WO2010128023A1 - Protection of user data transmission through a transport network - Google Patents
Protection of user data transmission through a transport network Download PDFInfo
- Publication number
- WO2010128023A1 WO2010128023A1 PCT/EP2010/055996 EP2010055996W WO2010128023A1 WO 2010128023 A1 WO2010128023 A1 WO 2010128023A1 EP 2010055996 W EP2010055996 W EP 2010055996W WO 2010128023 A1 WO2010128023 A1 WO 2010128023A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- network
- path
- user
- transport
- failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J3/00—Time-division multiplex systems
- H04J3/16—Time-division multiplex systems in which the time allocation to individual channels within a transmission cycle is variable, e.g. to accommodate varying complexity of signals, to vary number of channels transmitted
- H04J3/1605—Fixed allocated frame structures
- H04J3/1611—Synchronous digital hierarchy [SDH] or SONET
- H04J3/1617—Synchronous digital hierarchy [SDH] or SONET carrying packets or ATM cells
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J3/00—Time-division multiplex systems
- H04J3/02—Details
- H04J3/14—Monitoring arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0817—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/22—Alternate routing
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/24—Multipath
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/28—Routing or path finding of packets in data switching networks using route fault recovery
Definitions
- the present invention relates to the field of the communication networks, in particular to protection of user data transmission through a transport network.
- a communication network comprises a number of network elements interconnected for transporting data associated to various communication services.
- a communication network may be either a circuit- switched network or a packet-switched network.
- Exemplary circuit-switched networks are SDH (Synchronous Digital Hierarchy) networks, SONET (Synchronous Optical NETwork) and OTN (Optical Transport Network).
- SDH/SONET networks and OTN networks different types of data containers are provided, that are arranged according to a hierarchical structure. For instance, in SDH/SONET networks, lower order virtual containers and higher order virtual containers are different types of data containers.
- OTN networks optical channel payload units (OPU) and optical data units (ODU) are different types of data containers.
- circuit-switched networks In a circuit-switched network, the paths are typically manually established by an operator, by suitably configuring the network elements. Modifying the paths requires manually changing configuration of the network elements.
- circuit-switched networks have been developed (that are called ASTN, i.e. Automatic Switched Transport Networks), having the capability of autonomously establishing and modifying the paths. In case a change occurs in the network (e.g . network elements are added to or removed from the network, or a failure occurs in the network), such circuit- switched networks are capable of automatically modifying the paths taking into account such change, without requiring any manual intervention by the operator.
- packet-switched networks data to be transmitted are typically divided in packets, and each packet is independently routed by the network elements from source to destination. Exemplary packet-switched networks are Ethernet networks, IP (Internet Protocol) networks and ATM (Asynchronous Transfer Mode) networks.
- a communication system may comprise a transport network implemented as a circuit-switched network and user networks connected to the transport network, each user network being implemented as a packet-switched network.
- the transport network is connected to each user network by means of a respective user-network interface (briefly termed "UNI").
- each UNI For allowing transmission of user data in the form of packets across the transport network, at each UNI the user data received from the associated user network may be suitably encapsulated, and then mapped into a number of data containers supported by the transport network, which data containers are then transmitted to the transport network. Similarly, each UNI receiving data containers from the transport network extracts the user data mapped therein, and then transmits the user data to the associated user network.
- the Ethernet packets exchanged by such Ethernet network with other Ethernet networks may be encapsulated by means of the GFP (Generic Framing Procedure) technique, and then mapped in a number of higher order or lower order virtual containers.
- GFP Generic Framing Procedure
- the Ethernet packets exchanged by such Ethernet network with other Ethernet networks may be mapped in a number of OPUs or ODUs.
- the operator of the transport network typically allocates, for a given user, a number of data containers reserved for transporting user data exchanged by such a user.
- Data containers may be allocated according to different criteria. For instance, in SDH/SONET networks and in OTN networks, two techniques are known: contiguous concatenation and virtual concatenation (briefly, "VCAT").
- VCAT virtual concatenation
- the number of higher order virtual containers and lower order virtual containers of a virtual concatenation group may be dynamically changed by means of the known Link Capacity Adjustment Scheme (briefly, "LCAS”) according to the user traffic characteristics and to the transport network conditions.
- LCAS Link Capacity Adjustment Scheme
- a communication system having a transport network, a first user network and a second user network connected by means of the transport network
- user data exchanged between the first user network and the second user network are typically protected against failures occurring in the transport network as follows.
- the first user network has a pair of edge network elements connected to the transport network by means of respective UNIs.
- the second user network has a pair of edge network elements connected to the transport network by means of respective UNIs.
- a pair of paths crossing the transport network connects the pair of edge network elements of the first user network with the pair of edge network elements of the second user network.
- each path of the pair has a capacity equal to the maximum transmission rate of the exchanging user data.
- the maximum transmission rate of the Ethernet packets is 8.96 Gbit/s
- two paths are allocated in the SDH/SONET network, each having a capacity of 8.96 Gbit/s. This may be achieved for instance by allocating 64 higher order virtual containers VC-4 on the first path and 64 higher order virtual containers VC-4 on the second path, the transmission rate of a single higher order virtual container VC-4 being 140 Mbit/s.
- 64 higher order virtual containers VC-4 are used.
- the first path may be fully used while the second path may be unused.
- Ethernet packets may be transported by 32 higher order virtual containers VC-4 of the first path (while the remaining 32 higher order virtual containers VC-4 are unused) and 32 higher order virtual containers VC-4 of the second path (while the remaining 32 higher order virtual containers VC-4 are unused).
- the user data are rerouted to the unused resources. For instance, in the above mentioned case wherein the Ethernet packets are transported by 32 higher order virtual containers VC-4 of the first path and 32 higher order virtual containers VC-4 of the second path, if a failure occurs on the first path, the Ethernet packets are rerouted to the second path that, as mentioned above, has allocated 64 higher order virtual containers VC-4, and may therefore support transmission of all the Ethernet packets.
- an object of the present invention is providing a method for protecting transmission of user data through a transport network that overcomes the aforesaid drawbacks, i.e. that allows using resources of the transport network in a more efficient way.
- the present invention provides a method for protecting transmission of user data transmitted from a first user network to a second user network through a transport network, the user data having a maximum transmission rate, the method comprising: a) in the transport network, in a failure-free status, providing a first path and a second path connecting the first user network with the second user network, the first path and the second path having an overall capacity equal to the maximum transmission rate; b) transmitting a first portion of the user data along the first path, and transmitting a second portion of the user data along the second path; c) at a network management server cooperating with the transport network, detecting a failure affecting transmission of the second portion; d) at the network management server, switching from the failure-free status to a failure status by operating the transport network so as to increase capacity of the first path to the maximum transmission rate; and e) at the first user network, transmitting the user data along the first path only.
- step a) comprises allocating a first number of data containers on the first path and a second number of data containers on the second path by means of a virtual concatenation technique implemented by the transport network.
- step d) comprises increasing the first number of data containers by operating a link capacity adjustment scheme implemented by the transport network.
- step c) comprises receiving at the network management server a management message from the transport network, the management message being indicative of the failure.
- the method further comprises, if the transport network is an automatic switched transport network, using automatic switching functionalities of the transport network for allocating a path portion bypassing the failure, if the failure occurs on the second path.
- step b) comprises implementing an equal-cost multi-path routing function in the first user network, so that the first portion is transmitted through a first edge network element of the first user network to the first path, and the second portion through a second edge network element of the first user network to the second path.
- the first user network automatically performs step e) in response to step d) by means of the equal-cost multi-path routing function.
- the present invention provides a transport system comprising a transport network and a network management server cooperating with the transport network, the transport network being configured to connect a first user network and a second user network, wherein the transport network has a first path and a second path configured to connect the first user network with the second user network, wherein, in a failure-free status, the first path is suitable for supporting transmission of a first portion of user data and the second path is suitable for supporting transmission of a second portion of the user data, the first path and the second path having an overall capacity equal to a maximum transmission rate of the user data, and wherein the network management server is configured to detect a failure affecting transmission of the second portion and, in response to the detection, to switch from the failure-free status to a failure status by operating the transport network so as to increase capacity of the first path to the maximum transmission rate, thereby allowing the first path supporting transmission of all the user data.
- the transport network is configured to implement a virtual concatenation technique and to use the virtual concatenation technique for allocating a first number of data containers on the first path and a second number of data containers on the second path.
- the transport network is configured to implement a link capacity adjustment scheme and the network management server is configured to operate the link capacity adjustment scheme for increasing capacity of the first path by increasing the first number of data containers.
- the network management server is configured to detect the failure by receiving from the transport network a management message indicative of the failure.
- the transport network is an automatic switched transport network configured to use automatic switching functionalities for allocating a path portion bypassing the failure, if the failure occurs on the second path.
- the present i nvention provides a communication system comprising a first user network, a second user network and a transport system, the transport system comprising a transport network and a network management server cooperating with the transport network, the transport network connecting the first user network with second user network, wherein the transport system is as set forth above.
- the first user network is configured to implement an equal-cost multi-path routing function, so that the first portion is transmitted through a first edge network element of the first user network to the first path, and the second portion is transmitted through a second edge network element of the first user network to the second path.
- the first user network is configured to automatically start transmitting the user data only along the first path by means of the equal-cost multi-path routing function, in response to the increasing capacity of the first path.
- Figures 1 a to 1 d show various steps of the method according to a first em bod iment of the present invention , appl ied to an exem plary communication system;
- Figures 2a to 2d show various steps of the method according to a second embodiment of the present invention, applied to an exemplary communication system, in a first failure scenario;
- Figures 3a to 3d show various steps of the method according to the second embodiment of the present invention, applied to an exemplary communication system, in a second failure scenario.
- Figures 1 a to 1d show a communication system CS in which the method for protecting transmission of user data according to a first embodiment of the present invention may be implemented.
- the communication system CS comprises a transport system TS, a first user network UN1 and a second user network UN2.
- the transport system TS comprises a transport network TN and a network management server MGR cooperating with the transport network TN.
- the first user network UN 1 is connected to the second user network UN2 by means of the transport network TN.
- the transport network TN is preferably a circuit-switched network, such as for instance an SDH network, a SONET network, an OTN network, etc.
- the first user network UN1 and the second user network UN2 are preferably packet-switched networks of a same type, such as for instance Ethernet, IP, ATM, etc.
- the first user network UN1 preferably comprises a number of network elements.
- the network elements NE1 -1 , NE1 -2 and NE1 -3 are depicted, i.e. the network elements NE1 -1 , NE1 -2 and NE1 -3.
- the network element NE1 -3 is connected to both network elements NE1 -1 and NE1 -2.
- the network elements N E1 -1 and NE1 -2 are connected to the transport network TN by means of respective UNIs, that are not shown in the Figures for simplicity.
- the network elements NE1 -1 and NE1 -2 are then edge network elements of the first user network UN1.
- the second user network UN2 preferably comprises a number of network elements.
- the network element NE2-3 is connected to both network elements NE2-1 and NE2-2.
- the network elements NE2-1 and NE2-2 are connected to the transport network TN by means of UNIs, that are not shown in the Figures for simplicity.
- the network elements NE2-1 and NE2-2 are then edge network elements of the second user network UN2.
- the transport network TN preferably comprises a number of network elements and l inks between network elements.
- the detailed structure of the transport network TN is not shown in the Figures.
- the edge network elements (not shown in the drawings) of the transport network TN are preferably configured to implement the above mentioned VCAT technique with the above mentioned LCAS mechanism.
- a first path P1 and a second path P2 are allocated in the transport network TN for transporting the user data UD.
- the first path P1 and the second path P2 may be calculated by the network management server MGR.
- the transport network is an ASTN network
- the first path P1 and the second path P2 may be calculated by suitable GMPLS ("Generalized Multi-Protocol Label Switching") mechanisms implemented at all the network elements of the transport network TN.
- the first path P1 connects the edge network element NE1 -1 of the first user network UN1 and the edge network element NE2-1 of the second user network UN2, while the second path P2 connects the edge network element NE1 -2 of the first user network UN1 and the edge network element NE2-2 of the second user network UN2.
- the first path P1 and the second path P2 comprise network elements and links of the transport network TN. However, for clarity of the drawings, the detailed structure of the first path P1 and the second path P2 is not shown.
- a number of data containers DC1 is allocated, having an overall capacity C/2 equal to half the maximum transmission rate C of the user data UD.
- a number of data containers DC2 is allocated, having an overall capacity C/2 equal to half the maximum transmission rate C of the user data UD.
- the transport network TN is an SDH/SONET network (the data containers being higher order or lower order virtual containers, as mentioned above) or a OTN network (the data containers being OPUs and ODUs)
- the data containers are preferably allocated by using the above mentioned VCAT technique.
- the data containers allocated on the first path P1 are part of a same virtual concatenation group
- the data containers allocated on the second path P2 are part of a same virtual concatenation group.
- the transport network TN is an SDH/SONET network and the maximum transmission rate C is 8.96 Gbit/s
- 32 higher order virtual containers VC-4 may be allocated, providing on each path P1 , P2 a capacity C/2 of 4.48 Gbit/s.
- the user data UD are transmitted from the first user network UN1 to the second user network UN2 by using the first path P1 and the second path P2. More specifically, by referring to Figure 1 a, the user data UD are collected within the first user network UN1 by the network element NE1 -3.
- the network element NE1 -3 preferably implements the above mentioned ECMP mechanism, thus dividing the user data UD into a first data portion UD1 and a second data portion UD2. Both the first data portion UD1 and the second data portion UD2 preferably have a maximum transmission rate equal to C/2 (i.e. half the maximum transmission rate C of the user data UD).
- the network element NE1 -3 transmits the first data portion UD1 to the edge network element NE1 -1 , and the second data portion UD2 to the edge network element NE1 -2, as shown in Figure 1 a.
- the edge network element NE1 -1 forwards the first data portion UD1 to its UNI (not shown in Figure 1 a), that encapsulates it and maps it into the data containers DC1 allocated on the first path P1 . It has to be noticed that the allocated data containers DC1 may be only partially filled with the data of the first data portion UD1. Indeed, when the actual transmission rate of the user data UD is lower than the maximum transmission rate C, also the actual transmission rate of the first data portion UD1 is presumably lower than the capacity C/2 of the first path P1.
- the edge network element NE1 -1 After mapping the first data portion UD1 into the allocated data containers DC1 , the edge network element NE1 -1 transmits the data containers DC1 through the transport network TN along the first path P1 towards the second user network UN2, in particular to its edge network element N2-1 , as shown in Figure 1 a.
- the edge network element NE1 -2 When the edge network element NE1 -2 receives the second data portion UD2 from the network element NE1 -3, it preferably forwards the second data portion UD2 to its UNI (not shown in Figure 1 a), that encapsulates it and maps it into the data containers DC2 allocated on the second path P2.
- the edge network element NE1 -2 After mapping the second data portion U D2 into the allocated data containers DC2, the edge network element NE1 -2 transmits the data containers DC2 through the transport network TN along the second path P2 towards the second user network UN2, in particular to its edge network element N2-2, as shown in Figure 1 a.
- the edge network element N E2-1 receives the data containers DC1 from the first path P1 by means of its UNI (not shown in Figure 1 a), extracts the first data portion UD1 therefrom, and forwards the first data portion UD1 to the network element NE2-3.
- the edge network element NE2-2 receives the data containers DC2 from the second path P2 by means of its UNI (not shown in Figure 1 a), extracts the second data portion UD2 therefrom, and forwards the second data portion UD2 to the network element NE2-3.
- the network element NE2-3 then merges the first data portion U D1 and the second data portion U D2, thereby recovering the user data UD.
- the network element NE2-3 then forwards the user data UD to other network elements (not shown in the drawings) of the second user network UN2, according to their destinations.
- a failure occurs in the communication system CS.
- a failure may affect one of the first path P1 and the second path P2, or one of the edge network elements NE1 -1 , NE1 -2 of the first user network UN1 , or one of the edge network elements NE2-1 , NE2-2 of the second user network UN2, or one of the links connecting the network element NE1 -3 to the edge network elements NE1 -1 , NE1 -2 of the first user network UN1 , or one of the links connecting the network element NE2-3 to the edge network elements NE2-1 , NE2-2 of the second user network UN2.
- a failure F occurs on the second path P2.
- one of the links of the transport network TN forming the second path P2 becomes failed.
- This exemplary situation is shown in Figure 1 b. Due to the failure F, transmission of the data containers DC2 along the second path P2 is interrupted upstream the failure F.
- the transport network TN When the failure F is detected within the transport network TN (typically, by a network element downstream the failure F along the second path P2), the transport network TN preferably notifies the fail ure to the network management server MGR.
- the network element detecting the failure F preferably transmits an alarm message AM to the network management server MGR, as shown in Figure 1 b.
- the alarm message AM is preferably formatted according to a management protocol, such as for instance SNMP (Simple Network Management Protocol)/QB3.
- the network management server MGR Upon reception of the alarm message AM from the transport network TN, the network management server MGR preferably switches from the failure- free status to a failure status by operating the transport network TN so as to increase the capacity of the first path P1 from its current capacity C/2 to the maximum transmission rate C of the user data UD, namely by doubling the number of data containers DC1 allocated on the first path P1 .
- the network management server MGR preferably induces the transport network TN to double the number of data containers DC1 allocated on the first path P1 by suitably operating the LCAS mechanism executed by the edge network elements of the transport network TN .
- the network management server MGR operates the LCAS mechanism for raising the number of higher order virtual containers VC-4 allocated on the first path P1 from 32 to 64. This allows providing the first path P1 with a doubled capacity C, i.e. 8.96 Gbit/s.
- the ECMP mechanism implemented at the network element NE1 -3 of the first user network UN1 induces the network element NE1 -3 to forward all the user traffic UD collected from the other network elements of the first user network UN1 to the edge network element NE1 -1 , i.e. the edge network element connected to the path not affected by the failure F.
- the user data UD collected at the network element NE1 -3 of the first user network UN1 are all forwarded to the network element NE1 -1 , that transmits it along the first path P1 , as show in Figure 1 c.
- the first path P1 is now capable of supporting transmission of the whole user data UD, even when the actual transmission rate of the user data UD is equal to the maximum transmission rate C. Therefore, while the failure F on the second path P2 is being fixed, transmission of the user data UD is protected by the first path P1 , having now doubled capacity.
- resources of the transport network TN are used in a more efficient way than according to prior art solutions for protecting transmission of user data.
- the additional resources for protecting transmission of user data on both paths are allocated a priori in the transport network, and are accordingly unused until a failure occurs
- the additional resources for protecting transmission of user data are allocated only upon detection of a failure, on the path that is not affected by the failure.
- the communication system is normally operating (i.e. in the failure-free status)
- an amount of resources is reserved for transmission of user data on the two paths, that is tailored for allowing transmission of user data at their maximum transmission rate, i.e. C.
- C maximum transmission rate
- the network management server MGR receives a notification message NM from the transport network TN, as shown in Figure 1 d.
- the notification message MM is preferably formatted according to a management protocol, such as for instance the above cited SNMP/QB3.
- the network management server MGR preferably switches from the failure status to the failure-free status by operating the transport network TN so as to decrease the capacity of the first path P1 from its current capacity C (equal to the maximum transmission rate C of the user data UD) to its initial value C/2, by halving the number of data containers DC1 allocated on the first path P1 .
- the network management server MGR preferably induces the transport network TN to halve the number of data containers DC1 allocated on the first path P1 by suitably operating the LCAS mechanism executed at the edge network elements of the transport network TN.
- the network management server MGR operates the LCAS mechanism for reducing the number of higher order virtual containers VC-4 allocated on the first path P1 from 64 to 32. This allows providing the first path P1 with its initial capacity C/2, i.e. 4.48 Gbit/s.
- the ECMP mechanism implemented at the network element NE1 -3 of the first user network UN1 induces the network element NE1 -3 to divide again the user traffic UD collected from the other network elements of the first user network UN1 in a first data portion UD1 to be forwarded to the edge network element NE1 -1 and a second data portion UN2 to be forwarded to the edge network element N E 1 -2.
- the operation of the communication system CS is therefore the same as before the failure F occurred (see Figure 1 a).
- Figures 2a to 2d show a communication system CS' in which the method for protecting transmission of user data according to a second embodiment of the invention may be implemented.
- the structure of the communication system CS' is substantially similar to the structure of the communication system CS shown in Figures 1 a to 1 d. A detailed description will therefore not be repeated.
- the transport network TN' is a circuit-switched network of the above mentioned ASTN type, i.e. it is provided with GMPLS ("Generalized Multi- Protocol Label Switching") mechanisms allowing the transport network TN' to autonomously modify the paths when a change occurs in the network.
- GMPLS Generalized Multi- Protocol Label Switching
- the transport network TN' When a failure F occurs in the transport network TN', for example on the second path P2 transporting the second data portion UD2 of the user data UD (as shown in Figure 2b), according to this second embodiment the transport network TN' preferably modifies the second path P2, without requiring any intervention of the network management server MGR, by using the GMPLS mechanisms.
- the transport network TN' may allocated a portion of path bypassing the failure F, i.e. branching off the second path P2 at a network element located upstream the failure F, and joining again the second path P2 at a network element located downstream the failure F, so as to form a mod ified second path P2'.
- the GMPLS mechanisms also preferably changes configuration of the network elements at which the portion of path bypassing the failure F branches off and joins again the second path P2, so that the data containers DC2 in which the second data portion UD2 is mapped are now transmitted along the modified second path P2'.
- the second data portion UD2 may continue being transmitted along the modified second path P2'.
- the GMPLS mechanisms of the transport network TN' may automatically change again configuration of the network elements at which the portion of path bypassing the fixed failure F branches off and joins again the second path P2, for reverting transmission of the data containers DC2 to the originally allocated path P2.
- the failure F occurs out of the transport network TN', e.g. at one of the edge network elements of the first user network UN1 , e.g. the edge network element NE1 -2, as shown in Figure 3b.
- the GMPLS mechanisms can not protect transmission of the user data UD, since the failure F is out of the transport network TN'.
- the transport network TN' when the failure F is detected (typically, by a network element of the transport network TN' downstream the failure F along the second path P2), the transport network TN' preferably notifies the failure to the network management server MGR.
- the network element detecting the failure F preferably transmits an alarm message AM to the network management server MGR, as shown in Figure 3b.
- the alarm message AM is preferably formatted according to a management protocol, such as for instance the above mentioned SNMP/QB3.
- the network management server MGR Upon reception of the alarm message AM from the transport network TN', the network management server MGR preferably switches from the failure- free status to a failure status by operating the transport network TN so as to increase the capacity of the first path P1 from its current capacity C/2 to the maximum transmission rate C of the user data UD, namely by doubling the number of data containers DC1 allocated on the first path P1.
- the network management server MGR preferably induces the transport network TN' to double the number of data containers DC1 allocated on the first path P1 by suitably operating the LCAS mechanism executed by the edge network elements of the transport network TN'.
- the ECMP mechanism implemented at the network element NE1 -3 of the first user network UN1 induces the network element NE1 -3 to forward all the user traffic UD collected from the other network elements of the first user network UN1 to the edge network element NE1 -1 , i.e. the edge network element connected to the path not affected by the failure F.
- the user data UD collected at the network element NE1 -3 of the first user network UN1 are all forwarded to the network element NE1 -1 , that transmits it along the first path P1 , as show in Figure 3c.
- the first path P1 is now capable of supporting transmission of the whole user data UD, even when the actual transmission rate of the user data UD is equal to the maximum transmission rate C. Therefore, also according to this second embodiment, while the failure F on the second path P2 is being fixed, transmission of the user data UD is protected by the first path P1 , having now doubled capacity.
- the network management server MGR receives a notification message NM from the transport network TN', as shown in Figure 3d.
- the notification message NM is formatted according to a management protocol, such as for instance the above cited SNMP/QB3.
- the network management server MGR preferably switches from the failure status to the failure-free status by operating the transport network TN so as to decrease the capacity of the first path P1 from its current capacity C (equal to the maximum transmission rate C of the user data UD) to its initial value C/2, by halving the number of data containers DC1 allocated on the first path P1 .
- the network management server MGR preferably operates the transport network TN' so as to halve the number of data containers DC1 allocated on the first path P1 , by suitably operating the LCAS mechanism executed at the edge network elements of the transport network TN'.
- the ECMP mechanism implemented at the network element NE1 -3 of the first user network UN1 induces the network element NE1 -3 to divide again the user traffic UD collected from the other network elements of the first user network UN1 in a first data portion UD1 to be forwarded to the edge network element NE1 -1 and a second data portion UN2 to be forwarded to the edge network element NE1 -2.
- the mechanism for protecting transmission of user data in a transport network complements the GMPLS mechanisms of the ATSN-type transport network TN'.
- the GMPLS mechanisms take actions for protecting transmission of user traffic, without requiring any intervention of the network management server MGR.
- the network management server MGR suitably operates the transport network TN' for increasing capacity of the failure-free path, thus allowing it to protect transmission of the user data.
- program storage devices e.g., digital data storage media, which are machine or computer readable and encode machine-executable or computer-executable programs of instructions where said instructions perform some or all of the steps of methods described herein .
- the program storage devices may be, e.g . , dig ital memories, magnetic storage media such as a magnetic disks or tapes, hard drives, or optically readable digital data storage media.
- the embodiments are also intended to cover computers programmed to perform said steps of methods described herein.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/266,030 US20120044800A1 (en) | 2009-05-06 | 2010-05-04 | Protection of user data transmission through a transport network |
| JP2012509002A JP2012526436A (en) | 2009-05-06 | 2010-05-04 | Protection of user data transmission over the transport network |
| CN201080019973XA CN102422603A (en) | 2009-05-06 | 2010-05-04 | Protection of user data transmission through a transport network |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP09305403.9 | 2009-05-06 | ||
| EP09305403A EP2249526B1 (en) | 2009-05-06 | 2009-05-06 | Protection of user data transmission through a transport network |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2010128023A1 true WO2010128023A1 (en) | 2010-11-11 |
Family
ID=41055401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2010/055996 Ceased WO2010128023A1 (en) | 2009-05-06 | 2010-05-04 | Protection of user data transmission through a transport network |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20120044800A1 (en) |
| EP (1) | EP2249526B1 (en) |
| JP (1) | JP2012526436A (en) |
| KR (1) | KR20120005540A (en) |
| CN (1) | CN102422603A (en) |
| WO (1) | WO2010128023A1 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2276187B1 (en) * | 2009-06-24 | 2011-09-07 | Alcatel Lucent | Method of dynamically adjusting transmission capacity of a data transmission connection |
| EP2652918B1 (en) * | 2010-12-15 | 2016-03-09 | Telefonaktiebolaget LM Ericsson (publ) | Segment recovery in connection-oriented network |
| US9762434B2 (en) * | 2011-08-12 | 2017-09-12 | Rambus Inc. | Temporal redundancy |
| US9210599B2 (en) * | 2013-03-14 | 2015-12-08 | Aviat U.S., Inc. | Systems and methods for performing layer one link aggregation over wireless links |
| US9621968B2 (en) * | 2013-11-11 | 2017-04-11 | Infinera Corporation | Multi layer, multi vendor, multi domain, applications for software defined networking enabled networks |
| US9503361B2 (en) * | 2014-06-13 | 2016-11-22 | Cisco Technology, Inc. | Active/static path redundancy |
| US10623090B2 (en) * | 2018-05-24 | 2020-04-14 | At&T Intellectual Property I, L.P. | Multi-lane optical transport network recovery |
| US11496354B2 (en) * | 2020-06-16 | 2022-11-08 | Ciena Corporation | ECMP fast convergence on path failure using objects in a switching circuit |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6725401B1 (en) * | 2000-10-26 | 2004-04-20 | Nortel Networks Limited | Optimized fault notification in an overlay mesh network via network knowledge correlation |
| US20060187715A1 (en) * | 2005-01-21 | 2006-08-24 | Raza Microelectronics, Inc. | System and method for performing concatentation of diversely routed channels |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1471673B1 (en) * | 2003-04-22 | 2006-08-02 | Alcatel | Method for using the complete resource capacity of a synchronous digital hierarchy network, subject to a protection mechanism, in the presence of a data (packet) network, and related apparatus for the implementation of the method |
| ATE460784T1 (en) * | 2004-12-23 | 2010-03-15 | Tellabs Denmark As | REDUCING THE TRANSPORT CAPACITY OF A GROUP OF VIRTUAL CHAINS |
| DE102005037580B3 (en) * | 2005-08-09 | 2006-12-28 | Siemens Ag | Data transmitting method for data/communication network, involves transmitting data of two different types in two concatenated groups and characterizing groups through entry into field pertaining to link capacity adjustment scheme protocol |
| CN101005327B (en) * | 2006-01-17 | 2011-12-07 | 中兴通讯股份有限公司 | Regulating device and method for dynamic link capacity and flow of transmission net loaded ethernet |
| WO2007129699A1 (en) * | 2006-05-09 | 2007-11-15 | Nec Corporation | Communication system, node, terminal, communication method, and program |
| JP2008301147A (en) * | 2007-05-31 | 2008-12-11 | Fujitsu Ltd | Transmission apparatus and path verification method |
-
2009
- 2009-05-06 EP EP09305403A patent/EP2249526B1/en not_active Not-in-force
-
2010
- 2010-05-04 US US13/266,030 patent/US20120044800A1/en not_active Abandoned
- 2010-05-04 JP JP2012509002A patent/JP2012526436A/en active Pending
- 2010-05-04 CN CN201080019973XA patent/CN102422603A/en active Pending
- 2010-05-04 WO PCT/EP2010/055996 patent/WO2010128023A1/en not_active Ceased
- 2010-05-04 KR KR1020117028889A patent/KR20120005540A/en not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6725401B1 (en) * | 2000-10-26 | 2004-04-20 | Nortel Networks Limited | Optimized fault notification in an overlay mesh network via network knowledge correlation |
| US20060187715A1 (en) * | 2005-01-21 | 2006-08-24 | Raza Microelectronics, Inc. | System and method for performing concatentation of diversely routed channels |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102422603A (en) | 2012-04-18 |
| KR20120005540A (en) | 2012-01-16 |
| EP2249526A1 (en) | 2010-11-10 |
| US20120044800A1 (en) | 2012-02-23 |
| EP2249526B1 (en) | 2012-07-04 |
| JP2012526436A (en) | 2012-10-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10715888B2 (en) | Systems and methods for managing excess optical capacity and margin in optical networks | |
| EP2249526B1 (en) | Protection of user data transmission through a transport network | |
| US9455788B2 (en) | Hitless modulation scheme change systems and methods in optical networks | |
| US6940808B1 (en) | Adaptive rate traffic recovery mechanism for communication networks | |
| US6848006B1 (en) | Ring-mesh networks | |
| US8958701B2 (en) | Methods and systems of preserving client overhead bytes in optical transport network tunneling applications | |
| US9853722B1 (en) | Systems and methods for path protection switching due to client protection switching | |
| EP2156592B1 (en) | Response to otuk-bdi for otn interfaces to restore bidirectional communications | |
| EP1735950B1 (en) | Line-level path protection in the optical layer | |
| US7170852B1 (en) | Mesh with projection channel access (MPCA) | |
| US8965197B2 (en) | Method of switching optical transport network and node device | |
| EP2866398B1 (en) | Data transmission system providing improved failure resilience | |
| CN100370781C (en) | A ring network protection control method | |
| US20040221058A1 (en) | Nested protection switching in a mesh connected communications network | |
| US8045477B2 (en) | Smart protection escalation mechanism prevention | |
| EP2720391B1 (en) | Optical transport network power-save technique based on client signal information | |
| US7933199B2 (en) | Transmission system, path control method and transmission device | |
| CN106850256A (en) | A kind of Packet Transport Network and its guard method, network element device | |
| Ayandeh | Convergence of protection and restoration in telecommunication networks | |
| Aguirre-Torres et al. | A comparison of layer-2 protection and restoration mechanisms for data-aware transport networks | |
| Frigerio et al. | Realizing the optical transport networking vision in the 100 Gb/s era | |
| Sivarajan | 10 Advances in Packet Optical Transport in Optical Networking and Broadband Transmission | |
| Imamovic et al. | Practical benchmark analysis of traffic protection with Ethernet-over-SDH transmission | |
| Kartalopoulos | Next Generation SONET/SDH |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201080019973.X Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10715884 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13266030 Country of ref document: US |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012509002 Country of ref document: JP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 20117028889 Country of ref document: KR Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 10715884 Country of ref document: EP Kind code of ref document: A1 |