WO2007119040A2 - Apparatus and method for a hydrocarbon production facility - Google Patents

Apparatus and method for a hydrocarbon production facility Download PDF

Info

Publication number
WO2007119040A2
WO2007119040A2 PCT/GB2007/000974 GB2007000974W WO2007119040A2 WO 2007119040 A2 WO2007119040 A2 WO 2007119040A2 GB 2007000974 W GB2007000974 W GB 2007000974W WO 2007119040 A2 WO2007119040 A2 WO 2007119040A2
Authority
WO
WIPO (PCT)
Prior art keywords
tubing
export
pig
flow
production
Prior art date
Application number
PCT/GB2007/000974
Other languages
French (fr)
Other versions
WO2007119040A3 (en
Inventor
Hemant Naik
Original Assignee
Upstream Designs Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB0607648A external-priority patent/GB0607648D0/en
Priority claimed from GB0607689A external-priority patent/GB0607689D0/en
Application filed by Upstream Designs Limited filed Critical Upstream Designs Limited
Priority to US12/297,566 priority Critical patent/US20090223672A1/en
Priority to AU2007238389A priority patent/AU2007238389A1/en
Priority to EP07732066A priority patent/EP2008013A2/en
Priority to EA200802155A priority patent/EA200802155A1/en
Priority to BRPI0710630-0A priority patent/BRPI0710630A2/en
Publication of WO2007119040A2 publication Critical patent/WO2007119040A2/en
Publication of WO2007119040A3 publication Critical patent/WO2007119040A3/en
Priority to NO20084284A priority patent/NO20084284L/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/08Introducing or running tools by fluid pressure, e.g. through-the-flow-line tool systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/26Pigs or moles, i.e. devices movable in a pipe or conduit with or without self-contained propulsion means
    • F16L55/46Launching or retrieval of pigs or moles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2101/00Uses or applications of pigs or moles
    • F16L2101/10Treating the inside of pipes
    • F16L2101/12Cleaning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2101/00Uses or applications of pigs or moles
    • F16L2101/70Drill-well operations

Definitions

  • the present invention relates to apparatus for a hydrocarbon production facility for assisting with the export of hydrocarbons through a transportation pipeline.
  • the present invention relates to a method for launching a pipeline inspection gauge (pig) into a pipeline.
  • hydrocarbon fluids carried in these pipelines which are typically constructed from carbon steel, can be highly corrosive and may cause pipelines to degrade over time, resulting in significant maintenance costs and loss of production.
  • pipelines from non-corrosive alloys.
  • pipelines extend significant distances, such as from a production facility to shore, it may be prohibitively expensive to construct pipelines from such materials.
  • the bypass tubing defines a bypassed length
  • the bypassed length may
  • 18 length may extend a distance sufficient to receive a pig
  • The. bypassed length of the export tubing may
  • the apparatus forms a part of a rig and/or 29 platform, such as a wellhead platform, which may be
  • the facility may be located offshore or onshore.
  • the facility may be located offshore
  • the hydrocarbon production facility is a
  • the facility is preferably adapted to use space efficiently.
  • the production facility may be an unmanned facility.
  • the export tubing may comprise a pipeline for transport of production fluid to a remote treatment plant.
  • the export tubing may comprise a first export, riser, which may connect an end of the transport pipeline with the hydrocarbon production facility.
  • the first export riser may comprise a first end coupled to the facility and a second end coupled to the transport pipeline for passage of fluid from the production well into and through the pipeline.
  • the bypass tubing may comprise a second export riser.
  • the export tubing comprises an export riser connecting a pipeline with the production facility
  • the bypass tubing may comprise a second export riser for the flow of fluid from the production well and into the transport pipeline.
  • the bypass tubing may be formed from a corrosion resistant material.
  • the corrosion resistant material may comprise a metal alloy, and/or a synthetic composite material.
  • the pig launcher may comprise an access port for locating
  • the pig or pig train is adapted to carry
  • the pig may be adapted to deliver
  • the pig may comprise pipeline cleaning
  • the pig launcher may be adapted to allow successive
  • the pig train may thus comprise a
  • the pig launcher may be adapted to
  • the pig launcher may be sized to house a
  • the pig launcher is
  • the pig 27 launcher takes up a minimum of space.
  • the apparatus is adapted to allow a pig train
  • 31 pig train may be formed in the export tubing while the
  • the apparatus is adapted to selectively direct production fluid flow through the export tubing, the pig launcher, and/or the bypass tubing.
  • the apparatus may be adapted to switch between flow through the export tubing, the pig launcher, and/or the bypass tubing gradually and/or controllably.
  • the apparatus may be adapted to provide a gradual and/or controllable build up of pressure and production fluid flow rate upon switching.
  • the apparatus may comprise at least one valve to allow pigs in the pig launcher to be exposed to fluid flow from the export tubing.
  • the at least one valve allows the pigs to be temporarily exposed to fluid flow to launch the pig into the export tubing.
  • the valve is located in an inlet to the pig launcher from the export tubing, said inlet located upstream of a fluid flow valve in the export tubing.
  • the production fluid may be a mixed phase fluid.
  • the production fluid may comprise oil and/or gas hydrocarbons and water.
  • the production fluid may be a corrosive fluid, and may be a raw and/or untreated fluid from the production well(s) .
  • a method of launching a pig into a pipeline comprising the steps of: - exporting production fluid from a production well through export tubing; - directing a flow of production fluid through bypass tubing to bypass a first location of the export tubing; and - launching a pig into the export tubing at the first location.
  • the method includes the step of directing a flow of production fluid through bypass tubing to bypass a first length of the export tubing.
  • the method may comprise the step of forming a pig train in the length of the export tubing.
  • the method may comprise the step of successively launching pigs into the export tubing to form the pig train.
  • the step of successively launching pigs to form a pig train may be carried out while flow of production fluid is being directed through the bypass tubing.
  • the method may comprise the step of directing the flow of production fluid to launch the pig or pig train into the export tubing .
  • the method may comprise the step of switching between and/or controlling flow of production fluid through any one of the bypass tubing, the main tubing, and/or a pig launcher for launching pigs. 1
  • the method may comprise the step of selectively switching
  • the method may comprise the step of selectively switching
  • the method may comprise
  • Figure 1 is a schematic representation of apparatus 5 for launching a pig into a pipeline according to an 6 embodiment of the invention
  • 7 8 Figure 2 is a schematic representation of apparatus 9 for launching a pig into a pipeline according to an 0 alternative embodiment of the invention.
  • 1 2 We refer firstly to Figure 1, which generally shows 3 apparatus for a production facility 10.
  • the apparatus comprises a production manifold 14 through which production fluid from a sub-surface well is received before it is exported away downstream through a transport pipeline 18 according to arrow 19.
  • the apparatus 10 assists with export of hydrocarbons from a production well during preparation and launch of pipeline inspection gauges (pigs) into the transport pipeline 18.
  • the production manifold 14 is connected to the transport pipeline 18 via an intermediary pipe 12 and a main export riser 20, such that production fluid from the well can be transported away from the facility.
  • the apparatus 10 also comprises a pig launcher 16 to launch a pig into the pipeline.
  • a first end of the pig launcher is connected to the intermediary tubing 12 via launcher inlet tubing 26, and a second end is connected to the main export riser 20 and intermediary tubing 12 at a pipe intersection 21 via outlet tubing 27.
  • the inlet tubing -26 allows production fluid to be directed into the pig launcher 16 to push the pig 30 out and into the main export riser 20.
  • the pig launcher 16 allows a pig 30 to be launched through the outlet tubing 27 into the main export riser 20.
  • the pig launcher 16 has an injection fluid inlet 48 to allow batches of corrosion inhibitor fluid to be injected from a treatment unit 49 to a pig 30 placed inside the launcher 16.
  • Pigs 30 with corrosion inhibitor fluid may then be successively launched to form part of a pig train consisting of a number of individual pigs coupled together.
  • the corrosion inhibitor is used to prevent corrosion of the pipeline 18 and riser 20 as may occur upon exposure to production fluid.
  • Use of a train of pigs with batches of corrosion inhibitor fluid is particularly beneficial in long-distance pipelines, where a large volume of such fluid is required to sufficiently protect it from corrosion.
  • the apparatus 10 includes bypass tubing in the form of a second export riser 22 connected to the transport pipeline 18 at riser intersection 29 via a barred tee 54.
  • Barred tee 54 allows fluid flow in all directions but prevents passage of a pig from either of the main export riser 20 or the transport pipeline 18 to the second export riser 22.
  • the second export riser 22 is connected to the intermediary tubing 12 at its opposing end 28 upstream of the intersection of the intermediary tubing 12 and the pig launcher inlet tubing 26, and bypasses the main export riser 20, much of the intermediary tubing 12, and the pig launcher 16.
  • This second export riser 22 provides a second path for flow of production fluid from the production manifold 14 and into the pipeline 18.
  • a one-way check valve (not shown) may be provided upstream of the barred tee 54 on the second export riser to prevent flow of fluid into or along the second export riser 22 from the transport pipeline 18 or the main export riser 20.
  • the choke 44 and safety valves 46a, b are open, together with main export riser valves 36 and the intermediary tubing valve 34.
  • the second export riser valve 38 is closed to fluid flow, and the downstream isolation valves 40a, b and upstream isolation valves 42a, b are closed preventing production fluid from passing into the pig launcher 16.
  • production fluid is caused to flow along upstream section 45, the intermediary tubing 12, the main export riser 20 and into the pipeline 18.
  • the second export riser valve 38 is opened permitting flow through the second export riser, and then the intermediary tubing valve 34 is closed to prevent further flow through the intermediary tubing 12.
  • the valves 42a, b remain closed, and thus production fluid is diverted to flow through the second export riser 22 and into the pipeline 18.
  • a pigging train can be located in the main export riser.
  • isolation valves 40a b downstream of the pig launcher 16 are opened so that pigs 30 that are launched can move out of the launcher, through the open main riser valve 36, and into the export riser 20.
  • the second export riser valve 38 is closed and the upstream launcher isolation valves 42a, b are opened exposing the pig launcher to fluid upstream.
  • the production fluid is directed through the inlet tubing 26, pushing the pigs 30 fully into the export riser 20 past the main export riser valve 36 via the outlet tubing 27.
  • the intermediary tubing valve 34 is re- opened switching the flow back to the original route so that production fluid flows from the well through the intermediary piping 12, first export riser and the pipeline 18.
  • the pig train is then pushed along the pipeline by the pressure force exerted by the production fluid flow.
  • Corrosion inhibitor fluid is delivered by the pigs into the pipeline along its length, preventing pipeline corrosion being caused by the presence of production fluid.
  • isolation valves 42a, b and 40a, b are closed off again to isolate the pig launcher 16 so that the launcher may be accessed safely without exposure to production fluid pressures, allowing the pig launcher to be prepared ready for further pigging operations .
  • FIG 2 shows an alternative embodiment, sharing many components with the embodiment of Figure 1, but differing in that the second export riser 22 is provided with an additional flow restricting valve 52 located immediately upstream of the second riser valve 38.
  • flow is switched from flowing through the second export riser 22 (after preparation of pigs 30) to flow through the pig launcher 16 (with valves 42a, b opened) by gradually closing the restricting valve 52.
  • This creates a drop in differential pressure in the second export riser 22, and progressively more fluid is prevented from passing through the export riser 22 and into the inlet tubing 26 to the launcher to push the pig into the export riser 20.
  • the second export riser 22 is fully closed off to fluid flow by closure of the valve 52, and the pig is launched into the main export riser 20.
  • valve 34 is opened and launcher isolation valves 42a, b and valve 38 are closed.
  • the flow restriction valve 52 may be located in other locations between the pig launcher 16, and the second riser valve 38, including at locations on the inlet tubing 26 to the pig launcher.
  • the apparatus is installed on a hydrocarbon production facility with first and second export risers connecting to a pipeline for the export of hydrocarbon fluid from the production facility to shore.
  • the pigs 30 may be provided with other equipment, for example, cleaning elements to remove residue from pipeline interior surfaces.
  • the present apparatus provides a number of benefits. Primarily, it functions to permit pig trains of substantial length to be built up, in the main export riser, and launched into a pipeline while minimising or eliminating any need to cease production from the well. In certain embodiments, production does not need to cease at all. Accordingly, well fluids can be retrieved and exported more efficiently.
  • the pig launcher can be relatively small in size, lending itself to installation on a minimum footprint facility, such as a wellhead rig, where space is at a premium and low maintenance functionality is desired.
  • the present apparatus is suitable for protecting conventional long-distance pipelines formed from conventional metal materials, and which may be susceptible to corrosion in the presence of production fluids.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Pipeline Systems (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Cleaning In General (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

This application relates to an apparatus for a hydrocarbon production facility, the apparatus comprising export tubing (20) providing a first flow path for production fluid from a production well; a pig launcher (16) for launching a pig into the export tubing at a first location; and bypass tubing (22) providing a second flow path for the production fluid which bypasses the export tubing at the first location.

Description

Apparatus and method for a hydrocarbon production facility
The present invention relates to apparatus for a hydrocarbon production facility for assisting with the export of hydrocarbons through a transportation pipeline. In one of its aspects, the present invention relates to a method for launching a pipeline inspection gauge (pig) into a pipeline.
Oil and gas produced from sub-surface wells typically need to be transported from a well production facility, such as a production rig or platform, through a pipeline to another location for treatment and processing. Often there is a significant distance between the production facility near the well and the treatment plant. For example, in the case of an offshore production rig, hydrocarbons are often transported to a refinery or a treatment plant onshore.
The hydrocarbon fluids carried in these pipelines, which are typically constructed from carbon steel, can be highly corrosive and may cause pipelines to degrade over time, resulting in significant maintenance costs and loss of production.
To avoid corrosive degradation of the pipeline, it is known to treat the production fluid itself to prevent it from causing corrosion before the fluid is transported to shore. However, this typically needs complex processing equipment and chemical storage facilities to be installed on the production rig, which is undesirable due to lack of available space. It can also be expensive to maintain equipment, in particular where production rigs exist in remote locations that are difficult to access. Also, many well production rigs are unmanned and lack the necessary infrastructure to accommodate such complex equipment.
As an alternative, it is known to construct pipelines from non-corrosive alloys. However, where pipelines extend significant distances, such as from a production facility to shore, it may be prohibitively expensive to construct pipelines from such materials.
Pipeline pigging operations are carried out to treat the pipeline by locating in it one or more pigs which can travel along the pipeline to deliver corrosion inhibiting fluid. These pigs are propelled by the produced fluids.
There are however a number of drawbacks associated with such pigging operations. Multiple pigs may be prepared and launched into a pipeline as a pig train, allowing multiple, separated volumes of fluids to be used to treat the pipeline. However, such pig trains extend over significant distances. One approach is to provide a large pig launcher to accommodate the entire pig train during preparation and injection of treatment fluids. However, in many facilities sufficient space and infrastructure is not available for such a pig launcher. This requires preparation and launch of multiple pigs over a period of time to create the pig train. During this period, production from the wells may need to be interrupted. This downtime in production is costly; interruptions can also be detrimental to the normal processes of the facility and may necessitate an increase in manual intervention. Attempts to minimise downtime by accelerating the process of preparing and launching multiple pigs are faced with further difficulties, for example, the capital expenditure, space requirements, power supply and safety issues associated with high flow rate injection pumps for treatment fluid.
It is an aim of the present invention to obviate or at least mitigate the problems and drawbacks associated with conventional apparatus and methods.
Further aims and objects will become apparent from the description below.
According to a first aspect of the invention, there is provided apparatus for a hydrocarbon production facility, the apparatus comprising: - Export tubing providing a first flow path for production fluid from a production well; - A pig launcher for launching a pig into the export ■ tubing at a first location; and 1 bypass tubing providing a second flow path for the
2 production fluid which bypasses the export tubing at
3 the first location. 4
5 Thus, the apparatus may permit production fluid to
6 continue to flow from a' production well through the
7 export tubing even when a pig or pig train is being
8 located in the export tubing. 9
10 Preferably, the bypass tubing defines a bypassed length
11 of the export tubing, wherein the bypassed length extends
12 to include the first location. The bypassed length may
13 extend over a distance sufficient to accommodate a volume
14 of treatment fluid located in the export tubing. 15
16 Preferably, the bypassed length is adapted to receive a
17 pig train comprising a plurality of pigs. The bypassed
18 length may extend a distance sufficient to receive a pig
19 train equipped for treating a long-distance pipeline,
20 e.g., with batches of treatment fluid such as corrosion
21 inhibitor fluid. 22
23 The pig launcher may be installed at the production
2.4 facility. The. bypassed length of the export tubing may
25 extend substantially between the production facility and
26 a transport pipeline.
27
28 Preferably, the apparatus forms a part of a rig and/or 29 platform, such as a wellhead platform, which may be
30 located offshore or onshore. The facility may be located
31 remotely from a plant for treating the production fluid.
32 Preferably, the hydrocarbon production facility is a
33 minimum equipment/footprint facility. The facility is preferably adapted to use space efficiently. The production facility may be an unmanned facility.
The export tubing may comprise a pipeline for transport of production fluid to a remote treatment plant. The export tubing may comprise a first export, riser, which may connect an end of the transport pipeline with the hydrocarbon production facility. The first export riser may comprise a first end coupled to the facility and a second end coupled to the transport pipeline for passage of fluid from the production well into and through the pipeline.
The bypass tubing may comprise a second export riser. In embodiments where the export tubing comprises an export riser connecting a pipeline with the production facility, the bypass tubing may comprise a second export riser for the flow of fluid from the production well and into the transport pipeline.
The bypass tubing may comprise a first end fluidly connected to the export tubing upstream of the pig launcher, and a second end fluidly connected to the main tubing downstream of the pig launcher.
The bypass tubing may be formed from a corrosion resistant material. The corrosion resistant material may comprise a metal alloy, and/or a synthetic composite material. Advantageously therefore, this limits or eliminates the requirement to apply corrosion inhibitor chemicals to the production fluid to prevent corrosion of the bypass tubing. 1 The pig launcher may comprise an access port for locating
2 a pig in the launcher. The pig launcher may be adapted
3 to facilitate automatic and/or manual launch of pigs into
4 the export tubing. 5
6 Preferably, the pig or pig train is adapted to carry
7 corrosion inhibitor fluid for transport in the export
8 tubing. Thus, corrosion of the export tubing can be
9 reduced or prevented. The pig may be adapted to deliver
10 corrosion inhibitor at pre-determined locations in the
11 export tubing. The pig may comprise pipeline cleaning
12 apparatus, which may comprise, for example, scraping or
13 wiping members and/or jetting tools. 14
15 The pig launcher may be adapted to allow successive
16 launch of a plurality of pigs to form a pig train in the
17 export tubing. The pig train may thus comprise a
18 plurality of pigs coupled to each other for transport
19 through the tubing. The pig launcher may be adapted to
20 temporarily house at least one pig before location in the
21 export tubing. The pig launcher may be sized to house a
22 limited sub-set of the plurality of pigs forming the pig
23 train at any one time. Preferably, the pig launcher is
24 sized to a minimum configuration in which one pig is
25 temporarily accommodated. In embodiments when located
26 and/or installed on the production facility, the pig 27 launcher takes up a minimum of space.
A 0 SO3
29 Preferably, the apparatus is adapted to allow a pig train
30 to be formed in the export tubing. Advantageously, the
31 pig train may be formed in the export tubing while the
32 production fluid flows through the bypass tubing. 33 Preferably, the apparatus is adapted to selectively direct production fluid flow through the export tubing, the pig launcher, and/or the bypass tubing. The apparatus may be adapted to switch between flow through the export tubing, the pig launcher, and/or the bypass tubing gradually and/or controllably. The apparatus may be adapted to provide a gradual and/or controllable build up of pressure and production fluid flow rate upon switching.
The apparatus may comprise at least one fluid, flow valve for controlling the flow and/or pressure of production fluid in the pipeline. The at least one fluid flow valve may comprise at least one export tubing valve operable to ■ prevent flow through the export tubing and/or at least one bypass tubing valve operable to prevent flow through the bypass tubing.
The apparatus may comprise at least one valve to allow pigs in the pig launcher to be exposed to fluid flow from the export tubing. Preferably, the at least one valve allows the pigs to be temporarily exposed to fluid flow to launch the pig into the export tubing. Preferably, the valve is located in an inlet to the pig launcher from the export tubing, said inlet located upstream of a fluid flow valve in the export tubing.
The production fluid may be a mixed phase fluid. The production fluid may comprise oil and/or gas hydrocarbons and water. The production fluid may be a corrosive fluid, and may be a raw and/or untreated fluid from the production well(s) . According to a second aspect of the invention, there is provided a method of launching a pig into a pipeline, the method comprising the steps of: - exporting production fluid from a production well through export tubing; - directing a flow of production fluid through bypass tubing to bypass a first location of the export tubing; and - launching a pig into the export tubing at the first location.
Preferably, the method includes the step of directing a flow of production fluid through bypass tubing to bypass a first length of the export tubing.
The method may comprise the step of forming a pig train in the length of the export tubing. The method may comprise the step of successively launching pigs into the export tubing to form the pig train. The step of successively launching pigs to form a pig train may be carried out while flow of production fluid is being directed through the bypass tubing.
The method may comprise the step of directing the flow of production fluid to launch the pig or pig train into the export tubing .
The method may comprise the step of switching between and/or controlling flow of production fluid through any one of the bypass tubing, the main tubing, and/or a pig launcher for launching pigs. 1 The method may comprise the step of selectively switching
2 the flow of production fluid to push a pig along the main
3 tubing. 4
5 The method may comprise the step of selectively switching
6 the flow of production fluid through the bypass tubing
7 for flow of fluid along the export tubing. 8
9 The method may comprise the step of moving a first pig
10 from the first location to a second location, downstream
11. of the first, and launching a second pig into the export
12 tubing at the first location. The method may comprise
13 the step of coupling first and second pigs to form a pig
14 train. 15
16 Other method steps may be defined according to 7 corresponding features defined in the first aspect of the 8 invention. 9 0 There will now be described by way of example only 1 embodiments of the invention with reference to the 2 following figures, of which: 3 ' 4 Figure 1 is a schematic representation of apparatus 5 for launching a pig into a pipeline according to an 6 embodiment of the invention; and 7 8 Figure 2 is a schematic representation of apparatus 9 for launching a pig into a pipeline according to an 0 alternative embodiment of the invention. 1 2 We refer firstly to Figure 1, which generally shows 3 apparatus for a production facility 10. The apparatus comprises a production manifold 14 through which production fluid from a sub-surface well is received before it is exported away downstream through a transport pipeline 18 according to arrow 19. In particular, the apparatus 10 assists with export of hydrocarbons from a production well during preparation and launch of pipeline inspection gauges (pigs) into the transport pipeline 18.
In the embodiment shown, the production manifold 14 is connected to the transport pipeline 18 via an intermediary pipe 12 and a main export riser 20, such that production fluid from the well can be transported away from the facility.
The apparatus 10 also comprises a pig launcher 16 to launch a pig into the pipeline. A first end of the pig launcher is connected to the intermediary tubing 12 via launcher inlet tubing 26, and a second end is connected to the main export riser 20 and intermediary tubing 12 at a pipe intersection 21 via outlet tubing 27. The inlet tubing -26 allows production fluid to be directed into the pig launcher 16 to push the pig 30 out and into the main export riser 20. The pig launcher 16 allows a pig 30 to be launched through the outlet tubing 27 into the main export riser 20.
In this example, the pig launcher 16 has an injection fluid inlet 48 to allow batches of corrosion inhibitor fluid to be injected from a treatment unit 49 to a pig 30 placed inside the launcher 16. Pigs 30 with corrosion inhibitor fluid may then be successively launched to form part of a pig train consisting of a number of individual pigs coupled together. The corrosion inhibitor is used to prevent corrosion of the pipeline 18 and riser 20 as may occur upon exposure to production fluid. Use of a train of pigs with batches of corrosion inhibitor fluid is particularly beneficial in long-distance pipelines, where a large volume of such fluid is required to sufficiently protect it from corrosion.
The apparatus 10 includes bypass tubing in the form of a second export riser 22 connected to the transport pipeline 18 at riser intersection 29 via a barred tee 54. Barred tee 54 allows fluid flow in all directions but prevents passage of a pig from either of the main export riser 20 or the transport pipeline 18 to the second export riser 22. The second export riser 22 is connected to the intermediary tubing 12 at its opposing end 28 upstream of the intersection of the intermediary tubing 12 and the pig launcher inlet tubing 26, and bypasses the main export riser 20, much of the intermediary tubing 12, and the pig launcher 16. This second export riser 22 provides a second path for flow of production fluid from the production manifold 14 and into the pipeline 18.
Optionally, a one-way check valve (not shown) may be provided upstream of the barred tee 54 on the second export riser to prevent flow of fluid into or along the second export riser 22 from the transport pipeline 18 or the main export riser 20.
The second export riser 22 bypasses a significant length of the main export riser 20, and allows a pig train to be received in the main export riser 20. The length bypassed by the second export riser can be selected according to the length of pig train required for the pigging operation in the pipeline. The second export riser 22 is formed from a corrosion resistant alloy, in contrast with the pipeline 18 and first export riser, which are formed from a lower-grade metal material. Consequently, the second export riser 22 does not need to be pigged and treated with corrosion inhibitor fluid.
The apparatus 10 is configured to selectively direct and control production fluid flow through the first or second export risers and/or the pig launcher in use. The intermediary tubing 12 is provided with intermediary tubing flow valve 34, the second and first export risers are provided with shutdown valves 38 and 36 respectively. Either side of the pig launcher 16, there are provided isolation flow valves 40a,b and 42a, b in the inlet and outlet tubing. The apparatus is further provided with safety valves 4βa,b in the upstream section 45 together with a production choke valve 44 upstream of the production manifold 14. These valves are operated to switch or divert the flow of production fluid appropriately when a pigging operation is to be commenced and a pig is to be launched into the pipeline 18.
In use, the choke 44 and safety valves 46a, b are open, together with main export riser valves 36 and the intermediary tubing valve 34. The second export riser valve 38 is closed to fluid flow, and the downstream isolation valves 40a, b and upstream isolation valves 42a, b are closed preventing production fluid from passing into the pig launcher 16. Thus, production fluid is caused to flow along upstream section 45, the intermediary tubing 12, the main export riser 20 and into the pipeline 18. When it is desired to launch a pig to deliver corrosion inhibitor in the transportation pipeline 18, the second export riser valve 38 is opened permitting flow through the second export riser, and then the intermediary tubing valve 34 is closed to prevent further flow through the intermediary tubing 12. The valves 42a, b remain closed, and thus production fluid is diverted to flow through the second export riser 22 and into the pipeline 18.
In this configuration, a pigging train can be located in the main export riser. In preparation for this, isolation valves 40a b downstream of the pig launcher 16 are opened so that pigs 30 that are launched can move out of the launcher, through the open main riser valve 36, and into the export riser 20.
In the present example, the second export riser valve 38 is closed and the upstream launcher isolation valves 42a, b are opened exposing the pig launcher to fluid upstream. The production fluid is directed through the inlet tubing 26, pushing the pigs 30 fully into the export riser 20 past the main export riser valve 36 via the outlet tubing 27.
With the pig train successfully formed and located in the export riser, the intermediary tubing valve 34 is re- opened switching the flow back to the original route so that production fluid flows from the well through the intermediary piping 12, first export riser and the pipeline 18. The pig train is then pushed along the pipeline by the pressure force exerted by the production fluid flow. Corrosion inhibitor fluid is delivered by the pigs into the pipeline along its length, preventing pipeline corrosion being caused by the presence of production fluid.
The isolation valves 42a, b and 40a, b are closed off again to isolate the pig launcher 16 so that the launcher may be accessed safely without exposure to production fluid pressures, allowing the pig launcher to be prepared ready for further pigging operations .
Figure 2 shows an alternative embodiment, sharing many components with the embodiment of Figure 1, but differing in that the second export riser 22 is provided with an additional flow restricting valve 52 located immediately upstream of the second riser valve 38.
In this case, flow is switched from flowing through the second export riser 22 (after preparation of pigs 30) to flow through the pig launcher 16 (with valves 42a, b opened) by gradually closing the restricting valve 52. This creates a drop in differential pressure in the second export riser 22, and progressively more fluid is prevented from passing through the export riser 22 and into the inlet tubing 26 to the launcher to push the pig into the export riser 20. Eventually, the second export riser 22 is fully closed off to fluid flow by closure of the valve 52, and the pig is launched into the main export riser 20. Subsequently, valve 34 is opened and launcher isolation valves 42a, b and valve 38 are closed. In this way, flow is resumed through the intermediary tubing 12, main export riser and into the pipeline without stopping production from the well. It will be appreciated that in alternative embodiments the flow restriction valve 52 may be located in other locations between the pig launcher 16, and the second riser valve 38, including at locations on the inlet tubing 26 to the pig launcher.
In certain embodiments, the apparatus is installed on a hydrocarbon production facility with first and second export risers connecting to a pipeline for the export of hydrocarbon fluid from the production facility to shore.
It will be appreciated that in various embodiments the pigs 30 may be provided with other equipment, for example, cleaning elements to remove residue from pipeline interior surfaces.
In particular embodiments, the pig launcher 16 may be installed on an offshore production rig, and may be sized to occupy a minimum amount of space.
The present apparatus provides a number of benefits. Primarily, it functions to permit pig trains of substantial length to be built up, in the main export riser, and launched into a pipeline while minimising or eliminating any need to cease production from the well. In certain embodiments, production does not need to cease at all. Accordingly, well fluids can be retrieved and exported more efficiently.
In addition, as the pig train is built up in the main export riser, the pig launcher can be relatively small in size, lending itself to installation on a minimum footprint facility, such as a wellhead rig, where space is at a premium and low maintenance functionality is desired.
The present apparatus is suitable for protecting conventional long-distance pipelines formed from conventional metal materials, and which may be susceptible to corrosion in the presence of production fluids.
Various modifications and changes may be made within the scope of the invention herein described.

Claims

Claims
1. Apparatus for a hydrocarbon production facility, the apparatus comprising export tubing providing a first flow path for production fluid from a production well; a pig launcher for launching a pig into the export tubing at a first location; and bypass tubing providing a second flow path for the production fluid which bypasses the export tubing at the first location.
2. Apparatus as claimed in Claim 1 wherein the bypass tubing defines a bypassed length of the export tubing, and the bypassed length extends to include the first location.
3. Apparatus as claimed in Claim 2 wherein the bypassed length extends over a distance sufficient to • accommodate a volume of treatment fluid located in the export tubing. . • •
4. Apparatus as claimed in Claim 2 or Claim 3 wherein the bypassed length is adapted to receive a pig train comprising a plurality of pigs.
5. Apparatus as claimed in Claim 4 wherein the bypassed length extends a distance sufficient to receive a pig train equipped for treating a long-distance pipeline.
6. Apparatus as claimed in any preceding claim wherein the bypassed length extends substantially between the production facility and a transport pipeline.
7. Apparatus as claimed in any preceding claim wherein the export tubing comprises a first export riser connecting an end of a transport pipeline with the hydrocarbon production facility.
8. Apparatus as claimed in Claim 7 wherein the bypass tubing comprises a second export riser.
9. Apparatus as claimed' in any preceding claim wherein the .bypass tubing is formed from a corrosion resistant material.
10. Apparatus as claimed in any preceding claim wherein the pig launcher is adapted to allow successive launch of a plurality of pigs to form a pig train in the export tubing.
11. Apparatus as claimed in Claim 10 wherein the pig launcher is sized to house a limited sub-set of the plurality of pigs forming the pig train at any one time.
12. Apparatus as claimed in any preceding claim adapted to allow a pig train to be formed in the export tubing while the production fluid flows through the bypass tubing.
13. Apparatus as claimed in any preceding claim adapted to selectively direct production fluid flow through the export tubing, the pig launcher, and/or the bypass tubing.
14. Apparatus as claimed in any preceding claim adapted to gradually switch flow through the export tubing, the pig launcher, and/or the bypass tubing.
15. Apparatus as claimed in any preceding claim comprising at least one fluid flow valve for controlling the flow of production fluid in the pipeline.
16. Apparatus as claimed in any preceding claim comprising at least one export tubing valve operable to prevent flow through the export tubing.
17. Apparatus as claimed in any preceding claim comprising at least one bypass tubing valve operable to prevent flow through the bypass tubing.
18. Apparatus as claimed in any preceding claim comprising at least one valve to allow pigs in the pig launcher to be exposed to fluid flow from the export tubing to launch the pigs into the export , tubing.
19. A method of launching a pig into a pipeline, the method comprising the steps of: - exporting production fluid from a production well through export tubing; - directing a flow of production fluid through bypass tubing to bypass a first location of the export tubing; and - launching a pig into the export tubing at the first location.
1 20. The method as claimed in Claim 19 including the step
2 of directing a flow of production fluid through the
3 bypass tubing to bypass a first length of the export
4 tubing . 5
6 21. The method as claimed in Claim 19 or Claim 20
7 comprising the step of forming a pig train in the
8 length of the export tubing. 9
10 22. The method as claimed in Claim 21 comprising the
11. step of successively launching, pigs into the export
12 tubing to form the pig train. 13
14 23. The method as claimed in Claim 22 wherein the step
15 of successively launching pigs to form a pig train
16 is carried out while flow of production fluid is
17 being directed through the bypass tubing. 18
19 24. The method as claimed in any of Claims 19 to 23 0 comprising the step of directing the flow of 1 production fluid to launch the pig or pig train into 2 the export tubing. 3 4
25. The method as claimed in any of Claims 19 to 24 5 comprising the step of switching flow of production 6 fluid through any one of the bypass tubing, the main 7 tubing, and/or the pig launcher. 8 9
26. The method as claimed in any of Claims 19 to 25 0 comprising the step of selectively switching the 1 flow of production fluid to propel a pig along the 2 export tubing. 3
27. The method as claimed in any of Claims 19 to 26 comprising the steps of moving a first pig from the first location to a second location,- downstream of the first, and launching a second pig into the export tubing at the first location.
28. The method as claimed in Claim 27 comprising the step of forming a pig- train from the first and second pigs.
29. . Apparatus substantially as herein described .with reference to Figures 1 or 2 of the drawings .
PCT/GB2007/000974 2006-04-18 2007-03-19 Apparatus and method for a hydrocarbon production facility WO2007119040A2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
US12/297,566 US20090223672A1 (en) 2006-04-18 2007-03-19 Apparatus and method for a hydrocarbon production facility
AU2007238389A AU2007238389A1 (en) 2006-04-18 2007-03-19 Apparatus and method for a hydrocarbon production facility
EP07732066A EP2008013A2 (en) 2006-04-18 2007-03-19 Apparatus and method for a hydrocarbon production facility
EA200802155A EA200802155A1 (en) 2006-04-18 2007-03-19 EQUIPMENT FOR INSTALLING THE PRODUCTION OF HYDROCARBONS AND THE METHOD OF ITS APPLICATION
BRPI0710630-0A BRPI0710630A2 (en) 2006-04-18 2007-03-19 apparatus for a hydrocarbon production plant, and method for throwing a scraper piston into an oil pipeline
NO20084284A NO20084284L (en) 2006-04-18 2008-10-14 Apparatus and method for a hydrocarbon production plant

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
GB0607648.3 2006-04-18
GB0607648A GB0607648D0 (en) 2006-04-18 2006-04-18 Improvements relating to gas production
GB0607689A GB0607689D0 (en) 2006-04-19 2006-04-19 Improvements relating to gas production
GB0607689.7 2006-04-19
GB0703571.0 2007-02-23
GB0703571A GB2437304B (en) 2006-04-18 2007-02-23 Apparatus and method for a hydrocarbon production facility

Publications (2)

Publication Number Publication Date
WO2007119040A2 true WO2007119040A2 (en) 2007-10-25
WO2007119040A3 WO2007119040A3 (en) 2007-12-13

Family

ID=38290160

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2007/000974 WO2007119040A2 (en) 2006-04-18 2007-03-19 Apparatus and method for a hydrocarbon production facility

Country Status (8)

Country Link
US (1) US20090223672A1 (en)
EP (1) EP2008013A2 (en)
AU (1) AU2007238389A1 (en)
BR (1) BRPI0710630A2 (en)
EA (1) EA200802155A1 (en)
GB (1) GB2437304B (en)
NO (1) NO20084284L (en)
WO (1) WO2007119040A2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010077932A1 (en) * 2008-12-17 2010-07-08 Fluor Technologies Corporation Configurations and methods for improved subsea production control
US8555978B2 (en) * 2009-12-02 2013-10-15 Technology Commercialization Corp. Dual pathway riser and its use for production of petroleum products in multi-phase fluid pipelines
US8146667B2 (en) * 2010-07-19 2012-04-03 Marc Moszkowski Dual gradient pipeline evacuation method
WO2012058551A2 (en) * 2010-10-29 2012-05-03 Shell Oil Company Remote pig launcher
MY163719A (en) * 2010-10-29 2017-10-13 Shell Int Research Subsea pig handler
US8950498B2 (en) * 2013-01-10 2015-02-10 Chevron U.S.A. Inc. Methods, apparatus and systems for conveying fluids
WO2017039789A1 (en) * 2015-08-31 2017-03-09 Exxonmobil Upstream Research Company Corp-Urc-E2. 4A.296 Smart electrochemical sensor for pipeline corrosion measurement
US10663085B2 (en) * 2016-07-26 2020-05-26 Onesubsea Ip Uk Limited Subsea pipeline station
CN109458561B (en) * 2018-10-26 2023-07-07 西安交通大学 Early warning method, control method and system for harmful flow pattern of oil and gas gathering and transportation vertical pipe system
BR102021009961A2 (en) * 2021-05-21 2022-11-29 Petróleo Brasileiro S.A. - Petrobras SYSTEM AND METHOD FOR USE OF DESULPHATED INJECTION WATER FROM MARITIME PLATFORMS FOR USE IN INHIBITION SQUEEZES

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2915422A (en) * 1954-09-08 1959-12-01 Gulf Oil Corp Automatic plug injector and method of cleaning pipelines
US3158888A (en) * 1961-12-22 1964-12-01 Exxon Research Engineering Co Scraper launching mechanism
US3266076A (en) * 1964-11-20 1966-08-16 Sinclair Research Inc System for cleaning pipelines
US3261048A (en) * 1964-12-30 1966-07-19 Exxon Research Engineering Co Sphere director
US3396789A (en) * 1966-09-15 1968-08-13 Mobil Oil Corp Storage method and system for tel tools
US3664356A (en) * 1970-07-30 1972-05-23 M & J Valve Co Pumping station sphere handling method and system
US4135949A (en) * 1976-05-18 1979-01-23 Phillips Petroleum Company Safety interlock for pipeline pig launcher and receiver
US4160652A (en) * 1977-08-26 1979-07-10 Texas Eastern Engineering, Ltd. Method and apparatus for handling the fluids in a two-phase flow pipeline system
US4401133A (en) * 1981-05-28 1983-08-30 Gulf & Western Manufacturing Company Device for launching spherical pigs into a pipeline
BR9601401A (en) * 1996-04-16 1998-01-13 Petroleo Brasileiro Sa Method and apparatus for launching pigs into underwater pipelines
BR9602746A (en) * 1996-06-12 1998-09-08 Petroleo Brasileiro Sa Method and apparatus for underwater oil production with primary gas separation and flow through high pressure gas injection
US6569255B2 (en) * 1998-09-24 2003-05-27 On Stream Technologies Inc. Pig and method for cleaning tubes
US6170493B1 (en) * 1997-10-31 2001-01-09 Orlande Sivacoe Method of cleaning a heater
US6022421A (en) * 1998-03-03 2000-02-08 Sonsub International, Inc, Method for remotely launching subsea pigs in response to wellhead pressure change
US6533032B1 (en) * 1999-10-28 2003-03-18 Abb Vetco Gray Inc. Subsea pig launcher and method of using the same
US6336238B1 (en) * 2000-02-10 2002-01-08 Oil States Industries, Inc. Multiple pig subsea pig launcher
NO313767B1 (en) * 2000-03-20 2002-11-25 Kvaerner Oilfield Prod As Process for obtaining simultaneous supply of propellant fluid to multiple subsea wells and subsea petroleum production arrangement for simultaneous production of hydrocarbons from multi-subsea wells and supply of propellant fluid to the s.
US6412135B1 (en) * 2001-03-21 2002-07-02 Robert A. Benson Exchanger of wall clearing shuttles
GB0110398D0 (en) * 2001-04-27 2001-06-20 Alpha Thames Ltd Wellhead product testing system
WO2005042905A2 (en) * 2003-10-20 2005-05-12 Exxonmobil Upstream Research Company A piggable flowline-riser system
US7721807B2 (en) * 2004-09-13 2010-05-25 Exxonmobil Upstream Research Company Method for managing hydrates in subsea production line
AU2005319451B2 (en) * 2004-12-20 2009-07-23 Shell Internationale Research Maatschappij B.V. Method and apparatus for a cold flow subsea hydrocarbon production system
JP2009503299A (en) * 2005-07-29 2009-01-29 ロバート, エー. ベンソン, Transportation of products from submarine wells

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None

Also Published As

Publication number Publication date
EA200802155A1 (en) 2009-04-28
BRPI0710630A2 (en) 2011-08-23
NO20084284L (en) 2008-10-14
AU2007238389A1 (en) 2007-10-25
GB2437304A (en) 2007-10-24
GB0703571D0 (en) 2007-04-04
WO2007119040A3 (en) 2007-12-13
US20090223672A1 (en) 2009-09-10
EP2008013A2 (en) 2008-12-31
GB2437304B (en) 2008-08-20

Similar Documents

Publication Publication Date Title
US20090223672A1 (en) Apparatus and method for a hydrocarbon production facility
US5842816A (en) Pig delivery and transport system for subsea wells
AU2016391059B2 (en) Systems for removing blockages in subsea flowlines and equipment
EA010044B1 (en) Method for hydrate plug removal
US7426963B2 (en) Piggable flowline-riser system
WO1997028350A1 (en) Method and equipment for the flow of offshore oil production
WO1997039273A1 (en) Method and equipment for launching pigs into undersea pipes
US8678039B2 (en) Double layer conduit
WO2016028158A1 (en) Wellhead assembly
US20170110859A1 (en) Cable installation tool and method for such installation
WO2013050774A2 (en) Fire main cleaning apparatus and method
CN105814277B (en) The seabed filler line system and method for main flow pipeline is passed through for transporting multiple fluid
US8151394B2 (en) Pipeline systems using a reverse flow wye connector
WO2002044601A2 (en) Pigging method and apparatus
EP3400362B1 (en) Systems for reversing fluid flow to and from a single-direction fluid flow device
Mikalsen et al. Un-Locking Subsea Reserves Through a System-Based Approach for Tie-Back Solutions
US20200018138A1 (en) Offshore floating utility platform and tie-back system
Shen et al. Blind faith gas export pipeline pre-commissioning and commissioning (PCC) challenges
BRPI0401504B1 (en) pig displacement system and method of use
KR20170051580A (en) Liquid flow control system for Offshore Plant

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07732066

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2007732066

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 12297566

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007238389

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 200802155

Country of ref document: EA

ENP Entry into the national phase

Ref document number: 2007238389

Country of ref document: AU

Date of ref document: 20070319

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: PI0710630

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20081016