- WO2011000495A1 WO2011000495A1 PCT/EP2010/003790 EP2010003790W WO2011000495A1 WO 2011000495 A1 WO2011000495 A1 WO 2011000495A1 EP 2010003790 W EP2010003790 W EP 2010003790W WO 2011000495 A1 WO2011000495 A1 WO 2011000495A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- femtocell
- border
- femtocells
- femto
- arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
- H04W52/245—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account received signal strength
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/38—TPC being performed in particular situations
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/04—Reselecting a cell layer in multi-layered cells
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/24—Reselection being triggered by specific parameters
- H04W36/30—Reselection being triggered by specific parameters by measured or perceived connection quality data
- H04W36/304—Reselection being triggered by specific parameters by measured or perceived connection quality data due to measured or perceived resources with higher communication quality
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
- H04W52/243—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account interferences
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/30—Transmission power control [TPC] using constraints in the total amount of available transmission power
- H04W52/34—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
- H04W52/343—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading taking into account loading or congestion level
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W84/00—Network topologies
- H04W84/02—Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
- H04W84/04—Large scale networks; Deep hierarchical networks
- H04W84/042—Public Land Mobile systems, e.g. cellular systems
- H04W84/045—Public Land Mobile systems, e.g. cellular systems using private Base Stations, e.g. femto Base Stations, home Node B
Definitions
- the present invention relates to femtocell arrangements.
- Femtocells are low power, low cost, generally user-deployed base stations that are able to provide exceptional cellular service in residential or enterprise environments, with a typical coverage range of tens of meters. They have extensive auto-configuration and self-optimization capabilities to enable a simple 'plug and play' deployment, and are designed to automatically integrate themselves in an existing macrocellular network. Femtocells typically use the customer's broadband internet connection (e.g. Digital Subscriber Line (DSL), cable, etc.) as backhaul.
- DSL Digital Subscriber Line
- FIG. 1 A typical femtocell architecture is shown in Figure 1, where the 'Home cell' shown on the right hand side is a femtocell and is connected to a Home cell, or Femtocell, Controller/Gateway.
- elements on the left hand side of the figure are included in a Universal Mobile
- UMTS Telecommunications System
- NodeB a Radio Network Controller (RNC), Mobile Switching Centre (MSC), Serving GPRS Support Node (SGSN), and Gateway GPRS Support Node (GGSN).
- RNC Radio Network Controller
- MSC Mobile Switching Centre
- SGSN Serving GPRS Support Node
- GGSN Gateway GPRS Support Node
- PSTN public switched telephone network
- the number of primary scrambling codes (PSC) which may be allocated to a Femto is limited.
- the number that can be allocated is typically between 6 and 16.
- the selection of a primary scrambling code is typically auto-configured by the femtocells themselves based on measurements of other primary scrambling codes used in their vicinity. Therefore, in typical femtocell deployments, these scrambling codes will need to be heavily re-used.
- PSC primary scrambling codes
- a UE does not provide the Cell ID in its UE measurement report. Therefore, it is difficult for the target network to use measurements supplied by the UE to automatically determine the actual target cell when performing either macro to Femto, or Femto to Femto Handover procedures.
- the Home Cell Gateway When handling an incoming handover request from a macro cell, the Home Cell Gateway must be able to determine to which femtocell the UE is handing over. Efficient determination and subsequent reporting of the target cell for a handover procedure is an important requirement in maintaining a high quality of service to the UEs, since any interruption to an on-going session on the UE needs to be minimised.
- existing 3GPP standard messages do not provide a mechanism for the source cell to uniquely identify the target cell, as the UE will not report the Cell ID of the target cell in measurement reports to the source cell. The UE is able to report the PSC of the target cell.
- PSCs are re-used, the Gateway cannot rely on the reported value of the target cell PSC to uniquely identify it.
- the source femtocell also must be able to determine the target femtocell for the handover to complete effectively, but again, the target cell may not be uniquely identified where there is a high level of PSC re-use.
- the Gateway or the source Femto, is not able to uniquely determine the target femtocell from the information provided by the UE in the source cell, it makes it difficult for the Gateway or source Femto to decide to which femtocell the
- Handover Request should be forwarded. This is especially important when
- One possible approach is for the Femto Gateway to make a guess about the correct target femtocell using the limited information provided as part of the handover request. This solution is likely to lead to an increase in the duration of the handover procedure, which may in turn impact the end user's on-going call, for example, leading to packet loss or even call drop.
- Another possible approach is to prepare handover on all Femtos with the same PSC. However it will be appreciated that such an approach is extremely wasteful of resources and may soon become unmanageable as the number of deployed femto base stations and user equipment increases.
- a femtocell arrangement comprises a plurality of femtocells deployed over a region.
- a border femtocell at an entrance to the region is configured to operate at a higher transmit power level than neighboring femtocells to provide a larger area coverage than that provided by neighboring femtocells.
- the Femto Gateway is aware that any attachment is likely to be to a border Femto, it facilitates handover by aiding the identification of the target femtocell.
- the region over which the plurality of femtocells is deployed may be, for example, an office, a building, an outdoor area, or partially outdoors and partially indoors.
- the border femtocell has an assigned primary scrambling code (PSC) that identifies it as a border femtocell.
- PSC primary scrambling code
- the special PSC assists the Femto Gateway to make a swift identification as to which femtocell a UE is handing over to, as the number of entrances and hence number of "border" femto cells is likely to be a small number in comparison to the number of other femtocells deployed in such an environment.
- This has the advantage of minimising the delay in the Femto network when handling an incoming handover request, hence reducing the risk of impacting - A - the quality of service to the end user.
- the special PSC may be assigned to a border Femto by the femto management system, based on knowledge of where it is deployed, for example, at the entrance to a building. This contrasts with the approach described previously in which PSCs are autoconfigured and not specially assigned to a specific Femto or specific Femtos.
- the border femtocell has different access control requirements to non-border femtocells. Such a scheme may be useful when
- the invention may be applied to a deployment of femtocells using procedures and information which are compatible with 3GPP R99 compliant UEs and hence does not require a standards change from that currently proposed.
- Figure 1 schematically illustrates a typical femtocell base station architecture
- Figure 2 schematically illustrates for explanatory purposes an arrangement not in accordance with the invention
- FIG. 3 schematically illustrates a femtocell arrangement in accordance with the invention.
- Figure 4 schematically illustrates messaging associated with the operation of the arrangement shown in Figure 3.
- an office building has a plurality of femtocells, Femto 1 to Femto 13, deployed within it. Those Femtos located at the edge of the office radiate outside it.
- a UE may attempt to attach to any femtocell that meets its handover criteria.
- the UE 2 may equally attempt to attach to Femto 1, 2, or 3 as it approaches the entrance to the office.
- the Femto Gateway may not be able to make a unique identification of the handover target cell from the information it receives from the UE. Thus, handover may be delayed and adversely affect the operation of the UE.
- a plurality of Femtos 1 to 13 is deployed in an office or other space, such as, for example, a university campus.
- the Femto 3 having a coverage area that encompasses the top entrance, is arranged to be operated at a higher transmit power than adjacent Femtos 1, 2 and 4, such that its coverage extends more widely.
- Femto 3 constitutes a border Femto and is allocated a specific PSC, which in this embodiment is PSC #3, to denote its status.
- Femto 10 is similarly arranged to have a wider coverage area than others adjacent to it and is also allocated the same PSC #3 as Femto 3 to denote that it is a border Femto.
- the PSC #3 is not re-used elsewhere within the office.
- the UE 1 is about to enter the office at the bottom entrance and UE
- UEs 1 and 2 at the top.
- they attempt to attach to the border femtocells 10 and 3 respectively in preference to the other deployed cells because border femtocells 10 and 3 have wider coverage than their neighbors.
- UE 1 will attach to femtocell 10 in preference to femtocell 8 or femtocell 7. This therefore assists the Femto Gateway in identifying which femtocell a UE is attempting to handover to when it receives an incoming Handover Request, since it will most likely be one of the border Femto cells deployed at the entrances to the office or other space.
- the use of a special PSC then reduces the number of femtocells that the Gateway would consider as the handover target, for example the information provided by UE 1 in its measurement report will include the PSC of the target femtocell. In this example this should be femtocell 10. Since only the border Femto cells 10 and 3 have the same PSC, the Gateway quickly reduces the number of candidate handover target cells to these two. It then forwards the handover request to both these cells and subsequently the UE will attach to only one. Alternatively, the Gateway may use additional information to make a decision on the most likely border cell and initially forwards the handover request to that candidate.
- Figure 4 provides an example of the sequence where the Gateway forwards a request to both border cells, Femtos 3 and 10, of the arrangement shown in Figure 3.
- UE 1 As UE 1 roams towards the building, it sends a measurement report to the Macro Cell RNC (step (a)), indicating that the new cell (in this case Femto 10) is provides a much better quality signal than the existing macro cell.
- UEl is "attracted" to Femtocell 10 in preference to other deployed femto cells, since it is transmitting at a higher power.
- the macro cell RNC sends a Relocation Required message to the Core Network (CN).
- (c) Core Network sends corresponding Relocation Request message to the Femto Gateway, including the PSC of the target Cell (PSC 3).
- the Gateway uses the provided measurement information to determine that UE 1 is attempting to handover to one of the border Femto Cells.
- Femto Cell 10 and Femto 3 both respond, followed by acknowledgement and Relocation command back to the macro cell RNC.
- the majority of femtocells may only be accessible to UEs that are associated with the company that is based in that office. Therefore, whenever a visitor visits the office it is likely that their UE will not be allowed to access the femtocells deployed there. This can have negative impacts on the "visiting" UE, as it may attempt to handover to Femtos that it is not allowed to access, leading to a degradation in service and potential call drops.
- a company can designate the border Femtocells Femto 3 and 10 at the entrances to the building with a different access control requirement from that of other deployed femtocells. Hence "visiting" UEs may be allowed access to the border cells which cover areas within the building most frequently used by visitors. This permits them continuity of service, but also allows the hosting company to maintain restricted access to the other femtocells providing coverage within their office.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201080029115.3A CN102474825B (en) | 2009-06-30 | 2010-06-24 | Femtocell arrangements |
| KR1020127002286A KR101397410B1 (en) | 2009-06-30 | 2010-06-24 | Femtocell arrangements |
| US13/381,179 US8923842B2 (en) | 2009-06-30 | 2010-06-24 | Femtocell arrangements |
| JP2012518039A JP5571785B2 (en) | 2009-06-30 | 2010-06-24 | Femtocell placement |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP09290516.5 | 2009-06-30 | ||
| EP09290516.5A EP2273829B1 (en) | 2009-06-30 | 2009-06-30 | Femtocell arrangements |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2011000495A1 true WO2011000495A1 (en) | 2011-01-06 |
Family
ID=41401853
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2010/003790 Ceased WO2011000495A1 (en) | 2009-06-30 | 2010-06-24 | Femtocell arrangements |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US8923842B2 (en) |
| EP (1) | EP2273829B1 (en) |
| JP (1) | JP5571785B2 (en) |
| KR (1) | KR101397410B1 (en) |
| CN (1) | CN102474825B (en) |
| WO (1) | WO2011000495A1 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120309394A1 (en) * | 2010-09-16 | 2012-12-06 | Qualcomm Incorporated | Apparatus and methods for hand-in to a femto node |
| EP2557842B1 (en) * | 2011-08-10 | 2018-05-23 | Alcatel Lucent | Autonomous cell reselection by a user equipment |
| US9924443B2 (en) * | 2012-02-24 | 2018-03-20 | Qualcomm Incorporated | Methods and apparatus for selecting femtocell access modes and operational parameters based on the presence of nearby macrocells |
| WO2013181848A1 (en) * | 2012-06-08 | 2013-12-12 | 华为技术有限公司 | Method, source node, user equipment and system for determining target cell |
| US20140120932A1 (en) * | 2012-10-26 | 2014-05-01 | Broadcom Corporation | Method and System for Improving Performance of a Femtocell Self Organizing Network |
| EP2787776B1 (en) * | 2013-04-05 | 2016-06-22 | Alcatel Lucent | A telecommunications network, a base station and a method of predicting whether a small cell base station in a group of small cell base stations has a likelihood of being accessed first among the group by user terminals |
| US10757623B2 (en) * | 2018-11-27 | 2020-08-25 | International Business Machines Corporation | Cognitive analysis of temporal obstructions |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070097939A1 (en) * | 2005-10-04 | 2007-05-03 | Telefonaktiebolaget Lm Ericsson (Publ) | Automatic configuration of pico radio base station |
| WO2008057658A2 (en) * | 2006-10-27 | 2008-05-15 | Motorola, Inc. | A cellular communication system |
| US20090097448A1 (en) * | 2007-10-12 | 2009-04-16 | Lucent Technologies Inc. | Methods for idle registration and idle handoff in a femto environment |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08280057A (en) | 1995-04-07 | 1996-10-22 | Toshiba Corp | Mobile communication system and base station device thereof |
| JP3927193B2 (en) | 2004-03-31 | 2007-06-06 | 株式会社東芝 | Wireless communication terminal |
| US20070213067A1 (en) * | 2006-03-09 | 2007-09-13 | Patrick Li | Wireless communication handoffs within a macrocell |
| US7835740B2 (en) * | 2006-12-18 | 2010-11-16 | Alcatel-Lucent Usa Inc. | Establishing cell codes for picocells within a macrocell |
| US8711767B2 (en) | 2007-10-09 | 2014-04-29 | Qualcomm Incorporated | Distributed mobile access point acquisition |
| KR101126461B1 (en) * | 2007-11-26 | 2012-03-29 | 노키아 지멘스 네트웍스 오와이 | Methods, apparatuses and computer medium for indicating the availability of a local service at a location |
| GB2459434A (en) * | 2008-03-31 | 2009-10-28 | Vodafone Plc | Configuration of access points in a telecommunications network |
| US8886201B2 (en) * | 2008-12-29 | 2014-11-11 | Zte (Usa) Inc. | Virtual groups for femto-cell hand-in |
-
2009
- 2009-06-30 EP EP09290516.5A patent/EP2273829B1/en not_active Not-in-force
-
2010
- 2010-06-24 KR KR1020127002286A patent/KR101397410B1/en not_active Expired - Fee Related
- 2010-06-24 WO PCT/EP2010/003790 patent/WO2011000495A1/en not_active Ceased
- 2010-06-24 CN CN201080029115.3A patent/CN102474825B/en not_active Expired - Fee Related
- 2010-06-24 US US13/381,179 patent/US8923842B2/en not_active Expired - Fee Related
- 2010-06-24 JP JP2012518039A patent/JP5571785B2/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070097939A1 (en) * | 2005-10-04 | 2007-05-03 | Telefonaktiebolaget Lm Ericsson (Publ) | Automatic configuration of pico radio base station |
| WO2008057658A2 (en) * | 2006-10-27 | 2008-05-15 | Motorola, Inc. | A cellular communication system |
| US20090097448A1 (en) * | 2007-10-12 | 2009-04-16 | Lucent Technologies Inc. | Methods for idle registration and idle handoff in a femto environment |
Non-Patent Citations (1)
| Title |
|---|
| CHOWDHURY M Z ET AL: "Handover between macrocell and femtocell for UMTS based networks", ADVANCED COMMUNICATION TECHNOLOGY, 2009. ICACT 2009. 11TH INTERNATIONAL CONFERENCE ON, GIRI, PISCATAWAY, NJ, USA, 15 February 2009 (2009-02-15), pages 237 - 241, XP031446109, ISBN: 978-89-5519-138-7 * |
Also Published As
| Publication number | Publication date |
|---|---|
| US20120165005A1 (en) | 2012-06-28 |
| US8923842B2 (en) | 2014-12-30 |
| KR101397410B1 (en) | 2014-05-20 |
| JP5571785B2 (en) | 2014-08-13 |
| CN102474825B (en) | 2015-03-11 |
| JP2012531860A (en) | 2012-12-10 |
| CN102474825A (en) | 2012-05-23 |
| KR20120036994A (en) | 2012-04-18 |
| EP2273829A1 (en) | 2011-01-12 |
| EP2273829B1 (en) | 2014-08-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101452808B1 (en) | Maintaining different virtual active sets for different cell types | |
| EP2432284B1 (en) | A macrocell base station, a telecommunications network, and a femtocell base station, and a method of switching a femtocell base station between a dormant mode and an active mode | |
| US8923842B2 (en) | Femtocell arrangements | |
| US9179378B2 (en) | Femtocell base station, and a method of selecting carrier frequency band of a femtocell base station | |
| CN102754480B (en) | Switching controls | |
| EP2716129B1 (en) | Carrier aggregation support for home base stations | |
| US20120258718A1 (en) | Femtocell Base Station | |
| US9220040B2 (en) | Femto-gateway, a cellular telecommunications network, and a method of identifying a handover target femtocell base station | |
| CN103999542B (en) | communication system | |
| CN101860880A (en) | Interference information transmission method and base station | |
| EP2268079B1 (en) | Identifying a base station from a set of handover candidate base stations that use the same primary scrambling code | |
| EP2249603B1 (en) | Obtaining information of a neighbouring base station | |
| EP2395790B1 (en) | A wireless network and a method of handover of a call connection | |
| CN105208570B (en) | Small-sized base station and operation method thereof | |
| US20160337918A1 (en) | Method and device for managing radio access points | |
| EP2496028A1 (en) | A small cell base station, a vehicle for passengers and method of automatically setting the maximum permitted transmit power of a small cell base station | |
| Maiwada | The Role of Mobility Management in Macrocell-Femtocell for LTE Network Using HDA | |
| EP2391155A1 (en) | A femtocell base station and method of determining a macrocell location area within which a femtocell base station resides |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201080029115.3 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10734034 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012518039 Country of ref document: JP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 20127002286 Country of ref document: KR Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13381179 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 10734034 Country of ref document: EP Kind code of ref document: A1 |