WO2010093577A2 - Free standing steel catenary risers - Google Patents

Free standing steel catenary risers Download PDF

Info

Publication number
WO2010093577A2
WO2010093577A2 PCT/US2010/023455 US2010023455W WO2010093577A2 WO 2010093577 A2 WO2010093577 A2 WO 2010093577A2 US 2010023455 W US2010023455 W US 2010023455W WO 2010093577 A2 WO2010093577 A2 WO 2010093577A2
Authority
WO
WIPO (PCT)
Prior art keywords
pipeline
vessel
steel catenary
host vessel
host
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2010/023455
Other languages
French (fr)
Other versions
WO2010093577A3 (en
Inventor
You Sun Li
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Shell USA Inc
Original Assignee
Shell Internationale Research Maatschappij BV
Shell Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV, Shell Oil Co filed Critical Shell Internationale Research Maatschappij BV
Priority to BRPI1008525A priority Critical patent/BRPI1008525B8/en
Priority to US13/148,483 priority patent/US8596913B2/en
Priority to CN201080007153.9A priority patent/CN102317149B/en
Priority to GB1113553.0A priority patent/GB2479109B/en
Priority to AU2010213925A priority patent/AU2010213925B2/en
Publication of WO2010093577A2 publication Critical patent/WO2010093577A2/en
Publication of WO2010093577A3 publication Critical patent/WO2010093577A3/en
Anticipated expiration legal-status Critical
Priority to NO20111210A priority patent/NO339277B1/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water

Definitions

  • the invention generally relates to a free standing steel catenary riser that can be preinstalled before host arrival.
  • PCT Publication number WO2008042943 having attorney docket number TH2849 discloses a floating system positioned in a body of water having a water bottom, the system comprising a host member floating on a surface of the water; a flotation module floating under the surface of the water; a flexible hose connecting the host member to the flotation module; and an elongated underwater line structure, comprising a top portion connected to the flotation module; a bottom portion extending to the water bottom and adapted to connect to a flowline lying on the water bottom; and at least one of the top portion and the bottom portion comprising a catenary configuration.
  • PCT Publication number WO2008042943 is herein incorporated by reference in its entirety.
  • PCT Publication number WO2008036728 having attorney docket number TH2982 discloses a floating system positioned in a body of water having a water bottom, the system comprising a host member floating in the water; an elongated underwater line structure, comprising a top connected to the host; a bottom extending to the seabed and adapted to connect to a flowline lying on the seabed; a first portion of the line structure being shaped concave upward; a second portion of the line structure being shaped concave upward; and a transition segment between being shaped concave downward, the transition segment located between the first portion and the second portion.
  • PCT Publication number WO2008036728 is herein incorporated by reference in its entirety. Summary of the Invention
  • One aspect of the invention provides an offshore riser system comprising a tubular from a sea floor to a sea surface comprising a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion.
  • Another aspect of the invention provides a method of installing an offshore riser system comprising laying a first horizontal portion of a tubular on a sea floor; connecting a second vertical portion of the tubular to a flotation module at or near a sea surface; forming a third curved portion between the first horizontal portion and the second vertical portion; connecting the second portion to a floating host vessel; and disconnecting the flotation module from the second portion.
  • Figure 1 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
  • Figure 2 shows an example of a steel catenary riser after installation according to one or more embodiments of the present disclosure.
  • Figure 3 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
  • Figure 4 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
  • Figure 5 shows a free-standing mode of a free standing steel catenary riser according to one or more embodiments of the present disclosure.
  • Figure 6 shows a connection mode of a free standing steel catenary riser according to one or more embodiments of the present disclosure.
  • Offshore drilling and production may use a pipeline extending from the offshore production site on the seafloor, where the fluid product is extracted, to a product storage area.
  • the product storage area is disposed on a host vessel to which the pipeline is connected to allow for the fluid product to flow into the product storage area.
  • An example of such a pipeline is a steel catenary riser.
  • One or more embodiments of the disclosure relates to a buoyancy device for a steel catenary riser that allows the steel catenary riser to be pre-installed prior to arrival of a host vessel, while maintaining a catenary profile such that the steel catenary riser can be immediately attached to the host vessel upon its arrival, and fluid product can be extracted from the offshore drilling site without waiting for installation of the steel catenary riser after arrival of the host vessel.
  • a pipeline 17 may be formed into a steel catenary riser 20 using any of various different installation methods, several examples of which are detailed below. However, the installation methods are given below only as examples, and embodiments of the present disclosure are not limited thereto.
  • FIGs. 1-2 show one example of a steel catenary riser installation.
  • a host vessel 10 which floats on a body of water 100, and which may be, for example, a large tanker, initially contains the pipeline 17 that will form the steel catenary riser 20.
  • a distal end 23 of the pipeline 17 is attached to a secondary vessel 15, e.g., a tugboat, that is generally smaller and more mobile than the host vessel 10.
  • the host vessel 10 which stays substantially stationary, incrementally lowers the pipeline 17 for a first period while the secondary vessel 15 travels away from the host vessel 10.
  • the pipeline is shown being lowered through a receptacle 11 to which a near end 21 of the pipeline 17 is attached, the pipe may also be lowered from other sections of the host vessel 10.
  • the host vessel 10 then ceases lowering the pipeline 17 while the secondary vessel 15 moves back toward the host vessel 10 for a second period.
  • the host vessel 10 then again incrementally lowers the pipeline 17 for a third period while the secondary vessel 15 travels away from the host vessel 10. This process is repeated until the pipeline 17 contacts the seabed 101.
  • Each period may be a predetermined time interval or may be determined based on the length of pipeline lowered.
  • the secondary vessel 15 moves proximate to the host vessel 10 to ensure a desired catenary profile of the pipeline 17, which is a smooth curve between the horizontal portion of the pipeline 17 on the seabed 101 to the substantially vertical portion of the pipeline 17 which attaches to the receptacle 1 1.
  • the secondary vessel 15 then moves to a location above the offshore production site and releases the distal end 23 of the pipeline 17. This process of lowering the pipeline 17 creates the desired catenary profile with the pipeline 17, while avoiding unnecessary bending stresses on the pipeline 17.
  • the installed steel catenary riser is shown in Fig. 2.
  • the pipeline 17 forms a steel catenary riser 20, a near end 21 of which is attached to the host vessel 10, and the distal end 23 of which is connected to the offshore production site (not shown).
  • the pipeline 17 that makes up the steel catenary riser 20 comes off the host vessel 10 at a small angle from perpendicular to the seabed 101. As the pipeline 17 extends deeper into the body of water 100, the angle grows larger, until the pipeline 17 is substantially perpendicular to the seabed 101. Proximate to the seabed 101 , the pipeline 17 makes a curve that becomes substantially parallel as the pipeline 17 contacts the seabed 101. A large portion of the steel catenary riser 20 rests on the seabed 101 , extending to the offshore production site (not shown). The steel catenary riser 20 efficiently and cost-effectively delivers fluid product to the host vessel 10.
  • FIGs. 3-4 show another example of steel catenary riser installation.
  • the section of the pipeline 37 that rests on the seabed 101 may be laid down before host arrival and abandoned on the seafloor 37. That is, the pipeline 37 may be partially installed, and abandoned on the seafloor so that the remainder of the pipeline 17 can be installed at a later date.
  • the host vessel 10 arrives, and the partially installed pipeline 37 is retrieved from the site and attached to additional pipeline 17.
  • the near end 21 of the additional pipeline 17 is attached to a smaller, more mobile secondary vessel 15, which continues the laying process as described above with reference to Figs. 1 and 2, and the additional pipeline 17 is formed into a riser portion of the steel catenary riser 20.
  • the near end 21 of the steel catenary riser 20 is then attached to the receptacle 1 1 of the host vessel 10, at which point the steel catenary riser 20 will have a similar catenary profile as that shown in Fig. 2.
  • the riser portion of the steel catenary riser 20 may be included at the seabed before abandonment, in which case the riser portion is laid out along a curve on the seafloor 101 , and the near end 21 of the pipeline 17 will be at a location on the seabed 101 apart from a location directly under where the host vessel 10 will arrive.
  • the secondary vessel 15 or some other construction vessel retrieves the near end 21 from the seafloor, and the near end 21 is attached to the receptacle 11 of the host vessel 10.
  • Fig. 5 shows a free-standing mode
  • Fig. 6 shows a host connection mode of a free-standing steel catenary riser system according to one or more embodiments of the present disclosure.
  • the steel catenary riser 20 is pre-installed before host vessel arrival. The pre-installation may be accomplished by any installation method.
  • the pipeline 17 is formed into the catenary profile as with the steel catenary riser 20 shown in Fig. 2, except that the near end 21 of the pipeline that normally attaches to the host vessel 10 is free, and a buoyancy device 40 is attached proximate the near end 21.
  • the buoyancy device 40 may include one or more of a buoyancy foam, an air can, a buoy, or other buoyancy devices known in the art.
  • the buoyancy device 40 may be detachably attached around the pipeline 17.
  • the buoyancy device 40 may be attached to the pipeline 17 by one or more of a clamping mechanism, welding, bonding, and other attachment methods known in the art.
  • the buoyancy device 40 may be attached to the pipeline 17 after the near end 21 is attached to a vessel at the surface.
  • the distal end 23 of the pipeline is connected to the offshore production site (not shown).
  • the buoyancy device 40 provides an upward buoyancy force to the near end 21 of the pipeline 17 such that the catenary profile of the steel catenary riser 20 is maintained.
  • a bottom load required to maintain the catenary profile may be provided by an anchoring cable 30 attached to the steel catenary riser 20, such that the buoyancy device 40 does not float to the top surface of the body of water 100, and the curve portion of the steel catenary riser 20 can substantially maintain its pre-installed shape.
  • One end of the anchor cable 30 is attached to the steel catenary riser 20 at an anchor point 31 , while the other end of the anchor cable 30 is attached to a pile 33 disposed on the seabed 101.
  • the anchor cable 30 is taut, as it provides a downward force on the pipeline 17 that counters the upward buoyancy force of the buoyancy device 40.
  • the pipeline 17 above the anchor point 31 becomes perpendicular to the seabed 101 , while the pipeline 18 below the anchor point substantially, though not completely, maintains the normal catenary profile.
  • the near end 21 of the steel catenary riser 20 is attached to receptacle 1 1 of the host vessel 10, and the buoyancy device 40 is removed therefrom.
  • the catenary riser is attached to the host vessel 10, and the free-standing steel catenary riser system is in a host connection mode.
  • the host vessel 10 provides enough upward force on the near end 21 of the steel catenary riser 20 to support the pipeline 17.
  • the anchor cable 30 no longer needs to provide a counteracting force, and becomes slack.
  • the anchor cable may be disconnected altogether.
  • the pipeline functions as a normal steel catenary riser 20, and delivers fluid product from the offshore production site (not shown) to the host vessel 10.
  • the pipeline 17 forming the catenary riser 20 may be disconnected from the host vessel 10, and the buoyancy device 40 may be reattached to the pipeline 17, if the need arises.
  • embodiments of the present disclosure provide a steel catenary riser that can be installed before the arrival of the host vessel. Therfore, installation cycles may be shortened. Further, if the steel catenary riser installation is integrated with the pipeline laying process, installation cost may be reduced.
  • an offshore riser system comprising a tubular from a sea floor to a sea surface comprising a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion.
  • the system also includes an anchor cable connected to the third portion and to an anchoring mechanism on the sea floor.
  • the system also includes a host vessel connected to the second portion.
  • the host vessel comprises a spar, a semisub, an FPSO, or a TLP.
  • the system also includes at least one of a subsea well and a subsea manifold connected to the first portion.
  • an end of the second portion is at a depth of at least about 20 meters, for example at least about 50 meters.
  • a method of installing an offshore riser system comprising laying a first horizontal portion of a tubular on a sea floor; connecting a second vertical portion of the tubular to a flotation module at or near a sea surface; forming a third curved portion between the first horizontal portion and the second vertical portion; connecting the second portion to a floating host vessel; and disconnecting the flotation module from the second portion.
  • the method also includes anchoring the third portion to the sea floor.
  • the method also includes keeping the second portion and the flotation module at a depth of at least 10 meters, for example at least about 25 meters.
  • the flotation module comprises at least one of a buoyancy can and a foam.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Earth Drilling (AREA)
  • Materials For Medical Uses (AREA)

Abstract

An offshore riser system comprising a tubular from a sea floor to a sea surface comprising a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion.

Description

FREE STANDING STEEL CATENARY RISERS
Field of the Invention
The invention generally relates to a free standing steel catenary riser that can be preinstalled before host arrival.
Background of the Invention
PCT Publication number WO2008042943, having attorney docket number TH2849 discloses a floating system positioned in a body of water having a water bottom, the system comprising a host member floating on a surface of the water; a flotation module floating under the surface of the water; a flexible hose connecting the host member to the flotation module; and an elongated underwater line structure, comprising a top portion connected to the flotation module; a bottom portion extending to the water bottom and adapted to connect to a flowline lying on the water bottom; and at least one of the top portion and the bottom portion comprising a catenary configuration. PCT Publication number WO2008042943 is herein incorporated by reference in its entirety.
PCT Publication number WO2008036728, having attorney docket number TH2982 discloses a floating system positioned in a body of water having a water bottom, the system comprising a host member floating in the water; an elongated underwater line structure, comprising a top connected to the host; a bottom extending to the seabed and adapted to connect to a flowline lying on the seabed; a first portion of the line structure being shaped concave upward; a second portion of the line structure being shaped concave upward; and a transition segment between being shaped concave downward, the transition segment located between the first portion and the second portion. PCT Publication number WO2008036728 is herein incorporated by reference in its entirety. Summary of the Invention
One aspect of the invention provides an offshore riser system comprising a tubular from a sea floor to a sea surface comprising a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion.
Another aspect of the invention provides a method of installing an offshore riser system comprising laying a first horizontal portion of a tubular on a sea floor; connecting a second vertical portion of the tubular to a flotation module at or near a sea surface; forming a third curved portion between the first horizontal portion and the second vertical portion; connecting the second portion to a floating host vessel; and disconnecting the flotation module from the second portion.
Brief Description of the Drawings Figure 1 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
Figure 2 shows an example of a steel catenary riser after installation according to one or more embodiments of the present disclosure.
Figure 3 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
Figure 4 shows an example of a steel catenary riser during installation according to one or more embodiments of the present disclosure.
Figure 5 shows a free-standing mode of a free standing steel catenary riser according to one or more embodiments of the present disclosure. Figure 6 shows a connection mode of a free standing steel catenary riser according to one or more embodiments of the present disclosure.
Detailed Description of the Drawings Exemplary embodiments of the invention will be described with reference to the accompanying figures. Like items in the figures are shown with the same reference numbers.
In embodiments disclosed herein, numerous specific details are set forth in order to provide a more thorough understanding of the invention. However, it will be apparent to one of ordinary skill in the art that the invention may be practiced without these specific details. In other instances, well-known features have not been described in detail to avoid obscuring the invention.
Offshore drilling and production may use a pipeline extending from the offshore production site on the seafloor, where the fluid product is extracted, to a product storage area. In one example of offshore drilling and production, the product storage area is disposed on a host vessel to which the pipeline is connected to allow for the fluid product to flow into the product storage area. An example of such a pipeline is a steel catenary riser. One or more embodiments of the disclosure relates to a buoyancy device for a steel catenary riser that allows the steel catenary riser to be pre-installed prior to arrival of a host vessel, while maintaining a catenary profile such that the steel catenary riser can be immediately attached to the host vessel upon its arrival, and fluid product can be extracted from the offshore drilling site without waiting for installation of the steel catenary riser after arrival of the host vessel.
Figures 1 -2:
A pipeline 17 may be formed into a steel catenary riser 20 using any of various different installation methods, several examples of which are detailed below. However, the installation methods are given below only as examples, and embodiments of the present disclosure are not limited thereto.
Figs. 1-2 show one example of a steel catenary riser installation. A host vessel 10, which floats on a body of water 100, and which may be, for example, a large tanker, initially contains the pipeline 17 that will form the steel catenary riser 20. A distal end 23 of the pipeline 17 is attached to a secondary vessel 15, e.g., a tugboat, that is generally smaller and more mobile than the host vessel 10.
The host vessel 10, which stays substantially stationary, incrementally lowers the pipeline 17 for a first period while the secondary vessel 15 travels away from the host vessel 10. Although here, the pipeline is shown being lowered through a receptacle 11 to which a near end 21 of the pipeline 17 is attached, the pipe may also be lowered from other sections of the host vessel 10. The host vessel 10 then ceases lowering the pipeline 17 while the secondary vessel 15 moves back toward the host vessel 10 for a second period. The host vessel 10 then again incrementally lowers the pipeline 17 for a third period while the secondary vessel 15 travels away from the host vessel 10. This process is repeated until the pipeline 17 contacts the seabed 101. Each period may be a predetermined time interval or may be determined based on the length of pipeline lowered.
When the pipeline 17 contacts the seabed 101 , the secondary vessel 15 moves proximate to the host vessel 10 to ensure a desired catenary profile of the pipeline 17, which is a smooth curve between the horizontal portion of the pipeline 17 on the seabed 101 to the substantially vertical portion of the pipeline 17 which attaches to the receptacle 1 1. The secondary vessel 15 then moves to a location above the offshore production site and releases the distal end 23 of the pipeline 17. This process of lowering the pipeline 17 creates the desired catenary profile with the pipeline 17, while avoiding unnecessary bending stresses on the pipeline 17.
The installed steel catenary riser is shown in Fig. 2. The pipeline 17 forms a steel catenary riser 20, a near end 21 of which is attached to the host vessel 10, and the distal end 23 of which is connected to the offshore production site (not shown). The pipeline 17 that makes up the steel catenary riser 20 comes off the host vessel 10 at a small angle from perpendicular to the seabed 101. As the pipeline 17 extends deeper into the body of water 100, the angle grows larger, until the pipeline 17 is substantially perpendicular to the seabed 101. Proximate to the seabed 101 , the pipeline 17 makes a curve that becomes substantially parallel as the pipeline 17 contacts the seabed 101. A large portion of the steel catenary riser 20 rests on the seabed 101 , extending to the offshore production site (not shown). The steel catenary riser 20 efficiently and cost-effectively delivers fluid product to the host vessel 10.
Figures 3-4: Figs. 3-4 show another example of steel catenary riser installation. As shown in Fig. 3, the section of the pipeline 37 that rests on the seabed 101 may be laid down before host arrival and abandoned on the seafloor 37. That is, the pipeline 37 may be partially installed, and abandoned on the seafloor so that the remainder of the pipeline 17 can be installed at a later date. As shown in Fig. 4, at the later date, the host vessel 10 arrives, and the partially installed pipeline 37 is retrieved from the site and attached to additional pipeline 17. The near end 21 of the additional pipeline 17 is attached to a smaller, more mobile secondary vessel 15, which continues the laying process as described above with reference to Figs. 1 and 2, and the additional pipeline 17 is formed into a riser portion of the steel catenary riser 20. The near end 21 of the steel catenary riser 20 is then attached to the receptacle 1 1 of the host vessel 10, at which point the steel catenary riser 20 will have a similar catenary profile as that shown in Fig. 2.
Alternatively, the riser portion of the steel catenary riser 20 may be included at the seabed before abandonment, in which case the riser portion is laid out along a curve on the seafloor 101 , and the near end 21 of the pipeline 17 will be at a location on the seabed 101 apart from a location directly under where the host vessel 10 will arrive. In this case, the secondary vessel 15 or some other construction vessel retrieves the near end 21 from the seafloor, and the near end 21 is attached to the receptacle 11 of the host vessel 10.
Figures 5-6:
Fig. 5 shows a free-standing mode and Fig. 6 shows a host connection mode of a free-standing steel catenary riser system according to one or more embodiments of the present disclosure. As shown in Fig. 5, the steel catenary riser 20 is pre-installed before host vessel arrival. The pre-installation may be accomplished by any installation method. The pipeline 17 is formed into the catenary profile as with the steel catenary riser 20 shown in Fig. 2, except that the near end 21 of the pipeline that normally attaches to the host vessel 10 is free, and a buoyancy device 40 is attached proximate the near end 21. The buoyancy device 40 may include one or more of a buoyancy foam, an air can, a buoy, or other buoyancy devices known in the art. The buoyancy device 40 may be detachably attached around the pipeline 17. The buoyancy device 40 may be attached to the pipeline 17 by one or more of a clamping mechanism, welding, bonding, and other attachment methods known in the art. The buoyancy device 40 may be attached to the pipeline 17 after the near end 21 is attached to a vessel at the surface. The distal end 23 of the pipeline is connected to the offshore production site (not shown).
The buoyancy device 40 provides an upward buoyancy force to the near end 21 of the pipeline 17 such that the catenary profile of the steel catenary riser 20 is maintained. A bottom load required to maintain the catenary profile may be provided by an anchoring cable 30 attached to the steel catenary riser 20, such that the buoyancy device 40 does not float to the top surface of the body of water 100, and the curve portion of the steel catenary riser 20 can substantially maintain its pre-installed shape. One end of the anchor cable 30 is attached to the steel catenary riser 20 at an anchor point 31 , while the other end of the anchor cable 30 is attached to a pile 33 disposed on the seabed 101. In free-standing mode, the anchor cable 30 is taut, as it provides a downward force on the pipeline 17 that counters the upward buoyancy force of the buoyancy device 40. The pipeline 17 above the anchor point 31 becomes perpendicular to the seabed 101 , while the pipeline 18 below the anchor point substantially, though not completely, maintains the normal catenary profile.
As shown in Fig. 6, after the host vessel 10 arrives, the near end 21 of the steel catenary riser 20 is attached to receptacle 1 1 of the host vessel 10, and the buoyancy device 40 is removed therefrom. The catenary riser is attached to the host vessel 10, and the free-standing steel catenary riser system is in a host connection mode. The host vessel 10 provides enough upward force on the near end 21 of the steel catenary riser 20 to support the pipeline 17. Thus, the anchor cable 30 no longer needs to provide a counteracting force, and becomes slack. Alternatively, the anchor cable may be disconnected altogether. At this point, the pipeline functions as a normal steel catenary riser 20, and delivers fluid product from the offshore production site (not shown) to the host vessel 10. The pipeline 17 forming the catenary riser 20 may be disconnected from the host vessel 10, and the buoyancy device 40 may be reattached to the pipeline 17, if the need arises.
Advantageously, embodiments of the present disclosure provide a steel catenary riser that can be installed before the arrival of the host vessel. Therfore, installation cycles may be shortened. Further, if the steel catenary riser installation is integrated with the pipeline laying process, installation cost may be reduced.
Illustrative Embodiments: In one embodiment, there is disclosed an offshore riser system comprising a tubular from a sea floor to a sea surface comprising a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion. In some embodiments, the system also includes an anchor cable connected to the third portion and to an anchoring mechanism on the sea floor. In some embodiments, the system also includes a host vessel connected to the second portion. In some embodiments, the host vessel comprises a spar, a semisub, an FPSO, or a TLP. In some embodiments, the system also includes at least one of a subsea well and a subsea manifold connected to the first portion. In some embodiments, an end of the second portion is at a depth of at least about 20 meters, for example at least about 50 meters.
In one embodiment, there is disclosed a method of installing an offshore riser system comprising laying a first horizontal portion of a tubular on a sea floor; connecting a second vertical portion of the tubular to a flotation module at or near a sea surface; forming a third curved portion between the first horizontal portion and the second vertical portion; connecting the second portion to a floating host vessel; and disconnecting the flotation module from the second portion. In some embodiments, the method also includes anchoring the third portion to the sea floor. In some embodiments, the method also includes keeping the second portion and the flotation module at a depth of at least 10 meters, for example at least about 25 meters. In some embodiments, the flotation module comprises at least one of a buoyancy can and a foam. While the invention has been described with respect to a limited number of embodiments, those skilled in the art, having benefit of this disclosure, will appreciate that other embodiments can be devised which do not depart from the scope of the invention as disclosed herein. Accordingly, the scope of the invention should be limited only by the attached claims.

Claims

C L A I M S
1. An offshore riser system comprising: a tubular from a sea floor to a sea surface comprising: a first horizontal portion at the sea floor; a second vertical portion near the sea surface; and a third curved portion located between the first and second portions; and a buoyancy module connected to the second portion, adapted to maintain a shape of the curved portion and enable a connection of a vessel to the second portion.
2. The system of claim 1 , further comprising: an anchor cable connected to the third portion and to an anchoring mechanism on the sea floor.
3. The system of one or more of claims 1 -2, further comprising: a host vessel connected to the second portion.
4. The system of claim 3, wherein the host vessel comprises a spar, a semisub, an
FPSO, or a TLP.
5. The system of one or more of claims 1 -4, further comprising: at least one of a subsea well and a subsea manifold connected to the first portion.
6. The system of one or more of claims 1 -5, wherein an end of the second portion is at a depth of at least about 20 meters, for example at least about 50 meters.
7. A method of installing an offshore riser system comprising: laying a first horizontal portion of a tubular on a sea floor; connecting a second vertical portion of the tubular to a flotation module at or near a sea surface; forming a third curved portion between the first horizontal portion and the second vertical portion; connecting the second portion to a floating host vessel; and disconnecting the flotation module from the second portion.
8. The method of claim 7, further comprising anchoring the third portion to the sea floor.
9. The method of one or more of claims 7-8, further comprising keeping the second portion and the flotation module at a depth of at least 10 meters, for example at least about 25 meters.
10. The method of one or more of claims 7-9, wherein the flotation module comprises at least one of a buoyancy can and a foam.
PCT/US2010/023455 2009-02-10 2010-02-08 Free standing steel catenary risers Ceased WO2010093577A2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
BRPI1008525A BRPI1008525B8 (en) 2009-02-10 2010-02-08 "off-shore riser system, and method for installing off-shore riser system".
US13/148,483 US8596913B2 (en) 2009-02-10 2010-02-08 Free standing steel catenary risers
CN201080007153.9A CN102317149B (en) 2009-02-10 2010-02-08 Self Supporting Steel Catenary Riser
GB1113553.0A GB2479109B (en) 2009-02-10 2010-02-08 Free standing steel catenary risers
AU2010213925A AU2010213925B2 (en) 2009-02-10 2010-02-08 Free standing steel catenary risers
NO20111210A NO339277B1 (en) 2009-02-10 2011-09-07 Freestanding catheter-shaped steel riser

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US15127309P 2009-02-10 2009-02-10
US61/151,273 2009-02-10

Publications (2)

Publication Number Publication Date
WO2010093577A2 true WO2010093577A2 (en) 2010-08-19
WO2010093577A3 WO2010093577A3 (en) 2011-02-24

Family

ID=42562249

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2010/023455 Ceased WO2010093577A2 (en) 2009-02-10 2010-02-08 Free standing steel catenary risers

Country Status (8)

Country Link
US (1) US8596913B2 (en)
CN (1) CN102317149B (en)
AU (1) AU2010213925B2 (en)
BR (1) BRPI1008525B8 (en)
GB (1) GB2479109B (en)
MY (1) MY159069A (en)
NO (1) NO339277B1 (en)
WO (1) WO2010093577A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020136378A1 (en) 2018-12-28 2020-07-02 Subsea 7 Limited Installing subsea risers

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105004500A (en) * 2015-06-04 2015-10-28 浙江海洋学院 Steel catenary riser integral analysis test apparatus with pipe-soil interaction taken into consideration

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO160914C (en) * 1986-03-24 1989-06-14 Svensen Niels Alf BUILDING LOADING SYSTEM FOR OFFSHORE PETROLEUM PRODUCTION.
AUPP653998A0 (en) 1998-10-16 1998-11-05 Silverbrook Research Pty Ltd Micromechanical device and method (ij46B)
FR2766869B1 (en) * 1997-08-01 1999-09-03 Coflexip DEVICE FOR TRANSFERRING FLUID BETWEEN A SUBSEA GROUND EQUIPMENT AND A SURFACE UNIT
WO2000005129A1 (en) * 1998-07-23 2000-02-03 Fmc Corporation Riser arrangement for offshore vessel and method for installation
WO2000008262A1 (en) * 1998-08-06 2000-02-17 Fmc Corporation Enhanced steel catenary riser system
NO312358B1 (en) 2000-07-20 2002-04-29 Navion Asa Offshore loading or production system for a dynamically positioned ship
FR2826051B1 (en) * 2001-06-15 2003-09-19 Bouygues Offshore GROUND-SURFACE CONNECTION INSTALLATION OF A SUBSEA PIPE CONNECTED TO A RISER BY AT LEAST ONE FLEXIBLE PIPE ELEMENT HOLDED BY A BASE
GB2380747B (en) * 2001-10-10 2005-12-21 Rockwater Ltd A riser and method of installing same
FR2839110B1 (en) * 2002-04-29 2004-12-03 Technip Coflexip UPRIGHT SYSTEM CONNECTING AN UNDERWATER FIXED TO A FLOATING SURFACE UNIT
FR2840350B1 (en) * 2002-05-31 2004-12-10 Bouygues Offshore MULTI-CATENARY TYPE SURFACE LINK SUBMARINE CONDUCT
WO2004035375A1 (en) * 2002-10-16 2004-04-29 Single Buoy Moorings Inc. Riser installation vessel and method of using the same
US7025533B1 (en) * 2004-09-21 2006-04-11 Kellogg Brown & Root, Inc. Concentrated buoyancy subsea pipeline apparatus and method
WO2006076486A2 (en) * 2005-01-14 2006-07-20 Shell Internationale Research Maatschappij B.V. System and methods to install subsea structures
US20070081862A1 (en) * 2005-10-07 2007-04-12 Heerema Marine Contractors Nederland B.V. Pipeline assembly comprising an anchoring device and method for installing a pipeline assembly comprising an anchoring device
US8123437B2 (en) * 2005-10-07 2012-02-28 Heerema Marine Contractors Nederland B.V. Pipeline assembly comprising an anchoring device
BRPI0716924A2 (en) 2006-09-21 2013-11-12 Shell Int Research FLOATING SYSTEM POSITIONED ON A BODY OF WATER HAVING A WATER BACKGROUND, AND METHOD FOR MODIFYING A FLOATING SYSTEM
MY149380A (en) 2006-10-05 2013-08-30 Shell Int Research Hybrid riser systems and methods
US7628568B2 (en) * 2007-01-29 2009-12-08 Chevron U.S.A. Inc. Hinge-over riser assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020136378A1 (en) 2018-12-28 2020-07-02 Subsea 7 Limited Installing subsea risers
US11598156B2 (en) 2018-12-28 2023-03-07 Subsea 7 Limited Installing subsea risers

Also Published As

Publication number Publication date
CN102317149B (en) 2015-06-03
BRPI1008525A2 (en) 2016-03-08
BRPI1008525B8 (en) 2020-11-03
GB2479109A (en) 2011-09-28
BRPI1008525B1 (en) 2020-10-06
GB201113553D0 (en) 2011-09-21
CN102317149A (en) 2012-01-11
AU2010213925B2 (en) 2013-02-14
AU2010213925A1 (en) 2011-08-25
MY159069A (en) 2016-12-15
GB2479109B (en) 2012-12-26
WO2010093577A3 (en) 2011-02-24
US20110318110A1 (en) 2011-12-29
NO20111210A1 (en) 2011-09-07
NO339277B1 (en) 2016-11-21
US8596913B2 (en) 2013-12-03

Similar Documents

Publication Publication Date Title
CN103661819B (en) Floating system connected to an underwater line structure and methods of use
AU2007303175B2 (en) Hybrid riser systems and methods
NO20190762A1 (en) Hybrid riser tower and procedure for installing this
EP2326794A1 (en) A offshore seabed to surface conduit transfer system
US6257801B1 (en) Riser arrangement for offshore vessel and method for installation
US20060062635A1 (en) Concentrated buoyancy subsea pipeline apparatus and method
US20110286802A1 (en) Improved Subsea Riser System
EP2504517B1 (en) Riser configuration
NO347742B1 (en) Offshore flexible line installation and removal
EP2704945B1 (en) An offshore system
EP0907002A2 (en) Catenary riser supports
US8596913B2 (en) Free standing steel catenary risers
BRPI0719770B1 (en) Flotation system

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080007153.9

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 1113553

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20100208

WWE Wipo information: entry into national phase

Ref document number: 1113553.0

Country of ref document: GB

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2010213925

Country of ref document: AU

Date of ref document: 20100208

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13148483

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10741594

Country of ref document: EP

Kind code of ref document: A2

122 Ep: pct application non-entry in european phase

Ref document number: 10741594

Country of ref document: EP

Kind code of ref document: A2

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: PI1008525

Country of ref document: BR

ENP Entry into the national phase

Ref document number: PI1008525

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20110809