WO2008019561A1 - Transporteur à câble pour passerelle pour passagers - Google Patents

Transporteur à câble pour passerelle pour passagers Download PDF

Info

Publication number
WO2008019561A1
WO2008019561A1 PCT/CN2007/001832 CN2007001832W WO2008019561A1 WO 2008019561 A1 WO2008019561 A1 WO 2008019561A1 CN 2007001832 W CN2007001832 W CN 2007001832W WO 2008019561 A1 WO2008019561 A1 WO 2008019561A1
Authority
WO
WIPO (PCT)
Prior art keywords
drag chain
frame
channel
boarding bridge
chain
Prior art date
Application number
PCT/CN2007/001832
Other languages
English (en)
French (fr)
Inventor
Xuehai Cheng
Zhaohong Zhang
Handong Tan
Original Assignee
China International Marine Containers (Group) Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers (Group) Ltd. filed Critical China International Marine Containers (Group) Ltd.
Priority to CA2659646A priority Critical patent/CA2659646C/en
Priority to EP07721405.4A priority patent/EP2055632A4/en
Publication of WO2008019561A1 publication Critical patent/WO2008019561A1/zh

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64FGROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT; DESIGNING, MANUFACTURING, ASSEMBLING, CLEANING, MAINTAINING OR REPAIRING AIRCRAFT, NOT OTHERWISE PROVIDED FOR; HANDLING, TRANSPORTING, TESTING OR INSPECTING AIRCRAFT COMPONENTS, NOT OTHERWISE PROVIDED FOR
    • B64F1/00Ground or aircraft-carrier-deck installations
    • B64F1/30Ground or aircraft-carrier-deck installations for embarking or disembarking passengers
    • B64F1/305Bridges extending between terminal building and aircraft, e.g. telescopic, vertically adjustable
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G11/00Arrangements of electric cables or lines between relatively-movable parts
    • H02G11/006Arrangements of electric cables or lines between relatively-movable parts using extensible carrier for the cable, e.g. self-coiling spring

Definitions

  • the present invention relates to a boarding bridge, and more particularly to a cable conveyor in a boarding bridge. Background technique
  • the tail end of the first channel is connected to the pier of the boarding bridge, the second channel is telescopically sleeved on the first channel, and the third channel is telescopically sleeved on the second channel.
  • the first end of the first channel is connected to the tail end of the second channel, the first end of the second channel is connected to the tail end of the third channel, and the cable is transported through two sets of drag chains.
  • the device realizes that the drag chains of the two sets of drag chain devices are generally vertically arranged and horizontally arranged, and the vertical arrangement means that the rotational hinge center line of the drag chain links is perpendicular to the horizontal support surface, that is: the drag chain links
  • the side surface is fitted to the horizontal support surface;
  • the horizontal arrangement means that the rotational hinge center line of the drag chain link is parallel to the horizontal support surface, that is, the side of the drag chain link is perpendicular to the horizontal support surface.
  • the boarding bridge cable conveying device of this structure on the one hand, has a sliding friction between the vertically arranged towing chain and the horizontal supporting surface during movement, the movement resistance is large, the drag chain is easily damaged, and the service life of the entire device is short.
  • the object of the present invention is to overcome the deficiencies of the prior art and to provide a boarding bridge cable conveyor having a long service life, a small size and a loadable cable.
  • the present invention discloses a boarding bridge cable conveying device for a three-channel boarding bridge, the boarding bridge cable conveying device comprising a first towline device and a second towline device, first
  • the drag chain device includes a first drag chain and a first drag chain for carrying the cable and placing the first drag chain
  • the second drag chain device includes a second drag chain and a cable for carrying and placing the second drag chain a second drag chain frame
  • the first drag chain frame is disposed below the first channel and includes a first fixed end and a first free end, the first fixed end is connected to the tail end of the first channel, and the first free end is disposed along the
  • the first guide rail of the second passage is relatively moved, and the first drag chain is horizontally unfolded on the first drag chain and the two ends are respectively hinged to the first drag chain frame and the first a second channel
  • the second chain carrier is disposed below the second channel and includes a second fixed end and a second free end, the second fixed end is connected to the tail end of the second
  • the boarding bridge cable conveying device of the invention completely adopts a horizontally arranged drag chain, which can reduce the running resistance and prolong the service life of the component, and the second drag chain can be contracted into the first drag chain.
  • the frame is superimposed and integrated to make the structure of the whole device more compact and more cables can be loaded, and the truss structure of the drag chain frame can save manufacturing materials.
  • FIG. 1 is a schematic view showing the principle of a boarding bridge electric pick-up device of the present invention
  • FIG. 2 is a schematic view showing the principle of the cable conveying device of the present invention when the boarding bridge is fully deployed;
  • FIG. 3 is a schematic view showing the principle of the cable conveying device of the present invention when the boarding bridge is not fully deployed or when it is not fully retracted;
  • FIG. 4 is a schematic view showing the principle of the cable conveying device of the present invention when the boarding bridge is retracted;
  • Figure 5 is a schematic view of the embodiment of the cable transporting device of the present invention when the boarding bridge is fully deployed;
  • Figure 6 is a schematic view of the first drag chain frame of Figure 5;
  • Figure 7 is a schematic view of the second drag chain frame of Figure 5;
  • Figure 8 is a cross-sectional view showing the free end of the first drag chain and/or the second drag chain of Figure 5 mated with the limiting device;
  • Figure 9 is a schematic cross-sectional view of the first drag chain and the second drag chain of Figure 5 mated. detailed description
  • the boarding bridge includes a first channel 1, a second channel 2, and a third channel 3.
  • the second channel 2 and the third channel 3 are according to the boarding bridge.
  • the required expansion length is scaled.
  • the head end of the first channel 1 ie, the end on the right-hand side in FIG. 1
  • the tail end of the second channel 2 ie, the end on the left-hand side in FIG. 1
  • the second channel The head end of 2 (ie, the end on the right-hand side in FIG. 1) is connected to the end of the third channel 3 (ie, the end on the left-hand side in FIG. 1), and the first channel 1 and the second channel may be appropriately set as needed.
  • a first drag chain device for conveying a cable is disposed below the first channel 1
  • a second drag chain device for transporting the cable is disposed below the second channel 2.
  • Each of the drag chain devices includes a drag chain frame and a corresponding drag Chain, the drag chain frame 4 of the first drag chain device and the drag chain frame 5 of the second drag chain device are shown in FIG. 1, and the corresponding drag chain is not shown, and the first channel 1 is shown in FIG.
  • the tail end is connected with the pier 6 of the boarding bridge, the A end of the drag chain frame 4 is hinged to the tail end of the first channel 1, and the B end of the drag chain frame 4 is movable along the guide rail disposed on the second channel 2, the tow chain frame
  • the C end of the fifth end is connected to the rear end of the second passage 2, and the D end of the drag chain 5 is movable along the guide rail on the third passage 3.
  • one end of the drag chain frame 4 is hinged to the tail end of the first channel 1 of the boarding bridge, and the other end is guided by the main beam 7 on the drag chain frame 5, which can be opposite to the chain link frame 5. Or move on channel 2 to ensure the cable can be stretched as needed.
  • the main beam 7 is a profiled steel.
  • a limit device 8 may be disposed at the B end of the tow frame 4, and the limit device 8 includes, but is not limited to, a double rim roller.
  • the present invention is not limited to the use of the main beam 7 as a guide rail, for example:
  • a profile steel may be disposed under the second passage 2 as a guide rail of the tow frame 4.
  • one end of the drag chain 5 is coupled to the trailing end of the second channel 2 and is movable with the second channel 2.
  • the profile 10 fixed below the passage 3 is used as a guide rail.
  • a stopper 9 is provided at the D end of the drag chain 4.
  • the cable is input from the A end of the drag chain frame 4, horizontally extending along the first drag chain frame 4 and a part of the cable enters the second channel 2 (not shown), and the remaining cable portions are dragged through the drag chain 11
  • the C-end of the chain frame 5 then extends horizontally along the second drag chain 5, and through the drag chain 12 to the third channel 3 (not shown), when the boarding bridge is deployed, the drag chain 11 and the drag chain 12 are Stretching.
  • connection point of the drag chain 11 and the drag chain frame 4 the connection point F of the drag chain 12 and the drag chain frame 5 are preferably located at the drag chain frame 4 and the drag chain frame 5, respectively. midpoint. That is, one end of the drag chain 11 is preferably connected to the midpoint of the drag chain frame 4, and the other end is connected to the second channel 2; one end of the drag chain 12 is preferably connected to the midpoint of the drag chain frame 5, and the other end is connected. Go to the third channel 3.
  • the lengths of the tow frames 4, 5 can be appropriately designed, so that the B end of the tow frame 4 substantially coincides with the C end of the tow frame 5 when the boarding bridge is fully extended, and the D end of the tow frame 5 It basically coincides with the trailing end of the third channel 3 when the boarding bridge is fully deployed.
  • the third passage 3 pulls the drag chain 12, and the second passage 2 pulls the drag chain 11.
  • the drag chain 12 can be retracted into the drag chain frame 5 by the action of the third channel 3, and the drag chain 11 can be retracted into the drag chain frame 4 by the action of the second channel 2.
  • the drag chain 11 and the drag chain 12 are horizontally arranged.
  • the size of the drag chain frame 4 and the drag chain frame 5 can be appropriately set, so that the drag chain frame 5 is overlapped with the drag chain frame 4 when the boarding bridge is retracted, that is, The drag chain frame 5 is located within the cavity of the drag chain frame 4.
  • the centerlines of the tow frame 4 and the tow frame 5 are coincident.
  • the drag chain frame 4 adopts a truss structure with a diagonal bar, and the limit device 8 shown in FIG. 8 can be disposed at the B end of the drag chain frame 4, and the front part of the drag chain frame 4, that is, A
  • the section from the end to the end E has a cross-sectional shape of a groove having an open upper end as shown in FIG.
  • the tow frame 5 adopts a truss structure with a diagonal bar
  • the main beam 7 is a profile steel, and the main beam can serve as a track of the B end of the tow frame 4, and similarly, can be in the D of the tow frame 5
  • the limiting device 8 shown in FIG. 8 is disposed at the end, and the front portion of the drag chain frame 5, that is, the portion from the C end to the F end, has a cross-sectional shape of a trough shape of the upper end port as shown in FIG.
  • the guide rail 7 and the limiting device 8 cooperate, and the end portion of the drag chain can be moved along the guide rail 7 without being separated from the guide rail 7 by the limiting device 8 and other restraining members.
  • the tow frame 5 when the boarding bridge is in motion, the tow frame 5 is telescoped in the cavity of the tow frame 4. It is generally required that the width of the drag chain 11 be greater than the width of the drag chain 12. This is because: on the one hand, the drag chain will sag when unfolded, and the support surface 13 of the drag chain frame 4 can be used to support the drag chain 11 , and the support surface 14 of the drag chain frame 5 can be used to support the drag chain 12 to resist the sag of the drag chain; On the other hand, the drag chain 11 needs to transport more cables than the drag chain 12, requiring more space.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

登机桥电缆输送装置
技术领域
本发明涉及一种登机桥, 尤其涉及登机桥中的电缆输送装置。 背景技术
现有的三通道登机桥, 第一通道的尾端与登机桥的桥墩相连, 第二通道可伸缩地套设 在第一通道上, 第三通道可伸缩地套设在第二通道上, 在登机桥完全展开时, 第一通道的 首端与第二通道的尾端相接,第二通道的首端与第三通道的尾端相接,其中的电缆输送通 过两套拖链装置来实现, 这两套拖链装置的拖链一般分别为垂直布置和水平布置, 所谓垂 直布置是指拖链链节的转动铰接中心线与水平支撑面相垂直, 也就是: 拖链链节的侧面与 水平支撑面相贴合; 水平布置是指拖链链节的转动铰接中心线与水平支撑面相平行, 也就 是- 拖链链节的侧面与水平支撑面相垂直。这种结构的登机桥电缆输送装置, 一方面, 由 于垂直布置的拖链在运动时与水平支撑面之间存在滑动摩擦,运动阻力大,拖链容易损坏, 使得整个装置的使用寿命较短; 另一方面, 由于在登机桥的通道伸縮时, 垂直布置的拖链 装置与水平布置的拖链装置必须配合, 而造成整个装置的外观尺寸较大、可装载的电缆较 少。 发明内容
本发明要的目的在于克服现有技术的不足, 而提出一种使用寿命较长、外观尺寸小并 且可装载的电缆多的登机桥电缆输送装置。
为了实现上述目的,本发明公开了一种登机桥电缆输送装置,用于三通道的登机桥中, 该登机桥电缆输送装置包括第一拖链装置和第二拖链装置,第一拖链装置包括第一拖链和 用于承载电缆和放置该第一拖链的第一拖链架,第二拖链装置包括第二拖链和用于承载电 缆和放置该第二拖链的第二拖链架,第一拖链架设置在第一通道的下方且包括第一固定端 和第一自由端, 第一固定端与第一通道的尾端相连, 第一自由端可沿设置于第二通道的第 一导轨作相对运动,第一拖链可在第一拖链上水平展开且两端分别铰接于第一拖链架和第 二通道; 第二拖链架设置在第二通道的下方且包括第二固定端和第二自由端,第二固定端 与第二通道的尾端相连并随第二通道而移动,第二自由端可沿设置于第三通道的第二导轨 作相对运动, 第二拖链可在第二拖链架上水平展开且两端分别铰接第二拖链架和第三通 道, 在第二通道缩回而套在第一通道上时,第二拖链架回缩于第一拖链架中并与第一拖链 架叠合。
与现有技术相比, 本发明的登机桥电缆输送装置, 完全采用水平布置的拖链, 可减少 运行阻力, 延长零部件的使用寿命, 而第二拖链架可收缩入第一拖链架并与之叠合, 使整 个装置的结构更紧凑并能装载更多的电缆, 而拖链架采用桁架结构更可节省制造用料。 附图说明
下面将结合附图及实施例对本发明作进一步说明, 其中:
图 1是本发明的登机桥电缵输送装置的原理示意图;
图 2是本发明的电缆输送装置在登机桥完全展开时的原理示意图;
图 3是本发明的电缆输送装置在登机桥未完全展开时或未完全縮回时的原理示意图; 图 4是本发明的电缆输送装置在登机桥缩回时的原理示意图;
图 5是本发明的电缆输送装置实施例在登机桥完全展开时的示意图;
图 6是图 5中的第一拖链架示意图;
图 7是图 5中的第二拖链架示意图;
图 8是图 5中的第一拖链架和 /或第二拖链架的自由端与限位装置相配合的截面示意 图;
图 9是图 5中的第一拖链架和第二拖链架相配合的截面示意图。 具体实施方式
如图 1和图 5所示, 登机桥包括第一通道 1、第二通道 2、第三通道 3, 在登机桥运行 时, 第二通道 2、 第三通道 3可根据登机桥所需的展开长度按比例伸縮。 登机桥完全展开 时, 第一通道 1的首端(即图 1中右手侧的端部)与第二通道 2的尾端(即图 1中左手侧 的端部)相接, 第二通道 2的首端(即图 1中右手侧的端部)与第三通道 3的尾端(即图 1 中左手侧的端部)相接, 根据需要, 可适当设置第一通道 1、 第二通道 2、 第三通道 3 的尺寸大小, 使得在在登机桥缩回时第一通道 1、 第二通道 2和第三通道 3能够叠合、 套 装在一起。第一通道 1的下方设有用于输送电缆的第一拖链装置, 第二通道 2的下方设置 有用于输送电缆的第二拖链装置, 每套拖链装置都包括拖链架和对应的拖链, 图 1中示出 了第一拖链装置的拖链架 4和第二拖链装置的拖链架 5, 而未示出相应的拖链, 图 5中示 出了第一通道 1的尾端与登机桥的桥墩 6相连,拖链架 4的 A端铰接到第一通道 1的尾端, 拖链架 4的 B端可沿设置在第二通道 2的导轨移动, 拖链架 5的 C端与第二通道 2的尾 端连接, 拖链架 5的 D端可沿第三通道 3上的导轨移动。
在一优选实施例中, 拖链架 4的一端铰接到登机桥的第一通道 1的尾端上, 另一端则 以拖链架 5上的主梁 7为导轨, 可相对拖链架 5或通道 2而移动, 以确保电缆能够按需要 进行伸缩。优选地, 主梁 7为型钢。而为了防止拖链架 4与主梁 7脱离, 可在拖链架 4的 B端设置限位装置 8, 该限位装置 8包括, 但不限于是: 双轮缘滚轮。 当然, 本发明并也 不限于以主梁 7为导轨, 例如: 在一些情况之下, 可在第二通道 2下方设置型钢作为拖链 架 4的导轨。
类似地, 拖链架 5的一端连接到第二通道 2的尾端上, 可随第二通道 2动作。 另一端 则以固定在通道 3下方的型钢 10为导轨。 同样地, 为防止拖链架 5与导轨 10脱离, 在拖 链架 4的 D端部设置限位装置 9。
如图 2所示, 电缆从拖链架 4的 A端输入,沿着第一拖链架 4水平延伸且部分电缆进 入第二通道 2 (未示出) , 其余电缆部分通过拖链 11进入拖链架 5的 C端, 然后沿着第 二拖链架 5水平延伸, 在通过拖链 12到达第三通道 3 (未示出), 在登机桥展开时, 拖链 11和拖链 12被拉伸。
为有效地縮短拖链和电缆的长度, 拖链 11与拖链架 4的连接点£、 拖链 12与拖链架 5的连接点 F最好分别位于拖链架 4和拖链架 5的中点。 也就是说, 拖链 11的一端最好 连接到拖链架 4的中点, 另一端连接到第二通道 2; 拖链 12的一端最好连接到拖链架 5 的中点, 另一端连接到第三通道 3。
为了节省材料, 可适当设计拖链架 4、 5的长度, 使拖链架 4的 B端在登机桥完全展 幵时基本与拖链架 5的 C端重合,拖链架 5的 D端在登机桥完全展开时基本与第三通道 3 的尾端重合。
如图 3所示, 在登机桥展开时, 第三通道 3牵引拖链 12, 第二通道 2牵引拖链 11。 在登机桥缩回时, 拖链 12可在第三通道 3的作用下缩回到拖链架 5中, 拖链 11可在第二 通道 2的作用下缩回到拖链架 4中。
为了减少运行阻力、 延长零部件的寿命, 拖链 11和拖链 12均为水平布置。
如图 4和图 9所示, 为了使结构紧凑, 可适当设置拖链架 4和拖链架 5的大小, 使拖 链架 5在登机桥缩回时与拖链架 4叠合, 即拖链架 5位于拖链架 4的空腔内。优选地, 拖 链架 4和拖链架 5的中心线是重合的。
如图 6所示,拖链架 4采用带斜杆的桁架结构,可在拖链架 4的 B端设置图 8所示的 限位装置 8, 拖链架 4的前部, 也就是由 A端到 E端的那段, 其截面形状为如图 9所示的 上端开口的槽形。
如图 7所示, 拖链架 5采用带斜杆的桁架结构, 其主梁 7是型钢, 该主梁可作为拖链 架 4的 B端的轨道, 同样地, 可在拖链架 5的 D端设置图 8所示的限位装置 8, 拖链架 5 前部, 也就是由 C端到 F端的那段, 其截面形状为如图 9所示的上端幵口的槽形。
如图 8所示, 导轨 7和限位装置 8相配合, 拖链架的端部在限位装置 8以及其它约束 件的作用下, 能沿着导轨 7移动而不会脱离导轨 7。
如图 9所示, 登机桥动作时, 拖链架 5在拖链架 4的空腔内伸缩。 通常要求拖链 11 的宽度要大于拖链 12的宽度。 这是因为: 一方面, 拖链展开时会下垂, 拖链架 4的支撑 面 13可用来支撑拖链 11, 拖链架 5的支撑面 14可用来支撑拖链 12, 以抵御拖链下垂; 另一方面, 拖链 11比拖链 12需要传输更多的电缆, 从而需要更大的空间。

Claims

权利要求
1、 一种登机桥电缆输送装置, 用于三通道的登机桥中, 该登机桥电缆输送装置包括 第一拖链装置和第二拖链装置,所述第一拖链装置包括第一拖链和用于承载电缆和放置该 第一拖链的第一拖链架,第二拖链装置包括第二拖链和用于承载电缆和放置该第二拖链的 第二拖链架, 其特征在于:
所述第一拖链架设置在第一通道的下方且包括第一固定端和第一自由端,所述第一固 定端与第一通道的尾端相连, 所述第一自由端可沿设置于第二通道的第一导轨作相对运 动,所述第一拖链可在所述第一拖链上水平展开且两端分别铰接于所述第一拖链架和第二 通道;
所述第二拖链架设置在第二通道的下方且包括第二固定端和第二自由端,所述第二固 定端与所述第二通道的尾端相连并随第二通道而移动,所述第二自由端可沿设置于第三通 道的第二导轨作相对运动,所述第二拖链可在所述第二拖链架上水平展开且两端分别铰接 所述第二拖链架和所述第三通道,在第二通道缩回而套在第一通道上时,所述第二拖链架 回缩于第一拖链架中并与所述第一拖链架叠合。
2、 根据权利要求 1所述的登机桥电缆输送装置, 其特征在于: 所述第一拖链架的第 一自由端和第二拖链架的第二自由端均设有限位装置。
3、 根据权利要求 1所述的登机桥电缆输送装置, 其特征在于: 所述第一拖链架的中 心线和第二拖链架的中心线重合。
4、 根据权利要求 1所述的登机桥电缆输送装置, 其特征在于: 所述第一拖链的两端 是分别铰接到所述第一拖链架的中部和所述第二通道的尾端。
5、 根据权利要求 1所述的登机桥电缆输送装置, 其特征在于: 所述第二拖链的两端 是分别铰接到所述第二拖链架的中部和所述第三通道的尾端。
6、 根据权利要求 1-5所述的任一种登机桥电缆输送装置, 其特征在于: 所述第一拖 链架为桁架结构, 且所述第一拖链架前部的截面形状为槽形。
7、 根据权利要求 6所述的登机桥电缆输送装置, 其特征在于: 所述第 1拖链架均为 桁架结构, 且所述第二拖链架前部的截面形状为槽形。
8、 根据权利要求 1-5所述的任一种登机挢电缆输送装置, 其特征在于: 所述第二拖 链架包括主梁, 该主梁作为所述第一导轨。
9、 根据权利要求 2所述的登机桥电缆输送装置, 其特征在于: 所述限位装置为双轮 缘滚轮。
10、根据权利要求 1至 5所述的任一种登机桥电缆输送装置,其特征在于:所述第一 拖链的宽度大于第二拖链的宽度。
PCT/CN2007/001832 2006-08-09 2007-06-11 Transporteur à câble pour passerelle pour passagers WO2008019561A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA2659646A CA2659646C (en) 2006-08-09 2007-06-11 Cable conveying device for passenger bridge
EP07721405.4A EP2055632A4 (en) 2006-08-09 2007-06-11 CABLE TRANSPORT DEVICE FOR A PASSENGER BRIDGE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200610062056A CN101123346B (zh) 2006-08-09 2006-08-09 一种登机桥电缆输送装置
CN200610062056.5 2006-08-09

Publications (1)

Publication Number Publication Date
WO2008019561A1 true WO2008019561A1 (fr) 2008-02-21

Family

ID=39081919

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2007/001832 WO2008019561A1 (fr) 2006-08-09 2007-06-11 Transporteur à câble pour passerelle pour passagers

Country Status (4)

Country Link
EP (1) EP2055632A4 (zh)
CN (1) CN101123346B (zh)
CA (1) CA2659646C (zh)
WO (1) WO2008019561A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5296094B2 (ja) * 2007-12-18 2013-09-25 オーチス エレベータ カンパニー ボーディングブリッジのトンネル部移動装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3521316A (en) * 1968-11-05 1970-07-21 Stanray Corp Airplane loading ramp structure supplying utilities to the airplane
US3792189A (en) * 1972-02-11 1974-02-12 Messerschmitt Boelkow Blohm Telescopic cable guide
US4572550A (en) * 1983-07-02 1986-02-25 Thyssen Industrie Aktiengesellschaft Movable carrier for supply lines placed along a telescoping airplane passenger bridge
US4715077A (en) * 1985-11-18 1987-12-29 Air-A-Plane Corporation Conduit on passenger loading bridge
US5149017A (en) * 1991-11-15 1992-09-22 Teledyne Inet Service transport unit

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4526090A (en) * 1984-02-02 1985-07-02 Mccormick Morgan, Inc. Flexible conduit take-up apparatus
DE8526135U1 (de) * 1985-09-13 1988-03-17 Bewa Rolf Spieckermann Verwaltung & Trading, 5810 Witten Leitungsführung zur Kopfstation einer mehrschüssigen teleskopierbaren Fluggastbrücke, Gangway od.dgl.
DE3532657A1 (de) * 1985-09-13 1987-03-26 Bewa Spieckermann Kg Verbindungsleitung zur kopfstation einer mehrschuessigen teleskopierbaren fluggastbruecke, gangway oder dergleichen
DE3744050A1 (de) * 1987-12-24 1989-07-13 Vahle Paul Kg Leitungsfuehrung fuer eine teleskopierbare fluggastbruecke mit maximal drei schuessen
JP2569983Y2 (ja) * 1990-03-07 1998-04-28 川崎重工業株式会社 旅客搭乗橋におけるケーブル配線設備
CN2296309Y (zh) * 1996-12-20 1998-11-04 深圳天达空港设备有限公司 滑动式运动单元
DE29817462U1 (de) * 1998-09-30 1999-04-08 Manfred Fladung GmbH, 63776 Mömbris Teleskopierbare Passagierbrücke
CN1106977C (zh) * 2000-03-10 2003-04-30 吴俊� 一种通道结构与承重结构分离设置的登机桥
CN200976473Y (zh) * 2006-08-09 2007-11-14 中国国际海运集装箱(集团)股份有限公司 一种登机桥电缆输送装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3521316A (en) * 1968-11-05 1970-07-21 Stanray Corp Airplane loading ramp structure supplying utilities to the airplane
US3792189A (en) * 1972-02-11 1974-02-12 Messerschmitt Boelkow Blohm Telescopic cable guide
US4572550A (en) * 1983-07-02 1986-02-25 Thyssen Industrie Aktiengesellschaft Movable carrier for supply lines placed along a telescoping airplane passenger bridge
US4715077A (en) * 1985-11-18 1987-12-29 Air-A-Plane Corporation Conduit on passenger loading bridge
US5149017A (en) * 1991-11-15 1992-09-22 Teledyne Inet Service transport unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2055632A4 *

Also Published As

Publication number Publication date
CN101123346B (zh) 2010-05-12
EP2055632A1 (en) 2009-05-06
CA2659646A1 (en) 2008-02-21
CA2659646C (en) 2012-01-24
CN101123346A (zh) 2008-02-13
EP2055632A4 (en) 2015-11-25

Similar Documents

Publication Publication Date Title
JP5828241B2 (ja) コンベア装置
AU2011250855B2 (en) Conveyor for the transport of bulk materials
CN102730106B (zh) 车身组装线中车门的输送方法及车身组装线中车门的输送装置
WO2011143923A1 (zh) 变位平台运架一体机及桥梁架设方法
BRPI0709183A2 (pt) conjunto de roletes loucos de transportador
WO2009079614A3 (en) Apparatus for moving tunnel part of boarding bridge
MX2007008743A (es) Sistema de puente movil.
US10407252B1 (en) Conveyor assembly
WO2008019561A1 (fr) Transporteur à câble pour passerelle pour passagers
CN109070904B (zh) 缆索运输装备
ITMI20102374A1 (it) Impianto di trasporto a fune con almeno una fune traente e un carrello e relativo metodo di azionamento
ITMI20071869A1 (it) Impianto di trasporto a fune e metodo di azionamento di un veicolo di soccorso in tale impianto
CN202953542U (zh) 一种轨道对接锁紧机构
CN200976473Y (zh) 一种登机桥电缆输送装置
CN201647943U (zh) 五节折叠式集装箱吊臂装置
WO2009147448A3 (en) Transportation device and method
FI96405B (fi) Rautatievaunun kuormanpurkauslaite
JP2013035657A (ja) 移動装置
CN207434435U (zh) 输送系统导轨过渡装置
CN219636122U (zh) 一种带闭锁车的轨道管状带式输送机
CN221369129U (zh) 一种双向转运架
CN212245063U (zh) 一种用于水利的水运式输送机
CN220722038U (zh) 托网装置及钢筋网生产线
CN107801387A (zh) 用于将车辆联接到运输装置的牵引缆线的联接设备
KR200269889Y1 (ko) 차량운반용 트럭

Legal Events

Date Code Title Description
DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07721405

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2659646

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007721405

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: RU