WO2010059638A2 - Systems and methods for mitigating annular pressure buildup in an oil or gas well - Google Patents
Systems and methods for mitigating annular pressure buildup in an oil or gas well Download PDFInfo
- Publication number
- WO2010059638A2 WO2010059638A2 PCT/US2009/064828 US2009064828W WO2010059638A2 WO 2010059638 A2 WO2010059638 A2 WO 2010059638A2 US 2009064828 W US2009064828 W US 2009064828W WO 2010059638 A2 WO2010059638 A2 WO 2010059638A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- chamber
- pressure
- casing
- annular
- type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/10—Wear protectors; Centralising devices, e.g. stabilisers
- E21B17/1078—Stabilisers or centralisers for casing, tubing or drill pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/063—Valve or closure with destructible element, e.g. frangible disc
Definitions
- This invention relates generally to mitigation of temperature-related pressure buildup in the trapped annulus of an oil or gas well, and specifically to systems and methods for mitigating such annular pressure buildup, wherein such systems and methods typically employ production and/or tieback casing having one or more pressure mitigating chambers.
- VIT Vacuum insulated tubing
- APB mitigation efforts have involved placement of a compressible fluid, such as nitrogen (N 2 ), in the trapped annulus during the cement job to limit the pressure buildup associated with expansion of the trapped fluid. See, e.g., Williamson et al, United States Patent No. 4,109,725. While such methods can help limit the pressure in the annulus by liquefying the compressible fluid, the resulting pressures can still be quite high.
- Insulating fluid/gel has been placed in the tubing/casing annulus in an effort to limit the transfer of heat due to convection from the wellbore to the fluids in the trapped casing/casing annulus. Methods utilizing such insulating fluid/gel effect APB mitigation in a manner similar to those employing VIT. See, e.g., Lon et al., United States Patent No. 4,877,542.
- APB mitigation efforts have involved strapping a compressible solid material, such as foam or hollow particles, to the outside of the inner casing string to accommodate expansion of the fluids in the annulus by effectively "increasing" the volume in the annulus as the solid material compresses. See, e.g., Vargo et al., United States Patent No. 7,096,944.
- Another strategy for mitigating APB is to place a fluid or other material in the annulus that will "shrink" when activated due to heat and/or time. See, e.g., Hermes et al., United States Patent Application Publication No. 20070114033 Al, wherein methyl methacrylate is so used.
- Burst and/or collapse disks have been employed to act as a pressure relief means and to allow the heated fluid in the annulus to "vent” through the disc. See, e.g., Staudt, United States Patent No. 6,457,528.
- APB remains a serious problem — particularly for subsea operations. Accordingly, methods and systems that can better/further mitigate APB, either by themselves or in concert with one or more of the above-described techniques, would be particularly beneficial — particularly wherein such methods and systems can mitigate APB in subsea operations, and especially in deepwater operations.
- Embodiments of the present invention are generally directed to systems and methods for mitigating temperature-related pressure buildup in the trapped annulus of an oil or gas well, often wherein such systems and methods employ production and/or tieback casing having one or more pressure mitigating chambers, and wherein such chambers are typically integrated into/with one or more of said casing strings, e.g., as a joint and/or other coupling.
- such systems and methods can be advantageously utilized in offshore (e.g., deepwater) wells.
- the present invention is directed to one or more systems for mitigating pressure buildup in a wellbore casing annulus, said systems comprising: (a) one or more regions of annular space established by at least two casing strings having different diameters and arranged in a nested, concentric manner such that at least a portion of a smaller diameter casing string is situated in at least a portion of a larger diameter casing string; (b) at least one chamber that is integrated with a casing joint on at least one of the casing strings, wherein the at least one chamber contains an inert gas, and wherein said gas is introduced to said chamber via a gas fill port that is integrated with said chamber; and (c) at least one piston- containing piston assembly integrated with the at least one chamber such that annular liquid present in an annular region can, when increased in pressure, access the at least one chamber via an annular pressure buildup port, so as to move the piston in such a way as to increase pressure of the inert gas in the chamber and decrease, via expansion
- the present invention is directed to one or more methods for mitigating pressure buildup in a wellbore casing annulus, said method(s) comprising the steps of: (a) providing a chamber in a wellbore casing annulus, wherein the chamber is integrated via a casing joint on at least one casing string, and wherein said chamber comprises an integrated piston; (b) introducing/establishing a quantity of inert gas into/in said chamber; (c) allowing the piston to move, in response to a change in pressure in the wellbore casing annulus, so as to equilibrate pressure between the chamber and the wellbore casing annulus, thereby serving to mitigate annular pressure buildup in said wellbore.
- such method(s) further comprise deployment of a chamber of a second type, wherein said chamber incorporates one or more burst disks separating the chamber from the annular space.
- FIG. 1 schematically-depicts a system for mitigating annular pressure, in accordance with some embodiments of the present invention
- FIG. 2 illustrates an annular pressure mitigation chamber of the first configuration, in accordance with some embodiments of the present invention
- FIGS. 3 A and 3B illustrate how an annular pressure mitigation chamber can be integrated with a casing string, in accordance with some embodiments of the present invention
- FIG. 4 illustrates an annular pressure mitigation chamber of the second configuration, in accordance with some embodiments of the present invention.
- FIG. 5 depicts, in step-wise fashion, a method embodiment of the present.
- This invention is generally directed to systems and methods for mitigating temperature-related pressure buildup (APB) in the trapped annulus of an oil or gas well, wherein such systems and methods employ annular pressure buildup chambers, typically integrated with casing tubulars (e.g., production and/or tieback casing), and wherein such chambers make use of pistons, valves, and burst disks to mitigate pressure increases within the annulus.
- APIB temperature-related pressure buildup
- a "wellbore,” as defined herein, refers to a hole drilled into a geologic formation for the purpose of extracting a petroleum resource such as oil and/or gas.
- Such wellbores can be land-based, or they can reside off-shore (subsea).
- "Deepwater” off-shore wells are generally those in ten-thousand or more feet of water.
- casing generally refers to tubulars used in the completion of an oil and/or gas well.
- casing string will refer to any one of potentially numerous tubulars making up the casing or tubular assembly, and wherein such casing strings can be of the production and/or tie-back variety.
- Annular space refers to the region, void, and/or volume bounded by two adjacent concentric casing strings in the casing assembly.
- annular liquid refers to that liquid residing, or otherwise occupying, the annular regions of a wellbore.
- Sources of such liquid include, but are not limited to, drilling fluids, production fluids, formation fluids, and combinations thereof.
- annular pressure refers to the hydrostatic pressure of liquid in the annular space.
- the present invention is directed to one or more systems 100 for mitigating pressure buildup in a wellbore casing annulus, wherein wellbore 101 is established in formation 102, said systems comprising: one or more regions of annular space 103 established by at least two casing strings 106 having different diameters and arranged in a nested, concentric manner such that at least a portion of a smaller diameter casing string is situated in at least a portion of a larger diameter casing string, and further defined and/or established by one or more cement plugs 104; (b) at least one chamber 105 (chamber of a first type) that is integrated with a casing joint on at least one of the casing strings, wherein the at least one chamber contains an inert gas, and wherein said gas is introduced to said chamber via a gas fill port (not shown) that is integrated with said chamber; and (c) at least one piston-containing piston assembly (not shown) integrated with the at least one chamber such that annular liquid present
- FIG. 2 shown is a more detailed cutaway (side view) of annular pressure mitigation chamber 105.
- chamber 105 is established (i.e., integrated) with casing string 106.
- Chamber 105 is filled with an inert gas (e.g., N 2 ) via fill port 201, and annular pressure within the wellbore is regulated by piston(s) 202 and APB port(s) 205.
- FIGS. 3 A and 3B further depict how chamber 105 can be integrated with a casing string, in accordance with some embodiments of the present invention, wherein FIGS. 3 A and 3B depict plan and side views, respectively.
- such integration can be accomplished via the attachment of a larger diameter "shroud casing" to the outside of a smaller diameter production/tieback casing, where the ends are enclosed via a weldment or via end caps with seals.
- FIG. 4 depicts an APB mitigation chamber of a second type (107), established as an integral part of casing string 106 (e.g., via a joint), wherein said chamber is actuated via burst disk 401, in accordance with some embodiments of the present invention, whereby the burst disk is designed to rupture with a temperature-induced pressure increase in the annular space.
- burst disk 401 or the channel to the chamber for which it controls access, can be used as a fill port, in accordance with some embodiments of the present invention.
- the burst disk ruptures at an annular pressure of at least about 2500 psi.
- the at least two casing strings are selected from the group consisting of production casing, tieback casing, and combinations thereof.
- multiple casing strings are employed, and one or more APB mitigation chambers of a first and/or second type can be disposed into one or more of the potentially multiple annular regions so formed.
- APB mitigation chambers of a first and/or second type can be disposed into one or more of the potentially multiple annular regions so formed.
- any of the at least one chambers of a second type each comprise a volume of between 0.10 bbl and 20 bbl.
- Total chamber volume is not particularly limited, as multiple chambers (of either type) can be employed within a single well.
- the inert gas contained within the chamber is at vacuum pressures (e.g., less than 1 atm) under standard conditions. In other embodiments, the inert gas contained within said chamber is supra-atmospheric up to 6000 psi or greater. When multiple such chambers are employed, the pressure of the chambers can be different so as to tailor an engineered response to APB within the well in which they reside. In some or other such embodiments, the inert gas is selected from the group consisting of N 2 , Ar, He, and combinations thereof.
- the at least one chamber of a second type comprises a vacuum of less than 1 atm.
- the at least one chamber of a second type comprises an inert gas.
- said chamber of a second type comprises an inert gas at a pressure up to about 6000 psi or greater.
- a pre-determined pressure inside the at least one chamber is used to control the pressure in the annular space. Control of annular pressure is annular pressure regulation and can be employed concurrently with annular pressure mitigation methods and systems.
- such systems further comprise a means of changing, in situ, the amount of inert gas contained within at least one of said at least one chamber.
- a means of pressurizing/venting is employed so as to vary the pressure of such chambers downhole.
- the annular pressure buildup port separates annular fluid from the piston or piston assembly.
- Such ports can incorporate a diaphragm of sorts, or they can merely serve as an access point.
- the annular pressure buildup port comprises a flow control means selected from the group consisting of a burst disk, a check valve, a directional valve, a flow control valve, and combinations thereof.
- Method embodiments of the present invention are generally consistent with the system embodiments described above. In large part, they are process representations of such systems.
- the present invention is directed to one or more methods for mitigating pressure buildup in a wellbore casing annulus, said method(s) comprising the steps of: (Step 501) providing a chamber in a wellbore casing annulus, wherein the chamber is integrated via a casing joint on at least one casing string, and wherein said chamber comprises an integrated piston; (Step 502) introducing a quantity of inert gas to said chamber; (Step 503) allowing the piston to move, in response to a change in pressure in the wellbore casing annulus, so as to equilibrate pressure between the chamber and the wellbore casing annulus, thereby serving to mitigate annular pressure buildup in said wellbore.
- such method(s) further comprise deployment of a chamber of a second type, wherein said chamber incorporates one or more burst disks separating the chamber from the annular space.
- the chambers of the first and/or second type(s) contain an inert gas selected from the group consisting of N 2 , Ar, He, and combinations thereof. Said inert gas can be at a pressure of less than 1 atm to 6000 psi or greater.
- the one or more burst disks associated with the chamber of the second type are engineered to burst at an annular pressure of 2500 psi.
- multiple chambers are employed to mitigate annular pressure build up in a wellbore.
- multiple chambers of a second type are employed to mitigate annular pressure build up in a wellbore.
- such multiple chambers can function to regulate pressure in the annular regions of said wellbore.
- the annular pressure buildup port functions simply as a point of access for which the annular liquid can access the chamber piston/piston assembly.
- an annular pressure buildup port is employed to regulate fluid communication between the piston and annular liquid residing in the annular space.
- Variations (i.e., alternate embodiments) on the above-described systems and methods include applications directed primarily to annular pressure regulation, instead of being primarily directed to annular pressure buildup mitigation. Additionally, such methods and systems need not be restricted to oil and gas wells. Those of skill in the art will recognize that such systems and methods may find applicability in any tubular assembly comprising fluid- filled annular space that is subject to increases in pressure.
- An exemplary application for systems/methods of the present invention involve APB issues associated with Chevron's Tahiti project.
- the Tahiti wells require 10 %" tieback casing.
- a trapped annulus is created by the 10 3 A" tieback casing and the 20" x 16" surface/intermediate casing annulus. Trapped pressure in this annulus could be mitigated by installing 10 3 A" tieback casing with 13 5/8 shrouded casing, forming an annular pressure mitigation chamber (APMC). Calculations were performed and it was determined that approximately 10 bbls of additional volume created by the APMC would be required to mitigate against annular pressure buildup in a typical Tahiti well.
- APMC annular pressure mitigation chamber
- This 10 bbls of additional volume could be achieved by running 10 joints of 10 3 A" tieback casing with the shrouded 13 5/8" casing and associated APMC.
- the 13 5/8" shrouded casing would be 30' in length, leaving sufficient tong/slip/elevator space for handling the 10 3 A" casing on each end.
- this invention is directed to systems and methods for mitigating and/or regulating temperature-related annular pressure buildup in an oil or gas well, wherein such systems and methods employ integrated annular pressure buildup chambers, and wherein such chambers make use of pistons, valves, and burst disks to mitigate pressure increases within the annulus.
- Such systems and methods can provide advantages over the prior art, particularly with respect to offshore (e.g., deep water) wells.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Pressure Vessels And Lids Thereof (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Safety Valves (AREA)
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
- Moulds For Moulding Plastics Or The Like (AREA)
Abstract
Description
Claims
Priority Applications (7)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2009316726A AU2009316726B2 (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
| BRPI0921300A BRPI0921300A2 (en) | 2008-11-18 | 2009-11-17 | system and method for mitigating pressure buildup in an annular region of the borehole casing |
| CN200980145817.5A CN102216557B (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
| EA201170704A EA020176B1 (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
| GB1108285.6A GB2477670B (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
| CA2743164A CA2743164A1 (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
| NO20110890A NO20110890A1 (en) | 2008-11-18 | 2011-06-16 | Systems and methods of relief and annulus pressure built up in an oil or gas well |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/272,924 | 2008-11-18 | ||
| US12/272,924 US8066074B2 (en) | 2008-11-18 | 2008-11-18 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2010059638A2 true WO2010059638A2 (en) | 2010-05-27 |
| WO2010059638A3 WO2010059638A3 (en) | 2010-07-15 |
Family
ID=42171081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2009/064828 Ceased WO2010059638A2 (en) | 2008-11-18 | 2009-11-17 | Systems and methods for mitigating annular pressure buildup in an oil or gas well |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US8066074B2 (en) |
| CN (1) | CN102216557B (en) |
| AU (1) | AU2009316726B2 (en) |
| BR (1) | BRPI0921300A2 (en) |
| CA (1) | CA2743164A1 (en) |
| EA (1) | EA020176B1 (en) |
| GB (1) | GB2477670B (en) |
| NO (1) | NO20110890A1 (en) |
| WO (1) | WO2010059638A2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2497481B (en) * | 2010-10-19 | 2018-07-25 | Baker Hughes Inc | Apparatus and method for compensating for pressure changes within an isolated annular space of a wellbore |
Families Citing this family (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2820652C (en) | 2010-02-18 | 2017-06-27 | Ncs Oilfield Services Canada Inc. | Downhole tool assembly with debris relief, and method for using same |
| US8353351B2 (en) * | 2010-05-20 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for regulating pressure within a well annulus |
| GB201101566D0 (en) * | 2011-01-31 | 2011-03-16 | Tendeka Bv | Downhole pressure relief apparatus |
| US9631437B2 (en) * | 2011-02-03 | 2017-04-25 | Exxonmobil Upstream Research Company | Systems and methods for managing pressures in casing annuli of subterranean wells |
| US8752631B2 (en) | 2011-04-07 | 2014-06-17 | Baker Hughes Incorporated | Annular circulation valve and methods of using same |
| US8739889B2 (en) | 2011-08-01 | 2014-06-03 | Baker Hughes Incorporated | Annular pressure regulating diaphragm and methods of using same |
| US9145753B2 (en) * | 2011-09-02 | 2015-09-29 | Onesubsea Ip Uk Limited | Trapped pressure compensator |
| CA2797485C (en) | 2011-11-29 | 2016-08-09 | Ncs Oilfield Services Canada Inc. | Equalization valve |
| US8931559B2 (en) | 2012-03-23 | 2015-01-13 | Ncs Oilfield Services Canada, Inc. | Downhole isolation and depressurization tool |
| ES2710536T3 (en) * | 2013-02-21 | 2019-04-25 | Hunting Energy Services Inc | Combination of a submarine wellhead, a plurality of housing strings and a modified casing coupling |
| MX2016000076A (en) * | 2013-08-08 | 2016-07-05 | Landmark Graphics Corp | Casing joint assembly for producing an annulus gas cap. |
| US9488030B2 (en) | 2013-10-25 | 2016-11-08 | Baker Hughes Incorporated | Confined volume pressure compensation due to thermal loading |
| CA2993274A1 (en) | 2015-08-31 | 2017-03-09 | Halliburton Energy Services, Inc. | Use of crosslinked polymer system for mitigation of annular pressure buildup |
| CN105178944B (en) * | 2015-10-22 | 2018-07-24 | 中国石油大学(北京) | A kind of deepwater subsea well cylinder analogue experiment installation |
| CN105298445A (en) * | 2015-11-05 | 2016-02-03 | 中国石油天然气集团公司 | Method and device for reducing oil and gas well annulus belt pressure |
| CN106194117B (en) * | 2016-08-12 | 2018-07-06 | 中国海洋石油集团有限公司 | A kind of method for optimizing the marine unmanned main process pipelines pressure rating of wellhead platform |
| CN106761554B (en) * | 2016-12-20 | 2019-06-11 | 中国石油天然气股份有限公司 | Pressure relief device for casing trap space in deepwater oil and gas wells |
| WO2018170038A2 (en) * | 2017-03-14 | 2018-09-20 | Antelope Oil Tool & Mfg. Co., Llc | Expansion chamber |
| WO2019038643A1 (en) | 2017-08-23 | 2019-02-28 | Vallourec Tube-Alloy, Llc | Device and method for mitigating annular pressure buildup in a wellbore casing annulus |
| AU2017432603A1 (en) | 2017-09-19 | 2019-12-12 | Halliburton Energy Services, Inc. | Annular pressure buildup mitigation using acid swellable polymer system |
| US11118426B2 (en) | 2019-06-17 | 2021-09-14 | Chevron U.S.A. Inc. | Vacuum insulated tubing for high pressure, high temperature wells, and systems and methods for use thereof, and methods for making |
| US11215032B2 (en) | 2020-01-24 | 2022-01-04 | Saudi Arabian Oil Company | Devices and methods to mitigate pressure buildup in an isolated wellbore annulus |
| US11299968B2 (en) | 2020-04-06 | 2022-04-12 | Saudi Arabian Oil Company | Reducing wellbore annular pressure with a release system |
| US12060773B2 (en) * | 2022-09-26 | 2024-08-13 | Saudi Arabian Oil Company | Controlling a wellbore pressure |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3457864A (en) * | 1967-05-01 | 1969-07-29 | Bernard F Price | Pressure control for installation in wells |
| US4109725A (en) | 1977-10-27 | 1978-08-29 | Halliburton Company | Self adjusting liquid spring operating apparatus and method for use in an oil well valve |
| US4576235A (en) | 1983-09-30 | 1986-03-18 | S & B Engineers | Downhole relief valve |
| US4732211A (en) | 1986-08-07 | 1988-03-22 | Halliburton Company | Annulus pressure operated vent assembly |
| US4877542A (en) | 1988-05-10 | 1989-10-31 | Intevep, S. A. | Thermal insulating fluid |
| GB2229748B (en) * | 1989-03-29 | 1993-03-24 | Exploration & Prod Serv | Drill stem test tools |
| JP3135745B2 (en) * | 1993-05-14 | 2001-02-19 | 株式会社小松製作所 | Discharge control device for small diameter pipe propulsion machine |
| US5996696A (en) * | 1997-06-27 | 1999-12-07 | Fike Corporation | Method and apparatus for testing the integrity of oil delivery tubing within an oil well casing |
| US5947206A (en) * | 1997-11-25 | 1999-09-07 | Camco International Inc. | Deep-set annulus vent valve |
| US6293346B1 (en) * | 1998-09-21 | 2001-09-25 | Schlumberger Technology Corporation | Method and apparatus for relieving pressure |
| US6457528B1 (en) | 2001-03-29 | 2002-10-01 | Hunting Oilfield Services, Inc. | Method for preventing critical annular pressure buildup |
| BR0205883A (en) * | 2001-08-17 | 2003-11-18 | Kvaerner Oilfield Products Ltd | Wellhead housing installation, pressure monitoring / control system for an underwater wellhead arrangement and underwater wellhead arrangement |
| WO2004079240A1 (en) * | 2003-03-01 | 2004-09-16 | Raska Nathan C | Reversible rupture disk apparatus and method |
| US7207603B2 (en) | 2003-03-11 | 2007-04-24 | Grant Prideco, L.P. | Insulated tubular assembly |
| US7191830B2 (en) * | 2004-02-27 | 2007-03-20 | Halliburton Energy Services, Inc. | Annular pressure relief collar |
| US7096944B2 (en) | 2004-03-02 | 2006-08-29 | Halliburton Energy Services, Inc. | Well fluids and methods of use in subterranean formations |
| US20060243435A1 (en) | 2005-04-27 | 2006-11-02 | Halliburton Energy Services, Inc. | Pressure responsive centralizer |
| US7441599B2 (en) | 2005-11-18 | 2008-10-28 | Chevron U.S.A. Inc. | Controlling the pressure within an annular volume of a wellbore |
-
2008
- 2008-11-18 US US12/272,924 patent/US8066074B2/en active Active
-
2009
- 2009-11-17 AU AU2009316726A patent/AU2009316726B2/en not_active Ceased
- 2009-11-17 EA EA201170704A patent/EA020176B1/en not_active IP Right Cessation
- 2009-11-17 WO PCT/US2009/064828 patent/WO2010059638A2/en not_active Ceased
- 2009-11-17 GB GB1108285.6A patent/GB2477670B/en not_active Expired - Fee Related
- 2009-11-17 BR BRPI0921300A patent/BRPI0921300A2/en not_active IP Right Cessation
- 2009-11-17 CN CN200980145817.5A patent/CN102216557B/en not_active Expired - Fee Related
- 2009-11-17 CA CA2743164A patent/CA2743164A1/en not_active Abandoned
-
2011
- 2011-06-16 NO NO20110890A patent/NO20110890A1/en not_active Application Discontinuation
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2497481B (en) * | 2010-10-19 | 2018-07-25 | Baker Hughes Inc | Apparatus and method for compensating for pressure changes within an isolated annular space of a wellbore |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2009316726A1 (en) | 2010-05-27 |
| GB2477670A (en) | 2011-08-10 |
| EA201170704A1 (en) | 2012-01-30 |
| CN102216557A (en) | 2011-10-12 |
| BRPI0921300A2 (en) | 2015-12-29 |
| WO2010059638A3 (en) | 2010-07-15 |
| AU2009316726B2 (en) | 2015-10-22 |
| GB201108285D0 (en) | 2011-06-29 |
| US20100122811A1 (en) | 2010-05-20 |
| CN102216557B (en) | 2014-09-24 |
| US8066074B2 (en) | 2011-11-29 |
| NO20110890A1 (en) | 2011-11-14 |
| CA2743164A1 (en) | 2010-05-27 |
| EA020176B1 (en) | 2014-09-30 |
| GB2477670B (en) | 2013-02-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8066074B2 (en) | Systems and methods for mitigating annular pressure buildup in an oil or gas well | |
| US7090027B1 (en) | Casing hanger assembly with rupture disk in support housing and method | |
| US7841398B2 (en) | Gravel packing apparatus utilizing diverter valves | |
| US6719064B2 (en) | Expandable completion system and method | |
| CN101421486B (en) | Wellbore methods and apparatus for sand control and inflow control during well operations | |
| EP3730735B1 (en) | Shunt tube flowpaths extending through swellable packers | |
| US6293346B1 (en) | Method and apparatus for relieving pressure | |
| US20090159298A1 (en) | Methods and systems for completing a well with fluid tight lower completion | |
| GB2583395A (en) | Hybrid-tieback seal assembly using method and system for interventionless hydraulic setting of equipment when performing subterranean operations | |
| AU2015377209B2 (en) | Piston assembly to reduce annular pressure buildup | |
| US20060243435A1 (en) | Pressure responsive centralizer | |
| Śliwa et al. | The application of vacuum insulated tubing in deep borehole heat exchangers | |
| US5219025A (en) | Method and apparatus for gravel packing a well through a tubing string | |
| AU2018453334B2 (en) | Methods and tools to deploy downhole elements | |
| US20060243456A1 (en) | Pressure responsive centralizer | |
| WO2012104574A2 (en) | Downhole pressure relief apparatus | |
| NO348681B1 (en) | High pressure circulating shoe track with redundant pressure isolation feature | |
| US9556705B2 (en) | Casing joint assembly for producing an annulus gas cap | |
| AU2013397499B2 (en) | Casing joint assembly for producing an annulus gas cap | |
| US20150114651A1 (en) | Downhole fracturing system and technique |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 200980145817.5 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09828117 Country of ref document: EP Kind code of ref document: A2 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2009316726 Country of ref document: AU Ref document number: 2743164 Country of ref document: CA |
|
| ENP | Entry into the national phase |
Ref document number: 1108285 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20091117 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1108285.6 Country of ref document: GB |
|
| ENP | Entry into the national phase |
Ref document number: 2009316726 Country of ref document: AU Date of ref document: 20091117 Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 201170704 Country of ref document: EA |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 09828117 Country of ref document: EP Kind code of ref document: A2 |
|
| ENP | Entry into the national phase |
Ref document number: PI0921300 Country of ref document: BR Kind code of ref document: A2 Effective date: 20110518 |