WO2010144953A1 - A method of characterising a resource - Google Patents
A method of characterising a resource Download PDFInfo
- Publication number
- WO2010144953A1 WO2010144953A1 PCT/AU2010/000738 AU2010000738W WO2010144953A1 WO 2010144953 A1 WO2010144953 A1 WO 2010144953A1 AU 2010000738 W AU2010000738 W AU 2010000738W WO 2010144953 A1 WO2010144953 A1 WO 2010144953A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- property
- block
- resource
- calculating
- sample positions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. for interpretation or for event detection
- G01V1/30—Analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
Definitions
- the present invention broadly relates to a method of characterising a resource.
- a mining plan usually is established prior to mining a resource, such as iron ore or any other ore.
- a number of samples may be taken from drill holes and a property of the samples, such as an iron grade, is analysed. Statistical methods are then used to predict the property at locations in the proximity of the drill holes.
- Kriging is an established statistical method that is used for this purpose.
- kriging has significant disadvantages. For example, kriging systematically over- or underestimates values ("conditional bias").
- the present invention provides in a first aspect a method of characterising a resource in a block located in an area, the method comprising the steps of: providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block, the information being obtained from analyses of samples from the sample positions; modelling a change in the property along a distance at or within the block using the provided information; calculating parameters associated with the modelled change using
- Bayes' theorem and calculating a property characteristic of the resource for the block using the calculated parameters.
- block is used for a volume or body of material that may comprise the resource and typically has a predetermined width, length and depth.
- the block may be one of a plurality of blocks, such as adjacent blocks.
- each block may be a block of a mining area or an area that is to be characterised, such as an area for which a mining plan is established.
- the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with Bayesian inference.
- the resource may be an ore body, such as an iron ore or nickel ore body.
- the resource may comprise any other extractable substance.
- the property may for example be an ore grade, such as an iron ore grade or nickel ore grade.
- the property may for example be a density, a rock type, a material type, an ore type, an ore grade or combinations thereof.
- the method may comprise the additional step of providing an estimate of error of the parameter characteristic of the property for the block.
- the step of providing information concerning a property of the resource for a plurality of sample positions comprises providing samples from drill holes at the sample positions, which may comprise providing samples from more than 2, more than 5, more than 10, more than 20 or even more than 50 sample positions.
- the block is one of a plurality of adjacent blocks and each block may be a block of an area.
- drill holes may be placed at or near the boundary of adjacent blocks, such as at or near every second boundary.
- Embodiments of the present invention have significant commercial advantages. For example, it is possible to calculate the property for a block typically with error estimates. Further, conditional bias associated with ordinary kriging may be reduced or even largely avoided.
- the step of modelling the change in the property comprises obtaining a mean of the property and a covariance function c(x,xi -n ) of the property (x,xi -n : sample positions).
- the covariance function may be any suitable type of covariance function, but typically is a squared exponential - A -
- the step of calculating the property for the block comprises calculating an average for the block using the mean and the covariance function.
- the present invention provides in a second aspect a method of establishing a mining plan, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and selecting blocks for mining the resource.
- the present invention provides in a third aspect a method of guiding exploration of an area, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and guiding the exploration of the area.
- the method may also comprise the step of determining locations for sample positions at which samples are obtained from drill holes.
- the present invention provides in a fourth aspect a method of mining in which resources are extracted in accordance with the method of the first, second or third aspect of the present invention.
- Figure 1 is a flow diagram showing a method of characterising a resource in a block in accordance with an embodiment of the present invention
- Figure 2 is a top view of an area of land divided into blocks and showing drill holes corresponding to sample positions;
- Figure 3 is a graph of data points showing the position of each sample against a measured property of each sample for a 1 -dimensional example
- Figure 4 shows the graph of Figure 3 having a Gaussian process fitted to the data points to form a curve, and showing an estimated error for the curve;
- Figure 5 shows the graph of Figure 4 having sampled the curve at locations marked by circles
- FIG. 6 is a flow diagram showing a method of establishing a mining plan in accordance with a further embodiment of the present invention. Detailed Description of Specific Embodiments
- a method 10 of characterising a resource in a block generally comprises an initial step 12 of providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block.
- the information is obtained from analyses of samples from the sample positions.
- the resource is iron ore, and the property is iron ore grade. It will be appreciated that the resource may be any ore body, such as a nickel ore body, or the resource may comprise any other extractable substance.
- providing the information may comprise dividing an area of land 20 into blocks 22, and taking core samples from drill holes 24 at selected sample positions as shown in Figure 2. Each core sample is assayed to provide information regarding the iron ore grade at the sample positions corresponding to the drill holes 24.
- Each block 22 in this example measures 50 metres by 50 metres, and may further be given a depth so as to define a volume. It will be appreciated however that the size of each block 22 may be any size or shape, and the dimensions of each block 22 do not need to be uniform.
- the drill holes 24 are shown to be taken at positions corresponding to corners of the blocks 22, and are drilled in this example at 100 metre intervals. It will be appreciated, however, that the drill holes 24 may be taken at any other positions, including inside the blocks 22.
- the method comprises a second step 14 of modelling a change in the property along a distance at or within the block using the provided information.
- the method further comprises a third step 16 of calculating parameters associated with the modelled change using Bayes' theorem and a fourth step 18 of calculating a property for the block using the calculated parameters.
- the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with the Bayes 1 theorem.
- the Gaussian distribution can assist in making some of the calculations more convenient, however it will be appreciated that other distributions may be used.
- the Gaussian distribution it is assumed that a joint distribution of the iron ore grade as measured at each drill hole 24 is multivariate Gaussian.
- the change in the property i.e.: iron ore grade
- the change in the property can be modelled as a Gaussian process f(x) where x is representative of the sample position.
- the iron ore grades as measured at each drill hole 24 may also be obtained by calculating the Gaussian process f(x) for each value of x corresponding to respective drill holes 24.
- the Gaussian process f(x) may be defined by a corresponding mean function and a covahance function.
- the mean function is h(x) T B and the covariance function is c( ⁇ , ⁇ ) , where h(x) are a set of known functions and B are coefficients that may be determined from, for example, the core samples taken from corresponding drill holes 24, and where x and x' are values representative of sample locations of corresponding drill holes 24.
- the covariance function will comprise additional parameters. These additional parameters are also referred to as hyper-parameters.
- the hyper- parameters may control various aspects of the Gaussian process f(x).
- the covariance function in the Gaussian process f(x) is a squared exponential function. It will be appreciated, however, that the covariance function may alternatively be implemented as a neural network or as a Matern model. In the case where the covariance function is a squared exponential function, it will have the general form:
- K is a covariance function of Xi and X 2 ;
- xi and x 2 are variables that may, for example, be representative of sample positions corresponding to drill holes 24;
- ⁇ j is a smoothness parameter where, in general, ⁇ denotes variance and the subscript f denotes that the variance relates to a signal f, and / is a length scale.
- This function has two hyper parameters: ⁇ j , which is a smoothness parameter, and /, which is a length scale.
- the (hyper) parameters are determined from the samples by optimising an objective function known as the marginal likelihood. This function arrives in Bayesian statistics as a result of convolving the likelihood function with probability distributions over its parameters. The determination of the parameters as an optimisation procedure on the marginal likelihood is also referred to in the Gaussian process as learning the parameters.
- optimising the (log) marginal likelihood a trade-off between data fit and complexity is achieved resulting in parameters that generalise well to unobserved data. This, in turn, provides accurate covariance functions that aptly model property changes in each direction.
- an estimate of an average value of the iron ore grade over a volume V is calculated by determining the average of Gaussian process f(x) over volume V.
- f(x) is a Gaussian process with a mean h(x) T B and covariance function c(x,x )
- c(x,x ) covariance function c(x,x )
- H contains the values of the known functions h(x) at the
- B is a matrix that contains the coefficients for h(x), in this case known;
- A is a matrix containing the covariances between the data locations
- Equation 5 is the average of the mean function over volume V; T is the average covariance between all the points in volume V and all the data locations; and U corresponds to the variance of the volume V.
- Equation 2 If it is assumed that B (the coefficients for h(x) ) is unknown and ⁇ f 2 (the smoothness parameter for the covariance function) is known, then the integral k is normal distributed with mean and variance given by Equations 8 and 9 (below). Within the Gaussian process framework information available beforehand (before the analysis is carried out) about unknown parameters is determined through a prior distribution. In this case for B, a non informative prior is used as a starting point to derive the equations below. A non-informative prior distributions makes inferences that are not greatly affected by external information or when external information is not available.
- B is a matrix that contains the estimated values for the coefficients B from the samples having the form:
- Equations 5, 6, and 7 the integrals R, T and U are as per Equations 5, 6, and 7 and have closed form solutions when p(x) is Gaussian or a finite mixture of Gaussian distributions and when the covariance function is the squared exponential function.
- Gaussian distributions wherein ⁇ , are weights that are given to each Gaussian distribution
- P 1 (X) ⁇ 7V(/w,, v,) indicates that /?,(*) is drawn from a Gaussian distribution with mean m, and variance v, ;
- I represents the number of Gaussian distributions that make up the mixture
- i,j in Equation 15 and 16 are counters that loop over the number of Gaussian distributions that make up the mixture and wherein the maximum value i and j may both have is I
- x m are the locations where the Gaussian process f(x) is sampled, for example at sample points 52 as shown and described later with reference to Figure 5.
- Figure 3 shows a graph 30 comprising an x-axis 32 measuring the sample position of a sample, for example the position a core sample taken from drill holes 24 along a line passing through a block 22.
- the y-axis 34 corresponds to a parameter that has been measured, for example an assayed ore grade, from the core samples of each drill hole 24.
- the scales are arbitrary in this example, it will be appreciated that the scales may correspond to real measurements.
- the graph comprises a plurality of data points 36 corresponding to information derived from a plurality of drill holes 24.
- Figure 4 shows the curve 42 corresponding to a fitted Gaussian process f(x) having been fitted in accordance with the above. Since the curve 42 has been fitted by a statistical process, it is also possible to show an error 44 associated with the fitting of the curve to the data points 36. In this example, the error 44 is shown as a shaded area in Figure 4 and corresponds to twice the standard deviation of the Gaussian process f(x).
- the fitted Gaussian process f(x) may be sampled at sample points 52 so as to calculate an average value of the parameter (i.e.: the iron ore grade) over a particular length interval, in this case between -3 and 5 of the x-axis 32 as shown by a black bar 54.
- the mean and variance of the distribution of integral k is calculated over the interval -3 to 5.
- the mean is calculated as -0.3189 and the variance of the distribution of the integral k is calculated as 0.0206.
- the mean would be the average iron ore grade over the interval -3 and 5
- the variance would be related to an error parameter that provides an indication of the accuracy of the calculated mean. Since the distribution for integral k is Gaussian, it is completely defined by the calculated mean and variance.
- the method 60 comprises the first step 62 of evaluating a parameter characteristic of a property of a resource in a plurality of respective blocks, the parameter being calculated using method 10; and a second step 64 of selecting blocks for mining the resource based on the evaluation of the first step 62.
- the mean of the iron ore grade is sufficient for mining a block to be economically viable.
- the error parameter associated with the mean of the iron ore grade in a first block is beyond a threshold of risk, then it may be decided that the first block be mined along with a second block having a substantially smaller error parameter so as to minimise the risk associated with mining the first block.
- the error parameter is too high for a decision to be made with sufficient certainty.
- the third and fourth steps 16, 18 may be conducted again so as to assist in the method 60 of selecting the block for possible mining.
- a variation of the method 60 may also be used for guiding exploration, such as for guiding the selection of locations for drill holes.
- the invention has been described with reference to particular examples, it will be appreciated by those skilled in the art that the invention may be embodied in many other forms.
- the method may be applied to other ore bodies, for example nickel ore bodies, or to other extractable resources.
- Other appropriate statistical distributions may be used, and the methods for evaluating integrals for such distributions need not be restricted to those described in the foregoing description.
- the samples need not be taken from drill holes, and may be extracted in other fashions.
- Information relating to the parameter, for example iron ore grade may be obtained in ways other than analysing samples that have been extracted.
- the blocks may be of any shape arid size. Further, a block may be any combination of blocks, or alternatively may be a subdivision of a block. The samples may be taken from any number of positions and be taken from any distribution of positions.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Marine Sciences & Fisheries (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Animal Husbandry (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geophysics And Detection Of Objects (AREA)
- Complex Calculations (AREA)
- Mobile Radio Communication Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/378,964 US9449351B2 (en) | 2009-06-17 | 2010-06-15 | Method of characterising a resource |
| AU2010262748A AU2010262748B2 (en) | 2009-06-17 | 2010-06-15 | A method of characterising a resource |
| CA2765246A CA2765246C (en) | 2009-06-17 | 2010-06-15 | A method of characterising a resource |
| BRPI1015041-2A BRPI1015041B1 (en) | 2009-06-17 | 2010-06-15 | METHOD FOR ASSESSING A PROPERTY OF A RESOURCE IN A BLOCK LOCATED IN AN EARTH AREA, METHOD FOR ESTABLISHING A MINING PLAN AND METHOD FOR GUIDING EXPLORATION OF AN AREA |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2009902773A AU2009902773A0 (en) | 2009-06-17 | A method of characterising a resource | |
| AU2009902773 | 2009-06-17 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2010144953A1 true WO2010144953A1 (en) | 2010-12-23 |
Family
ID=43355597
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/AU2010/000738 Ceased WO2010144953A1 (en) | 2009-06-17 | 2010-06-15 | A method of characterising a resource |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9449351B2 (en) |
| AU (1) | AU2010262748B2 (en) |
| BR (1) | BRPI1015041B1 (en) |
| CA (1) | CA2765246C (en) |
| WO (1) | WO2010144953A1 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8930170B2 (en) * | 2009-11-18 | 2015-01-06 | Conocophillips Company | Attribute importance measure for parametric multivariate modeling |
| WO2014134655A1 (en) * | 2013-03-05 | 2014-09-12 | Technological Resources Pty Ltd | Estimating material properties |
| WO2019136511A1 (en) * | 2018-01-09 | 2019-07-18 | Technological Resources Pty. Limited | Mining system |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060190219A1 (en) * | 2002-10-09 | 2006-08-24 | Froyland Gary A | System and method(s) of mine planning, design and processing |
| US20070185750A1 (en) * | 2004-06-21 | 2007-08-09 | Merab Menabde | Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule |
| US7373251B2 (en) * | 2004-12-22 | 2008-05-13 | Marathon Oil Company | Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data |
| US20090256412A1 (en) * | 2008-03-04 | 2009-10-15 | Nieto Juan | Scanning system for 3d mineralogy modelling |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4370552A (en) * | 1980-10-31 | 1983-01-25 | Li Chou H | Method for ore prospecting |
| AU2002951892A0 (en) * | 2002-10-09 | 2002-10-24 | Bhp Billiton Innovation Pty Ltd | Mining process and design |
| US8346482B2 (en) * | 2003-08-22 | 2013-01-01 | Fernandez Dennis S | Integrated biosensor and simulation system for diagnosis and therapy |
| WO2006108213A1 (en) * | 2005-04-11 | 2006-10-19 | Bhp Billiton Innovation Pty Ltd | Mining optimisation |
| WO2008010174A2 (en) * | 2006-07-19 | 2008-01-24 | Petrus Christiaan Gouws | Dust particle catcher for a drilling apparatus |
| US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
| US7983490B1 (en) * | 2007-12-20 | 2011-07-19 | Thomas Cecil Minter | Adaptive Bayes pattern recognition |
| US7961955B1 (en) * | 2008-01-28 | 2011-06-14 | Thomas Cecil Minter | Adaptive bayes feature extraction |
| CN101557452B (en) * | 2008-03-04 | 2013-06-05 | 悉尼大学 | Scanning system for 3d mineralogy modelling |
| US7979363B1 (en) * | 2008-03-06 | 2011-07-12 | Thomas Cecil Minter | Priori probability and probability of error estimation for adaptive bayes pattern recognition |
-
2010
- 2010-06-15 AU AU2010262748A patent/AU2010262748B2/en active Active
- 2010-06-15 BR BRPI1015041-2A patent/BRPI1015041B1/en active IP Right Grant
- 2010-06-15 WO PCT/AU2010/000738 patent/WO2010144953A1/en not_active Ceased
- 2010-06-15 US US13/378,964 patent/US9449351B2/en active Active
- 2010-06-15 CA CA2765246A patent/CA2765246C/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060190219A1 (en) * | 2002-10-09 | 2006-08-24 | Froyland Gary A | System and method(s) of mine planning, design and processing |
| US20070185750A1 (en) * | 2004-06-21 | 2007-08-09 | Merab Menabde | Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule |
| US7373251B2 (en) * | 2004-12-22 | 2008-05-13 | Marathon Oil Company | Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data |
| US20090256412A1 (en) * | 2008-03-04 | 2009-10-15 | Nieto Juan | Scanning system for 3d mineralogy modelling |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2010262748B2 (en) | 2016-05-12 |
| CA2765246A1 (en) | 2010-12-23 |
| US20120205963A1 (en) | 2012-08-16 |
| CA2765246C (en) | 2021-01-05 |
| BRPI1015041A2 (en) | 2019-07-09 |
| US9449351B2 (en) | 2016-09-20 |
| BRPI1015041B1 (en) | 2020-11-24 |
| AU2010262748A1 (en) | 2011-12-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Jiang et al. | Bayesian updating of slope reliability in spatially variable soils with in-situ measurements | |
| Wang et al. | Spatial and temporal prediction and uncertainty of soil loss using the revised universal soil loss equation: a case study of the rainfall–runoff erosivity R factor | |
| Hassan et al. | Uncertainty assessment of a stochastic groundwater flow model using GLUE analysis | |
| Kerrou et al. | Issues in characterizing heterogeneity and connectivity in non-multiGaussian media | |
| Emamgholizadeh et al. | Comparison of artificial neural networks, geographically weighted regression and Cokriging methods for predicting the spatial distribution of soil macronutrients (N, P, and K) | |
| Tadjer et al. | Bayesian deep decline curve analysis: A new approach for well oil production modeling and forecasting | |
| Song et al. | Probabilistic assessment of earthquake-induced landslide hazard including the effects of ground motion directionality | |
| Ozkan et al. | Fuzzy logic approach in resource classification | |
| Madi et al. | Bayesian prediction of rainfall records using the generalized exponential distribution | |
| Masoumi et al. | Improvement of water table interpolation and groundwater storage volume using fuzzy computations | |
| CA2765246C (en) | A method of characterising a resource | |
| Chebbi et al. | Optimal extension of rain gauge monitoring network for rainfall intensity and erosivity index interpolation | |
| Faraone et al. | Design methodology for site-specific resistance factors based on foundation location and size | |
| McKenna et al. | Non-uniqueness of inverse transmissivity field calibration and predictive transport modeling | |
| Vatanchi et al. | Calibration and uncertainty analysis for isovel contours-based stage-discharge rating curve by sequential uncertainty fitting (SUFI-2) method | |
| Parasyris et al. | A decision support tool for optimising groundwater-level monitoring networks using an adaptive genetic algorithm | |
| Liu et al. | Regional characterization of vs30 with hybrid geotechnical and geological data | |
| Kim et al. | Influence of estimation method of compression index on spatial distribution of consolidation settlement in Songdo New City | |
| Spremić et al. | Local conditioning in posterior sampling methods with example cases in subsurface inversion | |
| Boyd et al. | Geostatistical estimation of Ground Class prior to and during excavation for the Caldecott Tunnel Fourth Bore project | |
| Bickel | Discretization, simulation, and the value of information | |
| Sarkar | Geostatistics in groundwater Modelling | |
| Moreno et al. | Machine Learning Regressors: An Alternative to Compact Grades Information, Generate Secondary Information, and Improve the Density Block Models | |
| Wambeke et al. | An integrated approach to simulate and validate orebody realizations with complex trends: A case study in heavy mineral sands | |
| Asghari et al. | Determining the optimum search range for 2D and 3D mapping based on kriging through quantitative analysis. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10788498 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2010262748 Country of ref document: AU |
|
| ENP | Entry into the national phase |
Ref document number: 2010262748 Country of ref document: AU Date of ref document: 20100615 Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2765246 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13378964 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 10788498 Country of ref document: EP Kind code of ref document: A1 |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: PI1015041 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: PI1015041 Country of ref document: BR Kind code of ref document: A2 Effective date: 20111219 |




