WO2007113142A2 - Converting independent resources into a product - Google Patents

Converting independent resources into a product Download PDF

Info

Publication number
WO2007113142A2
WO2007113142A2 PCT/EP2007/052814 EP2007052814W WO2007113142A2 WO 2007113142 A2 WO2007113142 A2 WO 2007113142A2 EP 2007052814 W EP2007052814 W EP 2007052814W WO 2007113142 A2 WO2007113142 A2 WO 2007113142A2
Authority
WO
WIPO (PCT)
Prior art keywords
stage
future
objective function
variables
resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2007/052814
Other languages
French (fr)
Inventor
Cherry Yuen
Andreas Poncet
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Research Ltd Switzerland
Original Assignee
ABB Research Ltd Switzerland
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from EP06405208A external-priority patent/EP1840807A1/en
Application filed by ABB Research Ltd Switzerland filed Critical ABB Research Ltd Switzerland
Publication of WO2007113142A2 publication Critical patent/WO2007113142A2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Definitions

  • the n th Bender's cut ⁇ t -i n is only to be used in the next forward simulation n+l, but not on behalf of the earlier stage t-1 in the presently ongoing n th backward recursion.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Tourism & Hospitality (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Feedback Control In General (AREA)

Description

DESCRIPTION
CONVERTING INDEPENDENT RESOURCES INTO A PRODUCT
FIELD OF THE INVENTION
The invention relates to the field of operation scheduling of systems converting independent resources into a product, in particular hydro and thermal plants. It departs from a method of converting two independent resources into a product as described in the preamble of claim 1.
BACKGROUND OF THE INVENTION
The objective of an optimal operation of a power system comprising a multitude of different power plants is to determine an operation schedule or strategy which, for each stage (a week or a month) of the planning period and given the system state at the beginning of the stage, produces generation targets for each plant. The operation strategy should minimize the expected total operation cost comprising e.g. the cost of the fossil fuels to be combusted in thermal power plants plus penalties for failure in load supply to the customer. In a hydrothermal power system comprising at least one hydro power plant, the instantaneous availability of limited amounts of hydroelectric energy in the form of stored water in the system reservoirs makes the optimal operation problem very complex. The reason for this resides in the fact that any operation decision for a given stage has a consequence that reaches far into the future. In other words, if a stock of hydroelectric energy is depleted, and low inflow volumes do occur, it may be necessary to use very expensive thermal generation in the future or even fail to supply the load. On the other hand, if the reservoir levels are kept high through a more intensive use of thermal generation, and high inflow volumes occur, there may be spillage in the system due to limited storage capability of each reservoir, which means a waste of energy and consequently higher operating costs. For many renewable sources of energy it is impossible to have a perfect forecast of their future availability such as the inflow of water to the reservoirs of a hydroelectric power plant. Accordingly, as well as to a lesser extent due to the future load itself, the operation problem is essentially stochastic. The dimensionality of the problem considerably increases if multiple interconnected reservoirs and multi-stage optimization have to be considered.
In addition, despite the fact that hydro plants have no direct operating costs, they provide the option of generating the energy today or storing the water for future use. In other words, they have an opportunity cost that reflects the revenue resulting from energy sales in the future. In real situations, however, there is again uncertainty regarding future prices, which can be either higher or lower than the current one. Therefore, the decision whether to store or use the water likewise depends on an analysis of the consequences of each decision for all the future price scenarios.
The optimization problem described above can be solved by means of so-called Stochastic Dual Dynamic Programming (SDDP) as detailed in the article by M.V.F. Pereira entitled "Optimal Stochastic Operations Scheduling of Large Hydroelectric Systems", International Journal of Electric Power and Energy Systems, Vol. 11, pp 161- 169, No.3, July 1989. The minimum-cost stochastic operating policy of a hydrothermal system is calculated taking into account various operational details of hydro plants (water balance, limits on storage and turbined outflow, spillage, filtration), a detailed thermal plant modelling (fuel contracts, convex efficiency curves, fuel consumption constraints) as well as hydrological uncertainty (seasonality, time and space dependence, severe droughts).
DESCRIPTION OF THE INVENTION It is an objective of the invention to optimize the consumption or use of a deterministic and a stochastic resource with, respectively, a predictable and non-predictable future availability in a system converting the resources independently into a product to meet a certain demand. In particular, if the conversion system comprises a combination of hydro and thermal power plants for generating electricity according to a hydrothermal operating schedule, the invention aims at minimizing a long-term consumption of a fossil fuel as a deterministic resource of a thermal power plant. These objectives are achieved by a method of and an operation scheduler for converting two independent resources according to the claims 1 and 9, respectively. Further preferred embodiments are evident from the dependent patent claims.
According to the invention, the backward recursion in a multi-stage stochastic programming procedure is streamlined, enabling one to consider and evaluate a wider range of stochastic parameter or constraint evolutions in the same evaluation time, and thus to produce further optimized operation schedules. The backward recursion procedure includes, for each one of the multiple stages or future time intervals, the calculation of a number of Bender's cuts or optimality cuts which does not exceed a number of states representing realizations of a random vector for one stage. In particular, this calculation is not repeated, for each stage and for each state, to additionally account for availability scenarios representing an inter-stage dependence or link of the states. Accordingly, and contrary to the aforementioned prior art comprising, for each stage and state, an additional loop over a number of availability scenarios, the number of Bender's cuts or optimality cuts to be calculated for each stage is not an integer multiple of a number of availability scenarios.
In more detail, the method of converting the two independent resources involves, for the stochastic resource and at a particular stage, a number of ND distinct states or vectors of exogenous variables representing time-wise independent realizations or discretizations of an a-priori unknown random vector. The latter gives rise to constraints that accompany an objective or cost function involving control variables indicative of a consumption of the resources. In a so-called forward simulation, for each one of a number of stages, tentative optimal solutions for the control variables are successively calculated. In the subsequent so-called backward recursion, for each stage an approximate future objective function is refined or improved. To this purpose, a number of Bender's cuts or optimality cuts are calculated, wherein this number is limited or reduced as detailed in the previous paragraph. After a few iterations of the forward simulation and the backward recursion, a production schedule indicating the preferred consumption of the resources during the future stages is finally derived, based on the optimal solutions of the control variables calculated at the ultimate iteration. In a preferred embodiment of the invention, an average objective function or expected cost function is calculated for each stage as a weighted average of the Benders cuts. This averaged or unified function is used in the forward simulation and further justifies the fact of disregarding the influence of individual availability scenarios. In a first advantageous variant of the invention, a particular scenario is selected among the number of availability scenarios, and the corresponding optimal solution obtained in the forward simulation is used in the subsequent backward recursion as a trial decision. It is one of the merits of the present invention to realize that the various results obtained with various selected availability scenarios are all within a specified tolerance and hence perfectly acceptable.
In a second advantageous variant of the invention, states and scenarios are identified both in their respective number and in their distinct states or vectors of exogenous variables. In the backward recursion, a single-stage sub problem for each stage and for each state k includes the respective optimal solution for the control vector as trial decision. According to a further refinement, a Bender's cut calculated for a given stage and state does only depend on the previously calculated Bender's cut for the same state. The average of the Benders' cuts for a given stage is then only used for the next forward simulation.
The present invention also relates to a computer program product including computer program code means for controlling one or more processors of an operation scheduler, in particular a computer program product including a computer readable medium containing therein the computer program code means.
BRIEF DESCRIPTION OF THE DRAWINGS The subject matter of the invention will be explained in more detail in the following text with reference to preferred exemplary embodiments which are illustrated in the attached drawings, wherein:
Fig.1 schematically depicts a system with two thermal and two hydro power plants,
Fig.2 is a flowchart of the forward iteration, Fig.3 is a flowchart of a first variant of the backward recursion, and
Fig.4 is a flowchart of a second variant of the backward recursion.
The reference symbols used in the drawings, and their meanings, are listed in summary form in the list of reference symbols. In principle, identical parts are provided with the same reference symbols in the figures. DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
Multi-stage stochastic optimization problems may be solved by so-called Stochastic
Dual Dynamic Programming (SDDP), based on the approximation of the expected-cost-to- go functions of stochastic dynamic programming by piecewise linear functions. The latter are obtained from the dual solutions of the optimization problem at each stage and can be interpreted as Bender's cuts or optimality cuts in a multistage decomposition algorithm. In the following, the procedure is explained in summarized form, details may be found in the article by M.V.F. Pereira entitled "Optimal Stochastic Operations Scheduling of Large
Hydroelectric Systems", International Journal of Electric Power and Energy Systems, Vol. l l, pp 161-169, No.3, July 1989.
In order to illustrate the basic concepts of dual dynamic programming, the following linear problem (1) for a two-stage deterministic case is considered:
Min c\X\ + C2X2 (eq.la) s.t. A\X\ > b\ (eq.lb)
Figure imgf000006_0001
where, at stage 1 and stage 2, respectively: Xi, Xi = vector of control and state variables, Ci, C2 = vector of cost coefficients, b\, b2 = vector of exogenous variables, matrix relating control and exogenous variables,
E1 = state-space matrix An example with illustrative numerical values is given further below.
The above problem (1) aims at minimizing a sum of a first stage or present objective
CiXi and a second stage or future objective c2x2, and thus can be interpreted as a two-stage decision or sequential decision process. Basically, in the first stage, corresponding to the present or to the immediate future, a possible solution or decision Jc1 obeying the first constraint (eq.lb) is chosen, following which an optimal solution of the second stage, corresponding to a more distant future, has to be found. This second-stage problem or single-stage sub-problem including the future objective function c2x2 is re-defined or translated as a scalar function of the solution Jc1 at the first stage: ccι(xι) = Min c2x2 (eq.2a) s.t. A2X2 > ό2 - EiXi (eq.2b)
With this future objective function Qr1(JC1), the master problem to be solved is rewritten: Min CiXi + ccι(xι) (eq.3a) s.t. AιXι > bι (eq.3b)
The future objective function ctι{xι) can be represented as a piecewise linear function by reverting, in accordance with Linear Programming (LP) theory, to the dual problem of the second stage problem (eqs.2). As detailed in the article mentioned above, an approximation άγ{xγ) to the future objective function ccι{xι) can be constructed as άγ (X1 ) = Min a (eq.4a) s.t. cc> πι (b2-EιXι) for i=l ...n (eq.4b) where {πι , i=l...n} is a subset of all the vectors {πv} of dual variables π that solve the constraint πAi < c-i of the dual problem to the second-stage problem (eqs.2). The subset {πι , i=l...n} comprises the dual variables which form the so-called Bender's cuts or optimality cuts associated to a set of first-stage trial decisions {x/, i=l ...n} and the corresponding solutions { x2' } of the second-stage problem (eq.2). The approximation άj(xj) is a lower bound to the true future cost function ccι(xι), leading to a lower bound ^ = C1X1 + ά(Xj) of the true optimal total cost (eq.la) when solving the approximating master problem:
Min CiXi + GC (eq.5a)
Figure imgf000007_0001
cc> πι\b2-EιXι) for i=l ...n (eq.5c) On the other hand, an upper bound z for the true optimal total cost can be obtained by solving the second-stage problem (eq.2) with the previously found optimal value X1 for Jc1. If the difference z - z_ between the two bounds is small enough, the procedure stops, otherwise, it reiterates with new trial values for the approximation of the future cost function. A good candidate for a new trial value is the optimal solution X1 of the previous iteration or approximate optimization problem. This way, the approximation ^1 (X1) of QTi (xi) is refined in the neighborhood of candidates for the true optimal solution.
A first generalization to Stochastic Dual Dynamic Programming (SDDP) takes into account the fact that the exogenous variables {bu t=l ...T} represent physical or environmental constraints that are not known in advance with absolute certainty. In this situation, the vectors {bt\ are assumed to follow a probability distribution that can be represented in discrete form by a limited number of ND states or sample vectors {bt,k, t=l ...T, k=l ...ND} or vectors of exogenous variables. From the latter, an exponentially increasing number NS of availability scenarios or trajectories may be conventionally generated by random sampling from the discretized set {bt,k} and building sequences comprising one of the states for each stage t. Furthermore, the different states {bt,k} as well as the different scenarios may both be assigned distinct probabilities.
Generally, the first-stage exogenous variable b\ is assumed to be known, i.e. deterministic. For a two-stage stochastic problem, the formulation in Linear Programming form is then given as: Min C1X1 + P1C2X21 + P2C2X22 + ... + pmc2x2m (eq.6a)
A1X1 ≥ bx , E1X1 + A2X21 ≥ b2l , s.t. E1X1 + A2X22 ≥ b22 , (eq.6b)
EΛ + A2*2m ≥ b2m where xtj = vector of control variables at stage t of scenario j , t = 1 ,2, j = 1 ,2, ... ,m,
Pj = probability associated to scenario j, Ct = vector of cost coefficients associated to the corresponding elements of x at stage t, m = ND = NS = total number of states and maximum number of scenarios for stage two.
With the decomposition approach, as for the deterministic case, the problem according to eq.6 is decomposed into a master problem (eq.3a, 3b) and a single-stage sub-problem (eq.2a, 2b) for each scenario. An averaged future objective function is defined as m ax (X1 ) = Miri∑ PjC2X2J (eq.7)
J=I
A2X21 ≥ (b2l - E1X1 ) A2X22 ≥ (b22 - E1X1 ) s.t.
A2X2m (b2rn - EΛ )
Therefore, the first-stage problem becomes
Min C1X1 + CCi (X1 ) (ecl-8) s.t. A1X1 ≥ b, Fig.l depicts a set-up of a system comprising two thermal power plants 1, 2 and two hydro power plants 3, 4 with their respective reservoirs 30, 40. In a practical but simplified two-stage numerical example of a stochastic scheduling problem for this system, the vector
Xt of control and state variables for stage t has the following eight components x 1...JC/ (which are likewise depicted in Fig.1 except for the index t): x 1, Xt2 = thermal output (the energy generated by thermal plant 1 and 2 at stage t) JC/, Xt = hydro output (the energy produced by hydro plant 3 and 4 at stage t) jc/, x? = hydro spillage (the quantity of water not used by the hydro plant 3 and 4) Xt , xf = hydro end storage (the reservoir level of hydro plant 3 and 4; state variables). The corresponding stage-independent cost vector ct = c\ = C2 has only two out of eight components different from zero. They relate to the first, cheaper and the second, more expensive thermal plant, and take the values c/ = 50 and c/ = 65 in arbitrary units. Accordingly, the objective function becomes
Min 50Xi1 + 65JCI 2 + 5Ox2 1 + 65x2 2 (eq.la). The constraints (eqs.lb, Ic) are determined by the upper and lower bounds of the six control variables x 1 to xt 6, in particular maximum power output and minimum spillage, and the two state variables, such as minimum storage requirement and maximum storage capacity. In addition, the load equations
Xt 1 + xt 2 + xt 3 + xt 4 = loadt as well as the water continuity equation at hydro plants 3 and 4 rf Xx + xt 5 + Xt7 - Xt-i7 = inflowt3 rf Xt + xt 6 + xt 8 - Xt-i8 = inflow/, where rf and rf provide a simplified conversion of the power output to the consumed quantity of water, have to be observed.
In arbitrary units, the vector of exogenous variable at stage t=l is b\ = inflowi =
Figure imgf000009_0001
In a stochastic case, the same vector of exogenous variables at stage t=2 is O2 = infiow2 and
180 210 is assumed to take two possible values, i.e. b2;1 = and 62,2 = , with equal 160 200 probability and corresponding to two distinct states or two distinct discretizations of the random vector ό2. An alternative first generalization of the concept to multistage Dual Dynamic Programming (DDP) comprises a planning horizon with T > 2 stages. The deterministic scheduling problem is represented as
T t=\ s.t. AtXt ≥ bt - Et-iXt-i (eq.9) and likewise decomposed into single-stage sub problems as will be apparent from the next paragraph. As the proposed procedure will be preferably applied to long-term problems, a planning horizon of more than one year, divided into T stages with a duration or length of somewhere between one week and several months, can be expected.
A second or combined generalization of the concept to multistage Stochastic Dual Dynamic Programming (SDDP) is depicted as a flowchart in Fig.2. The planning horizon again comprises T > 2 stages, and the following steps are performed successively:
Step 1.0: The approximate future cost άt(xt) for all stages t=l ...T is initialized to zero for a first iteration n=\. For subsequent iterations n>l, the approximate future cost άt(xt) will be increasingly refined in a backward recursion procedure as detailed below in connection with Fig.3.
Step 1.1: A first scenarioy-1 is chosen. Step 1.2: The first stage t=l is initialized. Step 1.3: The approximate deterministic first stage problem for the first scenario
Min C1X1 + άj (jCj ) s.t. A1X^ b1 (eq.lO) is solved to give an optimal first stage solution Jc1. In this notation, ^1(JC1) is the approximate objective function covering the entire planning horizon from stage two up to the ultimate stage T. The parameter b\ is assumed to be known exactly, i.e. the stochastic character only shows in stage two and later.
Step 1.4: The lower bound z = C1X1 + Cr1(Jc1) is calculated as the sum of the first stage objective and the approximate future objective. Step 1.5: The optimization problem is solved successively for stages t=2...T in a forward simulation. For the scenario j chosen, at each stage t the approximate single-stage sub-problem
Min ctxtJ + άt(xtJ ) s.t. Atxt j ≥ bt J - Et_xxt_X j (eq.l l) is solved to obtain the optimal solution xt } based on the optimal solution xt l } of the previous stage t-1. Here, άt(xt) is the approximate objective function representing all scenarios and covering the remaining planning horizon from stage t up to the ultimate stage T. As in the two-stage deterministic case above (eqs.5), άt(xt) is preferably represented as a set of inequalities involving Bender's cuts or optimality cuts comprising dual variables {πi, i=l ...n-l}. The latter are generated at each iteration n of the backward recursion procedure as detailed below in connection with Fig.3.
Step 1.6: Unlessy = jmax = NS, the next scenario j=j+\ is chosen, i.e. steps 1.2 to 1.5 are repeated for each of the scenarios.
T NS Step 1.7: An estimated upper bound z is calculated as z = ^ ^ p }ct t=\ j=l
Step 1.8: A difference between the upper bound and the lower bound is calculated and compared to a threshold or tolerance δ. If this threshold is not exceeded, the process terminates, otherwise, it proceeds to the next step. Termination of the process after step 1.8 includes the setting-up of a production schedule at least for the first stage, based on the optimal first stage solution Jc1 obtained in step 1.3 of the ultimate iteration n.
Step 1.9: If a maximum number of iterations nmax is exceeded, the process terminates, otherwise it proceeds to a further iteration. To this end, in the backward recursion process 2, an improved estimate for the approximate future cost functions άt (xt ) is produced as detailed below in connection with Fig.3. The further iteration resumes at step 1.1. As a consequence of the preferred variants of the backward recursion, άx (X1 ) in fact is a unique function for all scenarios. Accordingly, the lower bound z = C1X1 + άx (xx ) of step 1.4 takes the same value for all scenarios, and the loop over the scenarios need not include steps 1.2 to 1.4, as is indicated by the dashed arrow in Fig.2. Fig.3 depicts a flowchart of a first variant of the backward recursion process 2. It is assumed, without loss of generality, that the constraint vectors {btJ, t=l ...T, j=l ...NS } are independent random variables.
Step 2.1: One exemplary scenario y-j* is chosen, wherein the latter is advantageously representative of some average scenario. This choice determines the optimal solution xt found in the preceding forward simulation that will be exploited in steps 2.4 and 2.5 below. Step 2.2: The last stage t=Υ is initialized. Step 2.3: The first state A=I is initialized.
Step 2.4: The following single stage sub-problem for the ultimate stage T is solved, with the optimal solution xτ_x } obtained during the forward simulation at the penultimate stage
T-I (step 1.5 above) as trial decision:
Min CTXT, k (eq.12) s.t. ATxTJc ≥ bTJc - ET_xxT_Xj
For a given state k, the solution of eq.12 leads to one optimality cut or Bender's cut πτ-i,k associated to the penultimate stage trial decision xτ_x } .
Step 2.5: For stages t other than the ultimate stage T, the following single-stage sub- problem is solved, with the optimal solution xt_x } obtained during the previous forward simulation at the earlier stage t-\ (step 1.5 above) as trial decision. Likewise, said single- stage sub-problem includes a number of dual variables {πt,k , k=l ...ND, i=l ...n} forming Bender's cuts derived in all previous as well as in the ongoing nth backward recursion iteration at the later stage t+1.
Min ctxt,k + cc (eq.l3a) s.t. AtxtJc ≥ btJc - Et_xxt_Xj (eq.l3b)
Figure imgf000012_0001
For a given state k, the solution of eq.13 leads to one optimality cut or Bender's cut 7Ct-i,k associated to the earlier stage trial decision xt_x .
Step 2.6: The previous steps 2.4 and 2.5 are repeated for all states k, i.e. a number ND of Bender's cuts {πt-i,k", k=l ...ND} are derived at the present iteration n on behalf of the earlier stage t-1. Step 2.7: The Bender's cuts are averaged to yield the nth Bender's cut for stage t-1, indicative of an nth contribution to the approximate future objective function άt _γ (xt _γ) in the form of an additional inequality to be used in step 1.5 of the next iteration.
Fig.4 depicts a flowchart of a second variant of the backward recursion process 2. In these variants, it is assumed that the number NS of scenarios that have been used in the forward simulation (index j) equals the number ND of states to be considered in the backward recursion (index k). In other words, a one-to-one correspondence between states and scenarios is assumed. Hence the index k allows to identify optimal solutions xt k obtained during the forward simulation of the same iteration, and no exemplary scenario =j* has to be designated.
Step 3.2: The last stage t=Υ is initialized. Step 3.3: The first state A=I is initialized.
Step 3.4: The following single stage sub-problem for the ultimate stage T is solved, with the optimal solution xτ_γ k obtained during the forward simulation at the penultimate stage
T-I (step 1.5 above) as trial decision:
Min CTXT, k (eq.14) s.t. AτxTJc ≥ bTJc - Eτ_ιXτ_ιJc
For a given state k, the solution of eq.14 leads to one optimality cut or Bender's cut πτ-i,k associated to the penultimate stage trial decision xτ_γ k .
Step 3.5: For stages t other than the ultimate stage T, the following single-stage sub- problem is solved, with the optimal solution xt_l Ic obtained during the previous forward simulation at the earlier stage t-\ (step 1.5 above) as trial decision. Likewise, said single- stage sub-problem includes a number of dual variables {πt,k , i=l ...n} forming Bender's cuts derived in all previous as well as in the ongoing nth backward recursion iteration at the later stage t+1 and for the given state k. Contrary to step 2.5 above, these dual variables form individual Bender's cuts related to the given state k under consideration, and are thus not averaged.
Min ctxt>k + cc (eq.l5a) s.t. Atxt>k ≥ bt>k - Et_ιXt_hk (eq.l5b) a ≥ πt,k (bt+i,k-EtXt,k) for i= 1...n (eq.15c)
For a given state k, the solution of eq.15 leads to one optimality cut or Bender's cut 7Ct-i,k associated to the earlier stage trial decision xt_x .
Step 3.6: The previous steps 3.4 and 3.5 are repeated for all states k, i.e. a number ND of Bender's cuts {πt-i,k , k=l ...ND} are derived at the present iteration n.
Step 3.7: The ND Bender's cuts are averaged to yield the nth Bender's cut for stage t-1, indicative of an nth contribution to the approximate future objective function άt_x (xt_x) .
However, and again contrary to the first variant, the nth Bender's cut πt-in is only to be used in the next forward simulation n+l, but not on behalf of the earlier stage t-1 in the presently ongoing nth backward recursion. The latter, as detailed in step 3.5 above, includes exclusively dual variables
Figure imgf000014_0001
i=l ...n} forming individual Bender's cuts related to the given state k under consideration.
On the other hand, in an alternative sub-variant to this second variant, the average nth Bender's cut πt-in for stage t-1, obtained in step 3.7, may be used in the presently ongoing nth backward recursion. In other words, eq.l5c from the second variant is replaced by eq.13c known from the first variant.
To determine the scenarios, historical data of the different uncertain inputs, such as reservoir inflow and power demand, is obtained from a conversion system and evaluated. The data are then analyzed statistically to work out their trends, mean-reversion rates and mutual correlations. The statistical parameters derived are fed into a scenario generator which generates various availability scenarios using Monte Carlo simulation. From these scenarios, states are derived such that at a particular stage t, a limited number of ND discrete values of the exogenous variables of the vector bt approximate the distributed values according to the multitude of scenarios.

Claims

PATENT CLAIMS
1. A method of converting two independent resources into a product, wherein, during future stages t, a deterministic resource is available in a predictable manner and a stochastic resource is available in a non-predictable manner characterised by, for at least one future stage t, a number ND of distinct states {bt,k, k=l ...ND} or vectors of exogenous variables, comprising a) setting up an objective function (eq.la) covering at least two successive stages t, t+1, and based on a control vector xt with at least two control variables
Figure imgf000015_0001
x? indicative of a consumption of the two resources, b) determining constraints (eqs.lb, Ic) on the at least two control variables JC/, xf based on an availability of the two resources and based on a demand of the product, c) obtaining, for each of a number NS of availability scenarios, successively and in increasing order for each stage t of a number of T stages into the future, an optimal solution xt for the control vector by solving a single-stage sub-problem (eq.l 1) with a stage-dependent approximate future objective function άt(xt) based on the objective function (eq.la) and the constraints (eqs.lb, Ic), d) refining, successively and in decreasing order for each stage t, the stage-dependent approximate future objective function άt(xt) based on at least one of the optimal solutions x for the control vector as a trial decision in a single-stage sub-problem
(eq.l3, eq.l5), e) iteratively repeating steps c) and d), and f) setting up a production schedule for converting the resources based on at least the optimal solution X1 of the control vector for the first stage, characterized in that step d) comprises d') refining άt(xt) by means of at most ND Bender's cuts comprising dual variables πt,k" obtained by solving at most ND single-stage sub problems.
2. The method according to claim 1, characterised in that step d) comprises d') refining άt(xt) by means of exactly ND Bender's cuts comprising dual variables πt,k" obtained by solving one single-stage sub problem for each state k.
3. The method according to claim 1, characterised in that step d) comprises d') calculating a stage-dependent approximate future objective function άt(xt) by averaging the at most ND Bender's cuts.
4. The method according to claim 3, wherein a specific availability scenario j* is selected and characterised in that step d) comprises d") refining, successively and in decreasing order for each stage t, the stage-dependent approximate future objective function άt(xt) based on the optimal solution x , for the specific availability scenario j* as a trial decision.
5. The method according to claim 3, wherein each availability scenario corresponds to exactly one state and characterised in that step d) comprises d") refining, successively and in decreasing order for each stage t, the stage-dependent approximate future objective function άt(xt) based on, for each state k, the optimal solution χt k for the availability scenario corresponding to the state A: as a trial decision in the single-stage sub-problem (eq.15).
6. The method according to one of claims 1 to 5, wherein the stochastic resource is storable in a reservoir and characterised in that step b) comprises b') determining inter-stage constraints (eqs.lc) relating control variables JC/, xt+/ from two successive stages t, t+1.
7. The method according to claim 6, wherein the stochastic resource is hydropower, the deterministic resource is a fossil fuel, and the product is electric energy.
8. The method according to one of claims 1 to 6, characterised in that the distinct states {bt,k} are derived from historical data of a system converting the two independent resources into the product.
9. An operation scheduler setting up a production schedule for converting two independent resources into a product based on at least an optimal solution Jc1 of a control vector for a first stage, wherein, during future stages t, a deterministic resource is available in a predictable manner and a stochastic resource is available in a non- predictable manner characterised by, for at least one future stage t, a number ND of distinct states {bt,k, k=l ...ND} or vectors of exogenous variables, comprising a) an objective function (eq.la) covering at least two successive stages t, t+1, and based on a control vector xt with at least two control variables JC/, xf indicative of a consumption of the two resources, b) constraints (eqs.lb, Ic) on the at least two control variables x} , xt 3 based on an availability of the two resources and based on a demand of the product, c) means for obtaining, for each of a number NS of availability scenarios, successively and in increasing order for each stage t of a number of T stages into the future, an optimal solution x. for the control vector by solving a single-stage sub-problem
(eq.l l) with a stage-dependent approximate future objective function άt{xt) based on the objective function (eq.la) and the constraints (eqs.lb, Ic), d) means for refining, successively and in decreasing order for each stage t, the stage- dependent approximate future objective function άt(xt) based on at least one of the optimal solutions xt } for the control vector as a trial decision in at most ND single- stage sub-problems (eq.13, eq.15) yielding at most ND Bender's cuts comprising at most ND dual variables πt,k .
PCT/EP2007/052814 2006-03-31 2007-03-23 Converting independent resources into a product Ceased WO2007113142A2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US78749406P 2006-03-31 2006-03-31
US60/787,494 2006-03-31
EP06405208.7 2006-05-15
EP06405208A EP1840807A1 (en) 2006-03-31 2006-05-15 Converting independent resources into a product

Publications (1)

Publication Number Publication Date
WO2007113142A2 true WO2007113142A2 (en) 2007-10-11

Family

ID=38026880

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2007/052814 Ceased WO2007113142A2 (en) 2006-03-31 2007-03-23 Converting independent resources into a product

Country Status (1)

Country Link
WO (1) WO2007113142A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015073270A3 (en) * 2013-11-14 2015-07-23 Abb Technology Ag Method and apparatus for security constrained economic dispatch in hybrid power systems

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015073270A3 (en) * 2013-11-14 2015-07-23 Abb Technology Ag Method and apparatus for security constrained economic dispatch in hybrid power systems
GB2535395A (en) * 2013-11-14 2016-08-17 Abb Research Ltd Method and apparatus for security constrained economic dispatch in hybrid power systems
US9705336B2 (en) 2013-11-14 2017-07-11 Abb Research Ltd. Method and apparatus for security constrained economic dispatch in hybrid power systems
GB2535395B (en) * 2013-11-14 2021-08-18 Abb Schweiz Ag Method and apparatus for security constrained economic dispatch in hybrid power systems

Similar Documents

Publication Publication Date Title
CN103069442B (en) For dispatching the method for the running of generator
Pippia et al. A single-level rule-based model predictive control approach for energy management of grid-connected microgrids
da Silva et al. Parallel processing applied to the planning of hydrothermal systems
US20110046998A1 (en) Systems, Program Product, and Methods For Targeting Optimal Process Conditions That Render An Optimal Heat Exchanger Network Design Under Varying Conditions
De Ridder et al. A trading strategy for industrial CHPs on multiple power markets
US11630429B2 (en) Power grid resource allocation
Jurković et al. Review on unit commitment under uncertainty approaches
Samuel et al. Application of metaheuristic algorithms for solving real-world electricity demand forecasting and generation expansion planning problems
Ma et al. Event-based switching iterative learning model predictive control for batch processes with randomly varying trial lengths
Anders et al. Robust scheduling in a self-organizing hierarchy of autonomous virtual power plants
Chen et al. A carryover storage valuation framework for medium-term cascaded hydropower planning: A Portland General Electric system study
Jayawardana et al. Optimisation framework for the operation of battery storage within solar‐rich microgrids
Fan et al. M2WLLM: Multi-modal multi-task ultra-short-term wind power prediction algorithm based on large language model
WO2007113142A2 (en) Converting independent resources into a product
Lukianykhin et al. Promising AI applications in power systems: explainable AI (XAI), transformers, LLMs
EP1840807A1 (en) Converting independent resources into a product
Vardanyan et al. Hydropower bidding strategies to day-ahead and real-time markets: different approaches
Wang et al. Data purification for improved power dispatch against renewable uncertainty
Awwalu et al. A Conceptual model of mixed-integer linear programming water distribution system
Zhang et al. A robust model for scheduling power productions of multiple offshore wind farms using one‐to‐many maintenance services
Lopez-Salazar et al. A Reinforcement Learning Approach for Production Scheduling in Industry 4.0 Considering Limited Data
Pravin et al. Performance evaluation of various hyperparameter tuning strategies for forecasting uncertain parameters used in solving stochastic optimization problems
van der Heijden et al. Day ahead market price scenario generation using a combined quantile regression deep neural network and a non-parametric Bayesian network
Liu et al. Two‐Stage Robust Security‐Constrained Unit Commitment for Wind Power Reserve Provision Optimisation Under Decision‐Dependent Uncertainty
Inala et al. Enhancing the Power Load Prediction using LSTM in a Smart Grid Scenario for Household Data

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07727288

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase in:

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07727288

Country of ref document: EP

Kind code of ref document: A1