WO2009129240A2 - Selective zonal testing using a coiled tubing deployed submersible pump - Google Patents

Selective zonal testing using a coiled tubing deployed submersible pump Download PDF

Info

Publication number
WO2009129240A2
WO2009129240A2 PCT/US2009/040526 US2009040526W WO2009129240A2 WO 2009129240 A2 WO2009129240 A2 WO 2009129240A2 US 2009040526 W US2009040526 W US 2009040526W WO 2009129240 A2 WO2009129240 A2 WO 2009129240A2
Authority
WO
WIPO (PCT)
Prior art keywords
coiled tubing
formation
submersible pump
packer
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2009/040526
Other languages
French (fr)
Other versions
WO2009129240A3 (en
Inventor
Hisham Abou El Azm
Agha Hassan Akram
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Original Assignee
Schlumberger Canada Ltd
Services Petroliers Schlumberger SA
Schlumberger Technology BV
Schlumberger Technology Corp
Schlumberger Holdings Ltd
Prad Research and Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd, Services Petroliers Schlumberger SA, Schlumberger Technology BV, Schlumberger Technology Corp, Schlumberger Holdings Ltd, Prad Research and Development Ltd filed Critical Schlumberger Canada Ltd
Publication of WO2009129240A2 publication Critical patent/WO2009129240A2/en
Publication of WO2009129240A3 publication Critical patent/WO2009129240A3/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/128Adaptation of pump systems with down-hole electric drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Definitions

  • This invention is generally related to the testing of hydrocarbon wells, and more particularly to methods and apparatus associated with the testing of hydrocarbon wells that utilize a submersible pump deployed on coiled tubing to transport the hydrocarbons from the formation up the wellbore.
  • PTA pressure transient analysis
  • the coiled tubing is run down the well with a downhole assembly comprising one or more sensors and any other equipment and instruments needed during the well test.
  • a packer (seal cups, swab cup assemblies or set of packers) included in the coiled tubing bottomhole assembly is normally set above the formation, in the case of one packer/seal cup or straddling the formation in the case of two packers, one top packer and a lower swab cup or two swab cup assemblies.
  • Included in this bottomhole assembly (referred to as a "BHA" and also known as a downhole assembly) are one or more gauges that are used to acquire the downhole pressure and temperature.
  • the present invention aims to describe an apparatus and a method for testing wells that have, without assistance, insufficient reservoir drive to enable sufficient fluid flow to surface as to generate enough information in order to representatively test the well.
  • the present invention comprises an apparatus for measuring a property of a formation comprising a coiled tubing unit having one or more downhole sensors capable of being lowered into a wellbore, a submersible pump capable of being lowered into a wellbore by the coiled tubing unit, means to power the submersible pump and a packer lowered into the wellbore by the coiled tubing unit to isolate a formation of interest.
  • the apparatus may further comprise surface well testing equipment capable of measuring flow rate data, means for transmitting the sensor measurements to a server capable of collecting, storing, and retransmitting the measured data, and means for transmitting the measurements to a processing unit capable of calculating the properties of the formation.
  • the apparatus of the present invention includes at least one sensor to be lowered into the wellbore by the coiled tubing unit, wherein the sensors are selected from a group of sensors that measure pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation.
  • the apparatus of the present invention includes a submersible pump.
  • the submersible pump may be powered by a submersible pump cable lowered from surface along with the coiled tubing.
  • the submersible pump cable may or may not be clamped to the outside of the coiled tubing along its length.
  • the submersible pump cable may or may not be clamped to the coiled tubing as the coiled tubing is lowered into a wellbore. If the submersible pump cable is to be clamped to the coiled tubing as it is lowered into the wellbore, a work window device designed to be deployed together with the coiled tubing pressure control equipment that allows access to both the coiled tubing and the submersible pump cable may be used.
  • the work window can be closed to preserve pressure integrity of the surface pressure control system when desired.
  • the submersible pump cable may or may not be deployed through a stuffing box to preserve pressure integrity of the surface pressure control system.
  • a packer is located below the submersible pump.
  • the packer may be a straddle type packer, wherein the straddle packer has a pup joint in between that allows fluid from the outside to enter the pup joint.
  • the pup joint that allows fluid from the outside to enter the pup joint may be a perforated or slotted pup joint situated in between the straddle packer.
  • An alternate apparatus of the present invention may have one packer and further comprise a pup joint that allows fluid from the outside to enter the pup joint and a swab cup or flow restrictor assembly below the pup joint.
  • the apparatus has at least one sensor located inside the joint below the packer or located inside the joint above the pup joint in between the straddle packer that allows fluid to enter.
  • the sensors are selected from a group of sensors that measure pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation.
  • the apparatus may have at least one pressure and temperature sensor located in the submersible pump.
  • a safety valve may be located above the submersible pump and an emergency release sub may also be located above or below the submersible pump.
  • the present invention also comprises a method of servicing a hydrocarbon well using one or more sensors, a packer or straddle packer and a submersible pump all lowered on coiled tubing into a well that penetrates a formation; and surface well testing equipment, that includes determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; treating the formation by pumping fluid into the formation using the coiled tubing; and repeating the determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; wherein the coiled tubing remains deployed within the well throughout the determining, treating, and repeating the determining processes.
  • the method of servicing a hydrocarbon well described above may resolve a property of the formation determined while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; which may be included within a report that is created prior to treating the formation by pumping fluid into the formation using the coiled tubing
  • a further embodiment of the present invention is a method of servicing a hydrocarbon well as described above wherein one or more process parameters in the treatment process of the formation by pumping fluid into the formation using the coiled tubing is determined based on determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing.
  • Figure 1 shows an example embodiment of the present invention.
  • Figure 2 shows an example embodiment of the present invention wherein the wellhead surface equipment rig up and a detail of the work window is shown.
  • Figure 3 shows one embodiment of the present invention's assembly that might be lowered into a wellbore for testing a formation.
  • Figure 1 shows an exemplary embodiment of the present invention, wherein a coiled tubing unit 10, lowers into a wellbore a submersible pump 75 via coiled tubing 14. Below the submersible pump 75 a packer 16 is activated to isolate a particular formation to be tested. As used herein, the term "packer” can also alternatively refer to swab cup or seal cup assemblies that serve the same purpose of isolating regions on opposing sides of the packer.
  • the submersible pump 75 is activated to assist fluid from the formation to flow in sufficient quantity as to test the formation.
  • a set of sensors 77 is integrated into the bottomhole assembly of the coiled tubing.
  • a submersible pump cable spooling unit 12 feeds the submersible pump cable 75 through a T sub 19 located in the surface pressure equipment 20, the submersible pump cable 75 is clamped to the coiled tubing 14 using a work window 13 to access both the coiled tubing 14 and the submersible pump cable 75.
  • One or more properties of the formation are measured by the sensors 17, such properties by way of example but not to limit this disclosure are pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation.
  • the surface well testing equipment 77 measures flow rate data on the surface.
  • FIG. 2 shows an exemplary embodiment of the present invention, wherein most of the surface pressure equipment is shown.
  • the submersible pump cable 22 enters the surface pressure equipment via a T sub, which may or may not have means to control pressure such as a stuffing box, and it is accessed through a work window 23.
  • the work window 23 is used to access the coiled tubing 21 and the submersible pump cable 22 to be able to clamp the submersible pump cable to the coiled tubing 21 using a clamp 24.
  • the work window can be closed if and when desired, to preserve the pressure integrity of the surface pressure control equipment.
  • Figure 3 depicts an exemplary embodiment of the present invention, wherein an example of a coiled tubing bottomhole assembly for the current invention is shown.
  • the bottomhole assembly is lowered into the wellbore and positioned in place in front of the formation to be studied by coiled tubing 30.
  • the submersible pump cable 31 is lowered along with the coiled tubing 30 to provide power to the submersible pump 32 and to allow communication between the sensors housed in the bottomhole assembly and the surface processing unit.
  • the sensors may be housed above, below or in the submersible pump.
  • the sensors 35 are housed in a pup joint above the joint 35 that is designed to allow fluid to enter the system. Joint 35 is designed to allow fluid to enter the system and it is often called a perforated or slotted pup joint.
  • a safety valve 33 is deployed below the pump, the safety valve can be closed if needed to restrict fluid from entering the coiled tubing.
  • This is a common safety practice within the industry.
  • an emergency release sub 39 is depicted below the safety valve 33.
  • a shear activated release sub is commonly used. Its function is to release the assembly situated above the emergency release sub 39, should the operation need to do so (for example a stuck packer 34), from the assembly situated below the emergency release sub 39 hence freeing the coiled tubing 30 to be retrieved to surface.
  • a packer 34 to isolate the open formation 36 to be tested, the packer 34 can be replaced by a swab cup or seal cup assembly.
  • Below packer 34 are a series of joints, the number and length of joints will depend on the length of the open formation to be tested plus a predetermined extra length of joints to provide a safety margin. Among these joints is a joint that allows fluid to enter the bottomhole assembly.
  • a swab cup or seal cup assembly 37 As shown in figure 3, can be used; alternatively a second packer (i.e. a straddle packer, not shown) can be used replacing the shown swab cup assembly.
  • a person of ordinary skill in the art will recognize the use and functionality of surface pressure control equipment as a device or group of devices designed to contain fluid under pressure inside a wellbore while related equipment is moved in or out of the wellbore.
  • the first is a device to restrict fluid from entering the coiled tubing and the second device is used to release the assembly situated above the emergency release sub should the operation need to do so from the assembly situated below the emergency release sub.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

An apparatus for measuring a property of a formation comprising a coiled tubing unit having one or more downhole sensors capable of being lowered into a wellbore, a submersible pump capable of being lowered into a wellbore by the coiled tubing unit, means to power the submersible pump, and a packer lowered into the wellbore by the coiled tubing unit to isolate a formation. A method of servicing a hydrocarbon well using one or more sensors, one or more packers, and a submersible pump, all lowered on coiled tubing into a well that penetrates a predetermined formation; and using surface well testing equipment, determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; treating the formation by pumping fluid into the formation using the coiled tubing; and repeating the determining a property of the formation while flowing the well as described above, wherein the coiled tubing remains deployed within the well throughout the determining, treating, and repeating the determining processes.

Description

SELECTIVE ZONAL TESTING USING A COILED TUBING DEPLOYED SUBMERSIBLE PUMP
Field of the Invention:
[0001] This invention is generally related to the testing of hydrocarbon wells, and more particularly to methods and apparatus associated with the testing of hydrocarbon wells that utilize a submersible pump deployed on coiled tubing to transport the hydrocarbons from the formation up the wellbore.
Background of the Invention:
[0002] When a well is producing hydrocarbons to surface and its performance is not as expected, the well is often tested to determine the direct causation of this lack of flow rate. This is normally characterized by a dimensionless factor called skin, which quantifies the production efficiency of a formation. The wellbore damage or flow restriction must then be assessed to determine an appropriate method to treat the damage effectively. This damage can be the result of many conditions such as but not limited to solid or mud-filtrate invasion, perforating debris, inadequate perforations, near or far wellbore damage and low permeability formations. Stimulation methods such as fracturing or acidizing are typically used to attempt to increase formation productivity. Another test may be performed after stimulation to evaluate the effectiveness of the treatment.
[0003] To properly treat a damaged well, we first need to understand the origin and nature of the damage. One way to achieve this is by analyzing well test data.
[0004] One of the preferred methods used in well test interpretation is pressure transient analysis (also called "PTA"). This method combines flow rate and bottomhole pressure measurements obtained by flowing the well through instruments at the surface and by recording the bottomhole pressure with the well shut-in. Both measurements (flowing and shut-in) are recorded at one or a plurality of time periods depending on the complexity of the study. The pressure and pressure derivative curves are compared to known type-curves to determine the skin and permeability. After the treatment is formulated and executed, a post stimulation test may be conducted to record a final skin.
[0005] To better understand the reservoir using surface well testing and coiled tubing stimulating services to optimize production, the two services can be integrated. The ability to evaluate, treat, and test a well has been a long desired industry goal.
[0006] This can be accomplished by using enhanced Coiled Tubing Services as the means to stimulate and test a well. The coiled tubing is run down the well with a downhole assembly comprising one or more sensors and any other equipment and instruments needed during the well test. A packer (seal cups, swab cup assemblies or set of packers) included in the coiled tubing bottomhole assembly is normally set above the formation, in the case of one packer/seal cup or straddling the formation in the case of two packers, one top packer and a lower swab cup or two swab cup assemblies. Included in this bottomhole assembly (referred to as a "BHA" and also known as a downhole assembly) are one or more gauges that are used to acquire the downhole pressure and temperature.
[0007] The coiled tubing can now transport fluids to and from the well (allowing acidizing or fracturing fluids to be pumped into the well and allowing reservoir fluids from the well to flow to the surface, etc.) with the assistance of surface equipment where the flow rate is measured. To test, stimulate, and test again all through coiled tubing offers a great reduction in rig time and a much needed method to understand complex wells. [0008] The use of coiled tubing as a mean to well test a particular formation is not new to the industry. Such operations are disclosed in several U.S. patents mentioned hereinafter and included in their entirety by reference such as: U.S. Patent No. 5,287,741 entitled "Methods of Perforating and Testing Wells Using Coiled Tubing", issued February 22, 1994 to Schultz et al; U.S. Patent No. 5,638,904 entitled "Safeguarded Method and Apparatus for Fluid Communication Using Coiled Tubing, With Application to Drill Stem Testing", issued June 17, 1997 to Misselbrook and Sask; U.S. Patent No. 6,520,255 entitled "Method and apparatus for stimulation of multiple formation intervals", issued on February. 18, 2003 to Randy C. Tolman et al; U.S. Patent No. 6,959,763 entitled "Method and apparatus for integrated horizontal selective testing of wells", issued on November 1, 2005 to Hook and Ramsey; U.S. Patent No. 6,675,892 entitled "Well Testing Using Multiple Pressure Measurements" issued on June 13, 2004 to Fikri Kuchuk, et al.; and Published U.S. Patent Application No. 20070044960 entitled "Methods, systems and apparatus for coiled tubing testing" published on March 1, 2007 on behalf of John Lovell et al.
[0009] However a large percentage of wells currently on production or waiting to be studied are sufficiently depleted or the damage is so extensive that the reservoir pressure is not enough to drive the flow of formation fluids out to surface by itself in adequate volumes (if any at all) to perform a representative test.
[0010] The present invention aims to describe an apparatus and a method for testing wells that have, without assistance, insufficient reservoir drive to enable sufficient fluid flow to surface as to generate enough information in order to representatively test the well.
Summary of the Invention:
[0011] The present invention comprises an apparatus for measuring a property of a formation comprising a coiled tubing unit having one or more downhole sensors capable of being lowered into a wellbore, a submersible pump capable of being lowered into a wellbore by the coiled tubing unit, means to power the submersible pump and a packer lowered into the wellbore by the coiled tubing unit to isolate a formation of interest. The apparatus may further comprise surface well testing equipment capable of measuring flow rate data, means for transmitting the sensor measurements to a server capable of collecting, storing, and retransmitting the measured data, and means for transmitting the measurements to a processing unit capable of calculating the properties of the formation.
[0012] The apparatus of the present invention includes at least one sensor to be lowered into the wellbore by the coiled tubing unit, wherein the sensors are selected from a group of sensors that measure pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation.
[0013] The apparatus of the present invention includes a submersible pump. The submersible pump may be powered by a submersible pump cable lowered from surface along with the coiled tubing. The submersible pump cable may or may not be clamped to the outside of the coiled tubing along its length. The submersible pump cable may or may not be clamped to the coiled tubing as the coiled tubing is lowered into a wellbore. If the submersible pump cable is to be clamped to the coiled tubing as it is lowered into the wellbore, a work window device designed to be deployed together with the coiled tubing pressure control equipment that allows access to both the coiled tubing and the submersible pump cable may be used. The work window can be closed to preserve pressure integrity of the surface pressure control system when desired. The submersible pump cable may or may not be deployed through a stuffing box to preserve pressure integrity of the surface pressure control system. [0014] In one embodiment of the present invention, a packer is located below the submersible pump. The packer may be a straddle type packer, wherein the straddle packer has a pup joint in between that allows fluid from the outside to enter the pup joint. The pup joint that allows fluid from the outside to enter the pup joint may be a perforated or slotted pup joint situated in between the straddle packer.
[0015] An alternate apparatus of the present invention may have one packer and further comprise a pup joint that allows fluid from the outside to enter the pup joint and a swab cup or flow restrictor assembly below the pup joint.
[0016] The apparatus has at least one sensor located inside the joint below the packer or located inside the joint above the pup joint in between the straddle packer that allows fluid to enter. The sensors are selected from a group of sensors that measure pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation.
[0017] In one embodiment, the apparatus may have at least one pressure and temperature sensor located in the submersible pump. A safety valve may be located above the submersible pump and an emergency release sub may also be located above or below the submersible pump.
[0018] The present invention also comprises a method of servicing a hydrocarbon well using one or more sensors, a packer or straddle packer and a submersible pump all lowered on coiled tubing into a well that penetrates a formation; and surface well testing equipment, that includes determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; treating the formation by pumping fluid into the formation using the coiled tubing; and repeating the determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; wherein the coiled tubing remains deployed within the well throughout the determining, treating, and repeating the determining processes. The method of servicing a hydrocarbon well described above may resolve a property of the formation determined while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; which may be included within a report that is created prior to treating the formation by pumping fluid into the formation using the coiled tubing
[0019] A further embodiment of the present invention is a method of servicing a hydrocarbon well as described above wherein one or more process parameters in the treatment process of the formation by pumping fluid into the formation using the coiled tubing is determined based on determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing.
Brief description of the drawings: [0020] The present invention is illustrated by way of example and not intended to be limited by the figures of the accompanying drawings in which like references indicate similar elements and in which:
[0021] Figure 1 shows an example embodiment of the present invention.
[0022] Figure 2 shows an example embodiment of the present invention wherein the wellhead surface equipment rig up and a detail of the work window is shown.
[0023] Figure 3 shows one embodiment of the present invention's assembly that might be lowered into a wellbore for testing a formation.
Detailed description of the invention:
[0024] Figure 1 shows an exemplary embodiment of the present invention, wherein a coiled tubing unit 10, lowers into a wellbore a submersible pump 75 via coiled tubing 14. Below the submersible pump 75 a packer 16 is activated to isolate a particular formation to be tested. As used herein, the term "packer" can also alternatively refer to swab cup or seal cup assemblies that serve the same purpose of isolating regions on opposing sides of the packer. The submersible pump 75 is activated to assist fluid from the formation to flow in sufficient quantity as to test the formation. A set of sensors 77 is integrated into the bottomhole assembly of the coiled tubing. A submersible pump cable spooling unit 12 feeds the submersible pump cable 75 through a T sub 19 located in the surface pressure equipment 20, the submersible pump cable 75 is clamped to the coiled tubing 14 using a work window 13 to access both the coiled tubing 14 and the submersible pump cable 75. One or more properties of the formation are measured by the sensors 17, such properties by way of example but not to limit this disclosure are pressure, temperature, flowrate, spectroscopy, viscosity, H2S concentration, CO2 concentration, bubble count, a dielectric property, gas/oil ratio, water/gas ratio, water/oil ratio and gamma ray radiation. The surface well testing equipment 77 measures flow rate data on the surface.
[0025] Figure 2 shows an exemplary embodiment of the present invention, wherein most of the surface pressure equipment is shown. The submersible pump cable 22 enters the surface pressure equipment via a T sub, which may or may not have means to control pressure such as a stuffing box, and it is accessed through a work window 23. The work window 23 is used to access the coiled tubing 21 and the submersible pump cable 22 to be able to clamp the submersible pump cable to the coiled tubing 21 using a clamp 24. The work window can be closed if and when desired, to preserve the pressure integrity of the surface pressure control equipment. [0026] Figure 3 depicts an exemplary embodiment of the present invention, wherein an example of a coiled tubing bottomhole assembly for the current invention is shown. The bottomhole assembly is lowered into the wellbore and positioned in place in front of the formation to be studied by coiled tubing 30. The submersible pump cable 31 is lowered along with the coiled tubing 30 to provide power to the submersible pump 32 and to allow communication between the sensors housed in the bottomhole assembly and the surface processing unit. The sensors may be housed above, below or in the submersible pump. In the example shown in Figure 3, the sensors 35 are housed in a pup joint above the joint 35 that is designed to allow fluid to enter the system. Joint 35 is designed to allow fluid to enter the system and it is often called a perforated or slotted pup joint. In the present example embodiment shown in Figure 3, a safety valve 33 is deployed below the pump, the safety valve can be closed if needed to restrict fluid from entering the coiled tubing. This is a common safety practice within the industry. Below the safety valve 33, an emergency release sub 39 is depicted. A shear activated release sub is commonly used. Its function is to release the assembly situated above the emergency release sub 39, should the operation need to do so (for example a stuck packer 34), from the assembly situated below the emergency release sub 39 hence freeing the coiled tubing 30 to be retrieved to surface. Also shown in Figure 3 is a packer 34 to isolate the open formation 36 to be tested, the packer 34 can be replaced by a swab cup or seal cup assembly. Below packer 34 are a series of joints, the number and length of joints will depend on the length of the open formation to be tested plus a predetermined extra length of joints to provide a safety margin. Among these joints is a joint that allows fluid to enter the bottomhole assembly. To straddle the formation 36 to be tested, a swab cup or seal cup assembly 37, as shown in figure 3, can be used; alternatively a second packer (i.e. a straddle packer, not shown) can be used replacing the shown swab cup assembly. [0027] A person of ordinary skill in the art will recognize the use and functionality of surface pressure control equipment as a device or group of devices designed to contain fluid under pressure inside a wellbore while related equipment is moved in or out of the wellbore. Accordingly a person of ordinary skill in the art will recognize the use and functionality of a coiled tubing safety valve and a emergency release sub. The first is a device to restrict fluid from entering the coiled tubing and the second device is used to release the assembly situated above the emergency release sub should the operation need to do so from the assembly situated below the emergency release sub.
[0028] While the invention is described through the above exemplary embodiments, it will be understood by those of ordinary skill in the art that modification to and variation of the illustrated embodiments may be made without departing from the inventive concepts herein disclosed. It would be possible, for instance, to use a battery operated pump and a wireless communication system to start the test; a fluid sample chamber may be lowered into the wellbore; seal cups or swab cup assemblies can be used instead of packer or straddle packer; the position of the sensors, emergency release sub, packers, pup joints, safety valves, etc can vary in it relative position to each other and the amount thereof used in the string as described in the above exemplary embodiments. Accordingly, the invention should not be viewed as limited except by the scope of the appended claims.

Claims

Claims:
1. An apparatus for measuring a property of a formation comprising: i. a coiled tubing unit having one or more downhole sensors capable of being lowered into a wellbore; ii. a submersible pump capable of being lowered into a wellbore by said coiled tubing unit; iii. means to power the submersible pump; and, iv. a packer lowered into said wellbore by said coiled tubing unit to isolate a formation.
2. An apparatus as in claim 1, further comprising surface well testing equipment capable of measuring flow rate data.
3. An apparatus as in claim 1, further comprising means for transmitting said sensors measurements to a server capable of collecting, storing, and retransmitting the measured data.
4. An apparatus as in claim 1, further comprising means for transmitting the measurements to a processing unit capable of calculating the properties of the formation.
5. An apparatus as in claim 1, wherein said sensors are sensors from the group comprising pressure, temperature, flow, spectroscopy, viscosity, H2S, CO2, bubble count, dielectric, venturi, gas/oil ratio, water/gas ratio, water/oil ratio and gamma.
6. An apparatus as in claim 1, wherein said submersible pump is powered by a cable lowered from surface with the coiled tubing.
7. An apparatus as in claim 6, wherein said submersible pump cable is clamped to the outside of the coiled tubing and along its length.
8. An apparatus as in claim 7, wherein said cable is clamped to the coiled tubing as the coiled tubing is lowered into a wellbore.
9. An apparatus as in claim 7, wherein said cable is clamped to the coiled tubing through a work window device designed to be deployed together with the coiled tubing surface pressure control equipment that allows access to both the coiled tubing and the submersible pump cable; said work window can be closed to preserve pressure integrity of the surface pressure control system when desired.
10. An apparatus as in claim 6, wherein the submersible pump cable is deployed through a stuffing box to preserve pressure integrity of the surface pressure control system.
11. An apparatus as in claim 1 , wherein the packer is located below the submersible pump.
12. An apparatus as in claim 1, wherein the packer is a straddle type packer.
13. An apparatus as in claim 12, wherein the straddle packer has a pup joint in between said straddle packer that allows fluid from the outside to enter said pup joint.
14. An apparatus as in claim 12, wherein the straddle packer has a perforated or slotted pup joint in between said straddle packer.
15. An apparatus as in claim 1, further comprising a pup joint that allows fluid from the outside to enter said pup joint and a swab cup assembly below said pup joint.
16. An apparatus as in claim 1 or 12, wherein the packer is replaced by a swab cup assembly.
17. An apparatus as in claim 1, wherein at least one pressure sensor is located inside the joint below the packer.
18. An apparatus as in claim 1, wherein at least one flow sensor is located inside the join below the packer.
19. An apparatus as in claim 1, wherein at least one Gas-Oil Ratio sensor is located inside the join below the packer.
20. An apparatus as in claim 1, wherein at least one temperature sensor is located inside the join below the packer.
21. An apparatus as in claim 1, wherein at least one pressure sensor is located inside the joint above the pup joint in between the straddle packer that allows fluid to enter.
22. An apparatus as in claim 1, wherein at least one flow sensor is located inside the join above the pup joint in between the straddle packer that allows fluid to enter.
23. An apparatus as in claim 1, wherein at least one Gas-Oil Ratio sensor is located inside the joint above the pup joint in between the straddle packer that allows fluid to enter.
24. An apparatus as in claim 1, wherein at least one temperature sensor is located inside the joint above the pup joint in between the straddle packer that allows fluid to enter.
25. An apparatus as in claim 1, where in at least one pressure and temperature sensor is located in the submersible pump.
26. An apparatus as in claim 1, wherein a safety valve is located above the submersible pump.
27. An apparatus as in claim 1, wherein an emergency release sub is located above the submersible pump.
28. A method of servicing a hydrocarbon well using one or more sensors, one or more packers, and a submersible pump, all lowered on coiled tubing into a well that penetrates a formation; and surface well testing equipment, comprising: i. determining a property of a formation while flowing the well assisted by said submersible pump and using flow data measured using said surface well testing equipment integrated with pressure data measured using said one or more sensors lowered into said well penetrating said formation on said coiled tubing; ii. treating said formation by pumping fluid into said formation using said coiled tubing; and iii. repeating said determining a property of a formation while flowing the well assisted by said submersible pump and using flow data measured using said surface well testing equipment integrated with pressure data measured using said one or more sensors lowered into said well penetrating said formation on said coiled tubing; wherein said coiled tubing remains deployed within said well throughout said determining, treating, and repeating said determining processes.
29. A method of servicing a hydrocarbon well in accordance with claim 28, wherein said property of said formation determined in process i) is included within a report that is created prior to process ii).
30. A method of servicing a hydrocarbon well in accordance with claim 28, wherein one or more process parameters in said treatment process ii) is determined based on said property of said formation determined in process i).
PCT/US2009/040526 2008-04-18 2009-04-14 Selective zonal testing using a coiled tubing deployed submersible pump Ceased WO2009129240A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/105,391 2008-04-18
US12/105,391 US20090260807A1 (en) 2008-04-18 2008-04-18 Selective zonal testing using a coiled tubing deployed submersible pump

Publications (2)

Publication Number Publication Date
WO2009129240A2 true WO2009129240A2 (en) 2009-10-22
WO2009129240A3 WO2009129240A3 (en) 2010-01-14

Family

ID=41199688

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2009/040526 Ceased WO2009129240A2 (en) 2008-04-18 2009-04-14 Selective zonal testing using a coiled tubing deployed submersible pump

Country Status (2)

Country Link
US (1) US20090260807A1 (en)
WO (1) WO2009129240A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013072261A1 (en) 2011-11-18 2013-05-23 Framo Engineering As Pressure testing of subsea modules using heat
WO2013102312A1 (en) * 2012-01-06 2013-07-11 兰州海默科技股份有限公司 Steam flow metering device and metering method therefor

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2010005562A (en) * 2007-11-30 2010-06-02 Schlumberger Technology Bv Downhole, single trip, multi-zone testing system and downhole testing method using such.
NO340502B1 (en) * 2013-03-05 2017-05-02 Mikias Amare Mebratu Wire line assisted coiled tubing portion and method for operating such coiled tubing portion
US10508512B2 (en) * 2017-09-28 2019-12-17 Baker Hughes, A Ge Company, Llc Insert safety valve system
US11746602B2 (en) * 2020-02-27 2023-09-05 Power Feed-Thru Systems And Connectors Llc Systems and methods for testing electrical properties of a downhole power cable
CN114810622A (en) * 2021-01-22 2022-07-29 深圳景嘉机电科技有限公司 Underground flow multi-parameter carrier method for submersible pump

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4192375A (en) * 1978-12-11 1980-03-11 Union Oil Company Of California Gravel-packing tool assembly
US4320800A (en) * 1979-12-14 1982-03-23 Schlumberger Technology Corporation Inflatable packer drill stem testing system
US4984634A (en) * 1990-02-26 1991-01-15 Dowell Schlumberger Incorporated Logging of subterranean wells using coiled tubing
US5137086A (en) * 1991-08-22 1992-08-11 Tam International Method and apparatus for obtaining subterranean fluid samples
GB2320588B (en) * 1995-08-30 1999-12-22 Baker Hughes Inc An improved electrical submersible pump and methods for enhanced utilization of electrical submersible pumps in the completion and production of wellbores
US6009216A (en) * 1997-11-05 1999-12-28 Cidra Corporation Coiled tubing sensor system for delivery of distributed multiplexed sensors
US6092598A (en) * 1998-08-17 2000-07-25 Camco International, Inc. Method and apparatus for measuring operating parameters of a submergible pumping system
US6116340A (en) * 1998-12-24 2000-09-12 Atlantic Richfield Company Downhole build-up pressure test using coiled tubing
US6325146B1 (en) * 1999-03-31 2001-12-04 Halliburton Energy Services, Inc. Methods of downhole testing subterranean formations and associated apparatus therefor
US20030196797A1 (en) * 2002-04-22 2003-10-23 Crawford James B. Coiled tubing having multiple strings of smaller tubing embedded therein
US20050274527A1 (en) * 2004-04-05 2005-12-15 Misselbrook John G Apparatus and method for dewatering low pressure gradient gas wells
US7617873B2 (en) * 2004-05-28 2009-11-17 Schlumberger Technology Corporation System and methods using fiber optics in coiled tubing
US7588080B2 (en) * 2005-03-23 2009-09-15 Baker Hughes Incorporated Method for installing well completion equipment while monitoring electrical integrity
US7717181B2 (en) * 2007-01-09 2010-05-18 Terry Bullen Artificial lift system
US20080302529A1 (en) * 2007-06-11 2008-12-11 Fowler Jr Stewart Hampton Multi-zone formation fluid evaluation system and method for use of same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013072261A1 (en) 2011-11-18 2013-05-23 Framo Engineering As Pressure testing of subsea modules using heat
WO2013102312A1 (en) * 2012-01-06 2013-07-11 兰州海默科技股份有限公司 Steam flow metering device and metering method therefor

Also Published As

Publication number Publication date
US20090260807A1 (en) 2009-10-22
WO2009129240A3 (en) 2010-01-14

Similar Documents

Publication Publication Date Title
US8418546B2 (en) In-situ fluid compatibility testing using a wireline formation tester
US8397817B2 (en) Methods for downhole sampling of tight formations
CA2193309C (en) Early evaluation system with pump and method of servicing a well
US7296462B2 (en) Multi-purpose downhole tool
US20090288824A1 (en) Multi-zone formation fluid evaluation system and method for use of same
US20080302529A1 (en) Multi-zone formation fluid evaluation system and method for use of same
US20070193741A1 (en) Method and Apparatus For Testing And Treatment Of A Completed Well With Production Tubing In Place
US20020066563A1 (en) Method and apparatus for continuously testing a well
US20090260807A1 (en) Selective zonal testing using a coiled tubing deployed submersible pump
US9181784B2 (en) Method and apparatus for logging a well below a submersible pump deployed on coiled tubing
WO1997035093A1 (en) Method and apparatus using coiled-in-coiled tubing
CA2962574C (en) Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool
US12012853B2 (en) Formation testing and sampling tool for stimulation of tight and ultra-tight formations
AU2015318192B2 (en) Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool
US20110168389A1 (en) Surface Controlled Downhole Shut-In Valve
WO2001027432A2 (en) Methods and apparatus for making measurements on fluids produced from underground formations
US11203918B2 (en) Oil well flowback with zero outflow
McAlister et al. A new system of tools for better control and interpretation of drill-stem tests
US12404768B2 (en) Zero flaring zonal formation testing with drill stem testing capabilities
RU2280158C1 (en) Method to perform survey of well provided with sucker-rod pump
WO2024211585A1 (en) Systems for deploying downhole gas-lift tracers

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09732801

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09732801

Country of ref document: EP

Kind code of ref document: A2