WO2010019476A2 - Improvements in virtual metering - Google Patents
Improvements in virtual metering Download PDFInfo
- Publication number
- WO2010019476A2 WO2010019476A2 PCT/US2009/053174 US2009053174W WO2010019476A2 WO 2010019476 A2 WO2010019476 A2 WO 2010019476A2 US 2009053174 W US2009053174 W US 2009053174W WO 2010019476 A2 WO2010019476 A2 WO 2010019476A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- ieds
- ied
- measured
- utility
- parent
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/002—Remote reading of utility meters
- G01D4/004—Remote reading of utility meters to a fixed location
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/10—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods using digital techniques
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/30—Smart metering, e.g. specially adapted for remote reading
Definitions
- aspects disclosed herein relate generally to utility systems, and, in particular, to methods for automatically improving the accuracy of identifying virtual monitoring devices in a utility monitoring system.
- IEDs physical intelligent electronic devices
- Each IED measures data either continuously or as requested by the software managing the monitoring system.
- Spatial context of the physical IEDs manifested as a hierarchy is generally not a consideration for determining the order of interactions between the physical monitoring devices and the managing software. In fact, the order of interactions is commonly arbitrarily set by the software managing the power monitoring system.
- FIG. 1 illustrates a simplified hierarchy of a utility system 102 that includes both real or physical meters (M 1 , M 2 , M3, M 4 , M5) and a virtual meter (Vi).
- IED M 2 The energy flowing into the system bus 103 as measured by IED M 2 is diverted into some unknown number of paths.
- the energy flowing through two of those paths is being measured by physical IEDs (M 4 and M 5 ). If the energy flow measured in IED M 2 equals the energy flow measured in IEDs M 4 and M5 collectively, then it can be deduced that no further paths exist because the law of conservation of energy is satisfied. However, if the energy flow measured in IED M 2 is not equal to the energy flow measured in IEDs M 4 and M 5 , there must be some indefinite number of additional paths present that are unmetered if the system is ideal. Although determining the exact number of additional paths is not readily feasible (without visual inspection), it is possible to determine the aggregate energy flow through these additional unmetered paths in an ideal system.
- a method for calculating the aggregate energy flow in ideal systems is performed by calculating the difference in energy flow between the devices measuring energy flowing into the system node (here, M 2 ) and the devices measuring energy flow out of the system node (here, M 4 , and M5).
- the power, P consumed by the unmetered load(s) connected to the unmetered path(s) (represented by virtual meter Vi) is calculated by P M2 - (PM4+PM5), where PMN represents the power measured by device MN.
- a method of automatically determining whether an unmonitored portion exists in a utility system includes: determining a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; automatically storing a data representation of the hierarchy; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs that are directly linked in the hierarchy to the parent IED; receiving from the parent IED a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one
- the determining the hierarchy can be carried out automatically.
- the method can further include: calculating a difference between (a) the error-adjusted quantity associated with the parent IED and (b) the sum of the error-adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing; and storing the unmonitored quantity and an indication that the virtual device is consuming or producing the unmonitored quantity.
- the function for producing the error-adjusted quantity associated with the parent can include calculating a minimum quantity, P PTMIN , and a maximum quantity, P PTMAX , based on at least Pp, a mean of measurement error associated with the parent IED, and a standard deviation of measurement error associated with the parent IED.
- the function for producing the error-adjusted quantities associated with the one or more child IEDs can include: calculating a minimum quantity, P SMIN , based on P PTMIN , an aggregate mean associated with a mean of measurement error of each of the one or more child IEDs, and an aggregate standard deviation associated with a standard deviation of measurement error of each of the one or more child IEDs; calculating a maximum quantity, PSMAX, based on PPTMAX, the aggregate mean, and the aggregate standard deviation; calculating a minimum difference quantity, PDMIN, between PPTMIN and PSMAX; and calculating a maximum difference quantity, PDMAX, between PPTMAX and PSMIN.
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system includes, responsive to Pp-Ps being greater than or equal to P DMIN and Pp-Ps being less than or equal to
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being less than P DMIN , determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility to the utility system.
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than P DMAX , determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility to the utility system.
- the function for producing the error-adjusted quantity associated with the parent can include calculating a minimum quantity, P PMIN , and a maximum quantity, P PMAX , based on at least Pp and an absolute measurement error associated with the parent IED.
- the function for producing the error-adjusted quantities associated with the one or more child IEDs can include: calculating a minimum quantity, P SMIN , based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating a maximum quantity, P SMAX , based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating an absolute minimum difference quantity, PDMIN, between PPMIN and PSMAX; calculating an absolute maximum difference quantity, PDMAX, between PPMAX and PSMIN-
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than or equal to P DMIN and Pp-Ps being less than or equal to P DMAX , determining that no unmonitored quantity exists.
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being less than P DMIN , determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility.
- the method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than P DMAX , determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility.
- the IEDs can be power meters, the utility can be electricity, and the one or more characteristics can include power, current, or voltage.
- the utility can be water, air, gas, electricity, or steam, and wherein the one or more characteristic includes power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
- the method can further include determining a reading order of the respective measured quantities from the parent IED and the one or more child IEDs such that, after the measured quantity is received from the parent IED, the measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from any other IED in the hierarchy.
- a method of automatically determining a reading order of respective quantities indicative of a characteristic of a utility monitored by intelligent electronic devices (IEDs) arranged in a hierarchy of a utility system includes: receiving a data representation of a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs that are directly linked in the hierarchy to the parent IED; automatically determining a reading order of respective quantities indicative of a characteristic of a utility measured by the IEDs such that, after a measured quantity is received from the parent IED, measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from another IED in the hierarchy; and automatically determining a quantity of a characteristic of
- the method can further include receiving from the parent IED, according to the reading order, a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs, according to the reading order, respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one or more child IEDs to produce respective error-adjusted quantities; and based on the error-adjusted quantities, determining whether an unmonitored quantity exists in the utility system, and, if so, storing the unmonitored quantity and an indication that a virtual device corresponding to the unmonitored quantity is directly linked to the parent IED in the hierarchy.
- the method can further include calculating a difference between (a) the error- adjusted quantity associated with the parent IED and (b) the sum of the error-adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing.
- the IEDs can be power meters, the utility can be electricity, and the one or more characteristics can include power, current, or voltage.
- the utility can be water, air, gas, electricity, or steam, and the one or more characteristic can include power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
- FIG. 1 is a functional block diagram of an automated data integrated monitoring system that includes a virtual device evaluation system
- FIG. 2 is an exemplary hierarchy of a water system showing a virtual water meter and physical water meters;
- FIG. 3 is a flow chart for automatically determining whether an unmonitored path exists in a hierarchy of a utility system;
- FIG. 4 is a flow chart of a statistical and an absolute method for determining whether an unmonitored path exists in the hierarchy.
- FIG. 5 is a flow chart for automatically determining a reading sequence of IEDs such that a parent IEDs and its associated directly linked child IEDs are read in sequence to improve the synchronicity of the received measured data and thereby increase the accuracy of characterizing unmonitored paths or loads in the hierarchy.
- An automated data integrated monitoring system 100 is generally shown.
- An electrical system 102 having multiple physical intelligent electronic devices (hereafter "IEDs") designated by the letter M provides data from each IED M that is communicated to an automated data alignment system 104 and an automated hierarchy classification system 106.
- IED refers to any physical or real system element or apparatus with the ability to sample, collect, or measure one or more operational characteristics or parameters (characteristics and parameters are used interchangeably herein) of a utility monitoring system 102.
- the data is aligned automatically in temporal or pseudo- temporal context in the automated data alignment system 104 and produces data that is temporally aligned such that it represents the data when it was actually seen simultaneously by the monitoring devices M in the utility monitoring system 102.
- the hierarchy classification system 106 automatically learns the hierarchy of monitoring devices present in the electrical system 102 and their positional relationships relative to one another. Examples of the hierarchy classification system 106 and the auto-learned hierarchy algorithms 400, 500, 550 associated therewith are described in commonly assigned U.S. Patent No. 7,272,518, titled “Automated Hierarchy Classification in Utility Monitoring Systems," issued September 18, 2007, and in commonly assigned PCT Patent Application No. PCT/US2006/034394, titled “Improvements in Hierarchy Determination for Power Monitoring Systems,” filed
- a hierarchy as used herein includes a series of ordered groupings of things within a system. These relationships may be physical (based on a power system one-line diagram for example) or functional (based on cost centers or other organizational divisions). In an electrical power system context, a hierarchy describes the organization of the electrical power system (whether utility-side or demand-side of the point- of-common coupling (PCC)).
- PCC point- of-common coupling
- an "auto-learned hierarchy algorithm" refers to any of the auto-learned hierarchy algorithms disclosed in U.S. Patent No. 7,272,518.
- Each physical IED measures characteristics of the utility monitoring system 102, and quantifies these characteristics into data that can be analyzed by a computer.
- the IED can measure power, energy, current, voltage, or other characteristics of electricity.
- the IED may be based on a PowerLogic® Series 3000/4000 Circuit Monitor or a PowerLogic® ION7550/7650 Power and Energy Meter available from Schneider Electric or any other suitable IED device such as a microprocessor-based circuit breaker, relay, metering device, energy meter, or power meter.
- the IED can be a water meter, gas meter, air flow meter, or the like.
- the hierarchy classification system 106 utilizes an auto-learned hierarchy algorithm in the monitoring system software that is based on rules and statistical methods. Periodically, the monitoring system software polls each IED M in the utility monitoring system 102 to determine certain characteristics or parameters of the utility monitoring system 102 at that monitored node (represented by M). Multiple samples of specified parameters are taken from each IED in the utility monitoring system 102 at the same given point in time. Once the parameter data is collected from each node M in the utility monitoring system 102, the auto-learned hierarchy algorithm analyzes the data and traces the relationships or links among the monitoring devices with respect to the time the data sample was taken and the associated value of the data sample. This analysis may be performed periodically to increase the probability that the hierarchy is accurate, or to ascertain any changes in the hierarchy.
- the auto-learned hierarchy algorithm ends.
- the final layout of the utility monitoring system 102 is then presented to the user for concurrence.
- a basic layout of the hierarchical structure of the utility monitoring system 102 is determined based on the monitoring points available.
- the auto-learned hierarchy algorithm uses historical trends of the data from each IED, and those trends are compared to determine whether any interrelationship (link) exists between the IEDs.
- a more detailed hierarchical structure can be determined with more monitoring points available for analysis.
- Samples of specific parameters or characteristics are simultaneously taken from each IED in the utility monitoring system 102. This data is stored and analyzed with respect to the time the sample is taken, the associated value of the data point, and the IED providing the data. Data taken from each IED in the utility monitoring system 102 is compared with each other to determine whether any correlation exists between the IEDs. The data is analyzed for statistical trends and correlations as well as similarities and differences over a predetermined period of time.
- the data alignment system 104 aligns data, such as power, voltage, current, time, events, and the like, from the multiple IEDs in the utility monitoring system 102.
- data from all the IEDs is aligned to the same point (or approximately the same point based on pseudo-temporal alignment) in time that the data occurred, the data can be put into a temporal (synchronous) or pseudo-temporal (pseudo-synchronous) context from which additional decisions regarding hardware and software configuration can be automatically made or recommended.
- the measured data from various IEDs may be synchronized or approximately synchronized with each other within a temporal or pseudo-temporal context.
- Temporal alignment is more precise than pseudo-temporal alignment.
- Temporal alignment relates to alignment of meter cycle counts in time.
- Pseudo-temporal alignment systems typically utilize a global positioning system (GPS) or network time protocol (NTP) for clock synchronization.
- GPS global positioning system
- NTP network time protocol
- Automatic temporal alignment implementations are described in commonly assigned U.S. Patent Application No. 11/174,099, filed July 1, 2005, entitled “Automated Precision Alignment of Data in a Utility Monitoring System,” and in commonly assigned PCT Patent Application No. PCT/US2006/034394, titled “Improvements in Hierarchy Determination for Power Monitoring Systems,” filed November 5, 2007 [SPL-0099].
- the data alignment system 104 synchronously aligns all IEDs (represented by M) in an electrical system hierarchy to the zero-crossing of all three phase voltages without the use of additional hardware, notwithstanding potential phase shifts between various IEDs, such as for example, those caused by certain transformer configurations.
- IEDs represented by M
- the system data is essentially aligned with respect to the time it occurred, making more complex data analyses feasible.
- the data integrated monitoring system 100 also includes a virtual device evaluation system 105 according to aspects of the present invention, which may receive device data associated with the electrical system 102 via manual or automated methods.
- the virtual device evaluation system 105 includes the algorithms 300, 400, 500 disclosed herein.
- a "virtual" device or load is not a physical device, but represents what characteristics of the utility that a physical device, if it were placed in the hierarchy, would measure.
- An IED is not a virtual device as used herein.
- the virtual device evaluation system 105 uses several techniques to improve the accuracy of virtual meters, such as Vi shown in FIG. 1. Some of these techniques address the inherent accuracy constraints of physical IEDs, while other techniques address the sampling synchronicity across the physical IEDs used to calculate the virtual meter's data. Additionally, the virtual device evaluation system 105 makes recommendations to end-users regarding the need for additional monitoring devices at certain points within the monitoring system 102.
- Virtual data is calculated using the differences between measured parameters flowing into a system node and the measured parameters flowing out of the same system node.
- the general equation used to calculate the real power (kW) as determined for the virtual meter Vi shown in FIG. 1 (when the utility system 102 is a power monitoring system) would be:
- meter P equals the measured power flowing into the system node and sum of meters Ci through C N equal the measured power flowing out of the same system node.
- the unmetered parameters as indicated by the virtual meter are sometimes referred to as a 'residual' value because they represent the mathematical remainder of the system.
- P represents the power (when the utility system is an electrical power system) measured by M 2 , which is the parent of IEDs M 4 and M5.
- the subscript (me) refers to measurement error by an IED
- the subscript (He) refers to instrument transformer error. It should be noted that synchronicity error is not accounted for in this equation.
- P represents a quantity of a characteristic of the utility being monitored by a parent IED in the hierarchy, such as power or water flow rate.
- C represents a quantity of a characteristic of the utility being monitored by a physical child IED that is directly linked to the parent IED in the hierarchy.
- a measurement error is typically expressed as a percentage, and reflects a range of percentage error that can affect an IED 's measurements.
- a measurement error for an IED of a particular type is ⁇ 0.2%, this means that if an IED of that type reports that it measures 10,000W, then the actual power can be within the range of 9,98OW to 10,02OW, yielding a 4OW range of error. Because every IED can vary slightly from another even when they are of the same type and manufactured according to the same process, the error for each IED can differ slightly. For example, the measurement error for a first IED may be 0.2%, but for a second IED, the measurement error may be 0.1%. The accuracy or error associated with an IED of a particular type is typically available from the manufacturer's specifications for the IED. Otherwise, it can be determined by the end-user by applying a known quantity of a characteristic to an IED, measuring the quantity of the characteristic by the IED, and determining a percentage difference between the measured quantity and the actual quantity.
- a first described aspect provides a method to determine whether a residual parameter indicates additional unmetered paths or is merely due to measurement error by the IED and instrument transformer error (P me , C n me , Pi te , and C n i te ) of the physical IEDs. While the illustrations below assume power as the parameter (characteristic) for the sake of convenience, it is contemplated that any other WAGES parameters (characteristics) can be used instead. One or more of the following three assumptions can be made:
- a single metered utility path exists into the system node being analyzed, and this metered utility is distributed through a bus to feeders below it in the network hierarchy (as illustrated in the utility system 102 shown in FIG. 1).
- the measurement error probability density function (pdf) of a given IED has a normal distribution.
- PPTMIN and PPTMAX are the minimum and maximum values or quantities, respectively, for the true measurement of the power with a 95% confidence
- Pp is a measured quantity of the power measured by IED P.
- V SMiN PPTMIN( 1 +( ⁇ s - 2 ⁇ s)/l 00) (Equation 7)
- Pc n represents a quantity of power measured by a child IED n.
- Pp - Ps falls within the error tolerance of the IEDs (and instrument transformers) and thus no unmetered paths are assumed.
- an unmetered path is supplying power to the system (a generator perhaps?).
- an unmetered path of magnitude Pp - Ps is consuming power.
- Pp IOOkW (e.g., M 2 from FIG. 1)
- Pc2 60 kW (e.g., M 5 ; from FIG. 1)
- P DMAX ⁇ Pp - Ps there is assumed to be an unmetered utility path of approximately 5kW (e.g., Vi from FIG. 1).
- the hierarchy would be updated to include a virtually metered load (such as Vi from FIG. 1) and all calculated residual values from the difference between Pp and Ps would be attributed to that virtual meter Vi.
- a confidence level of 95% was assumed in determining the range of the measurements for the parent and child IEDs, which used two standard deviations. Using one standard deviation would produce a range with approximately 68% confidence and using three standard deviations would produce a range with approximately 99.7% confidence.
- a second described aspect provides an alternate method to determine whether a residual parameter indicates additional unmetered paths or is merely due to measurement error by the IED and instrument transformer error (P me , C n me , V ite , and C n i te ).
- the illustrations below assume water flow as the parameter for the sake of convenience; however, of course any other WAGES parameters can be used instead.
- FIG. 2 illustrates a water monitoring system 202 communicatively coupled to the virtual device evaluation system 105.
- the water monitoring system 202 includes a parent water meter, WM P , 204, and a number N of child water meters, WM C i 206, WM C2 208, WMcN 210, directly linked to the parent meter.
- a virtual water meter, WMy 212 which may or may not be present, is shown in hatched/dashed lines. The absolute method determines whether WMy exists, and, if so, what quantity of water flow would be attributable to it and is it measuring consumption or production of water.
- the minimum value for the water flow through the main (parent) IED 204 is WM PMIN and the maximum value for the water flow through the main (parent) IED 204 is WM PMAX -
- WMp is as defined as the actual reading of the parent IED 204, and N
- WM Cn represents the actual readings of the child IEDs 206, 208, 210, respectively.
- WMs represents the sum of these actual readings.
- WMp - WMs falls within the error tolerance of the IEDs and thus no unmetered (virtual) paths are assumed.
- an unmetered path is supplying water (the utility being monitored) to the system.
- an unmetered path of magnitude WMp - WMs is consuming water.
- the above-mentioned aspects disclose methods to determine whether a residual parameter indicates additional unmetered paths or is merely due to the measurement error associated with physical IEDs.
- the purpose of the third aspect is to reduce the effect of measurement errors on virtual meters by optimizing the order that measurement data is read from the IEDs in the hierarchy such that data from parent-child groupings in the hierarchy is received as synchronously as possible to ensure optimum accuracy.
- An exemplary flow chart of this third aspect is shown in FIG. 5 and described in more detail in the next section.
- data for the virtual meter Vi is calculated from physical IEDs that are linked to one other.
- Empirical data has shown that the order of sampling data from physical IEDs can affect the accuracy of virtually metered data because an arbitrary order introduces a latency that reduces the synchronicity of sampling with the related physical IEDs.
- the virtual device evaluation system 105 uses a hierarchical (spatial) context of the IEDs to automatically adapt/adjust the reading order of physical IEDs to improve the synchronicity of sampling between related IEDs. By adjusting the reading order so that a parent IED and its respective children IEDs are read sequentially, the synchronicity error is reduced resulting in a more accurate virtual measurement.
- This aspect generally requires knowledge of each physical IED 's spatial relationship with respect to every other physical IED in a hierarchy. These spatial relationships can be determined either automatically, such as by an auto-learned hierarchy algorithm, or manually by the end-user. Another method would be to manually configure the sampling order for devices without entering the monitoring system's hierarchy.
- the virtual device evaluation system 105 includes an algorithm 300.
- the algorithm 300 manually or automatically determines a hierarchy of the utility system being analyzed using the auto-learned hierarchy algorithm described above (302).
- the hierarchy indicates how a number, N, of IEDs are linked to one another in the utility system (e.g., directly, indirectly, or not at all).
- Each IED monitors one or more characteristics (e.g., power, voltage, current) of the utility (e.g., WAGES).
- the algorithm 300 stores a data representation of the hierarchy in a computer-readable medium (304).
- the data representation includes a data structure that indicates how the IEDs are linked together to form the hierarchy.
- the algorithm 300 identifies a parent IED (designated by subscript P) from the automatically determined hierarchy that is directly linked to at least one child IED (306).
- the algorithm 300 identifies a number, N, of child IEDs (designated by subscript C) that are directly linked to the parent IED in the hierarchy (308).
- parent IED M 2 is directly linked to child IEDs M 4 and M5.
- IED M3 is not linked at all to IEDs M 2 , M 4 , or M 5 .
- IEDs M 4 and M 5 are indirectly linked to the main IED M 1 .
- An actual measured quantity is received from the parent IED (310).
- the "P” refers to the measured quantity, and the subscript P refers to the parent IED.
- the measured quantity is a quantity of a characteristic of the utility measured by the parent IED. For example, in the electrical utility context, the quantity can be expressed as a value in kW, which represents an amount of power measured by the parent IED. In the water utility context, the quantity can be expressed as a value in gallons per minute, which represents an amount of water flow measured by the parent IED.
- Respective measured quantities, designated by P CN are received from each of the directly linked child IEDs (312).
- Pc 1 represents the quantity measured by a first child IED
- Pc 2 represents the quantity measured by a second child IED.
- Each child IED measures the same characteristic of the utility (e.g., power, water flow) that was measured by the parent IED and by each other.
- the algorithm 314 automatically adjusts the respective measured quantities measured by the parent IED and by the child IEDs as a function of respective measurement errors associated with the parent and child IEDs to produce respective error-adjusted quantities using statistical or absolute methods (314). Put differently, each of the quantities measured by the parent and child IEDs is adjusted to account for the measurement error associated with each respective IED. As described above, there are two methods for error- adjusting the measured quantities by an IED: statistical or absolute. These methods are described in more detail in connection with the algorithm 400 shown in FIG. 4.
- the algorithm 300 determines, based on the error-adjusted quantities, whether a virtual meter (unmonitored quantity) exists in the hierarchy (316). This virtual meter would represent an unmonitored quantity directly linked to the parent. The determination as to whether this virtual exists is thus more accurate because it has accounted for measurement errors and instrument transformer errors.
- the algorithm 300 stores an indication that the virtual meter is directly linked to the parent IED in the hierarchy (318).
- the algorithm 300 also stores an unmonitored quantity as an indication of the virtual meter.
- an unmonitored quantity of 5kW was calculated from the actual quantities measured by the parent and directly linked child IEDs.
- the algorithm 300 determines whether it should end (320), such as by checking whether all parent IEDs in the hierarchy have been checked for children, and, if so, it ends. Otherwise, it returns to block 306 to identify the next parent IED that is directly linked to one or more child IEDs.
- FIG. 4 is a flow chart of the algorithm 400 for determining the error-adjusted quantities measured by the IEDs under consideration.
- the algorithm 400 determines whether to use a statistical method for adjusting the measured quantities (402).
- the algorithm 400 can make this determination automatically, or it may do both methods, or it may receive an input from the end-user as to which method to carry out.
- a statistical method 402
- the algorithm 400 calculates a range (minimum, maximum) of a true quantity of total power based on a reading of the parent IED by calculating, for example, Equations 3 and 4 above based on the mean and standard deviation of the measurement error for the parent IED and on Pp (404).
- the algorithm 400 calculates a range (minimum, maximum) of the sum of child IED readings assuming that there are no unmetered loads connected to the parent IED by calculating, for example, Equations 7 and 8 above based on the mean and variance of the deviations associated with the child IEDs (406). Two sum (designated by subscript S) quantities are produced from this calculation: a minimum sum quantity, P SMIN , and a maximum sum quantity, P SMAX .
- the algorithm 400 calculates a range (minimum, maximum) of the difference between the true reading measured by the parent IED (within its associated error tolerance) and the sum of the child readings (within their respective associated error tolerances) by, for example, calculating Equations 9 and 10 above based on the previously calculated quantities PpTMiN, PPTMAX, PSMIN, and PSMAX- (408). Two difference (designated by subscript D) quantities are produced from this calculation: a minimum difference quantity, P DMIN , and a maximum difference quantity, P DMAX .
- the algorithm 400 calculates the difference between the actual parent measured quantity Pp and the sum of the actual child measured quantities Ps, where Ps can be calculated using, for example, Equation 14 above (410).
- Ps can be calculated using, for example, Equation 14 above (410).
- Pp-Ps is designated as P DACT , or the actual difference between the parent and children measured quantities.
- the algorithm 400 determines whether P DACT is greater than P DMAX (412) If so, then a virtual meter exists and is consuming a quantity of the characteristic (power in this example) of the utility (electricity in this example) corresponding to P DACT (418). Otherwise, the algorithm 400 determines whether P DACT is less than P DMIN (414). If so, the algorithm 400 determines that power is being supplied by an unmetered path (416). Otherwise, if Pp-Ps falls within the error tolerance of the IEDs and instrument transformers, the algorithm 400 determines that are no unmetered paths and returns. It should be emphasized that although the characteristic for the statistical method shown in FIG. 4 is power for convenience, any other characteristic of the WAGES utilities can be used.
- the algorithm calculates a range of true quantity of total water flow based on the actual reading from a parent IED in the hierarchy (420). Again, water flow is used for convenience only and any other characteristic of the WAGES utility can be used instead. This calculation produces WMPMIN and WMPMAX-
- the algorithm 400 calculates a range of the sum of the child IED measurements assuming that no unmetered loads exist that are directly linked to the parent IED in the hierarchy using equations similar to Equations 7 and 8 above but substituting the absolute error for the mean and standard deviation of the error (422). This calculation produces WMSMIN and WMSMAX-
- the algorithm 400 calculates a range of the difference between the true measurement from the parent IED and the sum of the true measurements from the child IEDs by calculating Equations 15 and 16 above (424). This calculation produces WD DMIN and
- the algorithm 400 calculates the difference between the actual measurement from the parent IED, WMp, and the sum of the actual measurements from the child IEDs, WMs, to produce WMDACT (426). If WMDACT is greater than WMDMAX (428), the algorithm 400 determines that a virtual meter is consuming water in an amount corresponding to WMACT (434). If WMDACT is less than WM D MIN (430), the algorithm 400 determines that water is being supplied by the unmetered path (432). If WM DACT falls within the error tolerance of the IEDs, the algorithm 400 determines that no unmetered paths directly linked to the parent IED exist.
- FIG. 5 is a flow chart diagram of an example algorithm 500 for automatically adjusting a reading order of IEDs to increase the accuracy of reading groupings of IEDs and improve the synchronicity of their measured data as it is received by the managing software 110.
- the algorithm 500 receives a data representation of a hierarchy of the utility system (502).
- the hierarchy indicates how a number, N, of IEDs are linked to one another in the utility system 102.
- Each IED monitors one or more characteristics of a utility monitored by the IEDs in the utility system.
- the hierarchy can be determined automatically by the auto- learned hierarchy algorithm or entered manually by the end-user as an input to the algorithm 500.
- the algorithm 500 identifies, from the hierarchy, a parent IED that is directly linked to at least one child IED (504). Once the hierarchy is known, the spatial relationships of all of the IEDs are known, and parent IEDs with child IEDs and any of their "progeny" as well as childless parent IEDs can be identified. The algorithm identifies all child IEDs that are directly linked to the parent IED (506). There may be only one child IED or more than one child IED that is directly linked to the parent IED. For example, in FIG. 1, IED Mi is directly linked to two child IEDs, M 2 and M3.
- the algorithm 500 automatically determines a reading order or sequence of respective quantities indicative of a characteristic of a utility measured by the IEDs so that the parent IED and its associated directly linked child IEDs are read in sequence as a group (508). For example, referring to FIG. 1, the algorithm 500 adjusts the reading order so that characteristics data measured by the IEDs M 2 , M 4 , and M5 are read in sequence. In other words, prior to the adjustment, the managing software 110 may have read the IEDs in the following order: M 1 , M 2 , M 3 , M 4 , M 5 . The algorithm 500 adjusts the reading order by grouping M 2 , M 4 , and M 5 together such that M3 is not read in between this grouping.
- the algorithm 500 would adjust the reading order by grouping M 1 , M 2 , and M 3 together as a group. In this case, M 2 would be read twice to ensure accurate virtual meter evaluation for both groups.
- the presence or absence of a virtual meter can be automatically determined by any of the methods or algorithms disclosed herein, such as algorithms 300, 400 (e.g., such as by returning to block 310).
- a "group" or “grouping" of IEDs means that, for example, a parent IED and its directly linked child IEDs form a single group.
- M 2 and M 3 form a group with respect to Mi (because Mi is the parent directly linked to M 2 and M 3 ), but M 3 does not form a group with respect to M 2 , M 4 , and M 5 because M 3 is not directly linked to M 4 or M 5 .
- Any of the algorithms disclosed herein, including the auto-learned algorithm, and the algorithms 300, 400, 500 include machine readable instructions for execution by: (a) a processor, (b) a controller, and/or (c) any other suitable processing device. It will be readily understood that the computer 132 includes such a suitable processing device.
- Any algorithm disclosed herein may be embodied in software stored on a tangible medium such as, for example, a flash memory, a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), or other memory devices, but persons of ordinary skill in the art will readily appreciate that the entire algorithm and/or parts thereof could alternatively be executed by a device other than a controller and/or embodied in firmware or dedicated hardware in a well known manner (e.g., it may be implemented by an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable logic device (FPLD), discrete logic, etc.). Also, some or all of the machine readable instructions represented in any flowchart depicted herein may be implemented manually.
- ASIC application specific integrated circuit
- PLD programmable logic device
- FPLD field programmable logic device
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing, Inspecting, Measuring Of Stereoscopic Televisions And Televisions (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Methods for improving the accuracy of characterizing unmonitored paths or virtual meters in a utility system. The hierarchical arrangement of IEDs in the utility system is determined. Measured quantities of a characteristic of the utility being monitored are received and error-adjusted using statistical or absolute methods. The statistical method accounts for the mean and standard deviation associated with error measurements of the subject IED, and the absolute method uses the absolute value of the error measurement, expressed as a percentage, to produce ranges of measured quantities within an error tolerance. The differences between the error-adjusted quantities are analyzed to determine whether an unmonitored path exists, and if so, whether the virtual meter is consuming or supplying the utility. The order in which IEDs are read is determined so that a parent and its children are read in sequence to increase synchronicity of the received data and the virtual meter evaluation.
Description
IMPROVEMENTS IN VIRTUAL METERING
FIELD OF THE INVENTION
[0001] Aspects disclosed herein relate generally to utility systems, and, in particular, to methods for automatically improving the accuracy of identifying virtual monitoring devices in a utility monitoring system.
BACKGROUND
[0002] Because energy consumers cannot afford to install monitoring equipment and devices at every point of utilization within their facility, nearly every monitoring system has unmetered or unmonitored loads. In many cases these unmetered loads can account for a substantial portion of the customer's usage of a utility. Although the primary charter of monitoring equipment manufacturers is to provide utility consumers with useful and accurate information on the quality and consumption of a utility within their facility, a proper evaluation of these unmetered loads through the use of virtual meters is often overlooked in the manufacturers' product offerings.
[0003] Many monitoring systems include a large number of physical intelligent electronic devices (IEDs). Each IED measures data either continuously or as requested by the software managing the monitoring system. Spatial context of the physical IEDs manifested as a hierarchy is generally not a consideration for determining the order of interactions between the physical monitoring devices and the managing software. In fact, the order of interactions is commonly arbitrarily set by the software managing the power monitoring system.
[0004] What is needed, therefore, are methods and systems for improving the accuracy of virtual meters in utility monitoring systems, which can account for a large percentage of customer loads.
BRIEF SUMMARY
[0005] A virtual meter or virtual device is not a physical intelligent electronic device (IED). Virtual meters are essentially a logical mathematical deduction made from the combination of data measured in nearby physical IEDs. The law of conservation of energy states that energy may neither be created nor destroyed. Therefore, the sum of all the energies into and out of a system node must be zero. Using this principle, the energy flowing
into a system bus must equal the energy flowing out of that system bus. FIG. 1 illustrates a simplified hierarchy of a utility system 102 that includes both real or physical meters (M1, M2, M3, M4, M5) and a virtual meter (Vi). The energy flowing into the system bus 103 as measured by IED M2 is diverted into some unknown number of paths. In this example, the energy flowing through two of those paths is being measured by physical IEDs (M4 and M5). If the energy flow measured in IED M2 equals the energy flow measured in IEDs M4 and M5 collectively, then it can be deduced that no further paths exist because the law of conservation of energy is satisfied. However, if the energy flow measured in IED M2 is not equal to the energy flow measured in IEDs M4 and M5, there must be some indefinite number of additional paths present that are unmetered if the system is ideal. Although determining the exact number of additional paths is not readily feasible (without visual inspection), it is possible to determine the aggregate energy flow through these additional unmetered paths in an ideal system. A method for calculating the aggregate energy flow in ideal systems is performed by calculating the difference in energy flow between the devices measuring energy flowing into the system node (here, M2) and the devices measuring energy flow out of the system node (here, M4, and M5). In FIG. 1, the power, P, consumed by the unmetered load(s) connected to the unmetered path(s) (represented by virtual meter Vi) is calculated by PM2 - (PM4+PM5), where PMN represents the power measured by device MN.
[0006] There are two potential concerns that can arise which adversely affect the accuracy of virtual meters, and virtual load monitoring in general. The first concern is the inherent accuracy constraints of the physical IEDs, and the second concern is the precision of synchronously sampling data across the physical IEDs used to calculate the virtual meter's data. The aspects disclosed herein provide methods and systems for addressing these and other concerns to improve the accuracy of virtually metered load data. Although the examples in this document are electrical in nature, this invention is useful in all forms of WAGES (water, air, gas, electricity, and steam) utility systems.
[0007] According to an aspect disclosed herein, a method of automatically determining whether an unmonitored portion exists in a utility system, includes: determining a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; automatically storing a data representation of the hierarchy; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs
that are directly linked in the hierarchy to the parent IED; receiving from the parent IED a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one or more child IEDs to produce respective error-adjusted quantities; and based on the error- adjusted quantities, determining whether an unmonitored quantity exists in the utility system, and, if so, storing an indication that a virtual device directly linked to the parent IED exists in the hierarchy.
[0008] The determining the hierarchy can be carried out automatically. The method can further include: calculating a difference between (a) the error-adjusted quantity associated with the parent IED and (b) the sum of the error-adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing; and storing the unmonitored quantity and an indication that the virtual device is consuming or producing the unmonitored quantity.
[0009] The function for producing the error-adjusted quantity associated with the parent can include calculating a minimum quantity, PPTMIN, and a maximum quantity, PPTMAX, based on at least Pp, a mean of measurement error associated with the parent IED, and a standard deviation of measurement error associated with the parent IED.
[0010] The function for producing the error-adjusted quantities associated with the one or more child IEDs can include: calculating a minimum quantity, PSMIN, based on PPTMIN, an aggregate mean associated with a mean of measurement error of each of the one or more child IEDs, and an aggregate standard deviation associated with a standard deviation of measurement error of each of the one or more child IEDs; calculating a maximum quantity, PSMAX, based on PPTMAX, the aggregate mean, and the aggregate standard deviation; calculating a minimum difference quantity, PDMIN, between PPTMIN and PSMAX; and calculating a maximum difference quantity, PDMAX, between PPTMAX and PSMIN.
[0011] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system includes,
responsive to Pp-Ps being greater than or equal to PDMIN and Pp-Ps being less than or equal to
PDMAX, determining that no unmonitored quantity exists.
[0012] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being less than PDMIN, determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility to the utility system.
[0013] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than PDMAX, determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility to the utility system.
[0014] The function for producing the error-adjusted quantity associated with the parent can include calculating a minimum quantity, PPMIN, and a maximum quantity, PPMAX, based on at least Pp and an absolute measurement error associated with the parent IED.
[0015] The function for producing the error-adjusted quantities associated with the one or more child IEDs can include: calculating a minimum quantity, PSMIN, based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating a maximum quantity, PSMAX, based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating an absolute minimum difference quantity, PDMIN, between PPMIN and PSMAX; calculating an absolute maximum difference quantity, PDMAX, between PPMAX and PSMIN-
[0016] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than or equal to PDMIN and Pp-Ps being less than or equal to PDMAX, determining that no unmonitored quantity exists.
[0017] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes,
responsive to Pp-Ps being less than PDMIN, determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility.
[0018] The method can further include adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than PDMAX, determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility.
[0019] The IEDs can be power meters, the utility can be electricity, and the one or more characteristics can include power, current, or voltage.
[0020] The utility can be water, air, gas, electricity, or steam, and wherein the one or more characteristic includes power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
[0021] The method can further include determining a reading order of the respective measured quantities from the parent IED and the one or more child IEDs such that, after the measured quantity is received from the parent IED, the measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from any other IED in the hierarchy.
[0022] According to another aspect disclosed herein, a method of automatically determining a reading order of respective quantities indicative of a characteristic of a utility monitored by intelligent electronic devices (IEDs) arranged in a hierarchy of a utility system, includes: receiving a data representation of a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs that are directly linked in the hierarchy to the parent IED; automatically determining a reading order of respective quantities indicative of a characteristic of a utility measured by the IEDs such that, after a measured quantity is received from the parent IED, measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from another IED in the hierarchy; and automatically determining a quantity of a characteristic of a utility attributable to an unmonitored portion of the hierarchy.
[0023] The method can further include receiving from the parent IED, according to the reading order, a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs, according to the reading order, respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one or more child IEDs to produce respective error-adjusted quantities; and based on the error-adjusted quantities, determining whether an unmonitored quantity exists in the utility system, and, if so, storing the unmonitored quantity and an indication that a virtual device corresponding to the unmonitored quantity is directly linked to the parent IED in the hierarchy.
[0024] The method can further include calculating a difference between (a) the error- adjusted quantity associated with the parent IED and (b) the sum of the error-adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing.
[0025] The IEDs can be power meters, the utility can be electricity, and the one or more characteristics can include power, current, or voltage.
[0026] The utility can be water, air, gas, electricity, or steam, and the one or more characteristic can include power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
[0027] The foregoing and additional aspects of the present invention will be apparent to those of ordinary skill in the art in view of the detailed description of various embodiments, which is made with reference to the drawings, a brief description of which is provided next.
BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The foregoing and other advantages of the invention will become apparent upon reading the following detailed description and upon reference to the drawings.
[0029] FIG. 1 is a functional block diagram of an automated data integrated monitoring system that includes a virtual device evaluation system;
[0030] FIG. 2 is an exemplary hierarchy of a water system showing a virtual water meter and physical water meters;
[0031] FIG. 3 is a flow chart for automatically determining whether an unmonitored path exists in a hierarchy of a utility system;
[0032] FIG. 4 is a flow chart of a statistical and an absolute method for determining whether an unmonitored path exists in the hierarchy; and
[0033] FIG. 5 is a flow chart for automatically determining a reading sequence of IEDs such that a parent IEDs and its associated directly linked child IEDs are read in sequence to improve the synchronicity of the received measured data and thereby increase the accuracy of characterizing unmonitored paths or loads in the hierarchy.
[0034] While the invention is susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and will be described in detail herein. It should be understood, however, that the invention is not intended to be limited to the particular forms disclosed. Rather, the invention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
DETAILED DESCRIPTION
[0035] Turning now to FIG. 1, an automated data integrated monitoring system 100 is generally shown. An electrical system 102 having multiple physical intelligent electronic devices (hereafter "IEDs") designated by the letter M provides data from each IED M that is communicated to an automated data alignment system 104 and an automated hierarchy classification system 106. As used herein, an IED refers to any physical or real system element or apparatus with the ability to sample, collect, or measure one or more operational characteristics or parameters (characteristics and parameters are used interchangeably herein) of a utility monitoring system 102. The data is aligned automatically in temporal or pseudo- temporal context in the automated data alignment system 104 and produces data that is temporally aligned such that it represents the data when it was actually seen simultaneously by the monitoring devices M in the utility monitoring system 102. The hierarchy classification system 106 automatically learns the hierarchy of monitoring devices present in the electrical system 102 and their positional relationships relative to one another. Examples of the hierarchy classification system 106 and the auto-learned hierarchy algorithms 400, 500, 550 associated therewith are described in commonly assigned U.S. Patent No. 7,272,518, titled "Automated Hierarchy Classification in Utility Monitoring Systems," issued September 18, 2007, and in commonly assigned PCT Patent Application No. PCT/US2006/034394,
titled "Improvements in Hierarchy Determination for Power Monitoring Systems," filed
November 5, 2007 [SPL-0099]. A hierarchy as used herein includes a series of ordered groupings of things within a system. These relationships may be physical (based on a power system one-line diagram for example) or functional (based on cost centers or other organizational divisions). In an electrical power system context, a hierarchy describes the organization of the electrical power system (whether utility-side or demand-side of the point- of-common coupling (PCC)). As used herein, an "auto-learned hierarchy algorithm" refers to any of the auto-learned hierarchy algorithms disclosed in U.S. Patent No. 7,272,518.
[0036] Each physical IED (M) measures characteristics of the utility monitoring system 102, and quantifies these characteristics into data that can be analyzed by a computer. For example, in an electrical system, the IED can measure power, energy, current, voltage, or other characteristics of electricity. In the electrical context, the IED may be based on a PowerLogic® Series 3000/4000 Circuit Monitor or a PowerLogic® ION7550/7650 Power and Energy Meter available from Schneider Electric or any other suitable IED device such as a microprocessor-based circuit breaker, relay, metering device, energy meter, or power meter. In other WAGES contexts, the IED can be a water meter, gas meter, air flow meter, or the like.
[0037] Generally, the hierarchy classification system 106 utilizes an auto-learned hierarchy algorithm in the monitoring system software that is based on rules and statistical methods. Periodically, the monitoring system software polls each IED M in the utility monitoring system 102 to determine certain characteristics or parameters of the utility monitoring system 102 at that monitored node (represented by M). Multiple samples of specified parameters are taken from each IED in the utility monitoring system 102 at the same given point in time. Once the parameter data is collected from each node M in the utility monitoring system 102, the auto-learned hierarchy algorithm analyzes the data and traces the relationships or links among the monitoring devices with respect to the time the data sample was taken and the associated value of the data sample. This analysis may be performed periodically to increase the probability that the hierarchy is accurate, or to ascertain any changes in the hierarchy. Once this iterative process reaches some predetermined level of statistical confidence that the determined layout of the electrical system 102 is correct, the auto-learned hierarchy algorithm ends. The final layout of the utility monitoring system 102 is then presented to the user for concurrence. As each IED 's data is evaluated over time (the learning period) with respect to all other IEDs using the auto-
learned hierarchy algorithm, a basic layout of the hierarchical structure of the utility monitoring system 102 is determined based on the monitoring points available. In this respect, the auto-learned hierarchy algorithm uses historical trends of the data from each IED, and those trends are compared to determine whether any interrelationship (link) exists between the IEDs. A more detailed hierarchical structure can be determined with more monitoring points available for analysis.
[0038] Samples of specific parameters or characteristics (such as power, energy, voltage, current, or the like in an electrical system) are simultaneously taken from each IED in the utility monitoring system 102. This data is stored and analyzed with respect to the time the sample is taken, the associated value of the data point, and the IED providing the data. Data taken from each IED in the utility monitoring system 102 is compared with each other to determine whether any correlation exists between the IEDs. The data is analyzed for statistical trends and correlations as well as similarities and differences over a predetermined period of time.
[0039] The data alignment system 104 aligns data, such as power, voltage, current, time, events, and the like, from the multiple IEDs in the utility monitoring system 102. When data from all the IEDs is aligned to the same point (or approximately the same point based on pseudo-temporal alignment) in time that the data occurred, the data can be put into a temporal (synchronous) or pseudo-temporal (pseudo-synchronous) context from which additional decisions regarding hardware and software configuration can be automatically made or recommended. The measured data from various IEDs may be synchronized or approximately synchronized with each other within a temporal or pseudo-temporal context. Temporal alignment is more precise than pseudo-temporal alignment. Temporal alignment relates to alignment of meter cycle counts in time. Pseudo-temporal alignment systems typically utilize a global positioning system (GPS) or network time protocol (NTP) for clock synchronization. Automatic temporal alignment implementations are described in commonly assigned U.S. Patent Application No. 11/174,099, filed July 1, 2005, entitled "Automated Precision Alignment of Data in a Utility Monitoring System," and in commonly assigned PCT Patent Application No. PCT/US2006/034394, titled "Improvements in Hierarchy Determination for Power Monitoring Systems," filed November 5, 2007 [SPL-0099]. In an automatic temporal alignment implementation, the data alignment system 104 synchronously aligns all IEDs (represented by M) in an electrical system hierarchy to the zero-crossing of all three phase voltages without the use of additional hardware, notwithstanding potential phase shifts
between various IEDs, such as for example, those caused by certain transformer configurations. When the data of the monitoring devices is aligned synchronously, in a temporal sense, with each other, the system data is essentially aligned with respect to the time it occurred, making more complex data analyses feasible.
[0040] The data integrated monitoring system 100 also includes a virtual device evaluation system 105 according to aspects of the present invention, which may receive device data associated with the electrical system 102 via manual or automated methods. The virtual device evaluation system 105 includes the algorithms 300, 400, 500 disclosed herein. As used herein a "virtual" device or load is not a physical device, but represents what characteristics of the utility that a physical device, if it were placed in the hierarchy, would measure. An IED is not a virtual device as used herein.
[0041] The virtual device evaluation system 105 uses several techniques to improve the accuracy of virtual meters, such as Vi shown in FIG. 1. Some of these techniques address the inherent accuracy constraints of physical IEDs, while other techniques address the sampling synchronicity across the physical IEDs used to calculate the virtual meter's data. Additionally, the virtual device evaluation system 105 makes recommendations to end-users regarding the need for additional monitoring devices at certain points within the monitoring system 102.
[0042] Virtual data is calculated using the differences between measured parameters flowing into a system node and the measured parameters flowing out of the same system node. For example, the general equation used to calculate the real power (kW) as determined for the virtual meter Vi shown in FIG. 1 (when the utility system 102 is a power monitoring system) would be:
N
Virtual Meter = P - ∑cn (Equation 1) n=l
[0043] where meter P equals the measured power flowing into the system node and sum of meters Ci through CN equal the measured power flowing out of the same system node. The unmetered parameters as indicated by the virtual meter are sometimes referred to as a 'residual' value because they represent the mathematical remainder of the system. For example, in FIG. 1, P represents the power (when the utility system is an electrical power system) measured by M2, which is the parent of IEDs M4 and M5.
[0044] While the equation shown above is fundamentally correct, it does not represent all relevant considerations. For example, what if measurements taken by one or
more of the IEDs (P, C1, C2... CN) are inaccurate? What if one or more of the instrument transformers used by the IEDs are inaccurate? What if the data sample taken from parent IED P is not synchronous with the data sample taken from one of the other child IEDs (C1, C2 ... CN)? Any one of these conditions will result in some degree of error being injected into Equation 1. A more exact equation for the virtual meter would be:
N
Virtual Meter ~ (P ± ep ) - ∑ (Cn ± eCχ ) (Equation 2) n=l
Cn v n,me n,ite )
[0046] for a given parameter. The subscript (me) refers to measurement error by an IED, and the subscript (He) refers to instrument transformer error. It should be noted that synchronicity error is not accounted for in this equation. "P" represents a quantity of a characteristic of the utility being monitored by a parent IED in the hierarchy, such as power or water flow rate. "C" represents a quantity of a characteristic of the utility being monitored by a physical child IED that is directly linked to the parent IED in the hierarchy. A measurement error is typically expressed as a percentage, and reflects a range of percentage error that can affect an IED 's measurements. For example, if a measurement error for an IED of a particular type is ±0.2%, this means that if an IED of that type reports that it measures 10,000W, then the actual power can be within the range of 9,98OW to 10,02OW, yielding a 4OW range of error. Because every IED can vary slightly from another even when they are of the same type and manufactured according to the same process, the error for each IED can differ slightly. For example, the measurement error for a first IED may be 0.2%, but for a second IED, the measurement error may be 0.1%. The accuracy or error associated with an IED of a particular type is typically available from the manufacturer's specifications for the IED. Otherwise, it can be determined by the end-user by applying a known quantity of a characteristic to an IED, measuring the quantity of the characteristic by the IED, and determining a percentage difference between the measured quantity and the actual quantity.
[0047] The consequences of these errors may be significant or trivial depending on each error component's magnitude and sign. In some instances these errors may accrue and in other instances they may nullify each other. To compound matters, the error associated with each physical IED (P, C1, C2, ... CN) is independent from every other physical IED (P,
C1, C2, ... CN) SO that the consequences are completely unpredictable. For example, a system that is completely monitored (i.e., all paths into and out of a system are physically metered) may appear to have residual paths (i.e., unmetered loads) as a result of the measurement errors described above. The virtual device evaluation system 105 does not necessarily eliminate these errors, but attempts to reduce and manage the errors in order to minimize their influence and potential distraction to the end-user.
Statistical Method for Accounting For Measurement Error In Determining The Presence or Absence of a Virtual Meter
[0048] A first described aspect provides a method to determine whether a residual parameter indicates additional unmetered paths or is merely due to measurement error by the IED and instrument transformer error (Pme, Cn me, Pite, and Cn ite) of the physical IEDs. While the illustrations below assume power as the parameter (characteristic) for the sake of convenience, it is contemplated that any other WAGES parameters (characteristics) can be used instead. One or more of the following three assumptions can be made:
[0049] 1. A single metered utility path exists into the system node being analyzed, and this metered utility is distributed through a bus to feeders below it in the network hierarchy (as illustrated in the utility system 102 shown in FIG. 1).
[0050] 2. There are at least N physical IEDs (where N > 0) monitoring the different feeders (as illustrated in the utility system 102 shown in FIG. 1).
[0051] 3. The measurement error probability density function (pdf) of a given IED has a normal distribution.
[0052] Let μp and σp be the mean and standard deviation, respectively, of the error for an IED (and its associated instrument transformers) monitoring the bus (parent) expressed as a percent. Because the error in the power measured by the parent IED has a normal distribution (Assumption #3), the following equations are valid: VpTMiN = Pp(l+(μp - 2σP)/100) (Equation 3)
1PpTMAx = Pp(l+(μp + 2σP)/100) (Equation 4)
[0053] where PPTMIN and PPTMAX are the minimum and maximum values or quantities, respectively, for the true measurement of the power with a 95% confidence, and Pp is a measured quantity of the power measured by IED P.
[0054] Assuming that no additional utility paths exist (i.e., no virtual meter), the sum of the measurements from the IEDs on the feeders (children Ci through CN) will equal the measurement of the parent IED P within the error tolerance of the parent and child IEDs. It is
known from elementary probability theory that the sum of N normally distributed random variables is also normal with mean and variance as follows:
N L1* ~ 2-ι ^n (Equation 5) n=\
N
2 _ y 2 s ~ Z~ι n (Equation 6) n=\
[0055] Applying the same reasoning to the sum of the power measurements of the child IEDs as to the parent, the following may be obtained: V SMiN = PPTMIN( 1 +(μs - 2σs)/l 00) (Equation 7)
P 1SMAX = PPTMAXK 1 +(μs + 2cs)l\ 00) (Equation 8)
[0056] Assuming that no unmetered (virtual) path exists, the difference between the parent measurement and the sum of the measurements of the children would have the following minimum and maximum: P DMiN = P ' PTMiN - P ' SMAX (Equation 9)
P DMAx = P PTMAX - P SMiN (Equation 10)
[0057] It is now possible to make a judgment as to whether or not additional unmetered paths exist. Three conditions are of importance:
[0058]
P DMiN ≤ Pp - Ps ≤ P DMAX, (Equation 11 )
P DMiN > Pp - Ps, and (Equation 12)
P DMAX < Pp - Ps (Equation 13)
[0059] In these three expressions, Pp is as defined above and
N p * = Y L-iP cn (Equation 14) n=\ where Pcn represents a quantity of power measured by a child IED n. In the first case, Pp - Ps falls within the error tolerance of the IEDs (and instrument transformers) and thus no unmetered paths are assumed. In the second case, an unmetered path is supplying power to the system (a generator perhaps?). In the third case, an unmetered path of magnitude Pp - Ps is consuming power.
Example of Statistical Method for Accounting for Measurement Error In Determining
[0062] σp = 0.2%
[0063] N = 2
[0064] μa = μc2 = 0
[0065] σc; = <3c2 = 0.5%
[0066] Pp = IOOkW (e.g., M2 from FIG. 1)
[0067] Pc; = 35kW (e.g., M4 from FIG. 1)
[0068] Pc2 = 60 kW (e.g., M5 ; from FIG. 1)
[0069] The following quantities are yielded from the equations above: σs = 4σc? + σc2 2 = °-5>/2 = 0.707 P = Pr + Pr = 95kW PpTMiN = 10OAr^(I - 2 * 0.2 / 100) = 99.6kW PpTMΛx = 10OkW(I + 2 * 0.2 / 100) = 100 AkW PSMIN = 99.6kW(\ - 2 * 0.707 / 100) = 9%2kW P8MAX = 100.4^^(1 + 2 * 0.707 / 100) = 101.8WF PDMIN = 99.6kW - l0l MW = -2.2kW PDMAX = 100 AkW -9S.2kW = 2.2kW PP - Ps = l 0OkW - 95kW = 5kW
[0070] Now it can be seen that PDMAX < Pp - Ps, and thus there is assumed to be an unmetered utility path of approximately 5kW (e.g., Vi from FIG. 1). In this example, the hierarchy would be updated to include a virtually metered load (such as Vi from FIG. 1) and all calculated residual values from the difference between Pp and Ps would be attributed to that virtual meter Vi. It should be noted that a confidence level of 95% was assumed in determining the range of the measurements for the parent and child IEDs, which used two standard deviations. Using one standard deviation would produce a range with approximately 68% confidence and using three standard deviations would produce a range with approximately 99.7% confidence.
Absolute (Non-Statistical) Method for Accounting For Measurement Error In Determining The Presence or Absence of a Virtual Meter
[0071] A second described aspect provides an alternate method to determine whether a residual parameter indicates additional unmetered paths or is merely due to measurement
error by the IED and instrument transformer error (Pme, Cn me, Vite, and Cn ite). The illustrations below assume water flow as the parameter for the sake of convenience; however, of course any other WAGES parameters can be used instead.
[0072] FIG. 2 illustrates a water monitoring system 202 communicatively coupled to the virtual device evaluation system 105. The water monitoring system 202 includes a parent water meter, WMP, 204, and a number N of child water meters, WMCi 206, WMC2 208, WMcN 210, directly linked to the parent meter. A virtual water meter, WMy 212, which may or may not be present, is shown in hatched/dashed lines. The absolute method determines whether WMy exists, and, if so, what quantity of water flow would be attributable to it and is it measuring consumption or production of water.
[0073] Using the absolute method, the minimum value for the water flow through the main (parent) IED 204 is WMPMIN and the maximum value for the water flow through the main (parent) IED 204 is WMPMAX-
[0074] Assuming no unmetered utility paths exist (virtual water flow), the sum of the water flow measurements from the child IEDs 206, 208, 210 on the feeders (children WMc1, WMc2, ... WMCN) will equal the reading of the parent IED 204 WMp within the absolute error of the main (parent) 204 and child IEDs 206, 208, 210 (children WMα, WMC2, . . . WMCN). Again assuming no unmetered utility paths exist (virtual water flow), the difference between the parent measurement (WMp 204) and the sum of the measurements of the children (WMs 206, 208, 210) would have the following absolute minimum and maximum: WMDMIN = WMPMIN - WMSMAX (Equation 15)
WMDMAX = WNpMAx - WMsMiN (Equation 16)
[0075] It is now possible to make a judgment as to whether or not additional unmetered paths exist. Three conditions are of importance: WMDMIN < WMP - WMS < WMDMAX, (Equation 17)
WMDMIN > WMP - WMS, and (Equation 18)
WMDMAX < WMP - WMS (Equation 19)
[0076] In these three expressions, WMp is as defined as the actual reading of the parent IED 204, and N
WM s = Y LuWM cn m (Equa tti.on 2 om0) n=\
[0077] where WMCn represents the actual readings of the child IEDs 206, 208, 210, respectively. WMs represents the sum of these actual readings.
[0078] In the first case, WMp - WMs falls within the error tolerance of the IEDs and thus no unmetered (virtual) paths are assumed. In the second case, an unmetered path is supplying water (the utility being monitored) to the system. In the third case, an unmetered path of magnitude WMp - WMs is consuming water. Example of Absolute Method for Accounting For Measurement Error In Determining
The Presence or Absence of a Virtual Meter [0079] Assume the following parameters and quantities: [0080] WMperror = 0.2%
[0081] WMc; error = 0.5%
[0082] WMc2 error = 0.5%
[0083] N = 2
[0084] WMp = 1000 gal/min
[0085] WMc; = 495 gal/min
[0086] WMc2 = 499 gal/min
[0087] The following quantities are yielded from the equations above:
[0088] WMp MiN = 1000 (1 - 0.2/100) = 998 gal/min
[0089] WMPMAX = 1000(1 + 0.2/100) = 1002 gal/min
[0090] WMc MiN = 495(1 - 0.5/100) + 499(1 - 0.5/100) = 492.525 + 496.505 = 989.03 gal/min
[0091] WMc MAX = 495(1 + 0.5/100) + 499(1 + 0.5/100) = 497.475 + 501.495 = 998.97 gal/min
[0092] WMDMIN = 998 gal/min - 998.97 gal/min = -0.97 gal/min
[0093] WMDMAX = 1002 gal/min - 989.03 gal/min = 12.97 gal/min
[0094] WMp - WMs = 1000 gal/min - 495 gal/min - 499 gal/min = 6 gal/min
[0095] It is apparent that WMDMAX > WMp - WMΛ and thus the residual water flow is attributed to measurement error by the IEDs. In this specific example, the hierarchy would not depict a virtual device WMy and residual values would be ignored or divided evenly between the physical IEDs. Method for Reducing the Effect of Measurement Error On Unmetered (Virtual) Loads
[0096] The above-mentioned aspects disclose methods to determine whether a residual parameter indicates additional unmetered paths or is merely due to the measurement
error associated with physical IEDs. The purpose of the third aspect is to reduce the effect of measurement errors on virtual meters by optimizing the order that measurement data is read from the IEDs in the hierarchy such that data from parent-child groupings in the hierarchy is received as synchronously as possible to ensure optimum accuracy. An exemplary flow chart of this third aspect is shown in FIG. 5 and described in more detail in the next section.
[0097] As previously indicated, data for the virtual meter Vi is calculated from physical IEDs that are linked to one other. Empirical data has shown that the order of sampling data from physical IEDs can affect the accuracy of virtually metered data because an arbitrary order introduces a latency that reduces the synchronicity of sampling with the related physical IEDs. The virtual device evaluation system 105 uses a hierarchical (spatial) context of the IEDs to automatically adapt/adjust the reading order of physical IEDs to improve the synchronicity of sampling between related IEDs. By adjusting the reading order so that a parent IED and its respective children IEDs are read sequentially, the synchronicity error is reduced resulting in a more accurate virtual measurement.
[0098] Referring to FIG. 1 as an example, it is important that the data measurements of the characteristics of the utility received from IEDs M2, M4 and M5 be acquired as synchronously as possible with respect to each other. Any latency between the samples taken from IEDs M2, M4 and M5 increases the likelihood of introducing error to the calculated virtual measurement (Vi). By contiguously sampling IEDs M2, M4 and M5, the latencies are reduced (i.e., more synchronous) and the accuracies of the residual calculations for Vi are improved as a result.
[0099] This aspect generally requires knowledge of each physical IED 's spatial relationship with respect to every other physical IED in a hierarchy. These spatial relationships can be determined either automatically, such as by an auto-learned hierarchy algorithm, or manually by the end-user. Another method would be to manually configure the sampling order for devices without entering the monitoring system's hierarchy.
[00100] Once a hierarchy is known and the sequence order of receiving measured data from the IEDs is adjusted, either the absolute or statistical method described above can be used to ascertain the existence of unmetered paths. The addition, relocation, or elimination of new IEDs in a utility system hierarchy necessitates adjustments to the sequence order of reading data and a re-evaluation of the virtual meter itself.
[00101] Because unmetered loads exist in basically every monitoring system, it is important to have the capability to accurately "meter" these unmetered paths (virtual meters).
Determining whether or not an unmetered path exists is critical to account for the utility product's consumption within the utility system 102. These aspects disclosed herein are important for developing a more accurate utility monitoring system model (including unmetered paths) for end-users.
Exemplary Algorithms
[00102] As mentioned above, the virtual device evaluation system 105 includes an algorithm 300. The algorithm 300 manually or automatically determines a hierarchy of the utility system being analyzed using the auto-learned hierarchy algorithm described above (302). The hierarchy indicates how a number, N, of IEDs are linked to one another in the utility system (e.g., directly, indirectly, or not at all). Each IED monitors one or more characteristics (e.g., power, voltage, current) of the utility (e.g., WAGES). The algorithm 300 stores a data representation of the hierarchy in a computer-readable medium (304). The data representation includes a data structure that indicates how the IEDs are linked together to form the hierarchy. The algorithm 300 identifies a parent IED (designated by subscript P) from the automatically determined hierarchy that is directly linked to at least one child IED (306). The algorithm 300 identifies a number, N, of child IEDs (designated by subscript C) that are directly linked to the parent IED in the hierarchy (308). For example, in FIG. 1, parent IED M2 is directly linked to child IEDs M4 and M5. IED M3 is not linked at all to IEDs M2, M4, or M5. IEDs M4 and M5 are indirectly linked to the main IED M1.
[00103] An actual measured quantity, designated by Pp, is received from the parent IED (310). The "P" refers to the measured quantity, and the subscript P refers to the parent IED. The measured quantity is a quantity of a characteristic of the utility measured by the parent IED. For example, in the electrical utility context, the quantity can be expressed as a value in kW, which represents an amount of power measured by the parent IED. In the water utility context, the quantity can be expressed as a value in gallons per minute, which represents an amount of water flow measured by the parent IED. Respective measured quantities, designated by PCN, are received from each of the directly linked child IEDs (312). For example, if there are two child IEDs, such that N=2, Pc1 represents the quantity measured by a first child IED and Pc2 represents the quantity measured by a second child IED. Each child IED measures the same characteristic of the utility (e.g., power, water flow) that was measured by the parent IED and by each other.
[00104] The algorithm 314 automatically adjusts the respective measured quantities measured by the parent IED and by the child IEDs as a function of respective measurement
errors associated with the parent and child IEDs to produce respective error-adjusted quantities using statistical or absolute methods (314). Put differently, each of the quantities measured by the parent and child IEDs is adjusted to account for the measurement error associated with each respective IED. As described above, there are two methods for error- adjusting the measured quantities by an IED: statistical or absolute. These methods are described in more detail in connection with the algorithm 400 shown in FIG. 4.
[00105] Once the algorithm 300 has determined the error-adjusted quantities measured by the parent and associated directly linked child IEDs, the algorithm 300 determines, based on the error-adjusted quantities, whether a virtual meter (unmonitored quantity) exists in the hierarchy (316). This virtual meter would represent an unmonitored quantity directly linked to the parent. The determination as to whether this virtual exists is thus more accurate because it has accounted for measurement errors and instrument transformer errors. The algorithm 300 stores an indication that the virtual meter is directly linked to the parent IED in the hierarchy (318). The algorithm 300 also stores an unmonitored quantity as an indication of the virtual meter. For example, in the statistical method example provided above, an unmonitored quantity of 5kW was calculated from the actual quantities measured by the parent and directly linked child IEDs. The algorithm 300 determines whether it should end (320), such as by checking whether all parent IEDs in the hierarchy have been checked for children, and, if so, it ends. Otherwise, it returns to block 306 to identify the next parent IED that is directly linked to one or more child IEDs.
[00106] FIG. 4 is a flow chart of the algorithm 400 for determining the error-adjusted quantities measured by the IEDs under consideration. The algorithm 400 determines whether to use a statistical method for adjusting the measured quantities (402). The algorithm 400 can make this determination automatically, or it may do both methods, or it may receive an input from the end-user as to which method to carry out. When a statistical method is used (402), the algorithm 400 calculates a range (minimum, maximum) of a true quantity of total power based on a reading of the parent IED by calculating, for example, Equations 3 and 4 above based on the mean and standard deviation of the measurement error for the parent IED and on Pp (404). Two error-adjusted measured quantities are produced from this calculation: a minimum measured quantity, PPTMIN, and a maximum measured quantity, PPTMAX- By true, it is meant that the actual reading from the IED will be somewhere between the minimum and maximum quantities but not outside of this range.
[00107] The algorithm 400 calculates a range (minimum, maximum) of the sum of child IED readings assuming that there are no unmetered loads connected to the parent IED by calculating, for example, Equations 7 and 8 above based on the mean and variance of the deviations associated with the child IEDs (406). Two sum (designated by subscript S) quantities are produced from this calculation: a minimum sum quantity, PSMIN, and a maximum sum quantity, PSMAX.
[00108] The algorithm 400 calculates a range (minimum, maximum) of the difference between the true reading measured by the parent IED (within its associated error tolerance) and the sum of the child readings (within their respective associated error tolerances) by, for example, calculating Equations 9 and 10 above based on the previously calculated quantities PpTMiN, PPTMAX, PSMIN, and PSMAX- (408). Two difference (designated by subscript D) quantities are produced from this calculation: a minimum difference quantity, PDMIN, and a maximum difference quantity, PDMAX.
[00109] The algorithm 400 calculates the difference between the actual parent measured quantity Pp and the sum of the actual child measured quantities Ps, where Ps can be calculated using, for example, Equation 14 above (410). This difference, Pp-Ps, is designated as PDACT, or the actual difference between the parent and children measured quantities.
[00110] The algorithm 400 determines whether PDACT is greater than PDMAX (412) If so, then a virtual meter exists and is consuming a quantity of the characteristic (power in this example) of the utility (electricity in this example) corresponding to PDACT (418). Otherwise, the algorithm 400 determines whether PDACT is less than PDMIN (414). If so, the algorithm 400 determines that power is being supplied by an unmetered path (416). Otherwise, if Pp-Ps falls within the error tolerance of the IEDs and instrument transformers, the algorithm 400 determines that are no unmetered paths and returns. It should be emphasized that although the characteristic for the statistical method shown in FIG. 4 is power for convenience, any other characteristic of the WAGES utilities can be used.
[00111] When an absolute method is used (402), the algorithm calculates a range of true quantity of total water flow based on the actual reading from a parent IED in the hierarchy (420). Again, water flow is used for convenience only and any other characteristic of the WAGES utility can be used instead. This calculation produces WMPMIN and WMPMAX-
[00112] The algorithm 400 calculates a range of the sum of the child IED measurements assuming that no unmetered loads exist that are directly linked to the parent IED in the hierarchy using equations similar to Equations 7 and 8 above but substituting the
absolute error for the mean and standard deviation of the error (422). This calculation produces WMSMIN and WMSMAX-
[00113] The algorithm 400 calculates a range of the difference between the true measurement from the parent IED and the sum of the true measurements from the child IEDs by calculating Equations 15 and 16 above (424). This calculation produces WDDMIN and
WDDMAX-
[00114] The algorithm 400 calculates the difference between the actual measurement from the parent IED, WMp, and the sum of the actual measurements from the child IEDs, WMs, to produce WMDACT (426). If WMDACT is greater than WMDMAX (428), the algorithm 400 determines that a virtual meter is consuming water in an amount corresponding to WMACT (434). If WMDACT is less than WMDMIN (430), the algorithm 400 determines that water is being supplied by the unmetered path (432). If WMDACT falls within the error tolerance of the IEDs, the algorithm 400 determines that no unmetered paths directly linked to the parent IED exist.
[00115] FIG. 5 is a flow chart diagram of an example algorithm 500 for automatically adjusting a reading order of IEDs to increase the accuracy of reading groupings of IEDs and improve the synchronicity of their measured data as it is received by the managing software 110. The algorithm 500 receives a data representation of a hierarchy of the utility system (502). The hierarchy indicates how a number, N, of IEDs are linked to one another in the utility system 102. Each IED monitors one or more characteristics of a utility monitored by the IEDs in the utility system. The hierarchy can be determined automatically by the auto- learned hierarchy algorithm or entered manually by the end-user as an input to the algorithm 500.
[00116] The algorithm 500 identifies, from the hierarchy, a parent IED that is directly linked to at least one child IED (504). Once the hierarchy is known, the spatial relationships of all of the IEDs are known, and parent IEDs with child IEDs and any of their "progeny" as well as childless parent IEDs can be identified. The algorithm identifies all child IEDs that are directly linked to the parent IED (506). There may be only one child IED or more than one child IED that is directly linked to the parent IED. For example, in FIG. 1, IED Mi is directly linked to two child IEDs, M2 and M3. The algorithm 500 automatically determines a reading order or sequence of respective quantities indicative of a characteristic of a utility measured by the IEDs so that the parent IED and its associated directly linked child IEDs are read in sequence as a group (508). For example, referring to FIG. 1, the algorithm 500
adjusts the reading order so that characteristics data measured by the IEDs M2, M4, and M5 are read in sequence. In other words, prior to the adjustment, the managing software 110 may have read the IEDs in the following order: M1, M2, M3, M4, M5. The algorithm 500 adjusts the reading order by grouping M2, M4, and M5 together such that M3 is not read in between this grouping. Likewise, the algorithm 500 would adjust the reading order by grouping M1, M2, and M3 together as a group. In this case, M2 would be read twice to ensure accurate virtual meter evaluation for both groups. Once the reading orders have been adjusted, optionally, the presence or absence of a virtual meter can be automatically determined by any of the methods or algorithms disclosed herein, such as algorithms 300, 400 (e.g., such as by returning to block 310). In this context, a "group" or "grouping" of IEDs means that, for example, a parent IED and its directly linked child IEDs form a single group. Thus, in FIG. 1, M2 and M3 form a group with respect to Mi (because Mi is the parent directly linked to M2 and M3), but M3 does not form a group with respect to M2, M4, and M5 because M3 is not directly linked to M4 or M5.
[00117] Any of the algorithms disclosed herein, including the auto-learned algorithm, and the algorithms 300, 400, 500 include machine readable instructions for execution by: (a) a processor, (b) a controller, and/or (c) any other suitable processing device. It will be readily understood that the computer 132 includes such a suitable processing device. Any algorithm disclosed herein may be embodied in software stored on a tangible medium such as, for example, a flash memory, a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), or other memory devices, but persons of ordinary skill in the art will readily appreciate that the entire algorithm and/or parts thereof could alternatively be executed by a device other than a controller and/or embodied in firmware or dedicated hardware in a well known manner (e.g., it may be implemented by an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable logic device (FPLD), discrete logic, etc.). Also, some or all of the machine readable instructions represented in any flowchart depicted herein may be implemented manually. Further, although specific algorithms are described with reference to flowcharts depicted herein, persons of ordinary skill in the art will readily appreciate that many other methods of implementing the example machine readable instructions may alternatively be used. For example, the order of execution of the blocks may be changed, and/or some of the blocks described may be changed, eliminated, or combined.
[00118] While particular embodiments and applications of the present invention have been illustrated and described, it is to be understood that the invention is not limited to the precise construction and compositions disclosed herein and that various modifications, changes, and variations can be apparent from the foregoing descriptions without departing from the spirit and scope of the invention as defined in the appended claims.
Claims
1. A method of automatically determining whether an unmonitored portion exists in a utility system, comprising: determining a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; automatically storing a data representation of the hierarchy; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs that are directly linked in the hierarchy to the parent IED; receiving from the parent IED a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one or more child IEDs to produce respective error- adjusted quantities; and based on the error-adjusted quantities, determining whether an unmonitored quantity exists in the utility system, and, if so, storing an indication that a virtual device directly linked to the parent IED exists in the hierarchy.
2. The method of claim 1, wherein the determining the hierarchy is carried out automatically, the method further comprising: calculating a difference between (a) the error-adjusted quantity associated with the parent IED and (b) the sum of the error-adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing; and storing the unmonitored quantity and an indication that the virtual device is consuming or producing the unmonitored quantity.
3. The method of claim 1, wherein the function for producing the error-adjusted quantity associated with the parent includes calculating a minimum quantity, PPTMIN, and a maximum quantity, PPTMAX, based on at least Pp, a mean of measurement error associated with the parent IED, and a standard deviation of measurement error associated with the parent IED.
4. The method of claim 3, wherein the function for producing the error-adjusted quantities associated with the one or more child IEDs includes: calculating a minimum quantity, PSMIN, based on PPTMIN, an aggregate mean associated with a mean of measurement error of each of the one or more child IEDs, and an aggregate standard deviation associated with a standard deviation of measurement error of each of the one or more child IEDs; calculating a maximum quantity, PSMAX, based on PPTMAX, the aggregate mean, and the aggregate standard deviation; calculating a minimum difference quantity, PDMIN, between PPTMIN and PSMAX; and calculating a maximum difference quantity, PDMAX, between PPTMAX and PSMIN.
5. The method of claim 4, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system includes, responsive to Pp-Ps being greater than or equal to PDMIN and Pp-Ps being less than or equal to PDMAX, determining that no unmonitored quantity exists.
6. The method of claim 4, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being less than PDMIN, determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility to the utility system.
7. The method of claim 4, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than PDMAX, determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility to the utility system.
8. The method of claim 1, wherein the function for producing the error-adjusted quantity associated with the parent includes calculating a minimum quantity, PPMIN, and a maximum quantity, PPMAX, based on at least Pp and an absolute measurement error associated with the parent IED.
9. The method of claim 8, wherein the function for producing the error-adjusted quantities associated with the one or more child IEDs includes: calculating a minimum quantity, PSMIN, based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating a maximum quantity, PSMAX, based on the sum of the measured quantities measured by the one or more child IEDs and an absolute measurement error associated with the one or more child IEDs; calculating an absolute minimum difference quantity, PDMIN, between PPMIN and
PSMAX; calculating an absolute maximum difference quantity, PDMAX, between PPMAX and
PsMIN-
10. The method of claim 9, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than or equal to PDMIN and Pp-Ps being less than or equal to PDMAX, determining that no unmonitored quantity exists.
11. The method of claim 9, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being less than PDMIN, determining that the unmonitored quantity does exist and storing an indication that the virtual device is supplying the characteristic of the utility.
12. The method of claim 9, further comprising adding the respective measured quantities measured by the one or more IEDs to produce a total measured quantity, Ps, wherein the determining whether the unmonitored quantity exists in the utility system further includes, responsive to Pp-Ps being greater than PDMAX, determining that the unmonitored quantity does exist and storing an indication that the virtual device is consuming the characteristic of the utility.
13. The method of claim 1 , wherein the IEDs are power meters, wherein the utility is electricity, and wherein the one or more characteristics includes power, current, or voltage.
14. The method of claim 1, wherein the utility is water, air, gas, electricity, or steam, and wherein the one or more characteristic includes power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
15. The method of claim 1, further comprising determining a reading order of the respective measured quantities from the parent IED and the one or more child IEDs such that, after the measured quantity is received from the parent IED, the measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from any other IED in the hierarchy.
16. A method of automatically determining a reading order of respective quantities indicative of a characteristic of a utility monitored by intelligent electronic devices (IEDs) arranged in a hierarchy of a utility system, comprising: receiving a data representation of a hierarchy of the utility system, the hierarchy indicating how a number of intelligent electronic devices (IEDs) are linked to one another in the utility system, each of the IEDs monitoring one or more characteristics of a utility; identifying, from the hierarchy, a parent IED in the hierarchy that is directly linked to at least one child IED; identifying, from the hierarchy, all of one or more child IEDs that are directly linked in the hierarchy to the parent IED; automatically determining a reading order of respective quantities indicative of a characteristic of a utility measured by the IEDs such that, after a measured quantity is received from the parent IED, measured quantities from each of the one or more child IEDs are received prior to receiving a measured quantity from another IED in the hierarchy; and automatically determining a quantity of a characteristic of a utility attributable to an unmonitored portion of the hierarchy.
17. The method of claim 16, further comprising: receiving from the parent IED, according to the reading order, a measured quantity, Pp, of the characteristic of the utility measured by the parent IED; receiving from each of the one or more child IEDs, according to the reading order, respective measured quantities of the characteristic of the utility measured by each of the one or more child IEDs; adjusting the measured quantities measured by the parent IED and by the one or more child IEDs as a function of respective measurement errors associated with the parent IED and with the one or more child IEDs to produce respective error- adjusted quantities; and based on the error-adjusted quantities, determining whether an unmonitored quantity exists in the utility system, and, if so, storing the unmonitored quantity and an indication that a virtual device corresponding to the unmonitored quantity is directly linked to the parent IED in the hierarchy.
18. The method of claim 16, further comprising calculating a difference between (a) the error-adjusted quantity associated with the parent IED and (b) the sum of the error- adjusted quantities associated with the one or more child IEDs, wherein the determining whether the unmonitored quantity exists in the utility system includes determining whether the calculated difference is within an error tolerance, and, if not, carrying out the storing.
19. The method of claim 16, wherein the IEDs are power meters, wherein the utility is electricity, and wherein the one or more characteristics includes power, current, or voltage.
20. The method of claim 16, wherein the utility is water, air, gas, electricity, or steam, and wherein the one or more characteristic includes power, voltage, current, voltage distortion, BTU per hour, MBTU per hour, energy, gallons per minute, or cubic feet per minute.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP09791301.6A EP2321657B1 (en) | 2008-08-12 | 2009-08-07 | Improvements in virtual metering |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/228,394 US7937247B2 (en) | 2008-08-12 | 2008-08-12 | Virtual metering |
US12/228,394 | 2008-08-12 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2010019476A2 true WO2010019476A2 (en) | 2010-02-18 |
WO2010019476A3 WO2010019476A3 (en) | 2010-05-27 |
Family
ID=41509033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2009/053174 WO2010019476A2 (en) | 2008-08-12 | 2009-08-07 | Improvements in virtual metering |
Country Status (3)
Country | Link |
---|---|
US (1) | US7937247B2 (en) |
EP (1) | EP2321657B1 (en) |
WO (1) | WO2010019476A2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014099148A1 (en) * | 2012-12-17 | 2014-06-26 | Itron, Inc. | Virtual cluster meter (vcm) |
WO2014131525A1 (en) * | 2013-03-01 | 2014-09-04 | Technische Universität Braunschweig | Method and device for generating counter signals |
US9082291B2 (en) | 2012-12-17 | 2015-07-14 | Itron, Inc. | Virtual metering with partitioned metrology |
FR3016968A1 (en) * | 2014-01-30 | 2015-07-31 | Keops Performance | SYSTEM FOR ESTIMATING ENERGY OR FLUID CONSUMPTION BY AT LEAST ONE EQUIPMENT OF A NETWORK |
US9677907B2 (en) | 2013-03-14 | 2017-06-13 | Itron Inc | Intelligent receptacle |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110001356A1 (en) * | 2009-03-31 | 2011-01-06 | Gridpoint, Inc. | Systems and methods for electric vehicle grid stabilization |
JP5187278B2 (en) * | 2009-06-17 | 2013-04-24 | 富士通株式会社 | Abnormal part identification program, abnormal part identification device, abnormal part identification method |
US20110264418A1 (en) * | 2010-04-21 | 2011-10-27 | Sentilla Corporation, Inc. | Determining electrical consumption in a facility |
US20120109716A1 (en) * | 2010-11-03 | 2012-05-03 | International Business Machines Corporation | Analyzing utility consumption |
US8799481B2 (en) | 2011-09-14 | 2014-08-05 | General Electric Company | Method and system for detection of communication activities of a meter board |
US9015326B2 (en) | 2011-09-14 | 2015-04-21 | General Electric Company | Method and system for managing power consumption of a meter during communication activities |
US8719681B2 (en) | 2011-09-14 | 2014-05-06 | General Electric Company | Diagnostic tool for metrology errors caused by communication activities |
US20130111013A1 (en) * | 2011-10-31 | 2013-05-02 | Jan Besehanic | Systems, methods, and apparatus to identify media presentation devices |
JP6056576B2 (en) * | 2013-03-18 | 2017-01-11 | 富士通株式会社 | Method and apparatus for identifying interrupt factor |
US11328344B2 (en) | 2013-05-31 | 2022-05-10 | Itron, Inc. | Utility application delivery platform |
US10205769B2 (en) | 2013-05-31 | 2019-02-12 | Itron, Inc. | Distributed applications across platforms |
US9342288B2 (en) | 2013-05-31 | 2016-05-17 | Itron, Inc. | Surfacing cross platform applications |
US9897647B2 (en) * | 2015-05-27 | 2018-02-20 | Eaton Corporation | Method and apparatus to commission voltage sensors and branch circuit current sensors for branch circuit monitoring systems |
US10371730B2 (en) * | 2015-12-28 | 2019-08-06 | Veris Industries, Llc | Branch current monitor with client level access |
US10809682B2 (en) | 2017-11-15 | 2020-10-20 | Johnson Controls Technology Company | Building management system with optimized processing of building system data |
US11281169B2 (en) * | 2017-11-15 | 2022-03-22 | Johnson Controls Tyco IP Holdings LLP | Building management system with point virtualization for online meters |
US11105528B2 (en) | 2017-11-15 | 2021-08-31 | Johnson Controls Tyco IP Holdings LLP | Building management system with automatic synchronization of point read frequency |
US11282369B2 (en) | 2018-07-06 | 2022-03-22 | Schneider Electric USA, Inc. | Systems and methods for managing voltage event alarms in an electrical system |
US10803733B2 (en) * | 2018-07-06 | 2020-10-13 | Schneider Electric USA, Inc. | Systems and methods for managing voltage event alarms in an electrical system |
US11211792B2 (en) | 2018-07-06 | 2021-12-28 | Schneider Electric USA, Inc. | Supplemental techniques for characterizing power quality events in an electrical system |
US11221353B2 (en) * | 2018-07-06 | 2022-01-11 | Schneider Electric USA, Inc. | Systems and methods for analyzing power quality events in an electrical system |
US11480596B2 (en) | 2020-11-12 | 2022-10-25 | Schneider Electric USA, Inc. | Systems and methods for verifying and maintaining accuracy of metering devices |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1217381A2 (en) * | 2000-12-20 | 2002-06-26 | Siemens Power Transmission & Distribution LLC | Multiple virtual meters in one physical meter |
US7272518B2 (en) * | 2005-07-01 | 2007-09-18 | Square D Company | Automated hierarchy classification in utility monitoring systems |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8036999B2 (en) * | 2007-02-14 | 2011-10-11 | Isagacity | Method for analyzing and classifying process data that operates a knowledge base in an open-book mode before defining any clusters |
EP2217886B1 (en) | 2007-11-05 | 2019-01-16 | Schneider Electric USA, Inc. | Improvements in hierarchy determination for power monitoring systems |
-
2008
- 2008-08-12 US US12/228,394 patent/US7937247B2/en active Active
-
2009
- 2009-08-07 WO PCT/US2009/053174 patent/WO2010019476A2/en active Application Filing
- 2009-08-07 EP EP09791301.6A patent/EP2321657B1/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1217381A2 (en) * | 2000-12-20 | 2002-06-26 | Siemens Power Transmission & Distribution LLC | Multiple virtual meters in one physical meter |
US7272518B2 (en) * | 2005-07-01 | 2007-09-18 | Square D Company | Automated hierarchy classification in utility monitoring systems |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014099148A1 (en) * | 2012-12-17 | 2014-06-26 | Itron, Inc. | Virtual cluster meter (vcm) |
US9082291B2 (en) | 2012-12-17 | 2015-07-14 | Itron, Inc. | Virtual metering with partitioned metrology |
US9747786B2 (en) | 2012-12-17 | 2017-08-29 | Itron, Inc. | Virtual cluster meter (VCM) |
WO2014131525A1 (en) * | 2013-03-01 | 2014-09-04 | Technische Universität Braunschweig | Method and device for generating counter signals |
US9677907B2 (en) | 2013-03-14 | 2017-06-13 | Itron Inc | Intelligent receptacle |
US10309800B2 (en) | 2013-03-14 | 2019-06-04 | Itron, Inc. | Intelligent receptacle |
FR3016968A1 (en) * | 2014-01-30 | 2015-07-31 | Keops Performance | SYSTEM FOR ESTIMATING ENERGY OR FLUID CONSUMPTION BY AT LEAST ONE EQUIPMENT OF A NETWORK |
Also Published As
Publication number | Publication date |
---|---|
WO2010019476A3 (en) | 2010-05-27 |
US7937247B2 (en) | 2011-05-03 |
EP2321657A2 (en) | 2011-05-18 |
US20100042372A1 (en) | 2010-02-18 |
EP2321657B1 (en) | 2016-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7937247B2 (en) | Virtual metering | |
EP2217886B1 (en) | Improvements in hierarchy determination for power monitoring systems | |
EP1900076B1 (en) | Automated precision alignment of data in a utility monitoring system | |
EP1913523B1 (en) | Automated hierarchy classification in utility monitoring systems | |
US9575475B2 (en) | Systems and methods for generating an energy usage model for a building | |
CN106338706B (en) | A kind of methods, devices and systems of electric energy metering device global error detection | |
US10261485B2 (en) | Systems and methods for detecting changes in energy usage in a building | |
RU2428708C2 (en) | Calibration method and system of measuring instruments | |
US10598705B2 (en) | Method and apparatus for monitoring power transmission | |
JP5644774B2 (en) | Power measurement system, power measurement method, and information processing apparatus | |
CN105247374B (en) | Using the measurement of Temperature Distribution weighting and the method and system of checking | |
WO2007005549A1 (en) | Automated integration of data in utility monitoring systems | |
CN106569164A (en) | Method and system for synchronization testing of electric quantity of double-core electric energy meter | |
Špelko et al. | CIGRE/CIRED JWG C4. 42: Overview of common methods for assessment of harmonic contribution from customer installation | |
KR102036166B1 (en) | Apparatus method for predicting and correcting meter reading data in a range not reading | |
CN114779154B (en) | Smart electric meter data time scale calibration method and device based on temporal analysis | |
CN111998918A (en) | Error correction method, error correction device and flow sensing system | |
CN103155476B (en) | Fixed frequency analog digital conversion is used to quantify the input sampled by interpolation | |
US8744787B2 (en) | Dynamic load estimation of multiple branch circuits | |
EP2912477B1 (en) | Device and method for determining an individual power representation of operation states | |
Akinsooto et al. | Energy savings reporting and uncertainty in Measurement & Verification | |
JP6213166B2 (en) | Unknown parameter estimation method, unknown parameter program, and unknown parameter estimation device | |
Woodall | SMART 2011/0072: methodology for energy efficiency mea-surements applicable to ICT in buildings (eeMeasure) | |
Benedá et al. | An Proposal to Energy Consumption Estimation of Residential Loads based on State Sensors Devices | |
CN113358192A (en) | Detecting abnormal metering drift in a flow meter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09791301 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REEP | Request for entry into the european phase |
Ref document number: 2009791301 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009791301 Country of ref document: EP |