WO2010046019A1 - Apparatus and methods for improved cement plug placement - Google Patents

Apparatus and methods for improved cement plug placement Download PDF

Info

Publication number
WO2010046019A1
WO2010046019A1 PCT/EP2009/007061 EP2009007061W WO2010046019A1 WO 2010046019 A1 WO2010046019 A1 WO 2010046019A1 EP 2009007061 W EP2009007061 W EP 2009007061W WO 2010046019 A1 WO2010046019 A1 WO 2010046019A1
Authority
WO
WIPO (PCT)
Prior art keywords
sensor
well
pipe
placement
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2009/007061
Other languages
French (fr)
Inventor
Simon James
Bernard Piot
Joel Rondeau
Michael Montgomery
Gérard DACCORD
Radovan Rolovic
Mathew Samuel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Original Assignee
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd, Services Petroliers Schlumberger SA, Schlumberger Technology BV, Schlumberger Holdings Ltd, Prad Research and Development Ltd filed Critical Schlumberger Canada Ltd
Priority to GB1105749.4A priority Critical patent/GB2476205B/en
Priority to US13/124,471 priority patent/US20120000649A1/en
Publication of WO2010046019A1 publication Critical patent/WO2010046019A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/005Monitoring or checking of cementation quality or level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/08Measuring diameters or related dimensions at the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/08Measuring diameters or related dimensions at the borehole
    • E21B47/085Measuring diameters or related dimensions at the borehole using radiant means, e.g. acoustic, radioactive or electromagnetic

Definitions

  • This invention relates to a method and apparatus for use during cement plug placement operations of the type encountered in wells in the oil and gas industry.
  • the invention relates to methods using instrumented pipes and downhole sensors.
  • Cement plugs are placed in wellbores for a variety of reasons; for curing wellbore instability or losses, plugging a wellbore or a portion of it, abandoning a wellbore or a section of it, providing a base for initiating a deviation or kick-off and more.
  • Cement plugs are constructed by pumping a relatively small amount of cement slurry down a drill pipe where it later sets solid.
  • Figure 1 shows a section of a well in which a cement plug is being set.
  • the well 10 has a viscous pill 12 set in the well 10 at the bottom of the desired plug location.
  • the end of a drill pipe 14 is then positioned just above the pill 12 and cement 16 is pumped down the drill pipe 14 into the well to form the plug 18 on the pill 12.
  • the drill pipe is pulled back so that it does not remain in the plug 18 when it sets.
  • the drill pipe 14 can be withdrawn and other operations continued.
  • a first aspect of the invention provides an apparatus for placing a cement plug in a well, comprising:
  • At least one sensor located at a lower end of the pipe and operable to measure parameters in the well at the predetermined location
  • an operating system located at the surface for receiving output signals from the sensor; wherein the sensor is configured to measure at least one parameter relevant to cement plug placement and is connected to the operating system by means of a cable.
  • the senor performs a caliper measurement for indicating hole diameter as the pipe is run into the well
  • a particularly preferred embodiment of the invention comprises a temperature sensor.
  • the apparatus can comprise a sensor package that is detachable from the pipe so as to remain at the predetermined location in the well and houses a sensor cable which can be withdrawn to connect the sensor to the operating system at the surface.
  • the sensor cable can be connected to the pipe such that withdrawal of the pipe from the well causes the sensor cable to be withdrawn from the sensor package.
  • the sensor cable can also be connected to a cable extending along the pipe to the operating system at the surface.
  • the apparatus preferably further comprises a release mechanism by which the sensor package is held in the pipe, the mechanism being operable by means of a body that can be pumped through the pipe to detach the sensor package on contact with the mechanism.
  • An anchoring system can be provided for securing the sensor package in position in the well after it is detached from the pipe.
  • the step of operating the sensor can comprise making a caliper measurement of the well, at least in the region of the predetermined location, to determine the diameter of the well.
  • the method can further comprise detaching the sensor package from the pipe so that it remains at the predetermined location in the well, and withdrawing the pipe.
  • the step of withdrawing the pipe from the well acts to withdraw the sensor cable from the sensor package.
  • the sensor cable can be connected to a cable extending along the pipe to the operating system at the surface.
  • the sensor package is held in the pipe by a release mechanism, the method comprising pumping a body through the pipe to contact the mechanism to detach the sensor package.
  • the sensor package can also comprise an anchoring system, the method comprising securing the sensor package in position in the well after it is detached from the pipe by operating the anchoring system.
  • the method according to the second aspect of the invention is preferably performed using an apparatus according to the first aspect of the invention.
  • the cement can comprise Portland cement, magnesium oxychloride cement, epoxy resins, geopolymers, etc. Other plugging material might be used.
  • Figure 1 shows a prior art cement plug placement operation
  • Figure 2 shows an embodiment of the invention
  • Figure 3 shows a further embodiment of the invention being lowered downhole
  • Figure 4 shows the retraction of the wired placement conduit and unrolling of the communication wire
  • Figure 5 shows an alternative embodiment whereby the wired placement conduit is only partially retracted
  • Figure 6 shows the sensor package released and deployed to the cement plug
  • Figure 7 shows the sensor package being secured to the well casing by means of a securing device.
  • Figure 2 shows a first embodiment of the invention, in which the lower end of the drill pipe 14 is provided with a downhole measurement package 20 comprising one or more sensors for measuring parameters in the well.
  • the sensor package is connected back to the surface by means of a wire or cable 22.
  • the wire or cable 22 can be run along the inside or outside of the drill pipe 14, and connects to an operating system 24 at the surface.
  • the cable 22 need not be continuous, wireless communication systems can be provided for at least part of the connection to the surface such as at pipe joints (see US7019665).
  • the sensors in the downhole measurement package can measure various parameters.
  • Including a sonic (or other) caliper measurement on the wired pipe 14 can give an accurate indication of the well diameter while running in to place the cement plug. This will allow the spacer and cement volumes to be recalculated to minimise mixing (optimise interfaces while pulling out) without loss of rig time since a separate wireline caliper run may not be required. It has to be noted that the term cement shall be understood as plug forming material even if cement is the preferred material.
  • a temperature measurement can give an idea of how long to wait on cement. Sensitivity tests on the cement thickening time beforehand will lead to optimised waiting time.
  • a downhole viscosity measurement can allow the quality of the viscous plug to be evaluated. If it is insufficient a second viscous pill can be placed prior to placing cement, thus minimising the risk of slumping.
  • a temperature (or other) probe can be dropped into the cement as the drill pipe 14 is being pulled out. This can be connected via thin conductor or fibre optic to the wired pipe 14.
  • the temperature monitor can allow indication of cement setting and pull out at the earliest time. This is particularly applicable to wells where the pipe is not pulled out on a routine basis during the setting.
  • a further embodiment of the invention provides a method of optimising cement plug placement by use of a wired placement conduit.
  • a sensor package is deployed into the cement plug while in its liquid state prior to setting to take measurements of down hole properties.
  • the method comprises assembly and deployment of the wired placement conduit which permits the correct placement of the sensor package and the unrolling of the communication wire and deployment of the slurry placement device which activates the release of the sensor package.
  • the wire can be coiled on the conduit/drill pipe, from which it would unroll as the pipe is withdrawn.
  • the wired placement conduit is assembled on the surface prior to deployment.
  • the sensor package and communication wire rolled as a bobbin are subsequently fastened to the lower end of the wired placement conduit.
  • the wired placement conduit is lowered downhole prior to the cement slurry being pumped.
  • the slurry placement device is launched from the surface through the wired placement conduit thus activating the release of the sensor package.
  • the release of the sensor package generates a pressure pulse.
  • the wired placement conduit is retracted to the surface in response to the pressure pulse.
  • the wired placement conduit may be partially retracted at a distance sufficient to ensure that the end is clear of the setting material.
  • the communication wire is unrolled to the surface in response to the pressure pulse.
  • the sensor package is capable of measuring downhole properties in a similar manner to that described above. These include but are not limited to; temperature, viscosity, density, pH, resistivity measurements, differential pressure, elastic modulus and acoustic impedance.
  • the sensor package may comprise multiple distributed sensors along the cement plug length. The data obtained from the sensor package can be used to manage the operation. For example, a viscous pill may be used in response to obtaining a low viscosity measurement indicative of slumping.
  • the sensor package may be attached to the well at the desired depth by a securing device.
  • the securing device may comprise arms which permit contact with the well walls.
  • the wired pipe may comprise a drill string.
  • the wired pipe may comprise coiled tubing. Devices located on the wired placement conduit permit the measurement of the hole diameter. Sonic measurements may be taken to determine hole diameter. Alternatively calipers may be incorporated to measure hole diameter.
  • the communication wire may comprise a fibre optic cable and/or an electrical cable.
  • This invention provides a method and apparatus for deploying sensors into the liquid cement plug immediately following its placement and until it is almost set. As the material evolves with time, an operator can follow in real time its actual properties. This enables the operator to make informed decisions, based on these measured properties, of when it is possible to resume drilling operations. The amount of unproductive time is minimised.
  • Figure 3 shows the wired placement conduit 30 being deployed down the wellbore 32.
  • the wired placement conduit Prior to the wired placement conduit being lowered downhole it is assembled at the surface with the sensor package 34 and communication wire 36 rolled as a bobbin fastened to the lower end of the wired pipe 30.
  • the wired placement conduit may be either a drill string or coiled tubing.
  • the wired placement conduit is lowered into the hole 32 and the cement slurry is pumped.
  • the slurry placement device 40 is launched from the surface through the wired placement conduit.
  • the slurry placement device may comprise a dart, ball or other similar device.
  • the slurry placement device 40 hits a seat which activates the release of the sensor package.
  • a pressure pulse may be generated and received at the surface providing a positive indication of the release of the sensor package.
  • Figure 4 shows the retraction of the wired placement conduit 30 and unrolling of the communication wire 36; this occurs in response to the reception of the pressure pulse.
  • the sensor package 34 is released the wired pipe 30 is progressively pulled out of the hole 32.
  • the communication wire 36 unrolls until it reaches the surface.
  • the communication wire 36 may be an electrical wire, a fibre optic or a combination of both.
  • Figure 5 shows an alternative embodiment of the invention whereby the wired placement conduit 30 may only be pulled up a certain distance to ensure that the end is clear of the setting material 38 while the sensor package 34 remains in contact with it.
  • the communication wire 36 connects to the wired placement conduit 30 and the signal is transmitted through the wired placement conduit 30 to the surface. This embodiment eliminates the need to retract the wired placement conduit 30 completely to the surface.
  • Figure 6 shows the sensor package 34 released and deployed to the cement plug 38.
  • the sensor package 34 is capable of measuring downhole properties. These include but are not limited to; temperature, viscosity, density, pH, differential pressure, elastic modulus and acoustic impedance.
  • the sensor package 34 may comprise multiple sensors 42 distributed along the cement plug length.
  • Figure 7 shows the sensor package 34 being secured to the borehole 32 at the required depth by means of a securing device.
  • the deployment of anchoring arms 44 permits contact to be made with the well casing 46 to hold the package 34 in place. This avoids the package sinking out of the plug or rising to its surface, or becoming displaced by contact with other equipment.
  • Other changes can be made within the scope of the invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Quality & Reliability (AREA)
  • Electromagnetism (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
  • Earth Drilling (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

A method and apparatus for making real-time measurements of downhole properties during cement plug placement. A wired placement conduit (30) is lowered downhole releasing a sensor package (34). The sensor package is capable of measuring downhole properties in real-time in the period while cement plug sets.

Description

APPARATUS AND METHODS FOR IMPROVED CEMENT PLUG PLACEMENT
Technical field
[0001] This invention relates to a method and apparatus for use during cement plug placement operations of the type encountered in wells in the oil and gas industry. In particular, the invention relates to methods using instrumented pipes and downhole sensors.
Background art
[0002] Cement plugs are placed in wellbores for a variety of reasons; for curing wellbore instability or losses, plugging a wellbore or a portion of it, abandoning a wellbore or a section of it, providing a base for initiating a deviation or kick-off and more. Cement plugs are constructed by pumping a relatively small amount of cement slurry down a drill pipe where it later sets solid.
[0003] Figure 1 shows a section of a well in which a cement plug is being set. The well 10 has a viscous pill 12 set in the well 10 at the bottom of the desired plug location. The end of a drill pipe 14 is then positioned just above the pill 12 and cement 16 is pumped down the drill pipe 14 into the well to form the plug 18 on the pill 12. As the plug builds up, the drill pipe is pulled back so that it does not remain in the plug 18 when it sets. Once all of the cement has been pumped into the well 10 and the plug 18 has formed, the drill pipe 14 can be withdrawn and other operations continued.
[0004] Drilling operations resume once the cement plug has set and developed enough strength to fulfil its objective, for example to initiate side tracking or to plug conductive fractures. There is great uncertainty however about when it is safe to resume drilling operations, to mitigate the risk of resuming drilling operations too soon, it is common practice to wait extra time, typically 24 hours.
[0005] Achieving proper placement of the cement plug presents a challenge as does uncertainty in the downhole temperature; frequently too much time is allowed for the cement plug to become set before an attempt to continue well operations is made. [0006] This invention seeks to overcome many of the challenges highlighted above by providing real-time measurements of wellbore properties during cement plug placement.
Disclosure of the invention
[0007] A first aspect of the invention provides an apparatus for placing a cement plug in a well, comprising:
- a pipe for delivering a cement slurry to a predetermined location in the well to be plugged;
- at least one sensor located at a lower end of the pipe and operable to measure parameters in the well at the predetermined location; and
- an operating system located at the surface for receiving output signals from the sensor; wherein the sensor is configured to measure at least one parameter relevant to cement plug placement and is connected to the operating system by means of a cable.
[0008] Preferably, the sensor performs a caliper measurement for indicating hole diameter as the pipe is run into the well
[0009] A particularly preferred embodiment of the invention comprises a temperature sensor.
[0010] Particularly when the sensor is a temperature sensor, the apparatus can comprise a sensor package that is detachable from the pipe so as to remain at the predetermined location in the well and houses a sensor cable which can be withdrawn to connect the sensor to the operating system at the surface. The sensor cable can be connected to the pipe such that withdrawal of the pipe from the well causes the sensor cable to be withdrawn from the sensor package. The sensor cable can also be connected to a cable extending along the pipe to the operating system at the surface.
[0011] The apparatus preferably further comprises a release mechanism by which the sensor package is held in the pipe, the mechanism being operable by means of a body that can be pumped through the pipe to detach the sensor package on contact with the mechanism. [0012] An anchoring system can be provided for securing the sensor package in position in the well after it is detached from the pipe. [0013] A second aspect of the invention provides method of placing a cement plug in a well, comprising:
- providing a pipe for delivery of the cement plug with a sensor at its end;
- introducing the pipe into the well such that its end is at a predetermined location for placement of the plug;
- operating the sensor to measure at least one parameter relevant to cement plug placement and/or to measure parameters in the well at the predetermined location; and
- sending output signals from the sensor to an operating system located at the surface by means of a cable.
[0014] The step of operating the sensor can comprise making a caliper measurement of the well, at least in the region of the predetermined location, to determine the diameter of the well.
[0015] When the sensor comprises a sensor package housing a sensor cable which can be withdrawn to connect the sensor to the operating system at the surface, the method can further comprise detaching the sensor package from the pipe so that it remains at the predetermined location in the well, and withdrawing the pipe.
[0016] When the sensor cable is connected to the pipe, the step of withdrawing the pipe from the well acts to withdraw the sensor cable from the sensor package.
[0017] The sensor cable can be connected to a cable extending along the pipe to the operating system at the surface.
[0018] In a preferred embodiment, the sensor package is held in the pipe by a release mechanism, the method comprising pumping a body through the pipe to contact the mechanism to detach the sensor package.
[0019] The sensor package can also comprise an anchoring system, the method comprising securing the sensor package in position in the well after it is detached from the pipe by operating the anchoring system.
[0020] The method according to the second aspect of the invention is preferably performed using an apparatus according to the first aspect of the invention. [0021] The cement can comprise Portland cement, magnesium oxychloride cement, epoxy resins, geopolymers, etc. Other plugging material might be used.
[0022] Further aspects of the invention will be apparent from the following description.
Brief description of the drawings
[0023] Figure 1 shows a prior art cement plug placement operation; Figure 2 shows an embodiment of the invention; Figure 3 shows a further embodiment of the invention being lowered downhole;
Figure 4 shows the retraction of the wired placement conduit and unrolling of the communication wire;
Figure 5 shows an alternative embodiment whereby the wired placement conduit is only partially retracted;
Figure 6 shows the sensor package released and deployed to the cement plug; and
Figure 7 shows the sensor package being secured to the well casing by means of a securing device.
Mode(s) for carrying out the invention
[0024] Figure 2 shows a first embodiment of the invention, in which the lower end of the drill pipe 14 is provided with a downhole measurement package 20 comprising one or more sensors for measuring parameters in the well. The sensor package is connected back to the surface by means of a wire or cable 22. The wire or cable 22 can be run along the inside or outside of the drill pipe 14, and connects to an operating system 24 at the surface. The cable 22 need not be continuous, wireless communication systems can be provided for at least part of the connection to the surface such as at pipe joints (see US7019665). The sensors in the downhole measurement package can measure various parameters.
[0025] Including a sonic (or other) caliper measurement on the wired pipe 14 can give an accurate indication of the well diameter while running in to place the cement plug. This will allow the spacer and cement volumes to be recalculated to minimise mixing (optimise interfaces while pulling out) without loss of rig time since a separate wireline caliper run may not be required. It has to be noted that the term cement shall be understood as plug forming material even if cement is the preferred material.
[0026] A temperature measurement can give an idea of how long to wait on cement. Sensitivity tests on the cement thickening time beforehand will lead to optimised waiting time.
[0027] A downhole viscosity measurement can allow the quality of the viscous plug to be evaluated. If it is insufficient a second viscous pill can be placed prior to placing cement, thus minimising the risk of slumping.
[0028] Once the cement plug is placed correctly a temperature (or other) probe can be dropped into the cement as the drill pipe 14 is being pulled out. This can be connected via thin conductor or fibre optic to the wired pipe 14. The temperature monitor can allow indication of cement setting and pull out at the earliest time. This is particularly applicable to wells where the pipe is not pulled out on a routine basis during the setting.
[0029] A further embodiment of the invention provides a method of optimising cement plug placement by use of a wired placement conduit. A sensor package is deployed into the cement plug while in its liquid state prior to setting to take measurements of down hole properties. The method comprises assembly and deployment of the wired placement conduit which permits the correct placement of the sensor package and the unrolling of the communication wire and deployment of the slurry placement device which activates the release of the sensor package. Alternatively, the wire can be coiled on the conduit/drill pipe, from which it would unroll as the pipe is withdrawn.
[0030] The wired placement conduit is assembled on the surface prior to deployment. The sensor package and communication wire rolled as a bobbin are subsequently fastened to the lower end of the wired placement conduit. The wired placement conduit is lowered downhole prior to the cement slurry being pumped.
[0031] The slurry placement device is launched from the surface through the wired placement conduit thus activating the release of the sensor package. The release of the sensor package generates a pressure pulse. The wired placement conduit is retracted to the surface in response to the pressure pulse. The wired placement conduit may be partially retracted at a distance sufficient to ensure that the end is clear of the setting material. The communication wire is unrolled to the surface in response to the pressure pulse.
[0032] The sensor package is capable of measuring downhole properties in a similar manner to that described above. These include but are not limited to; temperature, viscosity, density, pH, resistivity measurements, differential pressure, elastic modulus and acoustic impedance. The sensor package may comprise multiple distributed sensors along the cement plug length. The data obtained from the sensor package can be used to manage the operation. For example, a viscous pill may be used in response to obtaining a low viscosity measurement indicative of slumping.
[0033] The sensor package may be attached to the well at the desired depth by a securing device. The securing device may comprise arms which permit contact with the well walls.
[0034] The wired pipe may comprise a drill string. In an alternative embodiment the wired pipe may comprise coiled tubing. Devices located on the wired placement conduit permit the measurement of the hole diameter. Sonic measurements may be taken to determine hole diameter. Alternatively calipers may be incorporated to measure hole diameter.
[0035] The communication wire may comprise a fibre optic cable and/or an electrical cable.
[0036] This invention provides a method and apparatus for deploying sensors into the liquid cement plug immediately following its placement and until it is almost set. As the material evolves with time, an operator can follow in real time its actual properties. This enables the operator to make informed decisions, based on these measured properties, of when it is possible to resume drilling operations. The amount of unproductive time is minimised.
[0037] Figure 3 shows the wired placement conduit 30 being deployed down the wellbore 32. Prior to the wired placement conduit being lowered downhole it is assembled at the surface with the sensor package 34 and communication wire 36 rolled as a bobbin fastened to the lower end of the wired pipe 30. The wired placement conduit may be either a drill string or coiled tubing. The wired placement conduit is lowered into the hole 32 and the cement slurry is pumped. Once the cement plug 38 is in place, the slurry placement device 40 is launched from the surface through the wired placement conduit. The slurry placement device may comprise a dart, ball or other similar device. Upon reaching the end of the wired placement conduit 30, the slurry placement device 40 hits a seat which activates the release of the sensor package. 34 A pressure pulse may be generated and received at the surface providing a positive indication of the release of the sensor package. 34
[0038] Figure 4 shows the retraction of the wired placement conduit 30 and unrolling of the communication wire 36; this occurs in response to the reception of the pressure pulse. When the sensor package 34 is released the wired pipe 30 is progressively pulled out of the hole 32. The communication wire 36 unrolls until it reaches the surface. The communication wire 36 may be an electrical wire, a fibre optic or a combination of both.
[0039] Figure 5 shows an alternative embodiment of the invention whereby the wired placement conduit 30 may only be pulled up a certain distance to ensure that the end is clear of the setting material 38 while the sensor package 34 remains in contact with it. The communication wire 36 connects to the wired placement conduit 30 and the signal is transmitted through the wired placement conduit 30 to the surface. This embodiment eliminates the need to retract the wired placement conduit 30 completely to the surface.
[0040] Figure 6 shows the sensor package 34 released and deployed to the cement plug 38. The sensor package 34 is capable of measuring downhole properties. These include but are not limited to; temperature, viscosity, density, pH, differential pressure, elastic modulus and acoustic impedance. The sensor package 34 may comprise multiple sensors 42 distributed along the cement plug length.
[0041] Figure 7 shows the sensor package 34 being secured to the borehole 32 at the required depth by means of a securing device. The deployment of anchoring arms 44 permits contact to be made with the well casing 46 to hold the package 34 in place. This avoids the package sinking out of the plug or rising to its surface, or becoming displaced by contact with other equipment. Other changes can be made within the scope of the invention.

Claims

Claims
1. Apparatus for placing a cement plug in a well, comprising:
- a pipe for delivering a cement slurry to a predetermined location in the well to be plugged;
- at least one sensor located at a lower end of the pipe and operable to measure parameters in the well at the predetermined location; and
- an operating system located at the surface for receiving output signals from the sensor; wherein the sensor is configured to measure at least one parameter relevant to cement plug placement and is connected to the operating system by means of a cable. wherein the sensor performs a caliper measurement for indicating hole diameter as the pipe is run into the well.
2. Apparatus as claimed in claim 1 , wherein the sensor comprises a differential pressure sensor.
3. Apparatus as claimed in any preceding claim, wherein the sensor comprises a temperature sensor.
4. A method of placing a cement plug in a well, comprising:
- providing a pipe for delivery of the cement plug with a sensor at its end;
- introducing the pipe into the well such that its end is at a predetermined location for placement of the plug;
- operating the sensor is to measure at least one parameter relevant to cement plug placement to measure parameters in the well at the predetermined location; and
- sending output signals from the sensor to an operating system located at the surface by means of a cable.
5. A method as claimed in claim 4, wherein the step of operating the sensor comprises making a caliper measurement of the well, at least in the region of the predetermined location, to determine the diameter of the well.
6. A method as claimed in claim 4 or 5 wherein the step of operating the sensor comprises obtaining a differential pressure measurement in the fluids in the well in region of predetermined location.
7. A method as claimed in claim 4, wherein the step of operating the sensor comprises making a temperature measurement.
8. A method as claimed in any of claims 4-7, when performed using an apparatus as claimed in any of claims 1-3.
PCT/EP2009/007061 2008-10-20 2009-09-30 Apparatus and methods for improved cement plug placement Ceased WO2010046019A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB1105749.4A GB2476205B (en) 2008-10-20 2009-09-30 Apparatus and methods for improved cement plug placement
US13/124,471 US20120000649A1 (en) 2008-10-20 2009-09-30 Apparatus and methods for improved cement plug placement

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP08167050.7 2008-10-20
EP08167050A EP2177712A1 (en) 2008-10-20 2008-10-20 Apparatus and methods for improved cement plug placement

Publications (1)

Publication Number Publication Date
WO2010046019A1 true WO2010046019A1 (en) 2010-04-29

Family

ID=40380186

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/EP2009/007061 Ceased WO2010046019A1 (en) 2008-10-20 2009-09-30 Apparatus and methods for improved cement plug placement
PCT/EP2009/007385 Ceased WO2010046050A2 (en) 2008-10-20 2009-10-12 Apparatus and methods for improved cement plug placement

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/EP2009/007385 Ceased WO2010046050A2 (en) 2008-10-20 2009-10-12 Apparatus and methods for improved cement plug placement

Country Status (4)

Country Link
US (2) US20120000649A1 (en)
EP (1) EP2177712A1 (en)
GB (2) GB2476205B (en)
WO (2) WO2010046019A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2177712A1 (en) * 2008-10-20 2010-04-21 Services Pétroliers Schlumberger Apparatus and methods for improved cement plug placement
EP2177713A1 (en) 2008-10-20 2010-04-21 Services Pétroliers Schlumberger Methods and apparatus for improved cement plug placement
GB201108098D0 (en) * 2011-05-16 2011-06-29 Intelligent Well Controls Ltd Determining whether a wellbore cementation operation has been performed correctly
AU2013402083B2 (en) * 2013-09-26 2017-03-02 Halliburton Energy Services, Inc. Intelligent cement wiper plugs and casing collars
MX2016006945A (en) * 2013-12-28 2017-01-05 Halliburton Energy Services Inc Cementing job evaluation systems and methods for use with novel cement compositions including resin cement.
CN104847338A (en) * 2015-03-24 2015-08-19 胜利油田长龙橡塑有限责任公司 Ultrasonic tracking and positioning system of well cementation rubber plug
NO343153B1 (en) * 2015-12-17 2018-11-19 Hydra Systems As A method of assessing the integrity status of a barrier plug
WO2019125493A1 (en) * 2017-12-22 2019-06-27 Halliburton Energy Services, Inc. Fiber deployment system and communication
NO343780B1 (en) * 2018-02-21 2019-06-03 Hydra Systems As A method of assessing the integrity status of a barrier plug

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5036916A (en) * 1989-07-14 1991-08-06 Frank Bennett Method and apparatus for locating wet cement plugs in open bore holes
US5409071A (en) * 1994-05-23 1995-04-25 Shell Oil Company Method to cement a wellbore
WO2001007754A1 (en) * 1999-07-23 2001-02-01 Schlumberger Limited Methods and apparatus for long term monitoring of a hydrocarbon reservoir
WO2002059458A2 (en) * 2000-11-03 2002-08-01 Noble Engineering And Development, Ltd. Instrumented cementing plug and system
US20040047534A1 (en) * 2002-09-09 2004-03-11 Shah Vimal V. Downhole sensing with fiber in exterior annulus
US20040139791A1 (en) * 2003-01-21 2004-07-22 Johansen Espen S. Non-intrusive multiphase flow meter
GB2413814A (en) * 2002-04-10 2005-11-09 Bj Services Co System and method of detecting the launch of a device in oilfield applications
US20060249307A1 (en) * 2005-01-31 2006-11-09 Baker Hughes Incorporated Apparatus and method for mechanical caliper measurements during drilling and logging-while-drilling operations

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124070A (en) * 1977-09-06 1978-11-07 Gearhart-Owen Industries, Inc. Wireline shifting tool apparatus and methods
US4571993A (en) * 1984-02-27 1986-02-25 Halliburton Company Cementing system including real time display
NO306522B1 (en) 1992-01-21 1999-11-15 Anadrill Int Sa Procedure for acoustic transmission of measurement signals when measuring during drilling
US5315291A (en) 1992-02-04 1994-05-24 Furr Mark A Leak detection device
US5762149A (en) 1995-03-27 1998-06-09 Baker Hughes Incorporated Method and apparatus for well bore construction
US6766854B2 (en) 1997-06-02 2004-07-27 Schlumberger Technology Corporation Well-bore sensor apparatus and method
US5967231A (en) 1997-10-31 1999-10-19 Halliburton Energy Services, Inc. Plug release indication method
US6213201B1 (en) 1998-04-13 2001-04-10 Alan I. Renkis Tight sands gas well production enhancement system
US6736210B2 (en) 2001-02-06 2004-05-18 Weatherford/Lamb, Inc. Apparatus and methods for placing downhole tools in a wellbore
US6257332B1 (en) 1999-09-14 2001-07-10 Halliburton Energy Services, Inc. Well management system
US6629564B1 (en) * 2000-04-11 2003-10-07 Schlumberger Technology Corporation Downhole flow meter
US20030001753A1 (en) 2001-06-29 2003-01-02 Cernocky Edward Paul Method and apparatus for wireless transmission down a well
US6772837B2 (en) 2001-10-22 2004-08-10 Halliburton Energy Services, Inc. Screen assembly having diverter members and method for progressively treating an interval of a welibore
US20040211443A1 (en) 2002-03-19 2004-10-28 Frank's Casing Crew And Rental Tools, Inc. Magnetic plug detector
GB2391880B (en) * 2002-08-13 2006-02-22 Reeves Wireline Tech Ltd Apparatuses and methods for deploying logging tools and signalling in boreholes
US7188674B2 (en) 2002-09-05 2007-03-13 Weatherford/Lamb, Inc. Downhole milling machine and method of use
US20040206511A1 (en) 2003-04-21 2004-10-21 Tilton Frederick T. Wired casing
US7019665B2 (en) 2003-09-02 2006-03-28 Intelliserv, Inc. Polished downhole transducer having improved signal coupling
US7287591B2 (en) 2004-11-12 2007-10-30 Tony Campbell Primary electro-mechanical initiating dump bailer device and method of use
US7348893B2 (en) * 2004-12-22 2008-03-25 Schlumberger Technology Corporation Borehole communication and measurement system
BRPI0618659B1 (en) 2005-11-21 2017-12-05 Shell Internationale Research Maatschappij B.V. METHOD FOR MONITORING FLUID PROPERTIES WITH A DISTRIBUTED SENSOR IN A WELL HOLE
EP2177713A1 (en) 2008-10-20 2010-04-21 Services Pétroliers Schlumberger Methods and apparatus for improved cement plug placement
EP2177712A1 (en) 2008-10-20 2010-04-21 Services Pétroliers Schlumberger Apparatus and methods for improved cement plug placement

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5036916A (en) * 1989-07-14 1991-08-06 Frank Bennett Method and apparatus for locating wet cement plugs in open bore holes
US5409071A (en) * 1994-05-23 1995-04-25 Shell Oil Company Method to cement a wellbore
WO2001007754A1 (en) * 1999-07-23 2001-02-01 Schlumberger Limited Methods and apparatus for long term monitoring of a hydrocarbon reservoir
WO2002059458A2 (en) * 2000-11-03 2002-08-01 Noble Engineering And Development, Ltd. Instrumented cementing plug and system
GB2413814A (en) * 2002-04-10 2005-11-09 Bj Services Co System and method of detecting the launch of a device in oilfield applications
US20040047534A1 (en) * 2002-09-09 2004-03-11 Shah Vimal V. Downhole sensing with fiber in exterior annulus
US20040139791A1 (en) * 2003-01-21 2004-07-22 Johansen Espen S. Non-intrusive multiphase flow meter
US20060249307A1 (en) * 2005-01-31 2006-11-09 Baker Hughes Incorporated Apparatus and method for mechanical caliper measurements during drilling and logging-while-drilling operations

Also Published As

Publication number Publication date
US9404338B2 (en) 2016-08-02
WO2010046050A3 (en) 2011-09-15
WO2010046050A2 (en) 2010-04-29
GB2476205A (en) 2011-06-15
EP2177712A1 (en) 2010-04-21
GB201105723D0 (en) 2011-05-18
US20120000649A1 (en) 2012-01-05
US20120000655A1 (en) 2012-01-05
GB201105749D0 (en) 2011-05-18
GB2476205B (en) 2012-10-10
GB2477235A (en) 2011-07-27

Similar Documents

Publication Publication Date Title
US9404338B2 (en) Methods and apparatus for improved cement plug placement
US8826979B2 (en) Methods and apparatus for improved cement plug placement
US20240360752A1 (en) Advanced inground operations, system and associated apparatus
EP2192263A1 (en) Method for monitoring cement plugs
US8462013B2 (en) Apparatus, system, and method for communicating while logging with wired drill pipe
EA016253B1 (en) Method and apparatus for measuring a parameter within the well with a plug
US20090101340A1 (en) Technique and apparatus to perform a leak off test in a well
US20150027736A1 (en) Downhole wireline tension measurement
US20040246141A1 (en) Methods and apparatus for through tubing deployment, monitoring and operation of wireless systems
CN105041298A (en) Device and method for wirelessly positioning depths of strings in real time during coiled tubing operation
US20040231859A1 (en) Method, system & apparatus for orienting casing and liners
EP2466063B1 (en) Equipment and methods for determining waiting-on-cement time in a subterranean well
AU2020426637B2 (en) Cement head and fiber sheath for top plug fiber deployment
US20140083177A1 (en) System For Logging While Running Casing
Harrison et al. Probing the till beneath black rapids glacier, alaska, usa

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09778801

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 1105749

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20090930

WWE Wipo information: entry into national phase

Ref document number: 1105749.4

Country of ref document: GB

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13124471

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 09778801

Country of ref document: EP

Kind code of ref document: A1