WO2010144953A1 - A method of characterising a resource - Google Patents

A method of characterising a resource Download PDF

Info

Publication number
WO2010144953A1
WO2010144953A1 PCT/AU2010/000738 AU2010000738W WO2010144953A1 WO 2010144953 A1 WO2010144953 A1 WO 2010144953A1 AU 2010000738 W AU2010000738 W AU 2010000738W WO 2010144953 A1 WO2010144953 A1 WO 2010144953A1
Authority
WO
WIPO (PCT)
Prior art keywords
property
block
resource
calculating
sample positions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/AU2010/000738
Other languages
French (fr)
Inventor
Arja Jogita Jewbali
Arman Melkumyan
Fabio Ramos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technological Resources Pty Ltd
University of Sydney
Original Assignee
Technological Resources Pty Ltd
University of Sydney
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2009902773A external-priority patent/AU2009902773A0/en
Application filed by Technological Resources Pty Ltd, University of Sydney filed Critical Technological Resources Pty Ltd
Priority to US13/378,964 priority Critical patent/US9449351B2/en
Priority to AU2010262748A priority patent/AU2010262748B2/en
Priority to CA2765246A priority patent/CA2765246C/en
Priority to BRPI1015041-2A priority patent/BRPI1015041B1/en
Publication of WO2010144953A1 publication Critical patent/WO2010144953A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling

Definitions

  • the present invention broadly relates to a method of characterising a resource.
  • a mining plan usually is established prior to mining a resource, such as iron ore or any other ore.
  • a number of samples may be taken from drill holes and a property of the samples, such as an iron grade, is analysed. Statistical methods are then used to predict the property at locations in the proximity of the drill holes.
  • Kriging is an established statistical method that is used for this purpose.
  • kriging has significant disadvantages. For example, kriging systematically over- or underestimates values ("conditional bias").
  • the present invention provides in a first aspect a method of characterising a resource in a block located in an area, the method comprising the steps of: providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block, the information being obtained from analyses of samples from the sample positions; modelling a change in the property along a distance at or within the block using the provided information; calculating parameters associated with the modelled change using
  • Bayes' theorem and calculating a property characteristic of the resource for the block using the calculated parameters.
  • block is used for a volume or body of material that may comprise the resource and typically has a predetermined width, length and depth.
  • the block may be one of a plurality of blocks, such as adjacent blocks.
  • each block may be a block of a mining area or an area that is to be characterised, such as an area for which a mining plan is established.
  • the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with Bayesian inference.
  • the resource may be an ore body, such as an iron ore or nickel ore body.
  • the resource may comprise any other extractable substance.
  • the property may for example be an ore grade, such as an iron ore grade or nickel ore grade.
  • the property may for example be a density, a rock type, a material type, an ore type, an ore grade or combinations thereof.
  • the method may comprise the additional step of providing an estimate of error of the parameter characteristic of the property for the block.
  • the step of providing information concerning a property of the resource for a plurality of sample positions comprises providing samples from drill holes at the sample positions, which may comprise providing samples from more than 2, more than 5, more than 10, more than 20 or even more than 50 sample positions.
  • the block is one of a plurality of adjacent blocks and each block may be a block of an area.
  • drill holes may be placed at or near the boundary of adjacent blocks, such as at or near every second boundary.
  • Embodiments of the present invention have significant commercial advantages. For example, it is possible to calculate the property for a block typically with error estimates. Further, conditional bias associated with ordinary kriging may be reduced or even largely avoided.
  • the step of modelling the change in the property comprises obtaining a mean of the property and a covariance function c(x,xi -n ) of the property (x,xi -n : sample positions).
  • the covariance function may be any suitable type of covariance function, but typically is a squared exponential - A -
  • the step of calculating the property for the block comprises calculating an average for the block using the mean and the covariance function.
  • the present invention provides in a second aspect a method of establishing a mining plan, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and selecting blocks for mining the resource.
  • the present invention provides in a third aspect a method of guiding exploration of an area, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and guiding the exploration of the area.
  • the method may also comprise the step of determining locations for sample positions at which samples are obtained from drill holes.
  • the present invention provides in a fourth aspect a method of mining in which resources are extracted in accordance with the method of the first, second or third aspect of the present invention.
  • Figure 1 is a flow diagram showing a method of characterising a resource in a block in accordance with an embodiment of the present invention
  • Figure 2 is a top view of an area of land divided into blocks and showing drill holes corresponding to sample positions;
  • Figure 3 is a graph of data points showing the position of each sample against a measured property of each sample for a 1 -dimensional example
  • Figure 4 shows the graph of Figure 3 having a Gaussian process fitted to the data points to form a curve, and showing an estimated error for the curve;
  • Figure 5 shows the graph of Figure 4 having sampled the curve at locations marked by circles
  • FIG. 6 is a flow diagram showing a method of establishing a mining plan in accordance with a further embodiment of the present invention. Detailed Description of Specific Embodiments
  • a method 10 of characterising a resource in a block generally comprises an initial step 12 of providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block.
  • the information is obtained from analyses of samples from the sample positions.
  • the resource is iron ore, and the property is iron ore grade. It will be appreciated that the resource may be any ore body, such as a nickel ore body, or the resource may comprise any other extractable substance.
  • providing the information may comprise dividing an area of land 20 into blocks 22, and taking core samples from drill holes 24 at selected sample positions as shown in Figure 2. Each core sample is assayed to provide information regarding the iron ore grade at the sample positions corresponding to the drill holes 24.
  • Each block 22 in this example measures 50 metres by 50 metres, and may further be given a depth so as to define a volume. It will be appreciated however that the size of each block 22 may be any size or shape, and the dimensions of each block 22 do not need to be uniform.
  • the drill holes 24 are shown to be taken at positions corresponding to corners of the blocks 22, and are drilled in this example at 100 metre intervals. It will be appreciated, however, that the drill holes 24 may be taken at any other positions, including inside the blocks 22.
  • the method comprises a second step 14 of modelling a change in the property along a distance at or within the block using the provided information.
  • the method further comprises a third step 16 of calculating parameters associated with the modelled change using Bayes' theorem and a fourth step 18 of calculating a property for the block using the calculated parameters.
  • the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with the Bayes 1 theorem.
  • the Gaussian distribution can assist in making some of the calculations more convenient, however it will be appreciated that other distributions may be used.
  • the Gaussian distribution it is assumed that a joint distribution of the iron ore grade as measured at each drill hole 24 is multivariate Gaussian.
  • the change in the property i.e.: iron ore grade
  • the change in the property can be modelled as a Gaussian process f(x) where x is representative of the sample position.
  • the iron ore grades as measured at each drill hole 24 may also be obtained by calculating the Gaussian process f(x) for each value of x corresponding to respective drill holes 24.
  • the Gaussian process f(x) may be defined by a corresponding mean function and a covahance function.
  • the mean function is h(x) T B and the covariance function is c( ⁇ , ⁇ ) , where h(x) are a set of known functions and B are coefficients that may be determined from, for example, the core samples taken from corresponding drill holes 24, and where x and x' are values representative of sample locations of corresponding drill holes 24.
  • the covariance function will comprise additional parameters. These additional parameters are also referred to as hyper-parameters.
  • the hyper- parameters may control various aspects of the Gaussian process f(x).
  • the covariance function in the Gaussian process f(x) is a squared exponential function. It will be appreciated, however, that the covariance function may alternatively be implemented as a neural network or as a Matern model. In the case where the covariance function is a squared exponential function, it will have the general form:
  • K is a covariance function of Xi and X 2 ;
  • xi and x 2 are variables that may, for example, be representative of sample positions corresponding to drill holes 24;
  • ⁇ j is a smoothness parameter where, in general, ⁇ denotes variance and the subscript f denotes that the variance relates to a signal f, and / is a length scale.
  • This function has two hyper parameters: ⁇ j , which is a smoothness parameter, and /, which is a length scale.
  • the (hyper) parameters are determined from the samples by optimising an objective function known as the marginal likelihood. This function arrives in Bayesian statistics as a result of convolving the likelihood function with probability distributions over its parameters. The determination of the parameters as an optimisation procedure on the marginal likelihood is also referred to in the Gaussian process as learning the parameters.
  • optimising the (log) marginal likelihood a trade-off between data fit and complexity is achieved resulting in parameters that generalise well to unobserved data. This, in turn, provides accurate covariance functions that aptly model property changes in each direction.
  • an estimate of an average value of the iron ore grade over a volume V is calculated by determining the average of Gaussian process f(x) over volume V.
  • f(x) is a Gaussian process with a mean h(x) T B and covariance function c(x,x )
  • c(x,x ) covariance function c(x,x )
  • H contains the values of the known functions h(x) at the
  • B is a matrix that contains the coefficients for h(x), in this case known;
  • A is a matrix containing the covariances between the data locations
  • Equation 5 is the average of the mean function over volume V; T is the average covariance between all the points in volume V and all the data locations; and U corresponds to the variance of the volume V.
  • Equation 2 If it is assumed that B (the coefficients for h(x) ) is unknown and ⁇ f 2 (the smoothness parameter for the covariance function) is known, then the integral k is normal distributed with mean and variance given by Equations 8 and 9 (below). Within the Gaussian process framework information available beforehand (before the analysis is carried out) about unknown parameters is determined through a prior distribution. In this case for B, a non informative prior is used as a starting point to derive the equations below. A non-informative prior distributions makes inferences that are not greatly affected by external information or when external information is not available.
  • B is a matrix that contains the estimated values for the coefficients B from the samples having the form:
  • Equations 5, 6, and 7 the integrals R, T and U are as per Equations 5, 6, and 7 and have closed form solutions when p(x) is Gaussian or a finite mixture of Gaussian distributions and when the covariance function is the squared exponential function.
  • Gaussian distributions wherein ⁇ , are weights that are given to each Gaussian distribution
  • P 1 (X) ⁇ 7V(/w,, v,) indicates that /?,(*) is drawn from a Gaussian distribution with mean m, and variance v, ;
  • I represents the number of Gaussian distributions that make up the mixture
  • i,j in Equation 15 and 16 are counters that loop over the number of Gaussian distributions that make up the mixture and wherein the maximum value i and j may both have is I
  • x m are the locations where the Gaussian process f(x) is sampled, for example at sample points 52 as shown and described later with reference to Figure 5.
  • Figure 3 shows a graph 30 comprising an x-axis 32 measuring the sample position of a sample, for example the position a core sample taken from drill holes 24 along a line passing through a block 22.
  • the y-axis 34 corresponds to a parameter that has been measured, for example an assayed ore grade, from the core samples of each drill hole 24.
  • the scales are arbitrary in this example, it will be appreciated that the scales may correspond to real measurements.
  • the graph comprises a plurality of data points 36 corresponding to information derived from a plurality of drill holes 24.
  • Figure 4 shows the curve 42 corresponding to a fitted Gaussian process f(x) having been fitted in accordance with the above. Since the curve 42 has been fitted by a statistical process, it is also possible to show an error 44 associated with the fitting of the curve to the data points 36. In this example, the error 44 is shown as a shaded area in Figure 4 and corresponds to twice the standard deviation of the Gaussian process f(x).
  • the fitted Gaussian process f(x) may be sampled at sample points 52 so as to calculate an average value of the parameter (i.e.: the iron ore grade) over a particular length interval, in this case between -3 and 5 of the x-axis 32 as shown by a black bar 54.
  • the mean and variance of the distribution of integral k is calculated over the interval -3 to 5.
  • the mean is calculated as -0.3189 and the variance of the distribution of the integral k is calculated as 0.0206.
  • the mean would be the average iron ore grade over the interval -3 and 5
  • the variance would be related to an error parameter that provides an indication of the accuracy of the calculated mean. Since the distribution for integral k is Gaussian, it is completely defined by the calculated mean and variance.
  • the method 60 comprises the first step 62 of evaluating a parameter characteristic of a property of a resource in a plurality of respective blocks, the parameter being calculated using method 10; and a second step 64 of selecting blocks for mining the resource based on the evaluation of the first step 62.
  • the mean of the iron ore grade is sufficient for mining a block to be economically viable.
  • the error parameter associated with the mean of the iron ore grade in a first block is beyond a threshold of risk, then it may be decided that the first block be mined along with a second block having a substantially smaller error parameter so as to minimise the risk associated with mining the first block.
  • the error parameter is too high for a decision to be made with sufficient certainty.
  • the third and fourth steps 16, 18 may be conducted again so as to assist in the method 60 of selecting the block for possible mining.
  • a variation of the method 60 may also be used for guiding exploration, such as for guiding the selection of locations for drill holes.
  • the invention has been described with reference to particular examples, it will be appreciated by those skilled in the art that the invention may be embodied in many other forms.
  • the method may be applied to other ore bodies, for example nickel ore bodies, or to other extractable resources.
  • Other appropriate statistical distributions may be used, and the methods for evaluating integrals for such distributions need not be restricted to those described in the foregoing description.
  • the samples need not be taken from drill holes, and may be extracted in other fashions.
  • Information relating to the parameter, for example iron ore grade may be obtained in ways other than analysing samples that have been extracted.
  • the blocks may be of any shape arid size. Further, a block may be any combination of blocks, or alternatively may be a subdivision of a block. The samples may be taken from any number of positions and be taken from any distribution of positions.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Animal Husbandry (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Complex Calculations (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present disclosure provides a method of characterising a resource in a block located in an area. The method comprises the step of providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block. The information is obtained from analyses of samples from the sample positions. The method further comprises modelling a change in the property along a distance at or within the block using the provided information. The method also comprises calculating parameters associated with the modelled change using Bayes' theorem and calculating a property characteristic of the resource for the block using the calculated parameters.

Description

A METHOD OF CHARACTERISING A RESOURCE
Field of the Invention
The present invention broadly relates to a method of characterising a resource.
Background of the Invention
A mining plan usually is established prior to mining a resource, such as iron ore or any other ore. A number of samples may be taken from drill holes and a property of the samples, such as an iron grade, is analysed. Statistical methods are then used to predict the property at locations in the proximity of the drill holes.
Kriging is an established statistical method that is used for this purpose. However, kriging has significant disadvantages. For example, kriging systematically over- or underestimates values ("conditional bias").
Summary of the Invention
The present invention provides in a first aspect a method of characterising a resource in a block located in an area, the method comprising the steps of: providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block, the information being obtained from analyses of samples from the sample positions; modelling a change in the property along a distance at or within the block using the provided information; calculating parameters associated with the modelled change using
Bayes' theorem; and calculating a property characteristic of the resource for the block using the calculated parameters.
Throughout this specification the term "block" is used for a volume or body of material that may comprise the resource and typically has a predetermined width, length and depth.
The block may be one of a plurality of blocks, such as adjacent blocks. For example, each block may be a block of a mining area or an area that is to be characterised, such as an area for which a mining plan is established.
In one specific embodiment the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with Bayesian inference.
The resource may be an ore body, such as an iron ore or nickel ore body. Alternatively, the resource may comprise any other extractable substance.
The property may for example be an ore grade, such as an iron ore grade or nickel ore grade. Alternatively, the property may for example be a density, a rock type, a material type, an ore type, an ore grade or combinations thereof.
The method may comprise the additional step of providing an estimate of error of the parameter characteristic of the property for the block.
In one specific embodiment the step of providing information concerning a property of the resource for a plurality of sample positions comprises providing samples from drill holes at the sample positions, which may comprise providing samples from more than 2, more than 5, more than 10, more than 20 or even more than 50 sample positions. In this embodiment the block is one of a plurality of adjacent blocks and each block may be a block of an area. For example, drill holes may be placed at or near the boundary of adjacent blocks, such as at or near every second boundary.
Embodiments of the present invention have significant commercial advantages. For example, it is possible to calculate the property for a block typically with error estimates. Further, conditional bias associated with ordinary kriging may be reduced or even largely avoided.
In one specific example the step of modelling the change in the property comprises obtaining a mean of the property and a covariance function c(x,xi-n) of the property (x,xi-n: sample positions). The covariance function may be any suitable type of covariance function, but typically is a squared exponential - A -
covariance function. In this example the step of calculating the property for the block comprises calculating an average for the block using the mean and the covariance function.
The present invention provides in a second aspect a method of establishing a mining plan, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and selecting blocks for mining the resource.
The present invention provides in a third aspect a method of guiding exploration of an area, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with the first aspect of the present invention; evaluating the property; and guiding the exploration of the area.
The method may also comprise the step of determining locations for sample positions at which samples are obtained from drill holes.
The present invention provides in a fourth aspect a method of mining in which resources are extracted in accordance with the method of the first, second or third aspect of the present invention. The invention will be more fully understood from the following description of specific embodiments of the invention. The description is provided with reference to the accompanying drawings.
Brief Description of the Drawings
Figure 1 is a flow diagram showing a method of characterising a resource in a block in accordance with an embodiment of the present invention;
Figure 2 is a top view of an area of land divided into blocks and showing drill holes corresponding to sample positions;
Figure 3 is a graph of data points showing the position of each sample against a measured property of each sample for a 1 -dimensional example;
Figure 4 shows the graph of Figure 3 having a Gaussian process fitted to the data points to form a curve, and showing an estimated error for the curve; and
Figure 5 shows the graph of Figure 4 having sampled the curve at locations marked by circles; and
Figure 6 is a flow diagram showing a method of establishing a mining plan in accordance with a further embodiment of the present invention. Detailed Description of Specific Embodiments
Specific embodiments of the present invention are initially described with reference to Figures 1 to 5.
A method 10 of characterising a resource in a block, as illustrated in Figure 1 , generally comprises an initial step 12 of providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block. The information is obtained from analyses of samples from the sample positions.
In one example, the resource is iron ore, and the property is iron ore grade. It will be appreciated that the resource may be any ore body, such as a nickel ore body, or the resource may comprise any other extractable substance.
For the example, where the resource is iron ore, providing the information may comprise dividing an area of land 20 into blocks 22, and taking core samples from drill holes 24 at selected sample positions as shown in Figure 2. Each core sample is assayed to provide information regarding the iron ore grade at the sample positions corresponding to the drill holes 24.
Each block 22 in this example measures 50 metres by 50 metres, and may further be given a depth so as to define a volume. It will be appreciated however that the size of each block 22 may be any size or shape, and the dimensions of each block 22 do not need to be uniform. The drill holes 24 are shown to be taken at positions corresponding to corners of the blocks 22, and are drilled in this example at 100 metre intervals. It will be appreciated, however, that the drill holes 24 may be taken at any other positions, including inside the blocks 22.
The method comprises a second step 14 of modelling a change in the property along a distance at or within the block using the provided information. The method further comprises a third step 16 of calculating parameters associated with the modelled change using Bayes' theorem and a fourth step 18 of calculating a property for the block using the calculated parameters.
In one embodiment, the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with the Bayes1 theorem. The Gaussian distribution can assist in making some of the calculations more convenient, however it will be appreciated that other distributions may be used. When the Gaussian distribution is used, it is assumed that a joint distribution of the iron ore grade as measured at each drill hole 24 is multivariate Gaussian.
In the present embodiment, the change in the property (i.e.: iron ore grade) can be modelled as a Gaussian process f(x) where x is representative of the sample position. The iron ore grades as measured at each drill hole 24 may also be obtained by calculating the Gaussian process f(x) for each value of x corresponding to respective drill holes 24. The Gaussian process f(x) may be defined by a corresponding mean function and a covahance function. For the Gaussian process f(x) it may be assumed that the mean function is h(x)TB and the covariance function is c(χ,χ ) , where h(x) are a set of known functions and B are coefficients that may be determined from, for example, the core samples taken from corresponding drill holes 24, and where x and x' are values representative of sample locations of corresponding drill holes 24.
In general, the covariance function will comprise additional parameters. These additional parameters are also referred to as hyper-parameters. The hyper- parameters may control various aspects of the Gaussian process f(x). In one example, the covariance function in the Gaussian process f(x) is a squared exponential function. It will be appreciated, however, that the covariance function may alternatively be implemented as a neural network or as a Matern model. In the case where the covariance function is a squared exponential function, it will have the general form:
K(X1 5X2) -X2)2) Eqn. 1
Figure imgf000009_0001
Where: K is a covariance function of Xi and X2; xi and x2 are variables that may, for example, be representative of sample positions corresponding to drill holes 24; σj is a smoothness parameter where, in general, σ denotes variance and the subscript f denotes that the variance relates to a signal f, and / is a length scale.
This function has two hyper parameters: σj , which is a smoothness parameter, and /, which is a length scale. The (hyper) parameters are determined from the samples by optimising an objective function known as the marginal likelihood. This function arrives in Bayesian statistics as a result of convolving the likelihood function with probability distributions over its parameters. The determination of the parameters as an optimisation procedure on the marginal likelihood is also referred to in the Gaussian process as learning the parameters. By optimising the (log) marginal likelihood, a trade-off between data fit and complexity is achieved resulting in parameters that generalise well to unobserved data. This, in turn, provides accurate covariance functions that aptly model property changes in each direction.
After an appropriate covariance function and parameters have been provided, the property for the block is calculated. In this embodiment, an estimate of an average value of the iron ore grade over a volume V, for example the volume of a block 22, is calculated by determining the average of Gaussian process f(x) over volume V.
The above may be written as an integral k:
Figure imgf000011_0001
Where: k is an integral for determining the average of Gaussian process f(x) over volume V p{x) is a probability density function (i.e.: J p(x) = 1); and f(x)is a Gaussian process.
By assuming that f(x) is a Gaussian process with a mean h(x)TB and covariance function c(x,x ) , it is possible to derive a distribution for integral k. This can be done by first sampling the fitted Gaussian process at locations X15X2-^-Xn to find f = f(x,),f(x2)....f(xn).
The distribution of the integral k depends on the following three assumptions:
Assumption 1:
If it is assumed that B (the coefficients for h(x)) and σj (the smoothness parameter for the covariance function) are known, then the integral k is normal distributed with a mean and a variance given by Equations 3 and 4(below):
mean = RB + TA"1 (f - HB) Eqn. 3 var = σf 2(U -TA Tτ) Eqn. 4
Where :
Ji(X1 )1
H = contains the values of the known functions h(x) at the
Mxn )1
sampled locations χ,,χ2....xn ;
B is a matrix that contains the coefficients for h(x), in this case known; A is a matrix containing the covariances between the data locations
Xj , X2 ••••Xg ,
Figure imgf000012_0001
cov(x, x 1}
With t(x) representing a covariance matrix given by: ; and cov(x,xn)
U = Jc(x,x')p(x)p(x')dxdx' Eqn. 7
Regarding Equations 5, 6 and 7: R is the average of the mean function over volume V; T is the average covariance between all the points in volume V and all the data locations; and U corresponds to the variance of the volume V.
Assumption 2: If it is assumed that B (the coefficients for h(x) ) is unknown and σf 2 (the smoothness parameter for the covariance function) is known, then the integral k is normal distributed with mean and variance given by Equations 8 and 9 (below). Within the Gaussian process framework information available beforehand (before the analysis is carried out) about unknown parameters is determined through a prior distribution. In this case for B, a non informative prior is used as a starting point to derive the equations below. A non-informative prior distributions makes inferences that are not greatly affected by external information or when external information is not available.
mean = RB+ TA '(f -HB) Eqn. 8 var = σf 2(U-TA 1T^(R-TA 1H)(H7A 1H) '(R-TA 'H)τ) Eqn. 9
Where B is a matrix that contains the estimated values for the coefficients B from the samples having the form:
B = (H1A 1 H) 1H1A 'f Eqn. 10
The values for R, T and U are as per equations 5, 6 and 7 as used in the case for Assumption 1. In Assumption 2, variance is larger due to not knowing the B coefficients.
Assumption 3: If it is assumed that both B (the coefficients for h(χ)) and σ) (the smoothness parameter for the covariance function) are unknown then the distribution of integral k is a t-distribution with (n-q) degrees of freedom where n is the number of data locations Xj,x2....xn and q is the number of functions in h(x) . The mean and variance of k axe given in Equations 11 and 12 (below). In this case, prior information about the behaviour of B and σj is obtained by assuming a non informative prior as a starting point to derive the equations below:
mean = RB+ TA '(f - HB) ; Eqn. 11 var = d(U -TA 1T7 + (R -TA 1H)(H1A 1H) J (R -TA 1Hf) ; Eqn. 12 and
(I = ^(A 1 - A-1H(H1A 1H) 1 HTA 1Jf , Eqn. 13
In an example shown in Figures 3 to 5, Assumption 2 is used as it is assumed that the Gaussian process has been fitted to the data and that σj is thus known. It will be appreciated that this is just one example, and has been used for ease of calculation. With the different assumptions, the method can thus account for uncertainty in the parameters B and σj .
In this case, the integrals R, T and U are as per Equations 5, 6, and 7 and have closed form solutions when p(x) is Gaussian or a finite mixture of Gaussian distributions and when the covariance function is the squared exponential function. When p(x) is a finite mixture of Gaussian distributions i.e. P(χ) = λlρ,(x) with P1(X)-N(Jn1JV1), ∑λ, =1 , and we assume h(x)=1 for
Figure imgf000015_0001
simplicity, then Equations 5, 6 and 7 for R, T and U become:
Figure imgf000015_0002
Figure imgf000015_0003
Figure imgf000015_0004
Where:
Figure imgf000015_0005
Figure imgf000015_0006
Regarding the above equations: P(χ) = ∑ ΛA OO indicates that p(x) is drawn from a mixture of
<=i
Gaussian distributions wherein λ, are weights that are given to each Gaussian distribution;
P1(X) ~ 7V(/w,, v,) indicates that /?,(*) is drawn from a Gaussian distribution with mean m, and variance v, ;
I represents the number of Gaussian distributions that make up the mixture; i,j in Equation 15 and 16 are counters that loop over the number of Gaussian distributions that make up the mixture and wherein the maximum value i and j may both have is I; and xm are the locations where the Gaussian process f(x) is sampled, for example at sample points 52 as shown and described later with reference to Figure 5.
Other closed form solutions for Integrals R, T and U have also been derived for the "Matern" covariance function (eq.3) and a uniform p(x). In general a uniform p(x) is easiest to use since it gives any point inside the block equal weight. If no closed form solution for Integrals R, T and U is available they can be derived using numerical methods.
With these closed form solutions we can then calculate the parameters of the distribution for integral k. This process is illustrated in Figures 3 to 5. This example is described in one- dimension, again for ease of calculation, however it will be appreciated that the method may be extended to two and three dimensions.
Figure 3 shows a graph 30 comprising an x-axis 32 measuring the sample position of a sample, for example the position a core sample taken from drill holes 24 along a line passing through a block 22. The y-axis 34 corresponds to a parameter that has been measured, for example an assayed ore grade, from the core samples of each drill hole 24. Although the scales are arbitrary in this example, it will be appreciated that the scales may correspond to real measurements. The graph comprises a plurality of data points 36 corresponding to information derived from a plurality of drill holes 24.
Figure 4 shows the curve 42 corresponding to a fitted Gaussian process f(x) having been fitted in accordance with the above. Since the curve 42 has been fitted by a statistical process, it is also possible to show an error 44 associated with the fitting of the curve to the data points 36. In this example, the error 44 is shown as a shaded area in Figure 4 and corresponds to twice the standard deviation of the Gaussian process f(x).
Finally, as shown in Figure 5, the fitted Gaussian process f(x) may be sampled at sample points 52 so as to calculate an average value of the parameter (i.e.: the iron ore grade) over a particular length interval, in this case between -3 and 5 of the x-axis 32 as shown by a black bar 54. In this example, and using Equations 8 and 9 as described above, the mean and variance of the distribution of integral k is calculated over the interval -3 to 5. In this example, the mean is calculated as -0.3189 and the variance of the distribution of the integral k is calculated as 0.0206. For example, in the case where the iron ore grade is being measured, the mean would be the average iron ore grade over the interval -3 and 5, and the variance would be related to an error parameter that provides an indication of the accuracy of the calculated mean. Since the distribution for integral k is Gaussian, it is completely defined by the calculated mean and variance.
By the above method, it is therefore possible to calculate the mean of the iron ore grade for a given volume (for example if the above is extended to three- dimensions) and the variance of the iron ore grade so as to provide an error parameter to indicate how accurate the estimation is.
This allows a method 60 to be used for establishing a mining plan as shown in Figure 6. The method 60 comprises the first step 62 of evaluating a parameter characteristic of a property of a resource in a plurality of respective blocks, the parameter being calculated using method 10; and a second step 64 of selecting blocks for mining the resource based on the evaluation of the first step 62.
For example, it may be determined that the mean of the iron ore grade is sufficient for mining a block to be economically viable. Alternatively, if the error parameter associated with the mean of the iron ore grade in a first block is beyond a threshold of risk, then it may be decided that the first block be mined along with a second block having a substantially smaller error parameter so as to minimise the risk associated with mining the first block.
In a further alternative, it may be determined that the error parameter is too high for a decision to be made with sufficient certainty. In such a situation, it may be decided that mining a certain block is delayed until a time at which more data is available, for example by providing more information in accordance with the first step 12 of method 10. After more information is available, the third and fourth steps 16, 18 may be conducted again so as to assist in the method 60 of selecting the block for possible mining.
It will be appreciated that a variation of the method 60 may also be used for guiding exploration, such as for guiding the selection of locations for drill holes.
Although the invention has been described with reference to particular examples, it will be appreciated by those skilled in the art that the invention may be embodied in many other forms. For example, the method may be applied to other ore bodies, for example nickel ore bodies, or to other extractable resources. Other appropriate statistical distributions may be used, and the methods for evaluating integrals for such distributions need not be restricted to those described in the foregoing description. Further, the samples need not be taken from drill holes, and may be extracted in other fashions. Information relating to the parameter, for example iron ore grade, may be obtained in ways other than analysing samples that have been extracted.
The blocks may be of any shape arid size. Further, a block may be any combination of blocks, or alternatively may be a subdivision of a block. The samples may be taken from any number of positions and be taken from any distribution of positions.

Claims

The Claims:
1. A method of characterising a resource in a block located in an area, the method comprising the steps of:
5 providing information concerning a property of the resource for a plurality of sample positions in, at or in the environment of the block, the information being obtained from analyses of samples from the sample positions; modelling a change in the property along a distance at or withino the block using the provided information; calculating parameters associated with the modelled change using Bayes1 theorem; and calculating a property characteristic of the resource for the block using the calculated parameters. 5
2. The method of claim 1 wherein the step of calculating parameters comprises use of a Gaussian or Gaussian-like probability distribution with Bayesian inference. o
3. The method of claim 1 or 2 wherein the resource is an ore body.
4. The method of any one of the preceding claims wherein the ore body is an iron ore body.
5. The method of any one of the preceding claims wherein the property is an iron ore grade.
6. The method of any one of the preceding claims wherein the block is 5 one of a plurality of blocks.
7. The method of any one of the preceding claims wherein the method comprises calculating an average of a modelled change in the property for the block. 0
8. The method of any one of the preceding claims, wherein the step of providing information concerning a property of the resource for a plurality of sample positions comprises providing samples from drill holes at the sample positions. 5
9. The method of claim 8, wherein the block is one of a plurality of adjacent blocks of the area.
10. The method of claim 9, wherein the drill holes are placed at or near theo boundary of adjacent blocks, such as at or near every second boundary.
11. The method of any one of the preceding claims wherein the step of modelling the change in the property comprises obtaining a mean of the property and a covariance function c(x,Xi-n) of the property (x,xi-n: sample positions).
12. The method of claim 11 , wherein the covariance function is a squared exponential covariance function.
13. The method of claim 11 , wherein the step of calculating the property comprises calculating an average for the block using the mean of the property and the covariance function.
14. A method of establishing a mining plan, the method comprising: calculating a property of a resource for a plurality of blocks using the method as claimed in any one of the preceding claims; evaluating the property; and selecting blocks for mining the resource.
15. A method of guiding exploration of an area, the method comprising: calculating a property of a resource for a plurality of blocks using the method in accordance with any one of claim 1 to 16; evaluating the property; and guiding the exploration of the area.
16. The method of claim 16 comprising the step of determining locations for sample positions at which samples are obtained from drill holes.
17. A method of mining in which resources are extracted in accordance with the method of any one of the preceding claims.
PCT/AU2010/000738 2009-06-17 2010-06-15 A method of characterising a resource Ceased WO2010144953A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US13/378,964 US9449351B2 (en) 2009-06-17 2010-06-15 Method of characterising a resource
AU2010262748A AU2010262748B2 (en) 2009-06-17 2010-06-15 A method of characterising a resource
CA2765246A CA2765246C (en) 2009-06-17 2010-06-15 A method of characterising a resource
BRPI1015041-2A BRPI1015041B1 (en) 2009-06-17 2010-06-15 METHOD FOR ASSESSING A PROPERTY OF A RESOURCE IN A BLOCK LOCATED IN AN EARTH AREA, METHOD FOR ESTABLISHING A MINING PLAN AND METHOD FOR GUIDING EXPLORATION OF AN AREA

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2009902773A AU2009902773A0 (en) 2009-06-17 A method of characterising a resource
AU2009902773 2009-06-17

Publications (1)

Publication Number Publication Date
WO2010144953A1 true WO2010144953A1 (en) 2010-12-23

Family

ID=43355597

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2010/000738 Ceased WO2010144953A1 (en) 2009-06-17 2010-06-15 A method of characterising a resource

Country Status (5)

Country Link
US (1) US9449351B2 (en)
AU (1) AU2010262748B2 (en)
BR (1) BRPI1015041B1 (en)
CA (1) CA2765246C (en)
WO (1) WO2010144953A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8930170B2 (en) * 2009-11-18 2015-01-06 Conocophillips Company Attribute importance measure for parametric multivariate modeling
WO2014134655A1 (en) * 2013-03-05 2014-09-12 Technological Resources Pty Ltd Estimating material properties
WO2019136511A1 (en) * 2018-01-09 2019-07-18 Technological Resources Pty. Limited Mining system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060190219A1 (en) * 2002-10-09 2006-08-24 Froyland Gary A System and method(s) of mine planning, design and processing
US20070185750A1 (en) * 2004-06-21 2007-08-09 Merab Menabde Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
US7373251B2 (en) * 2004-12-22 2008-05-13 Marathon Oil Company Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data
US20090256412A1 (en) * 2008-03-04 2009-10-15 Nieto Juan Scanning system for 3d mineralogy modelling

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4370552A (en) * 1980-10-31 1983-01-25 Li Chou H Method for ore prospecting
AU2002951892A0 (en) * 2002-10-09 2002-10-24 Bhp Billiton Innovation Pty Ltd Mining process and design
US8346482B2 (en) * 2003-08-22 2013-01-01 Fernandez Dennis S Integrated biosensor and simulation system for diagnosis and therapy
WO2006108213A1 (en) * 2005-04-11 2006-10-19 Bhp Billiton Innovation Pty Ltd Mining optimisation
WO2008010174A2 (en) * 2006-07-19 2008-01-24 Petrus Christiaan Gouws Dust particle catcher for a drilling apparatus
US7577527B2 (en) * 2006-12-29 2009-08-18 Schlumberger Technology Corporation Bayesian production analysis technique for multistage fracture wells
US7983490B1 (en) * 2007-12-20 2011-07-19 Thomas Cecil Minter Adaptive Bayes pattern recognition
US7961955B1 (en) * 2008-01-28 2011-06-14 Thomas Cecil Minter Adaptive bayes feature extraction
CN101557452B (en) * 2008-03-04 2013-06-05 悉尼大学 Scanning system for 3d mineralogy modelling
US7979363B1 (en) * 2008-03-06 2011-07-12 Thomas Cecil Minter Priori probability and probability of error estimation for adaptive bayes pattern recognition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060190219A1 (en) * 2002-10-09 2006-08-24 Froyland Gary A System and method(s) of mine planning, design and processing
US20070185750A1 (en) * 2004-06-21 2007-08-09 Merab Menabde Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
US7373251B2 (en) * 2004-12-22 2008-05-13 Marathon Oil Company Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data
US20090256412A1 (en) * 2008-03-04 2009-10-15 Nieto Juan Scanning system for 3d mineralogy modelling

Also Published As

Publication number Publication date
AU2010262748B2 (en) 2016-05-12
CA2765246A1 (en) 2010-12-23
US20120205963A1 (en) 2012-08-16
CA2765246C (en) 2021-01-05
BRPI1015041A2 (en) 2019-07-09
US9449351B2 (en) 2016-09-20
BRPI1015041B1 (en) 2020-11-24
AU2010262748A1 (en) 2011-12-08

Similar Documents

Publication Publication Date Title
Jiang et al. Bayesian updating of slope reliability in spatially variable soils with in-situ measurements
Wang et al. Spatial and temporal prediction and uncertainty of soil loss using the revised universal soil loss equation: a case study of the rainfall–runoff erosivity R factor
Hassan et al. Uncertainty assessment of a stochastic groundwater flow model using GLUE analysis
Kerrou et al. Issues in characterizing heterogeneity and connectivity in non-multiGaussian media
Emamgholizadeh et al. Comparison of artificial neural networks, geographically weighted regression and Cokriging methods for predicting the spatial distribution of soil macronutrients (N, P, and K)
Tadjer et al. Bayesian deep decline curve analysis: A new approach for well oil production modeling and forecasting
Song et al. Probabilistic assessment of earthquake-induced landslide hazard including the effects of ground motion directionality
Ozkan et al. Fuzzy logic approach in resource classification
Madi et al. Bayesian prediction of rainfall records using the generalized exponential distribution
Masoumi et al. Improvement of water table interpolation and groundwater storage volume using fuzzy computations
CA2765246C (en) A method of characterising a resource
Chebbi et al. Optimal extension of rain gauge monitoring network for rainfall intensity and erosivity index interpolation
Faraone et al. Design methodology for site-specific resistance factors based on foundation location and size
McKenna et al. Non-uniqueness of inverse transmissivity field calibration and predictive transport modeling
Vatanchi et al. Calibration and uncertainty analysis for isovel contours-based stage-discharge rating curve by sequential uncertainty fitting (SUFI-2) method
Parasyris et al. A decision support tool for optimising groundwater-level monitoring networks using an adaptive genetic algorithm
Liu et al. Regional characterization of vs30 with hybrid geotechnical and geological data
Kim et al. Influence of estimation method of compression index on spatial distribution of consolidation settlement in Songdo New City
Spremić et al. Local conditioning in posterior sampling methods with example cases in subsurface inversion
Boyd et al. Geostatistical estimation of Ground Class prior to and during excavation for the Caldecott Tunnel Fourth Bore project
Bickel Discretization, simulation, and the value of information
Sarkar Geostatistics in groundwater Modelling
Moreno et al. Machine Learning Regressors: An Alternative to Compact Grades Information, Generate Secondary Information, and Improve the Density Block Models
Wambeke et al. An integrated approach to simulate and validate orebody realizations with complex trends: A case study in heavy mineral sands
Asghari et al. Determining the optimum search range for 2D and 3D mapping based on kriging through quantitative analysis.

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10788498

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010262748

Country of ref document: AU

ENP Entry into the national phase

Ref document number: 2010262748

Country of ref document: AU

Date of ref document: 20100615

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2765246

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13378964

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 10788498

Country of ref document: EP

Kind code of ref document: A1

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: PI1015041

Country of ref document: BR

ENP Entry into the national phase

Ref document number: PI1015041

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20111219