WO2011051218A1 - Reeling and unreeling an internally clad metal pipeline - Google Patents
Reeling and unreeling an internally clad metal pipeline Download PDFInfo
- Publication number
- WO2011051218A1 WO2011051218A1 PCT/EP2010/066050 EP2010066050W WO2011051218A1 WO 2011051218 A1 WO2011051218 A1 WO 2011051218A1 EP 2010066050 W EP2010066050 W EP 2010066050W WO 2011051218 A1 WO2011051218 A1 WO 2011051218A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pipeline
- pressure
- length
- pipe
- fluid
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/16—Laying or reclaiming pipes on or under water on the bottom
- F16L1/161—Laying or reclaiming pipes on or under water on the bottom the pipe being composed of sections of short length
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/16—Laying or reclaiming pipes on or under water on the bottom
- F16L1/166—Reclaiming pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
- F16L1/202—Accessories therefor, e.g. floats, weights fixed on or to vessels
- F16L1/203—Accessories therefor, e.g. floats, weights fixed on or to vessels the pipes being wound spirally prior to laying
Definitions
- the present invention relates to methods for winding a pipeline onto a reel in preparation for pipe laying, and also to the pipe laying method.
- US ⁇ A-3 r 934,647 describes a pipe laying system including a technique for hydrostatlcaily testing the pipeline as it is charged on a reel.
- an end section is passed through the reel hub or flange plate.
- the end section is attached to a full opening gate valve and a bleed vaive is connected to an open nozzle.
- a so-called "pig” is used, which is a device that is movable along a pipeline and can be temporarily fixed at any desired location within the pipeline.
- a pig is generally used to separate different fluids or gases, but it may also serve for cleaning and inspecting the inner bore of a pipeline.
- the pig is inserted into the open nozzle at the reel end of the pipe.
- a pig providing a substantially watertight seal with the internal surfaces of the pipeline should be used to minimize the leakage of water past the pig.
- a line from a low pressure water source is then attached to the nozzle.
- the pig is pushed ahead of the water as the line is filled.
- a test head assembly On the other end of the line, a test head assembly has been welded.
- This head assembly includes bleed valves to remove any collected air and to allow the pig to be run, a full opening gate valve to allow the pig to pass out of the section to be tested, and valve connections to pressurize the line and to monitor tine pressure.
- the pig is pumped through the line with all of the valves open except the bleed valve at the reei end until it hits the end cap.
- the end valve is then closed and any air is bled out of the other valves. When all the air is bled off, the gate valves are closed.
- the line is then pressurized through one of the small valves.
- the pig and water are pushed back towards the reel by air pressure applied to the end bleed valve with the gate vaive at the test assembly fully open.
- the gate valve or the bleed valve at the reel end is used to control the flow of the test water from the pipe and to seal the pipe after the pig has moved back far enough for the test assembly to be removed.
- a pipeline of carbon steel with an inner corrosion-resistant cladding or liner Such a pipeline, referred to as clad or lined p pe, combines the strength of the low-cost carbon steel with the corrosion-resistance of the liner.
- the liner is typically produced from a corrosion-resistant material, e.g. stainless steel, austenitic nickei-chromium- based superalioys, e.g. Inconei (RTM) or other alloy, and typically has a thickness from 1 - 7 mm, most typically about 3 mm.
- the liner may be installed either with mechanical contact, such as by plastically expanding a loosely fitting inner liner from inside, so as to elastically deform the outer carbon steel pipeline, thereby tightly fitting the inner liner within the pipeline when the expanding internal pressure is removed, or with a metallurgical bond by means of hot rolling, welding, brazing or clad welding.
- the feast expensive alternative is to fit the inner liner mechanically tightly against the carbon steel pipeline with a so-called metallic contact, generally without any appreciable space therebetween.
- the inner liner may become deformed by buckling or wrinkling. Such deformation may locally restrict the internal bore or otherwise, affect performance, which is undesirable.
- this wrinkling effect can be avoided if the pipe is pressurized during reeling and/or unreeling.
- the application of pressure ensures that the inner liner retains close metallic contact with the outer pipe as the two are wound on or off the storage reel of a pipe Say vessel and thus undergo bending or straightening.
- Such a pipeline is normally assembled from individual lengths, usually about 12 meters long, which are welded into sections which are typically 750 meters to 2000 meters long and are known as "stalks". These stalks are joined at a shore side spool base by welding at a welding station located before the vessel and the resulting pipeline is then wound onto a storage reel of a pipe lay vessel for laying offshore.
- the length of the stalks is limited by the length of the spool base, rather than by other technological considerations.
- the pipeline length is pressurized to a pressure between 5 and 25 bar by means of a pressurized fluid inside the pipeline length;
- WO 2008/072970 A1 also does not elaborate on how the pipe is to be pressurized.
- a method for reeling or unreeling a pipeline having an inner corrosion-resistant metallic liner that is tightly fitted within the pipeline wherein, to minimise or avoid wrinkling of the liner during the reeling or unreeiing, the following steps are performed: internally pressurising a length of the pipeline in a two-stage pressurising process, in the first stage of which the said length of the pipeline is filled with fluid at an elevated pressure and in the second stage of which the fluid pressure is raised to a higher pressure; and reeling or unreeling, as the case may be, the said length of the pipeline while pressurised.
- Pumps that are capable of filling the pipeline with fluid at elevated pressure need to have high volumetric delivery, in order to fill the pipe in an acceptably short period of time (for example about half an hour), but they would not normally be able alone to internally pressurise the pipeline to a pressure exceeding 25 bar absolute.
- the pressure can readily be raised above 25 bar absolute if a separate, lower volumetric delivery but higher delivery pressure, pump, or a high pressure accumulator is used.
- a centrifugal pump An example of a suitable high delivery pump to fill the pipeline is a centrifugal pump.
- this pump can be a containerised centrifugal pump driven by a diesel engine.
- a suitable higher delivery pressure pump is a reciprocating piston pump.
- this pump can be a skid mounted reciprocating piston pump driven by compressed air.
- a single high pressure accumulator or a bank of high pressure accumulators may be used instead.
- the higher pressure is more than 25 bar absolute and a multi-stage pump is used to internally pressurise the length of pipeline to said higher pressure.
- Multi-stage pumps are readily available that provide adequate volumetric delivery to fill the length of the pipe in an acceptably short time duration, when using water as the pressurising fluid, while also raising the water pressure above 25 bar absolute, or more, if needed.
- the multi-stage pump may be a centrifugal pump.
- the multi-stage pump may be a singular multi-stage diesel driven centrifugal pump, which typically would achieve the required delivery pressures, every 35 bar absolute or more, if necessary.
- the method comprises the operations of: pumping a movable plug along a length of pipeline towards a trailing end so that the length of pipeline is filled with fluid;
- a method of pipe laying in which a pipeline is unreeled from a pipe laying reel on a pipe lay barge, the pipeline having an inner corrosion-resistant metallic liner closely fitted within an outer pipe that is less corrosion-resistant, comprising the operations of: pressurizing the pipeline by raising the pressure of an internal fluid filling the pipeline to an absolute pressure of at least 25 bar; unwinding said pipeline from the reel whilst said absolute pressure of at least 25 bar is maintained in the pipeline; laying the pipeline on the seabed; and depressurizing the pipeline.
- FIG. 1 illustrates a pipe loading method according to one embodiment of the invention
- FIG. 2 is an end view of a pipe winding reel
- FIG. 3 is a side view of a pipe winding reel
- FIG. 4 illustrates a trailing end cap and pig
- FIG. 5 shows an initial pipeline length
- FIG. 6 shows an initial pipeline length together with a pig pumping setup
- FSG. 7 shows a pipeline length having a pig pumped to the trailing end and the pipe pressurized
- FIG. 8 shows a pressurized pipeline length loaded to a reel connection point
- FIG. 9 shows a pressurized pipeline length loaded onto a reel
- FIG. 10 shows a trailing end cap removed for joining of a next stalk
- FIG. 11 shows a new stalk joined to the pipeline training end
- FIG. 12 shows a pipe length ready for pig pumping and pressurizing
- FIG. 13 shows an additional length of pressurized pipeline being wound onto a reei
- FIG. 14 shows a pressurized pipeline length closed by an end cap and wound onto a reei
- FIG. 15 shows the pressurized- pipeline length with the end cap removed
- FIG. 6 shows an installed pig catcher at the trailing end
- FIG. 7 shows the pig pumped into the catcher of Fig. 16
- FIG. 18 shows the pig catcher removed and the pipe pressurized
- FIG. 9 shows the reel fully loaded
- FIG. 20 shows a variant of the pipe loading method
- FIG. 21a shows a side view of a preferred form of pig, when it is being moved within the pipeline
- FIG. 21 b is a corresponding view, showing the pig when locked In position at the end of the pipeline.
- FIG. 22 is a part-sectional, side view of a friction pig, which is an alternative form of pig to the smart pig shown in FIGs, 21a and 21b.
- FiG. 1 shows a pipeline loading arrangement in which pipe sections or stalks of lined pipe are assembled at a shore based pipeline making facility 1 and passed over a loading jetty 2 to a storage reel assembly 300 on a pipe lay vessel 4.
- the shore based pipe making facility 1 is sometimes known in the industry as a spoof base.
- a length of pipeline 6 passes over a series of support rollers 7 through first and second pipe joint welding and coating stations 8 and 9, which are also provided with testing and inspection capabiiities to test for weld quality.
- the pipeline 6 passes along a ramp 10, which supports a hold off clamp (HOC) 11 , a tensioner 12 and a straightener 3, and then over a chute/guide 14 before arriving at the storage reel assembly 300, having a storage reel 3.
- HOC hold off clamp
- the end of the pipeline which is initially fed onto the storage reel 3 is referred to as the leading end of the pipeline and the other end is referred to as the trailing end.
- lined pipe stalks are joined together in the spoof base 1 to form a length of pipeline 6 which can be wound onto the storage reel 3 on the vessel 4.
- an initial length of pipeline 6 is assembled by welding together a succession of pipe stalks.
- the pipeline is then pressurized with water to a required absolute pressure, being preferably at least 30 bar before being advanced up the ramp 10 over the chute 14 and onto the reel 3.
- a required absolute pressure being preferably at least 30 bar
- the pipe is depressurized, another length added, pressurized with water, and further advanced onto the reel 3. This process is repeated until reel 3 is full and the vessel 4 can then be transferred to the worksite.
- the pipe is re-pressurized and then laid on the seabed in the conventional manner.
- the level of pressurization during the winding process is important to success.
- the lowest value of the pressurisation range must be sufficient to 1.0
- a preferred pressurizaiion range is defined by a lower absolute value of 5 bar and an upper absolute value that is less than 25 bar.
- the upper vaiue is less than 24.95 bar, more preferably 24.9 bar, stili more preferably 24.49 bar, even more preferably to 24.45 bar, even more preferably still 24 bar.
- the lower value (absolute) of the pressurizaiion range is preferably 5.5 bar, more preferably 6 bar, even more preferably 6.5 bar and even more preferably still 10 bar.
- the pressurizaiion range may be defined by any combination of lower and upper stated values, as specified herein.
- the pressurizaiion of the pipeline during the reeling process is achieved by driving a pig towards the trailing end of the pipeline, so that the pipeline becomes fiiled with water.
- the pig may be a smart pig and is in any event sized to be driven through the pipe by water pressure applied behind it.
- This pig is equipped with seals and a remotely-operated locking mechanism such thai it can be used to form a watertight bulkhead near the trailing end of the pipeline.
- the locking and sealing arrangement permits the trailing end cap to be removed, whilst the pig, and the water behind it, are retained in place for the stalk joining operation. This means that draining of the pipeline is unnecessary.
- the pig sealing/Socking arrangements are important, as the end of the pipe has to be kept dry so as not to compromise the stalk to stalk joining (i.e. welding) operation.
- FIGs. 2 and 3 illustrate the reel assembly 300 in more detail.
- the rotatabie reel 3 of the reel assembly 300 is mounted on bearings 33 which are supported by a support structure 25.
- the reel 3 comprises a hub 22, onto which the pipeline 6 is wound, and two end flanges 23 and 24.
- Flange 24 carries a ring manifold 21 which, in one embodiment, provides a series of six valved pump connections 28 arranged annularly around the manifold 21. Each pump connection has a respective non-return valve.
- Radially inwards of the manifold 21 are provided four flange openings 26 through which pass respective pipe-to-manifold connectors 27 which are coupled to the manifold 21 by respective radially extending conduits 34.
- the provision of multiple vaived connections ensures that one connection is always accessible for connection of a pressurizing pump regardless of the reei position,
- the leading end of the pipeline 6 is configured for connection to one of the pipe-to-manifold connectors 27.
- the pipe end connection could be made through an opening in the reel hub, and thence to a similarly equipped manifold within the hub ⁇ not shown).
- a pump 32 is coupled to any selected one of the pump connectors 28.
- Also connected to the manifold 21 is an accumulator 30, and a wireless pressure monitoring unit 29.
- Pump 32 represents a pumping system which incorporates a high capacity pump to deliver a flow rate capable of filling the pipe within a reasonable timescaSe
- the high capacity pump may optionally be augmented by a high pressure pump or accumulator to make up the difference between the pressure capability of the high volume pump which is generally in the order of 10 bar and the desired pipeline pressure.
- the high capacity pump may optionally be augmented by an accumulator. In each case, the accumulator 30 is pre-charged to the required pipe pressure.
- the accumulator 30 will compensate for both increased and decreased pressure and is fitted with a shut-off valve 31 so that it can be isolated from/connected to the manifold 21 as necessary.
- a pressure monitor 29 is connected to the manifold arrangement 21 so that the pressure in the pipe can be monitored after the pump 32 is disconnected prior to reel rotation for loading/laying of pipe. To cater for reel rotation, the pressure monitor may be of wireless transmitting type.
- FIG. 4 shows the trailing end of a pipe section containing a pig 41 .
- a trailing end cap 43 connected to the pipe via a seal 44.
- the trailing end cap 43 is provided with an isolating vaive 45 designed to seal the pipe end up to the full working pressure.
- Valve 45 also provides an air vent and a means for checking the conditions in the pipeline 6 between the pig 41 and the end cap 43.
- the end cap 43 On its interna! side, the end cap 43 has a stand-off 46 having a buffer spring 47, which stops the pig 41 short of the trailing end,
- An internal passage 48 allows air to be vented through the end cap 43 when the isolating valve 45 is open. The stand-off distance is such that one stalk can be welded to another without damaging the pig (i.e. far enough from the heat affected zone so that the pig sealing and locking capabilities are not compromised).
- the pig 41 is inserted into the pipeline 6 at the leading end, which is then closed by a leading end cap 61 as shown in Fig. 6.
- the ieading end cap 61 is also provided with an isolating valve 64, and is designed to sea! the pipe up to full working pressure.
- the high capacity pump of a pumping station 62 is then operated to pump water through the ieading end cap 61 to create a water flow 63 to advance the pig 41 along the pipeline 6 in the direction of movement 66 until it reaches the spring 47 of stand-off 46 on the trailing end cap 43, as shown in FIG. 7.
- the isolating valve 45 on the trailing end cap 43 is open to allow air ahead of the pig 41 to vent out through the internal passage 48. This ensures a water filled (i.e. virtually air free) pipeline length for the subsequent pressurizing process. If required, the progress of the pig 41 along the pipe can be determined from the volume of water pumped in, and/or via an onboard acoustic signai. When the pig 41 reaches the stand off 46 at the trailing end cap 43, near to the trailing end of the pipe (for example about or substantially 2 metres away), the pig 41 is locked in position by the remotely actuated on-board hydraulics.
- the high capacity pump is then replaced by a high pressure pump or accumulator which pressurizes the pipeline to the required pressure, preferably above 25 bar and for example in the range of 30 bar to 50 bar.
- the high capacity pump then raises the water pressure to the required elevated pressure.
- the high capacity pump can be replaced by a high pressure pump or accumulator which pressurizes the pipeline to the required pressure, to prevent or minimise wrinkling of the liner when the pipeline is wound onto the reel 3.
- the trailing end cap isoiating valves 45 are then closed and the pumping station 62 disconnected as illustrated in FIG. 8, in preparation for reeling.
- the leading end of pipeline 6 can by-pass the hold-off clamp 1 1 , tensioner 12 and straightener 13 on ramp 10, and be fed directly to the powered reel 3.
- the number of bending cycles to which the pipe is subjected can be reduced, which increases the service fatigue life of the pipe as less of it is consumed during the reeling and installation process.
- the reel mounted accumulator 30 pre-charge pressure is then checked, adjusted if necessary, and its shut-off va!ve 31 opened to . connect it to the manifold 21.
- the pressurized pipeline length 6 is then wound onto the vessel reel 3 until its trailing end reaches the jetty end onshore welding/coating station 9, as shown in F!G, 9.
- the pipe 6 is then gripped in the vessel hold-off clamp 1 1.
- the pipe 6 is depressurized, the trailing end cap 43 is removed as shown in FIG, 10, and the next stalk is then held and welded on to the pipeline length.
- the new joint 121 is then NDT tested and coated as schematically illustrated in FIG. 1 1.
- the trailing end cap 43 is fitted to the new stalk end, and the pig 41 is released by operating the remotely actuated onboard hydraulics. After connecting the high capacity pump 32 to the manifold 21 , the pig 41 is pumped up against the trailing end cap stand-off 46, as iiiustrated in FIG. 13.
- the pig 41 is then locked in position, and if required the high capacity pump 32 replaced by a high pressure pump and the pipe 6 then re- pressurized to the correct eievated level in the range defined by the Iower value of 5 bar absolute and the upper value that is less than 25 bar absolute or in the range having the iower limit of at ieast 25 bar absolute, e.g. 30-50 bar, as the case may be.
- the pumping station 32 is then isolated and disconnected from the reel 3 and the accumulator 30 reconnected to maintain the pressure in the pipe during the reeling process.
- a length of pipe equal in length to the newly attached stalk is then wound onto the reel 3 so that the pipeline 6 moves in the direction of arrow 65 until the trailing end is again at the welding/coating station 9 as shown in FIG. 14.
- the pipe 6 is again gripped in the hold-off connector 11 and the process repeated until the required amount of pipe - except for the final stalk - has been stored on the reel 3.
- the trailing end cap 43 is then removed (FIG. 5) and a pig catcher 181 fitted to the pipe end 90, as illustrated in FIG. 16.
- the pig 41 is then released, pumped into the catcher 181 (FIG. 17 ⁇ and removed.
- the pipeline 6 is then pressurized to the correct reeling pressure.
- the final stalk is then wound onto the reel 3 as shown in FIG. 19, and the pipeline then depressuhzed.
- FiG. 20 A variant of the method illustrated and described with reference to FiGs, 1 to 19 will now be described with reference to FiG. 20.
- a number of stalks are welded together and coated to form an initial pipeline length, typically 750 - 1 ,500 meters long, for winding onto the storage reel 3.
- a pig similar to pig 41 but including an internal passage closed by a poppet valve, is inserted into the leading end of the pipeline, the leading end cap 61 is fitted and connected to a high capacity pressurizing pump 62, substantially as illustrated in FIG. 6.
- the end cap 43 At the trailing end of the pipeline 6, the end cap 43, with a stand-off 1.6
- the stand-off 46 includes an operating probe for opening the poppet valve.
- the isolating valve 45 in the trailing end cap 43 is opened to allow air ahead of the pig to be vented.
- the tow pressure pump 62 is then used to push the pig through the pipe 6 until it bears against the standoff 46, as indicated by a pressure rise in the pipe and the poppet valve is opened. As before, this ensures a water-filled and virtually air-free pipeline length for the subsequent pressurizing process. If required, the progress of the pig along the pipe 6 can be determined from the volume of water pumped in and/or by means of an onboard acoustic signal.
- the pig is then locked in position by operating the remotely actuated onboard hydraulics.
- the shut-off valve in the leading end cap 61 is then closed.
- the high-pressure pump or accumulator is then connected to the trailing end cap 43 and employed to pressurize the pipeline to the required elevated pressure, thai is to say within the range defined by the lower value of 5 bar absolute and an upper value that is below 25 bar absolute, or in a range having the lower limit of at least 25 bar absolute, e.g. 30 to 50 bar, as the case may be.
- the pressure is applied through the end cap 43 and the passage through the pig 41 , whilst its poppet valve is held open by the operating probe on the stand-off 46.
- valve 64 in the trailing end cap 43 is shut and the high pressure pump or accumulator disconnected.
- the pipe internal pressure can be checked and adjusted as necessary. With the accumulator 30 connected to maintain the required pressure level, the pipe 6 is then unreeled down the ramp 10 and onto the seabed in the conventional manner until the pipeline 6 has been successfully laid. Finally, the pipeline is depressurized.
- Figures 21 a, 21 b show a side view of a preferred form for the pig 41 of the preceding embodiments.
- the pig is preferably a smart pig comprising a central elongate body 41a, on each end of which is mounted an assembly of closely spaced disc seals 41 b.
- These seals can be in the form of polyurethane discs. These discs act to guide the pig through the pipe and also serve to limit the amount of water which leaks past the pig during the pipeline filling operation, to ensure the pig is efficiently displaced through the pipeline.
- a pair of engagement devices is located on a central portion of the elongate body 41a.
- Each such seal comprises a squashable locking disc 41 c sandwiched between a fixed plate 41d and a movable plate 41 e.
- the locking disc 41 c is flattened, which causes its outer circumferential surface to bulge outwardly and engage tightly with the inner wall surface of the pipeline, thereby locking the pig in position and providing a fluid-tight seal.
- the isolation pig is driven through the pipeline using water pressure applied at one end (the right hand end in Figures 21 a, 21 b),
- a transmitter receiver collar 100 is attached around the pipeline at a location adjacent to the end cap where the pipe is to be locked in position.
- a battery powered receiver 101 on board the pig detects a magnetic pulse signal ' from the collar 100 fitted around the pipe and causes the downstream seal (i.e. the one to the left in Figures 21 a, 21 b) to be actuated and lock the pig in this position using the pressure of the water in the pipeline upstream of the pig for the actuation.
- the receiver 101 causes an onboard hydraulic circuit (not shown in Figures 21a, 21 b) to actuate the upstream seal with a small hydraulic cylinder (also not shown), in this way, the pig is effectively locked in place within the pipeline and a seal is formed to isolate the interna! sections of pipe, upstream and downstream of the pig.
- an onboard hydraulic circuit not shown in Figures 21a, 21 b
- a small hydraulic cylinder also not shown
- a pressure sensor 102 onboard the pig in the space between the engagement devices provides a pressure reading which is received by the transmitter receiver coilar 100, attached to the pipeline 6, and relayed to an external iaptop computer (not shown). The pressure is monitored to establish whether a successful seal has been formed. if the pressure remains constant, then the seal provided by the engagement devices has been successful, if the pressure decreases, then it can be deduced that the downstream seal is ineffective. If the pressure rises, it can be established that the upstream seal is ineffective. If either of the engagement devices has not seated correctly, then they will be de-actuated, using the onboard hydraulic circuit of the pig, and further attempts will be made to lock the pig in position to form an effective seal.
- the pig is unlocked by sending a signal from the pipe collar to de-actuate the engagement devices, and is pumped through to the location of the next tie-in weld, and the process is repeated.
- the pig is recovered by pumping it into a pig receiver connected to the spool base end of the pipeline. If the onboard battery suppiy for the pig or the hydraulic system fails at any point, the pig is arranged so that it will failsafe to an isolation mode. The pig can then be removed from the pipeline by pressurising the downstream end of the pipeiine, causing a suitable pressure differential to unseat the failsafe sealing mechanism, allowing the pig to be pumped downstream and removed from the line in a controlled manner.
- a friction pig is used in place of the smart pig.
- the friction pig 41' comprises a centra! elongate body 41 'a, on each end of which is mounted an assembly of closely spaced disc seais 41 'b.
- these seals can be in the form of polyurethane discs. These discs act to guide the friction pig through the pipeiine 6.
- the threshold differential pressure is set at a value to resist the hydrostatic pressure due to the head of water in the pipeiine from the highpoint where the pipeiine passes up and over the chute/guide 14 ( Figure 1 ),
- the friction pig is used in the same way as the smart pig, described in detail with reference to Figures 1 to 19, and in particular the sequence of operating steps depicted in Figures 5 to 19, with the one difference that the pig is locked in position near the trailing end of the pipeline, to withstand the fluid pressure that is applied subsequently, by abutment against the trailing end cap 43, specifically in abutment against its buffer spring on the stand-off (both shown diagrammatically in Fig. 22) of the end cap 43.
- the end cap itself withstands the applied internal pressure, or substantially the whole pressure amount, rather than the tight frictional engagement with the pipeline wall in the case of the smart pig.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pipeline Systems (AREA)
- Pipe Accessories (AREA)
Abstract
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/504,127 US8894327B2 (en) | 2009-10-26 | 2010-10-25 | Method of reeling and unreeling an internally clad metal pipeline |
BRPI1013375A BRPI1013375B1 (en) | 2009-10-26 | 2010-10-25 | method for winding a pipeline, method for winding or unwinding a pipeline, and method of pipe launching |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0918768A GB2474713B (en) | 2009-10-26 | 2009-10-26 | Reeling and unreeling an internally clad metal pipeline |
GB0918768.3 | 2009-10-26 | ||
GB1005795.8 | 2010-04-07 | ||
GB1005795.8A GB2479379B (en) | 2010-04-07 | 2010-04-07 | Reeling and unreeling an internally clad metal pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011051218A1 true WO2011051218A1 (en) | 2011-05-05 |
Family
ID=43303940
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2010/066050 WO2011051218A1 (en) | 2009-10-26 | 2010-10-25 | Reeling and unreeling an internally clad metal pipeline |
PCT/EP2010/066057 WO2011051221A1 (en) | 2009-10-26 | 2010-10-25 | Reeling and unreeling an internally clad metal pipeline |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2010/066057 WO2011051221A1 (en) | 2009-10-26 | 2010-10-25 | Reeling and unreeling an internally clad metal pipeline |
Country Status (3)
Country | Link |
---|---|
US (2) | US8894327B2 (en) |
BR (2) | BRPI1015237B1 (en) |
WO (2) | WO2011051218A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014140794A1 (en) * | 2013-03-12 | 2014-09-18 | Acergy France Sa | Pipe bending for reel-lay operations |
US10392219B2 (en) * | 2008-07-24 | 2019-08-27 | Technip France | Method of spooling a bi-metallic pipe |
US10544881B2 (en) | 2016-09-16 | 2020-01-28 | Technip France | Method of installing an in-line structure in a pipeline |
WO2020107089A1 (en) | 2018-11-30 | 2020-06-04 | Subsea 7 Do Brasil Servicos Ltda | Pipe spooling for reel-lay operations |
WO2020118404A1 (en) | 2018-12-14 | 2020-06-18 | Subsea 7 Do Brasil Servicos Ltda | Incorporating structures into reeled pipelines |
US10865911B2 (en) | 2016-09-16 | 2020-12-15 | Technip France | Method of installing an in-line structure in a pipeline |
US11092262B2 (en) | 2016-09-01 | 2021-08-17 | Technip France | Mechanically lined pipe having an inner polymer liner |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0918589D0 (en) * | 2009-10-23 | 2009-12-09 | Technip France | Methods of reel-laying a mechanically lined pipe |
GB2518376B (en) * | 2013-09-18 | 2016-03-09 | Mackinnon Marine Ltd | Improved pipe laying methods |
GB2536492B (en) * | 2015-03-20 | 2017-10-18 | Pioneer Lining Tech Ltd | Method of laying lined pipeline |
WO2020037138A1 (en) * | 2018-08-16 | 2020-02-20 | J. Ray Mcdermott, S.A. | Systems and methods for pipe reeling and laying with mechanically lined pipe |
EP4058706A1 (en) | 2019-11-15 | 2022-09-21 | J. Ray McDermott, S.A. | Hybrid mechanically lined pipe methods and apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3934647A (en) | 1974-06-21 | 1976-01-27 | Dolphin International, Inc. | Pipe laying system |
WO2002084160A1 (en) * | 2001-04-11 | 2002-10-24 | Progenitive Services Limited | Method of flooding a pipeline |
US20060210361A1 (en) * | 2005-03-17 | 2006-09-21 | Kellogg Brown And Root, Inc. | Continuously pressurized pipeline |
WO2008072970A1 (en) | 2006-12-11 | 2008-06-19 | Statoil Asa | Method for laying a pipeline having an inner corrosion proof cladding |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2201241B1 (en) * | 1972-10-03 | 1977-09-02 | Benoto Sam Ste | |
US5289845A (en) * | 1992-11-12 | 1994-03-01 | Bowen Tools | Oilfield tubing reel and reel assembly |
US5503370A (en) | 1994-07-08 | 1996-04-02 | Ctes, Inc. | Method and apparatus for the injection of cable into coiled tubing |
IES20030696A2 (en) * | 2003-09-23 | 2005-03-23 | Carsphairn Ltd | A pipeline apparatus |
US7090026B2 (en) | 2004-05-06 | 2006-08-15 | Halliburton Energy Services, Inc. | Apparatus and method for injecting tubing in a well bore |
FR2906339B1 (en) * | 2006-09-27 | 2008-12-26 | Saipem S A Sa | METHOD FOR PRODUCING AN UNDERWATER DRIVING COMPRISING ANTI-CORROSION WELDINGS AND SHOTS |
GB2461954B (en) | 2008-07-24 | 2010-08-04 | Technip France Sa | Method of spooling a bi-metallic pipe |
GB0918589D0 (en) * | 2009-10-23 | 2009-12-09 | Technip France | Methods of reel-laying a mechanically lined pipe |
-
2010
- 2010-10-25 US US13/504,127 patent/US8894327B2/en active Active
- 2010-10-25 WO PCT/EP2010/066050 patent/WO2011051218A1/en active Application Filing
- 2010-10-25 BR BRPI1015237-7A patent/BRPI1015237B1/en active IP Right Grant
- 2010-10-25 WO PCT/EP2010/066057 patent/WO2011051221A1/en active Application Filing
- 2010-10-25 BR BRPI1013375A patent/BRPI1013375B1/en active IP Right Grant
- 2010-10-25 US US13/504,128 patent/US8876433B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3934647A (en) | 1974-06-21 | 1976-01-27 | Dolphin International, Inc. | Pipe laying system |
WO2002084160A1 (en) * | 2001-04-11 | 2002-10-24 | Progenitive Services Limited | Method of flooding a pipeline |
US20060210361A1 (en) * | 2005-03-17 | 2006-09-21 | Kellogg Brown And Root, Inc. | Continuously pressurized pipeline |
WO2008072970A1 (en) | 2006-12-11 | 2008-06-19 | Statoil Asa | Method for laying a pipeline having an inner corrosion proof cladding |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10392219B2 (en) * | 2008-07-24 | 2019-08-27 | Technip France | Method of spooling a bi-metallic pipe |
WO2014140794A1 (en) * | 2013-03-12 | 2014-09-18 | Acergy France Sa | Pipe bending for reel-lay operations |
AU2014229645B2 (en) * | 2013-03-12 | 2018-08-02 | Acergy France SAS | Pipe bending for reel-lay operations |
US10201842B2 (en) | 2013-03-12 | 2019-02-12 | Acergy France SAS | Pipe bending for reel-lay operations |
US11376644B2 (en) | 2013-03-12 | 2022-07-05 | Acergy France SAS | Pipe bending for reel-lay operations |
EP3617573A1 (en) | 2013-03-12 | 2020-03-04 | Acergy France SAS | Pipe bending apparatus for reel-lay operations |
US11092262B2 (en) | 2016-09-01 | 2021-08-17 | Technip France | Mechanically lined pipe having an inner polymer liner |
US10865911B2 (en) | 2016-09-16 | 2020-12-15 | Technip France | Method of installing an in-line structure in a pipeline |
US10544881B2 (en) | 2016-09-16 | 2020-01-28 | Technip France | Method of installing an in-line structure in a pipeline |
WO2020107089A1 (en) | 2018-11-30 | 2020-06-04 | Subsea 7 Do Brasil Servicos Ltda | Pipe spooling for reel-lay operations |
US11828389B2 (en) | 2018-11-30 | 2023-11-28 | Subsea 7 Do Brasil Servicos Ltda | Pipe spooling for reel-lay operations |
WO2020118404A1 (en) | 2018-12-14 | 2020-06-18 | Subsea 7 Do Brasil Servicos Ltda | Incorporating structures into reeled pipelines |
US11585464B2 (en) | 2018-12-14 | 2023-02-21 | Subsea 7 Do Brasil Servicos Ltda | Incorporating structures into reeled pipelines |
Also Published As
Publication number | Publication date |
---|---|
US20120269581A1 (en) | 2012-10-25 |
US20130034390A1 (en) | 2013-02-07 |
BRPI1015237A2 (en) | 2020-06-02 |
US8876433B2 (en) | 2014-11-04 |
BRPI1015237B1 (en) | 2021-03-23 |
BRPI1013375B1 (en) | 2019-12-24 |
WO2011051221A1 (en) | 2011-05-05 |
US8894327B2 (en) | 2014-11-25 |
BRPI1013375A2 (en) | 2016-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8894327B2 (en) | Method of reeling and unreeling an internally clad metal pipeline | |
CA2672210C (en) | Method for laying a pipeline having an inner corrosion proof cladding | |
US10392219B2 (en) | Method of spooling a bi-metallic pipe | |
US8235628B2 (en) | Continuously pressurized pipeline | |
WO2011124919A1 (en) | Assembly, reeling and unreeling of internally clad pipe | |
GB2474713A (en) | A method for reeling or unreeling a pipeline | |
AU2023201897A1 (en) | Systems and methods for pipe reeling and laying with mechanically lined pipe | |
US20030077125A1 (en) | Methods of fitting linings in pipelines | |
EP3887699B1 (en) | Pipe spooling for reel-lay operations | |
BR112021002709B1 (en) | METHOD FOR ROLLING A DUCT | |
Ved | Evaluation of the Valve-less Flooding System & Re-design of Hot Stab Guiding System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10768939 Country of ref document: EP Kind code of ref document: A1 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13504127 Country of ref document: US |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 10768939 Country of ref document: EP Kind code of ref document: A1 |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: PI1013375 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: PI1013375 Country of ref document: BR Kind code of ref document: A2 Effective date: 20111025 |