WO2009079160A1 - Optimizing drilling operations using petrotechnical data - Google Patents
Optimizing drilling operations using petrotechnical data Download PDFInfo
- Publication number
- WO2009079160A1 WO2009079160A1 PCT/US2008/084441 US2008084441W WO2009079160A1 WO 2009079160 A1 WO2009079160 A1 WO 2009079160A1 US 2008084441 W US2008084441 W US 2008084441W WO 2009079160 A1 WO2009079160 A1 WO 2009079160A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- well
- drilling
- earth model
- depth
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E21B41/0092—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Definitions
- Various techniques described herein are directed to a method for optimizing drilling operations.
- the method includes providing an earth model of a volume having a well, obtaining petrotechnical data about the volume while drilling the well, comparing the petrotechnical data with the earth model, updating the earth model with the petrotechnical data based on the comparison, and modifying a drilling plan of the well using the updated earth model.
- the earth model may be updated by performing a migration imaging process on the volume.
- the earth model may be updated by creating a three dimensional (3D) anisotropic depth model with the petrotechnical data, merging the 3D anisotropic depth model in depth sections, performing a prestack depth migration, performing tomographic anisotropic properties update, performing interpretation, performing inversion for pore pressure or lithology properties of the earth model, or combinations thereof.
- the drilling plan may be modified by comparing a subsurface image, property volume or interpretation, or combinations thereof, derived from the earth model with a subsurface image, property volume or interpretation, or combinations thereof, derived from the updated earth model; and generating a set of three dimensional (3D) or two dimensional (2D) coordinates for a well trajectory based on the comparison.
- the drilling plan may be modified by providing a design of a well trajectory, performing an economic and technical analysis of the well trajectory, changing an existing casing plan, defining a well construction based on the well trajectory, defining a well construction based on interpretations or properties derived from the updated earth model, or combinations thereof.
- providing the earth model may include: conducting an audit and feasibility study on the volume; and selecting the earth model based on the audit and feasibility study.
- Conducting the audit and feasibility study on the volume may include assessing the quality and relevance of available petrotechnical information regarding the volume.
- the available petrotechnical information regarding the volume may include reports or documentations pertaining to the subsurface structure and properties at or around the volume.
- Selecting the earth model based on the audit and feasibility study may include selecting the earth model that is most congruent with the available petrotechnical information regarding the volume.
- Conducting the audit and feasibility study on the volume may include performing forward modeling on earth models and seismic images of the volume.
- the forward modeling may include ray tracing, wavefield modeling or finite difference techniques or combinations thereof.
- the method may further include highgrading the earth model prior to drilling the well.
- Highgrading the earth model may include enhancing the resolution of the earth model. Enhancing the resolution of the selected earth model may include increasing the vertical and spatial sampling rate.
- highgrading the earth model may include enhancing the calibration of the earth model and enhancing the calibration of the earth model may include calibrating the earth model to depth.
- the petrotechnical data may include wellbore measurements, gravity acquisition data, borehole seismic data, electromagnetic survey data, surface seismic data or combinations thereof.
- the earth model is updated only if the variance between the petrotechnical data and the earth model exceeds a predetermined value.
- the method for optimizing drilling operations of a well may include highgrading an earth model of a volume having the well, obtaining petrotechnical data about the volume while drilling the well, comparing the petrotechnical data with the highgraded earth model, updating the highgraded earth model with the petrotechnical data based on the comparison, and modifying a drilling plan of the well using the updated highgraded earth model.
- Various techniques described herein are also directed to a method for conducting an audit and feasibility study for drilling operations.
- the method may include evaluating the quality and relevance of available petrotechnical information regarding a volume having a well to be drilled, performing a forward modeling on earth models and seismic images of the volume and generating a scenario plan for the well.
- Various techniques described herein are also directed to a method for providing a set of actions for modifying a drilling plan of a well.
- the method may include comparing a subsurface image, property volume or interpretation of an earth model of the well with a subsurface image, property volume or interpretation of an updated earth model; generating a set of three dimensional (3D) coordinates for a well trajectory based on the comparison; and modifying the drilling plan based on the well trajectory.
- Various techniques described herein are also directed to a method for updating an earth model of a volume having a well.
- the method may include creating a three dimensional anisotropic depth model; comparing the three dimensional anisotropic depth model with petrotechnical data obtained while drilling the well; determining whether the three dimensional anisotropic depth model deviates from the petrotechnical data by greater than a predetermined amount; and if the deviation exceeds the predetermined amount, then updating the three dimensional anisotropic depth model.
- Figure 1 illustrates a flow diagram of a method for optimizing drilling operations in accordance with implementations of various techniques described herein.
- Figure 2 illustrates a flow diagram of a method for conducting the audit and feasibility study in accordance with various implementations described herein.
- Figure 3 illustrates a process for generating the set of actions for modifying the drilling plan in accordance with implementations described herein.
- Figure 4 illustrates an example of a well trajectory that has been modified in accordance with various implementations described herein.
- Figure 5 illustrates a computing system, into which implementations of various techniques described herein may be implemented.
- Figure 6 illustrates a flow diagram of a method for performing a migration imaging process in accordance with implementations of various techniques described herein.
- FIG. 1 illustrates a flow diagram of a method 100 for optimizing drilling operations in accordance with implementations of various techniques described herein.
- an audit of available information regarding an earth volume having the planned well to be drilled and feasibility study of drilling the planned well may be conducted.
- implementations of various techniques are described with reference to a well, it should be understood that some implementations may be applied to a system of well bores, sidetracks, multi-laterals and the like.
- the quality and relevance of the available information may be assessed.
- the result of the audit and feasibility study may be used to minimize uncertainties and mitigate risks associated with drilling the planned well.
- Available information regarding the planned well may include reports or documentations pertaining to the subsurface structure and properties at or around the planned well. They may also include reports or documentations pertaining to offset wells. Such reports may include well logs, drilling reports, incident analysis, completion practices of offset wells, production history of offset wells and existing surface seismic data.
- Figure 2 illustrates a flow diagram of a method 200 for conducting the audit and feasibility study in accordance with various implementations described herein.
- the quality of existing seismic images, earth models, geologic models and reservoir models of the planned well and of offset wells and other petrotechnical data may be evaluated (step 210).
- petrotechnical data may refer to any reports or documentations obtained, wellbore measurements (e.g., sidetrack, multi-lateral or any well within the earth volume containing the planned well), gravity acquisition data, borehole acquired data (e.g., walkaway or 3D VSP), electromagnetic survey data or the assembled or updated earth model, images derived from the assembled or updated earth model in stacked or pre-stack domain, inversions or properties derived from the assembled or updated earth model, interpretations derived from the assembled or updated earth model, or any combinations thereof.
- Earth models may contain data that characterize the properties of geological features that form the earth's sub-surface, such as rock formations and faults.
- the data in an earth model may consist of measurements gathered during activities, such as the seismic, logging or drilling operations of the oil and gas industry, and of interpretations made from these measurements. The data may be gathered above, on, or below the earth's surface.
- the earth models to be evaluated are subsurface velocity models in the depth domain.
- the seismic images to be evaluated are prestack depth images.
- the earth models to be evaluated may be earth model property volumes. When evaluating earth models at the planned well or surrounding areas, vertical and spatial resolution of the earth models, structural constraints from surface geology and borehole measurements, borehole geologic imaging and the nature of model updates and calibration of the earth models by well logs and other available information may be evaluated.
- forward modeling may be performed on existing earth models of the earth volume, e.g., at the planned well and/or surrounding areas and seismic images of the planned well and/or surrounding areas (step 220).
- the forward modeling may be performed using ray tracing techniques or other seismic simulation techniques. In one implementation, this step may be performed to facilitate understanding whether the acquisition geometry illuminates the volume in which the planned well is located.
- a scenario plan for the drilling operation of the planned well may be created.
- the scenario plan may include evaluating and ranking risks associated with drilling the planned well and proposing appropriate contingency actions similar to an emergency response plan.
- the scenario plan may include recommendations for additional enhancements and/or interpretation of the subsurface earth model, such as prestack depth migration (PSDM) prior to drilling the well may be made.
- the scenario plan may include creating a fit-for-purpose catalog of migration algorithms for the construction of the well.
- the fit-for-purpose catalog of migration algorithms may include information on the quality and turn-around time (TAT) implication on the drilling operation.
- TAT quality and turn-around time
- the scenario plan may include establishing a pre-defined plan of earth model perturbations, which may facilitate understanding and quantifying possible impacts on the planned well trajectory as a result of changing seismic image volumes.
- a catalog of image volumes as a function of velocity field variations may be created. Such a catalog may be used as a look up utility while drilling, since it may include possible impacts in subsurface structural changes as a result of unexpected seismic velocity variations.
- the scenario plan may include revising the current well trajectory, preparing a drilling optimization contingency plan to reduce risk and minimize non productive time (NPT), workflows for inversion of reservoir properties for flowing wells, kicks, and the like.
- NPT non productive time
- the scenario plan may include integrating and visualizing well trajectory, predictive reservoir model, and resolved, calibrated depth imaged volumes to optimize well construction planning.
- the scenario plan may include using the seismic amplitude information to invert for material properties that can be vital not only to optimize ongoing drilling operations but also to assess reservoir sections yet to be drilled with respect to predicted hydrocarbon production and recovery.
- one earth model for the planned well and the surrounding areas based on the feasibility study may be selected.
- the earth model whose petrotechnical data are substantially similar or consistent is selected.
- the earth model whose gravity, borehole seismic, surface seismic and magnetotelluhc data provide substantially the same depth, volume and shape of the planned well is selected as the most accurate earth model.
- a determination may be made as to whether the selected earth model may be highgraded. This determination may be made based on the scenario plan created at step 230. If the answer is in the affirmative, then processing continues to step 130. Otherwise, processing skips step 130 and continues to step 140.
- the selected earth model may be highgraded.
- the resolution and/or calibration of the selected earth model may be enhanced.
- the resolution of the selected earth model may be enhanced, e.g., through multiple iterations of full 3D tomographic inversion.
- the resolution of the selected earth model may be enhanced by increasing the vertical and spatial sampling rate. The enhancement in resolution may improve the vertical, spatial and tomographic scale length resolution to levels required for various techniques to optimize drilling operations described herein.
- the selected earth model may be highgraded by calibrating the earth model to true depth, which may include obtaining wellbore measurements from nearby wells.
- the resolution and calibration of the selected earth model may be optimized in an iterative workflow using borehole-enhanced seismic processing techniques, measurements from offset wells and measurements from other sources, such as magnetotelluric, gravity and the like.
- the anisotropy components of the earth model may be calibrated. During this highgrading step, new earth models and images may be produced.
- a portion of the scenario plan may be modified.
- the integration and visualization of well trajectory, and predictive reservoir model may be modified using highgraded depth imaged volumes.
- drilling of the planned well may commence based on the scenario plan created at step 110.
- petrotechnical data regarding the earth volume may be obtained during drilling.
- the petrotechnical data obtained at step 150 may be compared with the highgraded earth model.
- the petrotechnical data may be compared with the results of the feasibility study conducted at step 110.
- the depth of the surface seismic data available from step 110 may be compared with the depth information obtained during drilling.
- the check-shot data may be compared with velocity data available from step 110.
- the lithology report may be compared with the lithology from the selected earth model.
- the petrotechnical data may be compared with the initial earth model selected at step 120.
- the petrotechnical data may be processed prior to being compared. For instance, the petrotechnical data may be processed to remove noise from the data.
- the comparison may be made on real time. In another implementation, the comparison may be made within a time period sufficient to modify or confirm the drilling plan.
- a determination may be made as to whether the deviation between the petrotechnical data obtained at step 150 and the initial selected earth model, the highgraded earth model or the results of the feasibility study exceeds a predetermined value. If the deviation is less than the predetermined value, then processing ends and the planned well is drilled according to the existing drilling plan. On the other hand, if the deviation exceeds the predetermined value, then processing continues to step 170.
- one or more set of actions may be performed based on the extent to which the petrotechnical data obtained at step 150 deviate from the highgraded earth model, the initial earth model or the results of the feasibility study.
- the set of actions may include techniques of various levels of technical sophistication for depth imaging, which may range from vertical stretching, map migration, post-stack depth migration to pre-stack depth migration. The magnitude of the deviation may be used to determine the action to be performed.
- the set of actions may be part of the scenario plan developed at step 230.
- the selected earth model may be updated, i.e., by relaunching the migration imaging process, when the wellbore measurements vary from the results of the feasibility study by a predetermined value, e.g., when the depth varies by more than 5%.
- the migration imaging process may range from creating a 3D anisotropic depth model, merging the 3D anisotropic depth model in depth sections, performing a prestack depth migration to performing tomographic anisotropic properties update.
- the level of technical sophistication and cost associated with the migration imaging process may be provided.
- the selected earth model may be updated using other types of measurements during drilling, e.g., gravity survey measurements, electromagnetic survey measurements and the like.
- the selected earth model may be updated at predetermined times in the drilling plan.
- FIG. 6 illustrates a flow diagram of a method 600 for performing a migration imaging process in accordance with implementations of various techniques described herein.
- the migration imaging process may be an iterative process.
- the earth model may be updated by creating a 3D anisotropic depth model.
- a comparison may then be made between the 3D anisotropic depth model and the petrotechnical data obtained at step 150, and a determination may be made as to whether the deviation exceeds a predetermined value. If the answer is in the affirmative, then the earth model may be updated using the petrotechnical data obtained during drilling (step 630). In one implementation, this updating step may include merging the 3D anisotropic depth model in depth sections.
- the updated earth model may then be used to perform a prestack depth migration (step 640).
- a determination may then be made as to whether the quality of the output of the prestack depth migration falls below a predetermined value (step 650).
- the "flatness" of the prestack depth gathers may be evaluated, i.e., a determination may be made as to whether the prestack depth gathers are substantially flat.
- the prestack depth stack may be compared against the petrotechnical data obtained during drilling (at step 150). The "focus" of the prestack depth stack may be interpreted prior to comparison.
- the errors of the residual moveout cube may be evaluated. If the quality of the output falls below the predetermined value, then the earth model may be further updated by performing a tomographic anisotropic properties update (step 660).
- a set of actions for modifying the well trajectory for drilling the planned well may be performed based on the updated earth model and information gained from the audit and feasibility study. In one implementation, steps 150 through 180 may continue as long as drilling is in progress.
- Figure 3 illustrates an example of the process 300 for performing the set of actions to modify the drilling plan in more detail.
- a comparison may be made between the subsurface image and property volume based on the updated earth model and the subsurface image and property volume based on the earth model prior to the update, e.g., the highgraded earth model.
- Variation between the subsurface image and property volume based on the updated earth model and the subsurface image and property volume based on the earth model prior to the update may be highlighted, characterized and interpreted in the context of the existing and future well location. The interpretation may be enhanced to include production related considerations, such as maximum reservoir contact, ultimate recovery, reservoir pressure, permeability and the like.
- a set of 3D coordinates (X 1 Y 1 Z) for a revised well trajectory may be generated based on the subsurface image and property volume of the updated earth model, the subsurface image and property volume of the earth model prior to the update and geosteering.
- the set of 3D coordinates (X, Y, Z) for the revised well trajectory may represent an optimal well trajectory for optimized production and recovery.
- a set of actions for reaching the new well based on the revised well trajectory may be performed.
- the set of actions may include providing a design of the revised well trajectory.
- the design may take into account various issues, such as effects on changing the drilling procedures, parameters and materials, a cost benefit and drilling risk analysis.
- economic and technical analysis may be performed to determine if the new well trajectory is adopted. Such economic analysis may include calculations of net present value, cost of drilling change, estimated ultimate recovery, safety and environmental implications.
- the set of actions for reaching the new well may include changing the casing plan, mud weights and the like.
- the set of actions for reaching the new well may include defining a new drilling plan and well construction, changing drilling, casing, coring, completion operations and production plans.
- the set of actions for reaching the new well may include recommendations for reducing drilling risk, e.g., by confirming, changing or modifying the drilling fluid, and/or deriving elastic properties from the updated earth model.
- Figure 4 illustrates an example of a well trajectory that has been modified in accordance with various implementations described herein.
- the initial well trajectory 410 is shown to traverse through hazard 420.
- a new well trajectory 430 is provided based on 3D coordinates 440, 450 and 460.
- the set of actions for reaching the new well may include full aperture, prestack, three dimensional depth imaging in real time (which may be referred to as SGD imaging) using the petrotechnical data acquired during drilling to improve the accuracy of the earth model with which the seismic data are depth imaged.
- SGD imaging may produce more structurally accurate images and common image gathers, which may be imaged hundreds to thousands of feet ahead of and around the drill bit, thereby providing a look ahead and around the drill bit.
- the resulting images, the common image gathers and the resulting earth model, the petrotechnical data acquired while drilling, petrotechnical data gathered prior to drilling, and/or inversions of any combination of the above mentioned petrotechnical data may be used to confirm or modify the drilling plan during the drilling operation.
- Common image gathers output from the SGD imaging in various domains, such as offset or angle, may be used to alter the earth model.
- the altered earth model may be used for additional iterations of SGD imaging or for possible inversions for fluid, porosity or pore pressure.
- Moveout estimates derived from the common image gathers provide input to tomography inversions to solve for depth velocity variations, and/or provide a measure of the quality of the image and/or input to anisotropy estimations.
- Depth velocity constitutes one of the properties of the earth model. Alterations to the depth velocity property and anisotropy parameters may be performed based on the petrotechnical data, such as check shot, mud log, sonic, seismicVision and VSP data acquired while drilling and/or gathered from prior drilling operations.
- various techniques described herein for optimizing drilling operations may include full aperture, three dimensional, prestack tomography inversion in real time to solve for depth velocity variations, which may include anisotropy parameters at, around and ahead of the drill bit during drilling operations.
- the tomography inversion and/or earth model may be constrained or altered by combining petrotechnical data acquired while drilling and/or gathered from prior drilling operations prior to and/or during the current drilling operation.
- Various techniques described herein may also make use of a-prioh anisotropy estimates derived from any petrotechnical data source, such as prior drilling operations, walkaway vertical seismic profile (VSP) data and/or lithology knowledge.
- VSP walkaway vertical seismic profile
- A-phori anisotropy estimates may be used to constrain or alter tomography inversions for depth velocity properties and/or directly alter the current version of the earth model.
- Various techniques described herein may also make use of interpretations of events exhibited in the seismic image.
- the interpretation of exhibited seismic image events alone and/or in combination with petrotechnical data acquired while drilling and/or petrotechnical data gathered from prior drilling operations may constrain and/or validate the current earth model and/or results from tomography inversions to produce a new earth model.
- the common image gather flatness output from an iteration of SGD imaging may be used to confirm the quality of the image for structural positioning and the quality of the earth model used for SGD imaging.
- One measure of the quality of the image and the earth model is the degree to which they tie the depths measured in the current drilling operation and/or any other prior drilling operations (i.e., which may be referred to as offset wells) from which we may have gathered petrotechnical data.
- the convergence of results between petrotechnical data acquired during drilling, and/or gathered prior to drilling and/or produced with various techniques described herein, prior to and/or during drilling operations, may be another validation to increase the confidence of advice given regarding changes to the drilling plan.
- the validated earth model and gathers may be used directly for pore pressure inversion.
- the resulting pore pressure volume constitutes another property of the earth model.
- the pore pressure property of the earth model may be used to provide the pressure curves along any selected drilling trajectory to better understand the mud weights required during drilling operations. This feature may be of particular benefit to drilling operations that are at risk of encountering unexpected pressures that deviate from the drilling plan, e.g., when accurate position of the base of salt is unknown prior to drilling operations.
- the updated images, common image gathers, earth models including any property extracted from the earth model and/or interpretations generated with various techniques described herein may enable a better prediction of the location of base of salt in advance of the drilling operation reaching the base of salt.
- Various techniques described herein may include multiple iterations of: a) full aperture, prestack, three dimensional depth imaging in real time during the drilling operation, which may be referred to as SGD imaging;
- the change in drilling plan may include changing the drilling trajectory, mud weights, bit gauge etc.
- FIG. 5 illustrates a computing system 500, into which implementations of various technologies described herein may be implemented.
- the computing system 500 may include one or more system computers 530, which may be implemented as any conventional personal computer or server.
- the system computers 530 may include an engineering workstation, which may be configured to support interactive tasks, such as job set-up, job monitoring and quality control, parameter selection, data visualization and the like.
- the system computers 530 may include a batch computer system, which may be configured to run batch data conditioning jobs, run batch imaging jobs and the like.
- the system computers 530 may include a utility server, which may be configured to perform database services, resource control management, job submission, directory services, systems installation and maintenance, security services and the like.
- HTTP hypertext transfer protocol
- the system computer 530 may be in communication with disk storage devices 529, 531 , and 533, which may be external hard disk storage devices. It is contemplated that disk storage devices 529, 531 , and 533 are conventional hard disk drives, and as such, will be implemented by way of a local area network or by remote access. Of course, while disk storage devices 529, 531 , and 533 are illustrated as separate devices, a single disk storage device may be used to store any and all of the program instructions, measurement data, and results as desired.
- various measurements may be stored in disk storage device 531.
- the system computer 530 may retrieve the appropriate data from the disk storage device 531 to process the various measurements according to program instructions that correspond to implementations of various technologies described herein.
- the program instructions may be written in a computer programming language, such as C++, Java and the like.
- the program instructions may be stored in a computer-readable medium, such as program disk storage device 533.
- Such computer-readable media may include computer storage media and communication media.
- Computer storage media may include volatile and non-volatile, and removable and non-removable media implemented in any method or technology for storage of information, such as computer-readable instructions, data structures, program modules or other data.
- Computer storage media may further include RAM, ROM, erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other solid state memory technology, CD-ROM, digital versatile disks (DVD), or other optical storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can be accessed by the system computer 530.
- Communication media may embody computer readable instructions, data structures, program modules or other data in a modulated data signal, such as a carrier wave or other transport mechanism and may include any information delivery media.
- modulated data signal may mean a signal that has one or more of its characteristics set or changed in such a manner as to encode information in the signal.
- communication media may include wired media such as a wired network or direct- wired connection, and wireless media such as acoustic, RF, infrared and other wireless media. Combinations of any of the above may also be included within the scope of computer readable media.
- the system computer 530 may present output primarily onto graphics display 527, or alternatively via printer 528.
- the system computer 530 may store the results of the methods described above on disk storage 529, for later use and further analysis.
- the keyboard 526 and the pointing device (e.g., a mouse, trackball, or the like) 525 may be provided with the system computer 530 to enable interactive operation.
- the system computer 530 may be located at a data center remote from the drilling operation.
- the system computer 530 may be in communication with the various measuring tools to receive various signals indicative of the planned well. These signals, after conventional formatting and other initial processing, may be stored by the system computer 530 as digital data in the disk storage 531 for subsequent retrieval and processing in the manner described above. While Figure 5 illustrates the disk storage 531 as directly connected to the system computer 530, it is also contemplated that the disk storage device 531 may be accessible through a local area network or by remote access.
- disk storage devices 529, 531 are illustrated as separate devices for storing petrotechnical data and analysis results, the disk storage devices 529, 531 may be implemented within a single disk drive (either together with or separately from program disk storage device 533), or in any other conventional manner as will be fully understood by one of skill in the art having reference to this specification.
- the computing system 500 may further be in communication with data storage 560, which is configured to store petrotechnical measurements.
- Data storage 560 may be located on a rig on site or away from the system computer 530. For instance, data storage 560 may be on a drilling platform or a land rig. Communication between the system computer 530 and the data storage 560 may be facilitated by a communication network 550.
- the communication network 550 may include a wide area network (WAN), a satellite link, local area network (LAN), or other suitable network or combinations thereof.
- the data storage 560 is shown to be connected to the system computer 530 via the communication network 550, it should be understood that each component may be connected to another component in any way convenient.
- the display 527 may be connected to disk storage device 529 through the system computer 530.
- the program storage 533 may be directly connected to the system computer 530.
- the system computer 530 may have many computing nodes that are distributed in various locations.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Geophysics (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- Acoustics & Sound (AREA)
- Remote Sensing (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2008338779A AU2008338779A1 (en) | 2007-12-14 | 2008-11-22 | Optimizing drilling operations using petrotechnical data |
| GB1011523.6A GB2468812B (en) | 2007-12-14 | 2008-11-22 | Optimizing drilling operations using petrotechnical data |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/957,274 | 2007-12-14 | ||
| US11/957,274 US9638830B2 (en) | 2007-12-14 | 2007-12-14 | Optimizing drilling operations using petrotechnical data |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2009079160A1 true WO2009079160A1 (en) | 2009-06-25 |
Family
ID=40510594
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2008/084441 Ceased WO2009079160A1 (en) | 2007-12-14 | 2008-11-22 | Optimizing drilling operations using petrotechnical data |
Country Status (4)
| Country | Link |
|---|---|
| US (2) | US9638830B2 (en) |
| AU (1) | AU2008338779A1 (en) |
| GB (2) | GB2468812B (en) |
| WO (1) | WO2009079160A1 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014116948A1 (en) * | 2013-01-25 | 2014-07-31 | Schlumberger Canada Limited | Hazard avoidance analysis |
| WO2014134655A1 (en) * | 2013-03-05 | 2014-09-12 | Technological Resources Pty Ltd | Estimating material properties |
| US8884964B2 (en) | 2008-04-22 | 2014-11-11 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2D and 3D visual environment |
| US8892407B2 (en) | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
| US8931580B2 (en) | 2010-02-03 | 2015-01-13 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
| US9595129B2 (en) | 2012-05-08 | 2017-03-14 | Exxonmobil Upstream Research Company | Canvas control for 3D data volume processing |
| US10584570B2 (en) | 2013-06-10 | 2020-03-10 | Exxonmobil Upstream Research Company | Interactively planning a well site |
Families Citing this family (69)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8061104B2 (en) | 2005-05-20 | 2011-11-22 | Valinge Innovation Ab | Mechanical locking system for floor panels |
| US8672055B2 (en) * | 2006-12-07 | 2014-03-18 | Canrig Drilling Technology Ltd. | Automated directional drilling apparatus and methods |
| US11725494B2 (en) | 2006-12-07 | 2023-08-15 | Nabors Drilling Technologies Usa, Inc. | Method and apparatus for automatically modifying a drilling path in response to a reversal of a predicted trend |
| US9026417B2 (en) | 2007-12-13 | 2015-05-05 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
| WO2009079355A1 (en) * | 2007-12-18 | 2009-06-25 | Schlumberger Canada Limited | System and method for improving surface electromagnetic surveys |
| BRPI0908156A2 (en) * | 2008-03-21 | 2015-08-11 | Exxonmobil Upstream Company | Methods for invoking measured geophysical data and for producing hydrocarbons from a subsurface region |
| US8793111B2 (en) * | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
| US8527248B2 (en) * | 2008-04-18 | 2013-09-03 | Westerngeco L.L.C. | System and method for performing an adaptive drilling operation |
| US20100185395A1 (en) * | 2009-01-22 | 2010-07-22 | Pirovolou Dimitiros K | Selecting optimal wellbore trajectory while drilling |
| US9594186B2 (en) | 2010-02-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
| EP2545461A4 (en) | 2010-03-12 | 2017-09-27 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
| US8576663B2 (en) * | 2010-04-30 | 2013-11-05 | Schlumberger Technology Corporation | Multicomponent seismic inversion of VSP data |
| WO2012006604A2 (en) * | 2010-07-08 | 2012-01-12 | Geco Technology B.V. | Methods and Devices for Transformation of Collected Data for Improved Visualization Capability |
| AU2011293804B2 (en) | 2010-08-24 | 2016-08-11 | Exxonmobil Upstream Research Company | System and method for planning a well path |
| EP2668641B1 (en) | 2011-01-26 | 2020-04-15 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
| BR112013020182A2 (en) * | 2011-02-08 | 2016-11-08 | Logined Bv | three-dimensional parameter modeling method for oilfield drilling, three-dimensional parameter modeling system for oilfield drilling, and computer program product |
| US9874648B2 (en) | 2011-02-21 | 2018-01-23 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3D earth model |
| CN102322256A (en) * | 2011-06-02 | 2012-01-18 | 中国石油天然气股份有限公司 | Horizontal Well Landing Steering Method |
| US8983779B2 (en) | 2011-06-10 | 2015-03-17 | International Business Machines Corporation | RTM seismic imaging using incremental resolution methods |
| US9063248B2 (en) | 2011-06-10 | 2015-06-23 | International Business Machines Corporation | RTM seismic imaging using combined shot data |
| US9291735B2 (en) | 2011-06-10 | 2016-03-22 | Globalfoundries Inc. | Probablistic subsurface modeling for improved drill control and real-time correction |
| US9291734B2 (en) | 2011-06-10 | 2016-03-22 | International Business Machines Corporation | Full waveform inversion using combined shot data and no scratch disk |
| US9223594B2 (en) | 2011-07-01 | 2015-12-29 | Exxonmobil Upstream Research Company | Plug-in installer framework |
| MX2015003998A (en) * | 2012-09-28 | 2015-09-29 | Landmark Graphics Corp | Self-guided geosteering assembly and method for optimizing well placement and quality. |
| US11480705B2 (en) * | 2013-04-01 | 2022-10-25 | Oliden Technology, Llc | Antenna, tool, and methods for directional electromagnetic well logging |
| US10871584B2 (en) * | 2013-06-17 | 2020-12-22 | Westerngeco L.L.C. | Seismic data processing |
| US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
| US10062044B2 (en) * | 2014-04-12 | 2018-08-28 | Schlumberger Technology Corporation | Method and system for prioritizing and allocating well operating tasks |
| EP3201423B1 (en) * | 2014-10-03 | 2023-05-03 | Weatherford Technology Holdings, LLC | Integrated drilling control system and associated method |
| US10339234B2 (en) * | 2014-11-25 | 2019-07-02 | Cgg Services Sas | Method for elastic model perturbation estimation from reverse time migration |
| CN107075938A (en) | 2014-12-31 | 2017-08-18 | 哈利伯顿能源服务公司 | Looking around electromagnetic tools using forward sight improves geosteering inverting |
| WO2016111678A1 (en) * | 2015-01-06 | 2016-07-14 | Halliburton Energy Services, Inc. | Formation characteristics determination apparatus, methods, and systems |
| CN104747165B (en) * | 2015-01-27 | 2017-06-13 | 中国石油天然气股份有限公司 | A 3D Horizontal Well Profile Design Method |
| CN106050215A (en) * | 2015-04-03 | 2016-10-26 | 普拉德研究及开发股份有限公司 | Direct control over target property |
| US11319780B2 (en) | 2015-04-03 | 2022-05-03 | Schlumberger Technology Corporation | Wellsite system services |
| CN106156934B (en) * | 2015-04-17 | 2022-06-28 | 普拉德研究及开发股份有限公司 | Distributed Well Engineering and Planning |
| US10410298B1 (en) | 2015-06-08 | 2019-09-10 | DataInfoCom USA, Inc. | Systems and methods for analyzing resource production |
| US20170103144A1 (en) * | 2015-10-08 | 2017-04-13 | Schlumbeger Technology Corporation | Well trajectory adjustment |
| US11151762B2 (en) * | 2015-11-03 | 2021-10-19 | Ubiterra Corporation | Systems and methods for shared visualization and display of drilling information |
| WO2017117542A1 (en) * | 2015-12-31 | 2017-07-06 | Schlumberger Technology Corporation | Geological imaging and inversion using object storage |
| US10114135B2 (en) * | 2015-12-31 | 2018-10-30 | General Electric Company | System and method for optimizing seismic data analysis |
| DE102016204392A1 (en) * | 2016-03-16 | 2017-09-21 | Trumpf Werkzeugmaschinen Gmbh + Co. Kg | System and process for production planning |
| AU2016402367A1 (en) * | 2016-04-15 | 2018-08-30 | Landmark Graphics Corporation | Real-time optimization and visualization of parameters for drilling operations |
| US10482202B2 (en) | 2016-06-30 | 2019-11-19 | The Procter & Gamble Company | Method for modeling a manufacturing process for a product |
| US10872183B2 (en) * | 2016-10-21 | 2020-12-22 | Baker Hughes, A Ge Company, Llc | Geomechanical risk and hazard assessment and mitigation |
| CN108005642A (en) * | 2016-10-31 | 2018-05-08 | 中石化石油工程技术服务有限公司 | Improve the standard the method for well oil-gas Layer Drilling ratio |
| US11519262B2 (en) | 2017-01-17 | 2022-12-06 | Schlumberger Technology Corporation | Systematic evaluation of shale plays |
| CN106897425A (en) * | 2017-02-24 | 2017-06-27 | 中国科学院电子学研究所 | A kind of three-dimensional visualization method of terrestrial gravitation field data |
| WO2019051435A1 (en) | 2017-09-11 | 2019-03-14 | Schlumberger Technology Corporation | Well planning system |
| US10866962B2 (en) | 2017-09-28 | 2020-12-15 | DatalnfoCom USA, Inc. | Database management system for merging data into a database |
| US12614136B2 (en) | 2018-09-19 | 2026-04-28 | Schlumberger Technology Corporation | Plan deviations visualization and interpretation |
| US20200190960A1 (en) | 2018-12-12 | 2020-06-18 | Baker Hughes, A Ge Company, Llc | Systems and methods to control drilling operations based on formation orientations |
| US11162356B2 (en) | 2019-02-05 | 2021-11-02 | Motive Drilling Technologies, Inc. | Downhole display |
| CA3123941A1 (en) | 2019-02-05 | 2020-08-13 | Magnetic Variation Services, Llc | Geosteering methods and systems for improved drilling performance |
| EP3928238A4 (en) * | 2019-02-12 | 2022-11-16 | Helmerich & Payne Technologies, LLC | ITERATIVE WELL PLANNING SYSTEMS AND METHODS FOR OPTIMIZED RESULTS |
| EP3942145B1 (en) | 2019-03-18 | 2025-02-19 | Magnetic Variation Services, LLC | Steering a wellbore using stratigraphic misfit heat maps |
| US11946360B2 (en) | 2019-05-07 | 2024-04-02 | Magnetic Variation Services, Llc | Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth |
| US12136054B2 (en) | 2019-06-19 | 2024-11-05 | Helmerich & Payne Technologies, Llc | Systems and methods of iterative well planning for optimized results |
| US12613355B2 (en) | 2019-08-23 | 2026-04-28 | Landmark Graphics Corporation | AI/ML and blockchained based automated reservoir management platform |
| CN112578445B (en) * | 2019-09-27 | 2024-07-26 | 中国石油天然气集团有限公司 | Method and device for seismic point-by-point guided drilling |
| WO2021081706A1 (en) | 2019-10-28 | 2021-05-06 | Schlumberger Technology Corporation | Drilling activity recommendation system and method |
| CN110765660B (en) * | 2019-11-21 | 2022-12-06 | 西南石油大学 | Rapid determination method of movable reserves of low-permeability gas reservoirs under different gas production rates |
| CN113738276B (en) * | 2020-05-27 | 2024-06-07 | 中国石油化工股份有限公司 | Control method and system for drilling horizontal well and drilling system for horizontal well |
| US11514382B2 (en) | 2020-12-10 | 2022-11-29 | Landmark Graphics Corporation | Utilizing micro-services for optimization workflows of borehole operations |
| CN112983389B (en) * | 2021-03-12 | 2023-04-25 | 中国石油天然气股份有限公司 | Double-two-dimensional combined three-dimensional horizontal well track design method |
| WO2022204718A1 (en) * | 2021-03-25 | 2022-09-29 | Schlumberger Technology Corporation | Well intervention performance system |
| US12467352B2 (en) | 2021-08-20 | 2025-11-11 | Landmark Graphics Corporation | Calibration of drillstring weight for friction factor estimation |
| US11982174B2 (en) * | 2021-12-09 | 2024-05-14 | Saudi Arabian Oil Company | Method for determining pore pressures of a reservoir |
| US12560075B2 (en) * | 2023-06-12 | 2026-02-24 | Halliburton Energy Services, Inc. | Gradational resistivity models with local anisotropy for distance to bed boundary inversion |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2354852A (en) * | 1999-10-01 | 2001-04-04 | Schlumberger Holdings | Borehole construction with real-time updating of earth model |
| GB2398900A (en) * | 2003-02-27 | 2004-09-01 | Schlumberger Holdings | Identification of best production potential oil wells and identification of drilling strategy to maximise production potential |
| WO2005071222A1 (en) * | 2004-01-20 | 2005-08-04 | Saudi Arabian Oil Company | Real time earth model for collaborative geosteering |
| US20050279532A1 (en) * | 2004-06-22 | 2005-12-22 | Baker Hughes Incorporated | Drilling wellbores with optimal physical drill string conditions |
| US20060090934A1 (en) * | 2004-10-28 | 2006-05-04 | Williams Danny T | Formation dip geo-steering method |
| US20070284147A1 (en) * | 2005-02-01 | 2007-12-13 | Smith International, Inc. | System for optimizing drilling in real time |
Family Cites Families (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US599544A (en) * | 1898-02-22 | Oil-well pump | ||
| CA1315191C (en) | 1988-10-31 | 1993-03-30 | Chandra Shekhar Rai | Method and system for geophysical exploration |
| US5012453A (en) | 1990-04-27 | 1991-04-30 | Katz Lewis J | Inverse vertical seismic profiling while drilling |
| US5513150A (en) | 1993-06-30 | 1996-04-30 | Atlantic Richfield Company | Method of determining 3-D acoustic velocities for seismic surveys |
| IT1277377B1 (en) | 1995-07-28 | 1997-11-10 | Agip Spa | METHOD FOR CONTINUOUS UPDATING OF THE TWO-DIMENSIONAL AND THREE-DIMENSIONAL DEPTH SEISMIC IMAGE BY MEANS |
| US5995446A (en) * | 1998-04-21 | 1999-11-30 | Schlumberger Technology Corporation | Method of conducting drilling operations using vertical seismic profiles |
| AU3229900A (en) | 1999-02-12 | 2000-08-29 | Prange, Michael | Uncertainty constrained subsurface modeling |
| US6675097B2 (en) | 1999-04-02 | 2004-01-06 | Conoco Inc. | Nonlinear constrained inversion method to determine base of salt interface from gravity and gravity tensor data |
| US6430507B1 (en) | 1999-04-02 | 2002-08-06 | Conoco Inc. | Method for integrating gravity and magnetic inversion with geopressure prediction for oil, gas and mineral exploration and production |
| US6424918B1 (en) | 1999-04-02 | 2002-07-23 | Conoco Inc. | Method for integrating gravity and magnetic inversion data with model based seismic data for oil, gas and mineral exploration and production |
| WO2000060379A1 (en) | 1999-04-02 | 2000-10-12 | Conoco, Inc. | A method for gravity and magnetic data inversion using vector and tensor data with seismic imaging and geopressure prediction for oil, gas and mineral exploration and production |
| US6344746B1 (en) * | 1999-12-03 | 2002-02-05 | Baker Hughes Incorporated | Method for processing the lapse measurements |
| US6826486B1 (en) | 2000-02-11 | 2004-11-30 | Schlumberger Technology Corporation | Methods and apparatus for predicting pore and fracture pressures of a subsurface formation |
| US7003439B2 (en) | 2001-01-30 | 2006-02-21 | Schlumberger Technology Corporation | Interactive method for real-time displaying, querying and forecasting drilling event and hazard information |
| US8995224B2 (en) | 2003-08-22 | 2015-03-31 | Schlumberger Technology Corporation | Real-time velocity and pore-pressure prediction ahead of drill bit |
| US7054750B2 (en) | 2004-03-04 | 2006-05-30 | Halliburton Energy Services, Inc. | Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole |
| US8812334B2 (en) | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
| US8942064B2 (en) | 2009-06-10 | 2015-01-27 | Baker Hughes Incorporated | Sending a seismic trace to surface after a vertical seismic profiling while drilling measurement |
| US8947974B2 (en) | 2009-06-23 | 2015-02-03 | Baker Hughes Incorporated | Seismic measurements while drilling |
-
2007
- 2007-12-14 US US11/957,274 patent/US9638830B2/en not_active Expired - Fee Related
-
2008
- 2008-11-22 GB GB1011523.6A patent/GB2468812B/en active Active
- 2008-11-22 AU AU2008338779A patent/AU2008338779A1/en not_active Abandoned
- 2008-11-22 WO PCT/US2008/084441 patent/WO2009079160A1/en not_active Ceased
- 2008-11-22 GB GB1207680.8A patent/GB2488460B/en active Active
-
2014
- 2014-10-17 US US14/517,578 patent/US20150039281A1/en not_active Abandoned
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2354852A (en) * | 1999-10-01 | 2001-04-04 | Schlumberger Holdings | Borehole construction with real-time updating of earth model |
| GB2398900A (en) * | 2003-02-27 | 2004-09-01 | Schlumberger Holdings | Identification of best production potential oil wells and identification of drilling strategy to maximise production potential |
| WO2005071222A1 (en) * | 2004-01-20 | 2005-08-04 | Saudi Arabian Oil Company | Real time earth model for collaborative geosteering |
| US20050279532A1 (en) * | 2004-06-22 | 2005-12-22 | Baker Hughes Incorporated | Drilling wellbores with optimal physical drill string conditions |
| US20060090934A1 (en) * | 2004-10-28 | 2006-05-04 | Williams Danny T | Formation dip geo-steering method |
| US20070284147A1 (en) * | 2005-02-01 | 2007-12-13 | Smith International, Inc. | System for optimizing drilling in real time |
Non-Patent Citations (1)
| Title |
|---|
| EPO: "Mitteilung des Europäischen Patentamts vom 1. Oktober 2007 über Geschäftsmethoden = Notice from the European Patent Office dated 1 October 2007 concerning business methods = Communiqué de l'Office européen des brevets,en date du 1er octobre 2007, concernant les méthodes dans le domaine des activités", JOURNAL OFFICIEL DE L'OFFICE EUROPEEN DES BREVETS.OFFICIAL JOURNAL OF THE EUROPEAN PATENT OFFICE.AMTSBLATTT DES EUROPAEISCHEN PATENTAMTS, OEB, MUNCHEN, DE, vol. 30, no. 11, 1 November 2007 (2007-11-01), pages 592 - 593, XP007905525, ISSN: 0170-9291 * |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8884964B2 (en) | 2008-04-22 | 2014-11-11 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2D and 3D visual environment |
| US8892407B2 (en) | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
| US8931580B2 (en) | 2010-02-03 | 2015-01-13 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
| US9595129B2 (en) | 2012-05-08 | 2017-03-14 | Exxonmobil Upstream Research Company | Canvas control for 3D data volume processing |
| WO2014116948A1 (en) * | 2013-01-25 | 2014-07-31 | Schlumberger Canada Limited | Hazard avoidance analysis |
| US9388682B2 (en) | 2013-01-25 | 2016-07-12 | Schlumberger Technology Corporation | Hazard avoidance analysis |
| WO2014134655A1 (en) * | 2013-03-05 | 2014-09-12 | Technological Resources Pty Ltd | Estimating material properties |
| US10584570B2 (en) | 2013-06-10 | 2020-03-10 | Exxonmobil Upstream Research Company | Interactively planning a well site |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2468812A (en) | 2010-09-22 |
| US20090157367A1 (en) | 2009-06-18 |
| AU2008338779A1 (en) | 2009-06-25 |
| GB2468812B (en) | 2012-11-07 |
| GB201011523D0 (en) | 2010-08-25 |
| US9638830B2 (en) | 2017-05-02 |
| GB201207680D0 (en) | 2012-06-13 |
| GB2488460B (en) | 2013-02-27 |
| GB2488460A (en) | 2012-08-29 |
| US20150039281A1 (en) | 2015-02-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9638830B2 (en) | Optimizing drilling operations using petrotechnical data | |
| US11828167B2 (en) | Well log correlation and propagation system | |
| RU2687668C1 (en) | Method and system for combined tracking of a well drilling process | |
| CA2826854C (en) | Three-dimensional modeling of parameters for oilfield drilling | |
| US9157318B2 (en) | Determining differential stress based on formation curvature and mechanical units using borehole logs | |
| US8265915B2 (en) | Method for predicting well reliability by computer simulation | |
| US8457940B2 (en) | Model-consistent structural restoration for geomechanical and petroleum systems modeling | |
| US9593558B2 (en) | System and method for planning a well path | |
| US7890264B2 (en) | Waterflooding analysis in a subterranean formation | |
| US10450860B2 (en) | Integrating reservoir modeling with modeling a perturbation | |
| US20050171698A1 (en) | Real time earth model for collaborative geosteering | |
| US9665604B2 (en) | Modeling and manipulation of seismic reference datum (SRD) in a collaborative petro-technical application environment | |
| CN104011564B (en) | 4D Saturation Modeling | |
| US9696441B2 (en) | Apparatus and method for predicting vertical stress fields | |
| CN110062897B (en) | Petrophysical Assessment Using Self-Organizing Mapping | |
| US11640012B2 (en) | Virtual high-density well survey | |
| Ramjohn et al. | 3D geomechanical modeling for wellbore stability analysis: starfish, ECMA, Trinidad and Tobago | |
| US12436305B2 (en) | Automatic tying structure maps of subsurface horizons to well-derived orientation information | |
| US20260072189A1 (en) | Passive source seismic re-datuming/positioning and deconvolution for sub-surface imaging | |
| US20250356086A1 (en) | Automation embedded simulation platform for reservoir modeling | |
| US20250224529A1 (en) | Method for validating paleogeographic models using seismic data |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08861825 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2008338779 Country of ref document: AU Date of ref document: 20081122 Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 1011523 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20081122 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1011523.6 Country of ref document: GB |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 08861825 Country of ref document: EP Kind code of ref document: A1 |