (i) the identical frequency as the reference signal, (ii) the reference signal frequency multiplied by an integer, (iii) the reference signal frequency divided by an integer, (iv) the phase of the reference signal, and (v) the phase of the reference signal plus an offset.
- the synchronization may be performed from clock 250 to clock 240.
- the reference signal may be sent to a plurality of clocks.
- low frequency conductor 280 may be capable of communicating low frequency signals but not high frequency signals (10 MHz and above). In some embodiments, low frequency conductor 280 may be part of a noncommunication circuit, such as a power line. In some embodiments, low frequency conductor 280 may be part of a communication system configured to convey communications with several tools along the carrier.
- the synchronization signal may be an output from demodulator 290.
- the synchronization signal may be an output from at least one processor (not shown) that may receive the demodulated signal and that does not use instructions from an associated computer storage medium.
- the synchronization signal may be an output from at least one processor (not shown) that may receive the demodulated signal and that does use instructions from an associated computer storage medium.
- the downhole tool 100 may be configured to initiate an operation (such as an acquisition of information) based on a difference between a signal from the first clock 240 and a signal from the second clock 250.
- This difference may be related to one more of: (i) phase, (ii) amplitude, and (iii) frequency.
- transmitter 210 may be triggered to begin a measurement operation when the phase difference between the clocks 240, 250 is within 1 degree.
- the phase difference for triggering an operation may be a user selected range.
- the phase difference may also be an offset, such that, for example, the operation may be triggered when the phase difference between the clocks 240, 250 is within 1 degree of a 40 degree phase difference (39-41 degrees).
- the first sub 215 and the second sub 225 may be adjacent or combined in the same housing without an intervening piece of equipment 235 between the first sub 215 and the second sub 225.
- the intervening equipment 235 may include sensors, devices, a spacer, etc. that separates the first section 215 from the second section 225.
- the transmitter 210 may be configured to impart a transient electromagnetic signal into an earth formation.
- the at least one receiver coil 220 may be configured to receive a transient electromagnetic signal from the earth formation and convert the received signal into an output signal.
- the tool 100 may be configured to perform nuclear measurement.
- the transmitter 210 may be configured to impart a neutron or gamma signal into the earth formation, such as through the use of a chemical nuclear source or a pulsed neutron source.
- the at least one receiver 210 may include at least one radiation detector.
- the tool 100 may be configured to perform acoustic measurements, where the transmitter 210 may be configured to impart an acoustic signal and receiver 220 may be configured to generate a signal in response to a received acoustic signal.
- tool 100 may include other devices.
- Such devices may include, but are not limited to, one or more of: (i) an inclinometer, (ii) a gravimeter, (iii) an accelerometer, (iv) a magnetometer, and (v) a gyroscope.
- the first clock 215 and its associated modem 270 may be located outside the downhole tool 100, such as at the surface, and the low frequency conductor 280 may extend from modem 270 to modem 290 in downhole tool 100.
- Fig. 3 shows of flow chart of a method 300 according to one embodiment of the present disclosure.
- a downhole tool 100 is conveyed into a borehole 12 in an earth formation 24.
- a reference signal may be generated using the first clock 240.
- the reference signal may be modulated by a first modem 270.
- the modulated reference signal may be transmitted along a low frequency conductor 280 configured to connect modem 270 and modem 290.
- the modulated reference signal may be demodulated by modem 290.
- the demodulated reference signal may be converted to a synchronization signal.
- second clock 250 may be synchronized with clock 240 via the synchronization signal.
- step 360 may be optional and step 370 may directly use the demodulated reference signal to synchronize the second clock 250 with the first clock 240.
- Synchronization of the clock 250 may include matching clock 250 to clock 240 in terms of one or more of: (i) a first clock frequency, (ii) an integral multiple of the first clock frequency, (iii) an integral division of the first clock frequency, (iv) phase, and (v) a phase with a selected offset.
- step 380 information may be acquired by the second sub 225 of the downhole tool 110.
- Some embodiments may include a step of initiating an operation (such as information acquisition) based on a difference between a signal from the first clock 240 and a signal from the second clock 250.
- This difference may be related to one more of: (i) phase, (ii) amplitude, and (iii) frequency.
- transmitter 210 may be triggered to begin a measurement operation when the phase difference between the clocks 240, 250 is within 1 degree.
- the phase difference for triggering an operation may be a user selected range.
- the phase difference may also be an offset, such that, for example, the operation may be triggered when the phase difference between the clocks 240, 250 is within 1 degree of a 40 degree phase difference (39-41 degrees).
- Fig. 4 shows a data flow chart for method 300.
- the first clock 240 may provide a clocking signal to a master transmitter direct digital synthesizer (DDS) 410 which may be associated with transmitter 210.
- the first clock 240 may also provide a clocking signal to a converter 440 and oscillator 450 associated with receiver 220.
- the master transmitter DDS 410 may transmit a square wave reference signal to modem 270.
- the master transmitter DDS 410 may also generate a signal for transmitter 210.
- the reference signal may be a binary division of the frequency of first clock 240.
- Modem 270 may modulate the reference signal and transmit the modulated signal along conductor 280.
- One exemplary modem that may serve as modem 270 is a remote FSK M33 powerline modulator.
- the modulated signal may be demodulated by modem 290 and transmitted to a phase loop lock circuit 420.
- One exemplary modem that may serve as modem 290 is a remote FSK M33 powerline modulator.
- the phase loop lock circuit 420 may be configured to lock onto the demodulated square wave signal and to produce a clock signal for synchronizing the second clock 250.
- the phase loop lock circuit 420 may be configured to generate a phase lock detection signal.
- the phase lock detection signal may be used to confirm the receipt of a valid reference signal and/or as an activation signal for transmitter driver 430. Upon receipt of the phase lock detection signal, the activation of transmitter driver 430 may be instantaneous or time delayed.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Remote Sensing (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR112013021796A BR112013021796A2 (en) | 2011-03-01 | 2012-02-29 | "Method and apparatus for tool operation in terrestrial formation" |
| GB1316424.9A GB2504016A (en) | 2011-03-01 | 2012-02-29 | Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors |
| NO20131020A NO20131020A1 (en) | 2011-03-01 | 2013-07-23 | Methods and devices for synchronizing borehole tools with remote transmitters and sensors |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201161448045P | 2011-03-01 | 2011-03-01 | |
| US61/448,045 | 2011-03-01 | ||
| US13/407,175 | 2012-02-28 | ||
| US13/407,175 US20130057411A1 (en) | 2011-03-01 | 2012-02-28 | Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2012118891A2 true WO2012118891A2 (en) | 2012-09-07 |
| WO2012118891A3 WO2012118891A3 (en) | 2012-11-08 |
Family
ID=46758474
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2012/027110 Ceased WO2012118891A2 (en) | 2011-03-01 | 2012-02-29 | Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20130057411A1 (en) |
| BR (1) | BR112013021796A2 (en) |
| GB (1) | GB2504016A (en) |
| NO (1) | NO20131020A1 (en) |
| WO (1) | WO2012118891A2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014099832A1 (en) * | 2012-12-18 | 2014-06-26 | Smith International, Inc. | Methods and systems for analyzing the quality of a wellbore |
| US10280739B2 (en) | 2014-12-05 | 2019-05-07 | Halliburton Energy Services, Inc. | Downhole clock calibration apparatus, systems, and methods |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9146334B2 (en) * | 2011-09-13 | 2015-09-29 | Baker Hughes Incorporated | Method of phase synchronization of MWD or wireline apparatus separated in the string |
| CA2969416A1 (en) * | 2014-12-31 | 2016-07-07 | Halliburton Energy Services, Inc. | Synchronizing downhole subs |
| US11242745B2 (en) * | 2017-04-26 | 2022-02-08 | Tracto-Technik Gmbh & Co. Kg | Drill head for earth boring, drilling device for earth boring having the drill head, method to detect objects while earth boring, and use of direct digital synthesizer as a signal in detecting an obstacle in earth boring |
| US10975688B2 (en) * | 2017-06-20 | 2021-04-13 | Halliburton Energy Services, Inc. | Methods and systems with downhole synchronization based on a direct digital synthesizer (DDS) |
| WO2021250438A1 (en) | 2020-06-10 | 2021-12-16 | Baker Hughes Oilfield Operations Llc | Active magnetic ranging by wellhead current injection |
| US20250237688A1 (en) * | 2024-01-22 | 2025-07-24 | Metrotech Corporation | Cable Locating System with Data Encoding |
| WO2025231385A1 (en) * | 2024-05-02 | 2025-11-06 | Baker Hughes Oilfield Operations Llc | Synchronization of downhole components |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2379694A1 (en) * | 1977-02-03 | 1978-09-01 | Schlumberger Prospection | BOREHOLE DATA TRANSMISSION SYSTEM |
| FR2805896B1 (en) * | 2000-03-01 | 2004-11-19 | Geoservices | DEVICE AND METHOD FOR SEISMIC MEASUREMENTS IN A WELLBORE |
| US6439046B1 (en) * | 2000-08-15 | 2002-08-27 | Baker Hughes Incorporated | Apparatus and method for synchronized formation measurement |
| US7668041B2 (en) * | 2002-03-28 | 2010-02-23 | Baker Hughes Incorporated | Apparatus and methods for acquiring seismic data while tripping |
| US7116182B2 (en) * | 2003-06-03 | 2006-10-03 | Halliburton Energy Services, Inc. | Method and system for downhole clock having compensation |
| US7046584B2 (en) * | 2003-07-09 | 2006-05-16 | Precision Drilling Technology Services Group Inc. | Compensated ensemble crystal oscillator for use in a well borehole system |
| GB2473591B (en) * | 2008-07-10 | 2013-02-27 | Schlumberger Holdings | System and method for generating true depth seismic surveys |
| US8514098B2 (en) * | 2009-04-28 | 2013-08-20 | Schlumberger Technology Corporation | Synchronization between devices |
| WO2010129297A2 (en) * | 2009-04-28 | 2010-11-11 | Schlumberger Canada Limited | Measuring the phase of received signals |
-
2012
- 2012-02-28 US US13/407,175 patent/US20130057411A1/en not_active Abandoned
- 2012-02-29 BR BR112013021796A patent/BR112013021796A2/en not_active IP Right Cessation
- 2012-02-29 WO PCT/US2012/027110 patent/WO2012118891A2/en not_active Ceased
- 2012-02-29 GB GB1316424.9A patent/GB2504016A/en not_active Withdrawn
-
2013
- 2013-07-23 NO NO20131020A patent/NO20131020A1/en not_active Application Discontinuation
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014099832A1 (en) * | 2012-12-18 | 2014-06-26 | Smith International, Inc. | Methods and systems for analyzing the quality of a wellbore |
| US10280739B2 (en) | 2014-12-05 | 2019-05-07 | Halliburton Energy Services, Inc. | Downhole clock calibration apparatus, systems, and methods |
Also Published As
| Publication number | Publication date |
|---|---|
| GB201316424D0 (en) | 2013-10-30 |
| NO20131020A1 (en) | 2013-08-20 |
| US20130057411A1 (en) | 2013-03-07 |
| BR112013021796A2 (en) | 2016-10-25 |
| WO2012118891A3 (en) | 2012-11-08 |
| GB2504016A (en) | 2014-01-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130057411A1 (en) | Methods and apparatuses for synchronization of downhole tool with remote transmitters and sensors | |
| US8922215B2 (en) | Measurement of formation parameters using rotating directional EM antenna | |
| CA2617062C (en) | Bi-directional drill string telemetry system for measurement and drilling control | |
| US6750783B2 (en) | Low frequency electromagnetic telemetry system employing high cardinality phase shift keying | |
| CN100443922C (en) | Downhole signal source | |
| US11228821B2 (en) | Two-way dual-tone methods and systems for synchronizing remote modules | |
| US20180348394A1 (en) | Modular tool having combined em logging and telemetry | |
| CA2806569C (en) | Systems and methods for downhole instrument communication via power cable | |
| CN110770412B (en) | Method for synchronizing signals between antennas with different clock systems | |
| AU2014415557B2 (en) | Synchronizing downhole subs | |
| WO2012087734A2 (en) | Synchronization methods for downhole communication | |
| EP3529453B1 (en) | Pipe for cableless bidirectional data transmission and the continuous circulation of stabilizing fluid in a well for the extraction of formation fluids and a pipe string comprising at least one of said pipes | |
| EP3485142B1 (en) | System for cableless bidirectional data transmission in a well for the extraction of formation fluids | |
| US9575202B2 (en) | Methods and devices for extra-deep azimuthal resistivity measurements | |
| CA3029929C (en) | System for cableless bidirectional data transmission in a well for the extraction of formation fluids | |
| WO2025231385A1 (en) | Synchronization of downhole components |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12753009 Country of ref document: EP Kind code of ref document: A2 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 1316424 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20120229 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1316424.9 Country of ref document: GB |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013021796 Country of ref document: BR |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12753009 Country of ref document: EP Kind code of ref document: A2 |
|
| ENP | Entry into the national phase |
Ref document number: 112013021796 Country of ref document: BR Kind code of ref document: A2 Effective date: 20130827 |