WO2012071912A1 - 矿用电梯柔性导轨张紧力自动调节装置及方法 - Google Patents

矿用电梯柔性导轨张紧力自动调节装置及方法 Download PDF

Info

Publication number
WO2012071912A1
WO2012071912A1 PCT/CN2011/078880 CN2011078880W WO2012071912A1 WO 2012071912 A1 WO2012071912 A1 WO 2012071912A1 CN 2011078880 W CN2011078880 W CN 2011078880W WO 2012071912 A1 WO2012071912 A1 WO 2012071912A1
Authority
WO
WIPO (PCT)
Prior art keywords
fixing
wire rope
tension
rope
holder
Prior art date
Application number
PCT/CN2011/078880
Other languages
English (en)
French (fr)
Inventor
曹国华
朱真才
吴仁愿
秦健聪
康虹桥
彭维红
陈国安
王重秋
邵杏国
李一磊
周公博
Original Assignee
中国矿业大学
东南电梯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to CN201010572049.6 priority Critical
Priority to CN2010105720496A priority patent/CN102085993B/zh
Application filed by 中国矿业大学, 东南电梯股份有限公司 filed Critical 中国矿业大学
Publication of WO2012071912A1 publication Critical patent/WO2012071912A1/zh

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/025End supports, i.e. at top or bottom
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F9/00Straining wire
    • B21F9/002Straining wire to maintain tension in the wire, e.g. to pull the wire taut
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft
    • E21D7/02Arrangement of guides for cages in shafts; Connection of guides for cages to shaft walls

Description

矿用电梯柔性导轨张紧力自动调节装置及方法 技术领域
本发明涉及一种矿用电梯柔性导轨张紧力自动调节装置及方法,尤其适用于矿山井下刚性导轨无法满足的电梯导轨系统。
背景技术
目前,在电梯导向系统方面主要采用刚性导轨,由于刚性导轨在设计、制造和安装过程中存在误差,同时又由于矿井井筒壁承受巨大压力,井筒变形,其导轨侧向倾斜、弯曲变形、接头错位和局部凸起时常发生,从而造成轿厢在提升运行过程中剧烈的振荡;严重时,依赖于低间隙导轨的电梯滑动导靴或滚动导向轮被卡住,造成电梯轿厢卡在井筒内,给矿用电梯的安全运行带来巨大的隐患,轿厢内的乘人构成生命安全危险。
在现有的矿山竖井中,目前已有钢丝绳罐道的柔性导轨,主要是基于井底重锤拉紧的钢丝绳罐道系统、液压螺杆拉紧的钢丝绳罐道系统以及基于快速卡绳装置的液压张紧装置。其中,基于井底重锤拉紧的钢丝绳罐道系统的优点是拉紧力稳定,但提升容器内货物等越重,拉紧重锤的质量就会越大,所占的空间也越大,因此需要开凿较深的井底水窝,若水窝内由于煤块等杂物的撒入,造成井底水窝被填高即重锤的拉紧力减少,致使轿厢横向偏摆严重,同时调整张紧力时工作效率低,工人强度大,且重锤的精确重量难调整;液压螺杆拉紧的钢丝绳罐道系统虽克服了重锤拉紧的许多不足,但是楔块装置加工困难、楔块不容易进入固定装置的底部,从而造成钢丝绳与楔块之间打滑,致使罐道钢丝绳从顶部坠入;而基于快速卡绳装置的液压张紧装置虽然克服了重锤式和螺杆式液压拉紧系统的弊端,但当钢丝绳由于持续张力作用造成永久伸长而使钢丝绳张紧力减小时,无法自动的实现钢丝绳的张紧,必须要工人松开钢丝绳夹板,然后再继续张紧,若油缸的行程不够,则张紧力达不到,需要重新卡绳后张紧,致使提升系统低效率。
根据以上分析可以发现,目前矿用电梯刚性导轨无法满足正常提升、尚没有矿用电梯钢丝绳系统;基于井底重锤拉紧的钢丝绳罐道系统的拉紧重锤质量大、所占的空间大、且重量不易调节;液压螺杆拉紧的钢丝绳罐道系统的楔块装置加工困难,容易造成钢丝绳与楔块之间打滑;基于快速卡绳装置的液压张紧装置的张紧力无法自动调节,且效率低等问题。
技术问题
本发明的目的是提供一种结构简单、易加工、性能可靠、安装和维护简单,同时具有纵向导向、横向偏摆约束,并能够实时监测导轨的张紧力以及根据监测的张紧力自动调节的矿用电梯柔性导轨张紧力自动调节装置及方法。
技术解决方案
本发明的矿用电梯柔性导轨张紧力自动调节装置,包括分别连接在钢丝绳两端的井口自动拉紧装置和井底固定装置,井口自动拉紧装置连接有液压系统和张紧力检测系统;所述的井口自动拉紧装置包括设在上承载梁上的下固定器座,下固定器座上设有位于钢丝绳左右两侧的拉紧油缸缸体,并设有位于钢丝绳前后两侧的销轴固定座及支撑架,拉紧油缸缸体的前后两侧设有防坠座,拉紧油缸缸体内的柱塞经销轴连接在固定于销轴固定座底部的销轴座上,销轴固定座的下方设有防止钢丝绳坠落的防坠卡绳器,销轴固定座的上方设有钢丝绳的拉紧固定卡绳器,支撑架上设有固定左右两个导向柱的上固定器座,上固定器座上设有调绳导向卡绳器;销轴固定座的两侧设有沿导向柱上下移动的导向槽;所述的井下固定装置包括设在下承载梁上的固定板,固定板上设有固定在钢丝绳下端的固定卡绳器。
所述的张紧力检测系统由设在液压系统管路上的油压传感器、与油压传感器相连的信号采集器和与信号采集器相连的实时检测工控机构成;
本发明的矿用电梯柔性导轨张紧力自动调节方法,通过油压传感器实时监控钢丝绳的张紧力,通过信号采集器将采集到的数据传输给张紧力检测系统的工控机,进行分析处理;
当钢丝绳的张紧力低于工控机设定的下限值时,工控机驱动液压系统给拉紧油缸缸体底部管路内加压而推动柱塞,柱塞将固定在销轴固定座的拉紧固定卡绳器往上推而拉紧钢丝绳;
当柱塞一次上升无法使钢丝绳的张紧力达到工控机设定的上限值,油缸另一侧加压,柱塞将固定在销轴固定座上的拉紧固定卡绳器从上部拉回,拉紧固定卡绳器的楔形块与钢丝绳分离,而调绳导向卡绳器和防坠卡绳器由于楔形块的自锁特性,钢丝绳被楔形块夹紧,并保持钢丝绳的张紧力;随后,继续往拉紧油缸缸体的底部管路加压将柱塞往上推,循环往复一次或几次直至钢丝绳的张紧力达到工控机设定的上限值。
有益效果
本发明能够起到轿厢在提升运行过程中的纵向导向、横向偏摆约束,导轨能够克服井筒的侧向变形,并使矿用电梯的轿厢在柔性导轨上稳定的运行,同时能够实时监测导轨的张紧力,并根据张紧力的大小,自动的进行调节,实现自动监测、自主调节的功能,同时也适用于矿井罐笼和箕斗的钢丝绳罐道导向系统。具有如下优点:
(1)柔性导轨可以保持所要求的张紧力,能够起到纵向导向作用、横向偏摆约束,实现轿厢的可靠运行;
(2)相对刚性导轨,安装、维护简单、成本低,尤其适用于侧向变形较大、刚性导轨无法满足的矿井井筒,解决了传统矿用电梯轿厢在刚性导轨上提升过程中噪音大、横向振动剧烈,甚至被卡住的问题;
(3)张紧力自动调节系统能够实时的监测钢丝绳的张紧力,并自动的对张紧力进行调节,实现了张紧力的自动监测、自动校正,提高了轿厢乘坐的安全、可靠和舒适性。
附图说明
图1是本发明的矿用电梯柔性导轨张紧力自动调节装置结构图;
图2是本发明的井口自动拉紧装置结构主视图;
图3是本发明的井口自动拉紧装置结构侧视图;
图4是本发明的卡绳器结构主视图;
图5是本发明的卡绳器结构俯视图;
图6是本发明的井下固定装置结构主视图;
图7是本发明的井下固定装置结构侧视图;
图8是本发明的张紧力检测系统结构图。
图中:井口自动拉紧装置-1、井下固定装置-2、钢丝绳-3、张紧力检测系统-4、液压系统-5;上承载梁-1-1、拉紧油缸缸体-1-2、柱塞-1-3、销轴-1-4、销轴座-1-5、支撑架-1-6、导向柱-1-7、调绳导向卡绳器-1-8、上固定器座-1-9、拉紧固定卡绳器-1-10、销轴固定座-1-11、防坠卡绳器-1-12、防坠座-1-13、下固定器座-1-14、楔形块-1-15、滚柱-1-16、栅架-1-17、连接螺栓-1-18、前夹板-1-19、后夹板-1-20;下承载梁-2-1、固定螺栓-2-2、固定板-2-3、绳卡-2-4、固定卡绳器-2-5;油压传感器-4-1、信号采集器-4-2,工控机-4-3。
本发明的实施方式
下面结合附图中对本发明的一个实施例作进一步描述:
图1所示,矿用电梯柔性导轨张紧力自动调节装置,主要由设在上承载梁1-1上的井口自动拉紧装置1、井底固定装置2、钢丝绳3、张紧力检测系统4和液压系统5构成,井口自动拉紧装置1与井底固定装置2两者通过中间穿过的钢丝绳3相连接,液压系统5和张紧力检测系统4与井口自动拉紧装置1相连接。
图2图3所示的井口自动拉紧装置1中,下固定器座1-14设在上承载梁1-1上,下固定器座1-14上依次设有固定钢丝绳3的防坠卡绳器1-12、拉紧固定卡绳器1-10和调绳导向卡绳器1-8,防坠卡绳器1-12的左右两侧设有拉紧油缸缸体1-2,拉紧油缸缸体1-2的前后两侧设有防坠座1-13,防坠卡绳器1-12之上设有销轴固定座1-11,拉紧固定卡绳器1-10设在销轴固定座1-11上方,拉紧油缸缸体1-2内的柱塞1-3经销轴1-4连接在固定于销轴固定座1-11底部的销轴座1-5上,销轴固定座1-11的外侧设有支撑架1-6,支撑架1-6上设有固定左右两个导向柱1-7的上固定器座1-9,调绳导向卡绳器1-8设在上固定器座1-9上;销轴固定座1-11的两侧端面上设有沿导向柱1-7上下移动的导向槽。上固定器座1-9的调绳导向卡绳器1-8受到的载荷由两侧的支撑架1-6进行承载,支撑架1-6为槽钢与上固定器座1-9和下固定器座1-8相连接固定。
图4图5所示,所有固定在钢丝绳3上的卡绳器结构均相同,只是大小不同,每个卡绳器结构包括中部开有楔形槽的前夹板1-19与后夹板1-20,前后两夹板通过连接螺栓1-18连接固定,楔形槽内对称设有两块可以上下移动的楔形块1-15,两块楔形快1-15相对的一面上开有圆弧绳槽,另一面与楔形槽相配合之间设有带有滚柱1-16的栅架1-17。
图6图7所示的井下固定装置2中,下端的固定卡绳器2-5反向设在钢丝绳3上,通过固定板2-3安装在下承载梁2-1底部,由固定螺栓2-2固定,该固定卡绳器2-5相对调绳导向卡绳器1-8、拉紧固定卡绳器1-10和防坠卡绳器1-12反向倒置安装。钢丝绳3同样穿过固定卡绳器2-5的楔形块1-15的中心绳槽,并通过绳卡2-4进行夹紧。
图8所示的张紧力检测系统,由设在液压系统5管路上的油压传感器4-1、与油压传感器4-1相连的信号采集器4-2和与信号采集器4-2相连的实时检测工控机4-3构成。
本发明的矿用电梯柔性导轨张紧力自动调节方法:
(1)首先将调绳导向卡绳器1-8、拉紧固定卡绳器1-10和防坠卡绳器1-12的楔形块1-15提起,钢丝绳3从调绳导向卡绳器1-8、拉紧固定卡绳器1-10和防坠卡绳器1-12的楔形块1-15中心绳槽穿过,直至井底;将调绳导向卡绳器1-8的楔形块1-15下放卡住钢丝绳3,井底钢丝绳3同样穿过倒置放置的固定卡绳器2-1的楔形块1-15中心绳槽,经固定卡绳器2-1的楔形块1-15夹紧并由绳卡2-4固定,然后连接在井底的下承载梁2-3上;随后,将拉紧固定卡绳器2-1和防坠卡绳器1-12的楔形块1-15下放,并将拉紧油缸缸体1-2内的柱塞1-3往上推,带动拉紧固定卡绳器1-10往上运行,由于楔形块1-15的自锁特性,钢丝绳3被调绳导向卡绳器1-8夹紧并被向上拉起,井底固定卡绳器2-1同样由于楔形块1-15的自锁特性而被夹紧;
(2)拉紧油缸缸体1-2内的压力通过油压传感器4-1实时监测,并将信号采集仪采集到的数据传输给工控机4-3,进行分析处理;
若钢丝绳3的张紧力低于工控机4-3设定的下限值时,工控机4-3驱动液压系统5给拉紧油缸缸体1-2底部管路内加压而推动柱塞1-3,柱塞1-3将固定在销轴固定座1-11的拉紧固定卡绳器1-10往上推而拉紧钢丝绳3;
若柱塞1-3一次上升无法使钢丝绳3的张紧力达到工控机4-3设定的上限值时,柱塞1-3将固定在销轴固定座1-11上的拉紧固定卡绳器1-10从上部拉回,拉紧固定卡绳器1-10的楔形块1-15与钢丝绳3分离,而调绳导向卡绳器1-8和防坠卡绳器1-12由于楔形块1-15的自锁特性,钢丝绳3被楔形块1-15夹紧,并保持钢丝绳3的张紧力;
随后,继续往拉紧油缸缸体1-2的底部管路加压将柱塞1-3往上推,柱塞1-3带动拉紧固定卡绳器1-10往上运行,在拉紧固定卡绳器1-10内的钢丝绳3将再次被夹紧并被向上拉起,从而进一步增大了钢丝绳3的张紧力,循环往复一次或几次直至钢丝绳3的张紧力达到工控机4-3设定的上限值。
(3)最后,若液压系统5出现故障,拉紧固定卡绳器1-10被迅速拉回时,则由防坠座1-13将拉紧固定卡绳器1-10挡住,从而保护拉紧油缸缸体1-2和柱塞1-3,此时钢丝绳3由拉紧固定卡绳器1-13、调绳导向卡绳器1-8和防坠卡绳器1-12三者夹紧来保持张紧力, 并由液压系统5的油压传感器4-1监测,并将信号通过采集仪4-2传输给工控机4-3进行故障的处理。

Claims (3)

  1. 一种矿用电梯柔性导轨张紧力自动调节装置,其特征在于:它包括分别连接在钢丝绳(3)两端的井口自动拉紧装置(1)和井底固定装置(2),井口自动拉紧装置(1)连接有液压系统(5)和张紧力检测系统(4);所述的井口自动拉紧装置(1)包括设在上承载梁(1-1)上的下固定器座(1-14),下固定器座(1-14)上设有位于钢丝绳(3)左右两侧的拉紧油缸缸体(1-2),并设有位于钢丝绳(3)前后两侧的销轴固定座(1-11)及支撑架(1-6),拉紧油缸缸体(1-2)的前后两侧设有防坠座(1-13),拉紧油缸缸体(1-2)内的柱塞(1-3)经销轴(1-4)连接在固定于销轴固定座(1-11)底部的销轴座(1-5)上,销轴固定座(1-11)的下方设有防止钢丝绳(3)坠落的防坠卡绳器(1-12),销轴固定座(1-11)的上方设有钢丝绳(3)的拉紧固定卡绳器(1-10),支撑架(1-6)上设有固定左右两个导向柱(1-7)的上固定器座(1-9),上固定器座(1-9)上设有调绳导向卡绳器(1-8);销轴固定座(1-11)的两侧设有沿导向柱(1-7)上下移动的导向槽;所述的井下固定装置(2)包括设在下承载梁(2-1)上的固定板(2-3),固定板(2-3)上设有固定在钢丝绳(3)下端的固定卡绳器(2-5)。
  2. 根据权利要求1所述的矿用电梯柔性导轨张紧力自动调节装置,其特征在于:所述的张紧力检测系统(4)由设在液压系统(5)管路上的油压传感器(4-1)、与油压传感器(4-1)相连的信号采集器(4-2)和与信号采集器(4-2)相连的实时检测工控机(4-3)构成。
  3. 一种矿用电梯柔性导轨张紧力自动调节方法,其特征在于:通过油压传感器(4-1)实时监控钢丝绳(3)的张紧力,通过信号采集器(4-2)将采集到的数据传输给张紧力检测系统(4)的工控机(4-3),进行分析处理;
    当钢丝绳(3)的张紧力低于工控机(4-3)设定的下限值时,工控机(4-3)驱动液压系统(5)给拉紧油缸缸体(1-2)的底部管路内加压而推动柱塞(1-3),柱塞(1-3)将固定在销轴固定座(1-11)的拉紧固定卡绳器(1-10)往上推而拉紧钢丝绳(3);
    当柱塞(1-3)一次上升无法使钢丝绳(3)的张紧力达到工控机(4-3)设定的上限值,油缸另一侧加压,柱塞(1-3)将固定在销轴固定座(1-11)上的拉紧固定卡绳器(1-10)从上部拉回,拉紧固定卡绳器(1-10)的楔形块(1-15)与钢丝绳(3)分离,而调绳导向卡绳器(1-8)和防坠卡绳器(1-12)由于楔形块(1-15)的自锁特性,钢丝绳(3)被楔形块(1-15)夹紧,并保持钢丝绳(3)的张紧力;随后,继续往拉紧油缸缸体(1-2)的底部管路加压将柱塞(1-3)往上推,循环往复一次或几次直至钢丝绳(3)的张紧力达到工控机(4-3)设定的上限值。
PCT/CN2011/078880 2010-12-03 2011-08-25 矿用电梯柔性导轨张紧力自动调节装置及方法 WO2012071912A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010572049.6 2010-12-03
CN2010105720496A CN102085993B (zh) 2010-12-03 2010-12-03 矿用电梯柔性导轨张紧力自动调节装置及方法

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2011335720A AU2011335720B2 (en) 2010-12-03 2011-08-25 Apparatus and method for automatically adjusting tension on mining elevator flexible guide rail
DE112011100795.7T DE112011100795B4 (de) 2010-12-03 2011-08-25 Vorrichtung und Verfahren zur automatischen Einstellung der Spannung einer fexiblen Führung eines Bergbauaufzugs
US13/637,949 US9242836B2 (en) 2010-12-03 2011-08-25 Apparatus and method for automatically adjusting the tension of a flexible guide rail
RU2012141512/11A RU2539437C2 (ru) 2010-12-03 2011-08-25 Устройство и способ автоматической регулировки натяжения гибкой направляющей шахтного подъемника

Publications (1)

Publication Number Publication Date
WO2012071912A1 true WO2012071912A1 (zh) 2012-06-07

Family

ID=44098024

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/078880 WO2012071912A1 (zh) 2010-12-03 2011-08-25 矿用电梯柔性导轨张紧力自动调节装置及方法

Country Status (6)

Country Link
US (1) US9242836B2 (zh)
CN (1) CN102085993B (zh)
AU (1) AU2011335720B2 (zh)
DE (1) DE112011100795B4 (zh)
RU (1) RU2539437C2 (zh)
WO (1) WO2012071912A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9242836B2 (en) 2010-12-03 2016-01-26 China University Of Mining And Technology Apparatus and method for automatically adjusting the tension of a flexible guide rail

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020161B (zh) * 2010-12-03 2012-08-22 中国矿业大学 一种矿用电梯曳引绳连接装置及其检测方法
CN102275799B (zh) * 2011-07-08 2013-01-16 中国矿业大学 一种矿用电梯
CN102602772B (zh) * 2012-03-27 2014-04-16 中国矿业大学 一种矿用高速电梯防坠制动缓冲系统
CN103359577B (zh) * 2013-07-23 2015-04-01 东南电梯股份有限公司 一种基于柔性导向的特种电梯防坠缓冲器
CN103538994B (zh) * 2013-09-29 2015-03-04 中国矿业大学 一种大型双层罐笼可调式中间盘体及其调移方法
CN104477734B (zh) * 2014-12-11 2016-05-04 中国矿业大学 一种超深立井罐道钢丝绳张紧装置及张紧方法
US10906780B2 (en) 2015-07-27 2021-02-02 Otis Elevator Company Absorber for elevator system rail
CN105089536B (zh) * 2015-08-07 2017-07-18 武汉卡特工业股份有限公司 一种用于旋挖钻机的钻杆救援装置
CN105314511B (zh) * 2015-12-04 2017-04-05 中国矿业大学 一种可水平移动式立井绳罐道及调节方法
DE102017129772A1 (de) * 2017-12-13 2019-06-13 Siemag Tecberg Gmbh Befestigungs- und Spannvorrichtung für Führungsseile einer Förderanlage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU593998A1 (ru) * 1976-06-18 1978-02-25 Специальное Конструкторское Бюро Главного Управления По Жилищному И Гражданскому Строительству Предохранительное устройство подъемника с гибкой направл ющей
CN1316365A (zh) * 2000-04-03 2001-10-10 陈明炬 登船电梯
US6352226B1 (en) * 1999-10-18 2002-03-05 Rosen Products, Llc Monitor lift apparatus
CN2789398Y (zh) * 2005-04-15 2006-06-21 焦作电力集团有限公司 一种柔性导轨安全支架及柔性导轨装置
US7143871B2 (en) * 2000-08-25 2006-12-05 Otis Elevator Company Elevator roller guide and rail assembly
CN102085993A (zh) * 2010-12-03 2011-06-08 中国矿业大学 矿用电梯柔性导轨张紧力自动调节装置及方法
CN201873409U (zh) * 2010-12-03 2011-06-22 中国矿业大学 矿用电梯柔性导轨张紧力自动调节装置

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB846096A (en) * 1956-09-11 1960-08-24 Reliance Rope Attachment Co Ld Improved rope tensioning means
GB897025A (en) * 1959-02-11 1962-05-23 Edgar Atheling Davies Improvements in and relating to the suspension and tensioning of guide and rubbing ropes in vertical pit shafts
US3692277A (en) * 1971-03-03 1972-09-19 Inst Cercetari In Constructii Device for stressing tensionable armatures
SU561704A1 (ru) * 1974-04-26 1977-06-15 Первое Шахтопроходческое Стройуправление Треста "Донецкшахтопроходка" Устройство дл нат жени канатов
SU594002A1 (ru) * 1976-11-22 1978-02-25 Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопастности Работ В Горной Промышленности Устройство дл нат жени каната
DE2804621C2 (zh) * 1978-02-03 1983-01-27 Ruhrkohle Ag, 4300 Essen, De
US4615509A (en) * 1985-10-23 1986-10-07 Cibeles International Inc. Continuous operation linear hydraulic winch
DE19536701C2 (de) * 1995-09-30 1999-07-15 Dyckerhoff & Widmann Ag Verfahren zum Spannen eines Zugglieds aus einer Mehrzahl von Einzelelementen
US6283451B1 (en) * 1998-06-05 2001-09-04 Jennmar Corporation Hydraulic tensioner for mine roof support cables
NL1010908C2 (nl) * 1998-12-28 2000-06-30 Altrex Bv Liftkooigeleidingsstelsel.
KR100381607B1 (ko) * 2001-03-02 2003-04-30 최정두 승강기 로우프 장력 균등화장치
CN100412316C (zh) * 2003-07-19 2008-08-20 中国矿业大学 一种钢丝绳罐道液压张紧装置
US7313975B1 (en) * 2006-02-13 2008-01-01 Romel Scorteanu Apparatus and method for measuring tension in guy wires
CN201092501Y (zh) * 2007-06-13 2008-07-30 张卫华 电梯曳引钢丝绳张力自动平衡器
DE102008032881B3 (de) * 2008-07-14 2009-11-12 Dywidag-Systems International Gmbh Vorrichtung und Verfahren zum Steuern einer Spannpresse beim Spannen eines Spannglieds
CN101759080A (zh) * 2009-11-20 2010-06-30 徐州市工大三森科技有限公司 罐道绳张力在线自动检测与调整装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU593998A1 (ru) * 1976-06-18 1978-02-25 Специальное Конструкторское Бюро Главного Управления По Жилищному И Гражданскому Строительству Предохранительное устройство подъемника с гибкой направл ющей
US6352226B1 (en) * 1999-10-18 2002-03-05 Rosen Products, Llc Monitor lift apparatus
CN1316365A (zh) * 2000-04-03 2001-10-10 陈明炬 登船电梯
US7143871B2 (en) * 2000-08-25 2006-12-05 Otis Elevator Company Elevator roller guide and rail assembly
CN2789398Y (zh) * 2005-04-15 2006-06-21 焦作电力集团有限公司 一种柔性导轨安全支架及柔性导轨装置
CN102085993A (zh) * 2010-12-03 2011-06-08 中国矿业大学 矿用电梯柔性导轨张紧力自动调节装置及方法
CN201873409U (zh) * 2010-12-03 2011-06-22 中国矿业大学 矿用电梯柔性导轨张紧力自动调节装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9242836B2 (en) 2010-12-03 2016-01-26 China University Of Mining And Technology Apparatus and method for automatically adjusting the tension of a flexible guide rail

Also Published As

Publication number Publication date
RU2012141512A (ru) 2014-05-10
CN102085993B (zh) 2013-06-26
CN102085993A (zh) 2011-06-08
US20130233654A1 (en) 2013-09-12
AU2011335720A1 (en) 2012-11-22
DE112011100795B4 (de) 2014-08-07
US9242836B2 (en) 2016-01-26
DE112011100795T5 (de) 2013-03-07
RU2539437C2 (ru) 2015-01-20
AU2011335720B2 (en) 2014-08-07

Similar Documents

Publication Publication Date Title
CN202481868U (zh) 一种轿厢设有制动器的电梯
CA2099963C (en) Safety device arrangement
CN101845958B (zh) 一种综采工作面支架回撤方法和回撤用支架牵引拉力器
CN104527652B (zh) 轨道式绳牵引架空乘人装置
CN104912004A (zh) 一种抱轨式轨道交通桥梁疏散检修平台
CN102303802B (zh) 垂直升降门的断绳保护装置
US9868616B2 (en) Double-deck elevator
WO2012071913A1 (zh) 一种矿用电梯曳引绳连接装置及其检测方法
US9409748B2 (en) Elevator safety device and elevator safety device mounting method
CN102001564B (zh) 提升容器柔性导轨导向装置及其动态特性检测方法
AU2013242674B2 (en) A fall prevention brake buffering system for high-speed mine lift
US20140216857A1 (en) Elevator safety device and elevator safety device mounting method
CN102229395B (zh) 一种矿用电梯多功能模拟实验系统
CN2813554Y (zh) 吊笼自控液压限速防坠落锁紧装置
CN201333597Y (zh) 十字形焊接机升降座防坠装置
CN202038786U (zh) 一种电梯制动绳安全钳
US9382094B2 (en) Elevator refurbishment method
CN107473038B (zh) 立井提升系统刚性罐道提升容器失稳评估装置及评估方法
CN105422149B (zh) 一种快速退锚器
CN106382014A (zh) 一种装配式可伸缩预警卸料平台及其组装施工方法
CN102275799A (zh) 一种矿用电梯
DE112011100795T5 (de) Vorrichtung und Verfahren zur automatischen Einstellung der Spannung einer fexiblen Führung eines Bergbauaufzugs
CN206800251U (zh) 耐撞安全防护升降限高设备
CN102762429B (zh) 可垂直收缩的轨钳
CN103979438A (zh) 一种用于拆除塔吊附着架的辅助装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11844732

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase in:

Ref document number: 2012141512

Country of ref document: RU

Kind code of ref document: A

ENP Entry into the national phase in:

Ref document number: 2011335720

Country of ref document: AU

Date of ref document: 20110825

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13637949

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1120111007957

Country of ref document: DE

Ref document number: 112011100795

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11844732

Country of ref document: EP

Kind code of ref document: A1