Systems and methods for under-frequency blackout protection Download PDFInfo
- Publication number
- WO2012027079A2 WO2012027079A2 PCT/US2011/046437 US2011046437W WO2012027079A2 WO 2012027079 A2 WO2012027079 A2 WO 2012027079A2 US 2011046437 W US2011046437 W US 2011046437W WO 2012027079 A2 WO2012027079 A2 WO 2012027079A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- loads
- ied
- leds
- electric power
- sub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J13/13—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
- H02J13/1321—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network using a wired telecommunication network or a data transmission bus
- H02J13/1323—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network using a wired telecommunication network or a data transmission bus using optical fibres
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/46—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to frequency deviations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J13/12—Monitoring network conditions, e.g. electrical magnitudes or operational status
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J13/14—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network the power network being locally controlled, e.g. home energy management systems [HEMS]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, the networks, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2105/00—Networks for supplying or distributing electric power characterised by their spatial reach or by the load
- H02J2105/10—Local stationary networks having a local or delimited stationary reach
- H02J2105/12—Local stationary networks having a local or delimited stationary reach supplying households or buildings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02P80/14—District level solutions, i.e. local energy networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/18—Systems supporting electrical power generation, transmission or distribution using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Definitions
- This disclosure relates to systems and methods for controlling and protecting an electric power delivery system and, more particularly, to systems and methods for wide-area under-frequency blackout protection in an electric power delivery system.
- Figure 1 illustrates a simplified diagram of one embodiment of an electric power delivery system that includes intelligent electronic devices.
- Figure 2 illustrates a block diagram of one embodiment of an intelligent electronic device for protection and control of an electric power delivery system.
- Figure 3 illustrates another block of one embodiment of an intelligent electronic device for protection and control of an electric power delivery system.
- Figure 4 illustrates one embodiment of a method for protection and control of an electric power delivery system.
- a software module or component may include any type of computer instruction or computer executable code located within a memory device that is operable in conjunction with appropriate hardware to implement the programmed instructions.
- a software module or component may, for instance, comprise one or more physical or logical blocks of computer instructions, which may be organized as a routine, program, object, component, data structure, etc., that performs one or more tasks or implements particular abstract data types.
- a particular software module or component may comprise disparate instructions stored in different locations of a memory device, which together implement the described functionality of the module.
- a module or component may comprise a single instruction or many instructions, and may be distributed over several different code segments, among different programs, and across several memory devices.
- Some embodiments may be practiced in a distributed computing environment where tasks are performed by a remote processing device linked through a communications network.
- software modules or components may be located in local and/or remote memory storage devices.
- data being tied or rendered together in a database record may be resident in the same memory device, or across several memory devices, and may be linked together in fields of a record in a database across a network.
- Embodiments may be provided as a computer program product including a non-transitory machine-readable medium having stored thereon instructions that may be used to program a computer or other electronic device to perform processes described herein.
- the non-transitory machine-readable medium may include, but is not limited to, hard drives, floppy diskettes, optical disks, CD-ROMs, DVD-ROMs, ROMs, RAMs, EPROMs, EEPROMs, magnetic or optical cards, solid-state memory devices, or other types of media/machine-readable medium suitable for storing electronic instructions.
- the computer or other electronic device may include a processing device such as a microprocessor, microcontroller, logic circuitry, or the like.
- the processing device may further include one or more special purpose processing devices such as an application specific interface circuit (ASIC), PAL, PLA, PLD, field programmable gate array (FPGA), or any other customizable or
- Electrical power generation and delivery systems are designed to generate, transmit, and distribute electrical energy to loads.
- Electrical power generation and delivery systems may include equipment, such as electrical generators, electrical motors, power transformers, power transmission and distribution lines, circuit breakers, switches, buses, transmission lines, voltage regulators, capacitor banks, and the like.
- equipment may be monitored, controlled, automated, and/or protected using intelligent electronic devices (lEDs) that receive electric power system information from the equipment, make decisions based on the information, and provide monitoring, control, protection, and/or automation outputs to the equipment.
- lEDs intelligent electronic devices
- an IED may include, for example, remote terminal units, differential relays, distance relays, directional relays, feeder relays, overcurrent relays, voltage regulator controls, voltage relays, breaker failure relays, generator relays, motor relays, automation controllers, bay controllers, meters, recloser controls, communication processors, computing platforms, programmable logic controllers (PLCs), programmable automation controllers, input and output modules, governors, exciters, statcom controllers, SVC controllers, OLTC controllers, and the like.
- PLCs programmable logic controllers
- lEDs may be communicatively connected via a network that includes, for example, multiplexers, routers, hubs, gateways, firewalls, and/or switches to facilitate communications on the networks, each of which may also function as an IED.
- Networking and communication devices may also be integrated into an IED and/or be in communication with an IED.
- an IED may include a single discrete IED or a system of multiple lEDs operating together.
- an IED may be configured to protect the electrical power system equipment from abnormal conditions, such as when the power generation capabilities of the electrical power system cannot adequately supply system loads. Under this unbalanced system condition, power loss or blackouts may occur that negatively affect both providers of electric power and their customers. Consistent with embodiments disclosed herein, an IED may utilize under-frequency (UF) load shedding techniques to minimize blackout conditions on a larger portion of the electric power delivery system.
- UF under-frequency
- Power imbalances in an electrical power delivery system may be associated with a fall in the frequency of the electrical power system fundamental voltage.
- loads when a threshold UF level is crossed, loads may be disconnected (e.g., shedded) from the electrical power system to rebalance the system.
- loads may be disconnected (e.g., shedded) from the electrical power system to rebalance the system.
- Figure 1 illustrates a simplified diagram of an electric power generation and delivery system 100 that includes lEDs 102-108 consistent with embodiments disclosed herein. Although illustrated as a one-line diagram for purposes of simplicity, electrical power generation and delivery system 100 may also be configured as a three phase power system. Moreover, embodiments disclosed herein may be utilized any electric power generation and delivery system and is therefore not limited to the specific system 100 illustrated in Figure 1. Accordingly, embodiments may be integrated, for example, in industrial plant power generation and delivery systems, deep-water vessel power generation and delivery systems, ship power generation and delivery systems, distributed generation power generation and delivery systems, and utility electric power generation and delivery systems.
- the electric power generation and delivery system 100 may include generation, transmission, distribution, and power consumption equipment.
- the system 100 may include one or more generators 1 10 -1 16 that, in some embodiments, may be operated by a utility provider for generation of electrical power for the system 100.
- Generators 1 10 and 1 12 may be coupled to a first transmission bus 1 18 via step up transformers 120 and 122, which are respectively configured to step up the voltages provided to first transmission bus 1 18.
- a transmission line 124 may be coupled between the first transmission bus 1 18 and a second transmission bus 126.
- Another generator 1 14 may be coupled to the second transmission bus 126 via step up transformer 128 which is configured to step up the voltage provided to the second transmission bus 126.
- a step down transformer 130 may be coupled between the second
- the transmission bus 126 and a distribution bus 132 configured to step down the voltage provided by the second transmission bus 126 at transmission levels to lower distribution levels at the distribution bus 132.
- One or more feeders 134, 136 may draw power from the distribution bus 132.
- the feeders 134, 136 may distribute electric power to one or more loads 138, 140.
- the electric power delivered to the loads 138, 140 may be further stepped down from distribution levels to load levels via step down transformers 142 and 144, respectively.
- Feeder 134 may feed electric power from the distribution bus 132 to a distribution site 146 (e.g., a refinery, smelter, paper production mill, or the like). Feeder 134 may be coupled to a distribution site bus 148.
- the distribution site 146 may also include a distributed generator 1 16 configured to provide power to the distribution site bus 148 at an appropriate level via transformer 150.
- the distributed generator 1 16 may comprise a turbine configured to produce electric power from the burning of waste, the use of waste heat, or the like.
- the distribution site 146 may further include one or more loads 138. In some embodiments, the power provided to the loads 138 from the distribution site bus 148 may be stepped up or stepped down to an appropriate level via transformer 142.
- the distribution site 146 may be capable of providing sufficient power to loads 138 independently by the distributed generator 1 16, may utilize power from generators 1 10-1 14, or my utilize both the distributed generator 1 16 and one or more of generators 1 10-1 14 to provide electric power to the loads.
- lEDs 102-108 may be configured to control, monitor, protect, and/or automate the electric power system 100.
- an IED may refer to any microprocessor-based device that monitors, controls, automates, and/or protects monitored equipment within an electric power system.
- An IED may include, for example, remote terminal units, differential relays, distance relays, directional relays, feeder relays, overcurrent relays, voltage regulator controls, voltage relays, breaker failure relays, generator relays, motor relays, automation controllers, bay controllers, meters, recloser controls, communications processors, computing platforms, programmable logic controllers (PLCs), programmable automation controllers, input and output modules, motor drives, and the like.
- PLCs programmable logic controllers
- lEDs 102-108 may gather status information from one or more pieces of monitored equipment.
- lEDs 102-108 may receive information concerning monitored equipment using sensors, transducers, actuators, and the like.
- Figure 1 illustrates separate lEDs monitoring a signal (e.g., IED 104) and controlling a breaker (e.g., IED 108), these capabilities may be combined into a single IED.
- Figure 1 illustrates various lEDs 102-108 performing various functions for illustrative purposes and does not imply any specific arrangements or functions required of any particular IED.
- lEDs 102-108 may be
- lEDs 102-108 may be configured to monitor and communicate information, such as voltages, currents, equipment status, temperature, frequency, pressure, density, infrared absorption, radio- frequency information, partial pressures, viscosity, speed, rotational velocity, mass, switch status, valve status, circuit breaker status, tap status, meter readings, and the like.
- lEDs 102-108 may be configured to communicate calculations, such as phasors (which may or may not be synchronized as synchrophasors), events, fault distances, differentials, impedances, reactances, frequency, and the like.
- lEDs 102- 108 may also communicate settings information, IED identification information, communications information, status information, alarm information, and the like.
- monitored system data Information of the types listed above, or more generally, information about the status of monitored equipment, may be generally referred to herein as monitored system data.
- lEDs 102-108 may issue control instructions to the monitored equipment in order to control various aspects relating to the monitored equipment.
- an IED e.g., IED 106
- a circuit breaker e.g., breaker 152
- an IED may be in communication with a recloser and capable of controlling reclosing operations.
- an IED may be in communication with a voltage regulator and capable of instructing the voltage regulator to tap up and/or down.
- Information of the types listed above, or more generally, information or instructions directing an IED or other device to perform a certain action, may be generally referred to as control instructions.
- the distributed site 146 may include an IED 108 for monitoring, controlling, and protecting the equipment of the distributed site 146 (e.g., generator 1 16,
- IED 108 may receive monitored system data, including current signals via current transformer (CT) 154 and voltage signals via potential transformer (PT 156) from one or more locations (e.g., line 158) in the distribution site 146.
- the IED 108 may further be in communication with a breaker 160 coupled between the feeder 134 and the distribution site bus 148.
- the IED 108 may be configurable to cause the breaker 160 to disconnect the distribution site bus 148 from the distribution bus 132, based on monitored system data received via CT 154 and PT 156.
- Feeder 136 may be communicatively coupled with an IED 106 configured to control a breaker 152 between the loads 140 and the distribution bus 132 based on monitored system data.
- the power provided to the loads 140 from the distribution bus 132 may be stepped up or stepped down to an appropriate level via transformer 144.
- monitored system data may be obtained by IED 106 using CTs and/or PTs (not shown).
- IEDs may be configured to monitor, control, and/or protect the electric power generation and delivery system 100.
- IED 104 may provide transformer and generator protection to the step-up transformer 120 and generator 1 10.
- lEDs 104-108 may be in communication with another IED 102, which may be a central controller, synchrophasor vector processor, automation controller, programmable logic controller (PLC), real-time automation controller, Supervisory Control and Data Acquisition (SCADA) system, or the like.
- IED 102 may be a synchrophasor vector processor, as described in U.S. Patent Application Publication No. 2009/0088990, which is
- IED 102 may be a real-time automation controller, such as is described in U.S. Patent Application Publication No. 2009/0254655, which is incorporated herein by reference in its entirety. IED 102 may also be a PLC or any similar device capable of receiving communications from other lEDs and processing the communications there from. In certain embodiments,
- lEDs 104-108 may communicate with IED 170 directly or via a
- communications network e.g., network 162.
- the central IED 102 may communicate with other lEDs 104-108 to provide control and monitoring of the other lEDs 104-108 and the power generation and delivery system 100 as a whole.
- lEDs 104-108 may be configured to generate monitored system data in the form of time-synchronized phasors (synchrophasors) of monitored currents and/or voltages.
- lEDs 104-108 may calculate synchrophasor data using a variety of methods including, for example, the methods described in U.S. Patent No. 6,662,124, U.S. Patent No. 6,845,333, and U.S. Patent No. 7,480,580, which are herein incorporated by reference in their entireties.
- synchrophasor measurements and communications may comply with the IEC C37.1 18 protocol.
- lEDs 102-108 may receive common time signals for synchronizing collected data (e.g., by applying time stamps for the like). Accordingly, lEDs 102-108 may receive common time signals from time references 164-170 respectively.
- the common time signals may be provided using a GPS satellite (e.g., IRIG), a common radio signal such as WWV or WWVB, a network time signal such as IEEE 1588, or the like.
- lEDs 102-108 may be configured to determine a power system operating frequency from monitored system data.
- the operating frequency of the power system may be determined using many methods including, for example, measuring time between zero-crossings of voltage and/or current, measuring positive-sequence phasor rotations, measuring time between period voltage and/or current peaks, and/or the like.
- lEDs 102-108 may be further configured to indicate when an operating frequency falls below a predetermined level.
- an IED may have a number of different UF levels and may indicate when an operating frequency falls below one or more of the UF levels.
- FIG. 2 illustrates a block diagram of an IED 200 for protection and control of an electric power delivery system (e.g., system 100 illustrated in Figure 1 ).
- IED 200 may communicate with one or more lEDs 1 1 1 configured to provide indications of UF events (e.g., when system operating frequencies fall below one or more UF levels) to IED 200.
- lEDs 222 may receive monitored system data and, based on the monitored system data, provide indications of UF events such as when measured operating frequencies fall below one or more UF levels to the IED 200.
- lEDs 222 may be programmed with a predetermined UF set point (e.g., level) and be configured to provide time synchronized indications of UF events to the IED 200.
- lEDs 222 may include one or more set points (e.g., levels) and be configured to provide time synchronized indications of UF events (e.g., when one or more of the set points are crossed) to the IED 200.
- lEDs 222 may indicate the UF set point (e.g., level) breached, a time indication of the UF event, the power consumed by a load associated with the IED, and/or synchrophasor data which may include a load angle.
- IED 200 may determine whether specific loads are exhibiting UF events and whether such loads can be disconnected (e.g., shed) to limit and/or avoid UF events and systems disturbances. This functionality may be achieved using one or more functional modules 202-220 included in the IED 200. For example, indications of UF events (e.g., breached UF set points, time indications of UF events, power consumed by loads associated with the lEDs, and/or synchrophasor data) detected by lEDs 222 may be provided to a UF level array calculation module included in the IED 200.
- indications of UF events e.g., breached UF set points, time indications of UF events, power consumed by loads associated with the lEDs, and/or synchrophasor data
- UF level array calculation module 208 may be configured to order UF events and their associated information based on time stamps indicating when the UF events were received by their associated lEDs 222 (e.g., UF events may be ordered based on their time of occurrence). Information from the UF level array calculation module 208, including one or more ordered UF events may be provided to a coinciding UF level event calculation module 206. The UF level event calculation module 206 may be configured to determine whether the one or more UF events ordered by the UF level array calculation module 208 are associated with a larger system UF event based on the time stamps associated with the one or more UF events.
- the UF level event calculation module 206 may determine that a particular set of UF events ordered by the UF level array calculation module 208 are associated with a larger system UF event based on their occurrence within a particular time period (e..g, a 10 ms period). Based on the UF events occurring within a particular time period, the UF level array calculation module 208 may determine that the loads associated with the UF events are associated with a power sub-grid experiencing a UF condition and provide this information to a load reduction calculation module 204.
- a particular time period e..g, a 10 ms period
- the IED 200 may also include a user adjustable parameter module 202 that, in some embodiments, includes parameters defining an amount of load to be shed for a particular UF-level.
- the amount of load to be shed may be in the form of a power/frequency value (e.g., MW/Hz).
- Information regarding the amount of load to be shed for a particular UF-level may be provided to the load reduction calculation module 204.
- the load reduction calculation module 204 may also utilize information regarding the UF events provided by the UF level array calculation module 208 and UF level event calculation module 206, including time indications of UF events and indications of UF set points breached.
- the load reduction calculation module 204 may determine an amount of load to shed (e.g., the about of load to shed from the system measured in MW) based on the defined user parameters and the other received UF event information.
- lEDs 222 may be further configured to monitor the power consumed by the loads they are associated with. Information regarding the power consumed by loads associated with the lEDs 222 may be monitored in terms of power (e.g., MW) or other coupled parameters such as current.
- IED 106 may be capable of monitoring the power consumed by loads 140
- IED 108 may be capable of indicating the power presented consumed by the distributed site 146.
- information regarding the power consumed by loads may be provided to a power array calculation module 212 included in the IED 200.
- the power array calculation module 212 may calculate a power consumption value for each load (e.g., by using parameters coupled to power consumption such as current). Further, the power array calculation module 212 may sort and/or order specific loads based on their associated power consumption.
- the user adjustable parameter module 202 may include a parameter that includes a priority indication for loads associated with the lEDs 222.
- the priority indication may include a priority queue indicating the order in which loads should be shed from the system in the event of an UF condition. Accordingly, the priority indication may indicate certain loads (e.g., a hospital) that should stay
- the information generated by the power array calculation module 212 may be provided to a load shedding selection module 210 included in the IED 200 along with the priority indication provided by the user adjustable parameter module 202.
- the load shedding selection module 210 may further receive information related to an amount of load to shed from the load reduction calculation module 204. Based on the received information (e.g., the amount of load to shed, the priority of the loads, and the amount of power consumed by the loads), the load shedding selection module 210 may determine which loads should be shed to reduce the effects of the detected UF event in the system. That is, the load shedding selection module 210 may match the amount of power to shed with the power used by each of the loads, prioritized by the priority information, and determine which loads to shed.
- the IED 200 may include a load shedding control module 214 configured to receive an indication from the load shedding selection module 210 of which loads should be shed and provide a control signal to the lEDs 222 associated with the loads that should be shed directing the lEDs 222 to shed (e.g., disconnect) the relevant loads from the system.
- the load shedding selection module 210 may determine that loads 140 should be shed, and the load shedding control module 214 may direct the IED 106 associated with the loads 140 to trip breaker 152, thereby disconnecting the loads from the system 100.
- Information regarding power sub-grids within a greater grid topology of an electric power delivery system may also be used by the IED 200 to calculate which loads should be shed in view of UF conditions.
- lEDs 222 may provide load angle information (e.g., synchrophasor information) to a phase angle array calculation module 220 included in the IED 200.
- load angle information e.g., synchrophasor information
- equipment ⁇ e.g., loads) associated with a certain power sub-grid of the electric power generation and delivery system may experience similar frequency decay rates when the system experiences an UF condition.
- equipment associated with different power sub-grids may experience different frequency decay rates when the system experiences an UF.
- the probability of both sub-grids experiencing the same frequency decay rate in a system UF condition is low.
- the frequency in one sub-grid may increase while the frequency in the other sub-grid may decrease.
- the frequency decays will likely reach set UF threshold levels at differing times.
- the IED 200 may determine that the loads are associated with a particular power sub-grids.
- IED 200 and its associated modules 202-220 may determine which loads are associated with a particular power sub-grid based on the methods described in U.S. Patent Application Publication No. 2009/0089608 which is herein incorporated by reference in its entirety.
- lEDs 222 may communicate time-synchronized load phase measurements to IED 200 using, for example, the IEC C38.1 18 protocol. Load angles measured by the lEDs 222 may be provided to the phase angle array calculation module 220 that, in some embodiments, may store such information. The phase angle array calculation module 220 may provide the measured load angles to a sub-grid detection module 218. Based on the measured load angles, the sub-grid detection module 218 may determine whether loads associated with the lEDs 222 are associated with particular sub-grids.
- Information regarding which loads are associated with particular sub-grids may be provided to a sub-grid and priority based load selection module 216.
- the sub- grid and priority based load selection module 216 may also receive the parameter that includes a priority indication for loads associated with the lEDs 222 from the user adjustable parameter module 202. Additionally, the sub-grid and priority based load selection module 216 may receive an indication of the amount of load to be shed from the load reduction calculation module 204.
- the sub-grid and priority based load selection module 216 may determine which loads should be shed by the system to reduce the effects of UF conditions. This information may provided by the sub-grid and priority based load selection module 216 to the load shedding control module 214. The load shedding control module may then use this information in conjunction with the information received from the load shedding selection module to determine which loads should be shed and direct the appropriate lEDs 222 to shed the loads from the system.
- the modules 202-220 included in IED 200 may be implemented in a programmable IED system.
- the functionality of IED 200 may be achieved using a synchrophasor vector process (e.g., the SEL-3378 available for Schweitzer Engineering Laboratories, Inc.) or a real-time automation controller (e.g., the SEL-3530 available from Schweitzer Engineering Laboratories, Inc.).
- FIG. 3 illustrates another block of an IED 300 for protection and control of an electric power delivery system.
- IED 300 may include a processor 302, a random access memory (RAM) 304, a communications interface 306, a user interface 308, and a computer-readable storage medium 310.
- the processor 302, RAM 304, communications interface 306, user interface 308, and computer-readable storage medium may be communicatively coupled to each other via a common data bus 312.
- the various components of IED 300 may be implemented using hardware, software, firmware, and/or any combination thereof.
- the user interface 308 may be used by a user to enter user defined settings such as, for example, an amount of load to shed for each event level, load priority information, and the like (e.g., the parameters included in the user adjustable parameter module 202 of Figure 2).
- the user interface 308 may be integrated in the IED 300 or, alternatively, may be a user interface for a laptop or other similar device
- Communications interface 306 may be any interface capable of communicating with lEDs and/or other electric power system equipment communicatively coupled to IED 300.
- communications interface 306 may be a network interface capable of receiving communications from other lEDs over a protocol such as the IEC 61850 or the like.
- communications interface 306 may include a fiber-optic or electrical communications interface for communicating with other lEDs.
- the processor 302 may include one or more general purpose processors, application specific processors, microcontrollers, digital signal processors, FPGAs, or any other customizable or programmable processing device.
- the processor 302 may be configured to execute computer-readable instructions stored on the computer- readable storage medium 310.
- the computer-readable instructions may be computer executable functional modules.
- the computer-readable instructions may include an UF load shedding module 314 configured to cause the processor to perform the UF load shedding operations and a time alignment module 316 used time-aligning and coordinating various
- the computer-readable instructions may also include any of the functional modules described in reference to Figure 2 to implement the functionality of the IED 200 described therein.
- FIG. 4 illustrates one embodiment of a method 400 for protection and control of an electric power delivery system.
- a central IED may receive system information from a remote lEDs each associated with a load.
- the system information may include information relating to the operating frequencies of the loads, the power consumption of the loads, synchrophasor information, an indication that an operating frequency of a load has reached a predetermined level, and the like.
- the central IED may determine which loads are associated with a particular sub-grid of the electric power delivery system experiencing an UF condition.
- determining which loads which loads are associated with a particular sub-grid of the electric power delivery system is based on the decay rates and/or decay times of operating frequencies of the loads.
- the central IED may determine whether to disconnect one or more loads associated with the sub-grid from the electric power delivery system to mitigate the UF condition, sending a signal to lEDs associated with the one or more loads directing the lEDs to disconnect the loads .
- determining which loads to disconnect from the electric power delivery system may be based on priority information associated with the loads.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Power Sources (AREA)
- Selective Calling Equipment (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR112013002373A BR112013002373A2 (en) | 2010-08-24 | 2011-08-03 | system and method for managing an electrical distribution system, and intelligent, electronic device |
| AU2011293767A AU2011293767B2 (en) | 2010-08-24 | 2011-08-03 | Systems and methods for under-frequency blackout protection |
| MX2013000689A MX2013000689A (en) | 2010-08-24 | 2011-08-03 | SYSTEMS AND METHODS FOR SUB-FREQUENCY SHUT OFF PROTECTION. |
| CA2808441A CA2808441A1 (en) | 2010-08-24 | 2011-08-03 | Systems and methods for under-frequency blackout protection |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US37634810P | 2010-08-24 | 2010-08-24 | |
| US61/376,348 | 2010-08-24 | ||
| US13/195,227 | 2011-08-01 | ||
| US13/195,227 US9008850B2 (en) | 2010-08-24 | 2011-08-01 | Systems and methods for under-frequency blackout protection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2012027079A2 true WO2012027079A2 (en) | 2012-03-01 |
| WO2012027079A3 WO2012027079A3 (en) | 2016-05-19 |
Family
ID=45698253
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2011/046437 Ceased WO2012027079A2 (en) | 2010-08-24 | 2011-08-03 | Systems and methods for under-frequency blackout protection |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US9008850B2 (en) |
| AU (1) | AU2011293767B2 (en) |
| BR (1) | BR112013002373A2 (en) |
| CA (1) | CA2808441A1 (en) |
| MX (1) | MX2013000689A (en) |
| WO (1) | WO2012027079A2 (en) |
Families Citing this family (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10310480B2 (en) | 2010-08-24 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
| US11522365B1 (en) | 2011-05-26 | 2022-12-06 | J. Carl Cooper | Inverter power source load dependent frequency control and load shedding |
| US11183843B1 (en) | 2011-05-26 | 2021-11-23 | J. Carl Cooper | Power source load control |
| US10879727B1 (en) | 2011-05-26 | 2020-12-29 | James Carl Cooper | Power source load control |
| US8791704B2 (en) * | 2011-10-11 | 2014-07-29 | Schweitzer Engineering Laboratories Inc. | Fault-type identification for electric power delivery systems |
| US9647495B2 (en) | 2012-06-28 | 2017-05-09 | Landis+Gyr Technologies, Llc | Power load control with dynamic capability |
| US9705329B2 (en) * | 2012-06-29 | 2017-07-11 | Operation Technology, Inc. | Proactive intelligent load shedding |
| US10261567B2 (en) * | 2013-05-21 | 2019-04-16 | Schweitzer Engineering Laboratories, Inc. | Automatically configurable intelligent electronic device |
| FR3015142B1 (en) * | 2013-12-16 | 2018-01-12 | Institut Polytechnique De Grenoble | METHOD FOR STABILIZING AN ELECTRICAL SYSTEM BY DELAYING LOADS |
| US9639643B2 (en) | 2014-06-06 | 2017-05-02 | General Electric Company | Method and system for generating electric load models |
| EP3065340A1 (en) * | 2015-03-04 | 2016-09-07 | ABB Technology AG | Method for automated configuration of an IED |
| ES2586469B2 (en) * | 2015-04-13 | 2018-02-16 | Universidad Politécnica de Madrid | Load shedding system for networks with high power motors |
| US9912158B2 (en) | 2016-03-16 | 2018-03-06 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
| US9906041B2 (en) | 2016-03-16 | 2018-02-27 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
| US10135250B2 (en) | 2016-05-25 | 2018-11-20 | Schweitzer Engineering Laboratories, Inc. | Inertia compensated load tracking in electrical power systems |
| US10833507B2 (en) | 2016-11-29 | 2020-11-10 | Schweitzer Engineering Laboratories, Inc. | Island detection and control of a microgrid |
| US10644493B2 (en) * | 2017-05-01 | 2020-05-05 | Schweitzer Engineering Laboratories, Inc. | Power system disturbance detection using power and frequency |
| US10381835B1 (en) | 2018-02-09 | 2019-08-13 | Schweitzer Engineering Laboratories, Inc. | Electric power generator selection, shedding, and runback for power system stability |
| US10476268B2 (en) | 2018-02-09 | 2019-11-12 | Schweitzer Engineering Laboratories, Inc. | Optimized decoupling and load shedding |
| US10859639B2 (en) | 2018-10-02 | 2020-12-08 | Schweitzer Engineering Laboratories, Inc. | Fault-type identification in an electric power delivery system using composite signals |
| US11398729B1 (en) | 2021-05-11 | 2022-07-26 | Schweitzer Engineering Laboratories, Inc. | Adaptive load management based on system capacity in a microgrid environment |
| US12149073B2 (en) | 2021-06-22 | 2024-11-19 | Schweitzer Engineering Laboratories, Inc. | Dynamic capability region for electric power system protection |
| US12126172B2 (en) | 2021-08-25 | 2024-10-22 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for reactor power flow management for system stability |
| US12107414B2 (en) | 2021-09-01 | 2024-10-01 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for operating an islanded distribution substation using inverter power generation |
| JP7678745B2 (en) * | 2021-12-23 | 2025-05-16 | 一般財団法人電力中央研究所 | Under-frequency relays and power systems |
| JP7781711B2 (en) * | 2022-07-11 | 2025-12-08 | 株式会社東芝 | Power trading and distribution systems |
Family Cites Families (87)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4349744A (en) | 1976-07-09 | 1982-09-14 | Westinghouse Electric Corp. | System for operating multiple gas turbines for coordinated dead load pickup |
| US4387336A (en) | 1980-02-12 | 1983-06-07 | Southwire Company | Method and apparatus for cable conductor shield fault detection |
| US4829298A (en) | 1983-04-13 | 1989-05-09 | Fernandes Roosevelt A | Electrical power line monitoring systems, including harmonic value measurements and relaying communications |
| US5006846A (en) | 1987-11-12 | 1991-04-09 | Granville J Michael | Power transmission line monitoring system |
| US5341265A (en) | 1990-05-30 | 1994-08-23 | Kearney National, Inc. | Method and apparatus for detecting and responding to downed conductors |
| US6265881B1 (en) | 1991-04-05 | 2001-07-24 | Georgia Tech Research Corporation | Method and apparatus for measuring ground impedance |
| US5224011A (en) | 1991-04-19 | 1993-06-29 | Gas Research Institute | Multifunction protective relay system |
| US5369356A (en) | 1991-08-30 | 1994-11-29 | Siemens Energy & Automation, Inc. | Distributed current and voltage sampling function for an electric power monitoring unit |
| CA2106357A1 (en) | 1993-07-07 | 1995-01-08 | Murty V. V. S. Yalla | Method for implementing selectable protective relay functions |
| US5446682A (en) | 1994-03-21 | 1995-08-29 | Square D Company | System for calibrating a line isolation monitor |
| US5596492A (en) | 1994-06-14 | 1997-01-21 | Electric Power Research Institute, Inc. | Method and apparatus for de-centralized signal frequency restoration in a distributed UPS system |
| US7761910B2 (en) | 1994-12-30 | 2010-07-20 | Power Measurement Ltd. | System and method for assigning an identity to an intelligent electronic device |
| US6944555B2 (en) * | 1994-12-30 | 2005-09-13 | Power Measurement Ltd. | Communications architecture for intelligent electronic devices |
| US6694270B2 (en) | 1994-12-30 | 2004-02-17 | Power Measurement Ltd. | Phasor transducer apparatus and system for protection, control, and management of electricity distribution systems |
| US6446682B1 (en) | 1995-06-06 | 2002-09-10 | James P. Viken | Auto-loading fluid exchanger and method of use |
| US6028754A (en) | 1995-10-20 | 2000-02-22 | Schweitzer Engineering Laboratories, Inc. | System for preventing undesired protective relay tripping actions due to coupling capacitor voltage transformer transients |
| US5703745A (en) | 1995-10-20 | 1997-12-30 | Schweitzer Engineering Laboratories, Inc. | System for detection of transients from a coupling capacitor voltage transformer used in a protective relay |
| US5694281A (en) | 1995-10-20 | 1997-12-02 | Schweitzer Engineering Laboratories, Inc. | Zero sequence voltage-polarized directional element for protective relays |
| US5731943A (en) | 1996-01-04 | 1998-03-24 | Schweitzer Engineering Laboratories, Inc. | Protective relay having out-of-step logic capability |
| AU707433B2 (en) | 1996-12-03 | 1999-07-08 | Kabushiki Kaisha Toshiba | Electric power system protection and control system and distributed control system |
| US5995911A (en) | 1997-02-12 | 1999-11-30 | Power Measurement Ltd. | Digital sensor apparatus and system for protection, control, and management of electricity distribution systems |
| US5963404A (en) | 1998-06-16 | 1999-10-05 | Schweitzer Engineering Laboratories, Inc. | Restricted earth fault protection for transformers using a directional element |
| US6341055B1 (en) | 1999-10-15 | 2002-01-22 | Schweitzer Engineering Laboratories, Inc. | Restraint-type differential relay |
| US6356421B1 (en) | 1999-11-29 | 2002-03-12 | Schweitzer Engineering Labs., Inc. | System for power transformer differential protection |
| US6442010B1 (en) | 2000-04-03 | 2002-08-27 | General Electric Company | Differential protective relay for electrical buses with improved immunity to saturation of current transformers |
| US6411865B1 (en) | 2000-06-26 | 2002-06-25 | Schweitzer Engineering Laboratories, Inc. | System for protection zone selection in microprocessor-based relays in an electric power system |
| US6356471B1 (en) | 2000-07-10 | 2002-03-12 | Powerware Corporation | Dynamic feedback adaptive control system and method for paralleling electric power sources and an uninterruptible power supply including same |
| GB0102212D0 (en) * | 2001-01-29 | 2001-03-14 | Lattice Intellectual Property | Controller |
| US6608742B2 (en) | 2001-07-06 | 2003-08-19 | Schweitzer Engineering Laboratories, Inc. | Voltage and current source selection system for use in the protection, automation and control of an electric power system |
| US6603298B2 (en) | 2001-07-06 | 2003-08-05 | Schweitzer Engineering Laboratories, Inc. | System for estimating the frequency of the power signal on a power transmission line |
| US6662124B2 (en) | 2002-04-17 | 2003-12-09 | Schweitzer Engineering Laboratories, Inc. | Protective relay with synchronized phasor measurement capability for use in electric power systems |
| US6757146B2 (en) | 2002-05-31 | 2004-06-29 | Schweitzer Engineering Laboratories, Inc. | Instantaneous overcurrent element for heavily saturated current in a power system |
| US6940702B2 (en) | 2002-07-12 | 2005-09-06 | Mcgraw-Edison Company | Electrical protection system |
| US6850074B2 (en) | 2002-08-05 | 2005-02-01 | Encorp, Inc. | System and method for island detection |
| US7116010B2 (en) | 2002-09-17 | 2006-10-03 | Wisconsin Alumni Research Foundation | Control of small distributed energy resources |
| JP4123890B2 (en) | 2002-10-04 | 2008-07-23 | 株式会社日立製作所 | Pump water wheel |
| US6839210B2 (en) | 2002-10-25 | 2005-01-04 | Schweitzer Engineering Laboratories, Inc. | Bus total overcurrent system for a protective relay |
| US6946753B2 (en) | 2002-11-14 | 2005-09-20 | Fyre Storm, Inc. | Switching power converter controller with watchdog timer |
| WO2005101607A1 (en) | 2004-04-09 | 2005-10-27 | The Tokyo Electric Power Company, Incorporated | Load interrupter upon lowering of frequency |
| US20060071554A1 (en) | 2004-09-27 | 2006-04-06 | Mcnamara James L | Electrical power distribution system and method thereof |
| US7582986B2 (en) | 2004-10-08 | 2009-09-01 | Schweitzer Engineering Laboratories, Inc. | Compensated inverse-time undervoltage load shedding systems |
| US7196884B2 (en) | 2005-03-02 | 2007-03-27 | Schweitzer Engineering Laboratories, Inc. | Apparatus and method for detecting the loss of a current transformer connection coupling a current differential relay to an element of a power system |
| US20060224336A1 (en) | 2005-04-05 | 2006-10-05 | Charles Petras | System and method for transmitting power system data over a wide area network |
| US20060259255A1 (en) * | 2005-04-05 | 2006-11-16 | Anderson James C | Method of visualizing power system quantities using a configurable software visualization tool |
| GB0511361D0 (en) | 2005-06-03 | 2005-07-13 | Responsiveload Ltd | Grid responsive control device |
| ZA200707394B (en) | 2005-06-24 | 2008-11-26 | Schweitzer Engineering Lab Inc | Dynamically configurable relay element and related methods |
| US7319576B2 (en) | 2005-08-18 | 2008-01-15 | Schweitzer Engineering Labortories, Inc. | Apparatus and method for providing differential protection for a phase angle regulating transformer in a power system |
| US7660088B2 (en) | 2005-09-07 | 2010-02-09 | Schweitzer Engineering Laboratories, Inc. | System, apparatus and method for compensating the sensitivity of a sequence element in a line current differential relay in a power system |
| EP1764894A1 (en) | 2005-09-19 | 2007-03-21 | ABB Schweiz AG | Method for detecting islanding operation of a distributed generator |
| US7480580B2 (en) | 2005-10-18 | 2009-01-20 | Schweitzer Engineering Laboratories, Inc. | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
| US7502696B2 (en) * | 2005-10-21 | 2009-03-10 | Schweitzer Engineering Laboratories, Inc. | System and method for detecting power system conditions |
| TWI312218B (en) | 2005-11-10 | 2009-07-11 | Ablerex Electronics Co Ltd | Islanding detection method for a distributed generation power system |
| US7519454B2 (en) | 2005-12-12 | 2009-04-14 | Virginia Tech Intellectual Properties, Inc. | Location determination of power system disturbances based on frequency responses of the system |
| US7184903B1 (en) | 2006-03-16 | 2007-02-27 | Vrb Power Systems Inc. | System and method for a self-healing grid using demand side management techniques and energy storage |
| US7356422B2 (en) | 2006-04-07 | 2008-04-08 | Schweitzer Engineering Laboratories, Inc. | Apparatus and method for high-speed load shedding in an electrical power system |
| US20080040296A1 (en) | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources |
| US7630863B2 (en) | 2006-09-19 | 2009-12-08 | Schweitzer Engineering Laboratories, Inc. | Apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith |
| US7457688B2 (en) | 2006-09-19 | 2008-11-25 | General Electric Company | Method and system for detection and transfer to electrical island operation |
| US7710693B2 (en) | 2006-09-22 | 2010-05-04 | Schweitzer Engineering Laboratories, Inc. | Apparatus and method for providing protection for a synchronous electrical generator in a power system |
| GB2464625A (en) | 2006-10-13 | 2010-04-28 | Responsiveload Ltd | Optimisation of use or provision of a resource or service |
| US7453674B2 (en) | 2007-03-20 | 2008-11-18 | Battelle Energy Alliance, Llc | Method for protecting an electric generator |
| US7635967B2 (en) | 2007-07-20 | 2009-12-22 | Eaton Corporation | Generator systems and methods using timing reference signal to control generator synchronization |
| MX2010002163A (en) | 2007-09-28 | 2010-06-02 | Schweitzer Engineering Lab Inc | Amplitude and phase comparators for line protection. |
| US8498832B2 (en) * | 2007-09-28 | 2013-07-30 | Schweitzer Engineering Laboratories Inc. | Method and device for assessing and monitoring voltage security in a power system |
| US7930117B2 (en) | 2007-09-28 | 2011-04-19 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for power swing and out-of-step detection using time stamped data |
| US20090088990A1 (en) | 2007-09-30 | 2009-04-02 | Schweitzer Iii Edmund O | Synchronized phasor processor for a power system |
| US8405944B2 (en) | 2007-10-09 | 2013-03-26 | Schweitzer Engineering Laboratories Inc | Distributed bus differential protection using time-stamped data |
| US7856327B2 (en) | 2007-10-09 | 2010-12-21 | Schweitzer Engineering Laboratories, Inc. | State and topology processor |
| US7987059B2 (en) | 2007-10-09 | 2011-07-26 | Schweitzer Engineering Laboratories, Inc | Real-time power system oscillation detection using modal analysis |
| WO2009048972A1 (en) | 2007-10-09 | 2009-04-16 | Schweitzer Engineering Laboratories, Inc. | Transformer through-fault current monitor |
| US7903381B2 (en) * | 2008-03-11 | 2011-03-08 | Schweitzer Engineering Laboratories, Inc. | Negative sequence differential element |
| US9401839B2 (en) * | 2008-04-04 | 2016-07-26 | Schweitzer Engineering Laboratories, Inc. | Generation and control of network events and conversion to SCADA protocol data types |
| US8155901B2 (en) | 2008-05-01 | 2012-04-10 | Southern California Edison | System for remedying electrical power instability |
| US8494795B2 (en) * | 2008-05-05 | 2013-07-23 | Schweitzer Engineering Laboratories Inc | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
| US8892375B2 (en) | 2008-05-09 | 2014-11-18 | Accenture Global Services Limited | Power grid outage and fault condition management |
| US8487634B2 (en) | 2008-09-25 | 2013-07-16 | Enmetric Systems, Inc. | Smart electrical wire-devices and premises power management system |
| EP2179838B1 (en) | 2008-10-23 | 2017-12-06 | Campagnolo S.r.l. | Sheet moulding compound |
| US20100114390A1 (en) | 2008-11-05 | 2010-05-06 | Square D Company | Load operation profiling and notification in a monitored electrical power distribution system |
| US8560255B2 (en) * | 2008-12-12 | 2013-10-15 | Schneider Electric USA, Inc. | Power metering and merging unit capabilities in a single IED |
| US8260579B2 (en) * | 2009-07-01 | 2012-09-04 | Schneider Electric USA, Inc. | Automatic identification of multiple power grids using data synchronization |
| US8082367B2 (en) | 2009-07-23 | 2011-12-20 | Schneider Electric USA, Inc. | Differential time synchronization of intelligent electronic devices |
| CH701506A1 (en) | 2009-07-30 | 2011-01-31 | Alstom Technology Ltd | The method for the early detection and proactive Mastering consumer end load shedding in an electrical network and apparatus for performing the method. |
| US9099866B2 (en) | 2009-09-01 | 2015-08-04 | Aden Seaman | Apparatus, methods and systems for parallel power flow calculation and power system simulation |
| EP2476132B1 (en) * | 2009-09-07 | 2019-11-20 | ABB Schweiz AG | Method and system for power management |
| US9388753B2 (en) | 2009-09-17 | 2016-07-12 | General Electric Company | Generator control having power grid communications |
| US8706309B2 (en) | 2010-04-10 | 2014-04-22 | Schweitzer Engineering Laboratories Inc | Systems and method for obtaining a load model and related parameters based on load dynamics |
| US8410633B2 (en) | 2010-06-03 | 2013-04-02 | Briggs & Stratton Corporation | Dynamic load shedding system for a standby generator |
-
2011
- 2011-08-01 US US13/195,227 patent/US9008850B2/en active Active
- 2011-08-03 MX MX2013000689A patent/MX2013000689A/en active IP Right Grant
- 2011-08-03 CA CA2808441A patent/CA2808441A1/en not_active Abandoned
- 2011-08-03 WO PCT/US2011/046437 patent/WO2012027079A2/en not_active Ceased
- 2011-08-03 BR BR112013002373A patent/BR112013002373A2/en not_active IP Right Cessation
- 2011-08-03 AU AU2011293767A patent/AU2011293767B2/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| AU2011293767A1 (en) | 2013-01-31 |
| US9008850B2 (en) | 2015-04-14 |
| BR112013002373A2 (en) | 2016-05-24 |
| MX2013000689A (en) | 2013-03-08 |
| WO2012027079A3 (en) | 2016-05-19 |
| US20120053744A1 (en) | 2012-03-01 |
| CA2808441A1 (en) | 2012-03-01 |
| AU2011293767B2 (en) | 2015-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9008850B2 (en) | Systems and methods for under-frequency blackout protection | |
| US8965592B2 (en) | Systems and methods for blackout protection | |
| CA2860147C (en) | Systems and methods for blackout protection | |
| US10971933B2 (en) | Distributed control in electric power delivery systems | |
| AU2013328964B2 (en) | Coordinated high-impedance fault detection systems and methods | |
| US9128130B2 (en) | Systems and methods for synchronizing distributed generation systems | |
| US8554385B2 (en) | Systems and methods for monitoring and controlling electrical system stability | |
| US10310480B2 (en) | Systems and methods for under-frequency blackout protection | |
| US8476874B2 (en) | Systems and methods for synchronized control of electrical power system voltage profiles | |
| US10644493B2 (en) | Power system disturbance detection using power and frequency | |
| AU2015202134B2 (en) | Systems and methods for synchronized control of electrical power system voltage profiles |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11820350 Country of ref document: EP Kind code of ref document: A2 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2013/000689 Country of ref document: MX |
|
| ENP | Entry into the national phase |
Ref document number: 2011293767 Country of ref document: AU Date of ref document: 20110803 Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 2808441 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11820350 Country of ref document: EP Kind code of ref document: A2 |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013002373 Country of ref document: BR |
|
| ENP | Entry into the national phase |