WO2011078155A1 - 省エネルギー診断システム - Google Patents

省エネルギー診断システム Download PDF

Info

Publication number
WO2011078155A1
WO2011078155A1 PCT/JP2010/072978 JP2010072978W WO2011078155A1 WO 2011078155 A1 WO2011078155 A1 WO 2011078155A1 JP 2010072978 W JP2010072978 W JP 2010072978W WO 2011078155 A1 WO2011078155 A1 WO 2011078155A1
Authority
WO
WIPO (PCT)
Prior art keywords
time
time zone
monitored device
period
efficiency improvement
Prior art date
Application number
PCT/JP2010/072978
Other languages
English (en)
French (fr)
Inventor
小林 美佐世
前田 龍一
知也 十河
昌史 村上
浩基 數野
高山 久
Original Assignee
パナソニック電工株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック電工株式会社 filed Critical パナソニック電工株式会社
Priority to EP10839385.1A priority Critical patent/EP2518576A4/en
Priority to US13/518,085 priority patent/US9710862B2/en
Priority to CN201080062844.9A priority patent/CN102741767B/zh
Publication of WO2011078155A1 publication Critical patent/WO2011078155A1/ja
Priority to HK12112779.8A priority patent/HK1172102A1/zh

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Definitions

  • the present invention relates to an energy saving diagnosis system.
  • power usage (resource usage) data is collected from electrical equipment (monitored equipment) installed in buildings and facilities, and environmental information such as temperature and humidity, and control information for each device are collected.
  • An energy-saving diagnostic system that collects and collects collected data every predetermined period (for example, day, month, year) and displays the power consumption in a graph such as a line graph or a bar graph has been provided (for example, Patent Literature) 1).
  • the energy saving diagnosis system of the present invention is a system for monitoring monitored devices that operate according to control schedule information.
  • the energy saving diagnosis system is beneficial to resource usage information acquisition means for acquiring resource usage information in which the usage amount of the resource in the monitored device operating according to the control schedule information is associated with the usage time, and to use the resource in the monitored device.
  • Useful use time period that is considered to be, a waste use time period that considers that the use of resources in the monitored device is wasted, and an efficiency improvement time zone that is considered to be to suppress the use of resources in the monitored device
  • the present invention whether the resource is used effectively by looking at the actual usage amount of the resource together with the ranges of the beneficial usage time zone, the wasteful usage time zone, and the efficiency improvement time zone. , You can be aware of whether you are wasting resources. That is, the administrator can determine that the use of resources in the beneficial use time zone is appropriate, and the use of resources in the efficiency improvement time zone is useless. In addition, there is an efficiency improvement time zone in which it is assumed that the amount of resources used in the monitored device should be suppressed. By providing such a time zone for the purpose of improving business efficiency, sufficient knowledge is provided. Even an administrator who is not able to perform energy-saving diagnosis while paying attention to the time zone for the purpose of improving business efficiency, can improve the control schedule by intuitive judgment, and can save energy.
  • the administrator can accurately grasp the resource usage status, estimate a lot of wasteful resource usage, On the other hand, it is possible to prevent the estimation from being made less, and the improvement point of the control schedule can be found accurately. That is, even an administrator who does not have sufficient knowledge can accurately determine whether or not the monitored device uses resources in vain.
  • the time zone setting unit acquires control schedule information of the monitored device, and sets the time zones by applying a preset time zone setting rule to the acquired control schedule information.
  • the time zone setting means sets the time zones by applying a preset time zone setting rule to the acquired control schedule information and the resource usage information acquired by the resource usage information acquisition unit. .
  • the administrator uses each of the beneficial usage time zone, the waste usage time zone, and the efficiency improvement time zone. It is possible to set automatically without bothering, and optimally set each time zone regardless of the expertise of the administrator. Thus, the administrator can grasp the usage status of the resource more accurately and can easily determine whether the usage of the resource is beneficial.
  • control schedule generation means for generating the control schedule information by applying a preset schedule setting rule to the setting state of each time zone.
  • control schedule is created and improved by applying the schedule setting rule to the setting status of each time zone, and the control schedule can be automatically created without bothering the administrator.
  • the control schedule generation rule is a monitored device according to control schedule information in which control content for turning on or off the operation of the monitored device is not set at at least one of the start time and the end time of the efficiency improvement time zone. When is operated, it is preferable to set the control content for turning off the operation of the monitored device at the time of the at least one time in the control schedule information.
  • control schedule generation unit generates the control schedule information by applying a preset schedule setting rule to the setting state of each time zone and the resource usage information acquired by the resource usage information acquisition unit. .
  • control schedule is improved in the energy saving direction in accordance with the usage status of the monitored device.
  • the control schedule generating unit varies the time at which the operation of the monitored device is turned off from the one time in the efficiency improvement time zone.
  • the efficiency is increased. It is preferable to shorten the useless time zone by changing the time at which the operation of the monitored device is turned off in the improvement time zone.
  • control schedule is improved in the energy saving direction in accordance with the usage status of the monitored device.
  • it is advantageous from the viewpoint of the limitation due to the upper limit of the number of registered control schedules and the actual comfort.
  • control schedule generation means When the control content for turning off the operation of the monitored device at the end time of the efficiency improvement time zone is set in the control schedule information, the control schedule generation means gradually decreases the resource usage in the efficiency improvement time zone. Thus, it is preferable to generate control schedule information for the monitored device to operate.
  • control schedule is improved in the energy saving direction in the efficiency improvement time zone, and energy saving is realized in the efficiency improvement time zone.
  • the resource usage state determination means compares the maximum usage amount of the resource that can be used in the efficiency improvement time period and the actual resource usage amount in the efficiency improvement time period, and calculates a difference between both usage amounts.
  • the presenting means preferably presents the difference between the calculated usage amounts.
  • the administrator is presented with the amount of reduction in resource usage, so that the consciousness for energy saving is further increased and the consciousness for energy saving is raised.
  • the resource usage state determination means evaluates whether or not the resource usage amount in the efficiency improvement time period is useless based on the resource usage information, and the presentation means presents the evaluation result. preferable.
  • the administrator can easily identify useless control contents in the efficiency improvement time period by presenting the use amount of the wasteful resources in the efficiency improvement time period, and can accurately improve the control schedule.
  • the time zone setting means sets a mandatory usage time zone that the monitored device must consider to use a resource, and the resource usage status determining means is based on the resource usage information in the mandatory usage time zone. It is preferable that the usage amount of the resource is calculated, and when the calculated usage amount is equal to or less than the predetermined amount, it is determined that the monitored device is not used, and the presenting unit presents the determination result.
  • the manager has stopped pursuing the energy saving effect, so that the operation of the monitored devices such as night signs and emergency lights is stopped and the necessary resources are easily reduced.
  • this error can be detected and notified to the administrator.
  • control schedule generation means for generating control schedule information.
  • control schedule ensures that the operation-required monitored device is operated in the required use time zone, and the operation of the monitored device can be improved appropriately.
  • the presenting means comprises: schedule input means for an operator to create the control schedule information; and schedule determination means for judging consistency between the created control schedule information and the setting state of each time zone. It is preferable to present the determination result of the schedule determination means.
  • the administrator can detect an error in the created control schedule, and can appropriately operate the monitored device.
  • the control schedule preferably has a scheduled start time for turning on the operation of the monitored device and a scheduled stop time for turning off the operation of the monitored device.
  • the time zone setting rule has a rule for setting a period after the scheduled start time and before the scheduled stop time as the beneficial use time zone.
  • the time zone setting rule has a rule for setting a period included after the scheduled stop time and included in the period up to the scheduled start time as the useless use time zone.
  • the time zone setting rule has a rule for setting a time zone other than the beneficial usage time zone and the wasteful usage time zone as an efficiency improvement time zone.
  • the control schedule preferably has a scheduled start time for turning on the operation of the monitored device and a scheduled stop time for turning off the operation of the monitored device.
  • the time zone setting rule has a rule for setting a period after the scheduled start time and before the scheduled stop time as the beneficial use time zone.
  • the time zone setting rule has a rule for setting a period from the first time that is a predetermined time before the scheduled activation time to the scheduled activation time as a first efficiency improvement period.
  • the time zone setting rule includes a rule for setting a period from the scheduled stop time to a second time that is a fixed time after the scheduled stop time as a second efficiency improvement period.
  • the time zone setting rule has a rule for setting the first efficiency improvement period and the second efficiency improvement period as an efficiency improvement time zone.
  • the time zone setting rule includes a rule for setting a time other than the beneficial usage time zone and the efficiency improvement time zone as a waste usage time zone, whereby the time zone setting means is configured to use the beneficial usage time.
  • a zone, the wasteful use time zone, and the efficiency improvement time zone are set.
  • the time zone setting rule includes a rule for setting a period between the scheduled start time and the next scheduled stop time as the beneficial use time zone.
  • the time zone setting rule includes a rule for setting a period from the first time that is a certain time before the scheduled start time to the next scheduled start time as the first efficiency improvement period. Preferably it is.
  • the time zone setting rule has a rule for setting, as the second efficiency improvement period, a period from the scheduled stop time to a second time that is next to the scheduled stop time and is a fixed time after the scheduled stop time. It is preferable.
  • the control schedule preferably has a scheduled start time for turning on the monitored device and a scheduled stop time for turning off the monitored device.
  • the time zone setting means is configured to determine a reference activation time based on a previous activation time, and the previous activation time indicates a time when the operation of the monitored device was turned on in the past.
  • the time zone setting means is configured to determine a reference stop time based on a previous stop time, and the previous stop time indicates a time when the operation of the monitored device was turned off in the past.
  • the time zone setting rule includes a rule for setting a period from the reference activation time to the scheduled activation time as a first efficiency improvement period.
  • the time zone setting rule includes a rule for setting a period from the scheduled stop time to the reference stop time as a second efficiency improvement period.
  • the time zone setting rule has a rule for setting the first efficiency improvement period and the second efficiency improvement period as an efficiency improvement time zone.
  • the time zone setting rule includes a rule for setting a time other than the beneficial usage time zone and the efficiency improvement time zone as a waste usage time zone, whereby the beneficial usage time is determined based on the control schedule information. Set the time zone, wasted time zone, and efficiency improvement time zone.
  • the time zone setting means is configured to recognize the previous activation time based on the resource usage information.
  • the time zone setting means is configured to recognize the previous stop time based on the resource usage information.
  • the time zone setting means is configured to recognize the previous activation time when the usage amount of the resource becomes larger than a threshold value.
  • the time zone setting means is configured to recognize the previous stop time when the usage amount of the resource becomes smaller than a threshold value.
  • the time zone setting means is configured to determine the reference activation time based on a plurality of the previous activation times.
  • the time zone setting means is configured to determine the reference stop time based on a plurality of the previous stop times.
  • the reference activation time is preferably set to a time between the earliest time of the previous activation time and the latest time of the previous activation time.
  • the reference stop time is preferably set to a time between the earliest time of the previous stop time and the latest time of the previous stop time.
  • the apparatus further includes a transmission unit that transmits the control schedule information generated by the control schedule generation unit to the monitored device.
  • the time zone setting rule is a rule for setting a period between the useless use time period and the beneficial use time period as a first efficiency improvement period. It is preferable that the time zone setting means recognizes the first efficiency improvement period as an efficiency improvement time zone.
  • the control schedule setting rule is the first efficiency improvement. It is preferable that the control content is set to control schedule information that turns off the operation of the monitored device within the period.
  • the control schedule setting rule sets a control content for turning off the operation of the monitored device in the control schedule information.
  • the control schedule setting rule is the first efficiency improvement. It is preferable that the rule sets a plurality of control contents for turning off the operation of the monitored device in the control schedule information within the period.
  • the time zone setting rule is a rule for setting a period from the beneficial usage time zone to the waste usage time zone as a second efficiency improvement period. It is preferable that the time zone setting means recognizes the second efficiency improvement period as an efficiency improvement time zone.
  • the control schedule setting rule is the second efficiency improvement It is preferable that the control content is set to control schedule information that turns off the operation of the monitored device within the period.
  • the control schedule information sets a control content for turning off the operation of the monitored device in the control schedule information.
  • the control schedule setting rule is the second efficiency improvement It is preferable that the rule sets a plurality of control contents for turning off the operation of the monitored device in the control schedule information within the period.
  • FIG. It is a figure which shows schematic structure of the energy saving diagnostic system of Embodiment 1.
  • FIG. It is a figure which shows the block configuration of a terminal device same as the above. It is a figure which shows the block configuration of a central monitoring board same as the above. It is a figure which shows schematic structure of the screen shown same as the above. It is a figure which shows the manual setting process of the time slot same as the above. It is a figure which shows the automatic setting process of a time slot same as the above.
  • (A) (b) It is a figure which shows the structure of ON / OFF information and time difference information same as the above. It is a figure which shows the block configuration of the calculating part of Embodiment 2.
  • FIG. 10 is a diagram illustrating a block configuration of a calculation unit according to a fifth embodiment.
  • Embodiment 1 In the present embodiment, for example, a configuration for managing the amount of power used (the amount of resources used) of lighting fixtures and air conditioners (monitored devices) installed in a restaurant will be described as an example. It is also possible to use a system that manages the amount of power used by the monitored device, or to monitor the amount of power used by an electrical device other than a lighting fixture or air conditioner as the monitored device.
  • FIG. 1 is a schematic configuration diagram showing the overall configuration of an energy saving diagnosis system.
  • This system uses monitored devices (for example, lighting fixtures L1 and L2 and air conditioners AC1 and AC2) installed in a store B. Used to manage energy consumption and perform energy saving diagnosis.
  • monitored devices for example, lighting fixtures L1 and L2 and air conditioners AC1 and AC2
  • This system includes a power monitoring device 3 that monitors the power consumption of monitored devices (lighting fixtures L1, L2, air conditioners AC1, AC2, etc.) installed in the store B and outputs them to the central monitoring panel 2.
  • Central control panel connected to the lighting control device 5 and the air conditioning control device 6 for controlling the operation of the monitoring equipment, and the power amount monitoring device 3, the lighting control device 5 and the air conditioning control device 6 through a communication network NT such as the Internet. 2 and a terminal device 1 connected to the central monitoring panel 2 via a communication network NT as main components.
  • a global IP address is set for each of the power amount monitoring device 3, the lighting control device 5, and the air conditioning control device 6 and has a function of performing communication via the communication network NT.
  • Store B is divided into two zones Z1, Z2.
  • Each zone Z1 and Z2 includes a plurality of lighting fixtures L1 and L2, air conditioners AC1 and AC2, and lighting fixtures L1 and L2 provided in each zone Z1 and Z2 in the same zone.
  • Operation switches S1 and S2 for performing the above operations and human sensors R1 and R2 (person detection means) for detecting the presence or absence of a person in each of the zones Z1 and Z2 are provided.
  • a distribution board 4 in which a main breaker 40 and branch breakers 41 to 44 connected to a commercial power supply AC are housed is installed, and a branch circuit 51 branched via the branch breaker 41 is installed.
  • a branch circuit 52 branched via the branch breaker 42 is connected to a plurality of lighting fixtures L2 arranged in the zone Z2.
  • the branch circuit 53 branched via the branch breaker 43 is connected to the air conditioner AC1 disposed in the zone Z1
  • the branch circuit 54 branched via the branch breaker 44 is disposed in the zone Z2.
  • Air conditioner AC4 is connected.
  • the branch circuits 51 to 54 are provided with measuring points P1 to P4, respectively.
  • the wattmeters 31 to 34 measure the load currents at the corresponding measuring points P1 to P4, respectively.
  • the power consumption is measured every predetermined measurement cycle and stored in the built-in memory.
  • the wattmeters 31 to 34 are connected to the power amount monitoring device 3 via the signal line LN3, and output the measurement results stored in the built-in memory to the power amount monitoring device 3 every time a predetermined transmission cycle elapses. .
  • the lighting fixtures L1, L2, the operation switches S1, S2, and the human sensors R1, R2 arranged in the zones Z1, Z2 are connected to the lighting control device 5 through the transmission line LN1.
  • Individual address information is assigned to the lighting fixtures L1 and L2, the operation switches S1 and S2, and the human sensors R1 and R2, and the lighting control device 5 sends a transmission signal including the address information to the transmission line LN1.
  • a transmission signal can be exchanged between desired lighting fixtures L1 and L2, operation switches S1 and S2, or human sensors R1 and R2.
  • the illumination control device 5 includes a storage unit (not shown) that stores control schedule information transmitted from the terminal device 1 or the central monitoring panel 2.
  • control schedule information for example, the time when the lighting fixtures L1, L2 of the zones Z1, Z2 are turned on and the time when the lights are turned off are registered for each day of the week, and when the lighting time specified by the control schedule information comes,
  • the lighting control signal is transmitted to the lighting fixtures L1 and L2 to be turned on, and when the lighting time specified by the control schedule information comes, the lighting control signal is transmitted to the corresponding lighting fixtures L1 and L2. Then turn off the lighting fixture.
  • an operation signal is transmitted from the operation switches S1 and S2 to the illumination control device 5.
  • the lighting control device 5 transmits a control signal to the corresponding lighting fixtures L1 and L2 in accordance with the operation signals input from the operation switches S1 and S2, and turns on or off the corresponding lighting fixtures L1 and L2. Therefore, the lighting fixtures L1 and L2 can be lit even outside the time period specified by the control schedule information.
  • the human sensors R1 and R2 installed in the zones Z1 and Z2 detect a person, human detection signals are transmitted from the human sensors R1 and R2 to the illumination control device 5, and the human detection signal is transmitted to the illumination control device 5. A history is stored.
  • the air conditioners AC1 and AC2 disposed in the zones Z1 and Z2 are connected to the air conditioning control device 6 via the transmission line LN2.
  • Individual address information is assigned to the air conditioners AC1 and AC2, and the air conditioning control device 6 sends a transmission signal including the address information to the transmission line LN2 to thereby connect the desired air conditioners AC1 and AC2.
  • the air conditioning control device 6 includes a storage unit (not shown) that stores the control schedule information transmitted from the terminal device 1 or the central monitoring panel 2. In the control schedule information, for example, the operation start time and the operation end time of the air conditioners AC1 and AC2 in the zones Z1 and Z2 are registered for each day of the week.
  • the operation start signal is transmitted to the corresponding air conditioners AC1 and AC2, and the air conditioner is switched to the operation state.
  • the operation end time specified by the control schedule information comes, the operation is terminated to the corresponding air conditioners AC1 and AC2.
  • a signal is transmitted to switch the air conditioner to a stopped state.
  • Each zone Z1 and Z2 is provided with an operation switch (not shown) for turning on / off the air conditioners AC1 and AC2 in the same zone.
  • the air conditioning controller 6 transmits a control signal to the corresponding air conditioners AC1 and AC2 according to the operation signal input from the operation switch, and the air conditioners AC1 and AC2 are changed from the operating state to the stopped state, or stopped. Since the state is switched to the operation state, the air conditioners AC1 and AC2 can be operated outside the time zone specified by the control schedule information.
  • FIG. 3 is a block diagram showing a schematic configuration of the central monitoring panel 2.
  • the communication unit 21 performs communication via the network NT, and the branch circuits 51 to 54 acquired from the power amount monitoring device 3 by the communication unit 21.
  • a storage unit 22 that stores measurement results of the power consumption and measurement data of the human sensors R1 and R2 acquired from the lighting control device 5 and a calculation unit 23 are provided as main components.
  • the calculation unit 23 of the central monitoring panel 2 transmits a data request signal from the communication unit 21 to the power amount monitoring device 3 and the illumination control device 5 every time a predetermined data collection period elapses, and power is generated in accordance with the data request signal.
  • the communication unit 21 receives them.
  • the measurement result of the used electric energy and the detection signals of the human sensors R1 and R2 are stored in the storage unit 22.
  • the terminal device 1 is loaded with a program for causing the terminal device 1 to execute processing for evaluating whether the power consumption is managed or whether the power consumption is beneficial, and the terminal device 1 executes this program. As a result, a power consumption management function and a power evaluation function are realized.
  • the terminal device 1 includes an input unit 11 including a keyboard, a mouse, a touch panel, and the like, and a display unit 12 (presentation means) such as a display whose display content is controlled by a calculation unit 14 described later. And a memory 13 such as a hard disk, a memory such as a ROM, a RAM, and the like, and the storage unit 13 for storing the above-mentioned program and the measurement result of the power consumption, and the program stored in the storage unit 13 are executed.
  • a calculation unit 14 and a communication unit 15 that performs communication via the network NT are provided.
  • the calculation unit 14 executes the program stored in the storage unit 13 to thereby obtain a resource usage information acquisition unit 14a (resource usage information acquisition unit), a time zone setting unit 14b (time zone setting unit), and a resource usage state determination unit. 14c (resource use state determination means).
  • control system on / off of monitored devices is controlled according to a preset control schedule. For example, all monitored devices are turned on during working hours, and all monitored devices are out of working hours. If the control schedule information is set to turn off, if all monitored devices are operating as scheduled, there is no monitored device that operates outside the working hours, and wasteful power consumption occurs. It does not occur. However, not all monitored devices are used according to a predetermined schedule. For example, when an employee wants to perform some work outside the working hours, he / she operates the operation switches S1, S2, etc. If you forget to stop the monitored device after operating the monitoring device (lighting fixtures L1, L2 or air conditioners AC1, AC2) and leave the company, the monitored device will continue to operate and power will be wasted. There was a possibility.
  • the energy-saving diagnosis system of the present invention can evaluate whether or not the use of power in each time segment of the monitored device is beneficial in the control system that uses such a method, and can reduce the amount of power used.
  • This procedure is used for energy saving diagnosis for creating a control schedule, and the following is a procedure in which the power manager of the store B performs energy saving diagnosis after grasping the power consumption of the monitored device using the terminal device 1 Will be described.
  • the resource usage information acquisition unit 14a of the calculation unit 14 of the terminal device 1 performs the central monitoring.
  • the power consumption data (resource usage information) in the branch circuits 51 to 54 is automatically collected from the panel 2 via the communication unit 15 and the collected power consumption data is stored in the storage unit 13. ing.
  • the power consumption data is associated with the time, and the storage unit 13 stores the power consumption data in association with the time.
  • the time zone setting unit 14b of the calculation unit 14 finds that the use of power in the monitored device is useful in 24 hours a day, and that the use of power in the monitored device is wasted.
  • Each time zone is set as a waste use time zone T2 to be considered and an efficiency improvement time zone T3 to be considered that the power consumption in the monitored device should be suppressed.
  • This time zone setting is set for each of the branch circuits 51 to 54, and is performed by the time zone setting unit 14b according to the operation of the input unit 11 by the power manager.
  • the resource usage state determination unit 14c calculates the power consumption in each time zone T1, T2, T3 set by the time zone setting unit 14b based on the data on the power usage acquired by the resource usage information acquisition unit 14a. And the display part 12 presents the electric energy used in each time slot
  • FIG. 4 is a screen that the display unit 12 presents on the display.
  • the resource use state determination unit 14c displays the beneficial use time period T1, the waste use time period T2, and the efficiency improvement time period T3 set in the branch circuit 51.
  • the time zone display part G1 which shows a time range is produced
  • the time zone display unit G1 displays, for each cell obtained by dividing 24 hours in units of one hour, by color indicating which time zone the cell belongs to.
  • the resource usage state determination unit 14c generates a weekly display unit G2 indicating the state of power usage of the branch circuit 51 in a period of one week from Monday to Sunday, below the time zone display unit G1.
  • the resource usage state determination unit 14c compares the power consumption data for each hour of the branch circuit 51 with a predetermined threshold (corresponding to the standby power consumption) and exceeds the threshold. Only the cells corresponding to the period (that is, the period during which the monitored device connected to the branch circuit 51 operates) are displayed in color, and the period less than the threshold value (that is, the monitored device connected to the branch circuit 51 is displayed). The cells during the period of stoppage are not displayed, and the weekly display portion G2 is generated.
  • the cell corresponding to the period exceeding the threshold indicates to which time zone the cell belongs, as in the time zone display unit G1. Display by color.
  • the cell of the week display part G2 is configured by dividing 24 hours in units of 30 minutes.
  • the resource usage state determination unit 14c generates a power usage status display unit G3 below the weekly display unit G2.
  • the power usage status display unit G3 specifies the total of the power usage in each period of the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 and the power usage amount in one week (total operation time zone). It is displayed with a typical number (kWh).
  • the power manager can view the presentation content of the display unit 12 generated as described above by operating the input unit 11. Then, whether or not the power is being used beneficially by looking at the results of the amount of power used together with the ranges of the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3. You can be conscious of whether you are using it in vain. That is, the power manager can determine that the power used in the beneficial usage time zone T1 is appropriate and the power usage in the waste usage time zone T2 is wasteful.
  • an efficiency improvement time zone T3 is provided in which it is assumed that the power consumption in the monitored device should be suppressed.
  • the efficiency improvement time zone T3 may or may not use power, but is a time zone intended to reduce the amount of power used as much as possible. It can be determined that the power used was used as necessary.
  • the power manager can accurately grasp the power usage status, and a lot of wasted power is consumed. It is possible to prevent estimation and, on the contrary, to estimate less, and to accurately find improvements in the control schedule.
  • the power manager operates the input unit 11 to improve the control schedule acquired from the lighting control device 5 and the air conditioning control device 6 for the purpose of energy saving, and then from the communication unit 15 to the lighting control device 5 and the air conditioning control device 6.
  • the control schedule information after the change is transmitted, and the control schedule information stored in the lighting control device 5 and the air conditioning control device 6 is updated.
  • the time zone setting unit 14b acquires control schedule information from the lighting control device 5 or the air conditioning control device 6 (control schedule information corresponding to each of the branch circuits 51 to 54), and sets a preset time zone setting rule. By applying to the acquired control schedule information, each of the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 may be automatically set. This automatic time zone setting will be described below.
  • the control schedule acquired from the lighting control device 5 registers the time for turning on and off the lighting fixture L (L1, L2), and the control schedule information acquired from the air conditioning control device 6 includes the air conditioner AC (AC1 , AC2), the operation start time and the operation end time are registered.
  • turning on the operation of the monitored device means turning on the lighting device L or starting the operation of the air conditioner AC
  • turning off the operation of the monitored device means that the lighting device L is turned off. Is turned off, or the operation of the air conditioner AC is terminated.
  • the time zone setting rule that the time zone setting unit 14b applies to the period automatic setting process is set in advance as follows.
  • the useful use time period T1 is set from the time when the operation of the monitored device is turned on to the time when the operation of the monitored device is turned off.
  • a time range from the start time of the beneficial use time period T1 to a predetermined time before (for example, 1 hour), and a time range from the end time of the beneficial use time period T1 to a predetermined time (for example, after 2 hours) Is set to the efficiency improvement time zone T3.
  • a time range other than the beneficial usage time zone T1 and the efficiency improvement time zone T3 set as described above is set as the waste usage time zone T2.
  • the time zone setting unit 14 b 8:00 to 20:00 is set to the beneficial usage time zone T1
  • 7:00 to 8:00, 20:00 to 22:00 is the efficiency improvement time zone T3
  • 0 to 7:00, 22:00 to 24:00 is set to the wasteful usage time zone T2.
  • each of the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 can be automatically set without bothering the power manager.
  • the time zone setting unit acquires the control schedule information of the monitored device, and applies the preset time zone setting rule to the acquired control schedule information to set each time zone.
  • control schedule has a scheduled start time for turning on the operation of the monitored device and a scheduled stop time for turning off the operation of the monitored device.
  • the time zone setting rule has a rule for setting a period after the scheduled start time and before the scheduled stop time as the beneficial use time zone.
  • the time zone setting rule has a rule for setting a period included after the scheduled stop time and included in the period up to the scheduled start time as the useless use time zone.
  • the time zone setting rule has a rule for setting a time zone other than the beneficial usage time zone and the wasteful usage time zone as an efficiency improvement time zone.
  • the scheduled start time is set to 8:00.
  • the scheduled stop time is set to 20:00.
  • the beneficial use time zone is set as a period from 8:00 to 20:00.
  • the useless time zone is set to a period from 22:00 to 24:00 and from 0:00 to 7:00. That is, the useless time zone is set as a period included in the period from the scheduled stop time to the scheduled start time.
  • the efficiency improvement time zone is set as a period from 7:00 to 8:00 and a period from 20:00 to 22:00. That is, the efficiency improvement time zone is set as a time zone other than the beneficial usage time zone and the wasteful usage time zone.
  • the time setting is not limited to the setting made in the above description.
  • control schedule has a scheduled start time for turning on the operation of the monitored device and a scheduled stop time for turning off the operation of the monitored device.
  • the time zone setting rule has a rule for setting a period after the scheduled start time and before the scheduled stop time as the beneficial use time zone.
  • the time zone setting rule has a rule for setting a period from the first time that is a predetermined time before the scheduled activation time to the scheduled activation time as a first efficiency improvement period.
  • the time zone setting rule includes a rule for setting a period from the scheduled stop time to a second time that is a fixed time after the scheduled stop time as a second efficiency improvement period.
  • the time zone setting rule has a rule for setting the first efficiency improvement period and the second efficiency improvement period as an efficiency improvement time zone.
  • the time zone setting rule includes a rule for setting a time other than the beneficial usage time zone and the efficiency improvement time zone as a waste usage time zone, whereby the time zone setting means is configured to use the beneficial usage time.
  • a zone, the wasteful use time zone, and the efficiency improvement time zone are set.
  • the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 can be automatically set without bothering the power manager.
  • the first efficiency improvement period is defined as a period from 7:00 to 8:00.
  • the second efficiency improvement period is defined as a period from 20:00 to 22:00.
  • the first efficiency improvement period and the second efficiency improvement period are not limited to the periods made in the above description.
  • the first time can be set to the same time as the scheduled start time. Therefore, the first efficiency improvement period can be set to a period of 0 or more.
  • the second time can be set to the same time as the scheduled stop time. Therefore, the second term rate improvement period can be set to a period of 0 or more.
  • the control schedule has a scheduled start time for turning on the operation of the monitored device and a scheduled stop time for turning off the operation of the monitored device.
  • the time zone setting rule has a rule for setting a period after the scheduled start time and before the scheduled stop time as the beneficial use time zone.
  • the time zone setting rule has at least one of the first rule and the second rule.
  • the first rule is defined as a period from the first time that is a certain time before the scheduled activation time to the scheduled activation time.
  • the second rule is defined as a period from the scheduled stop time to a second time after a predetermined time from the scheduled stop time.
  • the time zone setting rule has a rule for setting the first efficiency improvement period and the second efficiency improvement period as an efficiency improvement time zone.
  • the time zone setting rule includes a rule for setting a time other than the beneficial usage time zone and the efficiency improvement time zone as a waste usage time zone, whereby the time zone setting means is configured to use the beneficial usage time.
  • a zone, the wasteful use time zone, and the efficiency improvement time zone are set.
  • time zone setting rule has a rule for setting a period between the scheduled start time and the next scheduled stop time as the beneficial use time zone.
  • the time zone setting rule includes a rule for setting, as a first efficiency improvement period, a period from a first time that is a predetermined time before the scheduled activation time to a scheduled activation time next to the first time. is doing.
  • the time zone setting rule is a rule for setting, as the second efficiency improvement period, a period from the scheduled stop time to a second time that is subsequent to the scheduled stop time and is a fixed time after the scheduled stop time. Have.
  • the first time is set to 7 o'clock.
  • the second time is set to 22:00.
  • the first time and the second time are not limited to the time made in the above description.
  • the time zone setting unit 14b collects not only the control schedule information acquired from the lighting control device 5 or the air conditioning control device 6, but also the branch circuits 51 to 54 collected by the resource use information acquisition unit 14a and stored in the storage unit 13.
  • the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 may be automatically set. explain.
  • the time zone setting rule that the time zone setting unit 14b applies to the period automatic setting process is set in advance as follows. First, the useful use time period T1 is set from the time when the operation of the monitored device is turned on to the time when the operation of the monitored device is turned off.
  • the time zone setting unit 14b based on the data of the actual power consumption stored in the storage unit 13, in each day of the past predetermined period (for example, up to one week before), the beneficial usage time zone T1.
  • the time difference between the time when the operation of the monitored device is turned on before the start time and the start time of the beneficial use time zone T1 (hereinafter referred to as the start time difference) and the end time of the useful use time zone T1
  • a time difference (hereinafter referred to as an end time difference) between the time when the operation is turned off and the end time of the beneficial usage time period T1 is calculated.
  • the median start time difference calculated for each day as described above and the median end time difference calculated for each day as described above are derived.
  • each of the time zone from the start time of the beneficial usage time zone T1 to the median of the start time difference and the time zone from the end time of the beneficial usage time zone T1 to the median of the end time difference are each set as an efficiency improvement time zone. Set to T3.
  • a time range other than the beneficial use time zone T1 and the efficiency improvement time zone T3 set as described above is set as a waste use time zone T2.
  • the setting unit 14b sets 8:00 to 20:00 as the beneficial usage time period T1.
  • the time zone setting unit 14b reads out data for a predetermined period in the past (for example, up to one week before) from the data on the amount of power used in the branch circuit 51 stored in the storage unit 13, and sets the read amount of power used.
  • a predetermined threshold value corresponding to the standby electric energy
  • the threshold value is exceeded
  • the operation of the monitored device connected to the branch circuit 51 is turned off.
  • on / off information is created in which the time when the monitored device connected to the branch circuit 51 is turned on and the time when it is turned off are stored for each day.
  • the time zone setting unit 14b calculates the start time difference and the end time difference for each day based on the on / off information, and stores the start time difference and the end time difference for each day as shown in FIG. 7B. Create information.
  • the median start time difference and median end time difference in a past predetermined period are derived. In this case, the median start time difference is “1 hour” and the median end time difference is “1 hour”.
  • Each of the time period from the start time 8 o'clock of the beneficial use time period T1 to 1 hour before (7 o'clock) and the time period from the end time 20 o'clock of the beneficial use time period T1 to 1 hour later (21 o'clock) Is set in the efficiency improvement time zone T3 (see FIG. 6). Further, a time range other than the beneficial usage time zone T1 and the efficiency improvement time zone T3 is set as the waste usage time zone T2 (see FIG. 6).
  • zone setting part 14b sets each time slot
  • each of the useful usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 is set by the power manager. Can be set automatically without bothering, and each time zone can be set optimally regardless of the expertise of the power manager. Thus, the power manager can more accurately grasp the usage status of the power and can easily determine whether the power usage is beneficial.
  • the control schedule has a scheduled start time for turning on the monitored device and a scheduled stop time for turning off the monitored device.
  • the time zone setting means is configured to determine a reference activation time based on a previous activation time, and the previous activation time indicates a time when the operation of the monitored device was turned on in the past.
  • the time zone setting means is configured to determine a reference stop time based on a previous stop time, and the previous stop time indicates a time when the operation of the monitored device was turned off in the past.
  • the time zone setting rule has a rule for setting a period from the reference activation time to the scheduled activation time as a first efficiency improvement period.
  • the time zone setting rule includes a rule for setting a period from the scheduled stop time to the reference stop time as a second efficiency improvement period.
  • the time zone setting rule has a rule for setting the first efficiency improvement period and the second efficiency improvement period as an efficiency improvement time zone.
  • the time zone setting rule includes a rule for setting a time other than the beneficial usage time zone and the efficiency improvement time zone as a waste usage time zone, and thereby, based on the control schedule information, the beneficial usage time zone. , Set up wasteful use time zone and efficiency improvement time zone.
  • the time zone setting means is configured to recognize the previous activation time based on the resource usage information.
  • the time zone setting means is configured to recognize the previous stop time based on the resource usage information.
  • zone T1 useless use time slot
  • zone T2 and efficiency improvement time slot
  • zone T3 is set automatically without bothering a power manager's hand. be able to.
  • time zone setting means is configured to recognize the previous activation time when the usage amount of the resource becomes larger than a threshold value.
  • the time zone setting means recognizes the previous stop time when the usage amount of the resource becomes smaller than a threshold value.
  • the time zone setting means is configured to determine the reference activation time based on a plurality of the previous activation times.
  • the time zone setting means is configured to determine the reference stop time based on a plurality of the previous stop times.
  • the reference activation time is set to a time between the earliest time of the previous activation time and the latest time of the previous activation time.
  • This also makes it possible to determine the reference start time according to the past usage status of the monitored device.
  • the reference stop time is set to a time between the earliest time of the previous stop time and the latest time of the previous stop time.
  • This also makes it possible to determine the reference stop time according to the past usage status of the monitored device.
  • a control schedule generation unit 14 d (control schedule generation means) is provided in the calculation unit 14 of the terminal device 1, and a beneficial use time period T ⁇ b> 1, a waste use time period T ⁇ b> 2, and efficiency improvement
  • the schedule setting rule is applied to the setting status of each time zone to create and improve the control schedule.
  • symbol is attached
  • the beneficial usage time zone T1 is from 8:00 to 20:00
  • the wasteful usage time zone T2 is from 0 to 7:00, 22:00 to 24:00
  • the efficiency improvement time zone T31 is from 7:00 to 8:00.
  • the efficiency improvement time period T32 is set from 20:00 to 22:00
  • the control schedule information is registered at time 8:00 when the monitored device is turned on and time 20:00 when the monitored device is turned off. .
  • the control schedule generator 14d operates as follows.
  • the control schedule generation unit 14d acquires a control schedule from the lighting control device 5 or the air conditioning control device 6.
  • the control content for turning on the operation of the monitored device is set at the end time 8 of the efficiency improvement time period T31, and the efficiency improvement time period T32 starts.
  • the control content for turning off the operation of the monitored device is set at 20:00.
  • the schedule setting rule that the control schedule generating unit 14d applies to the automatic schedule setting process is preset as follows. First, the control content is not set at the start time 7:00 of the efficiency improvement time period T31 and the end time 22:00 of the efficiency improvement time period T32. Therefore, as shown in FIG. 9B, the control schedule generation unit 14d performs control to turn off the operation of the monitored device at the start time 7:00 of the efficiency improvement time zone T31 and the end time 22:00 of the efficiency improvement time zone T32. Set the contents. This is to create a control schedule that improves in the direction of energy saving as much as possible.
  • the control content for turning off the operation of the monitored device is set at the start time 7:00, and in the efficiency improvement time zone T32, the control content for turning off the operation of the monitored device at the end time 22:00. Is set.
  • the control schedule generation rule changes the control schedule of the monitored device to the first control content when the monitored device is operating according to the control schedule information including the first control content.
  • the second control content is set again.
  • the first instruction content is an instruction content indicating that the control content for turning on or off the operation of the monitored device is not set at at least one of the start time and the end time of the efficiency improvement time period.
  • the second instruction content is an instruction content for turning off the operation of the monitored device at at least one of the start time and the end time.
  • time zone setting rule is a rule for setting a period between the useless use time zone and the beneficial use time zone as a first efficiency improvement period.
  • the time zone setting means recognizes the first efficiency improvement period as an efficiency improvement time zone.
  • the control schedule setting rule indicates that the first efficiency is determined when the monitored device is operating according to control schedule information in which the control content for turning off the operation of the monitored device is not set within the first efficiency improvement period. This is a rule for setting the control content for turning off the operation of the monitored device in the control schedule information within the improvement period.
  • control schedule setting rule indicates that the monitored device is operating according to control schedule information in which the control content for turning off the operation of the monitored device is not set at the start time of the first efficiency improvement period. This is a rule for setting the control contents for turning off the operation of the monitored device at the start time in the control schedule information.
  • the first efficiency improvement period is defined as an efficiency improvement time period T31 from 7:00 to 8:00.
  • the second efficiency improvement period is defined as an efficiency improvement time period T32 from 20:00 to 22:00.
  • the first efficiency improvement period and the second efficiency improvement period are not limited to the periods described above.
  • time zone setting rule is a rule for setting a period from the beneficial usage time zone to the waste usage time zone as a second efficiency improvement period.
  • the time zone setting means recognizes the second efficiency improvement period as an efficiency improvement time zone.
  • the control schedule setting rule indicates that the second efficiency is determined when the monitored device is operating according to control schedule information in which the control content for turning off the operation of the monitored device is not set within the second efficiency improvement period. This is a rule for setting the control content for turning off the operation of the monitored device in the control schedule information within the improvement period.
  • control schedule setting rule is terminated. This is a rule for setting the control content for turning off the operation of the monitored device at the time in the control schedule information.
  • control schedule generation unit 14d may repeatedly set the control content for turning off the operation of the monitored device within the efficiency improvement time periods T31 and T32. Good. In this case, the control schedule is improved in the energy saving direction.
  • control schedule setting rule indicates that, when the monitored device is operating according to control schedule information in which the control content for turning off the operation of the monitored device is not set within the second efficiency improvement period, the second efficiency. This is a rule for setting, in the control schedule information, a plurality of control contents for turning off the operation of the monitored device within the improvement period.
  • the display unit 12 presents the control schedule shown in FIG. 9B or FIG. 9C generated by the control schedule generation unit 14d.
  • the power manager can confirm the control schedule generated as described above by operating the input unit 11, and if necessary, this improved control schedule is transmitted from the communication unit 15 to the lighting control device 5. And the control schedule information stored in the lighting control device 5 and the air conditioning control device 6 is updated.
  • the off control time the time at which the operation of the monitored device set in the efficiency improvement time zone T3 (T31, T32) is turned off (hereinafter referred to as the off control time) is automatically adjusted from the usage status of the monitored device.
  • the operation to be performed will be described.
  • generation part 14d applies to this schedule automatic adjustment process is preset as follows.
  • the beneficial use time zone T1 is from 8:00 to 20:00
  • the wasteful use time zone T2 is from 0 to 7 o'clock, 22:00 to 24:00
  • the efficiency improvement time zone T31 is 7:00.
  • the efficiency improvement time zone T32 is set from 20:00 to 22:00.
  • the control schedule generation unit 14 d acquires a control schedule from the lighting control device 5 or the air conditioning control device 6.
  • the acquired current control schedule includes a time 8:00 when the operation of the monitored device is turned on (on control time), a time 7:00, 20:00 when the operation of the monitored device is turned off, 22:00 (off control time) is registered.
  • control schedule generation unit 14d shortens the efficiency improvement time zone T32 and extends the useless time zone T2 by advancing the off control time 22:00 set as the end time of the efficiency improvement time zone T32. , Improve the control schedule in the direction of energy saving.
  • FIG. 10B is an enlarged view of the control schedule in the efficiency improvement time zone T32 from 20:00 to 22:00.
  • the initial state is set at the scheduled off control time 20:00 and off control time 22:00. Has been.
  • the control schedule generation unit 14d advances the off control time by 10 minutes from 22:00 once a day.
  • the worker operates the operation switches S1, S2, etc. for 10 minutes from 21:50 to 22:00 (extension period of the wasteful use time zone T2). To determine whether or not the operation of the monitored device is turned on.
  • the off-control time will be 21:30, and it will be done by the worker for 30 minutes from 21:30 to 22:00 (extension period of the wasteful use time zone T2). It is determined whether there is an ON operation.
  • the off-control time is delayed by 10 minutes on the 4th day and changed to 21:40, and 20 minutes from 21:40 to 22:00 (used time zone T2 It is determined whether or not there is an ON operation by the worker during the extension period). If there is no on-operation by the worker, on the 5th day, the off-control time will be 21:30, and it will be done by the worker for 30 minutes from 21:30 to 22:00 (extension period of the wasteful use time zone T2). It is determined whether there is an ON operation.
  • the off control time at the time (delay by 10 minutes) (In FIG. 10C, the off-control time at the time of the eighth day is 21:40).
  • control schedule is improved in the direction of energy saving in accordance with the usage status of the monitored device. Further, this example is advantageous from the viewpoint of the limitation due to the upper limit of the number of registered control schedules and the actual comfort.
  • the power manager can present and confirm the control schedule in which the off control time is automatically adjusted as described above on the display unit 12.
  • the control schedule is transmitted from the communication unit 15 to the lighting control device 5 and the air conditioning control device 6, and the control schedule information stored in the lighting control device 5 and the air conditioning control device 6 is updated.
  • the efficiency improvement time zone T31 is shortened and the useless time zone T2 is extended by delaying the off control time 7 o'clock set as the start time of the efficiency improvement time zone T31.
  • the control schedule can be improved in the direction of energy saving.
  • the time zone setting means is configured to set the efficiency improvement time zone between the beneficial usage time zone and the waste usage time zone.
  • the efficiency improvement time zone has a start time of the efficiency improvement time zone and an end time of the efficiency improvement time zone.
  • the schedule generation means operates as follows. First, the control schedule generation means generates control schedule information in which the time for turning off the operation of the monitored device in the efficiency improvement time zone is changed from the one time to extend the useless time zone.
  • the control schedule generation unit further extends the useless time period by changing the time at which the operation of the monitored device is turned off in the efficiency improvement time period.
  • the first condition is a condition that the monitored device is operating according to the generated control schedule information.
  • the second condition is a condition that the operation of the monitored device is not turned off by the user's operation within the extension period of the wasteful use time zone.
  • the control schedule generation unit changes the time at which the operation of the monitored device is turned off in the efficiency improvement time period to shorten the useless time period.
  • the third condition is a condition that the monitored device is operating according to the generated control schedule information.
  • the fourth condition is a condition that the operation of the monitored device is turned off by the user's operation within the extension period of the useless time zone.
  • control schedule generation unit 14d generates a control schedule in which the power consumption gradually decreases in the efficiency improvement time period T3 will be described.
  • the beneficial use time zone T1 is from 8:00 to 20:00
  • the wasteful use time zone T2 is from 0 to 7 o'clock
  • the efficiency improvement time zone T31 is 7:00.
  • the efficiency improvement time zone T32 is set from 20:00 to 22:00.
  • the control schedule generation unit 14 d acquires a control schedule from the lighting control device 5 or the air conditioning control device 6.
  • the acquired current control schedule includes the time when the operation of the monitored device is 8:00 and 20:00 (on control time), the time when the operation of the monitored device is turned off at 7:00, 22:00 (off control time) is registered.
  • the power consumption of the monitored device is as shown in FIG. 11B, and energy saving is achieved in the efficiency improvement time period T32. It's hard to say.
  • the control schedule generation unit 14d registers the on control at the start time 20:00 of the efficiency improvement time period T32 and the off control is registered at the end time 22:00 of the efficiency improvement time period T32. Paying attention, the control schedule is improved in the energy saving direction by generating a control schedule in which the amount of power used gradually decreases from 20:00 to 22:00. Therefore, the control schedule is improved in the energy saving direction in the efficiency improvement time zone T32, and the power consumption of the monitored device is as shown in FIG. 11C, realizing energy saving in the efficiency improvement time zone T32. is doing.
  • the power manager can make the display unit 12 present and confirm the control schedule in which the power consumption gradually decreases from 20:00 to 22:00 as described above. Accordingly, the improved control schedule is transmitted from the communication unit 15 to the lighting control device 5 and the air conditioning control device 6, and the control schedule information stored in the lighting control device 5 and the air conditioning control device 6 is updated.
  • the schedule setting rule is applied to the setting status of each time zone to create and improve the control schedule, and the control schedule is automatically created without bothering the power manager. Can do.
  • the resource usage state determination unit 14c calculates the power consumption for one week reduced in the efficiency improvement time period T3 based on the power consumption data acquired by the resource usage information acquisition unit 14a, and the display unit 12 presents the electric energy for one week reduced in the efficiency improvement time period T3.
  • the amount of power for one week reduced in the efficiency improvement time period T3 is the maximum amount of power for one week that can be used in the efficiency improvement time period T3 and the power for the actual week in the efficiency improvement time period T3. It is obtained by calculating the difference between the two usage amounts. Then, as shown in FIG. 12, the resource usage state determination unit 14c generates a power reduction amount display unit G4 below the week display unit G2. The power usage status display unit G4 displays the amount of power for one week reduced in the efficiency improvement time period T3 as a specific number (kWh).
  • the power manager can view the presentation content of the display unit 12 generated as described above by operating the input unit 11. Therefore, by presenting the amount of power reduction, awareness of energy conservation is further increased and awareness of energy conservation is raised.
  • the resource usage state determination unit 14c evaluates whether or not the power usage amount in the efficiency improvement time period T3 is useless based on the power consumption data acquired by the resource usage information acquisition unit 14a. Then, the display unit 12 presents the evaluation result.
  • the resource usage state determination unit 14c has never used zero power consumption in each efficiency improvement time period T3 based on the power consumption data acquired by the resource usage information acquisition unit 14a. In this case, or when the operation of the monitored device has never been turned off, it is determined that the amount of power used in the efficiency improvement time zone T3 is useless.
  • the resource usage state determination unit 14c may acquire measurement data of the human sensors R1 and R2 from the central monitoring panel 2, and a monitored device in an area where there is no person is operating in the efficiency improvement time period T3. Therefore, it is determined that the amount of power used in the efficiency improvement time period T3 is useless. Then, as shown in FIG. 13, the resource usage state determination unit 14c generates a waste power amount display unit G5 below the week display unit G2.
  • the wasted power amount display unit G5 displays the power amount for one week determined to be wasted in the efficiency improvement time period T3 as a specific number (kWh).
  • the power manager can view the presentation content of the display unit 12 generated as described above by operating the input unit 11. Therefore, it is easy to discriminate useless control contents in the efficiency improvement time zone T3 by presenting the wasteful electric energy in the efficiency improvement time zone T3, and the improvement point of the control schedule can be found accurately.
  • the time zone setting unit 14b must operate the monitored device in addition to the beneficial usage time zone T1, the wasteful usage time zone T2, and the efficiency improvement time zone T3 (the power must be used without fail).
  • the mandatory use time zone is set for a monitored device (operationally mandatory monitored device) that must be used in a predetermined time zone, such as a night sign or emergency light.
  • the resource usage state determination unit 14c calculates the power usage amount in the required usage time period based on the power usage amount data acquired by the resource usage information acquisition unit 14a, and the calculated power usage amount is a predetermined threshold value. If it is less than (corresponding to standby electric energy), it is determined that the operation-required monitored device is not operating.
  • the display unit 12 presents on the display that the operation-required monitored device is not operating, and the power manager who has viewed the presented content improves the control schedule of the operation-required monitored device.
  • the power manager pursues an energy-saving effect, so that an erroneous control schedule that stops the operation of monitored equipment such as night signs and emergency lights and easily reduces the necessary power When created, this error can be detected and notified to the power manager.
  • control schedule generation unit 14d when the control content is not set for each of the start time and end time of the essential use time zone in the control schedule acquired from the lighting control device 5 or the air conditioning control device 6, The control content for turning on the operation is set at the time. Or you may perform the said process only at the start time of an essential use time slot
  • control schedule ensures that the operation-required monitored device operates in the required use time zone, and the operation of the monitored device can be improved appropriately.
  • the power manager can make the display unit 12 present a control schedule that improves the operation of the monitored device during the essential usage time period as described above, and confirms it as necessary.
  • the improved control schedule is transmitted from the communication unit 15 to the lighting control device 5 and the air conditioning control device 6, and the control schedule information stored in the lighting control device 5 and the air conditioning control device 6 is updated.
  • a schedule determination unit 14e (schedule determination unit) may be provided in the calculation unit 14 of the terminal device 1 to detect an error in the control schedule created by the power manager.
  • the schedule determination unit 14e The consistency between each time zone set by the setting unit 14b and the created control schedule information is determined.
  • the schedule determination unit 14e sets the created control schedule information in the time zone setting unit 14b. It is determined that consistency with the required usage time zone is not achieved.
  • the display unit 12 presents on the display that the created control schedule information and the required usage time zone are not consistent, and the power manager who has viewed the presented content improves the control schedule. Therefore, the power manager can detect an error in the created control schedule and can appropriately operate the monitored device.
  • power is exemplified as a resource used by the monitored device, but the same effect can be obtained even with other resources such as gas.
  • terminal device 11 input unit (schedule input means) 12 Display (presentation means) 14a Resource usage information acquisition unit (resource usage information acquisition means) 14b Time zone setting part (time zone setting means) 14c Resource usage state determination unit (resource usage state determination means) 14d Control schedule generator (control schedule generator) 14e Schedule determination unit (schedule determination means) 2 Central monitoring panel 3 Electricity monitoring device 5 Lighting control device 6 Air conditioning control device L1, L2 Lighting fixture AC1, AC2 Air conditioner

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Water Supply & Treatment (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

 端末装置は、照明器具、空調機等の被監視機器における電力の使用を有益であるとみなす有益使用時間帯と、被監視機器における電力の使用を無駄であるとみなす無駄使用時間帯と、被監視機器における電力の使用量を抑制するべきであるとみなす効率改善時間帯とを含む3つ以上の各時間帯を設定し、被監視機器の使用電力量のデータに基づいて、各時間帯における使用電力量を算出し、当該算出した各時間帯における使用電力量を提示する。

Description

省エネルギー診断システム
 本発明は、省エネルギー診断システムに関するものである。
 従来、建物や施設内に設置された電気機器(被監視機器)から電力使用量(資源使用量)のデータを収集するとともに、温度や湿度などの環境情報や各機器の制御情報などのデータを収集し、所定の期間(例えば日、月、年の単位)毎に収集データを集計して、電力消費量を折れ線グラフや棒グラフなどでグラフ表示する省エネルギー診断システムが提供されていた(例えば特許文献1参照)。
特開平8-50501号公報
 上述した従来の省エネルギー診断システムでは、収集した数値をグラフ表示するだけで、運用の実態を把握し難く、電力やガス等の資源が無駄に消費されているか否かを的確に判断することは、エネルギー管理技術に精通した、十分な知識を有する管理者でなければ難しかった。
 また、所定の制御スケジュール情報にしたがって動作する電気機器の場合、制御スケジュールが的確に設定されているか否かを判断することも、十分な知識を有する管理者でなければ難しかった
 本発明は、上記事由に鑑みてなされたものであり、その目的は、十分な知識を有さない管理者であっても、被監視機器が資源を無駄に使用しているか否かを的確に判断することができる省エネルギー診断システムを提供することにある。
 本発明の省エネルギー診断システムは、制御スケジュール情報にしたがって動作する被監視機器を監視するためのシステムである。
 省エネルギー診断システムは、制御スケジュール情報にしたがって動作する被監視機器における資源の使用量を使用時刻に関連付けた資源使用情報を取得する資源使用情報取得手段と、被監視機器における資源の使用を有益であるとみなす有益使用時間帯と、被監視機器における資源の使用を無駄であるとみなす無駄使用時間帯と、被監視機器における資源の使用量を抑制するべきであるとみなす効率改善時間帯とを含む3つ以上の各時間帯を設定する時間帯設定手段と、資源使用情報取得手段が取得した資源使用情報に基づいて、時間帯設定手段が設定した各時間帯における資源の使用量を算出する資源使用状態判定手段と、当該算出した各時間帯における資源の使用量を提示する提示手段とを備えることを特徴とする。
 この発明によれば、資源の使用量の実績を、有益使用時間帯、無駄使用時間帯、効率改善時間帯の各期間の範囲と併せて見ることで、資源を有益に使用しているか否か、資源を無駄に使っているか否かを意識することができる。すなわち、管理者は、有益使用時間帯での資源の使用は適切であり、効率改善時間帯での資源の使用は無駄であると判断できる。さらに、被監視機器における資源の使用量を抑制するべきであるとみなす効率改善時間帯を設けており、このような業務効率化を目的とする時間帯を設けることによって、十分な知識を有さない管理者であっても、業務効率化を目的とする時間帯を意識しながら省エネルギー診断を行い、直感的な判断で制御スケジュールを改善して、省エネルギー化を図ることができる。また、有益使用時間帯、無駄使用時間帯、効率改善時間帯の各時間帯を設定することによって、管理者は、資源の使用状況を正確に把握でき、無駄な資源使用量を多く見積もったり、逆に少なく見積もることを防ぐことができ、制御スケジュールの改善点を的確に見出すことができる。すなわち、十分な知識を有さない管理者であっても、被監視機器が資源を無駄に使用しているか否かを的確に判断することができる。
 前記時間帯設定手段は、被監視機器の制御スケジュール情報を取得し、予め設定された時間帯設定ルールを当該取得した制御スケジュール情報に適用して前記各時間帯を設定することが好ましい。
 この発明によれば、制御スケジュール情報に基づいて、有益使用時間帯、無駄使用時間帯、効率改善時間帯の各時間帯を管理者の手を煩わせることなく自動設定することができる。
 前記時間帯設定手段は、予め設定された時間帯設定ルールを前記取得した制御スケジュール情報と前記資源使用情報取得手段が取得した資源使用情報とに適用して前記各時間帯を設定することが好ましい。
 この発明によれば、被監視機器の制御スケジュール情報と被監視機器の実際の使用状況とに基づいて、有益使用時間帯、無駄使用時間帯、効率改善時間帯の各時間帯を管理者の手を煩わせることなく自動設定することができ、管理者の専門性に関係なく、各時間帯を最適に設定できる。而して、管理者は、資源の使用状況をより正確に把握でき、資源の使用が有益か否かの判断を容易に行うことができる。
 予め設定されたスケジュール設定ルールを前記各時間帯の設定状態に適用して前記制御スケジュール情報を生成する制御スケジュール生成手段を備えることが好ましい。
 この発明によれば、スケジュール設定ルールを各時間帯の設定状況に適用して制御スケジュールを作成、改善しており、管理者の手を煩わせることなく制御スケジュールを自動作成することができる。
 前記制御スケジュール生成ルールは、前記効率改善時間帯の開始時刻と終了時刻との少なくとも一方の時刻において被監視機器の動作をオンまたはオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記少なくとも一方の時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定することであることが好ましい。
 この発明によれば、できるだけ省エネルギー方向に改善する制御スケジュールを管理者の手を煩わせることなく自動作成することができる。
 前記制御スケジュール生成手段は、予め設定されたスケジュール設定ルールを前記各時間帯の設定状態と前記資源使用情報取得手段が取得した資源使用情報とに適用して前記制御スケジュール情報を生成することが好ましい。
 この発明によれば、制御スケジュールは、被監視機器の使用状況に即して、より省エネルギー方向に改善される。
 前記有益使用時間帯と前記無駄使用時間帯との間に前記効率改善時間帯が設定され、当該効率改善時間帯の開始時刻および終了時刻の少なくとも一方の時刻において被監視機器の動作をオフさせる制御内容が設定された制御スケジュール情報にしたがって被監視機器が動作している場合、前記制御スケジュール生成手段は、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を前記一方の時刻から変動させて無駄使用時間帯を延長した制御スケジュール情報を生成し、被監視機器が当該生成した制御スケジュール情報にしたがって動作しているときに、前記無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフしなければ、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯をさらに延長し、被監視機器が当該生成した制御スケジュール情報にしたがって動作しているときに、前記無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフすれば、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯を短くすることが好ましい。
 この発明によれば、制御スケジュールは、被監視機器の使用状況に即して、より省エネルギー方向に改善される。また、制御スケジュールの登録件数の上限による制限や、実際の快適性の点からも有利である。
 前記効率改善時間帯の終了時刻に被監視機器の動作をオフする制御内容が制御スケジュール情報に設定されている場合、前記制御スケジュール生成手段は、効率改善時間帯における資源の使用量が漸次減少するように被監視機器が動作する制御スケジュール情報を生成することが好ましい。
 この発明によれば、制御スケジュールは、効率改善時間帯において、より省エネルギー方向に改善されており、効率改善時間帯での省エネルギー化を実現している。
 前記資源使用状態判定手段は、前記効率改善時間帯において使用可能な資源の最大使用量と、前記効率改善時間帯における実際の資源の使用量とを比較して、両使用量の差を算出し、前記提示手段は、当該算出した両使用量の差を提示することが好ましい。
 この発明によれば、管理者は、資源使用の削減量を提示されることで、省エネルギーに対する意識がより高まり、省エネルギー化に対する意識啓発となる。
 前記資源使用状態判定手段は、前記資源使用情報に基づいて、前記効率改善時間帯における資源の使用量が無駄であるか否かを評価し、前記提示手段は、当該評価結果を提示することが好ましい。
 この発明によれば、管理者は、効率改善時間帯における無駄な資源の使用量を提示されることで、効率改善時間帯における無駄な制御内容を判別しやすくなり、制御スケジュールの改善点を的確に見出すことができる。
 前記時間帯設定手段は、被監視機器が必ず資源を使用しなければならないとみなす必須使用時間帯を設定し、前記資源使用状態判定手段は、前記資源使用情報に基づいて、必須使用時間帯における資源の使用量を算出し、当該算出した使用量が所定量以下の場合、被監視機器が使用されていないと判定し、前記提示手段は、当該判定結果を提示することが好ましい。
 この発明によれば、管理者が、省エネルギー効果を追及するあまり、夜間の看板や非常灯等のような動作必須被監視機器の動作を停止させ、必要な資源も安易に削減するような誤った制御スケジュールを作成した場合に、この誤りを検出し、管理者に通知することができる。
 前記必須使用時間帯の少なくとも開始時刻に制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、当該必須使用時間帯の少なくとも開始時刻に被監視機器の動作をオンさせる制御スケジュール情報を生成する制御スケジュール生成手段を備えることが好ましい。
 この発明によれば、制御スケジュールは、必須使用時間帯における動作必須被監視機器を確実に動作させるものとなり、被監視機器の運用を適切に改善できる。
 操作者が前記制御スケジュール情報を作成するためのスケジュール入力手段と、当該作成された制御スケジュール情報と前記各時間帯の設定状態との整合性を判定するスケジュール判定手段とを備え、前記提示手段は、スケジュール判定手段の判定結果を提示することが好ましい。
 この発明によれば、管理者が、作成した制御スケジュールの誤りを検知でき、被監視機器の運用を適切に行うことができる。
 前記制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有していることが好ましい。時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有している。時間帯設定ルールは、前記停止予定時刻以後であり、前記起動予定時刻までの期間に含まれる期間を、前記無駄使用時間帯と設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記無駄使用時間帯以外の時間帯を、効率改善時間帯として設定するルールを有している。
 前記制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有していることが好ましい。時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有している。時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、起動予定時刻までの期間を、第1効率改善期間として設定するルールを有している。時間帯設定ルールは、前記停止予定時刻以後、停止予定時刻よりも一定時間後の第2時刻までの期間を、第2効率改善期間として設定するルールを有している。時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、前記時間帯設定手段は、前記有益使用時間帯,前記無駄使用時間帯,前記効率改善時間帯を設定する。
 時間帯設定ルールは、前記起動予定時刻以後、前記起動予定時刻の次の停止予定時刻までの間の期間を、前記有益使用時間帯として設定するルールを有していることが好ましい。
 前記時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、前記第1時刻の次の起動予定時刻までの期間を、第1効率改善期間として設定するルールを有していることが好ましい。
 前記時間帯設定ルールは、前記停止予定時刻以後、前記停止予定時刻の次でありかつ停止予定時刻よりも一定時間後である第2時刻までの期間を第2効率改善期間として設定するルールを有していることが好ましい。
 前記制御スケジュールは、被監視機器をオンする起動予定時刻と、被監視機器をオフする停止予定時刻とを有していることが好ましい。時間帯設定手段は、以前の起動時刻に基づいて、基準起動時刻を決定するように構成されており、前記以前の起動時刻は、過去に被監視機器の動作がオンされた時刻を示している。時間帯設定手段は、以前の停止時刻に基づいて、基準停止時刻を決定するように構成されており、前記以前の停止時刻は、過去に被監視機器の動作がオフされた時刻を示している。前記時間帯設定ルールは、前記基準起動時刻以後、前記起動予定時刻までの期間を、第1効率改善期間として設定するルールを有している。前記時間帯設定ルールは、前記停止予定時刻以後、前記基準停止時刻までの期間を、第2効率改善期間として設定するルールを有している。前記時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有している。前記時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、制御スケジュール情報に基づいて、有益使用時間帯,無駄使用時間帯,効率改善時間帯の設定を行う。
 前記時間帯設定手段は、前記資源使用情報に基づいて、前記以前の起動時刻を認定するように構成されていることが好ましい。時間帯設定手段は、前記資源使用情報に基づいて、前記以前の停止時刻を認定するように構成されている。
 前記時間帯設定手段は、前記資源の使用量がしきい値よりも大きくなったとき、前記以前の起動時刻を認定するように構成されていることが好ましい。時間帯設定手段は、前記資源の使用量がしきい値よりも小さくなったとき、前記以前の停止時刻を認定するように構成されている。
 前記時間帯設定手段は、複数の前記以前の起動時刻に基づいて、前記基準起動時刻を決定するように構成されていることが好ましい。時間帯設定手段は、複数の前記以前の停止時刻に基づいて、前記基準停止時刻を決定するように構成されている。
 前記基準起動時刻は、以前の起動時刻の最も早い時間と以前の起動時刻の最も遅い時刻との間の時刻に設定されていることが好ましい。
 前記基準停止時刻は、以前の停止時刻の最も早い時間と以前の停止時刻の最も遅い時刻との間の時刻に設定されていることが好ましい。
 前記制御スケジュール生成手段によって生成された制御スケジュール情報を被監視機器に送信する送信手段をさらに有していることが好ましい。
 時間帯設定ルールは、前記無駄使用時間帯以後、前記有益使用時間帯までの間の期間を、第1効率改善期間として設定するルールであることが好ましい。時間帯設定手段は、前記第1効率改善期間を、効率改善時間帯として認定することが好ましい。
 前記制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 前記制御スケジュール設定ルールは、前記第1効率改善期間の開始時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記開始時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 前記制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 前記時間帯設定ルールは、前記有益使用時間帯以後、前記無駄使用時間帯までの間の期間を、第2効率改善期間として設定するルールであることが好ましい。時間帯設定手段は、前記第2効率改善期間を、効率改善時間帯として認定することが好ましい。
 前記制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 前記制御スケジュール設定ルールは、前記第2効率改善期間の終了時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記終了時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 前記制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールであることが好ましい。
 以上説明したように、本発明では、十分な知識を有さない管理者であっても、被監視機器が資源を無駄に使用しているか否かを的確に判断することができるという効果がある。
実施形態1の省エネルギー診断システムの概略構成を示す図である。 同上の端末装置のブロック構成を示す図である。 同上の中央監視盤のブロック構成を示す図である。 同上の提示する画面の概略構成を示す図である。 同上の時間帯の手動設定処理を示す図である。 同上の時間帯の自動設定処理を示す図である。 (a)(b)同上のオン・オフ情報、時間差情報の構造を示す図である。 実施形態2の演算部のブロック構成を示す図である。 (a)~(c)同上の制御スケジュールの生成処理を示す図である。 (a)~(c)同上の制御スケジュールの自動調整処理を示す図である。 (a)~(c)同上の制御スケジュールの効率改善時間帯における制御内容を示す図である。 実施形態3の提示する画面の概略構成を示す図である。 実施形態4の提示する画面の概略構成を示す図である。 実施形態5の演算部のブロック構成を示す図である。
 以下、本発明の実施の形態を図面に基づいて説明する。
  (実施形態1)
 本実施形態では、例えば飲食店内に設置された照明器具及び空調機(被監視機器)の使用電力量(資源の使用量)を管理する形態を例に説明するが、スーパーマーケットや事業所などの建物内で被監視機器の使用電力量を管理するシステムでも良いし、また被監視機器として照明器具、空調機以外の電気機器の使用電力量を監視するようにしても良い。
 図1は省エネルギー診断システムの全体構成を示す概略構成図であり、本システムは、店舗B内に配設された被監視機器(例えば照明器具L1,L2および空調機AC1,AC2からなる)の使用電力量を管理して、省エネルギー診断を行うために用いられる。
 本システムは店舗B内に設置された被監視機器(照明器具L1,L2、空調機AC1,AC2など)の使用電力量を監視して中央監視盤2に出力する電力量監視装置3と、被監視機器の動作を制御する照明制御装置5および空調制御装置6と、電力量監視装置3、照明制御装置5および空調制御装置6にインターネットのような通信ネットワークNTを介して接続される中央監視盤2と、中央監視盤2に通信ネットワークNTを介して接続される端末装置1とを主要な構成として備えている。なお電力量監視装置3、照明制御装置5および空調制御装置6にはそれぞれグローバルIPアドレスが設定され、通信ネットワークNTを介して通信を行う機能を備えている。
 先ず店舗B内に配設された被監視機器について説明する。店舗Bは、2つのゾーンZ1,Z2に区分けしている。各ゾーンZ1,Z2には、各々複数台の照明器具L1,L2と、空調機AC1,AC2と、各ゾーンZ1,Z2に設けられて同じゾーン内にある照明器具L1,L2のオン/オフなどの操作を行うための操作スイッチS1,S2と、各ゾーンZ1,Z2における人の存否を感知する人感センサR1,R2(人検出手段)とが配設されている。
 また店舗B内には、商用電源ACに接続された主幹ブレーカ40および分岐ブレーカ41~44を内部に収納した分電盤4が設置されており、分岐ブレーカ41を介して分岐される分岐回路51にはゾーンZ1に配設された複数台の照明器具L1が接続され、分岐ブレーカ42を介して分岐される分岐回路52にはゾーンZ2に配設された複数台の照明器具L2が接続されている。また分岐ブレーカ43を介して分岐される分岐回路53にはゾーンZ1に配設された空調機AC1が接続され、分岐ブレーカ44を介して分岐される分岐回路54にはゾーンZ2に配設された空調機AC4が接続されている。各分岐回路51~54にはそれぞれ計量ポイントP1~P4が設けられ、電力計31~34がそれぞれ対応する計量ポイントP1~P4での負荷電流を計測することによって、各分岐回路51~54での使用電力量を所定の計測周期毎に測定し、内蔵メモリに記憶している。また電力計31~34は信号線LN3を介して電力量監視装置3に接続されており、所定の送信周期が経過する毎に、内蔵メモリに蓄積した計測結果を電力量監視装置3に出力する。
 また、各ゾーンZ1,Z2に配設された照明器具L1,L2、操作スイッチS1,S2、人感センサR1,R2は伝送線LN1を介して照明制御装置5に接続されている。照明器具L1,L2、操作スイッチS1,S2および人感センサR1,R2には個別のアドレス情報が割り当てられており、照明制御装置5では、アドレス情報を含めた伝送信号を伝送線LN1に送出することによって、所望の照明器具L1,L2、操作スイッチS1,S2又は人感センサR1,R2との間で伝送信号を授受することができる。ここで、照明制御装置5は、端末装置1或いは中央監視盤2から送信された制御スケジュール情報を記憶する記憶部(図示せず)を備えている。制御スケジュール情報には、例えば曜日毎に各ゾーンZ1,Z2の照明器具L1,L2を点灯させる時刻と消灯させる時刻とが登録されており、制御スケジュール情報で指定された点灯時刻がくると、対応する照明器具L1,L2に点灯制御信号を送信して、この照明器具を点灯させるとともに、制御スケジュール情報で指定された消灯時刻がくると、対応する照明器具L1,L2に消灯制御信号を送信して、この照明器具を消灯させる。また所望の照明器具L1,L2を点灯又は消灯させるために、就業者が対応する操作スイッチS1,S2を操作すると、操作スイッチS1,S2から照明制御装置5に操作信号が送信される。このとき、照明制御装置5では、操作スイッチS1,S2から入力された操作信号に応じて対応する照明器具L1,L2に制御信号を送信し、対応する照明器具L1,L2を点灯又は消灯させているので、制御スケジュール情報で指定された時間帯以外でも照明器具L1,L2を点灯させることができる。また各ゾーンZ1,Z2に設置された人感センサR1,R2が人を検知すると、人感センサR1,R2から照明制御装置5へ人体検知信号が送信され、照明制御装置5に人体検知信号の履歴が記憶される。
 一方、各ゾーンZ1,Z2に配設された空調機AC1,AC2は伝送線LN2を介して空調制御装置6に接続されている。空調機AC1,AC2には個別のアドレス情報が割り当てられており、空調制御装置6では、アドレス情報を含めた伝送信号を伝送線LN2に送出することによって、所望の空調機AC1,AC2との間で伝送信号を授受することができる。ここで、空調制御装置6は、端末装置1或いは中央監視盤2から送信された制御スケジュール情報を記憶する記憶部(図示せず)を備えている。制御スケジュール情報には、例えば曜日毎に各ゾーンZ1,Z2にある空調機AC1,AC2の運転開始時刻と運転終了時刻が登録されており、制御スケジュール情報で指定された運転開始時刻がくると、対応する空調機AC1,AC2に運転開始信号を送信して、この空調機を運転状態に切り替えるとともに、制御スケジュール情報で指定された運転終了時刻がくると、対応する空調機AC1,AC2に運転終了信号を送信して、この空調機を停止状態に切り替えている。また各ゾーンZ1,Z2には同じゾーンにある空調機AC1,AC2のオン/オフなどの操作を行うための操作スイッチ(図示せず)が配設されており、所望の空調機AC1,AC2を運転又は停止させるために、就業者が対応する操作スイッチを操作すると、操作スイッチから空調制御装置6に操作信号が送信される。このとき、空調制御装置6では、操作スイッチから入力された操作信号に応じて対応する空調機AC1,AC2に制御信号を送信し、空調機AC1,AC2を運転状態から停止状態へ、或いは、停止状態から運転状態に切り替えているので、制御スケジュール情報で指定された時間帯以外でも空調機AC1,AC2を動作させることができる。
 また図3は中央監視盤2の概略構成を示すブロック図であり、ネットワークNTを経由した通信を行う通信部21と、通信部21が電力量監視装置3から取得した各分岐回路51~54の使用電力量の計測結果や照明制御装置5から取得した人感センサR1,R2の測定データを記憶する記憶部22と、演算部23とを主要な構成として備えている。中央監視盤2の演算部23では、所定のデータ収集期間が経過する毎に通信部21から電力量監視装置3や照明制御装置5にデータ要求信号を送信し、このデータ要求信号に応じて電力量監視装置3から各分岐回路51~54の使用電力量の計測結果が返送されるとともに、照明制御装置5から人感センサR1,R2の検知信号などが返送されると、通信部21によって受信された使用電力量の計測結果や人感センサR1,R2の検知信号などを記憶部22に記憶させている。
 ここで、本システムでは端末装置1に、使用電力量の管理や使用電力が有益か否かを評価する処理を実行させるためのプログラムを搭載してあり、このプログラムを端末装置1が実行することによって、使用電力量の管理機能や電力評価機能が実現される。
 端末装置1は、図2のブロック図に示すように、キーボードやマウスやタッチパネルなどからなる入力部11と、後述の演算部14によって表示内容が制御されるディスプレイなどの表示部12(提示手段)と、ハードディスクのような大容量記憶装置やROM,RAMなどのメモリからなり、上述のプログラムや使用電力量の計測結果などを記憶する記憶部13と、記憶部13に記憶されたプログラムを実行する演算部14と、ネットワークNTを経由した通信を行う通信部15とを備えている。
 演算部14は、記憶部13に記憶されたプログラムを実行することで、資源使用情報取得部14a(資源使用情報取得手段)、時間帯設定部14b(時間帯設定手段)、資源使用状態判定部14c(資源使用状態判定手段)として機能する。
 上述の制御システムでは予め設定された制御スケジュールにしたがって被監視機器のオン、オフが制御されており、例えば就業時間中は全ての被監視機器をオンさせるとともに、就業時間外は全ての被監視機器をオフさせるような制御スケジュール情報が設定されている場合に、全ての被監視機器がスケジュール通りに動作していれば、就業時間外に動作する被監視機器は存在せず、無駄な電力消費が発生することはない。しかしながら、全ての被監視機器が所定のスケジュール通りに使用されるとは限らず、例えば就業時間外に従業員が何らかの作業を行いたい場合に、操作スイッチS1,S2等を操作して所望の被監視機器(照明器具L1,L2又は空調機AC1,AC2)を動作させた後に、被監視機器を停止させるのを忘れて退社すると、被監視機器がそのまま動作しつづけ、電力が無駄に消費されてしまう可能性があった。
 本発明の省エネルギー診断システムは、このような使われ方をする制御システムにおいて、被監視機器の各時間区分での電力使用が有益であるか否かを評価したり、使用電力量を低減可能な制御スケジュールを作成する省エネルギー診断のために用いられるものであり、以下に、店舗Bの電力管理者が、端末装置1を用いて被監視機器の使用電力量を把握した後、省エネルギー診断を行う手順について、説明する。
 まず、本システムのように端末装置1が通信ネットワークNTを介して監視対象の中央監視盤2に接続されている場合は、端末装置1の演算部14の資源使用情報取得部14aが、中央監視盤2から通信部15を介して、各分岐回路51~54における使用電力量のデータ(資源使用情報)を自動収集して、収集した使用電力量のデータを記憶部13に格納するようになっている。この使用電力量のデータは時刻に関連付けられており、記憶部13には、使用電力量のデータが時刻に対応付けて格納される。
 演算部14の時間帯設定部14bは、1日の24時間において、被監視機器における電力の使用を有益であるとみなす有益使用時間帯T1と、被監視機器における電力の使用を無駄であるとみなす無駄使用時間帯T2と、被監視機器における電力の使用量を抑制するべきであるとみなす効率改善時間帯T3の各時間帯を設定する。この時間帯設定は、各分岐回路51~54毎に設定され、電力管理者による入力部11の操作に応じて時間帯設定部14bが行う。以下、分岐回路51を対象として、店舗Bの営業時間である8時~20時を有益使用時間帯T1、店舗Bの閉店時間である0時~7時、22時~24時を無駄使用時間帯T2、開店準備および閉店準備の時間である7時~8時、20時~22時を効率改善時間帯T3に設定したとして説明する。
 そして、資源使用状態判定部14cは、資源使用情報取得部14aが取得した使用電力量のデータに基づいて、時間帯設定部14bが設定した各時間帯T1,T2,T3における使用電力量を算出し、表示部12が、各時間帯T1,T2,T3における使用電力量を提示する。
 図4は、表示部12がディスプレイ上に提示する画面であり、資源使用状態判定部14cは、分岐回路51に設定された有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の時間範囲を示す時間帯表示部G1を生成している。時間帯表示部G1は、24時間を1時間単位で分割したセル毎に、当該セルがどの時間帯に属しているかを色分けして表示する。なお、図4は白黒表示のため、有益使用時間帯T1に属するセルを右上がりの斜線で表し、無駄使用時間帯T2に属するセルを網線で表し、効率改善時間帯T3に属するセルをドットで表す。
 さらに資源使用状態判定部14cは、月曜日から日曜日までの一週間の期間における分岐回路51の使用電力の状態を示す週間表示部G2を、時間帯表示部G1の下方に生成している。資源使用状態判定部14cは、週間表示部G2の生成時に、分岐回路51の時間毎の使用電力量のデータを所定のしきい値(待機電力量に相当)と比較し、しきい値を超えた期間(つまり分岐回路51に接続された被監視機器が動作した期間)に対応するセルのみを色づけして表示させ、しきい値未満の期間(つまり分岐回路51に接続された被監視機器が停止した期間)のセルは非表示として、週間表示部G2を生成する。しきい値を超えた期間(つまり分岐回路51に接続された被監視機器が動作した期間)に対応するセルは、当該セルがどの時間帯に属しているかを、時間帯表示部G1と同様に色分けして表示する。なお、週間表示部G2のセルは、24時間を30分単位で分割して構成される。
 さらに資源使用状態判定部14cは、週間表示部G2の下方に電力使用状況表示部G3を生成している。電力使用状況表示部G3は、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各期間における使用電力量と、一週間(総稼動時間帯)における電力使用量の合計を具体的な数字(kWh)で表示している。
 電力管理者は、入力部11を操作することで、上記のように生成された表示部12の提示内容を見ることができる。そして、使用電力量の実績を、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各期間の範囲と併せて見ることで、電力を有益に使用しているか否か、電力を無駄に使っているか否かを意識することができる。すなわち、電力管理者は、有益使用時間帯T1での使用電力は適切であり、無駄使用時間帯T2での使用電力は無駄であると判断できる。
 さらに、本実施形態では、被監視機器における電力の使用量を抑制するべきであるとみなす効率改善時間帯T3を設けている。効率改善時間帯T3は、電力を使用しても使用しなくてもよいが、できるだけ使用電力量を低減させることを目的とする時間帯であり、電力管理者は、効率改善時間帯T3での使用電力は、必要に応じて使用されたと判断できる。このような業務効率化を目的とする時間帯を設けることによって、十分な知識を有さない電力管理者であっても、業務効率化を目的とする時間帯を意識しながら省エネルギー診断を行い、直感的な判断で制御スケジュールを改善して、省エネルギー化を図ることができる。
 また、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を設定することによって、電力管理者は、電力の使用状況を正確に把握でき、無駄な使用電力を多く見積もったり、逆に少なく見積もることを防ぐことができ、制御スケジュールの改善点を的確に見出すことができる。
 すなわち、十分な知識を有さない電力管理者であっても、被監視機器が電力を無駄に使用しているか否かを的確に判断することができる。
 電力管理者は、入力部11を操作して照明制御装置5及び空調制御装置6から取得した制御スケジュールを、省エネルギー化を目的として改善した後に、通信部15から照明制御装置5及び空調制御装置6に変更後の制御スケジュール情報を送信し、照明制御装置5及び空調制御装置6に記憶された制御スケジュール情報を更新する。
 また、時間帯設定部14bは、照明制御装置5または空調制御装置6から制御スケジュール情報を取得し(分岐回路51~54の各々に対応する制御スケジュール情報)、予め設定された時間帯設定ルールを当該取得した制御スケジュール情報に適用して有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を自動設定してもよく、この時間帯自動設定について、以下説明する。
 照明制御装置5から取得した制御スケジュールは、照明器具L(L1,L2)を点灯させる時刻と消灯させる時刻が登録されており、空調制御装置6から取得した制御スケジュール情報は、空調機AC(AC1,AC2)の運転開始時刻と運転終了時刻が登録されている。以降、制御スケジュール情報において、被監視機器の動作をオンするとは、照明器具Lを点灯させる、または空調機ACを運転開始させることを意味し、被監視機器の動作をオフするとは、照明器具Lを消灯させる、または空調機ACを運転終了させることを意味する。
 時間帯設定部14bが期間自動設定処理に適用する時間帯設定ルールは、以下のように予め設定されている。まず、被監視機器の動作がオンする時刻から、被監視機器の動作がオフする時刻までの間を、有益使用時間帯T1に設定する。次に、有益使用時間帯T1の開始時刻から所定時間前(例えば1時間前)までの時間範囲と、有益使用時間帯T1の終了時刻から所定時間後(例えば2時間後)までの時間範囲とを効率改善時間帯T3に設定する。次に、上記のように設定した有益使用時間帯T1および効率改善時間帯T3以外の時間範囲を無駄使用時間帯T2に設定する。
 例えば図5に示すように、制御スケジュール情報に、被監視機器の動作がオンする時刻8時、被監視機器の動作がオフする時刻20時が登録されている場合、時間帯設定部14bは、8時~20時を有益使用時間帯T1、7時~8時、20時~22時を効率改善時間帯T3、0時~7時、22時~24時を無駄使用時間帯T2に設定する。
 したがって、制御スケジュール情報に基づいて、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を電力管理者の手を煩わせることなく自動設定することができる。
 以上述べたように、時間帯設定手段は、被監視機器の制御スケジュール情報を取得し、予め設定された時間帯設定ルールを当該取得した制御スケジュール情報に適用して前記各時間帯を設定する。
 また、制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有している。時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有している。時間帯設定ルールは、前記停止予定時刻以後であり、前記起動予定時刻までの期間に含まれる期間を、前記無駄使用時間帯と設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記無駄使用時間帯以外の時間帯を、効率改善時間帯として設定するルールを有している。
 なお、上記説明において、起動予定時刻は、8時と設定されている。停止予定時刻は、20時と設定されている。有益使用時間帯は、8時以後、20時までの期間として設定されている。無駄使用時間帯は、22時以後、24時まで及び、0時以後、7時までの期間と設定されている。すなわち、無駄使用時間帯は、停止予定時刻以後、起動予定時刻までの期間に含まれる期間として設定されている。そして、効率改善時間帯は、7時以後8時までの期間及び、20時以後22時までの期間として設定されている。すなわち、効率改善時間帯は、有益使用時間帯及び無駄使用時間帯以外の時間帯として設定されている。しかしながら、時間の設定については、上記の説明においてなされた設定に限られない。
 また、制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有している。時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有している。時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、起動予定時刻までの期間を、第1効率改善期間として設定するルールを有している。時間帯設定ルールは、前記停止予定時刻以後、停止予定時刻よりも一定時間後の第2時刻までの期間を、第2効率改善期間として設定するルールを有している。時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、前記時間帯設定手段は、前記有益使用時間帯,前記無駄使用時間帯,前記効率改善時間帯を設定する。
 これにより、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を電力管理者の手を煩わせることなく自動設定することができる。
 なお、上記説明において、第1効率改善期間は、7時以後8時までの期間として定義されている。また、第2効率改善期間は、20時以後22時までの期間として定義される。しかしながら、第1効率改善期間及び第2効率改善期間は、上記の説明においてなされた期間に限られない。
 なお、第1時刻は、起動予定時刻と同じ時刻と設定することができる。したがって、第1効率改善期間は、0以上の期間に設定することができる。また、第2時刻は、停止予定時刻と同じ時刻と設定することができる。したがって、第2項率改善期間は、0以上の期間に設定することができる。
 これを別の観点から見ると、制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有している。時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有している。時間帯設定ルールは、第1ルールと第2ルールとの少なくとも一方を有する。第1ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、起動予定時刻までの期間として定義される。第2ルールは、前記停止予定時刻以後、停止予定時刻よりも一定時間後の第2時刻までの期間として定義される。時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、前記時間帯設定手段は、前記有益使用時間帯,前記無駄使用時間帯,前記効率改善時間帯を設定する。
 また、時間帯設定ルールは、前記起動予定時刻以後、前記起動予定時刻の次の停止予定時刻までの間の期間を、前記有益使用時間帯として設定するルールを有している。
 これにより、有益使用時間帯を確実に設定できる。
 そしてに、時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、前記第1時刻の次の起動予定時刻までの期間を、第1効率改善期間として設定するルールを有している。
 これにより、第1効率改善期間を確実に設定できる。すなわち、効率改善時間帯を確実に設定できる。
 また、時間帯設定ルールは、前記停止予定時刻以後、前記停止予定時刻の次でありかつ停止予定時刻よりも一定時間後である第2時刻までの期間を第2効率改善期間として設定するルールを有している。
 これにより、第2効率改善期間を確実に設定できる。すなわち、効率改善時間帯を確実に設定できる。
 なお、上記説明において、第1時刻は、7時と設定されている。第2時刻は22時と設定されている。しかしながら、第1時刻及び第2時刻は、上記説明においてなされた時間に限定されない。
 また、時間帯設定部14bは、照明制御装置5または空調制御装置6から取得した制御スケジュール情報だけでなく、資源使用情報取得部14aが収集して記憶部13に格納した各分岐回路51~54における使用電力量のデータも併せて用いることで、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を自動設定してもよく、この時間帯自動設定について、以下説明する。
 時間帯設定部14bが期間自動設定処理に適用する時間帯設定ルールは、以下のように予め設定されている。まず、被監視機器の動作がオンする時刻から、被監視機器の動作がオフする時刻までの間を、有益使用時間帯T1に設定する。
 次に、時間帯設定部14bは、記憶部13に格納している実際の使用電力量のデータに基づき、過去の所定期間(例えば1週間前まで)の各日において、有益使用時間帯T1の開始時刻より前に被監視機器の動作がオンした時刻と有益使用時間帯T1の開始時刻との時間差(以降、開始時間差と称す)、および有益使用時間帯T1の終了時刻より後に被監視機器の動作がオフした時刻と有益使用時間帯T1の終了時刻との時間差(以降、終了時間差と称す)を各々算出する。次に、上記のように日毎に算出した開始時間差の中央値、および上記のように日毎に算出した終了時間差の中央値を導出する。そして、有益使用時間帯T1の開始時刻から開始時間差の中央値前までの時間帯、および有益使用時間帯T1の終了時刻から終了時間差の中央値後までの時間帯の各々を、効率改善時間帯T3に設定する。
 さらに、上記のように設定した有益使用時間帯T1および効率改善時間帯T3以外の時間範囲を無駄使用時間帯T2に設定する。
 例えば、図6に示すように、分岐回路51の制御スケジュール情報に、被監視機器の動作がオンする時刻8時、被監視機器の動作がオフする時刻20時が登録されている場合、時間帯設定部14bは、8時~20時を有益使用時間帯T1に設定する。
 次に、時間帯設定部14bは、記憶部13に格納した分岐回路51における使用電力量のデータのうち過去の所定期間(例えば1週間前まで)のデータを読み出し、当該読み出した使用電力量のデータを所定のしきい値(待機電力量に相当)と比較し、しきい値を超えた場合、分岐回路51に接続した被監視機器の動作がオンしたと判断し、しきい値未満の場合、分岐回路51に接続した被監視機器の動作がオフしたと判断する。そして、図7(a)に示すように、分岐回路51に接続した被監視機器がオンした時刻、オフした時刻を日毎に格納したオン・オフ情報を作成する。
 次に、時間帯設定部14bは、オン・オフ情報に基づいて、日毎の開始時間差および終了時間差を算出し、図7(b)に示すように、日毎の開始時間差および終了時間差を格納した時間差情報を作成する。次に、時間差情報から、過去の所定期間(例えば1週間前まで)における開始時間差の中央値および終了時間差の中央値を導出する。この場合、開始時間差の中央値「1時間」、終了時間差の中央値「1時間」とする。そして、有益使用時間帯T1の開始時刻8時から1時間前(7時)までの時間帯、および有益使用時間帯T1の終了時刻20時から1時間後(21時)までの時間帯の各々を、効率改善時間帯T3に設定する(図6参照)。さらに、有益使用時間帯T1および効率改善時間帯T3以外の時間範囲を無駄使用時間帯T2に設定する(図6参照)。
 そして、時間帯設定部14bは、上記の各時間帯の設定処理を日毎に繰り返すことで、被監視機器の制御スケジュール情報と被監視機器の実際の使用状況とに基づいた各時間帯を設定することが可能となる。
 したがって、被監視機器の制御スケジュール情報と被監視機器の実際の使用状況とに基づいて、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を電力管理者の手を煩わせることなく自動設定することができ、電力管理者の専門性に関係なく、各時間帯を最適に設定できる。而して、電力管理者は、電力の使用状況をより正確に把握でき、使用電力が有益か否かの判断を容易に行うことができる。
 以上述べたように、制御スケジュールは、被監視機器をオンする起動予定時刻と、被監視機器をオフする停止予定時刻とを有している。時間帯設定手段は、以前の起動時刻に基づいて、基準起動時刻を決定するように構成されており、前記以前の起動時刻は、過去に被監視機器の動作がオンされた時刻を示している。時間帯設定手段は、以前の停止時刻に基づいて、基準停止時刻を決定するように構成されており、前記以前の停止時刻は、過去に被監視機器の動作がオフされた時刻を示している。時間帯設定ルールは、前記基準起動時刻以後、前記起動予定時刻までの期間を、第1効率改善期間として設定するルールを有している。時間帯設定ルールは、前記停止予定時刻以後、前記基準停止時刻までの期間を、第2効率改善期間として設定するルールを有している。時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有している。時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、制御スケジュール情報に基づいて、有益使用時間帯,無駄使用時間帯,効率改善時間帯の設定を行う。
 前記時間帯設定手段は、前記資源使用情報に基づいて、前記以前の起動時刻を認定するように構成されている。時間帯設定手段は、前記資源使用情報に基づいて、前記以前の停止時刻を認定するように構成されている。
 これにより、各被監視機器を個別に監視することなく、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を電力管理者の手を煩わせることなく自動設定することができる。
 また、時間帯設定手段は、前記資源の使用量がしきい値よりも大きくなったとき、前記以前の起動時刻を認定するように構成されている。時間帯設定手段は、前記資源の使用量がしきい値よりも小さくなったとき、前記以前の停止時刻を認定する。
 これによっても、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3の各時間帯を電力管理者の手を煩わせることなく自動設定することができる。
 また、前記時間帯設定手段は、複数の前記以前の起動時刻に基づいて、前記基準起動時刻を決定するように構成されている。
 これにより、過去の被監視機器の使用状況に応じた基準起動時刻を決定できる。すなわち、被監視機器の使用状況が変化した場合、変化した使用状況に応じて、基準起動時刻を決定することができる。
 時間帯設定手段は、複数の前記以前の停止時刻に基づいて、前記基準停止時刻を決定するように構成されている。
 これにより、過去の被監視機器の使用状況に応じた基準停止時刻を決定できる。すなわち、被監視機器の使用状況が変化した場合、変化した使用状況に応じて、基準停止時刻を決定することができる。
 また、基準起動時刻は、以前の起動時刻の最も早い時間と以前の起動時刻の最も遅い時刻との間の時刻に設定されている。
 これによっても、過去の被監視機器の使用状況に応じた基準起動時刻を決定できる。
 また、基準停止時刻は、以前の停止時刻の最も早い時間と以前の停止時刻の最も遅い時刻との間の時刻に設定されている。
 これによっても、過去の被監視機器の使用状況に応じた基準停止時刻を決定できる。
  (実施形態2)
 本実施形態は、図8に示すように、端末装置1の演算部14に、制御スケジュール生成部14d(制御スケジュール生成手段)を設けて、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3(T31,T32)の各時間帯が設定された後において、スケジュール設定ルールを各時間帯の設定状況に適用して制御スケジュールを作成、改善するものである。なお、実施形態1と同様の構成には同一の符号を付して説明は省略する。
 まず、図9に示すように、有益使用時間帯T1が8時~20時、無駄使用時間帯T2が0時~7時、22時~24時、効率改善時間帯T31が7時~8時、効率改善時間帯T32が20時~22時に設定され、制御スケジュール情報は、被監視機器の動作がオンする時刻8時、被監視機器の動作がオフする時刻20時が登録されているとする。この状態で、制御スケジュール生成部14dは、以下のように動作する。
 制御スケジュール生成部14dは、照明制御装置5または空調制御装置6から制御スケジュールを取得する。取得した現在の制御スケジュールは、図9(a)に示すように、効率改善時間帯T31の終了時刻8時に、被監視機器の動作をオンさせる制御内容が設定され、効率改善時間帯T32の開始時刻20時に、被監視機器の動作をオフさせる制御内容が設定されている。
 そして、制御スケジュール生成部14dが本スケジュール自動設定処理に適用するスケジュール設定ルールは、以下のように予め設定されている。まず、効率改善時間帯T31の開始時刻7時、効率改善時間帯T32の終了時刻22時には、制御内容が設定されていない。そこで、制御スケジュール生成部14dは、図9(b)に示すように、効率改善時間帯T31の開始時刻7時、効率改善時間帯T32の終了時刻22時に、被監視機器の動作をオフさせる制御内容を設定する。これは、できるだけ省エネルギー方向に改善する制御スケジュールを作成するためである。したがって、効率改善時間帯T31は、開始時刻7時に、被監視機器の動作をオフさせる制御内容を設定され、効率改善時間帯T32は、終了時刻22時に、被監視機器の動作をオフさせる制御内容を設定される。
 以上述べたように、制御スケジュール生成ルールは、被監視機器が、第1の制御内容を含む制御スケジュール情報にしたがって動作している場合、被監視機器の制御スケジュールを前記第1の制御内容に変えて第2制御内容に設定しなおすというルールである。第1の指示内容は、前記効率改善時間帯の開始時刻と終了時刻との少なくとも一方の時刻において被監視機器の動作をオンまたはオフさせる制御内容が設定されていないという指示内容である。第2の指示内容は、前記開始時刻と前記終了時刻との少なくとも一方の時刻に、被監視機器の動作をオフさせるという指示内容である。
 また、時間帯設定ルールは、前記無駄使用時間帯以後、前記有益使用時間帯までの間の期間を、第1効率改善期間として設定するルールである。時間帯設定手段は、前記第1効率改善期間を、効率改善時間帯として認定する。
 そして、制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールである。
 これにより、第1効率改善期間に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 より詳しくは、制御スケジュール設定ルールは、前記第1効率改善期間の開始時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記開始時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールである。
 これにより、第1効率改善期間の開始時刻に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 なお、上記説明において、第1効率改善期間は、7時以後8時までの効率改善時間帯T31として定義されている。第2効率改善期間は、20時以後22時までの効率改善時間帯T32として定義されている。しかしながら、第1効率改善期間及び第2効率改善期間は、上記説明における期間に限られない。
 また、時間帯設定ルールは、前記有益使用時間帯以後、前記無駄使用時間帯までの間の期間を、第2効率改善期間として設定するルールである。時間帯設定手段は、前記第2効率改善期間を、効率改善時間帯として認定する。
 そして、制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールである。
 これにより、第2効率改善期間に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 そして、制御スケジュール設定ルールは、前記第2効率改善期間の終了時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記終了時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールである。
 これにより、第2効率改善期間の終了時刻に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 または、制御スケジュール生成部14dは、図9(c)に示すように、効率改善時間帯T31,T32の期間内で、被監視機器の動作をオフさせる制御内容を複数回繰り返して設定してもよい。この場合、制御スケジュールは、より省エネルギー方向に改善される。
 すなわち、制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールである。
 これにより、第1効率改善期間に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 また、制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールである。
 これにより、第2効率改善期間に、被監視機器の動作をオフさせることができる。その結果、エネルギーの使用の削減を図ることができる。
 表示部12は、制御スケジュール生成部14dが生成した図9(b)または図9(c)に示す制御スケジュールを提示する。電力管理者は、入力部11を操作することで、上記のように生成された制御スケジュールを確認することができ、必要に応じて、この改善後の制御スケジュールを通信部15から照明制御装置5及び空調制御装置6に送信し、照明制御装置5及び空調制御装置6に記憶された制御スケジュール情報を更新する。
 次に、制御スケジュールにおいて、効率改善時間帯T3(T31,T32)に設定された被監視機器の動作をオフさせる時刻(以降、オフ制御時刻と称す)を、被監視機器の使用状況から自動調整する動作について説明する。なお、制御スケジュール生成部14dが本スケジュール自動調整処理に適用するスケジュール設定ルールは、以下のように予め設定されている。
 まず、図10(a)に示すように、有益使用時間帯T1が8時~20時、無駄使用時間帯T2が0時~7時、22時~24時、効率改善時間帯T31が7時~8時、効率改善時間帯T32が20時~22時に設定されている。制御スケジュール生成部14dは、照明制御装置5または空調制御装置6から制御スケジュールを取得する。取得した現在の制御スケジュールは、図10(a)に示すように、被監視機器の動作がオンする時刻8時(オン制御時刻)、被監視機器の動作がオフする時刻7時,20時,22時(オフ制御時刻)が登録されている。
 そこで、制御スケジュール生成部14dは、効率改善時間帯T32の終了時刻に設定されているオフ制御時刻22時を早めて、効率改善時間帯T32を短縮し、無駄使用時間帯T2を延長することで、制御スケジュールを省エネルギー方向に改善する。
 まず、図10(b)は、20時~22時の効率改善時間帯T32における制御スケジュールを拡大したものであり、初期状態は、スケジュール設定されたオフ制御時刻20時、オフ制御時刻22時に設定されている。制御スケジュール生成部14dは、図10(c)に示すように、1日に1回、オフ制御時刻を22時から10分ずつ早めていく。そして、1日目にオフ制御時刻21時50分に早めた後に、21時50分~22時までの10分間(無駄使用時間帯T2の延長期間)に、就業者が操作スイッチS1,S2等を操作して、被監視機器の動作をオンさせたか否かを判定する。就業者によるオン操作がなければ、2日目にオフ制御時刻21時40分に早めて、21時40分~22時までの20分間(無駄使用時間帯T2の延長期間)に、就業者によるオン操作があるか否かを判定する。就業者によるオン操作がなければ、3日目にオフ制御時刻21時30分に早めて、21時30分~22時までの30分間(無駄使用時間帯T2の延長期間)に、就業者によるオン操作があるか否かを判定する。
 3日目に就業者によるオン操作があれば、4日目にオフ制御時刻を10分遅らせて21時40分に変更し、21時40分~22時までの20分間(無駄使用時間帯T2の延長期間)に、就業者によるオン操作があるか否かを判定する。就業者によるオン操作がなければ、5日目にオフ制御時刻21時30分に早めて、21時30分~22時までの30分間(無駄使用時間帯T2の延長期間)に、就業者によるオン操作があるか否かを判定する。
 上記のように、無駄使用時間帯T2の延長期間に就業者によるオン操作がなければ、オフ制御時刻を10分早めて、無駄使用時間帯T2の延長期間に就業者によるオン操作があれば、オフ制御時刻を10分遅らせる処理を繰り返し、オフ制御時刻を10分早める処理とオフ制御時刻を10分遅らせる処理とが交互に3回繰り返された時点で、当該時点におけるオフ制御時刻(10分遅らせた側の時刻)に固定される(図10(c)では8日目の時点におけるオフ制御時刻21時40分)。
 したがって、制御スケジュールは、被監視機器の使用状況に即して、より省エネルギー方向に改善される。また、本例は、制御スケジュールの登録件数の上限による制限や、実際の快適性の点からも有利である。
 電力管理者は、入力部11を操作することで、上記のようにオフ制御時刻を自動調整した制御スケジュールを表示部12に提示させて確認することができ、必要に応じて、この改善後の制御スケジュールを通信部15から照明制御装置5及び空調制御装置6に送信し、照明制御装置5及び空調制御装置6に記憶された制御スケジュール情報を更新する。
 また、効率改善時間帯T31においても、効率改善時間帯T31の開始時刻に設定されているオフ制御時刻7時を遅らせて、効率改善時間帯T31を短縮し、無駄使用時間帯T2を延長することで、制御スケジュールを省エネルギー方向に改善することができる。
 以上述べたように、時間帯設定手段は、効率改善時間帯を、有益使用時間帯と無駄使用時間帯との間に設定するように構成されている。効率改善時間帯は、効率改善時間帯の開始時刻と、効率改善時間帯の終了時刻とを有している。そして、前記開始時刻と終了時刻の少なくとも一方の時刻において、被監視機器の動作をオフさせる制御内容が設定された制御スケジュールにしたがって被監視機器が動作している第1状況下にある場合、制御スケジュール生成手段は、次のような動作をする。まず、制御スケジュール生成手段は、効率改善時間帯で被監視機器の動作をオフさせる時刻を前記一方の時刻から変動させて無駄使用時間帯を延長した制御スケジュール情報を生成する。次に、第1条件及び第2条件が満たされる場合、制御スケジュール生成手段は、効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯をさらに延長する。第1条件は、被監視機器が当該生成した制御スケジュール情報にしたがって動作しているという条件である。第2条件は、無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフしないという条件である。一方、第3条件及び第4条件が満たされる場合、制御スケジュール生成手段は、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯を短くする。第3条件は、被監視機器が当該生成した制御スケジュール情報にしたがって動作しているという条件である。第4条件は、無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフされるという条件である。これにより、制御スケジュールを省エネルギー方向に改善することができる。
 次に、制御スケジュール生成部14dが、効率改善時間帯T3において電力の使用量が漸次減少する制御スケジュールを生成する動作について説明する。
 まず、図11(a)に示すように、有益使用時間帯T1が8時~20時、無駄使用時間帯T2が0時~7時、22時~24時、効率改善時間帯T31が7時~8時、効率改善時間帯T32が20時~22時に設定されている。制御スケジュール生成部14dは、照明制御装置5または空調制御装置6から制御スケジュールを取得する。取得した現在の制御スケジュールは、図11(a)に示すように、被監視機器の動作がオンする時刻8時,20時(オン制御時刻)、被監視機器の動作がオフする時刻7時,22時(オフ制御時刻)が登録されている。
 効率改善時間帯T32において電力の使用量を一定に設定した制御スケジュールでは、被監視機器の使用電力は図11(b)のようになり、効率改善時間帯T32で省エネルギー化を図っているとは言い難い。
 そこで、制御スケジュール生成部14dは、取得した制御スケジュールにおいて、効率改善時間帯T32の開始時刻20時にオン制御が登録され、効率改善時間帯T32の終了時刻22時にオフ制御が登録されていることに着目して、20時~22時に亘って電力の使用量が漸次減少する制御スケジュールを生成することで、制御スケジュールを省エネルギー方向に改善する。したがって、制御スケジュールは、効率改善時間帯T32において、より省エネルギー方向に改善されており、被監視機器の使用電力は図11(c)のようになり、効率改善時間帯T32での省エネルギー化を実現している。
 電力管理者は、入力部11を操作することで、上記のように20時~22時に亘って電力の使用量が漸次減少する制御スケジュールを表示部12に提示させて確認することができ、必要に応じて、この改善後の制御スケジュールを通信部15から照明制御装置5及び空調制御装置6に送信し、照明制御装置5及び空調制御装置6に記憶された制御スケジュール情報を更新する。
 このように、本実施形態では、スケジュール設定ルールを各時間帯の設定状況に適用して制御スケジュールを作成、改善しており、電力管理者の手を煩わせることなく制御スケジュールを自動作成することができる。
  (実施形態3)
 本実施形態では、資源使用状態判定部14cが、資源使用情報取得部14aが取得した使用電力量のデータに基づいて、効率改善時間帯T3において削減した一週間の電力量を算出し、表示部12が、効率改善時間帯T3において削減した一週間分の電力量を提示する。
 この効率改善時間帯T3において削減した一週間分の電力量は、効率改善時間帯T3において使用可能な一週間分の電力の最大使用量と、効率改善時間帯T3における実際の一週間分の電力の使用量とを比較して、両使用量の差を算出することで得られる。そして、資源使用状態判定部14cは、図12に示すように、週間表示部G2の下方に電力削減量表示部G4を生成している。電力使用状況表示部G4は、効率改善時間帯T3において削減した一週間分の電力量を具体的な数字(kWh)で表示している。
 電力管理者は、入力部11を操作することで、上記のように生成された表示部12の提示内容を見ることができる。したがって、電力の削減量を提示されることで、省エネルギーに対する意識がより高まり、省エネルギー化に対する意識啓発となる。
 なお、他の構成は実施形態1または2と同様であり、説明は省略する。
  (実施形態4)
 本実施形態では、資源使用状態判定部14cが、資源使用情報取得部14aが取得した使用電力量のデータに基づいて、効率改善時間帯T3における電力の使用量が無駄であるか否かを評価し、表示部12が、当該評価結果を提示する。
 具体的に、資源使用状態判定部14cは、資源使用情報取得部14aが取得した使用電力量のデータに基づいて、各効率改善時間帯T3において、1度も使用電力量が0にならなかった場合、または1度も被監視機器の動作がオフしなかった場合に、当該効率改善時間帯T3での使用電力量は無駄であると判断する。また、資源使用状態判定部14cは、中央監視盤2から人感センサR1,R2の測定データを取得し、効率改善時間帯T3において、人がいないエリアの被監視機器が動作している場合も、当該当該効率改善時間帯T3での使用電力量は無駄であると判断する。そして、資源使用状態判定部14cは、図13に示すように、週間表示部G2の下方に無駄電力量表示部G5を生成している。無駄電力量表示部G5は、効率改善時間帯T3において無駄であると判断された一週間分の電力量を具体的な数字(kWh)で表示している。
 電力管理者は、入力部11を操作することで、上記のように生成された表示部12の提示内容を見ることができる。したがって、効率改善時間帯T3における無駄な電力量を提示されることで、効率改善時間帯T3における無駄な制御内容を判別しやすくなり、制御スケジュールの改善点を的確に見出すことができる。
 なお、他の構成は実施形態1乃至3いずれかと同様であり、説明は省略する。
  (実施形態5)
 本実施形態では、時間帯設定部14bが、有益使用時間帯T1、無駄使用時間帯T2、効率改善時間帯T3以外に、被監視機器が必ず動作しなければならない(必ず電力を使用しなければならない)とみなす必須使用時間帯を設定する。必須使用時間帯は、夜間の看板や非常灯等のように、所定の時間帯に必ず使用しなければならない被監視機器(動作必須被監視機器)に対して設定される。
 資源使用状態判定部14cは、資源使用情報取得部14aが取得した使用電力量のデータに基づいて、必須使用時間帯における使用電力量を算出し、当該算出した使用電力量が所定のしきい値(待機電力量に相当)未満の場合、動作必須被監視機器が動作していないと判定する。表示部12は、動作必須被監視機器が動作していない旨をディスプレイ上に提示し、当該提示内容を見た電力管理者は、動作必須被監視機器の制御スケジュールを改善する。
 したがって、電力管理者が、省エネルギー効果を追及するあまり、夜間の看板や非常灯等のような動作必須被監視機器の動作を停止させ、必要な電力も安易に削減するような誤った制御スケジュールを作成した場合に、この誤りを検出し、電力管理者に通知することができる。
 また、制御スケジュール生成部14dは、照明制御装置5または空調制御装置6から取得した制御スケジュールにおいて、必須使用時間帯の開始時刻および終了時刻の各々に制御内容が設定されていない場合、被監視機器の動作をオンさせる制御内容を当該時刻に設定する。または、必須使用時間帯の開始時刻にのみ上記処理を行ってもよい。
 したがって、制御スケジュールは、必須使用時間帯における動作必須被監視機器を確実に動作させるものとなり、被監視機器の運用を適切に改善できる。
 電力管理者は、入力部11を操作することで、上記のように必須使用時間帯における被監視機器の運用を改善した制御スケジュールを表示部12に提示させて確認することができ、必要に応じて、この改善後の制御スケジュールを通信部15から照明制御装置5及び空調制御装置6に送信し、照明制御装置5及び空調制御装置6に記憶された制御スケジュール情報を更新する。
 さらに、図14に示すように、端末装置1の演算部14にスケジュール判定部14e(スケジュール判定手段)を設けて、電力管理者が作成した制御スケジュールの誤りを検出してもよい。
 電力管理者が入力部11(スケジュール入力手段)を操作して作成した制御スケジュール情報を、通信部15から照明制御装置5及び空調制御装置6に送信する前に、スケジュール判定部14eは、時間帯設定部14bが設定した各時間帯と、当該作成された制御スケジュール情報との整合性を判定する。
 例えば、スケジュール判定部14eは、制御スケジュール情報において、被監視機器の動作をオフする制御内容が必須使用時間帯に設定されていた場合、作成された制御スケジュール情報は、時間帯設定部14bが設定した必須使用時間帯との整合性がとれていないと判定する。表示部12は、作成された制御スケジュール情報と必須使用時間帯との整合性がとれていない旨をディスプレイ上に提示し、当該提示内容を見た電力管理者は、制御スケジュールを改善する。したがって、電力管理者が、作成した制御スケジュールの誤りを検知でき、被監視機器の運用を適切に行うことができる。
 なお、他の構成は実施形態1乃至4いずれかと同様であり、説明は省略する。
 また、各実施形態では、被監視機器が使用する資源として電力を例示したが、ガス等の他の資源であっても同様の効果を得ることができる。
 1 端末装置
 11 入力部(スケジュール入力手段)
 12 表示部(提示手段)
 14a 資源使用情報取得部(資源使用情報取得手段)
 14b 時間帯設定部(時間帯設定手段)
 14c 資源使用状態判定部(資源使用状態判定手段)
 14d 制御スケジュール生成部(制御スケジュール生成手段)
 14e スケジュール判定部(スケジュール判定手段)
 2 中央監視盤
 3 電力量監視装置
 5 照明制御装置
 6 空調制御装置
 L1,L2 照明器具
 AC1,AC2 空調機

Claims (33)

  1.  制御スケジュール情報にしたがって動作する被監視機器を監視するための省エネルギー診断システムであって、
     制御スケジュール情報にしたがって動作する被監視機器における資源の使用量を使用時刻に関連付けた資源使用情報を取得する資源使用情報取得手段と、
     被監視機器における資源の使用を有益であるとみなす有益使用時間帯と、被監視機器における資源の使用を無駄であるとみなす無駄使用時間帯と、被監視機器における資源の使用量を抑制するべきであるとみなす効率改善時間帯とを含む3つ以上の各時間帯を設定する時間帯設定手段と、
     資源使用情報取得手段が取得した資源使用情報に基づいて、時間帯設定手段が設定した各時間帯における資源の使用量を算出する資源使用状態判定手段と、
     当該算出した各時間帯における資源の使用量を提示する提示手段と
     を備えることを特徴とする省エネルギー診断システム。
  2.  前記時間帯設定手段は、被監視機器の制御スケジュール情報を取得し、予め設定された時間帯設定ルールを当該取得した制御スケジュール情報に適用して前記各時間帯を設定することを特徴とする請求項1記載の省エネルギー診断システム。
  3.  前記時間帯設定手段は、予め設定された時間帯設定ルールを前記取得した制御スケジュール情報と前記資源使用情報取得手段が取得した資源使用情報とに適用して前記各時間帯を設定することを特徴とする請求項2記載の省エネルギー診断システム。
  4.  予め設定されたスケジュール設定ルールを前記各時間帯の設定状態に適用して前記制御スケジュール情報を生成する制御スケジュール生成手段を備えることを特徴とする請求項1乃至3いずれか記載の省エネルギー診断システム。
  5.  前記制御スケジュール生成ルールは、前記効率改善時間帯の開始時刻と終了時刻との少なくとも一方の時刻において被監視機器の動作をオンまたはオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記少なくとも一方の時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定することであることを特徴とする請求項4記載の省エネルギー診断システム。
  6.  前記制御スケジュール生成手段は、予め設定されたスケジュール設定ルールを前記各時間帯の設定状態と前記資源使用情報取得手段が取得した資源使用情報とに適用して前記制御スケジュール情報を生成することを特徴とする請求項4記載の省エネルギー診断システム。
  7.  前記有益使用時間帯と前記無駄使用時間帯との間に前記効率改善時間帯が設定され、当該効率改善時間帯の開始時刻および終了時刻の少なくとも一方の時刻において被監視機器の動作をオフさせる制御内容が設定された制御スケジュール情報にしたがって被監視機器が動作している場合、
     前記制御スケジュール生成手段は、
     当該効率改善時間帯で被監視機器の動作をオフさせる時刻を前記一方の時刻から変動させて無駄使用時間帯を延長した制御スケジュール情報を生成し、
     被監視機器が当該生成した制御スケジュール情報にしたがって動作しているときに、前記無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフしなければ、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯をさらに延長し、
     被監視機器が当該生成した制御スケジュール情報にしたがって動作しているときに、前記無駄使用時間帯の延長期間内にユーザの操作によって被監視機器の動作がオフすれば、当該効率改善時間帯で被監視機器の動作をオフさせる時刻を変動させて無駄使用時間帯を
    短くする
     ことを特徴とする請求項6記載の省エネルギー診断システム。
  8.  前記効率改善時間帯の終了時刻に被監視機器の動作をオフする制御内容が制御スケジュール情報に設定されている場合、前記制御スケジュール生成手段は、効率改善時間帯における資源の使用量が漸次減少するように被監視機器が動作する制御スケジュール情報を生成することを特徴とする請求項4記載の省エネルギー診断システム。
  9.  前記資源使用状態判定手段は、前記効率改善時間帯において使用可能な資源の最大使用量と、前記効率改善時間帯における実際の資源の使用量とを比較して、両使用量の差を算出し、前記提示手段は、当該算出した両使用量の差を提示することを特徴とする請求項1乃至8いずれか記載の省エネルギー診断システム。
  10.  前記資源使用状態判定手段は、前記資源使用情報に基づいて、前記効率改善時間帯における資源の使用量が無駄であるか否かを評価し、前記提示手段は、当該評価結果を提示することを特徴とする請求項1乃至9いずれか記載の省エネルギー診断システム。
  11.  前記時間帯設定手段は、被監視機器が必ず資源を使用しなければならないとみなす必須使用時間帯を設定し、
     前記資源使用状態判定手段は、前記資源使用情報に基づいて、必須使用時間帯における資源の使用量を算出し、当該算出した使用量が所定量以下の場合、被監視機器が使用されていないと判定し、
     前記提示手段は、当該判定結果を提示する
     ことを特徴とする請求項1乃至10いずれか記載の省エネルギー診断システム。
  12.  前記必須使用時間帯の少なくとも開始時刻に制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、当該必須使用時間帯の少なくとも開始時刻に被監視機器の動作をオンさせる制御スケジュール情報を生成する制御スケジュール生成手段を備えることを特徴とする請求項11記載の省エネルギー診断システム。
  13.  操作者が前記制御スケジュール情報を作成するためのスケジュール入力手段と、
     当該作成された制御スケジュール情報と前記各時間帯の設定状態との整合性を判定するスケジュール判定手段とを備え、
     前記提示手段は、スケジュール判定手段の判定結果を提示する
     ことを特徴とする請求項1乃至12いずれか記載の省エネルギー診断システム。
  14.  前記制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有しており、
     前記時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有しており、
     前記時間帯設定ルールは、前記停止予定時刻以後であり、前記起動予定時刻までの期間に含まれる期間を、前記無駄使用時間帯と設定するルールを有しており、
     前記時間帯設定ルールは、前記有益使用時間帯及び前記無駄使用時間帯以外の時間帯を、効率改善時間帯として設定するルールを有していることを特徴とする請求項2に記載の省エネルギー診断システム。
  15.  前記制御スケジュールは、被監視機器の動作をオンする起動予定時刻と、被監視機器の動作をオフする停止予定時刻とを有しており、
     前記時間帯設定ルールは、前記起動予定時刻以後であり、前記停止予定時刻までの期間を、前記有益使用時間帯と設定するルールを有しており、
     前記時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、起動予定時刻までの期間を、第1効率改善期間として設定するルールを有しており、
     前記時間帯設定ルールは、前記停止予定時刻以後、停止予定時刻よりも一定時間後の第2時刻までの期間を、第2効率改善期間として設定するルールを有しており、
     前記時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有しており、
     前記時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、前記時間帯設定手段は、前記有益使用時間帯,前記無駄使用時間帯,前記効率改善時間帯を設定することを特徴とする請求項2に記載の省エネルギー診断システム。
  16.  前記時間帯設定ルールは、前記起動予定時刻以後、前記起動予定時刻の次の停止予定時刻までの間の期間を、前記有益使用時間帯として設定するルールを有していることを特徴とする請求項15に記載の省エネルギー診断システム。
  17.  前記時間帯設定ルールは、前記起動予定時刻よりも一定時間前の第1時刻以後、前記第1時刻の次の起動予定時刻までの期間を、第1効率改善期間として設定するルールを有していることを特徴とする請求項15に記載の省エネルギー診断システム。
  18.  前記時間帯設定ルールは、前記停止予定時刻以後、前記停止予定時刻の次でありかつ停止予定時刻よりも一定時間後である第2時刻までの期間を第2効率改善期間として設定するルールを有していることを特徴とする請求項15に記載の省エネルギー診断システム。
  19.  前記制御スケジュールは、被監視機器をオンする起動予定時刻と、被監視機器をオフする停止予定時刻とを有しており、
     前記時間帯設定手段は、以前の起動時刻に基づいて、基準起動時刻を決定するように構成されており、前記以前の起動時刻は、過去に被監視機器の動作がオンされた時刻を示しており、
     前記時間帯設定手段は、以前の停止時刻に基づいて、基準停止時刻を決定するように構成されており、前記以前の停止時刻は、過去に被監視機器の動作がオフされた時刻を示しており、
     前記時間帯設定ルールは、前記基準起動時刻以後、前記起動予定時刻までの期間を、第1効率改善期間として設定するルールを有しており、
     前記時間帯設定ルールは、前記停止予定時刻以後、前記基準停止時刻までの期間を、第2効率改善期間として設定するルールを有しており、
     前記時間帯設定ルールは、前記第1効率改善期間及び前記第2効率改善期間を、効率改善時間帯として設定するルールを有しており、
     前記時間帯設定ルールは、前記有益使用時間帯及び前記効率改善時間帯以外の時間を、無駄使用時間帯として設定するルールを有しており、これにより、制御スケジュール情報に基づいて、有益使用時間帯,無駄使用時間帯,効率改善時間帯の設定を行うことを特徴とする請求項3に記載の省エネルギー診断システム。
  20.  前記時間帯設定手段は、前記資源使用情報に基づいて、前記以前の起動時刻を認定するように構成されており、
     前記時間帯設定手段は、前記資源使用情報に基づいて、前記以前の停止時刻を認定するように構成されていることを特徴とする請求項19に記載の省エネルギー診断システム。
  21.  前記時間帯設定手段は、前記資源の使用量がしきい値よりも大きくなったとき、前記以前の起動時刻を認定するように構成されており、
     前記時間帯設定手段は、前記資源の使用量がしきい値よりも小さくなったとき、前記以前の停止時刻を認定するように構成されていることを特徴とする請求項20に記載の省エネルギー診断システム。
  22.  前記時間帯設定手段は、複数の前記以前の起動時刻に基づいて、前記基準起動時刻を決定するように構成されており、
     前記時間帯設定手段は、複数の前記以前の停止時刻に基づいて、前記基準停止時刻を決定するように構成されていることを特徴とする請求項19に記載の省エネルギー診断システム。
  23.  前記基準起動時刻は、以前の起動時刻の最も早い時間と以前の起動時刻の最も遅い時刻との間の時刻に設定されていることを特徴とする請求項22に記載の省エネルギー診断システム。
  24.  前記基準停止時刻は、以前の停止時刻の最も早い時間と以前の停止時刻の最も遅い時刻との間の時刻に設定されていることを特徴とする請求項22または請求項23に記載の省エネルギー診断システム。
  25.  前記制御スケジュール生成手段によって生成された制御スケジュール情報を被監視機器に送信する送信手段をさらに有していることを特徴とする請求項4に記載の省エネルギー診断システム。
  26.  時間帯設定ルールは、前記無駄使用時間帯以後、前記有益使用時間帯までの間の期間を、第1効率改善期間として設定するルールであり、
     前記時間帯設定手段は、前記第1効率改善期間を、効率改善時間帯として認定することを特徴とする請求項4に記載の省エネルギー診断システム。
  27.  前記制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項26に記載の省エネルギー診断システム。
  28.  前記制御スケジュール設定ルールは、前記第1効率改善期間の開始時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記開始時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項26に記載の省エネルギー診断システム。
  29.  前記制御スケジュール設定ルールは、前記第1効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第1効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項26に記載の省エネルギー診断システム。
  30.  前記時間帯設定ルールは、前記有益使用時間帯以後、前記無駄使用時間帯までの間の期間を、第2効率改善期間として設定するルールであり、
     前記時間帯設定手段は、前記第2効率改善期間を、効率改善時間帯として認定することを特徴とする請求項4に記載の省エネルギー診断システム。
  31.  前記制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項30に記載の省エネルギー診断システム。
  32.  前記制御スケジュール設定ルールは、前記第2効率改善期間の終了時刻において被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報にしたがって被監視機器が動作している場合、前記終了時刻に被監視機器の動作をオフさせる制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項30に記載の省エネルギー診断システム。
  33.  前記制御スケジュール設定ルールは、前記第2効率改善期間内において、被監視機器の動作をオフさせる制御内容が設定されていない制御スケジュール情報に従って被監視機器が動作している場合、前記第2効率改善期間内に、被監視機器の動作をオフさせる複数の制御内容を制御スケジュール情報に設定するルールであることを特徴とする請求項30に記載の省エネルギー診断システム。
PCT/JP2010/072978 2009-12-21 2010-12-21 省エネルギー診断システム WO2011078155A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP10839385.1A EP2518576A4 (en) 2009-12-21 2010-12-21 ENERGY SAVING ANALYSIS SYSTEM
US13/518,085 US9710862B2 (en) 2009-12-21 2010-12-21 Energy conservation analysis system
CN201080062844.9A CN102741767B (zh) 2009-12-21 2010-12-21 节能分析系统
HK12112779.8A HK1172102A1 (zh) 2009-12-21 2012-12-11 節能分析系統

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009289703A JP5416571B2 (ja) 2009-12-21 2009-12-21 省エネルギー診断システム
JP2009-289703 2009-12-21

Publications (1)

Publication Number Publication Date
WO2011078155A1 true WO2011078155A1 (ja) 2011-06-30

Family

ID=44195682

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/072978 WO2011078155A1 (ja) 2009-12-21 2010-12-21 省エネルギー診断システム

Country Status (6)

Country Link
US (1) US9710862B2 (ja)
EP (1) EP2518576A4 (ja)
JP (1) JP5416571B2 (ja)
CN (1) CN102741767B (ja)
HK (1) HK1172102A1 (ja)
WO (1) WO2011078155A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103918159A (zh) * 2011-11-07 2014-07-09 松下电器产业株式会社 能源管理装置
CN104429095A (zh) * 2012-07-05 2015-03-18 松下知识产权经营株式会社 设备控制装置、设备控制系统、程序

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2518682B1 (en) * 2009-12-21 2016-05-25 Panasonic Intellectual Property Management Co., Ltd. Diagnosis system for saving energy in a building
JP5399961B2 (ja) * 2010-03-26 2014-01-29 パナソニック株式会社 省エネルギー診断システム
US9224115B2 (en) * 2012-05-23 2015-12-29 Infosys Limited Information technology energy wastage management system
JP6085111B2 (ja) * 2012-07-24 2017-02-22 株式会社三共 消費電力調整システム
JP2014032151A (ja) * 2012-08-06 2014-02-20 Mitsubishi Electric Corp 電力表示器
US10719797B2 (en) 2013-05-10 2020-07-21 Opower, Inc. Method of tracking and reporting energy performance for businesses
JP2017011529A (ja) * 2015-06-23 2017-01-12 株式会社リコー 無線センサネットワークシステム
JP7122527B2 (ja) * 2018-06-28 2022-08-22 パナソニックIpマネジメント株式会社 表示方法、プログラム、分析システム及び管理システム
CN110986317A (zh) * 2019-12-09 2020-04-10 山东圣克莱尔新能源有限公司 一种中央空调楼宇智能化控制系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0850501A (ja) 1994-08-05 1996-02-20 Takenaka Komuten Co Ltd ダイナミックエネルギーマネジメント方法およびシステム
JP2009180741A (ja) * 2004-03-26 2009-08-13 Cosmo Life Kk 使用電力監視システム
JP2009245360A (ja) * 2008-03-31 2009-10-22 Tokyo Electric Power Co Inc:The 省エネルギー支援システム及び省エネルギー支援方法
WO2009151078A1 (ja) * 2008-06-10 2009-12-17 パナソニック電工株式会社 エネルギーマネジメントシステム及びコンピュータプログラム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5344068A (en) * 1993-04-16 1994-09-06 Staefa Control System, Inc. Dynamically controlled environmental control system
US5555927A (en) * 1995-06-07 1996-09-17 Honeywell Inc. Thermostat system having an optimized temperature recovery ramp rate
DE19738819C2 (de) * 1997-09-05 2001-07-05 Dete Immobilien Deutsche Telek Klima-Anlage
WO2002007365A2 (en) * 2000-07-13 2002-01-24 Nxegen System and method for monitoring and controlling energy usage
US20090302994A1 (en) * 2008-06-10 2009-12-10 Mellennial Net, Inc. System and method for energy management
US8760113B2 (en) * 2009-02-24 2014-06-24 Qualcomm Incorporated Wireless power charging timing and charging control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0850501A (ja) 1994-08-05 1996-02-20 Takenaka Komuten Co Ltd ダイナミックエネルギーマネジメント方法およびシステム
JP2009180741A (ja) * 2004-03-26 2009-08-13 Cosmo Life Kk 使用電力監視システム
JP2009245360A (ja) * 2008-03-31 2009-10-22 Tokyo Electric Power Co Inc:The 省エネルギー支援システム及び省エネルギー支援方法
WO2009151078A1 (ja) * 2008-06-10 2009-12-17 パナソニック電工株式会社 エネルギーマネジメントシステム及びコンピュータプログラム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2518576A4

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103918159A (zh) * 2011-11-07 2014-07-09 松下电器产业株式会社 能源管理装置
CN103918159B (zh) * 2011-11-07 2016-04-27 松下知识产权经营株式会社 能源管理装置
CN104429095A (zh) * 2012-07-05 2015-03-18 松下知识产权经营株式会社 设备控制装置、设备控制系统、程序
US20150185720A1 (en) * 2012-07-05 2015-07-02 Panasonic Intellectual Property Management Co., Ltd. Apparatus control device, apparatus control system, program
CN104429095B (zh) * 2012-07-05 2018-05-11 松下知识产权经营株式会社 设备控制装置、设备控制系统、程序
US10054915B2 (en) * 2012-07-05 2018-08-21 Panasonic Intellectual Property Management Co., Ltd. Apparatus control device, apparatus control system and method for controlling apparatus for controlling an operation of an intended apparatus in accordance with a control schedule

Also Published As

Publication number Publication date
CN102741767B (zh) 2015-11-25
JP5416571B2 (ja) 2014-02-12
EP2518576A4 (en) 2014-11-26
JP2011129067A (ja) 2011-06-30
CN102741767A (zh) 2012-10-17
HK1172102A1 (zh) 2013-04-12
US9710862B2 (en) 2017-07-18
US20120277924A1 (en) 2012-11-01
EP2518576A1 (en) 2012-10-31

Similar Documents

Publication Publication Date Title
JP5416571B2 (ja) 省エネルギー診断システム
CN102314548B (zh) 能源管理装置和方法
EP2701262B1 (en) Power control device, control system, and control method
US9267971B2 (en) Energy consumption monitoring system, method, and computer program
JP3839440B2 (ja) エネルギー管理装置、施設監視制御装置、エネルギー管理プログラムおよび施設監視制御プログラム
EP2518517A1 (en) Home electric appliance
JP2011129085A (ja) 電力消費を制御するスマートエネルギー管理装置およびその方法
JP5331212B2 (ja) 省エネルギー診断システム
US20130060390A1 (en) Energy-saving diagnostic system
US20140148925A1 (en) Network system
JP2017126328A (ja) 情報端末の制御方法、プログラム、および情報端末
KR20140052644A (ko) 스마트 그리드를 이용한 가정용 전력사용량 표시장치 및 그 제어방법
JP2013005657A (ja) 電力分配システム及び電力分配方法
JP2011145932A (ja) 施設管理装置及び施設管理方法
JP2012220397A (ja) エネルギーモニタリングシステム
WO2013145525A1 (ja) エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体
EP3618452B1 (en) Control system, scene control execution method, and program
JP2009300367A (ja) 電気使用量報知システムおよびその異常判定方法
JP5653227B2 (ja) 監視装置
WO2014013693A1 (ja) 計測量監視装置、プログラム
US20140040458A1 (en) Component for network system
WO2016017587A1 (ja) 機器制御装置
KR101174361B1 (ko) 전력사용량을 표시하는 조명제어시스템
JPWO2015098986A1 (ja) 電力管理装置、電力管理システム及び電力管理方法
JP2015032222A (ja) エネルギー管理システム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080062844.9

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10839385

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 1201003033

Country of ref document: TH

WWE Wipo information: entry into national phase

Ref document number: 2010839385

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 6149/CHENP/2012

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 13518085

Country of ref document: US