WO2010035816A1 - 仮設補強部材付き建物ユニット、ユニット建物、及びユニット建物の構築工法 - Google Patents

仮設補強部材付き建物ユニット、ユニット建物、及びユニット建物の構築工法 Download PDF

Info

Publication number
WO2010035816A1
WO2010035816A1 PCT/JP2009/066719 JP2009066719W WO2010035816A1 WO 2010035816 A1 WO2010035816 A1 WO 2010035816A1 JP 2009066719 W JP2009066719 W JP 2009066719W WO 2010035816 A1 WO2010035816 A1 WO 2010035816A1
Authority
WO
WIPO (PCT)
Prior art keywords
building
building unit
temporary
unit
main body
Prior art date
Application number
PCT/JP2009/066719
Other languages
English (en)
French (fr)
Inventor
大西 克則
小林 昭彦
諭 西郷
海 林
Original Assignee
積水化学工業株式会社
株式会社スタジオキューブ
株式会社アルカディア
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 積水化学工業株式会社, 株式会社スタジオキューブ, 株式会社アルカディア filed Critical 積水化学工業株式会社
Priority to US13/121,504 priority Critical patent/US8769886B2/en
Priority to CN200980000444.2A priority patent/CN101784731B/zh
Publication of WO2010035816A1 publication Critical patent/WO2010035816A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/3483Elements not integrated in a skeleton the supporting structure consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S52/00Static structures, e.g. buildings
    • Y10S52/12Temporary protective expedient

Definitions

  • the present invention relates to a building unit, a unit building composed of the building unit, and a construction method for the unit building.
  • Patent Document 1 it is known to construct a medium-sized or larger building such as an apartment house by assembling a plurality of building units (see Patent Document 1).
  • This building unit uses a short building unit that can be stably loaded on the loading platform of a medium-sized truck as a means of transportation.
  • the maximum length is, for example, in Japan, a transportation method that complies with the strict road traffic law. This is the length excluding the gooseneck part of the carrier semi-trailer carrier.
  • this length is halfway in length, including multiple rooms such as apartment buildings and corridors, so in the end, it is necessary to construct a unit building using many shorter building units. In other words, the construction efficiency cannot be increased and the construction period cannot be shortened.
  • An object of the present invention is to provide a simple building unit, a unit building comprising the building unit, and a construction method for the unit building.
  • the building unit with a temporary reinforcing member of the present invention is provided with a removable temporary reinforcing member on both short sides of the building unit main body, and the temporary reinforcing member has a lower end portion. A projecting portion for supporting the building unit main body projecting downward is provided.
  • the temporary reinforcing member may be provided with a hooking portion for lifting.
  • the temporary reinforcing member is provided with a hook for fixing transportation.
  • the temporary reinforcing member is constructed such that braces are laid between reinforcing columns arranged at both left and right ends of the short side surface of the building unit main body.
  • a reinforcing beam may be installed at a height position lower than the bottom surface of the building unit main body between the reinforcing columns.
  • a lifting hook is formed on the upper end of the reinforcing column.
  • a hook for transport fixation is formed at the lower end of the reinforcing pillar.
  • a detachable temporary reinforcing brace is provided in the opening on the long side surface of the building unit main body.
  • the unit building of the present invention is characterized in that any one of the above-described building units with temporary reinforcing members is used, and a plurality of the building unit main bodies from which the temporary reinforcing members are removed are assembled.
  • a plurality of the building unit bodies are arranged side by side and stacked in a plurality of stages vertically, and these building unit bodies are made of steel with a plurality of bolts and nuts between columns and beams between short sides. It is preferable that the joint strength is increased as it goes to the lower floor by combining the synthetic joint integrated in a rigid state with the plate-made plate and the pin joint simply connected.
  • an overhang member narrower than this is attached to the short side surface side of the building unit main body, and a corner outer wall panel is also attached to a corner portion of the building unit main body facing outward, and the overhang
  • a decorative member may be attached between the member and the outer wall panel and between the overhang members, and an empty space may be formed inside these decorative members.
  • an overhang member may be attached to the short side surface of the building unit body, and a cantilever balcony or a cantilever corridor may be formed by these overhang members.
  • the first unit building construction method of the present invention after removing the temporary reinforcing member of any one of the building units with temporary reinforcing members loaded on the loading platform of the transportation means, It is characterized in that it is lifted from the side surface by at least two cranes while maintaining balance, transferred to a predetermined position, the building unit body is assembled, and a unit building is constructed.
  • the second unit building construction method of the present invention there is provided at least two cranes from both short side end face sides to the hooking portion of any one of the building units with temporary reinforcing members loaded on the loading platform of the transportation means.
  • Each of the engaging parts is hooked, lifted while maintaining a balance, transferred to a predetermined position, the temporary reinforcing member is removed, the building unit body is assembled, and a unit building is constructed.
  • a detachable temporary reinforcing member is provided on both short side surfaces of the building unit main body, and the temporary reinforcing member has a protruding portion protruding downward at the lower end portion thereof. It is set as the structure provided.
  • the building unit with temporary reinforcing members even if the length exceeds the rear end of the gooseneck from the rear end of the container semi-trailer carrier as a means of transportation in accordance with the strict road traffic laws in Japan, etc.
  • the gooseneck side in front of the container is supported on the gooseneck by the lower beam on the short side, and the rear side is supported on the carrier by the protruding part, so that it is supported almost horizontally as a whole. Therefore, it is not necessary to provide a notch or the like that impairs the structural strength on the lower surface of the building unit main body, and the building unit body can be stably loaded on the loading platform of the container semi-trailer.
  • the building unit with a temporary reinforcing member of the same size that is stacked in the ship's warehouse bears the heavy load of the building unit with a temporary reinforcing member of the same size. It is not necessary to make the pillar of the main body thicker than necessary, and it can be implemented economically.
  • the building unit with a temporary reinforcing member in the shipboard warehouse is guarded with the temporary reinforcing member disposed outside the building unit main body, so that the building unit main body is hardly damaged and maintains high quality. Can be transported.
  • the temporary reinforcing member is detachable, it is easy to use and economical.
  • the lifting hook is provided on the temporary reinforcing member
  • the lifting hook provided on the temporary reinforcing member is used when lifting, so the building unit main body is There is no worry about hurting.
  • the temporary reinforcing member is provided with a hook for fixing the transportation
  • the engagement hole provided in the loading platform is provided.
  • the lowest building unit with temporary reinforcing members is engaged with the floor of the ship's warehouse.
  • a building unit with a temporary reinforcing member that is fixed on a hole or the like and a hook for transport fixing with a twist lock, etc. and is stacked on top of the hole is fixed to the lower part of the building unit with a temporary reinforcing member.
  • the temporary reinforcement member is constructed by bracing between the reinforcement pillars arranged at the left and right ends of the short side surface of the building unit body, the temporary reinforcement member bears the vertical load and the brace is horizontal. Since it is a simple structure that bears force, it can be implemented at low cost.
  • this building unit with temporary reinforcement members is supported on the gooseneck by the reinforcing beam on the gooseneck side in front of the container semi-trailer loading platform, so that the beam on the lower side of the short side is damaged or the paint is peeled off. There is no fear of
  • the building unit with a temporary reinforcing member can be lifted in a well-balanced manner without damaging the building unit body.
  • the building unit with a temporary reinforcing member can be transported in a stable state without damaging the building unit body.
  • the long side of the building unit body is weaker than other parts during transportation or lifting. Since the opening of the surface and the vicinity thereof are reinforced and excessive deformation is suppressed, the building unit main body can be maintained in high quality.
  • the unit building of the present invention uses any one of the above-described building units with temporary reinforcing members, and has a structure in which a plurality of building unit bodies from which the temporary reinforcing members are removed are assembled. Therefore, it is not necessary to design with the uselessly high strength, and it is possible to design with the strength required as a unit building.
  • a plurality of building unit bodies are arranged side by side and stacked in multiple stages vertically, and these building unit bodies are composite joints in which the short side surfaces are integrated with each other in a rigid state between columns and beams. And the pin joint that is simply connected, the assembly strength is increased as it goes down the floor. Can be made.
  • an overhang member that is narrower than this is attached to the short side of the building unit body, and a corner outer wall panel is also attached to the corner portion of the building unit body that faces the outside.
  • a cantilever balcony or a cantilever corridor is formed by the overhang member attached to the short side surface side of the building unit main body, and these overhang members are formed, the cantilever balcony or the cantilever corridor is simplified. Can be provided by simple construction.
  • the building unit main body is connected to both short side surfaces. From the side, the crane is lifted by at least two cranes while maintaining balance, transferred to a predetermined position, the building unit body is assembled, and a unit building is constructed.
  • the building unit itself can be transferred in a stable state while keeping it approximately horizontal, thus increasing construction efficiency while ensuring safety.
  • the construction period can be shortened.
  • At least two cranes are provided to the hooking portion of any of the building units with temporary reinforcing members loaded on the loading platform of the transportation means from both short side surfaces.
  • Each engaging portion is hooked, lifted while maintaining balance, transferred to a predetermined position, the temporary reinforcing member is removed, the building unit body is assembled, and a unit building is constructed.
  • the building unit body is kept in a substantially horizontal state and transferred in a stable state. Therefore, while ensuring safety, the construction efficiency can be increased and the construction period can be shortened.
  • FIG. 9 is a cross-sectional view taken along line AA in FIG. It is the horizontal sectional view which showed schematic structure inside the unit building at the time of forming a cantilever balcony. It is the elements on larger scale in the B section of FIG. It is the elements on larger scale in the C section of FIG.
  • FIG. 13 is a cross-sectional view taken along line DD in FIG. It is the elements on larger scale in the E section of FIG. It is the elements on larger scale in the F section of FIG.
  • FIG. 13 is a sectional view taken along line GG in FIG. 12. It is the elements on larger scale in the H section of FIG.
  • FIG. 1 shows a schematic configuration of a building unit 1 with a temporary reinforcing member of the present embodiment.
  • such a building unit 1 with a temporary reinforcing member is mainly composed of a box-shaped long building unit main body 1A and temporary reinforcing members 2 and 2.
  • this box-shaped long building unit main body 1A has four steel (H-shaped steel) columns 7,... And four steel (H-shaped steel) beams 8,. , Each end is rigidly joined.
  • each of the five structural surfaces four reinforcing beams 9,... are laid between the beams 8, 8, and are formed by the beams 8,.
  • horizontal braces 10 and 10 are respectively provided in X-shape on each of the five structural surfaces, and a ceiling panel 11 made of an ALC (lightweight cellular concrete) plate is provided below the horizontal braces 10. Attached.
  • a plurality of floor joists 12,... are laid between the beams 8 and 8, and a floor panel 13,. Yes.
  • the surface of the central portion is an opening of the building unit main body 1A, and temporary reinforcing braces 4 and 4 are detachably provided in an X shape by bolts and nuts (not shown).
  • the temporary reinforcing member 2 is detachably provided between the reinforcing columns 21 and 21 and the columns 7 and 7 by a plurality of bolts and nuts (not shown).
  • the upper ends of the reinforcing columns 21,... are used as lifting hooks for hooking hooks 61 as hooking parts of a crane (not shown).
  • the upper corner fittings 31 in which the hooking holes 31 a are formed are provided so that the upper end portions thereof substantially coincide with the upper end portions of the columns 7.
  • a lower corner metal fitting 32 having a hooking hole 32a as a hooking part for transport fixation that is fixed to a hole or the like with a twist lock or the like is provided.
  • the lower end part of the reinforcement pillar 21 and the lower corner metal fitting 32 protrude below from the lower end part of the building unit main body 1A, respectively.
  • the projecting height h of the projecting portion 3 is, for example, a height projecting upward from the loading platform of a gooseneck (not shown) of a semi-trailer dedicated to containers as a means of transportation in accordance with strict road traffic laws such as Japan.
  • the height is substantially the same as 139 mm) in the standard.
  • the upper corner bracket 31 and the lower corner bracket 32 are cast as the same thing.
  • the engaging portion of the crane (not shown) is not limited to the hook 61, and a shackle or the like may be used as appropriate.
  • the reinforcing beam 2 a may be installed at a height slightly lower than the bottom surface of the building unit main body 1 ⁇ / b> A between the reinforcing columns 21 and 21 of the temporary reinforcing member 2.
  • the building unit 1 with a temporary reinforcing member is supported on the gooseneck by the reinforcing beam 2a on the gooseneck side in front of the loading platform of the container semi-trailer. There is no risk of the paint peeling off.
  • the construction method of the unit building according to the present embodiment is the above-described embodiment that has been transported by the semi-trailer 5 dedicated to containers as a transportation means in accordance with the strict road traffic law such as Japan.
  • the two cranes 6 and 6 are arranged on both short side surfaces of the building unit 1 with temporary reinforcing members.
  • hooks 61, 61 provided at the tips of the two wires 33, 33 are temporarily installed as shown in FIG. After removing the reinforcing members 2, 2 and the temporary reinforcing braces 4,..., The building unit body 1 ⁇ / b> A is hooked on temporary hooks (not shown) provided at the upper four corners.
  • the building unit main body 1A is lifted while maintaining a balance, transferred to the position where the foundation 34 of the construction site is provided, arranged, stacked and assembled.
  • the temporary reinforcement members 2 and 2 are left, the building unit 1 with temporary reinforcement members is transferred using the hooking holes 31a of the upper corner brackets 31,.
  • the temporary reinforcing members 2 and 2 and the temporary reinforcing braces 4 may be removed from the building unit 1 with members.
  • the outer wall steel plate panels 18 as overhang members narrower than this are respectively attached to both short side surfaces of the building unit main body 1A from which the temporary reinforcing members 2 and 2 are removed. .
  • this outer wall steel plate panel 18 with a volt
  • a fireproof wall panel 19 made of an ALC plate is also attached to both long side surfaces (both side surfaces) of the building unit main body 1A.
  • an outer wall panel 23 made of an ALC plate is attached to the outer long side surface (side surface) of the building unit main body 1A facing the outer side instead of the fireproof wall panel 19, and the corner The corner outer wall panels 20 and 20 are attached to the portion.
  • the fireproof wall panel 19 and the outer wall panel 23 may be pre-attached to the building unit main body 1A.
  • a curtain wall unit 35A as a decorative member is attached and closed between the corner outer wall panel 20 and the outer wall steel plate panel 18, and the width between the outer wall steel plate panels 18 and 18 is about twice that of the curtain wall unit 35A.
  • the curtain wall unit 35B as a decorative member is attached and closed.
  • a unit building U is constructed by assembling a total of 20 building unit bodies 1A,..., 4 horizontally and 5 vertically. Is done.
  • the synthetic joint R1 is formed by connecting a plurality of (here, four) spacers 37 between the flanges of the H-shaped steel columns 7 and 7. )
  • the steel plate 24 is integrated in a rigid state by bolts 25,... And nuts (not shown).
  • the synthetic joint R2 is a plurality of (here, four pieces) between the flanges of the H-shaped steel beams 8 and 8 with spacers 37 interposed therebetween. )
  • the steel plate 24 is integrated in a rigid state by bolts 25,... And nuts (not shown).
  • the columns 7 and 7 of the building unit main body 1A,... On the second floor are also firmly joined by the synthetic joint R1 at the upper and lower ends and the middle.
  • the columns 7 and 7 of the building unit main body 1A,... On the third floor are firmly joined to each other at the upper and lower ends by the synthetic joint R1.
  • the beams 8 and 8 of the building unit main body 1A on the third floor and the building unit main body 1A on the fourth floor are firmly joined to each other at the left and right ends by the composite joint R2. ing.
  • the columns 7 and 7 of the building unit main body 1A,... On the fourth floor are also firmly joined at the upper and lower ends by the synthetic joint R1.
  • the beams 8 and 8 of the building unit main body 1A,... On the fourth floor part and the building unit main body 1A,... On the fifth floor part are respectively joined at the left and right ends by pin joints R3.
  • this pin joint R3 is a space between the flanges of the H-shaped steel beams 8 and 8, and two bolts 27 and 27 and a nut (not shown). Is simply connected by the steel plate 26.
  • this pin joint R4 is a space between the flanges of the H-shaped steel columns 7 and 7, with two bolts 27 and 27 and a nut (not shown). Is simply connected by the steel plate 26.
  • the unit building body 1,... is assembled so that the bonding strength increases as it goes to the lower floor, so that the unit building U has the necessary strength.
  • the inside of the unit building U is four on each side of the central corridor 29 formed on one floor with the openings of the building unit main bodies 1A,. There are a total of 8 rooms 28.
  • a watering equipment room 30 having a wash basin, a toilet, and a bath is provided next to the entrance.
  • each room 28 a large area inside the dotted line in which the water facility room 30 is provided is formed by the building unit main body 1A, and a small area outside the dotted line at the window is an outer wall steel plate panel as an overhang member 18 is formed.
  • the piping (not shown) from this watering equipment room 30 is each arrange
  • these empty spaces 16,... May be used for air-conditioning spaces and the like in addition to such pipe spaces.
  • each unit building U is attached with a balcony member 18A as an overhang member on the short side surface side of each building unit main body 1A, and these balcony members 18A,. May be formed to form a cantilever balcony.
  • a cantilever corridor can be formed.
  • a cantilever balcony or a cantilever corridor can be provided by simple construction.
  • the space between the outer wall panel 23 made of an ALC plate and the outer wall steel plate panel 18 is covered with a fireproof covering material 36 such as rock wool. It has fire resistance and heat insulation performance.
  • the fireproof covering material 36 such as rock wool is provided between the fireproof wall panel 19 and the outer wall steel plate panel 18 made of ALC plates. It is covered and has fireproof performance and heat insulation performance.
  • the ceiling panel 11 is also covered with a fireproof covering material 36 such as rock wool to provide fireproof performance and heat insulation performance.
  • FIGS. 19 and 20 between the ceiling panel 11A made of an ALC plate of the outer wall steel plate panel 18 as an overhang member to be retrofitted and the ceiling panel 11 made of an ALC plate, rock wool or the like is also provided. It is covered with a fireproof covering material 36,... To provide fireproof performance and heat insulation performance.
  • floor floor 13A which consists of floor joists 12A and ... which comprise the floor structure of the outer wall steel plate panel 18 and a particle board was implemented retrofit, you may implement ahead of the outer wall steel plate panel 18.
  • removable temporary reinforcing members 2 are respectively provided on both short side surfaces of the building unit main body 1A, and the temporary reinforcing member 2 has a lower end portion thereof. Further, the lower end portion of the reinforcing column 21 and the lower corner metal fittings 32,...
  • this building with a temporary reinforcing member
  • the unit 1 is supported on the gooseneck by a beam 8 on the lower side of the short side surface on the front side of the loading platform of the container semi-trailer 5 and on the loading platform by the protruding parts 3 and 3 on the rear side. Therefore, the lower surface of the building unit main body 1A does not need to be provided with a notch that impairs structural strength, and can be stably loaded on the loading platform of the container semi-trailer 5.
  • the building unit with temporary reinforcing members 1 in the inboard warehouse is guarded with the temporary reinforcing members 2 and 2 arranged outside the building unit main body 1A, so that the building unit main body 1A is hardly damaged. It is not given and can be transported with high quality.
  • the temporary reinforcing members 2 and 2 are detachable, they are easy to use and economical.
  • the temporary reinforcing member 2 is provided with the hooking holes 31a and 31a as the hooking portions for lifting, the hooks 61 and 61 as the engaging portions of the crane 6 are used when lifting. There is no worry of damaging the building unit main body 1A because the hook holes 31a and 31a can be hooked and lifted.
  • the temporary reinforcing member 2 is provided with hooking holes 32a and 32a as hooking parts for transport fixation.
  • the engagement hole provided in the cargo bed and the hook holes 32a for fixing the transport are twist-locked.
  • the building unit main body 1A can be transported on the ground in a stable state without being damaged.
  • the building unit 1 with temporary reinforcing members at the bottom is the floor of the ship warehouse.
  • the building unit 1 with a temporary reinforcing member stacked on the engagement hole or the like provided in the transport fixing hook 32a By fixing the holes 32a,... With the lifting hook holes 31a,. Can be transported by sea in the state.
  • the temporary reinforcement member 2 is constructed by braces 22 and 22 being laid between the reinforcement columns 21 and 21 disposed at the left and right ends of the short side surface of the building unit main body 1A, the temporary reinforcement member 2 is provided with the reinforcement columns 21 and 21. Since 21 has a simple structure that bears a vertical load and the braces 22 and 22 bear a horizontal force, it can be implemented at low cost.
  • an upper corner bracket 31 is provided at the upper end portion of the reinforcing column 21, and the upper corner bracket 31 is formed with a hooking hole 31a as a hooking portion for lifting, so that the building unit main body 1A is damaged.
  • the building unit 1 with a temporary reinforcing member can be lifted in a well-balanced manner.
  • the temporary reinforcing member is not damaged without damaging the building unit main body 1A.
  • the attached building unit 1 can be transported in a stable state.
  • the detachable temporary reinforcing braces 4,... are provided in the opening of the long side surface (side surface) of the building unit main body 1A, the strength is higher than that of other parts during transportation or lifting. Since the opening of the long side surface of the weak building unit main body 1A and the vicinity thereof are reinforced and excessive deformation is suppressed, the building unit main body 1A can be maintained in high quality.
  • the unit building U of the present embodiment uses the building units with temporary reinforcing members 1,... Of the present embodiment, and a plurality of building unit main bodies 1A from which the temporary reinforcing members 2 and 2 are removed are assembled. Therefore, it is not necessary to design with the uselessly high strength required for marine transportation or the like, and it is possible to design with the strength required for the unit building U.
  • building unit main bodies 1A are arranged side by side and stacked vertically in five tiers. These building unit main bodies 1A,... Have columns 7 and 7 and beams 8, By combining the joints R1,..., R2,. Therefore, it is assembled so as to increase the bonding strength.
  • outer wall steel plate panel 18 as an overhang member narrower than this is respectively attached to the short side surface side of the building unit main body 1A,..., And the building unit main body 1A,. Corner outer wall panels 20 are also attached to the corner portions.
  • a curtain wall unit 35A as a decorative member is attached between the outer wall steel plate panel 18 and the corner outer wall panel 20, and a curtain wall unit 35B as a decorative member is attached between the outer wall steel plate panels 18 and 18, respectively.
  • Empty spaces 16 are formed inside the curtain wall units 35A,... And 35B,.
  • an outer wall panel 23 made of an ALC plate, a fireproof wall panel 19 and a ceiling panel 11 are provided on the long side surfaces (side surfaces and ceiling surface) of the building unit main body 1A,.
  • the ceiling surfaces of the steel plate panels 18,... are also provided with ceiling panels 11A made of ALC plates, and the gaps between these ALC plates are closed by the fireproof coatings 36,.
  • the fireproof covering materials 36 are located between the outer wall panel 23 and the outer wall steel plate panel 18 made of an ALC plate and between the fire wall panel 19 and the outer wall steel plate panel 18 made of an ALC plate, the fireproof covering materials 36,. It is.
  • the construction method of the unit building according to the present embodiment is obtained by removing the temporary reinforcing members 2 and 2 of the building unit 1 with the temporary reinforcing member of the present embodiment loaded on the loading platform of the container semi-trailer 5 as a transportation means.
  • the building unit main body 1A is lifted from both short sides by cranes 6 and 6 while maintaining balance, transferred to the position where the foundation 34 of the construction site is provided, stacked, assembled, and unit building U Is configured to build.
  • the building unit main body 1A can be transferred in a stable state while keeping it substantially horizontal. Can shorten the construction period.
  • the unit building U is constructed in five stories using 20 building units 1 with temporary reinforcing members, but the present invention is not limited to this, and various designs are possible.
  • the temporary reinforcement member 2 was implemented using what the braces 22 and 22 constructed between the reinforcement pillars 21 and 21 arrange
  • the temporary reinforcing member 2 may be implemented using a flat plate that is slightly larger than the short side surface of the building unit main body 1A.

Abstract

 特に集合住宅などの中規模以上のユニット建物を構築する際に、施工効率を上げて工期を短縮でき、経済的に実施できる長大な建物ユニットを提供する。  建物ユニット本体1Aの両短辺面に、着脱可能な仮設補強部材2がそれぞれ設けられ、仮設補強部材2には、その下端部に下方に突出部3,・・・が突出した構成とされている。

Description

仮設補強部材付き建物ユニット、ユニット建物、及びユニット建物の構築工法
 本発明は、建物ユニット、この建物ユニットから成るユニット建物、及びこのユニット建物の構築工法に関するものである。
 従来から、集合住宅などの中規模以上の建物を、建物ユニットを複数個組み付けて構築することが知られている(特許文献1等を参照)。
 この建物ユニットには、輸送手段としての中型トラックの荷台に、安定して積載可能な短小な建物ユニットが用いられている。
 すなわち、従来では、長大な建物ユニットを組み付けて構築されたユニット建物は、見聞されない。
日本国特開2004-346705号公報
 ここで、かりに、施工効率を上げて工期を短縮するために、長大な建物ユニットを輸送しようとしても、その長さは、最大でも、例えば日本国などでは、厳しい道路交通法に則した輸送手段としてのコンテナ専用セミトレーラーの荷台のグースネックの部分を除いた長さとなる。
 しかしながら、この長さでは、集合住宅などの複数の部屋や廊下などを含めた長さとしては中途半端なため、結局のところ、これよりも短い建物ユニットを多数用いてユニット建物を構築しなければならず、施工効率を上げて工期を短縮することはできない。
 また、この長大な建物ユニットを、海外で生産し、海上輸送しようとしても、陸上での仮置きや海上輸送中の船内倉庫内では、複数個積み重ねなければならないので、これらの建物ユニットのサイズを同一としても、同建物ユニットの柱を必要以上に太くして実施しなければならず、不経済である。
 そこで、本発明は、特に集合住宅などの中規模以上のユニット建物を構築する際に、施工効率を上げて工期を短縮でき、柱を必要以上に太くしないで済み、経済的に実施できる、長大な建物ユニット、この建物ユニットから成るユニット建物、及びこのユニット建物の構築工法を提供することを目的としている。
 前記目的を達成するために、本発明の仮設補強部材付き建物ユニットは、建物ユニット本体の両短辺面に、着脱可能な仮設補強部材が設けられ、該仮設補強部材には、その下端部に下方に突出する前記建物ユニット本体を支持するための突出部が設けられていることを特徴とする。
 ここで、前記仮設補強部材に、吊上げ用の引掛け部が設けられているとよい。
 また、前記仮設補強部材に、輸送固定用の引掛け部が設けられているとよい。
 さらに、前記仮設補強部材は、前記建物ユニット本体の短辺面の左右両端に配置した補強柱間にブレースが架設されて成るとよい。
 また、前記補強柱間の前記建物ユニット本体の底面より低い高さ位置に、補強梁が架設されていてもよい。
 さらに、前記補強柱の上端部に、吊上げ用の引掛け部が形成されているとよい。
 また、前記補強柱の下端部に、輸送固定用の引掛け部が形成されているとよい。
 さらに、前記建物ユニット本体の長辺面の開口部に、着脱可能な仮設補強ブレースが設けられているとよい。
 本発明のユニット建物は、上記したいずれかの仮設補強部材付き建物ユニットが用いられ、前記仮設補強部材が取り除かれた前記建物ユニット本体が複数組み付けられて成ることを特徴とする。
 ここで、前記建物ユニット本体が、横に複数個並べられ、縦に複数段積み上げられ、これらの建物ユニット本体は、短辺面間が、柱同士及び梁同士を、複数のボルト及びナットにより鋼製プレートで剛状態に一体化する合成接合と単に接続するだけのピン接合とを組み合わせることにより、下階にいくにしたがって接合強度が大きくなるように組み付けられているとよい。
 また、前記建物ユニット本体の短辺面側に、これよりも幅狭なオーバーハング部材が取付けられ、外側に面する前記建物ユニット本体のコーナー部分には、コーナー外壁パネルも取付けられ、前記オーバーハング部材と前記外壁パネル間及び前記オーバーハング部材同士間に、化粧部材がそれぞれ取付けられ、これらの化粧部材の内側に、空きスペースが形成されているとよい。
 さらに、前記建物ユニット本体の短辺面側に、オーバーハング部材が取付けられ、これらのオーバーハング部材により、片持ちバルコニー又は片持ち廊下が形成されていてもよい。
 本発明の第1のユニット建物の構築工法は、輸送手段の荷台に積載された上記したいずれかの仮設補強部材付き建物ユニットの前記仮設補強部材を取り除いてから、前記建物ユニット本体を、両短辺面側から、少なくとも2台のクレーンにより、バランスを保ちながら吊上げ、所定の位置に移載していき、前記建物ユニット本体を組み付け、ユニット建物を構築することを特徴とする。
 本発明の第2のユニット建物の構築工法は、輸送手段の荷台に積載された上記したいずれかの仮設補強部材付き建物ユニットの前記引掛け部に両短辺側端面側から少なくとも2台のクレーンの係合部をそれぞれ引っ掛け、バランスを保ちながら吊上げ、所定の位置に移載していき、前記仮設補強部材を取り除いてから、前記建物ユニット本体を組み付け、ユニット建物を構築することを特徴とする。
 このような本発明の仮設補強部材付き建物ユニットは、建物ユニット本体の両短辺面に、着脱可能な仮設補強部材が設けられ、仮設補強部材には、その下端部に下方に突出する突出部が設けられた構成とされている。
 こうした構成なので、例えば日本国などの厳しい道路交通法に則した輸送手段としてのコンテナ専用セミトレーラーの荷台の後端部からグースネックの後端部を超える長さとしても、この仮設補強部材付き建物ユニットは、コンテナ専用セミトレーラーの荷台の前方のグースネック側は短辺面の下側の梁でグースネック上に支持され、後方側は突出部で荷台上に支持されて、全体として略水平に支持されるため、建物ユニット本体の下面には構造耐力を損なう切り欠きなどを設ける必要がなく、コンテナ専用セミトレーラーの荷台に安定して積載することができる。
 よって、特に集合住宅などの中規模以上のユニット建物を構築する際に、施工効率を上げて工期を短縮できる長大な建物ユニットを実現することができる。
 また、輸送段階で、海上輸送を利用する場合には、船内倉庫内で、複数個積み重ねた同一サイズの仮設補強部材付き建物ユニットの大きな荷重は、剛強な仮設補強部材が負担するため、建物ユニット本体の柱を必要以上に太くしなくても済み、経済的に実施できる。
 さらに、船内倉庫内の仮設補強部材付き建物ユニットは、仮設補強部材が建物ユニット本体の外側に配置されてガードされるため、建物ユニット本体には殆どダメージが与えられることがなく、高品質を保って輸送が行える。
 また、仮設補強部材は、着脱可能なため、使い回しがきき、経済的である。
 ここで、仮設補強部材に、吊上げ用の引掛け部が設けられている場合は、吊上げる際には、仮設補強部材に設けられた吊上げ用の引掛け部を使用するため、建物ユニット本体を傷つける心配がない。
 また、仮設補強部材に、輸送固定用の引掛け部が設けられている場合は、仮設補強部材付き建物ユニットを、コンテナ専用セミトレーラーで陸上輸送する際は、その荷台に設けられた係合穴などと輸送固定用の引掛け部とをツイストロックなどで固定することにより、建物ユニット本体を傷つけずに、安定した状態で陸上輸送することができる。
 さらに、同一サイズの仮設補強部材付き建物ユニットを、船内倉庫内で、複数個積み重ねて海上輸送する際には、最下部の仮設補強部材付き建物ユニットは、船内倉庫の床に設けられた係合穴などと輸送固定用の引掛け部とをツイストロックなどで固定し、その上に積み重ねられる仮設補強部材付き建物ユニットは、輸送固定用の引掛け部を、下部の仮設補強部材付き建物ユニットの吊上げ用の引掛け部とツイストロックなどで固定することにより、建物ユニット本体を傷つけずに、安定した状態で海上輸送することができる。
 また、仮設補強部材が、建物ユニット本体の短辺面の左右両端に配置した補強柱間にブレースが架設されて成る場合は、仮設補強部材が、補強柱は鉛直荷重を負担し、ブレースは水平力を負担する簡易な構造であるため、低コストで実施することができる。
 さらに、補強柱間の建物ユニット本体の底面より低い高さ位置に、補強梁が架設されている場合は、陸上輸送のためのコンテナ専用セミトレーラーに、仮設補強部材付き建物ユニットを積み込む際に、補強梁により保護されているため、建物ユニット本体の底面がグースネックに当たり、傷つけてしまう心配がない。
 そのうえ、この仮設補強部材付き建物ユニットは、コンテナ専用セミトレーラーの荷台の前方のグースネック側は補強梁でグースネック上に支持されるため、短辺面の下側の梁が傷ついたり、その塗装が剥げたりするおそれがない。
 また、補強柱の上端部に、吊上げ用の引掛け部が形成されている場合は、建物ユニット本体を傷つけることなく、仮設補強部材付き建物ユニットをバランス良く吊上げることができる。
 さらに、補強柱の下端部に、輸送固定用の引掛け部が形成されている場合は、建物ユニット本体を傷つけることなく、仮設補強部材付き建物ユニットを安定した状態で輸送することができる。
 また、建物ユニット本体の長辺面の開口部に、着脱可能な仮設補強ブレースが設けられている場合は、輸送中や吊上げ中に、他の部分に比べて強度の弱い建物ユニット本体の長辺面の開口部及びその近傍が補強されて、過度な変形が抑制されるため、建物ユニット本体を高品質に保つことができる。
 本発明のユニット建物は、上記したいずれかの仮設補強部材付き建物ユニットが用いられ、仮設補強部材が取り除かれた建物ユニット本体が複数組み付けられた構成とされているので、海上輸送などで必要とされる無駄に高い強度で設計する必要がなく、ユニット建物として必要とされる強度で設計することができる。
 ここで、建物ユニット本体が、横に複数個並べられ、縦に複数段積み上げられ、これらの建物ユニット本体は、短辺面間が、柱同士及び梁同士を、剛状態に一体化する合成接合と単に接続するだけのピン接合とを組み合わせることにより、下階にいくにしたがって接合強度が大きくなるように組み付けられている場合は、施工手間を極力少なくして、ユニット建物に必要な強度を持たせることができる。
 また、建物ユニット本体の短辺面側に、これよりも幅狭なオーバーハング部材が取付けられ、外側に面する建物ユニット本体のコーナー部分には、コーナー外壁パネルも取付けられ、オーバーハング部材とコーナー外壁パネルとの間及びオーバーハング部材同士間に、化粧部材がそれぞれ取付けられ、これらの化粧部材の内側に、空きスペースが形成されている場合は、これらの空きスペースを、パイプスペースや空調スペースなどに有効に利用することができる。
 さらに、建物ユニット本体の短辺面側に、オーバーハング部材が取付けられ、これらのオーバーハング部材により、片持ちバルコニー又は片持ち廊下が形成されている場合は、片持ちバルコニー又は片持ち廊下を簡易な施工で設けることができる。
 本発明の第1のユニット建物の構築工法は、輸送手段の荷台に積載された上記したいずれかの仮設補強部材付き建物ユニットの仮設補強部材を取り除いてから、建物ユニット本体を、両短辺面側から、少なくとも2台のクレーンにより、バランスを保ちながら吊上げ、所定の位置に移載していき、建物ユニット本体を組み付け、ユニット建物を構築する構成とされている。
 こうした構成なので、特に集合住宅などの中規模以上のユニット建物を構築する際に、建物ユニット本体を略水平に保って安定した状態で移載できるため、安全性を確保しながら、施工効率を上げて工期を短縮することができる。
 本発明の第2のユニット建物の構築工法は、輸送手段の荷台に積載された上記したいずれかの仮設補強部材付き建物ユニットの引掛け部に両短辺面側から、少なくとも2台のクレーンの係合部をそれぞれ引っ掛け、バランスを保ちながら吊上げ、所定の位置に移載していき、仮設補強部材を取り除いてから、建物ユニット本体を組み付け、ユニット建物を構築する構成とされている。
 こうした構成なので、本発明の第1のユニット建物の構築工法と同様、特に集合住宅などの中規模以上のユニット建物を構築する際に、建物ユニット本体を略水平に保って安定した状態で移載できるため、安全性を確保しながら、施工効率を上げて工期を短縮することができる。
本発明の実施の形態の仮設補強部材付き建物ユニットの概略構成を示した斜視図である。 本実施の形態の上側隅金具近傍の部分を拡大して示した部分拡大斜視図である。 本実施の形態の下側隅金具近傍の部分を拡大して示した部分拡大斜視図である。 本発明の仮設補強部材に補強梁を設けた場合の仮設補強部材付き建物ユニットの概略構成を示した斜視図である。 本実施の形態のユニット建物の構築工法の施工段階を示した説明図である。 本実施の形態のユニット建物の構築工法の施工段階を示した説明図である。 本実施の形態のユニット建物の構築工法の施工段階を示した説明図である。 本実施の形態のユニット建物の概略構成を示した正面図である。 図8の側面図である。 (a)~(d)は、建物ユニット本体間の合成接合された部分を示した説明図である。 (a)~(d)は、建物ユニット本体間のピン接合された部分を示した説明図である。 図8におけるA-A線矢視断面図である。 片持ちバルコニーを形成した場合のユニット建物の内部の概略構成を示した水平断面図である。 図12のB部における部分拡大図である。 図12のC部における部分拡大図である。 図12におけるD-D線矢視断面図である。 図16のE部における部分拡大図である。 図16のF部における部分拡大図である。 図12におけるG-G線矢視断面図である。 図19のH部における部分拡大図である。
 以下、本発明を実施するための形態について図面に基づいて説明する。
 図1は、本実施の形態の仮設補強部材付き建物ユニット1の概略構成を示している。
 まず、このような仮設補強部材付き建物ユニット1は、箱形の長大な建物ユニット本体1Aと仮設補強部材2,2とから主に構成されている。
 ここで、この箱形の長大な建物ユニット本体1Aは、4本の鋼製(H型鋼)の柱7,・・・と4本の鋼製(H型鋼)の梁8,・・・とが、各端部で剛接合されて成る。
 また、この建物ユニット本体1Aの上面では、梁8,8間に、4本の補強梁9,・・・が架設され、梁8,・・・と補強梁9,・・・とで形成された5つの各構面にX字状に水平ブレース10,10がそれぞれ設けられ、この水平ブレース10,・・・の下部に、ALC(軽量気泡コンクリート)板から成る天井パネル11,・・・が貼設されている。
 さらに、この建物ユニット本体1Aの下面では、梁8,8間に、複数の床根太12,・・・が架設され、その上部に、パーチクルボードから成る床パネル13,・・・が貼設されている。
 また、この建物ユニット本体1Aの両長辺面(両側面)では、梁8,8間に、4本の補強柱14,・・・が架設され、柱7,7と梁8,8と補強柱14,・・・とで形成された5つの構面のうち、中央部を除いた4つの各構面にX字状に壁面ブレース15,15がそれぞれ設けられている。
 ここで、中央部の構面は、建物ユニット本体1Aの開口部とされ、ボルト及びナット(図示せず)により仮設補強ブレース4,4がX字状に着脱可能に設けられている。
 そして、この建物ユニット本体1Aの両短辺面では、鋼製(角形鋼)の補強柱21,21間にブレース22,22がX字状に架設されて成る仮設補強部材2がそれぞれ設けられている。
 ここで、この仮設補強部材2は、補強柱21,21と柱7,7との間が複数のボルト及びナット(図示せず)により、着脱可能に設けられている。
 また、補強柱21,・・・の上端部には、図2に示したように、クレーン(図示せず)の係合部としてのフック61を引掛けるための吊上げ用の引掛け部としての引掛け孔31aが形成された上側隅金具31が、その上端部が柱7の上端部と略一致するようにそれぞれ設けられている。
 さらに、補強柱21,・・・の下端部には、図3に示したように、陸上輸送する際のコンテナ専用セミトレーラーの荷台や海上輸送する際の船内倉庫の床に設けられた係合穴などとツイストロックなどで固定される輸送固定用の引掛け部としての引掛け孔32aが形成された下側隅金具32が設けられている。
 そして、突出部3として、補強柱21の下端部及び下側隅金具32は、建物ユニット本体1Aの下端部から下方にそれぞれ突出している。
 この突出部3の突出する高さhは、例えば日本国などの厳しい道路交通法に則した輸送手段としてのコンテナ専用セミトレーラーのグースネック(図示せず)の荷台から上方に突出する高さ(JIS規格では139mm)と略同一の高さとされている。
 また、上側隅金具31と下側隅金具32とは、同一のものとして鋳造されている。
 ここで、クレーン(図示せず)の係合部は、フック61に限定されず、シャックルその他のものを適宜使用してもよい。
 なお、図4に示したように、仮設補強部材2の補強柱21,21間の建物ユニット本体1Aの底面より若干低い高さ位置に、補強梁2aを架設して実施してもよい。
 この場合は、陸上輸送のためのコンテナ専用セミトレーラーに、仮設補強部材付き建物ユニット1を積み込む際に、補強梁2aにより保護されているため、建物ユニット本体1Aの底面がグースネックに当たり、傷つけてしまう心配がない。
 そのうえ、この仮設補強部材付き建物ユニット1は、コンテナ専用セミトレーラーの荷台の前方のグースネック側は補強梁2aでグースネック上に支持されるため、短辺面の下側の梁8が傷ついたり、その塗装が剥げたりするおそれがない。
 次に、本実施の形態のユニット建物の構築工法について説明する。
 本実施の形態のユニット建物の構築工法は、図5に示したように、日本国などの厳しい道路交通法に則した輸送手段としてのコンテナ専用セミトレーラー5で輸送してきた上記した本実施の形態の仮設補強部材付き建物ユニット1の両短辺面側に2台のクレーン6,6を配置して実施される。
 具体的には、図2に示したように、2台のクレーン6,6ともに、2本のワイヤー33,33の先端に設けられたフック61,61を、図6に示したように、仮設補強部材2,2及び仮設補強ブレース4,・・・を取り除いてから、建物ユニット本体1Aに上側の四隅に設けた仮設の引掛け部(図示せず)へそれぞれ引っ掛ける。
 そして、建物ユニット本体1Aを、バランスを保ちながら吊上げ、建築現場の基礎34が設けられた位置へ移載して並べ、積み上げ、組み付けていく。
 なお、仮設補強部材2,2を残しておき、上側隅金具31,・・・の引掛け孔31a,・・・を利用して仮設補強部材付き建物ユニット1を移載し、その後、仮設補強部材付き建物ユニット1から仮設補強部材2,2及び仮設補強ブレース4,・・・を取り除いてもよい。
 このように移載した建物ユニット本体1Aについて、仮設補強部材2,2を取り除いた建物ユニット本体1Aの両短辺面に、これよりも幅狭なオーバーハング部材としての外壁鋼板パネル18をそれぞれ取付ける。
 なお、この外壁鋼板パネル18は、仮設補強部材2を取付けていたボルト孔を利用してボルト及びナット(図示せず)により取付けてもよい。
 ここで、建物ユニット本体1Aの両長辺面(両側面)には、ALC板から成る耐火界壁パネル19もそれぞれ取付ける。
 また、外側に面する建物ユニット本体1Aの外側の長辺面(側面)には、図7に示したように、耐火界壁パネル19の代わりに、ALC板から成る外壁パネル23を取付け、コーナー部分には、コーナー外壁パネル20,20を取り付ける。
 なお、耐火界壁パネル19や外壁パネル23は、建物ユニット本体1Aに先付けされていてもよい。
 続いて、後続のコンテナ専用セミトレーラー5で輸送してきた仮設補強部材付き建物ユニット1についても、同様の手順で作業を行う。
 この間、コーナー外壁パネル20と外壁鋼板パネル18との間に、化粧部材としてのカーテンウォールユニット35Aを取付けて塞ぎ、外壁鋼板パネル18,18同士間には、カーテンウォールユニット35Aの約2倍の幅の化粧部材としてのカーテンウォールユニット35Bを取付けて塞いでいく。
 こうして、本実施の形態では、図8及び図9に示したように、横に4個、縦に5段の合計20個の建物ユニット本体1A,・・・を組み付けて成るユニット建物Uが構築される。
 こうして構築された本実施の形態のユニット建物Uでは、図9に示したように、1階部分の建物ユニット本体1A,・・・の柱7,7間は、上下端部及び中間部で、合成接合R1により強固にそれぞれ接合されている。
 この合成接合R1とは、図10(a)及び図10(b)に示したように、H型鋼の柱7,7のフランジ間が、スペーサー37を介して、複数の(ここでは4本の)ボルト25,・・・及びナット(図示せず)により鋼製プレート24で剛状態に一体化されていることである。
 また、1階部分の建物ユニット本体1A,・・・と2階部分の建物ユニット本体1A,・・・の梁8,8間は、左右端部及び中間部で、合成接合R2により強固にそれぞれ接合されている。
 この合成接合R2とは、図10(c)及び図10(d)に示したように、H型鋼の梁8,8のフランジ間が、スペーサー37を介して、複数の(ここでは4本の)ボルト25,・・・及びナット(図示せず)により鋼製プレート24で剛状態に一体化されていることである。
 さらに、2階部分の建物ユニット本体1A,・・・の柱7,7間も、上下端部及び中間部で、合成接合R1により強固にそれぞれ接合されている。
 また、2階部分の建物ユニット本体1A,・・・と3階部分の建物ユニット本体1A,・・・の梁8,8間は、左右端部で、合成接合R2により強固にそれぞれ接合されている。
 さらに、3階部分の建物ユニット本体1A,・・・の柱7,7間は、上下端部で、合成接合R1により強固にそれぞれ接合されている。
 また、3階部分の建物ユニット本体1A,・・・と4階部分の建物ユニット本体1A,・・・の各梁8,8間は、左右端部で、合成接合R2により強固にそれぞれ接合されている。
 さらに、4階部分の建物ユニット本体1A,・・・の柱7,7間も、上下端部で、合成接合R1により強固にそれぞれ接合されている。
 また、4階部分の建物ユニット本体1A,・・・と5階部分の建物ユニット本体1A,・・・の梁8,8間は、左右端部で、ピン接合R3によりそれぞれ接合されている。
 このピン接合R3とは、図11(c)及び図11(d)に示したように、H型鋼の梁8,8のフランジ間が、2本のボルト27,27及びナット(図示せず)により鋼製プレート26で単に接続されていることである。
 さらに、5階部分の建物ユニット本体1A,・・・の柱7,7間は、上下端部で、ピン接合R4によりそれぞれ接合されている。
 このピン接合R4とは、図11(a)及び図11(b)に示したように、H型鋼の柱7,7のフランジ間が、2本のボルト27,27及びナット(図示せず)により鋼製プレート26で単に接続されていることである。
 こうして、ユニット建物本体1,・・・は、下階にいくにしたがって接合強度が大きくなるように組み付けられ、ユニット建物Uに必要な強度を持たせている。
 また、ユニット建物Uの内部は、図12に示したように、1つの階に、建物ユニット本体1A,・・・の開口部が連通して形成された中央の廊下29の両側に4つずつの計8つの部屋28,・・・がある。
 さらに、各部屋28には、入り口を入ったすぐ横に、洗面台、トイレ、バスを有する水回り設備室30がそれぞれ設けられている。
 また、各部屋28は、水回り設備室30が設けられた点線の内側の大きな領域が、建物ユニット本体1Aで形成され、窓際の点線の外側の小さな領域は、オーバーハング部材としての外壁鋼板パネル18で形成されている。
 そして、この水回り設備室30からの配管(図示せず)は、図14及び図15に示したように、建物ユニット本体1Aの短辺面側の空きスペース16に、それぞれ配設されている。
 これらの空きスペース16,・・・は、ユニット建物Uのコーナー部分では、コーナー外壁パネル20とカーテンウォールユニット35Aとの内側に1階部分から5階部分まで連通してそれぞれ形成されており、中央部分では、カーテンウォールユニット35Bの内側に1階部分から5階部分まで連通してそれぞれ形成されている。
 ここで、これらの空きスペース16,・・・は、このようなパイプスペースの他に、空調スペースなどに利用してもよい。
 なお、ユニット建物Uは、図13に示したように、各建物ユニット本体1Aの短辺面側に、オーバーハング部材としてのバルコニー用部材18Aをそれぞれ取付け、これらのバルコニー用部材18A,・・・を連続させて片持ちバルコニーを形成してもよい。
 また、図示は省略したが、オーバーハング部材として、バルコニー用部材18Aの代わりに、廊下用部材を取付ければ、片持ち廊下を形成することもできる。
 これらの場合は、片持ちバルコニー又は片持ち廊下を簡易な施工で設けることができる。
 ここで、ユニット建物Uのコーナー部分では、図14に示したように、ALC板から成る外壁パネル23と外壁鋼板パネル18との間が、ロックウールなどの耐火被覆材36,・・・で覆われており、耐火性能と断熱性能とを持たせている。
 また、ユニット建物Uの中央部分でも、図15に示したように、ALC板から成る耐火界壁パネル19と外壁鋼板パネル18との間が、ロックウールなどの耐火被覆材36,・・・で覆われており、耐火性能と断熱性能とを持たせている。
 さらに、図16~図18に示したように、ALC板から成る外壁パネル23,23とALC板から成る天井パネル11との間及びALC板から成る耐火界壁パネル19,・・・とALC板から成る天井パネル11との間も、ロックウールなどの耐火被覆材36,・・・で覆われており、耐火性能と断熱性能とを持たせている。
 また、図19及び図20に示したように、後付けされるオーバーハング部材としての外壁鋼板パネル18のALC板から成る天井パネル11AとALC板から成る天井パネル11との間も、ロックウールなどの耐火被覆材36,・・・で覆われており、耐火性能と断熱性能とを持たせている。
 なお、外壁鋼板パネル18の床構造を構成する床根太12A,・・・及びパーチクルボードから成る床パネル13Aは、後付けして実施したが、外壁鋼板パネル18に先付けして実施してもよい。
 次に、本実施の形態の作用効果について説明する。
 このような本実施の形態の仮設補強部材付き建物ユニット1は、建物ユニット本体1Aの両短辺面に、着脱可能な仮設補強部材2がそれぞれ設けられ、仮設補強部材2には、その下端部に下方に突出部3,・・・として補強柱21の下端部及び下側隅金具32,・・・がそれぞれ同じ長さに突出した構成とされている。
 こうした構成なので、例えば日本国などの厳しい道路交通法に則した輸送手段としてのコンテナ専用セミトレーラー5の荷台の後端部からグースネックの後端部を超える長さとしても、この仮設補強部材付き建物ユニット1は、コンテナ専用セミトレーラー5の荷台の前方のグースネック側は短辺面の下側の梁8でグースネック上に支持され、後方側は突出部3,3で荷台上に支持されて、全体として略水平に支持されるため、建物ユニット本体1Aの下面には構造耐力を損なう切り欠きなどを設ける必要がなく、コンテナ専用セミトレーラー5の荷台に安定して積載することができる。
 よって、特に集合住宅などの中規模以上のユニット建物Uを構築する際に、施工効率を上げて工期を短縮できる長大な建物ユニットを実現することができる。
 また、輸送段階で、海上輸送を利用する場合には、船内倉庫内で、複数個積み重ねた同一サイズの仮設補強部材付き建物ユニット1,・・・の大きな荷重は、剛強な仮設補強部材2,・・・が負担するため、建物ユニット本体1Aの柱7,・・・を必要以上に太くしなくても済み、経済的に実施できる。
 さらに、船内倉庫内の仮設補強部材付き建物ユニット1,・・・は、仮設補強部材2,2が建物ユニット本体1Aの外側に配置されてガードされるため、建物ユニット本体1Aには殆どダメージが与えられることがなく、高品質を保って輸送が行える。
 また、仮設補強部材2,2は、着脱可能なため、使い回しがきき、経済的である。
 ここで、仮設補強部材2に、吊上げ用の引掛け部としての引掛け孔31a,31aがそれぞれ設けられているので、吊上げる際には、クレーン6の係合部としてのフック61,61を引掛け孔31a,31aに引っ掛けて吊上げればよいため、建物ユニット本体1Aを傷つける心配がない。
 また、仮設補強部材2に、輸送固定用の引掛け部としての引掛け孔32a,32aがそれぞれ設けられている。
 このため、仮設補強部材付き建物ユニット1を、コンテナ専用セミトレーラーで陸上輸送する際は、その荷台に設けられた係合穴などと輸送固定用の引掛け孔32a,・・・とをツイストロックなどで固定することにより、建物ユニット本体1Aを傷つけずに、安定した状態で陸上輸送することができる。
 さらに、同一サイズの仮設補強部材付き建物ユニット1,・・・を、船内倉庫内で、複数個積み重ねて海上輸送する際には、最下部の仮設補強部材付き建物ユニット1は、船内倉庫の床に設けられた係合穴などと輸送固定用の引掛け孔32a,・・・とをツイストロックなどで固定し、その上に積み重ねられる仮設補強部材付き建物ユニット1は、輸送固定用の引掛け孔32a,・・・を、下部の仮設補強部材付き建物ユニット1の吊上げ用の引掛け孔31a,・・・とツイストロックなどで固定することにより、建物ユニット本体1Aを傷つけずに、安定した状態で海上輸送することができる。
 また、仮設補強部材2が、建物ユニット本体1Aの短辺面の左右両端に配置した補強柱21,21間にブレース22,22が架設されて成るので、仮設補強部材2が、補強柱21,21は鉛直荷重を負担し、ブレース22,22は水平力を負担する簡易な構造であるため、低コストで実施することができる。
 さらに、補強柱21の上端部には、上側隅金具31が設けられ、この上側隅金具31に吊上げ用の引掛け部としての引掛け孔31aが形成されているので、建物ユニット本体1Aを傷つけることなく、仮設補強部材付き建物ユニット1をバランス良く吊上げることができる。
 また、補強柱21の下端部に設けられた下側隅金具32に輸送固定用の引掛け部としての引掛け孔32aが形成されているので、建物ユニット本体1Aを傷つけることなく、仮設補強部材付き建物ユニット1を安定した状態で輸送することができる。
 さらに、建物ユニット本体1Aの長辺面(側面)の開口部に、着脱可能な仮設補強ブレース4,・・・が設けられているので、輸送中や吊上げ中に、他の部分に比べて強度の弱い建物ユニット本体1Aの長辺面の開口部及びその近傍が補強されて、過度な変形が抑制されるため、建物ユニット本体1Aを高品質に保つことができる。
 本実施の形態のユニット建物Uは、本実施の形態の仮設補強部材付き建物ユニット1,・・・が用いられ、仮設補強部材2,2が取り除かれた建物ユニット本体1Aが複数組み付けられた構成とされているので、海上輸送などで必要とされる無駄に高い強度で設計する必要がなく、ユニット建物Uとして必要とされる強度で設計することができる。
 ここで、建物ユニット本体1Aが、横に4個並べられ、縦に5段積み上げられ、これらの建物ユニット本体1A,・・・は、短辺面間が、柱7,7同士及び梁8,8同士を、剛状態に一体化する合成接合R1,・・・,R2,・・・と単に接続するピン接合R3・・・,R4,・・・とを組み合わせることにより、下階にいくにしたがって接合強度が大きくなるように組み付けられている。
 このため、施工手間を極力少なくして、ユニット建物Uに必要な強度を持たせることができる。
 また、建物ユニット本体1A,・・・の短辺面側に、これよりも幅狭なオーバーハング部材としての外壁鋼板パネル18がそれぞれ取付けられ、外側に面する建物ユニット本体1A,・・・のコーナー部分には、コーナー外壁パネル20もそれぞれ取付けられている。
 そして、外壁鋼板パネル18とコーナー外壁パネル20との間に、化粧部材としてのカーテンウォールユニット35Aがそれぞれ取付けられ、外壁鋼板パネル18,18間に、化粧部材としてのカーテンウォールユニット35Bがそれぞれ取付けられ、これらのカーテンウォールユニット35A,・・・及び35B,・・・の内側に、空きスペース16がそれぞれ形成されている。
 このため、これらの空きスペース16,・・・を、パイプスペースや空調スペースなどに有効に利用することができる。
 さらに、建物ユニット本体1A,・・・の長辺面(側面及び天井面)に、ALC板から成る外壁パネル23及び耐火界壁パネル19並びに天井パネル11がそれぞれ設けられ、オーバーハング部材としての外壁鋼板パネル18,・・・の天井面にも、ALC板から成る天井パネル11Aがそれぞれ設けられており、これらのALC板間の隙間が耐火被覆材36,・・・で塞がれている。
 そして、ALC板から成る外壁パネル23と外壁鋼板パネル18との間及びALC板から成る耐火界壁パネル19と外壁鋼板パネル18との間も、耐火被覆材36,・・・で、それぞれ塞がれている。
 このため、特に集合住宅などの建物で厳しい基準が有る耐火性能を満たし、そのうえ、ユニット建物Uの内部と外部との間及びユニット建物Uの内部の部屋28同士間の十分な断熱性能を持たせることができる。
 本実施の形態のユニット建物の構築工法は、輸送手段としてのコンテナ専用セミトレーラー5の荷台に積載された本実施の形態の仮設補強部材付き建物ユニット1の仮設補強部材2,2を取り除いてから、建物ユニット本体1Aを、両短辺面側から、クレーン6,6により、バランスを保ちながら吊上げ、建築現場の基礎34が設けられた位置に移載し、積み上げ、組み付けていき、ユニット建物Uを構築する構成とされている。
 こうした構成なので、特に集合住宅などの中規模以上のユニット建物Uを構築する際に、建物ユニット本体1Aを略水平に保って安定した状態で移載できるため、安全性を確保しながら、施工効率を上げて工期を短縮することができる。
 以上、図面を参照して、本発明の最良の実施の形態を詳述してきたが、具体的な構成は、この実施の形態に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。
 例えば、前記実施の形態では、ユニット建物Uを、仮設補強部材付き建物ユニット1を20個用いて、5階建てに構築したが、これに限定されず、様々な設計が可能である。
 また、前記実施の形態では、仮設補強部材2を、建物ユニット本体1Aの短辺面の左右両端に配置した補強柱21,21間にブレース22,22が架設して成るものを用いて実施したが、これに限定されない。
 例えば、この仮設補強部材2として、建物ユニット本体1Aの短辺面よりもやや大きい平板状のものを用いて実施することなどもできる。
 さらに、建物ユニット本体1Aの柱7,・・・及び梁8,・・・としては、H型鋼を用いて実施したが、これに限定されず、例えば、溝型鋼などを用いて実施してもよい。
[関連出願への相互参照]
 本出願は、2008年9月29日に日本国特許庁に出願された特願2008-250545号に基づいて優先権を主張し、その全ての開示は完全に本明細書で参照により組み込まれる。

Claims (14)

  1.  建物ユニット本体の両短辺面に、着脱可能な仮設補強部材が設けられ、該仮設補強部材には、その下端部に下方に突出する前記建物ユニット本体を支持するための突出部が設けられていることを特徴とする仮設補強部材付き建物ユニット。
  2.  請求項1に記載の仮設補強部材付き建物ユニットにおいて、
     前記仮設補強部材に、吊上げ用の引掛け部が設けられていることを特徴とする。
  3.  請求項1又は2に記載の仮設補強部材付き建物ユニットにおいて、
     前記仮設補強部材に、輸送固定用の引掛け部が設けられていることを特徴とする。
  4.  請求項1乃至3のいずれか1項に記載の仮設補強部材付き建物ユニットにおいて、
     前記仮設補強部材は、前記建物ユニット本体の短辺面の左右両端に配置した補強柱間にブレースが架設されて成ることを特徴とする。
  5.  請求項4に記載の仮設補強部材付き建物ユニットにおいて、
     前記補強柱間の前記建物ユニット本体の底面より低い高さ位置に、補強梁が架設されていることを特徴とする。
  6.  請求項4又は5に記載の仮設補強部材付き建物ユニットにおいて、
     前記補強柱の上端部に、吊上げ用の引掛け部が形成されていることを特徴とする。
  7.  請求項4乃至6のいずれか1項に記載の仮設補強部材付き建物ユニットにおいて、
     前記補強柱の下端部に、輸送固定用の引掛け部が形成されていることを特徴とする。
  8.  請求項1乃至7のいずれか1項に記載の仮設補強部材付き建物ユニットにおいて、
     前記建物ユニット本体の長辺面の開口部に、着脱可能な仮設補強ブレースが設けられていることを特徴とする。
  9.  請求項1乃至8のいずれか1項に記載の仮設補強部材付き建物ユニットが用いられ、前記仮設補強部材が取り除かれた前記建物ユニット本体が複数組み付けられて成ることを特徴とするユニット建物。
  10.  請求項9に記載のユニット建物において、
     前記建物ユニット本体が、横に複数個並べられ、縦に複数段積み上げられ、これらの建物ユニット本体は、短辺面間が、柱同士及び梁同士を、複数のボルト及びナットにより鋼製プレートで剛状態に一体化する合成接合と単に接続するだけのピン接合とを組み合わせることにより、下階にいくにしたがって接合強度が大きくなるように組み付けられていることを特徴とする。
  11.  請求項9又は10に記載のユニット建物において、
     前記建物ユニット本体の短辺面側に、これよりも幅狭なオーバーハング部材が取付けられ、外側に面する前記建物ユニット本体のコーナー部分には、コーナー外壁パネルも取付けられ、前記オーバーハング部材と前記外壁パネル間及び前記オーバーハング部材同士間に、化粧部材がそれぞれ取付けられ、これらの化粧部材の内側に、空きスペースが形成されていることを特徴とする。
  12.  請求項9乃至11のいずれか1項に記載のユニット建物において、
     前記建物ユニット本体の短辺面側に、オーバーハング部材が取付けられ、これらのオーバーハング部材により、片持ちバルコニー又は片持ち廊下が形成されていることを特徴とする。
  13.  輸送手段の荷台に積載された請求項1乃至8のいずれか1項に記載の仮設補強部材付き建物ユニットの前記仮設補強部材を取り除いてから、前記建物ユニット本体を、両短辺面側から、少なくとも2台のクレーンにより、バランスを保ちながら吊上げ、所定の位置に移載していき、前記建物ユニット本体を組み付け、ユニット建物を構築することを特徴とするユニット建物の構築工法。
  14.  輸送手段の荷台に積載された請求項1乃至8のいずれか1項に記載の仮設補強部材付き建物ユニットの前記引掛け部に両短辺面側から、少なくとも2台のクレーンの係合部をそれぞれ引っ掛け、バランスを保ちながら吊上げ、所定の位置に移載していき、前記仮設補強部材を取り除いてから、前記建物ユニット本体を組み付け、ユニット建物を構築することを特徴とするユニット建物の構築工法。
PCT/JP2009/066719 2008-09-29 2009-09-28 仮設補強部材付き建物ユニット、ユニット建物、及びユニット建物の構築工法 WO2010035816A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/121,504 US8769886B2 (en) 2008-09-29 2009-09-28 Building unit with temporary reinforcing members, unit building, and method for constructing unit building
CN200980000444.2A CN101784731B (zh) 2008-09-29 2009-09-28 带临时加强部件的建筑物单元、单元建筑物及其建造施工法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008250545A JP4282745B1 (ja) 2008-09-29 2008-09-29 仮設補強部材付き建物ユニット及びユニット建物並びにユニット建物の構築工法
JP2008-250545 2008-09-29

Publications (1)

Publication Number Publication Date
WO2010035816A1 true WO2010035816A1 (ja) 2010-04-01

Family

ID=40872230

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/066719 WO2010035816A1 (ja) 2008-09-29 2009-09-28 仮設補強部材付き建物ユニット、ユニット建物、及びユニット建物の構築工法

Country Status (4)

Country Link
US (1) US8769886B2 (ja)
JP (1) JP4282745B1 (ja)
CN (1) CN101784731B (ja)
WO (1) WO2010035816A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017515027A (ja) * 2014-04-30 2017-06-08 ボーロン、ジュリアン 構造的なモジュール式建物のコネクタ
USD867108S1 (en) 2016-03-18 2019-11-19 Vector Bloc, Corp. Connector assembly
US10870980B2 (en) 2017-01-19 2020-12-22 Z-Modular Holding, Inc. Modular building connector
US11174630B2 (en) 2015-04-15 2021-11-16 Z-Modular Holding, Inc. Modular building structure
US11479961B2 (en) 2013-02-22 2022-10-25 Z-Modular Holding, Inc. Modular building units, and methods of constructing and transporting same
US11536020B2 (en) 2015-08-14 2022-12-27 Z-Modular Holding, Inc. Connector for a modular building
US11732459B2 (en) 2018-07-12 2023-08-22 Z-Modular Holding, Inc. Locating pin assembly for a modular frame

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8621337B1 (en) * 2010-09-30 2013-12-31 Juniper Networks, Inc. Detecting memory corruption
WO2015001463A1 (en) * 2013-07-03 2015-01-08 Gerntholtz, Otto Carl Structural arrangement
USD745703S1 (en) * 2013-07-23 2015-12-15 Nikolay Ivanov Expandable structure
CN103510725B (zh) * 2013-10-22 2014-08-20 广州鸿力复合材料有限公司 一种整体卫浴间
CN104213637A (zh) * 2014-08-11 2014-12-17 美国国绿投资集团 集成式钢结构建筑
US10280608B2 (en) * 2015-04-07 2019-05-07 Storage Ip Llc Self-storage facility, fabrication, and methodology
JP5830191B1 (ja) * 2015-04-24 2015-12-09 株式会社アーキビジョン二十一 木造建築物輸送用金具およびこの金具を用いた木造建築物の輸送方法
NO341254B1 (en) * 2015-11-02 2017-09-25 Orient Holding As Heating and cooling system of a modular residential building
US10301813B1 (en) * 2016-10-31 2019-05-28 John P. Hawkins Portable core facility for a building
WO2018085297A1 (en) 2016-11-01 2018-05-11 Storage Ip Llc Self-storage facility, fabrication, and methodology
JP6883304B2 (ja) * 2016-12-28 2021-06-09 株式会社ヒーローライフカンパニー 組立式建築物
US20190078330A1 (en) * 2017-09-13 2019-03-14 Xtreme Structures & Fabrication, LLC Modular truss
US10499612B2 (en) * 2018-01-09 2019-12-10 Charles H. Raml Portable windbreak shelter assembly
KR20200137942A (ko) * 2019-05-29 2020-12-09 아이맥 엔지니어링 가부시키가이샤 플랜트 설비의 시공 방법 및 플랜트 구성 모듈
WO2021024382A1 (ja) * 2019-08-06 2021-02-11 日揮グローバル株式会社 分割搬送用モジュール、プラント用構造物、およびプラント用構造物の建設方法
GB2596222A (en) * 2019-08-21 2021-12-22 Studioanyo Ltd Modular buildings
GB2585715B (en) * 2019-08-21 2021-07-28 Studioanyo Ltd Improved fire compartment strategy for modular buildings
JP6762548B1 (ja) * 2019-11-15 2020-09-30 株式会社小島組 ユニット構造体およびユニット建築物
US20230160196A1 (en) * 2021-11-23 2023-05-25 Optima, Inc. Modular habitable structures, and associated systems and methods
JP7309994B1 (ja) 2022-11-11 2023-07-18 清貴 鈴木 戸建て住宅およびその改築方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762745A (ja) * 1993-08-31 1995-03-07 Sekisui Chem Co Ltd 建築物の耐火構造
JP7100975B2 (ja) * 2017-12-19 2022-07-14 積水化学工業株式会社 合わせガラス

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3182424A (en) * 1962-10-12 1965-05-11 Insbrandtsen Company Inc Combination shipping container and showcase
US3530982A (en) * 1968-07-01 1970-09-29 Bigelow F E Jun Assembly of collapsed buildings for shipping
FR2095412A5 (ja) * 1970-03-02 1972-02-11 Berce Jacques
US5447000A (en) * 1988-09-26 1995-09-05 Larsen; Peter W. Prefabricated building kit
US5193325A (en) * 1991-11-27 1993-03-16 Allison Robert S Standardized portable housing unit
US5403055A (en) * 1993-04-16 1995-04-04 Allison; Robert S. Cargo units of panels
JPH085150B2 (ja) 1993-10-04 1996-01-24 生田鉄工株式会社 紙管製造方法
GB9515322D0 (en) * 1995-07-26 1995-09-20 Pgi Manufacturing Limited A fabricated structure,especially a housing for a generator set,and a method of fabricating such a structure
US5661930A (en) * 1996-02-21 1997-09-02 Porter; William H. House floor system and shipping container therefor
US5706614A (en) * 1996-10-16 1998-01-13 Wiley, Jr.; James G. Modular building having a steel shipping container core
US5735639A (en) * 1996-12-13 1998-04-07 The United States Of America As Represented By The Secretary Of The Navy Modular mobile safety structure for containment and handling of hazardous materials
US6463705B1 (en) * 1998-11-20 2002-10-15 Oakwood Homes Corporation Container for prefabricated transportable buildings
JP2004346705A (ja) 2003-05-26 2004-12-09 Sekisui Chem Co Ltd 建物ユニット及びこの建物ユニットを用いた集合住宅
GB0324363D0 (en) 2003-10-17 2003-11-19 Verbus Ltd Building modules
PE20070661A1 (es) 2005-09-26 2007-07-19 Weatherhaven Resources Ltd Refugio modular plegable para transporte en contenedores
US7827738B2 (en) * 2006-08-26 2010-11-09 Alexander Abrams System for modular building construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762745A (ja) * 1993-08-31 1995-03-07 Sekisui Chem Co Ltd 建築物の耐火構造
JP7100975B2 (ja) * 2017-12-19 2022-07-14 積水化学工業株式会社 合わせガラス

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11479961B2 (en) 2013-02-22 2022-10-25 Z-Modular Holding, Inc. Modular building units, and methods of constructing and transporting same
JP7289048B2 (ja) 2014-04-30 2023-06-09 ゼッド-モデュラー・ホールディング、インコーポレイテッド 構造的なモジュール式建物のコネクタ
JP2021167563A (ja) * 2014-04-30 2021-10-21 ゼッド−モデュラー・ホールディング、インコーポレイテッドZ−Modular Holding, Inc. 構造的なモジュール式建物のコネクタ
US11739520B2 (en) 2014-04-30 2023-08-29 Z-Modular Holding, Inc. Structural modular building connector
US10947716B2 (en) 2014-04-30 2021-03-16 Z-Modular Holding, Inc. Structural modular building connector
JP2017515027A (ja) * 2014-04-30 2017-06-08 ボーロン、ジュリアン 構造的なモジュール式建物のコネクタ
US10450737B2 (en) 2014-04-30 2019-10-22 Vectorbloc Corp. Structural modular building connector
US11174630B2 (en) 2015-04-15 2021-11-16 Z-Modular Holding, Inc. Modular building structure
US11536020B2 (en) 2015-08-14 2022-12-27 Z-Modular Holding, Inc. Connector for a modular building
USD927965S1 (en) 2016-03-18 2021-08-17 Z-Modular Holding, Inc. Structural modular building connector
USD867108S1 (en) 2016-03-18 2019-11-19 Vector Bloc, Corp. Connector assembly
USD929209S1 (en) 2016-03-18 2021-08-31 Z-Modular Holding, Inc. Structural modular building connector
US11479962B2 (en) 2017-01-19 2022-10-25 Z-Modular Holding, Inc. Modular building connector
US10870980B2 (en) 2017-01-19 2020-12-22 Z-Modular Holding, Inc. Modular building connector
US11828057B2 (en) 2017-01-19 2023-11-28 Z-Modular Holding, Inc. Modular building connector
US11732459B2 (en) 2018-07-12 2023-08-22 Z-Modular Holding, Inc. Locating pin assembly for a modular frame

Also Published As

Publication number Publication date
CN101784731A (zh) 2010-07-21
CN101784731B (zh) 2013-02-13
JP4282745B1 (ja) 2009-06-24
US8769886B2 (en) 2014-07-08
US20110219708A1 (en) 2011-09-15
JP2010077776A (ja) 2010-04-08

Similar Documents

Publication Publication Date Title
JP4282745B1 (ja) 仮設補強部材付き建物ユニット及びユニット建物並びにユニット建物の構築工法
US6463705B1 (en) Container for prefabricated transportable buildings
US5950373A (en) Transportable structure kit
US5193325A (en) Standardized portable housing unit
CA2824364C (en) Pivotally erectable structural frame system
CN104755678A (zh) 模块化建筑物
US20140130444A1 (en) Tilt-Up Concrete Spandrel Assemblies and Methods
WO2006122372A1 (en) Modular building frame
CN103590491A (zh) 一种新型可拆卸折叠集装箱式活动板房
JP2011202439A (ja) 建物ユニット
AU2013201744A1 (en) Transportable steel structure enclosed unit module and its manufacturing method
US20100107517A1 (en) Structural brace for modular housing module
US11713582B2 (en) Building structure and method of construction
JP5439084B2 (ja) 出窓の固定構造およびその施工方法
KR101639256B1 (ko) 공학용 목재를 이용한 복합모듈러 및 그 시공방법
JP7086877B2 (ja) ユニット輸送用治具及びユニット輸送用治具を用いた輸送方法
JPH06219376A (ja) 殻艤一体構造ユニットキャビン及び該ユニットキャビンの組立方法
JP2020066864A (ja) 建築ユニット構造体
CN215858416U (zh) 一种无结构装配式隔墙安装体系
US20230374805A1 (en) Building Structure and Method of Construction
JP3069832U (ja) ピロティ―形式を採用したモジュ―ル建造物
RU147139U1 (ru) Сборно-разборное сооружение
WO1993011328A1 (en) Standardized portable housing unit
JP3802715B2 (ja) 部屋ボックスにおける補強仮設材の取付け構造
JP3069831U (ja) 連結モジュ―ル建物及びモジュ―ル建物を組み合わせた建造物

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980000444.2

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09816230

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13121504

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 09816230

Country of ref document: EP

Kind code of ref document: A1